01_MILD_UCV_General overview.pdf

Embed Size (px)

Citation preview

  • 8/14/2019 01_MILD_UCV_General overview.pdf

    1/13

    - MILD HOME-

    Project number: SEE/D/0201/2.4/XProject duration: from 1October 2012 to 30 September 2014

    Venice, 19th November 2012

    Ms M. Flavia Di Noto Mr. Donato Bedin

    My Modular, Intelligent, Low cost, Do it yourself, nearly zero energy

    House for our Eco Green Village

  • 8/14/2019 01_MILD_UCV_General overview.pdf

    2/13

    Project summaryMain objective:

    Defining, designing and boosting the building the first MILDHOMEs (zero emission, in passive house style, reliable,

    recyclable and low cost) conceived to be located in an EcoGreen Village (energetically self sustainable, zero emission

    with eco waste management and low water footprint )The innovative aspect?MILD HOME lies in combining the

    characteristics of a nearly zero energyhouse with low costs :

    How?- materials with good performance

    but not so expensive;- Modularity;- Standardization;- simple but essential automation;- Do it Yourself option

    Innovation is also in modeling of theEco Green Village, where solutions willbe sought for additional energy savingand environmental added value

  • 8/14/2019 01_MILD_UCV_General overview.pdf

    3/13

    Main outputs :

    Main results :

    8 description of MILD HOME at Municipality levelcontaining performance grid, tailored to the local needsand 8 models / structure and organization of Eco GreenVillage

    8 competition of ideas for building an Eco Green villagebased on the MILD HOME concept (creative/innovative

    proposals will be received) Set up 4 pilot executive project of the eco green village

    based on MILD HOME (Castelnuovo Rangone, Milies,Sofia, Savski Venac)

    2 Pilot EGV authorized

    Set up of a permanent SEE network ofexperts to lead design of MILD HOMEand create exchange of know-how

    Development of condition and terms onhow the EGV, based on MILD HOME,may find place in territory planningdocuments and building regulations in theSEE area

    Development of chances for innovativecomponent-products for MILD HOMEtanks to the joining of the SEE intellectualresources and the development of thelocal supply chains

  • 8/14/2019 01_MILD_UCV_General overview.pdf

    4/13

    12 Project Partners

    EU Partners

    UCV - Union of Veneto chambers of commerce ( ITALY);CARA Municipality of Castelnuovo Rangone ( ITALY);

    ENERO Centre for Promotion of Clean and Efficient Energy in Romania (ROMANIA);

    CJCS Caras-Severin Country Council (ROMANIA);

    BCCI Bulgarian Chamber of Commerce and Industry (BULGARIA);ELI European labour Institute (BULGARIA);SOF - Municipality of Sofia (BULGARIA);

    EEE - European Center for Renewable Energy Gussing Ltd Regional ( AUSTRIA);BBI Building Biology Institute (AUSTRIA);

    SZE Szechenyi Istvan University ( HUNGARY)

    IPA PARTNERSMSV - The city Municipality of savski venac (SERBIA);

    Change of 1 partnerMDC Municipal Development Company of Milies will be replaced by the Region of Thessaly

    Project involves partners from EU as well as IPA countries, representing a broad network ofpublic stakeholders, with relevant competences and complementary interests: NationalEnergy Agencies, RES Research Centres and universities , Chamber of Commerce system,regional and local public authorities

  • 8/14/2019 01_MILD_UCV_General overview.pdf

    5/13

    BenefitsDirect beneficiaries

    a)Local public administrationMunicipalities

    They will benefit fromthe :competition of ideas forthe design of the EcoGreen Village based onMild Home

    tools for better orientingthe urban developmentplan

    b) Citizens and civil societyorganizations

    The project aim toinvolve :

    Pairs and singles in theage group ranging from 25to 45 years, which are:a) sensitive toenvironmental problems;b) little capacity to pay forthe purchase of atraditional house;c) strong sense of initiativeand participation in familylife

  • 8/14/2019 01_MILD_UCV_General overview.pdf

    6/13

    Direct beneficiaries

    c) experts, architects and civilengigneers, designers

    They will be involvedin the :

    design of the eco greenvillage based on MildHome realization of the Mildhome exemplary pilotimplementation in

    municipality(Castelnuovo Rangone,Milies, Sofia and savskyVenac)

    d) Selected innovative SMEs ofbuilding local supply chains

    They will find throughthe project:New ways ofdevelopment in a witherSEE marketA great chance ofbecoming leader of anew way of building

  • 8/14/2019 01_MILD_UCV_General overview.pdf

    7/13

    BenefitsKey stakeholders

    a) association/cluster for:house heating/cooling system,building automation and home

    security,Home lighting systems,Association of Home Builders:

    They will becomesuppliers of the promotedtechnologies

    They will see anincrease in their business

    b) Investors and financialinstitution asProject developers, energyservice companies (ESCO) andEPC ( Engineering procurementand construction organization)

    They will providetechnical solutions andturn key systems forvarious Mild HomeModels

  • 8/14/2019 01_MILD_UCV_General overview.pdf

    8/13

    Main steps and WPs

    - WP3 Responsible partner: UCV

    Definition of MILD HOME target users,price band, performance grid and EcoGreen Village model development

    After a first establishment of common frameof performance characteristics for the Mild

    Home:

    8 municipality involved in the project willdevelop their own Eco green village vision onthe basis of an operative model set up byMILD HOME expert

    will be profiled, in terms of structure andorganization 8 model of Eco Green Village

  • 8/14/2019 01_MILD_UCV_General overview.pdf

    9/13

    Main steps and WPs

    WP4Responsible partner: SZE ( University of Gyor)

    MILD HOME design development andknowledge exchange among market and

    technical experts

    Each Municipality group of experts, also taking into accountthe know-how and experience gained during the transnationalweek of meetings (transnational MILD HOME week) :

    will establish in more detail the configuration features ofthe EGVillage for their territory

    will set precisely goals, requirements and technicalspecifications of the MILD HOME

  • 8/14/2019 01_MILD_UCV_General overview.pdf

    10/13

    Main steps and WPs

    WP5Responsible partner: EEE ( European Centre forRenewable Energy Gussing)

    MILD HOME supply chains promotion indifferent regions and training oftechnical assistants and market

    facilitators of the project

    In order to promote the supply chain for MILD HOME itwill be required to set up a verification at local level, withthe presence of suitable building suppliers (materials,components, services).

    Training programme will be addressed to a pool ofarchitects/engineers in each one of the eight locationsdesigned for MILD HOME. The topics will be: design of MILDHOME and Eco Green Villages, administrative procedures, permits forbuilding, commissioning and site management.

  • 8/14/2019 01_MILD_UCV_General overview.pdf

    11/13

  • 8/14/2019 01_MILD_UCV_General overview.pdf

    12/13

    Main steps and WPs

    WP7Responsible partner: SOF( Municipality of Sofia)

    Actions and plans to strengthen thesustainability of MILD HOME projects

    The 4 municipalities, will involve stakeholders, policy makers andsupply chains to address opportunities and problems for building

    MILD HOME and take necessary responsible agreements forfuture realization of an EGVillage based on MILD HOME..

    At the end in at least 2 municipalities, practical concreteactivities should take place , which will lead to the authorizationof the construction of a MILD HOME or better an Eco Green Villagebased on MILD HOME ( two pilots )

  • 8/14/2019 01_MILD_UCV_General overview.pdf

    13/13

    Thanks for your attention

    Unioncamere del Veneto (IT)[email protected]

    [email protected]

    Tel. 0039 340 9709572