l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l 25.73 25.80 25.80 25.95 25.80 25.95 25.955 25.65 25.58 25.41 25.37 25.31 24.80 25.21 24.80 2 5.165 25.2 10 25.74 25.8 5 25.75 25.59 25.74 25.74 25.85 25.79 25.95 25.995 25.95 25.995 25.95 25.995 25.95 25.95 25.80 25.85 25.95 25.995 25.995 F A L L 2 ° F A L L 2 ° F A L L 2 ° F A L L 2 ° F A L L 2 ° F A L L 2 ° F A L L 2 ° D D D D D D D D D D D D D D D D D D D D D PROPRIETARY TYPE RAINHEAD & POP TO SUIT 150mm DOWNPIPE WITH SELECTED COLOURBOND FINISH ø15 0 PVC D P FEJ. 200 WIDE x 100 DEEP x 0.55 PGI EAVES GUTTER WITH SELECTED PAINT FINISH 9m WIDE x 12m LONG 210mm THICK FIBRE-REINFORCED CONCRETE HARDSTAND . FALL TO EVEN GRADE TO LEVELS SHOWN. S IPH DP . SIPH O P. FALL 1° 600x150 DEEP (MIN. DEPTH) ZINCALUME BOX GUTTER ON CUSTOMORB ZINCALUME ON 50mm WIDE GUTTER STRAPS WITH SADDLES AT MAX. 900 CTRS. FALL GUTTER TO OUTLET AT MIN. 1:200 150ø OVERFLOW POP DISCHARGING THROUGH PANEL (TYP) OUTLET POP SET 25mm BELOW TOP OF GUTTER AT ITS LOWEST POINT & PROTRUDE 20mm PAST FACE OF PANEL OP . SPREADER DOWNPIPE TO DISCHARGE ONTO ROOF BELOW VIA SPREADER O P. DOWNPIPE TO DISCHARGE INTO BOX GUTTER BELOW SELECTED FLEXIBLE EXPANSION JOINT. AQUARIUS OR SIMILAR APPROVED. INSTALLED AS PER MANUFACTURER'S SPECIFICATION. TYP. FALL 2° DOWNPIPE TO DISCHARGE INTO BOX GUTTER BELOW FEJ. 600x150 DEEP (MIN. DEPTH) ZINCALUME BOX GUTTER ON CUSTOM ORB ZINCALUME ON 50mm WIDE GUTTER STRAPS WITH SADDLES AT MAX. 900 CTRS. FALL GUTTER TO OUTLET AT MIN. 1:200 O P. DOWNPIPE TO DISCHARGE INTO BOX GUTTER BELOW FALL 2° "FIELDERS" FASCIA GUTTER OR SIMILAR WITH SELECTED COLORBOND FINISH. FALL GUTTER TO OUTLET AT MIN. 1:200 FALL 1° FALL 1° 300 x 300 CONCRETE RWP SUMP BOX AND GRATE (LOCKDOWN) TYP. D D D D D D D D D CEILING PIPE WORK IN LUNCHROOM ø90 DP DP ø 1 5 0 PVC DP ø 1 5 0 PVC D P ø 1 50 PVC D P ø 1 5 0 PVC O P. OP. 200 WIDE x 100 DEEP x 0.55 PGI EAVES GUTTER WITH SELECTED PAINT FINISH FALL 2° ø150 PVC DP ø 1 5 0 PVC D P ø15 0 PVC D P SPREADER DOWNPIPE TO DISCHARGE ONTO ROOF BELOW VIA SPREADER ADS STORMTECH SC-310 INFILTRATION SYSTEM SPREADER ø 9 0 D P DOWNPIPE TO DISCHARGE ONTO ROOF BELOW VIA SPREADER SPREADER ø90 DP DOWNPIPE TO DISCHARGE ONTO ROOF BELOW VIA SPREADER ø 9 0 D P SPREADER FALL 1° SIPHONIC PIPE DISCHARGE SUMP Ø1800 x 1500 EFFECTIVE DEPTH Ø1800 x 1500 SOAKWELL SOAKWELL Ø1800 x 1500 SOAKWELL Ø1800 x 1500 SOAKWELL Ø1800 x 1200 D D D D D D D D D D D D Ø300 PVC GRADE 1:200 Ø300 PVC GRADE 1:200 Ø 2 2 5 PV C G R AD E 1 : 2 0 0 Ø 1 5 0 P VC G R AD E 1 : 2 0 0 Ø 1 5 0 PV C G R AD E 1 : 2 0 0 Ø300 PVC GRADE 1:200 TYP GRATE LEVEL ON GRADE SIPHONIC PRIMARY Ø160 HDPE SIPHONIC OVERFLOW Ø160 HDPE Ø100 GRADE 1:187 24.15 24.26 ADS STORMTECH SC-310 INFILTRATION SYSTEM 25.90 DISCHARGE PIPE TO MUNICIPAL DRAINAGE SYSTEM. OUTFLOW LEVEL RL 24.60m DRAWING No. DRAWN PROJECT No. DATE REV. SCALE Suite 11w, 817 Beeliar Drive, COCKBURN CENTRAL WA 6164 DATE REV COMMENTS BY CHK [email protected] www.mulderkampman.com.au BUILDING PERMIT This drawing and all information shown hereon is the exclusive property of MULDER KAMPMAN DESIGN and is submitted on a confidential basis. This drawing may not be copied or disclosed to a third party without prior consent from MULDER KAMPMAN DESIGN. It is the responsibility of the Builder & Contractor to check all drawing scales and dimensions and confirm any discrepencies with MULDER KAMPMAN DESIGN immediately. (08) 9417 9966 B GENERAL NOTES: 1. ALL LEVELS, DIMENSIONS, POSITIONS & HEIGHTS TO BE CHECKED AND VERIFIED ON SITE BEFORE COMMENCING ANY BUILDING WORK. DATUM AHD 2. FIGURED DIMENSIONS ARE TO BE TAKEN AND NO SCALING OF DRAWINGS WILL BE ALLOWED. 3. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH SPECIFICATIONS AND ALL OTHER RELEVANT DRAWINGS FROM ARCHITECTURAL, STRUCTURAL, ELECTRICAL, HYDRAULICS & MECHANICAL ENGINEER'S. 4. ANY DISCREPANCIES ARE TO BE REPORTED TO THE AUTHOR OF THE PLANS IMMEDIATELY. 5. REFER TO STRUCTURAL ENGINEER'S DRAWINGS FOR ALL STRUCTURAL WORKS. 6. LARGE SCALE DRAWINGS WILL SUPERCEDE SMALL SCALE DRAWINGS. 