10
PROJECT: 24’’ SUBSEA PIPELINE ENGINEERING SERVICES FOR MUARA KARANG FSRU PROJECT OPERATOR: PT. NUSANTARA REGAS (INDONESIA) PROJECT VALUE: TOTAL PROJECT PROJECT DESCRIPTION: • Review of existing pipeline drawings, related specification & barge data. • Prepare complete Pipeline Installation Engineering as Follows : Stability analysis of the pipelay barge Pipelay analysis during initiation, normal lay, termination, abandon and recovery Pipelay barge mooring analysis during initiation, normal lay, termination, abandon and recovery Transportation analysis and stability analysis for material barge Above water tie in analysis Riser and spool installation Shore pull analysis. Date: 2011 CLIENT: PT. NUSANTARA REGAS (INDONESIA) CONTACT PERSON: Mr. Sudayat +62 21 7988 707 SCOPE OF WORK: 24” Pipe line Installation Engineering analysis from FSRU to Muara Karang in Jakarta Bay, Indonesia. These scope are to generate the pipeline analysis for loadout, transportation, installation sequence and related drawings for barge positioning and Anchor Pattern, length of pipe line is approximately 15 km VALUE OF WORK: TOTAL US$ 105,000 PROJECT: BLANKET ENGINEERING SERVICES FOR VARIOUS PROJECT DEVELOPMENT OPERATOR: SANTOS (SAMPANG) Pty Ltd PROJECT VALUE: TOTAL PROJECT PROJECT DESCRIPTION: • Review of Existing Process Simulation report including multidiscipline documents and Study New liquid handling facilities to be develop at Grati ORF as per CTR propose to COMPANY. • Prepare complete FEED package for Multi discipline Engineering of 2000 to 3000 bbl/d Condensate Stabilize system at Grati Onshore Receiving Facilities, Santos (Sampang) Pty Ltd. Which Consists of : •Modification of 4-Fingger Slug Catcher •Additional Liquid Handling Facilities Equipment, such as Separator Condensate Stabilize Tank & pumps. •Crude Oil Storage Tanks •Crude Oil Transfer Pumps •Pipeline & Jetty Loading/unloading modification. •Power Generation Study including all associated facilities. • Structure Analysis for New Power Generation at FPSO SG-101, including Dynamic simulation of Flexible Hose discharge to the sea. Date: 2011-2012 CLIENT: SANTOS (SAMPANG) Pty Ltd. (INDONESIA) CONTACT PERSON: Mr. Apriandy Zainudin +62 21 2750 2330 SCOPE OF WORK: FEED engineering work for Onshore Receiving Facilities at Grati, Pasuruan, East Java. Four Finger type slug catcher is modified at the OPF to allow new liquids (condensates and water) from the existing Offshore FPSO and Oyong Platform. The liquids stream will flow through the new condensate stabilization system and crude storage tanks at Indonesian Power area. Free and condensed water will be processed in the existing produced water treatment facility and then discharged to the existing fire water pond. VALUE OF WORK: TOTAL US$ 2,019,250.00 www.isb-eng.com

· PDF file . PROJECT: NEW OIL ... technical Bid Evaluation and includes design of civil works of land clearing, ... design water depth of 150 meters,

Embed Size (px)

Citation preview

Page 1: · PDF file . PROJECT: NEW OIL ... technical Bid Evaluation and includes design of civil works of land clearing, ... design water depth of 150 meters,

PROJECT:24’’ SUBSEA PIPELINE ENGINEERING SERVICES FOR

MUARA KARANG FSRU PROJECT

OPERATOR:PT. NUSANTARA REGAS (INDONESIA)

PROJECT VALUE:TOTAL PROJECT

PROJECT DESCRIPTION:• Review of existing pipeline drawings, related specification & barge data.• Prepare complete Pipeline Installation Engineering as Follows :

•Stability analysis of the pipelay barge•Pipelay analysis during initiation, normal lay, termination, abandon and recovery•Pipelay barge mooring analysis during initiation, normal lay, termination, abandon and recovery•Transportation analysis and stability analysis for material barge•Above water tie in analysis•Riser and spool installation•Shore pull analysis.

