HUAWEI TECHNOLOGIES CO., LTD. www.huawei.com Mobilink 2G 3G Site SWAP Solution

0. Mobilink 2G3G Swap Guide V1.8 20150406

Embed Size (px)

DESCRIPTION

Huawei BTS3900 swap solution

Citation preview

  • HUAWEI TECHNOLOGIES CO., LTD.

    www.huawei.com

    Mobilink 2G

    3G Site SWAP

    Solution

  • Page 2HUAWEI TECHNOLOGIES CO., LTD.

    1. Project Background2. SWAP Solution and Scenarios Overview3. Indoor SWAP

    A. Indoor HOT SWAPB. Indoor COLD SWAP

    4. Outdoor SWAPA. Outdoor HOT SWAP

    5. Appendix

    Agenda:

  • Page 3HUAWEI TECHNOLOGIES CO., LTD.

    2G3GProgram Delivery Map( 28 Cluster )

    2G3G Swap Background

    Swap Regions

    Footprint Regions

    Before Swap: After

    Swap:

    Swap

  • Page 4HUAWEI TECHNOLOGIES CO., LTD.

    BTS Swap Solution : Scenarios

    Place: Indoor & Out DoorMethod: HOT SWAP & COLD SWAP

    Existed Cabinets(All -48V DC): 1) RBS6201 (600x400)Indoor Feeder 2) RBS6101 (700x680)Outdoor Feeder3) RBS6301 (450x500)Mini RRU Outdoor 4) RBS6102 (1300x700)Feeder Outdoor

    Proposed Cabinets:1) Huawei APM 30 (DBS 3900 BBU, 2G)2) Huawei APM 30 (DBS 3900 BBU, 2G & 3G)

    Dimensions of the cabinet (W x H x D)600 mm x 700 mm x 480 mm

    Locations/Regions:Karachi & Hyderabad

    Existed Technologies: 1) GSM (2G),

    (G900)

    2) GSM (2G + 3G), (G900 +G1800)

    3) 2GSM+UMTS (2*2G + 3G),(G900+G1800+U2100)

  • Page 5HUAWEI TECHNOLOGIES CO., LTD.

    Solution Band Configuration Product Power

    Output Multi-

    Mode Control

    Board Backup

    Wireless Macro

    Solution

    (DBS Combined)

    RAN16.0

    G900 S444_000 RRU 3936 20W with 4 TRX GO GTMU

    UBRI(if more

    then 6 Carrier)

    G1800 S000_444 RRU 3936 20W with 4 TRX GOGTMU

    UBRI(if more

    then 6

    Carrier

    G900+D180

    0S444_444 RRU 3936 20W GO

    GTMUUBRI(if more

    then 6

    Carrier

    U2100 S222 RRU 3826 20W UO UMPTUBBPd2

    G900+D180

    0+U2100

    S444_444+S22

    2

    RRU3936+RR

    U 382620W GU

    GTMU+UMP

    T

    UBBPd2+UB

    RI

    BTS Swap Solution : Huawei Configurations

  • Page 6HUAWEI TECHNOLOGIES CO., LTD.

    BTS Swap Solution : Huawei Cabinet

    3U

  • Page 7HUAWEI TECHNOLOGIES CO., LTD.

    Specifications of BBU3900

    442 mm x 310 mmx86 mm

    7~12 kg

    A single BBU: Max 24 cells Max CE

    UL: 3072 DL: 4608

    Typical Power consumption: 200W

    Maximal Power consumption: 325W

    2 FE/GE + 4 E1; Max 12 E1 (able to

    share transmission with 2G)

    2U Height, 8 slots

    86.1 mm

    Standard 19 inch cabinet

    UEIU

    Board Description

    WBBP WCDMA BaseBand Processing

    unit(3G)

    UBRI Universal BaseBand Radio

    Interface board(2G )

    UMPT Universal Main Processing &

    Transmission unit(2G/3G/4G co-

    Processing unit)

    UPEU Universal Power and

    Environment interface Unit

    UEIU Universal Environment Interface

    Unit

    Main equipment BBU3900

  • Page 8HUAWEI TECHNOLOGIES CO., LTD.

