Upload
others
View
7
Download
0
Embed Size (px)
Citation preview
l l l l l l l l l l
ll
ll
ll
ll
ll
ll
ll
ll
ll
ll
ll
ll
ll
ll
ll
25.7325.80
25.80
25.95
25
.80
25
.95
25
.95
5
25.65 25.58 25.41
25.37
25.31 24.80
25.21 24.80
25.165
25.210
25.74
25.85
25.75
25.59
25.74
25.74
25.85
25.79
25
.95
25.9
95
25
.95
25.9
95
25.95
25.995 25.95 25.9525.80
25.8525.95
25.995
25.995
FALL 2°
FALL 2°
FALL 2°
FALL 2°
FALL 2°
FALL 2°
FALL 2°
D D
D
D
D D D
D
D
D
D
D
DD
DD
DD
DD
D
PROPRIETARY TYPE RAINHEAD & POP TOSUIT 150mm DOWNPIPE WITH SELECTEDCOLOURBOND FINISH
ø150
PVC
DP
FEJ.
200 WIDE x 100 DEEP x 0.55 PGI EAVES
GUTTER WITH SELECTED PAINT FINISH
9m WIDE x 12m LONG 210mm THICK
FIBRE-REINFORCED CONCRETE HARDSTAND .
FALL TO EVEN GRADE TO LEVELS SHOWN.
SIPH
DP.
SIPH
OP.
FA
LL 1
°
600x150 DEEP (MIN. DEPTH) ZINCALUME BOX GUTTER ONCUSTOMORB ZINCALUME ON 50mm WIDE GUTTERSTRAPS WITH SADDLES AT MAX. 900 CTRS. FALL GUTTERTO OUTLET AT MIN. 1:200
150ø OVERFLOW POP DISCHARGING THROUGH PANEL(TYP) OUTLET POP SET 25mm BELOW TOP OF GUTTERAT ITS LOWEST POINT & PROTRUDE 20mm PAST FACEOF PANEL
OP.
SPREADER
DOWNPIPE TO DISCHARGEONTO ROOF BELOW VIASPREADER
OP.
DOWNPIPE TO DISCHARGEINTO BOX GUTTER BELOW
SELECTED FLEXIBLE EXPANSIONJOINT. AQUARIUS OR SIMILARAPPROVED. INSTALLED AS PERMANUFACTURER'SSPECIFICATION. TYP.
FALL 2°
DOWNPIPE TO DISCHARGEINTO BOX GUTTER BELOW
FEJ.
600x150 DEEP (MIN. DEPTH) ZINCALUME BOX GUTTER ON CUSTOMORB ZINCALUME ON 50mm WIDE GUTTER STRAPS WITH SADDLESAT MAX. 900 CTRS. FALL GUTTER TO OUTLET AT MIN. 1:200
OP.
DOWNPIPE TO DISCHARGEINTO BOX GUTTER BELOW
FALL 2°
"FIELDERS" FASCIA GUTTER OR SIMILARWITH SELECTED COLORBOND FINISH. FALLGUTTER TO OUTLET AT MIN. 1:200
FALL 1°
FALL 1°
300 x 300 CONCRETE RWP SUMP BOX ANDGRATE (LOCKDOWN) TYP.
D
D D D D D
D
D
D
CEILINGPIPE WORK IN LUNCHROOM
ø90 D
P
DPø15
0 PVC
DPø15
0 PVC
DPø15
0 PVC
DPø15
0 PVC
OP.
OP.
