Slide 1 TITLE WINONA BRIDGE Visual Quality Review Committee December 18, 2013 Recap Meeting 7

131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Slide 1

TITLE

WINONA BRIDGEVisual Quality Review Committee

December 18, 2013Recap Meeting

7

Page 2: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 2

COMMITTEE GOALS AND ROLES

• Provide background

• Present illustrative options

• Outline technical parameters

• Take the project to the next phase

• Actively participate

• Provide constructive comments

• Reach out to neighbors, business associates, constituencies

• Serve an advisory role

MnDOT/Consultant Staff

Local Representatives

• Strive for consensus yet acknowledge diff erences of opinion

• Develop the visual character of the bridge, supporting elements, and riverfront connection

• Create a project that the community will embrace

Overall

Page 3: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 3

COMMITTEE FOCUS TOPICS

• Bridge Piers

• Overlooks

• Bridge Abutments and Retaining Walls

• Railings and Barriers

• Pedestrian and Bicycle Circulation

• River Connections

• Lighting

• Landscaping

• Signage

VQRC Input Provided

Page 4: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 4

CRAFTING A VISION

The Winona Bridge Project should refl ect the current era while respecting the past. The existing

bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual

presence. The new bridge should celebrate the river’s natural beauty and the cultural history

of Winona that is intertwined with the river. Together, the two bridges should symbolize a

welcoming gateway to beauty, culture, and prosperity.

Project Vision Statement

Page 5: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 5

PROJECT CONTEXT

Residential AreaResidential Area

BoathousesBoathouses

BoathousesBoathouses

Back ChannelBack Channel

Bridge 5930Bridge 5930

Municipal MarinaMunicipal Marina

Bridge 5900Bridge 5900

NewNewBridge 85851Bridge 85851

LatschLatschIslandIsland

2nd St.2nd St.

Front St.Front St.

RailroadRailroad

Riverview Dr.Riverview Dr.

3rd St.3rd St.

4th St.4th St.

5th St.5th St.

W. BroadwayW. Broadway Hu

ff St.

Huff S

t.

Was

hingto

n St.

Was

hingto

n St.

John

son S

t.Jo

hnso

n St.

Main

St.

Main

St.

Cente

r St.

Cente

r St.

Lafay

ette S

t.La

fayett

e St.

Waln

utSt

.W

alnut

St.

Marke

t St.

Marke

t St.

Harrie

t St.

Harrie

t St.

Wils

onSt

.W

ilson

St.

Gran

d St.

Gran

d St.

Wino

naSt

.W

inona

St.

SwimmingSwimmingBeachBeach

FloodplainFloodplainForest, typ.Forest, typ.

Levee ParkLevee Park

Mississippi RiverMississippi River

DowntownDowntownWinonaWinona

WaterfrontWaterfront TrailTrail

Page 6: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 6

PROJECT CONTEXT

Page 7: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 7

PROJECT RENDERINGS

View of Bridges Looking Upstream(Exisitng Bridge in Foreground)

Daytime View

Page 8: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 8

PROJECT RENDERINGS

View of Bridges Looking Downstream(New Bridge in Foreground / Proposed Trailhead not Illustrated)

Daytime View

Page 9: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 9

PROJECT RENDERINGS

View from Existing Bridge - Northbound Towards Latsch Island

Daytime View

Page 10: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 10

PROJECT RENDERINGS

View from New Bridge - Southbound Towards Winona

Daytime View

Page 11: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 11

BRIDGE PIERS AND OVERLOOKS

View of Main Span Looking Downstream

Concept B

Page 12: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 12

BRIDGE PIERS AND OVERLOOKS

View of Main River Pier 11

4’-6” Railing HeightUpdate per VQRC input

Overlook

Twin Pier Walls

Pier Base

Concept B

Page 13: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 13

View of South Approach Piers

BRIDGE PIERS AND OVERLOOKS Concept B

Page 14: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 14

BRIDGE PIERS AND OVERLOOKS

View of Main Span Looking Downstream

Concept A

Page 15: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 15

BRIDGE PIERS AND OVERLOOKS

Overlook

4’-6” Railing HeightUpdate per VQRC input

Twin Pier Walls

Pier Base

Concept A

View of Main River Pier 11

Page 16: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 16

BRIDGE PIERS AND OVERLOOKS Concept A

View of South Approach Piers

Page 17: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 17

COLOR Color Concept A

Main Piers - Summer Main Piers - Winter

Page 18: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 18

COLOR Color Concept B

Main Piers - Summer Main Piers - Winter

Page 19: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 19

ABUTMENTS AND WALLS

Plan View

Existing Abutment Corner Pilaster

New Bridge

New Retaining Wall

Abutment Wall

Retaining Wall Replaced in Kind

Abutment ConnectionShallow Recess

New Corner Treatment

Existing Corner Treatment Replaced in Kind

Existing Bridge

3rd

St.

South Abutment

Page 20: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 20

ABUTMENTS AND WALLS

Flat Slab with Haunches

3rd St.3rd St.

