Goodman Networks
ATT-002-290-502 Civil Construction Quality
Checklist Overview & Training
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 2
ATT-002-290-502 Overview
The ATT-002-290-502 is an Audit – Civil Construction
Checklist and applies to New Site Builds, UMTS, 2nd, 3rd, 4th,
Carrier, Site modifications and LTE Projects. It will be used
for Third Party, Internal Quality Audits and GC Self
Assessment Audits.
The Checklist can be utilized on both AT&T Turf and non-
Turf sites.
This document is intended to be a guide for performing
Civil Construction Audits. The Naming convention is set up
so that the document number (ATT-002-290-502) is
followed by the item number on the presentation (e.g.,
ATT-002-290-502-22) All Service Impacting findings are
noted in RED, and Non-service affecting findings are noted
in BLUE.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 3
Purpose of this Overview
• AT&T Scorecard results are below customer requirements in some Turf’s
• Corporate Quality audit results are negatively impacting our TL Metrics
• Findings from both Corporate and 3rd Party Audits are repeating
• Service Interruptions are on the rise, negatively impacting TL Metrics
• Training to this standard is required when working on a Goodman Site
• A passing score of 80% is required for this test
• Must have a certification credential available on site at all times
• Training will be required for all CM’s, PM’s and subcontractors
within 30 days of being assigned to the Turf
• Annual recertification will be required
ATT-002-290-502 Overview
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 4
Purpose of this Overview (con’t)
• Understand ATT-002-290-502 requirements and other ATT Documentation
• Ensure PM/CMs and contractors get the same message
• Increase Quality Awareness
• Pareto Analysis of performance YTD as of September, 25th, 2011
• Corporate Audit Results are well below expectations as indicated by
our Service Quality TL Metric
• Understand Roles and Responsibilities
• Maintain a 90% or better third party pass rate
ATT-002-290-502 Overview
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 5
Corporate & 3rd Party Audit Comparison
Jan Feb
Mar AprMay Jun
JulyAug
Sept
OctNov
Dec Jan0
50
100
150
200
250
300
350
400
450
500
0%
20%
40%
60%
80%
100%
120%
Internal Sites Audited
3rd Party Sites Audited
Corp Site Pass rate
3rd Party Site Pass Rate
Min Reqm't
Site
s A
udit
ed
Site
Pas
s Ra
te
Site Pass Rate vs. Sites Audited - All Turfs
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 6
•2011 Third Party Audits Defect Pareto
Service Affecting Non Service Affecting
0
100
200
300
400
500
# o
f D
efec
tsTop 40 Defects Reported
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 7
•ALL TURFS Internal Corporate Audits Defect Pareto YTD
Service Affecting Non Service Affecting
0
50
100
150
200
250#
of
Def
ects
Top 40 Defects
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 8
NIS 3rd Party Audits – 2011
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 9
ATT-002-290-502 Overview
Logbook Entry
AT&T Managers and Technicians want to know who
enters their shelters and what they are doing! If there
is none notify the AT&T Cell Tech.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 10
• ATT-002-290-502 Overview
Photograph Criteria Each photograph shall have these characteristics:• Medium Format – 640 x 480 or better• Medium Density – 6 mega-pixels or better• 150 ppi or better• Sharp focus• Color• Natural daylight except for dark locations and mandatory night
shots which may use a flash• JPEG (jpg) file format, labeled with a descriptive text. (included
is site #, location, date and brief description) • Format with maximum file size of 1 MB• Date Stamp on the photo itself• A soft copy and Hard copy are to be provided for close out
documentation.
This is very important when the site is audited. Service impacting discrepancies have been reversed because of
good dated handover package photographs!
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 11
• This Document is set up by the order of the top findings per the
Pareto Chart and listed in the header.
• Top 85% of findings will be covered.
• This training program has findings from 2368 Corporate Audits and
1038 3rd Party Audits.
ATT-002-290-502 Overview
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 12
#1 Weatherproofing
ATT-002-290-502-36; Connector Weather proofing. Butyl, Self amalgamated tape, Canisters
are all nationally approved methods. Individual markets will dictate how they wish to
weatherproof the connectors in that market. (below is the butyl method)
1. Start with a courtesy wrap of the
connector, adhesive side up.
2. Fill in the voids and gaps
with extra butyl. Allow for a
smooth transition from one to
the other connector.
3. Overlap the outer wrap of
butyl the entire length of the
connector. Ensure you extend
beyond the courtesy wrap.
4. Wrap the butyl with overlapping
2” tape. Extend beyond the butyl.
3 layers of coverage is required,
up, down and back up again.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 13
#1 Weatherproofing (con’t)
Weatherproofing continued.
5. Make sure you overlap both the 2” and
the ¾” tape when you apply it to the
connectors.
6. Wrap the 2” tape with overlapping ¾”
tape. Extend beyond the 2” tape. 3 layers of
coverage is required, up, down and back up
again. Make sure your last wrap is upward
as the connector is dressed in on the tower
to allow for proper shingling of the tape.
7. Extend the last 6”-8” of ¾”
tape beyond the connection. Do
not stress the tape and cut it with
scissors or a knife. Then apply it
to the connector with out
stretching the tape.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 14
#2 Ground Bars: Stainless Hardware
ATT-002-290-502-63; Ground bars: Stainless steel hardware, Verify the
hardware (nuts/bolts/flat and locking washers) for installing the ground bars &
connecting the wires to the ground bars are stainless. Insure all bolts are “up
and out”. Appropriate sized hardware must be used for the ground bar and lug
that you are installing. The correct hardware stack up is required. Flat washers
cannot overlap the washer next to it. It is acceptable to sandwich the ground bar
but not piggyback the lugs together.
