1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section of the Air & Waste Management Association March 13, 2008 Holiday Inn, Pittsburgh, PA Virendra Trivedi, Chief, NSR/Title V Section

1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

Embed Size (px)

Citation preview

Page 1: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

1

NSR Rule Review and Guidance

25 Pa. Code, Chapter 121. General ProvisionsChapter 127 Subchapter E. New Source Review

The Allegheny Mountain Section of

the Air & Waste Management AssociationMarch 13, 2008

Holiday Inn, Pittsburgh, PA

Virendra Trivedi, Chief, NSR/Title V Section Division of Permits, Bureau of Air Quality

717-787-4325 [email protected]

Page 2: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

2

What is New Source Review (NSR)?

NSR is a preconstruction permitting program applicable to major new or modified major stationary facilities.

NSR permitting has two different components which address increased emissions of criteria pollutants depending on the attainment designation of the area in which the facility is located.

Prevention of Significant Deterioration (PSD)Nonattainment New Source Review (NSR)

Page 3: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

3

NSR Program

Federal PSD Reform regulations in 40 CFR 52.21 are adopted and incorporated by reference in their entirety in the Pennsylvania Code.

Title 25, Chapter 127, Subchapter D Effective in Pennsylvania as of March 3,

2003

NSR regulations at 25 Pa. Code Chapter 127, Subchapter E were amended on May 19, 2007.

Page 4: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

4

PADEP’s NSR regulations

These amended NSR requirements apply to an owner or operator of a facility to which a plan approval will be issued by the Department after May 19, 2007.

The final NSR regulations were submitted to the United States Environmental Protection Agency (EPA) on August 9, 2007, as an equivalency demonstration and revision to the Pennsylvania State Implementation Plan (SIP).

Page 5: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

5

PADEP’s NSR regulations (Continued)

Before you submit a plan approval application, you must determine whether the NSR regulations apply to the proposed project.

The term “project” means a physical change or change in the method of operation of an existing facility, including a new emission unit.

The term “emissions unit” is defined at 25 Pa. Code §121.1. An existing emissions unit is a part of a facility that emits or has the potential to emit a regulated NSR pollutant and has existed for more than 2 years.

Page 6: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

6

What is a major facility?

The term “major facility” is defined at 25 Pa.Code Section 121.1. A major facility has the potential to emit at least 100 tons per year (tpy) of a regulated NSR pollutant. These thresholds have been lowered to:

50 tpy for volatile organic compounds (VOCs) and 100 tpy for NOx in moderate nonattainment areas

25 tpy for VOCs and NOx in severe nonattainment areas.

Page 7: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

7

Ozone Nonattainment Areas Major facilities located in Philadelphia CMSA

(counties of Bucks, Chester, Delaware, Montgomery or Philadelphia) are subject to the requirements applicable to severe nonattainment areas for ozone. [25 Pa. Code §127.203(b)]

The remainder of the state is treated as a moderate ozone nonattainment area for VOCs and NOx even though the counties are classified as attainment or “basic” since Pennsylvania is included in the Northeast Ozone Transport Region. [25 Pa. Code §127.201(c)]

Page 8: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

8

PM-2.5 Nonattainment Areas

EPA has indicated that you may continue to use PM-10 as a surrogate of PM-2.5

Page 9: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

9

NSR applicabilityAn applicability determination is the process for

determining which new source requirements apply to an existing major facility.

An applicability determination consists of two steps: Step 1: Emissions increase due to the project Step 2: Net emissions increase calculation

The provisions in 25 Pa. Code Sections 127.203 and 127.203(a) outline NSR applicability requirements.

Page 10: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

10

Step 1:Emissions increase due to the project

The calculation of an emissions increase due to the project depends on whether the project includes new emissions units or existing emissions units.

You need to consider only the emissions increases associated with the project, not any emissions reductions.

Page 11: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

11

Step 1:Emissions increase due to the project

Physical change or change in method of operation at existing emissions units: Baseline actual to projected actual emissions §127.203a(a)(1)(i)(A)

Construction of a new emissions unit Potential to emit (PTE) §127.203a(a)(1)(i)(B)

Page 12: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

12

Baseline Actual Emissions §127.203a(4)

PADEP NSR Approach The average rate, in tpy,

during a consecutive 24-month period within the five-year period. The Department may approve a different period within the last 10 years if it is more representative of the normal source operation.

Federal NSR Approach The average rate, in

tpy, during a consecutive 24-month period selected by the owner or the operator within the ten-year period. (Non- EGU)

Page 13: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

13

Baseline Emissions (Continued)

PADEP NSR Approach The same consecutive

24-month period shall be used for all regulated NSR pollutants unless the owner or operator demonstrates, that a different consecutive 24-month period is more appropriate.

Federal NSR Approach A different

consecutive 24-month period is allowed for a different pollutant.

Page 14: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

14

Projected actual emissions §127.203a(5)

Projected actual emissions is the maximum annual rate in tpy at which an existing emissions unit is projected to emit a regulated NSR pollutant.

