By Ashley Bishop ([email protected]) at 9:39 am, Apr 09, 2020
By Derek Kenison ([email protected]) at 1:13 pm, Apr 03, 2020
By james marshall ([email protected]) at 12:40 pm, Apr 16, 2020
By Kristin Driscoll ([email protected]) at 9:03 am, Apr 21, 2020
By Matthew Colburn ([email protected]) at 1:51 pm, Apr 02, 2020
By Nancy Avery ([email protected]) at 1:26 pm, Apr 02, 2020
By Sandra ([email protected]) at 12:30 pm, Apr 14, 2020
By Jonathan Armstrong ([email protected]) at 2:41 pm, Apr 15, 2020
By Jon Kaplan ([email protected]) at 9:06 am, Apr 20, 2020
By Jane Brown ([email protected]) at 12:54 pm, Apr 15, 2020
By Jeff Ramsey ([email protected]) at 1:04 pm, Apr 02, 2020
By Tyler Guazzoni ([email protected]) at 9:46 am, Apr 16, 2020
04-23-2020
Stantec Consulting Services Inc.
www.stantec.com
Fax: (802) 864-0165
Phone: (802) 864-0223
South Burlington VT U.S.A. 05403
55 Green Mountain Drive
CANADA
ORLEANSESSEX
WASHI
NGTON
LAMOILLE
FRANKLIN
GR
AN
D IS
LE
ADDISON
CHIT
TE
ND
EN
ORANGE
CA
LE
DO
NIA
WIN
DS
OR
RUTLAND
BE
NNIN
GT
ON
WINDHAM
APPROVED DATE
DATUM
NEW YORK
State of
MASSACHUSETTS
Commonwealth of
NEW HAMPSHIRE
State of
SHEET OF SHEETS1 16
PLANS.
SPECIAL PROVISIONS AS ARE INCORPORATED IN THESE
REVISIONS AND SUCH REVISED SPECIFICATIONS AND
FOR USE ON THIS PROJECT, INCLUDING ALL SUBSEQUENT
FEDERAL HIGHWAY ADMINISTRATION ON APRI L 1 3, 2018
FOR CONSTRUCTION DATED 2018, AS APPROVED BY THE
WITH THESE PLANS AND THE STANDARD SPECIFICATIONS
CONSTRUCTION IS TO BE CARRIED ON IN ACCORDANCE
PLACE LOGO AND P.E. STAMP INSIDE THIS BOX (AGENCY CONSULTANT USE ONLY - (THIS BOX MAY BE TURNED OFF)
N
VT
ST
AT
E P
LA
NE
GRID
101
AT FULL SIZE
APPROX. SCALE 3/4" = 1/2 MI
STP BP18(3)
PROJECT
SHELBURNE
7
VSESURVEYED BY :
11/2019SURVEYED DATE :
TO
U.S. R
OUTE 7
FALLS R
D
TO
VT R
OUTE 116
IRIS
H
HILL R
D
0 80 160
SCALE IN FEET
N
VT
ST
AT
E
PL
AN
E
GRID
False N
orthing:
0.0000
False E
asting:
1640416.
6667
Origin L
atitude:
42°30'00
.0000"N
Central
Meridia
n: 72°3
0'00.000
0"W
US Su
rvey F
oot
Transve
rse Mer
cator
NAD83
Vermon
t State
Planes
VT83
INDEX OF SHEETS
THIS PROJECT IS LOCATED ALONG IRISH HILL ROAD BETWEEN THE LAPLATTE RIVER NATURE PARK AND THOMPSON ROAD IN THE TOWN OF SHELBURNE.
LENGTH OF SIDEWALK = 592.65 FT (0.112 MILES)
SHELBURNEPROJECT NAME :
STP BP18(3)PROJECT NUMBER :
IRISH HILL R
D
TH
OM
AS
RD
IRISH HILL RD (MAJOR COLLECTOR)COUNTY OF CHITTENDEN
TOWN OF SHELBURNE
LA
PL
AT
TE
RI
VE
R
STA. 9+60.92
END PROJECT
0+00
1+00
2+00 3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
BRIDGE, STORMWATER IMPROVEMENTS AND RELATED ITEMS.
OF A 5 FOOT WIDE CONCRETE SIDEWALK, AN 8 FOOT WIDE PEDESTRIAN
WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES: CONSTRUCTION
PROJECT LOCATION
SHELBURNE FALLS
LOCATION MAP
STA. 0+28.52
BEGIN PROJECT
SIDEWALK & PEDESTRIAN BRIDGE
MUNICIPAL PROJECT MANAGERQUALITY ASSURANCE PROGRAM : LEVEL 3
NAD83(2011)HORIZONTAL
NAVD88VERTICAL
7-16CROSS SECTION SHEET
5-6PLAN SHEETS
4TIE SHEET
3TYPICAL SECTION SHEET
2SYMBOLOGY LEGEND SHEET
1TITLE
STA. 2+66.94
STOP PROJECT
STA. 2+28.84
END BRIDGE
STA. 1+30.06
BEGIN BRIDGESTA. 5+07.91
RESUME PROJECT
LENGTH OF BRIDGE = 98.78 FT (0.019 MILES)
PROJECT MANAGER : DEBRA PIERCE
0+00
1+00
2+003+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
I see drainage but seems misleading to say stormwater improvements as no treatment is being proposed
Include project name and number
Typicals and estimate show this as a bituminous walk.
