266
OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2 BRIDGES) LETTING: 01/24/01 COMPLETION DATE: 07/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: R & I CONSTRUCTION INC AWARDED AMOUNT: $ 321,707.28 ENGINEERS ESTIMATE: $ 367,000.00 AWARDED BIDDER BIDDER 02 R & I CONSTRUCTION INC DENNISON BRIDGE INC 2931 STATE ROUTE 67 SOUTH 500 STILLWATER AVE TIFFIN ,OH 44883 DENNISON ,OH 44621-1350 BIDDER 03 BIDDER 04 FORT DEFIANCE CONSTRUCTION & SUPPLY IN G W MELVIN CONTRACTING CO 07622 SR 66 N 1539 WALSH AVE DEFIANCE ,OH 43512 COLUMBUS ,OH 43223 BIDDER 05 BIDDER 06 SHAW & HOLTER INC PHOENIX BRIDGE COMPANY INC 2625 COONPATH RD NE 4011 HILLMAN WAY STE 160 LANCASTER ,OH 43130 BOARDMAN ,OH 44513 BIDDER 07 BIDDER 08 MAIDEN & JENKINS CONSTRUCTION COMPANY DIAL CONSTRUCTION CO INC 14820 KIMBERLY RD 616 MAIN ST NELSONVILLE ,OH 45764 STOCKDALE ,OH 45683-0068

 · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

Embed Size (px)

Citation preview

Page 1:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2 BRIDGES) LETTING: 01/24/01 COMPLETION DATE: 07/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: R & I CONSTRUCTION INC AWARDED AMOUNT: $ 321,707.28 ENGINEERS ESTIMATE: $ 367,000.00 AWARDED BIDDER BIDDER 02 R & I CONSTRUCTION INC DENNISON BRIDGE INC 2931 STATE ROUTE 67 SOUTH 500 STILLWATER AVE TIFFIN ,OH 44883 DENNISON ,OH 44621-1350 BIDDER 03 BIDDER 04 FORT DEFIANCE CONSTRUCTION & SUPPLY IN G W MELVIN CONTRACTING CO 07622 SR 66 N 1539 WALSH AVE DEFIANCE ,OH 43512 COLUMBUS ,OH 43223 BIDDER 05 BIDDER 06 SHAW & HOLTER INC PHOENIX BRIDGE COMPANY INC 2625 COONPATH RD NE 4011 HILLMAN WAY STE 160 LANCASTER ,OH 43130 BOARDMAN ,OH 44513 BIDDER 07 BIDDER 08 MAIDEN & JENKINS CONSTRUCTION COMPANY DIAL CONSTRUCTION CO INC 14820 KIMBERLY RD 616 MAIN ST NELSONVILLE ,OH 45764 STOCKDALE ,OH 45683-0068

Page 2:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 1 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 201E11000 CLEARING AND GRUBBING LUMP SUM AWD $ 1,600.00000 $ 1,600.00 02 $ 2,000.00000 $ 2,000.00 03 $ 3,000.00000 $ 3,000.00 04 $ 1,000.00000 $ 1,000.00 05 $ 2,280.00000 $ 2,280.00 06 $ 2,000.00000 $ 2,000.00 07 $ 2,000.00000 $ 2,000.00 08 $ 4,000.00000 $ 4,000.00 2 203E11001 EXCAVATION W/EMBANKMENT, APP 20.000 CU YD AWD $ 15.00000 $ 300.00 02 $ 10.00000 $ 200.00 03 $ 14.00000 $ 280.00 04 $ 13.22000 $ 264.40 05 $ 43.00000 $ 860.00 06 $ 24.00000 $ 480.00 07 $ 10.00000 $ 200.00 08 $ 15.00000 $ 300.00 3 203E12000 EXCAVATION W/O EMBANKMENT 114.000 CU YD AWD $ 5.00000 $ 570.00 02 $ 5.00000 $ 570.00 03 $ 38.00000 $ 4,332.00 04 $ 5.00000 $ 570.00 05 $ 16.70000 $ 1,903.80 06 $ 10.00000 $ 1,140.00 07 $ 10.00000 $ 1,140.00 08 $ 6.50000 $ 741.00 4 203E20000 EMBANKMENT 498.000 CU YD AWD $ 7.00000 $ 3,486.00 02 $ 10.00000 $ 4,980.00 03 $ 5.00000 $ 2,490.00 04 $ 13.22000 $ 6,583.56 05 $ 18.00000 $ 8,964.00 06 $ 18.00000 $ 8,964.00 07 $ 9.00000 $ 4,482.00 08 $ 15.00000 $ 7,470.00 5 203E50000 SUBGRADE COMPACTION 645.000 SQ YD AWD $ 1.00000 $ 645.00 02 $ 1.00000 $ 645.00 03 $ 2.25000 $ 1,451.25 04 $ 1.25000 $ 806.25 05 $ 2.00000 $ 1,290.00 06 $ 3.00000 $ 1,935.00 07 $ 2.75000 $ 1,773.75 08 $ 1.20000 $ 774.00

Page 3:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 2 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 6 606E13000 GUARDRAIL, TYPE 5 250.000 LIN FT AWD $ 10.30000 $ 2,575.00 02 $ 11.00000 $ 2,750.00 03 $ 9.60000 $ 2,400.00 04 $ 10.25000 $ 2,562.50 05 $ 9.60000 $ 2,400.00 06 $ 9.60000 $ 2,400.00 07 $ 9.60000 $ 2,400.00 08 $ 9.80000 $ 2,450.00 7 606E25000 ANCHOR ASSEMBLY, TYPE A 4.000 EACH AWD $ 595.00000 $ 2,380.00 02 $ 600.00000 $ 2,400.00 03 $ 600.00000 $ 2,400.00 04 $ 600.00000 $ 2,400.00 05 $ 600.00000 $ 2,400.00 06 $ 600.00000 $ 2,400.00 07 $ 600.00000 $ 2,400.00 08 $ 600.00000 $ 2,400.00 8 606E35140 BRIDGE TERM ASSY, TYPE 4 4.000 EACH AWD $ 451.00000 $ 1,804.00 02 $ 500.00000 $ 2,000.00 03 $ 450.00000 $ 1,800.00 04 $ 600.00000 $ 2,400.00 05 $ 450.00000 $ 1,800.00 06 $ 450.00000 $ 1,800.00 07 $ 450.00000 $ 1,800.00 08 $ 450.00000 $ 1,800.00

S.1 ROADWAY (PART 1) TOTALS AWD $ 13,360.00 02 $ 15,545.00 03 $ 18,153.25 04 $ 16,586.71 05 $ 21,897.80 06 $ 21,119.00 07 $ 16,195.75 08 $ 19,935.00 9 601E32205 ROCK CH PROT, C W/FAB FLT,APP 62.000 CU YD AWD $ 33.00000 $ 2,046.00 02 $ 35.00000 $ 2,170.00 03 $ 33.00000 $ 2,046.00 04 $ 41.12000 $ 2,549.44 05 $ 50.00000 $ 3,100.00 06 $ 40.00000 $ 2,480.00 07 $ 45.00000 $ 2,790.00 08 $ 45.00000 $ 2,790.00

Page 4:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 3 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 10 616E10000 WATER 1.000 M GAL AWD $ 1.00000 $ 1.00 02 $ 0.10000 $ 0.10 03 $ 7.00000 $ 7.00 04 $ 0.10000 $ 0.10 05 $ 50.00000 $ 50.00 06 $ 20.00000 $ 20.00 07 $ 10.00000 $ 10.00 08 $ 0.50000 $ 0.50 11 616E20000 CALCIUM CHLORIDE 0.100 TON AWD $ 1.00000 $ 0.10 02 $ 25.00000 $ 2.50 03 $ 250.00000 $ 25.00 04 $ 100.00000 $ 10.00 05 $ 500.00000 $ 50.00 06 $ 225.00000 $ 22.50 07 $ 400.00000 $ 40.00 08 $ 250.00000 $ 25.00 12 870E00100 SOIL ANALYSIS TEST 2.000 EACH AWD $ 25.00000 $ 50.00 02 $ 25.00000 $ 50.00 03 $ 50.00000 $ 100.00 04 $ 100.00000 $ 200.00 05 $ 142.00000 $ 284.00 06 $ 100.00000 $ 200.00 07 $ 50.00000 $ 100.00 08 $ 50.00000 $ 100.00 13 870E00200 PLACING TOPSOIL 51.000 CU YD AWD $ 30.00000 $ 1,530.00 02 $ 50.00000 $ 2,550.00 03 $ 28.00000 $ 1,428.00 04 $ 22.00000 $ 1,122.00 05 $ 28.00000 $ 1,428.00 06 $ 20.00000 $ 1,020.00 07 $ 25.00000 $ 1,275.00 08 $ 60.00000 $ 3,060.00

Page 5:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 4 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 14 870E10000 SEEDING AND MULCHING 909.000 SQ YD AWD $ 1.60000 $ 1,454.40 02 $ 2.00000 $ 1,818.00 03 $ 2.25000 $ 2,045.25 04 $ 1.10000 $ 999.90 05 $ 2.20000 $ 1,999.80 06 $ 2.50000 $ 2,272.50 07 $ 1.45000 $ 1,318.05 08 $ 2.25000 $ 2,045.25 15 870E14000 REPAIR SEEDING AND MULCHING 50.000 SQ YD AWD $ 0.50000 $ 25.00 02 $ 0.10000 $ 5.00 03 $ 1.50000 $ 75.00 04 $ 0.15000 $ 7.50 05 $ 0.80000 $ 40.00 06 $ 0.32000 $ 16.00 07 $ 0.55000 $ 27.50 08 $ 0.80000 $ 40.00 16 870E20000 COMMERCIAL FERTILIZER 0.160 TON AWD $ 500.00000 $ 80.00 02 $ 1,000.00000 $ 160.00 03 $ 500.00000 $ 80.00 04 $ 400.00000 $ 64.00 05 $ 375.00000 $ 60.00 06 $ 400.00000 $ 64.00 07 $ 375.00000 $ 60.00 08 $ 450.00000 $ 72.00 17 870E30000 AGRICULTURAL LIME 0.380 TON AWD $ 125.00000 $ 47.50 02 $ 200.00000 $ 76.00 03 $ 125.00000 $ 47.50 04 $ 120.00000 $ 45.60 05 $ 40.00000 $ 15.20 06 $ 400.00000 $ 152.00 07 $ 100.00000 $ 38.00 08 $ 50.00000 $ 19.00 18 870E35000 WATER 6.000 M GAL AWD $ 1.00000 $ 6.00 02 $ 0.10000 $ 0.60 03 $ 10.00000 $ 60.00 04 $ 0.10000 $ 0.60 05 $ 0.40000 $ 2.40 06 $ 15.00000 $ 90.00 07 $ 5.00000 $ 30.00 08 $ 0.50000 $ 3.00

Page 6:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 5 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 19 877E10000 TEMPORARY SEEDING AND MULCHING 200.000 SQ YD AWD $ 0.10000 $ 20.00 02 $ 0.10000 $ 20.00 03 $ 0.30000 $ 60.00 04 $ 0.15000 $ 30.00 05 $ 0.20000 $ 40.00 06 $ 0.20000 $ 40.00 07 $ 0.55000 $ 110.00 08 $ 0.30000 $ 60.00 20 877E30100 TEMPORARY PERIMETER FILTER FABRIC FENCE 800.000 LIN FT AWD $ 0.50000 $ 400.00 02 $ 2.00000 $ 1,600.00 03 $ 0.25000 $ 200.00 04 $ 1.00000 $ 800.00 05 $ 2.00000 $ 1,600.00 06 $ 0.70000 $ 560.00 07 $ 1.75000 $ 1,400.00 08 $ 2.25000 $ 1,800.00

S.2 EROSION CONTROL (PART 1) TOTALS AWD $ 5,660.00 02 $ 8,452.20 03 $ 6,173.75 04 $ 5,829.14 05 $ 8,669.40 06 $ 6,937.00 07 $ 7,198.55 08 $ 10,014.75 21 603E00900 6" CONDUIT, TYPE B 25.000 LIN FT AWD $ 1.00000 $ 25.00 02 $ 1.50000 $ 37.50 03 $ 6.00000 $ 150.00 04 $ 1.00000 $ 25.00 05 $ 1.50000 $ 37.50 06 $ 8.00000 $ 200.00 07 $ 3.00000 $ 75.00 08 $ 1.10000 $ 27.50 22 603E01400 6" CONDUIT, TYPE E 25.000 LIN FT AWD $ 1.00000 $ 25.00 02 $ 1.75000 $ 43.75 03 $ 4.00000 $ 100.00 04 $ 1.00000 $ 25.00 05 $ 1.50000 $ 37.50 06 $ 6.00000 $ 150.00 07 $ 3.00000 $ 75.00 08 $ 1.10000 $ 27.50

Page 7:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 6 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 23 603E01500 6" CONDUIT, TYPE F 25.000 LIN FT AWD $ 1.00000 $ 25.00 02 $ 2.00000 $ 50.00 03 $ 4.00000 $ 100.00 04 $ 1.00000 $ 25.00 05 $ 1.50000 $ 37.50 06 $ 6.00000 $ 150.00 07 $ 3.00000 $ 75.00 08 $ 1.10000 $ 27.50 24 605E31100 AGGREGATE DRAIN 96.000 LIN FT AWD $ 7.00000 $ 672.00 02 $ 5.00000 $ 480.00 03 $ 5.00000 $ 480.00 04 $ 7.50000 $ 720.00 05 $ 6.00000 $ 576.00 06 $ 6.00000 $ 576.00 07 $ 6.75000 $ 648.00 08 $ 15.00000 $ 1,440.00

S.3 DRAINAGE (PART 1) TOTALS AWD $ 747.00 02 $ 611.25 03 $ 830.00 04 $ 795.00 05 $ 688.50 06 $ 1,076.00 07 $ 873.00 08 $ 1,522.50 25 301E46000 BITUMINOUS AGGREGATE BASE, PG64-22 75.000 CU YD AWD $ 100.00000 $ 7,500.00 02 $ 111.00000 $ 8,325.00 03 $ 100.00000 $ 7,500.00 04 $ 103.00000 $ 7,725.00 05 $ 100.00000 $ 7,500.00 06 $ 100.00000 $ 7,500.00 07 $ 100.00000 $ 7,500.00 08 $ 125.00000 $ 9,375.00 26 304E20000 AGGREGATE BASE 118.000 CU YD AWD $ 25.00000 $ 2,950.00 02 $ 35.00000 $ 4,130.00 03 $ 26.00000 $ 3,068.00 04 $ 40.00000 $ 4,720.00 05 $ 44.00000 $ 5,192.00 06 $ 38.00000 $ 4,484.00 07 $ 35.00000 $ 4,130.00 08 $ 32.00000 $ 3,776.00

Page 8:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 7 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 27 407E14000 TACK COAT FOR INTERMEDIATE COURSE 26.000 GALLON AWD $ 1.25000 $ 32.50 02 $ 2.50000 $ 65.00 03 $ 1.25000 $ 32.50 04 $ 2.00000 $ 52.00 05 $ 1.25000 $ 32.50 06 $ 1.25000 $ 32.50 07 $ 1.25000 $ 32.50 08 $ 1.50000 $ 39.00 28 408E10000 BITUMINOUS PRIME COAT 268.000 GALLON AWD $ 2.50000 $ 670.00 02 $ 1.50000 $ 402.00 03 $ 2.50000 $ 670.00 04 $ 2.25000 $ 603.00 05 $ 2.50000 $ 670.00 06 $ 2.50000 $ 670.00 07 $ 2.50000 $ 670.00 08 $ 2.00000 $ 536.00 29 448E46050 ASPH CONC INTERMEDIATE, TYPE 2, PG64-22 32.000 CU YD AWD $ 115.00000 $ 3,680.00 02 $ 111.00000 $ 3,552.00 03 $ 115.00000 $ 3,680.00 04 $ 103.00000 $ 3,296.00 05 $ 115.00000 $ 3,680.00 06 $ 115.00000 $ 3,680.00 07 $ 115.00000 $ 3,680.00 08 $ 150.00000 $ 4,800.00 30 448E47020 ASPH CONC SURFACE, TYPE 1, PG64-22 23.000 CU YD AWD $ 140.00000 $ 3,220.00 02 $ 111.00000 $ 2,553.00 03 $ 140.00000 $ 3,220.00 04 $ 103.00000 $ 2,369.00 05 $ 140.00000 $ 3,220.00 06 $ 140.00000 $ 3,220.00 07 $ 140.00000 $ 3,220.00 08 $ 150.00000 $ 3,450.00

S.4 PAVEMENT (PART 1) TOTALS AWD $ 18,052.50 02 $ 19,027.00 03 $ 18,170.50 04 $ 18,765.00 05 $ 20,294.50 06 $ 19,586.50 07 $ 19,232.50 08 $ 21,976.00

Page 9:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 8 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 31 202E11002 STR RMVD, >20 SPAN LUMP SUM AWD $ 10,500.00000 $ 10,500.00 02 $ 20,000.00000 $ 20,000.00 03 $ 10,000.00000 $ 10,000.00 04 $ 14,000.00000 $ 14,000.00 05 $ 6,425.00000 $ 6,425.00 06 $ 7,800.00000 $ 7,800.00 07 $ 18,480.00000 $ 18,480.00 08 $ 12,000.00000 $ 12,000.00 32 407E14000 TACK COAT FOR INTERMEDIATE COURSE 8.000 GALLON AWD $ 1.25000 $ 10.00 02 $ 2.50000 $ 20.00 03 $ 1.25000 $ 10.00 04 $ 2.00000 $ 16.00 05 $ 1.25000 $ 10.00 06 $ 1.25000 $ 10.00 07 $ 1.25000 $ 10.00 08 $ 1.50000 $ 12.00 33 448E46050 ASPH CONC INTERMEDIATE, TYPE 2, PG64-22 9.000 CU YD AWD $ 160.00000 $ 1,440.00 02 $ 111.00000 $ 999.00 03 $ 160.00000 $ 1,440.00 04 $ 103.00000 $ 927.00 05 $ 160.00000 $ 1,440.00 06 $ 160.00000 $ 1,440.00 07 $ 160.00000 $ 1,440.00 08 $ 155.00000 $ 1,395.00 34 448E47020 ASPH CONC SURFACE, TYPE 1, PG64-22 7.000 CU YD AWD $ 175.00000 $ 1,225.00 02 $ 111.00000 $ 777.00 03 $ 175.00000 $ 1,225.00 04 $ 103.00000 $ 721.00 05 $ 175.00000 $ 1,225.00 06 $ 175.00000 $ 1,225.00 07 $ 175.00000 $ 1,225.00 08 $ 155.00000 $ 1,085.00

Page 10:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 9 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 35 503E21301 UNCLASSIFIED EXC, APP LUMP SUM AWD $ 1,000.00000 $ 1,000.00 02 $ 1,750.00000 $ 1,750.00 03 $ 3,700.00000 $ 3,700.00 04 $ 1,300.00000 $ 1,300.00 05 $ 1,900.00000 $ 1,900.00 06 $ 2,500.00000 $ 2,500.00 07 $ 2,500.00000 $ 2,500.00 08 $ 4,500.00000 $ 4,500.00 36 505E11100 PILE DRIVING EQUIP. MOBIL. LUMP SUM AWD $ 2,500.00000 $ 2,500.00 02 $ 500.00000 $ 500.00 03 $ 4,000.00000 $ 4,000.00 04 $ 2,000.00000 $ 2,000.00 05 $ 1,420.00000 $ 1,420.00 06 $ 8,000.00000 $ 8,000.00 07 $ 7,500.00000 $ 7,500.00 08 $ 2,300.00000 $ 2,300.00 37 507E00100 STEEL PILES HP10X42, FURNISHED 264.000 LIN FT AWD $ 30.00000 $ 7,920.00 02 $ 24.00000 $ 6,336.00 03 $ 14.00000 $ 3,696.00 04 $ 13.50000 $ 3,564.00 05 $ 17.70000 $ 4,672.80 06 $ 20.00000 $ 5,280.00 07 $ 15.00000 $ 3,960.00 08 $ 14.65000 $ 3,867.60 38 507E00150 STEEL PILES HP10X42, DRIVEN 264.000 LIN FT AWD $ 5.00000 $ 1,320.00 02 $ 1.00000 $ 264.00 03 $ 7.00000 $ 1,848.00 04 $ 6.20000 $ 1,636.80 05 $ 10.00000 $ 2,640.00 06 $ 5.00000 $ 1,320.00 07 $ 10.00000 $ 2,640.00 08 $ 8.00000 $ 2,112.00 39 507E50500 STEEL PILE SPLICES 6.000 EACH AWD $ 3.00000 $ 18.00 02 $ 300.00000 $ 1,800.00 03 $ 30.00000 $ 180.00 04 $ 0.50000 $ 3.00 05 $ 10.00000 $ 60.00 06 $ 25.00000 $ 150.00 07 $ 85.00000 $ 510.00 08 $ 60.00000 $ 360.00

Page 11:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 10 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 40 512E33010 TYPE 3 WATERPROOFING 196.000 SQ YD AWD $ 17.00000 $ 3,332.00 02 $ 18.00000 $ 3,528.00 03 $ 12.00000 $ 2,352.00 04 $ 17.80000 $ 3,488.80 05 $ 21.00000 $ 4,116.00 06 $ 17.50000 $ 3,430.00 07 $ 16.00000 $ 3,136.00 08 $ 19.40000 $ 3,802.40 41 512E67502 SEALING OF CONC. SURF.(EPOXY) 37.000 SQ YD AWD $ 8.00000 $ 296.00 02 $ 12.00000 $ 444.00 03 $ 19.00000 $ 703.00 04 $ 16.40000 $ 606.80 05 $ 17.00000 $ 629.00 06 $ 9.00000 $ 333.00 07 $ 7.00000 $ 259.00 08 $ 25.00000 $ 925.00 42 512E67504 SLG OF CONC SURF (NON-EPOXY) 36.000 SQ YD AWD $ 8.00000 $ 288.00 02 $ 5.00000 $ 180.00 03 $ 16.00000 $ 576.00 04 $ 5.00000 $ 180.00 05 $ 1.00000 $ 36.00 06 $ 8.00000 $ 288.00 07 $ 9.50000 $ 342.00 08 $ 10.00000 $ 360.00 43 516E13600 1" PREF EXP JT FILLER 123.000 SQ FT AWD $ 4.00000 $ 492.00 02 $ 2.00000 $ 246.00 03 $ 3.50000 $ 430.50 04 $ 2.50000 $ 307.50 05 $ 3.00000 $ 369.00 06 $ 4.00000 $ 492.00 07 $ 3.00000 $ 369.00 08 $ 4.50000 $ 553.50

Page 12:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 11 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 44 516E31011 2" DEEP JOINT SEALER, APP 57.000 LIN FT AWD $ 6.00000 $ 342.00 02 $ 2.00000 $ 114.00 03 $ 1.00000 $ 57.00 04 $ 2.00000 $ 114.00 05 $ 4.50000 $ 256.50 06 $ 7.00000 $ 399.00 07 $ 4.00000 $ 228.00 08 $ 5.50000 $ 313.50 45 516E31200 SAWING & SEALING BIT CONC JTS 57.000 LIN FT AWD $ 6.00000 $ 342.00 02 $ 2.00000 $ 114.00 03 $ 5.00000 $ 285.00 04 $ 17.50000 $ 997.50 05 $ 15.00000 $ 855.00 06 $ 7.00000 $ 399.00 07 $ 8.50000 $ 484.50 08 $ 5.50000 $ 313.50 46 516E41100 1/8" PREFORMED BEARING PAD , (8"X1'-2") 14.000 EACH AWD $ 3.00000 $ 42.00 02 $ 5.00000 $ 70.00 03 $ 5.00000 $ 70.00 04 $ 1.00000 $ 14.00 05 $ 7.50000 $ 105.00 06 $ 6.00000 $ 84.00 07 $ 4.50000 $ 63.00 08 $ 6.50000 $ 91.00 47 516E43100 BRG/INT LAM(NEOPRENE <2") , 8"X1'-2"X1-1/4" 28.000 EACH AWD $ 50.00000 $ 1,400.00 02 $ 80.00000 $ 2,240.00 03 $ 90.00000 $ 2,520.00 04 $ 87.00000 $ 2,436.00 05 $ 107.00000 $ 2,996.00 06 $ 100.00000 $ 2,800.00 07 $ 110.00000 $ 3,080.00 08 $ 85.00000 $ 2,380.00

Page 13:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 12 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 48 517E72300 RLG(#2 POSTS & BOLTS) 137.500 LIN FT AWD $ 32.50000 $ 4,468.75 02 $ 38.00000 $ 5,225.00 03 $ 32.50000 $ 4,468.75 04 $ 35.25000 $ 4,846.88 05 $ 32.50000 $ 4,468.75 06 $ 32.50000 $ 4,468.75 07 $ 32.50000 $ 4,468.75 08 $ 34.25000 $ 4,709.38 49 518E21230 POROUS BACKFILL WITH FILTER FABRIC LUMP SUM AWD $ 3,000.00000 $ 3,000.00 02 $ 1,500.00000 $ 1,500.00 03 $ 2,000.00000 $ 2,000.00 04 $ 2,400.00000 $ 2,400.00 05 $ 3,668.00000 $ 3,668.00 06 $ 2,000.00000 $ 2,000.00 07 $ 1,700.00000 $ 1,700.00 08 $ 3,500.00000 $ 3,500.00 50 518E22300 STEEL DRIP STRIP 137.000 LIN FT AWD $ 7.00000 $ 959.00 02 $ 6.00000 $ 822.00 03 $ 4.00000 $ 548.00 04 $ 8.00000 $ 1,096.00 05 $ 4.60000 $ 630.20 06 $ 5.00000 $ 685.00 07 $ 6.00000 $ 822.00 08 $ 6.25000 $ 856.25 51 518E40000 6" PERF CORR. PLASTIC PIPE 86.000 LIN FT AWD $ 7.00000 $ 602.00 02 $ 6.00000 $ 516.00 03 $ 6.00000 $ 516.00 04 $ 4.40000 $ 378.40 05 $ 5.60000 $ 481.60 06 $ 7.00000 $ 602.00 07 $ 5.00000 $ 430.00 08 $ 6.50000 $ 559.00 52 518E40010 6" NON-PERF CORR PLASTIC PIPE 45.000 LIN FT AWD $ 7.00000 $ 315.00 02 $ 6.00000 $ 270.00 03 $ 6.00000 $ 270.00 04 $ 4.40000 $ 198.00 05 $ 5.60000 $ 252.00 06 $ 7.00000 $ 315.00 07 $ 5.25000 $ 236.25 08 $ 6.50000 $ 292.50

Page 14:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 13 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 53 844E48040 HIGH PERFORMANCE CONCRETE SUBSTRUCTURE 58.000 CU YD AWD $ 375.00000 $ 21,750.00 02 $ 325.00000 $ 18,850.00 03 $ 415.00000 $ 24,070.00 04 $ 464.49000 $ 26,940.42 05 $ 502.00000 $ 29,116.00 06 $ 450.00000 $ 26,100.00 07 $ 525.00000 $ 30,450.00 08 $ 450.00000 $ 26,100.00 54 844E49000 HIGH PERFORMANCE CONCRETE TRIAL MIX LUMP SUM AWD $ 1,000.00000 $ 1,000.00 02 $ 850.00000 $ 850.00 03 $ 1,800.00000 $ 1,800.00 04 $ 1,000.00000 $ 1,000.00 05 $ 1,187.00000 $ 1,187.00 06 $ 1,400.00000 $ 1,400.00 07 $ 900.00000 $ 900.00 08 $ 1,200.00000 $ 1,200.00 55 844E49010 HIGH PERFORMANCE CONCRETE TESTING LUMP SUM AWD $ 3,000.00000 $ 3,000.00 02 $ 2,500.00000 $ 2,500.00 03 $ 2,300.00000 $ 2,300.00 04 $ 2,300.00000 $ 2,300.00 05 $ 2,280.00000 $ 2,280.00 06 $ 1,500.00000 $ 1,500.00 07 $ 1,750.00000 $ 1,750.00 08 $ 3,200.00000 $ 3,200.00 56 865E10070 PREST NON COM BRIDGE MEMBER B27-48 7.000 EACH AWD $ 5,554.00000 $ 38,878.00 02 $ 5,500.00000 $ 38,500.00 03 $ 6,000.00000 $ 42,000.00 04 $ 7,385.33000 $ 51,697.31 05 $ 5,800.00000 $ 40,600.00 06 $ 5,700.00000 $ 39,900.00 07 $ 6,100.00000 $ 42,700.00 08 $ 6,035.28000 $ 42,246.96

Page 15:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 14 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S.5 STRUCTURE OVER 20 FOOT SPAN (PART 1) TOTALS AWD $ 106,439.75 02 $ 108,415.00 03 $ 111,065.25 04 $ 123,169.41 05 $ 111,838.85 06 $ 112,920.75 07 $ 129,683.50 08 $ 119,034.59 57 201E11000 CLEARING AND GRUBBING LUMP SUM AWD $ 1,600.00000 $ 1,600.00 02 $ 100.00000 $ 100.00 03 $ 3,000.00000 $ 3,000.00 04 $ 500.00000 $ 500.00 05 $ 1,326.00000 $ 1,326.00 06 $ 2,000.00000 $ 2,000.00 07 $ 2,000.00000 $ 2,000.00 08 $ 4,000.00000 $ 4,000.00 58 203E11001 EXCAVATION W/EMBANKMENT, APP 20.000 CU YD AWD $ 15.00000 $ 300.00 02 $ 10.00000 $ 200.00 03 $ 14.00000 $ 280.00 04 $ 13.22000 $ 264.40 05 $ 43.00000 $ 860.00 06 $ 24.00000 $ 480.00 07 $ 10.00000 $ 200.00 08 $ 15.00000 $ 300.00 59 203E12000 EXCAVATION W/O EMBANKMENT 137.000 CU YD AWD $ 5.00000 $ 685.00 02 $ 5.00000 $ 685.00 03 $ 14.00000 $ 1,918.00 04 $ 5.00000 $ 685.00 05 $ 14.00000 $ 1,918.00 06 $ 8.00000 $ 1,096.00 07 $ 10.00000 $ 1,370.00 08 $ 6.50000 $ 890.50 60 203E20000 EMBANKMENT 259.000 CU YD AWD $ 7.00000 $ 1,813.00 02 $ 10.00000 $ 2,590.00 03 $ 5.00000 $ 1,295.00 04 $ 13.22000 $ 3,423.98 05 $ 18.00000 $ 4,662.00 06 $ 15.00000 $ 3,885.00 07 $ 9.00000 $ 2,331.00 08 $ 15.00000 $ 3,885.00

Page 16:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 15 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 61 203E50000 SUBGRADE COMPACTION 440.000 SQ YD AWD $ 1.00000 $ 440.00 02 $ 1.00000 $ 440.00 03 $ 2.25000 $ 990.00 04 $ 1.50000 $ 660.00 05 $ 2.00000 $ 880.00 06 $ 4.00000 $ 1,760.00 07 $ 2.75000 $ 1,210.00 08 $ 1.20000 $ 528.00 62 606E13000 GUARDRAIL, TYPE 5 300.000 LIN FT AWD $ 10.30000 $ 3,090.00 02 $ 11.00000 $ 3,300.00 03 $ 9.60000 $ 2,880.00 04 $ 10.50000 $ 3,150.00 05 $ 9.60000 $ 2,880.00 06 $ 9.60000 $ 2,880.00 07 $ 9.60000 $ 2,880.00 08 $ 9.80000 $ 2,940.00 63 606E25000 ANCHOR ASSEMBLY, TYPE A 4.000 EACH AWD $ 595.00000 $ 2,380.00 02 $ 600.00000 $ 2,400.00 03 $ 600.00000 $ 2,400.00 04 $ 600.00000 $ 2,400.00 05 $ 600.00000 $ 2,400.00 06 $ 600.00000 $ 2,400.00 07 $ 600.00000 $ 2,400.00 08 $ 600.00000 $ 2,400.00 64 606E35140 BRIDGE TERM ASSY, TYPE 4 4.000 EACH AWD $ 451.00000 $ 1,804.00 02 $ 500.00000 $ 2,000.00 03 $ 450.00000 $ 1,800.00 04 $ 600.00000 $ 2,400.00 05 $ 450.00000 $ 1,800.00 06 $ 450.00000 $ 1,800.00 07 $ 450.00000 $ 1,800.00 08 $ 450.00000 $ 1,800.00 65 690E50000 MAILBOX SUPPORT 1.000 EACH AWD $ 82.25000 $ 82.25 02 $ 150.00000 $ 150.00 03 $ 95.00000 $ 95.00 04 $ 100.00000 $ 100.00 05 $ 95.00000 $ 95.00 06 $ 95.00000 $ 95.00 07 $ 95.00000 $ 95.00 08 $ 100.00000 $ 100.00

Page 17:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 16 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S.6 ROADWAY (PART 2) TOTALS AWD $ 12,194.25 02 $ 11,865.00 03 $ 14,658.00 04 $ 13,583.38 05 $ 16,821.00 06 $ 16,396.00 07 $ 14,286.00 08 $ 16,843.50 66 601E32204 ROCK CH PROT, C W/FAB FILTER 212.000 CU YD AWD $ 33.00000 $ 6,996.00 02 $ 35.00000 $ 7,420.00 03 $ 34.00000 $ 7,208.00 04 $ 41.12000 $ 8,717.44 05 $ 49.00000 $ 10,388.00 06 $ 40.00000 $ 8,480.00 07 $ 38.00000 $ 8,056.00 08 $ 40.00000 $ 8,480.00 67 616E10000 WATER 1.000 M GAL AWD $ 1.00000 $ 1.00 02 $ 0.10000 $ 0.10 03 $ 7.00000 $ 7.00 04 $ 0.10000 $ 0.10 05 $ 50.00000 $ 50.00 06 $ 15.00000 $ 15.00 07 $ 10.00000 $ 10.00 08 $ 0.50000 $ 0.50 68 616E20000 CALCIUM CHLORIDE 0.080 TON AWD $ 1.00000 $ 0.08 02 $ 25.00000 $ 2.00 03 $ 250.00000 $ 20.00 04 $ 5.00000 $ 0.40 05 $ 500.00000 $ 40.00 06 $ 225.00000 $ 18.00 07 $ 400.00000 $ 32.00 08 $ 200.00000 $ 16.00 69 870E00100 SOIL ANALYSIS TEST 2.000 EACH AWD $ 25.00000 $ 50.00 02 $ 25.00000 $ 50.00 03 $ 50.00000 $ 100.00 04 $ 100.00000 $ 200.00 05 $ 142.00000 $ 284.00 06 $ 100.00000 $ 200.00 07 $ 50.00000 $ 100.00 08 $ 50.00000 $ 100.00

Page 18:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 17 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 70 870E00200 PLACING TOPSOIL 40.000 CU YD AWD $ 30.00000 $ 1,200.00 02 $ 50.00000 $ 2,000.00 03 $ 28.00000 $ 1,120.00 04 $ 22.00000 $ 880.00 05 $ 28.00000 $ 1,120.00 06 $ 20.00000 $ 800.00 07 $ 25.00000 $ 1,000.00 08 $ 60.00000 $ 2,400.00 71 870E10000 SEEDING AND MULCHING 704.000 SQ YD AWD $ 1.50000 $ 1,056.00 02 $ 2.00000 $ 1,408.00 03 $ 2.25000 $ 1,584.00 04 $ 1.10000 $ 774.40 05 $ 2.25000 $ 1,584.00 06 $ 3.00000 $ 2,112.00 07 $ 1.45000 $ 1,020.80 08 $ 2.25000 $ 1,584.00 72 870E14000 REPAIR SEEDING AND MULCHING 36.000 SQ YD AWD $ 0.10000 $ 3.60 02 $ 0.10000 $ 3.60 03 $ 1.50000 $ 54.00 04 $ 0.10000 $ 3.60 05 $ 0.75000 $ 27.00 06 $ 0.32000 $ 11.52 07 $ 0.55000 $ 19.80 08 $ 0.80000 $ 28.80 73 870E20000 COMMERCIAL FERTILIZER 0.110 TON AWD $ 500.00000 $ 55.00 02 $ 1,000.00000 $ 110.00 03 $ 500.00000 $ 55.00 04 $ 400.00000 $ 44.00 05 $ 400.00000 $ 44.00 06 $ 450.00000 $ 49.50 07 $ 375.00000 $ 41.25 08 $ 450.00000 $ 49.50

Page 19:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 18 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 74 870E30000 AGRICULTURAL LIME 0.290 TON AWD $ 125.00000 $ 36.25 02 $ 200.00000 $ 58.00 03 $ 125.00000 $ 36.25 04 $ 120.00000 $ 34.80 05 $ 50.00000 $ 14.50 06 $ 450.00000 $ 130.50 07 $ 100.00000 $ 29.00 08 $ 60.00000 $ 17.40 75 870E35000 WATER 5.000 M GAL AWD $ 1.00000 $ 5.00 02 $ 0.10000 $ 0.50 03 $ 10.00000 $ 50.00 04 $ 0.10000 $ 0.50 05 $ 0.16000 $ 0.80 06 $ 15.00000 $ 75.00 07 $ 5.00000 $ 25.00 08 $ 0.50000 $ 2.50 76 877E10000 TEMPORARY SEEDING AND MULCHING 141.000 SQ YD AWD $ 0.10000 $ 14.10 02 $ 0.10000 $ 14.10 03 $ 0.30000 $ 42.30 04 $ 0.10000 $ 14.10 05 $ 0.30000 $ 42.30 06 $ 0.20000 $ 28.20 07 $ 0.55000 $ 77.55 08 $ 0.30000 $ 42.30 77 877E30100 TEMPORARY PERIMETER FILTER FABRIC FENCE 760.000 LIN FT AWD $ 1.00000 $ 760.00 02 $ 2.00000 $ 1,520.00 03 $ 0.25000 $ 190.00 04 $ 1.06000 $ 805.60 05 $ 2.00000 $ 1,520.00 06 $ 0.72000 $ 547.20 07 $ 1.75000 $ 1,330.00 08 $ 2.25000 $ 1,710.00

S.7 EROSION CONTROL (PART 2) TOTALS AWD $ 10,177.03 02 $ 12,586.30 03 $ 10,466.55 04 $ 11,474.94 05 $ 15,114.60 06 $ 12,466.92 07 $ 11,741.40 08 $ 14,431.00

Page 20:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 19 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 78 603E00900 6" CONDUIT, TYPE B 25.000 LIN FT AWD $ 1.00000 $ 25.00 02 $ 1.50000 $ 37.50 03 $ 6.00000 $ 150.00 04 $ 1.00000 $ 25.00 05 $ 1.50000 $ 37.50 06 $ 8.00000 $ 200.00 07 $ 3.00000 $ 75.00 08 $ 1.10000 $ 27.50 79 603E01400 6" CONDUIT, TYPE E 25.000 LIN FT AWD $ 1.00000 $ 25.00 02 $ 1.75000 $ 43.75 03 $ 4.00000 $ 100.00 04 $ 1.00000 $ 25.00 05 $ 1.50000 $ 37.50 06 $ 6.00000 $ 150.00 07 $ 3.00000 $ 75.00 08 $ 1.10000 $ 27.50 80 603E01500 6" CONDUIT, TYPE F 25.000 LIN FT AWD $ 1.00000 $ 25.00 02 $ 2.00000 $ 50.00 03 $ 4.00000 $ 100.00 04 $ 1.00000 $ 25.00 05 $ 1.50000 $ 37.50 06 $ 6.00000 $ 150.00 07 $ 3.00000 $ 75.00 08 $ 1.10000 $ 27.50 81 605E31100 AGGREGATE DRAIN 78.000 LIN FT AWD $ 7.00000 $ 546.00 02 $ 5.00000 $ 390.00 03 $ 5.00000 $ 390.00 04 $ 7.50000 $ 585.00 05 $ 7.50000 $ 585.00 06 $ 6.00000 $ 468.00 07 $ 6.75000 $ 526.50 08 $ 15.00000 $ 1,170.00

S.8 DRAINAGE (PART 2) TOTALS AWD $ 621.00 02 $ 521.25 03 $ 740.00 04 $ 660.00 05 $ 697.50 06 $ 968.00 07 $ 751.50 08 $ 1,252.50

Page 21:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 20 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 82 301E46000 BITUMINOUS AGGREGATE BASE, PG64-22 51.000 CU YD AWD $ 100.00000 $ 5,100.00 02 $ 111.00000 $ 5,661.00 03 $ 100.00000 $ 5,100.00 04 $ 120.00000 $ 6,120.00 05 $ 100.00000 $ 5,100.00 06 $ 100.00000 $ 5,100.00 07 $ 100.00000 $ 5,100.00 08 $ 125.00000 $ 6,375.00 83 304E20000 AGGREGATE BASE 83.000 CU YD AWD $ 25.00000 $ 2,075.00 02 $ 35.00000 $ 2,905.00 03 $ 28.00000 $ 2,324.00 04 $ 40.00000 $ 3,320.00 05 $ 44.00000 $ 3,652.00 06 $ 38.00000 $ 3,154.00 07 $ 38.00000 $ 3,154.00 08 $ 32.00000 $ 2,656.00 84 407E14000 TACK COAT FOR INTERMEDIATE COURSE 18.000 GALLON AWD $ 1.25000 $ 22.50 02 $ 2.50000 $ 45.00 03 $ 1.25000 $ 22.50 04 $ 3.00000 $ 54.00 05 $ 1.25000 $ 22.50 06 $ 1.25000 $ 22.50 07 $ 1.25000 $ 22.50 08 $ 1.50000 $ 27.00 85 408E10000 BITUMINOUS PRIME COAT 183.000 GALLON AWD $ 2.50000 $ 457.50 02 $ 1.50000 $ 274.50 03 $ 2.50000 $ 457.50 04 $ 2.00000 $ 366.00 05 $ 2.50000 $ 457.50 06 $ 2.50000 $ 457.50 07 $ 2.50000 $ 457.50 08 $ 2.00000 $ 366.00 86 448E46050 ASPH CONC INTERMEDIATE, TYPE 2, PG64-22 22.000 CU YD AWD $ 115.00000 $ 2,530.00 02 $ 111.00000 $ 2,442.00 03 $ 115.00000 $ 2,530.00 04 $ 120.00000 $ 2,640.00 05 $ 115.00000 $ 2,530.00 06 $ 115.00000 $ 2,530.00 07 $ 115.00000 $ 2,530.00 08 $ 150.00000 $ 3,300.00

Page 22:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 21 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 87 448E47020 ASPH CONC SURFACE, TYPE 1, PG64-22 16.000 CU YD AWD $ 140.00000 $ 2,240.00 02 $ 111.00000 $ 1,776.00 03 $ 140.00000 $ 2,240.00 04 $ 120.00000 $ 1,920.00 05 $ 140.00000 $ 2,240.00 06 $ 140.00000 $ 2,240.00 07 $ 140.00000 $ 2,240.00 08 $ 150.00000 $ 2,400.00

S.9 PAVEMENT (PART 2) TOTALS AWD $ 12,425.00 02 $ 13,103.50 03 $ 12,674.00 04 $ 14,420.00 05 $ 14,002.00 06 $ 13,504.00 07 $ 13,504.00 08 $ 15,124.00 88 202E11002 STR RMVD, >20 SPAN LUMP SUM AWD $ 10,500.00000 $ 10,500.00 02 $ 20,000.00000 $ 20,000.00 03 $ 10,000.00000 $ 10,000.00 04 $ 14,000.00000 $ 14,000.00 05 $ 5,700.00000 $ 5,700.00 06 $ 7,800.00000 $ 7,800.00 07 $ 16,127.55000 $ 16,127.55 08 $ 12,000.00000 $ 12,000.00 89 407E14000 TACK COAT FOR INTERMEDIATE COURSE 8.000 GALLON AWD $ 1.25000 $ 10.00 02 $ 2.50000 $ 20.00 03 $ 1.25000 $ 10.00 04 $ 3.00000 $ 24.00 05 $ 1.25000 $ 10.00 06 $ 1.25000 $ 10.00 07 $ 1.25000 $ 10.00 08 $ 1.50000 $ 12.00 90 448E46050 ASPH CONC INTERMEDIATE, TYPE 2, PG64-22 9.000 CU YD AWD $ 160.00000 $ 1,440.00 02 $ 111.00000 $ 999.00 03 $ 160.00000 $ 1,440.00 04 $ 112.00000 $ 1,008.00 05 $ 160.00000 $ 1,440.00 06 $ 160.00000 $ 1,440.00 07 $ 160.00000 $ 1,440.00 08 $ 155.00000 $ 1,395.00

Page 23:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 22 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 91 448E47020 ASPH CONC SURFACE, TYPE 1, PG64-22 7.000 CU YD AWD $ 175.00000 $ 1,225.00 02 $ 111.00000 $ 777.00 03 $ 175.00000 $ 1,225.00 04 $ 112.00000 $ 784.00 05 $ 175.00000 $ 1,225.00 06 $ 175.00000 $ 1,225.00 07 $ 175.00000 $ 1,225.00 08 $ 155.00000 $ 1,085.00 92 503E21301 UNCLASSIFIED EXC, APP LUMP SUM AWD $ 1,000.00000 $ 1,000.00 02 $ 2,000.00000 $ 2,000.00 03 $ 3,500.00000 $ 3,500.00 04 $ 1,300.00000 $ 1,300.00 05 $ 1,900.00000 $ 1,900.00 06 $ 3,000.00000 $ 3,000.00 07 $ 2,500.00000 $ 2,500.00 08 $ 4,500.00000 $ 4,500.00 93 505E11100 PILE DRIVING EQUIP. MOBIL. LUMP SUM AWD $ 2,500.00000 $ 2,500.00 02 $ 500.00000 $ 500.00 03 $ 6,000.00000 $ 6,000.00 04 $ 2,000.00000 $ 2,000.00 05 $ 1,420.00000 $ 1,420.00 06 $ 8,000.00000 $ 8,000.00 07 $ 3,500.00000 $ 3,500.00 08 $ 2,000.00000 $ 2,000.00 94 507E00100 STEEL PILES HP10X42, FURNISHED 308.000 LIN FT AWD $ 30.00000 $ 9,240.00 02 $ 24.00000 $ 7,392.00 03 $ 14.00000 $ 4,312.00 04 $ 13.50000 $ 4,158.00 05 $ 17.30000 $ 5,328.40 06 $ 20.00000 $ 6,160.00 07 $ 15.00000 $ 4,620.00 08 $ 14.65000 $ 4,512.20

Page 24:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 23 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 95 507E00150 STEEL PILES HP10X42, DRIVEN 308.000 LIN FT AWD $ 5.00000 $ 1,540.00 02 $ 1.00000 $ 308.00 03 $ 7.00000 $ 2,156.00 04 $ 6.20000 $ 1,909.60 05 $ 10.00000 $ 3,080.00 06 $ 5.00000 $ 1,540.00 07 $ 10.00000 $ 3,080.00 08 $ 8.00000 $ 2,464.00 96 507E50500 STEEL PILE SPLICES 7.000 EACH AWD $ 3.00000 $ 21.00 02 $ 300.00000 $ 2,100.00 03 $ 25.00000 $ 175.00 04 $ 1.00000 $ 7.00 05 $ 1.00000 $ 7.00 06 $ 25.00000 $ 175.00 07 $ 85.00000 $ 595.00 08 $ 60.00000 $ 420.00 97 512E33010 TYPE 3 WATERPROOFING 196.000 SQ YD AWD $ 17.00000 $ 3,332.00 02 $ 18.00000 $ 3,528.00 03 $ 12.00000 $ 2,352.00 04 $ 17.80000 $ 3,488.80 05 $ 21.40000 $ 4,194.40 06 $ 17.50000 $ 3,430.00 07 $ 16.00000 $ 3,136.00 08 $ 19.40000 $ 3,802.40 98 512E67502 SEALING OF CONC. SURF.(EPOXY) 43.000 SQ YD AWD $ 8.00000 $ 344.00 02 $ 12.00000 $ 516.00 03 $ 22.00000 $ 946.00 04 $ 16.40000 $ 705.20 05 $ 15.00000 $ 645.00 06 $ 9.00000 $ 387.00 07 $ 7.00000 $ 301.00 08 $ 25.00000 $ 1,075.00 99 512E67504 SLG OF CONC SURF (NON-EPOXY) 36.000 SQ YD AWD $ 8.00000 $ 288.00 02 $ 5.00000 $ 180.00 03 $ 16.00000 $ 576.00 04 $ 5.00000 $ 180.00 05 $ 1.00000 $ 36.00 06 $ 8.00000 $ 288.00 07 $ 9.50000 $ 342.00 08 $ 10.00000 $ 360.00

Page 25:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 24 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 100 516E13600 1" PREF EXP JT FILLER 157.000 SQ FT AWD $ 4.00000 $ 628.00 02 $ 2.00000 $ 314.00 03 $ 3.00000 $ 471.00 04 $ 2.50000 $ 392.50 05 $ 3.00000 $ 471.00 06 $ 4.00000 $ 628.00 07 $ 3.00000 $ 471.00 08 $ 4.50000 $ 706.50 101 516E31011 2" DEEP JOINT SEALER, APP 65.000 LIN FT AWD $ 6.00000 $ 390.00 02 $ 2.00000 $ 130.00 03 $ 1.25000 $ 81.25 04 $ 2.00000 $ 130.00 05 $ 4.50000 $ 292.50 06 $ 7.00000 $ 455.00 07 $ 4.00000 $ 260.00 08 $ 5.50000 $ 357.50 102 516E31200 SAWING & SEALING BIT CONC JTS 65.000 LIN FT AWD $ 6.00000 $ 390.00 02 $ 2.00000 $ 130.00 03 $ 5.00000 $ 325.00 04 $ 15.30000 $ 994.50 05 $ 15.00000 $ 975.00 06 $ 7.00000 $ 455.00 07 $ 7.00000 $ 455.00 08 $ 5.50000 $ 357.50 103 516E41100 1/8" PREFORMED BEARING PAD , (8"X1'-2") 14.000 EACH AWD $ 3.00000 $ 42.00 02 $ 5.00000 $ 70.00 03 $ 5.00000 $ 70.00 04 $ 1.00000 $ 14.00 05 $ 7.50000 $ 105.00 06 $ 6.00000 $ 84.00 07 $ 4.50000 $ 63.00 08 $ 6.50000 $ 91.00

Page 26:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 25 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 104 516E43100 BRG/INT LAM(NEOPRENE <2") , 8'X1'-2"X1-1/4" 28.000 EACH AWD $ 50.00000 $ 1,400.00 02 $ 80.00000 $ 2,240.00 03 $ 90.00000 $ 2,520.00 04 $ 86.00000 $ 2,408.00 05 $ 107.00000 $ 2,996.00 06 $ 100.00000 $ 2,800.00 07 $ 110.00000 $ 3,080.00 08 $ 85.00000 $ 2,380.00 105 517E72300 RLG(#2 POSTS & BOLTS) 137.500 LIN FT AWD $ 32.50000 $ 4,468.75 02 $ 38.00000 $ 5,225.00 03 $ 32.50000 $ 4,468.75 04 $ 35.25000 $ 4,846.88 05 $ 32.50000 $ 4,468.75 06 $ 32.50000 $ 4,468.75 07 $ 32.50000 $ 4,468.75 08 $ 34.25000 $ 4,709.38 106 518E21230 POROUS BACKFILL WITH FILTER FABRIC LUMP SUM AWD $ 3,000.00000 $ 3,000.00 02 $ 1,500.00000 $ 1,500.00 03 $ 2,500.00000 $ 2,500.00 04 $ 2,400.00000 $ 2,400.00 05 $ 4,760.00000 $ 4,760.00 06 $ 2,000.00000 $ 2,000.00 07 $ 1,700.00000 $ 1,700.00 08 $ 3,500.00000 $ 3,500.00 107 518E22300 STEEL DRIP STRIP 137.000 LIN FT AWD $ 7.00000 $ 959.00 02 $ 6.00000 $ 822.00 03 $ 4.00000 $ 548.00 04 $ 9.00000 $ 1,233.00 05 $ 4.60000 $ 630.20 06 $ 6.00000 $ 822.00 07 $ 6.00000 $ 822.00 08 $ 6.25000 $ 856.25

Page 27:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 26 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 108 518E40000 6" PERF CORR. PLASTIC PIPE 100.000 LIN FT AWD $ 7.00000 $ 700.00 02 $ 6.00000 $ 600.00 03 $ 6.00000 $ 600.00 04 $ 4.40000 $ 440.00 05 $ 6.70000 $ 670.00 06 $ 7.00000 $ 700.00 07 $ 5.00000 $ 500.00 08 $ 6.50000 $ 650.00 109 518E40010 6" NON-PERF CORR PLASTIC PIPE 50.000 LIN FT AWD $ 7.00000 $ 350.00 02 $ 6.00000 $ 300.00 03 $ 6.00000 $ 300.00 04 $ 4.40000 $ 220.00 05 $ 6.70000 $ 335.00 06 $ 7.00000 $ 350.00 07 $ 5.25000 $ 262.50 08 $ 6.50000 $ 325.00 110 844E48040 HIGH PERFORMANCE CONCRETE SUBSTRUCTURE 67.000 CU YD AWD $ 375.00000 $ 25,125.00 02 $ 325.00000 $ 21,775.00 03 $ 415.00000 $ 27,805.00 04 $ 464.49000 $ 31,120.83 05 $ 472.00000 $ 31,624.00 06 $ 450.00000 $ 30,150.00 07 $ 525.00000 $ 35,175.00 08 $ 450.00000 $ 30,150.00 111 844E49000 HIGH PERFORMANCE CONCRETE TRIAL MIX LUMP SUM AWD $ 1,000.00000 $ 1,000.00 02 $ 850.00000 $ 850.00 03 $ 1,800.00000 $ 1,800.00 04 $ 300.00000 $ 300.00 05 $ 1,187.00000 $ 1,187.00 06 $ 1,400.00000 $ 1,400.00 07 $ 900.00000 $ 900.00 08 $ 1,200.00000 $ 1,200.00 112 844E49010 HIGH PERFORMANCE CONCRETE TESTING LUMP SUM AWD $ 3,000.00000 $ 3,000.00 02 $ 2,500.00000 $ 2,500.00 03 $ 2,300.00000 $ 2,300.00 04 $ 1,500.00000 $ 1,500.00 05 $ 2,280.00000 $ 2,280.00 06 $ 1,500.00000 $ 1,500.00 07 $ 1,750.00000 $ 1,750.00 08 $ 3,200.00000 $ 3,200.00

Page 28:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 27 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 113 865E10070 PREST NON COM BRIDGE MEMBER B27-48 7.000 EACH AWD $ 5,934.00000 $ 41,538.00 02 $ 5,500.00000 $ 38,500.00 03 $ 6,500.00000 $ 45,500.00 04 $ 7,385.33000 $ 51,697.31 05 $ 6,000.00000 $ 42,000.00 06 $ 6,000.00000 $ 42,000.00 07 $ 6,300.00000 $ 44,100.00 08 $ 5,648.28000 $ 39,537.96

S.10 STRUCTURE OVER 20 FOOT SPAN (PART 2) TOTALS AWD $ 114,430.75 02 $ 113,276.00 03 $ 121,981.00 04 $ 127,261.62 05 $ 117,780.25 06 $ 121,267.75 07 $ 130,883.80 08 $ 121,646.69 114 103E05000 CONTRACT PERFORMANCE BOND (PARTS 1 & 2) LUMP SUM AWD $ 5,000.00000 $ 5,000.00 02 $ 4,000.00000 $ 4,000.00 03 $ 4,000.00000 $ 4,000.00 04 $ 4,500.00000 $ 4,500.00 05 $ 4,320.00000 $ 4,320.00 06 $ 5,000.00000 $ 5,000.00 07 $ 8,650.00000 $ 8,650.00 08 $ 59,000.00000 $ 59,000.00 115 614E11000 MAINTAINING TRAFFIC (PARTS 1 & 2) LUMP SUM AWD $ 8,000.00000 $ 8,000.00 02 $ 4,000.00000 $ 4,000.00 03 $ 5,000.00000 $ 5,000.00 04 $ 4,500.00000 $ 4,500.00 05 $ 4,433.00000 $ 4,433.00 06 $ 4,000.00000 $ 4,000.00 07 $ 3,000.00000 $ 3,000.00 08 $ 2,000.00000 $ 2,000.00

Page 29:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010002 PAGE NO. 28 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 116 623E10000 CONSTRUCTION LAYOUT STAKES (PARTS 1 & 2) LUMP SUM AWD $ 4,000.00000 $ 4,000.00 02 $ 5,000.00000 $ 5,000.00 03 $ 5,000.00000 $ 5,000.00 04 $ 4,000.00000 $ 4,000.00 05 $ 3,630.00000 $ 3,630.00 06 $ 4,000.00000 $ 4,000.00 07 $ 3,500.00000 $ 3,500.00 08 $ 5,000.00000 $ 5,000.00 117 624E10000 MOBILIZATION (PARTS 1 & 2) LUMP SUM AWD $ 10,000.00000 $ 10,000.00 02 $ 4,000.00000 $ 4,000.00 03 $ 10,000.00000 $ 10,000.00 04 $ 2,560.00000 $ 2,560.00 05 $ 10,000.00000 $ 10,000.00 06 $ 10,000.00000 $ 10,000.00 07 $ 10,000.00000 $ 10,000.00 08 $ 8,000.00000 $ 8,000.00 118 806E16000 FIELD OFFICE, TYPE A (PARTS 1 & 2) 6.000 MONTH AWD $ 100.00000 $ 600.00 02 $ 500.00000 $ 3,000.00 03 $ 1,200.00000 $ 7,200.00 04 $ 150.00000 $ 900.00 05 $ 500.00000 $ 3,000.00 06 $ 900.00000 $ 5,400.00 07 $ 750.00000 $ 4,500.00 08 $ 500.00000 $ 3,000.00

S.11 INCIDENTALS TOTALS AWD $ 27,600.00 02 $ 20,000.00 03 $ 31,200.00 04 $ 16,460.00 05 $ 25,383.00 06 $ 28,400.00 07 $ 29,650.00 08 $ 77,000.00

TOTAL AMOUNT OF THE BID AWD $ 321,707.28 02 $ 323,402.50 03 $ 346,112.30 04 $ 349,005.20 05 $ 353,187.40 06 $ 354,641.92 07 $ 374,000.00 08 $ 418,780.53

Page 30:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010006 PID. 20994 FAY-71-0.00 TE21-G000(514) TYPE: FOUR LANE RESURFACING LETTING: 01/24/01 COMPLETION DATE: 08/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: JOHN R JURGENSEN COMPANY AWARDED AMOUNT: $ 3,234,710.16 ENGINEERS ESTIMATE: $ 3,190,000.00 AWARDED BIDDER BIDDER 02 JOHN R JURGENSEN COMPANY L P CAVETT COMPANY 11641 MOSTELLER RD 600 SHEPHERD AVE CINCINNATI ,OH 45241 LOCKLAND ,OH 45215 BIDDER 03 BIDDER 04 KOKOSING CONSTRUCTION COMPANY INC SHELLY & SANDS INC 886 MC KINLEY AVE 3570 SOUTH RIVER RD COLUMBUS ,OH 43222 ZANESVILLE ,OH 43702-1585

Page 31:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010006 PAGE NO. 30 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E54100 RAISED PVMT MRK RMVD/STRG 2,850.000 EACH AWD $ 3.04000 $ 8,664.00 02 $ 2.00000 $ 5,700.00 03 $ 4.00000 $ 11,400.00 04 $ 3.00000 $ 8,550.00 2 251E01002 PRTL DEPTH PVMT REPAIR 220.000 CU YD AWD $ 322.32000 $ 70,910.40 02 $ 200.00000 $ 44,000.00 03 $ 250.00000 $ 55,000.00 04 $ 340.00000 $ 74,800.00 3 253E02000 PAVEMENT REPAIR 10.000 CU YD AWD $ 606.60000 $ 6,066.00 02 $ 300.00000 $ 3,000.00 03 $ 350.00000 $ 3,500.00 04 $ 340.00000 $ 3,400.00 4 254E01000 PAVEMENT PLANING, BITUMINOUS 791,309.000 SQ YD AWD $ 0.41000 $ 324,436.69 02 $ 0.65000 $ 514,350.85 03 $ 0.40000 $ 316,523.60 04 $ 0.75000 $ 593,481.75 5 407E10000 TACK COAT 60,018.000 GALLON AWD $ 1.17000 $ 70,221.06 02 $ 0.85000 $ 51,015.30 03 $ 0.63000 $ 37,811.34 04 $ 1.00000 $ 60,018.00 7 446E50002 ASPH CONC SURF, W/1059 WARRANTY 21,742.000 CU YD AWD $ 70.23000 $ 1,526,940.66 02 $ 64.20000 $ 1,395,836.40 03 $ 66.00000 $ 1,434,972.00 04 $ 68.00000 $ 1,478,456.00 8 614E11100 LEO WITH PATROL CAR 640.000 HOUR AWD $ 38.61000 $ 24,710.40 02 $ 50.00000 $ 32,000.00 03 $ 47.00000 $ 30,080.00 04 $ 37.50000 $ 24,000.00