7. CONTRACTOR TO CONFIRM LOCATION, DEPTH, AND EXTENT OF ALL OTHER SERVICES, AS SHOWN ON SERVICES LAYOUT PLAN, PRIOR TO THE COMMENCEMENT OF ANY WORK. ENGINEER TO BE NOTIFIED UPON DISCREPANCIES. 8. CONTRACTOR TO CONFIRM GROUND WATER TABLE LEVEL PRIOR TO THE COMMENCEMENT OF ANY WORK AND IF ANY DE-WATERING IS REQUIRED. 9. EXISTING GROUND LEVELS AND LOCATION AND INVERT LEVEL OF EXISTING SEWER SHALL BE CONFIRMED PRIOR TO THE COMMENCEMENT OF ANY WORK. 10. ALL GRAVITY PIPES SHALL BE PVC SN8 UNLESS SPECIFIED. 11. ALL BACK FILL TO BE COMPACTED TO A DRY DENSITY NOT LESS THAN THAT OF THE SURROUNDING UNDISTURBED SOIL. BACKFILL OF SEWERS IN ROAD RESERVES SHALL BE COMPACTED TO GIVE A MINIMUM RESISTANCE OF 8 BLOWS PER 300mm USING A STANDARD FALLING WEIGHT PENETROMETER FOR THE FULL DEPTH OF FILL. 12. CONTRACTOR TO MAKE GOOD ALL FENCING, KERBING, ROADS, DRIVEWAYS, ETC IN THE AREA OF EXCAVATION, ALL NECESSARY APPROVALS FROM RELEVANT AUTHORITIES TO BE OBTAINED PRIOR TO THE COMMENCEMENT OF ANY WORK. DRAINAGE 1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANTS DRAWINGS AND LOCAL AUTHORITY DRAINAGE CONSTRUCTION DRAWINGS. 2. ALL SOAKWELLS IN PAVED AREAS SHALL HAVE HEAVY DUTY REINFORCED CONCRETE TRAFFICABLE LIDS, CLASS D. 3. SUBGRADE AT BASE OF PRECAST LINER TO BE COMPACTED TO 8 BLOWS PER 300mm WITH A STANDARD PERTH PENETROMETER OR 95% OF MMDD AS PER AS1289. 4. BACKFILL TO PIT TO BE COMPACTED TO 8 BLOWS PER 300mm WITH A STANDARD PERTH PENETROMETER. 5. GULLY DRAINS SHALL BE SUPPLIED AND FITTED TO ALL EXTERNAL DOWNPIPES TO AS3500. 6. GUTTERS AND DOWNPIPES TO BE DIRECTLY CONNECTED TO STORMWATER SYSTEM INTERNALLY BY DRAINAGE CONTRACTOR TO AS3500 7. GROUT (MORTAR) TO BE 4 SAND : 1 CEMENT 8. WHERE MANHOLE LINER DEPTH EXCEEDS 2.0m, BOLT ON GALVANISED DOUBLE STEP IRONS AT 350mm CENTRES. LINER TO BE MADE GOOD EXTERNALLY USING CEMENT MORTAR FOLLOWING STEP IRON INSTALLATION. NOT APPLICABLE FOR SOAKWELLS. 9. STEP IRONS TO BE LOCATED ON SIDE WITH LEAST INTERFERENCE FROM PIPES ON ALL MANHOLES, GULLEYS, SIDE ENTRY AND COMBINATION SIDE ENTRY PITS WHERE DEPTH EXCEEDS 2.0m. WARNING ALL SERVICES ARE SHOWN DIAGRAMMATICALLY. IT IS THE CONTRACTORS RESPONSIBILITY TO LOCATE ALL SERVICES PRIOR TO COMMENCEMENT OF WORKS. NOTE THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONSULTANTS DRAWINGS. STORMWATER DRAINAGE - GENERAL ARRANGEMENT SCALE 1:100 DOCUMENTATION BY: TCC REF: 15-043 TRUE CIVIL CONSULTING WA PO Box 1113, CLOVERDALE, WA 6985 MOB. 0433 828 213 ISSUED BY AMENDMENT No. DATE A 03/02/16 PRELIMINARY ISSUE IRMcC LEGEND PROPOSED DRAINAGE SOAKWELL PROPOSED STORMWATER DRAINAGE PIPE CONTOUR MINIMUM Ø300 PVC OR RCP - REFER TO LAYOUT T T EXISTING TELECOMMUNICATIONS SERVICE Ø1800 X 1800 (DEPTH VARIES) WITH Ø600 CAST IRON GULLY GRATE G G EXISTING GAS SERVICE S S EXISTING SEWER SERVICE W W EXISTING WATER SERVICE P P EXISTING POWER SERVICE DRAINAGE OVERLAND FLOW PATH PROPOSED DRAINAGE LOCATION ENVELOPE PIPE GRADE DIRECTION 37.50 GENERAL PAVEMENT / DRAINAGE STRUCTURE SURFACE LEVEL US DS D PVC 150 / 100 19.59 9.98 19.49 PIPE DIAMETER / PIPE GRADE UPSTREAM INVERT LEVEL PIPE LENGTH DOWNSTREAM INVERT LEVEL PROPOSED STROMWATER DRAINAGE PIPE ADS STORMTECH MODULAR INFILTRATION SYSTEM STORMTECH SC-310 CHAMBER - INDIVIDUAL MODULE 864mm (W) x 2170 (L) x 406 (H) GEOFABRIC WRAP TOP SIDES AND ENDS OF STONE MATRIX INSTALLED TO MANUFACTURERS DETAILS AND SPECIFICATIONS PROPOSED MANHOLE / JUNCTION Ø900 X 1500 (DEPTH VARIES) WITH 450 x 450 GULLY COVER D D MINIMUM Ø100 PVC - REFER TO LAYOUT IF ALTERNATE SIZE USED PROPOSED SIPHONIC DISCHARGE AND OVERFLOW PIPE MINIMUM Ø160 HDPE - REFER TO LAYOUT PIPE DIAMETER / PIPE GRADE / PIPE LENGTH Ø160 HDPE GENERALLY Ø150 PVC - GRADE FOR SELF CLEANSING HENSBROOK LOOP SYPHONIC OUTLET VALSIR 110 OULTET SYPHONIC OUTLET VALSIR 110 OVERFLOW VALSIR 110 OULTET SYPHONIC OUTLET VALSIR 110 OVERFLOW SYPHONIC OUTLET VALSIR 110 OULTET SYPHONIC OUTLET VALSIR 110 OVERFLOW SYPHONIC OUTLET VALSIR 110 OVERFLOW SYPHONIC OUTLET SDP 160 SOF 160 PROPOSED WORKSHOP DEVELOPMENT GROUNDBREAKING MINING SOLUTIONS PTY LTD LOT 238 (#53) HENSBROOK LOOP FORRESTDALE WA 6112 STORMWATER DRAINAGE GENERAL ARRANGEMENT C100 507 IRMcC JAN 15 1:100 B 05/02/16 BUILDING PERMIT ISSUE IRMcC