Joel Perrigo?
Project does not appear in VTransparency
With the structural items, isn't this going to be a Level 2?
SOV symbol
Traffic control?
CZ
DITCH
FOUNDATION
GARDEN
HEDGE
E
L
T
R
D
BK
AH
STA
POE
POB
PRC
PCC
PT
CC
PI
PC
CURVE EXTERNAL DISTANCE
CURVE LENGTH OF
CURVE TANGENT LENGTH
CURVE RADUIS OF
CURVE DEGREE OF (100FT)
BACK STATION SUFFIX
AHEAD STATION SUFFIX
STATION PREFIX
POINT OF ENDING
POINT OF BEGINNING
POINT OF REVERSE CURVE
POINT OF COMPOUND CURVE
POINT OF TANGENCY
CENTER OF CURVE
POINT OF INTERSECTION
POINT OF CURVATURE
WITH PROPOSED ANNOTATION.
FEATURES WITH HEAVIER LINEWEIGHT, IN COMBINATION
FOR EXISTING FEATURES, ALSO USED FOR PROPOSED
THESE ARE COMMON VAOT SURVEY POINT SYMBOLS
BODY OF WATER EDGE
WOOD LINE
STONE WALL
ROAD EDGE PAVEMENT
ROAD EDGE GRAVEL
DRIVEWAY EDGE
RAILROAD TRACKS
LEDGE EXPOSED
BRUSH LINE
WALL
SLOPE RIGHTS
SURVEY LINE
6F PROPERTY BOUNDARY
4F PROPERTY BOUNDARY
PROPERTY LINE (P/L)
TOWN BOUNDARY LINE
COUNTY BOUNDARY LINE
STATE BOUNDARY LINE
C
FENCE STEEL POST
FENCE (EXISTING)
FENCE WOOD POST
CULVERT (EXISTING)
ELECTRIC+CABLE
CABLE (TV)
ELECTRIC+TELEPHONE
UTILITY POLE GUY WIRE
ELECTRIC+TELEPHONE
PLAN LAYOUT MATCHLINE
CLEAR ZONE
TELEPHONE
ELECTRIC
CABLE+TELEPHONE
ELECTRIC+CABLE+TELEP.
ELECTRIC+TELEPHONE
ELECTRIC+CABLE
CABLE+TELEPHONE
SANITARY SEWER (SEPTIC)
ELECTRIC+CABLE+TELEP.
WATER LINE
GAS LINE
TELEPHONE
CABLE (TV)
ELECTRIC
CULVERT PROPOSED
BOTTOM OF DITCH L
STRUCTURE SUBSURFACE
HISTORIC DIST
ARCH
T&E
HISTORIC
AG
HABITAT
FLOOD PLAIN
.
SR SR SR
L
P P
L
FILTER CURTAIN
SILT FENCE
SILT FENCE WOVEN WIRE
EPSC MEASURES
WETLAND BOUNDARY
RIPARIAN BUFFER ZONE
SOIL TYPE BOUNDARY
HISTORIC STRUCTURE
HISTORIC DISTRICT BOUNDARY
HISTORIC AREA
AGRICULTURAL LAND
HAZARDOUS WASTE AREA
ENVIRONMENTAL RESOURCES
FISH & WILDLIFE HABITAT
FLOOD PLAIN
STORM WATER
USDA FOREST SERVICE LANDS
WILDLIFE HABITAT SUIT/CONN
CHECK DAM
ARCHEOLOGICAL BOUNDARY
ARCHEOLOGICAL & HISTORIC
UTILITY SYMBOLOGY
UNDERGROUND UTILITIES
ABOVE GROUND UTILITIES (AERIAL)
PROJECT DESIGN & LAYOUT SYMBOLOGY
CODE DESCRIPTIONPOINT
COMMON TOPOGRAPHIC POINT SYMBOLS
DESCRIPTION
PROPOSED GEOMETRY CODES
CODE
BARRIER FENCE
EPSC LAYOUT PLAN SYMBOLOGY
PROJECT CONSTRUCTION SYMBOLOGY
EROSION MATTING
PROJECT CONSTRUCTION FEATURES
STONE FILL
TOE OF FILL SLOPE
TOP OF CUT SLOPE CONVENTIONAL TOPOGRAPHIC SYMBOLOGY
EXISTING FEATURES
CONVENTIONAL BOUNDARY SYMBOLOGY
STRIPING LINE REMOVAL
REQUIRING RE-VEGETATION
DISTURBED AREAS
THREATENED & ENDANGERED SPECIES
SHEET PILES
HAZARDOUS WASTE
WSO
WELL
VCTRL
TSIGN
TIE
TEL
STUMP
SIGN
SHRUB
SAT
S
RRSL
RRSIG
POST
PMK
PM
MM
MH
MB
LI
IPIPE
IP
HYD
HVCTRL
HCTRL
H
GV
GUYW
GUY
GSO
GP
GASFIL
FPOLE
EL
DITHR
COMB
CB
BND
BM
APL
PERMANENT EASEMENT LINE (P)
TEMPORARY EASEMENT LINE (T)
BOUNDARY LINES
DESCRIPTIONCODE
IRON PIN TO BE SET
BNDNS
IPNS
CALC CALCULATED ROW POINT
DISTANCE CARRIED ON NEXT SHEETDISTANCE
POINT
STATE ROW
TOWN ROW
STATE ROW (LIMITED ACCESS)
PROJECT DEMARCATION FENCE
TREE PROTECTION ZONE (TPZ)
PROPOSED STATE R.O.W.
