OWMS Proposal May 7, 2004

1

Proposal on Olympus Proposal on Olympus Warehouse Management Warehouse Management System (OWMS)System (OWMS)as of May 7, 2004as of May 7, 2004

By: Kennis See

OWMS Proposal May 7, 2004

2

• On-line warehouse management system to fulfill business growth and need

• Interface with SAP WM System with on-line update

• Implement at Hong Kong at the first site and role out to other warehouses in Asia Pacific at the second phase

• Handle warehouse operations on finish product and spare parts

Project Objective

OWMS Proposal May 7, 2004

3

1. Implementation covers Hong Kong warehouse only.2. Random location on OWMS.3. It is an on-line update system using bar-coding.4. Interface with SAP.5. Packing list and Invoicing to be printed from SAP and not

covered by OWMS.6. 1 SO link to 1 picking list to 1 packing list to 1 invoice.7. Same shell would have multiple product.8. It is not require to develop separate function for sales return

as it is the same as good reception.9. It is not require to develop separate function for supplier

return as it is the same as goods shipment.10. Special instruction code is required to be included in OWMS.11. Not more than 6 standard reports to be generated from

OWMS.

Preliminary Requirements

OWMS Proposal May 7, 2004

4

1. OWMS need to suggest the number of outer carton per packing and Olympus will advise the calculation logic.

2. Olympus is responsible for apply radio frequency.

3. Estimation does not cover the equipment cost of on-line bar-code system.

Outstanding

OWMS Proposal May 7, 2004

5

Process Flow – Goods Receiving Process

SAP SystemMQ Series

OWMS

Download purchase order information for

generate Goods Receiving Notes

Download information to

hand-held terminal

Goods Reception Note

Put goods on to shelf

Upload storage location

information to OWMS

OWMS

Scan location forgoods storage

Upload Goods

Receiving information

SAP System

MQ Series

OWMS Proposal May 7, 2004

6

Process Flow – Picking Process

SAP SystemMQ Series

OWMS

Download sales order information for generate picking list

Pick up stockfrom multiple

warehouse locationusing hand-held

terminal scanning

Upload picking information to

OWMS

OWMS

Download information to

hand-held terminal

OWMS Proposal May 7, 2004

7

Process Flow – Packaging Process

Pick up goodsfor packaging

Packaging

Update packaging information to

OWMS

OWMS SAP SystemMQ Series

Upload packaging information

of sales order

Invoice Packing List

OWMS Proposal May 7, 2004

8

Process Flow – Change Goods Location Process

OWMS

Download information to

hand-held terminal

Transfer goods toNew location andScan the address

Upload storage location

information to OWMS

OWMS

Update new location

OWMS Proposal May 7, 2004

9

Process Flow – Stock Take Process

SAP SystemMQ Series

Freeze OWMS

Download trigger to freeze the OWMS for Stock Take

Process begin

Freeze OWMS

Upload information to OWMS

OWMS

Scan location andupdate inventory

quantity on hand-heldDownload required

Information toHand-held terminal

Scan stockand key in

quantity of eachstock on each shelf

OWMS

Stock Take Report

Verify and agree result

Release Stock Take andupdate stock take result

to OWMS

Upload Stock Take result to

SAP

SAP System

Process Begin

During Stock Take

Stock Take Complete

OWMS Proposal May 7, 2004

10

High Level Development Effort Estimation

Items Effort Estimation

(Man days)

Detail requirement study & system design 30

Development on receiving 50

Development on picking 33

Development on packing 55

Development on changing location 15

Development on stock take process 45

Project management 30

Training and installation in Hong Kong 8

Total 266Remarks: Final effort estimation after detail requirement study.