HUAWEI TECHNOLOGIES CO., LTD.
www.huawei.com
Mobilink 2G
3G Site SWAP
Solution
Page 2HUAWEI TECHNOLOGIES CO., LTD.
1. Project Background2. SWAP Solution and Scenarios Overview3. Indoor SWAP
A. Indoor HOT SWAPB. Indoor COLD SWAP
4. Outdoor SWAPA. Outdoor HOT SWAP
5. Appendix
Agenda:
Page 3HUAWEI TECHNOLOGIES CO., LTD.
2G3GProgram Delivery Map( 28 Cluster )
2G3G Swap Background
Swap Regions
Footprint Regions
Before Swap: After
Swap:
Swap
Page 4HUAWEI TECHNOLOGIES CO., LTD.
BTS Swap Solution : Scenarios
Place: Indoor & Out DoorMethod: HOT SWAP & COLD SWAP
Existed Cabinets(All -48V DC): 1) RBS6201 (600x400)Indoor Feeder 2) RBS6101 (700x680)Outdoor Feeder3) RBS6301 (450x500)Mini RRU Outdoor 4) RBS6102 (1300x700)Feeder Outdoor
Proposed Cabinets:1) Huawei APM 30 (DBS 3900 BBU, 2G)2) Huawei APM 30 (DBS 3900 BBU, 2G & 3G)
Dimensions of the cabinet (W x H x D)600 mm x 700 mm x 480 mm
Locations/Regions:Karachi & Hyderabad
Existed Technologies: 1) GSM (2G),
(G900)
2) GSM (2G + 3G), (G900 +G1800)
3) 2GSM+UMTS (2*2G + 3G),(G900+G1800+U2100)
Page 5HUAWEI TECHNOLOGIES CO., LTD.
Solution Band Configuration Product Power
Output Multi-
Mode Control
Board Backup
Wireless Macro
Solution
(DBS Combined)
RAN16.0
G900 S444_000 RRU 3936 20W with 4 TRX GO GTMU
UBRI(if more
then 6 Carrier)
G1800 S000_444 RRU 3936 20W with 4 TRX GOGTMU
UBRI(if more
then 6
Carrier
G900+D180
0S444_444 RRU 3936 20W GO
GTMUUBRI(if more
then 6
Carrier
U2100 S222 RRU 3826 20W UO UMPTUBBPd2
G900+D180
0+U2100
S444_444+S22
2
RRU3936+RR
U 382620W GU
GTMU+UMP
T
UBBPd2+UB
RI
BTS Swap Solution : Huawei Configurations
Page 6HUAWEI TECHNOLOGIES CO., LTD.
BTS Swap Solution : Huawei Cabinet
3U
Page 7HUAWEI TECHNOLOGIES CO., LTD.
Specifications of BBU3900
442 mm x 310 mmx86 mm
7~12 kg
A single BBU: Max 24 cells Max CE
UL: 3072 DL: 4608
Typical Power consumption: 200W
Maximal Power consumption: 325W
2 FE/GE + 4 E1; Max 12 E1 (able to
share transmission with 2G)
2U Height, 8 slots
86.1 mm
Standard 19 inch cabinet
UEIU
Board Description
WBBP WCDMA BaseBand Processing
unit(3G)
UBRI Universal BaseBand Radio
Interface board(2G )
UMPT Universal Main Processing &
Transmission unit(2G/3G/4G co-
Processing unit)
UPEU Universal Power and
Environment interface Unit
UEIU Universal Environment Interface
Unit
Main equipment BBU3900
Page 8HUAWEI TECHNOLOGIES CO., LTD.