PROPOSED STATE R.O.W. (LIMITED ACCESS)
BOUND TO BE SETBNDNS
IPNS
BOUND SET
IRON PIN SET
R.O.W. ABBREVIATIONS (CODES) & SYMBOLS
TEMPORARY EASEMENT
PERMANENT EASEMENT
UTILITY EASEMENT
SLOPE RIGHT
LANDSCAPE EASEMENT
INSTALL & MAINTAIN EASEMENT
EROSION CONTROL
DRIVEWAY EASEMENT
DRAINAGE EASEMENT
DITCH EASEMENT
DISCONNECT & CONNECT
CULVERT EASEMENT
CONSTRUCTION EASEMENT
CHANNEL EASEMENT
(T)
(P)
UE
SR
LAND
I&M
EC
DRIVE
DR
DIT
D&C
CUL
CONST
CH
ORDINARY HIGH WATER (OHW)
WETLAND BUFFER ZONE
OHW
USED TO CLARIFY AS NEEDED.
VARY, PLAN ANNOTATIONS AND NOTES SHOULD BE
SHEET COVERS THE BASICS. SYMBOLOGY ON PLANS MAY
AS NOTED ON PROJECT PLAN SHEETS. THIS LEGEND
LINEWEIGHT, IN COMBINATION WITH PROJECT ANNOTATION,
USED FOR EXISTING & PROPOSED FEATURES WITH HEAVIER
STANDARD CONVENTIONAL SYMBOLOGY. THE SYMBOLOGY IS
THE SYMBOLOGY ON THIS SHEET IS INTENDED TO COVER
SYMBOLOGY LEGEND NOTE
GENERAL INFORMATION
ROAD GUARDRAIL
WATER SHUT OFF
WELL
CONTROL VERTICAL
SIGN W/DOUBLE POST
TIE
TELEPHONE POLE
STUMP
SIGN
SHRUB
SATELLITE DISH
TREE SOFTWOOD
RAILROAD SWITCH LEVER
RAILROAD SIGNAL
POST STONE/WOOD
PROJECT MARKER
PARKING METER
MILE MARKER
MANHOLE (MH)
MAILBOX
LIGHT - STREET OR YARD
IRON PIPE
IRON PIN
HYDRANT
CONTROL HORIZ. & VERTICAL
CONTROL HORIZONTAL
TREE HARDWOOD
GATE VALVE
GUY WIRE
GUY POLE
GAS SHUT OFF
GUIDE POST
GAS FILLER
FLAGPOLE
ELECTRIC POWER POLE
DROP INLET THROATED DNC
COMBINATION POLE
CATCH BASIN
BOUND
BENCH MARK
BOUND APPARENT LOCATION
2/28/2020
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF2 16
19F010frm.dgn
STP BP18(3)
S. NEELY
E. ALLING
CONVENTIONAL SYMBOLOGY LEGEND SHEET
SHELBURNE
E. ALLING
---
2.5'
2'
17"
1'EXISTING ROADWAY
2/28/2020
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF3 16
19F010typ.dgn
2% MAX
1:6
1:1.
5 MAX.
TYPICAL SECTIONS
SHELBURNE
STP BPI8(3)
E. ALLING
S. NEELY
S. NEELY
1
1
1
1
AND MULCH (TYP)
4" TOPSOIL, SEED,
TOLERANCE
THICKNESSMATERIAL ITEM
SUBBASE
BASE COURSES (TOTAL DEPTH)
PAVEMENT COURSES (TOTAL DEPTH)
+/- 1"
+/- 1"
+ 1/4"
TRANSVERSE SECTION OF SUPERSTRUCTURENOT TO SCALE
(TYP.)