Correct
Hardware
Stack-up
If 2 hole lug is
used follow the
same stack-up
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 15
#3 Ground Wire Lugs
ATT-002-290-502-66; Ground wire lugs: Verify ground wire lugs are two-hole
long barrel, and are sized for the ground wire. Transparent heat shrink tubing is
in place on internal lugs. Black heat shrink on external lugs. The ground
conductor must be seated all the way to the end of the lug barrel.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 16
• #4 Tower Top Jumper Supports
ATT-002-290-502-12; Tower top jumper support; Support the jumper at
maximum of 18” from the connector and then every 3’. If you use
butterfly supports one of the jumpers has to be supported back to the
tower steel very close to the butterfly. Zip ties or wax string are not
acceptable to support jumpers on top of the tower.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 17
#5 RET Cables
ATT-002-290-502-169; RET Cables: Verify the RET cables are installed per the
construction drawings and/or project specifications. Ensure the cable supports are
adequate and supporting the cables properly. Dependent upon the market you may
have different requirements for supporting the RET cable. They may be large Zip
ties, snap ins with grommets, or hoisting grips on the tower. At no time will you use
an improvised method such as ropes or heavy gauge wire to support the RET cable.
Support for the RET cable will follow the same direction as for coax cable. You are
allowed to secure the ret to the outside of a coax snap in but not directly to the
coax itself.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 18
#6 Penetrations
ATT-002-290-502 -147; Shelter / cabinet penetrations, Verify penetrations
are sealed and any unused conduits or ports are capped. Verify penetrations
have been cushioned, grommeted, or otherwise protected per the
construction drawings and/or project specifications to prevent damage to coax
or jumper cables. You cannot cut into a port cap and then seal it with silicone.
Appropriate sized conduit with caps or silicone can be utilized to seal flex conduit. When
sealing penetrations through floors and interior walls proper fire stopping methods must be
followed.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 19
#7 Equipment Frame Grounding
ATT-002-290-502-57; Equipment frame(s) grounding: Verify the frames of newly
installed equipment have been connected to the ground grid per the construction
drawings and/or project specifications. Some manufactures require only one
grounding point as well as single hole grounding lugs, for their equipment. Confirm
with the manufacture and AT&T if it is acceptable to do so with the equipment that
you are installing. Clear Heatshrink is required inside
a shelter
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 20
#8 Site Cleanliness
ATT-002-290-502-99; Site cleanliness: Verify site is clean: all trash, debris, and all
construction aids and equipment have been removed. This includes all items that are inside as
well as outside. Trash should be removed or staged on a daily basis to prevent it from being
blown onto an adjacent property. During the day’s work the site must be kept in an orderly
fashion for safety reasons. Empty the trash can before you leave. Take a picture.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 21
#9 Ground Conductor
ATT-002-290-502-61; Ground conductor installation / color / labeling: Verify the
ground conductors are installed and labeled and are the size/gauge/color/type as
specified per the construction drawings and/or project specifications. Ground
conductors from diplexers, duplexers, TMAs and coax can use #6 stranded.
Between bus bars, from the BTS cabinets, and other non equipment metal objects
require #2 stranded. Any conductor that is buried must be #2 tinned. All grounds
required to have printed labels at each end of the conductor. You are allowed not
more than 1/8” shiner when connecting to a ground lug. Any shiner on the ground
conductor greater than 1/8” must be redone.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 22
#10 Antenna Orientation
ATT-002-290-502-1 & RFDS; Antenna orientation: Azimuths set according to the
latest RFDS. Verify before you complete the job. You must use a Sunnto or other survey
quality compass to verify azimuths
A declination value represents the error between Magnetic North and True North, at a specific
location. Declinations can be found by zip code or Latitude and Longitude at:
http://www.ngdc.noaa.gov/geomagmodels/struts/calcDeclination
Add the declination to the RFDS if you are East of 0 declination, subtract the declination if
you are west of 0 to get magnetic North referenced setting. (REF; If you are looking at the
map or settings obtained from NOAA you must compute the declination back to zero.)
Always confirm that the market is utilizing this declination. They may keep one value for
all sites in the market.
DECLINATION - Declination refers to the measured difference between the Magnetic North indicated
by the compass and the True North of the map. All antennae are set to TRUE NORTH.
DEVIATION - Iron and metal objects near the compass, e.g. some watches or glasses with metal
frames, will cause deviation; towers, fences, vehicles and piers made of metal reinforced concrete,
and underground pipes are also potential causes for deviation.
Use the following map for general guidance, it is a 2004 map, but the theory is the same:
If east of the Mississippi, add the value to the RFDS; if west subtract the value.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 23
•
Add the declination to the RFDS if east of 0 declination or
Subtract the declination to the RFDS if west of 0 declination. (An alternative method per the
AT&T 502 allows you to start with a magnetic azimuth but you must utilize the declination as
it is represented on the NOAA website or on the depiction below.)
Antenna azimuth: azimuth variance +/- 5 degrees of RFDS, true north. Take into account the
ATT market specified declination. Another method using Earth.google.com is
acceptable when verifying azimuths on a rooftop.
#10 Antenna Orientation (cont.)
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
# 10 Antenna Orientation (cont.)
Below you can see the difference that takes place in relationship from true North to magnetic North. Because the earth leans on an axis and the magnetic North is basically straight up and down there will be a deviation between the two.
24
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 25
#11 Identification – Color Coding
ATT-002-290-502-46; Coax identification color coding: Verify coax has been
color coded using colored vinyl tape per project specifications. Color Code may be
Market specific. Coax is required to have color coding at the top of the tower,
bottom and inside the penetration of a shelter or between floors. Top side color
coding must be 3 wraps, 3” bands with a 1” spacing between bands. Bottom side
of the tower uses 3 wraps of ¾” colored tape with ¾” separation.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 26
#12 Identification: Tagging
ATT-002-290-502-46; Coax identification / Tagging: Verify the appropriate tags as called
for by the Project or Market specifications have been attached to the coax inside the hatch
plate. Tags are not required on top. Each RF cable will be identified with a metal ID tag made of
stainless steel or brass. The tags will be 1-1/2” in diameter with ¼” stamped letters and
numbers.