Page 32:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010006 PAGE NO. 31 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 9 614E12460 WORK ZONE MARKING SIGN 40.000 EACH AWD $ 128.33000 $ 5,133.20 02 $ 30.00000 $ 1,200.00 03 $ 150.00000 $ 6,000.00 04 $ 100.00000 $ 4,000.00 10 614E18601 PORTABLE CHNGBL MESSG SIGN, APP 12.000 SIGN MNTH AWD $ 1,578.63000 $ 18,943.56 02 $ 1,800.00000 $ 21,600.00 03 $ 1,200.00000 $ 14,400.00 04 $ 1,265.00000 $ 15,180.00 11 614E20400 TEMP LANE LINE, CL II 39.000 MILE AWD $ 512.84000 $ 20,000.76 02 $ 450.00000 $ 17,550.00 03 $ 180.00000 $ 7,020.00 04 $ 250.00000 $ 9,750.00 12 618E40100 RUMBLE STRIPS, TYPE 2 (ASPHALT) 203,696.000 LIN FT AWD $ 0.08000 $ 16,295.68 02 $ 0.08000 $ 16,295.68 03 $ 0.08000 $ 16,295.68 04 $ 0.10000 $ 20,369.60 13 621E00200 RAISED PAVEMENT MARKER, INSTALL ONLY 2,212.000 EACH AWD $ 7.00000 $ 15,484.00 02 $ 7.95000 $ 17,585.40 03 $ 6.94000 $ 15,351.28 04 $ 7.40000 $ 16,368.80 14 632E26500 DETECTOR LOOP 4.000 EACH AWD $ 865.00000 $ 3,460.00 02 $ 865.00000 $ 3,460.00 03 $ 1,090.00000 $ 4,360.00 04 $ 913.00000 $ 3,652.00 15 632E27200 LOOP DETECTOR TIE IN 4.000 EACH AWD $ 65.00000 $ 260.00 02 $ 65.00000 $ 260.00 03 $ 65.00000 $ 260.00 04 $ 69.00000 $ 276.00

Page 33:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010006 PAGE NO. 32 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 16 644E00100 EDGE LINE 83.000 MILE AWD $ 1,435.00000 $ 119,105.00 02 $ 1,435.00000 $ 119,105.00 03 $ 1,435.00000 $ 119,105.00 04 $ 1,514.00000 $ 125,662.00 17 644E00200 LANE LINE 39.000 MILE AWD $ 515.00000 $ 20,085.00 02 $ 515.00000 $ 20,085.00 03 $ 515.00000 $ 20,085.00 04 $ 544.00000 $ 21,216.00 18 644E00400 CHANNELIZING LINE 5,611.000 LIN FT AWD $ 1.26000 $ 7,069.86 02 $ 1.26000 $ 7,069.86 03 $ 1.26000 $ 7,069.86 04 $ 1.30000 $ 7,294.30 19 644E00500 STOP LINE 141.000 LIN FT AWD $ 4.79000 $ 675.39 02 $ 4.79000 $ 675.39 03 $ 4.79000 $ 675.39 04 $ 5.00000 $ 705.00 20 644E00700 TRANSVERSE LINE 2,325.000 LIN FT AWD $ 3.90000 $ 9,067.50 02 $ 3.90000 $ 9,067.50 03 $ 3.90000 $ 9,067.50 04 $ 4.10000 $ 9,532.50 21 644E40000 AIR SPEED ZONE MARKING 2.000 EACH AWD $ 900.00000 $ 1,800.00 02 $ 900.00000 $ 1,800.00 03 $ 900.00000 $ 1,800.00 04 $ 950.00000 $ 1,900.00 22 841E10000 TREATING OF CONCRETE SURFACES WITH SRS 4,813.000 SQ YD AWD $ 5.00000 $ 24,065.00 02 $ 8.00000 $ 38,504.00 03 $ 5.42000 $ 26,086.46 04 $ 5.30000 $ 25,508.90

Page 34:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010006 PAGE NO. 33 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S. 1 ITEMS OF WORK TOTALS AWD $ 3,106,689.76 02 $ 3,100,370.73 03 $ 3,099,343.11 04 $ 3,310,197.85 23 103E06000 CONTRACT PERF, PAYMENT & MNTC BOND LUMP SUM AWD $ 13,506.32000 $ 13,506.32 02 $ 5,000.00000 $ 5,000.00 03 $ 12,000.00000 $ 12,000.00 04 $ 19,500.00000 $ 19,500.00 24 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 50,748.28000 $ 50,748.28 02 $ 110,000.00000 $ 110,000.00 03 $ 72,350.00000 $ 72,350.00 04 $ 139,000.00000 $ 139,000.00 25 623E10000 CONSTRUCTION LAYOUT STAKES LUMP SUM AWD $ 15,572.44000 $ 15,572.44 02 $ 15,000.00000 $ 15,000.00 03 $ 9,000.00000 $ 9,000.00 04 $ 11,500.00000 $ 11,500.00 26 624E10000 MOBILIZATION LUMP SUM AWD $ 40,000.00000 $ 40,000.00 02 $ 65,600.00000 $ 65,600.00 03 $ 100,000.00000 $ 100,000.00 04 $ 100,000.00000 $ 100,000.00 27 806E16010 FIELD OFFICE, TYPE B 4.000 MONTH AWD $ 2,048.34000 $ 8,193.36 02 $ 1,000.00000 $ 4,000.00 03 $ 2,000.00000 $ 8,000.00 04 $ 1,500.00000 $ 6,000.00

S. 2 INCIDENTALS TOTALS AWD $ 128,020.40 02 $ 199,600.00 03 $ 201,350.00 04 $ 276,000.00

Page 35:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010006 PAGE NO. 34 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 100 446E47000 ASPH CONC SURFACE, TYPE 1, PG76-22 12,031.000 CU YD AWD $ 67.60000 $ 813,295.60 02 $ 64.85000 $ 780,210.35 03 $ 80.00000 $ 962,480.00 04 $ 67.00000 $ 806,077.00

S. 1 ITEMS OF WORK TOTALS AWD $ 3,106,689.76 02 $ 3,100,370.73 03 $ 3,099,343.11 04 $ 3,310,197.85

TOTAL AMOUNT OF THE BID AWD $ 3,234,710.16 02 $ 3,299,970.73 03 $ 3,300,693.11 04 $ 3,586,197.85

Page 36:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010008 PID. 12836 STA-77-5.938 TE21-G990(576) TYPE: BRIDGE REPLACEMENT (1 BRIDGE) LETTING: 01/24/01 COMPLETION DATE: 10/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: GAGLIONE CONSTRUCTION INC AWARDED AMOUNT: $ 1,478,053.61 ENGINEERS ESTIMATE: $ 1,570,000.00 AWARDED BIDDER BIDDER 02 GAGLIONE CONSTRUCTION INC KEFFLER BRIDGE/KEFFLER CONSTRUCTION-JV 4195 W MIDDLETOWN RD PO BOX 247 CANFIELD ,OH 44406 CANFIELD ,OH 44406-0247 BIDDER 03 BIDDER 04 RUHLIN COMPANY J D WILLIAMSON CONSTRUCTION CO INC 6931 RIDGE RD 441 GENEVA AVE SHARON CENTER ,OH 44274 TALLMADGE ,OH 44278 BIDDER 05 BIDDER 06 S E JOHNSON COMPANIES INC NORTHERN VALLEY CONTRACTORS INC 1345 FORD ST 7640 WHIPPLE AVE NW MAUMEE ,OH 43537 NORTH CANTON ,OH 44720 BIDDER 07 BIDDER 08 BECDIR CONSTRUCTION COMPANY VELOTTA COMPANY 4990 MAHONING AVE 6740 RIDGE RD YOUNGSTOWN ,OH 44515 SHARON CENTER ,OH 44274

Page 37:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 36 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 201M11000 CLEARING AND GRUBBING LUMP SUM AWD $ 22,225.00000 $ 22,225.00 02 $ 11,000.00000 $ 11,000.00 03 $ 15,000.00000 $ 15,000.00 04 $ 10,000.00000 $ 10,000.00 05 $ 2,000.00000 $ 2,000.00 06 $ 15,000.00000 $ 15,000.00 07 $ 20,000.00000 $ 20,000.00 08 $ 29,200.00000 $ 29,200.00 2 202M22900 APPROACH SLAB REM 223.000 SQ METER AWD $ 23.00000 $ 5,129.00 02 $ 18.00000 $ 4,014.00 03 $ 20.00000 $ 4,460.00 04 $ 21.00000 $ 4,683.00 05 $ 35.00000 $ 7,805.00 06 $ 7.00000 $ 1,561.00 07 $ 26.00000 $ 5,798.00 08 $ 47.00000 $ 10,481.00 3 202M38000 GUARDRAIL REMOVED 481.600 METER AWD $ 3.00000 $ 1,444.80 02 $ 4.00000 $ 1,926.40 03 $ 2.75000 $ 1,324.40 04 $ 3.00000 $ 1,444.80 05 $ 3.00000 $ 1,444.80 06 $ 3.00000 $ 1,444.80 07 $ 3.50000 $ 1,685.60 08 $ 3.00000 $ 1,444.80 4 202M75000 FENCE REMOVED 43.100 METER AWD $ 14.75000 $ 635.73 02 $ 3.00000 $ 129.30 03 $ 4.00000 $ 172.40 04 $ 3.00000 $ 129.30 05 $ 5.00000 $ 215.50 06 $ 3.00000 $ 129.30 07 $ 3.50000 $ 150.85 08 $ 4.00000 $ 172.40 5 203M12000 EXCAVATION W/O EMBANKMENT 1,343.000 CU METER AWD $ 14.00000 $ 18,802.00 02 $ 12.50000 $ 16,787.50 03 $ 9.00000 $ 12,087.00 04 $ 11.00000 $ 14,773.00 05 $ 9.00000 $ 12,087.00 06 $ 15.00000 $ 20,145.00 07 $ 0.50000 $ 671.50 08 $ 18.00000 $ 24,174.00

Page 38:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 37 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 6 203M20000 EMBANKMENT 7,122.000 CU METER AWD $ 8.40000 $ 59,824.80 02 $ 14.50000 $ 103,269.00 03 $ 15.00000 $ 106,830.00 04 $ 13.20000 $ 94,010.40 05 $ 9.00000 $ 64,098.00 06 $ 15.00000 $ 106,830.00 07 $ 10.50000 $ 74,781.00 08 $ 11.00000 $ 78,342.00 7 203M50000 SUBGRADE COMPACTION 791.000 SQ METER AWD $ 2.75000 $ 2,175.25 02 $ 4.00000 $ 3,164.00 03 $ 7.00000 $ 5,537.00 04 $ 3.50000 $ 2,768.50 05 $ 2.50000 $ 1,977.50 06 $ 1.00000 $ 791.00 07 $ 4.00000 $ 3,164.00 08 $ 4.00000 $ 3,164.00 8 606M13000 GUARDRAIL, TYPE 5 445.770 METER AWD $ 32.00000 $ 14,264.64 02 $ 35.00000 $ 15,601.95 03 $ 30.70000 $ 13,685.14 04 $ 33.50000 $ 14,933.30 05 $ 30.70000 $ 13,685.14 06 $ 32.00000 $ 14,264.64 07 $ 32.25000 $ 14,376.08 08 $ 32.00000 $ 14,264.64 9 606M22010 ANCHOR ASSEMBLY, TYPE E-98 2.000 EACH AWD $ 1,650.00000 $ 3,300.00 02 $ 1,500.00000 $ 3,000.00 03 $ 1,550.00000 $ 3,100.00 04 $ 1,700.00000 $ 3,400.00 05 $ 1,550.00000 $ 3,100.00 06 $ 1,650.00000 $ 3,300.00 07 $ 1,700.00000 $ 3,400.00 08 $ 1,650.00000 $ 3,300.00

Page 39:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 38 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 10 606M26500 ANCHOR ASSEMBLY, TYPE T 2.000 EACH AWD $ 425.00000 $ 850.00 02 $ 450.00000 $ 900.00 03 $ 450.00000 $ 900.00 04 $ 450.00000 $ 900.00 05 $ 450.00000 $ 900.00 06 $ 425.00000 $ 850.00 07 $ 500.00000 $ 1,000.00 08 $ 430.00000 $ 860.00 11 606M35000 BRIDGE TERM. ASSY, TYPE 1 4.000 EACH AWD $ 880.00000 $ 3,520.00 02 $ 900.00000 $ 3,600.00 03 $ 890.00000 $ 3,560.00 04 $ 925.00000 $ 3,700.00 05 $ 890.00000 $ 3,560.00 06 $ 880.00000 $ 3,520.00 07 $ 900.00000 $ 3,600.00 08 $ 880.00000 $ 3,520.00 12 606M35100 BRIDGE TERM ASSY, TYPE 2 4.000 EACH AWD $ 370.00000 $ 1,480.00 02 $ 400.00000 $ 1,600.00 03 $ 270.00000 $ 1,080.00 04 $ 385.00000 $ 1,540.00 05 $ 270.00000 $ 1,080.00 06 $ 370.00000 $ 1,480.00 07 $ 275.00000 $ 1,100.00 08 $ 370.00000 $ 1,480.00 13 607M15000 FENCE, TYPE 47 43.100 METER AWD $ 37.00000 $ 1,594.70 02 $ 20.00000 $ 862.00 03 $ 25.00000 $ 1,077.50 04 $ 38.50000 $ 1,659.35 05 $ 25.00000 $ 1,077.50 06 $ 37.00000 $ 1,594.70 07 $ 25.00000 $ 1,077.50 08 $ 37.00000 $ 1,594.70

S. 1 ROADWAY TOTALS AWD $ 135,245.92 02 $ 165,854.15 03 $ 168,813.44 04 $ 153,941.65 05 $ 113,030.44 06 $ 170,910.44 07 $ 130,804.53 08 $ 171,997.54

Page 40:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 39 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 14 601M32200 ROCK CH PROT, C W/FILTER 10.000 CU METER AWD $ 91.00000 $ 910.00 02 $ 50.00000 $ 500.00 03 $ 65.00000 $ 650.00 04 $ 100.00000 $ 1,000.00 05 $ 100.00000 $ 1,000.00 06 $ 81.00000 $ 810.00 07 $ 40.00000 $ 400.00 08 $ 120.00000 $ 1,200.00 15 601M34200 ROCK CH PROT, C W/O FILTER 5.000 CU METER AWD $ 91.00000 $ 455.00 02 $ 60.00000 $ 300.00 03 $ 65.00000 $ 325.00 04 $ 100.00000 $ 500.00 05 $ 90.00000 $ 450.00 06 $ 77.00000 $ 385.00 07 $ 40.00000 $ 200.00 08 $ 120.00000 $ 600.00 16 870M00100 SOIL ANALYSIS TEST 1.000 EACH AWD $ 200.00000 $ 200.00 02 $ 100.00000 $ 100.00 03 $ 50.00000 $ 50.00 04 $ 52.00000 $ 52.00 05 $ 50.00000 $ 50.00 06 $ 500.00000 $ 500.00 07 $ 53.00000 $ 53.00 08 $ 100.00000 $ 100.00 17 870M00200 PLACING TOPSOIL 300.000 CU METER AWD $ 10.15000 $ 3,045.00 02 $ 10.00000 $ 3,000.00 03 $ 12.00000 $ 3,600.00 04 $ 15.00000 $ 4,500.00 05 $ 20.00000 $ 6,000.00 06 $ 24.00000 $ 7,200.00 07 $ 20.00000 $ 6,000.00 08 $ 13.00000 $ 3,900.00 18 870M10000 SEEDING AND MULCHING 5,947.000 SQ METER AWD $ 0.99000 $ 5,887.53 02 $ 0.65000 $ 3,865.55 03 $ 0.42000 $ 2,497.74 04 $ 0.45000 $ 2,676.15 05 $ 0.42000 $ 2,497.74 06 $ 0.95000 $ 5,649.65 07 $ 0.50000 $ 2,973.50 08 $ 1.00000 $ 5,947.00

Page 41:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 40 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 19 870M14000 REPAIR SEEDING AND MULCHING 300.000 SQ METER AWD $ 0.60000 $ 180.00 02 $ 0.05000 $ 15.00 03 $ 0.25000 $ 75.00 04 $ 0.25000 $ 75.00 05 $ 0.25000 $ 75.00 06 $ 0.60000 $ 180.00 07 $ 0.30000 $ 90.00 08 $ 0.60000 $ 180.00 20 870M15000 INTER-SEEDING 300.000 SQ METER AWD $ 0.40000 $ 120.00 02 $ 0.10000 $ 30.00 03 $ 0.30000 $ 90.00 04 $ 0.30000 $ 90.00 05 $ 0.30000 $ 90.00 06 $ 0.40000 $ 120.00 07 $ 0.35000 $ 105.00 08 $ 0.40000 $ 120.00 21 870M20000 COMMERCIAL FERTILIZER 1,555.000 KILOGRAM AWD $ 0.10000 $ 155.50 02 $ 0.50000 $ 777.50 03 $ 0.30000 $ 466.50 04 $ 0.30000 $ 466.50 05 $ 0.30000 $ 466.50 06 $ 0.10000 $ 155.50 07 $ 0.35000 $ 544.25 08 $ 0.10000 $ 155.50 22 870M30000 AGRICULTURAL LIME 6,049.000 KILOGRAM AWD $ 0.03000 $ 181.47 02 $ 0.15000 $ 907.35 03 $ 0.05000 $ 302.45 04 $ 0.04000 $ 241.96 05 $ 0.05000 $ 302.45 06 $ 0.03000 $ 181.47 07 $ 0.10000 $ 604.90 08 $ 0.03000 $ 181.47

Page 42:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 41 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 23 870M35000 WATER 160.000 CU METER AWD $ 0.10000 $ 16.00 02 $ 1.00000 $ 160.00 03 $ 1.00000 $ 160.00 04 $ 1.00000 $ 160.00 05 $ 1.00000 $ 160.00 06 $ 0.10000 $ 16.00 07 $ 1.00000 $ 160.00 08 $ 0.10000 $ 16.00 24 877M10000 TEMPORARY SEEDING AND MUCLHING 1,200.000 SQ METER AWD $ 0.15000 $ 180.00 02 $ 0.20000 $ 240.00 03 $ 0.30000 $ 360.00 04 $ 0.30000 $ 360.00 05 $ 0.30000 $ 360.00 06 $ 0.15000 $ 180.00 07 $ 0.30000 $ 360.00 08 $ 0.20000 $ 240.00 25 877M30100 TEMPORARY PERIMETER FILTER FABRIC FENCE 1,595.000 METER AWD $ 6.30000 $ 10,048.50 02 $ 5.00000 $ 7,975.00 03 $ 4.50000 $ 7,177.50 04 $ 4.00000 $ 6,380.00 05 $ 4.00000 $ 6,380.00 06 $ 3.50000 $ 5,582.50 07 $ 4.00000 $ 6,380.00 08 $ 8.00000 $ 12,760.00 26 877M30200 TEMP DITCH CHECK FILTER FABRIC FENCE 36.000 METER AWD $ 14.16000 $ 509.76 02 $ 6.00000 $ 216.00 03 $ 8.00000 $ 288.00 04 $ 8.00000 $ 288.00 05 $ 17.00000 $ 612.00 06 $ 6.00000 $ 216.00 07 $ 11.00000 $ 396.00 08 $ 18.00000 $ 648.00 27 877M30300 TEMP INLET PROT FILTER FABRIC FENCE 56.000 METER AWD $ 14.46000 $ 809.76 02 $ 6.00000 $ 336.00 03 $ 12.00000 $ 672.00 04 $ 12.00000 $ 672.00 05 $ 18.00000 $ 1,008.00 06 $ 6.00000 $ 336.00 07 $ 7.00000 $ 392.00 08 $ 19.00000 $ 1,064.00

Page 43:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 42 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 28 877M40000 TEMPORARY SLOPE DRAINS 15.000 METER AWD $ 35.00000 $ 525.00 02 $ 15.00000 $ 225.00 03 $ 18.00000 $ 270.00 04 $ 20.00000 $ 300.00 05 $ 1.50000 $ 22.50 06 $ 17.00000 $ 255.00 07 $ 17.00000 $ 255.00 08 $ 47.00000 $ 705.00 29 877M50000 TEMP SEDIMENT BASINS AND DAMS 250.000 CU METER AWD $ 6.50000 $ 1,625.00 02 $ 8.00000 $ 2,000.00 03 $ 2.75000 $ 687.50 04 $ 10.00000 $ 2,500.00 05 $ 1.00000 $ 250.00 06 $ 39.00000 $ 9,750.00 07 $ 3.00000 $ 750.00 08 $ 9.00000 $ 2,250.00 30 877M55000 TEMPORARY DIKES 200.000 CU METER AWD $ 9.00000 $ 1,800.00 02 $ 5.00000 $ 1,000.00 03 $ 6.50000 $ 1,300.00 04 $ 5.00000 $ 1,000.00 05 $ 1.00000 $ 200.00 06 $ 3.00000 $ 600.00 07 $ 2.00000 $ 400.00 08 $ 13.00000 $ 2,600.00 31 877M55500 TEMPORARY DITCH PROTECTION 100.000 SQ METER AWD $ 0.95000 $ 95.00 02 $ 2.00000 $ 200.00 03 $ 3.00000 $ 300.00 04 $ 3.00000 $ 300.00 05 $ 3.00000 $ 300.00 06 $ 3.70000 $ 370.00 07 $ 3.15000 $ 315.00 08 $ 1.00000 $ 100.00

Page 44:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 43 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 32 877M60000 SEDIMENT REMOVAL 40.000 CU METER AWD $ 10.40000 $ 416.00 02 $ 6.00000 $ 240.00 03 $ 13.00000 $ 520.00 04 $ 20.00000 $ 800.00 05 $ 3.00000 $ 120.00 06 $ 8.00000 $ 320.00 07 $ 5.00000 $ 200.00 08 $ 18.00000 $ 720.00

S. 2 EROSION CONTROL TOTALS AWD $ 27,159.52 02 $ 22,087.40 03 $ 19,791.69 04 $ 22,361.61 05 $ 20,344.19 06 $ 32,807.12 07 $ 20,578.65 08 $ 33,486.97 33 603M01500 150 MM CONDUIT, TYPE F 21.000 METER AWD $ 74.67000 $ 1,568.07 02 $ 40.00000 $ 840.00 03 $ 35.00000 $ 735.00 04 $ 35.00000 $ 735.00 05 $ 40.00000 $ 840.00 06 $ 74.00000 $ 1,554.00 07 $ 33.00000 $ 693.00 08 $ 97.00000 $ 2,037.00 34 603M05900 375 MM CONDUIT, TYPE B , 706.02 5.000 METER AWD $ 175.00000 $ 875.00 02 $ 150.00000 $ 750.00 03 $ 200.00000 $ 1,000.00 04 $ 120.00000 $ 600.00 05 $ 150.00000 $ 750.00 06 $ 198.00000 $ 990.00 07 $ 206.00000 $ 1,030.00 08 $ 230.00000 $ 1,150.00 35 604M01200 CATCH BASIN, NO. 4 1.000 EACH AWD $ 1,785.00000 $ 1,785.00 02 $ 5,000.00000 $ 5,000.00 03 $ 5,000.00000 $ 5,000.00 04 $ 1,550.00000 $ 1,550.00 05 $ 2,500.00000 $ 2,500.00 06 $ 1,600.00000 $ 1,600.00 07 $ 1,700.00000 $ 1,700.00 08 $ 2,450.00000 $ 2,450.00

Page 45:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 44 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 36 605M11100 150 MM SHALLOW PIPE UD 66.000 METER AWD $ 46.75000 $ 3,085.50 02 $ 34.00000 $ 2,244.00 03 $ 40.00000 $ 2,640.00 04 $ 31.00000 $ 2,046.00 05 $ 15.00000 $ 990.00 06 $ 18.00000 $ 1,188.00 07 $ 28.00000 $ 1,848.00 08 $ 62.00000 $ 4,092.00

S. 3 DRAINAGE TOTALS AWD $ 7,313.57 02 $ 8,834.00 03 $ 9,375.00 04 $ 4,931.00 05 $ 5,080.00 06 $ 5,332.00 07 $ 5,271.00 08 $ 9,729.00 37 254M01000 PAVEMENT PLANING, BITUMINOUS (38 MM AVERAGE) 424.000 SQ METER AWD $ 10.00000 $ 4,240.00 02 $ 7.00000 $ 2,968.00 03 $ 10.45000 $ 4,430.80 04 $ 10.45000 $ 4,430.80 05 $ 10.00000 $ 4,240.00 06 $ 18.00000 $ 7,632.00 07 $ 8.00000 $ 3,392.00 08 $ 8.00000 $ 3,392.00 38 301M46010 BITUMINOUS AGGREGATE BASE, PG64-28 40.000 CU METER AWD $ 175.00000 $ 7,000.00 02 $ 75.00000 $ 3,000.00 03 $ 175.00000 $ 7,000.00 04 $ 185.00000 $ 7,400.00 05 $ 175.00000 $ 7,000.00 06 $ 275.00000 $ 11,000.00 07 $ 95.00000 $ 3,800.00 08 $ 90.00000 $ 3,600.00

Page 46:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 45 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 39 304M20000 AGGREGATE BASE 119.000 CU METER AWD $ 35.10000 $ 4,176.90 02 $ 45.00000 $ 5,355.00 03 $ 70.00000 $ 8,330.00 04 $ 36.50000 $ 4,343.50 05 $ 60.00000 $ 7,140.00 06 $ 35.00000 $ 4,165.00 07 $ 65.00000 $ 7,735.00 08 $ 46.00000 $ 5,474.00 40 407M10000 TACK COAT 311.000 LITER AWD $ 0.25000 $ 77.75 02 $ 0.50000 $ 155.50 03 $ 0.25000 $ 77.75 04 $ 0.30000 $ 93.30 05 $ 0.25000 $ 77.75 06 $ 0.55000 $ 171.05 07 $ 0.75000 $ 233.25 08 $ 0.70000 $ 217.70 41 407M14000 TACK COAT FOR INTERMEDIATE COURSE 159.000 LITER AWD $ 0.25000 $ 39.75 02 $ 0.50000 $ 79.50 03 $ 0.25000 $ 39.75 04 $ 0.30000 $ 47.70 05 $ 0.25000 $ 39.75 06 $ 0.55000 $ 87.45 07 $ 0.75000 $ 119.25 08 $ 0.70000 $ 111.30 42 408M10000 BITUMINOUS PRIME COAT 481.000 LITER AWD $ 0.30000 $ 144.30 02 $ 1.50000 $ 721.50 03 $ 0.30000 $ 144.30 04 $ 0.50000 $ 240.50 05 $ 0.30000 $ 144.30 06 $ 1.50000 $ 721.50 07 $ 0.50000 $ 240.50 08 $ 0.50000 $ 240.50 43 448M46040 ASPH CONC INTERMEDIATE, TYPE 2, PG64-28 51.000 CU METER AWD $ 105.00000 $ 5,355.00 02 $ 300.00000 $ 15,300.00 03 $ 105.00000 $ 5,355.00 04 $ 110.00000 $ 5,610.00 05 $ 105.00000 $ 5,355.00 06 $ 300.00000 $ 15,300.00 07 $ 90.00000 $ 4,590.00 08 $ 85.00000 $ 4,335.00

Page 47:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 46 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 44 448M50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1H 26.000 CU METER AWD $ 180.00000 $ 4,680.00 02 $ 400.00000 $ 10,400.00 03 $ 180.00000 $ 4,680.00 04 $ 190.00000 $ 4,940.00 05 $ 180.00000 $ 4,680.00 06 $ 390.00000 $ 10,140.00 07 $ 140.00000 $ 3,640.00 08 $ 130.00000 $ 3,380.00 45 451M30000 PRESSURE RELIEF JT, TYPE A 60.000 METER AWD $ 250.00000 $ 15,000.00 02 $ 200.00000 $ 12,000.00 03 $ 250.00000 $ 15,000.00 04 $ 235.00000 $ 14,100.00 05 $ 280.00000 $ 16,800.00 06 $ 216.00000 $ 12,960.00 07 $ 350.00000 $ 21,000.00 08 $ 400.00000 $ 24,000.00 46 611M25000 APPROACH SLAB (T=380 MM) 560.000 SQ METER AWD $ 172.00000 $ 96,320.00 02 $ 140.00000 $ 78,400.00 03 $ 135.00000 $ 75,600.00 04 $ 150.00000 $ 84,000.00 05 $ 130.00000 $ 72,800.00 06 $ 154.00000 $ 86,240.00 07 $ 135.00000 $ 75,600.00 08 $ 150.00000 $ 84,000.00

S. 4 PAVEMENT TOTALS AWD $ 137,033.70 02 $ 128,379.50 03 $ 120,657.60 04 $ 125,205.80 05 $ 118,276.80 06 $ 148,417.00 07 $ 120,350.00 08 $ 128,750.50 47 626M00100 BARRIER REFLECTOR, TYPE A 19.000 EACH AWD $ 4.25000 $ 80.75 02 $ 7.00000 $ 133.00 03 $ 5.50000 $ 104.50 04 $ 4.50000 $ 85.50 05 $ 5.00000 $ 95.00 06 $ 4.25000 $ 80.75 07 $ 5.00000 $ 95.00 08 $ 4.00000 $ 76.00

Page 48:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 47 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 48 630M02100 GR MTD SUPP, #2 POST 13.400 METER AWD $ 27.50000 $ 368.50 02 $ 20.00000 $ 268.00 03 $ 22.00000 $ 294.80 04 $ 28.00000 $ 375.20 05 $ 22.00000 $ 294.80 06 $ 27.00000 $ 361.80 07 $ 30.00000 $ 402.00 08 $ 28.00000 $ 375.20 49 630M80102 SIGN, FLAT SHEET, TYPE G 1.080 SQ METER AWD $ 200.00000 $ 216.00 02 $ 160.00000 $ 172.80 03 $ 155.00000 $ 167.40 04 $ 235.00000 $ 253.80 05 $ 155.00000 $ 167.40 06 $ 200.00000 $ 216.00 07 $ 230.00000 $ 248.40 08 $ 200.00000 $ 216.00 50 630M84900 RMVL/GR MTD SIGN & DISP 4.000 EACH AWD $ 9.00000 $ 36.00 02 $ 12.00000 $ 48.00 03 $ 25.00000 $ 100.00 04 $ 50.00000 $ 200.00 05 $ 50.00000 $ 200.00 06 $ 9.00000 $ 36.00 07 $ 50.00000 $ 200.00 08 $ 9.00000 $ 36.00 51 630M86002 RMVL/GR MTD POST SUP/DISP 4.000 EACH AWD $ 10.00000 $ 40.00 02 $ 15.00000 $ 60.00 03 $ 25.00000 $ 100.00 04 $ 50.00000 $ 200.00 05 $ 50.00000 $ 200.00 06 $ 10.00000 $ 40.00 07 $ 50.00000 $ 200.00 08 $ 10.00000 $ 40.00

Page 49:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 48 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 52 642M00100 EDGE LINE, TYPE 1 8.010 KILOMETER AWD $ 340.00000 $ 2,723.40 02 $ 300.00000 $ 2,403.00 03 $ 300.00000 $ 2,403.00 04 $ 355.00000 $ 2,843.55 05 $ 340.00000 $ 2,723.40 06 $ 300.00000 $ 2,403.00 07 $ 357.00000 $ 2,859.57 08 $ 340.00000 $ 2,723.40 53 642M00200 LANE LINE, TYPE 1 2.000 KILOMETER AWD $ 480.00000 $ 960.00 02 $ 250.00000 $ 500.00 03 $ 300.00000 $ 600.00 04 $ 250.00000 $ 500.00 05 $ 240.00000 $ 480.00 06 $ 300.00000 $ 600.00 07 $ 250.00000 $ 500.00 08 $ 240.00000 $ 480.00 54 642M00700 TRANSVERSE LINE, TYPE 1 2,680.000 METER AWD $ 2.60000 $ 6,968.00 02 $ 6.00000 $ 16,080.00 03 $ 4.47000 $ 11,979.60 04 $ 3.00000 $ 8,040.00 05 $ 3.00000 $ 8,040.00 06 $ 4.45000 $ 11,926.00 07 $ 3.25000 $ 8,710.00 08 $ 3.00000 $ 8,040.00

S. 5 TRAFFIC CONTROL TOTALS AWD $ 11,392.65 02 $ 19,664.80 03 $ 15,749.30 04 $ 12,498.05 05 $ 12,200.60 06 $ 15,663.55 07 $ 13,214.97 08 $ 11,986.60 55 301M46011 BITUMINOUS AGGREGATE BASE, PG64-28, APP 564.000 CU METER AWD $ 90.00000 $ 50,760.00 02 $ 120.00000 $ 67,680.00 03 $ 90.00000 $ 50,760.00 04 $ 95.00000 $ 53,580.00 05 $ 90.00000 $ 50,760.00 06 $ 96.00000 $ 54,144.00 07 $ 115.00000 $ 64,860.00 08 $ 110.00000 $ 62,040.00

Page 50:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 49 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 56 614M11100 LEO WITH PATROL CAR 200.000 HOUR AWD $ 40.00000 $ 8,000.00 02 $ 35.00000 $ 7,000.00 03 $ 37.50000 $ 7,500.00 04 $ 35.50000 $ 7,100.00 05 $ 40.00000 $ 8,000.00 06 $ 45.00000 $ 9,000.00 07 $ 20.00000 $ 4,000.00 08 $ 58.00000 $ 11,600.00 57 614M13000 BITUMINOUS CONCRETE FOR MAINTAINING TRAF 40.000 CU METER AWD $ 125.00000 $ 5,000.00 02 $ 75.00000 $ 3,000.00 03 $ 200.00000 $ 8,000.00 04 $ 75.00000 $ 3,000.00 05 $ 100.00000 $ 4,000.00 06 $ 182.00000 $ 7,280.00 07 $ 100.00000 $ 4,000.00 08 $ 200.00000 $ 8,000.00 58 614M13200 BARRIER REFL, TYPE A 136.000 EACH AWD $ 4.00000 $ 544.00 02 $ 4.00000 $ 544.00 03 $ 4.00000 $ 544.00 04 $ 5.00000 $ 680.00 05 $ 5.00000 $ 680.00 06 $ 5.00000 $ 680.00 07 $ 5.00000 $ 680.00 08 $ 5.00000 $ 680.00 59 614M13300 BARRIER REFL, TYPE B 230.000 EACH AWD $ 4.50000 $ 1,035.00 02 $ 4.00000 $ 920.00 03 $ 4.00000 $ 920.00 04 $ 5.00000 $ 1,150.00 05 $ 5.00000 $ 1,150.00 06 $ 5.00000 $ 1,150.00 07 $ 5.00000 $ 1,150.00 08 $ 5.00000 $ 1,150.00 60 614M13350 OBJECT MARKER 228.000 EACH AWD $ 12.50000 $ 2,850.00 02 $ 8.00000 $ 1,824.00 03 $ 9.00000 $ 2,052.00 04 $ 11.00000 $ 2,508.00 05 $ 10.80000 $ 2,462.40 06 $ 10.80000 $ 2,462.40 07 $ 12.00000 $ 2,736.00 08 $ 11.00000 $ 2,508.00

Page 51:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 50 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 61 614M18601 PORTABLE CHNGBL MESSG SIGN, APP 18.000 SIGN MNTH AWD $ 1,500.00000 $ 27,000.00 02 $ 300.00000 $ 5,400.00 03 $ 1,250.00000 $ 22,500.00 04 $ 1,000.00000 $ 18,000.00 05 $ 1,300.00000 $ 23,400.00 06 $ 1,400.00000 $ 25,200.00 07 $ 1,100.00000 $ 19,800.00 08 $ 1,300.00000 $ 23,400.00 62 614M22200 TEMP EDGE LINE, CL I,740.06, TYPE I 3.360 KILOMETER AWD $ 2,100.00000 $ 7,056.00 02 $ 5,000.00000 $ 16,800.00 03 $ 3,400.00000 $ 11,424.00 04 $ 3,750.00000 $ 12,600.00 05 $ 3,600.00000 $ 12,096.00 06 $ 3,600.00000 $ 12,096.00 07 $ 3,650.00000 $ 12,264.00 08 $ 3,600.00000 $ 12,096.00 63 614M23400 TEMP CH LINE, CL I, 740.06, TYPE I 1,681.000 METER AWD $ 3.00000 $ 5,043.00 02 $ 7.00000 $ 11,767.00 03 $ 6.85000 $ 11,514.85 04 $ 7.50000 $ 12,607.50 05 $ 7.20000 $ 12,103.20 06 $ 7.20000 $ 12,103.20 07 $ 7.25000 $ 12,187.25 08 $ 7.00000 $ 11,767.00 64 615M20001 TEMP PAVEMENT, CLASS A, APP 4,475.000 SQ METER AWD $ 22.20000 $ 99,345.00 02 $ 30.00000 $ 134,250.00 03 $ 32.00000 $ 143,200.00 04 $ 32.50000 $ 145,437.50 05 $ 30.00000 $ 134,250.00 06 $ 35.00000 $ 156,625.00 07 $ 25.00000 $ 111,875.00 08 $ 32.00000 $ 143,200.00

Page 52:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 51 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 65 616M10000 WATER 400.000 CU METER AWD $ 5.28000 $ 2,112.00 02 $ 1.00000 $ 400.00 03 $ 5.00000 $ 2,000.00 04 $ 5.00000 $ 2,000.00 05 $ 3.00000 $ 1,200.00 06 $ 5.00000 $ 2,000.00 07 $ 5.00000 $ 2,000.00 08 $ 8.00000 $ 3,200.00 66 616M20000 CALCIUM CHLORIDE 10.000 METRIC TON AWD $ 528.00000 $ 5,280.00 02 $ 1.00000 $ 10.00 03 $ 500.00000 $ 5,000.00 04 $ 150.00000 $ 1,500.00 05 $ 300.00000 $ 3,000.00 06 $ 650.00000 $ 6,500.00 07 $ 50.00000 $ 500.00 08 $ 320.00000 $ 3,200.00 67 622M40020 PORTABLE CONC BARRIER, 813 MM 1,698.000 METER AWD $ 27.75000 $ 47,119.50 02 $ 26.00000 $ 44,148.00 03 $ 30.00000 $ 50,940.00 04 $ 32.50000 $ 55,185.00 05 $ 30.00000 $ 50,940.00 06 $ 46.00000 $ 78,108.00 07 $ 27.50000 $ 46,695.00 08 $ 27.00000 $ 45,846.00 68 622M40040 PORT CONC BARR, 813 MM, BRDG MTD 132.000 METER AWD $ 35.50000 $ 4,686.00 02 $ 30.00000 $ 3,960.00 03 $ 45.00000 $ 5,940.00 04 $ 36.00000 $ 4,752.00 05 $ 42.00000 $ 5,544.00 06 $ 53.00000 $ 6,996.00 07 $ 30.00000 $ 3,960.00 08 $ 27.00000 $ 3,564.00

S. 6 MAINTENANCE OF TRAFFIC TOTALS AWD $ 265,830.50 02 $ 297,703.00 03 $ 322,294.85 04 $ 320,100.00 05 $ 309,585.60 06 $ 374,344.60 07 $ 286,707.25 08 $ 332,251.00

Page 53:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 52 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 69 202M11203 PORT OF STR REM, >6 METER, APP LUMP SUM AWD $ 42,000.00000 $ 42,000.00 02 $ 55,000.00000 $ 55,000.00 03 $ 40,000.00000 $ 40,000.00 04 $ 99,000.00000 $ 99,000.00 05 $ 75,000.00000 $ 75,000.00 06 $ 33,000.00000 $ 33,000.00 07 $ 70,000.00000 $ 70,000.00 08 $ 27,500.00000 $ 27,500.00 70 503M11100 COFFERDAMS, CRIBS & SHEETING LUMP SUM AWD $ 1,800.00000 $ 1,800.00 02 $ 2,000.00000 $ 2,000.00 03 $ 4,000.00000 $ 4,000.00 04 $ 6,000.00000 $ 6,000.00 05 $ 10,000.00000 $ 10,000.00 06 $ 9,400.00000 $ 9,400.00 07 $ 10,000.00000 $ 10,000.00 08 $ 8,120.00000 $ 8,120.00 71 503M21103 UNCL EXC, INCL SHALE, APP 203.000 CU METER AWD $ 32.50000 $ 6,597.50 02 $ 35.00000 $ 7,105.00 03 $ 45.00000 $ 9,135.00 04 $ 58.00000 $ 11,774.00 05 $ 120.00000 $ 24,360.00 06 $ 48.00000 $ 9,744.00 07 $ 40.00000 $ 8,120.00 08 $ 99.00000 $ 20,097.00 72 505M11100 PILE DRIVING EQUIP. MOBIL. LUMP SUM AWD $ 4,000.00000 $ 4,000.00 02 $ 2,000.00000 $ 2,000.00 03 $ 10,000.00000 $ 10,000.00 04 $ 7,000.00000 $ 7,000.00 05 $ 10,000.00000 $ 10,000.00 06 $ 13,000.00000 $ 13,000.00 07 $ 5,000.00000 $ 5,000.00 08 $ 10,000.00000 $ 10,000.00 73 507M00100 STEEL PILES HP250X62, FURNISHED 195.000 METER AWD $ 38.50000 $ 7,507.50 02 $ 37.00000 $ 7,215.00 03 $ 55.00000 $ 10,725.00 04 $ 35.50000 $ 6,922.50 05 $ 68.00000 $ 13,260.00 06 $ 60.00000 $ 11,700.00 07 $ 35.00000 $ 6,825.00 08 $ 37.19000 $ 7,252.05

Page 54:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 53 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 74 507M00150 STEEL PILES HP250X62, DRIVEN 195.000 METER AWD $ 60.00000 $ 11,700.00 02 $ 61.00000 $ 11,895.00 03 $ 45.00000 $ 8,775.00 04 $ 46.00000 $ 8,970.00 05 $ 75.00000 $ 14,625.00 06 $ 39.00000 $ 7,605.00 07 $ 10.00000 $ 1,950.00 08 $ 26.23000 $ 5,114.85 75 507M50500 STEEL PILE SPLICES 14.000 EACH AWD $ 25.00000 $ 350.00 02 $ 40.00000 $ 560.00 03 $ 1.00000 $ 14.00 04 $ 50.00000 $ 700.00 05 $ 275.00000 $ 3,850.00 06 $ 25.00000 $ 350.00 07 $ 10.00000 $ 140.00 08 $ 50.00000 $ 700.00 76 512M33000 TYPE 2 WATERPROOFING 10.000 SQ METER AWD $ 24.00000 $ 240.00 02 $ 20.00000 $ 200.00 03 $ 17.00000 $ 170.00 04 $ 25.00000 $ 250.00 05 $ 52.40000 $ 524.00 06 $ 23.30000 $ 233.00 07 $ 55.00000 $ 550.00 08 $ 61.00000 $ 610.00 77 512M67510 SLG OF CONC SURF (EPOXY-URETHANE) 529.000 SQ METER AWD $ 14.00000 $ 7,406.00 02 $ 12.00000 $ 6,348.00 03 $ 12.14000 $ 6,422.06 04 $ 12.50000 $ 6,612.50 05 $ 10.00000 $ 5,290.00 06 $ 12.00000 $ 6,348.00 07 $ 8.00000 $ 4,232.00 08 $ 12.00000 $ 6,348.00

Page 55:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 54 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 78 516M13900 51 MM PREFORMED EXP JT FILLER 4.000 SQ METER AWD $ 25.00000 $ 100.00 02 $ 20.00000 $ 80.00 03 $ 75.00000 $ 300.00 04 $ 55.00000 $ 220.00 05 $ 11.00000 $ 44.00 06 $ 22.00000 $ 88.00 07 $ 75.00000 $ 300.00 08 $ 150.00000 $ 600.00 79 516M44001 BRG/INT LAM/PLATE,APP , 180 X 280 X 30 WITH 38 X 230 X 306 LOAD PLATE 14.000 EACH AWD $ 620.00000 $ 8,680.00 02 $ 450.00000 $ 6,300.00 03 $ 550.00000 $ 7,700.00 04 $ 635.00000 $ 8,890.00 05 $ 500.00000 $ 7,000.00 06 $ 350.00000 $ 4,900.00 07 $ 330.00000 $ 4,620.00 08 $ 420.00000 $ 5,880.00 80 516M44001 BRG/INT LAM/PLATE,APP , 240 X 405 X 39 WITH 38 X 266 X 431 LOAD PLATE 14.000 EACH AWD $ 620.00000 $ 8,680.00 02 $ 450.00000 $ 6,300.00 03 $ 550.00000 $ 7,700.00 04 $ 635.00000 $ 8,890.00 05 $ 500.00000 $ 7,000.00 06 $ 363.00000 $ 5,082.00 07 $ 330.00000 $ 4,620.00 08 $ 420.00000 $ 5,880.00 81 516M47001 JACKING/TEMP SUPP, APP LUMP SUM AWD $ 7,500.00000 $ 7,500.00 02 $ 6,000.00000 $ 6,000.00 03 $ 5,000.00000 $ 5,000.00 04 $ 7,600.00000 $ 7,600.00 05 $ 5,000.00000 $ 5,000.00 06 $ 18,000.00000 $ 18,000.00 07 $ 25,000.00000 $ 25,000.00 08 $ 18,500.00000 $ 18,500.00

Page 56:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 55 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 82 518M21200 POROUS BACKFILL W/FILT FABRIC 61.000 CU METER AWD $ 120.00000 $ 7,320.00 02 $ 70.00000 $ 4,270.00 03 $ 40.00000 $ 2,440.00 04 $ 50.00000 $ 3,050.00 05 $ 90.00000 $ 5,490.00 06 $ 57.00000 $ 3,477.00 07 $ 80.00000 $ 4,880.00 08 $ 110.00000 $ 6,710.00 83 518M40000 150 MM PERF CORR. PLASTIC PIPE , 707.03 TYPE SP 49.000 METER AWD $ 29.50000 $ 1,445.50 02 $ 30.00000 $ 1,470.00 03 $ 35.00000 $ 1,715.00 04 $ 35.00000 $ 1,715.00 05 $ 30.00000 $ 1,470.00 06 $ 48.00000 $ 2,352.00 07 $ 10.00000 $ 490.00 08 $ 11.00000 $ 539.00 84 518M40010 150 MM NON-PERF CORR PLASTIC PIPE , 707.33 TYPE S 12.000 METER AWD $ 40.00000 $ 480.00 02 $ 30.00000 $ 360.00 03 $ 40.00000 $ 480.00 04 $ 35.00000 $ 420.00 05 $ 55.00000 $ 660.00 06 $ 75.00000 $ 900.00 07 $ 17.00000 $ 204.00 08 $ 11.00000 $ 132.00 85 601M20000 CR AGG SLOPE PROT 153.000 SQ METER AWD $ 12.85000 $ 1,966.05 02 $ 16.00000 $ 2,448.00 03 $ 17.00000 $ 2,601.00 04 $ 17.00000 $ 2,601.00 05 $ 45.00000 $ 6,885.00 06 $ 24.00000 $ 3,672.00 07 $ 30.00000 $ 4,590.00 08 $ 17.00000 $ 2,601.00

Page 57:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 56 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 86 601M20001 CR AGG SLOPE PROT, APP 126.000 SQ METER AWD $ 12.85000 $ 1,619.10 02 $ 16.00000 $ 2,016.00 03 $ 15.00000 $ 1,890.00 04 $ 17.00000 $ 2,142.00 05 $ 25.00000 $ 3,150.00 06 $ 26.00000 $ 3,276.00 07 $ 28.00000 $ 3,528.00 08 $ 17.00000 $ 2,142.00 87 625M25400 CONDUIT, 51 MM, 713.04 31.000 METER AWD $ 50.00000 $ 1,550.00 02 $ 26.00000 $ 806.00 03 $ 35.00000 $ 1,085.00 04 $ 25.00000 $ 775.00 05 $ 60.00000 $ 1,860.00 06 $ 31.00000 $ 961.00 07 $ 33.00000 $ 1,023.00 08 $ 29.00000 $ 899.00 88 816M00620 FIELD PNTG OF NEW STEEL, IZEU 180.000 SQ METER AWD $ 15.00000 $ 2,700.00 02 $ 27.00000 $ 4,860.00 03 $ 10.80000 $ 1,944.00 04 $ 11.00000 $ 1,980.00 05 $ 22.00000 $ 3,960.00 06 $ 22.00000 $ 3,960.00 07 $ 20.00000 $ 3,600.00 08 $ 13.00000 $ 2,340.00 89 815M00504 GRINDING FINS, TEARS, SLIVERS 40.000 MAN HOUR AWD $ 35.00000 $ 1,400.00 02 $ 25.00000 $ 1,000.00 03 $ 65.00000 $ 2,600.00 04 $ 68.00000 $ 2,720.00 05 $ 25.00000 $ 1,000.00 06 $ 25.00000 $ 1,000.00 07 $ 20.00000 $ 800.00 08 $ 65.00000 $ 2,600.00 90 815M00508 GRINDING FLANGE EDGES 244.000 METER AWD $ 6.00000 $ 1,464.00 02 $ 3.00000 $ 732.00 03 $ 9.75000 $ 2,379.00 04 $ 10.00000 $ 2,440.00 05 $ 5.00000 $ 1,220.00 06 $ 5.00000 $ 1,220.00 07 $ 4.00000 $ 976.00 08 $ 10.00000 $ 2,440.00

Page 58:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 57 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 91 842M31509 CLASS S CONCRETE, SUPERSTRUCTURE, APP 201.000 CU METER AWD $ 670.00000 $ 134,670.00 02 $ 500.00000 $ 100,500.00 03 $ 600.00000 $ 120,600.00 04 $ 625.00000 $ 125,625.00 05 $ 625.00000 $ 125,625.00 06 $ 566.00000 $ 113,766.00 07 $ 900.00000 $ 180,900.00 08 $ 850.00000 $ 170,850.00 92 842M41000 CLASS C CONCRETE, PIER ABOVE FOOTINGS 19.000 CU METER AWD $ 950.00000 $ 18,050.00 02 $ 700.00000 $ 13,300.00 03 $ 625.00000 $ 11,875.00 04 $ 940.00000 $ 17,860.00 05 $ 750.00000 $ 14,250.00 06 $ 820.00000 $ 15,580.00 07 $ 1,200.00000 $ 22,800.00 08 $ 1,860.00000 $ 35,340.00 93 842M43000 CLASS C CONCRETE, PIER 3.000 CU METER AWD $ 1,500.00000 $ 4,500.00 02 $ 1,000.00000 $ 3,000.00 03 $ 1,500.00000 $ 4,500.00 04 $ 1,400.00000 $ 4,200.00 05 $ 1,600.00000 $ 4,800.00 06 $ 1,000.00000 $ 3,000.00 07 $ 2,225.00000 $ 6,675.00 08 $ 2,170.00000 $ 6,510.00 94 842M43501 CL C, ABUTMENT INCLD FTG, APP 80.000 CU METER AWD $ 550.00000 $ 44,000.00 02 $ 700.00000 $ 56,000.00 03 $ 400.00000 $ 32,000.00 04 $ 415.00000 $ 33,200.00 05 $ 425.00000 $ 34,000.00 06 $ 535.00000 $ 42,800.00 07 $ 475.00000 $ 38,000.00 08 $ 440.00000 $ 35,200.00

Page 59:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 58 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 95 842M46500 CLASS C CONCRETE, FOOTING 22.000 CU METER AWD $ 500.00000 $ 11,000.00 02 $ 500.00000 $ 11,000.00 03 $ 450.00000 $ 9,900.00 04 $ 335.00000 $ 7,370.00 05 $ 375.00000 $ 8,250.00 06 $ 390.00000 $ 8,580.00 07 $ 200.00000 $ 4,400.00 08 $ 390.00000 $ 8,580.00 96 843M50000 PATCHING CONC STRC W/TROWELABLE MORTAR 8.000 SQ METER AWD $ 525.00000 $ 4,200.00 02 $ 300.00000 $ 2,400.00 03 $ 540.00000 $ 4,320.00 04 $ 400.00000 $ 3,200.00 05 $ 500.00000 $ 4,000.00 06 $ 468.00000 $ 3,744.00 07 $ 475.00000 $ 3,800.00 08 $ 650.00000 $ 5,200.00 97 863M10240 STRC STEEL MEM, LEVEL 2 FAB 11,300.000 KILOGRAM AWD $ 1.95000 $ 22,035.00 02 $ 3.00000 $ 33,900.00 03 $ 2.50000 $ 28,250.00 04 $ 1.98000 $ 22,374.00 05 $ 1.87000 $ 21,131.00 06 $ 2.10000 $ 23,730.00 07 $ 2.30000 $ 25,990.00 08 $ 2.00000 $ 22,600.00 98 863M20000 WELDED STUD SHEAR CONNECTOR 2,226.000 EACH AWD $ 1.85000 $ 4,118.10 02 $ 2.00000 $ 4,452.00 03 $ 1.60000 $ 3,561.60 04 $ 1.85000 $ 4,118.10 05 $ 1.60000 $ 3,561.60 06 $ 1.80000 $ 4,006.80 07 $ 2.00000 $ 4,452.00 08 $ 2.00000 $ 4,452.00 99 885M10000 SURF PREP EXST W/WARRANTY LUMP SUM AWD $ 24,000.00000 $ 24,000.00 02 $ 13,000.00000 $ 13,000.00 03 $ 24,250.00000 $ 24,250.00 04 $ 25,000.00000 $ 25,000.00 05 $ 14,000.00000 $ 14,000.00 06 $ 14,000.00000 $ 14,000.00 07 $ 13,000.00000 $ 13,000.00 08 $ 24,300.00000 $ 24,300.00

Page 60:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 59 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 100 885M11000 FLD PNTG EXT, PRIME, W/WARRANTY LUMP SUM AWD $ 3,000.00000 $ 3,000.00 02 $ 5,000.00000 $ 5,000.00 03 $ 4,850.00000 $ 4,850.00 04 $ 5,000.00000 $ 5,000.00 05 $ 14,000.00000 $ 14,000.00 06 $ 14,000.00000 $ 14,000.00 07 $ 10,000.00000 $ 10,000.00 08 $ 4,850.00000 $ 4,850.00 101 885M12000 FLD PTNG EXST, INTER, W/WARRANTY LUMP SUM AWD $ 3,000.00000 $ 3,000.00 02 $ 5,000.00000 $ 5,000.00 03 $ 4,850.00000 $ 4,850.00 04 $ 5,000.00000 $ 5,000.00 05 $ 14,000.00000 $ 14,000.00 06 $ 14,000.00000 $ 14,000.00 07 $ 10,000.00000 $ 10,000.00 08 $ 4,850.00000 $ 4,850.00 102 885M13000 FLD PNTG EXST, FINISH, W/WARRANTY LUMP SUM AWD $ 3,000.00000 $ 3,000.00 02 $ 5,000.00000 $ 5,000.00 03 $ 4,850.00000 $ 4,850.00 04 $ 5,000.00000 $ 5,000.00 05 $ 14,000.00000 $ 14,000.00 06 $ 14,000.00000 $ 14,000.00 07 $ 10,000.00000 $ 10,000.00 08 $ 4,850.00000 $ 4,850.00

S. 7 STRUCTURES OVER 6 METER SPAN TOTALS AWD $ 402,078.75 02 $ 381,517.00 03 $ 380,881.66 04 $ 448,619.10 05 $ 473,265.60 06 $ 411,474.80 07 $ 491,465.00 08 $ 464,586.90 103 202M11203 PORT OF STR REM, >6 METER, APP LUMP SUM AWD $ 42,000.00000 $ 42,000.00 02 $ 55,000.00000 $ 55,000.00 03 $ 40,000.00000 $ 40,000.00 04 $ 99,000.00000 $ 99,000.00 05 $ 75,000.00000 $ 75,000.00 06 $ 33,000.00000 $ 33,000.00 07 $ 71,000.00000 $ 71,000.00 08 $ 27,500.00000 $ 27,500.00

Page 61:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 60 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 104 503M11100 COFFERDAMS, CRIBS & SHEETING LUMP SUM AWD $ 1,800.00000 $ 1,800.00 02 $ 2,000.00000 $ 2,000.00 03 $ 4,000.00000 $ 4,000.00 04 $ 6,000.00000 $ 6,000.00 05 $ 10,000.00000 $ 10,000.00 06 $ 9,400.00000 $ 9,400.00 07 $ 10,000.00000 $ 10,000.00 08 $ 8,120.00000 $ 8,120.00 105 503M21103 UNCL EXC, INCL SHALE, APP 245.000 CU METER AWD $ 32.50000 $ 7,962.50 02 $ 35.00000 $ 8,575.00 03 $ 45.00000 $ 11,025.00 04 $ 50.00000 $ 12,250.00 05 $ 120.00000 $ 29,400.00 06 $ 48.00000 $ 11,760.00 07 $ 40.00000 $ 9,800.00 08 $ 100.00000 $ 24,500.00 106 505M11100 PILE DRIVING EQUIP. MOBIL. LUMP SUM AWD $ 4,000.00000 $ 4,000.00 02 $ 2,000.00000 $ 2,000.00 03 $ 10,000.00000 $ 10,000.00 04 $ 7,000.00000 $ 7,000.00 05 $ 10,000.00000 $ 10,000.00 06 $ 13,000.00000 $ 13,000.00 07 $ 5,000.00000 $ 5,000.00 08 $ 10,000.00000 $ 10,000.00 107 507M00100 STEEL PILES HP250X62, FURNISHED 105.000 METER AWD $ 38.50000 $ 4,042.50 02 $ 37.00000 $ 3,885.00 03 $ 55.00000 $ 5,775.00 04 $ 35.50000 $ 3,727.50 05 $ 68.00000 $ 7,140.00 06 $ 39.00000 $ 4,095.00 07 $ 35.00000 $ 3,675.00 08 $ 37.19000 $ 3,904.95

Page 62:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 61 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 108 507M00150 STEEL PILES HP250X62, DRIVEN 105.000 METER AWD $ 60.00000 $ 6,300.00 02 $ 61.00000 $ 6,405.00 03 $ 45.00000 $ 4,725.00 04 $ 46.00000 $ 4,830.00 05 $ 75.00000 $ 7,875.00 06 $ 60.00000 $ 6,300.00 07 $ 10.00000 $ 1,050.00 08 $ 26.23000 $ 2,754.15 109 507M50500 STEEL PILE SPLICES 10.000 EACH AWD $ 25.00000 $ 250.00 02 $ 40.00000 $ 400.00 03 $ 1.00000 $ 10.00 04 $ 50.00000 $ 500.00 05 $ 275.00000 $ 2,750.00 06 $ 25.00000 $ 250.00 07 $ 10.00000 $ 100.00 08 $ 50.00000 $ 500.00 110 512M33000 TYPE 2 WATERPROOFING 11.000 SQ METER AWD $ 24.00000 $ 264.00 02 $ 20.00000 $ 220.00 03 $ 17.00000 $ 187.00 04 $ 25.00000 $ 275.00 05 $ 60.00000 $ 660.00 06 $ 23.30000 $ 256.30 07 $ 55.00000 $ 605.00 08 $ 55.00000 $ 605.00 111 512M67510 SLG OF CONC SURF (EPOXY-URETHANE) 549.000 SQ METER AWD $ 14.00000 $ 7,686.00 02 $ 12.00000 $ 6,588.00 03 $ 12.14000 $ 6,664.86 04 $ 12.50000 $ 6,862.50 05 $ 10.00000 $ 5,490.00 06 $ 12.00000 $ 6,588.00 07 $ 8.00000 $ 4,392.00 08 $ 12.00000 $ 6,588.00 112 516M13900 51 MM PREFORMED EXP JT FILLER 4.000 SQ METER AWD $ 25.00000 $ 100.00 02 $ 20.00000 $ 80.00 03 $ 75.00000 $ 300.00 04 $ 55.00000 $ 220.00 05 $ 11.00000 $ 44.00 06 $ 22.00000 $ 88.00 07 $ 75.00000 $ 300.00 08 $ 16.00000 $ 64.00

Page 63:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 62 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 113 516M44001 BRG/INT LAM/PLATE,APP , 180 X 280 X 30 WITH 38 X 230 X 306 LOAD PLATE 14.000 EACH AWD $ 620.00000 $ 8,680.00 02 $ 450.00000 $ 6,300.00 03 $ 550.00000 $ 7,700.00 04 $ 635.00000 $ 8,890.00 05 $ 500.00000 $ 7,000.00 06 $ 350.00000 $ 4,900.00 07 $ 330.00000 $ 4,620.00 08 $ 420.00000 $ 5,880.00 114 516M44001 BRG/INT LAM/PLATE,APP , 240 X 405 X 39 WITH 38 X 266 X 431 LOAD PLATE 14.000 EACH AWD $ 620.00000 $ 8,680.00 02 $ 450.00000 $ 6,300.00 03 $ 550.00000 $ 7,700.00 04 $ 635.00000 $ 8,890.00 05 $ 500.00000 $ 7,000.00 06 $ 390.00000 $ 5,460.00 07 $ 330.00000 $ 4,620.00 08 $ 420.00000 $ 5,880.00 115 516M47001 JACKING/TEMP SUPP, APP LUMP SUM AWD $ 7,500.00000 $ 7,500.00 02 $ 6,000.00000 $ 6,000.00 03 $ 5,000.00000 $ 5,000.00 04 $ 7,600.00000 $ 7,600.00 05 $ 5,000.00000 $ 5,000.00 06 $ 18,000.00000 $ 18,000.00 07 $ 25,000.00000 $ 25,000.00 08 $ 18,500.00000 $ 18,500.00 116 518M21200 POROUS BACKFILL W/FILT FABRIC 70.000 CU METER AWD $ 120.00000 $ 8,400.00 02 $ 70.00000 $ 4,900.00 03 $ 40.00000 $ 2,800.00 04 $ 48.00000 $ 3,360.00 05 $ 90.00000 $ 6,300.00 06 $ 57.00000 $ 3,990.00 07 $ 80.00000 $ 5,600.00 08 $ 96.00000 $ 6,720.00

