Well Testing1. Initial production tests at surface after wellbore cleanup
and fracing. Sometimes called initial potential or IP.
IP= Initial Production
IPF = flowing
IPP = pumping
COF = calculated
open-flow
CAOF = calculated
absolute
open flow
2
Well Testing2. Various types of surface pressure tests (usually for gas wells).
This data is also used to calculate bottom-hole pressures
3. THE DST!!! Or Drill Stem Test
Used in both oil and gas wells, in cased or uncased wells. Very, very common test so learn about them!!
Used to determine
• formation permeability
• boundary conditions of reservoir
• formation pressures
• fluid (oil and water), and gas recovery from formation
3DST tool schematic
4Conventional DST recorder
Pre
ssu
reTr
ip in
Hol
e (T
IH)
Time (~hours)
1 2 3 4 5 6 7 8 9 10 11 12
IHP
IpfP FpfP
ISIP
IFP
FFP
FSIP
FHP
ISI period
Main flow or Final flow
Pre
-flo
w
FSI period
FpfP = final pre-flow pressure
FFP = final flowing pressure
FHP = final hydrostatic pressure
FSIP = final shut-in pressure
IFP = initial flowing pressure
IHP = initial hydrostatic pressure
IpfP = initial pre-flow pressure
ISI = initial shut-in
ISIP = initial shut-in pressure
Trip out of
hole (TOH
)
1
2
3
4
56
5
1. As the DST tool is lowered down the hole, the hydrostatic tool measures the increasing weight of the water/mud column in pounds per square foot (PSI). After the tool reaches either total depth (TD) or the desired depth of the test it is opened to atmospheric pressure and a pressure drop is recorded almost instantaneously. This is done to relieve the hydrostatic pressure from the annular space within the tested interval.
2. The length of the pre-flow (sometimes called initial flow) is determined by the surface blow monitored on the drill floor according to the following observations:
About 5 minutes in duration if the permeability is estimated to be > 15 md.
About 10 minutes in duration if the permeability is estimated to be > 15 md.
If the pre-flow period is too short the hydrostatic pressure will not be dissipated and the following shut-in period may be under the influence of hydrostatic pressure.
At the end of the pre-flow period the tool is closed and the pressure below the packer is allowed to build up. This is called the initial shut-in pressure (ISIP).
3. The purpose of the initial shut-in period is to record the reservoir pressure before any production has occurred. It is important to have an initial shut-in period long enough to extrapolate a maximum reservoir pressure. Many times it is too short to determine a reliable extrapolated reservoir pressure. This can make it more difficult to determine if the reservoir is of limited areal extent.
When the initial shut-in period is complete, the tool is again opened. The purpose of this second flowing period (Main Flow) is to allow reservoir fluid and gas to enter the drill string. Analysis of the final flow data will help determine the flowing capabilities of the tested reservoir. Depending on conditions, when the tool is opened the pressure will drop from reservoir pressure to the pre-flow pressure and will record the weight of the formation fluid entering the drill string. If gas is present the flowing pressure will reflect the upstream pressure of the gas flow.
6
4. The duration of the final flow period (Main Flow) should be about 60 to 180 minutes, depending on conditions and estimated permeability. The air blow at the surface will indicate whether formation fluid or gas is entering the drill string. If gas flows to the surface a stabilized measured rate is desirable for proper reservoir evaluation.
When the final flow period is concluded the tool is again closed for a second shut-in period (Final Shut-in Period) which stops the flow of fluid and gas into the drill string. The pressure below the packer is then allowed to build. The duration of the Final Shut-In Period should be about 1.5 to 2 times as long as the Main Flow (second flowing period), depending again on conditions and estimated permeability. In low permeable zones, longer shut-in times are necessary for proper reservoir evaluation.
5. The purpose of this second shut-in period (Final Shut-in Period) is to once again measure the reservoir pressure after a certain amount of production has occurred. Remember, during this test period, fluid and/or is not being recovered. Only pressure is being measured. Proper evaluation of the second shut-in data will help determine if the tested reservoir is of limited areal extent. Skin damage, permeability, radius of investigation, and other reservoir parameters can also be determined.
6. At the end of the Final Shut-in Period, the packer is released which allows the drilling fluid to flow from the borehole annulus and into the test zone. Hydrostatic pressure is then recorded for a second time. Because the pressure should be equalized (sometimes the packer gets stuck), the packer can be easily be unseated from against the borehole walls so the tool can be recovered.
7Main Flow Period Shut In Period Tripping out (or in)
Hydraulic valve closed
Bypass ports open
Packer deflated to avoid
swabbing
Water and/or hydrocarbons recovered in
drill pipe during this flow period
Pressure recorded in both
flow and shut-in periods
Expanded packer
8
Hydrostatic pressure
Tool open
Initial flowing pressure
Final flowing pressure
Tool closed
Shut-in pressure
Pipe recovery
Pressures are at test depth