1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

1 CS 501 Spring 2008

CS 501: Software Engineering

Lecture 4

Project Management

Page 2: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

2 CS 501 Spring 2008

Administration

Projects

• Announcements by project teams

Quiz 1

• Quiz 1 is next Thursday. Information is posted on the web site.

Office hours

• No office hours on Tuesday, February 5.

Page 3: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

3 CS 501 Spring 2008

OS 360

The operating system for the IBM 360 was two years late.

Question: How does a project get two years behind schedule?

Answer: One day at a time!

Fred Brooks Jr., The Mythical Man Month

Page 4: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

4 CS 501 Spring 2008

The Aim of Project Management

To complete a project:

• On time

• On budget

• With required functionality

• To the satisfaction of the client

• Without exhausting the team

To provide visibility about the progress of a project

Page 5: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

5 CS 501 Spring 2008

Aspects of Project Management

Planning

• Outline schedule during feasibility study

• Detailed schedule at the beginning of a project or phase of a project

Progress tracking

• Regular comparison of progress against plan

Final analysis

• Analysis of project for improvements during next project

Page 6: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

6 CS 501 Spring 2008

Terminology

Deliverable

Work product that is provided to the customer (report, presentation, documentation, code, etc.)

Milestone

Completion of a specified set of activities (e.g., delivery of a deliverable, completion of a process step)

Page 7: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

7 CS 501 Spring 2008

Terminology

Activity

Part of a project that takes place over time (also known as a task).

Event

The end of a group of activities.

Dependency

An activity that cannot begin until some event is reached

Resource

Staff time, equipment, or other limited resources required by an activity.

Page 8: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

8 CS 501 Spring 2008

General Approach to Project Planning

Identify deliverables and milestones

Divide project into activities (tasks)

For each activity estimate:

• time to complete from when activity begins

• dependencies on events before beginning

• resource requirements

Build a model that uses this data to create a work-plan, including schedule, resource allocation, and flexibility

Page 9: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

9 CS 501 Spring 2008

Project Planning Methods

Critical Path Method, Gantt charts, Activity bar charts, etc.

• Build a work-plan from activity data.

• Display work-plan in graphical form.

Project planning software (e.g., Microsoft Project)

• Maintain a database of activities and related data

• Calculate and display schedules

• Provide progress reports

Page 10: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

10 CS 501 Spring 2008

A Simple Gantt Chart

Source: Microsoft using Excel

Page 11: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

11 CS 501 Spring 2008

Gantt Charts

• Dates run along the top (days, weeks or months).

• Each row represents an activity. Activities may be scheduled sequentially, in parallel or overlapping.

• The schedule for an activity is a horizontal bar. The left end marks the planned beginning of the task. The right end marks the expected end date.

• The chart may be updated by filling in each activity to a length proportional to the work accomplished.

• Progress to date can be compared with the plan by drawing a vertical line through the chart at the current date.

Page 12: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

12 CS 501 Spring 2008

A More Complex Gantt Chart

Source: SmartDraw

Page 13: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

13 CS 501 Spring 2008

Activity Graph

An activity (task)

A dummy activity (dependency)

An event

A milestone

A scheduling technique that emphasizes dependencies

Page 14: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

14 CS 501 Spring 2008

Example: Activity Graph for a Distance Learning Course

START

Edit 1

Script TV

Make TV

Edit 2

Prototype Software

WriteSoftware

DocumentSoftware

Mail

Plan TV

Plan 1

Write 1

Plan 2

Plan Software

Write 2

Typeset 1

Typeset 2

Print

Page 15: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

15 CS 501 Spring 2008

Scheduling: Background

PERT

Program Evaluation and Review Technique introduced by the U.S. Navy in 1957 to support the development of its Polaris submarine missile program.

PERT/Time

Activity graph with three time estimates (shortest, most probable, longest) on each activity to compute schedules.

PERT/Cost

Added scheduling of resources (e.g., facilities, skilled people, etc.)

Page 16: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

16 CS 501 Spring 2008

Critical Path Method

Uses Activity Graph with single time estimate for each activity to estimate:

earliest start date -- every activity begins at first possible time

latest start date -- every activity begins at the last possible time

slack -- difference between the latest and earliest start dates

A standard method for managing large construction projects.

On big projects, activity graphs with more than 10,000 activities are common.