    RRU3936 900M RRU3826 2100M

    GU

    BBU3900

    GSM/UMTS

    Multi-mode BBU CPRI (Optical Fiber)

    UMTS only

    Weight: 15Kg

    Power: -48V DC

    400mm 300mm 120mm (H*W*D)

    Power consumption: 270W

    IT2R

    Scenario:G444

    Weight: 15Kg

    Power: -48V DC

    400mm 300mm 120mm (H*W*D)

    Power consumption: 270W

    IT2R

    Scenario:D444

    Weight: 15 kg

    Power: 48 V DC

    400mm x 300mm x 120mm (H*W*D)

    Power consumption: 260W

    IT2R

    UMTS only

    GUL

    RRU3936 1800M

    Main equipment RRU

  • Page 9HUAWEI TECHNOLOGIES CO., LTD.

    BTS Swap IT/Mobile Tools

    Team Viewer

    WeChatWhatsAppLine

    Huawei APP

    Get your Smartphone

    Add your contact in advance.

    Take and send pictures to show others.

  • Page 10HUAWEI TECHNOLOGIES CO., LTD.

    BTS Swap IT/Mobile Tools Team Viewerhttp://www.teamviewer.com/

  • Page 11HUAWEI TECHNOLOGIES CO., LTD.

    WeChat Application:http://www.wechat.com/en/

    BTS Swap IT/Mobile Tools

  • Page 12HUAWEI TECHNOLOGIES CO., LTD.

    BTS Swap Solution

    A. Feeder Site Solution.

    B. CRPI Site Solution.

    C. Feeder + CPRI site Solution.

    D. Micro Site Solution

  • Page 13HUAWEI TECHNOLOGIES CO., LTD.

    Karachi and Hyderabad Swap Scenarios

    For All

    Scenario

    New APM30 will be installed at all site

    BBU will be installed in Huawei APM30 cabinet

    IDU shifting to APM30 is required in case E/// IDU is in same cabinet with E/// BTS

    Reuse Jumper and DBC

    Install RRU Pole before SWAP in case there is no space for new RRU.(CIVIL Part monopole MUST )

    Specific

    ScenarioFeeder (macro) CPRI(macro) MIX (Feeder + CPRI) (macro) Micro

    ( 2G + 3G )

    Hot SWAP

    Dismantle E/// BTS,

    Loop test

    Ping test,

    Install Huawei

    BTS,Integration

    Install Huawei RRU\RRU

    power cable and CPRI fiber

    SWAP,

    Reuse exiting RCU.

    Reuse exiting DBC.

    Hot SWAP

    Dismantle E/// RRU first ,then

    install Huawei RRU during

    SWAP.

    Loop test

    Ping test,

    Reuse exiting RCU.

    Reuse exiting CPRI(if possible)

    Reuse exiting RRU power

    Cable(If possible ).

    Hot SWAP

    Dismantle E/// RRU first ,then

    install Huawei RRU during

    SWAP.

    Loop test

    Ping test,

    Reuse exiting Feeder if no

    space available for RRU.

    Reuse exiting RCU.

    Reuse exiting CPRI(if

    possible)

    Reuse exiting RRU power

    Cable(If possible ).Install

    Jumper with feeder to RRU

    Cold Swap / Hot Swap

    DAS part remain same .

    Dismantle E/// RRU first ,then install

    Huawei RRU during SWAP.

    Loop test

    Ping test

    Reuse exiting CPRI(if possible)

    Reuse exiting RRU power Cable(If

    possible ).

  • Page 14HUAWEI TECHNOLOGIES CO., LTD.

    Overview of E/// Existing SiteIndoor Site

  • Page 15HUAWEI TECHNOLOGIES CO., LTD.

    E// BTS Swap solution : Indoor Site

    15

    Before Swap Key Points:

    Remove E// cabinet;Remove Dual band Combiner ;Remove E// IDU if installed in BTS Cabinet if its in E// BTS cab;

    Install HW APM 30 then DBS3900;

    Reuse: existing DC power ;existing jumpers, antenna and DBC;

    New:Power & GND cableTransmission FE cable (New port if E1 2G IP 3G ) External Alarm cable

  • Page 16HUAWEI TECHNOLOGIES CO., LTD.

    E// BTS Swap solution : Indoor Site & Outdoor

    16

    Swap Key Points

    1. Remove RBS Cab 2. Remove Lighting protection 3. Remove Feeder

    1. Reuse Antenna 2. Reuse existing breaker 3. Reuse DBC and RCU

  • Page 17HUAWEI TECHNOLOGIES CO., LTD.