RRU3936 900M RRU3826 2100M
GU
BBU3900
GSM/UMTS
Multi-mode BBU CPRI (Optical Fiber)
UMTS only
Weight: 15Kg
Power: -48V DC
400mm 300mm 120mm (H*W*D)
Power consumption: 270W
IT2R
Scenario:G444
Weight: 15Kg
Power: -48V DC
400mm 300mm 120mm (H*W*D)
Power consumption: 270W
IT2R
Scenario:D444
Weight: 15 kg
Power: 48 V DC
400mm x 300mm x 120mm (H*W*D)
Power consumption: 260W
IT2R
UMTS only
GUL
RRU3936 1800M
Main equipment RRU
Page 9HUAWEI TECHNOLOGIES CO., LTD.
BTS Swap IT/Mobile Tools
Team Viewer
WeChatWhatsAppLine
Huawei APP
Get your Smartphone
Add your contact in advance.
Take and send pictures to show others.
Page 10HUAWEI TECHNOLOGIES CO., LTD.
BTS Swap IT/Mobile Tools Team Viewerhttp://www.teamviewer.com/
Page 11HUAWEI TECHNOLOGIES CO., LTD.
WeChat Application:http://www.wechat.com/en/
BTS Swap IT/Mobile Tools
Page 12HUAWEI TECHNOLOGIES CO., LTD.
BTS Swap Solution
A. Feeder Site Solution.
B. CRPI Site Solution.
C. Feeder + CPRI site Solution.
D. Micro Site Solution
Page 13HUAWEI TECHNOLOGIES CO., LTD.
Karachi and Hyderabad Swap Scenarios
For All
Scenario
New APM30 will be installed at all site
BBU will be installed in Huawei APM30 cabinet
IDU shifting to APM30 is required in case E/// IDU is in same cabinet with E/// BTS
Reuse Jumper and DBC
Install RRU Pole before SWAP in case there is no space for new RRU.(CIVIL Part monopole MUST )
Specific
ScenarioFeeder (macro) CPRI(macro) MIX (Feeder + CPRI) (macro) Micro
( 2G + 3G )
Hot SWAP
Dismantle E/// BTS,
Loop test
Ping test,
Install Huawei
BTS,Integration
Install Huawei RRU\RRU
power cable and CPRI fiber
SWAP,
Reuse exiting RCU.
Reuse exiting DBC.
Hot SWAP
Dismantle E/// RRU first ,then
install Huawei RRU during
SWAP.
Loop test
Ping test,
Reuse exiting RCU.
Reuse exiting CPRI(if possible)
Reuse exiting RRU power
Cable(If possible ).
Hot SWAP
Dismantle E/// RRU first ,then
install Huawei RRU during
SWAP.
Loop test
Ping test,
Reuse exiting Feeder if no
space available for RRU.
Reuse exiting RCU.
Reuse exiting CPRI(if
possible)
Reuse exiting RRU power
Cable(If possible ).Install
Jumper with feeder to RRU
Cold Swap / Hot Swap
DAS part remain same .
Dismantle E/// RRU first ,then install
Huawei RRU during SWAP.
Loop test
Ping test
Reuse exiting CPRI(if possible)
Reuse exiting RRU power Cable(If
possible ).
Page 14HUAWEI TECHNOLOGIES CO., LTD.
Overview of E/// Existing SiteIndoor Site
Page 15HUAWEI TECHNOLOGIES CO., LTD.
E// BTS Swap solution : Indoor Site
15
Before Swap Key Points:
Remove E// cabinet;Remove Dual band Combiner ;Remove E// IDU if installed in BTS Cabinet if its in E// BTS cab;
Install HW APM 30 then DBS3900;
Reuse: existing DC power ;existing jumpers, antenna and DBC;
New:Power & GND cableTransmission FE cable (New port if E1 2G IP 3G ) External Alarm cable
Page 16HUAWEI TECHNOLOGIES CO., LTD.
E// BTS Swap solution : Indoor Site & Outdoor
16
Swap Key Points
1. Remove RBS Cab 2. Remove Lighting protection 3. Remove Feeder
1. Reuse Antenna 2. Reuse existing breaker 3. Reuse DBC and RCU
Page 17HUAWEI TECHNOLOGIES CO., LTD.