Page 64:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 63 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 117 518M40000 150 MM PERF CORR. PLASTIC PIPE , 707.03 TYPE SP 51.000 METER AWD $ 29.50000 $ 1,504.50 02 $ 30.00000 $ 1,530.00 03 $ 35.00000 $ 1,785.00 04 $ 35.00000 $ 1,785.00 05 $ 30.00000 $ 1,530.00 06 $ 48.00000 $ 2,448.00 07 $ 10.00000 $ 510.00 08 $ 11.00000 $ 561.00 118 518M40010 150 MM NON-PERF CORR PLASTIC PIPE , 707.33 TYPE S 13.000 METER AWD $ 40.00000 $ 520.00 02 $ 30.00000 $ 390.00 03 $ 40.00000 $ 520.00 04 $ 35.00000 $ 455.00 05 $ 55.00000 $ 715.00 06 $ 75.00000 $ 975.00 07 $ 17.00000 $ 221.00 08 $ 11.00000 $ 143.00 119 601M20000 CR AGG SLOPE PROT 155.000 SQ METER AWD $ 12.85000 $ 1,991.75 02 $ 16.00000 $ 2,480.00 03 $ 17.00000 $ 2,635.00 04 $ 17.00000 $ 2,635.00 05 $ 45.00000 $ 6,975.00 06 $ 24.00000 $ 3,720.00 07 $ 30.00000 $ 4,650.00 08 $ 17.00000 $ 2,635.00 120 601M20001 CR AGG SLOPE PROT, APP 129.000 SQ METER AWD $ 12.85000 $ 1,657.65 02 $ 16.00000 $ 2,064.00 03 $ 15.00000 $ 1,935.00 04 $ 17.00000 $ 2,193.00 05 $ 25.00000 $ 3,225.00 06 $ 26.00000 $ 3,354.00 07 $ 28.00000 $ 3,612.00 08 $ 17.00000 $ 2,193.00

Page 65:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 64 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 121 625M25400 CONDUIT, 51 MM, 713.04 32.000 METER AWD $ 50.00000 $ 1,600.00 02 $ 26.00000 $ 832.00 03 $ 35.00000 $ 1,120.00 04 $ 25.00000 $ 800.00 05 $ 60.00000 $ 1,920.00 06 $ 31.00000 $ 992.00 07 $ 33.00000 $ 1,056.00 08 $ 29.00000 $ 928.00 122 816M00620 FIELD PNTG OF NEW STEEL, IZEU 182.000 SQ METER AWD $ 15.00000 $ 2,730.00 02 $ 27.00000 $ 4,914.00 03 $ 10.80000 $ 1,965.60 04 $ 11.00000 $ 2,002.00 05 $ 22.00000 $ 4,004.00 06 $ 22.00000 $ 4,004.00 07 $ 20.00000 $ 3,640.00 08 $ 13.00000 $ 2,366.00 123 815M00504 GRINDING FINS, TEARS, SLIVERS 40.000 MAN HOUR AWD $ 35.00000 $ 1,400.00 02 $ 25.00000 $ 1,000.00 03 $ 65.00000 $ 2,600.00 04 $ 68.00000 $ 2,720.00 05 $ 25.00000 $ 1,000.00 06 $ 25.00000 $ 1,000.00 07 $ 20.00000 $ 800.00 08 $ 65.00000 $ 2,600.00 124 815M00508 GRINDING FLANGE EDGES 247.000 METER AWD $ 6.00000 $ 1,482.00 02 $ 3.00000 $ 741.00 03 $ 9.75000 $ 2,408.25 04 $ 10.00000 $ 2,470.00 05 $ 5.00000 $ 1,235.00 06 $ 5.00000 $ 1,235.00 07 $ 4.00000 $ 988.00 08 $ 10.00000 $ 2,470.00 125 842M31509 CLASS S CONCRETE, SUPERSTRUCTURE, APP 204.000 CU METER AWD $ 670.00000 $ 136,680.00 02 $ 500.00000 $ 102,000.00 03 $ 600.00000 $ 122,400.00 04 $ 620.00000 $ 126,480.00 05 $ 625.00000 $ 127,500.00 06 $ 566.00000 $ 115,464.00 07 $ 900.00000 $ 183,600.00 08 $ 840.00000 $ 171,360.00

Page 66:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 65 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 126 842M41000 CLASS C CONCRETE, PIER ABOVE FOOTINGS 22.000 CU METER AWD $ 950.00000 $ 20,900.00 02 $ 700.00000 $ 15,400.00 03 $ 625.00000 $ 13,750.00 04 $ 890.00000 $ 19,580.00 05 $ 750.00000 $ 16,500.00 06 $ 820.00000 $ 18,040.00 07 $ 1,200.00000 $ 26,400.00 08 $ 1,690.00000 $ 37,180.00 127 842M43000 CLASS C CONCRETE, PIER 4.000 CU METER AWD $ 1,500.00000 $ 6,000.00 02 $ 1,000.00000 $ 4,000.00 03 $ 1,500.00000 $ 6,000.00 04 $ 2,100.00000 $ 8,400.00 05 $ 1,600.00000 $ 6,400.00 06 $ 1,000.00000 $ 4,000.00 07 $ 2,225.00000 $ 8,900.00 08 $ 1,650.00000 $ 6,600.00 128 842M43501 CL C, ABUTMENT INCLD FTG, APP 93.000 CU METER AWD $ 550.00000 $ 51,150.00 02 $ 700.00000 $ 65,100.00 03 $ 400.00000 $ 37,200.00 04 $ 410.00000 $ 38,130.00 05 $ 475.00000 $ 44,175.00 06 $ 535.00000 $ 49,755.00 07 $ 475.00000 $ 44,175.00 08 $ 420.00000 $ 39,060.00 129 842M46500 CLASS C CONCRETE, FOOTING 22.000 CU METER AWD $ 500.00000 $ 11,000.00 02 $ 500.00000 $ 11,000.00 03 $ 450.00000 $ 9,900.00 04 $ 335.00000 $ 7,370.00 05 $ 375.00000 $ 8,250.00 06 $ 390.00000 $ 8,580.00 07 $ 200.00000 $ 4,400.00 08 $ 390.00000 $ 8,580.00

Page 67:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 66 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 130 843M50000 PATCHING CONC STRC W/TROWELABLE MORTAR 3.000 SQ METER AWD $ 525.00000 $ 1,575.00 02 $ 300.00000 $ 900.00 03 $ 540.00000 $ 1,620.00 04 $ 400.00000 $ 1,200.00 05 $ 500.00000 $ 1,500.00 06 $ 468.00000 $ 1,404.00 07 $ 475.00000 $ 1,425.00 08 $ 650.00000 $ 1,950.00 131 863M10240 STRC STEEL MEM, LEVEL 2 FAB 11,500.000 KILOGRAM AWD $ 1.95000 $ 22,425.00 02 $ 3.00000 $ 34,500.00 03 $ 2.50000 $ 28,750.00 04 $ 1.98000 $ 22,770.00 05 $ 1.86000 $ 21,390.00 06 $ 2.10000 $ 24,150.00 07 $ 2.30000 $ 26,450.00 08 $ 2.00000 $ 23,000.00 132 863M20000 WELDED STUD SHEAR CONNECTOR 2,226.000 EACH AWD $ 1.85000 $ 4,118.10 02 $ 2.00000 $ 4,452.00 03 $ 1.60000 $ 3,561.60 04 $ 1.85000 $ 4,118.10 05 $ 1.60000 $ 3,561.60 06 $ 1.80000 $ 4,006.80 07 $ 2.00000 $ 4,452.00 08 $ 2.00000 $ 4,452.00 133 885M10000 SURF PREP EXST W/WARRANTY LUMP SUM AWD $ 24,000.00000 $ 24,000.00 02 $ 13,000.00000 $ 13,000.00 03 $ 24,250.00000 $ 24,250.00 04 $ 25,000.00000 $ 25,000.00 05 $ 14,000.00000 $ 14,000.00 06 $ 14,000.00000 $ 14,000.00 07 $ 13,000.00000 $ 13,000.00 08 $ 24,300.00000 $ 24,300.00 134 885M11000 FLD PNTG EXT, PRIME, W/WARRANTY LUMP SUM AWD $ 3,000.00000 $ 3,000.00 02 $ 5,000.00000 $ 5,000.00 03 $ 4,850.00000 $ 4,850.00 04 $ 5,000.00000 $ 5,000.00 05 $ 14,000.00000 $ 14,000.00 06 $ 14,000.00000 $ 14,000.00 07 $ 10,000.00000 $ 10,000.00 08 $ 4,850.00000 $ 4,850.00

Page 68:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 67 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 135 885M12000 FLD PTNG EXST, INTER, W/WARRANTY LUMP SUM AWD $ 3,000.00000 $ 3,000.00 02 $ 5,000.00000 $ 5,000.00 03 $ 4,850.00000 $ 4,850.00 04 $ 5,000.00000 $ 5,000.00 05 $ 14,000.00000 $ 14,000.00 06 $ 14,000.00000 $ 14,000.00 07 $ 10,000.00000 $ 10,000.00 08 $ 4,850.00000 $ 4,850.00 136 885M13000 FLD PNTG EXST, FINISH, W/WARRANTY LUMP SUM AWD $ 3,000.00000 $ 3,000.00 02 $ 5,000.00000 $ 5,000.00 03 $ 4,850.00000 $ 4,850.00 04 $ 5,000.00000 $ 5,000.00 05 $ 14,000.00000 $ 14,000.00 06 $ 14,000.00000 $ 14,000.00 07 $ 10,000.00000 $ 10,000.00 08 $ 4,850.00000 $ 4,850.00

S. 8 BRIDGE NO. STA-77-05938 L TOTALS AWD $ 407,399.00 02 $ 387,956.00 03 $ 382,837.31 04 $ 452,513.10 05 $ 479,539.60 06 $ 416,215.10 07 $ 504,041.00 08 $ 466,444.10 137 103M06000 CONTRACT PER BOND, PYMNT & MNTC BOND LUMP SUM AWD $ 14,000.00000 $ 14,000.00 02 $ 13,000.00000 $ 13,000.00 03 $ 7,500.00000 $ 7,500.00 04 $ 17,000.00000 $ 17,000.00 05 $ 20,000.00000 $ 20,000.00 06 $ 20,000.00000 $ 20,000.00 07 $ 25,000.00000 $ 25,000.00 08 $ 11,600.00000 $ 11,600.00 138 614M11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 20,000.00000 $ 20,000.00 02 $ 45,000.00000 $ 45,000.00 03 $ 40,000.00000 $ 40,000.00 04 $ 56,000.00000 $ 56,000.00 05 $ 80,000.00000 $ 80,000.00 06 $ 35,000.00000 $ 35,000.00 07 $ 50,000.00000 $ 50,000.00 08 $ 40,000.00000 $ 40,000.00

Page 69:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010008 PAGE NO. 68 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 139 623M10000 CONSTRUCTION LAYOUT STAKES LUMP SUM AWD $ 11,000.00000 $ 11,000.00 02 $ 15,000.00000 $ 15,000.00 03 $ 15,000.00000 $ 15,000.00 04 $ 20,000.00000 $ 20,000.00 05 $ 3,200.00000 $ 3,200.00 06 $ 15,000.00000 $ 15,000.00 07 $ 8,000.00000 $ 8,000.00 08 $ 10,500.00000 $ 10,500.00 140 624M10000 MOBILIZATION LUMP SUM AWD $ 30,000.00000 $ 30,000.00 02 $ 40,000.00000 $ 40,000.00 03 $ 40,000.00000 $ 40,000.00 04 $ 40,000.00000 $ 40,000.00 05 $ 40,000.00000 $ 40,000.00 06 $ 40,000.00000 $ 40,000.00 07 $ 40,000.00000 $ 40,000.00 08 $ 40,000.00000 $ 40,000.00 141 806M16010 FIELD OFFICE, TYPE B 12.000 MONTH AWD $ 800.00000 $ 9,600.00 02 $ 400.00000 $ 4,800.00 03 $ 2,250.00000 $ 27,000.00 04 $ 900.00000 $ 10,800.00 05 $ 1,000.00000 $ 12,000.00 06 $ 750.00000 $ 9,000.00 07 $ 750.00000 $ 9,000.00 08 $ 2,050.00000 $ 24,600.00

S. 9 INCIDENTALS TOTALS AWD $ 84,600.00 02 $ 117,800.00 03 $ 129,500.00 04 $ 143,800.00 05 $ 155,200.00 06 $ 119,000.00 07 $ 132,000.00 08 $ 126,700.00

TOTAL AMOUNT OF THE BID AWD $ 1,478,053.61 02 $ 1,529,795.85 03 $ 1,549,900.85 04 $ 1,683,970.31 05 $ 1,686,522.83 06 $ 1,694,164.61 07 $ 1,704,432.40 08 $ 1,745,932.61

Page 70:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010013 PID. 18000 GEA-322-0.00 NON-FEDERAL TYPE: TWO LANE RESURFACING LETTING: 01/24/01 COMPLETION DATE: 10/15/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: SCHLOSS PAVING CO AWARDED AMOUNT: $ 582,687.30 ENGINEERS ESTIMATE: $ 641,000.00 AWARDED BIDDER BIDDER 02 SCHLOSS PAVING CO NORTHERN OHIO PAVING COMPANY 13700 MC CRACKEN RD 1749 HIGHLAND RD CLEVELAND ,OH 44125 TWINSBURG ,OH 44087 BIDDER 03 BIDDER 04 G R OSTERLAND COMPANY KARVO PAVING COMPANY 2100 WEST 3RD ST 449 MUNROE FALLS RD CLEVELAND ,OH 44113 TALLMADGE ,OH 44278 BIDDER 05 BIDDER 06 ROMANO PAVING & EXCAVATING INC MC COURT CONSTRUCTION COMPANY 1103 EAST POLAND AVE 720 HOME AVE BESSEMER ,PA 16112 AKRON ,OH 44310 BIDDER 07 BIDDER 08 KENMORE CONSTRUCTION CO INC BURTON SCOT CORPORATION 700 HOME AVE 14728 MAPLEWOOD RD AKRON ,OH 44310 BURTON ,OH 44021

Page 71:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010013 PAGE NO. 70 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E38000 GUARDRAIL REMOVED 2,050.000 LIN FT AWD $ 1.00000 $ 2,050.00 02 $ 1.00000 $ 2,050.00 03 $ 1.00000 $ 2,050.00 04 $ 1.00000 $ 2,050.00 05 $ 1.00000 $ 2,050.00 06 $ 1.00000 $ 2,050.00 07 $ 1.00000 $ 2,050.00 08 $ 1.00000 $ 2,050.00 2 202E54101 RSD PVMT MRK RMVD/STRG, APP 447.000 EACH AWD $ 5.00000 $ 2,235.00 02 $ 4.15000 $ 1,855.05 03 $ 4.00000 $ 1,788.00 04 $ 6.00000 $ 2,682.00 05 $ 5.50000 $ 2,458.50 06 $ 4.50000 $ 2,011.50 07 $ 3.00000 $ 1,341.00 08 $ 4.00000 $ 1,788.00 3 203E11000 EXCAVATION W/EMBANKMENT 200.000 CU YD AWD $ 20.00000 $ 4,000.00 02 $ 11.00000 $ 2,200.00 03 $ 17.00000 $ 3,400.00 04 $ 20.00000 $ 4,000.00 05 $ 20.00000 $ 4,000.00 06 $ 50.00000 $ 10,000.00 07 $ 50.00000 $ 10,000.00 08 $ 50.00000 $ 10,000.00 4 203E20000 EMBANKMENT 102.000 CU YD AWD $ 42.00000 $ 4,284.00 02 $ 25.00000 $ 2,550.00 03 $ 30.00000 $ 3,060.00 04 $ 15.00000 $ 1,530.00 05 $ 12.00000 $ 1,224.00 06 $ 15.00000 $ 1,530.00 07 $ 20.00000 $ 2,040.00 08 $ 30.00000 $ 3,060.00 5 203E60000 LINEAR GRADING 356.000 STATION AWD $ 17.75000 $ 6,319.00 02 $ 15.00000 $ 5,340.00 03 $ 45.00000 $ 16,020.00 04 $ 120.00000 $ 42,720.00 05 $ 65.00000 $ 23,140.00 06 $ 40.00000 $ 14,240.00 07 $ 35.00000 $ 12,460.00 08 $ 120.00000 $ 42,720.00

Page 72:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010013 PAGE NO. 71 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 6 251E01000 PRTL DEPTH PVMT REPAIR 2,569.000 SQ YD AWD $ 5.00000 $ 12,845.00 02 $ 4.00000 $ 10,276.00 03 $ 12.55000 $ 32,240.95 04 $ 11.00000 $ 28,259.00 05 $ 8.50000 $ 21,836.50 06 $ 7.00000 $ 17,983.00 07 $ 18.00000 $ 46,242.00 08 $ 24.00000 $ 61,656.00 7 254E01001 PAVEMENT PLANING, BIT., APP 52,058.000 SQ YD AWD $ 1.25000 $ 65,072.50 02 $ 1.09000 $ 56,743.22 03 $ 0.95000 $ 49,455.10 04 $ 0.65000 $ 33,837.70 05 $ 0.80000 $ 41,646.40 06 $ 0.80000 $ 41,646.40 07 $ 1.30000 $ 67,675.40 08 $ 1.15000 $ 59,866.70 8 407E10000 TACK COAT 5,204.000 GALLON AWD $ 0.60000 $ 3,122.40 02 $ 0.65000 $ 3,382.60 03 $ 0.75000 $ 3,903.00 04 $ 1.10000 $ 5,724.40 05 $ 1.00000 $ 5,204.00 06 $ 0.50000 $ 2,602.00 07 $ 0.80000 $ 4,163.20 08 $ 1.50000 $ 7,806.00 9 407E14000 TACK COAT FOR INTERMEDIATE COURSE 2,601.000 GALLON AWD $ 0.60000 $ 1,560.60 02 $ 0.65000 $ 1,690.65 03 $ 0.75000 $ 1,950.75 04 $ 1.10000 $ 2,861.10 05 $ 1.00000 $ 2,601.00 06 $ 0.50000 $ 1,300.50 07 $ 0.80000 $ 2,080.80 08 $ 1.50000 $ 3,901.50

Page 73:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010013 PAGE NO. 72 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 10 441E90000 ASPHALT CONCRETE, MISC.: SAND ASPHALT W/SBR LATEX, SURFACE COURSE, PG64-22 1,445.000 CU YD AWD $ 85.00000 $ 122,825.00 02 $ 82.00000 $ 118,490.00 03 $ 97.50000 $ 140,887.50 04 $ 106.00000 $ 153,170.00 05 $ 98.70000 $ 142,621.50 06 $ 98.00000 $ 141,610.00 07 $ 95.00000 $ 137,275.00 08 $ 104.50000 $ 151,002.50 11 448E46020 ASPH CONC INTERMEDIATE, TYPE 1, PG64-22 1,445.000 CU YD AWD $ 64.00000 $ 92,480.00 02 $ 64.00000 $ 92,480.00 03 $ 78.00000 $ 112,710.00 04 $ 71.00000 $ 102,595.00 05 $ 74.30000 $ 107,363.50 06 $ 73.00000 $ 105,485.00 07 $ 75.00000 $ 108,375.00 08 $ 74.50000 $ 107,652.50 12 448E46048 ASPH CONC INTERMEDIATE, T-1, PG64-22 80.000 CU YD AWD $ 150.00000 $ 12,000.00 02 $ 177.00000 $ 14,160.00 03 $ 120.00000 $ 9,600.00 04 $ 135.00000 $ 10,800.00 05 $ 94.00000 $ 7,520.00 06 $ 188.00000 $ 15,040.00 07 $ 175.00000 $ 14,000.00 08 $ 189.00000 $ 15,120.00 13 448E46060 ASPH CONC INT CRS, TYPE 1, UNDER GR 74.000 CU YD AWD $ 200.00000 $ 14,800.00 02 $ 120.00000 $ 8,880.00 03 $ 175.00000 $ 12,950.00 04 $ 190.00000 $ 14,060.00 05 $ 112.00000 $ 8,288.00 06 $ 187.00000 $ 13,838.00 07 $ 125.00000 $ 9,250.00 08 $ 127.00000 $ 9,398.00

Page 74:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010013 PAGE NO. 73 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 14 601E32104 ROCK CH PROT, B W/FAB FILTER 10.000 CU YD AWD $ 120.00000 $ 1,200.00 02 $ 100.00000 $ 1,000.00 03 $ 200.00000 $ 2,000.00 04 $ 300.00000 $ 3,000.00 05 $ 150.00000 $ 1,500.00 06 $ 180.00000 $ 1,800.00 07 $ 50.00000 $ 500.00 08 $ 100.00000 $ 1,000.00 15 603E06100 15" CONDUIT, TYPE C , 706.02 142.000 LIN FT AWD $ 45.00000 $ 6,390.00 02 $ 30.00000 $ 4,260.00 03 $ 25.00000 $ 3,550.00 04 $ 35.00000 $ 4,970.00 05 $ 30.00000 $ 4,260.00 06 $ 34.00000 $ 4,828.00 07 $ 32.00000 $ 4,544.00 08 $ 50.00000 $ 7,100.00 16 603E10600 24" CONDUIT, TYPE C , 706.02 50.000 LIN FT AWD $ 65.00000 $ 3,250.00 02 $ 41.00000 $ 2,050.00 03 $ 38.00000 $ 1,900.00 04 $ 70.00000 $ 3,500.00 05 $ 40.00000 $ 2,000.00 06 $ 63.00000 $ 3,150.00 07 $ 40.00000 $ 2,000.00 08 $ 60.00000 $ 3,000.00 17 604E09001 CATCH BASIN ADJ TO GRADE,APP 39.000 EACH AWD $ 200.00000 $ 7,800.00 02 $ 250.00000 $ 9,750.00 03 $ 265.00000 $ 10,335.00 04 $ 200.00000 $ 7,800.00 05 $ 200.00000 $ 7,800.00 06 $ 200.00000 $ 7,800.00 07 $ 650.00000 $ 25,350.00 08 $ 350.00000 $ 13,650.00

Page 75:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010013 PAGE NO. 74 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 18 604E09500 CATCH BASIN RECON TO GRADE 10.000 EACH AWD $ 350.00000 $ 3,500.00 02 $ 650.00000 $ 6,500.00 03 $ 700.00000 $ 7,000.00 04 $ 500.00000 $ 5,000.00 05 $ 1,000.00000 $ 10,000.00 06 $ 350.00000 $ 3,500.00 07 $ 1,500.00000 $ 15,000.00 08 $ 1,200.00000 $ 12,000.00 19 604E20601 INLET ADJ TO GRADE, APP 24.000 EACH AWD $ 200.00000 $ 4,800.00 02 $ 350.00000 $ 8,400.00 03 $ 265.00000 $ 6,360.00 04 $ 300.00000 $ 7,200.00 05 $ 200.00000 $ 4,800.00 06 $ 350.00000 $ 8,400.00 07 $ 650.00000 $ 15,600.00 08 $ 300.00000 $ 7,200.00 20 604E20800 INLET RECON TO GRADE 5.000 EACH AWD $ 300.00000 $ 1,500.00 02 $ 850.00000 $ 4,250.00 03 $ 700.00000 $ 3,500.00 04 $ 700.00000 $ 3,500.00 05 $ 1,000.00000 $ 5,000.00 06 $ 890.00000 $ 4,450.00 07 $ 1,500.00000 $ 7,500.00 08 $ 1,100.00000 $ 5,500.00 21 604E34501 MANHOLE ADJUSTED TO GRADE,APP 10.000 EACH AWD $ 300.00000 $ 3,000.00 02 $ 250.00000 $ 2,500.00 03 $ 265.00000 $ 2,650.00 04 $ 300.00000 $ 3,000.00 05 $ 300.00000 $ 3,000.00 06 $ 200.00000 $ 2,000.00 07 $ 450.00000 $ 4,500.00 08 $ 350.00000 $ 3,500.00 22 604E35500 MANHOLE RECONST TO GRADE 2.000 EACH AWD $ 650.00000 $ 1,300.00 02 $ 500.00000 $ 1,000.00 03 $ 700.00000 $ 1,400.00 04 $ 800.00000 $ 1,600.00 05 $ 1,200.00000 $ 2,400.00 06 $ 350.00000 $ 700.00 07 $ 2,000.00000 $ 4,000.00 08 $ 1,200.00000 $ 2,400.00

Page 76:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010013 PAGE NO. 75 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 23 604E39501 MON BOX ADJ TO GRADE, APP 1.000 EACH AWD $ 500.00000 $ 500.00 02 $ 260.45000 $ 260.45 03 $ 325.00000 $ 325.00 04 $ 100.00000 $ 100.00 05 $ 200.00000 $ 200.00 06 $ 400.00000 $ 400.00 07 $ 200.00000 $ 200.00 08 $ 250.00000 $ 250.00 24 604E50000 MISCELLANEOUS METAL 1,000.000 POUND AWD $ 1.00000 $ 1,000.00 02 $ 1.00000 $ 1,000.00 03 $ 3.00000 $ 3,000.00 04 $ 1.50000 $ 1,500.00 05 $ 1.00000 $ 1,000.00 06 $ 2.00000 $ 2,000.00 07 $ 2.50000 $ 2,500.00 08 $ 1.50000 $ 1,500.00 25 606E13000 GUARDRAIL, TYPE 5 1,725.000 LIN FT AWD $ 10.00000 $ 17,250.00 02 $ 10.00000 $ 17,250.00 03 $ 10.00000 $ 17,250.00 04 $ 11.00000 $ 18,975.00 05 $ 12.00000 $ 20,700.00 06 $ 10.00000 $ 17,250.00 07 $ 10.00000 $ 17,250.00 08 $ 10.45000 $ 18,026.25 26 606E22010 ANCHOR ASSEMBLY, TYPE E-98 9.000 EACH AWD $ 1,630.00000 $ 14,670.00 02 $ 1,630.00000 $ 14,670.00 03 $ 1,630.00000 $ 14,670.00 04 $ 1,650.00000 $ 14,850.00 05 $ 2,000.00000 $ 18,000.00 06 $ 1,630.00000 $ 14,670.00 07 $ 1,600.00000 $ 14,400.00 08 $ 1,700.00000 $ 15,300.00

Page 77:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010013 PAGE NO. 76 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 27 606E26500 ANCHOR ASSEMBLY, TYPE T 6.000 EACH AWD $ 420.00000 $ 2,520.00 02 $ 420.00000 $ 2,520.00 03 $ 420.00000 $ 2,520.00 04 $ 450.00000 $ 2,700.00 05 $ 500.00000 $ 3,000.00 06 $ 420.00000 $ 2,520.00 07 $ 400.00000 $ 2,400.00 08 $ 440.00000 $ 2,640.00 28 614E12460 WORK ZONE MARKING SIGN 38.000 EACH AWD $ 50.00000 $ 1,900.00 02 $ 101.37000 $ 3,852.06 03 $ 50.00000 $ 1,900.00 04 $ 70.00000 $ 2,660.00 05 $ 100.00000 $ 3,800.00 06 $ 65.00000 $ 2,470.00 07 $ 150.00000 $ 5,700.00 08 $ 100.00000 $ 3,800.00 29 614E13000 BIT CONC FOR MAINT TRAF 75.000 CU YD AWD $ 40.00000 $ 3,000.00 02 $ 58.34000 $ 4,375.50 03 $ 40.00000 $ 3,000.00 04 $ 30.00000 $ 2,250.00 05 $ 60.00000 $ 4,500.00 06 $ 85.00000 $ 6,375.00 07 $ 60.00000 $ 4,500.00 08 $ 100.00000 $ 7,500.00 30 614E21100 TEMP CL, CL I, 642 PAINT 3.960 MILE AWD $ 795.00000 $ 3,148.20 02 $ 427.42000 $ 1,692.58 03 $ 1,200.00000 $ 4,752.00 04 $ 800.00000 $ 3,168.00 05 $ 600.00000 $ 2,376.00 06 $ 700.00000 $ 2,772.00 07 $ 650.00000 $ 2,574.00 08 $ 1,255.00000 $ 4,969.80 31 614E21500 TEMP CL, CL II, 642 PAINT 1.980 MILE AWD $ 430.00000 $ 851.40 02 $ 454.96000 $ 900.82 03 $ 900.00000 $ 1,782.00 04 $ 450.00000 $ 891.00 05 $ 720.00000 $ 1,425.60 06 $ 700.00000 $ 1,386.00 07 $ 650.00000 $ 1,287.00 08 $ 940.00000 $ 1,861.20

Page 78:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010013 PAGE NO. 77 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 32 614E23200 TEMP CH LINE, CL I, 642 PT 1,380.000 LIN FT AWD $ 0.80000 $ 1,104.00 02 $ 0.62000 $ 855.60 03 $ 0.75000 $ 1,035.00 04 $ 1.00000 $ 1,380.00 05 $ 1.00000 $ 1,380.00 06 $ 1.30000 $ 1,794.00 07 $ 0.50000 $ 690.00 08 $ 0.80000 $ 1,104.00 33 614E26200 TEMP STOP LINE, CL I, 642 PT 108.000 LIN FT AWD $ 5.00000 $ 540.00 02 $ 7.57000 $ 817.56 03 $ 3.00000 $ 324.00 04 $ 5.00000 $ 540.00 05 $ 4.80000 $ 518.40 06 $ 7.50000 $ 810.00 07 $ 5.00000 $ 540.00 08 $ 3.10000 $ 334.80 34 617E10101 COMP AGGREGATE, TYPE A, APP 232.000 CU YD AWD $ 20.00000 $ 4,640.00 02 $ 55.00000 $ 12,760.00 03 $ 45.00000 $ 10,440.00 04 $ 35.00000 $ 8,120.00 05 $ 30.00000 $ 6,960.00 06 $ 48.00000 $ 11,136.00 07 $ 30.00000 $ 6,960.00 08 $ 60.00000 $ 13,920.00 35 621E00200 RAISED PAVEMENT MARKER, INSTALL ONLY 447.000 EACH AWD $ 7.60000 $ 3,397.20 02 $ 10.10000 $ 4,514.70 03 $ 10.00000 $ 4,470.00 04 $ 11.00000 $ 4,917.00 05 $ 15.00000 $ 6,705.00 06 $ 7.60000 $ 3,397.20 07 $ 12.00000 $ 5,364.00 08 $ 10.45000 $ 4,671.15

Page 79:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010013 PAGE NO. 78 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 36 626E00300 BARRIER REFLECTOR, TYPE A2 27.000 EACH AWD $ 5.00000 $ 135.00 02 $ 5.00000 $ 135.00 03 $ 5.00000 $ 135.00 04 $ 11.00000 $ 297.00 05 $ 12.00000 $ 324.00 06 $ 5.00000 $ 135.00 07 $ 11.00000 $ 297.00 08 $ 5.20000 $ 140.40 37 632E26500 DETECTOR LOOP 10.000 EACH AWD $ 1,200.00000 $ 12,000.00 02 $ 975.00000 $ 9,750.00 03 $ 850.00000 $ 8,500.00 04 $ 1,100.00000 $ 11,000.00 05 $ 1,000.00000 $ 10,000.00 06 $ 1,000.00000 $ 10,000.00 07 $ 900.00000 $ 9,000.00 08 $ 890.00000 $ 8,900.00 38 632E63000 PHONE DROP 1.000 EACH AWD $ 785.00000 $ 785.00 02 $ 700.00000 $ 700.00 03 $ 1,000.00000 $ 1,000.00 04 $ 200.00000 $ 200.00 05 $ 1,000.00000 $ 1,000.00 06 $ 300.00000 $ 300.00 07 $ 300.00000 $ 300.00 08 $ 200.00000 $ 200.00 39 638E10801 VALVE BOX ADJ TO GRADE, APP 4.000 EACH AWD $ 75.00000 $ 300.00 02 $ 75.00000 $ 300.00 03 $ 150.00000 $ 600.00 04 $ 100.00000 $ 400.00 05 $ 200.00000 $ 800.00 06 $ 200.00000 $ 800.00 07 $ 125.00000 $ 500.00 08 $ 300.00000 $ 1,200.00 40 690E50000 MAILBOX SUPPORT 36.000 EACH AWD $ 85.00000 $ 3,060.00 02 $ 85.00000 $ 3,060.00 03 $ 85.00000 $ 3,060.00 04 $ 100.00000 $ 3,600.00 05 $ 100.00000 $ 3,600.00 06 $ 60.00000 $ 2,160.00 07 $ 100.00000 $ 3,600.00 08 $ 100.00000 $ 3,600.00

Page 80:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010013 PAGE NO. 79 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 41 828E10000 EDGE LINE 3.960 MILE AWD $ 2,250.00000 $ 8,910.00 02 $ 2,250.00000 $ 8,910.00 03 $ 2,500.00000 $ 9,900.00 04 $ 3,000.00000 $ 11,880.00 05 $ 3,000.00000 $ 11,880.00 06 $ 2,250.00000 $ 8,910.00 07 $ 2,450.00000 $ 9,702.00 08 $ 2,610.00000 $ 10,335.60 42 828E10200 CENTER LINE 1.980 MILE AWD $ 2,650.00000 $ 5,247.00 02 $ 2,650.00000 $ 5,247.00 03 $ 3,500.00000 $ 6,930.00 04 $ 3,500.00000 $ 6,930.00 05 $ 4,200.00000 $ 8,316.00 06 $ 2,650.00000 $ 5,247.00 07 $ 3,450.00000 $ 6,831.00 08 $ 3,655.00000 $ 7,236.90 43 828E10300 CHANNELIZING LINE 460.000 LIN FT AWD $ 3.30000 $ 1,518.00 02 $ 3.30000 $ 1,518.00 03 $ 1.80000 $ 828.00 04 $ 2.00000 $ 920.00 05 $ 2.00000 $ 920.00 06 $ 3.30000 $ 1,518.00 07 $ 1.75000 $ 805.00 08 $ 1.90000 $ 874.00 44 828E10400 STOP LINE 36.000 LIN FT AWD $ 34.00000 $ 1,224.00 02 $ 34.00000 $ 1,224.00 03 $ 15.00000 $ 540.00 04 $ 15.00000 $ 540.00 05 $ 18.00000 $ 648.00 06 $ 34.00000 $ 1,224.00 07 $ 20.00000 $ 720.00 08 $ 15.60000 $ 561.60

Page 81:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010013 PAGE NO. 80 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 45 828E10600 TRANSVERSE LINE 457.000 LIN FT AWD $ 11.00000 $ 5,027.00 02 $ 11.00000 $ 5,027.00 03 $ 7.50000 $ 3,427.50 04 $ 8.00000 $ 3,656.00 05 $ 9.00000 $ 4,113.00 06 $ 11.00000 $ 5,027.00 07 $ 8.00000 $ 3,656.00 08 $ 7.80000 $ 3,564.60 46 828E20300 LANE ARROW 7.000 EACH AWD $ 120.00000 $ 840.00 02 $ 120.00000 $ 840.00 03 $ 175.00000 $ 1,225.00 04 $ 200.00000 $ 1,400.00 05 $ 200.00000 $ 1,400.00 06 $ 120.00000 $ 840.00 07 $ 200.00000 $ 1,400.00 08 $ 180.00000 $ 1,260.00 47 828E20400 WORD ON PAVEMENT, 72" 4.000 EACH AWD $ 500.00000 $ 2,000.00 02 $ 500.00000 $ 2,000.00 03 $ 250.00000 $ 1,000.00 04 $ 250.00000 $ 1,000.00 05 $ 300.00000 $ 1,200.00 06 $ 500.00000 $ 2,000.00 07 $ 250.00000 $ 1,000.00 08 $ 260.00000 $ 1,040.00 48 830E10000 ASPHALT CONCRETE CURB, TYPE 1 13,306.000 LIN FT AWD $ 1.90000 $ 25,281.40 02 $ 2.12000 $ 28,208.72 03 $ 2.50000 $ 33,265.00 04 $ 2.50000 $ 33,265.00 05 $ 3.20000 $ 42,579.20 06 $ 2.85000 $ 37,922.10 07 $ 1.75000 $ 23,285.50 08 $ 3.25000 $ 43,244.50 49 837E10001 LINER PIPE, APP 50.000 LIN FT AWD $ 130.00000 $ 6,500.00 02 $ 250.00000 $ 12,500.00 03 $ 200.00000 $ 10,000.00 04 $ 400.00000 $ 20,000.00 05 $ 420.00000 $ 21,000.00 06 $ 280.00000 $ 14,000.00 07 $ 175.00000 $ 8,750.00 08 $ 400.00000 $ 20,000.00

Page 82:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010013 PAGE NO. 81 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 50 870E10000 SEEDING AND MULCHING 10,716.000 SQ YD AWD $ 0.75000 $ 8,037.00 02 $ 0.20000 $ 2,143.20 03 $ 0.75000 $ 8,037.00 04 $ 0.50000 $ 5,358.00 05 $ 1.65000 $ 17,681.40 06 $ 0.40000 $ 4,286.40 07 $ 0.50000 $ 5,358.00 08 $ 0.80000 $ 8,572.80 51 870E20000 COMMERCIAL FERTILIZER 1.000 TON AWD $ 388.00000 $ 388.00 02 $ 350.00000 $ 350.00 03 $ 388.00000 $ 388.00 04 $ 400.00000 $ 400.00 05 $ 200.00000 $ 200.00 06 $ 350.00000 $ 350.00 07 $ 400.00000 $ 400.00 08 $ 405.00000 $ 405.00

S. 1 ITEMS OF WORK TOTALS AWD $ 525,387.30 02 $ 529,196.21 03 $ 590,174.40 04 $ 630,900.40 05 $ 628,443.00 06 $ 592,950.10 07 $ 649,792.40 08 $ 736,586.80 52 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 3,000.00000 $ 3,000.00 02 $ 5,900.00000 $ 5,900.00 03 $ 2,000.00000 $ 2,000.00 04 $ 5,000.00000 $ 5,000.00 05 $ 6,800.00000 $ 6,800.00 06 $ 7,500.00000 $ 7,500.00 07 $ 3,500.00000 $ 3,500.00 08 $ 8,000.00000 $ 8,000.00 53 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 23,000.00000 $ 23,000.00 02 $ 35,107.72000 $ 35,107.72 03 $ 1,132.05500 $ 1,132.06 04 $ 30,000.00000 $ 30,000.00 05 $ 40,000.00000 $ 40,000.00 06 $ 67,000.00000 $ 67,000.00 07 $ 43,000.00000 $ 43,000.00 08 $ 50,000.00000 $ 50,000.00

Page 83:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010013 PAGE NO. 82 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 54 623E10000 CONSTRUCTION LAYOUT STAKES LUMP SUM AWD $ 1,800.00000 $ 1,800.00 02 $ 2,500.00000 $ 2,500.00 03 $ 3,000.00000 $ 3,000.00 04 $ 500.00000 $ 500.00 05 $ 1,000.00000 $ 1,000.00 06 $ 5,000.00000 $ 5,000.00 07 $ 500.00000 $ 500.00 08 $ 1,000.00000 $ 1,000.00 55 624E10000 MOBILIZATION LUMP SUM AWD $ 28,500.00000 $ 28,500.00 02 $ 20,000.00000 $ 20,000.00 03 $ 5,000.00000 $ 5,000.00 04 $ 8,000.00000 $ 8,000.00 05 $ 5,000.00000 $ 5,000.00 06 $ 20,000.00000 $ 20,000.00 07 $ 5,000.00000 $ 5,000.00 08 $ 10,000.00000 $ 10,000.00 56 690E86000 CELLULAR PHONE 2.000 EACH AWD $ 500.00000 $ 1,000.00 02 $ 750.00000 $ 1,500.00 03 $ 500.00000 $ 1,000.00 04 $ 400.00000 $ 800.00 05 $ 750.00000 $ 1,500.00 06 $ 200.00000 $ 400.00 07 $ 500.00000 $ 1,000.00 08 $ 100.00000 $ 200.00

S. 2 INCIDENTALS TOTALS AWD $ 57,300.00 02 $ 65,007.72 03 $ 12,132.06 04 $ 44,300.00 05 $ 54,300.00 06 $ 99,900.00 07 $ 53,000.00 08 $ 69,200.00 100 201E11001 CLEARING AND GRUBBING, APP LUMP SUM AWD $ 7,800.00000 $ 7,800.00 02 $ 12,500.00000 $ 12,500.00 03 $ 3,000.00000 $ 3,000.00 04 $ 12,000.00000 $ 12,000.00 05 $ 10,000.00000 $ 10,000.00 06 $ 3,600.00000 $ 3,600.00 07 $ 5,000.00000 $ 5,000.00 08 $ 8,000.00000 $ 8,000.00

Page 84:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010013 PAGE NO. 83 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 110 252E01000 FULL DPT PVMT REM/FLEX REPL 50.000 SQ YD AWD $ 72.00000 $ 3,600.00 02 $ 117.00000 $ 5,850.00 03 $ 50.00000 $ 2,500.00 04 $ 50.00000 $ 2,500.00 05 $ 75.00000 $ 3,750.00 06 $ 150.00000 $ 7,500.00 07 $ 100.00000 $ 5,000.00 08 $ 60.00000 $ 3,000.00 111 252E01500 FULL DEPTH PAVEMENT SAWING 110.000 LIN FT AWD $ 5.00000 $ 550.00 02 $ 3.00000 $ 330.00 03 $ 3.00000 $ 330.00 04 $ 3.00000 $ 330.00 05 $ 10.00000 $ 1,100.00 06 $ 8.00000 $ 880.00 07 $ 5.00000 $ 550.00 08 $ 5.00000 $ 550.00 120 202E32000 CURB REMOVED 13,306.000 LIN FT AWD $ 0.10000 $ 1,330.60 02 $ 0.25000 $ 3,326.50 03 $ 0.10000 $ 1,330.60 04 $ 0.70000 $ 9,314.20 05 $ 0.50000 $ 6,653.00 06 $ 1.00000 $ 13,306.00 07 $ 0.25000 $ 3,326.50 08 $ 0.50000 $ 6,653.00

S. 1 ITEMS OF WORK TOTALS AWD $ 525,387.30 02 $ 529,196.21 03 $ 590,174.40 04 $ 630,900.40 05 $ 628,443.00 06 $ 592,950.10 07 $ 649,792.40 08 $ 736,586.80

TOTAL AMOUNT OF THE BID AWD $ 582,687.30 02 $ 594,203.93 03 $ 602,306.46 04 $ 675,200.40 05 $ 682,743.00 06 $ 692,850.10 07 $ 702,792.40 08 $ 805,786.80

Page 85:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010021 PID. 21287 DAR-C.R. 10-0.330 TE21-G000(378) TYPE: TWO LANE RESURFACING LETTING: 01/24/01 COMPLETION DATE: 07/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: JUTTE EXCAVATING INC AWARDED AMOUNT: $ 848,976.01 ENGINEERS ESTIMATE: $ 988,000.00 AWARDED BIDDER BIDDER 02 JUTTE EXCAVATING INC WALLS BROS ASPHALT CO INC 1140 FT RECOVERY-MINSTER RD 3690 HOLLANSBURG-SAMPSON FORT RECOVERY ,OH 45846 GREENVILLE ,OH 45331 BIDDER 03 BIDDER 04 S E JOHNSON COMPANIES INC FORT DEFIANCE CONSTRUCTION & SUPPLY IN 1345 FORD ST 07622 SR 66 N MAUMEE ,OH 43537 DEFIANCE ,OH 43512 BIDDER 05 BIDDER 06 MUNICIPAL PIPE CONTRACTORS J & J SCHLAEGEL INC 5288 CAMPBELL ROAD 107 1/2 N MAIN ST COLUMBUS GROVE ,OH 45830 URBANA ,OH 43078

Page 86:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010021 PAGE NO. 85 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 201E11001 CLEARING AND GRUBBING, APP LUMP SUM AWD $ 5,000.00000 $ 5,000.00 02 $ 25,900.00000 $ 25,900.00 03 $ 17,562.00000 $ 17,562.00 04 $ 25,000.00000 $ 25,000.00 05 $ 18,000.00000 $ 18,000.00 06 $ 30,000.00000 $ 30,000.00 07 $ 28,400.00000 $ 28,400.00 2 201E21800 TREE REM., 18" 16.000 EACH AWD $ 100.00000 $ 1,600.00 02 $ 600.00000 $ 9,600.00 03 $ 405.00000 $ 6,480.00 04 $ 270.00000 $ 4,320.00 05 $ 125.00000 $ 2,000.00 06 $ 100.00000 $ 1,600.00 07 $ 1,000.00000 $ 16,000.00 3 201E23000 TREE REM., 30" 2.000 EACH AWD $ 200.00000 $ 400.00 02 $ 800.00000 $ 1,600.00 03 $ 669.00000 $ 1,338.00 04 $ 425.00000 $ 850.00 05 $ 150.00000 $ 300.00 06 $ 150.00000 $ 300.00 07 $ 1,600.00000 $ 3,200.00 4 201E24800 TREE REM., 48" 2.000 EACH AWD $ 400.00000 $ 800.00 02 $ 1,000.00000 $ 2,000.00 03 $ 1,071.00000 $ 2,142.00 04 $ 705.00000 $ 1,410.00 05 $ 200.00000 $ 400.00 06 $ 150.00000 $ 300.00 07 $ 2,000.00000 $ 4,000.00 5 201E26500 STUMP REMOVED 2.000 EACH AWD $ 200.00000 $ 400.00 02 $ 200.00000 $ 400.00 03 $ 100.00000 $ 200.00 04 $ 530.00000 $ 1,060.00 05 $ 25.00000 $ 50.00 06 $ 150.00000 $ 300.00 07 $ 430.00000 $ 860.00

Page 87:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010021 PAGE NO. 86 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 6 202E35100 PIPE REMOVED, 24" & UNDER 33.000 LIN FT AWD $ 5.00000 $ 165.00 02 $ 12.00000 $ 396.00 03 $ 10.00000 $ 330.00 04 $ 30.00000 $ 990.00 05 $ 11.00000 $ 363.00 06 $ 19.18000 $ 632.94 07 $ 7.00000 $ 231.00 7 202E38000 GUARDRAIL REMOVED 132.000 LIN FT AWD $ 4.00000 $ 528.00 02 $ 1.25000 $ 165.00 03 $ 2.00000 $ 264.00 04 $ 1.50000 $ 198.00 05 $ 3.00000 $ 396.00 06 $ 1.50000 $ 198.00 07 $ 4.00000 $ 528.00 8 203E12000 EXCAVATION W/O EMBANKMENT 17,046.000 CU YD AWD $ 6.00000 $ 102,276.00 02 $ 5.83000 $ 99,378.18 03 $ 7.50000 $ 127,845.00 04 $ 8.00000 $ 136,368.00 05 $ 10.00000 $ 170,460.00 06 $ 15.60000 $ 265,917.60 07 $ 9.00000 $ 153,414.00 9 203E20000 EMBANKMENT 12,459.000 CU YD AWD $ 6.70000 $ 83,475.30 02 $ 8.10000 $ 100,917.90 03 $ 3.78000 $ 47,095.02 04 $ 5.00000 $ 62,295.00 05 $ 5.00000 $ 62,295.00 06 $ 6.50000 $ 80,983.50 07 $ 11.00000 $ 137,049.00 10 203E50000 SUBGRADE COMPACTION 8,819.000 SQ YD AWD $ 0.75000 $ 6,614.25 02 $ 1.00000 $ 8,819.00 03 $ 1.20000 $ 10,582.80 04 $ 1.50000 $ 13,228.50 05 $ 0.55000 $ 4,850.45 06 $ 1.00000 $ 8,819.00 07 $ 0.80000 $ 7,055.20

Page 88:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010021 PAGE NO. 87 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 11 606E25000 ANCHOR ASSEMBLY, TYPE A 8.000 EACH AWD $ 700.00000 $ 5,600.00 02 $ 600.00000 $ 4,800.00 03 $ 600.00000 $ 4,800.00 04 $ 600.00000 $ 4,800.00 05 $ 645.00000 $ 5,160.00 06 $ 620.00000 $ 4,960.00 07 $ 620.00000 $ 4,960.00 12 606E35140 BRIDGE TERM ASSY, TYPE 4 8.000 EACH AWD $ 600.00000 $ 4,800.00 02 $ 585.00000 $ 4,680.00 03 $ 450.00000 $ 3,600.00 04 $ 450.00000 $ 3,600.00 05 $ 625.00000 $ 5,000.00 06 $ 500.00000 $ 4,000.00 07 $ 470.00000 $ 3,760.00 13 690E50100 MAILBOX SUPPORT SYST, SINGLE 27.000 EACH AWD $ 150.00000 $ 4,050.00 02 $ 75.00000 $ 2,025.00 03 $ 120.00000 $ 3,240.00 04 $ 98.00000 $ 2,646.00 05 $ 100.00000 $ 2,700.00 06 $ 100.00000 $ 2,700.00 07 $ 100.00000 $ 2,700.00

S. 1 ROADWAY TOTALS AWD $ 215,708.55 02 $ 260,681.08 03 $ 225,478.82 04 $ 256,765.50 05 $ 271,974.45 06 $ 400,711.04 07 $ 362,157.20 14 601E32200 ROCK CH PROT, C W/FILTER 10.000 CU YD AWD $ 30.00000 $ 300.00 02 $ 35.00000 $ 350.00 03 $ 40.00000 $ 400.00 04 $ 15.00000 $ 150.00 05 $ 44.00000 $ 440.00 06 $ 20.00000 $ 200.00 07 $ 49.00000 $ 490.00

Page 89:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010021 PAGE NO. 88 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 15 601E34200 ROCK CH PROT, C W/O FILTER 30.000 CU YD AWD $ 30.00000 $ 900.00 02 $ 25.00000 $ 750.00 03 $ 38.00000 $ 1,140.00 04 $ 33.00000 $ 990.00 05 $ 40.00000 $ 1,200.00 06 $ 50.00000 $ 1,500.00 07 $ 49.00000 $ 1,470.00 16 870E10000 SEEDING AND MULCHING 86,852.000 SQ YD AWD $ 0.40000 $ 34,740.80 02 $ 0.37000 $ 32,135.24 03 $ 0.32000 $ 27,792.64 04 $ 0.35000 $ 30,398.20 05 $ 0.50000 $ 43,426.00 06 $ 0.34000 $ 29,529.68 07 $ 0.40000 $ 34,740.80 17 870E35000 WATER 180.000 M GAL AWD $ 0.10000 $ 18.00 02 $ 1.00000 $ 180.00 03 $ 5.00000 $ 900.00 04 $ 5.00000 $ 900.00 05 $ 1.00000 $ 180.00 06 $ 1.00000 $ 180.00 07 $ 1.00000 $ 180.00 18 877E30100 TEMPORARY PERIMETER FILTER FABRIC FENCE 8,215.000 LIN FT AWD $ 0.40000 $ 3,286.00 02 $ 1.50000 $ 12,322.50 03 $ 2.00000 $ 16,430.00 04 $ 0.25000 $ 2,053.75 05 $ 1.75000 $ 14,376.25 06 $ 2.50000 $ 20,537.50 07 $ 2.00000 $ 16,430.00

S. 2 EROSION CONTROL TOTALS AWD $ 39,244.80 02 $ 45,737.74 03 $ 46,662.64 04 $ 34,491.95 05 $ 59,622.25 06 $ 51,947.18 07 $ 53,310.80

Page 90:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010021 PAGE NO. 89 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 19 603E00101 4" CONDUIT, TYPE B, APP 150.000 LIN FT AWD $ 5.00000 $ 750.00 02 $ 21.50000 $ 3,225.00 03 $ 6.00000 $ 900.00 04 $ 7.00000 $ 1,050.00 05 $ 14.50000 $ 2,175.00 06 $ 10.00000 $ 1,500.00 07 $ 26.00000 $ 3,900.00 20 603E00200 4" CONDUIT, TYPE C 50.000 LIN FT AWD $ 5.00000 $ 250.00 02 $ 11.50000 $ 575.00 03 $ 6.00000 $ 300.00 04 $ 5.00000 $ 250.00 05 $ 9.75000 $ 487.50 06 $ 8.00000 $ 400.00 07 $ 20.00000 $ 1,000.00 21 603E01100 6" CONDUIT, TYPE C 100.000 LIN FT AWD $ 6.00000 $ 600.00 02 $ 13.00000 $ 1,300.00 03 $ 6.00000 $ 600.00 04 $ 4.00000 $ 400.00 05 $ 8.25000 $ 825.00 06 $ 13.00000 $ 1,300.00 07 $ 14.00000 $ 1,400.00 22 603E01400 6" CONDUIT, TYPE E 50.000 LIN FT AWD $ 6.00000 $ 300.00 02 $ 13.00000 $ 650.00 03 $ 6.00000 $ 300.00 04 $ 4.00000 $ 200.00 05 $ 8.50000 $ 425.00 06 $ 10.00000 $ 500.00 07 $ 9.00000 $ 450.00 23 603E01500 6" CONDUIT, TYPE F 100.000 LIN FT AWD $ 6.00000 $ 600.00 02 $ 13.00000 $ 1,300.00 03 $ 6.00000 $ 600.00 04 $ 4.00000 $ 400.00 05 $ 8.00000 $ 800.00 06 $ 12.00000 $ 1,200.00 07 $ 13.00000 $ 1,300.00

Page 91:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010021 PAGE NO. 90 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 24 603E01801 8" CONDUIT, TYPE B, APP 230.000 LIN FT AWD $ 15.00000 $ 3,450.00 02 $ 26.00000 $ 5,980.00 03 $ 21.50000 $ 4,945.00 04 $ 8.00000 $ 1,840.00 05 $ 25.00000 $ 5,750.00 06 $ 21.25000 $ 4,887.50 07 $ 32.00000 $ 7,360.00 25 603E02500 8" CONDUIT, TYPE E 50.000 LIN FT AWD $ 8.00000 $ 400.00 02 $ 16.00000 $ 800.00 03 $ 12.00000 $ 600.00 04 $ 5.00000 $ 250.00 05 $ 11.00000 $ 550.00 06 $ 10.00000 $ 500.00 07 $ 10.00000 $ 500.00 26 603E04401 12" CONDUIT, TYPE B, APP 175.000 LIN FT AWD $ 54.57000 $ 9,549.75 02 $ 34.70000 $ 6,072.50 03 $ 75.00000 $ 13,125.00 04 $ 85.00000 $ 14,875.00 05 $ 54.00000 $ 9,450.00 06 $ 25.00000 $ 4,375.00 07 $ 46.00000 $ 8,050.00 27 603E04600 12" CONDUIT, TYPE C 839.000 LIN FT AWD $ 8.83000 $ 7,408.37 02 $ 13.25000 $ 11,116.75 03 $ 22.00000 $ 18,458.00 04 $ 22.00000 $ 18,458.00 05 $ 19.00000 $ 15,941.00 06 $ 24.00000 $ 20,136.00 07 $ 20.00000 $ 16,780.00 28 603E04901 12" CONDUIT, TYPE D, APP 1,297.000 LIN FT AWD $ 21.37000 $ 27,716.89 02 $ 26.25000 $ 34,046.25 03 $ 27.00000 $ 35,019.00 04 $ 23.00000 $ 29,831.00 05 $ 24.00000 $ 31,128.00 06 $ 23.00000 $ 29,831.00 07 $ 27.00000 $ 35,019.00

Page 92:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010021 PAGE NO. 91 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 29 603E05901 15" CONDUIT, TYPE B, APP 175.000 LIN FT AWD $ 44.45000 $ 7,778.75 02 $ 36.90000 $ 6,457.50 03 $ 46.00000 $ 8,050.00 04 $ 41.00000 $ 7,175.00 05 $ 55.00000 $ 9,625.00 06 $ 29.00000 $ 5,075.00 07 $ 40.00000 $ 7,000.00 30 603E06100 15" CONDUIT, TYPE C 300.000 LIN FT AWD $ 15.66000 $ 4,698.00 02 $ 16.80000 $ 5,040.00 03 $ 23.00000 $ 6,900.00 04 $ 22.00000 $ 6,600.00 05 $ 27.00000 $ 8,100.00 06 $ 28.00000 $ 8,400.00 07 $ 22.00000 $ 6,600.00 31 603E07401 18" CONDUIT, TYPE B, APP 240.000 LIN FT AWD $ 42.16000 $ 10,118.40 02 $ 39.00000 $ 9,360.00 03 $ 72.00000 $ 17,280.00 04 $ 51.00000 $ 12,240.00 05 $ 56.00000 $ 13,440.00 06 $ 34.00000 $ 8,160.00 07 $ 46.00000 $ 11,040.00 32 603E07901 18" CONDUIT, TYPE D, APP 30.000 LIN FT AWD $ 39.00000 $ 1,170.00 02 $ 30.10000 $ 903.00 03 $ 30.00000 $ 900.00 04 $ 30.00000 $ 900.00 05 $ 32.00000 $ 960.00 06 $ 35.00000 $ 1,050.00 07 $ 39.00000 $ 1,170.00 33 603E10401 24" CONDUIT, TYPE B, APP 42.000 LIN FT AWD $ 48.85000 $ 2,051.70 02 $ 46.50000 $ 1,953.00 03 $ 75.00000 $ 3,150.00 04 $ 57.00000 $ 2,394.00 05 $ 58.00000 $ 2,436.00 06 $ 37.00000 $ 1,554.00 07 $ 45.00000 $ 1,890.00

Page 93:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010021 PAGE NO. 92 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 34 603E13401 30" CONDUIT, TYPE B, APP 50.000 LIN FT AWD $ 60.00000 $ 3,000.00 02 $ 55.30000 $ 2,765.00 03 $ 76.00000 $ 3,800.00 04 $ 72.00000 $ 3,600.00 05 $ 68.00000 $ 3,400.00 06 $ 50.00000 $ 2,500.00 07 $ 77.00000 $ 3,850.00 35 603E19401 42" CONDUIT, TYPE B, APP 50.000 LIN FT AWD $ 108.00000 $ 5,400.00 02 $ 78.65000 $ 3,932.50 03 $ 125.00000 $ 6,250.00 04 $ 110.00000 $ 5,500.00 05 $ 120.00000 $ 6,000.00 06 $ 90.00000 $ 4,500.00 07 $ 87.00000 $ 4,350.00 36 604E04500 CATCH BASIN, NO. 2-2B 5.000 EACH AWD $ 600.00000 $ 3,000.00 02 $ 725.00000 $ 3,625.00 03 $ 600.00000 $ 3,000.00 04 $ 600.00000 $ 3,000.00 05 $ 925.00000 $ 4,625.00 06 $ 1,200.00000 $ 6,000.00 07 $ 800.00000 $ 4,000.00 37 604E10100 INLET, SIDE DITCH 1.000 EACH AWD $ 150.00000 $ 150.00 02 $ 200.00000 $ 200.00 03 $ 550.00000 $ 550.00 04 $ 750.00000 $ 750.00 05 $ 755.00000 $ 755.00 06 $ 500.00000 $ 500.00 07 $ 3,000.00000 $ 3,000.00 38 604E37000 INSPECTION WELL 5.000 EACH AWD $ 50.00000 $ 250.00 02 $ 300.00000 $ 1,500.00 03 $ 225.00000 $ 1,125.00 04 $ 280.00000 $ 1,400.00 05 $ 600.00000 $ 3,000.00 06 $ 500.00000 $ 2,500.00 07 $ 300.00000 $ 1,500.00

Page 94:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010021 PAGE NO. 93 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S. 3 DRAINAGE TOTALS AWD $ 93,951.86 02 $ 102,660.00 03 $ 129,569.00 04 $ 113,768.00 05 $ 121,996.50 06 $ 110,178.50 07 $ 122,814.00 39 301E46000 BITUMINOUS AGGREGATE BASE, PG64-22 1,888.000 CU YD AWD $ 51.70000 $ 97,609.60 02 $ 59.89000 $ 113,072.32 03 $ 67.00000 $ 126,496.00 04 $ 67.00000 $ 126,496.00 05 $ 61.00000 $ 115,168.00 06 $ 57.79000 $ 109,107.52 07 $ 58.20000 $ 109,881.60 40 304E20000 AGGREGATE BASE 2,067.000 CU YD AWD $ 24.00000 $ 49,608.00 02 $ 23.13000 $ 47,809.71 03 $ 21.50000 $ 44,440.50 04 $ 33.00000 $ 68,211.00 05 $ 24.30000 $ 50,228.10 06 $ 23.55000 $ 48,677.85 07 $ 19.00000 $ 39,273.00 41 407E10000 TACK COAT 3,387.000 GALLON AWD $ 0.98000 $ 3,319.26 02 $ 0.98000 $ 3,319.26 03 $ 0.75000 $ 2,540.25 04 $ 0.75000 $ 2,540.25 05 $ 1.00000 $ 3,387.00 06 $ 1.28000 $ 4,335.36 07 $ 1.00000 $ 3,387.00 42 407E14000 TACK COAT FOR INTERMEDIATE COURSE 1,947.000 GALLON AWD $ 0.98000 $ 1,908.06 02 $ 0.98000 $ 1,908.06 03 $ 0.75000 $ 1,460.25 04 $ 0.75000 $ 1,460.25 05 $ 1.00000 $ 1,947.00 06 $ 1.28000 $ 2,492.16 07 $ 1.00000 $ 1,947.00