Date: 2011

CLIENT:PT. NUSANTARA REGAS (INDONESIA)

CONTACT PERSON:Mr. Sudayat+62 21 7988 707

SCOPE OF WORK:24” Pipe line Installation Engineering analysis from FSRU to Muara Karang in Jakarta Bay, Indonesia. Thesescope are to generate the pipeline analysis for loadout, transportation, installation sequence and relateddrawings for barge positioning and Anchor Pattern, length of pipe line is approximately 15 km

VALUE OF WORK: TOTAL US$ 105,000

PROJECT:BLANKET ENGINEERING SERVICES FOR VARIOUS

PROJECT DEVELOPMENT

OPERATOR:SANTOS (SAMPANG) Pty Ltd

PROJECT VALUE:TOTAL PROJECT

PROJECT DESCRIPTION:• Review of Existing Process Simulation report including multidiscipline documents and Study New liquid handlingfacilities to be develop at Grati ORF as per CTR propose to COMPANY.• Prepare complete FEED package for Multi discipline Engineering of 2000 to 3000 bbl/d Condensate Stabilize system atGrati Onshore Receiving Facilities, Santos (Sampang) Pty Ltd. Which Consists of :

•Modification of 4-Fingger Slug Catcher•Additional Liquid Handling Facilities Equipment, such as Separator Condensate Stabilize Tank & pumps.•Crude Oil Storage Tanks•Crude Oil Transfer Pumps•Pipeline & Jetty Loading/unloading modification.•Power Generation Study including all associated facilities.

• Structure Analysis for New Power Generation at FPSO SG-101, including Dynamic simulation of Flexible Hose dischargeto the sea.

Date: 2011-2012

CLIENT:SANTOS (SAMPANG) Pty Ltd. (INDONESIA)

CONTACT PERSON:Mr. Apriandy Zainudin+62 21 2750 2330

SCOPE OF WORK:FEED engineering work for Onshore Receiving Facilities at Grati, Pasuruan, East Java. Four Finger type slug catcher ismodified at the OPF to allow new liquids (condensates and water) from the existing Offshore FPSO and OyongPlatform.The liquids stream will flow through the new condensate stabilization system and crude storage tanks at IndonesianPower area. Free and condensed water will be processed in the existing produced water treatment facility and thendischarged to the existing fire water pond.

VALUE OF WORK: TOTAL US$ 2,019,250.00

www.isb-en

g.com

Page 2: · PDF file . PROJECT: NEW OIL ... technical Bid Evaluation and includes design of civil works of land clearing, ... design water depth of 150 meters,

PROJECT: NEW OIL TERMINAL AT PULAU LAUT KALIMANTAN

OPERATOR:PT.SHELL (INDONESIA)

PROJECT VALUE:TOTAL PROJECT US$ 160,000.00

PROJECT DESCRIPTION:

Construction of Oil Tank Terminal with Total Storage Capacity of 17,650 m3.

Date: 2010

CLIENT:PT. PUNJ LLOYD INDONESIA

CONTACT PERSON:Mr. Ajay Agarwal+62 21 5741128

SCOPE OF WORK:Complete Scope of Detail Engineering for 4 (Four) New tanks, Building and Utility Process. ISB Scope assist oftechnical Bid Evaluation and includes design of civil works of land clearing, cut & well. Facilities consists of :

– 4 Units of Crude Oil Storage Tanks Size 42 meter Diameter x 16 meter height– 3 Units Loading Arm Size 12”– 3 Units Shipping Pumps Capacity 250 m3/hour– Control/Office Building, Firewater System, DCS/Scada System, Pipeline etc.

PROJECT:

PROJECT VALUE :STAR ENERGY KAKAP LTD.

CONTACT PERSON :STAR ENERGY KAKAP LTD. Mr. Sejati N. Lambang

+62 21 532 58 28

SCOPE OF WORK :

VALUE OF WORK : US$ 1,140,900

The facility engineering activities anticipated for the contract period are described as follows:

1.GAS PRODUCTION FACILITIES

- Gas Compression Facilities Review

- Modification/Re-wheeling of KF, KRA Compressors

- Utilizing existing Gas Lift Compressors for Booster Compressors

- Gas Processing System Studies for process optimization and efficiency from each platform (KH, KF,

KRA. KG, KF)

- KG Associated Gas Tie-in to KAKAP Gas Production System

- Other unidentified gas facilities projects involving Process, Mechanical, Electrical, Instrumentation,