200 WIDE x 100 DEEP x 0.55 PGI
EAVES GUTTER WITH SELECTED
PAINT FINISH
FALL 2°
ø150
PVC
DP
ø150
PVC
DP
ø150
PVC
DP
SPREADER
DOWNPIPE TO DISCHARGE
ONTO ROOF BELOW VIA
SPREADER
ADS STORMTECH SC-310
INFILTRATION SYSTEM
SPREADER
ø90 D
P
DOWNPIPE TO DISCHARGE
ONTO ROOF BELOW VIA
SPREADER
SPREADER
ø90 DP
DOWNPIPE TO DISCHARGE
ONTO ROOF BELOW VIA
SPREADER
ø90 D
P
SPREADER
FALL 1°
SIPHONIC PIPE DISCHARGE SUMPØ1800 x 1500 EFFECTIVE DEPTH
Ø1800 x 1500SOAKWELL
SOAKWELLØ1800 x 1500
SOAKWELLØ1800 x 1500
SOAKWELLØ1800 x 1200
D D D D D D D
D
D
D
D DØ300 PVC GRADE 1:200Ø300 PVC GRADE 1:200
Ø225 PVC GRADE 1:200
Ø150 PVC GRADE 1:200
Ø150 PVC GRADE 1:200
Ø300 PVC G
RADE 1:200 TYP
GRATE LEVEL ON GRADE
SI P
HO
NIC
PR
IMA
RY
Ø1
60 H
DP
ES
IPH
ON
IC O
VE
RF
LO
W Ø
16
0 H
DP
E
Ø100
GR
AD
E 1
:18
7
24.1
524
.26
ADS STORMTECH SC-310
INFILTRATION SYSTEM
25.90
DISCHARGE PIPE TO MUNICIPAL
DRAINAGE SYSTEM. OUTFLOW
LEVEL RL 24.60m
DRAWING No.
DRAWN
PROJECT No.
DATE
REV.
SCALE
Suite 11w, 817 Beeliar Drive, COCKBURN CENTRAL WA 6164
DATEREV COMMENTS BY CHK
www.mulderkampman.com.au
BUILDING PERMIT
This drawing and all information shown hereon is the exclusive property of MULDER KAMPMAN
DESIGN and is submitted on a confidential basis. This drawing may not be copied or disclosed
to a third party without prior consent from MULDER KAMPMAN DESIGN.
It is the responsibility of the Builder & Contractor to check all drawing scales and dimensions
and confirm any discrepencies with MULDER KAMPMAN DESIGN immediately.
(08) 9417 9966
B
GENERAL NOTES:
1. ALL LEVELS, DIMENSIONS, POSITIONS & HEIGHTS TO BE CHECKED AND
VERIFIED ON SITE BEFORE COMMENCING ANY BUILDING WORK. DATUM AHD
2. FIGURED DIMENSIONS ARE TO BE TAKEN AND NO SCALING OF DRAWINGS
WILL BE ALLOWED.
3. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH SPECIFICATIONS
AND ALL OTHER RELEVANT DRAWINGS FROM ARCHITECTURAL,
STRUCTURAL, ELECTRICAL, HYDRAULICS & MECHANICAL ENGINEER'S.
4. ANY DISCREPANCIES ARE TO BE REPORTED TO THE AUTHOR OF THE PLANS
IMMEDIATELY.
5. REFER TO STRUCTURAL ENGINEER'S DRAWINGS FOR ALL STRUCTURAL
WORKS.
6. LARGE SCALE DRAWINGS WILL SUPERCEDE SMALL SCALE DRAWINGS.
7. CONTRACTOR TO CONFIRM LOCATION, DEPTH, AND EXTENT OF ALL OTHER
SERVICES, AS SHOWN ON SERVICES LAYOUT PLAN, PRIOR TO THE
COMMENCEMENT OF ANY WORK. ENGINEER TO BE NOTIFIED UPON
DISCREPANCIES.
8. CONTRACTOR TO CONFIRM GROUND WATER TABLE LEVEL PRIOR TO THE
COMMENCEMENT OF ANY WORK AND IF ANY DE-WATERING IS REQUIRED.
9. EXISTING GROUND LEVELS AND LOCATION AND INVERT LEVEL OF EXISTING
SEWER SHALL BE CONFIRMED PRIOR TO THE COMMENCEMENT OF ANY
WORK.
10. ALL GRAVITY PIPES SHALL BE PVC SN8 UNLESS SPECIFIED.
11. ALL BACK FILL TO BE COMPACTED TO A DRY DENSITY NOT LESS THAN THAT
OF THE SURROUNDING UNDISTURBED SOIL. BACKFILL OF SEWERS IN ROAD
RESERVES SHALL BE COMPACTED TO GIVE A MINIMUM RESISTANCE OF 8
BLOWS PER 300mm USING A STANDARD FALLING WEIGHT PENETROMETER
FOR THE FULL DEPTH OF FILL.