TIMBER RUB RAILS
BRIDGE RAIL WITH
PEDESTRIAN/BICYCLE
54" HIGH STEEL
RAIL TO RAIL
8'-0" (MIN.)
PREFABRICATED BRIDGETRUSS (TYP.)
PREFABRICATED
BOTTOM CHORD
TRUSS (TYP.)
PREFABRICATED
TOP CHORD
SYSTEM COMPONENTS)
SPACING OF DECK
TYPE, SIZE AND
(MFGR. TO SPECIFY
STEEL TRUSS
PREFABRICATED
TYPE II
STONE FILL
1
1
STONE FILL
GEOTEXTILE UNDER
GRAVEL, FINE GRADED
12" SUBBASE OF CRUSHED
E. ALLING
2" BITUMINOUS SIDEWALK
1:4 MAX
1:6 MAX.
SIDEWALK WITHOUT CURB TYPICAL
1:6 OR FLATTER (TYP.)
1' (MIN.) SHOULDER OF
EDGE DETAIL FOR STEEP SLOPES
CHAIN-LINK FENCE
4 FOOT
VARIES
2" BITUMINOUS PAVEMENT
SAW CUT LINE
1
1
4" BITUMINOUS PAVEMENT
GRADED CRUSHED STONE
SUBBASE OF DENSE
CURB DETAIL
CONCRETE CURB, TYPE B, 7" REVEAL
4'-6"
3'-0"TIMBER DECK
LIVE LOAD = 90 PSF/H-5
L
L
B
CONST.
B
CONST.
GRASS STRIP
5' (MIN.)
GREEN STRIP
5' (MIN.)
0.5'
NOT TO SCALE
NOT TO SCALE
1.5'
NOT TO SCALE
SIDEWALK
5'
Is 2" really adequate depth of paving for a sidewalk?
not on est?
not on est?
not sure the prefad truss is included in any of the pay items you show on the est?
not on est?
4 16
VSE
VSE
VSE
TIE SHEET
N
VT
ST
AT
E
PL
AN
E
GRID
PID PG1580
N
VT
ST
AT
E
PL
AN
E
GRID
NORTH = 680139.073
EAST = 1448455.676
N
VT
ST
AT
E
PL
AN
E
GRID
HVCTRL
1
VSE CONTROL CAP5/8"REBAR
AHEADSTOP
312852336
PAVTEDGE
IRIS
H HIL
L ROAD
50.94'
16.5'
66.89'
N
VT
ST
AT
E
PL
AN
E
GRID
MOTEL, AND 13.5 METERS (44.3 FT) SOUTHWEST OF LIGHT POLE 01.
NORTHEAST OF THE CENTERLINE OF U.S. ROUTE 7, 26.9 METERS (88.3 FT) SOUTH OF THE CENTERLINE OF A DRIVEWAY LEADING TO THE
VERGENNES GO NORTH ALONG U.S. ROUTE 7 FOR 13.1 MI (21.1 KM) TO THE MARK ON THE RIGHT. THE MARK IS 13.7 METERS (44.9 FT)
THE MARK ON THE LEFT IN THE LAWN AT THE COUNTRYSIDE MOTEL. TO REACH FROM THE JUNCTION OF VT ROUTE 22A AND U.S. ROUTE 7 IN
SHELBURNE, VT. TO REACH FROM THE METHODIST CHURCH IN SHELBURNE VILLAGE GO SOUTH ALONG U.S. ROUTE 7 FOR 1.0 MI (1.6 KM) TO
RECOVERY NOTE BY VERMONT AGENCY OF TRANSPORTATION 1995 (CHR). GENERAL LOCATION, SHELBURNE, VT. OWNERSHIP, COUNTRYSIDE MOTEL,F 65
ELEV. = 266.361
* SURVEY COMPLETED: NOVEMBER 15, 2019 BY VSE, M. BACKMAN-PC, J. SHAW
10"MAPLE
24"MAPLE
8"MAPLE
24"MAPLE IRIS
H HIL
L ROAD
HVCTRL
2
3128321A35
VSE CONTROL CAP5/8"REBAR
BASINCATCH
64.74'
57.4
3'
27.28'
#97
HVCTRL
3
MON 1'AG4"X4"CONC 31174
1831
STOP2-WAY
IRISH HILL RDTHOMAS RD
VSE CONTROL CAP5/8"REBAR
MH
BASINCATCH
51.7
8'
IRISH HILL ROAD
RO
AD
TH
OM
AS
RIV
ER
La
PL
AT
TE
14.2
3'
11.39'
HVCTRL
4
VSE CONTROL CAP5/8"REBAR
1629
1293117
#1141MB
#344HYDRANT
FALLS RO
AD
80.36'
25.91'
28.98'
SHELBURNE
STP BP18(3)
DATUM
VERTICAL
HORIZONTAL
ALI
GN
ME
NT
TI
ES
TR
AV
ER
SE
TI
ES
GP
S
CO
NT
RO
L
POI
NT
S
NAVD88
NAD83(2011)
ADJUSTMENT NONE
NORTH =
EAST =
ELEV. =
NORTH =
EAST =
ELEV. =
HVCTRL #4 NORTH = 682738.751
EAST = 1452996.936
ELEV. = 187.618
NORTH =
EAST =
ELEV. =
HVCTRL #3 NORTH = 682571.916
EAST = 1453290.125
ELEV. = 169.132
NORTH =
EAST =
ELEV. =
HVCTRL #2 NORTH = 682730.198
EAST = 1453774.000
ELEV. = 203.583
NORTH =
EAST =
ELEV. =
HVCTRL #1 NORTH = 682933.443
EAST = 1454024.811
ELEV. = 212.991
NORTH =
EAST =
ELEV. =
2/28/2020
DESIGNED BY:
PROJECT LEADER: VSE DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
HVCTRL
CROSS ON LEDGE
HVCTRL
5/8"REBAR VSE CONTROL CAP
BM
DISK 29=171.4
2 88=170.