6’ Railing HeightStyle to be Updated per VQRC input

Concept B Approach Piers 1 and 2 Shown

South Abutment

4’-6” Railing HeightWall SurfaceTreatment

Corner Pilaster

Page 21: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 21

ABUTMENTS AND WALLS

4’-6” Railing HeightWall SurfaceTreatment

Flat Slab with Haunches

3rd St.3rd St.

6’ Railing HeightStyle to be Updated per VQRC input

Concept A Approach Piers 1 and 2 Shown

South Abutment

Corner Pilaster

Page 22: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 22

ABUTMENTS AND WALLS

North Abutment Plan View

New Bridge

Abutment

Retaining Wall

Rip Rap below Bridge

Trail below Bridges

Stone Slope Paving Replaced

below Bridge

Existing Bridge

Abutment ConnectionRecess

New Corner Treatment

Existing Corner Treatment

North Abutment

Page 23: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 23

ABUTMENTS AND WALLS

4’-6” Railing Height

6’ Railing Height Style to be Updated

per VQRC inputCorner Pilaster

Latsch Island Access RoadLatsch Island Access Road

Rip Rap Slope TreatmentRip Rap Slope Treatment

Trail with FenceTrail with Fence

North Abutment

Page 24: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 24

RAILINGS AND BARRIERS Pedestrian Railing Concept 1

4’-6” Railing Height 5’-3” Railing Height

Stepped Transition

6’ Railing Height

Page 25: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 25

RAILINGS AND BARRIERS Hybrid Railing Concept 1/3

Arching Branches Motif/Paddle Wheel Motif at Overlook

Page 26: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 26

RAILINGS AND BARRIERS Pedestrian Railing Concept 5

4’-6” Railing Height

Transition

6’ Railing Height

Draped Curve Motif (New)

Page 27: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 27

PEDESTRIAN/BICYCLE CIRCULATION S. Approach

Huff St.

Winona St.

New Bridge 85851

Existing Bridge 5900

3rd

St.

4th.

St.

2nd

St.

Exis

ting

Wat

erfr

ont T

rail

Shor

elin

e

Railr

oad

MRT TrailShoulder Bikeway

Potential Path at Ground LevelProject Area Including AcquisitionAt-Grade Trail

Bridge Trail Sidewalk

Riverview Dr.

Abutment

Potential Stair

Potential Trailhead

Page 28: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 28

2nd St.2nd St.

Potential Stair Support Structure to Be Determined and Railing Style to

Be Updated per VQRC Input

Trail on New Bridge

Overall Stair Size

Height - 37’

Length - 30’

Width - 15’

Note: Stair structure and railing design is shown only in conceptual detail to illustrate approximate size

PEDESTRIAN/BICYCLE CIRCULATION S. Approach

Page 29: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 29

RIVER CONNECTION/LANDSCAPING

Huff St.

New Bridge 85851

Existing Bridge 5900

3rd

St.

4th.

St.

2nd

St.

Wat

erfr

ont T

rail

Shor

elin

e

Railr

oad

SmallPerformance

Space

Infi ltration Basins

Stormwater Pond, typ

Paving Under BridgesRR Crossing

Cross Walk, typ

Winona St.

RiverviewDr.

Kiosk

Overlook Terrace and Trailhead with Kiosk

ApApAppprprprproxoxoxoooox. 1111 AcAcAcccAcccrererrrer AAAAvavavavv ililillabababableleleefofofofor r r r ReReReRedededed vevevevevvv lololol pmpmpmenenenenntttt

Entry Plaza

ApApApApprprprp oxoxoxox... 1111 AcAcAcAcrererere AAAvavavailililababababa lelelelefofofofofoffor r r rr ReReReReReReedededededdeeevevevvevvvvv loloolopmpmpmmenenene tttt

ApApApApprprprp oxoxox... 111 AcAcAcrereree AAAAvavavavailililabababableleleefofofor r r r ReReReRedededed veveevelolololopmpmpmpmenenenee ttt

Historic Paver Area

Apprp ox. 0.0000 2 AcA reAvvvvailablbbbb e fof r

Redevelooooopment

Terraced Plantings

Boulder Terraces

Planting Bed and Low Wall, typ

Stone Seat Walls, typ

Potential Stair

S. Approach

Page 30: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 30

PEDESTRIAN/BICYCLE CIRCULATION

Shor

elin

e

At-Grade Trail (Above 100 Yr Flood Plain Elevation)Bridge Trail

New Bridge 85851

Stone Steps to RemainFence adjacent steep slope

Abutment

BusinessMarina Parking

Existing Bridge 5900 Existing Bridge 5930

Boathouses

Main Channel Back Channel

N. Approach

Page 31: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 31

Shor

elin

e

New Bridge 85851

Stone Steps to Remain

Abutment

BusinessMarina Parking

Existing Bridge 5900 Existing Bridge 5930

Boathouses

Main Channel Back Channel

100 Year Flood Elevation

N. ApproachRIVER CONNECTION/LANDSCAPING

Fence adjacent steep slope

Trail Under Bridges Tree and Shrub Massings and Native Prairie Seeding

Native Wet Meadow Seeding Around Ponds

Page 32: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 32

SIGNAGE South Approach Area

Plan View

Sign 1 Messages Sign 2 Message

Winona St.

