TAKING-OFF LISTNOITEMUNIT OF MEASUREMENTSMM CLAUSE1Preambles2Precast pre-stress concrete systemNoF.34/F.17.13Precast concrete beamNoF.17.14DuctingmF.39.15VentsNoF.39.36TendonsNoF.40.17AnchorageNoF.40.28Filling of anchorage pocketNoF.39.4Preambles

Precast pre-stress concrete systemClause F.34.5

DRAWING NO 9 Notes 5 (ii)Precast concrete beamClause F.17.1 & F.17.2

DuctingClause F.39.1

Refer Drawing No 9Stressing end anchorage detailsPVC sheeting, cement grout and grooves for tendons each average sizeVentsF.39.3

assumeTendonsF.40.1

AnchorageF.40.2

AnchorageF.40.2

Filling of anchorage pocketF.39.4