Page 95:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010021 PAGE NO. 94 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 43 408E10000 BITUMINOUS PRIME COAT 3,450.000 GALLON AWD $ 1.40000 $ 4,830.00 02 $ 1.40000 $ 4,830.00 03 $ 1.25000 $ 4,312.50 04 $ 1.25000 $ 4,312.50 05 $ 1.47000 $ 5,071.50 06 $ 1.42000 $ 4,899.00 07 $ 1.40000 $ 4,830.00 44 448E46050 ASPH CONC INTERMEDIATE, TYPE 2, PG64-22 2,824.000 CU YD AWD $ 51.70000 $ 146,000.80 02 $ 58.20000 $ 164,356.80 03 $ 59.00000 $ 166,616.00 04 $ 58.50000 $ 165,204.00 05 $ 61.00000 $ 172,264.00 06 $ 56.21000 $ 158,737.04 07 $ 58.20000 $ 164,356.80 45 448E47020 ASPH CONC SURFACE, TYPE 1, PG64-22 1,897.000 CU YD AWD $ 54.48000 $ 103,348.56 02 $ 60.98000 $ 115,679.06 03 $ 64.00000 $ 121,408.00 04 $ 63.00000 $ 119,511.00 05 $ 64.00000 $ 121,408.00 06 $ 58.81000 $ 111,562.57 07 $ 61.00000 $ 115,717.00 46 448E48020 ASPH CONC SURF, T1, PG64-22 (DRIVEWAYS) 73.000 CU YD AWD $ 114.33000 $ 8,346.09 02 $ 120.83000 $ 8,820.59 03 $ 165.00000 $ 12,045.00 04 $ 165.00000 $ 12,045.00 05 $ 126.75000 $ 9,252.75 06 $ 115.00000 $ 8,395.00 07 $ 121.00000 $ 8,833.00 47 617E10100 COMP AGGREGATE, TYPE A 641.000 CU YD AWD $ 30.00000 $ 19,230.00 02 $ 20.15000 $ 12,916.15 03 $ 23.00000 $ 14,743.00 04 $ 52.00000 $ 33,332.00 05 $ 21.15000 $ 13,557.15 06 $ 20.77000 $ 13,313.57 07 $ 29.00000 $ 18,589.00

Page 96:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010021 PAGE NO. 95 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S. 4 PAVEMENT TOTALS AWD $ 434,200.37 02 $ 472,711.95 03 $ 494,061.50 04 $ 533,112.00 05 $ 492,283.50 06 $ 461,520.07 07 $ 466,814.40 48 642E00090 EDGE LINE 8.680 MILE AWD $ 256.00000 $ 2,222.08 02 $ 256.00000 $ 2,222.08 03 $ 260.00000 $ 2,256.80 04 $ 256.00000 $ 2,222.08 05 $ 269.00000 $ 2,334.92 06 $ 260.00000 $ 2,256.80 07 $ 310.00000 $ 2,690.80 49 642E00290 CENTER LINE 4.340 MILE AWD $ 412.00000 $ 1,788.08 02 $ 412.00000 $ 1,788.08 03 $ 425.00000 $ 1,844.50 04 $ 412.00000 $ 1,788.08 05 $ 432.00000 $ 1,874.88 06 $ 420.00000 $ 1,822.80 07 $ 390.00000 $ 1,692.60

S. 5 TRAFFIC CONTROL TOTALS AWD $ 4,010.16 02 $ 4,010.16 03 $ 4,101.30 04 $ 4,010.16 05 $ 4,209.80 06 $ 4,079.60 07 $ 4,383.40 50 614E21400 TEMP CL, CL II 4.340 MILE AWD $ 126.79000 $ 550.27 02 $ 126.79000 $ 550.27 03 $ 150.00000 $ 651.00 04 $ 200.00000 $ 868.00 05 $ 133.00000 $ 577.22 06 $ 500.00000 $ 2,170.00 07 $ 1,400.00000 $ 6,076.00

Page 97:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010021 PAGE NO. 96 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 51 616E10000 WATER 100.000 M GAL AWD $ 0.10000 $ 10.00 02 $ 20.00000 $ 2,000.00 03 $ 5.00000 $ 500.00 04 $ 5.00000 $ 500.00 05 $ 7.00000 $ 700.00 06 $ 1.00000 $ 100.00 07 $ 170.00000 $ 17,000.00 52 616E20000 CALCIUM CHLORIDE 10.000 TON AWD $ 50.00000 $ 500.00 02 $ 30.00000 $ 300.00 03 $ 150.00000 $ 1,500.00 04 $ 250.00000 $ 2,500.00 05 $ 100.00000 $ 1,000.00 06 $ 250.00000 $ 2,500.00 07 $ 350.00000 $ 3,500.00

S. 6 MAINTENANCE OF TRAFFIC TOTALS AWD $ 1,060.27 02 $ 2,850.27 03 $ 2,651.00 04 $ 3,868.00 05 $ 2,277.22 06 $ 4,770.00 07 $ 26,576.00 53 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 6,000.00000 $ 6,000.00 02 $ 8,504.28000 $ 8,504.28 03 $ 3,751.00000 $ 3,751.00 04 $ 7,000.00000 $ 7,000.00 05 $ 35,000.00000 $ 35,000.00 06 $ 8,500.00000 $ 8,500.00 07 $ 9,100.00000 $ 9,100.00 54 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 40,000.00000 $ 40,000.00 02 $ 4,790.94000 $ 4,790.94 03 $ 17,755.00000 $ 17,755.00 04 $ 9,000.00000 $ 9,000.00 05 $ 10,000.00000 $ 10,000.00 06 $ 10,000.00000 $ 10,000.00 07 $ 5,000.00000 $ 5,000.00

Page 98:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010021 PAGE NO. 97 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 55 623E10000 CONSTRUCTION LAYOUT STAKES LUMP SUM AWD $ 8,000.00000 $ 8,000.00 02 $ 9,000.00000 $ 9,000.00 03 $ 30,000.00000 $ 30,000.00 04 $ 8,000.00000 $ 8,000.00 05 $ 32,000.00000 $ 32,000.00 06 $ 25,000.00000 $ 25,000.00 07 $ 18,700.00000 $ 18,700.00 56 624E10000 MOBILIZATION LUMP SUM AWD $ 5,000.00000 $ 5,000.00 02 $ 4,155.41000 $ 4,155.41 03 $ 27,500.00000 $ 27,500.00 04 $ 40,000.00000 $ 40,000.00 05 $ 20,000.00000 $ 20,000.00 06 $ 10,000.00000 $ 10,000.00 07 $ 20,400.00000 $ 20,400.00 57 806E16000 FIELD OFFICE, TYPE A 6.000 MONTH AWD $ 300.00000 $ 1,800.00 02 $ 1,202.85000 $ 7,217.10 03 $ 1,500.00000 $ 9,000.00 04 $ 1,500.00000 $ 9,000.00 05 $ 1,200.00000 $ 7,200.00 06 $ 350.00000 $ 2,100.00 07 $ 1,300.00000 $ 7,800.00

S. 7 INCIDENTALS TOTALS AWD $ 60,800.00 02 $ 33,667.73 03 $ 88,006.00 04 $ 73,000.00 05 $ 104,200.00 06 $ 55,600.00 07 $ 61,000.00 100 605E31100 AGGREGATE DRAIN 531.000 LIN FT AWD $ 10.00000 $ 5,310.00 02 $ 3.50000 $ 1,858.50 03 $ 7.00000 $ 3,717.00 04 $ 5.00000 $ 2,655.00 05 $ 4.00000 $ 2,124.00 06 $ 10.00000 $ 5,310.00 07 $ 5.00000 $ 2,655.00

Page 99:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010021 PAGE NO. 98 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S. 3 DRAINAGE TOTALS AWD $ 93,951.86 02 $ 102,660.00 03 $ 129,569.00 04 $ 113,768.00 05 $ 121,996.50 06 $ 110,178.50 07 $ 122,814.00

TOTAL AMOUNT OF THE BID AWD $ 848,976.01 02 $ 922,318.93 03 $ 990,530.26 04 $ 1,019,015.61 05 $ 1,056,563.72 06 $ 1,088,806.39 07 $ 1,097,055.80

Page 100:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010022 PID. 14005 FRA-70-13.22 TE21-G010(033) TYPE: BRIDGE PAINTING LETTING: 01/24/01 COMPLETION DATE: 10/15/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: VIMAS PAINTING COMPANY INC AWARDED AMOUNT: $ 1,825,983.00 ENGINEERS ESTIMATE: $ 2,575,000.00 AWARDED BIDDER BIDDER 02 VIMAS PAINTING COMPANY INC ALLSTATE PAINTING & CONTRACTING CO INC 629 DUMONT AVE 5826 STATE RD CAMPBELL ,OH 44405 CLEVELAND ,OH 44134 BIDDER 03 BIDDER 04 AMERICAN NATIVE CONSTRUCTION & SUPPLY AMERICAN PAINTING CO INC 1560 MAZEPA TRAIL 287 PARK DR CLEVELAND ,OH 44134 CAMPBELL ,OH 44405 BIDDER 05 BIDDER 06 HERCULES PAINTING COMPANY M & J CONSTRUCTION CO OF PINELLAS COUN 1102 SAMPSON ST 809 S SAFFORD AVE NEW CASTLE ,PA 16101 TARPON SPRINGS ,FL 34688-0698 BIDDER 07 BIDDER 08 NORTH STAR PAINTING COMPANY INC CORCON INC 3526 MC CARTNEY RD 3763 MC CARTNEY RD YOUNGSTOWN ,OH 44505 LOWELLVILLE ,OH 44436

Page 101:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010022 PAGE NO. 100 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 614E11100 LEO WITH PATROL CAR 24.000 HOUR AWD $ 50.00000 $ 1,200.00 02 $ 50.00000 $ 1,200.00 03 $ 60.00000 $ 1,440.00 04 $ 40.00000 $ 960.00 05 $ 40.00000 $ 960.00 06 $ 75.00000 $ 1,800.00 07 $ 50.00000 $ 1,200.00 08 $ 55.00000 $ 1,320.00

S. 1 ITEMS OF WORK TOTALS AWD $ 1,200.00 02 $ 1,200.00 03 $ 1,440.00 04 $ 960.00 05 $ 960.00 06 $ 1,800.00 07 $ 1,200.00 08 $ 1,320.00 2 512E67510 SLG OF CONC SURF (EPOXY-URETHANE) 434.000 SQ YD AWD $ 8.00000 $ 3,472.00 02 $ 12.00000 $ 5,208.00 03 $ 10.00000 $ 4,340.00 04 $ 9.00000 $ 3,906.00 05 $ 10.00000 $ 4,340.00 06 $ 27.00000 $ 11,718.00 07 $ 8.00000 $ 3,472.00 08 $ 9.00000 $ 3,906.00 3 516E14600 STR JOINT/SEALER, MISC.: DOW CORNING XJS SILICON JOINT SEALER 518.000 LIN FT AWD $ 30.00000 $ 15,540.00 02 $ 29.00000 $ 15,022.00 03 $ 38.00000 $ 19,684.00 04 $ 29.00000 $ 15,022.00 05 $ 29.00000 $ 15,022.00 06 $ 34.80000 $ 18,026.40 07 $ 39.50000 $ 20,461.00 08 $ 29.00000 $ 15,022.00 4 519E11100 PATCHING CONC STRUC 500.000 SQ FT AWD $ 40.00000 $ 20,000.00 02 $ 39.00000 $ 19,500.00 03 $ 40.00000 $ 20,000.00 04 $ 39.00000 $ 19,500.00 05 $ 39.00000 $ 19,500.00 06 $ 46.80000 $ 23,400.00 07 $ 48.00000 $ 24,000.00 08 $ 45.00000 $ 22,500.00

Page 102:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010022 PAGE NO. 101 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 5 863E21500 REPLACEMENT OF DET. END CROSSFRAMES 3,764.000 POUND AWD $ 5.50000 $ 20,702.00 02 $ 7.50000 $ 28,230.00 03 $ 8.00000 $ 30,112.00 04 $ 5.35000 $ 20,137.40 05 $ 5.35000 $ 20,137.40 06 $ 6.42000 $ 24,164.88 07 $ 7.50000 $ 28,230.00 08 $ 7.00000 $ 26,348.00 6 863E95030 STRUCTURAL STEEL, MISC.: WELDING EXISTING STEEL 5.000 EACH AWD $ 80.00000 $ 400.00 02 $ 80.00000 $ 400.00 03 $ 80.00000 $ 400.00 04 $ 96.40000 $ 482.00 05 $ 96.40000 $ 482.00 06 $ 120.00000 $ 600.00 07 $ 80.00000 $ 400.00 08 $ 600.00000 $ 3,000.00 7 885E10000 SURFACE PREP OF EX STEEL W/WARRANTY LUMP SUM AWD $ 350,000.00000 $ 350,000.00 02 $ 604,800.00000 $ 604,800.00 03 $ 475,238.00000 $ 475,238.00 04 $ 570,000.00000 $ 570,000.00 05 $ 817,000.00000 $ 817,000.00 06 $ 675,000.00000 $ 675,000.00 07 $ 950,000.00000 $ 950,000.00 08 $ 1,110,000.00000 $ 1,110,000.00 8 885E11000 PAINTING, EXST STEEL, PRIME, W/WARRANTY LUMP SUM AWD $ 100,000.00000 $ 100,000.00 02 $ 96,000.00000 $ 96,000.00 03 $ 164,054.00000 $ 164,054.00 04 $ 142,500.00000 $ 142,500.00 05 $ 240,000.00000 $ 240,000.00 06 $ 225,000.00000 $ 225,000.00 07 $ 190,000.00000 $ 190,000.00 08 $ 200,000.00000 $ 200,000.00

Page 103:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010022 PAGE NO. 102 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 9 885E12000 FLD PNTG EX., INTERMEDIATE W/WARRANTY LUMP SUM AWD $ 100,000.00000 $ 100,000.00 02 $ 96,000.00000 $ 96,000.00 03 $ 164,053.00000 $ 164,053.00 04 $ 142,500.00000 $ 142,500.00 05 $ 192,000.00000 $ 192,000.00 06 $ 337,500.00000 $ 337,500.00 07 $ 190,000.00000 $ 190,000.00 08 $ 200,000.00000 $ 200,000.00 10 885E13000 FLD PNTG EXST, FINISH, W/WARRANTY LUMP SUM AWD $ 100,000.00000 $ 100,000.00 02 $ 96,000.00000 $ 96,000.00 03 $ 162,407.00000 $ 162,407.00 04 $ 142,500.00000 $ 142,500.00 05 $ 240,000.00000 $ 240,000.00 06 $ 337,500.00000 $ 337,500.00 07 $ 190,000.00000 $ 190,000.00 08 $ 200,000.00000 $ 200,000.00

S. 2 BRIDGE PAINTING TOTALS AWD $ 710,114.00 02 $ 961,160.00 03 $ 1,040,288.00 04 $ 1,056,547.40 05 $ 1,548,481.40 06 $ 1,652,909.28 07 $ 1,596,563.00 08 $ 1,780,776.00 11 512E67510 SLG OF CONC SURF (EPOXY-URETHANE) 347.000 SQ YD AWD $ 8.00000 $ 2,776.00 02 $ 12.00000 $ 4,164.00 03 $ 10.00000 $ 3,470.00 04 $ 9.00000 $ 3,123.00 05 $ 10.00000 $ 3,470.00 06 $ 27.00000 $ 9,369.00 07 $ 8.00000 $ 2,776.00 08 $ 9.00000 $ 3,123.00 12 516E14600 STR JOINT/SEALER, MISC.: DOW CORNING XJS SILICON JOINT SEALER 503.000 LIN FT AWD $ 30.00000 $ 15,090.00 02 $ 29.00000 $ 14,587.00 03 $ 38.00000 $ 19,114.00 04 $ 29.00000 $ 14,587.00 05 $ 29.00000 $ 14,587.00 06 $ 34.80000 $ 17,504.40 07 $ 39.50000 $ 19,868.50 08 $ 29.00000 $ 14,587.00

Page 104:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010022 PAGE NO. 103 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 13 519E11100 PATCHING CONC STRUC 500.000 SQ FT AWD $ 40.00000 $ 20,000.00 02 $ 39.00000 $ 19,500.00 03 $ 40.00000 $ 20,000.00 04 $ 39.00000 $ 19,500.00 05 $ 39.00000 $ 19,500.00 06 $ 46.80000 $ 23,400.00 07 $ 48.00000 $ 24,000.00 08 $ 45.00000 $ 22,500.00 14 863E21500 REPLACEMENT OF DET. END CROSSFRAMES 3,346.000 POUND AWD $ 5.50000 $ 18,403.00 02 $ 7.50000 $ 25,095.00 03 $ 8.00000 $ 26,768.00 04 $ 5.35000 $ 17,901.10 05 $ 5.35000 $ 17,901.10 06 $ 6.42000 $ 21,481.32 07 $ 7.50000 $ 25,095.00 08 $ 7.00000 $ 23,422.00 15 863E95030 STRUCTURAL STEEL, MISC.: WELDING EXISTING STEEL 5.000 EACH AWD $ 80.00000 $ 400.00 02 $ 80.00000 $ 400.00 03 $ 80.00000 $ 400.00 04 $ 96.40000 $ 482.00 05 $ 96.40000 $ 482.00 06 $ 120.00000 $ 600.00 07 $ 80.00000 $ 400.00 08 $ 600.00000 $ 3,000.00 16 885E10000 SURFACE PREP OF EX STEEL W/WARRANTY LUMP SUM AWD $ 500,000.00000 $ 500,000.00 02 $ 639,450.00000 $ 639,450.00 03 $ 500,000.00000 $ 500,000.00 04 $ 630,000.00000 $ 630,000.00 05 $ 730,000.00000 $ 730,000.00 06 $ 630,000.00000 $ 630,000.00 07 $ 1,050,000.00000 $ 1,050,000.00 08 $ 1,110,000.00000 $ 1,110,000.00

Page 105:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010022 PAGE NO. 104 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 17 885E11000 PAINTING, EXST STEEL, PRIME, W/WARRANTY LUMP SUM AWD $ 150,000.00000 $ 150,000.00 02 $ 101,500.00000 $ 101,500.00 03 $ 175,573.00000 $ 175,573.00 04 $ 157,500.00000 $ 157,500.00 05 $ 210,000.00000 $ 210,000.00 06 $ 210,000.00000 $ 210,000.00 07 $ 210,000.00000 $ 210,000.00 08 $ 200,000.00000 $ 200,000.00 18 885E12000 FLD PNTG EX., INTERMEDIATE W/WARRANTY LUMP SUM AWD $ 150,000.00000 $ 150,000.00 02 $ 101,500.00000 $ 101,500.00 03 $ 175,573.00000 $ 175,573.00 04 $ 157,500.00000 $ 157,500.00 05 $ 168,000.00000 $ 168,000.00 06 $ 315,000.00000 $ 315,000.00 07 $ 210,000.00000 $ 210,000.00 08 $ 200,000.00000 $ 200,000.00 19 885E13000 FLD PNTG EXST, FINISH, W/WARRANTY LUMP SUM AWD $ 150,000.00000 $ 150,000.00 02 $ 101,500.00000 $ 101,500.00 03 $ 175,574.00000 $ 175,574.00 04 $ 157,500.00000 $ 157,500.00 05 $ 210,000.00000 $ 210,000.00 06 $ 315,000.00000 $ 315,000.00 07 $ 210,000.00000 $ 210,000.00 08 $ 200,000.00000 $ 200,000.00

S. 3 BRIDGE NO. FRA-70-1322 L TOTALS AWD $ 1,006,669.00 02 $ 1,007,696.00 03 $ 1,096,472.00 04 $ 1,158,093.10 05 $ 1,373,940.10 06 $ 1,542,354.72 07 $ 1,752,139.50 08 $ 1,776,632.00 20 103E06000 CONTRACT PERF, PAYMENT & MNTC BOND LUMP SUM AWD $ 30,000.00000 $ 30,000.00 02 $ 60,000.00000 $ 60,000.00 03 $ 77,000.00000 $ 77,000.00 04 $ 65,000.00000 $ 65,000.00 05 $ 60,000.00000 $ 60,000.00 06 $ 65,000.00000 $ 65,000.00 07 $ 60,000.00000 $ 60,000.00 08 $ 76,272.00000 $ 76,272.00

Page 106:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010022 PAGE NO. 105 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 21 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 50,000.00000 $ 50,000.00 02 $ 15,000.00000 $ 15,000.00 03 $ 120,000.00000 $ 120,000.00 04 $ 35,000.00000 $ 35,000.00 05 $ 25,000.00000 $ 25,000.00 06 $ 90,000.00000 $ 90,000.00 07 $ 200,000.00000 $ 200,000.00 08 $ 25,000.00000 $ 25,000.00 22 624E10000 MOBILIZATION LUMP SUM AWD $ 20,000.00000 $ 20,000.00 02 $ 80,000.00000 $ 80,000.00 03 $ 60,000.00000 $ 60,000.00 04 $ 100,000.00000 $ 100,000.00 05 $ 100,000.00000 $ 100,000.00 06 $ 40,000.00000 $ 40,000.00 07 $ 60,000.00000 $ 60,000.00 08 $ 50,000.00000 $ 50,000.00 23 806E16010 FIELD OFFICE, TYPE B 4.000 MONTH AWD $ 2,000.00000 $ 8,000.00 02 $ 500.00000 $ 2,000.00 03 $ 2,200.00000 $ 8,800.00 04 $ 1,500.00000 $ 6,000.00 05 $ 2,000.00000 $ 8,000.00 06 $ 3,000.00000 $ 12,000.00 07 $ 1,000.00000 $ 4,000.00 08 $ 2,500.00000 $ 10,000.00

S. 4 INCIDENTALS TOTALS AWD $ 108,000.00 02 $ 157,000.00 03 $ 265,800.00 04 $ 206,000.00 05 $ 193,000.00 06 $ 207,000.00 07 $ 324,000.00 08 $ 161,272.00

TOTAL AMOUNT OF THE BID AWD $ 1,825,983.00 02 $ 2,127,056.00 03 $ 2,404,000.00 04 $ 2,421,600.50 05 $ 3,116,381.50 06 $ 3,404,064.00 07 $ 3,673,902.50 08 $ 3,720,000.00

Page 107:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010023 PID. 17594 HAM-KEMPER ROAD (C.R.266) TE21-G990(779) TYPE: SPOT SAFETY LETTING: 01/24/01 COMPLETION DATE: 10/31/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: SUNESIS CONSTRUCTION CO AWARDED AMOUNT: $ 2,606,227.90 ENGINEERS ESTIMATE: $ 3,360,000.00 AWARDED BIDDER BIDDER 02 SUNESIS CONSTRUCTION CO R E HOLLAND EXCAVATING INC 10310 S MEDALLION DR 1780 ENON RD CINCINNATI ,OH 45241- ENON ,OH 45323 BIDDER 03 BIDDER 04 BARRETT PAVING MATERIALS INC FORT DEFIANCE CONSTRUCTION & SUPPLY IN 7374 MAIN ST 07622 SR 66 N CINCINNATI ,OH 45244 DEFIANCE ,OH 43512 BIDDER 05 BIDDER 06 JOHN R JURGENSEN COMPANY FRED A NEMANN CO 11641 MOSTELLER RD 6480 BENDER RD SUITE A CINCINNATI ,OH 45241 CINCINNATI ,OH 45233

Page 108:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 107 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 201M11000 CLEARING AND GRUBBING LUMP SUM AWD $ 25,000.00000 $ 25,000.00 02 $ 25,000.00000 $ 25,000.00 03 $ 37,000.00000 $ 37,000.00 04 $ 45,100.00000 $ 45,100.00 05 $ 54,574.48000 $ 54,574.48 06 $ 15,000.00000 $ 15,000.00 07 $ 95,000.00000 $ 95,000.00 2 202M23000 PAVEMENT REMOVED 8,192.000 SQ METER AWD $ 6.00000 $ 49,152.00 02 $ 3.90000 $ 31,948.80 03 $ 5.75000 $ 47,104.00 04 $ 7.00000 $ 57,344.00 05 $ 5.78000 $ 47,349.76 06 $ 4.00000 $ 32,768.00 07 $ 3.20000 $ 26,214.40 3 202M30000 WALK REMOVED 286.000 SQ METER AWD $ 8.00000 $ 2,288.00 02 $ 3.00000 $ 858.00 03 $ 20.50000 $ 5,863.00 04 $ 4.50000 $ 1,287.00 05 $ 5.90000 $ 1,687.40 06 $ 3.00000 $ 858.00 07 $ 3.00000 $ 858.00 4 202M30204 STEPS REMOVED LUMP SUM AWD $ 400.00000 $ 400.00 02 $ 500.00000 $ 500.00 03 $ 225.00000 $ 225.00 04 $ 250.00000 $ 250.00 05 $ 994.95000 $ 994.95 06 $ 500.00000 $ 500.00 07 $ 500.00000 $ 500.00 5 202M32000 CURB REMOVED 257.000 METER AWD $ 11.00000 $ 2,827.00 02 $ 10.00000 $ 2,570.00 03 $ 3.00000 $ 771.00 04 $ 4.50000 $ 1,156.50 05 $ 21.24000 $ 5,458.68 06 $ 10.00000 $ 2,570.00 07 $ 10.00000 $ 2,570.00

Page 109:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 108 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 6 202M35100 PIPE REMOVED, 600 MM & UNDER 578.000 METER AWD $ 12.00000 $ 6,936.00 02 $ 42.00000 $ 24,276.00 03 $ 30.00000 $ 17,340.00 04 $ 32.00000 $ 18,496.00 05 $ 47.21000 $ 27,287.38 06 $ 20.00000 $ 11,560.00 07 $ 35.00000 $ 20,230.00 7 202M38000 GUARDRAIL REMOVED 521.000 METER AWD $ 11.00000 $ 5,731.00 02 $ 5.50000 $ 2,865.50 03 $ 5.25000 $ 2,735.25 04 $ 4.50000 $ 2,344.50 05 $ 5.25000 $ 2,735.25 06 $ 10.00000 $ 5,210.00 07 $ 5.75000 $ 2,995.75 8 202M56100 BUILDING DEMOLISHED 3.000 EACH AWD $ 6,000.00000 $ 18,000.00 02 $ 6,000.00000 $ 18,000.00 03 $ 5,000.00000 $ 15,000.00 04 $ 3,000.00000 $ 9,000.00 05 $ 1,000.00000 $ 3,000.00 06 $ 10,000.00000 $ 30,000.00 07 $ 12,000.00000 $ 36,000.00 9 202M58100 CATCH BASIN REMOVED 8.000 EACH AWD $ 250.00000 $ 2,000.00 02 $ 150.00000 $ 1,200.00 03 $ 165.00000 $ 1,320.00 04 $ 100.00000 $ 800.00 05 $ 267.37000 $ 2,138.96 06 $ 200.00000 $ 1,600.00 07 $ 250.00000 $ 2,000.00 10 202M66000 DRILLED WATER WELL ABANDONED 1.000 EACH AWD $ 500.00000 $ 500.00 02 $ 800.00000 $ 800.00 03 $ 1,725.00000 $ 1,725.00 04 $ 1,000.00000 $ 1,000.00 05 $ 750.00000 $ 750.00 06 $ 2,000.00000 $ 2,000.00 07 $ 5,000.00000 $ 5,000.00

Page 110:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 109 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 11 202M75200 FENCE REMOVED FOR REUSE 157.000 METER AWD $ 11.00000 $ 1,727.00 02 $ 14.00000 $ 2,198.00 03 $ 13.25000 $ 2,080.25 04 $ 13.25000 $ 2,080.25 05 $ 13.25000 $ 2,080.25 06 $ 17.00000 $ 2,669.00 07 $ 14.50000 $ 2,276.50 12 202M98100 REMOVAL MISC.: BOLLARDS 6.000 EACH AWD $ 150.00000 $ 900.00 02 $ 100.00000 $ 600.00 03 $ 18.00000 $ 108.00 04 $ 40.00000 $ 240.00 05 $ 44.55000 $ 267.30 06 $ 50.00000 $ 300.00 07 $ 100.00000 $ 600.00 13 202M98100 REMOVAL MISC.: JUNCTION BOX 10.000 EACH AWD $ 100.00000 $ 1,000.00 02 $ 50.00000 $ 500.00 03 $ 11.00000 $ 110.00 04 $ 100.00000 $ 1,000.00 05 $ 133.68000 $ 1,336.80 06 $ 200.00000 $ 2,000.00 07 $ 150.00000 $ 1,500.00 14 202M98100 REMOVAL MISC.: STONE COLUMN 1.000 EACH AWD $ 300.00000 $ 300.00 02 $ 150.00000 $ 150.00 03 $ 330.00000 $ 330.00 04 $ 100.00000 $ 100.00 05 $ 133.64000 $ 133.64 06 $ 500.00000 $ 500.00 07 $ 250.00000 $ 250.00 15 202M98200 REMOVAL MISC.: RETAINING WALL 20.000 METER AWD $ 40.00000 $ 800.00 02 $ 50.00000 $ 1,000.00 03 $ 195.00000 $ 3,900.00 04 $ 100.00000 $ 2,000.00 05 $ 57.19000 $ 1,143.80 06 $ 75.00000 $ 1,500.00 07 $ 66.00000 $ 1,320.00

Page 111:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 110 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 16 203M12000 EXCAVATION W/O EMBANKMENT 55,062.000 CU METER AWD $ 10.80000 $ 594,669.60 02 $ 6.80000 $ 374,421.60 03 $ 8.00000 $ 440,496.00 04 $ 9.00000 $ 495,558.00 05 $ 9.92000 $ 546,215.04 06 $ 10.00000 $ 550,620.00 07 $ 13.75000 $ 757,102.50 17 203M20000 EMBANKMENT 2,620.000 CU METER AWD $ 11.00000 $ 28,820.00 02 $ 4.50000 $ 11,790.00 03 $ 3.00000 $ 7,860.00 04 $ 5.00000 $ 13,100.00 05 $ 4.85000 $ 12,707.00 06 $ 7.00000 $ 18,340.00 07 $ 2.60000 $ 6,812.00 18 203M50000 SUBGRADE COMPACTION 17,962.000 SQ METER AWD $ 2.25000 $ 40,414.50 02 $ 1.40000 $ 25,146.80 03 $ 0.70000 $ 12,573.40 04 $ 0.50000 $ 8,981.00 05 $ 1.17000 $ 21,015.54 06 $ 0.60000 $ 10,777.20 07 $ 1.70000 $ 30,535.40 19 606M13051 GR, TYPE 5A, AS PER PLAN 335.000 METER AWD $ 65.00000 $ 21,775.00 02 $ 67.00000 $ 22,445.00 03 $ 64.95000 $ 21,758.25 04 $ 64.95000 $ 21,758.25 05 $ 64.95000 $ 21,758.25 06 $ 82.00000 $ 27,470.00 07 $ 71.50000 $ 23,952.50 20 606M26000 ANCHOR ASSEMBLY, TYPE B 3.000 EACH AWD $ 950.00000 $ 2,850.00 02 $ 975.00000 $ 2,925.00 03 $ 945.00000 $ 2,835.00 04 $ 945.00000 $ 2,835.00 05 $ 945.00000 $ 2,835.00 06 $ 750.00000 $ 2,250.00 07 $ 1,000.00000 $ 3,000.00

Page 112:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 111 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 21 606M26500 ANCHOR ASSEMBLY, TYPE T 1.000 EACH AWD $ 560.00000 $ 560.00 02 $ 570.00000 $ 570.00 03 $ 555.00000 $ 555.00 04 $ 555.00000 $ 555.00 05 $ 555.00000 $ 555.00 06 $ 600.00000 $ 600.00 07 $ 600.00000 $ 600.00 22 690M50100 MAILBOX SUPPORT SYST, SINGLE 21.000 EACH AWD $ 100.00000 $ 2,100.00 02 $ 125.00000 $ 2,625.00 03 $ 130.00000 $ 2,730.00 04 $ 65.00000 $ 1,365.00 05 $ 110.70000 $ 2,324.70 06 $ 100.00000 $ 2,100.00 07 $ 100.00000 $ 2,100.00 23 690M98400 MISC. SOILS CONSULTANT AND FIELD TESTING LUMP SUM AWD $ 15,000.00000 $ 15,000.00 02 $ 21,000.00000 $ 21,000.00 03 $ 4,500.00000 $ 4,500.00 04 $ 11,000.00000 $ 11,000.00 05 $ 14,450.00000 $ 14,450.00 06 $ 40,000.00000 $ 40,000.00 07 $ 16,500.00000 $ 16,500.00

S. 1 ROADWAY TOTALS AWD $ 823,750.10 02 $ 573,389.70 03 $ 628,919.15 04 $ 697,350.50 05 $ 772,799.18 06 $ 761,192.20 07 $ 1,037,917.05 24 601M34200 ROCK CH PROT, C W/O FILTER 3.000 CU METER AWD $ 100.00000 $ 300.00 02 $ 107.00000 $ 321.00 03 $ 195.00000 $ 585.00 04 $ 80.00000 $ 240.00 05 $ 214.86000 $ 644.58 06 $ 200.00000 $ 600.00 07 $ 500.00000 $ 1,500.00

Page 113:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 112 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 25 660M25000 SODDING STAKED 17,914.000 SQ METER AWD $ 5.80000 $ 103,901.20 02 $ 5.95000 $ 106,588.30 03 $ 6.00000 $ 107,484.00 04 $ 5.76000 $ 103,184.64 05 $ 5.76000 $ 103,184.64 06 $ 5.00000 $ 89,570.00 07 $ 12.00000 $ 214,968.00 26 870M35000 WATER 100.000 CU METER AWD $ 5.00000 $ 500.00 02 $ 5.15000 $ 515.00 03 $ 5.00000 $ 500.00 04 $ 5.00000 $ 500.00 05 $ 5.00000 $ 500.00 06 $ 10.00000 $ 1,000.00 07 $ 10.00000 $ 1,000.00 27 877M30000 TEMP PREIMETER, DITCH/INLET PROTECTION 1,592.000 METER AWD $ 6.00000 $ 9,552.00 02 $ 5.65000 $ 8,994.80 03 $ 4.75000 $ 7,562.00 04 $ 1.00000 $ 1,592.00 05 $ 10.36000 $ 16,493.12 06 $ 5.00000 $ 7,960.00 07 $ 6.30000 $ 10,029.60

S. 2 EROSION CONTROL TOTALS AWD $ 114,253.20 02 $ 116,419.10 03 $ 116,131.00 04 $ 105,516.64 05 $ 120,822.34 06 $ 99,130.00 07 $ 227,497.60 28 602M20000 CONCRETE MASONRY 0.500 CU METER AWD $ 1,800.00000 $ 900.00 02 $ 1,000.00000 $ 500.00 03 $ 3,400.00000 $ 1,700.00 04 $ 2,000.00000 $ 1,000.00 05 $ 3,319.42000 $ 1,659.71 06 $ 3,000.00000 $ 1,500.00 07 $ 6,000.00000 $ 3,000.00

Page 114:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 113 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 29 603M00200 100 MM CONDUIT, TYPE C 130.000 METER AWD $ 24.00000 $ 3,120.00 02 $ 30.00000 $ 3,900.00 03 $ 29.60000 $ 3,848.00 04 $ 10.00000 $ 1,300.00 05 $ 50.45000 $ 6,558.50 06 $ 50.00000 $ 6,500.00 07 $ 50.00000 $ 6,500.00 30 603M00400 100 MM CONDUIT, TYPE E 20.000 METER AWD $ 24.00000 $ 480.00 02 $ 30.00000 $ 600.00 03 $ 20.00000 $ 400.00 04 $ 5.00000 $ 100.00 05 $ 25.00000 $ 500.00 06 $ 50.00000 $ 1,000.00 07 $ 50.00000 $ 1,000.00 31 603M04400 300 MM CONDUIT, TYPE B 396.000 METER AWD $ 95.00000 $ 37,620.00 02 $ 104.00000 $ 41,184.00 03 $ 125.00000 $ 49,500.00 04 $ 115.00000 $ 45,540.00 05 $ 111.29000 $ 44,070.84 06 $ 180.00000 $ 71,280.00 07 $ 85.60000 $ 33,897.60 32 603M04600 300 MM CONDUIT, TYPE C 3.000 METER AWD $ 92.00000 $ 276.00 02 $ 110.00000 $ 330.00 03 $ 108.00000 $ 324.00 04 $ 115.00000 $ 345.00 05 $ 144.89000 $ 434.67 06 $ 180.00000 $ 540.00 07 $ 85.60000 $ 256.80 33 603M04900 300 MM CONDUIT, TYPE D 11.000 METER AWD $ 96.00000 $ 1,056.00 02 $ 90.00000 $ 990.00 03 $ 47.00000 $ 517.00 04 $ 100.00000 $ 1,100.00 05 $ 83.09000 $ 913.99 06 $ 180.00000 $ 1,980.00 07 $ 85.60000 $ 941.60

Page 115:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 114 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 34 603M05900 375 MM CONDUIT, TYPE B 137.000 METER AWD $ 100.00000 $ 13,700.00 02 $ 112.00000 $ 15,344.00 03 $ 115.00000 $ 15,755.00 04 $ 110.00000 $ 15,070.00 05 $ 91.39000 $ 12,520.43 06 $ 200.00000 $ 27,400.00 07 $ 93.55000 $ 12,816.35 35 603M06100 375 MM CONDUIT, TYPE C 10.000 METER AWD $ 98.00000 $ 980.00 02 $ 112.00000 $ 1,120.00 03 $ 125.00000 $ 1,250.00 04 $ 140.00000 $ 1,400.00 05 $ 139.93000 $ 1,399.30 06 $ 200.00000 $ 2,000.00 07 $ 93.55000 $ 935.50 36 603M06400 375 MM CONDUIT, TYPE D 40.000 METER AWD $ 100.00000 $ 4,000.00 02 $ 100.00000 $ 4,000.00 03 $ 68.69000 $ 2,747.60 04 $ 100.00000 $ 4,000.00 05 $ 80.06000 $ 3,202.40 06 $ 200.00000 $ 8,000.00 07 $ 93.55000 $ 3,742.00 37 603M07400 450 MM CONDUIT, TYPE B 122.000 METER AWD $ 116.00000 $ 14,152.00 02 $ 120.00000 $ 14,640.00 03 $ 175.00000 $ 21,350.00 04 $ 180.00000 $ 21,960.00 05 $ 158.16000 $ 19,295.52 06 $ 230.00000 $ 28,060.00 07 $ 112.35000 $ 13,706.70 38 603M08900 525 MM CONDUIT, TYPE B 30.000 METER AWD $ 130.00000 $ 3,900.00 02 $ 130.00000 $ 3,900.00 03 $ 205.00000 $ 6,150.00 04 $ 185.00000 $ 5,550.00 05 $ 166.04000 $ 4,981.20 06 $ 260.00000 $ 7,800.00 07 $ 243.80000 $ 7,314.00

Page 116:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 115 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 39 603M09100 525 MM CONDUIT, TYPE C 111.000 METER AWD $ 115.00000 $ 12,765.00 02 $ 139.00000 $ 15,429.00 03 $ 143.00000 $ 15,873.00 04 $ 150.00000 $ 16,650.00 05 $ 135.99000 $ 15,094.89 06 $ 200.00000 $ 22,200.00 07 $ 123.50000 $ 13,708.50 40 604M00400 CATCH BASIN, NO. 3 16.000 EACH AWD $ 1,900.00000 $ 30,400.00 02 $ 2,300.00000 $ 36,800.00 03 $ 2,635.00000 $ 42,160.00 04 $ 2,500.00000 $ 40,000.00 05 $ 1,838.94000 $ 29,423.04 06 $ 2,000.00000 $ 32,000.00 07 $ 2,400.00000 $ 38,400.00 41 604M04500 CATCH BASIN, NO. 2-2B 3.000 EACH AWD $ 800.00000 $ 2,400.00 02 $ 1,100.00000 $ 3,300.00 03 $ 1,000.00000 $ 3,000.00 04 $ 800.00000 $ 2,400.00 05 $ 808.68000 $ 2,426.04 06 $ 1,000.00000 $ 3,000.00 07 $ 1,720.00000 $ 5,160.00 42 604M31500 MANHOLE, NO. 3 14.000 EACH AWD $ 1,400.00000 $ 19,600.00 02 $ 2,200.00000 $ 30,800.00 03 $ 2,400.00000 $ 33,600.00 04 $ 2,000.00000 $ 28,000.00 05 $ 1,255.03000 $ 17,570.42 06 $ 2,000.00000 $ 28,000.00 07 $ 2,100.00000 $ 29,400.00

S. 3 DRAINAGE TOTALS AWD $ 145,349.00 02 $ 172,837.00 03 $ 198,174.60 04 $ 184,415.00 05 $ 160,050.95 06 $ 241,260.00 07 $ 170,779.05

Page 117:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 116 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 43 301M46000 BITUMINOUS AGGREGATE BASE, PG64-22 3,055.000 CU METER AWD $ 71.00000 $ 216,905.00 02 $ 72.65000 $ 221,945.75 03 $ 70.50000 $ 215,377.50 04 $ 70.50000 $ 215,377.50 05 $ 73.45000 $ 224,389.75 06 $ 74.00000 $ 226,070.00 07 $ 78.75000 $ 240,581.25 44 304M20000 AGGREGATE BASE 285.000 CU METER AWD $ 57.00000 $ 16,245.00 02 $ 34.00000 $ 9,690.00 03 $ 73.81000 $ 21,035.85 04 $ 50.00000 $ 14,250.00 05 $ 33.30000 $ 9,490.50 06 $ 60.00000 $ 17,100.00 07 $ 40.00000 $ 11,400.00 45 407M14000 TACK COAT FOR INTERMEDIATE COURSE 3,021.000 LITER AWD $ 0.20000 $ 604.20 02 $ 0.25000 $ 755.25 03 $ 0.21000 $ 634.41 04 $ 0.21000 $ 634.41 05 $ 0.78000 $ 2,356.38 06 $ 0.50000 $ 1,510.50 07 $ 1.00000 $ 3,021.00 46 408M10000 BITUMINOUS PRIME COAT 507.000 LITER AWD $ 2.00000 $ 1,014.00 02 $ 2.10000 $ 1,064.70 03 $ 2.00000 $ 1,014.00 04 $ 2.00000 $ 1,014.00 05 $ 1.48000 $ 750.36 06 $ 2.50000 $ 1,267.50 07 $ 1.50000 $ 760.50 47 448M46050 ASPH CONC INTERMEDIATE, TYPE 2, PG64-22 591.000 CU METER AWD $ 82.00000 $ 48,462.00 02 $ 83.40000 $ 49,289.40 03 $ 80.90000 $ 47,811.90 04 $ 80.90000 $ 47,811.90 05 $ 82.24000 $ 48,603.84 06 $ 85.00000 $ 50,235.00 07 $ 90.00000 $ 53,190.00

Page 118:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 117 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 48 448M47020 ASPH CONC SURFACE, TYPE 1, PG64-22 420.000 CU METER AWD $ 90.00000 $ 37,800.00 02 $ 90.70000 $ 38,094.00 03 $ 88.00000 $ 36,960.00 04 $ 88.00000 $ 36,960.00 05 $ 93.63000 $ 39,324.60 06 $ 93.00000 $ 39,060.00 07 $ 100.00000 $ 42,000.00 49 448M48020 ASPH CONC SURFACE, T1, PG64-22 (DRIVES) 9.000 CU METER AWD $ 210.00000 $ 1,890.00 02 $ 210.00000 $ 1,890.00 03 $ 200.00000 $ 1,800.00 04 $ 200.00000 $ 1,800.00 05 $ 229.53000 $ 2,065.77 06 $ 250.00000 $ 2,250.00 07 $ 240.00000 $ 2,160.00 50 452M09990 150 MM PLAIN CONCRETE PAVEMENT 327.000 SQ METER AWD $ 42.00000 $ 13,734.00 02 $ 62.10000 $ 20,306.70 03 $ 34.10000 $ 11,150.70 04 $ 34.10000 $ 11,150.70 05 $ 39.29000 $ 12,847.83 06 $ 50.00000 $ 16,350.00 07 $ 38.85000 $ 12,703.95 51 452M11500 200 MM PLAIN CONCRETE PAVEMENT 281.000 SQ METER AWD $ 44.00000 $ 12,364.00 02 $ 63.90000 $ 17,955.90 03 $ 35.80000 $ 10,059.80 04 $ 35.80000 $ 10,059.80 05 $ 45.17000 $ 12,692.77 06 $ 55.00000 $ 15,455.00 07 $ 45.35000 $ 12,743.35 52 608M10000 100 MM CONCRETE WALK 236.000 SQ METER AWD $ 34.00000 $ 8,024.00 02 $ 43.75000 $ 10,325.00 03 $ 26.95000 $ 6,360.20 04 $ 32.00000 $ 7,552.00 05 $ 32.37000 $ 7,639.32 06 $ 40.00000 $ 9,440.00 07 $ 31.25000 $ 7,375.00

Page 119:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 118 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 53 608M51000 CURB RAMP, TYPE 2 1.000 EACH AWD $ 125.00000 $ 125.00 02 $ 175.00000 $ 175.00 03 $ 100.00000 $ 100.00 04 $ 100.00000 $ 100.00 05 $ 154.26000 $ 154.26 06 $ 300.00000 $ 300.00 07 $ 75.00000 $ 75.00 54 830M26000 CURB, TYPE 6 1,337.000 METER AWD $ 30.00000 $ 40,110.00 02 $ 36.30000 $ 48,533.10 03 $ 24.30000 $ 32,489.10 04 $ 24.30000 $ 32,489.10 05 $ 32.51000 $ 43,465.87 06 $ 26.00000 $ 34,762.00 07 $ 30.00000 $ 40,110.00

S. 4 PAVEMENT TOTALS AWD $ 397,277.20 02 $ 420,024.80 03 $ 384,793.46 04 $ 379,199.41 05 $ 403,781.25 06 $ 413,800.00 07 $ 426,120.05 55 202M35100 PIPE REMOVED, 600 MM & UNDER 30.000 METER AWD $ 17.00000 $ 510.00 02 $ 30.00000 $ 900.00 03 $ 68.60000 $ 2,058.00 04 $ 30.00000 $ 900.00 05 $ 55.08000 $ 1,652.40 06 $ 35.00000 $ 1,050.00 07 $ 82.00000 $ 2,460.00 56 202M35200 PIPE REMOVED, OVER 600 MM 269.000 METER AWD $ 17.00000 $ 4,573.00 02 $ 65.00000 $ 17,485.00 03 $ 95.00000 $ 25,555.00 04 $ 45.00000 $ 12,105.00 05 $ 68.94000 $ 18,544.86 06 $ 35.00000 $ 9,415.00 07 $ 100.00000 $ 26,900.00

Page 120:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 119 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 57 202M75000 FENCE REMOVED 157.000 METER AWD $ 8.50000 $ 1,334.50 02 $ 7.60000 $ 1,193.20 03 $ 7.35000 $ 1,153.95 04 $ 2.00000 $ 314.00 05 $ 7.35000 $ 1,153.95 06 $ 17.00000 $ 2,669.00 07 $ 8.00000 $ 1,256.00 58 304M20000 AGGREGATE BASE 92.000 CU METER AWD $ 54.00000 $ 4,968.00 02 $ 37.00000 $ 3,404.00 03 $ 69.00000 $ 6,348.00 04 $ 50.00000 $ 4,600.00 05 $ 61.95000 $ 5,699.40 06 $ 60.00000 $ 5,520.00 07 $ 80.00000 $ 7,360.00 59 603M04400 300 MM CONDUIT, TYPE B 65.000 METER AWD $ 98.00000 $ 6,370.00 02 $ 115.00000 $ 7,475.00 03 $ 145.00000 $ 9,425.00 04 $ 150.00000 $ 9,750.00 05 $ 107.61000 $ 6,994.65 06 $ 180.00000 $ 11,700.00 07 $ 113.00000 $ 7,345.00 60 604M04500 CATCH BASIN, NO. 2-2B 1.000 EACH AWD $ 1,000.00000 $ 1,000.00 02 $ 925.00000 $ 925.00 03 $ 1,000.00000 $ 1,000.00 04 $ 1,200.00000 $ 1,200.00 05 $ 809.46000 $ 809.46 06 $ 1,500.00000 $ 1,500.00 07 $ 2,000.00000 $ 2,000.00 61 604M31500 MANHOLE, NO. 3 1.000 EACH AWD $ 1,400.00000 $ 1,400.00 02 $ 1,600.00000 $ 1,600.00 03 $ 2,200.00000 $ 2,200.00 04 $ 1,700.00000 $ 1,700.00 05 $ 1,254.99000 $ 1,254.99 06 $ 2,000.00000 $ 2,000.00 07 $ 2,500.00000 $ 2,500.00

Page 121:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 120 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 62 607M20000 FENCE, TYPE CL 157.000 METER AWD $ 20.00000 $ 3,140.00 02 $ 20.10000 $ 3,155.70 03 $ 19.50000 $ 3,061.50 04 $ 19.50000 $ 3,061.50 05 $ 19.50000 $ 3,061.50 06 $ 65.00000 $ 10,205.00 07 $ 21.45000 $ 3,367.65 63 607M98100 FENCE, MISC. GATE, TYPE DOUBLE PULL GATE 1.000 EACH AWD $ 585.00000 $ 585.00 02 $ 600.00000 $ 600.00 03 $ 585.00000 $ 585.00 04 $ 585.00000 $ 585.00 05 $ 585.00000 $ 585.00 06 $ 1,500.00000 $ 1,500.00 07 $ 600.00000 $ 600.00 64 607M98100 FENCE, MISC. GATE, TYPE PIPE SWING GATE 1.000 EACH AWD $ 360.00000 $ 360.00 02 $ 370.00000 $ 370.00 03 $ 360.00000 $ 360.00 04 $ 360.00000 $ 360.00 05 $ 360.00000 $ 360.00 06 $ 1,500.00000 $ 1,500.00 07 $ 400.00000 $ 400.00 65 638M80600 FURN & LYG 152 MM DIP & FTGS 20.000 METER AWD $ 400.00000 $ 8,000.00 02 $ 250.00000 $ 5,000.00 03 $ 260.00000 $ 5,200.00 04 $ 500.00000 $ 10,000.00 05 $ 175.05000 $ 3,501.00 06 $ 250.00000 $ 5,000.00 07 $ 715.00000 $ 14,300.00 66 638M80700 FURN & LYG 203 MM DIP & FTGS 5.000 METER AWD $ 790.00000 $ 3,950.00 02 $ 310.00000 $ 1,550.00 03 $ 412.00000 $ 2,060.00 04 $ 1,000.00000 $ 5,000.00 05 $ 407.06000 $ 2,035.30 06 $ 500.00000 $ 2,500.00 07 $ 560.00000 $ 2,800.00

Page 122:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 121 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 67 638M80900 FURN & LYG 305 MM DIP & FTGS 718.000 METER AWD $ 180.00000 $ 129,240.00 02 $ 200.00000 $ 143,600.00 03 $ 204.00000 $ 146,472.00 04 $ 210.00000 $ 150,780.00 05 $ 203.30000 $ 145,969.40 06 $ 226.00000 $ 162,268.00 07 $ 200.00000 $ 143,600.00 68 638M81000 FURN & LYG 406 MM DIP & FTGS 250.000 METER AWD $ 280.00000 $ 70,000.00 02 $ 311.00000 $ 77,750.00 03 $ 311.44000 $ 77,860.00 04 $ 310.00000 $ 77,500.00 05 $ 225.07000 $ 56,267.50 06 $ 372.00000 $ 93,000.00 07 $ 280.00000 $ 70,000.00 69 638M81200 FURN & LYG 610 MM DIP & FTGS 193.000 METER AWD $ 500.00000 $ 96,500.00 02 $ 515.00000 $ 99,395.00 03 $ 480.00000 $ 92,640.00 04 $ 700.00000 $ 135,100.00 05 $ 584.24000 $ 112,758.32 06 $ 820.00000 $ 158,260.00 07 $ 575.00000 $ 110,975.00 70 638M81800 FURN & LAYING 914 MM CONCRETE WATER PIPE 656.000 METER AWD $ 580.00000 $ 380,480.00 02 $ 526.00000 $ 345,056.00 03 $ 645.00000 $ 423,120.00 04 $ 750.00000 $ 492,000.00 05 $ 573.15000 $ 375,986.40 06 $ 898.00000 $ 589,088.00 07 $ 835.00000 $ 547,760.00 71 638M82000 HAULING WATER WORK MATERIAL 1.000 METRIC TON AWD $ 85.00000 $ 85.00 02 $ 300.00000 $ 300.00 03 $ 50.00000 $ 50.00 04 $ 400.00000 $ 400.00 05 $ 100.93000 $ 100.93 06 $ 100.00000 $ 100.00 07 $ 100.00000 $ 100.00

Page 123:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 122 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 72 638M84300 EXCVTN FOR TPPG SLV & VLV 915 MM X 305 MM 1.000 EACH AWD $ 800.00000 $ 800.00 02 $ 9,352.00000 $ 9,352.00 03 $ 7,250.00000 $ 7,250.00 04 $ 2,500.00000 $ 2,500.00 05 $ 1,336.81000 $ 1,336.81 06 $ 5,000.00000 $ 5,000.00 07 $ 1,115.00000 $ 1,115.00 73 638M84500 CONCRETE, CLASS C 19.000 CU METER AWD $ 150.00000 $ 2,850.00 02 $ 275.00000 $ 5,225.00 03 $ 235.00000 $ 4,465.00 04 $ 200.00000 $ 3,800.00 05 $ 622.99000 $ 11,836.81 06 $ 140.00000 $ 2,660.00 07 $ 325.00000 $ 6,175.00 74 638M84900 305 MM VALVE CHAMBER 4.000 EACH AWD $ 800.00000 $ 3,200.00 02 $ 2,525.00000 $ 10,100.00 03 $ 3,400.00000 $ 13,600.00 04 $ 2,600.00000 $ 10,400.00 05 $ 2,047.01000 $ 8,188.04 06 $ 2,100.00000 $ 8,400.00 07 $ 2,000.00000 $ 8,000.00 75 638M85500 406 MM BUTTERFLY VALVE CHAMBER 2.000 EACH AWD $ 1,200.00000 $ 2,400.00 02 $ 6,050.00000 $ 12,100.00 03 $ 6,200.00000 $ 12,400.00 04 $ 5,200.00000 $ 10,400.00 05 $ 14,330.95000 $ 28,661.90 06 $ 4,500.00000 $ 9,000.00 07 $ 10,000.00000 $ 20,000.00 76 638M85900 RELOCATING EXISTING FIRE HYDRANT 6.000 EACH AWD $ 1,000.00000 $ 6,000.00 02 $ 750.00000 $ 4,500.00 03 $ 1,050.00000 $ 6,300.00 04 $ 700.00000 $ 4,200.00 05 $ 1,004.88000 $ 6,029.28 06 $ 1,000.00000 $ 6,000.00 07 $ 2,000.00000 $ 12,000.00

Page 124:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 123 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 77 638M86100 FURN & INST FIRE HYDRANT EXTENSION 1.000 EACH AWD $ 750.00000 $ 750.00 02 $ 465.00000 $ 465.00 03 $ 495.00000 $ 495.00 04 $ 730.00000 $ 730.00 05 $ 1,199.42000 $ 1,199.42 06 $ 350.00000 $ 350.00 07 $ 1,000.00000 $ 1,000.00 78 638M86300 FURN & INST VALVE BOX, COMPLETE 10.000 EACH AWD $ 500.00000 $ 5,000.00 02 $ 350.00000 $ 3,500.00 03 $ 250.00000 $ 2,500.00 04 $ 320.00000 $ 3,200.00 05 $ 821.98000 $ 8,219.80 06 $ 200.00000 $ 2,000.00 07 $ 300.00000 $ 3,000.00 79 638M86400 ADDITIONAL EXCAVATION 5.000 CU METER AWD $ 5.00000 $ 25.00 02 $ 50.00000 $ 250.00 03 $ 25.00000 $ 125.00 04 $ 40.00000 $ 200.00 05 $ 44.37000 $ 221.85 06 $ 30.00000 $ 150.00 07 $ 30.00000 $ 150.00 80 638M86404 EXPLATORY EXCAVATION 5.000 CU METER AWD $ 5.00000 $ 25.00 02 $ 75.00000 $ 375.00 03 $ 25.00000 $ 125.00 04 $ 70.00000 $ 350.00 05 $ 66.83000 $ 334.15 06 $ 30.00000 $ 150.00 07 $ 30.00000 $ 150.00 81 638M86500 FILLING ABANDONED WATER WORK STRUCTURE 2.000 CU METER AWD $ 85.00000 $ 170.00 02 $ 130.00000 $ 260.00 03 $ 50.00000 $ 100.00 04 $ 280.00000 $ 560.00 05 $ 130.55000 $ 261.10 06 $ 150.00000 $ 300.00 07 $ 250.00000 $ 500.00

Page 125:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 124 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 82 638M86800 CHANGING 200 MM & UNDER PIPE SEWER 2.000 METER AWD $ 10.00000 $ 20.00 02 $ 500.00000 $ 1,000.00 03 $ 74.00000 $ 148.00 04 $ 150.00000 $ 300.00 05 $ 147.17000 $ 294.34 06 $ 175.00000 $ 350.00 07 $ 30.00000 $ 60.00 83 638M86900 CHANGING 250-600 MM PIPE SEWER 2.000 METER AWD $ 12.00000 $ 24.00 02 $ 500.00000 $ 1,000.00 03 $ 100.00000 $ 200.00 04 $ 220.00000 $ 440.00 05 $ 248.27000 $ 496.54 06 $ 175.00000 $ 350.00 07 $ 35.00000 $ 70.00 84 638M87100 RESETTING EX VALVE BOX 2.000 EACH AWD $ 200.00000 $ 400.00 02 $ 250.00000 $ 500.00 03 $ 260.00000 $ 520.00 04 $ 170.00000 $ 340.00 05 $ 559.17000 $ 1,118.34 06 $ 100.00000 $ 200.00 07 $ 250.00000 $ 500.00 85 638M87600 FURN, INST & CONN 19 MM COPPER SVC 132.000 METER AWD $ 100.00000 $ 13,200.00 02 $ 95.00000 $ 12,540.00 03 $ 120.00000 $ 15,840.00 04 $ 100.00000 $ 13,200.00 05 $ 52.79000 $ 6,968.28 06 $ 164.00000 $ 21,648.00 07 $ 165.00000 $ 21,780.00 86 638M87604 FURN, INST & CONN 25 MM COPPER SERVICE 26.000 METER AWD $ 102.00000 $ 2,652.00 02 $ 110.00000 $ 2,860.00 03 $ 180.00000 $ 4,680.00 04 $ 100.00000 $ 2,600.00 05 $ 68.06000 $ 1,769.56 06 $ 164.00000 $ 4,264.00 07 $ 165.00000 $ 4,290.00

Page 126:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 125 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 87 638M88700 FURN & INST CURB & RDWY BOX 16.000 EACH AWD $ 200.00000 $ 3,200.00 02 $ 75.00000 $ 1,200.00 03 $ 350.00000 $ 5,600.00 04 $ 40.00000 $ 640.00 05 $ 729.42000 $ 11,670.72 06 $ 50.00000 $ 800.00 07 $ 300.00000 $ 4,800.00 88 638M89300 RELOC EX 19 MM FROST-PROOF METER 1.000 EACH AWD $ 250.00000 $ 250.00 02 $ 275.00000 $ 275.00 03 $ 550.00000 $ 550.00 04 $ 700.00000 $ 700.00 05 $ 1,681.66000 $ 1,681.66 06 $ 400.00000 $ 400.00 07 $ 300.00000 $ 300.00 89 638M89400 RELOC EX 25 MM FROST-PROOF METER 1.000 EACH AWD $ 250.00000 $ 250.00 02 $ 275.00000 $ 275.00 03 $ 550.00000 $ 550.00 04 $ 700.00000 $ 700.00 05 $ 1,124.54000 $ 1,124.54 06 $ 400.00000 $ 400.00 07 $ 300.00000 $ 300.00 90 638M89650 RESETTING EX. 16 MM FR. PROOF METER 5.000 EACH AWD $ 250.00000 $ 1,250.00 02 $ 250.00000 $ 1,250.00 03 $ 225.00000 $ 1,125.00 04 $ 150.00000 $ 750.00 05 $ 784.10000 $ 3,920.50 06 $ 400.00000 $ 2,000.00 07 $ 300.00000 $ 1,500.00 91 638M98000 WATER WORK, MISC. 915 MM CHECK VALVE CHAMBER (CIN. 1111) 1.000 EACH AWD $ 20,000.00000 $ 20,000.00 02 $ 27,350.00000 $ 27,350.00 03 $ 8,185.00000 $ 8,185.00 04 $ 8,000.00000 $ 8,000.00 05 $ 13,763.48000 $ 13,763.48 06 $ 31,000.00000 $ 31,000.00 07 $ 5,000.00000 $ 5,000.00