In projecting the emissions, you should consider both the expected and highest projections of the business activity that could be expected to be achieved.

Page 15: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

15

Projected actual emissions (Continued)

PADEP NSR Approach The projected actual

emissions must be incorporated into the permit as an emission limit.

The owner or operator must monitor the emissions and maintain records. 

Federal NSR Approach The projected actual

emissions are not incorporated as a permit limit.

The owner or operator must monitor the emissions and maintain records. 

Page 16: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

16

Product demand growth§ 127.203a(a)(1)(i)(A) and § 127.203a(a)(5)(i)(C)

When you compare baseline actual emissions to projected actual emissions, you may adjust the projection to exclude any portion of the emissions increase that the changed unit(s) could have accommodated during the 24- month

baseline period, AND is unrelated to the change.

Page 17: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

17

Final procedure of Step 1 Final procedure of Step 1 of NSR applicability is to

compare emissions increase in each regulated NSR pollutant due to the project with the applicable emissions rate listed in the definition of significant.

The applicable emissions rate listed in the definition of significant is: 40 tpy of VOCs or NOx (moderate nonattainment areas) 25 tpy of VOCs or NOx (severe nonattainment areas) 15 tpy of PM-10

Page 18: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

18

Final procedure for Step 1 (Continued)

Emissions increase due to the project ≥ the applicable emissions rate that is significant; use provisions of §127.203a(a)(1)(ii) to calculate net emissions increase.

Note: this approach is similar to the Federal NSR provisions.

Emissions increase due to the project < the applicable emissions rate that is significant; use provisions of §127.203a(a)(2) to calculate net emissions increase.

De minimis emissions increase calculation.

Page 19: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

19

Step 2: NSR Applicability In the second step of a NSR applicability

calculate the net emissions increase either using provisions of §127.203a(a)(1)(ii) [similar to Federal NSR] or §127.203a(a)(2) [De minimis emissions increase] ; and then

compare it with the applicable emissions rate that is significant

The second step of applicability for the facilities located in Philadelphia CMSA is different than the rest of the Pennsylvania. [25 Pa. Code §127.203(b)]

Page 20: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

20

Similar to the Federal NSR provisionsStep 2: Net Emissions Increase Calculation

Provisions of §127.203a(a)(1)(ii) Emissions increase due to the project ≥ the applicable

emissions rate that is significant

Net emissions increase = Increase in emissions due to the project

Plus Other increases in actual emissions occurring within the 5-year period.

Minus Other creditable decreases in actual emissions occurring within the 5-year period.

The 5-year period includes 5 years before construction on the project commences and the date that construction on the project is completed

Page 21: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

21

Similar to the Federal NSR provisions Step 2: Compare the calculated net emissions increase with the applicable significant rate

If the net emissions increase ≥ the applicable emission rate that is significant, the proposed project is subject to the following NSR requirements:

Emissions Offset Lowest Achievable Emissions Rate (LAER) Alternative Analysis

If the net emissions increase < the applicable emission rate that is significant, the proposed project is not subject to the NSR requirements.

Page 22: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

22

De minimis emissions increaseStep 2: Net Emissions Increase Calculation

Provisions of §127.203a(a)(2) Emissions increase due to the project < the applicable

emissions rate that is significant

Net emissions increase = Proposed de minimis emissions increase

due to the projectPlus Other previously determined increases

that occurred within 10 years period. Minus Other creditable decreases in actual

emissions that occurred within 10 years period.

Page 23: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

23

De minimis emissions increase Step 2: Compare the calculated net emissions increase with the applicable significant rate §127.203a(a)(2)

If the net emissions increase ≥ the applicable emission rate that is significant only the emissions offset requirements apply to

the net emissions increase the proposed project is not subject to the LAER

requirements If the net emissions increase < the applicable

emission rate that is significant the proposed project is not subject to the NSR

requirements.

Page 24: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

24

Example (Moderate Area)

Existing NOx major facility proposed to construct a new Boiler D in 2008. Facility also proposed to replace Boiler C with Boiler DPotential to emit (PTE) of a new Boiler D = 39 tpy of NOxAverage actual emission of Boiler C = 30 tpy of NOxFacility added a Boiler B in 2005 (PTE) = 19 tpy of NOxFacility added a Boiler A in 1999 (PTE) = 20 tpy of NOx Step 1: Emissions increase from the new Boiler D (39 tpy of NOx) is less the applicable emissions rate that is significant (40 tpy of NOx); therefore we will use the provisions of §127.203a(a)(2) to calculate net emissions increase.