Each physical tag will be stamped with the sector, cable number, and “AT&T” in accordance to
the example diagram below: The letter indicates the sector and the number BEFORE the decimal
indicates the main coax number on that sector increasing in a clock-wise direction. The number
AFTER the decimal is only used when more than one jumper is associated with a main coax and
indicates the jumper number that is associated with that main coax.
AT&T
B-4.1
The tags should be
attached with corrosion
proof wire, such as
stainless seizing wire,
around the cable
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 27
#13 Coax Supports
ATT-002-290-502-45; Coax hanger/support: Verify coax is supported in accordance
with project specifications and manufacturer’s recommendations. Dependent upon type
of coax hangers the general rule to follow is support the coax (hard line) 12” from the
connector and then every 3’ horizontally and every 4’ vertically up a waveguide ladder.
Coax hoisting grips are required at the top of the tower and mid spans if over 200’. The
hoisting grip will be placed below the coax ground kits on the tower.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 28
#14 Jumpers
ATT-002-290-502-49; Coax jumpers - Verify the correct number and length
jumpers have been installed. Verify jumpers are dressed (routed), supported (18”
from the connector and then minimum every 3’) ,and drip loops are supported. On a
vertical cable ladder you will be required to support it every foot. You are allowed
to have the jumper hang 3’ maximum from the cable tray to the BTS equipment.
18 inches
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#15 RET Grounding
ATT-002-290-502-168; RET cable grounding is a requirement similar to coax grounding.
• Ground the RET system at the antenna actuator, or the ATLP200-xxx unit if a ground stud exists.
• Depending upon the market, ground mid span with correct ground kit. (Market specific)
• Ground the lightning protection device at the bottom to the MGB.
29
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 30
#16 Antenna Mechanical Down Tilt
ATT-002-290-502-2; Antenna mechanical down tilt: Make sure each antenna has a
label with site name and antenna position. Make sure the photographs have a date
stamp. As specified on the RFDS +/- 1.0 degrees tolerance is allowed. Down tilt readings
should be taken from the top back plane of the antenna.
Ensure the level has not been placed on hold function to take the downtilt readings
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 31
#17 Fiber Paper
ATT-002-290-502-143; Fiber paper: Verify that fiber paper is utilized when cable
waterfall over the cable racks. Fiber paper is also required for jumper transitions,
and around sharp objects on an inside cable tray. (example, all thread, edges of
customized racks.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 32
#18 Lacing & Tie Wraps
ATT-002-290-502-48; Lacing & tie wraps: Verify lacing and tie wraps are installed in
accordance with Regional and/or market standards. Verify tie wraps are installed where
required to secure ground wires. Verify the ends have been trimmed flush with no sharp
ends (within 1/32”). Tie wraps are not to be used as primary support for coax or power
cables on vertical runs. Black UV rated tie wraps are required when outside. When
securing jumper material the tie wrap or lacing cannot cut into the outer sheeting of the
jumper. Use the proper stitch when securing.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 33
#19 Ground Bar Size & Type
ATT-002-290-502-59; Ground bar size & type: Verify ground bars are the correct
type and sized in accordance the engineering specifications and the site
construction drawings. Dependent upon the purpose of the ground bar, it’s size
should be adequate to serve the purpose that it is intended. There is a size
difference in a collection bar, Master Ground Bar, and Telco bar. For this reason
you will be required to confirm with the construction drawings and/or AT&T specs
to get the correct size ground bars. All interior ground bars will require isolators.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 34
#20 Ground Wire Lug Attachment
ATT-002-290-502-67; Ground wire lug attachment: Verify ground lugs are
crimped per the manufactures recommendation with no deeply nicked or broken
wire strands, and that the wire insulation termination is within 1/8 inch of the
barrel. A shiner greater than 1/8” must be redone. You will be required to prep
the surface that you are attaching the lug to. If it is painted you must remove the
paint to bare metal at least 1/8” around the lug.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 35
#21 Breaker Labeling
ATT-002-290-502-82; Breaker panel and sub panel Labeling: Verify installed
breakers and/or sub panels are clearly labeled or identified as spares per the
construction drawings and/or project specifications and/or other regulatory
agencies specs. All labels are to be a printed label. No hand written labels are
allowed.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#22 BTS or RBS Equipment Labeling
ATT-002-290-502-85; BTS or RBS equipment labeling must be in a location that can easily be viewed, clean, dry, smooth surface.
• It must be legible from a normal distance, and not hand written. • Stamping or labeling is the only approved method for designating equipment.• The minimum font size for labeling is 1/16”. Font size shall be increased to fit
available space.• When applying a label to a textured or smooth surface, a piece of plastic or
rubber shall be used to press the label to conform to the textured surface. This can be visually verified when the label changes from a slight haze to a clear finish.
• Labels shall be placed so that they do not peel or lift but remain permanently affixed.
36
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 37
#23 Earthquake Bracing
ATT-002-290-502-96; Earthquake bracing: Verify earthquake bracing is installed
per the construction drawings and/or project specifications. Confirm with your
market if earthquake bracing is required.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#24 RET Installation
ATT-002-290-502-166; RET installation can encompass all aspects of the RET install. The antennas to the controller will be assessed to ensure installation was conducted according to manufactures and AT&T’s specificaiton.
• Ground all items that are to be grounded. Insure connections are tight. • Utilize all, and correct hardware when installing the controller and dressing in
the cableing. • Make appropriate connections, do not over tighten or leave a cable hanging. • Tag or label DC power conductors at the controller and circuit breaker. • Make sure it is functional and electrical tilts have been completed and
verified.
38
Female
Male
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#25 Site Grounding
ATT-002-290-502-69; Site grounding. This can also be a catch all for grounding issues. Line item such as 55,60,62,68,70,71,75 all encompass some type of site grounding. Specifically watch for issues that are connecting bus bars and equipment to the external ground ring.
• All MGBs should have dual #2 tinned ground conductors run down to the external buried ground ring. Surround those conductors with sealed PVC or flex conduit.
• Secure all down leads at a minimum of every 3’ to tower steel or the shelter wall.
• Connections to MGBs and underground will be made with cad weld process. Minor exceptions may apply.