Page 127:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 126 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 92 638M98000 WATER WORK, MISC. EXISTING 36" BUTTERFLY VALVE - REMOVE AND DISPOSE (CIN. 1118) 1.000 EACH AWD $ 500.00000 $ 500.00 02 $ 1,500.00000 $ 1,500.00 03 $ 2,050.00000 $ 2,050.00 04 $ 2,100.00000 $ 2,100.00 05 $ 714.85000 $ 714.85 06 $ 2,400.00000 $ 2,400.00 07 $ 1,000.00000 $ 1,000.00 93 638M98000 WATER WORK, MISC. EXISTING 36" CHECK VALVE - REMOVE AND DISPOSE (CIN. 1118) 1.000 EACH AWD $ 500.00000 $ 500.00 02 $ 1,500.00000 $ 1,500.00 03 $ 1,900.00000 $ 1,900.00 04 $ 2,000.00000 $ 2,000.00 05 $ 714.85000 $ 714.85 06 $ 2,400.00000 $ 2,400.00 07 $ 1,000.00000 $ 1,000.00 94 638M98000 WATER WORK, MISC. REMOVE EXISTING VALVE BOX COMPLETE (CIN. 1122) 1.000 EACH AWD $ 250.00000 $ 250.00 02 $ 250.00000 $ 250.00 03 $ 100.00000 $ 100.00 04 $ 350.00000 $ 350.00 05 $ 1,429.75000 $ 1,429.75 06 $ 100.00000 $ 100.00 07 $ 300.00000 $ 300.00 95 690M98400 MISC. TEMPORARY SHORING LUMP SUM AWD $ 180,000.00000 $ 180,000.00 02 $ 325,000.00000 $ 325,000.00 03 $ 320,000.00000 $ 320,000.00 04 $ 185,000.00000 $ 185,000.00 05 $ 353,312.59000 $ 353,312.59 06 $ 375,000.00000 $ 375,000.00 07 $ 689,490.00000 $ 689,490.00

Page 128:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 127 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 96 870M10000 SEEDING AND MULCHING , CLASS 3C, CROWN VETCH MIXTURE 1,150.000 SQ METER AWD $ 2.50000 $ 2,875.00 02 $ 3.30000 $ 3,795.00 03 $ 2.49000 $ 2,863.50 04 $ 2.49000 $ 2,863.50 05 $ 2.49000 $ 2,863.50 06 $ 2.00000 $ 2,300.00 07 $ 2.50000 $ 2,875.00 97 877M10000 TEMPORARY SEEDING AND MUCLHING 1,450.000 SQ METER AWD $ 0.25000 $ 362.50 02 $ 0.25000 $ 362.50 03 $ 0.25000 $ 362.50 04 $ 0.25000 $ 362.50 05 $ 0.25000 $ 362.50 06 $ 0.60000 $ 870.00 07 $ 1.20000 $ 1,740.00

S. 5 WATER WORK TOTALS AWD $ 959,449.00 02 $ 1,136,543.40 03 $ 1,211,182.45 04 $ 1,162,041.50 05 $ 1,205,230.22 06 $ 1,535,767.00 07 $ 1,730,818.65 98 202M35100 PIPE REMOVED, 600 MM & UNDER 105.000 METER AWD $ 17.00000 $ 1,785.00 02 $ 20.00000 $ 2,100.00 03 $ 6.21000 $ 652.05 04 $ 10.00000 $ 1,050.00 05 $ 47.66000 $ 5,004.30 06 $ 33.00000 $ 3,465.00 07 $ 88.00000 $ 9,240.00 99 202M58000 MANHOLE REMOVED 3.000 EACH AWD $ 250.00000 $ 750.00 02 $ 600.00000 $ 1,800.00 03 $ 250.00000 $ 750.00 04 $ 100.00000 $ 300.00 05 $ 476.58000 $ 1,429.74 06 $ 500.00000 $ 1,500.00 07 $ 1,800.00000 $ 5,400.00

Page 129:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 128 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 100 603M04400 300 MM CONDUIT, TYPE B , 707.44 76.000 METER AWD $ 220.00000 $ 16,720.00 02 $ 196.00000 $ 14,896.00 03 $ 380.00000 $ 28,880.00 04 $ 230.00000 $ 17,480.00 05 $ 247.59000 $ 18,816.84 06 $ 250.00000 $ 19,000.00 07 $ 317.00000 $ 24,092.00 101 603M98300 CONDUIT, MISC. 150 MM CONDUIT, TYPE 1 (PER MSD STANDARDS) 28.000 METER AWD $ 58.00000 $ 1,624.00 02 $ 140.00000 $ 3,920.00 03 $ 495.00000 $ 13,860.00 04 $ 190.00000 $ 5,320.00 05 $ 1,009.84000 $ 28,275.52 06 $ 200.00000 $ 5,600.00 07 $ 348.00000 $ 9,744.00 102 604M98000 DRAINAGE STRUCTURE, MISC. 150 MM CLEANOUT (PER MSD STANDARDS) 2.000 EACH AWD $ 550.00000 $ 1,100.00 02 $ 175.00000 $ 350.00 03 $ 1,635.00000 $ 3,270.00 04 $ 400.00000 $ 800.00 05 $ 1,639.40000 $ 3,278.80 06 $ 1,000.00000 $ 2,000.00 07 $ 2,250.00000 $ 4,500.00 103 604M98000 DRAINAGE STRUCTURE, MISC. KEY BLOCK (PER MSD STANDARDS) 2.000 EACH AWD $ 400.00000 $ 800.00 02 $ 250.00000 $ 500.00 03 $ 880.00000 $ 1,760.00 04 $ 700.00000 $ 1,400.00 05 $ 724.32000 $ 1,448.64 06 $ 500.00000 $ 1,000.00 07 $ 635.00000 $ 1,270.00

Page 130:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 129 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 104 604M98000 DRAINAGE STRUCTURE, MISC. SANITARY MANHOLD (PER MSD STANDARDS) 3.000 EACH AWD $ 2,300.00000 $ 6,900.00 02 $ 2,200.00000 $ 6,600.00 03 $ 4,000.00000 $ 12,000.00 04 $ 2,100.00000 $ 6,300.00 05 $ 1,656.78000 $ 4,970.34 06 $ 3,000.00000 $ 9,000.00 07 $ 2,700.00000 $ 8,100.00 105 604M98000 DRAINAGE STRUCTURE, MISC. WYE (PER MSD STANDARDS) 1.000 EACH AWD $ 140.00000 $ 140.00 02 $ 150.00000 $ 150.00 03 $ 900.00000 $ 900.00 04 $ 300.00000 $ 300.00 05 $ 380.48000 $ 380.48 06 $ 100.00000 $ 100.00 07 $ 100.00000 $ 100.00

S. 6 SANITARY SEWER TOTALS AWD $ 29,819.00 02 $ 30,316.00 03 $ 62,072.05 04 $ 32,950.00 05 $ 63,604.66 06 $ 41,665.00 07 $ 62,446.00 106 202M54000 RAISED PVMT MARKER REMOVED 68.000 EACH AWD $ 5.00000 $ 340.00 02 $ 12.00000 $ 816.00 03 $ 1.00000 $ 68.00 04 $ 12.00000 $ 816.00 05 $ 4.91000 $ 333.88 06 $ 25.00000 $ 1,700.00 07 $ 10.00000 $ 680.00 107 621M00100 RAISED PAVEMENT MARKER 95.000 EACH AWD $ 25.50000 $ 2,422.50 02 $ 27.00000 $ 2,565.00 03 $ 25.47000 $ 2,419.65 04 $ 25.47000 $ 2,419.65 05 $ 25.47000 $ 2,419.65 06 $ 30.00000 $ 2,850.00 07 $ 28.00000 $ 2,660.00

Page 131:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 130 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 108 625M25400 CONDUIT, 51 MM, 713.04 247.000 METER AWD $ 17.60000 $ 4,347.20 02 $ 12.60000 $ 3,112.20 03 $ 12.20000 $ 3,013.40 04 $ 12.20000 $ 3,013.40 05 $ 17.60000 $ 4,347.20 06 $ 13.00000 $ 3,211.00 07 $ 19.35000 $ 4,779.45 109 625M25500 CONDUIT, 76 MM, 713.04 8.000 METER AWD $ 27.10000 $ 216.80 02 $ 45.00000 $ 360.00 03 $ 43.60000 $ 348.80 04 $ 43.60000 $ 348.80 05 $ 27.10000 $ 216.80 06 $ 50.00000 $ 400.00 07 $ 30.00000 $ 240.00 110 625M29000 TRENCH 253.000 METER AWD $ 11.25000 $ 2,846.25 02 $ 16.00000 $ 4,048.00 03 $ 15.45000 $ 3,908.85 04 $ 15.45000 $ 3,908.85 05 $ 11.25000 $ 2,846.25 06 $ 18.00000 $ 4,554.00 07 $ 12.50000 $ 3,162.50 111 625M30700 PULL BOX, 713.08, 450 MM 7.000 EACH AWD $ 505.00000 $ 3,535.00 02 $ 530.00000 $ 3,710.00 03 $ 515.00000 $ 3,605.00 04 $ 515.00000 $ 3,605.00 05 $ 505.00000 $ 3,535.00 06 $ 550.00000 $ 3,850.00 07 $ 550.00000 $ 3,850.00 112 625M30706 PULL BOX, 713.08, 600 MM 1.000 EACH AWD $ 590.00000 $ 590.00 02 $ 600.00000 $ 600.00 03 $ 580.00000 $ 580.00 04 $ 580.00000 $ 580.00 05 $ 590.00000 $ 590.00 06 $ 700.00000 $ 700.00 07 $ 650.00000 $ 650.00

Page 132:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 131 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 113 625M32000 GROUND ROD 5.000 EACH AWD $ 95.00000 $ 475.00 02 $ 115.00000 $ 575.00 03 $ 110.00000 $ 550.00 04 $ 110.00000 $ 550.00 05 $ 95.00000 $ 475.00 06 $ 120.00000 $ 600.00 07 $ 105.00000 $ 525.00 114 630M03100 GR MTD SUPP, #3 POST 78.000 METER AWD $ 15.00000 $ 1,170.00 02 $ 15.45000 $ 1,205.10 03 $ 15.00000 $ 1,170.00 04 $ 15.00000 $ 1,170.00 05 $ 15.00000 $ 1,170.00 06 $ 33.00000 $ 2,574.00 07 $ 20.00000 $ 1,560.00 115 630M79000 SIGN HNGR ASSY, SPAN WIRE 4.000 EACH AWD $ 170.00000 $ 680.00 02 $ 135.00000 $ 540.00 03 $ 130.00000 $ 520.00 04 $ 130.00000 $ 520.00 05 $ 130.00000 $ 520.00 06 $ 250.00000 $ 1,000.00 07 $ 187.00000 $ 748.00 116 630M79500 SIGN SUP ASSY, POLE MTD 10.000 EACH AWD $ 58.00000 $ 580.00 02 $ 60.00000 $ 600.00 03 $ 58.00000 $ 580.00 04 $ 58.00000 $ 580.00 05 $ 58.00000 $ 580.00 06 $ 100.00000 $ 1,000.00 07 $ 85.00000 $ 850.00 117 630M80100 SIGN, FLAT SHEET 15.000 SQ METER AWD $ 146.00000 $ 2,190.00 02 $ 150.00000 $ 2,250.00 03 $ 146.00000 $ 2,190.00 04 $ 146.00000 $ 2,190.00 05 $ 146.00000 $ 2,190.00 06 $ 216.00000 $ 3,240.00 07 $ 125.00000 $ 1,875.00

Page 133:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 132 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 118 630M80102 SIGN, FLAT SHEET, TYPE G 6.000 SQ METER AWD $ 160.00000 $ 960.00 02 $ 165.00000 $ 990.00 03 $ 160.00000 $ 960.00 04 $ 160.00000 $ 960.00 05 $ 160.00000 $ 960.00 06 $ 270.00000 $ 1,620.00 07 $ 180.00000 $ 1,080.00 119 630M80500 SIGN, DOUBLE FACED, ST NAME 4.000 EACH AWD $ 80.00000 $ 320.00 02 $ 85.00000 $ 340.00 03 $ 80.00000 $ 320.00 04 $ 80.00000 $ 320.00 05 $ 80.00000 $ 320.00 06 $ 100.00000 $ 400.00 07 $ 100.00000 $ 400.00 120 630M84900 RMVL/GR MTD SIGN & DISP 23.000 EACH AWD $ 10.00000 $ 230.00 02 $ 11.00000 $ 253.00 03 $ 10.00000 $ 230.00 04 $ 10.00000 $ 230.00 05 $ 10.00000 $ 230.00 06 $ 50.00000 $ 1,150.00 07 $ 12.00000 $ 276.00 121 630M86002 RMVL/GR MTD POST SUP/DISP 19.000 EACH AWD $ 15.00000 $ 285.00 02 $ 16.00000 $ 304.00 03 $ 15.00000 $ 285.00 04 $ 15.00000 $ 285.00 05 $ 15.00000 $ 285.00 06 $ 50.00000 $ 950.00 07 $ 15.00000 $ 285.00 122 632M00300 VH SG HD,3SEC,300 MM,1-WAY 6.000 EACH AWD $ 432.00000 $ 2,592.00 02 $ 450.00000 $ 2,700.00 03 $ 435.00000 $ 2,610.00 04 $ 435.00000 $ 2,610.00 05 $ 432.00000 $ 2,592.00 06 $ 500.00000 $ 3,000.00 07 $ 475.00000 $ 2,850.00

Page 134:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 133 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 123 632M00500 VH SG HD,5SEC,300 MM,1WAY 2.000 EACH AWD $ 640.00000 $ 1,280.00 02 $ 720.00000 $ 1,440.00 03 $ 700.00000 $ 1,400.00 04 $ 700.00000 $ 1,400.00 05 $ 640.00000 $ 1,280.00 06 $ 750.00000 $ 1,500.00 07 $ 700.00000 $ 1,400.00 124 632M20100 PED SGNL HD, TYPE A2 2.000 EACH AWD $ 404.00000 $ 808.00 02 $ 415.00000 $ 830.00 03 $ 400.00000 $ 800.00 04 $ 400.00000 $ 800.00 05 $ 404.00000 $ 808.00 06 $ 500.00000 $ 1,000.00 07 $ 440.00000 $ 880.00 125 632M25000 COVERING/VEH SIG HEAD 8.000 EACH AWD $ 20.00000 $ 160.00 02 $ 25.00000 $ 200.00 03 $ 20.00000 $ 160.00 04 $ 20.00000 $ 160.00 05 $ 20.00000 $ 160.00 06 $ 22.00000 $ 176.00 07 $ 22.00000 $ 176.00 126 632M25010 COVERING OF PED SIGNAL HEAD 2.000 EACH AWD $ 15.00000 $ 30.00 02 $ 25.00000 $ 50.00 03 $ 20.00000 $ 40.00 04 $ 20.00000 $ 40.00 05 $ 15.00000 $ 30.00 06 $ 22.00000 $ 44.00 07 $ 16.00000 $ 32.00 127 632M26000 PED PUSHBUTTON 2.000 EACH AWD $ 120.00000 $ 240.00 02 $ 85.00000 $ 170.00 03 $ 80.00000 $ 160.00 04 $ 80.00000 $ 160.00 05 $ 120.00000 $ 240.00 06 $ 100.00000 $ 200.00 07 $ 130.00000 $ 260.00

Page 135:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 134 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 128 632M26500 DETECTOR LOOP 10.000 EACH AWD $ 820.00000 $ 8,200.00 02 $ 835.00000 $ 8,350.00 03 $ 810.00000 $ 8,100.00 04 $ 810.00000 $ 8,100.00 05 $ 820.00000 $ 8,200.00 06 $ 900.00000 $ 9,000.00 07 $ 900.00000 $ 9,000.00 129 632M29900 MSGR WIRE, 7 ST, 6 MM W/ACC 114.000 METER AWD $ 13.10000 $ 1,493.40 02 $ 10.25000 $ 1,168.50 03 $ 9.95000 $ 1,134.30 04 $ 9.95000 $ 1,134.30 05 $ 13.10000 $ 1,493.40 06 $ 11.00000 $ 1,254.00 07 $ 14.00000 $ 1,596.00 130 632M40300 SGNL CABLE, 3 COND, 14AWG 77.000 METER AWD $ 3.95000 $ 304.15 02 $ 4.40000 $ 338.80 03 $ 4.30000 $ 331.10 04 $ 4.30000 $ 331.10 05 $ 3.95000 $ 304.15 06 $ 5.00000 $ 385.00 07 $ 4.40000 $ 338.80 131 632M40500 SGNL CABLE, 5 COND, 14AWG 77.000 METER AWD $ 4.25000 $ 327.25 02 $ 4.75000 $ 365.75 03 $ 4.60000 $ 354.20 04 $ 4.60000 $ 354.20 05 $ 4.25000 $ 327.25 06 $ 5.00000 $ 385.00 07 $ 4.70000 $ 361.90 132 632M40700 SGNL CABLE, 7 COND, 14AWG 412.000 METER AWD $ 4.80000 $ 1,977.60 02 $ 5.15000 $ 2,121.80 03 $ 5.00000 $ 2,060.00 04 $ 5.00000 $ 2,060.00 05 $ 4.80000 $ 1,977.60 06 $ 6.00000 $ 2,472.00 07 $ 5.00000 $ 2,060.00

Page 136:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 135 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 133 632M64000 STRAIN POLE FOUNDATION 4.000 EACH AWD $ 1,615.00000 $ 6,460.00 02 $ 1,565.00000 $ 6,260.00 03 $ 1,520.00000 $ 6,080.00 04 $ 1,520.00000 $ 6,080.00 05 $ 1,615.00000 $ 6,460.00 06 $ 1,600.00000 $ 6,400.00 07 $ 1,700.00000 $ 6,800.00 134 632M65200 LOOP DETECTOR LEAD-IN CABLE 926.000 METER AWD $ 4.00000 $ 3,704.00 02 $ 3.50000 $ 3,241.00 03 $ 3.40000 $ 3,148.40 04 $ 3.40000 $ 3,148.40 05 $ 4.00000 $ 3,704.00 06 $ 4.00000 $ 3,704.00 07 $ 4.40000 $ 4,074.40 135 632M68300 POWER CABLE, 3 COND, 6AWG 16.000 METER AWD $ 7.10000 $ 113.60 02 $ 6.35000 $ 101.60 03 $ 6.15000 $ 98.40 04 $ 6.15000 $ 98.40 05 $ 7.10000 $ 113.60 06 $ 10.00000 $ 160.00 07 $ 8.00000 $ 128.00 136 632M70001 POWER SERVICE, APP 1.000 EACH AWD $ 815.00000 $ 815.00 02 $ 865.00000 $ 865.00 03 $ 840.00000 $ 840.00 04 $ 840.00000 $ 840.00 05 $ 815.00000 $ 815.00 06 $ 1,000.00000 $ 1,000.00 07 $ 890.00000 $ 890.00 137 632M82501 STR POLE, 81.10M, DES 5, APP 4.000 EACH AWD $ 2,422.00000 $ 9,688.00 02 $ 2,375.00000 $ 9,500.00 03 $ 2,305.00000 $ 9,220.00 04 $ 2,305.00000 $ 9,220.00 05 $ 2,422.00000 $ 9,688.00 06 $ 2,500.00000 $ 10,000.00 07 $ 2,660.00000 $ 10,640.00

Page 137:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 136 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 138 633M39100 CONT, 170E, W/MD 332 CAB & ACCES. 1.000 EACH AWD $ 8,650.00000 $ 8,650.00 02 $ 9,450.00000 $ 9,450.00 03 $ 9,145.00000 $ 9,145.00 04 $ 9,145.00000 $ 9,145.00 05 $ 8,650.00000 $ 8,650.00 06 $ 10,000.00000 $ 10,000.00 07 $ 9,500.00000 $ 9,500.00 139 633M70000 CONCRETE/CABINET FOUND 0.100 CU METER AWD $ 960.00000 $ 96.00 02 $ 1,470.00000 $ 147.00 03 $ 1,425.00000 $ 142.50 04 $ 1,425.00000 $ 142.50 05 $ 959.90000 $ 95.99 06 $ 2,000.00000 $ 200.00 07 $ 1,000.00000 $ 100.00 140 633M70500 CONTROLLER WORK PAD 3.500 SQ METER AWD $ 120.00000 $ 420.00 02 $ 220.00000 $ 770.00 03 $ 210.00000 $ 735.00 04 $ 210.00000 $ 735.00 05 $ 120.00000 $ 420.00 06 $ 300.00000 $ 1,050.00 07 $ 130.00000 $ 455.00 141 642M00100 EDGE LINE, TYPE 1 2.200 KILOMETER AWD $ 190.00000 $ 418.00 02 $ 200.00000 $ 440.00 03 $ 190.00000 $ 418.00 04 $ 190.00000 $ 418.00 05 $ 190.00000 $ 418.00 06 $ 250.00000 $ 550.00 07 $ 210.00000 $ 462.00 142 642M00300 CENTER LINE, TYPE 1 1.500 KILOMETER AWD $ 280.00000 $ 420.00 02 $ 290.00000 $ 435.00 03 $ 280.00000 $ 420.00 04 $ 280.00000 $ 420.00 05 $ 280.00000 $ 420.00 06 $ 300.00000 $ 450.00 07 $ 310.00000 $ 465.00

Page 138:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 137 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 143 642M00400 CHANNELIZING LINE, TYPE 1 216.000 METER AWD $ 1.15000 $ 248.40 02 $ 1.20000 $ 259.20 03 $ 1.15000 $ 248.40 04 $ 1.15000 $ 248.40 05 $ 1.15000 $ 248.40 06 $ 2.00000 $ 432.00 07 $ 1.25000 $ 270.00 144 642M00500 STOP LINE, TYPE 1 41.000 METER AWD $ 6.45000 $ 264.45 02 $ 6.60000 $ 270.60 03 $ 6.41000 $ 262.81 04 $ 6.41000 $ 262.81 05 $ 6.41000 $ 262.81 06 $ 10.00000 $ 410.00 07 $ 7.05000 $ 289.05 145 642M00600 CROSSWALK LINE, TYPE 1 34.000 METER AWD $ 5.45000 $ 185.30 02 $ 5.60000 $ 190.40 03 $ 5.44000 $ 184.96 04 $ 5.44000 $ 184.96 05 $ 5.44000 $ 184.96 06 $ 10.00000 $ 340.00 07 $ 6.00000 $ 204.00 146 642M00700 TRANSVERSE LINE, TYPE 1 205.000 METER AWD $ 6.00000 $ 1,230.00 02 $ 6.20000 $ 1,271.00 03 $ 6.00000 $ 1,230.00 04 $ 6.00000 $ 1,230.00 05 $ 6.00000 $ 1,230.00 06 $ 7.00000 $ 1,435.00 07 $ 6.60000 $ 1,353.00 147 642M00900 ISLAND MARKING, TYPE 1 6.000 SQ METER AWD $ 16.25000 $ 97.50 02 $ 16.75000 $ 100.50 03 $ 16.25000 $ 97.50 04 $ 16.25000 $ 97.50 05 $ 16.25000 $ 97.50 06 $ 20.00000 $ 120.00 07 $ 18.00000 $ 108.00

Page 139:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 138 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 148 642M01300 LANE ARROW, TYPE 1 8.000 EACH AWD $ 40.00000 $ 320.00 02 $ 41.20000 $ 329.60 03 $ 40.00000 $ 320.00 04 $ 40.00000 $ 320.00 05 $ 40.00000 $ 320.00 06 $ 50.00000 $ 400.00 07 $ 44.00000 $ 352.00 149 642M01410 WORD ON PVMT, 2500 MM, TYPE 1 4.000 EACH AWD $ 50.00000 $ 200.00 02 $ 52.00000 $ 208.00 03 $ 50.00000 $ 200.00 04 $ 50.00000 $ 200.00 05 $ 50.00000 $ 200.00 06 $ 60.00000 $ 240.00 07 $ 55.00000 $ 220.00

S. 7 TRAFFIC CONTROL TOTALS AWD $ 71,930.40 02 $ 73,842.05 03 $ 70,689.27 04 $ 71,437.27 05 $ 71,759.44 06 $ 86,106.00 07 $ 78,886.10 150 410M11000 TRAF COMP SURF, TYPE B 90.000 CU METER AWD $ 35.00000 $ 3,150.00 02 $ 40.00000 $ 3,600.00 03 $ 40.00000 $ 3,600.00 04 $ 55.00000 $ 4,950.00 05 $ 55.35000 $ 4,981.50 06 $ 60.00000 $ 5,400.00 07 $ 67.00000 $ 6,030.00 151 616M10000 WATER 200.000 CU METER AWD $ 10.00000 $ 2,000.00 02 $ 3.00000 $ 600.00 03 $ 1.50000 $ 300.00 04 $ 9.00000 $ 1,800.00 05 $ 19.73000 $ 3,946.00 06 $ 5.00000 $ 1,000.00 07 $ 3.50000 $ 700.00

Page 140:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 139 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 152 616M20000 CALCIUM CHLORIDE 3.000 METRIC TON AWD $ 350.00000 $ 1,050.00 02 $ 115.00000 $ 345.00 03 $ 85.00000 $ 255.00 04 $ 150.00000 $ 450.00 05 $ 167.67000 $ 503.01 06 $ 200.00000 $ 600.00 07 $ 200.00000 $ 600.00

S. 8 MAINTENANCE OF TRAFFIC TOTALS AWD $ 6,200.00 02 $ 4,545.00 03 $ 4,155.00 04 $ 7,200.00 05 $ 9,430.51 06 $ 7,000.00 07 $ 7,330.00 153 103M05000 PERFORMANCE BOND LUMP SUM AWD $ 12,000.00000 $ 12,000.00 02 $ 25,000.00000 $ 25,000.00 03 $ 17,000.00000 $ 17,000.00 04 $ 34,500.00000 $ 34,500.00 05 $ 20,246.55000 $ 20,246.55 06 $ 31,000.00000 $ 31,000.00 07 $ 35,000.00000 $ 35,000.00 154 614M11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 9,000.00000 $ 9,000.00 02 $ 25,000.00000 $ 25,000.00 03 $ 35,000.00000 $ 35,000.00 04 $ 10,000.00000 $ 10,000.00 05 $ 17,265.63000 $ 17,265.63 06 $ 20,000.00000 $ 20,000.00 07 $ 20,000.00000 $ 20,000.00 155 623M10000 CONSTRUCTION LAYOUT STAKES LUMP SUM AWD $ 25,000.00000 $ 25,000.00 02 $ 25,000.00000 $ 25,000.00 03 $ 20,000.00000 $ 20,000.00 04 $ 58,500.00000 $ 58,500.00 05 $ 132,292.95000 $ 132,292.95 06 $ 40,000.00000 $ 40,000.00 07 $ 25,000.00000 $ 25,000.00

Page 141:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010023 PAGE NO. 140 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 156 624M10000 MOBILIZATION LUMP SUM AWD $ 5,000.00000 $ 5,000.00 02 $ 100,000.00000 $ 100,000.00 03 $ 90,000.00000 $ 90,000.00 04 $ 100,000.00000 $ 100,000.00 05 $ 50,000.00000 $ 50,000.00 06 $ 10,000.00000 $ 10,000.00 07 $ 10,000.00000 $ 10,000.00 157 806M16000 FIELD OFFICE, TYPE A 18.000 MONTH AWD $ 400.00000 $ 7,200.00 02 $ 1,000.00000 $ 18,000.00 03 $ 1,000.00000 $ 18,000.00 04 $ 1,000.00000 $ 18,000.00 05 $ 1,308.02000 $ 23,544.36 06 $ 800.00000 $ 14,400.00 07 $ 1,000.00000 $ 18,000.00

S. 9 INCIDENTALS TOTALS AWD $ 58,200.00 02 $ 193,000.00 03 $ 180,000.00 04 $ 221,000.00 05 $ 243,349.49 06 $ 115,400.00 07 $ 108,000.00

TOTAL AMOUNT OF THE BID AWD $ 2,606,227.90 02 $ 2,720,917.05 03 $ 2,856,116.98 04 $ 2,861,110.32 05 $ 3,050,828.04 06 $ 3,301,320.20 07 $ 3,849,794.50

Page 142:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010024 PID. 18212 HAM-42-15.980 TE21-G000(545) TYPE: MISC. TRAFFIC CONTROL MAINT/UPGRADE LETTING: 01/24/01 COMPLETION DATE: 05/31/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: ELEX INC AWARDED AMOUNT: $ 1,337,794.00 ENGINEERS ESTIMATE: $ 1,316,000.00 AWARDED BIDDER BIDDER 02 ELEX INC DAVIS H ELLIOT COMPANY INC 11000 WINTON RD 673 BLUE SKY PARKWAY CINCINNATI ,OH 45218 LEXINGTON ,KY 40509- BIDDER 03 BIDDER 04 ATKINS AND STANG ELECTRIC INC UNICUSTOM INCORPORATED 409 WEST LIBERTY ST 3263 HOMEWARD WAY CINCINNATI ,OH 45214 FAIRFIELD ,OH 45014 BIDDER 05 BIDDER 06 W G FAIRFIELD CO WAGNER-SMITH COMPANY 4255 KROPF AVE SW 3178 ENCRETE LANE CANTON ,OH 44706 DAYTON ,OH 45401

Page 143:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 142 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202M30000 WALK REMOVED 946.000 SQ METER AWD $ 25.00000 $ 23,650.00 02 $ 12.00000 $ 11,352.00 03 $ 49.77000 $ 47,082.42 04 $ 12.60000 $ 11,919.60 05 $ 9.00000 $ 8,514.00 06 $ 35.82000 $ 33,885.72 2 202M30001 WALK REMOVED, AS PER PLAN 55.000 SQ METER AWD $ 42.00000 $ 2,310.00 02 $ 15.00000 $ 825.00 03 $ 51.98000 $ 2,858.90 04 $ 16.80000 $ 924.00 05 $ 128.00000 $ 7,040.00 06 $ 213.32000 $ 11,732.60 3 202M32000 CURB REMOVED 175.000 METER AWD $ 30.00000 $ 5,250.00 02 $ 17.00000 $ 2,975.00 03 $ 36.12000 $ 6,321.00 04 $ 15.75000 $ 2,756.25 05 $ 12.00000 $ 2,100.00 06 $ 42.59000 $ 7,453.25 4 608M10000 100 MM CONCRETE WALK 956.000 SQ METER AWD $ 59.00000 $ 56,404.00 02 $ 45.00000 $ 43,020.00 03 $ 39.59000 $ 37,848.04 04 $ 75.00000 $ 71,700.00 05 $ 31.00000 $ 29,636.00 06 $ 60.48000 $ 57,818.88 5 608M50000 CURB RAMP, TYPE 1 20.000 EACH AWD $ 158.00000 $ 3,160.00 02 $ 1,000.00000 $ 20,000.00 03 $ 378.00000 $ 7,560.00 04 $ 655.00000 $ 13,100.00 05 $ 322.00000 $ 6,440.00 06 $ 270.00000 $ 5,400.00 6 608M50001 CURB RAMP, TYPE 1, APP 2.000 EACH AWD $ 1,260.00000 $ 2,520.00 02 $ 1,200.00000 $ 2,400.00 03 $ 630.00000 $ 1,260.00 04 $ 710.00000 $ 1,420.00 05 $ 500.00000 $ 1,000.00 06 $ 1,117.58000 $ 2,235.16

Page 144:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 143 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 7 608M51000 CURB RAMP, TYPE 2 32.000 EACH AWD $ 158.00000 $ 5,056.00 02 $ 900.00000 $ 28,800.00 03 $ 378.00000 $ 12,096.00 04 $ 350.00000 $ 11,200.00 05 $ 160.00000 $ 5,120.00 06 $ 216.00000 $ 6,912.00 8 608M51001 CURB RAMP, TYPE 2, APP 2.000 EACH AWD $ 1,050.00000 $ 2,100.00 02 $ 1,200.00000 $ 2,400.00 03 $ 630.00000 $ 1,260.00 04 $ 350.00000 $ 700.00 05 $ 400.00000 $ 800.00 06 $ 1,117.58000 $ 2,235.16 9 625M17961 BRACKET ARM, 2.4 METER, AS PER PLAN 3.000 EACH AWD $ 321.00000 $ 963.00 02 $ 500.00000 $ 1,500.00 03 $ 430.00000 $ 1,290.00 04 $ 570.00000 $ 1,710.00 05 $ 477.00000 $ 1,431.00 06 $ 361.91000 $ 1,085.73 10 625M23304 #8 AWG 600 V DIST CABLE 76.000 METER AWD $ 2.10000 $ 159.60 02 $ 1.50000 $ 114.00 03 $ 2.70000 $ 205.20 04 $ 15.00000 $ 1,140.00 05 $ 2.60000 $ 197.60 06 $ 3.00000 $ 228.00 11 625M23400 #10 AWG POLE & BRKT CABLE 46.000 METER AWD $ 3.30000 $ 151.80 02 $ 1.00000 $ 46.00 03 $ 3.32000 $ 152.72 04 $ 14.00000 $ 644.00 05 $ 2.20000 $ 101.20 06 $ 2.72000 $ 125.12

Page 145:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 144 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 12 625M25402 CONDUIT, 51 MM, 713.07 783.000 METER AWD $ 2.75000 $ 2,153.25 02 $ 6.00000 $ 4,698.00 03 $ 4.05000 $ 3,171.15 04 $ 5.00000 $ 3,915.00 05 $ 8.80000 $ 6,890.40 06 $ 4.93000 $ 3,860.19 13 625M25502 CONDUIT, 76 MM, 713.07 266.000 METER AWD $ 8.00000 $ 2,128.00 02 $ 8.00000 $ 2,128.00 03 $ 17.50000 $ 4,655.00 04 $ 6.00000 $ 1,596.00 05 $ 12.80000 $ 3,404.80 06 $ 5.47000 $ 1,455.02 14 625M25602 CONDUIT, 102 MM, 713.07 125.000 METER AWD $ 8.00000 $ 1,000.00 02 $ 10.00000 $ 1,250.00 03 $ 17.25000 $ 2,156.25 04 $ 8.00000 $ 1,000.00 05 $ 13.90000 $ 1,737.50 06 $ 5.85000 $ 731.25 15 625M25920 CONDUIT, MISC.: CONDUIT UNDER PAVEMENT, 102MM 642.000 METER AWD $ 164.00000 $ 105,288.00 02 $ 75.00000 $ 48,150.00 03 $ 145.00000 $ 93,090.00 04 $ 189.00000 $ 121,338.00 05 $ 149.00000 $ 95,658.00 06 $ 409.10000 $ 262,642.20 16 625M27600 LUMINAIRE, MISC. LUMINAIRE 3.000 EACH AWD $ 260.00000 $ 780.00 02 $ 500.00000 $ 1,500.00 03 $ 445.00000 $ 1,335.00 04 $ 375.00000 $ 1,125.00 05 $ 707.00000 $ 2,121.00 06 $ 282.47000 $ 847.41

Page 146:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 145 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 17 625M29002 TRENCH, 0.6 M DEEP 1,172.000 METER AWD $ 30.20000 $ 35,394.40 02 $ 6.00000 $ 7,032.00 03 $ 33.00000 $ 38,676.00 04 $ 12.50000 $ 14,650.00 05 $ 13.20000 $ 15,470.40 06 $ 12.81000 $ 15,013.32 18 625M30700 PULL BOX, 713.08, 450 MM 72.000 EACH AWD $ 385.00000 $ 27,720.00 02 $ 800.00000 $ 57,600.00 03 $ 435.00000 $ 31,320.00 04 $ 425.00000 $ 30,600.00 05 $ 524.00000 $ 37,728.00 06 $ 560.84000 $ 40,380.48 19 625M30706 PULL BOX, 713.08, 600 MM 23.000 EACH AWD $ 450.00000 $ 10,350.00 02 $ 900.00000 $ 20,700.00 03 $ 555.00000 $ 12,765.00 04 $ 590.00000 $ 13,570.00 05 $ 628.00000 $ 14,444.00 06 $ 614.84000 $ 14,141.32 20 625M32000 GROUND ROD 75.000 EACH AWD $ 110.00000 $ 8,250.00 02 $ 30.00000 $ 2,250.00 03 $ 90.00000 $ 6,750.00 04 $ 125.00000 $ 9,375.00 05 $ 91.00000 $ 6,825.00 06 $ 81.84000 $ 6,138.00 21 630M79500 SIGN SUP ASSY, POLE MTD (MAST ARM) 127.000 EACH AWD $ 87.00000 $ 11,049.00 02 $ 110.00000 $ 13,970.00 03 $ 185.00000 $ 23,495.00 04 $ 210.00000 $ 26,670.00 05 $ 77.00000 $ 9,779.00 06 $ 163.67000 $ 20,786.09

Page 147:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 146 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 22 630M80102 SIGN, FLAT SHEET, TYPE G 39.150 SQ METER AWD $ 152.00000 $ 5,950.80 02 $ 185.00000 $ 7,242.75 03 $ 215.00000 $ 8,417.25 04 $ 263.00000 $ 10,296.45 05 $ 182.00000 $ 7,125.30 06 $ 354.96000 $ 13,896.68 23 630M84900 RMVL/GR MTD SIGN & DISP 1.000 EACH AWD $ 25.00000 $ 25.00 02 $ 12.00000 $ 12.00 03 $ 45.00000 $ 45.00 04 $ 15.00000 $ 15.00 05 $ 33.00000 $ 33.00 06 $ 16.62000 $ 16.62 24 630M86002 RMVL/GR MTD POST SUP/DISP 1.000 EACH AWD $ 25.00000 $ 25.00 02 $ 18.00000 $ 18.00 03 $ 95.00000 $ 95.00 04 $ 20.00000 $ 20.00 05 $ 33.00000 $ 33.00 06 $ 16.62000 $ 16.62 25 630M87100 RMVL/OVHD MTD SIGN/REERECT 1.000 EACH AWD $ 90.00000 $ 90.00 02 $ 30.00000 $ 30.00 03 $ 250.00000 $ 250.00 04 $ 1,250.00000 $ 1,250.00 05 $ 233.00000 $ 233.00 06 $ 292.90000 $ 292.90 26 630M87520 RMVL OF POLE MTD SIGN & REERECT 3.000 EACH AWD $ 82.00000 $ 246.00 02 $ 100.00000 $ 300.00 03 $ 45.00000 $ 135.00 04 $ 70.00000 $ 210.00 05 $ 130.00000 $ 390.00 06 $ 120.47000 $ 361.41 27 630M88900 RMVL OVHD SUPP & REERECTION 1.000 EACH AWD $ 1,035.00000 $ 1,035.00 02 $ 5,000.00000 $ 5,000.00 03 $ 760.00000 $ 760.00 04 $ 1,450.00000 $ 1,450.00 05 $ 984.00000 $ 984.00 06 $ 2,023.27000 $ 2,023.27

Page 148:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 147 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 28 631M93001 SCHL SPEED LIMIT, 600X1050, APP 3.000 EACH AWD $ 1,346.00000 $ 4,038.00 02 $ 4,500.00000 $ 13,500.00 03 $ 1,200.00000 $ 3,600.00 04 $ 3,290.00000 $ 9,870.00 05 $ 2,235.00000 $ 6,705.00 06 $ 901.04000 $ 2,703.12 29 632M00303 VH SG HD,3SEC,300 MM,1W,POLY,APP 129.000 EACH AWD $ 427.00000 $ 55,083.00 02 $ 325.00000 $ 41,925.00 03 $ 445.00000 $ 57,405.00 04 $ 439.00000 $ 56,631.00 05 $ 425.00000 $ 54,825.00 06 $ 452.14000 $ 58,326.06 30 632M00503 VH SG HD,5SEC,300 MM,1W,POLY,APP 21.000 EACH AWD $ 706.00000 $ 14,826.00 02 $ 550.00000 $ 11,550.00 03 $ 660.00000 $ 13,860.00 04 $ 645.00000 $ 13,545.00 05 $ 682.00000 $ 14,322.00 06 $ 724.90000 $ 15,222.90 31 632M03201 VH SG HD,OPT PRG,3SEC,300,APP 11.000 EACH AWD $ 1,510.00000 $ 16,610.00 02 $ 2,500.00000 $ 27,500.00 03 $ 1,350.00000 $ 14,850.00 04 $ 1,675.00000 $ 18,425.00 05 $ 1,439.00000 $ 15,829.00 06 $ 1,275.70000 $ 14,032.70 32 632M03205 VH SG HD,OPT PRG,5SEC,300,APP 7.000 EACH AWD $ 2,720.00000 $ 19,040.00 02 $ 3,500.00000 $ 24,500.00 03 $ 2,285.00000 $ 15,995.00 04 $ 2,490.00000 $ 17,430.00 05 $ 2,306.00000 $ 16,142.00 06 $ 2,120.61000 $ 14,844.27

Page 149:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 148 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 33 632M20601 PED SGNL HD, TYPE D2, APP 116.000 EACH AWD $ 381.00000 $ 44,196.00 02 $ 300.00000 $ 34,800.00 03 $ 375.00000 $ 43,500.00 04 $ 425.00000 $ 49,300.00 05 $ 368.00000 $ 42,688.00 06 $ 399.22000 $ 46,309.52 34 632M25000 COVERING/VEH SIG HEAD 125.000 EACH AWD $ 20.00000 $ 2,500.00 02 $ 10.00000 $ 1,250.00 03 $ 20.00000 $ 2,500.00 04 $ 30.00000 $ 3,750.00 05 $ 20.00000 $ 2,500.00 06 $ 22.02000 $ 2,752.50 35 632M25010 COVERING OF PED SIGNAL HEAD 96.000 EACH AWD $ 20.00000 $ 1,920.00 02 $ 10.00000 $ 960.00 03 $ 20.00000 $ 1,920.00 04 $ 30.00000 $ 2,880.00 05 $ 20.00000 $ 1,920.00 06 $ 22.02000 $ 2,113.92 36 632M26000 PED PUSHBUTTON 58.000 EACH AWD $ 80.00000 $ 4,640.00 02 $ 100.00000 $ 5,800.00 03 $ 135.00000 $ 7,830.00 04 $ 190.00000 $ 11,020.00 05 $ 110.00000 $ 6,380.00 06 $ 71.04000 $ 4,120.32 37 632M26500 DETECTOR LOOP 83.000 EACH AWD $ 530.00000 $ 43,990.00 02 $ 900.00000 $ 74,700.00 03 $ 830.00000 $ 68,890.00 04 $ 890.00000 $ 73,870.00 05 $ 867.00000 $ 71,961.00 06 $ 749.99000 $ 62,249.17 38 632M29900 MSGR WIRE, 7 ST, 6 MM W/ACC 305.000 METER AWD $ 10.60000 $ 3,233.00 02 $ 10.00000 $ 3,050.00 03 $ 12.50000 $ 3,812.50 04 $ 14.70000 $ 4,483.50 05 $ 14.40000 $ 4,392.00 06 $ 14.89000 $ 4,541.45

Page 150:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 149 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 39 632M30992 SIGNAL CABLE, 5 CONDUCTOR, NO 10 AWG 900.000 METER AWD $ 6.10000 $ 5,490.00 02 $ 2.00000 $ 1,800.00 03 $ 3.60000 $ 3,240.00 04 $ 2.90000 $ 2,610.00 05 $ 5.00000 $ 4,500.00 06 $ 6.39000 $ 5,751.00 40 632M40700 SGNL CABLE, 7 COND, 14AWG 10,435.000 METER AWD $ 5.00000 $ 52,175.00 02 $ 1.75000 $ 18,261.25 03 $ 3.10000 $ 32,348.50 04 $ 3.50000 $ 36,522.50 05 $ 4.70000 $ 49,044.50 06 $ 6.72000 $ 70,123.20 41 632M62803 INT CABLE, INT MSG, 6 PR, APP 5,732.000 METER AWD $ 6.10000 $ 34,965.20 02 $ 9.00000 $ 51,588.00 03 $ 6.60000 $ 37,831.20 04 $ 6.90000 $ 39,550.80 05 $ 9.60000 $ 55,027.20 06 $ 8.54000 $ 48,951.28 42 632M63000 PHONE DROP 3.000 EACH AWD $ 300.00000 $ 900.00 02 $ 9.00000 $ 27.00 03 $ 485.00000 $ 1,455.00 04 $ 500.00000 $ 1,500.00 05 $ 850.00000 $ 2,550.00 06 $ 120.47000 $ 361.41 43 632M64001 STRAIN POLE FOUNDATION, AS PER PLAN 7.000 EACH AWD $ 1,315.00000 $ 9,205.00 02 $ 1,000.00000 $ 7,000.00 03 $ 1,275.00000 $ 8,925.00 04 $ 1,390.00000 $ 9,730.00 05 $ 2,337.00000 $ 16,359.00 06 $ 1,653.48000 $ 11,574.36

Page 151:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 150 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 44 632M64011 SIGNAL SUPPORT FOUNDATION, APP 44.000 EACH AWD $ 1,220.00000 $ 53,680.00 02 $ 900.00000 $ 39,600.00 03 $ 1,200.00000 $ 52,800.00 04 $ 1,390.00000 $ 61,160.00 05 $ 2,299.00000 $ 101,156.00 06 $ 1,919.38000 $ 84,452.72 45 632M64020 PEDESTAL FOUNDATION 12.000 EACH AWD $ 335.00000 $ 4,020.00 02 $ 500.00000 $ 6,000.00 03 $ 420.00000 $ 5,040.00 04 $ 380.00000 $ 4,560.00 05 $ 221.00000 $ 2,652.00 06 $ 467.21000 $ 5,606.52 46 632M65200 LOOP DETECTOR LEAD-IN CABLE 5,556.000 METER AWD $ 3.80000 $ 21,112.80 02 $ 2.50000 $ 13,890.00 03 $ 3.35000 $ 18,612.60 04 $ 2.50000 $ 13,890.00 05 $ 3.30000 $ 18,334.80 06 $ 5.20000 $ 28,891.20 47 632M68300 POWER CABLE, 3 COND, 6AWG 1,070.000 METER AWD $ 6.10000 $ 6,527.00 02 $ 9.00000 $ 9,630.00 03 $ 5.80000 $ 6,206.00 04 $ 2.75000 $ 2,942.50 05 $ 7.80000 $ 8,346.00 06 $ 4.85000 $ 5,189.50 48 632M70001 POWER SERVICE, APP 13.000 EACH AWD $ 836.00000 $ 10,868.00 02 $ 1,500.00000 $ 19,500.00 03 $ 720.00000 $ 9,360.00 04 $ 890.00000 $ 11,570.00 05 $ 1,572.00000 $ 20,436.00 06 $ 830.84000 $ 10,800.92 49 632M70400 COND RISER, 51 MM 36.000 EACH AWD $ 315.00000 $ 11,340.00 02 $ 300.00000 $ 10,800.00 03 $ 405.00000 $ 14,580.00 04 $ 310.00000 $ 11,160.00 05 $ 209.00000 $ 7,524.00 06 $ 186.95000 $ 6,730.20

Page 152:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 151 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 50 632M70600 COND RISER, 76 MM 3.000 EACH AWD $ 500.00000 $ 1,500.00 02 $ 400.00000 $ 1,200.00 03 $ 490.00000 $ 1,470.00 04 $ 490.00000 $ 1,470.00 05 $ 260.00000 $ 780.00 06 $ 264.71000 $ 794.13 51 632M75011 SG SUPP, 81.20M, D3, 81.20M D2 & D1, APP 2.000 EACH AWD $ 3,020.00000 $ 6,040.00 02 $ 4,200.00000 $ 8,400.00 03 $ 3,675.00000 $ 7,350.00 04 $ 3,244.00000 $ 6,488.00 05 $ 3,946.00000 $ 7,892.00 06 $ 3,859.49000 $ 7,718.98 52 632M75021 SG SPP, 81.20M, D4, W/81.20M D2/ D2, APP 1.000 EACH AWD $ 3,785.00000 $ 3,785.00 02 $ 4,995.00000 $ 4,995.00 03 $ 4,500.00000 $ 4,500.00 04 $ 3,980.00000 $ 3,980.00 05 $ 4,881.00000 $ 4,881.00 06 $ 4,556.09000 $ 4,556.09 53 632M75041 SG SPP, 81.20M D4, W/81.20M D3/D3, APP 3.000 EACH AWD $ 3,830.00000 $ 11,490.00 02 $ 5,150.00000 $ 15,450.00 03 $ 4,560.00000 $ 13,680.00 04 $ 4,100.00000 $ 12,300.00 05 $ 5,047.00000 $ 15,141.00 06 $ 4,696.49000 $ 14,089.47 54 632M75101 SG SP, 81.20M, D12, 81.20M D11 & D2, APP 1.000 EACH AWD $ 5,351.00000 $ 5,351.00 02 $ 6,310.00000 $ 6,310.00 03 $ 6,210.00000 $ 6,210.00 04 $ 5,640.00000 $ 5,640.00 05 $ 6,430.00000 $ 6,430.00 06 $ 5,895.29000 $ 5,895.29

Page 153:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 152 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 55 632M77031 COMB SGNL SUPP, TC8120 DES 4 POLE, APP 1.000 EACH AWD $ 3,600.00000 $ 3,600.00 02 $ 5,210.00000 $ 5,210.00 03 $ 4,350.00000 $ 4,350.00 04 $ 4,150.00000 $ 4,150.00 05 $ 5,150.00000 $ 5,150.00 06 $ 4,777.49000 $ 4,777.49 56 632M80101 SGNL SUPP, 81.20M, DES 1, APP 3.000 EACH AWD $ 2,000.00000 $ 6,000.00 02 $ 3,100.00000 $ 9,300.00 03 $ 2,390.00000 $ 7,170.00 04 $ 2,120.00000 $ 6,360.00 05 $ 2,496.00000 $ 7,488.00 06 $ 2,486.59000 $ 7,459.77 57 632M80201 SGNL SUPP, 81.20M, DES 2, APP 11.000 EACH AWD $ 2,065.00000 $ 22,715.00 02 $ 3,275.00000 $ 36,025.00 03 $ 2,490.00000 $ 27,390.00 04 $ 2,075.00000 $ 22,825.00 05 $ 3,469.00000 $ 38,159.00 06 $ 2,664.79000 $ 29,312.69 58 632M80301 SGNL SUPP, 81.20M, DES 3, APP 4.000 EACH AWD $ 2,226.00000 $ 8,904.00 02 $ 3,500.00000 $ 14,000.00 03 $ 2,575.00000 $ 10,300.00 04 $ 2,346.00000 $ 9,384.00 05 $ 2,970.00000 $ 11,880.00 06 $ 2,891.59000 $ 11,566.36 59 632M80501 SGNL SUPP, 81.20M, DES 11, APP 13.000 EACH AWD $ 4,030.00000 $ 52,390.00 02 $ 3,300.00000 $ 42,900.00 03 $ 4,575.00000 $ 59,475.00 04 $ 4,250.00000 $ 55,250.00 05 $ 2,650.00000 $ 34,450.00 06 $ 2,502.79000 $ 32,536.27 60 632M80601 SGNL SUPP, 81.20M, DES 12, APP 3.000 EACH AWD $ 4,630.00000 $ 13,890.00 02 $ 5,385.00000 $ 16,155.00 03 $ 5,170.00000 $ 15,510.00 04 $ 4,590.00000 $ 13,770.00 05 $ 5,184.00000 $ 15,552.00 06 $ 4,700.59000 $ 14,101.77

Page 154:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 153 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 61 632M81501 COMB SG SUP, 81.20M,DES 11,APP 2.000 EACH AWD $ 4,325.00000 $ 8,650.00 02 $ 4,991.00000 $ 9,982.00 03 $ 4,975.00000 $ 9,950.00 04 $ 4,600.00000 $ 9,200.00 05 $ 4,736.00000 $ 9,472.00 06 $ 4,290.19000 $ 8,580.38 62 632M82501 STR POLE, 81.10M, DES 5, APP 7.000 EACH AWD $ 1,830.00000 $ 12,810.00 02 $ 2,710.00000 $ 18,970.00 03 $ 2,150.00000 $ 15,050.00 04 $ 1,980.00000 $ 13,860.00 05 $ 2,061.00000 $ 14,427.00 06 $ 1,707.70000 $ 11,953.90 63 632M89900 PEDESTAL, 2.4 M, TRANSF BASE 13.000 EACH AWD $ 310.00000 $ 4,030.00 02 $ 820.00000 $ 10,660.00 03 $ 335.00000 $ 4,355.00 04 $ 690.00000 $ 8,970.00 05 $ 489.00000 $ 6,357.00 06 $ 282.47000 $ 3,672.11 64 632M90010 PEDESTAL, MISC.: REUSE OF PEDESTAL FOUNDATION 1.000 EACH AWD $ 155.00000 $ 155.00 02 $ 500.00000 $ 500.00 03 $ 70.00000 $ 70.00 04 $ 250.00000 $ 250.00 05 $ 340.00000 $ 340.00 06 $ 88.07000 $ 88.07 65 632M90101 RMVL TRAF SIG INST, APP 19.000 EACH AWD $ 1,750.00000 $ 33,250.00 02 $ 1,000.00000 $ 19,000.00 03 $ 1,875.00000 $ 35,625.00 04 $ 1,290.00000 $ 24,510.00 05 $ 977.00000 $ 18,563.00 06 $ 3,202.77000 $ 60,852.63

Page 155:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 154 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 66 633M39001 CONTRLR, MASTER,TRAF RESPON,APP 3.000 EACH AWD $ 3,140.00000 $ 9,420.00 02 $ 15,000.00000 $ 45,000.00 03 $ 6,450.00000 $ 19,350.00 04 $ 5,490.00000 $ 16,470.00 05 $ 7,528.00000 $ 22,584.00 06 $ 2,847.47000 $ 8,542.41

67 633M39100 CONT, 170E, W/MD 332 CAB & ACCES. (BASE MOUNT) 19.000 EACH AWD $ 12,100.00000 $ 229,900.00 02 $ 10,500.00000 $ 199,500.00 03 $ 13,550.00000 $ 257,450.00 04 $ 14,325.00000 $ 272,175.00 05 $ 13,648.00000 $ 259,312.00 06 $ 12,339.86000 $ 234,457.34 68 633M40100 CONTROLLER, MISC. PORTABLE ARTERIAL MONITORING SYSTEM 1.000 EACH AWD $ 5,930.00000 $ 5,930.00 02 $ 25,000.00000 $ 25,000.00 03 $ 3,875.00000 $ 3,875.00 04 $ 4,505.00000 $ 4,505.00 05 $ 4,242.00000 $ 4,242.00 06 $ 5,852.28000 $ 5,852.28 69 633M40100 CONTROLLER, MISC. SPARES 2.000 EACH AWD $ 15,055.00000 $ 30,110.00 02 $ 7,500.00000 $ 15,000.00 03 $ 19,150.00000 $ 38,300.00 04 $ 11,980.00000 $ 23,960.00 05 $ 14,232.00000 $ 28,464.00 06 $ 14,796.42000 $ 29,592.84 70 633M40500 CENTRAL OFFICE MONITOR 1.000 EACH AWD $ 8,700.00000 $ 8,700.00 02 $ 40,000.00000 $ 40,000.00 03 $ 4,375.00000 $ 4,375.00 04 $ 4,500.00000 $ 4,500.00 05 $ 6,456.00000 $ 6,456.00 06 $ 8,273.64000 $ 8,273.64

Page 156:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 155 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 71 633M64001 PREEMPTION, APP (RAILROAD) 1.000 EACH AWD $ 1,100.00000 $ 1,100.00 02 $ 5,000.00000 $ 5,000.00 03 $ 660.00000 $ 660.00 04 $ 980.00000 $ 980.00 05 $ 578.00000 $ 578.00 06 $ 573.70000 $ 573.70 72 633M70001 CONC FOR CAB FOUND, APP 17.100 CU METER AWD $ 730.00000 $ 12,483.00 02 $ 600.00000 $ 10,260.00 03 $ 585.00000 $ 10,003.50 04 $ 390.00000 $ 6,669.00 05 $ 513.00000 $ 8,772.30 06 $ 830.88000 $ 14,208.05 73 642M00202 LANE LINE, TYPE 2 0.736 KILOMETER AWD $ 255.98000 $ 188.40 02 $ 678.70000 $ 499.52 03 $ 260.82000 $ 191.96 04 $ 255.00000 $ 187.68 05 $ 244.00000 $ 179.58 06 $ 263.25000 $ 193.75 74 642M00302 CENTER LINE, TYPE 2 0.974 KILOMETER AWD $ 711.50000 $ 693.00 02 $ 847.00000 $ 824.98 03 $ 275.05000 $ 267.90 04 $ 710.00000 $ 691.54 05 $ 348.00000 $ 338.95 06 $ 731.83000 $ 712.80 75 642M00402 CHANNELIZING LINE, TYPE 2 542.000 METER AWD $ 1.40000 $ 758.80 02 $ 1.10000 $ 596.20 03 $ 1.40000 $ 758.80 04 $ 1.38000 $ 747.96 05 $ 1.30000 $ 704.60 06 $ 1.41000 $ 764.22

Page 157:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 156 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 76 642M00502 STOP LINE, TYPE 2 617.000 METER AWD $ 6.55000 $ 4,041.35 02 $ 8.38000 $ 5,170.46 03 $ 6.66000 $ 4,109.22 04 $ 6.56000 $ 4,047.52 05 $ 6.30000 $ 3,887.10 06 $ 6.73000 $ 4,152.41 77 642M00602 CROSSWALK LINE, TYPE 2 1,644.000 METER AWD $ 4.15000 $ 6,822.60 02 $ 6.41000 $ 10,538.04 03 $ 4.25000 $ 6,987.00 04 $ 4.20000 $ 6,904.80 05 $ 4.00000 $ 6,576.00 06 $ 4.26000 $ 7,003.44 78 642M01302 LANE ARROW, TYPE 2 62.000 EACH AWD $ 40.00000 $ 2,480.00 02 $ 44.00000 $ 2,728.00 03 $ 41.00000 $ 2,542.00 04 $ 40.00000 $ 2,480.00 05 $ 38.00000 $ 2,356.00 06 $ 41.04000 $ 2,544.48 79 642M01402 WORD ON PVMT, 1800 MM, TYPE 2 16.000 EACH AWD $ 55.50000 $ 888.00 02 $ 55.00000 $ 880.00 03 $ 57.00000 $ 912.00 04 $ 56.00000 $ 896.00 05 $ 53.00000 $ 848.00 06 $ 57.24000 $ 915.84 80 642M30000 REMOVAL OF PAVEMENT MARKING 120.000 METER AWD $ 3.30000 $ 396.00 02 $ 0.92000 $ 110.40 03 $ 3.50000 $ 420.00 04 $ 3.30000 $ 396.00 05 $ 3.20000 $ 384.00 06 $ 3.37000 $ 404.40

Page 158:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 157 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 81 633M40100 CONTROLLER, MISC. SOFTWARE AND TRAINING 1.000 EACH AWD $ 14,255.00000 $ 14,255.00 02 $ 55,000.00000 $ 55,000.00 03 $ 54,500.00000 $ 54,500.00 04 $ 25,000.00000 $ 25,000.00 05 $ 39,656.00000 $ 39,656.00 06 $ 13,992.48000 $ 13,992.48

S. 1 TRAFFIC SIGNALS TOTALS AWD $ 1,283,794.00 02 $ 1,378,108.60 03 $ 1,429,768.11 04 $ 1,404,712.10 05 $ 1,430,630.23 06 $ 1,594,502.12 83 100M00300 RAILROAD INSURANCE BOND LUMP SUM AWD $ 5,000.00000 $ 5,000.00 02 $ 5,000.00000 $ 5,000.00 03 $ 2,500.00000 $ 2,500.00 04 $ 1,000.00000 $ 1,000.00 05 $ 2,960.00000 $ 2,960.00 06 $ 1,080.00000 $ 1,080.00 84 103M05000 PERFORMANCE BOND LUMP SUM AWD $ 11,000.00000 $ 11,000.00 02 $ 7,500.00000 $ 7,500.00 03 $ 6,580.00000 $ 6,580.00 04 $ 5,000.00000 $ 5,000.00 05 $ 14,521.00000 $ 14,521.00 06 $ 7,200.00000 $ 7,200.00 85 614M11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 12,500.00000 $ 12,500.00 02 $ 27,664.40000 $ 27,664.40 03 $ 9,825.00000 $ 9,825.00 04 $ 19,000.00000 $ 19,000.00 05 $ 22,875.00000 $ 22,875.00 06 $ 3,738.96000 $ 3,738.96 86 623M10000 CONSTRUCTION LAYOUT STAKES LUMP SUM AWD $ 12,500.00000 $ 12,500.00 02 $ 7,500.00000 $ 7,500.00 03 $ 1,260.00000 $ 1,260.00 04 $ 9,000.00000 $ 9,000.00 05 $ 7,079.00000 $ 7,079.00 06 $ 864.00000 $ 864.00