STORMWATER DRAINAGE - GENERAL ARRANGEMENT · this drawing to be read in conjunction with all relevant consultants drawings. stormwater drainage - general arrangement scale 1:100 documentation

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: STORMWATER DRAINAGE - GENERAL ARRANGEMENT · this drawing to be read in conjunction with all relevant consultants drawings. stormwater drainage - general arrangement scale 1:100 documentation

l l l l l l l l l l

ll

ll

ll

ll

ll

ll

ll

ll

ll

ll

ll

ll

ll

ll

ll

25.7325.80

25.80

25.95

25

.80

25

.95

25

.95

5

25.65 25.58 25.41

25.37

25.31 24.80

25.21 24.80

25.165

25.210

25.74

25.85

25.75

25.59

25.74

25.74

25.85

25.79

25

.95

25.9

95

25

.95

25.9

95

25.95

25.995 25.95 25.9525.80

25.8525.95

25.995

25.995

FALL 2°

FALL 2°

FALL 2°

FALL 2°

FALL 2°

FALL 2°

FALL 2°

D D

D

D

D D D

D

D

D

D

D

DD

DD

DD

DD

D

PROPRIETARY TYPE RAINHEAD & POP TOSUIT 150mm DOWNPIPE WITH SELECTEDCOLOURBOND FINISH

ø150

PVC

DP

FEJ.

200 WIDE x 100 DEEP x 0.55 PGI EAVES

GUTTER WITH SELECTED PAINT FINISH

9m WIDE x 12m LONG 210mm THICK

FIBRE-REINFORCED CONCRETE HARDSTAND .

FALL TO EVEN GRADE TO LEVELS SHOWN.

SIPH

DP.

SIPH

OP.

FA

LL 1

°

600x150 DEEP (MIN. DEPTH) ZINCALUME BOX GUTTER ONCUSTOMORB ZINCALUME ON 50mm WIDE GUTTERSTRAPS WITH SADDLES AT MAX. 900 CTRS. FALL GUTTERTO OUTLET AT MIN. 1:200

150ø OVERFLOW POP DISCHARGING THROUGH PANEL(TYP) OUTLET POP SET 25mm BELOW TOP OF GUTTERAT ITS LOWEST POINT & PROTRUDE 20mm PAST FACEOF PANEL

OP.

SPREADER

DOWNPIPE TO DISCHARGEONTO ROOF BELOW VIASPREADER

OP.