88
WOOD
SHELBURNE, VT 05482
PO BOX 88TOWN OF SHELBURNEPARCEL 072
0128000
SPAN 582-183
-12596
SOUTH BURLINGTON, VT 05403
1037 HIN
ESBURG RDSTERLING LAND CO., L
LC
PARCEL 2020039SPAN 58
2-183-1293
0
AA
A
A
A
A
A
A
A
A
A
0+00
1+00
2+00
3+00
4+00
ST
A 0
+00.00
PO
B
ST
A 0
+14.74P
C
ST
A 3
+27.62
PT
ST
A 1
+81.11
PI
2/28/2020
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF5 16
19F010bdr.dgn
ST
A 4+50
MA
TC
HLIN
E S
HE
ET 2
SHELBURNE
E. ALLING
J. BURKE
S. NEELY
STP BP18(3)
EXISTIN
G ROW
EXISTING ROW
EXISTIN
G ROW
EXISTING ROW
TH
OM
AS
RD
IRISH
HILL
RD
FALLS RD
N
VT
ST
AT
E
PL
AN
E
GRID
False N
orthing:
0.0000
False E
asting:
1640416.
6667
Origin L
atitude:
42°30'00
.0000"N
Central
Meridia
n: 72°30
'00.000
0"WUS
Survey F
ootTra
nsverse
Mercato
rNAD
83 Ver
mont St
ate Plan
esVT8
3
0 20 40
SCALE IN FEET
LA
PL
AT
TE
RIV
ER
E = 35.51'
L = 312.88'
T = 166.36'
R = 372.00'
CURVE 1
APPROACHES)
WALL (TYP. BOTH
PROPOSED RETAINING
SIDEWALK TO REMAIN
EXISTING BITUMINOUS
NEWLY CONSTRUCTED
STA. 0+28.52
BEGIN PROJECT
E. ALLING
PLAN SHEET 1
4 FOOT CHAIN-LINK FENCE (TYP.)
PEDESTRIAN BRIDGE
PREFABRICATED
PROPOSED 94' X 8'
POLE
TO UTILITY
AVOID IMPACTS
PRIOR TO PRELIMINARY PLANS
OUTLET PIPE TO BE DETAILED
NEW DRAINAGE STRUCTURE AND
STA. 1+30.06
BEGIN BRIDGE
STA. 2+28.84
END BRIDGE
STA. 2+66.94
STOP PROJECT
PAD
STONE
PROPOSED
EXISTING SIDEWALK
SIDEWALK, TIE INTO
END PROPOSED
per MUTCD, STOP signs are not allowed on the opposite side of an intersection, or installed on a warning sign (Large double arrow). Stop signs are regulatory signs and the different sign categories should not be mixed facing in the same direction.
there are signs within the project area that will have to be accomodated for.
Add note to "Match Existing walk" add item
include longitudinal section/elevation of bridge & abutments
All reasonable efforts shall be made to accommodate pedestrian and bicycle travel. Traffic control plans should replicate the existing pedestrian pathway as nearly as practical. This can include but is not limited to a dedicated pedestrian escort (not a Flagger on duty), signage, and pedestrian channelizing device walkways that meet ADA requirements or have bicyclist follow the rules of the road just like a motorist. Also, to ensure that obstacles, equipment, construction materials, traffic control devices, etc. do not encroach into the bicycle path of travel and that these routes are free of ruts, sand and mud to prevent cyclist's crashes.
Correct. A red object marker could be placed on the pole below the arrow to help with visibility
Need stations where walk widening begins
15"CPEP15"CPEP
15"CPEP
HVCTRL
5/8"REBAR VSE CONTROL CAP
.
.
