FOREST FOCUS FOREST FOCUS (EC regulation n° 2152/2003)(EC regulation n° 2152/2003)
INTENTIONINTENTION : : BIOSOILSBIOSOILS to broaden the scope of the monitoring to broaden the scope of the monitoring
scheme to new environmental issues scheme to new environmental issues such as such as soilssoils and and forest biodiversityforest biodiversity
(Article 6: demonstration projects)(Article 6: demonstration projects)
22/10/2004 85th Standing Forestry Committee
2
Demonstration Demonstration ProjectProject
Further development of soil and Further development of soil and biodiversity monitoringbiodiversity monitoring(Standing Forestry Committee – 22/10/2004)(Standing Forestry Committee – 22/10/2004)
Soil ModuleSoil Module Comes close to a new surveyComes close to a new survey Will be used to test the recently Will be used to test the recently
updated ICP Forests manual updated ICP Forests manual
3
BackgroundBackground
11stst Forest Soil Condition DatabaseForest Soil Condition Database
1985-19981985-19985,289 5,289 Level ILevel I plots in 28 Countries plots in 28 Countries
LimitationsLimitations:: 58 % 58 % overlap overlap with Crown Condition dbasewith Crown Condition dbase Only limited number of plots with complete Only limited number of plots with complete
mandatory datasetmandatory dataset NoNo possibilities for possibilities for element poolselement pools
calculation (limited depths and bulk calculation (limited depths and bulk densitiesdensities missing missing))
4
BackgroundBackground
Soil data quality:Soil data quality: Transnational comparability of data limited Missing pedological information (soil and site
description) to allow for integrity checks
First stepFirst step : Update of ICP Forest Manual on ‘Sampling and Analysis of Soil’ Part IIIa (2003)
Level II soil conditionLevel II soil condition: : soil chemistrysoil chemistryCharacterised from 1995 onwardsCharacterised from 1995 onwards
5
Major ObjectivesMajor Objectives
CompleteComplete and and Improve the qualityImprove the quality of of Forest Soil Forest Soil Condition DatabaseCondition Database (Level I and II) (Level I and II)
Improve overlay with Improve overlay with Crown Condition databaseCrown Condition database on on 4635 plots within EU25 (2003)4635 plots within EU25 (2003) – 5915 plots (30 – 5915 plots (30 countries)countries)
Complete (updated) set of Complete (updated) set of mandatory parametersmandatory parameters on on all Level I plots – optional parameters desirableall Level I plots – optional parameters desirable
CreateCreate data compatibilitydata compatibility important forimportant for other other European objectives (e.g. EU Thematic Soil Strategy)European objectives (e.g. EU Thematic Soil Strategy)
Monitor Monitor changes in soil chemistrychanges in soil chemistry after 10 yearsafter 10 years Testing of updated Testing of updated manual manual and other QA/QC effortsand other QA/QC efforts
6
Time scheduleTime schedule
Phase IPhase I 2005 Preparation of survey: develop QA/QC strategy, planning meetings, ring test
Phase Phase IIII
2006-2007
Soil survey and soil analysis in the MS and central laboratory
by end 2008
Central database completed
Phase Phase IIIIII
2009 - ?
Data evaluation, interpretation and reporting, writing of Forest Soil Condition Report
7
ActorsActors
Co-ordination by Co-ordination by Forest Soil Co-Forest Soil Co-ordinating Centreordinating Centre in close co-operation in close co-operation with with JRCJRC
Survey and soil analyses by Survey and soil analyses by MSMS’s’s Subset of samples and parameters Subset of samples and parameters
analysed by analysed by central laboratorycentral laboratory After completion database => After completion database => JRCJRC and and
DG ENVDG ENV
8
Cost estimate per plot:Cost estimate per plot: sampling and analysessampling and analyses
Level I:Level I: Mandatory parameters Mandatory parameters € € 10001000
Level I:Level I: Mandatory and optional Mandatory and optional parametersparameters
€ € 22002200
Level II:Level II: Mandatory parameters Mandatory parameters € € 52005200
Level II:Level II: Mandatory and optional Mandatory and optional parametersparameters
€ € 76007600
Soil profile descriptionSoil profile description € € 20002000
9
Cost estimatesCost estimates
Costs partly depend on:Costs partly depend on: Level I and/or Level II plots?Level I and/or Level II plots?
about about 48004800 Level I and Level I and 750750 Level IILevel II
AllAll plots or plots or subsetsubset? ? MandatoryMandatory or mandatory and or mandatory and optional optional
parameters (see ICP Forests manual)?parameters (see ICP Forests manual)? Include Include soil profile descriptionssoil profile descriptions and related and related
laboratory analyses?laboratory analyses?
10
Scenario 1:Scenario 1: Mandatory param. Mandatory param. all level I and II plotsall level I and II plots
Costs/point
# Plots
Total € EU contr. % €
FSCC preparation 333,305 100 333,305
FSCC co-ordination survey 513,600 100 513,600FSCC data evaluation, interpretation and reporting
366,475 100 366,475
Soil survey Level I: :all plots mand. param.
1000 4700 4,700,000 75 3,525,000
Soil survey Level II: all plots mand. param.
5200 750 3,900,000 75 2,925,000
Data management for plots 100 5450 545,000 75 408,750
Transport of subset samples 15 1200 18,000 75 13,500Central laboratory 600 1200 720,000 100 720,000Total 8,805,630
11
Scenario 2:Scenario 2: Level I: Mand. param. Level I: Mand. param. all, Optional subsetall, Optional subsetLevel II: Mand. & Option. subsetLevel II: Mand. & Option. subset
Cost/ plot
# Plots
Total € EU contr. %
€FSCC preparation of survey 333,305 100 333,305FSCC co-ordination of survey 513,600 100 513,600FSCC data evaluation,
interpretation & reporting 366,475
100366,475
Soil survey Level I mand.: 1000 3500 3,500,000 75 4,605,000Mand. & optional parameters: 2200 1200 2,640,000 Soil survey Level II: subset of plots, Mand. & opt. param.
7600 250 1,900,00075
1,425,000
Data management of plots 100 4950 495,000 75 371,250Transport of subset samples 15 1200 18,000 75 13,500Central laboratory 600 1200 100 720,000Total 8,348,130
12
PlanningPlanning
Monday 29/11Monday 29/11 Tuesday 30/11Tuesday 30/11
FSEP workshop on FSEP workshop on QA/QCQA/QC
FSEP meetingFSEP meetingon demonstration on demonstration projectproject
FSEP workshop on QA/QCFSEP workshop on QA/QC29-30 November 200429-30 November 2004 initially meant for limited N° experts
New invitation, new programme:
13
Monday 29 Nov ‘04Monday 29 Nov ‘04
8:30 – 12:30: 8:30 – 12:30: QA/QC in the fieldQA/QC in the field
14:00 – 17:30: 14:00 – 17:30: QA/QC in the laboratoryQA/QC in the laboratory
Tuesday 30 Nov ‘04Tuesday 30 Nov ‘04Proposal of demonstration project: • Content: What and how? Which scenario?• Timing: When?• Role of the MS, JRC, FSCC: Who?• Structure of national programmes