1BCF-215: Course Admin and Overview
Course Administration and Overview
10/12/2010
2BCF-215: Course Admin and Overview
Course Objectives
Provide introductory level concepts and methodologies needed to develop operating and support (O&S) cost estimates used in support of weapon systems.
3BCF-215: Course Admin and Overview
Enabling Objectives
1. Prepare O&S Cost Estimatesa. Know the full scope of O&S costs
b. Know the purpose and uses of cost estimating structures and know the OSD CAPE O&S structure
c. Know the major O&S data sources and their limitations
d. Know basic O&S cost estimating methods
f. Understand how system technical characteristics, operating concepts, and support concepts influence O&S cost estimates
2. Document And Present O&S Cost Analysesa. Understand the overall O&S cost estimating process
4BCF-215: Course Admin and Overview
Course Layout
Monday: Basic O&S Concepts
Tuesday: Estimating Techniques
Wednesday: O&S Data
Thursday/Friday: Practical Application Case Study Workshop and Team Presentation
5BCF-215: Course Admin and Overview
Case Study
Discuss C-17 O&S Cost Estimate Discuss approaches to estimating C-17 O&S costs,
using information that was available in 1987 Bottom-Up and Analogy
Focus: maintenance manpower, fuel consumption, depot level reparables, and depot maintenance
Themes: How would we construct detailed “bottoms-up” estimates? How would we construct simple analogy or parametric
estimates? What are the major risk areas? What are the important lessons learned?
Read And Be Ready To Discuss For Day 4
6BCF-215: Course Admin and Overview
O&S Workshop
Integrating Exercise Incrementally developed throughout the week Culminates in development of a complete O&S
estimate on Day 4 and presentation of the estimates on Day 5
Homework For Tuesday: Develop An Estimate
Structure For Wednesday: Inventory and Optempo For Thursday: Enlisted Maintenance
Manpower
7BCF-215: Course Admin and Overview
Graded Assessments
In order to successfully complete the course, you must obtain a cumulative 80% (80 points).
Assignment Points Due
Homework #1 15 Tuesday 0800 Sharp!
Homework #2 15 Wednesday 0800 Sharp!
Homework #3 15 Thursday 0800 Sharp!
Case 40 Thursday 1700
Case Brief 15 Friday
100
8BCF-215: Course Admin and Overview
What Will You Get From This Week?
The “big picture” of O&S cost estimating Where O&S fits in LCC cost estimates The full scope of O&S costs
Basic knowledge to do an estimate A framework for estimating O&S costs Methods used to estimate O&S costs O&S cost data sources
Practical applications
9BCF-215: Course Admin and Overview
What the course is NOT
Advanced course in O&SDetailed logistics courseData analysis
Forward Employed Reconnaissance of Regional Enemies & Terrorists
Ferret
Program Office
O&S Cost Estimate
- Preliminary -
Program Office
O&S Cost Estimate
- Preliminary -
FY02$ K Total
Level 1 Level 2 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
Ferret O&S Costs 2,144,720 31832 80235 89524 97183 116640 116646 116653 116660 116667 116674 116681 116688 116696 116703 116710 116718 116726 97283 94088 84483 53230
1. Unit Personnel 642,866
1.1 Crew and Support
Officers 231,250 5781 11563 11563 11563 11563 11563 11563 11563 11563 11563 11563 11563 11563 11563 11563 11563 11563 11563 11563 11563 5781
Enlisted 113,369 2834 5668 5668 5668 5668 5668 5668 5668 5668 5668 5668 5668 5668 5668 5668 5668 5668 5668 5668 5668 2834
1.2 Maintenance
Officers 8,632 216 432 432 432 432 432 432 432 432 432 432 432 432 432 432 432 432 432 432 432 216
Enlisted 260,620 6516 13031 13031 13031 13031 13031 13031 13031 13031 13031 13031 13031 13031 13031 13031 13031 13031 13031 13031 13031 6516
1.3 Support
Officers 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Enlisted 28,995 725 1450 1450 1450 1450 1450 1450 1450 1450 1450 1450 1450 1450 1450 1450 1450 1450 1450 1450 1450 725
2. Unit Operations 88,490
2.1 Fuel 45,956 1149 2298 2298 2298 2298 2298 2298 2298 2298 2298 2298 2298 2298 2298 2298 2298 2298 2298 2298 2298 1149
2.2 Ammunition 14,400 360 720 720 720 720 720 720 720 720 720 720 720 720 720 720 720 720 720 720 720 360
2.3 Other Consumables 2,000 50 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 50
2.4 TDY 23,520 588 1176 1176 1176 1176 1176 1176 1176 1176 1176 1176 1176 1176 1176 1176 1176 1176 1176 1176 1176 588
2.5 Admin Expenses 2,613 65 131 131 131 131 131 131 131 131 131 131 131 131 131 131 131 131 131 131 131 65
3. Maintenance 713,605
3.1 Unit & Intermediate
3.1.1Consumables 138,635 3466 6932 6932 6932 6932 6932 6932 6932 6932 6932 6932 6932 6932 6932 6932 6932 6932 6932 6932 6932 3466
3.1.2 DLRs 380,106 9503 19005 19005 19005 19005 19005 19005 19005 19005 19005 19005 19005 19005 19005 19005 19005 19005 19005 19005 19005 9503
3.2 Depot
3.2.1 Depot - Aircraft 173,159 0 0 3913 10761 10761 10761 10761 10761 10761 10761 10761 10761 10761 10761 10761 10761 10761 10761 7826
3.2.2 Depot - Engine 21,704 0 0 536 1340 1340 1340 1340 1340 1340 1340 1340 1340 1340 1340 1340 1340 1340 1340 1072
4. Sustaining Support 434,722
4.1 Replacement Training 342,880 17144 17144 17144 17144 17144 17144 17144 17144 17144 17144 17144 17144 17144 17144 17144 17144 17144 17144 17144 17144
4.2 Support Equipment Reqplacement 3,759 198 198 198 198 198 198 198 198 198 198 198 198 198 198 198 198 198 198 198
4.3 SE/PM 88,082 4636 4636 4636 4636 4636 4636 4636 4636 4636 4636 4636 4636 4636 4636 4636 4636 4636 4636 4636
5. Continuing Improvement 265,038
5.1 Hardware Mods 252,850 19450 19450 19450 19450 19450 19450 19450 19450 19450 19450 19450 19450 19450
5.2 Software Upgrades 12,188 580 586 593 599 606 613 619 626 633 640 647 655 662 669 677 684 692 700 707
sqdrn 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1