    Huawei DBS 3900

    BBU

    ESN

    ESN needed

    BBU ESN for commissioning

    RCU ESN for RET

  • Page 18HUAWEI TECHNOLOGIES CO., LTD.

    Scenario 1A: Feeder site solution E// BTS +MW in Separate Cab APM30 + DBS3900

    Scenario description :

    Before After

    Scenario description :

    Overall view of site before swapping

    AC

    ROOM

    Equipment be swapped

    AC power cable

    DC power cable

    Grounding cable

    1/2 jumper

    7/8 feeder

    E1 cable

    MW IF cable

    Alarm Report Cable

    GSM

    900

    GSM

    1800

    MW ODU &

    Antenna

    Grounding BarGrounding Bar

    Grounding Bar

    Alarm BoxATS

    ACDB

    DG

    Grounding Bar

    Existing

    MW

    Antenna

    BT

    Overall view of site after swapping

    AC

    ROOM

    AC power cable

    DC power cable

    Grounding cable

    1/2 jumper

    7/8 feeder

    Transmission Cable IP

    MW IF cable

    Alarm Report Cable

    MW ODU &

    Antenna

    Grounding

    Bar

    Grounding Bar

    Grounding

    BarATS

    ACDB

    DG

    19 inch rackAPM 30

    2G&3G

    share

    BBU

    Alarm Box

    Antenna+ RCU

    HW-MW

    RRURRU power Cable

    New AC power cable

    New CPRI cable

  • Page 19HUAWEI TECHNOLOGIES CO., LTD.

    Scenario 1B: Feeder site solution E// BTS +MW in single Cab APM30 + DBS3900

    Scenario description :

    Before After

    Scenario description : In door to Indoor with IDU will be installed in DBS 3900 cab.

    Overall view of site before swapping

    AC

    ROOM

    Equipment be swapped

    AC power cable

    DC power cable

    Grounding cable

    1/2 jumper

    7/8 feeder

    E1 cable

    MW IF cable

    Alarm Report Cable

    GSM

    900

    GSM

    1800

    MW ODU &

    Antenna

    Grounding BarGrounding Bar

    Grounding Bar

    Alarm BoxATS

    ACDB

    DG

    Grounding Bar

    Existing

    MW

    Antenna

    BT

    Overall view of site after swapping

    AC

    ROOM

    AC power cable

    DC power cable

    Grounding cable

    1/2 jumper

    7/8 feeder

    Transmission Cable IP

    MW IF cable

    Alarm Report Cable

    MW ODU &

    Antenna

    Grounding

    Bar

    Grounding Bar

    Grounding

    BarATS

    ACDB

    DGAPM 30

    IDU

    Alarm Box

    Antenna+ RCU

    HW-MW

    RRURRU power Cable

    New AC power cable

    New CPRI cable

  • Page 20HUAWEI TECHNOLOGIES CO., LTD. Page 20

    Scenario 1C: Feeder site Outdoor solution E// BTS +MW in Same Cab APM30 + DBS3900

    Scenario description :

    Page 20

    Before After

    Overall view of site after 2G & 3G

    AC

    Existing Equipment

    AC power cable

    DC power cable

    Grounding cable

    CPRI Cable

    7/8 feeder

    E1 cable

    MW IF cable

    Alarm Report Cable

    MW ODU &

    Antenna

    Grounding BarGrounding

    Bar

    Grounding Bar

    ATS

    ACDB

    DG

    Grounding Bar

    RRU

    Antenna

    Scenario description : Feeder is installed in existing scenario, we will remove the feeder , install RRU on Tower.

    Overall view of site 2G

    AC

    Equipment be swapped

    AC power cable

    DC power cable

    Grounding cable

    1/2 jumper

    7/8 feeder

    E1 cable

    MW IF cable

    Alarm Report Cable

    MW ODU &

    Antenna

    Grounding BarGrounding Bar

    Grounding Bar

    ATSACDB

    DG

    Grounding Bar

    Existing

    MW

    Antenna + RCU

    CPRI Cable

    Existing

    MW

    BBU

    AC power cable

    APM 30

    CPRI cable

  • Page 21HUAWEI TECHNOLOGIES CO., LTD.

