“Where America’s Climate, Weather and Ocean Services Begin”
FY16 Production Suite Plans
Rebecca CosgroveChief, Production Management Branch, NCO
August 4, 2015
WCOSS and the NCEP Production Suite
Planning Process: Quad charts with model upgrade scope, schedule and issues/risks for the
next 12 months presented to the NCEP Director and other Senior Management quarterly
Developers submit estimated compute requirements for upgrades and they are mapped into holistic NCEP Production Suite view
WCOSS System Details: Phase 1 IBM iDataPlex System:
620 compute nodes
Phase 2 IBM iDataPlex System: 1080 compute nodes
Task Order 4 Cray System: 2048 compute nodes
2
High Water Mark Charts (HWM) Total system utilization by model over the day Each set of nodes (P1,P2,TO4) has a unique HWM chart
because resources are not interchangeable Operational NCEP Production Suite comes up from the
bottom, test jobs drop down from the top Limitations:
Can only assign shared node usage to one application, resulting in some underreporting
3
4
Production Machine
HRRR
GEFS
Pha
se 2
Pha
se 1HIRESW
HWRF (6 storms)
SREF CFS
RTOFS
HWRF (5 storms)
ECMWF-based Model Output Statistics (MOS)High-Resolution Window (HIRESW)
Short Range Ensemble Forecast System (SREF)Global Ensemble Forecast System(GEFS)NHC Guidance SuiteReal-Time Ocean Forecast System (RTOFS) GlobalCPC International Grids
AWC Graphical Turbulence GuidanceCommunity Multi-scale Air Quality (CMAQ) modelExtra-Tropical Storm Surge (ETSS)
Climate Forecast System (CFS)
GFS-based MOS (Sandy project) and NAM-based MOS
Gridded Lamp
Global Wave Model
Near-shore Wave Prediction System (NWPS)
RTOFS Atlantic
FY15 Q4 ImplementationsIndicates Sandy Supplemental Project
Node Usage at end of FY2015 Quarter 4
GEFS Legacy
GEFS Legacy GEFS
SREF
HWRF
HIRESW
RTOFS
NWPS has stripe of 4 nodes
Pha
se 2
Pha
se 1
Space Weather Prediction Center(SWPC) Geospace Model North American Mesoscale (NAM) Forecast System Real-Time Mesoscale Analysis (RTMA) National Blend Rapid Refresh Model (RAP) National Ocean Service (NOS) Regional Ocean Modeling System (ROMS) High-Resolution Rapid Refresh (HRRR) Global Wave Ensemble (GWES) NEMS GFS Aerosol Component (NGAC) NCEP-FNMOC Combined Wave Ensemble (NFCENS) North American Ensemble Forecast System (NAEFS) Hybrid Single Particle Lagrangian Integrated Trajectory (HYSPLIT) Climate Calibrated Precipitation Analysis (CCPA)
FY16 Q1 Implementations
Indicates Sandy Supplemental Project
Node Usage at end of FY2016 Quarter 1
GEFS LegacyCFSWave Ensemble
SREF
GFSNAM
HWRF
NAMRR
HRRR
GDAS
GEFS
GEFS LEG
HIRES
NWPS has stripe of 4 nodes
Geospace has stripe of 6 nodes
Pha
se 2
Pha
se 1
9
Global Forecast System (GFS)**GFS-based MOS** Probabilistic Extra-tropical Storm Surge (P-ETSS) and Extra-tropical Storm Surge (ETSS)Great Lakes Wave (GLW) Great Lakes Operational Forecast System (GLOFS)North American Land Data Assimilation System (NLDAS) NAM-based MOS RTOFS Global
FY16 Q2 Implementations
Indicates Sandy Supplemental Project**Moved from previous quarter
Node Usage at end of FY2016 Quarter 2
CFS
Task
Ord
er 4
Pha
se 2
Ph
ase
1
11
Weather Research and Forecasting Hydrological Modeling Extension (WRF-Hydro)
Probabilistic Storm Surge (PSURGE)
Hurricane Storm Surge Operational Forecast System (HSSOFS)
Gridded LAMP
NAEFS
Hurricane Weather Research and Forecasting (HWRF)
FY16 Q3 Implementations*Initial list
Indicates Sandy Supplemental Project
Node Usage at end of FY2016 Quarter 3
CFSHWRF
WRF-HYDROHSSOFS
PSURGE
Task
Ord
er 4
Pha
se 2
Ph
ase