• Coax runs more than 200’ must have a mid level ground, supported by a mid level hoisting grip below the ground point.
39
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 40
#26 Disconnect Switch Labeling
ATT-002-290-502-83; Disconnect switch labeling: Verify the electrical disconnect
switch is clearly labeled per the construction drawings and/or project
specifications. The individual market will dictate size and type of label. The label
must be a printed or embossed type of label. It cannot be hand written.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 41
#27 Meter Pan Labeling
ATT-002-290-502-84; Meter pan labeling: Verify the meter pan for the AT&T site is
labeled per the construction drawings and/or project specifications. The individual
market will dictate size and type of label. The label must be a printed or embossed type
of label. It cannot be hand written.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 42
#28 Ground Bars: Anti-Corrosion Compound
ATT-002-290-502-64; Ground bars: Anti-corrosion compound: Verify the ground wire
lugs/ground bars have been coated with anti-corrosion compound prior to making and
tightening the connections to the ground bars. Use of the anti-corrosion compound
should be utilized anytime you have two dissimilar metals that are connected to
perform a ground.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 43
#29 Electrical Routing & Termination
ATT-002-290-502-120; Electrical routing
and termination: Verify conductors are
routed, terminated, and are tight per the
construction drawings and/or project
specifications. This inspection should be
performed prior to energizing the system
(otherwise, visually inspect only). SEPARATE
THE DC POWER FROM ANY RF OR FIBER RUNS
IN A CABLE TRAY. Underground power runs
will be run per the AT&T construction
drawings. Any deviation must be annotated
on the redline construction drawings. Power
conductors must be either taped or have heat
shrink on the ends if they are not terminated.
Lock out tag out must be utilized. P-touch
type labels are the only labels permitted for
signal and power installations
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#30 Cold Galv on Cut Unistrut
ATT-002-290-502-146; Cold galv coating is required on cut unistrut as well as other galvanized material. After cutting or grinding the galvanization off the metal it must be treated with at least 3 coats of cold galv to protect from rusting. Caps must be placed on the ends of unistrut. The only exception to this is when the unistrut has been flush cut with the end of the equipment that is being mounted to it.
44
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#31 Fiber and DC Cable Installation
ATT-002-290-502-31; Fiber and DC cable installations must be run seperately. Each has their own set of specifications. Fiber specs can be located in ATT-TP-76461 and DC runs are located in the ATT-TP-76300.
• Each has their own minimum bend radius that has to be adhered to. • They must be tagged and terminated properly.• Excess fiber must be coiled and placed in a fiber management box located
outside the shelter. No more than 10% of the run can be inside the shelter.• DC cable is required to be trimmed to fit, unless it is in a temporary location
and a further hot swap is anticipated. • Fiber must have factory terminated ends remain in tact until they are
installed in the equipment.
45
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 46
#32 Ground Wire Bend Radius
ATT-002-290-502-65; Ground wire bend radius: Verify the minimum 6 inches ground
wire bend radius has been maintained per the construction drawings and/or project
specifications. You cannot have a ground conductor with more than a 90° bend at the
ground lug connection. The connection between the ground lug and the ground
conductor cannot be stressed. The conductor must flow out of the lug barrel before it
starts any bend.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 47
#33 Ice Bridge Grounding
ATT-002-290-502-60; Ice bridge grounding: Verify the ice bridge support posts are
grounded to the ground grid per the construction drawings and/or project
specifications. Verify that the grip strut is grounded across sections and the grip
strut is grounded to the ice bridge post in a down and away manner from the tower,
with #2 ground conductor. Cold galv paint must be applied where cad welds have
been used or cuts and abrasions have occurred. Flex conduit/PVC is required for #2
tinned it must be sealed and extend into the ground several inches.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 48
#34 Trespassing Signs
ATT-002-290-502-159; Danger No Trespassing signs: Verify "DANGER NO
TRESPASSING" signage is posted (AT&T sites only): This needs to be posted at
access points and per construction drawing directions.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 49
#35 Surge Arrestor Grounding
ATT-002-290-502-23; Verify surge arrestors have been grounded to
specification. You can ground each one individually with #6 green stranded or
each shelf of the surge arrestor rack with a #2 green stranded or if the side
brackets of the surge arrestor rack is the same copper material you may use two
#2 green stranded conductors back to the MGB. Lugs must be 3/8” double hole
lugs and are the appropriate size for the conductor, crimped properly, and landed
with stainless steel hardware.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 50
#35 Surge Arrestors, RET Lighting Protection, Bias T’s
ATT-002-290-502-23; Surge Arrestors, RET lightning protection devices, Bias-Ts
etc, have been installed correctly and mounting hardware is tight
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 51
#36 Connector Weatherproofing
ATT-002-290-502-31; Service affecting, weather proofing. Findings that fall
in this category are generally connectors that do not have any weather
proofing at all , only a courtesy wrap on the connector, reservoirs where water
is pooling and If it is perceived to not be able to last the warranty period.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 52
#37 Mast Grounds
ATT-002-290-502-78; Mast grounds: Verify installed masts are grounded using
exothermic welds or made using another project approved connection method and are
connected to the ground grid per the construction drawings and project specs. The size
of conductor is required to be a #2. Exothermic weld is the preferred method of
grounding where practical. (exothermic welds can be done on the ground and then
installed at heights)
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 53
#38 Coax Bend Radius
ATT-002-290-502-43; Coax Bend Radius; Verify coax has not been damaged by over-
bending per project specifications and manufacture commendations. Verify drip loops
are installed where required and supported. The bend Radius is minimum of 7 X the
diameter of the coax used.
7 x coax diameter
at a minimum
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 54
#39 Cad Welds
ATT-002-290-502-68; Exothermic Bonds (cad welds): Verify exothermic bonds are formed
per specifications. All ground ring connections buried in earth are parallel, exothermically
welded connections. Exothermic welds shall be done by technicians certified on the process.