    Scenario 2: CPRI Site solution E// BTS +MW in Same Cab APM30 + DBS3900

    Before After

    Overall view of site after 2G & 3G

    AC

    Existing Equipment

    AC power cable

    DC power cable

    Grounding cable

    CPRI Cable

    E1 cable

    MW IF cable

    Alarm Report Cable

    MW ODU &

    Antenna

    Grounding BarGrounding

    Bar

    Grounding Bar

    ATS

    ACDB

    DG

    Grounding Bar

    RRU

    Antenna

    Scenario description : Reuse of existing CPRI & RRU Power cable, Reuse of RCU.

    Overall view of site 2G/ 3G / 2G+3G

    AC

    Equipment be swapped

    AC power cable

    DC power cable

    Grounding cable

    1/2 jumper

    7/8 feeder

    E1 cable

    MW IF cable

    Alarm Report Cable

    MW ODU &

    Antenna

    Grounding BarGrounding Bar

    Grounding Bar

    ATSACDB

    DG

    Grounding Bar

    Existing

    MW

    Antenna + RCU

    CPRI CableExisting

    MW

    BBU

    AC power cable

    APM 30

    CPRI cableCPRI cable

    CPRI Cable

  • Page 22HUAWEI TECHNOLOGIES CO., LTD.

    Scenario 3: MIX Feeder + CPRI Site solution E// BTS +MW in Same Cab APM30 + DBS3900

    Before After

    Overall view of site after 2G & 3G

    AC

    Existing Equipment

    AC power cable

    DC power cable

    Grounding cable

    CPRI Cable

    E1 cable

    MW IF cable

    Alarm Report Cable

    MW ODU &

    Antenna

    Grounding BarGrounding

    Bar

    Grounding Bar

    ATS

    ACDB

    DG

    Grounding Bar

    RRU

    Antenna

    Scenario description : Reuse of existing CPRI & RRU Power cable, Reuse of RCU Install RRU on shed Leg in cross for load balance.

    Overall view of site 2G/ 3G / 2G+3G

    AC

    Equipment be swapped

    AC power cable

    DC power cable

    Grounding cable

    1/2 jumper

    7/8 feeder

    E1 cable

    MW IF cable

    Alarm Report Cable

    MW ODU &

    Antenna

    Grounding BarGrounding Bar

    Grounding Bar

    ATSACDB

    DG

    Grounding Bar

    Existing

    MW

    Antenna + RCU

    CPRI CableExisting

    MW

    BBU

    AC power cable

    APM 30

    CPRI cableCPRI cable

    CPRI Cable

    BTS Shed

    BTS Shed

    RRU ion tower leg if no space on tower

  • Page 23HUAWEI TECHNOLOGIES CO., LTD.

    Per SWAP if possible : Indoor Site

    23

    Pre Installation Before Swap

    1

    2

    3

    4

    5

    6 2

    Steps:

    1. Install HW Temporary APM30 & DBS3900;

    2. Connect grounding and Power cables

    3. Power on HW DBS3900 cabinet;

    4. Lay FE cables 5. Install RRU if space

    available6. Lay RF jumpers 7. Lay External Alarm

    connection

    7

    IDU

    RBS E// Cab

  • Page 24HUAWEI TECHNOLOGIES CO., LTD.

    Pre swap if possible: Indoor Site

    24

    Swap Remove Key Steps:0. SWAP preparation & Transmission check(ping)

    1. Dismantle & Swap Transmission (E1/FE) cables

    2. Power off E// cabinet;3. Disconnect RF

    jumpers, Dismantle & Lightening cable,

    3. connect HW Jumpers;4. Connect external

    alarm cable5. Disconnect Power &

    grounding cables6. Remove Cabinet

    1

    2

    3

    4

    5Dismantle

    APM30

    CPRI

    6

    4

  • Page 25HUAWEI TECHNOLOGIES CO., LTD.

    RRU Connectivity for 2G A B C

    *NOTE : Connect FE cable from BBU FE0 to IDU for Future use

  • Page 26HUAWEI TECHNOLOGIES CO., LTD.

    RRU Connectivity for 2G Dual Band (6+ RRU) A B C

  • Page 27HUAWEI TECHNOLOGIES CO., LTD.

    RRU Connectivity for 2G Dual Band +3 G

  • Page 28HUAWEI TECHNOLOGIES CO., LTD.

