6
1 Amor Nadji Amor Nadji January 16-17 2014, SOLEIL , TWIICE 2014 WELCOME TO SOLEIL WELCOME TO SOLEIL

1 Amor Nadji January 16-17 2014, SOLEIL, TWIICE 2014 WELCOME TO SOLEIL WELCOME TO SOLEIL

Embed Size (px)

Citation preview

Page 1: 1 Amor Nadji January 16-17 2014, SOLEIL, TWIICE 2014 WELCOME TO SOLEIL WELCOME TO SOLEIL

1

Amor NadjiAmor Nadji

January 16-17 2014, SOLEIL , TWIICE 2014

WELCOME TO SOLEILWELCOME TO SOLEIL

Page 2: 1 Amor Nadji January 16-17 2014, SOLEIL, TWIICE 2014 WELCOME TO SOLEIL WELCOME TO SOLEIL

OPERATION in 2013OPERATION in 2013 ROCK

Photon Beam availability in 2013: 98%98%

+ 2 new beamlines (total of 2929)

MTBF : ~68 h68 h MTTR : 1h23 1h23

January 16-17 2014, SOLEIL , TWIICE 2014 2

Page 3: 1 Amor Nadji January 16-17 2014, SOLEIL, TWIICE 2014 WELCOME TO SOLEIL WELCOME TO SOLEIL

5 Modes of Operation for the Users5 Modes of Operation for the Users

Mode of operation User Operation in 2013 Ultimate performance achieved

Multibunch 430 mA430 mA 500 mA

Hybrid 425 mA + 5 mA425 mA + 5 mA 425 mA + 10 mA

8 bunch 88 mA88 mA 110 mA

1 bunch 15 mA15 mA 20 mA

Low : bunch length and

current

4.7 ps RMS and 65 4.7 ps RMS and 65 A per A per

bunchbunch< 8 ps FWHM and 10 A

per bunch

All in Top-up injection

3

5 feedbacks simultaneously in operation: TFB, SOFB, FOFB, BTUNE-FB, Coupling-FB

January 16-17 2014, SOLEIL , TWIICE 2014

Page 4: 1 Amor Nadji January 16-17 2014, SOLEIL, TWIICE 2014 WELCOME TO SOLEIL WELCOME TO SOLEIL

26 Very Diverse Insertion Devices are 26 Very Diverse Insertion Devices are installedinstalled

HU65

HU256

HU256

HU256

W164

26 installés1 à venir

U18

4

EM

Mixte

HU640

Légende

U20

U20

U20

HU60

HU80

HU44

HU60

U20HU36

HU52

HU80

U20

PM

WSV50

U18

U24

HU80

HU44 HU5

2

HU64

HU42

January 16-17 2014, SOLEIL , TWIICE 2014

Page 5: 1 Amor Nadji January 16-17 2014, SOLEIL, TWIICE 2014 WELCOME TO SOLEIL WELCOME TO SOLEIL

FEMTOSLICING UNDER COMMISSIONINGFEMTOSLICING UNDER COMMISSIONINGLaser hutch

January 16-17 2014, SOLEIL , TWIICE 2014 5

• 100 – 200 fs FWHM100 – 200 fs FWHM

• Soft X (Tempo) and Soft X (Tempo) and Hard X-ray (Cristal)Hard X-ray (Cristal)

• Commissioning withCommissioning with beam will start by beam will start by January 24th.January 24th.

• Laser at the modulatorlocation

Page 6: 1 Amor Nadji January 16-17 2014, SOLEIL, TWIICE 2014 WELCOME TO SOLEIL WELCOME TO SOLEIL

6

In future ring-based light sources (DLSR), the combination of ultra low emittance, high current and narrow chambers will mean that collective effects will be important!

January 16-17 2014, SOLEIL , TWIICE 2014

Collective effects phenomena occurring in synchrotron radiation sources include:

Beam instabilitiesLifetime-limiting effectsIon effects

Strongly influence the quality of synchrotron radiation delivered to the users.

In view of the high costs in constructing a synchrotron radiation facility, a reduction of the beam quality due to collective effects is not acceptable.

Countermeasures have to be considered at an early stage of the machine design.