DOWNPIPE TO DISCHARGEINTO BOX GUTTER BELOW

SELECTED FLEXIBLE EXPANSIONJOINT. AQUARIUS OR SIMILARAPPROVED. INSTALLED AS PERMANUFACTURER'SSPECIFICATION. TYP.

FALL 2°

DOWNPIPE TO DISCHARGEINTO BOX GUTTER BELOW

FEJ.

600x150 DEEP (MIN. DEPTH) ZINCALUME BOX GUTTER ON CUSTOMORB ZINCALUME ON 50mm WIDE GUTTER STRAPS WITH SADDLESAT MAX. 900 CTRS. FALL GUTTER TO OUTLET AT MIN. 1:200

OP.

DOWNPIPE TO DISCHARGEINTO BOX GUTTER BELOW

FALL 2°

"FIELDERS" FASCIA GUTTER OR SIMILARWITH SELECTED COLORBOND FINISH. FALLGUTTER TO OUTLET AT MIN. 1:200

FALL 1°

FALL 1°

300 x 300 CONCRETE RWP SUMP BOX ANDGRATE (LOCKDOWN) TYP.

D

D D D D D

D

D

D

CEILINGPIPE WORK IN LUNCHROOM

ø90 D

P

DPø15

0 PVC

DPø15

0 PVC

DPø15

0 PVC

DPø15

0 PVC

OP.

OP.

200 WIDE x 100 DEEP x 0.55 PGI

EAVES GUTTER WITH SELECTED

PAINT FINISH

FALL 2°

ø150

PVC

DP

ø150

PVC

DP

ø150

PVC

DP

SPREADER

DOWNPIPE TO DISCHARGE

ONTO ROOF BELOW VIA

SPREADER

ADS STORMTECH SC-310

INFILTRATION SYSTEM

SPREADER

ø90 D

P

DOWNPIPE TO DISCHARGE

ONTO ROOF BELOW VIA

SPREADER

SPREADER

ø90 DP

DOWNPIPE TO DISCHARGE

ONTO ROOF BELOW VIA

SPREADER

ø90 D

P

SPREADER

FALL 1°

SIPHONIC PIPE DISCHARGE SUMPØ1800 x 1500 EFFECTIVE DEPTH

Ø1800 x 1500SOAKWELL

SOAKWELLØ1800 x 1500

SOAKWELLØ1800 x 1500

SOAKWELLØ1800 x 1200

D D D D D D D

D

D

D

D DØ300 PVC GRADE 1:200Ø300 PVC GRADE 1:200

Ø225 PVC GRADE 1:200

Ø150 PVC GRADE 1:200

Ø150 PVC GRADE 1:200

Ø300 PVC G

RADE 1:200 TYP

GRATE LEVEL ON GRADE

SI P

HO

NIC

PR

IMA

RY

Ø1

60 H

DP

ES

IPH

ON

IC O

VE

RF

LO

W Ø

16

0 H

DP

E

Ø100

GR

AD

E 1

:18

7

24.1

524

.26

ADS STORMTECH SC-310

INFILTRATION SYSTEM

25.90

DISCHARGE PIPE TO MUNICIPAL

DRAINAGE SYSTEM. OUTFLOW

LEVEL RL 24.60m

DRAWING No.

DRAWN

PROJECT No.

DATE

REV.

SCALE

Suite 11w, 817 Beeliar Drive, COCKBURN CENTRAL WA 6164

DATEREV COMMENTS BY CHK

[email protected]

www.mulderkampman.com.au

BUILDING PERMIT

This drawing and all information shown hereon is the exclusive property of MULDER KAMPMAN

DESIGN and is submitted on a confidential basis. This drawing may not be copied or disclosed

to a third party without prior consent from MULDER KAMPMAN DESIGN.

It is the responsibility of the Builder & Contractor to check all drawing scales and dimensions

and confirm any discrepencies with MULDER KAMPMAN DESIGN immediately.

(08) 9417 9966

B

GENERAL NOTES:

1. ALL LEVELS, DIMENSIONS, POSITIONS & HEIGHTS TO BE CHECKED AND

VERIFIED ON SITE BEFORE COMMENCING ANY BUILDING WORK. DATUM AHD

2. FIGURED DIMENSIONS ARE TO BE TAKEN AND NO SCALING OF DRAWINGS

WILL BE ALLOWED.

3. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH SPECIFICATIONS

AND ALL OTHER RELEVANT DRAWINGS FROM ARCHITECTURAL,

STRUCTURAL, ELECTRICAL, HYDRAULICS & MECHANICAL ENGINEER'S.

4. ANY DISCREPANCIES ARE TO BE REPORTED TO THE AUTHOR OF THE PLANS

IMMEDIATELY.

5. REFER TO STRUCTURAL ENGINEER'S DRAWINGS FOR ALL STRUCTURAL

WORKS.

6. LARGE SCALE DRAWINGS WILL SUPERCEDE SMALL SCALE DRAWINGS.

7. CONTRACTOR TO CONFIRM LOCATION, DEPTH, AND EXTENT OF ALL OTHER

SERVICES, AS SHOWN ON SERVICES LAYOUT PLAN, PRIOR TO THE

COMMENCEMENT OF ANY WORK. ENGINEER TO BE NOTIFIED UPON

DISCREPANCIES.

8. CONTRACTOR TO CONFIRM GROUND WATER TABLE LEVEL PRIOR TO THE

COMMENCEMENT OF ANY WORK AND IF ANY DE-WATERING IS REQUIRED.