Structural Engineering and Draftin

2. OIL PRODUCTION FACILITIES

- Study for additional facilities due to work over program

- KF Gas Lifting System Evaluation based on operation feasibility

- Other unidentified projects involving Process, Mechanical, Electrical, Instrumentation, Structural

Engineering and Drafting

- KG Gas Lift Compressor Cooling System Evaluation

3. FACILITY MODIFICATION / PREPARATION FOR INTERFACING WITH FUTURE FIELD

DEVELOPMENT PROJECTS

4. UTILITY SYSTEM & OTHER FACILITIES UPGRADE

5. DETAIL ENGINEERING

OPERATOR :

PROJECT DESCRIPTION :

CLIENT :

PROVISION OF GENERAL PROJECT ENGINEERING SERVICE

Star Energy (Kakap) Ltd. (Company) Currently is producing oil from four platforms KH, KF, KG and

KRA and five sub sea wells. Oil is produced and shipped to the Kakap Natuna FPSO for storage and

export via tankers.The Kakap Gas Compression facility which consist of gas gathering, treatment and

compression facilities on the existing KH, KRA and KF Platforms through two infield pipelines to export

gas to Singapore via the WNTS pipeline is in operation since 2001.

Further development of the Kakap field are as follows : tie in of KG gas fields into the system, providing

KF Gas Booster System for lowering suction pressure of incoming gas supply, production system

evaluation, process plant optimization, improvement facility/ modifications to existing facilities for

increasing facilities reliability & integrity, and facilities for Water Injection Application in KF Field.

www.isb-eng.com

www.isb-en

g.com

Page 3: · PDF file . PROJECT: NEW OIL ... technical Bid Evaluation and includes design of civil works of land clearing, ... design water depth of 150 meters,

PROJECT:

PROJECT VALUE :PT. PERTAGAS - E1 Corporation

CONTACT PERSON :PT. PERTAGAS - E1 Corporation Mr. Dennis Bretton

+62 21 515 04 93

SCOPE OF WORK :

VALUE OF WORK : US$ 800,000

FEED engineering work for LPG extraction plant in Sumatra selatan. The scope also included 8” NGL

pipeline (89 KM.) from the Extraction Plant, Prabumulih Barat to Pulau Layang. The extent of the

pipeline is from the mating outlet flange of the pig launcher at Prabumulih Barat to the inlet mating

flange of the pig receiver at Pulau Layang. Another 6” pipeline (3KM) from Pulau layang to Pertamina

refinery.

OPERATOR :

PROJECT DESCRIPTION :

CLIENT :

ENGINEERING AND TECHNICAL SERVICES FOR SOUTH SUMATRA NGL PROJECT

• Review of process flow scheme & agree final scheme with client

• Check proposed sites for the facilities in Prabumulih Barat and Sungai Gerong and prepare draft plot

plans for inclusion in the ITB

• Check and advise on the suitability of existing Pertamina pipeline Right of Way (ROW) to

accommodate the NGL pipeline

• Propose potential pipeline route from the termination point of the Pertamina ROW to the proposed site

for the fractionation and storage facilities in Sungai Gerong

• Prepare scope of any required soil investigation work

• Review and advise on logistics with respect to delivery of large equipment to the Prabumulih Barat

site

• Prepare an Invitation to Bid (ITB) for EPC bidders including form of contract, guarantee requirements,

proposed schedules, codes & standards, etc.

• Provide Capital Cost Estimate for the facilities

• Assist with responding to EPC bidder queries during bid preparation

• Provide technical evaluation of EPC bids

www.isb-eng.com www.isb-eng.com

www.isb-en

g.com

Page 4: · PDF file . PROJECT: NEW OIL ... technical Bid Evaluation and includes design of civil works of land clearing, ... design water depth of 150 meters,

PROJECT: PAGERUNGAN UTARA DEVELOPMENTPROJECT

OPERATOR:Kangean Energy Indonesia (KEI)

PROJECT VALUE:

PROJECT DESCRIPTION:

Due to operational requirements, Kangean Energy Indonesia (KEI) is planning to install power andfiber optic cables from a FPSO to the wellhead platform (WHP) at Pagerungan Utara Offshore (PUO)field. PT Indonesia Service Bureau (ISB) in affiliate with ZEE Engineering Consultants (ZEE) wasrequested by KEI to undertake scope of work related to the in-place engineering services includingstructural design for cable support and developing cables bundling method and specification .

