1.12 ASPEC GMP

Embed Size (px)

Citation preview

  • 8/3/2019 1.12 ASPEC GMP

    1/43

    ELIZA ARMAN0811012030

  • 8/3/2019 1.12 ASPEC GMP

    2/43

    1. Quality ManagementPrinciple

    Quality Assurance is the sum total of the organisedarrangements made with the object of assuring that

    Active Ingredients are of the quality required for theirintended use.

    The assurance of product quality cannot be delegatedto any single organizational unit such as Quality

    Control but is the responsibility of every member ofthe company.

    This should have been confirmed in a managementpolicy statement.

  • 8/3/2019 1.12 ASPEC GMP

    3/43

    Quality assurance

    The assurance of product quality is enhanced byensuring that all activities associated with thepurchasing, storage, production, filling, control anddistribution of Active Ingredients are carried out in asystematic and approved manner.

  • 8/3/2019 1.12 ASPEC GMP

    4/43

    Quality Control (QC)

    QC is that part of GMP which is concerned withsampling, specification and testing, and with theorganization, documentation and release procedureswhich ensure that the necessary and relevant test areactually carried out.

  • 8/3/2019 1.12 ASPEC GMP

    5/43

    2. Personnel Principle

    The capability and attitude of all staff involved in the

    manufacture and control of Active Ingredients has adecisive influence upon the quality of the products.

  • 8/3/2019 1.12 ASPEC GMP

    6/43

    Personnel at all levels should be sufficient in numberto carry out their tasks according to the prescribedprocedures.

    Personnel involved in the production and controlActive Ingredients should be adequately trained,including training in GMP.

  • 8/3/2019 1.12 ASPEC GMP

    7/43

    Training should be carried out at appropriate intervalsand when new processes are being introduced.

    Training should be given to other personnel whoseactivities affect critical aspects of production and/orcontrol of Active Ingredients. Records of training

    should be maintained

  • 8/3/2019 1.12 ASPEC GMP

    8/43

    3. Facilities and Utilities

    Principle

    Buildings should be of adequate size and should be

    located, designed, constructed, adapted andmaintained to suit the operations carried out in them.

    Adequate utilities should be available and suitableareas for the manufacture, testing, and storage of A.I.sshould be provided

  • 8/3/2019 1.12 ASPEC GMP

    9/43

    4. Equipment Equipment used in the manufacture of Active

    Ingredients should be designed, constructed andlocated so as to minimise the risk of contamination or

    mix-ups during the manufacture of Active Ingredients

    Equipment should be non-reactive with respect to thematerials contained there in Food grade lubricants and

    oils should be used whenever there is a risk ofcontamination of Active Ingredients

  • 8/3/2019 1.12 ASPEC GMP

    10/43

    Closed equipment should be used when feasible.

    When open equipment is used, or equipment isopened, care must be taken to avoid contamination ofthe products within the equipment, particularly whensuch products are pure or final Active Ingredients.

    The equipment to be used should be suitable for itsintended purpose and if the reproducible performanceof the equipment is critical for maintaining productquality, the equipment should have been qualified.

    Equipment should be clearly labelled and its status

    identifiable at all times

  • 8/3/2019 1.12 ASPEC GMP

    11/43

    5. Sanitation and Hygeine

    Principle:

    high level or sanitation and hygiene should be

    practiced in every aspect of manufacturingpharmaceutical product.

    the scope of sanitation and hygiene covers personnel,

    premises, equipment and apparatus, productionmaterials.

  • 8/3/2019 1.12 ASPEC GMP

    12/43

    Equipment cleaning and sanitation

    Equipment should be cleaned both inside and outsideafter use according to established procedure andshould be kept or stored in a clean condition.

    Vacuum or wet cleaning methods are to be preferred.

    Written procedures in sufficient detail should beestablished, validated and followed for cleaning and

    sanitaizing equipment

  • 8/3/2019 1.12 ASPEC GMP

    13/43

    Validation of cleaning sanitation procedures

    In all instances, the cleaning , sanitation, and hygieneprocedures should be validated and periodicallyassessed to ensure that the effectiveness of theprocedures meet the requirements.

  • 8/3/2019 1.12 ASPEC GMP

    14/43

    Personal hygiene

    All personal should receive medical examinationupon recruitment.

    All prsonal should practise good personal hygiene. Personel should be use the hand-washing facilities

    and wash their hands before entering productionareas.