Huawei DBS 3900
BBU
ESN
ESN needed
BBU ESN for commissioning
RCU ESN for RET
Page 18HUAWEI TECHNOLOGIES CO., LTD.
Scenario 1A: Feeder site solution E// BTS +MW in Separate Cab APM30 + DBS3900
Scenario description :
Before After
Scenario description :
Overall view of site before swapping
AC
ROOM
Equipment be swapped
AC power cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
E1 cable
MW IF cable
Alarm Report Cable
GSM
900
GSM
1800
MW ODU &
Antenna
Grounding BarGrounding Bar
Grounding Bar
Alarm BoxATS
ACDB
DG
Grounding Bar
Existing
MW
Antenna
BT
Overall view of site after swapping
AC
ROOM
AC power cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
Transmission Cable IP
MW IF cable
Alarm Report Cable
MW ODU &
Antenna
Grounding
Bar
Grounding Bar
Grounding
BarATS
ACDB
DG
19 inch rackAPM 30
2G&3G
share
BBU
Alarm Box
Antenna+ RCU
HW-MW
RRURRU power Cable
New AC power cable
New CPRI cable
Page 19HUAWEI TECHNOLOGIES CO., LTD.
Scenario 1B: Feeder site solution E// BTS +MW in single Cab APM30 + DBS3900
Scenario description :
Before After
Scenario description : In door to Indoor with IDU will be installed in DBS 3900 cab.
Overall view of site before swapping
AC
ROOM
Equipment be swapped
AC power cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
E1 cable
MW IF cable
Alarm Report Cable
GSM
900
GSM
1800
MW ODU &
Antenna
Grounding BarGrounding Bar
Grounding Bar
Alarm BoxATS
ACDB
DG
Grounding Bar
Existing
MW
Antenna
BT
Overall view of site after swapping
AC
ROOM
AC power cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
Transmission Cable IP
MW IF cable
Alarm Report Cable
MW ODU &
Antenna
Grounding
Bar
Grounding Bar
Grounding
BarATS
ACDB
DGAPM 30
IDU
Alarm Box
Antenna+ RCU
HW-MW
RRURRU power Cable
New AC power cable
New CPRI cable
Page 20HUAWEI TECHNOLOGIES CO., LTD. Page 20
Scenario 1C: Feeder site Outdoor solution E// BTS +MW in Same Cab APM30 + DBS3900
Scenario description :
Page 20
Before After
Overall view of site after 2G & 3G
AC
Existing Equipment
AC power cable
DC power cable
Grounding cable
CPRI Cable
7/8 feeder
E1 cable
MW IF cable
Alarm Report Cable
MW ODU &
Antenna
Grounding BarGrounding
Bar
Grounding Bar
ATS
ACDB
DG
Grounding Bar
RRU
Antenna
Scenario description : Feeder is installed in existing scenario, we will remove the feeder , install RRU on Tower.
Overall view of site 2G
AC
Equipment be swapped
AC power cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
E1 cable
MW IF cable
Alarm Report Cable
MW ODU &
Antenna
Grounding BarGrounding Bar
Grounding Bar
ATSACDB
DG
Grounding Bar
Existing
MW
Antenna + RCU
CPRI Cable
Existing
MW
BBU
AC power cable
APM 30
CPRI cable
Page 21HUAWEI TECHNOLOGIES CO., LTD.
Scenario 2: CPRI Site solution E// BTS +MW in Same Cab APM30 + DBS3900
Before After
Overall view of site after 2G & 3G
AC
Existing Equipment
AC power cable
DC power cable
Grounding cable
CPRI Cable
E1 cable
MW IF cable
Alarm Report Cable
MW ODU &
Antenna
Grounding BarGrounding
Bar
Grounding Bar
ATS
ACDB
DG
Grounding Bar
RRU
Antenna
Scenario description : Reuse of existing CPRI & RRU Power cable, Reuse of RCU.