Date of Completion: December 2008

CLIENT:Kangean Energy Indonesia (KEI)

CONTACT PERSON:Mr. Sudarsono Hadiwinoto

SCOPE OF WORK:

The project scopes are:1.Carry out studies to determine the most optimum method for routing the power and fiber optic cablefrom FPSO to WHP.2.Evaluate engineering acceptance criteria for the most optimum method including structural designfor cable support and developing cables bundling method and specification.

VALUE OF WORK:

www.isb-eng.com

www.isb-en

g.com

Page 5: · PDF file . PROJECT: NEW OIL ... technical Bid Evaluation and includes design of civil works of land clearing, ... design water depth of 150 meters,

www.isb-eng.com www.isb-eng.com

www.isb-en

g.com

Page 6: · PDF file . PROJECT: NEW OIL ... technical Bid Evaluation and includes design of civil works of land clearing, ... design water depth of 150 meters,

www.isb-eng.com www.isb-eng.com

www.isb-en

g.com

Page 7: · PDF file . PROJECT: NEW OIL ... technical Bid Evaluation and includes design of civil works of land clearing, ... design water depth of 150 meters,

PROJECT: Umbilical Re-Termination AnalysisSA-21 Subsea Wellhead Modification

OPERATOR:Premier Oil Natuna Sea B.V

PROJECT VALUE:UNKNOWN(Lump Sum Engineering Package)

PROJECT DESCRIPTION:Premier Oil Natuna Sea B.V. is planning to carry out further development on their ANOA Field locatedin the West Natuna Sea, Indonesia. PT. Indonesian Service Bureau (ISB) in association with ZEEEngineering Consultants (ZEE) was requested by Premier Oil Natuna Sea B.V. to undertake scope ofwork related to umbilical re-termination analysis at SA-21 subsea wellhead vicinity.

Date of Completion: September 2008

CLIENT:

Premier Oil Indonesia - Jakarta

CONTACT PERSON:

Mr. T.I. Santoso(+62 21-5151800~8121)

SCOPE OF WORK:

Complete installation engineering scope include stress analysis and design installation aids forholding and bending prevention umbilical during termination on the DSV and laying down umbilicalfrom deck of DSV to Seabed.

VALUE OF WORK: US$ 120,000.00

PROJECT: LAY BARGE STINGER DETAIL DESIGNENGINEERING

OPERATOR:Punj Lloyd (INDIA)

PROJECT VALUE:

PROJECT DESCRIPTION:Punj Lloyd has appointed PT Indonesian service bureau (ISB) in affiliate with ZEE EngineeringConsultants (ZEE) to carry out the detail design of the Stinger for 120m Accommodation / Pipe LayingBarge to lay (Kuber). The stinger shall be able to lay the pipe in the range 4” to 48” at a maximumdesign water depth of 150 meters, and be operational up to Beaufort Scale 5 weather condition.

Date of Completion: February 2009

CLIENT:

Punj Lloyd (INDIA)

CONTACT PERSON:

Mr. Dedy Sarwono(+62 21 57852581)(+91 22 2665605)

SCOPE OF WORK:

The project scopes are:1.Pipelay analysis for the critical condition to establish the maximum loads on the Stinger rollers,2.Stress analysis of the Stinger, A-Frame and appurtenances during operation and survival condition,3.Flotation design,4.Fatigue analysis,5.Detailed MTO, AFC drawings and specification,6.3rd Party certification assistance.

VALUE OF WORK:

www.isb-en

g.com

Page 8: · PDF file . PROJECT: NEW OIL ... technical Bid Evaluation and includes design of civil works of land clearing, ... design water depth of 150 meters,

www.isb-eng.com www.isb-eng.com

www.isb-en

g.com

Page 9: · PDF file . PROJECT: NEW OIL ... technical Bid Evaluation and includes design of civil works of land clearing, ... design water depth of 150 meters,

www.isb-eng.com www.isb-eng.com

www.isb-en

g.com

Page 10: · PDF file . PROJECT: NEW OIL ... technical Bid Evaluation and includes design of civil works of land clearing, ... design water depth of 150 meters,

www.isb-eng.com

www.isb-en

g.com