    Every person entering the manufacturing areas shouldwear protective garments appropriate to theoperations to be carried

  • 8/3/2019 1.12 ASPEC GMP

    15/43

    6. Production

    Priciple:

    production operation must follow clearly definedprocedures; they nuat comply with the principle ofGMP in order to provide assurance.

  • 8/3/2019 1.12 ASPEC GMP

    16/43

    At every stage of processing, product and

    materials should be protect from microbial andother contaminations.

    Any deviation from instructions or procedures

    should be avoided as far a possible.

    Production should be perfomed and

    supervised by competent people.

  • 8/3/2019 1.12 ASPEC GMP

    17/43

    All incoming materials should be checked to ensurethat the consignment corresponds to the order.

    Damaged to containers and any other problemshould be investigated.

    All materials and products should be stored underthe appropriate conditions.

  • 8/3/2019 1.12 ASPEC GMP

    18/43

    Prevention of cross contamination in production

    Production in separate building

    Providing appropriate air-locks and air extraction

    Minimizing the risk of contamination caused byrecirculation air.

    Keeping protective clothing inside production areas.

    Using cleaning and decontamination procedures of

    known effectiveness. Using self containing system

    Testing for residues

  • 8/3/2019 1.12 ASPEC GMP

    19/43

  • 8/3/2019 1.12 ASPEC GMP

    20/43

    Processing

    oAll materials utilized in processing should be checkedbefore used.

    o The environment of an area should be monitored and

    controlled to the deree required for the operation to beperformed.

    oAll equipment employed in processing should bechecked before used.

    oAll operation should be performed in accordance withthe written procedures.

  • 8/3/2019 1.12 ASPEC GMP

    21/43

    Process Validation

    Validation studies should reinforce GMP and beconducted in accordance with defined procedures.

    Significant changes in process,equipment or materials

    should be accompanied by further validation steps. Processes and procedures should be periodically

    revalidation to ensure that they remain capable ofachieving the intended results.

  • 8/3/2019 1.12 ASPEC GMP

    22/43

    7. Quality Control Quality Control is one or more organisational

    unit(s) with defined responsibilities for

    controlling, through checking or testing, thatspecifications are met and quality systems are

    maintained.

  • 8/3/2019 1.12 ASPEC GMP

    23/43

    8. Self-inspections and Quality

    Audit

    Principle

    Self Inspections should be conducted in order tomonitor the implementation and the compliance withGood Manufacturing Practices and to proposenecessary corrective measures.

  • 8/3/2019 1.12 ASPEC GMP

    24/43

    In order to verify the compliance with the GMPprinciples for A.I.s described in these guidelines,manufacturers should designate an expert or team of

    experts to conduct regular Self-Inspections.

    Self-inspection findings and the corrective action(s),

    where necessary, should be recorded.

    Management is responsible for implementing thecorrective actions derived from the findings.

  • 8/3/2019 1.12 ASPEC GMP

    25/43

    9. Rejection, recovery,

    reprocessing and returns

    Principle

    The treatment of materials not meeting specificationshould be consistent with assuring the quality of theproduct involved together with a responsible use ofnatural resources and protection of the environment.

    Recovery and reworking or reprocessing of rejectedmaterials is prefered to disposal to waste.

  • 8/3/2019 1.12 ASPEC GMP

    26/43

    Rejection of materials

    Materials not meeting specification should beadequately stored to prevent unauthorized use until adecision has been taken as to their use.

    It may not always be necessary to reject materials notmeeting specification but if such non-conformingmaterials are used then additional controls may benecessary.

  • 8/3/2019 1.12 ASPEC GMP

    27/43

    Use of materials not meeting specification should beapproved by Quality Control.

    When a batch of material is rejected, an evaluation asto whether other batches could have been similarly

    affected, should be carried out.

  • 8/3/2019 1.12 ASPEC GMP

    28/43

    Recovery of materials and solvents

    If materials are recovered for further use in an Active

    Ingredients process, there should be written evidencethat the subsequent use of such materials will result ina product meeting its specification.

    Solvents should be recovered when feasable.

    Recovered solvents should meet an approvedspecification appropriate to their subsequent use.

    The working-up of mother liquors or similar materialsto obtain further materials or an Active Ingredients if

    carried out, should be specifically prescribed inwriting and recorded.

  • 8/3/2019 1.12 ASPEC GMP

    29/43

    Reprocessing or reworking of materials

    In general there is no objection to occasionallyreprocessing materials not meeting specification by

    repeating all or part of the same process, however ifthis becomes a routine procedure, investigationsshould be conducted into the adequacy of the originalprocess.