Unacceptable
Strands showing below weld level
Higher than normal
Normal
Minimum acceptable
Minimum acceptable levelNormal
Higher than normal
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 55
#40 Equipment Hold Down Bolts
ATT-002-290-502-93; Frame or equipment anchor and/or hold down hardware:
Verify frame or equipment hold down hardware is installed and tightened (thread
projection requirements) where required per the construction drawings and/or
project specifications. The anchors in concrete should be fully seated and tight
when anchor bolt is installed. Tower anchor bolts should have enough threads on
top of the locking nut to shed water and not create a pool effect. Confirm with the
turf if a plinth is required.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#41 Lightning Protection Devices
ATT-002-290-502-170; RET lightning protection devices (LPD) are to be installed correctly per mfg specifications. The LPD must have the AISG cables connected and finger tight. Do not over tighten this connection. The pins can shear off and short out the RET system. They must either be grounded with #6 green stranded ground conductor or mounted directly to the ground bar. (Confirm with the market when mounting directly to the bus bar.)
56
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 57
#42 Ground Kits
ATT-002-290-502-40; Ground kits: Verify coax ground kits are installed per the
construction drawings and/or manufacturer’s recommendations. Additional coax ground
kits may be required if you are over 200’ distance from the kits at the bottom of the
tower.. Coax ground kits are to be installed at the top of a tower, bottom of a tower, at
the port entry(unless the coax run is less than 8’ from the tower). Ground the coax at
least 6” above the drip loop bend in a down and away manner. Ground kits cannot be
installed on the bend radius of the coax. They must be no more than 10’ and no less
than 18” from the connector.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 58
#43 Ground Bars: Location & Labeling
ATT-002-290-502-62; Ground bars: Location and Labeling: Verify the installed ground
bars are located and labeled per the construction drawings and the project
specifications. Confirm that you have an additional ground bars when you are going
over 200’ run. Locate the ground bars appropriately as the height of the RAD center
increases.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 59
#44 GPS Antenna/Mounts
ATT-002-290-502-79; GPS Antenna / Mounts: Verify the GPS antenna and mounts are
grounded per project specifications. This line item indicates that the GPS mount is
required to be grounded as well as the GPS antenna. If the antenna does not have a
grounding lug then the mount itself will be required to be grounded.
These GPS mounts
do not have the
required
grounding.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 60
#45 Conduit Support Clamps
ATT-002-290-502-95; Conduit support clamps: Verify conduits clamps are
installed per the construction drawings and/or project specifications. Support of
flex conduit or carflex falls under this same line item. Ground conductors in PVC or
flex conduit must be secured between the MGB to the ground. It must also be
secured to a concrete pad to prevent a trip hazard.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 61
#46 Transport Alarms Wiring Installation
ATT-002-290-502-130; Transport Alarms wiring installation: Verify transport alarm
wiring and the 66 block has been installed and labeled.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#47 Battery Installation
ATT-002-290-502-184; Battery installation is according to manufactures specifications. AT&T does have a few check items that are required when installing batteries.
• No-ox is required on terminal lugs and straps• Battery racks are required to be grounded• Proper crimps are required on lugs. (correct dies, no loose or protruding
wires, no shiners, clear heat shrink at lug points)• Battery wiring must be secured to framework/cable trays. No zip ties, laced
and fiber insulation wraps are to be installed at framework contact and transition points. (fiber insulation wraps must be installed at every framework contact point unless textile covered power wiring is installed. Fiber wraps are required on textile covered power wiring at any bend or transition across or over the framework.
• Batteries connected to interim bus bars prior to DC plant connection.• Labeled with manufacturer, install date, and rating.• Stainless steel washers applied per manufacturer specifications.• Verify the battery installation is documented in the Environmental Database
of record (CSS). • Confirm with the turf if earth quake bracing is required for that region.• Confirm with the turf if an ISO isolation pad is required for that region.
62
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#48 Antenna Mounting Bracket
ATT-002-290-502-3; Antenna mounting bracket and hardware are to be properly installed per manufacture specs. They will have the correct stack up with the hardware provided by the manufacture and be tightened. All brackets that came with the antenna will be installed. Some exemptions can be allowed for the down tilt bracket to be installed on the bottom to gain the correct Mechanical Down Tilt.
63
If back up nuts come with the
antenna they must be installed
and tightened
It is doubtful that you will ever have this much
mechanical down tilt on an antenna.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 64
#49 TMA/LNA & PDU Installed
ATT-002-290-502-5; TMA/LNA & PDU installation; Correct units installed per
RFDS or redline RFDS to submit to AT&T in close out documentation. Installed
and mounted properly with correct hardware and tightened to mfg specification.
Grounded to AT&T specifications. ATT spec allows for no more than 5* +- tilt
angle.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 65
#50 Connector Stress & Distortion
ATT-002-290-502-32; Jumpers stressed at the connector. AT&T requirement is
the jumper must extend 6” beyond the connector before the bend radius begins on
a jumper and 12” for coax larger than ½”.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 66
#51 Coax Protective Ice Shield
ATT-002-290-502-50; Coax protective ice shield: Verify coax ice shielding is
installed per construction drawings and/or project specifications. Insure the
mounting hardware for the grip strut is in place and tightened to manufacture
specifications. Trapeze are required to be hung in correct locations to support
coax under the grip strut. Cold galv paint must be applied where cad welds have
been used or cuts and abrasions have occurred.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#52 H-Frame Installation
ATT-002-290-502-148; H-frame installation encompass, External frames, diplexer frames, end caps, cold galvanized paint, stainless steel or galvanized hardware outside, and stainless steel hardware inside. All mounting bolts are to be tightened and a mark placed across the nut and bolt to show it has been tightened. Adequate amount of unistrut is utilized to secure the equipment being installed.
67
Additional support and proper dressing is required on
jumpers and conductorsEnd caps and cold galv paint
required on unistrut
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 68
• #53 Mounting Hardware
ATT-002-290-502-19; Mounting hardware for diplexers should be tight and mounting rack
should be secure. Hardware should be stainless steel inside or outside applications.