Overall view of site 2G/ 3G / 2G+3G
AC
Equipment be swapped
AC power cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
E1 cable
MW IF cable
Alarm Report Cable
MW ODU &
Antenna
Grounding BarGrounding Bar
Grounding Bar
ATSACDB
DG
Grounding Bar
Existing
MW
Antenna + RCU
CPRI CableExisting
MW
BBU
AC power cable
APM 30
CPRI cableCPRI cable
CPRI Cable
Page 22HUAWEI TECHNOLOGIES CO., LTD.
Scenario 3: MIX Feeder + CPRI Site solution E// BTS +MW in Same Cab APM30 + DBS3900
Before After
Overall view of site after 2G & 3G
AC
Existing Equipment
AC power cable
DC power cable
Grounding cable
CPRI Cable
E1 cable
MW IF cable
Alarm Report Cable
MW ODU &
Antenna
Grounding BarGrounding
Bar
Grounding Bar
ATS
ACDB
DG
Grounding Bar
RRU
Antenna
Scenario description : Reuse of existing CPRI & RRU Power cable, Reuse of RCU Install RRU on shed Leg in cross for load balance.
Overall view of site 2G/ 3G / 2G+3G
AC
Equipment be swapped
AC power cable
DC power cable
Grounding cable
1/2 jumper
7/8 feeder
E1 cable
MW IF cable
Alarm Report Cable
MW ODU &
Antenna
Grounding BarGrounding Bar
Grounding Bar
ATSACDB
DG
Grounding Bar
Existing
MW
Antenna + RCU
CPRI CableExisting
MW
BBU
AC power cable
APM 30
CPRI cableCPRI cable
CPRI Cable
BTS Shed
BTS Shed
RRU ion tower leg if no space on tower
Page 23HUAWEI TECHNOLOGIES CO., LTD.
Per SWAP if possible : Indoor Site
23
Pre Installation Before Swap
1
2
3
4
5
6 2
Steps:
1. Install HW Temporary APM30 & DBS3900;
2. Connect grounding and Power cables
3. Power on HW DBS3900 cabinet;
4. Lay FE cables 5. Install RRU if space
available6. Lay RF jumpers 7. Lay External Alarm
connection
7
IDU
RBS E// Cab
Page 24HUAWEI TECHNOLOGIES CO., LTD.
Pre swap if possible: Indoor Site
24
Swap Remove Key Steps:0. SWAP preparation & Transmission check(ping)
1. Dismantle & Swap Transmission (E1/FE) cables
2. Power off E// cabinet;3. Disconnect RF
jumpers, Dismantle & Lightening cable,
3. connect HW Jumpers;4. Connect external
alarm cable5. Disconnect Power &
grounding cables6. Remove Cabinet
1
2
3
4
5Dismantle
APM30
CPRI
6
4
Page 25HUAWEI TECHNOLOGIES CO., LTD.
RRU Connectivity for 2G A B C
*NOTE : Connect FE cable from BBU FE0 to IDU for Future use
Page 26HUAWEI TECHNOLOGIES CO., LTD.
RRU Connectivity for 2G Dual Band (6+ RRU) A B C
Page 27HUAWEI TECHNOLOGIES CO., LTD.
RRU Connectivity for 2G Dual Band +3 G
Page 28HUAWEI TECHNOLOGIES CO., LTD.
RRU Connectivity for Configuration more 1 RRU in 1 Sec in same Freq
IF more then 1 RRU required in 1 Frequency band then short CPRI will be used to cascade them.
Page 29HUAWEI TECHNOLOGIES CO., LTD.
RRU Installation with minimum Space
Note : To install 3 Blade RRU with using only 1 Bracket.
1 2 3
4 56
Page 30HUAWEI TECHNOLOGIES CO., LTD.