  • 8/3/2019 1.12 ASPEC GMP

    30/43

    If it is necessary to rework materials by a process differingsubstantially from the original process, including the useof different solvents or reactions or purification steps, thenadditional tests should be carried out to verify that theresulting product not only meets the applicablespecifications but also that any new and possibly unknownimpurities have been adequately investigated.

    The procedures used to reprocess or rework materials notmeeting specification should be made jointly by thoseresponsible in Production and Quality Control.

    .

  • 8/3/2019 1.12 ASPEC GMP

    31/43

    The procedure actually used to reprocess or reworkbatches of materials should be documented andincluded as part of the batch records.

    Reprocessed or reworked materials should be assigneda new batch number.

  • 8/3/2019 1.12 ASPEC GMP

    32/43

    Returned materials

    Returned materials should be quarantined until a

    decision has been taken as to their use. The decision on how to deal with returned material

    should be made by Quality Control taking intoaccount the age, appearance, integrity of the original

    closures, storage and transport conditions, (if known)and conformance with specification of the returnedmaterial. If reprocessing or reworking is indicated thisshould be agreed upon between Production and

    Quality Control. Additional process steps or tests maythen be required.

  • 8/3/2019 1.12 ASPEC GMP

    33/43

    10. Documentation

    There should be written procedures which lay downhow long documents should be retained. In generalthis should be at least 6 years unless otherwisejustified

    Documents which should fall under the above rulinginclude, but are not limited to are:

    - material receipt records,

    - material testing and release records,- batch production records for A.I.s,

    - batch analytical records for A.I.s,

  • 8/3/2019 1.12 ASPEC GMP

    34/43

    - batch release records for A.I.s,

    - batch production records for critical intermediates,

    - batch analytical records for critical intermediates,

    - equipment cleaning records for that equipment usedto manufacture A.I.s

    - maintenance and calibration records for equipmentused in the manufacture of change control records,

  • 8/3/2019 1.12 ASPEC GMP

    35/43

    - environmental monitoring records, includingtemperature recording for critical areas,as well as

    microbiological monitoring records,- packaging records,

    - distribution records,

    - customer complaint investigation records, - all records associated with any product recalls

  • 8/3/2019 1.12 ASPEC GMP

    36/43

    Other documents which should be retained are, forexample

    - product development reports,

    - specifications and test procedures for materials,

    - validation reports of the analytical test procedures,

    - equipment layout plans,

    - equipment installations reports, (IQ Reports)

    - equipment acceptance reports, (OQ Reports)

    - the records supporting the validity of the process,(Validation Reports)

  • 8/3/2019 1.12 ASPEC GMP

    37/43

    11. Contract manufacture or

    analysis

    Principle

    Production or analysis under contract of those steps ofa A.I. process which fall under GMP should also becarried out at the contractor under GMP

  • 8/3/2019 1.12 ASPEC GMP

    38/43

    Contract

    There should be a written and approved contractbetween the contract giver and the contract acceptor,which lays down the responsibilities of each party.

    In general the recommendations on GMP as described

    in these guidelines are also applicable to contractacceptors.

  • 8/3/2019 1.12 ASPEC GMP

    39/43

    12. Qualification and Validation

    Design qualification

    o The first element of the validation of new facilities,systems or equipment could be design qualification(DQ)

    o The compliance of the design with GMP should bedemontrated and documented.

    Intallation Qualification

  • 8/3/2019 1.12 ASPEC GMP

    40/43

    Qualification

    Operational Qualifications OQ is performed after IQ has been com pleted,

    reviewed and approved. OQ must include : tests that have been developed

    from knowledge of prosesses, systems andequipment

    Performance Qualificatios PQ must include : tests using production materials,

    qualified substitutes or simulated product, that havebeen developed from knowledge of the process andthe facilities, systems or equipment.

  • 8/3/2019 1.12 ASPEC GMP

    41/43

    Validation

    Validation is a requirement of GMP thatmanufacturers identify what validation work is neededto prove control of critical aspects of their particular

    operations. Significant changes to the facilities, the equipment

    and the processes, which may affect the quality of theproduct, should be validated.

  • 8/3/2019 1.12 ASPEC GMP

    42/43

    Planning for validation

    The Validation Master Plan should contain data : Validation policy

    Organization structure or validation activities

    Summary of facilities, systems and equipment andprocess should be validated

    Documentation format

    Change control

    Reference to existin document

  • 8/3/2019 1.12 ASPEC GMP

    43/43

    THANKS