Page 159:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010024 PAGE NO. 158 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 87 624M10000 MOBILIZATION LUMP SUM AWD $ 13,000.00000 $ 13,000.00 02 $ 25,000.00000 $ 25,000.00 03 $ 10,950.00000 $ 10,950.00 04 $ 23,490.00000 $ 23,490.00 05 $ 40,000.00000 $ 40,000.00 06 $ 2,409.48000 $ 2,409.48

S. 2 INCIDENTALS TOTALS AWD $ 54,000.00 02 $ 72,664.40 03 $ 31,115.00 04 $ 57,490.00 05 $ 87,435.00 06 $ 15,292.44 100 633M99300 CONTROLLER ITEM, MISC. SYSTEM TIMING AND ANALYSIS LUMP SUM AWD $ 27,500.00000 $ 27,500.00 02 $ 40,000.00000 $ 40,000.00 03 $ 33,000.00000 $ 33,000.00 04 $ 25,000.00000 $ 25,000.00 05 $ 59,500.00000 $ 59,500.00 06 $ 27,000.00000 $ 27,000.00

S. 1 TRAFFIC SIGNALS TOTALS AWD $ 1,283,794.00 02 $ 1,378,108.60 03 $ 1,429,768.11 04 $ 1,404,712.10 05 $ 1,430,630.23 06 $ 1,594,502.12

TOTAL AMOUNT OF THE BID AWD $ 1,337,794.00 02 $ 1,450,773.00 03 $ 1,460,883.11 04 $ 1,462,202.10 05 $ 1,518,065.23 06 $ 1,609,794.56

Page 160:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010025 PID. 20896 MAD-29-0.00 TE21-G000(500) TYPE: TWO LANE RESURFACING LETTING: 01/24/01 COMPLETION DATE: 06/30/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: MC DANIELS CONSTRUCTION CORP INC AWARDED AMOUNT: $ 805,490.45 ENGINEERS ESTIMATE: $ 840,000.00 AWARDED BIDDER BIDDER 02 MC DANIELS CONSTRUCTION CORP INC SHELLY & SANDS INC 901 OAK ST 3570 SOUTH RIVER RD COLUMBUS ,OH 43205 ZANESVILLE ,OH 43702-1585 BIDDER 03 BIDDER 04 KOKOSING CONSTRUCTION COMPANY INC NORTHWOOD STONE & ASPHALT INC 886 MC KINLEY AVE 1558 COUNTY RD 105 COLUMBUS ,OH 43222 BELLE CENTER ,OH 43310

Page 161:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010025 PAGE NO. 160 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E54100 RAISED PVMT MRK RMVD/STRG 897.000 EACH AWD $ 3.00000 $ 2,691.00 02 $ 5.00000 $ 4,485.00 03 $ 2.50000 $ 2,242.50 04 $ 9.79000 $ 8,781.63 05 $ 3.93000 $ 3,525.21 2 604E38500 MONUMENT ASSEMBLY 5.000 EACH AWD $ 500.00000 $ 2,500.00 02 $ 900.00000 $ 4,500.00 03 $ 300.00000 $ 1,500.00 04 $ 1,268.03000 $ 6,340.15 05 $ 590.60000 $ 2,953.00

S. 1 ROADWAY TOTALS AWD $ 5,191.00 02 $ 8,985.00 03 $ 3,742.50 04 $ 15,121.78 05 $ 6,478.21 3 251E01002 PRTL DEPTH PVMT REPAIR 250.000 CU YD AWD $ 120.00000 $ 30,000.00 02 $ 210.00000 $ 52,500.00 03 $ 140.00000 $ 35,000.00 04 $ 350.00000 $ 87,500.00 05 $ 265.38000 $ 66,345.00 4 254E01000 PAVEMENT PLANING, BITUMINOUS 8,103.000 SQ YD AWD $ 2.70000 $ 21,878.10 02 $ 2.00000 $ 16,206.00 03 $ 1.50000 $ 12,154.50 04 $ 3.33000 $ 26,982.99 05 $ 2.98000 $ 24,146.94 5 407E10000 TACK COAT 15,023.000 GALLON AWD $ 0.80000 $ 12,018.40 02 $ 1.00000 $ 15,023.00 03 $ 0.65000 $ 9,764.95 04 $ 0.79000 $ 11,868.17 05 $ 1.28000 $ 19,229.44

Page 162:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010025 PAGE NO. 161 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 6 407E14000 TACK COAT FOR INTERMEDIATE COURSE 4,553.000 GALLON AWD $ 0.80000 $ 3,642.40 02 $ 1.00000 $ 4,553.00 03 $ 0.65000 $ 2,959.45 04 $ 0.79000 $ 3,596.87 05 $ 1.56000 $ 7,102.68 7 448E46020 ASPH CONC INTERMEDIATE, TYPE 1, PG64-22 3,228.000 CU YD AWD $ 59.90000 $ 193,357.20 02 $ 53.00000 $ 171,084.00 03 $ 56.00000 $ 180,768.00 04 $ 57.90000 $ 186,901.20 05 $ 63.09000 $ 203,654.52 8 448E47020 ASPH CONC SURFACE, TYPE 1, PG64-22 6,947.000 CU YD AWD $ 59.90000 $ 416,125.30 02 $ 59.00000 $ 409,873.00 03 $ 65.00000 $ 451,555.00 04 $ 57.90000 $ 402,231.30 05 $ 62.79000 $ 436,202.13 9 617E10100 COMP AGGREGATE, TYPE A 1,747.000 CU YD AWD $ 20.80000 $ 36,337.60 02 $ 25.00000 $ 43,675.00 03 $ 31.00000 $ 54,157.00 04 $ 25.50000 $ 44,548.50 05 $ 27.27000 $ 47,640.69 10 617E25000 WATER 3.000 M GAL AWD $ 100.00000 $ 300.00 02 $ 40.00000 $ 120.00 03 $ 100.00000 $ 300.00 04 $ 10.00000 $ 30.00 05 $ 50.03000 $ 150.09

S. 2 PAVEMENT TOTALS AWD $ 713,659.00 02 $ 713,034.00 03 $ 746,658.90 04 $ 763,659.03 05 $ 804,471.49

Page 163:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010025 PAGE NO. 162 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 11 621E00200 RAISED PAVEMENT MARKER, INSTALL ONLY 942.000 EACH AWD $ 7.50000 $ 7,065.00 02 $ 6.70000 $ 6,311.40 03 $ 6.36000 $ 5,991.12 04 $ 7.50000 $ 7,065.00 05 $ 7.50000 $ 7,065.00 12 621E00300 PRISMATIC RETROREFLECTOR 942.000 EACH AWD $ 2.75000 $ 2,590.50 02 $ 3.70000 $ 3,485.40 03 $ 3.50000 $ 3,297.00 04 $ 2.75000 $ 2,590.50 05 $ 2.75000 $ 2,590.50 13 626E00100 BARRIER REFLECTOR, TYPE A 62.000 EACH AWD $ 6.00000 $ 372.00 02 $ 11.90000 $ 737.80 03 $ 5.00000 $ 310.00 04 $ 10.04000 $ 622.48 05 $ 10.25000 $ 635.50 14 642E00102 EDGE LINE, TYPE 2 25.960 MILE AWD $ 230.00000 $ 5,970.80 02 $ 265.00000 $ 6,879.40 03 $ 251.00000 $ 6,515.96 04 $ 230.00000 $ 5,970.80 05 $ 230.00000 $ 5,970.80 15 642E00302 CENTER LINE, TYPE 2 13.130 MILE AWD $ 425.00000 $ 5,580.25 02 $ 418.00000 $ 5,488.34 03 $ 396.00000 $ 5,199.48 04 $ 425.00000 $ 5,580.25 05 $ 425.00000 $ 5,580.25 16 644E00400 CHANNELIZING LINE 120.000 LIN FT AWD $ 1.65000 $ 198.00 02 $ 1.20000 $ 144.00 03 $ 1.15000 $ 138.00 04 $ 1.65000 $ 198.00 05 $ 1.65000 $ 198.00

Page 164:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010025 PAGE NO. 163 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 17 644E00500 STOP LINE 66.000 LIN FT AWD $ 4.65000 $ 306.90 02 $ 6.00000 $ 396.00 03 $ 5.65000 $ 372.90 04 $ 4.65000 $ 306.90 05 $ 4.65000 $ 306.90 18 644E00700 TRANSVERSE LINE 340.000 LIN FT AWD $ 4.40000 $ 1,496.00 02 $ 5.80000 $ 1,972.00 03 $ 5.50000 $ 1,870.00 04 $ 4.40000 $ 1,496.00 05 $ 4.40000 $ 1,496.00 19 644E01300 LANE ARROW 2.000 EACH AWD $ 95.00000 $ 190.00 02 $ 68.00000 $ 136.00 03 $ 64.00000 $ 128.00 04 $ 95.00000 $ 190.00 05 $ 95.00000 $ 190.00 20 644E01410 WORD ON PAVEMENT, 96" 1.000 EACH AWD $ 125.00000 $ 125.00 02 $ 89.00000 $ 89.00 03 $ 84.00000 $ 84.00 04 $ 125.00000 $ 125.00 05 $ 125.00000 $ 125.00

S. 3 TRAFFIC CONTROL TOTALS AWD $ 23,894.45 02 $ 25,639.34 03 $ 23,906.46 04 $ 24,144.93 05 $ 24,157.95 21 614E12460 WORK ZONE MARKING SIGN 72.000 EACH AWD $ 35.00000 $ 2,520.00 02 $ 105.00000 $ 7,560.00 03 $ 85.00000 $ 6,120.00 04 $ 81.63000 $ 5,877.36 05 $ 77.98000 $ 5,614.56

Page 165:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010025 PAGE NO. 164 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 22 614E21400 TEMP CL, CL II 18.950 MILE AWD $ 100.00000 $ 1,895.00 02 $ 220.00000 $ 4,169.00 03 $ 140.00000 $ 2,653.00 04 $ 221.36000 $ 4,194.77 05 $ 509.14000 $ 9,648.20

S. 4 MAINTENANCE OF TRAFFIC TOTALS AWD $ 4,415.00 02 $ 11,729.00 03 $ 8,773.00 04 $ 10,072.13 05 $ 15,262.76 23 516E31200 SAWING & SEALING BIT CONC JTS 352.000 LIN FT AWD $ 8.00000 $ 2,816.00 02 $ 5.00000 $ 1,760.00 03 $ 8.00000 $ 2,816.00 04 $ 15.82000 $ 5,568.64 05 $ 8.00000 $ 2,816.00 24 519E12200 PTCHNG CONC DECK-TYPE A 28.000 SQ YD AWD $ 280.00000 $ 7,840.00 02 $ 366.00000 $ 10,248.00 03 $ 150.00000 $ 4,200.00 04 $ 455.36000 $ 12,750.08 05 $ 245.00000 $ 6,860.00

S. 5 STRUCTURE TOTALS AWD $ 10,656.00 02 $ 12,008.00 03 $ 7,016.00 04 $ 18,318.72 05 $ 9,676.00 25 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 3,800.00000 $ 3,800.00 02 $ 3,400.00000 $ 3,400.00 03 $ 1,500.00000 $ 1,500.00 04 $ 1,365.00000 $ 1,365.00 05 $ 2,195.43000 $ 2,195.43

Page 166:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010025 PAGE NO. 165 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 26 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 34,375.00000 $ 34,375.00 02 $ 30,000.00000 $ 30,000.00 03 $ 19,355.76000 $ 19,355.76 04 $ 15,952.83000 $ 15,952.83 05 $ 19,685.05000 $ 19,685.05 27 623E10001 CONST LAYOUT STAKES, APP LUMP SUM AWD $ 3,000.00000 $ 3,000.00 02 $ 5,000.00000 $ 5,000.00 03 $ 1,900.00000 $ 1,900.00 04 $ 2,972.66000 $ 2,972.66 05 $ 4,929.80000 $ 4,929.80 28 624E10000 MOBILIZATION LUMP SUM AWD $ 5,000.00000 $ 5,000.00 02 $ 20,000.00000 $ 20,000.00 03 $ 20,000.00000 $ 20,000.00 04 $ 20,000.00000 $ 20,000.00 05 $ 40,000.00000 $ 40,000.00 29 806E16001 FIELD OFFICE, TYPE A, APP 3.000 MONTH AWD $ 500.00000 $ 1,500.00 02 $ 1,300.00000 $ 3,900.00 03 $ 1,800.00000 $ 5,400.00 04 $ 1,700.00000 $ 5,100.00 05 $ 1,908.12000 $ 5,724.36

S. 6 INCIDENTALS TOTALS AWD $ 47,675.00 02 $ 62,300.00 03 $ 48,155.76 04 $ 45,390.49 05 $ 72,534.64

TOTAL AMOUNT OF THE BID AWD $ 805,490.45 02 $ 833,695.34 03 $ 838,252.62 04 $ 876,707.08 05 $ 932,581.05

Page 167:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010026 PID. 19361 MAR-23-18.15 TE21-G000(650) TYPE: BRIDGE REPAIR LETTING: 01/24/01 COMPLETION DATE: 10/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: COMPLETE GENERAL CONSTRUCTION COMPANY AWARDED AMOUNT: $ 1,037,303.72 ENGINEERS ESTIMATE: $ 1,075,000.00 AWARDED BIDDER BIDDER 02 COMPLETE GENERAL CONSTRUCTION COMPANY RIGHTER COMPANY INC 1221 EAST FIFTH AVE 2424 HARRISON RD COLUMBUS ,OH 43219 COLUMBUS ,OH 43204 BIDDER 03 BIDDER 04 FORT DEFIANCE CONSTRUCTION & SUPPLY IN CRAWFORD CONSTRUCTION COMPANY INC 07622 SR 66 N 782 CHARLES ST DEFIANCE ,OH 43512 GALION ,OH 44833-0148 BIDDER 05 BIDDER 06 S E JOHNSON COMPANIES INC MAIDEN & JENKINS CONSTRUCTION COMPANY 1345 FORD ST 14820 KIMBERLY RD MAUMEE ,OH 43537 NELSONVILLE ,OH 45764 BIDDER 07 BIDDER 08 BECDIR CONSTRUCTION COMPANY MOSSER CONSTRUCTION INC 4990 MAHONING AVE 122 S WILSON AVE DRAWER D YOUNGSTOWN ,OH 44515 FREMONT ,OH 43420

Page 168:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 167 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E22900 APPROACH SLAB REM 267.000 SQ YD AWD $ 18.00000 $ 4,806.00 02 $ 21.01000 $ 5,609.67 03 $ 25.00000 $ 6,675.00 04 $ 14.93000 $ 3,986.31 05 $ 27.50000 $ 7,342.50 06 $ 17.00000 $ 4,539.00 07 $ 24.00000 $ 6,408.00 08 $ 25.00000 $ 6,675.00 09 $ 23.00000 $ 6,141.00 2 202E38000 GUARDRAIL REMOVED 814.000 LIN FT AWD $ 2.00000 $ 1,628.00 02 $ 2.00000 $ 1,628.00 03 $ 3.00000 $ 2,442.00 04 $ 1.00000 $ 814.00 05 $ 2.00000 $ 1,628.00 06 $ 2.00000 $ 1,628.00 07 $ 2.50000 $ 2,035.00 08 $ 1.00000 $ 814.00 09 $ 1.70000 $ 1,383.80 3 202E54100 RAISED PVMT MRK RMVD/STRG 9.000 EACH AWD $ 18.00000 $ 162.00 02 $ 18.57000 $ 167.13 03 $ 15.00000 $ 135.00 04 $ 3.95000 $ 35.55 05 $ 20.00000 $ 180.00 06 $ 10.00000 $ 90.00 07 $ 10.00000 $ 90.00 08 $ 50.00000 $ 450.00 09 $ 10.00000 $ 90.00 4 203E12000 EXCAVATION W/O EMBANKMENT 437.000 CU YD AWD $ 10.00000 $ 4,370.00 02 $ 28.33000 $ 12,380.21 03 $ 8.00000 $ 3,496.00 04 $ 11.96000 $ 5,226.52 05 $ 17.50000 $ 7,647.50 06 $ 10.00000 $ 4,370.00 07 $ 5.00000 $ 2,185.00 08 $ 8.00000 $ 3,496.00 09 $ 16.00000 $ 6,992.00

Page 169:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 168 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 5 203E20000 EMBANKMENT 34.000 CU YD AWD $ 27.00000 $ 918.00 02 $ 78.66000 $ 2,674.44 03 $ 6.00000 $ 204.00 04 $ 23.59000 $ 802.06 05 $ 15.00000 $ 510.00 06 $ 30.00000 $ 1,020.00 07 $ 8.75000 $ 297.50 08 $ 25.00000 $ 850.00 09 $ 16.00000 $ 544.00 6 203E50000 SUBGRADE COMPACTION 599.000 SQ YD AWD $ 3.00000 $ 1,797.00 02 $ 5.00000 $ 2,995.00 03 $ 7.50000 $ 4,492.50 04 $ 1.04000 $ 622.96 05 $ 2.00000 $ 1,198.00 06 $ 3.00000 $ 1,797.00 07 $ 2.25000 $ 1,347.75 08 $ 2.00000 $ 1,198.00 09 $ 1.20000 $ 718.80 7 606E13000 GUARDRAIL, TYPE 5 1,031.250 LIN FT AWD $ 9.00000 $ 9,281.25 02 $ 9.00000 $ 9,281.25 03 $ 10.05000 $ 10,364.06 04 $ 9.60000 $ 9,900.00 05 $ 9.00000 $ 9,281.25 06 $ 9.00000 $ 9,281.25 07 $ 9.50000 $ 9,796.88 08 $ 9.60000 $ 9,900.00 09 $ 9.60000 $ 9,900.00 8 606E22010 ANCHOR ASSEMBLY, TYPE E-98 4.000 EACH AWD $ 1,500.00000 $ 6,000.00 02 $ 1,500.00000 $ 6,000.00 03 $ 1,510.00000 $ 6,040.00 04 $ 1,660.00000 $ 6,640.00 05 $ 1,500.00000 $ 6,000.00 06 $ 1,500.00000 $ 6,000.00 07 $ 1,550.00000 $ 6,200.00 08 $ 1,660.00000 $ 6,640.00 09 $ 1,660.00000 $ 6,640.00

Page 170:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 169 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 9 606E35000 BRIDGE TERM. ASSY, TYPE 1 8.000 EACH AWD $ 890.00000 $ 7,120.00 02 $ 890.00000 $ 7,120.00 03 $ 880.00000 $ 7,040.00 04 $ 885.00000 $ 7,080.00 05 $ 890.00000 $ 7,120.00 06 $ 890.00000 $ 7,120.00 07 $ 925.00000 $ 7,400.00 08 $ 885.00000 $ 7,080.00 09 $ 885.00000 $ 7,080.00 10 660E20000 SODDING REINFORCED 186.000 SQ YD AWD $ 9.05000 $ 1,683.30 02 $ 9.05000 $ 1,683.30 03 $ 30.00000 $ 5,580.00 04 $ 9.05000 $ 1,683.30 05 $ 10.00000 $ 1,860.00 06 $ 9.00000 $ 1,674.00 07 $ 9.25000 $ 1,720.50 08 $ 9.05000 $ 1,683.30 09 $ 9.05000 $ 1,683.30

S. 1 ROADWAY TOTALS AWD $ 37,765.55 02 $ 49,539.00 03 $ 46,468.56 04 $ 36,790.70 05 $ 42,767.25 06 $ 37,519.25 07 $ 37,480.63 08 $ 38,786.30 09 $ 41,172.90 11 870E00100 SOIL ANALYSIS TEST 2.000 EACH AWD $ 50.00000 $ 100.00 02 $ 100.00000 $ 200.00 03 $ 40.00000 $ 80.00 04 $ 30.00000 $ 60.00 05 $ 300.00000 $ 600.00 06 $ 50.00000 $ 100.00 07 $ 45.00000 $ 90.00 08 $ 100.00000 $ 200.00 09 $ 100.00000 $ 200.00

Page 171:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 170 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 12 870E00200 PLACING TOPSOIL 105.000 CU YD AWD $ 40.00000 $ 4,200.00 02 $ 42.00000 $ 4,410.00 03 $ 42.00000 $ 4,410.00 04 $ 41.25000 $ 4,331.25 05 $ 42.00000 $ 4,410.00 06 $ 35.00000 $ 3,675.00 07 $ 40.00000 $ 4,200.00 08 $ 20.00000 $ 2,100.00 09 $ 30.00000 $ 3,150.00 13 870E10000 SEEDING AND MULCHING 1,877.000 SQ YD AWD $ 1.70000 $ 3,190.90 02 $ 1.73000 $ 3,247.21 03 $ 1.50000 $ 2,815.50 04 $ 1.70000 $ 3,190.90 05 $ 1.73000 $ 3,247.21 06 $ 1.00000 $ 1,877.00 07 $ 1.75000 $ 3,284.75 08 $ 1.70000 $ 3,190.90 09 $ 1.70000 $ 3,190.90 14 870E14000 REPAIR SEEDING AND MULCHING 94.000 SQ YD AWD $ 1.00000 $ 94.00 02 $ 1.50000 $ 141.00 03 $ 1.50000 $ 141.00 04 $ 1.00000 $ 94.00 05 $ 1.50000 $ 141.00 06 $ 0.75000 $ 70.50 07 $ 1.10000 $ 103.40 08 $ 1.00000 $ 94.00 09 $ 1.00000 $ 94.00 15 870E20000 COMMERCIAL FERTILIZER 0.300 TON AWD $ 378.00000 $ 113.40 02 $ 450.00000 $ 135.00 03 $ 350.00000 $ 105.00 04 $ 378.00000 $ 113.40 05 $ 450.00000 $ 135.00 06 $ 350.00000 $ 105.00 07 $ 300.00000 $ 90.00 08 $ 378.00000 $ 113.40 09 $ 378.00000 $ 113.40

Page 172:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 171 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 16 870E30000 AGRICULTURAL LIME 0.800 TON AWD $ 52.00000 $ 41.60 02 $ 125.00000 $ 100.00 03 $ 100.00000 $ 80.00 04 $ 52.00000 $ 41.60 05 $ 125.00000 $ 100.00 06 $ 150.00000 $ 120.00 07 $ 200.00000 $ 160.00 08 $ 52.00000 $ 41.60 09 $ 52.00000 $ 41.60 17 870E35000 WATER 12.000 M GAL AWD $ 1.50000 $ 18.00 02 $ 5.00000 $ 60.00 03 $ 10.00000 $ 120.00 04 $ 1.50000 $ 18.00 05 $ 5.00000 $ 60.00 06 $ 2.50000 $ 30.00 07 $ 2.00000 $ 24.00 08 $ 1.50000 $ 18.00 09 $ 1.50000 $ 18.00 18 877E10000 TEMPORARY SEEDING AND MULCHING 370.000 SQ YD AWD $ 0.24000 $ 88.80 02 $ 0.30000 $ 111.00 03 $ 2.00000 $ 740.00 04 $ 0.24000 $ 88.80 05 $ 0.30000 $ 111.00 06 $ 0.80000 $ 296.00 07 $ 0.90000 $ 333.00 08 $ 0.24000 $ 88.80 09 $ 0.24000 $ 88.80 19 877E30100 TEMPORARY PERIMETER FILTER FABRIC FENCE 1,790.000 LIN FT AWD $ 3.00000 $ 5,370.00 02 $ 0.73000 $ 1,306.70 03 $ 0.30000 $ 537.00 04 $ 1.72000 $ 3,078.80 05 $ 2.00000 $ 3,580.00 06 $ 1.85000 $ 3,311.50 07 $ 1.50000 $ 2,685.00 08 $ 1.75000 $ 3,132.50 09 $ 1.00000 $ 1,790.00

Page 173:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 172 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 20 877E30200 TEMP DITCH CHECK FILTER FABRIC FENCE 160.000 LIN FT AWD $ 3.00000 $ 480.00 02 $ 1.48000 $ 236.80 03 $ 0.30000 $ 48.00 04 $ 4.43000 $ 708.80 05 $ 5.00000 $ 800.00 06 $ 3.50000 $ 560.00 07 $ 3.50000 $ 560.00 08 $ 2.00000 $ 320.00 09 $ 1.00000 $ 160.00 21 877E30300 TEMP INLET PROT FILTER FABRIC FENCE 160.000 LIN FT AWD $ 3.00000 $ 480.00 02 $ 1.32000 $ 211.20 03 $ 0.30000 $ 48.00 04 $ 4.05000 $ 648.00 05 $ 5.00000 $ 800.00 06 $ 5.00000 $ 800.00 07 $ 2.00000 $ 320.00 08 $ 2.00000 $ 320.00 09 $ 1.00000 $ 160.00

S. 2 EROSION CONTROL TOTALS AWD $ 14,176.70 02 $ 10,158.91 03 $ 9,124.50 04 $ 12,373.55 05 $ 13,984.21 06 $ 10,945.00 07 $ 11,850.15 08 $ 9,619.20 09 $ 9,006.70 22 254E01000 PAVEMENT PLANING, BITUMINOUS 1,520.000 SQ YD AWD $ 7.50000 $ 11,400.00 02 $ 6.23000 $ 9,469.60 03 $ 5.25000 $ 7,980.00 04 $ 7.50000 $ 11,400.00 05 $ 5.25000 $ 7,980.00 06 $ 5.25000 $ 7,980.00 07 $ 5.50000 $ 8,360.00 08 $ 7.50000 $ 11,400.00 09 $ 7.50000 $ 11,400.00

Page 174:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 173 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 23 302E46000 BITUMINOUS AGGREGATE BASE, PG64-22 49.000 CU YD AWD $ 145.00000 $ 7,105.00 02 $ 140.00000 $ 6,860.00 03 $ 145.00000 $ 7,105.00 04 $ 100.00000 $ 4,900.00 05 $ 145.00000 $ 7,105.00 06 $ 145.00000 $ 7,105.00 07 $ 150.00000 $ 7,350.00 08 $ 100.00000 $ 4,900.00 09 $ 100.00000 $ 4,900.00 24 304E20000 AGGREGATE BASE 82.000 CU YD AWD $ 45.00000 $ 3,690.00 02 $ 98.35000 $ 8,064.70 03 $ 45.00000 $ 3,690.00 04 $ 25.58000 $ 2,097.56 05 $ 32.00000 $ 2,624.00 06 $ 35.00000 $ 2,870.00 07 $ 45.00000 $ 3,690.00 08 $ 50.00000 $ 4,100.00 09 $ 29.70000 $ 2,435.40 25 407E10000 TACK COAT 114.000 GALLON AWD $ 1.00000 $ 114.00 02 $ 1.00000 $ 114.00 03 $ 1.00000 $ 114.00 04 $ 0.65000 $ 74.10 05 $ 0.80000 $ 91.20 06 $ 1.00000 $ 114.00 07 $ 1.00000 $ 114.00 08 $ 0.65000 $ 74.10 09 $ 0.65000 $ 74.10 26 407E14000 TACK COAT FOR INTERMEDIATE COURSE 25.000 GALLON AWD $ 1.00000 $ 25.00 02 $ 1.00000 $ 25.00 03 $ 1.00000 $ 25.00 04 $ 0.65000 $ 16.25 05 $ 0.80000 $ 20.00 06 $ 1.00000 $ 25.00 07 $ 1.00000 $ 25.00 08 $ 0.65000 $ 16.25 09 $ 0.65000 $ 16.25

Page 175:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 174 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 27 408E10000 BITUMINOUS PRIME COAT 68.000 GALLON AWD $ 3.00000 $ 204.00 02 $ 1.00000 $ 68.00 03 $ 3.00000 $ 204.00 04 $ 0.90000 $ 61.20 05 $ 3.00000 $ 204.00 06 $ 3.00000 $ 204.00 07 $ 3.00000 $ 204.00 08 $ 0.90000 $ 61.20 09 $ 0.90000 $ 61.20 28 446E46040 ASPH CONC INTERMEDIATE, TYPE 2, PG64-28 8.000 CU YD AWD $ 300.00000 $ 2,400.00 02 $ 140.00000 $ 1,120.00 03 $ 300.00000 $ 2,400.00 04 $ 100.00000 $ 800.00 05 $ 300.00000 $ 2,400.00 06 $ 300.00000 $ 2,400.00 07 $ 310.00000 $ 2,480.00 08 $ 100.00000 $ 800.00 09 $ 100.00000 $ 800.00 29 446E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1H 71.000 CU YD AWD $ 135.00000 $ 9,585.00 02 $ 140.00000 $ 9,940.00 03 $ 135.00000 $ 9,585.00 04 $ 100.00000 $ 7,100.00 05 $ 135.00000 $ 9,585.00 06 $ 135.00000 $ 9,585.00 07 $ 140.00000 $ 9,940.00 08 $ 106.50000 $ 7,561.50 09 $ 106.50000 $ 7,561.50 30 611E25000 APPROACH SLAB (T=15") 433.000 SQ YD AWD $ 100.00000 $ 43,300.00 02 $ 137.96000 $ 59,736.68 03 $ 115.00000 $ 49,795.00 04 $ 109.22000 $ 47,292.26 05 $ 125.00000 $ 54,125.00 06 $ 115.00000 $ 49,795.00 07 $ 130.00000 $ 56,290.00 08 $ 114.00000 $ 49,362.00 09 $ 128.00000 $ 55,424.00

Page 176:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 175 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 31 830E26000 CURB, TYPE 6 12.000 LIN FT AWD $ 28.00000 $ 336.00 02 $ 45.00000 $ 540.00 03 $ 45.00000 $ 540.00 04 $ 72.00000 $ 864.00 05 $ 70.00000 $ 840.00 06 $ 25.00000 $ 300.00 07 $ 44.00000 $ 528.00 08 $ 45.00000 $ 540.00 09 $ 60.00000 $ 720.00

S. 3 PAVEMENT TOTALS AWD $ 78,159.00 02 $ 95,937.98 03 $ 81,438.00 04 $ 74,605.37 05 $ 84,974.20 06 $ 80,378.00 07 $ 88,981.00 08 $ 78,815.05 09 $ 83,392.45 32 621E00100 RAISED PAVEMENT MARKER 10.000 EACH AWD $ 60.00000 $ 600.00 02 $ 49.36000 $ 493.60 03 $ 49.36000 $ 493.60 04 $ 145.00000 $ 1,450.00 05 $ 50.00000 $ 500.00 06 $ 49.36000 $ 493.60 07 $ 50.00000 $ 500.00 08 $ 145.00000 $ 1,450.00 09 $ 145.00000 $ 1,450.00 33 626E00100 BARRIER REFLECTOR, TYPE A 17.000 EACH AWD $ 5.00000 $ 85.00 02 $ 5.00000 $ 85.00 03 $ 6.10000 $ 103.70 04 $ 5.00000 $ 85.00 05 $ 5.00000 $ 85.00 06 $ 5.00000 $ 85.00 07 $ 5.00000 $ 85.00 08 $ 4.20000 $ 71.40 09 $ 5.00000 $ 85.00

Page 177:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 176 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 34 626E00200 BARRIER REFLECTOR, TYPE B 5.000 EACH AWD $ 5.00000 $ 25.00 02 $ 5.00000 $ 25.00 03 $ 6.30000 $ 31.50 04 $ 4.20000 $ 21.00 05 $ 5.00000 $ 25.00 06 $ 5.00000 $ 25.00 07 $ 5.00000 $ 25.00 08 $ 15.00000 $ 75.00 09 $ 4.20000 $ 21.00 35 642E00102 EDGE LINE, TYPE 2 4.960 MILE AWD $ 510.00000 $ 2,529.60 02 $ 415.00000 $ 2,058.40 03 $ 415.00000 $ 2,058.40 04 $ 480.00000 $ 2,380.80 05 $ 415.00000 $ 2,058.40 06 $ 415.00000 $ 2,058.40 07 $ 500.00000 $ 2,480.00 08 $ 480.00000 $ 2,380.80 09 $ 480.00000 $ 2,380.80 36 642E00202 LANE LINE, TYPE 2 2.480 MILE AWD $ 369.00000 $ 915.12 02 $ 300.00000 $ 744.00 03 $ 300.00000 $ 744.00 04 $ 270.00000 $ 669.60 05 $ 300.00000 $ 744.00 06 $ 300.00000 $ 744.00 07 $ 300.00000 $ 744.00 08 $ 270.00000 $ 669.60 09 $ 270.00000 $ 669.60

S. 4 TRAFFIC CONTROL TOTALS AWD $ 4,154.72 02 $ 3,406.00 03 $ 3,431.20 04 $ 4,606.40 05 $ 3,412.40 06 $ 3,406.00 07 $ 3,834.00 08 $ 4,646.80 09 $ 4,606.40

Page 178:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 177 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 37 411E10000 STABILIZED CR AGG 94.000 CU YD AWD $ 30.00000 $ 2,820.00 02 $ 51.86000 $ 4,874.84 03 $ 48.00000 $ 4,512.00 04 $ 48.73000 $ 4,580.62 05 $ 30.00000 $ 2,820.00 06 $ 25.00000 $ 2,350.00 07 $ 50.00000 $ 4,700.00 08 $ 45.00000 $ 4,230.00 09 $ 40.00000 $ 3,760.00 38 614E11100 LEO WITH PATROL CAR 32.000 HOUR AWD $ 40.00000 $ 1,280.00 02 $ 40.00000 $ 1,280.00 03 $ 45.00000 $ 1,440.00 04 $ 39.05000 $ 1,249.60 05 $ 40.00000 $ 1,280.00 06 $ 40.00000 $ 1,280.00 07 $ 40.00000 $ 1,280.00 08 $ 45.00000 $ 1,440.00 09 $ 40.00000 $ 1,280.00 39 614E12200 TEMPORARY GUARDRAIL 387.500 LIN FT AWD $ 7.50000 $ 2,906.25 02 $ 7.50000 $ 2,906.25 03 $ 12.20000 $ 4,727.50 04 $ 16.40000 $ 6,355.00 05 $ 7.50000 $ 2,906.25 06 $ 7.50000 $ 2,906.25 07 $ 8.00000 $ 3,100.00 08 $ 16.40000 $ 6,355.00 09 $ 16.40000 $ 6,355.00 40 614E12500 REPLACEMENT SIGN 100.000 SQ FT AWD $ 16.00000 $ 1,600.00 02 $ 13.91000 $ 1,391.00 03 $ 12.00000 $ 1,200.00 04 $ 16.50000 $ 1,650.00 05 $ 12.00000 $ 1,200.00 06 $ 10.30000 $ 1,030.00 07 $ 7.00000 $ 700.00 08 $ 12.00000 $ 1,200.00 09 $ 10.00000 $ 1,000.00

Page 179:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 178 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 41 614E12600 REPLACEMENT DRUM 25.000 EACH AWD $ 65.00000 $ 1,625.00 02 $ 73.22000 $ 1,830.50 03 $ 55.00000 $ 1,375.00 04 $ 82.50000 $ 2,062.50 05 $ 65.00000 $ 1,625.00 06 $ 50.00000 $ 1,250.00 07 $ 60.00000 $ 1,500.00 08 $ 65.00000 $ 1,625.00 09 $ 60.00000 $ 1,500.00 42 614E12756 TEMP CROSSOVER LTG SYSTEM 2.000 EACH AWD $ 15,000.00000 $ 30,000.00 02 $ 20,000.00000 $ 40,000.00 03 $ 15,405.00000 $ 30,810.00 04 $ 25,900.00000 $ 51,800.00 05 $ 19,255.00000 $ 38,510.00 06 $ 25,000.00000 $ 50,000.00 07 $ 55,000.00000 $ 110,000.00 08 $ 24,000.00000 $ 48,000.00 09 $ 27,000.00000 $ 54,000.00 43 614E12800 TEMP RAISED PVMT MARKER 2,283.000 EACH AWD $ 3.00000 $ 6,849.00 02 $ 2.78000 $ 6,346.74 03 $ 2.40000 $ 5,479.20 04 $ 3.30000 $ 7,533.90 05 $ 1.35000 $ 3,082.05 06 $ 2.50000 $ 5,707.50 07 $ 3.50000 $ 7,990.50 08 $ 4.00000 $ 9,132.00 09 $ 2.20000 $ 5,022.60 44 614E13000 BIT CONC FOR MAINT TRAF 50.000 CU YD AWD $ 100.00000 $ 5,000.00 02 $ 50.00000 $ 2,500.00 03 $ 110.00000 $ 5,500.00 04 $ 16.50000 $ 825.00 05 $ 90.00000 $ 4,500.00 06 $ 85.00000 $ 4,250.00 07 $ 80.00000 $ 4,000.00 08 $ 100.00000 $ 5,000.00 09 $ 50.00000 $ 2,500.00

Page 180:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 179 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 45 614E13200 BARRIER REFL, TYPE A 71.000 EACH AWD $ 7.00000 $ 497.00 02 $ 3.75000 $ 266.25 03 $ 3.75000 $ 266.25 04 $ 3.75000 $ 266.25 05 $ 2.35000 $ 166.85 06 $ 5.00000 $ 355.00 07 $ 6.00000 $ 426.00 08 $ 3.75000 $ 266.25 09 $ 3.50000 $ 248.50 46 614E13300 BARRIER REFL, TYPE B 519.000 EACH AWD $ 7.00000 $ 3,633.00 02 $ 3.75000 $ 1,946.25 03 $ 3.00000 $ 1,557.00 04 $ 3.75000 $ 1,946.25 05 $ 2.35000 $ 1,219.65 06 $ 4.75000 $ 2,465.25 07 $ 5.50000 $ 2,854.50 08 $ 3.75000 $ 1,946.25 09 $ 3.50000 $ 1,816.50 47 614E13350 OBJECT MARKER 10.000 EACH AWD $ 12.00000 $ 120.00 02 $ 7.95000 $ 79.50 03 $ 7.95000 $ 79.50 04 $ 7.95000 $ 79.50 05 $ 14.50000 $ 145.00 06 $ 13.00000 $ 130.00 07 $ 13.00000 $ 130.00 08 $ 7.95000 $ 79.50 09 $ 10.00000 $ 100.00 48 614E18601 PORTABLE CHNGBL MESSG SIGN, APP 18.000 SIGN MNTH AWD $ 700.00000 $ 12,600.00 02 $ 2,864.59000 $ 51,562.62 03 $ 1,500.00000 $ 27,000.00 04 $ 2,255.00000 $ 40,590.00 05 $ 1,100.00000 $ 19,800.00 06 $ 2,000.00000 $ 36,000.00 07 $ 1,200.00000 $ 21,600.00 08 $ 2,000.00000 $ 36,000.00 09 $ 2,200.00000 $ 39,600.00

Page 181:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 180 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 49 614E20400 TEMP LANE LINE, CL II 1.140 MILE AWD $ 500.00000 $ 570.00 02 $ 5,745.23000 $ 6,549.56 03 $ 270.00000 $ 307.80 04 $ 270.00000 $ 307.80 05 $ 1,350.00000 $ 1,539.00 06 $ 1,000.00000 $ 1,140.00 07 $ 285.00000 $ 324.90 08 $ 270.00000 $ 307.80 09 $ 270.00000 $ 307.80 50 614E22000 TEMP EDGE LINE, CLASS I 1.180 MILE AWD $ 3,000.00000 $ 3,540.00 02 $ 5,595.82000 $ 6,603.07 03 $ 750.00000 $ 885.00 04 $ 750.00000 $ 885.00 05 $ 1,350.00000 $ 1,593.00 06 $ 1,000.00000 $ 1,180.00 07 $ 775.00000 $ 914.50 08 $ 750.00000 $ 885.00 09 $ 750.00000 $ 885.00 51 614E22200 TEMP EDGE LINE, CL I,740.06, TYPE I 3.570 MILE AWD $ 4,500.00000 $ 16,065.00 02 $ 5,432.06000 $ 19,392.45 03 $ 4,800.00000 $ 17,136.00 04 $ 6,000.00000 $ 21,420.00 05 $ 4,911.00000 $ 17,532.27 06 $ 5,750.00000 $ 20,527.50 07 $ 6,200.00000 $ 22,134.00 08 $ 4,500.00000 $ 16,065.00 09 $ 6,000.00000 $ 21,420.00 52 615E10000 TEMPORARY ROAD LUMP SUM AWD $ 37,000.00000 $ 37,000.00 02 $ 30,378.27000 $ 30,378.27 03 $ 29,000.00000 $ 29,000.00 04 $ 29,000.00000 $ 29,000.00 05 $ 41,000.00000 $ 41,000.00 06 $ 20,000.00000 $ 20,000.00 07 $ 53,000.00000 $ 53,000.00 08 $ 65,000.00000 $ 65,000.00 09 $ 70,000.00000 $ 70,000.00

Page 182:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 181 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 53 615E20000 TEMP PAVEMENT, CLASS A 2,360.000 SQ YD AWD $ 23.15000 $ 54,634.00 02 $ 24.00000 $ 56,640.00 03 $ 18.50000 $ 43,660.00 04 $ 33.00000 $ 77,880.00 05 $ 23.15000 $ 54,634.00 06 $ 35.00000 $ 82,600.00 07 $ 30.00000 $ 70,800.00 08 $ 30.00000 $ 70,800.00 09 $ 24.00000 $ 56,640.00 54 622E40020 PORTABLE CONC BARRIER, 32" 490.000 LIN FT AWD $ 15.00000 $ 7,350.00 02 $ 14.34000 $ 7,026.60 03 $ 9.00000 $ 4,410.00 04 $ 10.95000 $ 5,365.50 05 $ 10.95000 $ 5,365.50 06 $ 12.00000 $ 5,880.00 07 $ 14.00000 $ 6,860.00 08 $ 10.95000 $ 5,365.50 09 $ 12.25000 $ 6,002.50 55 622E40021 PORTABLE CONC BARRIER,32",APP 20.000 LIN FT AWD $ 110.00000 $ 2,200.00 02 $ 10.95000 $ 219.00 03 $ 25.00000 $ 500.00 04 $ 10.95000 $ 219.00 05 $ 55.95000 $ 1,119.00 06 $ 70.00000 $ 1,400.00 07 $ 50.00000 $ 1,000.00 08 $ 10.95000 $ 219.00 09 $ 12.25000 $ 245.00 56 622E40030 PORTABLE CONC BARRIER, 50" 6,404.000 LIN FT AWD $ 9.00000 $ 57,636.00 02 $ 11.25000 $ 72,045.00 03 $ 9.00000 $ 57,636.00 04 $ 11.25000 $ 72,045.00 05 $ 11.25000 $ 72,045.00 06 $ 15.00000 $ 96,060.00 07 $ 11.50000 $ 73,646.00 08 $ 11.25000 $ 72,045.00 09 $ 21.00000 $ 134,484.00

Page 183:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 182 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S. 5 MAINTENANCE OF TRAFFIC TOTALS AWD $ 247,925.25 02 $ 313,837.90 03 $ 237,481.25 04 $ 326,060.92 05 $ 272,082.57 06 $ 336,511.50 07 $ 386,960.40 08 $ 345,961.30 09 $ 407,166.90 57 202E11203 PORT OF STR REM, >20', APP LUMP SUM AWD $ 35,000.00000 $ 35,000.00 02 $ 25,000.00000 $ 25,000.00 03 $ 46,250.00000 $ 46,250.00 04 $ 83,378.00000 $ 83,378.00 05 $ 43,000.00000 $ 43,000.00 06 $ 60,119.11000 $ 60,119.11 07 $ 45,000.00000 $ 45,000.00 08 $ 112,000.00000 $ 112,000.00 09 $ 72,000.00000 $ 72,000.00 58 503E21301 UNCLASSIFIED EXC, APP LUMP SUM AWD $ 4,500.00000 $ 4,500.00 02 $ 1,412.39000 $ 1,412.39 03 $ 5,000.00000 $ 5,000.00 04 $ 5,146.86000 $ 5,146.86 05 $ 8,000.00000 $ 8,000.00 06 $ 3,000.00000 $ 3,000.00 07 $ 5,000.00000 $ 5,000.00 08 $ 25,000.00000 $ 25,000.00 09 $ 6,000.00000 $ 6,000.00 59 505E11100 PILE DRIVING EQUIP. MOBIL. LUMP SUM AWD $ 8,000.00000 $ 8,000.00 02 $ 4,593.30000 $ 4,593.30 03 $ 4,500.00000 $ 4,500.00 04 $ 2,844.51000 $ 2,844.51 05 $ 10,000.00000 $ 10,000.00 06 $ 8,500.00000 $ 8,500.00 07 $ 10,000.00000 $ 10,000.00 08 $ 25,000.00000 $ 25,000.00 09 $ 6,000.00000 $ 6,000.00

Page 184:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 183 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 60 507E00100 STEEL PILES HP10X42, FURNISHED 168.000 LIN FT AWD $ 17.00000 $ 2,856.00 02 $ 18.28000 $ 3,071.04 03 $ 20.00000 $ 3,360.00 04 $ 12.89000 $ 2,165.52 05 $ 30.00000 $ 5,040.00 06 $ 20.00000 $ 3,360.00 07 $ 42.00000 $ 7,056.00 08 $ 15.00000 $ 2,520.00 09 $ 17.00000 $ 2,856.00 61 507E00150 STEEL PILES HP10X42, DRIVEN 168.000 LIN FT AWD $ 15.00000 $ 2,520.00 02 $ 14.00000 $ 2,352.00 03 $ 9.50000 $ 1,596.00 04 $ 22.54000 $ 3,786.72 05 $ 25.00000 $ 4,200.00 06 $ 12.00000 $ 2,016.00 07 $ 3.00000 $ 504.00 08 $ 10.00000 $ 1,680.00 09 $ 16.00000 $ 2,688.00 62 507E50500 STEEL PILE SPLICES 4.000 EACH AWD $ 100.00000 $ 400.00 02 $ 36.61000 $ 146.44 03 $ 20.00000 $ 80.00 04 $ 10.13000 $ 40.52 05 $ 70.00000 $ 280.00 06 $ 85.00000 $ 340.00 07 $ 100.00000 $ 400.00 08 $ 1.00000 $ 4.00 09 $ 10.00000 $ 40.00 63 512E67200 WATERPROOFING, MISC. SEMI-INTEGRAL ABUTMENT JOINT WATERPROOFING 31.000 SQ YD AWD $ 88.00000 $ 2,728.00 02 $ 91.06000 $ 2,822.86 03 $ 9.00000 $ 279.00 04 $ 59.13000 $ 1,833.03 05 $ 100.00000 $ 3,100.00 06 $ 80.00000 $ 2,480.00 07 $ 100.00000 $ 3,100.00 08 $ 100.00000 $ 3,100.00 09 $ 85.00000 $ 2,635.00

Page 185:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 184 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 64 512E67510 SLG OF CONC SURF (EPOXY-URETHANE) 421.000 SQ YD AWD $ 9.25000 $ 3,894.25 02 $ 11.00000 $ 4,631.00 03 $ 9.00000 $ 3,789.00 04 $ 11.07000 $ 4,660.47 05 $ 12.00000 $ 5,052.00 06 $ 9.00000 $ 3,789.00 07 $ 10.00000 $ 4,210.00 08 $ 7.00000 $ 2,947.00 09 $ 11.50000 $ 4,841.50 65 516E13900 2" PREFORMED EXP JT FILLER 63.000 SQ FT AWD $ 8.00000 $ 504.00 02 $ 4.59000 $ 289.17 03 $ 5.00000 $ 315.00 04 $ 5.92000 $ 372.96 05 $ 5.00000 $ 315.00 06 $ 6.00000 $ 378.00 07 $ 6.25000 $ 393.75 08 $ 2.00000 $ 126.00 09 $ 6.00000 $ 378.00 66 516E45305 REFURBISH BRNG DEVICE, APP 10.000 EACH AWD $ 275.00000 $ 2,750.00 02 $ 141.19000 $ 1,411.90 03 $ 350.00000 $ 3,500.00 04 $ 275.00000 $ 2,750.00 05 $ 500.00000 $ 5,000.00 06 $ 350.00000 $ 3,500.00 07 $ 360.00000 $ 3,600.00 08 $ 600.00000 $ 6,000.00 09 $ 450.00000 $ 4,500.00 67 516E47001 JACKING/TEMP SUPP, APP LUMP SUM AWD $ 6,750.00000 $ 6,750.00 02 $ 3,500.00000 $ 3,500.00 03 $ 2,000.00000 $ 2,000.00 04 $ 6,750.00000 $ 6,750.00 05 $ 5,000.00000 $ 5,000.00 06 $ 2,000.00000 $ 2,000.00 07 $ 2,200.00000 $ 2,200.00 08 $ 7,000.00000 $ 7,000.00 09 $ 10,000.00000 $ 10,000.00

Page 186:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 185 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 68 518E21200 POROUS BACKFILL W/FILT FABRIC 63.000 CU YD AWD $ 34.00000 $ 2,142.00 02 $ 44.57000 $ 2,807.91 03 $ 52.00000 $ 3,276.00 04 $ 63.96000 $ 4,029.48 05 $ 50.00000 $ 3,150.00 06 $ 35.00000 $ 2,205.00 07 $ 60.00000 $ 3,780.00 08 $ 55.00000 $ 3,465.00 09 $ 46.00000 $ 2,898.00 69 518E40000 6" PERF CORR. PLASTIC PIPE 119.000 LIN FT AWD $ 8.00000 $ 952.00 02 $ 5.51000 $ 655.69 03 $ 6.00000 $ 714.00 04 $ 3.13000 $ 372.47 05 $ 8.00000 $ 952.00 06 $ 5.25000 $ 624.75 07 $ 2.75000 $ 327.25 08 $ 4.00000 $ 476.00 09 $ 4.00000 $ 476.00 70 518E40010 6" NON-PERF CORR PLASTIC PIPE 43.000 LIN FT AWD $ 10.00000 $ 430.00 02 $ 5.50000 $ 236.50 03 $ 6.00000 $ 258.00 04 $ 5.99000 $ 257.57 05 $ 8.00000 $ 344.00 06 $ 6.50000 $ 279.50 07 $ 4.50000 $ 193.50 08 $ 4.00000 $ 172.00 09 $ 4.00000 $ 172.00 71 601E20500 CR AGG SLOPE PROT 29.000 CU YD AWD $ 27.00000 $ 783.00 02 $ 94.55000 $ 2,741.95 03 $ 45.00000 $ 1,305.00 04 $ 0.69200 $ 20.07 05 $ 80.00000 $ 2,320.00 06 $ 55.00000 $ 1,595.00 07 $ 60.00000 $ 1,740.00 08 $ 60.00000 $ 1,740.00 09 $ 48.00000 $ 1,392.00

Page 187:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 186 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 72 815E00504 GRINDING FINS, TEARS, SLIVERS 25.000 MAN HOUR AWD $ 52.00000 $ 1,300.00 02 $ 45.00000 $ 1,125.00 03 $ 50.00000 $ 1,250.00 04 $ 50.00000 $ 1,250.00 05 $ 50.00000 $ 1,250.00 06 $ 50.00000 $ 1,250.00 07 $ 45.00000 $ 1,125.00 08 $ 25.00000 $ 625.00 09 $ 55.00000 $ 1,375.00 73 841E10000 TREATING OF CONCRETE SURFACES WITH SRS 835.000 SQ YD AWD $ 7.00000 $ 5,845.00 02 $ 4.32000 $ 3,607.20 03 $ 7.00000 $ 5,845.00 04 $ 5.01000 $ 4,183.35 05 $ 5.00000 $ 4,175.00 06 $ 5.00000 $ 4,175.00 07 $ 6.50000 $ 5,427.50 08 $ 3.00000 $ 2,505.00 09 $ 8.00000 $ 6,680.00 74 842E44100 CLASS C CONCRETE, W/O FTNG 37.000 CU YD AWD $ 340.00000 $ 12,580.00 02 $ 507.17000 $ 18,765.29 03 $ 320.00000 $ 11,840.00 04 $ 323.79000 $ 11,980.23 05 $ 400.00000 $ 14,800.00 06 $ 530.00000 $ 19,610.00 07 $ 500.00000 $ 18,500.00 08 $ 230.00000 $ 8,510.00 09 $ 460.00000 $ 17,020.00 75 842E46500 CLASS C CONCRETE, FOOTING 23.000 CU YD AWD $ 270.00000 $ 6,210.00 02 $ 235.49000 $ 5,416.27 03 $ 300.00000 $ 6,900.00 04 $ 350.64000 $ 8,064.72 05 $ 350.00000 $ 8,050.00 06 $ 530.00000 $ 12,190.00 07 $ 275.00000 $ 6,325.00 08 $ 200.00000 $ 4,600.00 09 $ 250.00000 $ 5,750.00

Page 188:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 187 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 76 844E48000 HIGH PERFORMANCE CONCRETE SPSTRC (DECK) 164.000 CU YD AWD $ 550.00000 $ 90,200.00 02 $ 600.00000 $ 98,400.00 03 $ 740.00000 $ 121,360.00 04 $ 470.15000 $ 77,104.60 05 $ 620.00000 $ 101,680.00 06 $ 560.00000 $ 91,840.00 07 $ 600.00000 $ 98,400.00 08 $ 450.00000 $ 73,800.00 09 $ 700.00000 $ 114,800.00 77 844E48020 HIGH PERF CONCRETE SPSTRC (PARAPET) 41.000 CU YD AWD $ 260.00000 $ 10,660.00 02 $ 550.00000 $ 22,550.00 03 $ 550.00000 $ 22,550.00 04 $ 423.11000 $ 17,347.51 05 $ 550.00000 $ 22,550.00 06 $ 530.00000 $ 21,730.00 07 $ 525.00000 $ 21,525.00 08 $ 330.00000 $ 13,530.00 09 $ 890.00000 $ 36,490.00 78 844E48040 HIGH PERFORMANCE CONCRETE SUBSTRUCTURE 30.000 CU YD AWD $ 250.00000 $ 7,500.00 02 $ 421.79000 $ 12,653.70 03 $ 480.00000 $ 14,400.00 04 $ 404.63000 $ 12,138.90 05 $ 500.00000 $ 15,000.00 06 $ 530.00000 $ 15,900.00 07 $ 600.00000 $ 18,000.00 08 $ 340.00000 $ 10,200.00 09 $ 370.00000 $ 11,100.00 79 844E49000 HIGH PERFORMANCE CONCRETE TRIAL MIX LUMP SUM AWD $ 1,000.00000 $ 1,000.00 02 $ 1,601.79000 $ 1,601.79 03 $ 1,300.00000 $ 1,300.00 04 $ 485.10000 $ 485.10 05 $ 1,024.11000 $ 1,024.11 06 $ 1,000.00000 $ 1,000.00 07 $ 500.00000 $ 500.00 08 $ 500.00000 $ 500.00 09 $ 1,000.00000 $ 1,000.00

Page 189:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 188 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 80 844E49010 HIGH PERFORMANCE CONCRETE TESTING LUMP SUM AWD $ 3,800.00000 $ 3,800.00 02 $ 3,800.00000 $ 3,800.00 03 $ 6,400.00000 $ 6,400.00 04 $ 4,180.00000 $ 4,180.00 05 $ 2,000.00000 $ 2,000.00 06 $ 3,800.00000 $ 3,800.00 07 $ 1,000.00000 $ 1,000.00 08 $ 2,500.00000 $ 2,500.00 09 $ 4,000.00000 $ 4,000.00 81 863E20000 WELDED STUD SHEAR CONNECTORS 2,145.000 EACH AWD $ 1.60000 $ 3,432.00 02 $ 1.60000 $ 3,432.00 03 $ 2.90000 $ 6,220.50 04 $ 1.60000 $ 3,432.00 05 $ 2.50000 $ 5,362.50 06 $ 2.25000 $ 4,826.25 07 $ 3.00000 $ 6,435.00 08 $ 1.50000 $ 3,217.50 09 $ 1.60000 $ 3,432.00 82 885E10000 SURFACE PREP OF EX STEEL W/WARRANTY LUMP SUM AWD $ 36,000.00000 $ 36,000.00 02 $ 34,500.00000 $ 34,500.00 03 $ 34,500.00000 $ 34,500.00 04 $ 20,500.00000 $ 20,500.00 05 $ 36,400.00000 $ 36,400.00 06 $ 34,500.00000 $ 34,500.00 07 $ 25,000.00000 $ 25,000.00 08 $ 30,000.00000 $ 30,000.00 09 $ 69,600.00000 $ 69,600.00 83 885E11000 PAINTING, EXST STEEL, PRIME, W/WARRANTY LUMP SUM AWD $ 10,275.00000 $ 10,275.00 02 $ 10,000.00000 $ 10,000.00 03 $ 10,000.00000 $ 10,000.00 04 $ 11,000.00000 $ 11,000.00 05 $ 10,000.00000 $ 10,000.00 06 $ 10,000.00000 $ 10,000.00 07 $ 7,000.00000 $ 7,000.00 08 $ 5,000.00000 $ 5,000.00 09 $ 8,700.00000 $ 8,700.00

Page 190:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 189 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 84 885E12000 FLD PNTG EX., INTERMEDIATE W/WARRANTY LUMP SUM AWD $ 10,275.00000 $ 10,275.00 02 $ 10,000.00000 $ 10,000.00 03 $ 10,000.00000 $ 10,000.00 04 $ 11,000.00000 $ 11,000.00 05 $ 10,000.00000 $ 10,000.00 06 $ 10,000.00000 $ 10,000.00 07 $ 7,000.00000 $ 7,000.00 08 $ 5,000.00000 $ 5,000.00 09 $ 8,700.00000 $ 8,700.00 85 885E13000 FLD PNTG EXST, FINISH, W/WARRANTY LUMP SUM AWD $ 10,275.00000 $ 10,275.00 02 $ 10,000.00000 $ 10,000.00 03 $ 10,000.00000 $ 10,000.00 04 $ 11,000.00000 $ 11,000.00 05 $ 10,000.00000 $ 10,000.00 06 $ 10,000.00000 $ 10,000.00 07 $ 7,000.00000 $ 7,000.00 08 $ 5,000.00000 $ 5,000.00 09 $ 8,700.00000 $ 8,700.00

S. 6 STRUCTURE REPAIR TOTALS AWD $ 283,561.25 02 $ 291,523.40 03 $ 338,787.50 04 $ 312,074.59 05 $ 338,044.61 06 $ 335,007.61 07 $ 310,742.00 08 $ 356,217.50 09 $ 414,223.50 86 202E11203 PORT OF STR REM, >20', APP LUMP SUM AWD $ 35,000.00000 $ 35,000.00 02 $ 25,000.00000 $ 25,000.00 03 $ 46,250.00000 $ 46,250.00 04 $ 83,378.00000 $ 83,378.00 05 $ 43,000.00000 $ 43,000.00 06 $ 50,118.07000 $ 50,118.07 07 $ 45,000.00000 $ 45,000.00 08 $ 112,000.00000 $ 112,000.00 09 $ 72,000.00000 $ 72,000.00

Page 191:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 190 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 87 503E21301 UNCLASSIFIED EXC, APP LUMP SUM AWD $ 4,500.00000 $ 4,500.00 02 $ 1,412.39000 $ 1,412.39 03 $ 5,000.00000 $ 5,000.00 04 $ 5,146.86000 $ 5,146.86 05 $ 8,000.00000 $ 8,000.00 06 $ 3,000.00000 $ 3,000.00 07 $ 5,000.00000 $ 5,000.00 08 $ 25,000.00000 $ 25,000.00 09 $ 6,000.00000 $ 6,000.00 88 505E11100 PILE DRIVING EQUIP. MOBIL. LUMP SUM AWD $ 8,000.00000 $ 8,000.00 02 $ 5,000.00000 $ 5,000.00 03 $ 4,500.00000 $ 4,500.00 04 $ 2,844.51000 $ 2,844.51 05 $ 10,000.00000 $ 10,000.00 06 $ 6,500.00000 $ 6,500.00 07 $ 10,000.00000 $ 10,000.00 08 $ 25,000.00000 $ 25,000.00 09 $ 6,000.00000 $ 6,000.00 89 507E00100 STEEL PILES HP10X42, FURNISHED 168.000 LIN FT AWD $ 17.00000 $ 2,856.00 02 $ 18.28000 $ 3,071.04 03 $ 20.00000 $ 3,360.00 04 $ 12.89000 $ 2,165.52 05 $ 30.00000 $ 5,040.00 06 $ 20.00000 $ 3,360.00 07 $ 42.00000 $ 7,056.00 08 $ 15.00000 $ 2,520.00 09 $ 17.00000 $ 2,856.00 90 507E00150 STEEL PILES HP10X42, DRIVEN 168.000 LIN FT AWD $ 15.00000 $ 2,520.00 02 $ 20.67000 $ 3,472.56 03 $ 9.50000 $ 1,596.00 04 $ 22.54000 $ 3,786.72 05 $ 25.00000 $ 4,200.00 06 $ 12.00000 $ 2,016.00 07 $ 3.00000 $ 504.00 08 $ 10.00000 $ 1,680.00 09 $ 16.00000 $ 2,688.00