12. CONTRACTOR TO MAKE GOOD ALL FENCING, KERBING, ROADS, DRIVEWAYS,
ETC IN THE AREA OF EXCAVATION, ALL NECESSARY APPROVALS FROM
RELEVANT AUTHORITIES TO BE OBTAINED PRIOR TO THE COMMENCEMENT
OF ANY WORK.
DRAINAGE
1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER
CONSULTANTS DRAWINGS AND LOCAL AUTHORITY DRAINAGE
CONSTRUCTION DRAWINGS.
2. ALL SOAKWELLS IN PAVED AREAS SHALL HAVE HEAVY DUTY
REINFORCED CONCRETE TRAFFICABLE LIDS, CLASS D.
3. SUBGRADE AT BASE OF PRECAST LINER TO BE COMPACTED TO 8
BLOWS PER 300mm WITH A STANDARD PERTH PENETROMETER OR 95%
OF MMDD AS PER AS1289.
4. BACKFILL TO PIT TO BE COMPACTED TO 8 BLOWS PER 300mm WITH A
STANDARD PERTH PENETROMETER.
5. GULLY DRAINS SHALL BE SUPPLIED AND FITTED TO ALL EXTERNAL
DOWNPIPES TO AS3500.
6. GUTTERS AND DOWNPIPES TO BE DIRECTLY CONNECTED TO
STORMWATER SYSTEM INTERNALLY BY DRAINAGE CONTRACTOR TO
AS3500
7. GROUT (MORTAR) TO BE 4 SAND : 1 CEMENT
8. WHERE MANHOLE LINER DEPTH EXCEEDS 2.0m, BOLT ON GALVANISED
DOUBLE STEP IRONS AT 350mm CENTRES. LINER TO BE MADE GOOD
EXTERNALLY USING CEMENT MORTAR FOLLOWING STEP IRON
INSTALLATION. NOT APPLICABLE FOR SOAKWELLS.
9. STEP IRONS TO BE LOCATED ON SIDE WITH LEAST INTERFERENCE
FROM PIPES ON ALL MANHOLES, GULLEYS, SIDE ENTRY AND
COMBINATION SIDE ENTRY PITS WHERE DEPTH EXCEEDS 2.0m.
WARNING
ALL SERVICES ARE SHOWN DIAGRAMMATICALLY. IT IS THE
CONTRACTORS RESPONSIBILITY TO LOCATE ALL
SERVICES PRIOR TO COMMENCEMENT OF WORKS.
NOTE
THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL
RELEVANT CONSULTANTS DRAWINGS.
STORMWATER DRAINAGE - GENERAL ARRANGEMENTSCALE 1:100
DOCUMENTATION BY:
TCC REF: 15-043
TRUE CIVIL CONSULTING WA
PO Box 1113, CLOVERDALE, WA 6985
MOB. 0433 828 213
ISSUED BYAMENDMENTNo. DATE
A 03/02/16 PRELIMINARY ISSUE IRMcC
LEGEND
PROPOSED DRAINAGE SOAKWELL
PROPOSED STORMWATER DRAINAGE PIPE
CONTOUR
MINIMUM Ø300 PVC OR RCP - REFER TO LAYOUT
T T EXISTING TELECOMMUNICATIONS SERVICE
Ø1800 X 1800 (DEPTH VARIES) WITH Ø600 CAST IRON GULLY GRATE
G G EXISTING GAS SERVICE
S S EXISTING SEWER SERVICE
W W EXISTING WATER SERVICE
P P EXISTING POWER SERVICE
DRAINAGE OVERLAND FLOW PATH
PROPOSED DRAINAGE LOCATION ENVELOPE
PIPE GRADE DIRECTION
37.50 GENERAL PAVEMENT / DRAINAGE STRUCTURE SURFACE LEVEL
US
DS
D
PVC
150 / 100
19.599.98
19.49PIPE DIAMETER / PIPE GRADE
UPSTREAM INVERT LEVELPIPE LENGTH
DOWNSTREAM INVERT LEVEL
PROPOSED STROMWATER DRAINAGE PIPE