RRU Installation with minimum Space
Existing RRU Power cables will be reused for Newly
installed RRUs. Existing RRU CPRI Optical cable will
be reused for Newly installed RRUs
RRU Mounting Options:
Priority1:
Install RRUs on back of Antenna using same Antenna
Mounts,
Priority2:
a.Install RRUs on tower Platform in case of
railing tower or on Ring poles
incase of monopole tower,
Priority3:
Install RRU on Tower leg,
Page 31HUAWEI TECHNOLOGIES CO., LTD.
2. Macro RT Site RRU and Antenna install on Wall
Scenarios New solution New solution sketch
For rooftop Macro sites
RRUs cant be installed behind the antenna on existing pole due to loading issue. First option solution: install RRU on the wall, recommended distance between RRUs is 500mm, minimum distance between RRUs is 300mm.
Page 32HUAWEI TECHNOLOGIES CO., LTD.
First option:
3 Micro / IBS RRU and Antenna install on Wall (installation location)
Special case second option:
Page 33HUAWEI TECHNOLOGIES CO., LTD.
RCU Connectivity
RRU 0 RRU 1 RRU 2
DBS Swap solution:
Sector BSector A Sector C
Page 34HUAWEI TECHNOLOGIES CO., LTD.
Overview Antenna System
3G RCU
3G Antenna
2G Antenna
Page 35HUAWEI TECHNOLOGIES CO., LTD.
Overview SBT Site solution
Existing SBT solution
Huawei Purposed SBT solution
Page 36HUAWEI TECHNOLOGIES CO., LTD.
HW - Antenna Installation Color Rings
Make feeder or jumper color rings for 2G & 3G
Need confirm and mark color ring for existed system and Huawei jumpers BEFORE SWAP
Page 37HUAWEI TECHNOLOGIES CO., LTD.
BTS Swap solution : Abis OverE1 & IUb IP Transmission
37
IDU Board Layout
3G
FE Port
1st E1 White blue White orange
2nd E1 White green White brown
3rd E1 Red Blue Red Orange
4th E1 RedGreen Red Brown
E/// E1 Color Code
Page 38HUAWEI TECHNOLOGIES CO., LTD.
BTS Swap solution : Transmission
20P 10 U space 6P 3 U Space 2P / CN 1 U Space
Page 39HUAWEI TECHNOLOGIES CO., LTD.
BTS Swap solution : MW Transmission
20P 10 U space
6P 3 U Space
Page 40HUAWEI TECHNOLOGIES CO., LTD.
BTS Swap solution : CN 210
Page 41HUAWEI TECHNOLOGIES CO., LTD.
BTS Swap solution : CN 210
PMCL Will configure the Free Port as mirror of working port for testing. And Media will be testedBefore swap on New Port.
This Port will be used for pre-
testing.E/// Node-B is connected.
Page 42HUAWEI TECHNOLOGIES CO., LTD.
BTS Swap solution : TN
Page 43HUAWEI TECHNOLOGIES CO., LTD.
BTS Swap solution : TN 2PB and TN 6PC
This Port will be used for pre-
testing.
PMCL Will configure the Free Port as mirror of working port for testing. And Media will be testedBefore swap on New Port.
E/// Node-B is connected.
Page 44HUAWEI TECHNOLOGIES CO., LTD.
BTS Swap solution : TN 20PB
This Port will be used for
pre-testing.
PMCL Will configure the Free Port as mirror of working port for testing. And Media will be testedBefore swap on New Port.
E/// Node-B is connected.
Page 45HUAWEI TECHNOLOGIES CO., LTD.
BTS Swap solution : MW IDU Detail
MW IDU Type Qty of sites
AMM 20PB 154
AMM 2PB 943
AMM 6PC 271
MINI-LINK CN210 101
SPO1410 13
SPO1460 38
Grand Total 1520
Page 46HUAWEI TECHNOLOGIES CO., LTD.