Page 25: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

25

Example (Continued)Step 2 De minimis emissions increase calculationNet emissions increase =

Proposed de minimis emissions increase due to the project [39 tpy (Boiler D)] 

Plus Other previously determined increases that occurred within 10 years period. [20 tpy (Boiler A) + 19 tpy (Boiler B) = 39 tpy]

Minus Other creditable decreases in actual emissions that occurred within 10 years period. [30 tpy (Boiler C)]

= 39 tpy + 39 tpy – 30 tpy = 48 tpy

Page 26: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

26

Example (continued)

Step 2: The net emissions increase (48 tpy of NOx) is greater than the applicable emission rate that is significant (40 tpy of NOx) therefore:

the owner or operator of the facility needs to provide 55.2 tpy (48 * 1.15) of NOx ERCs

Boiler D is not subject to LAER requirements

Page 27: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

27

Creditable emission decreases or ERC

Creditable emissions reduction or ERCs shall be:

Surplus Permanent Quantifiable and Federally Enforceable

[25 Pa. Code Section 127.207(1)]

Page 28: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

28

Major or Minor Source ERC Generation Techniques

Shutdown of an existing source or a facility Permanent curtailment of production or operating hours. Improved control measures including improved control

of fugitive emissions New technology and materials New process equipment Economic Incentive Program, Mobile Emission

Reduction Credit Program, Airport Emission Reduction Credit Program

[25 Pa. Code Section 127.207(5)]

Page 29: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

29

ERC: Amnesty period Expiring on May 19, 2008

Section 127.206 (r) provides a one-year amnesty period for the owner or operator of a facility, which has generated emission reductions for all criteria pollutants after January 1, 2002, to submit ERC registry applications to the Department for approval.

Any facility owner or operator that missed the deadline to submit applications is given an opportunity to generate ERCs if the reductions are surplus, permanent, quantifiable and federally enforceable.

Page 30: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

30

ERC Registry Application §127.207 (2)

ERC registry application shall be submitted to the Department within 2 years of the initiation of an emissions reduction used to generate ERCs. For deactivated sources or facilities, the following shall apply: Submit a written notice within 1 year after the

deactivation of a source or facility to request preservation of the emissions in the inventory.

Submit a maintenance plan in accordance with §127.11a or §127.215 (relating to reactivation of sources; and reactivation)

Page 31: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

31

Use of ERCs

ERCs may be used to:satisfy NSR emission offset ratio requirements; “net-out" of NSR at ERC-generating facilities; sell or trade the ERCs for use as emission offsets at new or modified facilities.

Pennsylvania has Reciprocity Agreements with New York and Maryland to allow interstate ERC trades.

Page 32: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

32

ERCs Status Since 1994, more than 201companies have

submitted ERC registry applications. DEP has certified a total of 27,708.9 tpy of NOx,

12,872.3tpy of VOCs, and 1,156.27 tpy of PM10 ERCs.

DEP has approved requests for trading of a total 14,596.5 tpy of NOx credits and 7,248.57 tpy of VOCs ERCs.

Currently, the ERC registry system has 13,112.4 tpy of NOx, 5,394.73 tpy of VOCs and 357.46 PM-10 credits available to use.

Page 33: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

33

Plantwide Applicability Limit (PAL) §127.218

PAL is an alternative approach for determining major NSR applicability.A PAL is an annual (facility-wide) emission limit (12-month rolling total, rolled monthly) under which the facility can make changes without triggering NSR review for that pollutant. Pollutant-specific 10-year term.

Page 34: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

34

Establishing a 10-year PAL §127.218(f)

Determine baseline actual emissions for all existing emissions units using the same consecutive 24-month period for all units. A different 24-month period may be used for each different PAL pollutant.

Add the pollutant-specific emissions rate that is significant to the baseline actual emissions for the PAL pollutant.

Subtract any emissions from emissions units that operated during the 24-month period and have since been permanently shut down.

Add the PTE for any emissions unit that was added to the major facility after the selected 24-month period.

Page 35: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

35

New sources installed under PAL §127.218(g)(10)

Owners or operators of new sources or emission units added under an existing PAL must reduce or control emissions from new sources by using the best available technology (BAT) for new sources, as authorized under section 6.6(c) of the APCA

BAT will not be required for sources modified after the PAL is established unless the cost of the modification

“… exceeds 50% of the fixed capital costs that would be required to construct a comparable entirely new source.…”

Page 36: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

36

PAL Renewal §127.218(k) An owner or Operator may apply for renewal at least 6

months, but not earlier than 18 months before the date of permit expiration.

If the emissions level from the facility is “equal to or greater than 80 percent of the PAL level, then PAL may be renewed at current level.

If the emissions level from the facility is less than 80 percent then: The PAL may be established at a level that is more

representative of baseline actual emissions, or a level that is appropriate based on air quality needs or other considerations.

Page 37: 1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section

37

PAL Expiration §127.218(j) Within the timeframe specified for PAL

renewals, the facility owner or operator shall submit a proposed allocation of the PAL to each emissions unit.

The Department will decide whether and how the PAL will be distributed and issue a revised permit incorporating allowable limits for each emissions unit.

Any subsequent physical or operational change at the facility will be subject to major NSR review.