Page 192:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 191 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 91 507E50500 STEEL PILE SPLICES 4.000 EACH AWD $ 100.00000 $ 400.00 02 $ 36.61000 $ 146.44 03 $ 20.00000 $ 80.00 04 $ 10.13000 $ 40.52 05 $ 70.00000 $ 280.00 06 $ 85.00000 $ 340.00 07 $ 100.00000 $ 400.00 08 $ 1.00000 $ 4.00 09 $ 10.00000 $ 40.00 92 512E67200 WATERPROOFING, MISC. SEMI-INTEGRAL ABUTMENT JOINT WATERPROOFING 31.000 SQ YD AWD $ 88.00000 $ 2,728.00 02 $ 91.06000 $ 2,822.86 03 $ 9.00000 $ 279.00 04 $ 59.13000 $ 1,833.03 05 $ 100.00000 $ 3,100.00 06 $ 80.00000 $ 2,480.00 07 $ 100.00000 $ 3,100.00 08 $ 100.00000 $ 3,100.00 09 $ 85.00000 $ 2,635.00 93 512E67510 SLG OF CONC SURF (EPOXY-URETHANE) 421.000 SQ YD AWD $ 9.25000 $ 3,894.25 02 $ 11.00000 $ 4,631.00 03 $ 9.00000 $ 3,789.00 04 $ 11.07000 $ 4,660.47 05 $ 12.00000 $ 5,052.00 06 $ 9.00000 $ 3,789.00 07 $ 10.00000 $ 4,210.00 08 $ 7.00000 $ 2,947.00 09 $ 11.50000 $ 4,841.50 94 516E13900 2" PREFORMED EXP JT FILLER 63.000 SQ FT AWD $ 8.00000 $ 504.00 02 $ 4.59000 $ 289.17 03 $ 5.00000 $ 315.00 04 $ 5.92000 $ 372.96 05 $ 5.00000 $ 315.00 06 $ 6.00000 $ 378.00 07 $ 6.25000 $ 393.75 08 $ 2.00000 $ 126.00 09 $ 6.00000 $ 378.00

Page 193:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 192 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 95 516E45305 REFURBISH BRNG DEVICE, APP 10.000 EACH AWD $ 275.00000 $ 2,750.00 02 $ 141.19000 $ 1,411.90 03 $ 350.00000 $ 3,500.00 04 $ 275.00000 $ 2,750.00 05 $ 500.00000 $ 5,000.00 06 $ 350.00000 $ 3,500.00 07 $ 360.00000 $ 3,600.00 08 $ 600.00000 $ 6,000.00 09 $ 450.00000 $ 4,500.00 96 516E47001 JACKING/TEMP SUPP, APP LUMP SUM AWD $ 6,750.00000 $ 6,750.00 02 $ 3,500.00000 $ 3,500.00 03 $ 2,000.00000 $ 2,000.00 04 $ 6,750.00000 $ 6,750.00 05 $ 5,000.00000 $ 5,000.00 06 $ 2,000.00000 $ 2,000.00 07 $ 2,200.00000 $ 2,200.00 08 $ 7,000.00000 $ 7,000.00 09 $ 10,000.00000 $ 10,000.00 97 518E21200 POROUS BACKFILL W/FILT FABRIC 63.000 CU YD AWD $ 34.00000 $ 2,142.00 02 $ 44.57000 $ 2,807.91 03 $ 52.00000 $ 3,276.00 04 $ 44.26000 $ 2,788.38 05 $ 50.00000 $ 3,150.00 06 $ 35.00000 $ 2,205.00 07 $ 60.00000 $ 3,780.00 08 $ 55.00000 $ 3,465.00 09 $ 46.00000 $ 2,898.00 98 518E40000 6" PERF CORR. PLASTIC PIPE 119.000 LIN FT AWD $ 8.00000 $ 952.00 02 $ 5.51000 $ 655.69 03 $ 6.00000 $ 714.00 04 $ 3.13000 $ 372.47 05 $ 8.00000 $ 952.00 06 $ 5.25000 $ 624.75 07 $ 2.75000 $ 327.25 08 $ 4.00000 $ 476.00 09 $ 4.00000 $ 476.00

Page 194:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 193 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 99 518E40010 6" NON-PERF CORR PLASTIC PIPE 43.000 LIN FT AWD $ 10.00000 $ 430.00 02 $ 5.50000 $ 236.50 03 $ 6.00000 $ 258.00 04 $ 5.99000 $ 257.57 05 $ 8.00000 $ 344.00 06 $ 6.50000 $ 279.50 07 $ 4.50000 $ 193.50 08 $ 4.00000 $ 172.00 09 $ 4.00000 $ 172.00 100 601E20500 CR AGG SLOPE PROT 29.000 CU YD AWD $ 27.00000 $ 783.00 02 $ 94.55000 $ 2,741.95 03 $ 45.00000 $ 1,305.00 04 $ 53.84000 $ 1,561.36 05 $ 80.00000 $ 2,320.00 06 $ 55.00000 $ 1,595.00 07 $ 60.00000 $ 1,740.00 08 $ 60.00000 $ 1,740.00 09 $ 48.00000 $ 1,392.00 101 815E00504 GRINDING FINS, TEARS, SLIVERS 25.000 MAN HOUR AWD $ 52.00000 $ 1,300.00 02 $ 45.00000 $ 1,125.00 03 $ 50.00000 $ 1,250.00 04 $ 50.00000 $ 1,250.00 05 $ 50.00000 $ 1,250.00 06 $ 50.00000 $ 1,250.00 07 $ 45.00000 $ 1,125.00 08 $ 25.00000 $ 625.00 09 $ 55.00000 $ 1,375.00 102 841E10000 TREATING OF CONCRETE SURFACES WITH SRS 835.000 SQ YD AWD $ 7.00000 $ 5,845.00 02 $ 4.32000 $ 3,607.20 03 $ 7.00000 $ 5,845.00 04 $ 4.53000 $ 3,782.55 05 $ 5.00000 $ 4,175.00 06 $ 5.00000 $ 4,175.00 07 $ 6.50000 $ 5,427.50 08 $ 3.00000 $ 2,505.00 09 $ 8.00000 $ 6,680.00

Page 195:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 194 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 103 842E44100 CLASS C CONCRETE, W/O FTNG 37.000 CU YD AWD $ 340.00000 $ 12,580.00 02 $ 507.17000 $ 18,765.29 03 $ 320.00000 $ 11,840.00 04 $ 322.60000 $ 11,936.20 05 $ 400.00000 $ 14,800.00 06 $ 520.00000 $ 19,240.00 07 $ 500.00000 $ 18,500.00 08 $ 230.00000 $ 8,510.00 09 $ 460.00000 $ 17,020.00 104 842E46500 CLASS C CONCRETE, FOOTING 23.000 CU YD AWD $ 270.00000 $ 6,210.00 02 $ 235.49000 $ 5,416.27 03 $ 300.00000 $ 6,900.00 04 $ 384.01000 $ 8,832.23 05 $ 350.00000 $ 8,050.00 06 $ 520.00000 $ 11,960.00 07 $ 275.00000 $ 6,325.00 08 $ 200.00000 $ 4,600.00 09 $ 250.00000 $ 5,750.00 105 844E48000 HIGH PERFORMANCE CONCRETE SPSTRC (DECK) 164.000 CU YD AWD $ 550.00000 $ 90,200.00 02 $ 600.00000 $ 98,400.00 03 $ 740.00000 $ 121,360.00 04 $ 470.15000 $ 77,104.60 05 $ 620.00000 $ 101,680.00 06 $ 540.00000 $ 88,560.00 07 $ 600.00000 $ 98,400.00 08 $ 450.00000 $ 73,800.00 09 $ 700.00000 $ 114,800.00 106 844E48020 HIGH PERF CONCRETE SPSTRC (PARAPET) 41.000 CU YD AWD $ 260.00000 $ 10,660.00 02 $ 550.00000 $ 22,550.00 03 $ 550.00000 $ 22,550.00 04 $ 423.11000 $ 17,347.51 05 $ 550.00000 $ 22,550.00 06 $ 520.00000 $ 21,320.00 07 $ 525.00000 $ 21,525.00 08 $ 330.00000 $ 13,530.00 09 $ 890.00000 $ 36,490.00

Page 196:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 195 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 107 844E48040 HIGH PERFORMANCE CONCRETE SUBSTRUCTURE 30.000 CU YD AWD $ 250.00000 $ 7,500.00 02 $ 421.79000 $ 12,653.70 03 $ 480.00000 $ 14,400.00 04 $ 404.63000 $ 12,138.90 05 $ 500.00000 $ 15,000.00 06 $ 520.00000 $ 15,600.00 07 $ 600.00000 $ 18,000.00 08 $ 340.00000 $ 10,200.00 09 $ 370.00000 $ 11,100.00 108 844E49000 HIGH PERFORMANCE CONCRETE TRIAL MIX LUMP SUM AWD $ 1,000.00000 $ 1,000.00 02 $ 1,601.79000 $ 1,601.79 03 $ 1,300.00000 $ 1,300.00 04 $ 1,206.70000 $ 1,206.70 05 $ 2,000.00000 $ 2,000.00 06 $ 1,000.00000 $ 1,000.00 07 $ 500.00000 $ 500.00 08 $ 500.00000 $ 500.00 09 $ 1,000.00000 $ 1,000.00 109 844E49010 HIGH PERFORMANCE CONCRETE TESTING LUMP SUM AWD $ 3,800.00000 $ 3,800.00 02 $ 3,800.00000 $ 3,800.00 03 $ 6,400.00000 $ 6,400.00 04 $ 4,180.00000 $ 4,180.00 05 $ 2,000.00000 $ 2,000.00 06 $ 3,800.00000 $ 3,800.00 07 $ 1,000.00000 $ 1,000.00 08 $ 2,500.00000 $ 2,500.00 09 $ 4,000.00000 $ 4,000.00 110 863E20000 WELDED STUD SHEAR CONNECTORS 2,145.000 EACH AWD $ 1.60000 $ 3,432.00 02 $ 1.60000 $ 3,432.00 03 $ 2.90000 $ 6,220.50 04 $ 1.60000 $ 3,432.00 05 $ 2.50000 $ 5,362.50 06 $ 2.25000 $ 4,826.25 07 $ 3.00000 $ 6,435.00 08 $ 1.50000 $ 3,217.50 09 $ 1.60000 $ 3,432.00

Page 197:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 196 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 111 885E10000 SURFACE PREP OF EX STEEL W/WARRANTY LUMP SUM AWD $ 36,000.00000 $ 36,000.00 02 $ 34,500.00000 $ 34,500.00 03 $ 34,500.00000 $ 34,500.00 04 $ 20,500.00000 $ 20,500.00 05 $ 36,400.00000 $ 36,400.00 06 $ 34,500.00000 $ 34,500.00 07 $ 25,000.00000 $ 25,000.00 08 $ 30,000.00000 $ 30,000.00 09 $ 69,600.00000 $ 69,600.00 112 885E11000 PAINTING, EXST STEEL, PRIME, W/WARRANTY LUMP SUM AWD $ 10,275.00000 $ 10,275.00 02 $ 10,000.00000 $ 10,000.00 03 $ 10,000.00000 $ 10,000.00 04 $ 11,000.00000 $ 11,000.00 05 $ 10,000.00000 $ 10,000.00 06 $ 10,000.00000 $ 10,000.00 07 $ 7,000.00000 $ 7,000.00 08 $ 5,000.00000 $ 5,000.00 09 $ 8,700.00000 $ 8,700.00 113 885E12000 FLD PNTG EX., INTERMEDIATE W/WARRANTY LUMP SUM AWD $ 10,275.00000 $ 10,275.00 02 $ 10,000.00000 $ 10,000.00 03 $ 10,000.00000 $ 10,000.00 04 $ 11,000.00000 $ 11,000.00 05 $ 10,000.00000 $ 10,000.00 06 $ 10,000.00000 $ 10,000.00 07 $ 7,000.00000 $ 7,000.00 08 $ 5,000.00000 $ 5,000.00 09 $ 8,700.00000 $ 8,700.00 114 885E13000 FLD PNTG EXST, FINISH, W/WARRANTY LUMP SUM AWD $ 10,275.00000 $ 10,275.00 02 $ 10,000.00000 $ 10,000.00 03 $ 10,000.00000 $ 10,000.00 04 $ 11,000.00000 $ 11,000.00 05 $ 10,000.00000 $ 10,000.00 06 $ 10,000.00000 $ 10,000.00 07 $ 7,000.00000 $ 7,000.00 08 $ 5,000.00000 $ 5,000.00 09 $ 8,700.00000 $ 8,700.00

Page 198:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 197 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S. 7 BRIDGE NO. MAR-23-1815 R TOTALS AWD $ 283,561.25 02 $ 293,050.66 03 $ 338,787.50 04 $ 313,419.06 05 $ 339,020.50 06 $ 318,416.57 07 $ 310,742.00 08 $ 356,217.50 09 $ 414,223.50 115 103E06000 CONTRACT PERF, PAYMENT & MNTC BOND LUMP SUM AWD $ 9,000.00000 $ 9,000.00 02 $ 3,600.00000 $ 3,600.00 03 $ 12,000.00000 $ 12,000.00 04 $ 15,030.50000 $ 15,030.50 05 $ 4,900.00000 $ 4,900.00 06 $ 33,816.07000 $ 33,816.07 07 $ 15,000.00000 $ 15,000.00 08 $ 20,000.00000 $ 20,000.00 09 $ 28,000.00000 $ 28,000.00 116 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 25,000.00000 $ 25,000.00 02 $ 30,000.00000 $ 30,000.00 03 $ 44,000.00000 $ 44,000.00 04 $ 29,135.00000 $ 29,135.00 05 $ 30,000.00000 $ 30,000.00 06 $ 36,000.00000 $ 36,000.00 07 $ 60,000.00000 $ 60,000.00 08 $ 35,000.00000 $ 35,000.00 09 $ 89,000.00000 $ 89,000.00 117 623E10000 CONSTRUCTION LAYOUT STAKES LUMP SUM AWD $ 7,000.00000 $ 7,000.00 02 $ 5,300.00000 $ 5,300.00 03 $ 6,000.00000 $ 6,000.00 04 $ 6,182.00000 $ 6,182.00 05 $ 15,000.00000 $ 15,000.00 06 $ 5,000.00000 $ 5,000.00 07 $ 4,000.00000 $ 4,000.00 08 $ 1,500.00000 $ 1,500.00 09 $ 10,000.00000 $ 10,000.00

Page 199:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010026 PAGE NO. 198 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 118 624E10000 MOBILIZATION LUMP SUM AWD $ 40,000.00000 $ 40,000.00 02 $ 40,000.00000 $ 40,000.00 03 $ 40,000.00000 $ 40,000.00 04 $ 40,417.30000 $ 40,417.30 05 $ 40,000.00000 $ 40,000.00 06 $ 40,000.00000 $ 40,000.00 07 $ 40,000.00000 $ 40,000.00 08 $ 40,000.00000 $ 40,000.00 09 $ 40,000.00000 $ 40,000.00 119 806E16000 FIELD OFFICE, TYPE A 10.000 MONTH AWD $ 700.00000 $ 7,000.00 02 $ 500.00000 $ 5,000.00 03 $ 500.00000 $ 5,000.00 04 $ 642.52000 $ 6,425.20 05 $ 900.00000 $ 9,000.00 06 $ 1,100.00000 $ 11,000.00 07 $ 900.00000 $ 9,000.00 08 $ 250.00000 $ 2,500.00 09 $ 500.00000 $ 5,000.00

S. 8 INCIDENTALS TOTALS AWD $ 88,000.00 02 $ 83,900.00 03 $ 107,000.00 04 $ 97,190.00 05 $ 98,900.00 06 $ 125,816.07 07 $ 128,000.00 08 $ 99,000.00 09 $ 172,000.00

TOTAL AMOUNT OF THE BID AWD $ 1,037,303.72 02 $ 1,141,353.85 03 $ 1,162,518.51 04 $ 1,177,120.59 05 $ 1,193,185.74 06 $ 1,248,000.00 07 $ 1,278,590.18 08 $ 1,289,263.65 09 $ 1,545,792.35

Page 200:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010027 PID. 18994 MOE-78-(7.10)(18.22)(18.35) TE21-G000(563) TYPE: BRIDGE REPLACEMENT (1 BRIDGE) LETTING: 01/24/01 COMPLETION DATE: 11/15/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: TOM MAYLE & SONS CONSTRUCTION INC AWARDED AMOUNT: $ 713,933.99 ENGINEERS ESTIMATE: $ 915,000.00 AWARDED BIDDER BIDDER 02 TOM MAYLE & SONS CONSTRUCTION INC PARKER CORPORATION STATE ROUTE 550 ST RT 681 BARTLETT ,OH 45713 TUPPERS PLAINS ,OH 45783 BIDDER 03 BIDDER 04 R C CONSTRUCTION COMPANY AND SON INC OHIO-WEST VIRGINIA EXCAVATING CO RT #1 PO BOX 247A 57245 FERRY LANDING RD CUTLER ,OH 45724 SHADYSIDE ,OH 43947- BIDDER 05 BIDDER 06 GARY A RUBEL INC ALAN STONE CO INC 35479 SR 78 S R 377 LEWISVILLE ,OH 43754 CHESTERHILL ,OH 43728 BIDDER 07 BIDDER 08 J & J SCHLAEGEL INC DENNISON BRIDGE INC 107 1/2 N MAIN ST 500 STILLWATER AVE URBANA ,OH 43078 DENNISON ,OH 44621-1350

Page 201:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 200 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 201E11000 CLEARING AND GRUBBING LUMP SUM AWD $ 13,300.00000 $ 13,300.00 02 $ 5,000.00000 $ 5,000.00 03 $ 15,000.00000 $ 15,000.00 04 $ 16,000.00000 $ 16,000.00 05 $ 20,000.00000 $ 20,000.00 06 $ 20,000.00000 $ 20,000.00 07 $ 20,000.00000 $ 20,000.00 08 $ 25,000.00000 $ 25,000.00 09 $ 18,500.00000 $ 18,500.00 2 202E11000 STRUCTURE REMOVED LUMP SUM AWD $ 15,000.00000 $ 15,000.00 02 $ 15,000.00000 $ 15,000.00 03 $ 20,000.00000 $ 20,000.00 04 $ 14,000.00000 $ 14,000.00 05 $ 15,000.00000 $ 15,000.00 06 $ 20,000.00000 $ 20,000.00 07 $ 35,000.00000 $ 35,000.00 08 $ 35,000.00000 $ 35,000.00 09 $ 12,900.00000 $ 12,900.00 3 202E35100 PIPE REMOVED, 24" & UNDER 28.000 LIN FT AWD $ 6.00000 $ 168.00 02 $ 5.00000 $ 140.00 03 $ 3.00000 $ 84.00 04 $ 25.00000 $ 700.00 05 $ 10.00000 $ 280.00 06 $ 3.00000 $ 84.00 07 $ 5.00000 $ 140.00 08 $ 5.00000 $ 140.00 09 $ 13.80000 $ 386.40 4 202E38100 GUARDRAIL REM FOR STRG 1,000.000 LIN FT AWD $ 0.75000 $ 750.00 02 $ 1.00000 $ 1,000.00 03 $ 3.00000 $ 3,000.00 04 $ 2.00000 $ 2,000.00 05 $ 1.15000 $ 1,150.00 06 $ 1.00000 $ 1,000.00 07 $ 1.50000 $ 1,500.00 08 $ 1.00000 $ 1,000.00 09 $ 1.10000 $ 1,100.00

Page 202:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 201 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 5 202E54100 RAISED PVMT MRK RMVD/STRG 21.000 EACH AWD $ 3.00000 $ 63.00 02 $ 5.00000 $ 105.00 03 $ 15.00000 $ 315.00 04 $ 7.00000 $ 147.00 05 $ 5.00000 $ 105.00 06 $ 6.00000 $ 126.00 07 $ 5.00000 $ 105.00 08 $ 5.00000 $ 105.00 09 $ 4.00000 $ 84.00 6 203E12000 EXCAVATION W/O EMBANKMENT 18,204.000 CU YD AWD $ 2.30000 $ 41,869.20 02 $ 3.00000 $ 54,612.00 03 $ 3.00000 $ 54,612.00 04 $ 4.15000 $ 75,546.60 05 $ 3.50000 $ 63,714.00 06 $ 8.12000 $ 147,816.48 07 $ 6.25000 $ 113,775.00 08 $ 10.00000 $ 182,040.00 09 $ 7.63000 $ 138,896.52 7 203E20000 EMBANKMENT 6,012.000 CU YD AWD $ 2.00000 $ 12,024.00 02 $ 3.50000 $ 21,042.00 03 $ 6.00000 $ 36,072.00 04 $ 1.50000 $ 9,018.00 05 $ 2.00000 $ 12,024.00 06 $ 2.88000 $ 17,314.56 07 $ 1.25000 $ 7,515.00 08 $ 5.00000 $ 30,060.00 09 $ 3.40000 $ 20,440.80 8 203E50000 SUBGRADE COMPACTION 5,001.000 SQ YD AWD $ 2.50000 $ 12,502.50 02 $ 0.50000 $ 2,500.50 03 $ 2.00000 $ 10,002.00 04 $ 1.50000 $ 7,501.50 05 $ 1.00000 $ 5,001.00 06 $ 0.77000 $ 3,850.77 07 $ 1.00000 $ 5,001.00 08 $ 1.00000 $ 5,001.00 09 $ 2.71000 $ 13,552.71

Page 203:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 202 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 9 604E40500 REFERENCE MONUMENT 10.000 EACH AWD $ 80.00000 $ 800.00 02 $ 200.00000 $ 2,000.00 03 $ 300.00000 $ 3,000.00 04 $ 85.00000 $ 850.00 05 $ 200.00000 $ 2,000.00 06 $ 112.00000 $ 1,120.00 07 $ 350.00000 $ 3,500.00 08 $ 250.00000 $ 2,500.00 09 $ 148.00000 $ 1,480.00 10 606E13000 GUARDRAIL, TYPE 5 1,487.500 LIN FT AWD $ 11.00000 $ 16,362.50 02 $ 10.74000 $ 15,975.75 03 $ 10.80000 $ 16,065.00 04 $ 10.06000 $ 14,964.25 05 $ 12.42000 $ 18,474.75 06 $ 10.20000 $ 15,172.50 07 $ 10.00000 $ 14,875.00 08 $ 12.00000 $ 17,850.00 09 $ 11.88000 $ 17,671.50 11 606E22010 ANCHOR ASSEMBLY, TYPE E-98 6.000 EACH AWD $ 1,830.00000 $ 10,980.00 02 $ 1,500.00000 $ 9,000.00 03 $ 1,775.00000 $ 10,650.00 04 $ 1,500.00000 $ 9,000.00 05 $ 2,041.25000 $ 12,247.50 06 $ 1,700.00000 $ 10,200.00 07 $ 1,600.00000 $ 9,600.00 08 $ 2,000.00000 $ 12,000.00 09 $ 1,952.50000 $ 11,715.00 12 606E26500 ANCHOR ASSEMBLY, TYPE T 1.000 EACH AWD $ 480.00000 $ 480.00 02 $ 450.00000 $ 450.00 03 $ 1,000.00000 $ 1,000.00 04 $ 450.00000 $ 450.00 05 $ 546.25000 $ 546.25 06 $ 525.00000 $ 525.00 07 $ 500.00000 $ 500.00 08 $ 500.00000 $ 500.00 09 $ 523.00000 $ 523.00

Page 204:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 203 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S. 1 ROADWAY TOTALS AWD $ 124,299.20 02 $ 126,825.25 03 $ 169,800.00 04 $ 150,177.35 05 $ 150,542.50 06 $ 237,209.31 07 $ 211,511.00 08 $ 311,196.00 09 $ 237,249.93 13 601E11000 RIPRAP, 6" REIN SLAB 28.000 SQ YD AWD $ 53.00000 $ 1,484.00 02 $ 62.00000 $ 1,736.00 03 $ 55.00000 $ 1,540.00 04 $ 130.00000 $ 3,640.00 05 $ 80.00000 $ 2,240.00 06 $ 34.00000 $ 952.00 07 $ 100.00000 $ 2,800.00 08 $ 45.00000 $ 1,260.00 09 $ 102.00000 $ 2,856.00 14 601E32000 ROCK CH PROT, A W/FILTER 233.000 CU YD AWD $ 22.50000 $ 5,242.50 02 $ 30.00000 $ 6,990.00 03 $ 45.00000 $ 10,485.00 04 $ 25.00000 $ 5,825.00 05 $ 42.00000 $ 9,786.00 06 $ 35.00000 $ 8,155.00 07 $ 35.00000 $ 8,155.00 08 $ 36.00000 $ 8,388.00 09 $ 62.60000 $ 14,585.80 15 601E32100 ROCK CH PROT, B W/FILTER 112.000 CU YD AWD $ 22.50000 $ 2,520.00 02 $ 30.00000 $ 3,360.00 03 $ 45.00000 $ 5,040.00 04 $ 30.00000 $ 3,360.00 05 $ 44.00000 $ 4,928.00 06 $ 30.00000 $ 3,360.00 07 $ 35.00000 $ 3,920.00 08 $ 36.00000 $ 4,032.00 09 $ 60.21000 $ 6,743.52

Page 205:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 204 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 16 670E40000 DITCH EROSION PROTECTION 475.000 SQ YD AWD $ 2.00000 $ 950.00 02 $ 1.25000 $ 593.75 03 $ 3.00000 $ 1,425.00 04 $ 1.50000 $ 712.50 05 $ 2.85000 $ 1,353.75 06 $ 3.50000 $ 1,662.50 07 $ 1.60000 $ 760.00 08 $ 3.00000 $ 1,425.00 09 $ 2.64000 $ 1,254.00 17 870E10000 SEEDING AND MULCHING 17,181.000 SQ YD AWD $ 0.29000 $ 4,982.49 02 $ 0.50000 $ 8,590.50 03 $ 0.60000 $ 10,308.60 04 $ 0.36000 $ 6,185.16 05 $ 0.56000 $ 9,621.36 06 $ 0.55000 $ 9,449.55 07 $ 0.35000 $ 6,013.35 08 $ 0.75000 $ 12,885.75 09 $ 0.61000 $ 10,480.41 18 870E20000 COMMERCIAL FERTILIZER 1.660 TON AWD $ 300.00000 $ 498.00 02 $ 302.00000 $ 501.32 03 $ 1,000.00000 $ 1,660.00 04 $ 350.00000 $ 581.00 05 $ 450.00000 $ 747.00 06 $ 500.00000 $ 830.00 07 $ 450.00000 $ 747.00 08 $ 1,000.00000 $ 1,660.00 09 $ 385.00000 $ 639.10 19 870E30000 AGRICULTURAL LIME 7.110 TON AWD $ 40.00000 $ 284.40 02 $ 71.00000 $ 504.81 03 $ 300.00000 $ 2,133.00 04 $ 75.00000 $ 533.25 05 $ 125.00000 $ 888.75 06 $ 70.00000 $ 497.70 07 $ 100.00000 $ 711.00 08 $ 200.00000 $ 1,422.00 09 $ 44.00000 $ 312.84

Page 206:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 205 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 20 870E35000 WATER 45.000 M GAL AWD $ 0.10000 $ 4.50 02 $ 0.50000 $ 22.50 03 $ 0.50000 $ 22.50 04 $ 1.00000 $ 45.00 05 $ 5.00000 $ 225.00 06 $ 1.00000 $ 45.00 07 $ 1.00000 $ 45.00 08 $ 0.05000 $ 2.25 09 $ 1.00000 $ 45.00 21 877E30000 TEMP PERIMETER, DITCH CHECK/INLT PROT 3,200.000 LIN FT AWD $ 0.35000 $ 1,120.00 02 $ 0.95000 $ 3,040.00 03 $ 3.00000 $ 9,600.00 04 $ 1.00000 $ 3,200.00 05 $ 1.70000 $ 5,440.00 06 $ 1.44000 $ 4,608.00 07 $ 3.00000 $ 9,600.00 08 $ 2.00000 $ 6,400.00 09 $ 1.70000 $ 5,440.00

S. 2 EROSION CONTROL TOTALS AWD $ 17,085.89 02 $ 25,338.88 03 $ 42,214.10 04 $ 24,081.91 05 $ 35,229.86 06 $ 29,559.75 07 $ 32,751.35 08 $ 37,475.00 09 $ 42,356.67 22 503E11101 COFFERDAMS/CRIBS/SHTG, APP LUMP SUM AWD $ 7,500.00000 $ 7,500.00 02 $ 25,000.00000 $ 25,000.00 03 $ 17,000.00000 $ 17,000.00 04 $ 56,000.00000 $ 56,000.00 05 $ 21,000.00000 $ 21,000.00 06 $ 20,000.00000 $ 20,000.00 07 $ 46,000.00000 $ 46,000.00 08 $ 25,000.00000 $ 25,000.00 09 $ 27,400.00000 $ 27,400.00

Page 207:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 206 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 23 503E21300 UNCLASSIFIED EXCAVATION LUMP SUM AWD $ 4,800.00000 $ 4,800.00 02 $ 5,000.00000 $ 5,000.00 03 $ 10,000.00000 $ 10,000.00 04 $ 20,000.00000 $ 20,000.00 05 $ 15,000.00000 $ 15,000.00 06 $ 9,000.00000 $ 9,000.00 07 $ 15,000.00000 $ 15,000.00 08 $ 10,000.00000 $ 10,000.00 09 $ 17,800.00000 $ 17,800.00 24 512E33000 TYPE 2 WATERPROOFING 738.000 SQ YD AWD $ 14.60000 $ 10,774.80 02 $ 11.00000 $ 8,118.00 03 $ 10.00000 $ 7,380.00 04 $ 12.00000 $ 8,856.00 05 $ 18.00000 $ 13,284.00 06 $ 13.00000 $ 9,594.00 07 $ 13.00000 $ 9,594.00 08 $ 12.00000 $ 8,856.00 09 $ 16.43000 $ 12,125.34 25 512E33010 TYPE 3 WATERPROOFING 19.000 SQ YD AWD $ 18.00000 $ 342.00 02 $ 72.00000 $ 1,368.00 03 $ 18.00000 $ 342.00 04 $ 20.00000 $ 380.00 05 $ 23.58000 $ 448.02 06 $ 15.00000 $ 285.00 07 $ 50.00000 $ 950.00 08 $ 50.00000 $ 950.00 09 $ 22.11000 $ 420.09 26 512E67502 SEALING OF CONC. SURF.(EPOXY) 148.000 SQ YD AWD $ 10.00000 $ 1,480.00 02 $ 8.00000 $ 1,184.00 03 $ 25.00000 $ 3,700.00 04 $ 13.00000 $ 1,924.00 05 $ 24.00000 $ 3,552.00 06 $ 13.00000 $ 1,924.00 07 $ 30.00000 $ 4,440.00 08 $ 12.00000 $ 1,776.00 09 $ 9.22000 $ 1,364.56

Page 208:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 207 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 27 516E13600 1" PREF EXP JT FILLER 118.000 SQ FT AWD $ 6.00000 $ 708.00 02 $ 3.25000 $ 383.50 03 $ 25.00000 $ 2,950.00 04 $ 2.35000 $ 277.30 05 $ 4.00000 $ 472.00 06 $ 3.00000 $ 354.00 07 $ 6.00000 $ 708.00 08 $ 2.00000 $ 236.00 09 $ 4.28000 $ 505.04 28 518E21230 POROUS BACKFILL WITH FILTER FABRIC LUMP SUM AWD $ 6,000.00000 $ 6,000.00 02 $ 4,000.00000 $ 4,000.00 03 $ 9,000.00000 $ 9,000.00 04 $ 6,000.00000 $ 6,000.00 05 $ 6,000.00000 $ 6,000.00 06 $ 6,300.00000 $ 6,300.00 07 $ 6,000.00000 $ 6,000.00 08 $ 2,500.00000 $ 2,500.00 09 $ 17,234.00000 $ 17,234.00 29 603E10900 24" CONDUIT, TYPE D 50.000 LIN FT AWD $ 15.00000 $ 750.00 02 $ 25.00000 $ 1,250.00 03 $ 45.00000 $ 2,250.00 04 $ 30.00000 $ 1,500.00 05 $ 75.00000 $ 3,750.00 06 $ 48.00000 $ 2,400.00 07 $ 30.00000 $ 1,500.00 08 $ 45.00000 $ 2,250.00 09 $ 34.10000 $ 1,705.00 30 603E95801 12'X6' CONDUIT, A, 706.05,APP 168.000 LIN FT AWD $ 555.00000 $ 93,240.00 02 $ 575.00000 $ 96,600.00 03 $ 570.00000 $ 95,760.00 04 $ 550.00000 $ 92,400.00 05 $ 800.00000 $ 134,400.00 06 $ 823.00000 $ 138,264.00 07 $ 825.00000 $ 138,600.00 08 $ 790.00000 $ 132,720.00 09 $ 881.50000 $ 148,092.00

Page 209:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 208 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 31 603E96001 12'X8' CONDUIT, A, 706.05,APP 80.000 LIN FT AWD $ 680.00000 $ 54,400.00 02 $ 600.00000 $ 48,000.00 03 $ 615.00000 $ 49,200.00 04 $ 715.00000 $ 57,200.00 05 $ 900.00000 $ 72,000.00 06 $ 815.00000 $ 65,200.00 07 $ 900.00000 $ 72,000.00 08 $ 800.00000 $ 64,000.00 09 $ 1,043.50000 $ 83,480.00 32 605E31100 AGGREGATE DRAIN 630.000 LIN FT AWD $ 8.20000 $ 5,166.00 02 $ 6.00000 $ 3,780.00 03 $ 10.00000 $ 6,300.00 04 $ 8.00000 $ 5,040.00 05 $ 6.00000 $ 3,780.00 06 $ 2.20000 $ 1,386.00 07 $ 10.00000 $ 6,300.00 08 $ 5.00000 $ 3,150.00 09 $ 5.14000 $ 3,238.20 33 842E46000 CLASS C CONCRETE , WINGWALL ABOVE FOOTING 39.000 CU YD AWD $ 400.00000 $ 15,600.00 02 $ 500.00000 $ 19,500.00 03 $ 400.00000 $ 15,600.00 04 $ 950.00000 $ 37,050.00 05 $ 500.00000 $ 19,500.00 06 $ 640.00000 $ 24,960.00 07 $ 450.00000 $ 17,550.00 08 $ 380.00000 $ 14,820.00 09 $ 1,211.85000 $ 47,262.15 34 842E46500 CLASS C CONCRETE, FOOTING 114.000 CU YD AWD $ 400.00000 $ 45,600.00 02 $ 300.00000 $ 34,200.00 03 $ 400.00000 $ 45,600.00 04 $ 325.00000 $ 37,050.00 05 $ 400.00000 $ 45,600.00 06 $ 512.00000 $ 58,368.00 07 $ 450.00000 $ 51,300.00 08 $ 380.00000 $ 43,320.00 09 $ 500.00000 $ 57,000.00

Page 210:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 209 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 35 842E51100 CLASS C CONCRETE, MISC.: HEADWALLS 4.000 CU YD AWD $ 400.00000 $ 1,600.00 02 $ 400.00000 $ 1,600.00 03 $ 400.00000 $ 1,600.00 04 $ 535.00000 $ 2,140.00 05 $ 1,000.00000 $ 4,000.00 06 $ 910.00000 $ 3,640.00 07 $ 500.00000 $ 2,000.00 08 $ 500.00000 $ 2,000.00 09 $ 1,443.50000 $ 5,774.00

S. 3 DRAINAGE TOTALS AWD $ 247,960.80 02 $ 249,983.50 03 $ 266,682.00 04 $ 325,817.30 05 $ 342,786.02 06 $ 341,675.00 07 $ 371,942.00 08 $ 311,578.00 09 $ 423,400.38 36 254E01000 PAVEMENT PLANING, BITUMINOUS 786.000 SQ YD AWD $ 5.00000 $ 3,930.00 02 $ 3.50000 $ 2,751.00 03 $ 12.00000 $ 9,432.00 04 $ 9.00000 $ 7,074.00 05 $ 5.00000 $ 3,930.00 06 $ 5.66000 $ 4,448.76 07 $ 10.00000 $ 7,860.00 08 $ 10.00000 $ 7,860.00 09 $ 8.64000 $ 6,791.04 37 301E46000 BITUMINOUS AGGREGATE BASE, PG64-22 854.000 CU YD AWD $ 105.00000 $ 89,670.00 02 $ 98.16000 $ 83,828.64 03 $ 98.16000 $ 83,828.64 04 $ 125.00000 $ 106,750.00 05 $ 110.00000 $ 93,940.00 06 $ 115.50000 $ 98,637.00 07 $ 100.00000 $ 85,400.00 08 $ 115.00000 $ 98,210.00 09 $ 121.00000 $ 103,334.00

Page 211:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 210 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 38 304E20000 AGGREGATE BASE 910.000 CU YD AWD $ 30.00000 $ 27,300.00 02 $ 45.00000 $ 40,950.00 03 $ 45.00000 $ 40,950.00 04 $ 46.00000 $ 41,860.00 05 $ 50.00000 $ 45,500.00 06 $ 40.00000 $ 36,400.00 07 $ 68.00000 $ 61,880.00 08 $ 65.00000 $ 59,150.00 09 $ 53.15000 $ 48,366.50 39 407E10000 TACK COAT 80.000 GALLON AWD $ 1.00000 $ 80.00 02 $ 1.20000 $ 96.00 03 $ 1.20000 $ 96.00 04 $ 7.00000 $ 560.00 05 $ 8.05000 $ 644.00 06 $ 7.35000 $ 588.00 07 $ 7.00000 $ 560.00 08 $ 10.00000 $ 800.00 09 $ 7.70000 $ 616.00 40 407E14000 TACK COAT FOR INTERMEDIATE COURSE 231.000 GALLON AWD $ 1.00000 $ 231.00 02 $ 1.20000 $ 277.20 03 $ 1.20000 $ 277.20 04 $ 7.00000 $ 1,617.00 05 $ 8.05000 $ 1,859.55 06 $ 7.35000 $ 1,697.85 07 $ 7.00000 $ 1,617.00 08 $ 10.00000 $ 2,310.00 09 $ 1.95000 $ 450.45 41 408E10000 BITUMINOUS PRIME COAT 2,048.000 GALLON AWD $ 1.00000 $ 2,048.00 02 $ 1.78000 $ 3,645.44 03 $ 1.78000 $ 3,645.44 04 $ 2.25000 $ 4,608.00 05 $ 2.59000 $ 5,304.32 06 $ 2.36000 $ 4,833.28 07 $ 2.25000 $ 4,608.00 08 $ 5.00000 $ 10,240.00 09 $ 2.48000 $ 5,079.04

Page 212:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 211 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 42 448E46050 ASPH CONC INTERMEDIATE, TYPE 2, PG64-22 423.000 CU YD AWD $ 111.00000 $ 46,953.00 02 $ 122.36000 $ 51,758.28 03 $ 122.36000 $ 51,758.28 04 $ 120.00000 $ 50,760.00 05 $ 110.00000 $ 46,530.00 06 $ 115.50000 $ 48,856.50 07 $ 110.00000 $ 46,530.00 08 $ 115.00000 $ 48,645.00 09 $ 121.00000 $ 51,183.00 43 448E47020 ASPH CONC SURFACE, TYPE 1, PG64-22 230.000 CU YD AWD $ 123.00000 $ 28,290.00 02 $ 135.78000 $ 31,229.40 03 $ 124.70000 $ 28,681.00 04 $ 125.00000 $ 28,750.00 05 $ 120.00000 $ 27,600.00 06 $ 126.00000 $ 28,980.00 07 $ 120.00000 $ 27,600.00 08 $ 125.00000 $ 28,750.00 09 $ 147.31000 $ 33,881.30 44 450E41500 PVMT CRACK & JT REINF FABRIC 211.000 SQ YD AWD $ 19.00000 $ 4,009.00 02 $ 20.00000 $ 4,220.00 03 $ 18.00000 $ 3,798.00 04 $ 22.00000 $ 4,642.00 05 $ 12.08000 $ 2,548.88 06 $ 19.00000 $ 4,009.00 07 $ 18.00000 $ 3,798.00 08 $ 20.00000 $ 4,220.00 09 $ 19.80000 $ 4,177.80

S. 4 PAVEMENT TOTALS AWD $ 202,511.00 02 $ 218,755.96 03 $ 222,466.56 04 $ 246,621.00 05 $ 227,856.75 06 $ 228,450.39 07 $ 239,853.00 08 $ 260,185.00 09 $ 253,879.13

Page 213:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 212 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 45 626E00100 BARRIER REFLECTOR, TYPE A 28.000 EACH AWD $ 6.00000 $ 168.00 02 $ 4.50000 $ 126.00 03 $ 10.00000 $ 280.00 04 $ 4.00000 $ 112.00 05 $ 5.75000 $ 161.00 06 $ 8.00000 $ 224.00 07 $ 5.00000 $ 140.00 08 $ 10.00000 $ 280.00 09 $ 5.50000 $ 154.00 46 630E03100 GR MTD SUPP, #3 POST 24.000 LIN FT AWD $ 13.00000 $ 312.00 02 $ 8.00000 $ 192.00 03 $ 10.00000 $ 240.00 04 $ 8.00000 $ 192.00 05 $ 11.50000 $ 276.00 06 $ 12.00000 $ 288.00 07 $ 7.00000 $ 168.00 08 $ 10.00000 $ 240.00 09 $ 11.00000 $ 264.00 47 630E80102 SIGN, FLAT SHEET, TYPE G 12.000 SQ FT AWD $ 21.00000 $ 252.00 02 $ 20.00000 $ 240.00 03 $ 140.00000 $ 1,680.00 04 $ 20.00000 $ 240.00 05 $ 23.00000 $ 276.00 06 $ 22.00000 $ 264.00 07 $ 13.00000 $ 156.00 08 $ 20.00000 $ 240.00 09 $ 22.00000 $ 264.00 48 630E84900 RMVL/GR MTD SIGN & DISP 2.000 EACH AWD $ 5.00000 $ 10.00 02 $ 10.00000 $ 20.00 03 $ 40.00000 $ 80.00 04 $ 10.00000 $ 20.00 05 $ 5.75000 $ 11.50 06 $ 10.00000 $ 20.00 07 $ 10.00000 $ 20.00 08 $ 25.00000 $ 50.00 09 $ 5.50000 $ 11.00

Page 214:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 213 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 49 630E86002 RMVL/GR MTD POST SUP/DISP 2.000 EACH AWD $ 5.00000 $ 10.00 02 $ 10.00000 $ 20.00 03 $ 20.00000 $ 40.00 04 $ 10.00000 $ 20.00 05 $ 11.50000 $ 23.00 06 $ 10.00000 $ 20.00 07 $ 10.00000 $ 20.00 08 $ 25.00000 $ 50.00 09 $ 11.00000 $ 22.00 50 642E00102 EDGE LINE, TYPE 2 0.690 MILE AWD $ 5,000.00000 $ 3,450.00 02 $ 1,900.00000 $ 1,311.00 03 $ 1,664.00000 $ 1,148.16 04 $ 1,664.00000 $ 1,148.16 05 $ 1,913.60000 $ 1,320.38 06 $ 1,800.00000 $ 1,242.00 07 $ 1,700.00000 $ 1,173.00 08 $ 2,000.00000 $ 1,380.00 09 $ 1,831.88000 $ 1,264.00 51 642E00302 CENTER LINE, TYPE 2 0.380 MILE AWD $ 5,000.00000 $ 1,900.00 02 $ 2,550.00000 $ 969.00 03 $ 1,809.00000 $ 687.42 04 $ 1,809.00000 $ 687.42 05 $ 2,080.35000 $ 790.53 06 $ 1,900.00000 $ 722.00 07 $ 1,900.00000 $ 722.00 08 $ 2,000.00000 $ 760.00 09 $ 1,992.11000 $ 757.00 52 642E00490 STOP LINE 35.000 LIN FT AWD $ 6.00000 $ 210.00 02 $ 12.00000 $ 420.00 03 $ 2.55000 $ 89.25 04 $ 2.55000 $ 89.25 05 $ 2.94000 $ 102.90 06 $ 2.75000 $ 96.25 07 $ 3.00000 $ 105.00 08 $ 3.00000 $ 105.00 09 $ 2.83000 $ 99.05

Page 215:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 214 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S. 5 TRAFFIC CONTROL TOTALS AWD $ 6,312.00 02 $ 3,298.00 03 $ 4,244.83 04 $ 2,508.83 05 $ 2,961.31 06 $ 2,876.25 07 $ 2,504.00 08 $ 3,105.00 09 $ 2,835.05 53 410E12000 TRAF COMP SURF, TYPE A OR B 60.000 CU YD AWD $ 23.00000 $ 1,380.00 02 $ 33.00000 $ 1,980.00 03 $ 40.00000 $ 2,400.00 04 $ 25.00000 $ 1,500.00 05 $ 30.00000 $ 1,800.00 06 $ 33.00000 $ 1,980.00 07 $ 30.00000 $ 1,800.00 08 $ 31.00000 $ 1,860.00 09 $ 46.73000 $ 2,803.80 54 410E13000 TRAF COMP SURF, TYPE C 40.000 CU YD AWD $ 25.00000 $ 1,000.00 02 $ 33.00000 $ 1,320.00 03 $ 40.00000 $ 1,600.00 04 $ 27.00000 $ 1,080.00 05 $ 35.00000 $ 1,400.00 06 $ 35.00000 $ 1,400.00 07 $ 30.00000 $ 1,200.00 08 $ 31.00000 $ 1,240.00 09 $ 51.95000 $ 2,078.00 55 614E12800 TEMP RAISED PVMT MARKER 1,122.000 EACH AWD $ 3.00000 $ 3,366.00 02 $ 2.00000 $ 2,244.00 03 $ 5.00000 $ 5,610.00 04 $ 2.50000 $ 2,805.00 05 $ 4.00000 $ 4,488.00 06 $ 3.30000 $ 3,702.60 07 $ 5.00000 $ 5,610.00 08 $ 3.00000 $ 3,366.00 09 $ 4.61000 $ 5,172.42

Page 216:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 215 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 56 614E13000 BIT CONC FOR MAINT TRAF 10.000 CU YD AWD $ 45.00000 $ 450.00 02 $ 150.00000 $ 1,500.00 03 $ 30.00000 $ 300.00 04 $ 150.00000 $ 1,500.00 05 $ 100.00000 $ 1,000.00 06 $ 90.00000 $ 900.00 07 $ 25.00000 $ 250.00 08 $ 75.00000 $ 750.00 09 $ 620.10000 $ 6,201.00 57 614E13302 BARRIER REFL, TYPE B2 181.000 EACH AWD $ 5.00000 $ 905.00 02 $ 3.00000 $ 543.00 03 $ 10.00000 $ 1,810.00 04 $ 4.00000 $ 724.00 05 $ 4.00000 $ 724.00 06 $ 7.00000 $ 1,267.00 07 $ 6.00000 $ 1,086.00 08 $ 5.00000 $ 905.00 09 $ 4.66000 $ 843.46 58 614E13350 OBJECT MARKER , BI-DIRECTIONAL 181.000 EACH AWD $ 6.00000 $ 1,086.00 02 $ 10.00000 $ 1,810.00 03 $ 20.00000 $ 3,620.00 04 $ 18.00000 $ 3,258.00 05 $ 18.00000 $ 3,258.00 06 $ 15.00000 $ 2,715.00 07 $ 15.00000 $ 2,715.00 08 $ 20.00000 $ 3,620.00 09 $ 17.45000 $ 3,158.45 59 614E21100 TEMP CL, CL I, 642 PAINT 0.900 MILE AWD $ 1,500.00000 $ 1,350.00 02 $ 3,000.00000 $ 2,700.00 03 $ 1,489.00000 $ 1,340.10 04 $ 1,320.00000 $ 1,188.00 05 $ 1,518.00000 $ 1,366.20 06 $ 1,200.00000 $ 1,080.00 07 $ 1,500.00000 $ 1,350.00 08 $ 1,500.00000 $ 1,350.00 09 $ 1,639.00000 $ 1,475.10

Page 217:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 216 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 60 614E22100 TEMP EDGE LINE, CL I, 642 PT 1.700 MILE AWD $ 1,500.00000 $ 2,550.00 02 $ 2,000.00000 $ 3,400.00 03 $ 1,344.00000 $ 2,284.80 04 $ 980.00000 $ 1,666.00 05 $ 1,127.00000 $ 1,915.90 06 $ 688.00000 $ 1,169.60 07 $ 1,400.00000 $ 2,380.00 08 $ 1,400.00000 $ 2,380.00 09 $ 1,479.00000 $ 2,514.30 61 614E26200 TEMP STOP LINE, CL I, 642 PT 84.000 LIN FT AWD $ 3.50000 $ 294.00 02 $ 5.00000 $ 420.00 03 $ 3.23000 $ 271.32 04 $ 9.00000 $ 756.00 05 $ 10.35000 $ 869.40 06 $ 4.00000 $ 336.00 07 $ 3.50000 $ 294.00 08 $ 5.00000 $ 420.00 09 $ 3.56000 $ 299.04 62 615E10000 TEMPORARY ROAD LUMP SUM AWD $ 5,600.00000 $ 5,600.00 02 $ 5,000.00000 $ 5,000.00 03 $ 25,000.00000 $ 25,000.00 04 $ 20,000.00000 $ 20,000.00 05 $ 25,000.00000 $ 25,000.00 06 $ 8,000.00000 $ 8,000.00 07 $ 28,000.00000 $ 28,000.00 08 $ 25,000.00000 $ 25,000.00 09 $ 21,629.00000 $ 21,629.00 63 615E25000 TEMP PAVEMENT, CLASS B 426.000 SQ YD AWD $ 37.00000 $ 15,762.00 02 $ 30.00000 $ 12,780.00 03 $ 45.00000 $ 19,170.00 04 $ 25.00000 $ 10,650.00 05 $ 39.10000 $ 16,656.60 06 $ 27.00000 $ 11,502.00 07 $ 64.00000 $ 27,264.00 08 $ 40.00000 $ 17,040.00 09 $ 59.74000 $ 25,449.24

Page 218:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 217 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 64 616E10000 WATER 21.000 M GAL AWD $ 0.10000 $ 2.10 02 $ 0.50000 $ 10.50 03 $ 0.25000 $ 5.25 04 $ 8.00000 $ 168.00 05 $ 10.00000 $ 210.00 06 $ 1.00000 $ 21.00 07 $ 1.00000 $ 21.00 08 $ 0.50000 $ 10.50 09 $ 77.10000 $ 1,619.10 65 616E20000 CALCIUM CHLORIDE 3.000 TON AWD $ 75.00000 $ 225.00 02 $ 10.00000 $ 30.00 03 $ 100.00000 $ 300.00 04 $ 600.00000 $ 1,800.00 05 $ 200.00000 $ 600.00 06 $ 100.00000 $ 300.00 07 $ 200.00000 $ 600.00 08 $ 25.00000 $ 75.00 09 $ 828.33000 $ 2,484.99 66 622E40020 PORTABLE CONC BARRIER, 32" 4,150.000 LIN FT AWD $ 5.30000 $ 21,995.00 02 $ 11.00000 $ 45,650.00 03 $ 9.00000 $ 37,350.00 04 $ 11.00000 $ 45,650.00 05 $ 12.00000 $ 49,800.00 06 $ 18.00000 $ 74,700.00 07 $ 12.00000 $ 49,800.00 08 $ 12.00000 $ 49,800.00 09 $ 16.95000 $ 70,342.50

S. 6 MAINTENANCE OF TRAFFIC TOTALS AWD $ 55,965.10 02 $ 79,387.50 03 $ 101,061.47 04 $ 92,745.00 05 $ 109,088.10 06 $ 109,073.20 07 $ 122,370.00 08 $ 107,816.50 09 $ 146,070.40

Page 219:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 218 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 67 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 13,000.00000 $ 13,000.00 02 $ 19,000.00000 $ 19,000.00 03 $ 18,000.04000 $ 18,000.04 04 $ 7,000.00000 $ 7,000.00 05 $ 10,000.00000 $ 10,000.00 06 $ 10,000.00000 $ 10,000.00 07 $ 13,000.00000 $ 13,000.00 08 $ 12,000.00000 $ 12,000.00 09 $ 8,250.00000 $ 8,250.00 68 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 20,000.00000 $ 20,000.00 02 $ 30,000.00000 $ 30,000.00 03 $ 30,000.00000 $ 30,000.00 04 $ 37,000.00000 $ 37,000.00 05 $ 40,000.00000 $ 40,000.00 06 $ 25,000.00000 $ 25,000.00 07 $ 30,000.00000 $ 30,000.00 08 $ 40,000.00000 $ 40,000.00 09 $ 59,983.00000 $ 59,983.00 69 623E10001 CONST LAYOUT STAKES, APP LUMP SUM AWD $ 9,000.00000 $ 9,000.00 02 $ 7,500.00000 $ 7,500.00 03 $ 10,000.00000 $ 10,000.00 04 $ 6,000.00000 $ 6,000.00 05 $ 30,000.00000 $ 30,000.00 06 $ 9,000.00000 $ 9,000.00 07 $ 18,000.00000 $ 18,000.00 08 $ 16,000.00000 $ 16,000.00 09 $ 17,852.00000 $ 17,852.00 70 624E10000 MOBILIZATION LUMP SUM AWD $ 14,600.00000 $ 14,600.00 02 $ 15,000.00000 $ 15,000.00 03 $ 10,000.00000 $ 10,000.00 04 $ 20,000.00000 $ 20,000.00 05 $ 30,000.00000 $ 30,000.00 06 $ 10,000.00000 $ 10,000.00 07 $ 10,000.00000 $ 10,000.00 08 $ 40,000.00000 $ 40,000.00 09 $ 31,350.00000 $ 31,350.00

Page 220:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010027 PAGE NO. 219 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 71 806E16000 FIELD OFFICE, TYPE A 8.000 MONTH AWD $ 400.00000 $ 3,200.00 02 $ 600.00000 $ 4,800.00 03 $ 625.00000 $ 5,000.00 04 $ 900.00000 $ 7,200.00 05 $ 1,000.00000 $ 8,000.00 06 $ 500.00000 $ 4,000.00 07 $ 350.00000 $ 2,800.00 08 $ 1,500.00000 $ 12,000.00 09 $ 1,763.00000 $ 14,104.00

S. 7 INCIDENTALS TOTALS AWD $ 59,800.00 02 $ 76,300.00 03 $ 73,000.04 04 $ 77,200.00 05 $ 118,000.00 06 $ 58,000.00 07 $ 73,800.00 08 $ 120,000.00 09 $ 131,539.00

TOTAL AMOUNT OF THE BID AWD $ 713,933.99 02 $ 779,889.09 03 $ 879,469.00 04 $ 919,151.39 05 $ 986,464.54 06 $ 1,006,843.90 07 $ 1,054,731.35 08 $ 1,151,355.50 09 $ 1,237,330.56

Page 221:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010028 PID. 20277 MOT-741-5.86 TE21-G010(5) TYPE: TWO LANE RESURFACING LETTING: 01/24/01 COMPLETION DATE: 09/15/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: BARRETT PAVING MATERIALS INC AWARDED AMOUNT: $ 1,101,721.20 ENGINEERS ESTIMATE: $ 1,175,000.00 AWARDED BIDDER BIDDER 02 BARRETT PAVING MATERIALS INC S E JOHNSON COMPANIES INC 7374 MAIN ST 1345 FORD ST CINCINNATI ,OH 45244 MAUMEE ,OH 43537 BIDDER 03 BIDDER 04 L P CAVETT COMPANY JOHN R JURGENSEN COMPANY 600 SHEPHERD AVE 11641 MOSTELLER RD LOCKLAND ,OH 45215 CINCINNATI ,OH 45241

Page 222:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010028 PAGE NO. 221 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E23500 WEARING COURSE REMOVED 1,083.000 SQ YD AWD $ 4.50000 $ 4,873.50 02 $ 4.00000 $ 4,332.00 03 $ 2.00000 $ 2,166.00 04 $ 5.27000 $ 5,707.41 2 202E54100 RAISED PVMT MRK RMVD/STRG 1,381.000 EACH AWD $ 4.00000 $ 5,524.00 02 $ 4.00000 $ 5,524.00 03 $ 4.00000 $ 5,524.00 04 $ 3.82000 $ 5,275.42 3 254E01000 PAVEMENT PLANING, BITUMINOUS 130,024.000 SQ YD AWD $ 0.60000 $ 78,014.40 02 $ 0.66000 $ 85,815.84 03 $ 0.76000 $ 98,818.24 04 $ 0.82000 $ 106,619.68 4 407E10000 TACK COAT 13,004.000 GALLON AWD $ 0.50000 $ 6,502.00 02 $ 0.75000 $ 9,753.00 03 $ 0.85000 $ 11,053.40 04 $ 1.00000 $ 13,004.00 5 409E98000 SEALING, MISC: MULTI-SEAL SURFACING, TYPE 12 INTERLAYER (SPECIAL) 130,024.000 SQ YD AWD $ 1.85000 $ 240,544.40 02 $ 1.85000 $ 240,544.40 03 $ 1.85000 $ 240,544.40 04 $ 1.85000 $ 240,544.40 6 448E46010 ASPH CONC INTERMEDIATE, TYPE 1, PG64-28 2,675.000 CU YD AWD $ 64.00000 $ 171,200.00 02 $ 60.00000 $ 160,500.00 03 $ 57.65000 $ 154,213.75 04 $ 73.52000 $ 196,666.00 7 448E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1H 5,417.000 CU YD AWD $ 67.00000 $ 362,939.00 02 $ 61.00000 $ 330,437.00 03 $ 68.85000 $ 372,960.45 04 $ 71.12000 $ 385,257.04

Page 223:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010028 PAGE NO. 222 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 8 512E33010 TYPE 3 WATERPROOFING 749.000 SQ YD AWD $ 15.00000 $ 11,235.00 02 $ 16.50000 $ 12,358.50 03 $ 10.00000 $ 7,490.00 04 $ 14.10000 $ 10,560.90 9 519E12300 PTCHNG CONC DECK-TYPE B 238.000 SQ YD AWD $ 185.00000 $ 44,030.00 02 $ 185.00000 $ 44,030.00 03 $ 140.00000 $ 33,320.00 04 $ 182.00000 $ 43,316.00 10 611E25001 APPROACH SLAB (T=15"), APP 289.000 SQ YD AWD $ 191.00000 $ 55,199.00 02 $ 195.00000 $ 56,355.00 03 $ 191.00000 $ 55,199.00 04 $ 191.00000 $ 55,199.00 11 614E12460 WORK ZONE MARKING SIGN 12.000 EACH AWD $ 90.00000 $ 1,080.00 02 $ 50.00000 $ 600.00 03 $ 30.00000 $ 360.00 04 $ 85.00000 $ 1,020.00 12 614E20400 TEMP LANE LINE, CL II 14.720 MILE AWD $ 370.00000 $ 5,446.40 02 $ 144.00000 $ 2,119.68 03 $ 475.00000 $ 6,992.00 04 $ 297.18000 $ 4,374.49 13 614E21400 TEMP CL, CL II 7.360 MILE AWD $ 380.00000 $ 2,796.80 02 $ 155.00000 $ 1,140.80 03 $ 475.00000 $ 3,496.00 04 $ 340.80000 $ 2,508.29 14 617E10100 COMP AGGREGATE, TYPE A 231.000 CU YD AWD $ 40.00000 $ 9,240.00 02 $ 25.00000 $ 5,775.00 03 $ 33.80000 $ 7,807.80 04 $ 32.99000 $ 7,620.69

Page 224:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010028 PAGE NO. 223 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 15 621E00200 RAISED PAVEMENT MARKER, INSTALL ONLY 1,381.000 EACH AWD $ 7.00000 $ 9,667.00 02 $ 8.35000 $ 11,531.35 03 $ 7.00000 $ 9,667.00 04 $ 7.00000 $ 9,667.00 16 644E00100 EDGE LINE 2.380 MILE AWD $ 1,850.00000 $ 4,403.00 02 $ 1,585.00000 $ 3,772.30 03 $ 1,850.00000 $ 4,403.00 04 $ 1,850.00000 $ 4,403.00 17 644E00200 LANE LINE 7.400 MILE AWD $ 920.00000 $ 6,808.00 02 $ 845.00000 $ 6,253.00 03 $ 920.00000 $ 6,808.00 04 $ 920.00000 $ 6,808.00 18 644E00300 CENTER LINE 3.700 MILE AWD $ 3,450.00000 $ 12,765.00 02 $ 2,990.00000 $ 11,063.00 03 $ 3,450.00000 $ 12,765.00 04 $ 3,450.00000 $ 12,765.00 19 644E00400 CHANNELIZING LINE 6,263.000 LIN FT AWD $ 1.10000 $ 6,889.30 02 $ 1.05000 $ 6,576.15 03 $ 1.10000 $ 6,889.30 04 $ 1.10000 $ 6,889.30 20 644E00500 STOP LINE 970.000 LIN FT AWD $ 4.25000 $ 4,122.50 02 $ 4.80000 $ 4,656.00 03 $ 4.25000 $ 4,122.50 04 $ 4.25000 $ 4,122.50 21 644E00600 CROSSWALK LINE 450.000 LIN FT AWD $ 2.05000 $ 922.50 02 $ 2.50000 $ 1,125.00 03 $ 2.05000 $ 922.50 04 $ 2.05000 $ 922.50