New Bridge 85851

Existing Bridge 5900

3rd

St.

4th.

St.

2nd

St.

Wat

erfr

ont

Trai

l

Shor

elin

e

Railr

oad

Overhead Sign Bridge (Sign 1)

Update to Street

Cantilever Overhead Sign(Sign 2)

Page 33: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 33

SIGNAGE North Approach Area

Shor

elin

e

New Bridge 85851

BusinessMarina Parking

Existing Bridge 5900 Existing Bridge 5930

Boathouses

Main Channel Back Channel

Plan View

Sign 3 Message State Entry Sign

Potential State Entrance Sign

Trail Under Bridges

Cantilever Overhead Sign(Sign 3)

Page 34: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 34

LIGHTING

“Base” Design Cross Section Views (Looking North)

Roadway and Trail Lighting - Approach Areas

New Bridge

• Single-side Layout on Barrier between Trail and Roadway• Lights both Trail and Roadway

Existing Bridge

• Staggered Layout Both Sides of Bridge

(Note: Lighting design dependent on fi nal historic barrier design)

50’ Approx.

MnDOT Standard LED Light Pole

(Approx. 35’ Mounting Height)

Potential Enhanced Luminaire and Pole for New Bridge

Original Light Standard

(Approx. 25’ Mounting Height)

Page 35: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 35

LIGHTING

“Base” Design Cross Section Views (Looking North)

Roadway and Trail Lighting - Main Span

70’ A

ppro

x.

50’ Approx.

Peak

Hei

ght o

f Thr

ough

-tru

ss

New Bridge

• Single-side Layout on Barrier between Trail and Roadway• Lights both Trail and Roadway

Existing Bridge

MnDOT Standard LED Light Pole

(Approx. 35’ Mounting Height)

Replica Original Light Fixture(Mounted to

Truss Bracing)

Potential Enhanced Luminaire and Pole for New Bridge

Page 36: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 36

LIGHTING Aesthetic Lighting - Concept A

NEW BRIDGE: • WASH OF LIGHT ON FASCIA OF NEW

BRIDGE FADES FROM “BRIGHT” TO “DIM” FROM MAIN SPAN PIERS TO CENTER OF SPAN.

• WASH OF LIGHT ON INSIDE AND OUTSIDE FACES OF MAIN SPAN PIERS.

• WASH OF LIGHT ON OUTSIDE FACES OF ALL WINONA PIERS

TRUSS BRIDGE: • WASH OF LIGHT FROM TOPS OF

ANGLED MEMBERS DOWN ROADWAY-FACING SIDES OF “VERTICAL” ANGLED MEMBERS.

• WASH OF LIGHT ACROSS VERTICAL FACES OF HORIZONTAL MEMBERS AT TOP OF TRUSS STRUCTURE.

• WASH OF LIGHT ON OUTSIDE FACES OF MAIN SPAN AND WINONA PIERS.

Page 37: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 37

LIGHTING Aesthetic Lighting - Concept B

NEW BRIDGE: • WASH OF LIGHT ON UNDERSIDE OF

HAUNCHED GIRDERS FADES FROM “BRIGHT” TO “DIM” FROM MAIN SPAN PIERS TO CENTER OF SPAN.

• WASH OF LIGHT ON INSIDE FACES OF MAIN SPAN PIERS AND ON INSIDE AND OUTSIDE EDGES OF ALL WINONA PIERS

TRUSS BRIDGE: • WASH OF LIGHT FROM TOPS OF

ANGLED MEMBERS DOWN NORTH AND SOUTH FACING SIDES OF “VERTICAL” ANGLED MEMBERS.

• WASH OF LIGHT ON INSIDE AND OUTSIDE EDGES OF MAIN SPAN AND ALL WINONA PIERS

Page 38: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 38

LIGHTING

View of Bridges Looking Upstream(Exisitng Bridge in Foreground)

Night Views

Page 39: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 39

LIGHTING

View of Bridges Looking Downstream(New Bridge in Foreground / Proposed Trailhead not Illustrated)

Night Views

Page 40: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 40

LIGHTING

View from Existing Bridge - Northbound Towards Latsch Island

Night Views

Page 41: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 41

LIGHTING

View from New Bridge - Southbound Towards Winona

Night Views

Page 42: 131217 Winona Bridge VQRCMtg7 Presentation · bridge is a visual icon for the city, and so the new bridge should defer to its prominent visual presence. The new bridge should celebrate

Winona Bridge Visual Quality Review Committee Meeting 7 Slide 42

NEXT STEPS

Visual Quality Manual

Transition to Final Design

Ongoing Coordination with the City of Winona and other Agencies

Ongoing Consultation with MnDOT CRU