ADS STORMTECH MODULAR INFILTRATION SYSTEMSTORMTECH SC-310 CHAMBER - INDIVIDUAL MODULE 864mm (W) x 2170 (L) x 406 (H)GEOFABRIC WRAP TOP SIDES AND ENDS OF STONE MATRIXINSTALLED TO MANUFACTURERS DETAILS AND SPECIFICATIONS
PROPOSED MANHOLE / JUNCTION
Ø900 X 1500 (DEPTH VARIES) WITH 450 x 450 GULLY COVER
D D
MINIMUM Ø100 PVC - REFER TO LAYOUT IF ALTERNATE SIZE USED
PROPOSED SIPHONIC DISCHARGE AND OVERFLOW PIPE
MINIMUM Ø160 HDPE - REFER TO LAYOUT
PIPE DIAMETER / PIPE GRADE / PIPE LENGTH
Ø160 HDPE
GENERALLY Ø150 PVC - GRADE FOR SELF CLEANSING
HE
NS
BR
OO
K L
OO
P
SYPHONIC OUTLETVALSIR 110 OULTET
SYPHONIC OUTLETVALSIR 110 OVERFLOW
VALSIR 110 OULTETSYPHONIC OUTLET
VALSIR 110 OVERFLOWSYPHONIC OUTLET
VALSIR 110 OULTETSYPHONIC OUTLET
VALSIR 110 OVERFLOWSYPHONIC OUTLET
VALSIR 110 OVERFLOWSYPHONIC OUTLET
SDP
160
SOF
160
PROPOSED WORKSHOP DEVELOPMENTGROUNDBREAKING MINING SOLUTIONS PTY LTD
LOT 238 (#53) HENSBROOK LOOP
FORRESTDALE WA 6112
STORMWATER DRAINAGEGENERAL ARRANGEMENT
C100507
IRMcC JAN 15 1:100
B 05/02/16 BUILDING PERMIT ISSUE IRMcC
50
900
VALSIR 110 OUTLET & OVERFLOW IN SUMP ELEVATION
FALL FALL
GUTTER BASEGUTTER BASE
Ø286
FALL FALL
SUMP 900X600X50MM
VALSIR 110 OUTLET & OVERFLOW IN SUMP TOP VIEW
VALSIR OVERFLOW OUTLET VALSIR 110MM OUTLET
Ø286
DRAWING No.
DRAWN
PROJECT No.
DATE
REV.
SCALE
Suite 11w, 817 Beeliar Drive, COCKBURN CENTRAL WA 6164
DATEREV COMMENTS BY CHK
www.mulderkampman.com.au
BUILDING PERMIT
This drawing and all information shown hereon is the exclusive property of MULDER KAMPMAN
DESIGN and is submitted on a confidential basis. This drawing may not be copied or disclosed
to a third party without prior consent from MULDER KAMPMAN DESIGN.
It is the responsibility of the Builder & Contractor to check all drawing scales and dimensions
and confirm any discrepencies with MULDER KAMPMAN DESIGN immediately.
(08) 9417 9966
B
GENERAL NOTES:
1. ALL LEVELS, DIMENSIONS, POSITIONS & HEIGHTS TO BE CHECKED AND
VERIFIED ON SITE BEFORE COMMENCING ANY BUILDING WORK. DATUM AHD
2. FIGURED DIMENSIONS ARE TO BE TAKEN AND NO SCALING OF DRAWINGS
WILL BE ALLOWED.
3. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH SPECIFICATIONS
AND ALL OTHER RELEVANT DRAWINGS FROM ARCHITECTURAL,
STRUCTURAL, ELECTRICAL, HYDRAULICS & MECHANICAL ENGINEER'S.
4. ANY DISCREPANCIES ARE TO BE REPORTED TO THE AUTHOR OF THE PLANS
IMMEDIATELY.
5. REFER TO STRUCTURAL ENGINEER'S DRAWINGS FOR ALL STRUCTURAL
WORKS.