Must use stainless hardware, not zinc
plated
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 69
#54 Loose or Cross-Threaded Connectors
ATT-002-290-502-30; Loose or cross threaded connectors should be aligned
straight before threading the connectors together and should be tightened to
AT&T or Manufacture specifications. You will be required to utilize a torque
wrench for this purpose.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 70
#55 Structural Steel Bolts
ATT-002-290-502-94; Structural steel bolts for tower, steel platform, ice bridge,
and other appurtenances: Verify structural steel bolts are installed and tightened,
have the minimum required thread engagement, and have the correct washers
installed per the construction drawings and/or project specifications. Tower anchor
bolts should have enough threads on top of the locking nut to shed water and not
create a pool effect.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 71
#56 Fences & Gates Locked
ATT-002-290-502-108; All AT&T facilities and equipment are required to be
locked and secured. Fences & gates locked: Verify fences and gates are installed
per the construction drawings and are intact, and that gates have locks installed
and are locked upon arriving at the site. Notification of The CM, PM, and AT&T is
mandatory when you find this issue. Do not just walk away from a compound that
hasn’t been secured. Ensure the gates are locked upon departure.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 72
#57 Electrical Component Installation
ATT-002-290-502-119; Electrical component installation: Verify breakers, pull
boxes, junction boxes, and panels etc. are installed per the construction drawings
and project specs. If the installation is not reflected on the construction drawings
you will maintain at least the NEC standards of installation. Red line the
construction drawings and have them signed off by AT&T market personnel.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#58 RET Controller
ATT-002-290-502-167; RET controllers are to be installed level, utilizing all the stainless steel hardware for appropriate mounting of the unit.
The unit is to be grounded with #6 green stranded conductor and associated lugs. If you are grounding to the FIFE rack, you must scrape the paint off and apply no-ox prior to attaching the ground lug. Some turfs may allow for smaller ground conductor size. Confirm before dropping to a smaller size conductor.
You must place a P-tag on the DC power supply.
73
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 74
#59 Documentation
ATT-002-290-502-196; Documentation: Verify the inspection documentation
provided to the auditor is up to date and accurate. All close out documentation
must be uploaded to the appropriate data base.
If there are any Red lined drawings, or RFDS it must also be uploaded with the
close out documentation.
Failure to upload the most recent or the corrected RFDS may create issues with
how the third party auditors review the site and create unnecessary findings.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#60 Correct Antennas Installed
ATT-002-290-502-#4; Insure correct antennas are installed per RFDS specifications. When you document the antenna models and serial numbers do not copy it directly from the RFDS. Verify the information from the antenna on the tower. If a change has been made by RF, redline it on the RFDS and upload into the correct database.
75
New Antenna Manufacturer Andrew Andrew AndrewNew Antenna Model Number
DBXLH-8585A-R2M
DBXLH-8585A-R2M
DBXLH-8585A-R2M
Excerpt taken from RFDS shows incorrect
antennas have been installed.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 76
#61 External Kinks & Dents
ATT-002-290-502-44; External kinks and dents: Verify coax has not been
damaged as evidenced by kinks or noticeable dents in the cable. Protect all
jumpers and coax from tower steel to prevent dents and coax damage.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#62 Interior Grounding Ring
ATT-002-290-502-56; Interior halo grounding ring must be designed with in AT&T specifications. There may be some adjustments depending upon the space that you are installing the ground ring in. ex. TI or replacing an existing shelters halo.
The interior of the shelter/TI is a separate grounding window. All cable trays, metal work over a 6” size should be separately grounded to the
MGB. The down leads to the exterior ground ring should be bi-directional when attaching to the halo.
All connections should flow in the direction of the MGB. All peripheral grounds should flow in the direction of the MGB.C-tap or H-tap compression crimp type connections are the only allowable
conneciton when mating to the interior ground halo.The Halo should have two ground conductors attached to the halo. Each one will
flow in the opposite direction
77
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 78
#63 Conduit Grounding
ATT-002-290-502-72; Conduit grounding: Verify metal conduits have been
grounded per the construction drawings and/or project specifications. Verify that
National Electrical Code has been taken into account when grounding conduits. For
clamps, the heavy duty type using bronze saddles is preferred.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#64 Telco Cabinet Labeling
ATT-220-290-502-86; Labeling the telco cabinet/enclosure is a requirement on all AT&T owned sites and AT&T proprietary cabinets. If the there is a community telco rack that is owned by another entity (ATC or Crown) the requirement is not there to label that cabinet.
The label must not be hand written and follow similar labeling requirements that have been published for meter bases, disconnect switches, BTS cabinets and other.
The label must be a printed label.
79
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#65 Cable Grip Kits / Strain Relief
ATT-002-290-502-177; Hoisting grips are required on Coax, as well as other cabling going up the tower. The installation of the grip must adhere to the mfgs installation instructions. If it is a lace up style it must be tied off according to the instructions supplied.
The hoisting grip must be secured back to the cable that it is supporting. This can be done with the clip that comes with the grip or with several wraps of 2” tape. Insure that you start on the cable and extend at least 2” above the bottom of the grip.
You must secure the actual grip to the tower steel at a location capable of supporting 3x the weight of the cable that it is attached to. It must be secured with shackles or other connecting device capable of carrying the weight.
Hoisting grips must be installed below coax ground kits that have been installed.
Follow the same rule for installing hoisting grips as you do for ground kits. If you are going over 200’you must have a mid level hoisting grip, and thenone at the top. 400’ would require yet another grip.on monopoles you will need to support it at the top and connect to the attachments provided with the tower.
80
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#66 Antenna Spacing
ATT-002-290-502-6; Per the RFDS what position is the antenna supposed to be in. If the turf has indicated a minimum antenna separation, it must be followed. Below is an excerpt from a RFDS. It is in the general information that is given for the scope of work on the site. If the position has been changed, redline the RFDS and upload it into the appropriate database.