9. EXISTING GROUND LEVELS AND LOCATION AND INVERT LEVEL OF EXISTING

SEWER SHALL BE CONFIRMED PRIOR TO THE COMMENCEMENT OF ANY

WORK.

10. ALL GRAVITY PIPES SHALL BE PVC SN8 UNLESS SPECIFIED.

11. ALL BACK FILL TO BE COMPACTED TO A DRY DENSITY NOT LESS THAN THAT

OF THE SURROUNDING UNDISTURBED SOIL. BACKFILL OF SEWERS IN ROAD

RESERVES SHALL BE COMPACTED TO GIVE A MINIMUM RESISTANCE OF 8

BLOWS PER 300mm USING A STANDARD FALLING WEIGHT PENETROMETER

FOR THE FULL DEPTH OF FILL.

12. CONTRACTOR TO MAKE GOOD ALL FENCING, KERBING, ROADS, DRIVEWAYS,

ETC IN THE AREA OF EXCAVATION, ALL NECESSARY APPROVALS FROM

RELEVANT AUTHORITIES TO BE OBTAINED PRIOR TO THE COMMENCEMENT

OF ANY WORK.

DRAINAGE

1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER

CONSULTANTS DRAWINGS AND LOCAL AUTHORITY DRAINAGE

CONSTRUCTION DRAWINGS.

2. ALL SOAKWELLS IN PAVED AREAS SHALL HAVE HEAVY DUTY

REINFORCED CONCRETE TRAFFICABLE LIDS, CLASS D.

3. SUBGRADE AT BASE OF PRECAST LINER TO BE COMPACTED TO 8

BLOWS PER 300mm WITH A STANDARD PERTH PENETROMETER OR 95%

OF MMDD AS PER AS1289.

4. BACKFILL TO PIT TO BE COMPACTED TO 8 BLOWS PER 300mm WITH A

STANDARD PERTH PENETROMETER.

5. GULLY DRAINS SHALL BE SUPPLIED AND FITTED TO ALL EXTERNAL

DOWNPIPES TO AS3500.

6. GUTTERS AND DOWNPIPES TO BE DIRECTLY CONNECTED TO

STORMWATER SYSTEM INTERNALLY BY DRAINAGE CONTRACTOR TO

AS3500

7. GROUT (MORTAR) TO BE 4 SAND : 1 CEMENT

8. WHERE MANHOLE LINER DEPTH EXCEEDS 2.0m, BOLT ON GALVANISED

DOUBLE STEP IRONS AT 350mm CENTRES. LINER TO BE MADE GOOD

EXTERNALLY USING CEMENT MORTAR FOLLOWING STEP IRON

INSTALLATION. NOT APPLICABLE FOR SOAKWELLS.

9. STEP IRONS TO BE LOCATED ON SIDE WITH LEAST INTERFERENCE

FROM PIPES ON ALL MANHOLES, GULLEYS, SIDE ENTRY AND

COMBINATION SIDE ENTRY PITS WHERE DEPTH EXCEEDS 2.0m.

WARNING

ALL SERVICES ARE SHOWN DIAGRAMMATICALLY. IT IS THE

CONTRACTORS RESPONSIBILITY TO LOCATE ALL

SERVICES PRIOR TO COMMENCEMENT OF WORKS.

NOTE

THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL

RELEVANT CONSULTANTS DRAWINGS.

STORMWATER DRAINAGE - GENERAL ARRANGEMENTSCALE 1:100

DOCUMENTATION BY:

TCC REF: 15-043

TRUE CIVIL CONSULTING WA

PO Box 1113, CLOVERDALE, WA 6985

MOB. 0433 828 213

ISSUED BYAMENDMENTNo. DATE

A 03/02/16 PRELIMINARY ISSUE IRMcC

LEGEND

PROPOSED DRAINAGE SOAKWELL

PROPOSED STORMWATER DRAINAGE PIPE

CONTOUR

MINIMUM Ø300 PVC OR RCP - REFER TO LAYOUT

T T EXISTING TELECOMMUNICATIONS SERVICE

Ø1800 X 1800 (DEPTH VARIES) WITH Ø600 CAST IRON GULLY GRATE

G G EXISTING GAS SERVICE

S S EXISTING SEWER SERVICE

W W EXISTING WATER SERVICE

P P EXISTING POWER SERVICE

DRAINAGE OVERLAND FLOW PATH

PROPOSED DRAINAGE LOCATION ENVELOPE

PIPE GRADE DIRECTION

37.50 GENERAL PAVEMENT / DRAINAGE STRUCTURE SURFACE LEVEL

US

DS

D

PVC

150 / 100

19.599.98

19.49PIPE DIAMETER / PIPE GRADE

UPSTREAM INVERT LEVELPIPE LENGTH

DOWNSTREAM INVERT LEVEL

PROPOSED STROMWATER DRAINAGE PIPE

ADS STORMTECH MODULAR INFILTRATION SYSTEMSTORMTECH SC-310 CHAMBER - INDIVIDUAL MODULE 864mm (W) x 2170 (L) x 406 (H)GEOFABRIC WRAP TOP SIDES AND ENDS OF STONE MATRIXINSTALLED TO MANUFACTURERS DETAILS AND SPECIFICATIONS

