1/29/15 – Structural steel erection 1/29/15 – Masonry wall erection 1/29/15 – Masonry wall erection

1/29/15 – Structural steel erection

  • Upload
    others

  • View
    25

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1/29/15 – Structural steel erection

1/29/15 – Structural steel erection

1/29/15 – Masonry wall erection

1/29/15 – Masonry wall erection

Page 2: 1/29/15 – Structural steel erection

2/12/15 – Masonry wall and main floor structural erection

2/12/15 – Structural steel erection progress

Page 3: 1/29/15 – Structural steel erection

2/12/15 – Electrical panel progress in basement

2/26/15 – Structural steel erection progress

Page 4: 1/29/15 – Structural steel erection

2/26/15 – Concrete pour preparations for HVAC penthouse

3/12/15 – Last remaining barrel roof truss installation

3/12/15 – Storm drainage improvements ready for installation

Page 5: 1/29/15 – Structural steel erection

3/12/15 – Main floor framing progress

4/16/15 – Exterior view from south

4/16/15 – Interior view from north end of library, focusing on barrel roofline

Page 6: 1/29/15 – Structural steel erection

4/16/15 – Interior view looking north from main library entryway

4/16/15 – Basement construction progress

5/1/15 – Exterior library progress

Page 7: 1/29/15 – Structural steel erection

5/1/15 – Parking Lot reconstruction

4/30/15 – Access floor installation

Page 8: 1/29/15 – Structural steel erection

4/30/15 – Interior view looking south from north stairwell; Access floor in foreground

5/14/15 – Exterior library progress

Page 9: 1/29/15 – Structural steel erection

5/14/15 – Parking Lot reconstruction

5/14/15 – Interior progress, looking north from library main entrance

5/14/15 – Basement finishing