1 ZDCs in CMS ZDCs in CMS Michael Murray,U Michael Murray,U Kansas Kansas pp Lum EM Had PMTs Lead / plas tic Fiber 1.5cm tungsten plates 2mm plat es Beam LED Spare space for flow upgrade Light guide Coppe r frame to take heat out

1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

Embed Size (px)

DESCRIPTION

3 Scope, Structure and People The scope of the project has been set. For HI runs we will provide centrality (1-50 neutrons) and luminosity measurement while for low luminosity pp we will measure bremstralung photons The structure will be a tungstan quartz sandwich divided into an EM section with 4 equal hadronic sections. The EM section will have 5 horizontal divisions. The project is a collaboration of Iowa, UIC, FNAL and Kansas plus David d’Enterria of CERN.

Citation preview

Page 1: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

1

ZDCs in CMS ZDCs in CMS Michael Murray,U KansasMichael Murray,U Kansas

pp Lum

EM Had PMTs

Lead/plastic

Fiber

1.5cm tungsten plates

2mm plates

Beam

LED

Spare space for flow upgrade

Lightguide

Copper frame to take heat out

Page 2: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

2

The geometry of nuclear collisionsThe geometry of nuclear collisionsSpectators

Spectators

Participant Region

The number and orientation of spectator neutrons tells us the geometry of the collision. For low luminosity pp we will help diffractive physics.

Page 3: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

3

Scope, Structure and PeopleScope, Structure and PeopleThe scope of the project has been set. For HI runs we will provide centrality (1-50 neutrons) and luminosity measurement while for low luminosity pp we will measure bremstralung photons The structure will be a tungstan quartz sandwich divided into an EM section with 4 equal hadronic sections. The EM section will have 5 horizontal divisions. The project is a collaboration of Iowa, UIC, FNAL and Kansas plus David d’Enterria of CERN.

Page 4: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

4

Simulation softwareSimulation softwareZDC is being integrated into CMSSW framework. We would like to include pp luminosity monitor.

Eventually we would like a complete description of the very forward region.

Chadd Smith UIC

Page 5: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

5

Narrow showers give info on beam Narrow showers give info on beam angleangle

Only the high energy core of the shower produces Cerenkov light. This means that we can get horizontal position information. We will bundle the electromagnetic fibers onto 5 different PMTs. This will allow us to measure the the beam crossing angle with a resolution of ~ 10 rad within a minute.

FWHM = 5 mm

Horizontal Position (mm)

Page 6: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

6

Radiation HardnessRadiation Hardness

For first 3 years of heavy ion and low luminosity pp running we expect 6GRad to hit the ZDC. So far we Iowa group has tested quartz/plastic fibers up to 1GRad without significant damage. However we are confident that quartz-quartz can do the job. We plan to use HF phototubes (or similar) since they have been very well characterized.

Page 7: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

7

During pp runs detector heats by 20During pp runs detector heats by 20ooCC During pp running sycnotron radiation will produce 200W.We measured the effect of thisby injecting heat into aninsulated plate and measuringthe temperature increase. Theplate was connected to copperstrips for cooling.

X

Y

Heat

TimeTime

T

20o

0o0o

20o

Page 8: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

8

Front End ElectronicsFront End ElectronicsIn order to minimize radiation problems we are planning to have as little electronics in the tunnel as possible. The PMTs will be connected by short cables to a patch panel where they connect to fast low loss cables. Collaboration of FNAL and KU.

140m signal cablePatch panel

CMS electonics

PMT by ZDC Tunnel Counting Room

Time

Vol

tag

e reference cable

Two cables/PMT

1m cable

Page 9: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

9

Schedule, cost and radiation riskSchedule, cost and radiation risk

To minimize these risks we will maximize the use of elements of HF and minimize mission creep. From HF we will copy light insertion system, albedo protection, light guides, PMTs and readout electronics. We also benefiting from experience of Iowa, FNAL and Boston.

To avoid mission creep we differ building a flow detector for now but will leave space for future work. Also we will not work on timing for first runs but will leave option open. Finally since the 1 neutron peak gives a natural physics calibration point we will not use a radioactive source for calibration.

Page 10: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

10

Timing Timing useful for useful for clean up.clean up.

Vertex trigger gives factor of 2 increase in useful data for BRAHMS

= 2.8cm

Page 11: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

11

Funding ProfileFunding Profile

Manpower for ZDC is supported by NSF Career award. We have started work on a prototype using $53K from DOE Nuclear program. Remaining $250k has been secured from DOE this week. This June we will get money for fibers and cables. We will build one detector and calibrate in test beam in August.

Page 12: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

12

ConclusionsConclusionsZDCs have been very useful at RHIC for both AA,dA and pp. For CMS they would make a significant contribution to the heavy ion and diffraction groups. The justification for the detector is accepted by NSF and DOE and we will be able to complete the detector with US nuclear funds. The schedule is very aggressive but the technology choices are conservative and we are gaining considerably from HEP experience.

Page 13: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

13

Backup slidesBackup slides

Page 14: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

14

Schedule, cost and radiation riskSchedule, cost and radiation risk

To minimize these risks we will maximize the use of elements of HF and minimize mission creep. From HF we will copy light insertion system, albedo protection, light guides, PMTs and readout electronics. We also benefiting from experience of Iowa, FNAL and Boston.

To avoid mission creep we differ building a flow detector for now but will leave space for future work. Also we will not work on timing for first runs but will leave option open. Finally since the 1 neutron peak gives a natural physics calibration point we will not use a radioactive source for calibration.

Page 15: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

15

Construction PrototypeConstruction Prototype

We have built a prototype that is 1/4 as long as the final module. KU machine shop is able to reach desired tolerances. We are now confident that we can construct a full size ZDC with quartz fibers.

Page 16: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

16

Summary Summary This week DOE agreed to cover ZDC development. We now have first design of hadronic section and are ready to purchase fibers, cables and tungsten (PMTs already bought). We hadronic prototype with steal plates to build up experience. EM section will come later.

Page 17: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

17

Acceptance is ~100% for gray neutronsAcceptance is ~100% for gray neutrons

Protons will be swept down the beam pipe.Coalesence may remove some neutrons by converting them into deuterons.

KE=200MeV

RHIC 32GeVRHIC 100GeVCMS 2.7TeV

Py

MeV

• neutron• proton

Beam crossing angle shits Px acceptance away from zero

Page 18: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

18

Luminosity & beam Luminosity & beam tuning at RHIC tuning at RHIC

AuAu ZDC coincdence vs time pp Van de

Meer scan

Page 19: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

19

Centrality & Centrality & ultraperipheral ultraperipheral collisionscollisions

Page 20: 1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light

20Number of Photon Electrons

Mean = 347RMS = 197 ≈ 19%

50GeV photon into 50GeV photon into EM sectionEM section

Z of Photon Electrons

Limit ofEM part