PROPOSED MANHOLE / JUNCTION

Ø900 X 1500 (DEPTH VARIES) WITH 450 x 450 GULLY COVER

D D

MINIMUM Ø100 PVC - REFER TO LAYOUT IF ALTERNATE SIZE USED

PROPOSED SIPHONIC DISCHARGE AND OVERFLOW PIPE

MINIMUM Ø160 HDPE - REFER TO LAYOUT

PIPE DIAMETER / PIPE GRADE / PIPE LENGTH

Ø160 HDPE

GENERALLY Ø150 PVC - GRADE FOR SELF CLEANSING

HE

NS

BR

OO

K L

OO

P

SYPHONIC OUTLETVALSIR 110 OULTET

SYPHONIC OUTLETVALSIR 110 OVERFLOW

VALSIR 110 OULTETSYPHONIC OUTLET

VALSIR 110 OVERFLOWSYPHONIC OUTLET

VALSIR 110 OULTETSYPHONIC OUTLET

VALSIR 110 OVERFLOWSYPHONIC OUTLET

VALSIR 110 OVERFLOWSYPHONIC OUTLET

SDP

160

SOF

160

PROPOSED WORKSHOP DEVELOPMENTGROUNDBREAKING MINING SOLUTIONS PTY LTD

LOT 238 (#53) HENSBROOK LOOP

FORRESTDALE WA 6112

STORMWATER DRAINAGEGENERAL ARRANGEMENT

C100507

IRMcC JAN 15 1:100

B 05/02/16 BUILDING PERMIT ISSUE IRMcC

Cadman1
Stamp
Page 2: STORMWATER DRAINAGE - GENERAL ARRANGEMENT · this drawing to be read in conjunction with all relevant consultants drawings. stormwater drainage - general arrangement scale 1:100 documentation

50

900

VALSIR 110 OUTLET & OVERFLOW IN SUMP ELEVATION

FALL FALL

GUTTER BASEGUTTER BASE

Ø286

FALL FALL

SUMP 900X600X50MM

VALSIR 110 OUTLET & OVERFLOW IN SUMP TOP VIEW

VALSIR OVERFLOW OUTLET VALSIR 110MM OUTLET

Ø286

DRAWING No.

DRAWN

PROJECT No.

DATE

REV.

SCALE

Suite 11w, 817 Beeliar Drive, COCKBURN CENTRAL WA 6164

DATEREV COMMENTS BY CHK

[email protected]

www.mulderkampman.com.au

BUILDING PERMIT

This drawing and all information shown hereon is the exclusive property of MULDER KAMPMAN

DESIGN and is submitted on a confidential basis. This drawing may not be copied or disclosed

to a third party without prior consent from MULDER KAMPMAN DESIGN.

It is the responsibility of the Builder & Contractor to check all drawing scales and dimensions

and confirm any discrepencies with MULDER KAMPMAN DESIGN immediately.

(08) 9417 9966

B

GENERAL NOTES:

1. ALL LEVELS, DIMENSIONS, POSITIONS & HEIGHTS TO BE CHECKED AND

VERIFIED ON SITE BEFORE COMMENCING ANY BUILDING WORK. DATUM AHD

2. FIGURED DIMENSIONS ARE TO BE TAKEN AND NO SCALING OF DRAWINGS

WILL BE ALLOWED.

3. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH SPECIFICATIONS

AND ALL OTHER RELEVANT DRAWINGS FROM ARCHITECTURAL,

STRUCTURAL, ELECTRICAL, HYDRAULICS & MECHANICAL ENGINEER'S.

4. ANY DISCREPANCIES ARE TO BE REPORTED TO THE AUTHOR OF THE PLANS

IMMEDIATELY.

5. REFER TO STRUCTURAL ENGINEER'S DRAWINGS FOR ALL STRUCTURAL

WORKS.

6. LARGE SCALE DRAWINGS WILL SUPERCEDE SMALL SCALE DRAWINGS.

7. CONTRACTOR TO CONFIRM LOCATION, DEPTH, AND EXTENT OF ALL OTHER

SERVICES, AS SHOWN ON SERVICES LAYOUT PLAN, PRIOR TO THE

COMMENCEMENT OF ANY WORK. ENGINEER TO BE NOTIFIED UPON

DISCREPANCIES.

8. CONTRACTOR TO CONFIRM GROUND WATER TABLE LEVEL PRIOR TO THE

COMMENCEMENT OF ANY WORK AND IF ANY DE-WATERING IS REQUIRED.

9. EXISTING GROUND LEVELS AND LOCATION AND INVERT LEVEL OF EXISTING

SEWER SHALL BE CONFIRMED PRIOR TO THE COMMENCEMENT OF ANY

WORK.

10. ALL GRAVITY PIPES SHALL BE PVC SN8 UNLESS SPECIFIED.

11. ALL BACK FILL TO BE COMPACTED TO A DRY DENSITY NOT LESS THAN THAT

OF THE SURROUNDING UNDISTURBED SOIL. BACKFILL OF SEWERS IN ROAD

RESERVES SHALL BE COMPACTED TO GIVE A MINIMUM RESISTANCE OF 8

BLOWS PER 300mm USING A STANDARD FALLING WEIGHT PENETROMETER

FOR THE FULL DEPTH OF FILL.

12. CONTRACTOR TO MAKE GOOD ALL FENCING, KERBING, ROADS, DRIVEWAYS,

ETC IN THE AREA OF EXCAVATION, ALL NECESSARY APPROVALS FROM

RELEVANT AUTHORITIES TO BE OBTAINED PRIOR TO THE COMMENCEMENT

OF ANY WORK.