    RRU Connectivity for Configuration more 1 RRU in 1 Sec in same Freq

    IF more then 1 RRU required in 1 Frequency band then short CPRI will be used to cascade them.

  • Page 29HUAWEI TECHNOLOGIES CO., LTD.

    RRU Installation with minimum Space

    Note : To install 3 Blade RRU with using only 1 Bracket.

    1 2 3

    4 56

  • Page 30HUAWEI TECHNOLOGIES CO., LTD.

    RRU Installation with minimum Space

    Existing RRU Power cables will be reused for Newly

    installed RRUs. Existing RRU CPRI Optical cable will

    be reused for Newly installed RRUs

    RRU Mounting Options:

    Priority1:

    Install RRUs on back of Antenna using same Antenna

    Mounts,

    Priority2:

    a.Install RRUs on tower Platform in case of

    railing tower or on Ring poles

    incase of monopole tower,

    Priority3:

    Install RRU on Tower leg,

  • Page 31HUAWEI TECHNOLOGIES CO., LTD.

    2. Macro RT Site RRU and Antenna install on Wall

    Scenarios New solution New solution sketch

    For rooftop Macro sites

    RRUs cant be installed behind the antenna on existing pole due to loading issue. First option solution: install RRU on the wall, recommended distance between RRUs is 500mm, minimum distance between RRUs is 300mm.

  • Page 32HUAWEI TECHNOLOGIES CO., LTD.

    First option:

    3 Micro / IBS RRU and Antenna install on Wall (installation location)

    Special case second option:

  • Page 33HUAWEI TECHNOLOGIES CO., LTD.

    RCU Connectivity

    RRU 0 RRU 1 RRU 2

    DBS Swap solution:

    Sector BSector A Sector C

  • Page 34HUAWEI TECHNOLOGIES CO., LTD.

    Overview Antenna System

    3G RCU

    3G Antenna

    2G Antenna

  • Page 35HUAWEI TECHNOLOGIES CO., LTD.

    Overview SBT Site solution

    Existing SBT solution

    Huawei Purposed SBT solution

  • Page 36HUAWEI TECHNOLOGIES CO., LTD.

    HW - Antenna Installation Color Rings

    Make feeder or jumper color rings for 2G & 3G

    Need confirm and mark color ring for existed system and Huawei jumpers BEFORE SWAP

  • Page 37HUAWEI TECHNOLOGIES CO., LTD.

    BTS Swap solution : Abis OverE1 & IUb IP Transmission

    37

    IDU Board Layout

    3G

    FE Port

    1st E1 White blue White orange

    2nd E1 White green White brown

    3rd E1 Red Blue Red Orange

    4th E1 RedGreen Red Brown

    E/// E1 Color Code

  • Page 38HUAWEI TECHNOLOGIES CO., LTD.

    BTS Swap solution : Transmission

    20P 10 U space 6P 3 U Space 2P / CN 1 U Space

  • Page 39HUAWEI TECHNOLOGIES CO., LTD.

    BTS Swap solution : MW Transmission

    20P 10 U space

    6P 3 U Space

  • Page 40HUAWEI TECHNOLOGIES CO., LTD.

    BTS Swap solution : CN 210

  • Page 41HUAWEI TECHNOLOGIES CO., LTD.

    BTS Swap solution : CN 210

    PMCL Will configure the Free Port as mirror of working port for testing. And Media will be testedBefore swap on New Port.

    This Port will be used for pre-

    testing.E/// Node-B is connected.

  • Page 42HUAWEI TECHNOLOGIES CO., LTD.

    BTS Swap solution : TN

  • Page 43HUAWEI TECHNOLOGIES CO., LTD.

    BTS Swap solution : TN 2PB and TN 6PC

    This Port will be used for pre-

    testing.

    PMCL Will configure the Free Port as mirror of working port for testing. And Media will be testedBefore swap on New Port.

    E/// Node-B is connected.

  • Page 44HUAWEI TECHNOLOGIES CO., LTD.

    BTS Swap solution : TN 20PB

    This Port will be used for

    pre-testing.

    PMCL Will configure the Free Port as mirror of working port for testing. And Media will be testedBefore swap on New Port.

    E/// Node-B is connected.

  • Page 45HUAWEI TECHNOLOGIES CO., LTD.