DBC Reuse solution:
Description Spec Quantity Clamp set 30~127 mm 2PCS
Page 47HUAWEI TECHNOLOGIES CO., LTD.
External Alarm Swap solution :
47
Extend Alarm Solution
UEIU+UPEU Board Sensor DDF
BBU Box
Page 48HUAWEI TECHNOLOGIES CO., LTD.
External Alarm Swap solution :
48
Extend Alarm Solution
UEIU+UPEU Board Sensor DDFDATB
BBU Box
Page 49HUAWEI TECHNOLOGIES CO., LTD.49
Extend Alarm Solution
External Alarm Swap solution : Indoor Site
Indoor Scenario
SA
PIN NOCable Color Cable Color
Mobilink Alarm Definition
always on/off
Severity
P01 White
GENSET ON off 3
14 Blue
P12 White
AC MAIN FAILURE off 2
15 Orange
P23 White
INTRUDER on 3
16 Green
P34 White
FIRE ALARM on 3
17 Brown
P45 White
HIGH TEMP on 3
18 Gray
P56 Red
LOW VOLTAGE on 2
19 Blue
P67 Red
RECTIFIER MAJOR on 2
20 Orange
P78 Red
RECTIFIER MINOR on 2
21 Green
Outdoor Scenario
SA
PIN NOCable Color Cable Color
Mobilink Alarm Definition
always on/off
Severity
P01 White
GENSET ON off 3
14 Blue
P12 White
AC MAIN FAILURE off 2
15 Orange
P23 White
RECTIFIER DOOR on 3
16 Green
P34 White
DC LOAD FUSE on 3
17 Brown
P45 White
BATTERIES HIGH TEMP on 2
18 Gray
P56 Red
LOW VOLTAGE on 2
19 Blue
P67 Red
RECTIFIER MAJOR on 2
20 Orange
P78 Red
SYSTEM ON BATTERIES on 3
P8 Rectifier Door on 3
Page 50HUAWEI TECHNOLOGIES CO., LTD.
Ping Test for 3G site solution:
Page 51HUAWEI TECHNOLOGIES CO., LTD. Page 51
Pre Swap Testing , Swap Activity and Swap Troubleshooting
RM
"" indicates the Owner, while "O" indicates the support.
Key Point Mobilink Huawei Third party
Site access arrangement O
Media Provisioning MW+ MSTP+ Datacom
O
Core and PS Core CGI ,LAC,RAC definitions
Neighbor addition O
O
Acknowledgement on swap activity closure
Spares provision O
Media verification MW+ MSTP+Datacom O
Configuration and Troubleshooting of Huawei equipment
Configuration and Troubleshooting of other vendor equipment O
Conclusion of activity failure due to Other Vendor equipment O O
Decision of roll back
O O
Perform Rollback O O
Page 52HUAWEI TECHNOLOGIES CO., LTD.
Support Required from Mobilink
1. For 3G Sites additional port configuration to perform ping test before
swap-
2. Involve other vendor support for joint troubleshooting with SLA of 30min
3. 2 hour and 50min troubleshooting window before decision of rollback
4. Extension ECRF if needed will apply before 5:30AM and need PMCL
support to approve it before 5:45AM
5. One Swap TL from PMCL for each activity to coordinate with all internal
teams and Huawei Swap TL to assure activity successful
6. Spares availability for swap include RAN , Power, MW
7. Enough NOC and planning engineer of MSTP+ MW+Datacom during
activity consider work for cross connects , media verification of 50 sites
per night
8. MW,MSTP LLD await detailed topology +capacity+utilization from PMCL
Thank youwww.huawei.com
Copyright2014 Huawei Technologies Co., Ltd. All Rights Reserved.The information in this document may contain predictive statements including, without limitation, statements regarding the future financial andoperating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments todiffer materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only andconstitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.