0 08.10.2019 FIRST ISSUE Proposed Elevation (Front) Scale: 1:100 1 0 2 3 4 5 6 7 M FFL 1 2925 FFL 0 0 FFL 2 5850 EAVES 6553 RIDGE 9089 EAVES 5350 RIDGE 9089 Proposed Elevation (Front) Scale: 1:100 2 1 10.12.2019 PRE-APP COMMENTS 2 20.12.2019 CLIENT COMMENTS 3 18.03.2020 DESIGN DEVELOPMENT 4 26.03.2020 DESIGN DEVELOPMENT 99 Hutton Drive, Hutton Brentwood, Essex CM13 2TB +44 79 8085 3234 [email protected] Stephen Alderdice Ventures Limited Company Registration No: 11125094 DATE DESCRIPTION GENERAL NOTES Stephen Alderdice Studio 296 Coombe Lane Raynes Park Kisiel Group General Arrangement Drawings REV Briefing Concept Design Technical Pricing Construction Comment Approval Information 125 | 120 Proposed Elevation Front 1 3 4 5 6 1 RED FACING BRICK EXTERNAL WALL - 2 PPC STEEL HANDRAIL & RAILINGS 3 ANODISED ALUMINIUM WINDOWS 4 PRE-CAST CONCRETE FASCIA 5 EXTERNAL FINISHES KEY: TILED ROOF 6 5 05.10.2020 ROOF AMENDMENTS 6 06.10.2020 DORMER WINDOW SETTING OUT Page 385

125-120-General Arrangement Drawings 2021-07-06

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 125-120-General Arrangement Drawings 2021-07-06

0 08.10.2019 FIRST ISSUE

Proposed Elevation (Front)Scale: 1:1001

0 2 3 4 5 6 7 M

FFL 12925

FFL 00

FFL 25850

EAVES6553

RIDGE9089

EAVES5350

RIDGE9089

Proposed Elevation (Front)Scale: 1:1002

1 10.12.2019 PRE-APP COMMENTS

2 20.12.2019 CLIENT COMMENTS

3 18.03.2020 DESIGN DEVELOPMENT

4 26.03.2020 DESIGN DEVELOPMENT

99 Hutton Drive, HuttonBrentwood, EssexCM13 2TB+44 79 8085 [email protected]

Stephen Alderdice Ventures LimitedCompany Registration No: 11125094

DATE DESCRIPTION

GENERAL NOTES

Stephen Alderdice Studio

296 Coombe LaneRaynes Park

Kisiel Group

General Arrangement Drawings

REV

BriefingConceptDesignTechnicalPricingConstruction

CommentApprovalInformation

125 | 120Proposed ElevationFront

1

3

4

5

6

1 RED FACING BRICK EXTERNAL WALL

-2

PPC STEEL HANDRAIL & RAILINGS3

ANODISED ALUMINIUM WINDOWS4

PRE-CAST CONCRETE FASCIA5

EXTERNAL FINISHES KEY:

TILED ROOF6

5 05.10.2020 ROOF AMENDMENTS

6 06.10.2020 DORMER WINDOW SETTING OUT