Page 17: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

17 CS 501 Spring 2008

Time Estimates for Activities (Weeks)

6

4

2

2

3

3

3

3

82

1 1

4

12

12

1

4

Page 18: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

18 CS 501 Spring 2008

Earliest Start Dates

6

4

2

2

3

3

3

3

82

11

4

12

12

1

4

0

1

12

12

4

17

19

23

5

2522

17

17

15

15

8

2023 24

All activities beginning at a given event have the same earliest start date.

Earliest start dates in red

Page 19: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

19 CS 501 Spring 2008

Latest Start Dates

6

4

2

2

3

3

3

3

82

11

4

12

12

1

11

12

14

13

15

20

23 24 25

4 22

0

17

17

10

1817

2019

Each event must be achieved by the date shown or the final date will not be met.

Latest start dates in blue

Page 20: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

20 CS 501 Spring 2008

Critical Path

0/0

1/11

12/12

12/14

4/13

15/15 17/17

17/17

17/17

19/20

22/23 23/24 25/25

Every activity on the critical path must begin on the earliest start date.

Critical path in orange

Page 21: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

21 CS 501 Spring 2008

Slack

0/0

1/11

17/17

23/24

1

22

12/12

12/14

4/13

15/15 17/17

17/17 19/20

22/23 25/25

4

8

123 2

312

4

4

3

3

6

1 1

Slack of activity = (latest start)end - (earliest start)begin - (time estimate)

10 10

00 0

0

00

9

9

2

2

23

11

11

5

Slack in purple

Page 22: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

22 CS 501 Spring 2008

Estimating the Time for an Activity

With experienced staff, estimating the actual time to carry out a single task is usually fairly accurate, but ...

The little bits and pieces are underestimated

• The time from almost "done" to completely "done" is much longer than anticipated. (There's just one thing to tidy up. I need to put the comments into better shape. I really should get rid of that patch.)

• The distractions are not planned for. (My system crashed and I decided to upgrade the software. My child's school was closed because of snow. I spent the day showing visitors around.)

Some things have to be done twice.

Page 23: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

23 CS 501 Spring 2008

Start-up Time

On a big project, the start-up time is typically three to six months:

• Personnel have to complete previous projects (fatigue) or be recruited.

• Hardware and software has to be acquired and installed.

• Staff have to learn new domain areas and software (slow while learning).

• Clients may not be ready.

Page 24: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

24 CS 501 Spring 2008

Final Analysis with Critical Path Method

Administrative computing department at Dartmouth used the Critical Path Method for implementation phase of major projects (plan developed after project was well-understood).

Experience: Elapsed time to complete projects was consistently 30% to 40% longer than predicted by model.

Analysis:

• Some tasks not anticipated (incomplete understanding)• Some tasks had to be redone (change of requirements, technical changes)• Key personnel were on many activities (schedule conflicts)• System ZZZ (non-billable hours)

Page 25: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

25 CS 501 Spring 2008

Adding Resources to Activity Graph or Gantt Chart

Each activity is labeled with resources, e.g.,

Number of people (e.g., 2 Java programmers)

Key personnel (e.g., chief system architect)

Equipment (e.g., 3 servers with specified software)

Facilities (e.g., video conference center)

Each resource is labeled with availability, e.g.,

Hiring and training

Vacations

Equipment availability

Page 26: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

26 CS 501 Spring 2008

Using Critical Path Method for Resources

Assume every activity begins at earliest start date:

In each time period, calculate:

resources required

resources available

Identify shortage / surplus resources

Adjust schedule

acquire extra staff (e.g., consultants)

rearrange schedule (e.g., change vacations)

change order of carrying out activities

The earlier that a problem is known, the easier it is to fix.

Page 27: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

27 CS 501 Spring 2008

Key Personnel: The Mythical Man Month

In computing, not all people are equal

• The best are at least 5 times more productive.• Some tasks are too difficult for everybody.

Adding more people adds communications complexity

• Some activities need a single mind.• Sometimes, the elapsed time for an activity can not be

shortened.

What happens to the project if a key person is sick or quits?

Page 28: 1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management

28 CS 501 Spring 2008

The Project Manager

• Create and maintain the schedule.• Track progress against schedule.• Keep some slack in the schedule (minimize risk).• Continually make adjustments:

Start activities before previous activity completeSub-contract activitiesRenegotiate deliverables

• Keep senior management informed (visibility).

The project manager needs the support of the head of the development team and the confidence of the team members.