81
Description of Cabling Configuration Changes / Additions(Append sketches to next page regarding
antenna/cabling details)
Sector A
Remove: - Tower (6) diplexers - Cable trayInstall:- New (2) Ericsson KRY112 75/1 TMA's (match existing) - Move GSM to Antenna 1 and UMTS to Antenna 5 - New 3106 UMTS Cabinet (room on pad) - Install new 50 amp AC breaker, - Add AC/Telco conduit for new 3106 cabinet - Power GSM TMA's from 1900 cabinet (existing) - Add new DC stops as required - Add RF jumpers (see diagram) - Existing RET main and daisy chains - Add (6) surge arrestors
Sector B
Install:- New (2) Ericsson KRY112 75/1 TMA's (match existing) - Move GSM to Antenna 1 and UMTS to Antenna 5 - Add new DC stops as required - Add RF jumpers (see diagram) - Existing RET main and daisy chains
Sector C
Install:- New (2) Ericsson KRY112 75/1 TMA's (match existing) - Move GSM to Antenna 1 and UMTS to Antenna 5 - Add new DC stops as required - Add RF jumpers (see diagram) - Existing RET main and daisy chains
General Comments 2010 UMTS Add
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#67 Correct Surge Arrestors Installed
ATT-002-290-502-22; Ensure correct surge arrestors have been installed per RFDS. This may or may not be detailed on the RFDS. If it is not then verify with the turf which ones to use and document it on the redline RFDS and upload it into the appropriate database.
Correct installation of surge arrestors is required. Andrews coax surge arrestors are designed to have the barrel up or down, Huber Suhner installation instructions call that the barrel be in the upright position. There is a small amount of variance for plumb.
Place a mark across the nut and connector to indicate that proper torque has been placed on the connection.
Each surge must be grounded. Either Individually or in a surge arrestor rack.
82
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 83
#68 Interior Coax to Jumper Connections
ATT-002-290-502-35; Interior jumper to coax connections. Connectors have been
properly installed with no copper showing.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#69 Coax Size
ATT-002-290-502-39; Ensure correct size and type of coax has been installed per RFDS. Insure that the correct coax is picked from the warehouse. If it is not the same size as the coax that is existing VERIFY with appropriate management to ensure the changes are correct.
84
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 85
#70 Lock Washers
ATT-002-290-502-92; Lock washers: Verify fasteners have lock washers installed
where required per the construction drawings and/or project specifications.
Hardware must be tightened to ensure full engagement of the lock washers. This
would apply to all locking washers utilized on the project.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 86
#71 Safety Climb
ATT-002-290-502-105; Safety climbs: Verify AT&T-owned towers and/or
monopoles have a usable safety climb (not obstructed by cable runs or protruding
hardware) that is in good working order and installed per the construction
drawings, OSHA requirements, and/or project specifications. Always do a body
weight check prior to climbing the tower. Verify that the cable is tightened to
specifications and that all the cable securing points have the appropriate hardware
to prevent the cable from flapping in the wind.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 87
#72 Stone Fabric
ATT-002-290-502-149; Stone fabric: Verify vegetation barrier fabric and stone
are installed per the construction drawings and/or project specifications. For
existing sites, verify disturbed areas have had the vegetation barrier and stone
replaced or repaired. The mil of the barrier must be commercial grade and per
construction drawings. The depth of the finish grade rock must come up to the
bottom of the fence on the compound. The finish grade rock should not have
excessive dirt from sub grade in it.
Vegetation
fabric must be
covered by
finish grade
rock and come
up to the
bottom of the
fenced
compound
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary
#73 Battery Installation
ATT-002-290-502-181; Verify battery installation is per the construction drawings and or manufacturer specifications. Covers are in place and there is no fluid leaking, cracks, odor, cracking or corrosion on the batteries.
Batteries and battery racls are required to be labeled, With the appropriate sensors installed per manufacturer specifications.
Isolation pads may be required per the turf. Verify with turf management for this issue.
88
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 89
#74 Cable Tray Covers
ATT-002-290-502-91; Cable tray covers: Verify tray covers and fasteners and are
installed per the construction drawings and/or project specifications. There should be
no large gaps between cable tray covers unless required by project specifications.
Cable tray fasteners should be stainless steel or galvanized for external use. Should
be at a minimum, #6 ground conductor. Refer to construction drawings or project
specs to determine material for covers.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 90
#75 Ice Bridge
ATT-002-290-502-97; Each ice bridge leg shall be bonded to the buried ground
ring with No. 2 AWG bare tinned copper conductor. Provide exothermic weld at
both the ice bridge leg and buried ground ring. Ice bridge is installed with
correct hardware. Support posts are properly capped, secured and grounded.
Sharp edges of ice bridge are covered if in close proximity to coax cable.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 91
#76 Lighting
ATT-002-290-502-124; Insure all lighting (indoor/outdoor) is functional,
including DC powered lights if equipped. Insure the lighting in the equipment
areas is adequate and in good repair. Verify emergency lamps are working
properly?
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 92
Corporate Wireless Quality Team
Quality Contacts
Bryan Thornburg
NIS Quality Manager
Mobile 214-364-1207
Jeff Reagin
Wireless Quality Engineer
Mobile 214-491-9143
James Hornbeck
Wireless Quality Engineer
Mobile 214-842-3966
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 93
Quality Contacts
TBDQuality/Safety Officer
Georgia
Brad KollajaQuality/Safety Officer
STX Mobile 469-236-1492
Keith RouseQuality/Safety Officer
IL/WI (Acting)Mobile 214-620-5035
Ryan CaudleQuality/Safety Officer
NTX (Acting)Mobile 214-686-8729
TBDQuality/Safety Officer
AR/OK
Rob SchlotterbeckQuality/Safety Officer
MI/INMobile 214-762-5375
Mike ScottQuality/Safety Officer
PNWMobile 214-240-0351
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 94
Quality Contacts
Ronnie Cechan
Director of Quality and Safety
Office: 972-421-5267
Cell: 214-240-5912
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 95
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 96
# Grounding Test Ports
ATT-002-290-502-70; Grounding inspection sleeve (test port): Verify the ground
test ports are installed per the construction drawings and/or project specifications.
