PROJECT REPORT
ON
“INDUSTRIAL VISIT AT WANAKBORI (T.P.S)”
Submitted in accordance with the INDUSTRIAL VISIT requirements for
4thsemester of the BE course in the branch of
ELECTRICAL ENGINEERING
Of
GUJARAT TECHNOLOGICAL UNIVERSITY
YEAR 2015
Submitted By:-Mihir Patel
(130340109028)
7/25/2019 130340109028_Wanakbori Visit Report
http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 2/11
INDEX
1 Introduction
2 Purpose of Visit
3 Block diagram of power plant
4 Working Power Plant Models
5 Future
6 Equipment Details
7 Switch Yard
8 Other Details
9 Control Room
10 Conclusion
7/25/2019 130340109028_Wanakbori Visit Report
http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 3/11
INTRODUCTION:-
W.T.P.S is the biggest power plant in GUJARAT.
Wanakbori Thermal Power Station is a coal-f ired power station in Gujarat,
India. It is located on the bank of Mahi river in Kheda district.
There are 7 Turbo Generator sets each of 210MW out of which first 3
units are equipped with Russian Turbines and other 4 Units are equipped
with German Turbines. Unit no 7 is entirely computerized and well advanced.All the above units are of BHEL make.
7/25/2019 130340109028_Wanakbori Visit Report
http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 4/11
Purpose of Visit:-
Electrical Engineering Dept. of Narnarayan Shastri Institute of Technology
decided to arrange one day industrial visit for 4th Electrical Engineering students to
improve practical knowledge and get benefited their theoretical knowledge
In W.T.P.S, Students will get benefit regarding their theoretical
subject of conventional power engineering, Electrical Power and
Electrical & Electronic Measurement.
Block Diagram of Power Plant:-
Coal to Electricity
7/25/2019 130340109028_Wanakbori Visit Report
http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 5/11
Energy Balance
7/25/2019 130340109028_Wanakbori Visit Report
http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 6/11
Feed water and Steam Flow Diagram
7/25/2019 130340109028_Wanakbori Visit Report
http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 7/11
WORKING POWER PLANT MODELS:-
Generator, Generator Transformer Turbine
Boiler,
Boiler Drum
Boiler Burners,
Dampers arrangement
Boiler Feed Pump
Air Pre-heater
ID Fan,
FD Fan,
PA Fan
Coal Mill
FW Pump
FEATURES:-
Installed Capacity: 7× 210 = 1470 MW Total Area of Project: 1571 Acres
PLF %: Between 84.64 to 91.24%
Plant Area: 626.2 ha
Ash Dump Area: 215.7 ha
Cooling Water Quantity Required: From Canal of Mahi River Reservoir 60 to 70
Cusecs / month
Cooling Tower Heights: Stage I & II - 112 Mtrs,
Stage III - 118 Mtrs.
7/25/2019 130340109028_Wanakbori Visit Report
http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 8/11
EQUIPMENT DETAILS:-
Fuel: Bituminous Coal
Linked Coal Mines: Coal India From Bihar, Orissa, M.P., West Bengal, Andhra
Pradesh Generally 400 Wagons received per day
Record of Unloading Wagons : 650 Wagons / Day
Gross Calorific Value of Coal : 4400 Kcal/Kg
No’s of Wagon Tip plers: 05 NOS.
Coal Quantity Required :
With Design Coal : 16000 MT / Day
With Actual Coal: 18000 MT / Day
Stock Yard: Storage Capacity:02 Lacks MT
Area : 48000 m2
Oil : LSHS / LDO
Boiler Details:-
Stage I & II: Tangentially Fired, Balance Draft, Natural Circulation, Radiant RehType
Stage III : Vertically Suspended Water Tubes, Radiant Reheat Cycle, Natural
Circulation
Capacity : 700 Tones / hr. / unit
Feed Water Temp. : 241 C
Steam Pressures at Boiler Outlets: [1] SH: 137 Kg / Cm2
[2] RH: 25.8 Kg / Cm2
7/25/2019 130340109028_Wanakbori Visit Report
http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 9/11
Turbine Details:-
Type: Three Cylinders Condensing Tandem, Compound Horizontal Reheat Type.
Nos. of Stages: Stage I: HP - 12,
IP -11,
LP - Double Flow each having 4 stages.
Stage II: HP - 25,
IP - Double Flow each having 20 stages,
LP - Double Flow each having 4 stages
Generator Details:-
Type: THW - 210 - 2B (Water & Hydrogen Cooled Turbo Generator)
Rated Capacity: 210 MW, 247 MVA
Power Factor: 0.85 Lag
Stator: 15.75 Volts, 9050 A
Rotor: 310 V DC, 2600 A
Excitation System: Static
Type of Cooling: Water, Hydrogen
Hydrogen Pressure: 3.5 Kg / Cm2
7/25/2019 130340109028_Wanakbori Visit Report
http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 10/11
TRANSFORMER :-
Generator Transformer:
Stage I: 250 MVA, 15.75 / 220KV
Stage II: 250 MVA, 15.75/400KV
Interconnection Transformer: 500 MVA (167 x 4, 3+1 St by), 220 / 400 KV
Station Transformers: 25 MVA, 220 / 07 KV
Unit Auxiliary Transformers: 15 MVA, 15.75 / 07 KV
Unit Service Transformers: 07 KV / 433 Volts
Station Service Transformers: 02 MVA, 07 KV / 433 Volts
SWITCH YARD:-
The switchyard houses transformers, circuit breaker sand switches
for connecting and disconnecting the transformers and circuit breakers. Italso has lightning arrestors for the protection of the power station against
lighting strokes.
CONTROL ROOM:- Types of Control Panel
Fuel Gas Panel
Combustion Air Panel Primary Air & Coal Panel
Steam Panel (Boiler)
Feed Water panel
Condensate & Cooling Water Panel
Turbovisory Panel
7/25/2019 130340109028_Wanakbori Visit Report
http://slidepdf.com/reader/full/130340109028wanakbori-visit-report 11/11
CONCLUSION:-
After visit at the Wanakbori Thermal Power Station I can say
that one can visualize the complex study of power generation using coalas a fuel, which will help me a lot in future in many field & I can
understand the function of each component in thermal power station, their
importance, their arrangement & precautions that to be used for the safety
in the plant.
At last I will only say that I really enjoyed my visit over hereand I again want to thank all my faculties, staff of Wanakbori Thermal
Power Station to give me this great pleasure of the training.