SHELB
UR
NE V
T 05482
69 IRISH HILL R
D
CA
MPB
ELL, SUEA
NN
E
SWA
NB
OR
N, SC
OT
PAR
CEL 1120006000
SPAN 582-183-12495
SHELB
UR
NE V
T 05482
97 IRISH HILL R
D
LAFO
RCE, PA
TRICIA
BEA
N, D
ON
ALD TR
UST
PAR
CEL 1120008000
SPAN 582-183-10140
A
A
A
A
A
A
A
A A
A
A5+00
6+00
7+00
8+00
9+00
ST
A 5
+59.43PC
ST
A 7
+83.46
PT
ST
A 6
+73.47
PI
10+00
ST
A 7
+83.46
PT
ST
A 10
+00.00
PO
E
. . . . . . . . . . . . . . .
.
.
.
.
.
.
.
6 16
19F010bdr.dgn 2/28/2020
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
ST
A 4+50
MA
TC
HLIN
E S
HE
ET 2
SHELBURNE
E. ALLING
J. BURKE
S. NEELY
STP BP18(3)
EXISTING ROW
EXISTING ROW
EXISTING ROW
EXISTING ROW
IRISH HILL RD
N
VT ST
ATE P
LA
NE
GRID
False No
rthing: 0.
0000
False Ea
sting: 164
0416.666
7
Origin L
atitude: 4
2°30'00.0
000"N
Central M
eridian:
72°30'00
.0000"W
US Surv
ey Foot
Transver
se Merca
tor
NAD83
Vermont S
tate Plan
es
VT83
0 20 40
SCALE IN FEET
E = 13.17'
L = 224.03'
T = 114.03'
R = 487.00'
CURVE 2
E. ALLING
PLAN SHEET 2
(TYP.)
WITHIN ROW
REMOVE TREES OWNER
PROPERTY
RETURN TO
ROW AND
ITEMS WITHIN
LANDSCAPING
REMOVE
SIDEWALK GUY
UTILITY POLE, INSTALL
AVOID IMPACTS TO
HEDGE ROW
NEW CEDAR
LINE
ROTATED TO MATCH CURB
NEW CONE AND GRATE,
SIDEWALK
TIE INTO EXISTING
BEGIN NEW SIDEWALK, EXISTING GRAVEL PATH
SIDEWALK, TIE INTO
END PROPOSED
TO EXISTING STRUCTURE
CONNECT PROPOSED DI
PIPE
NEW DI AND STORMWATER
STA. 9+60.92
END PROJECT
FIRE HYDRANT
AVOID IMPACTS TO
STA. 5+07.91
RESUME PROJECT
a new grate needs to be counted in your DI qty
how are you paying for this?
should this be done by the Util company?
what cone?
Add detail to show drive being paved out to street and some distance back from new back of walk (TYP.)
can curbing be eliminated and associated drainage? would very likely be better for water quality to sheet flow and not add untreated concentrated flow to the river. curbing seems out of context and unneeded to me here.
For all drives, add existing surface type - paved or gravel.
There are some large trees here. This house is 32' +/- off centerline right at the ROW line and one of the trees is right up against the house. Plans show the slope going out to the ROW line. Clearing these trees will be no small feat with them sandwiched between the house and an overhead utility line. I would look at the clearing/tree cutting estimate. Also at sta 7+25 you have a 1:3.4 slope with the hedges planted on the slope going right to the front porch.
should this say "connect prop PIPE to exit struct...??
drive material types? TYP
2/28/2020
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF7 16
19f010xs.dgn
170
180
190
0 10 20 30-10-20-30
0+00.00
170
180
190
170
180
190
0 10 20 30-10-20-30
0+25.00
170
180
190
170
180
190
0 10 20 30-10-20-30
0+50.00
170
180
190
F.G. = 175.02
-0.020 -0.065
SHELBURNE
STP BP18(3)
E. ALLING
E. ALLING
S. NEELY
S. NEELY
CROSS SECTION SHEET 1
RO
W
RO
W
STA.0+00 TO STA.0+50
2/28/2020
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF8 16
19f010xs.dgn
160
170
180
190
0 10 20 30 40 50-10-20-30-40-50
0+75.00
160
170
180
190
150
160
170
180
190
0 10 20 30 40 50-10-20-30-40-50
1+00.00
150
160
170
180
190
STA.0+75 TO STA.1+00
SHELBURNE
STP BP18(3)
CROSS SECTION SHEET 2
E. ALLING
E. ALLINGS. NEELY
S. NEELY
-1:2.0
-1:6.0 -0.020-1:6.0-1:4.0
-1:6.0-0.020-1:6.0
-1:4.0
F.G. = 172.97
F.G. = 171.23
