1.- WHAT IS TECFOS?
The Training and Technological Applications Development Centre in Underground
Construction is implanted based in the experience of Santa Barbara Foundation during
its 20 years of operation in collaboration with Universities, Technological Centers and
leader companies, constituting an open consortium created from 2008 with the goal to
respond, through training programs and applicated investigation lines, to the needs
surging from companies and public administrations related to underground construction
2.- SERVICES OFFERED
TECHNOLOGY (Real Scale Tests)
• Machinery.
• Materials.
• Construction methods.
• Procedures in Emergency situations.
TRAINING
Training line for responsible staff and technical staff in
underground construction
• New drilling technologies.
• Blast technologies.
• Shotcrete Technologies.
• Special Concretes.
• Safety and Risk Prevention in underground works.
Training line for operators, maintenance staff and
specialist.
• Drilling jumbos, roadheaders and concrete spraying
machines operators.
• Explosives experts.
• Maintenance staff.
• Laboratory technicians and operatives.
3.- COMPLETED PROJECTS
R & D Projects / Technological applications:
Project “Multidimensional City”.
Project “Tunconstruct”.
Project “NCEX”.
Project “DrillSim”. Drilling Jumbo
simulator.
Concrete spraying machine simulator.
Real scale tests:
o Machinery:
Jumbo Sandvik DT 920i.
Concrete Spraying Machine Sika PM 500.
Concrete Spraying Machine Prototype ML.
Concrete Mixer Machine ML Hurón 7.
o Materials:
Fire resistance test of “Fire Segment” (Acciona/Sika).
Fire resistance test of “Bilayer Segment” (Dragados/IETcc).
Fire resistance test for Concrete Coating Santa Agueda tunnels (UTE
Gorostiza-TECSA).
4.- TRAINING Course in Shotcrete´s Technologies (2 editions). Client: Putzmeister.
Course for Operators of Computerized Drilling Jumbos, intermediate level (2
editions). Clients: ALDESA and INSERSA.
Journeys in blasting initiation modern systems (4 editions). Clients: Acciona,
Economy Counseling JCyL.
Journeys in explosives destruction and blasting accessories (7 editions). Clients:
Acciona, Economy Counseling JCyL., Police Corps.
Course about fires in tunneling construction (2 editions). Clients: Economy
Counseling JCyL., Ministry of Industry.
ADIF Master “Civil Protection in Railway Sector. Module 12. Fire Performance in
Confined Spaces”. (3 editions). Client: Administrator of Railway Infrastructures (ADIF).
Course about regulatory requirements and control procedures for blasting
vibration and airwave generation. Client: Economy Counseling JCyL.
Course about risk control techniques in special blasting. Client: Economy
Counseling JCyL.
Course about technical supervision and control in the start-up and periodic
inspections of machinery (ITC 02.2.01). Client: Economy Counseling JCyL.
Course about the methodology of the work accidents investigation. Client: Economy
Counseling JCyL.
5.- UNDERGROUND INFRASTRUCTURES
Experimental Tunnels:
Underground infrastructure is composed of two tunnels named respectively
Experimental Tunnel number 1 and Experimental Tunnel number 2.
Tunnel 1 Tunnel 2
Current length 390 m 210 m
Final length 636,18 m 645,21 m
Excavated section 50 m2 50 m2
Covered section 44 m2 44 m2
Excavation method Two excavation stages (top
heading and bench diving)
Complete Section
Ventilation:
Tunnel construction: longitudinal ventilation. Axial fan, impeller diameter 1000
mm, motor rating 75 KW.
Tunnel exploitation: longitudinal ventilation. 2 pairs of Jet Fans 2 * 22 KW,
impeller diameter 700 mm.
Future: longitudinal and semi-transverse with masive point extraction (in
execution).
EXPERIMENTAL TUNNELS
TECFOS
100m
Fire Test Gallery
The Fire Test Gallery has a 10 m2 cross section, and its length is 110 meters. The
beginning and the end of the gallery is covered with concrete rings, and its middle
section consists of hard rock bolted supporting system. The gallery is also served by a
110 KW ventilator with a remote controlled frequency regulator, allowing the control of
the air velocity inside the installation. Remote controlled doors can be opened or
closed, according to the ventilation requirements.
Control Rooms. Communications.
Monitoring and Control of underground infrastructure is centralized in two control rooms
using an optical fiber network to provide communication between the sensors and
actuators, and the SCADA software installed in them. This supervision and control
system provide the following capabilities:
1. Monitoring and control of the ventilation system in tunnels and fire test gallery.
2. Remote controlled doors in the ventilation circuit.
3. Monitoring large number of sensors (temperature, pressure, air velocity, gas
control) and remote operational performances.
4. Video supervision of the works and tests made in the infrastructures. Network
Dome IP cameras PTZ working even in low luminosity (minor than 0.005 lux).
5. Radio communication system and Wi-Fi real time location system.
6.- COLLABORATORS
It is signed a collaboration agreement to develop and to promote different activities within the
Tecfos initiative framework with the following institutions and companies:
Politechnical University of Madrid (UPM)
Centre of Studies and Technical Research of Gipuzkoa (Navarra University).
Ove Arup & Partners.
Geocontrol S.A.
Sika S.A.U.
Putzmeister GmbH.
Maxam Europe.
Sandvik Mining and Construction.
Dräger Safety
Contact:
Fundación Santa Bárbara
Aguilonjos s/n 24310.- La Ribera de Folgoso (León). SPAIN
Phone: (+34) 987.52.30.69
Fax: (+34) 987.52.30.70
Mail: [email protected]
Website: www.tecfos.com