Page 225:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010028 PAGE NO. 224 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 22 644E00700 TRANSVERSE LINE 3,191.000 LIN FT AWD $ 3.80000 $ 12,125.80 02 $ 3.45000 $ 11,008.95 03 $ 3.80000 $ 12,125.80 04 $ 3.80000 $ 12,125.80 23 644E01300 LANE ARROW 55.000 EACH AWD $ 70.00000 $ 3,850.00 02 $ 65.00000 $ 3,575.00 03 $ 70.00000 $ 3,850.00 04 $ 70.00000 $ 3,850.00 24 644E01400 WORD ON PAVEMENT, 72" 18.000 EACH AWD $ 90.00000 $ 1,620.00 02 $ 88.00000 $ 1,584.00 03 $ 90.00000 $ 1,620.00 04 $ 90.00000 $ 1,620.00 25 644E01510 DOTTED LINE, 6" 536.000 LIN FT AWD $ 1.35000 $ 723.60 02 $ 0.75000 $ 402.00 03 $ 1.35000 $ 723.60 04 $ 1.35000 $ 723.60

S. 1 ITEMS OF WORK TOTALS AWD $ 1,062,521.20 02 $ 1,020,831.97 03 $ 1,063,841.74 04 $ 1,141,570.02 26 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 6,200.00000 $ 6,200.00 02 $ 2,750.00000 $ 2,750.00 03 $ 1,670.00000 $ 1,670.00 04 $ 6,142.74000 $ 6,142.74 27 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 18,000.00000 $ 18,000.00 02 $ 56,444.00000 $ 56,444.00 03 $ 50,000.00000 $ 50,000.00 04 $ 43,568.70000 $ 43,568.70

Page 226:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010028 PAGE NO. 225 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 28 624E10000 MOBILIZATION LUMP SUM AWD $ 15,000.00000 $ 15,000.00 02 $ 40,000.00000 $ 40,000.00 03 $ 20,250.00000 $ 20,250.00 04 $ 40,000.00000 $ 40,000.00

S. 2 INCIDENTALS TOTALS AWD $ 39,200.00 02 $ 99,194.00 03 $ 71,920.00 04 $ 89,711.44

TOTAL AMOUNT OF THE BID AWD $ 1,101,721.20 02 $ 1,120,025.97 03 $ 1,135,761.74 04 $ 1,231,281.46

Page 227:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010029 PID. 19149 ADA-41-27.27 & VARIOUS NON-FEDERAL TYPE: RAISED PAVEMENT MARKERS LETTING: 01/24/01 COMPLETION DATE: 07/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: BARBOUR COMPANY AWARDED AMOUNT: $ 195,141.77 ENGINEERS ESTIMATE: $ 262,000.00 AWARDED BIDDER BIDDER 02 BARBOUR COMPANY TRAFFIC SPECIALISTS INC 1784 STATE ROUTE 63 5009 CINCINNATI-BROOKVILLE RD LEBANON ,OH 45036 OKEANA ,OH 45053-0190 BIDDER 03 BIDDER 04 INTERNATIONAL CONTR W L MARKERS, INC 450 E. STARR AVE 639 GLENMOOR DRIVE COLUMBUS ,OH 43201 COLUMBUS ,OH 43228

Page 228:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010029 PAGE NO. 227 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 621E00300 PRISMATIC RETROREFLECTOR 39,727.000 EACH AWD $ 3.51000 $ 139,441.77 02 $ 3.97000 $ 157,716.19 03 $ 4.30000 $ 170,826.10 04 $ 4.50000 $ 178,771.50 05 $ 4.60000 $ 182,744.20 2 621E00600 RAISED PVMT MARKER CASTING, INSTALL ONLY 3,600.000 EACH AWD $ 6.25000 $ 22,500.00 02 $ 10.00000 $ 36,000.00 03 $ 6.75000 $ 24,300.00 04 $ 7.00000 $ 25,200.00 05 $ 8.50000 $ 30,600.00 3 621E01000 TWO-WAY RADIO EQUIPMENT LUMP SUM AWD $ 150.00000 $ 150.00 02 $ 100.00000 $ 100.00 03 $ 192.80000 $ 192.80 04 $ 279.88000 $ 279.88 05 $ 55.80000 $ 55.80

S. 1 ITEMS OF WORK TOTALS AWD $ 162,091.77 02 $ 193,816.19 03 $ 195,318.90 04 $ 204,251.38 05 $ 213,400.00 4 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 1,050.00000 $ 1,050.00 02 $ 3,000.00000 $ 3,000.00 03 $ 4,000.00000 $ 4,000.00 04 $ 4,000.00000 $ 4,000.00 05 $ 1,250.00000 $ 1,250.00 5 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 30,000.00000 $ 30,000.00 02 $ 10,000.00000 $ 10,000.00 03 $ 15,000.00000 $ 15,000.00 04 $ 18,500.00000 $ 18,500.00 05 $ 16,650.00000 $ 16,650.00

Page 229:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010029 PAGE NO. 228 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 6 624E10000 MOBILIZATION LUMP SUM AWD $ 2,000.00000 $ 2,000.00 02 $ 10,000.00000 $ 10,000.00 03 $ 10,000.00000 $ 10,000.00 04 $ 5,500.00000 $ 5,500.00 05 $ 1,050.00000 $ 1,050.00

S. 2 INCIDENTALS TOTALS AWD $ 33,050.00 02 $ 23,000.00 03 $ 29,000.00 04 $ 28,000.00 05 $ 18,950.00

TOTAL AMOUNT OF THE BID AWD $ 195,141.77 02 $ 216,816.19 03 $ 224,318.90 04 $ 232,251.38 05 $ 232,350.00

Page 230:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010030 PID. 20308 ASD-3-0.00 NON-FEDERAL TYPE: HERBICIDAL SPRAYING LETTING: 01/24/01 COMPLETION DATE: 06/30/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: DEANGELO BROTHERS INC AWARDED AMOUNT: $ 123,900.00 ENGINEERS ESTIMATE: $ 149,000.00 AWARDED BIDDER BIDDER 02 DEANGELO BROTHERS INC CHEMI-TROL CHEMICAL CO 100 NORTH CONAHAN DR 2776 C.R. 69 HAZLETON ,PA 18201 GIBSONBURG ,OH 43431

Page 231:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010030 PAGE NO. 230 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 690E98400 MISC. TWO WAY RADIO EQUIPMENT LUMP SUM AWD $ 1,000.00000 $ 1,000.00 02 $ 100.00000 $ 100.00 2 691E41200 HERBICIDAL SPRAYING NON SELECT VEGETATION CONTROL, SAHARA CONCENTRATE 754.800 POUND AWD $ 17.50000 $ 13,209.00 02 $ 39.70000 $ 29,965.56 3 691E60060 HERBICIDAL SPRAYING, MISC. SELECT BROADLEAF WEED CONTROL, ESCORT CONCENTRATE 1,047.000 OUNCE AWD $ 41.00000 $ 42,927.00 02 $ 57.16000 $ 59,846.52 4 691E60070 HERBICIDAL SPRAYING, MISC. SELECT BROADLEAF WEED CONTROL, TORDON K CONCENTRATE 2,094.000 PINT AWD $ 29.00000 $ 60,726.00 02 $ 28.58000 $ 59,846.52

S. 1 ITEMS OF WORK TOTALS AWD $ 117,862.00 02 $ 149,758.60 5 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 3,038.00000 $ 3,038.00 02 $ 2,000.00000 $ 2,000.00 6 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 2,000.00000 $ 2,000.00 02 $ 100.00000 $ 100.00 7 624E10000 MOBILIZATION LUMP SUM AWD $ 1,000.00000 $ 1,000.00 02 $ 130.00000 $ 130.00

Page 232:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010030 PAGE NO. 231 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S. 2 INCIDENTALS TOTALS AWD $ 6,038.00 02 $ 2,230.00

TOTAL AMOUNT OF THE BID AWD $ 123,900.00 02 $ 151,988.60

Page 233:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010031 PID. 19473 BEL-70-0.05 & VAR NON-FEDERAL TYPE: PAVEMENT MARKING LETTING: 01/24/01 COMPLETION DATE: 11/15/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: CSA MARKING & MAINTENANCE, INC. AWARDED AMOUNT: $ 113,323.16 ENGINEERS ESTIMATE: $ 137,000.00 AWARDED BIDDER BIDDER 02 CSA MARKING & MAINTENANCE INC YANKEE CLIPPER COMPANY INC 11971 CHAMBERLAIN ROAD 98 HEATHER CREEK RUN AURORA ,OH 44202 YOUNGSTOWN ,OH 44511 BIDDER 03 BIDDER 04 AERO-MARK INC OGLESBY CONSTRUCTION INC 7600-B BOND ST 1600 TOLEDO RD RT 20 WEST GLENWILLOW ,OH 44139 NORWALK ,OH 44857 BIDDER 05 BIDDER 06 BARBOUR COMPANY HARTSOOK CONTRACTING COMPANY LTD 1784 STATE ROUTE 63 202 E MULBERRY ST LEBANON ,OH 45036 LEBANON ,OH 45036

Page 234:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010031 PAGE NO. 233 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 642E00202 LANE LINE, TYPE 2 9.480 MILE AWD $ 275.00000 $ 2,607.00 02 $ 350.00000 $ 3,318.00 03 $ 397.50000 $ 3,768.30 04 $ 300.00000 $ 2,844.00 05 $ 400.00000 $ 3,792.00 06 $ 377.00000 $ 3,573.96 07 $ 125.00000 $ 1,185.00 2 642E00402 CHANNELIZING LINE, TYPE 2 132,589.000 LIN FT AWD $ 0.14000 $ 18,562.46 02 $ 0.20000 $ 26,517.80 03 $ 0.17000 $ 22,540.13 04 $ 0.16000 $ 21,214.24 05 $ 0.17000 $ 22,540.13 06 $ 0.17000 $ 22,540.13 07 $ 0.20000 $ 26,517.80 3 642E00403 CHANNELIZING LINE, TYPE 2, APP 500.000 LIN FT AWD $ 0.50000 $ 250.00 02 $ 0.30000 $ 150.00 03 $ 0.70000 $ 350.00 04 $ 0.30000 $ 150.00 05 $ 0.34000 $ 170.00 06 $ 0.77000 $ 385.00 07 $ 0.20000 $ 100.00 4 642E00502 STOP LINE, TYPE 2 9,610.000 LIN FT AWD $ 1.20000 $ 11,532.00 02 $ 1.25000 $ 12,012.50 03 $ 1.40000 $ 13,454.00 04 $ 1.35000 $ 12,973.50 05 $ 1.29000 $ 12,396.90 06 $ 1.37000 $ 13,165.70 07 $ 1.00000 $ 9,610.00 5 642E00503 STOP LINE, TYPE 2, AS PER PLAN 100.000 LIN FT AWD $ 3.00000 $ 300.00 02 $ 1.00000 $ 100.00 03 $ 3.50000 $ 350.00 04 $ 2.50000 $ 250.00 05 $ 2.50000 $ 250.00 06 $ 3.77000 $ 377.00 07 $ 1.00000 $ 100.00

Page 235:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010031 PAGE NO. 234 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 6 642E00602 CROSSWALK LINE, TYPE 2 642.000 LIN FT AWD $ 1.00000 $ 642.00 02 $ 1.00000 $ 642.00 03 $ 1.40000 $ 898.80 04 $ 1.30000 $ 834.60 05 $ 1.00000 $ 642.00 06 $ 1.17000 $ 751.14 07 $ 1.25000 $ 802.50 7 642E00702 TRANSVERSE LINE, TYPE 2 55,937.000 LIN FT AWD $ 0.55000 $ 30,765.35 02 $ 0.60000 $ 33,562.20 03 $ 0.74000 $ 41,393.38 04 $ 0.72000 $ 40,274.64 05 $ 0.76000 $ 42,512.12 06 $ 0.77000 $ 43,071.49 07 $ 0.75000 $ 41,952.75 8 642E00802 CURB MARKING, TYPE 2 25,365.000 LIN FT AWD $ 0.20000 $ 5,073.00 02 $ 0.50000 $ 12,682.50 03 $ 0.38000 $ 9,638.70 04 $ 0.40000 $ 10,146.00 05 $ 0.37000 $ 9,385.05 06 $ 0.37000 $ 9,385.05 07 $ 0.75000 $ 19,023.75 9 642E00902 ISLAND MARKING, TYPE 2 2,929.000 SQ FT AWD $ 0.40000 $ 1,171.60 02 $ 1.50000 $ 4,393.50 03 $ 0.40000 $ 1,171.60 04 $ 1.30000 $ 3,807.70 05 $ 0.35000 $ 1,025.15 06 $ 0.57000 $ 1,669.53 07 $ 0.35000 $ 1,025.15 10 642E01002 RR SYMBOL MARKING, TYPE 2 55.000 EACH AWD $ 120.00000 $ 6,600.00 02 $ 100.00000 $ 5,500.00 03 $ 112.00000 $ 6,160.00 04 $ 119.00000 $ 6,545.00 05 $ 100.00000 $ 5,500.00 06 $ 117.00000 $ 6,435.00 07 $ 110.00000 $ 6,050.00

Page 236:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010031 PAGE NO. 235 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 11 642E01003 RR SYMBOL MARKING, TYPE 2, APP 5.000 EACH AWD $ 200.00000 $ 1,000.00 02 $ 100.00000 $ 500.00 03 $ 195.00000 $ 975.00 04 $ 175.00000 $ 875.00 05 $ 200.00000 $ 1,000.00 06 $ 177.00000 $ 885.00 07 $ 110.00000 $ 550.00 12 642E01112 SCHOOL SYMBOL MKG, 96",TYPE 2 74.000 EACH AWD $ 120.00000 $ 8,880.00 02 $ 100.00000 $ 7,400.00 03 $ 128.00000 $ 9,472.00 04 $ 140.00000 $ 10,360.00 05 $ 137.00000 $ 10,138.00 06 $ 127.00000 $ 9,398.00 07 $ 110.00000 $ 8,140.00 13 642E01113 SCHOOL SYM MKG, 96", TYPE 2,APP 5.000 EACH AWD $ 120.00000 $ 600.00 02 $ 100.00000 $ 500.00 03 $ 217.00000 $ 1,085.00 04 $ 190.00000 $ 950.00 05 $ 200.00000 $ 1,000.00 06 $ 177.00000 $ 885.00 07 $ 110.00000 $ 550.00 14 642E01202 PARKING LOT STALL MKG, TYPE 2 10,450.000 LIN FT AWD $ 0.25000 $ 2,612.50 02 $ 0.25000 $ 2,612.50 03 $ 0.34000 $ 3,553.00 04 $ 0.35000 $ 3,657.50 05 $ 0.35000 $ 3,657.50 06 $ 0.37000 $ 3,866.50 07 $ 0.50000 $ 5,225.00 15 642E01302 LANE ARROW, TYPE 2 333.000 EACH AWD $ 20.00000 $ 6,660.00 02 $ 30.00000 $ 9,990.00 03 $ 29.00000 $ 9,657.00 04 $ 30.00000 $ 9,990.00 05 $ 30.00000 $ 9,990.00 06 $ 27.00000 $ 8,991.00 07 $ 29.50000 $ 9,823.50

Page 237:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010031 PAGE NO. 236 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 16 642E01303 LANE ARROW, TYPE 2, AS PER PLAN 10.000 EACH AWD $ 50.00000 $ 500.00 02 $ 20.00000 $ 200.00 03 $ 49.00000 $ 490.00 04 $ 50.00000 $ 500.00 05 $ 60.00000 $ 600.00 06 $ 37.00000 $ 370.00 07 $ 29.50000 $ 295.00 17 642E01412 WORD ON PVMT, 96", TYPE 2 129.000 EACH AWD $ 35.00000 $ 4,515.00 02 $ 35.00000 $ 4,515.00 03 $ 39.00000 $ 5,031.00 04 $ 47.00000 $ 6,063.00 05 $ 40.00000 $ 5,160.00 06 $ 47.00000 $ 6,063.00 07 $ 38.50000 $ 4,966.50 18 642E01413 WORD ON PAVEMENT, 96", TYPE 2, APP 5.000 EACH AWD $ 60.00000 $ 300.00 02 $ 30.00000 $ 150.00 03 $ 71.00000 $ 355.00 04 $ 60.00000 $ 300.00 05 $ 80.00000 $ 400.00 06 $ 57.00000 $ 285.00 07 $ 38.50000 $ 192.50 19 642E01512 DOTTED LINE, 6", TYPE 2 1,809.000 LIN FT AWD $ 0.25000 $ 452.25 02 $ 0.35000 $ 633.15 03 $ 0.48000 $ 868.32 04 $ 0.35000 $ 633.15 05 $ 0.35000 $ 633.15 06 $ 0.37000 $ 669.33 07 $ 0.60000 $ 1,085.40 20 642E01704 HANDICAP SYMBOL MARKING, TYPE 2 10.000 EACH AWD $ 30.00000 $ 300.00 02 $ 20.00000 $ 200.00 03 $ 35.00000 $ 350.00 04 $ 40.00000 $ 400.00 05 $ 43.00000 $ 430.00 06 $ 37.00000 $ 370.00 07 $ 42.00000 $ 420.00

Page 238:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010031 PAGE NO. 237 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 21 642E20000 TWO-WAY RADIO EQUIPMENT LUMP SUM AWD $ 140.00000 $ 140.00 02 $ 1,000.00000 $ 1,000.00 03 $ 100.00000 $ 100.00 04 $ 150.00000 $ 150.00 05 $ 100.00000 $ 100.00 06 $ 57.00000 $ 57.00 07 $ 100.00000 $ 100.00

S. 1 TRAFFIC CONTROL TOTALS AWD $ 103,463.16 02 $ 126,579.15 03 $ 131,661.23 04 $ 132,918.33 05 $ 131,322.00 06 $ 133,193.83 07 $ 137,714.85 22 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 3,800.00000 $ 3,800.00 02 $ 2,000.00000 $ 2,000.00 03 $ 650.00000 $ 650.00 04 $ 1,000.00000 $ 1,000.00 05 $ 750.00000 $ 750.00 06 $ 1,700.00000 $ 1,700.00 07 $ 450.00000 $ 450.00 23 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 1,000.00000 $ 1,000.00 02 $ 1,000.00000 $ 1,000.00 03 $ 188.77000 $ 188.77 04 $ 170.00000 $ 170.00 05 $ 1,300.00000 $ 1,300.00 06 $ 257.00000 $ 257.00 07 $ 250.00000 $ 250.00 24 624E10000 MOBILIZATION LUMP SUM AWD $ 5,000.00000 $ 5,000.00 02 $ 1,000.00000 $ 1,000.00 03 $ 200.00000 $ 200.00 04 $ 200.00000 $ 200.00 05 $ 1,000.00000 $ 1,000.00 06 $ 214.00000 $ 214.00 07 $ 226.50000 $ 226.50

Page 239:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010031 PAGE NO. 238 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 25 806E16001 FIELD OFFICE, TYPE A, APP 6.000 MONTH AWD $ 10.00000 $ 60.00 02 $ 50.00000 $ 300.00 03 $ 50.00000 $ 300.00 04 $ 35.00000 $ 210.00 05 $ 50.00000 $ 300.00 06 $ 50.00000 $ 300.00 07 $ 100.00000 $ 600.00

S. 2 INCIDENTALS TOTALS AWD $ 9,860.00 02 $ 4,300.00 03 $ 1,338.77 04 $ 1,580.00 05 $ 3,350.00 06 $ 2,471.00 07 $ 1,526.50

TOTAL AMOUNT OF THE BID AWD $ 113,323.16 02 $ 130,879.15 03 $ 133,000.00 04 $ 134,498.33 05 $ 134,672.00 06 $ 135,664.83 07 $ 139,241.35

Page 240:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010032 PID. 18073 CHP-36-16.53 NON-FEDERAL TYPE: TWO LANE RESURFACING LETTING: 01/24/01 COMPLETION DATE: 07/15/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: A & B ASPHALT CORPORATION AWARDED AMOUNT: $ 354,180.17 ENGINEERS ESTIMATE: $ 380,000.00 AWARDED BIDDER BIDDER 02 A & B ASPHALT CORPORATION NORTHWOOD STONE & ASPHALT INC 1995 REBERT PIKE 1558 COUNTY RD 105 SPRINGFIELD ,OH 45506 BELLE CENTER ,OH 43310

Page 241:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010032 PAGE NO. 240 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E23500 WEARING COURSE REMOVED 357.000 SQ YD AWD $ 8.35000 $ 2,980.95 02 $ 35.00000 $ 12,495.00 03 $ 4.75000 $ 1,695.75 2 202E54100 RAISED PVMT MRK RMVD/STRG 279.000 EACH AWD $ 4.25000 $ 1,185.75 02 $ 7.90000 $ 2,204.10 03 $ 3.60000 $ 1,004.40 3 203E60000 LINEAR GRADING 339.000 STATION AWD $ 92.50000 $ 31,357.50 02 $ 108.00000 $ 36,612.00 03 $ 100.00000 $ 33,900.00 4 254E01000 PAVEMENT PLANING, BITUMINOUS 4,623.000 SQ YD AWD $ 1.57000 $ 7,258.11 02 $ 2.30000 $ 10,632.90 03 $ 2.25000 $ 10,401.75 5 301E46000 BITUMINOUS AGGREGATE BASE, PG64-22 1,281.000 CU YD AWD $ 60.75000 $ 77,820.75 02 $ 48.90000 $ 62,640.90 03 $ 65.00000 $ 83,265.00 6 407E10000 TACK COAT 4,778.000 GALLON AWD $ 1.15000 $ 5,494.70 02 $ 0.79000 $ 3,774.62 03 $ 0.75000 $ 3,583.50 7 448E46020 ASPH CONC INTERMEDIATE, TYPE 1, PG64-22 824.000 CU YD AWD $ 60.80000 $ 50,099.20 02 $ 56.20000 $ 46,308.80 03 $ 80.00000 $ 65,920.00 8 448E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1H 2,091.000 CU YD AWD $ 74.25000 $ 155,256.75 02 $ 74.50000 $ 155,779.50 03 $ 75.00000 $ 156,825.00

Page 242:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010032 PAGE NO. 241 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 9 614E12460 WORK ZONE MARKING SIGN 33.000 EACH AWD $ 68.00000 $ 2,244.00 02 $ 82.00000 $ 2,706.00 03 $ 45.00000 $ 1,485.00 10 614E21400 TEMP CL, CL II 6.420 MILE AWD $ 164.00000 $ 1,052.88 02 $ 198.00000 $ 1,271.16 03 $ 125.00000 $ 802.50 11 617E10100 COMP AGGREGATE, TYPE A 20.000 CU YD AWD $ 79.60000 $ 1,592.00 02 $ 87.80000 $ 1,756.00 03 $ 42.25000 $ 845.00 12 621E00200 RAISED PAVEMENT MARKER, INSTALL ONLY 199.000 EACH AWD $ 13.62000 $ 2,710.38 02 $ 10.20000 $ 2,029.80 03 $ 13.62000 $ 2,710.38 13 642E00102 EDGE LINE, TYPE 2 6.420 MILE AWD $ 396.00000 $ 2,542.32 02 $ 300.00000 $ 1,926.00 03 $ 396.00000 $ 2,542.32 14 642E00302 CENTER LINE, TYPE 2 3.210 MILE AWD $ 543.00000 $ 1,743.03 02 $ 480.00000 $ 1,540.80 03 $ 543.00000 $ 1,743.03 15 690E50000 MAILBOX SUPPORT 6.000 EACH AWD $ 122.00000 $ 732.00 02 $ 187.71000 $ 1,126.26 03 $ 58.50000 $ 351.00 16 829E18060 STOP LINE, TYPE B 105.000 LIN FT AWD $ 10.57000 $ 1,109.85 02 $ 17.45000 $ 1,832.25 03 $ 10.57000 $ 1,109.85

Page 243:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010032 PAGE NO. 242 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S. 1 ITEMS OF WORK TOTALS AWD $ 345,180.17 02 $ 344,636.09 03 $ 368,184.48 17 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 800.00000 $ 800.00 02 $ 560.01000 $ 560.01 03 $ 1,300.00000 $ 1,300.00 18 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 6,700.00000 $ 6,700.00 02 $ 3,803.61000 $ 3,803.61 03 $ 11,250.00000 $ 11,250.00 19 624E10000 MOBILIZATION LUMP SUM AWD $ 1,500.00000 $ 1,500.00 02 $ 10,000.00000 $ 10,000.00 03 $ 10,000.00000 $ 10,000.00

S. 2 INCIDENTALS TOTALS AWD $ 9,000.00 02 $ 14,363.62 03 $ 22,550.00

TOTAL AMOUNT OF THE BID AWD $ 354,180.17 02 $ 358,999.71 03 $ 390,734.48

Page 244:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010033 PID. 17998 CUY-174-0.00 NON-FEDERAL TYPE: TWO LANE RESURFACING LETTING: 01/24/01 COMPLETION DATE: 07/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: S E JOHNSON COMPANIES INC AWARDED AMOUNT: $ 389,756.50 ENGINEERS ESTIMATE: $ 409,000.00 AWARDED BIDDER BIDDER 02 S E JOHNSON COMPANIES INC NORTHERN OHIO PAVING COMPANY 1345 FORD ST 1749 HIGHLAND RD MAUMEE ,OH 43537 TWINSBURG ,OH 44087 BIDDER 03 BIDDER 04 KARVO PAVING COMPANY SCHLOSS PAVING CO 449 MUNROE FALLS RD 13700 MC CRACKEN RD TALLMADGE ,OH 44278 CLEVELAND ,OH 44125 BIDDER 05 BIDDER 06 G R OSTERLAND COMPANY ROMANO PAVING & EXCAVATING INC 2100 WEST 3RD ST 1103 EAST POLAND AVE CLEVELAND ,OH 44113 BESSEMER ,PA 16112 BIDDER 07 BIDDER 08 MC COURT CONSTRUCTION COMPANY KENMORE CONSTRUCTION CO INC 720 HOME AVE 700 HOME AVE AKRON ,OH 44310 AKRON ,OH 44310

Page 245:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010033 PAGE NO. 244 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E32001 CURB REMOVED, AS PER PLAN 400.000 LIN FT AWD $ 2.75000 $ 1,100.00 02 $ 1.00000 $ 400.00 03 $ 1.00000 $ 400.00 04 $ 2.00000 $ 800.00 05 $ 2.25000 $ 900.00 06 $ 1.00000 $ 400.00 07 $ 2.00000 $ 800.00 08 $ 2.00000 $ 800.00 2 253E01000 PAVEMENT REPAIR 3,000.000 SQ YD AWD $ 8.00000 $ 24,000.00 02 $ 5.00000 $ 15,000.00 03 $ 10.00000 $ 30,000.00 04 $ 5.00000 $ 15,000.00 05 $ 9.50000 $ 28,500.00 06 $ 8.50000 $ 25,500.00 07 $ 14.00000 $ 42,000.00 08 $ 15.00000 $ 45,000.00 3 254E01001 PAVEMENT PLANING, BIT., APP 58,817.000 SQ YD AWD $ 0.40000 $ 23,526.80 02 $ 1.02000 $ 59,993.34 03 $ 0.55000 $ 32,349.35 04 $ 1.15000 $ 67,639.55 05 $ 1.00000 $ 58,817.00 06 $ 0.80000 $ 47,053.60 07 $ 1.25000 $ 73,521.25 08 $ 1.50000 $ 88,225.50 4 254E01600 PATCHING PLANED SURF 6,000.000 SQ YD AWD $ 0.50000 $ 3,000.00 02 $ 0.55000 $ 3,300.00 03 $ 0.75000 $ 4,500.00 04 $ 0.10000 $ 600.00 05 $ 0.50000 $ 3,000.00 06 $ 0.75000 $ 4,500.00 07 $ 1.00000 $ 6,000.00 08 $ 1.00000 $ 6,000.00 5 407E10000 TACK COAT 5,950.000 GALLON AWD $ 0.50000 $ 2,975.00 02 $ 0.65000 $ 3,867.50 03 $ 1.05000 $ 6,247.50 04 $ 0.60000 $ 3,570.00 05 $ 0.70000 $ 4,165.00 06 $ 1.00000 $ 5,950.00 07 $ 0.50000 $ 2,975.00 08 $ 1.00000 $ 5,950.00

Page 246:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010033 PAGE NO. 245 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 6 407E14000 TACK COAT FOR INTERMEDIATE COURSE 2,942.000 GALLON AWD $ 0.50000 $ 1,471.00 02 $ 0.65000 $ 1,912.30 03 $ 1.05000 $ 3,089.10 04 $ 0.60000 $ 1,765.20 05 $ 0.70000 $ 2,059.40 06 $ 1.00000 $ 2,942.00 07 $ 0.50000 $ 1,471.00 08 $ 1.00000 $ 2,942.00 7 448E46020 ASPH CONC INTERMEDIATE, TYPE 1, PG64-22 815.000 CU YD AWD $ 76.00000 $ 61,940.00 02 $ 58.20000 $ 47,433.00 03 $ 74.00000 $ 60,310.00 04 $ 67.50000 $ 55,012.50 05 $ 85.25000 $ 69,478.75 06 $ 74.30000 $ 60,554.50 07 $ 63.00000 $ 51,345.00 08 $ 70.00000 $ 57,050.00 8 448E90000 ASPHALT CONCRETE, MISC.: ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG70-22 2,451.000 CU YD AWD $ 77.50000 $ 189,952.50 02 $ 72.35000 $ 177,329.85 03 $ 78.00000 $ 191,178.00 04 $ 73.50000 $ 180,148.50 05 $ 75.00000 $ 183,825.00 06 $ 83.00000 $ 203,433.00 07 $ 75.00000 $ 183,825.00 08 $ 85.00000 $ 208,335.00 9 604E09001 CATCH BASIN ADJ TO GRADE,APP 12.000 EACH AWD $ 250.00000 $ 3,000.00 02 $ 150.00000 $ 1,800.00 03 $ 400.00000 $ 4,800.00 04 $ 350.00000 $ 4,200.00 05 $ 70.00000 $ 840.00 06 $ 200.00000 $ 2,400.00 07 $ 400.00000 $ 4,800.00 08 $ 650.00000 $ 7,800.00

Page 247:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010033 PAGE NO. 246 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 10 604E09500 CATCH BASIN RECON TO GRADE 1.000 EACH AWD $ 400.00000 $ 400.00 02 $ 550.00000 $ 550.00 03 $ 700.00000 $ 700.00 04 $ 1,000.00000 $ 1,000.00 05 $ 500.00000 $ 500.00 06 $ 1,500.00000 $ 1,500.00 07 $ 920.00000 $ 920.00 08 $ 1,500.00000 $ 1,500.00 11 604E20601 INLET ADJ TO GRADE, APP 2.000 EACH AWD $ 365.00000 $ 730.00 02 $ 150.00000 $ 300.00 03 $ 500.00000 $ 1,000.00 04 $ 400.00000 $ 800.00 05 $ 100.00000 $ 200.00 06 $ 500.00000 $ 1,000.00 07 $ 400.00000 $ 800.00 08 $ 650.00000 $ 1,300.00 12 604E20800 INLET RECON TO GRADE 1.000 EACH AWD $ 400.00000 $ 400.00 02 $ 550.00000 $ 550.00 03 $ 800.00000 $ 800.00 04 $ 1,000.00000 $ 1,000.00 05 $ 500.00000 $ 500.00 06 $ 1,500.00000 $ 1,500.00 07 $ 920.00000 $ 920.00 08 $ 1,500.00000 $ 1,500.00 13 604E39501 MON BOX ADJ TO GRADE, APP 1.000 EACH AWD $ 100.00000 $ 100.00 02 $ 375.00000 $ 375.00 03 $ 200.00000 $ 200.00 04 $ 400.00000 $ 400.00 05 $ 275.00000 $ 275.00 06 $ 500.00000 $ 500.00 07 $ 400.00000 $ 400.00 08 $ 200.00000 $ 200.00 14 604E50000 MISCELLANEOUS METAL 2,500.000 POUND AWD $ 0.50000 $ 1,250.00 02 $ 1.00000 $ 2,500.00 03 $ 1.00000 $ 2,500.00 04 $ 0.50000 $ 1,250.00 05 $ 0.75000 $ 1,875.00 06 $ 1.00000 $ 2,500.00 07 $ 2.00000 $ 5,000.00 08 $ 2.00000 $ 5,000.00

Page 248:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010033 PAGE NO. 247 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 15 614E12460 WORK ZONE MARKING SIGN 26.000 EACH AWD $ 75.00000 $ 1,950.00 02 $ 55.00000 $ 1,430.00 03 $ 70.00000 $ 1,820.00 04 $ 50.00000 $ 1,300.00 05 $ 50.00000 $ 1,300.00 06 $ 100.00000 $ 2,600.00 07 $ 70.00000 $ 1,820.00 08 $ 150.00000 $ 3,900.00 16 614E13000 BIT CONC FOR MAINT TRAF 100.000 CU YD AWD $ 75.00000 $ 7,500.00 02 $ 45.00000 $ 4,500.00 03 $ 20.00000 $ 2,000.00 04 $ 40.00000 $ 4,000.00 05 $ 50.00000 $ 5,000.00 06 $ 60.00000 $ 6,000.00 07 $ 90.00000 $ 9,000.00 08 $ 60.00000 $ 6,000.00 17 614E21100 TEMP CL, CL I, 642 PAINT 15.180 MILE AWD $ 740.00000 $ 11,233.20 02 $ 255.00000 $ 3,870.90 03 $ 740.00000 $ 11,233.20 04 $ 740.00000 $ 11,233.20 05 $ 1,200.00000 $ 18,216.00 06 $ 600.00000 $ 9,108.00 07 $ 500.00000 $ 7,590.00 08 $ 500.00000 $ 7,590.00 18 614E21500 TEMP CL, CL II, 642 PAINT 7.590 MILE AWD $ 390.00000 $ 2,960.10 02 $ 150.00000 $ 1,138.50 03 $ 390.00000 $ 2,960.10 04 $ 390.00000 $ 2,960.10 05 $ 1,000.00000 $ 7,590.00 06 $ 720.00000 $ 5,464.80 07 $ 600.00000 $ 4,554.00 08 $ 500.00000 $ 3,795.00

Page 249:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010033 PAGE NO. 248 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 19 614E26200 TEMP STOP LINE, CL I, 642 PT 198.000 LIN FT AWD $ 4.40000 $ 871.20 02 $ 5.00000 $ 990.00 03 $ 4.50000 $ 891.00 04 $ 4.40000 $ 871.20 05 $ 3.00000 $ 594.00 06 $ 4.80000 $ 950.40 07 $ 4.00000 $ 792.00 08 $ 2.00000 $ 396.00 20 632E26501 DETECTOR LOOP, APP 2.000 EACH AWD $ 1,000.00000 $ 2,000.00 02 $ 1,200.00000 $ 2,400.00 03 $ 1,100.00000 $ 2,200.00 04 $ 1,000.00000 $ 2,000.00 05 $ 1,200.00000 $ 2,400.00 06 $ 1,400.00000 $ 2,800.00 07 $ 1,350.00000 $ 2,700.00 08 $ 950.00000 $ 1,900.00 21 638E10801 VALVE BOX ADJ TO GRADE, APP 5.000 EACH AWD $ 110.00000 $ 550.00 02 $ 75.00000 $ 375.00 03 $ 75.00000 $ 375.00 04 $ 250.00000 $ 1,250.00 05 $ 100.00000 $ 500.00 06 $ 200.00000 $ 1,000.00 07 $ 100.00000 $ 500.00 08 $ 125.00000 $ 625.00 22 828E10000 EDGE LINE 7.590 MILE AWD $ 2,050.00000 $ 15,559.50 02 $ 2,050.00000 $ 15,559.50 03 $ 2,100.00000 $ 15,939.00 04 $ 2,050.00000 $ 15,559.50 05 $ 2,500.00000 $ 18,975.00 06 $ 2,800.00000 $ 21,252.00 07 $ 2,050.00000 $ 15,559.50 08 $ 2,450.00000 $ 18,595.50 23 828E10200 CENTER LINE 3.790 MILE AWD $ 3,480.00000 $ 13,189.20 02 $ 3,480.00000 $ 13,189.20 03 $ 3,500.00000 $ 13,265.00 04 $ 3,480.00000 $ 13,189.20 05 $ 4,200.00000 $ 15,918.00 06 $ 4,800.00000 $ 18,192.00 07 $ 3,480.00000 $ 13,189.20 08 $ 4,100.00000 $ 15,539.00

Page 250:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010033 PAGE NO. 249 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 24 828E10400 STOP LINE 66.000 LIN FT AWD $ 13.00000 $ 858.00 02 $ 13.00000 $ 858.00 03 $ 13.00000 $ 858.00 04 $ 13.00000 $ 858.00 05 $ 20.00000 $ 1,320.00 06 $ 24.00000 $ 1,584.00 07 $ 13.00000 $ 858.00 08 $ 20.00000 $ 1,320.00 25 828E20100 SCHOOL SYMBOL MARKING, 72" 4.000 EACH AWD $ 550.00000 $ 2,200.00 02 $ 550.00000 $ 2,200.00 03 $ 550.00000 $ 2,200.00 04 $ 550.00000 $ 2,200.00 05 $ 500.00000 $ 2,000.00 06 $ 600.00000 $ 2,400.00 07 $ 550.00000 $ 2,200.00 08 $ 500.00000 $ 2,000.00 26 830E10000 ASPHALT CONCRETE CURB, TYPE 1 400.000 LIN FT AWD $ 4.10000 $ 1,640.00 02 $ 5.35000 $ 2,140.00 03 $ 6.00000 $ 2,400.00 04 $ 6.00000 $ 2,400.00 05 $ 3.50000 $ 1,400.00 06 $ 7.00000 $ 2,800.00 07 $ 7.50000 $ 3,000.00 08 $ 5.00000 $ 2,000.00

S. 1 ITEMS OF WORK TOTALS AWD $ 374,356.50 02 $ 363,962.09 03 $ 394,215.25 04 $ 391,006.95 05 $ 430,148.15 06 $ 433,884.30 07 $ 436,539.95 08 $ 495,263.00 27 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 1,500.00000 $ 1,500.00 02 $ 7,000.00000 $ 7,000.00 03 $ 3,000.00000 $ 3,000.00 04 $ 2,050.00000 $ 2,050.00 05 $ 1,500.00000 $ 1,500.00 06 $ 4,600.00000 $ 4,600.00 07 $ 3,500.00000 $ 3,500.00 08 $ 2,000.00000 $ 2,000.00

Page 251:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010033 PAGE NO. 250 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 28 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 3,000.00000 $ 3,000.00 02 $ 24,100.00000 $ 24,100.00 03 $ 7,500.00000 $ 7,500.00 04 $ 13,000.00000 $ 13,000.00 05 $ 1,500.00000 $ 1,500.00 06 $ 22,000.00000 $ 22,000.00 07 $ 20,000.00000 $ 20,000.00 08 $ 31,000.00000 $ 31,000.00 29 623E10000 CONSTRUCTION LAYOUT STAKES LUMP SUM AWD $ 700.00000 $ 700.00 02 $ 1,400.00000 $ 1,400.00 03 $ 400.00000 $ 400.00 04 $ 1,000.00000 $ 1,000.00 05 $ 270.00000 $ 270.00 06 $ 1,000.00000 $ 1,000.00 07 $ 3,000.00000 $ 3,000.00 08 $ 1,500.00000 $ 1,500.00 30 624E10000 MOBILIZATION LUMP SUM AWD $ 10,000.00000 $ 10,000.00 02 $ 10,000.00000 $ 10,000.00 03 $ 3,000.00000 $ 3,000.00 04 $ 1,350.00000 $ 1,350.00 05 $ 1,500.00000 $ 1,500.00 06 $ 5,000.00000 $ 5,000.00 07 $ 10,000.00000 $ 10,000.00 08 $ 2,000.00000 $ 2,000.00 31 690E86000 CELLULAR PHONE 2.000 EACH AWD $ 100.00000 $ 200.00 02 $ 200.00000 $ 400.00 03 $ 300.00000 $ 600.00 04 $ 500.00000 $ 1,000.00 05 $ 500.00000 $ 1,000.00 06 $ 750.00000 $ 1,500.00 07 $ 400.00000 $ 800.00 08 $ 300.00000 $ 600.00

Page 252:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010033 PAGE NO. 251 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S. 2 INCIDENTALS TOTALS AWD $ 15,400.00 02 $ 42,900.00 03 $ 14,500.00 04 $ 18,400.00 05 $ 5,770.00 06 $ 34,100.00 07 $ 37,300.00 08 $ 37,100.00

TOTAL AMOUNT OF THE BID AWD $ 389,756.50 02 $ 406,862.09 03 $ 408,715.25 04 $ 409,406.95 05 $ 435,918.15 06 $ 467,984.30 07 $ 473,839.95 08 $ 532,363.00

Page 253:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010035 PID. 19810 LOG-235-15.47 NON-FEDERAL TYPE: TWO LANE RESURFACING LETTING: 01/24/01 COMPLETION DATE: 08/15/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: NORTHWOOD STONE & ASPHALT INC AWARDED AMOUNT: $ 245,884.44 ENGINEERS ESTIMATE: $ 260,000.00 AWARDED BIDDER BIDDER 02 NORTHWOOD STONE & ASPHALT INC S E JOHNSON COMPANIES INC 1558 COUNTY RD 105 1345 FORD ST BELLE CENTER ,OH 43310 MAUMEE ,OH 43537

Page 254:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010035 PAGE NO. 253 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E23500 WEARING COURSE REMOVED 1,308.000 SQ YD AWD $ 9.85000 $ 12,883.80 02 $ 3.00000 $ 3,924.00 2 202E54100 RAISED PVMT MRK RMVD/STRG 442.000 EACH AWD $ 3.70000 $ 1,635.40 02 $ 5.75000 $ 2,541.50 3 203E60700 GRADING MAILBOX APPROACHES 3.000 EACH AWD $ 56.00000 $ 168.00 02 $ 60.00000 $ 180.00 4 254E01000 PAVEMENT PLANING, BITUMINOUS 4,631.000 SQ YD AWD $ 1.30000 $ 6,020.30 02 $ 1.55000 $ 7,178.05 5 407E10000 TACK COAT 7,429.000 GALLON AWD $ 0.85000 $ 6,314.65 02 $ 1.00000 $ 7,429.00 6 448E46020 ASPH CONC INTERMEDIATE, TYPE 1, PG64-22 1,044.000 CU YD AWD $ 57.00000 $ 59,508.00 02 $ 70.00000 $ 73,080.00 7 448E47020 ASPH CONC SURFACE, TYPE 1, PG64-22 2,063.000 CU YD AWD $ 57.00000 $ 117,591.00 02 $ 70.00000 $ 144,410.00 8 516E31300 POLYMER MOD ASPH EXP JT SYSTEM 56.000 LIN FT AWD $ 91.86000 $ 5,144.16 02 $ 80.00000 $ 4,480.00 9 614E12460 WORK ZONE MARKING SIGN 44.000 EACH AWD $ 101.00000 $ 4,444.00 02 $ 48.00000 $ 2,112.00 10 614E21400 TEMP CL, CL II 7.960 MILE AWD $ 125.00000 $ 995.00 02 $ 100.00000 $ 796.00

Page 255:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010035 PAGE NO. 254 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 11 617E10100 COMP AGGREGATE, TYPE A 519.000 CU YD AWD $ 23.00000 $ 11,937.00 02 $ 25.00000 $ 12,975.00 12 621E00200 RAISED PAVEMENT MARKER, INSTALL ONLY 330.000 EACH AWD $ 8.53000 $ 2,814.90 02 $ 10.00000 $ 3,300.00 13 642E00102 EDGE LINE, TYPE 2 8.300 MILE AWD $ 320.00000 $ 2,656.00 02 $ 327.00000 $ 2,714.10 14 642E00302 CENTER LINE, TYPE 2 3.980 MILE AWD $ 460.00000 $ 1,830.80 02 $ 474.00000 $ 1,886.52 15 642E00402 CHANNELIZING LINE, TYPE 2 125.000 LIN FT AWD $ 0.45000 $ 56.25 02 $ 0.45000 $ 56.25 16 642E00502 STOP LINE, TYPE 2 117.000 LIN FT AWD $ 2.25000 $ 263.25 02 $ 2.55000 $ 298.35 17 642E01302 LANE ARROW, TYPE 2 4.000 EACH AWD $ 38.00000 $ 152.00 02 $ 45.00000 $ 180.00 18 642E01412 WORD ON PVMT, 96", TYPE 2 2.000 EACH AWD $ 55.00000 $ 110.00 02 $ 55.00000 $ 110.00 19 690E50000 MAILBOX SUPPORT 3.000 EACH AWD $ 96.56000 $ 289.68 02 $ 75.00000 $ 225.00

S. 1 ITEMS OF WORK TOTALS AWD $ 234,814.19 02 $ 267,875.77

Page 256:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 010035 PAGE NO. 255 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 20 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 350.00000 $ 350.00 02 $ 1,500.00000 $ 1,500.00 21 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 3,720.25000 $ 3,720.25 02 $ 8,000.00000 $ 8,000.00 22 624E10000 MOBILIZATION LUMP SUM AWD $ 7,000.00000 $ 7,000.00 02 $ 10,000.00000 $ 10,000.00

S. 2 INCIDENTALS TOTALS AWD $ 11,070.25 02 $ 19,500.00

TOTAL AMOUNT OF THE BID AWD $ 245,884.44 02 $ 287,375.77

Page 257:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 013000 PID. 18722 MAH-11-16.04 TE21-G000(640) TYPE: BRIDGE REPLACEMENT (3 BRIDGES) LETTING: 01/24/01 COMPLETION DATE: 06/30/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: VELOTTA COMPANY AWARDED AMOUNT: $ 4,139,117.91 ENGINEERS ESTIMATE: $ 3,980,000.00 AWARDED BIDDER BIDDER 02 VELOTTA COMPANY BECDIR CONSTRUCTION COMPANY 6740 RIDGE RD 4990 MAHONING AVE SHARON CENTER ,OH 44274 YOUNGSTOWN ,OH 44515 BIDDER 03 BIDDER 04 KEFFLER BRIDGE/KEFFLER CONSTRUCTION-JV A P O'HORO COMPANY PO BOX 247 3130 BELMONT AVE CANFIELD ,OH 44406-0247 YOUNGSTOWN ,OH 44504

Page 258:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 013000 PAGE NO. 257 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 201E11000 CLEARING AND GRUBBING LUMP SUM AWD $ 11,379.30000 $ 11,379.30 02 $ 25,000.00000 $ 25,000.00 03 $ 45,000.00000 $ 45,000.00 04 $ 90,000.00000 $ 90,000.00 2 202E11000 STRUCTURE REMOVED LUMP SUM AWD $ 12,858.00000 $ 12,858.00 02 $ 1.00000 $ 1.00 03 $ 35,000.00000 $ 35,000.00 04 $ 14,000.00000 $ 14,000.00 3 690E21000 MISC.: APPROACH SLAB REMOVED LUMP SUM AWD $ 16,256.42000 $ 16,256.42 02 $ 30,000.00000 $ 30,000.00 03 $ 20,000.00000 $ 20,000.00 04 $ 11,000.00000 $ 11,000.00 4 690E21000 MISC.: DRAINAGE LUMP SUM AWD $ 20,819.97000 $ 20,819.97 02 $ 1.00000 $ 1.00 03 $ 25,000.00000 $ 25,000.00 04 $ 10,000.00000 $ 10,000.00 7 690E21000 MISC.: GUARDRAIL LUMP SUM AWD $ 24,975.00000 $ 24,975.00 02 $ 10,000.00000 $ 10,000.00 03 $ 20,000.00000 $ 20,000.00 04 $ 20,000.00000 $ 20,000.00

S. 1 ROADWAY TOTALS AWD $ 350,236.99 02 $ 565,002.00 03 $ 677,000.00 04 $ 773,910.00 11 877E98000 TEMPORARY EROSION CONTROL, MISC.: PERMANENT EROSION CONTROL AS PER SS877 LUMP SUM AWD $ 4,310.00000 $ 4,310.00 02 $ 15,000.00000 $ 15,000.00 03 $ 3,000.00000 $ 3,000.00 04 $ 4,500.00000 $ 4,500.00

Page 259:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 013000 PAGE NO. 258 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 12 877E98000 TEMPORARY EROSION CONTROL, MISC.: TEMPORARY ERION CONTROL AS PER SS877 LUMP SUM AWD $ 4,279.30000 $ 4,279.30 02 $ 2,000.00000 $ 2,000.00 03 $ 3,000.00000 $ 3,000.00 04 $ 3,000.00000 $ 3,000.00

S. 2 EROSION CONTROL TOTALS AWD $ 8,589.30 02 $ 17,000.00 03 $ 6,000.00 04 $ 7,500.00 13 690E21000 MISC.: LIGHTING LUMP SUM AWD $ 1,258,550.00000 $ 1,258,550.00 02 $ 1,295,000.00000 $ 1,295,000.00 03 $ 1,266,000.00000 $ 1,266,000.00 04 $ 1,258,550.00000 $ 1,258,550.00 14 690E21000 MISC.: MAINTAIN LIGHTING LUMP SUM AWD $ 7,500.00000 $ 7,500.00 02 $ 8,000.00000 $ 8,000.00 03 $ 1.00000 $ 1.00 04 $ 7,500.00000 $ 7,500.00

S. 3 LIGHTING TOTALS AWD $ 1,266,050.00 02 $ 1,303,000.00 03 $ 1,266,001.00 04 $ 1,266,050.00 15 690E21000 MISC.: PAVEMENT MARKINGS LUMP SUM AWD $ 29,730.00000 $ 29,730.00 02 $ 20,000.00000 $ 20,000.00 03 $ 20,000.00000 $ 20,000.00 04 $ 26,725.00000 $ 26,725.00

Page 260:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 013000 PAGE NO. 259 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 16 690E21000 MISC.: SIGNS, SUPPORTS AND SIGN LIGHTING LUMP SUM AWD $ 53,500.00000 $ 53,500.00 02 $ 58,000.00000 $ 58,000.00 03 $ 50,000.00000 $ 50,000.00 04 $ 81,715.00000 $ 81,715.00

S. 4 TRAFFIC CONTROL TOTALS AWD $ 83,230.00 02 $ 78,000.00 03 $ 70,000.00 04 $ 108,440.00 17 690E21000 MISC.: TEMPORARY PAVEMENT LUMP SUM AWD $ 5,928.66000 $ 5,928.66 02 $ 35,000.00000 $ 35,000.00 03 $ 1.00000 $ 1.00 04 $ 50,000.00000 $ 50,000.00

S. 5 MAINTENANCE OF TRAFFIC TOTALS AWD $ 5,928.66 02 $ 35,000.00 03 $ 1.00 04 $ 50,000.00 18 202E11203 PORT OF STR REM, >20', APP LUMP SUM AWD $ 89,041.34000 $ 89,041.34 02 $ 140,000.00000 $ 140,000.00 03 $ 190,000.00000 $ 190,000.00 04 $ 110,000.00000 $ 110,000.00 19 530E00200 STRUCTURE, MISC. L SUBSTRUCTURE LUMP SUM AWD $ 50,470.42000 $ 50,470.42 02 $ 40,000.00000 $ 40,000.00 03 $ 50,000.00000 $ 50,000.00 04 $ 50,000.00000 $ 50,000.00 20 530E00200 STRUCTURE, MISC. L SUPERSTRUCTURE LUMP SUM AWD $ 458,354.00000 $ 458,354.00 02 $ 55,000.00000 $ 55,000.00 03 $ 140,000.00000 $ 140,000.00 04 $ 82,000.00000 $ 82,000.00

Page 261:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 013000 PAGE NO. 260 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S. 6 STRUCTURE REPAIR TOTALS AWD $ 772,940.08 02 $ 765,000.00 03 $ 820,000.00 04 $ 862,000.00 21 202E11203 PORT OF STR REM, >20', APP LUMP SUM AWD $ 109,354.21000 $ 109,354.21 02 $ 120,000.00000 $ 120,000.00 03 $ 230,000.00000 $ 230,000.00 04 $ 120,000.00000 $ 120,000.00 22 530E00200 STRUCTURE, MISC. L SUBSTRUCTURE LUMP SUM AWD $ 60,117.90000 $ 60,117.90 02 $ 90,000.00000 $ 90,000.00 03 $ 50,000.00000 $ 50,000.00 04 $ 70,000.00000 $ 70,000.00 23 530E00200 STRUCTURE, MISC. L SUPERSTRUCTURE LUMP SUM AWD $ 472,000.00000 $ 472,000.00 02 $ 250,000.00000 $ 250,000.00 03 $ 130,000.00000 $ 130,000.00 04 $ 360,000.00000 $ 360,000.00

S. 7 BRIDGE NO. MAH-11-1605 TOTALS AWD $ 646,472.11 02 $ 640,000.00 03 $ 530,000.00 04 $ 730,000.00 24 202E11203 PORT OF STR REM, >20', APP LUMP SUM AWD $ 58,773.37000 $ 58,773.37 02 $ 100,000.00000 $ 100,000.00 03 $ 130,000.00000 $ 130,000.00 04 $ 70,000.00000 $ 70,000.00 25 530E00200 STRUCTURE, MISC. L SUBSTRUCTURE LUMP SUM AWD $ 35,669.98000 $ 35,669.98 02 $ 40,000.00000 $ 40,000.00 03 $ 50,000.00000 $ 50,000.00 04 $ 47,000.00000 $ 47,000.00

Page 262:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 013000 PAGE NO. 261 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 26 530E00200 STRUCTURE, MISC. L SUPERSTRUCTURE LUMP SUM AWD $ 281,000.00000 $ 281,000.00 02 $ 30,000.00000 $ 30,000.00 03 $ 120,000.00000 $ 120,000.00 04 $ 65,000.00000 $ 65,000.00

S. 8 BRIDGE NO. MAH-11-1615 TOTALS AWD $ 471,403.35 02 $ 440,000.00 03 $ 500,000.00 04 $ 460,000.00 27 107E99000 UTILITY COORDINATION LUMP SUM AWD $ 41,657.00000 $ 41,657.00 02 $ 10,000.00000 $ 10,000.00 03 $ 15,000.00000 $ 15,000.00 04 $ 4,300.00000 $ 4,300.00 28 690E20010 AS-BUILT CONSTRUCTION PLANS LUMP SUM AWD $ 7,218.00000 $ 7,218.00 02 $ 5,000.00000 $ 5,000.00 03 $ 60,000.00000 $ 60,000.00 04 $ 36,900.00000 $ 36,900.00 29 690E20020 FIELD SURVEYS LUMP SUM AWD $ 40,000.00000 $ 40,000.00 02 $ 30,000.00000 $ 30,000.00 03 $ 90,000.00000 $ 90,000.00 04 $ 41,400.00000 $ 41,400.00 30 690E20060 FINAL PLAN SUBMISSION LUMP SUM AWD $ 169,773.00000 $ 169,773.00 02 $ 80,000.00000 $ 80,000.00 03 $ 165,000.00000 $ 165,000.00 04 $ 45,700.00000 $ 45,700.00

S. 9 ENGINEERING AND SURVEYING SERVICES TOTALS AWD $ 258,648.00 02 $ 125,000.00 03 $ 330,000.00 04 $ 128,300.00

Page 263:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 013000 PAGE NO. 262 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 32 100E99010 PROFESSIONAL LIABILITY INSURANCE LUMP SUM AWD $ 19,435.74000 $ 19,435.74 02 $ 40,000.00000 $ 40,000.00 03 $ 30,000.00000 $ 30,000.00 04 $ 31,250.00000 $ 31,250.00 33 103E99000 PREMIUM FOR PREFORMANCE/PAYMENT LUMP SUM AWD $ 46,041.71000 $ 46,041.71 02 $ 75,000.00000 $ 75,000.00 03 $ 50,000.00000 $ 50,000.00 04 $ 50,000.00000 $ 50,000.00 34 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 76,844.67000 $ 76,844.67 02 $ 160,000.00000 $ 160,000.00 03 $ 180,000.00000 $ 180,000.00 04 $ 206,660.00000 $ 206,660.00 35 623E10000 CONSTRUCTION LAYOUT STAKES LUMP SUM AWD $ 10,086.20000 $ 10,086.20 02 $ 15,000.00000 $ 15,000.00 03 $ 100,000.00000 $ 100,000.00 04 $ 11,250.00000 $ 11,250.00 36 624E10000 MOBILIZATION LUMP SUM AWD $ 100,000.00000 $ 100,000.00 02 $ 100,000.00000 $ 100,000.00 03 $ 100,000.00000 $ 100,000.00 04 $ 50,000.00000 $ 50,000.00 37 806E16011 FIELD OFFICE, TYPE B, AS PER PLAN 10.000 MONTH AWD $ 2,321.11000 $ 23,211.10 02 $ 1,500.00000 $ 15,000.00 03 $ 3,000.00000 $ 30,000.00 04 $ 1,000.00000 $ 10,000.00

S.10 INCIDENTALS TOTALS AWD $ 275,619.42 02 $ 405,000.00 03 $ 490,000.00 04 $ 359,160.00

Page 264:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 013000 PAGE NO. 263 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 100 690E20080 SUBSURFACE INVESTIGATIONS LUMP SUM AWD $ 62,750.00000 $ 62,750.00 02 $ 90,000.00000 $ 90,000.00 03 $ 70,000.00000 $ 70,000.00 04 $ 62,250.00000 $ 62,250.00

S. 1 ROADWAY TOTALS AWD $ 350,236.99 02 $ 565,002.00 03 $ 677,000.00 04 $ 773,910.00 101 885E99000 SPECIAL -FLD PNT EX STEEL W/WARRANTY LUMP SUM AWD $ 170,074.32000 $ 170,074.32 02 $ 170,000.00000 $ 170,000.00 03 $ 200,000.00000 $ 200,000.00 04 $ 240,000.00000 $ 240,000.00 102 894E99000 HIGH PERFORMANCE CONCRETE W/WARRANTY LUMP SUM AWD $ 5,000.00000 $ 5,000.00 02 $ 360,000.00000 $ 360,000.00 03 $ 240,000.00000 $ 240,000.00 04 $ 380,000.00000 $ 380,000.00

S. 6 STRUCTURE REPAIR TOTALS AWD $ 772,940.08 02 $ 765,000.00 03 $ 820,000.00 04 $ 862,000.00 103 894E99000 HIGH PERFORMANCE CONCRETE W/WARRANTY LUMP SUM AWD $ 5,000.00000 $ 5,000.00 02 $ 180,000.00000 $ 180,000.00 03 $ 120,000.00000 $ 120,000.00 04 $ 180,000.00000 $ 180,000.00

S. 7 BRIDGE NO. MAH-11-1605 TOTALS AWD $ 646,472.11 02 $ 640,000.00 03 $ 530,000.00 04 $ 730,000.00

Page 265:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 013000 PAGE NO. 264 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 104 885E99000 SPECIAL -FLD PNT EX STEEL W/WARRANTY LUMP SUM AWD $ 90,960.00000 $ 90,960.00 02 $ 70,000.00000 $ 70,000.00 03 $ 70,000.00000 $ 70,000.00 04 $ 93,000.00000 $ 93,000.00 105 894E99000 HIGH PERFORMANCE CONCRETE W/WARRANTY LUMP SUM AWD $ 5,000.00000 $ 5,000.00 02 $ 200,000.00000 $ 200,000.00 03 $ 130,000.00000 $ 130,000.00 04 $ 185,000.00000 $ 185,000.00

S. 8 BRIDGE NO. MAH-11-1615 TOTALS AWD $ 471,403.35 02 $ 440,000.00 03 $ 500,000.00 04 $ 460,000.00 106 690E20200 SPECIAL - PRELIMINARY PLANS FOR DB LUMP SUM AWD $ 37,500.00000 $ 37,500.00 02 $ 130,000.00000 $ 130,000.00 03 $ 230,000.00000 $ 230,000.00 04 $ 146,000.00000 $ 146,000.00 107 690E20220 CONST PLANS FOR DESIGN-BUILD LUMP SUM AWD $ 35,000.00000 $ 35,000.00 02 $ 100,000.00000 $ 100,000.00 03 $ 72,000.00000 $ 72,000.00 04 $ 250,100.00000 $ 250,100.00 110 203E99100 MISC.: APPROACH SLABS LUMP SUM AWD $ 110,243.30000 $ 110,243.30 02 $ 160,000.00000 $ 160,000.00 03 $ 100,000.00000 $ 100,000.00 04 $ 150,560.00000 $ 150,560.00 112 448E99000 FLEXIBLE PAVEMENT LUMP SUM AWD $ 18,455.00000 $ 18,455.00 02 $ 20,000.00000 $ 20,000.00 03 $ 60,000.00000 $ 60,000.00 04 $ 20,000.00000 $ 20,000.00

Page 266:  · OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010002 PID. 14264 CHP-T.R. 214-0.58 PART 1; CHP-T.R. 214-0.14 PART 2 TE21-G000(381) TYPE: BRIDGE REPLACEMENT (2

PROJ. NO. 013000 PAGE NO. 265 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S. 1 ROADWAY TOTALS AWD $ 350,236.99 02 $ 565,002.00 03 $ 677,000.00 04 $ 773,910.00

TOTAL AMOUNT OF THE BID AWD $ 4,139,117.91 02 $ 4,373,002.00 03 $ 4,689,002.00 04 $ 4,745,360.00