DRAINAGE

1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER

CONSULTANTS DRAWINGS AND LOCAL AUTHORITY DRAINAGE

CONSTRUCTION DRAWINGS.

2. ALL SOAKWELLS IN PAVED AREAS SHALL HAVE HEAVY DUTY

REINFORCED CONCRETE TRAFFICABLE LIDS, CLASS D.

3. SUBGRADE AT BASE OF PRECAST LINER TO BE COMPACTED TO 8

BLOWS PER 300mm WITH A STANDARD PERTH PENETROMETER OR 95%

OF MMDD AS PER AS1289.

4. BACKFILL TO PIT TO BE COMPACTED TO 8 BLOWS PER 300mm WITH A

STANDARD PERTH PENETROMETER.

5. GULLY DRAINS SHALL BE SUPPLIED AND FITTED TO ALL EXTERNAL

DOWNPIPES TO AS3500.

6. GUTTERS AND DOWNPIPES TO BE DIRECTLY CONNECTED TO

STORMWATER SYSTEM INTERNALLY BY DRAINAGE CONTRACTOR TO

AS3500

7. GROUT (MORTAR) TO BE 4 SAND : 1 CEMENT

8. WHERE MANHOLE LINER DEPTH EXCEEDS 2.0m, BOLT ON GALVANISED

DOUBLE STEP IRONS AT 350mm CENTRES. LINER TO BE MADE GOOD

EXTERNALLY USING CEMENT MORTAR FOLLOWING STEP IRON

INSTALLATION. NOT APPLICABLE FOR SOAKWELLS.

9. STEP IRONS TO BE LOCATED ON SIDE WITH LEAST INTERFERENCE

FROM PIPES ON ALL MANHOLES, GULLEYS, SIDE ENTRY AND

COMBINATION SIDE ENTRY PITS WHERE DEPTH EXCEEDS 2.0m.

WARNING

ALL SERVICES ARE SHOWN DIAGRAMMATICALLY. IT IS THE

CONTRACTORS RESPONSIBILITY TO LOCATE ALL

SERVICES PRIOR TO COMMENCEMENT OF WORKS.

NOTE

THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL

RELEVANT CONSULTANTS DRAWINGS.

DOCUMENTATION BY:

TCC REF: 15-043

TRUE CIVIL CONSULTING WA

PO Box 1113, CLOVERDALE, WA 6985

MOB. 0433 828 213

ISSUED BYAMENDMENTNo. DATE

A 03/02/16 PRELIMINARY ISSUE IRMcC

STORMWATER CALCULATIONS

SITE CATCHMENT AREA (m2) = 3205.2m

PROPOSED INFILTRATION SYSTEM COMPRISES :

1 x ø1800 x 1200mm EFFECTIVE DEPTH SOAKWELLS

3 x ø1800 x 1500mm EFFECTIVE DEPTH SOAKWELLS

1 x ø1800 x 1500mm EFFECTIVE DEPTH SYPHONIC SOAKWELL

ADS STORMTECH SC-310 INFILTRATION SYSTEM. 20 UNITS, INDIVIDUAL UNIT SIZE 406mm(h) x 2169mm(l) x

864mm(w) EFFECTIVE VOLUME 20.1m³

CALCULATED PRE-DEVELOPMENT USING KINEMATIC WAVE ANALYSIS 16.64 LITRES PER SECOND

GROUNDWATER NOT ENCOUNTERED IN FIELD TESTING (TEST DEPTH RL 22.4m AHD)*

CONTROLLED GROUNDWATER LEVEL (SUB-SOIL DRAIN INVERT) = RL 23.56m AHD

SITE MATERIAL = SAND FILL OVER MEDIUM GRAINED BASSENDEAN SAND*

CALCULATION INFILTRATION = 5x10 ^-4 m/s (4m/day)*. *CWM GEOSCIENCES GEOTECHNICAL REPORT DATED 7 JANUARY 2016

DRAINAGE SYSTEM CAPACITY:

DESIGN EVENT 1 IN 1YR ARI 60MIN (1 HOUR) DURATION REQUIRED DRAINAGE CAPACITY = 51.06 m³

DRAINGE SYSTEM STORAGE INCLUDING INFILTRATION, CAPACITY IN ONE HOUR = 102.26m³

TOTAL DRAINAGE SYSTEM CAPACITY FOR 1 IN 1 YEAR 1 HOUR DURATION EVENT = 137.53m³

ONE HOUR EVENT TO INFILTRATE WITHIN THE REQUIRED 24 HOUR PERIOD

DESIGN EVENT 1 IN 20 YR ARI 10 MINUTE DURATION REQUIRED DRAINAGE CAPACITY = 51.92m³

DESIGN SYSTEM CAPACITY FOR EVENT DURATION INCLUDING INFILTRATION = 52.5m³

PERMISSABLE DISCHARGE TO LOCAL AUTHORITY CONNECTION PIT = 16.6 l/s

OVERLAND FLOW PATHS AWAY FROM STRUCTURES HAVE BEEN PROVIDED FOR SITE SYSTEM.