6. LARGE SCALE DRAWINGS WILL SUPERCEDE SMALL SCALE DRAWINGS.
7. CONTRACTOR TO CONFIRM LOCATION, DEPTH, AND EXTENT OF ALL OTHER
SERVICES, AS SHOWN ON SERVICES LAYOUT PLAN, PRIOR TO THE
COMMENCEMENT OF ANY WORK. ENGINEER TO BE NOTIFIED UPON
DISCREPANCIES.
8. CONTRACTOR TO CONFIRM GROUND WATER TABLE LEVEL PRIOR TO THE
COMMENCEMENT OF ANY WORK AND IF ANY DE-WATERING IS REQUIRED.
9. EXISTING GROUND LEVELS AND LOCATION AND INVERT LEVEL OF EXISTING
SEWER SHALL BE CONFIRMED PRIOR TO THE COMMENCEMENT OF ANY
WORK.
10. ALL GRAVITY PIPES SHALL BE PVC SN8 UNLESS SPECIFIED.
11. ALL BACK FILL TO BE COMPACTED TO A DRY DENSITY NOT LESS THAN THAT
OF THE SURROUNDING UNDISTURBED SOIL. BACKFILL OF SEWERS IN ROAD
RESERVES SHALL BE COMPACTED TO GIVE A MINIMUM RESISTANCE OF 8
BLOWS PER 300mm USING A STANDARD FALLING WEIGHT PENETROMETER
FOR THE FULL DEPTH OF FILL.
12. CONTRACTOR TO MAKE GOOD ALL FENCING, KERBING, ROADS, DRIVEWAYS,
ETC IN THE AREA OF EXCAVATION, ALL NECESSARY APPROVALS FROM
RELEVANT AUTHORITIES TO BE OBTAINED PRIOR TO THE COMMENCEMENT
OF ANY WORK.
DRAINAGE
1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER
CONSULTANTS DRAWINGS AND LOCAL AUTHORITY DRAINAGE
CONSTRUCTION DRAWINGS.
2. ALL SOAKWELLS IN PAVED AREAS SHALL HAVE HEAVY DUTY
REINFORCED CONCRETE TRAFFICABLE LIDS, CLASS D.
3. SUBGRADE AT BASE OF PRECAST LINER TO BE COMPACTED TO 8
BLOWS PER 300mm WITH A STANDARD PERTH PENETROMETER OR 95%
OF MMDD AS PER AS1289.
4. BACKFILL TO PIT TO BE COMPACTED TO 8 BLOWS PER 300mm WITH A
STANDARD PERTH PENETROMETER.
5. GULLY DRAINS SHALL BE SUPPLIED AND FITTED TO ALL EXTERNAL
DOWNPIPES TO AS3500.
6. GUTTERS AND DOWNPIPES TO BE DIRECTLY CONNECTED TO
STORMWATER SYSTEM INTERNALLY BY DRAINAGE CONTRACTOR TO
AS3500
7. GROUT (MORTAR) TO BE 4 SAND : 1 CEMENT
8. WHERE MANHOLE LINER DEPTH EXCEEDS 2.0m, BOLT ON GALVANISED
DOUBLE STEP IRONS AT 350mm CENTRES. LINER TO BE MADE GOOD
EXTERNALLY USING CEMENT MORTAR FOLLOWING STEP IRON
INSTALLATION. NOT APPLICABLE FOR SOAKWELLS.
9. STEP IRONS TO BE LOCATED ON SIDE WITH LEAST INTERFERENCE
FROM PIPES ON ALL MANHOLES, GULLEYS, SIDE ENTRY AND
COMBINATION SIDE ENTRY PITS WHERE DEPTH EXCEEDS 2.0m.
WARNING
ALL SERVICES ARE SHOWN DIAGRAMMATICALLY. IT IS THE
CONTRACTORS RESPONSIBILITY TO LOCATE ALL
SERVICES PRIOR TO COMMENCEMENT OF WORKS.
NOTE
THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL
RELEVANT CONSULTANTS DRAWINGS.