RO
W
RO
W
2/28/2020
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF9 16
19f010xs.dgn
150
160
170
180
190
0 10 20 30-10-20-30
1+25.00
150
160
170
180
190
140
150
160
170
180
190
0 10 20 30-10-20-30
1+50.00
140
150
160
170
180
190
STA.1+25 TO STA.1+50
F.G. = 169.96
-0.019 -0.091 -0.079
-0.020
SHELBURNE
STP BP18(3)
E. ALLING
E. ALLINGS. NEELY
S. NEELY
CROSS SECTION SHEET 3
2/28/2020
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF10 16
19f010xs.dgn
140
150
160
170
180
0 10 20 30-10-20-30
1+75.00
140
150
160
170
180
140
150
160
170
180
0 10 20 30-10-20-30
2+00.00
140
150
160
170
180
150
160
170
180
0 10 20 30-10-20-30
2+25.00
150
160
170
180
STA.1+75 TO STA.2+50
F.G. = 167.86
-0.020
-0.020
-0.020
SHELBURNE
STP BP18(3)
E. ALLING
E. ALLING
S. NEELY
S. NEELY
CROSS SECTION SHEET 4
150
160
170
180
0 10 20 30-10-20-30-40-50
2+50.00
150
160
170
180
-0.020-1:6.0
-1:6.0-1:4.0
-1:2.0
RO
W
2/28/2020
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF11 16
19f010xs.dgn
160
170
180
0 10 20 30-10-20-30
2+75.00
160
170
180
160
170
180
0 10 20 30-10-20-30
3+00.00
160
170
180
160
170
180
190
0 10 20 30-10-20-30
3+25.00
160
170
180
190
160
170
180
190
0 10 20 30-10-20-30
3+50.00
160
170
180
190
160
170
180
190
0 10 20 30-10-20-30
3+75.00
160
170
180
190
STA.2+75 TO STA.3+75
SHELBURNE
STP BP18(3)
E. ALLING
E. ALLING
S. NEELY
S. NEELY
CROSS SECTION SHEET 5
RO
W
RO
WR
OW
RO
WR
OW
2/28/2020
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF12 16
19f010xs.dgn
170
180
190
0 10 20 30-10-20-30
4+00.00
170
180
190
170
180
190
0 10 20 30-10-20-30
4+25.00
170
180
190
170
180
190
0 10 20 30-10-20-30
4+50.00
170
180
190
170
180
190
200
0 10 20 30-10-20-30
4+75.00
170
180
190
200
170
180
190
200
0 10 20 30-10-20-30
5+00.00
170
180
190
200
STA.4+00 TO STA.5+00
F.G. = 181.87
F.G. = 184.44
1:-7.2 -0.084
1:-6.2 -0.043
SHELBURNE
STP BP18(3)
E. ALLING
E. ALLING
S. NEELY
S. NEELY
CROSS SECTION SHEET 6
RO
WR
OW
RO
W
RO
WR
OW
2/28/2020
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF13 16
19f010xs.dgn
180
190
200
0 10 20 30-10-20-30
5+25.00
180
190
200
180
190
200
0 10 20 30-10-20-30
5+50.00
180
190
200
180
190
200
210
0 10 20 30-10-20-30
5+75.00
180
190
200
210
180
190
200
210
0 10 20 30-10-20-30
6+00.00
180
190
200
210
190
200
210
0 10 20 30-10-20-30
6+25.00
190
200
210
190
200
210
0 10 20 30-10-20-30
6+50.00
190
200
210
STA.5+25 TO STA.6+50
F.G. = 186.93
F.G. = 189.36
F.G. = 191.81
F.G. = 194.23
F.G. = 196.36
F.G. = 198.06
1:-4.1
-0.020-0.031
-0.075-0.020 -0.088 -0.044
1:-5.0
-0.020-0.049
1:-3.6
-0.020 -0.020-0.060
-0.097-0.020 -0.079-0.076
1:-4.8
-0.020 -0.0201:-9.3
SHELBURNE
STP BP18(3)
E. ALLING
E. ALLING
S. NEELY
S. NEELY
CROSS SECTION SHEET 7
RO
WR
OW
RO
W
RO
WR
OW
RO
W
2/28/2020
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF14 16
19f010xs.dgn
190
200
210
220
0 10 20 30-10-20-30
6+75.00
190
200
210
220
190
200
210
220
0 10 20 30-10-20-30
7+00.00
190
200
210
220
190
200
210
220
0 10 20 30-10-20-30
7+25.00
190
200
210
220
200
210
220
0 10 20 30-10-20-30
7+50.00
200
210
220
200
210
220
0 10 20 30-10-20-30
7+75.00
200
210
220
STA.6+75 TO STA.7+75
F.G. = 199.65
F.G. = 200.93
F.G. = 202.37
F.G. = 203.78
F.G. = 205.10
1:-9.60.001
-0.084
1:6.00.020 0.020
-0.088
1:3.40.020 0.020
-0.080
1:5.80.020
-0.056
0.094 0.013-0.045
SHELBURNE
STP BP18(3)
E. ALLING