TOTAL DRAINAGE SYSTEM CAPACITY EXCEEDS DESIGN EVENT REQUIREMENTS

PROPOSED WORKSHOP DEVELOPMENTGROUNDBREAKING MINING SOLUTIONS PTY LTD

LOT 238 (#53) HENSBROOK LOOP

FORRESTDALE WA 6112

STORMWATER DRAINAGEDRAINAGE DETAILS

C200507

IRMcC JAN 15 N/A

STORMTECH SECTION DETAIL (TYP)NOT TO SCALE

STORMTECH NOTES:

1. "ACCEPTABLE FILL MATERIALS" TABLE ABOVE PROVIDES MATERIAL LOCATIONS, DESCRIPTIONS, GRADATIONS, AND COMPACTION REQUIREMENTS FOR FOUNDATION, EMBEDMENT, AND FILL MATERIALS.

2. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.

3. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS

OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.

SUBGRADE SOIL

PAVEMENT LAYER

SC-310

END CAP

D

C

B

A

PERIMETER STONE

(SEE NOTE 6)

405 mm

450 mm MIN

150 mm MIN.

300 mm MIN

EXCAVATION WALL

(CAN BE SLOPED OR VERTICAL)

300 mm MIN 300 mm TYP865 mm150 mm MIN

ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND

CLEAN CRUSHED, ANGULAR STONE IN A & B LAYERS

STORMTECH SYSTEM

BASE RL 23.86m

SUMP DEPTH 50 mm MIN

300 mm HDPE ACCESS PIPE REQUIRED USE

FACTORY PRE-FABRICATED END CAP

PART #: SC310EPE12B

TWO LAYERS OF ADS

GEOSYNTHETICS 315WTK

WOVEN GEOTEXTILE BETWEEN

FOUNDATION STONE AND

CHAMBERS 1.2 m MIN WIDE

CONTINUOUS FABRIC WITHOUT

SEAMS

ACCESS

MANHOLE

COVER ENTIRE ISOLATOR ROW WITH ADS GEOSYNTHETICS

601T NON-WOVEN GEOTEXTILE 1.5 m MIN WIDE

SC-310 CHAMBER

SC-310 ISOLATOR ROW DETAILNOT TO SCALE

REFER TO

GENERAL

ARRANGEMENT

LAYOUT

ACCEPTABLE FILL MATERIALS: STORMTECH SC-310 CHAMBER SYSTEMS

PLEASE NOTE:

1. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR, CLEAN STONE.

2. FOR 'A' LOCATION MATERIALS TO BE PLACED AND COMPACTED IN 150 mm (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.

MATERIAL LOCATION DESCRIPTIONCOMPACTION / DENSITY

REQUIREMENT

D

FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS

FROM THE TOP OF THE 'C' LAYER TO THE BOTTOM

OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED

GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE

MAY BE PART OF THE 'D' LAYER

AS PER PAVEMENT SUBGRADE REQUIREMENTS. PREPARE PER SITE DESIGN PLANS.

C

INITIAL FILL: FILL MATERIAL FOR LAYER 'C'

STARTS FROM THE TOP OF THE EMBEDMENT

STONE ('B' LAYER) TO 450 mm ABOVE THE TOP OF

THE CHAMBER. NOTE THAT PAVEMENT SUBBASE

MAY BE A PART OF THE 'C' LAYER.

GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35%

FINES OR PROCESSED AGGREGATE.

TYPICAL PAVEMENT SUBBASE MATERIALS .

BEGIN COMPACTIONS AFTER 300 mm OF MATERIAL

OVER THE CHAMBERS IS REACHED. COMPACT

ADDITIONAL LAYERS IN 150 mm MAX LIFTS TO A

MIN. 95% MMDD. ROLLER GROSS VEHICLE WEIGHT

NOT TO EXCEED 53 kN. DYNAMIC FORCE NOT TO

EXCEED 89 kN.

B

EMBEDMENT STONE: FILL SURROUNDING THE

CHAMBERS FROM THE FOUNDATION STONE ('A'

LAYER) TO THE 'C' LAYER ABOVE.

CLEAN, CRUSHED, ANGULAR STONE, NOMINAL SIZE

DISTRIBUTION BETWEEN 20-50 mmNO COMPACTION REQUIRED.

A

FOUNDATION STONE: FILL BELOW CHAMBERS

FROM THE SUBGRADE UP TO THE BOTTOM OF THE

CHAMBER.

CLEAN, CRUSHED, ANGULAR STONE, NOMINAL SIZE

DISTRIBUTION BETWEEN 20-50 mm

PLATE COMPACT OR ROLL TO ACHIEVE A FLAT

SURFACE.

INSPECTION & MAINTENANCE

STEP 1) INSPECT ISOLATOR ROW FOR SEDIMENT

A. INSPECTION PORTS (IF PRESENT)

A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN

A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED

A.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG

A.4. LOWER A CAMERA INTO ISOLATOR ROW FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL)

A.5. IF SEDIMENT IS AT, OR ABOVE, 80 mm PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.

B. ALL ISOLATOR ROWS

B.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW

B.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW THROUGH OUTLET PIPE

i) MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY

ii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE

B.3. IF SEDIMENT IS AT, OR ABOVE, 80 mm PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.

STEP 2) CLEAN OUT ISOLATOR ROW USING THE JETVAC PROCESS

C. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 1.1 m OR MORE IS PREFERRED

D. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN

E. VACUUM STRUCTURE SUMP AS REQUIRED

STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS.

STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM.

NOTES

1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON

PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS.

2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY.

B 05/02/16 BUILDING PERMIT ISSUE IRMcC

Cadman1
Stamp