DOCUMENTATION BY:
TCC REF: 15-043
TRUE CIVIL CONSULTING WA
PO Box 1113, CLOVERDALE, WA 6985
MOB. 0433 828 213
ISSUED BYAMENDMENTNo. DATE
A 03/02/16 PRELIMINARY ISSUE IRMcC
STORMWATER CALCULATIONS
SITE CATCHMENT AREA (m2) = 3205.2m
PROPOSED INFILTRATION SYSTEM COMPRISES :
1 x ø1800 x 1200mm EFFECTIVE DEPTH SOAKWELLS
3 x ø1800 x 1500mm EFFECTIVE DEPTH SOAKWELLS
1 x ø1800 x 1500mm EFFECTIVE DEPTH SYPHONIC SOAKWELL
ADS STORMTECH SC-310 INFILTRATION SYSTEM. 20 UNITS, INDIVIDUAL UNIT SIZE 406mm(h) x 2169mm(l) x
864mm(w) EFFECTIVE VOLUME 20.1m³
CALCULATED PRE-DEVELOPMENT USING KINEMATIC WAVE ANALYSIS 16.64 LITRES PER SECOND
GROUNDWATER NOT ENCOUNTERED IN FIELD TESTING (TEST DEPTH RL 22.4m AHD)*
CONTROLLED GROUNDWATER LEVEL (SUB-SOIL DRAIN INVERT) = RL 23.56m AHD
SITE MATERIAL = SAND FILL OVER MEDIUM GRAINED BASSENDEAN SAND*
CALCULATION INFILTRATION = 5x10 ^-4 m/s (4m/day)*. *CWM GEOSCIENCES GEOTECHNICAL REPORT DATED 7 JANUARY 2016
DRAINAGE SYSTEM CAPACITY:
DESIGN EVENT 1 IN 1YR ARI 60MIN (1 HOUR) DURATION REQUIRED DRAINAGE CAPACITY = 51.06 m³
DRAINGE SYSTEM STORAGE INCLUDING INFILTRATION, CAPACITY IN ONE HOUR = 102.26m³
TOTAL DRAINAGE SYSTEM CAPACITY FOR 1 IN 1 YEAR 1 HOUR DURATION EVENT = 137.53m³
ONE HOUR EVENT TO INFILTRATE WITHIN THE REQUIRED 24 HOUR PERIOD
DESIGN EVENT 1 IN 20 YR ARI 10 MINUTE DURATION REQUIRED DRAINAGE CAPACITY = 51.92m³
DESIGN SYSTEM CAPACITY FOR EVENT DURATION INCLUDING INFILTRATION = 52.5m³
PERMISSABLE DISCHARGE TO LOCAL AUTHORITY CONNECTION PIT = 16.6 l/s
OVERLAND FLOW PATHS AWAY FROM STRUCTURES HAVE BEEN PROVIDED FOR SITE SYSTEM.
TOTAL DRAINAGE SYSTEM CAPACITY EXCEEDS DESIGN EVENT REQUIREMENTS
PROPOSED WORKSHOP DEVELOPMENTGROUNDBREAKING MINING SOLUTIONS PTY LTD
LOT 238 (#53) HENSBROOK LOOP
FORRESTDALE WA 6112
STORMWATER DRAINAGEDRAINAGE DETAILS
C200507
IRMcC JAN 15 N/A
STORMTECH SECTION DETAIL (TYP)NOT TO SCALE
STORMTECH NOTES:
1. "ACCEPTABLE FILL MATERIALS" TABLE ABOVE PROVIDES MATERIAL LOCATIONS, DESCRIPTIONS, GRADATIONS, AND COMPACTION REQUIREMENTS FOR FOUNDATION, EMBEDMENT, AND FILL MATERIALS.
2. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.
3. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS
OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.
SUBGRADE SOIL
PAVEMENT LAYER
SC-310
END CAP
D
C
B
A
PERIMETER STONE
(SEE NOTE 6)
405 mm
450 mm MIN
150 mm MIN.
