Module 3.2 Vertical Pump Construction

CENTRIFUGAL PUMPModule 3.2 Vertical Pump Construction

www.cryostar.com [email protected]

Page 2: 1 Module 3.2 Vertical Pump Construction CENTRIFUGAL PUMP Module 3.2 Vertical Pump Construction  contact@cryostar.com

2

Module 3.2 Vertical Pump Construction

Main Uses are:

Air separation

Liquefaction plants.

Various applications:

Internal compressionCrude argon recyclingRe-injectionBack-up

Page 3: 1 Module 3.2 Vertical Pump Construction CENTRIFUGAL PUMP Module 3.2 Vertical Pump Construction  contact@cryostar.com

3

Module 3.2 Vertical Pump Construction

8 stages

Vertical

VP 8/145/4L-3,0 C/0

RemindersImpeller

diameter

Impeller tipwidth

Labyrinth

Speed*100

Material

Page 4: 1 Module 3.2 Vertical Pump Construction CENTRIFUGAL PUMP Module 3.2 Vertical Pump Construction  contact@cryostar.com

4

Module 3.2 Vertical Pump Construction

Page 5: 1 Module 3.2 Vertical Pump Construction CENTRIFUGAL PUMP Module 3.2 Vertical Pump Construction  contact@cryostar.com

5

Module 3.2 Vertical Pump Construction

Page 6: 1 Module 3.2 Vertical Pump Construction CENTRIFUGAL PUMP Module 3.2 Vertical Pump Construction  contact@cryostar.com

6

Module 3.2 Vertical Pump Construction

Principles

Vertical pumps divided in Three parts:

Cold End

Warm box or Intermediate piece

Motor Side

Single and Multi stage pumps

Cold box installation with thermal barrier

All seal types available

Cold end with direct coupled motor.

Synchronous speed (50/60Hz) or variable speed

Page 7: 1 Module 3.2 Vertical Pump Construction CENTRIFUGAL PUMP Module 3.2 Vertical Pump Construction  contact@cryostar.com

7

Module 3.2 Vertical Pump Construction

VP construction

Drive shaft with coupling

Shaft seals :

LabyrinthMechanicalGas sealDual Gas seal

Total mass supported by mounting flange

Page 8: 1 Module 3.2 Vertical Pump Construction CENTRIFUGAL PUMP Module 3.2 Vertical Pump Construction  contact@cryostar.com

8

Module 3.2 Vertical Pump Construction

Construction: Warm box (Intermediate piece on VP)

grease retainerchamber

leak detector

coupling

heating coil

Outlet of the labyrinth

Page 9: 1 Module 3.2 Vertical Pump Construction CENTRIFUGAL PUMP Module 3.2 Vertical Pump Construction  contact@cryostar.com

9

Module 3.2 Vertical Pump Construction

Construction: Warm box (cont’d)

Page 10: 1 Module 3.2 Vertical Pump Construction CENTRIFUGAL PUMP Module 3.2 Vertical Pump Construction  contact@cryostar.com

10

Module 3.2 Vertical Pump Construction

Construction: Warm box (cont’d)

Heater on motor side

Page 11: 1 Module 3.2 Vertical Pump Construction CENTRIFUGAL PUMP Module 3.2 Vertical Pump Construction  contact@cryostar.com

11

Module 3.2 Vertical Pump Construction

Construction: Cold end

inducerdiffusorimpelleroutlet

vent

inlet

Page 12: 1 Module 3.2 Vertical Pump Construction CENTRIFUGAL PUMP Module 3.2 Vertical Pump Construction  contact@cryostar.com

12

Module 3.2 Vertical Pump Construction

Construction: Cold end (cont’d)

Page 13: 1 Module 3.2 Vertical Pump Construction CENTRIFUGAL PUMP Module 3.2 Vertical Pump Construction  contact@cryostar.com

13

Module 3.2 Vertical Pump Construction

Construction: Cold end (cont’d)