If there is a change to the method of grounding you must get prior AT&T approval
and redline the construction drawings for the close out documentation. The
inspection sleeve should not be in a location for vehicle traffic. You must be able to
verify the cad weld connection by viewing it through the test well.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 97
# Exterior Grounding System Components
ATT-002-290-502-55; Exterior grounding system components: Verify exterior
grounding system components are installed and connected i.e. ground bars,
conductors, exothermic welds, etc. All Master ground bars are required to have
two #2 tinned conductors that route down to the external ground ring for the
shelter. These leads must be attached at the ground ring itself and not tapped into
an existing stinger meant for another piece of equipment. These connections must
be made with exothermic welds where practical. The ground ring for the shelter
must also be connected to the tower ground ring under grade.
2-#2 conductors required
at MGB to the ground
ring
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 98
# Tower Construction
ATT-002-290-502-138; Tower construction (includes stealth designs): Verify
tower is assembled and erected per the construction drawings, project
specifications, and manufacturer’s drawings and specifications. Hardware is
correct type and tight. All tower steel should be hot dipped galvanized. Verify weep
holes are open and abrasions on the steel are covered with three coats of cold
galvanized paint. Verify that there isn’t any bent members. Upon completion of the
construction, verify all hardware has been tightened.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 99
# HVAC & Thermostat Operation
ATT-002-290-502-112; HVAC and thermostat operation: Verify the HVAC system
is functioning for both heating and cooling conditions. Vents are not obstructed.
Let the systems cycle at least once for heat and cool, before you complete your
verification. AT&T market will determine what temperature settings are to remain
on the thermostat after the test is complete.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 100
# Landscaping
ATT-002-290-502-151; Landscaping: Verify landscaping is installed per the
construction drawings and/or project specifications. Note in Comments column if
landscaping installation has been deferred due to weather or season (deferred
item). The landscaping must be alive.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 101
# Fence Grounding
ATT-002-290-502-75; Fence grounding: Verify fence posts are grounded to the
ground grid per the construction drawings and/or project specifications. Metal
fence posts within 6 feet of the buried ground ring shall be bonded at 25 foot
intervals if run continuously. Provide flexible copper strap exothermically welded to
the gate fence post and gate. This ground system will tie into the buried tower
ground ring with a exothermic weld process.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 102
# Tray Grounding
ATT-002-290-502-71; Tray grounding: Verify metal electrical trays have been
grounded per the construction drawings and/or project specifications. Grounding
across sections of cable trays is required. On a rooftop or exterior application you
must use #2, and inside a shelter cable trays you are allowed to use #6. You are
required to use long barrel double holed lugs with stainless steel hardware. The
stack up would be the same as on a ground bar application.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 103
# RF Exposure Signage
ATT-002-290-502-156; RF Exposure Signage: Verify that RF Exposure warning/notice
signs are posted when deemed necessary by local AT&T RF Engineers. Signs should be
posted at access to the sites. if multiple access points there should be multiple signs.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 104
# Antenna Rad Center
ATT-002-290-502-7; Rad Center Height, ensure RAD center is
correct per RFDS +/- 3’. This is a required picture as well as
documented form that will be submitted in the close out
documentation. If it is found to be incorrect it impacts more than just
AT&T. It is also an issue with the FAA, as well as the tower owner.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 105
# Duplexers and/or Diplexers Installed
ATT-002-290-502-15; Correct Diplexers or duplexers installed. Confirm with
RFDS or redline a copy of RFDS to submit to AT&T in close out documentation.
ATT-002-290-502-16; Diplexers or duplexers installed correctly. Verify their
location and that they have been installed to construction drawings
specifications.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 106
# Temporary Structured Removed
ATT-002-290-502-100; Temporary structures removed: Verify temporary
structures built or added to aid with site construction have been removed. This
would include concrete forms, foundation casings (if they are cased to the bottom
of the leg foundation), sonatubes, trash boxes, job trailers, and coax spools.
Forms &
materials
should be
removed after
pour
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 107
# Concrete/Rooftop Equipment Pads
ATT-002-290-502-142; Concrete equipment pad and roof top equipment pads:
Verify rooftop and ground-level equipment pad/platform is installed per the
construction drawings and/or project specifications or photos (location, within lease
boundaries, size, depth (footers excluded), penetrations, etc.). Inspect concrete
for signs of chipping and/or leaching. A champher on the concrete pad is required
on AT&T construction drawings. Pad should be square and level.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 108
# Fuel Tank/Generator Frame Grounding
ATT-002-290-502-73; Fuel tank / generator frame(s) grounding: Verify the
frames of any newly installed generators and/or fuel tanks have been connected
to the ground grid per the construction drawings and/or project specifications.
Metallic objects, not classified as bays or cabinets, such as engine-alternator
sets, fuel tanks, fans and similar units require unit bonding.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 109
# Generator Receptacle
ATT-002-290-502-122; Generator receptacle: Verify site is equipped with AT&T
Mobility standard generator receptacle (cam-lock). The generator plug on the
shelters are required to be grounded to the external ground ring.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 110
# Tower Mounting
ATT-002-290-502-133; Tower mounting (includes stealth designs): Verify tower is
mounted to base and anchorage system per the construction drawings, project
specifications, and manufacturer’s drawings. Tower has been set for positioning of
the tower per manufacture specs. Hardware is correct type and tight. All anchor
nuts are tightened to spec and tower is plumb. Locking nuts are in place and
tightened to specs. There should be enough anchor bolts protruding from the lock
nut that it doesn’t create a reservoir.
© 2008, Goodman Networks, Inc.Confidential and proprietary.
© 2011 Goodman Networks, Inc.Confidential and Proprietary 111
# Cable Rack/Ladder Installation
ATT-002-290-502-150; Cable rack/ladder installation: Verify cable rack/ladder
installation is per the construction drawings and/or project specifications. Verify
that all mounting hardware is tightened to spec. All external hardware must be hot
dipped galvanized or stainless steel. All interior hardware must be stainless steel
or Jacketed Metallic Clad (JMC).