300 mm MIN
EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
300 mm MIN 300 mm TYP865 mm150 mm MIN
ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND
CLEAN CRUSHED, ANGULAR STONE IN A & B LAYERS
STORMTECH SYSTEM
BASE RL 23.86m
SUMP DEPTH 50 mm MIN
300 mm HDPE ACCESS PIPE REQUIRED USE
FACTORY PRE-FABRICATED END CAP
PART #: SC310EPE12B
TWO LAYERS OF ADS
GEOSYNTHETICS 315WTK
WOVEN GEOTEXTILE BETWEEN
FOUNDATION STONE AND
CHAMBERS 1.2 m MIN WIDE
CONTINUOUS FABRIC WITHOUT
SEAMS
ACCESS
MANHOLE
COVER ENTIRE ISOLATOR ROW WITH ADS GEOSYNTHETICS
601T NON-WOVEN GEOTEXTILE 1.5 m MIN WIDE
SC-310 CHAMBER
SC-310 ISOLATOR ROW DETAILNOT TO SCALE
REFER TO
GENERAL
ARRANGEMENT
LAYOUT
ACCEPTABLE FILL MATERIALS: STORMTECH SC-310 CHAMBER SYSTEMS
PLEASE NOTE:
1. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR, CLEAN STONE.
2. FOR 'A' LOCATION MATERIALS TO BE PLACED AND COMPACTED IN 150 mm (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.
MATERIAL LOCATION DESCRIPTIONCOMPACTION / DENSITY
REQUIREMENT
D
FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS
FROM THE TOP OF THE 'C' LAYER TO THE BOTTOM
OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED
GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE
MAY BE PART OF THE 'D' LAYER
AS PER PAVEMENT SUBGRADE REQUIREMENTS. PREPARE PER SITE DESIGN PLANS.
C
INITIAL FILL: FILL MATERIAL FOR LAYER 'C'
STARTS FROM THE TOP OF THE EMBEDMENT
STONE ('B' LAYER) TO 450 mm ABOVE THE TOP OF
THE CHAMBER. NOTE THAT PAVEMENT SUBBASE
MAY BE A PART OF THE 'C' LAYER.
GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35%
FINES OR PROCESSED AGGREGATE.
TYPICAL PAVEMENT SUBBASE MATERIALS .
BEGIN COMPACTIONS AFTER 300 mm OF MATERIAL
OVER THE CHAMBERS IS REACHED. COMPACT
ADDITIONAL LAYERS IN 150 mm MAX LIFTS TO A
MIN. 95% MMDD. ROLLER GROSS VEHICLE WEIGHT
NOT TO EXCEED 53 kN. DYNAMIC FORCE NOT TO
EXCEED 89 kN.
B
EMBEDMENT STONE: FILL SURROUNDING THE
CHAMBERS FROM THE FOUNDATION STONE ('A'
LAYER) TO THE 'C' LAYER ABOVE.
CLEAN, CRUSHED, ANGULAR STONE, NOMINAL SIZE
DISTRIBUTION BETWEEN 20-50 mmNO COMPACTION REQUIRED.
A
FOUNDATION STONE: FILL BELOW CHAMBERS
FROM THE SUBGRADE UP TO THE BOTTOM OF THE
CHAMBER.
CLEAN, CRUSHED, ANGULAR STONE, NOMINAL SIZE
DISTRIBUTION BETWEEN 20-50 mm
PLATE COMPACT OR ROLL TO ACHIEVE A FLAT
SURFACE.
INSPECTION & MAINTENANCE
STEP 1) INSPECT ISOLATOR ROW FOR SEDIMENT
A. INSPECTION PORTS (IF PRESENT)
A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN
A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED
A.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG
A.4. LOWER A CAMERA INTO ISOLATOR ROW FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL)
A.5. IF SEDIMENT IS AT, OR ABOVE, 80 mm PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.
B. ALL ISOLATOR ROWS
B.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW
B.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW THROUGH OUTLET PIPE
i) MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY
ii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE
B.3. IF SEDIMENT IS AT, OR ABOVE, 80 mm PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.
STEP 2) CLEAN OUT ISOLATOR ROW USING THE JETVAC PROCESS
C. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 1.1 m OR MORE IS PREFERRED
D. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN
E. VACUUM STRUCTURE SUMP AS REQUIRED
STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS.
STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM.
NOTES
1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON
PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS.
2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY.
B 05/02/16 BUILDING PERMIT ISSUE IRMcC