E. ALLING
S. NEELY
S. NEELY
CROSS SECTION SHEET 8
RO
W
RO
WR
OW
RO
W
2/28/2020
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF15 16
19f010xs.dgn
200
210
220
0 10 20 30-10-20-30
8+00.00
200
210
220
200
210
220
0 10 20 30-10-20-30
8+25.00
200
210
220
200
210
220
0 10 20 30-10-20-30
8+50.00
200
210
220
200
210
220
0 10 20 30-10-20-30
8+75.00
200
210
220
200
210
220
0 10 20 30-10-20-30
9+00.00
200
210
220
200
210
220
0 10 20 30-10-20-30
9+25.00
200
210
220
STA.8+00 TO STA.9+25
F.G. = 206.33
F.G. = 207.21
F.G. = 207.92
F.G. = 208.46
F.G. = 208.97
F.G. = 209.42
0.047 -0.020 -0.020-0.053
1:-9.5-0.020 -0.020
-0.014
1:-4.9 -0.020 -0.020
-0.021
1:-6.5 -0.020 -0.028
1:-7.1 -0.020 -0.034
-0.015 -0.020-0.037
SHELBURNE
STP BP18(3)
E. ALLING
E. ALLINGS. NEELY
S. NEELY
CROSS SECTION SHEET 9
RO
WR
OW
RO
W
RO
WR
OW
RO
W
2/28/2020
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF16 16
19f010xs.dgn
200
210
220
230
0 10 20 30-10-20-30
9+50.00
200
210
220
230
200
210
220
230
0 10 20 30-10-20-30
9+75.00
200
210
220
230
200
210
220
230
0 10 20 30-10-20-30
10+00.00
200
210
220
230
STA.9+50 TO STA.10+00
SHELBURNE
STP BP18(3)
E. ALLING
E. ALLING
S. NEELY
S. NEELY
RO
WR
OW
RO
W
CROSS SECTION SHEET 10
Initials DateCalc'd By: CJW 2/11/2020Checked By: ENA 2/11/2020Revised By: CJW 2/28/2020Checked By: ENA 2/28/2020
Item No. Unit Unit Price Quantity $
201.10 CLEARING AND GRUBBING, INCLUDING INDIVIDUAL TREES AND STUMPS LS $15,000.00 1 $15,000.00203.15 COMMON EXCAVATION CY $20.00 290 $5,800.00204.20 TRENCH EXCAVATION OF EARTH CY $30.00 280 $8,400.00301.35 SUBBASE OF DENSE GRADED CRUSHED STONE CY $40.00 230 $9,200.00406.38 HAND-PLACED BITUMINOUS CONCRETE PAVEMENT, DRIVES SY $25.00 325 $8,125.00601.2615 18" CPEP(SL) LF $78.00 190 $14,820.00604.20 PRECAST REINFORCED CONCRETE CATCH BASIN WITH CAST IRON GRATE EACH $3,800.00 3 $11,400.00613.11 STONE FILL, TYPE II CY $45.00 6 $270.00616.28 CAST-IN-PLACE CONCRETE CURB, TYPE B LF $32.00 440 $14,080.00618.15 BITUMINOUS CONCRETE SIDEWALK TON $400.00 40 $16,000.00630.15 FLAGGERS HR $35.00 1000 $35,000.00635.11 MOBILIZATION/DEMOBILIZATION LS $38,607.60 1 $38,607.60641.11 TRAFFIC CONTROL, ALL-INCLUSIVE LS $10,000.00 1 $10,000.00651.35 TOPSOIL CY $36.00 125 $4,500.00900.645 SPECIAL PROVISION LANDSCAPING LS $5,000.00 1 $5,000.00900.645 SPECIAL PROVISION Bridge Timber Deck LS $115,000.00 1 $115,000.00900.645 SPECIAL PROVISION Bridge Erection LS $60,000.00 1 $60,000.00900.645 SPECIAL PROVISION Bridge Substructure LS $80,000.00 1 $80,000.00900.645 SPECIAL PROVISION Bridge Retaining Walls LS $45,000.00 1 $45,000.00900.645 SPECIAL PROVISION Bridge Excavation and Backfill LS $25,000.00 1 $25,000.00
Sub Total $521,203Contingencies ( 25%) $130,301
Total Opinion of Probable Construction Cost $651,503
Quantity Summary
SHELBURNE
STP BP18(3)
Item Description
55 Green Mountain DriveSouth Burlington, VT 05403Tel: (802) 864-0223
IRISH HILL ROAD SIDEWALK AND PEDESTRIAN BRIDGE
V:\1794\active\179450041\transportation\calculations\Sidewalk Quantities\Shelburne Quantity Book.xlsm
Seems odd how these bridge items are broken out. Usually, with a prefab bridge, the bridge itself is all one pay item and the abutments/retaining walls and their excavation are addressed separately. Why is the erection it's own pay item? Please revisit this.
seems low
TC Plan?