    BTS Swap solution : MW IDU Detail

    MW IDU Type Qty of sites

    AMM 20PB 154

    AMM 2PB 943

    AMM 6PC 271

    MINI-LINK CN210 101

    SPO1410 13

    SPO1460 38

    Grand Total 1520

  • Page 46HUAWEI TECHNOLOGIES CO., LTD.

    DBC Reuse solution:

    Description Spec Quantity Clamp set 30~127 mm 2PCS

  • Page 47HUAWEI TECHNOLOGIES CO., LTD.

    External Alarm Swap solution :

    47

    Extend Alarm Solution

    UEIU+UPEU Board Sensor DDF

    BBU Box

  • Page 48HUAWEI TECHNOLOGIES CO., LTD.

    External Alarm Swap solution :

    48

    Extend Alarm Solution

    UEIU+UPEU Board Sensor DDFDATB

    BBU Box

  • Page 49HUAWEI TECHNOLOGIES CO., LTD.49

    Extend Alarm Solution

    External Alarm Swap solution : Indoor Site

    Indoor Scenario

    SA

    PIN NOCable Color Cable Color

    Mobilink Alarm Definition

    always on/off

    Severity

    P01 White

    GENSET ON off 3

    14 Blue

    P12 White

    AC MAIN FAILURE off 2

    15 Orange

    P23 White

    INTRUDER on 3

    16 Green

    P34 White

    FIRE ALARM on 3

    17 Brown

    P45 White

    HIGH TEMP on 3

    18 Gray

    P56 Red

    LOW VOLTAGE on 2

    19 Blue

    P67 Red

    RECTIFIER MAJOR on 2

    20 Orange

    P78 Red

    RECTIFIER MINOR on 2

    21 Green

    Outdoor Scenario

    SA

    PIN NOCable Color Cable Color

    Mobilink Alarm Definition

    always on/off

    Severity

    P01 White

    GENSET ON off 3

    14 Blue

    P12 White

    AC MAIN FAILURE off 2

    15 Orange

    P23 White

    RECTIFIER DOOR on 3

    16 Green

    P34 White

    DC LOAD FUSE on 3

    17 Brown

    P45 White

    BATTERIES HIGH TEMP on 2

    18 Gray

    P56 Red

    LOW VOLTAGE on 2

    19 Blue

    P67 Red

    RECTIFIER MAJOR on 2

    20 Orange

    P78 Red

    SYSTEM ON BATTERIES on 3

    P8 Rectifier Door on 3

  • Page 50HUAWEI TECHNOLOGIES CO., LTD.

    Ping Test for 3G site solution:

  • Page 51HUAWEI TECHNOLOGIES CO., LTD. Page 51

    Pre Swap Testing , Swap Activity and Swap Troubleshooting

    RM

    "" indicates the Owner, while "O" indicates the support.

    Key Point Mobilink Huawei Third party

    Site access arrangement O

    Media Provisioning MW+ MSTP+ Datacom

    O

    Core and PS Core CGI ,LAC,RAC definitions

    Neighbor addition O

    O

    Acknowledgement on swap activity closure

    Spares provision O

    Media verification MW+ MSTP+Datacom O

    Configuration and Troubleshooting of Huawei equipment

    Configuration and Troubleshooting of other vendor equipment O

    Conclusion of activity failure due to Other Vendor equipment O O

    Decision of roll back

    O O

    Perform Rollback O O

  • Page 52HUAWEI TECHNOLOGIES CO., LTD.

    Support Required from Mobilink

    1. For 3G Sites additional port configuration to perform ping test before

    swap-

    2. Involve other vendor support for joint troubleshooting with SLA of 30min

    3. 2 hour and 50min troubleshooting window before decision of rollback

    4. Extension ECRF if needed will apply before 5:30AM and need PMCL

    support to approve it before 5:45AM

    5. One Swap TL from PMCL for each activity to coordinate with all internal

    teams and Huawei Swap TL to assure activity successful

    6. Spares availability for swap include RAN , Power, MW

    7. Enough NOC and planning engineer of MSTP+ MW+Datacom during

    activity consider work for cross connects , media verification of 50 sites

    per night

    8. MW,MSTP LLD await detailed topology +capacity+utilization from PMCL

  • Thank youwww.huawei.com

    Copyright2014 Huawei Technologies Co., Ltd. All Rights Reserved.The information in this document may contain predictive statements including, without limitation, statements regarding the future financial andoperating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments todiffer materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only andconstitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.