82
COUNTY AGENCY PIN PROJECT DESCRIPTION FUND SOURCES FFY TOTAL 4-YEAR PROGRAM in millions of dollars PHASE AQ CODE FFY 2022 FFY 2023 FFY 2021 FFY 2020 4-YEAR PROGRAM (FFY) Starting October 01, 2019 Thursday, January 2, 2020 Page 1 of 82 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 08 TOTAL PROJECT COST 0.080 STBG LG URB 0.080 ROWACQU 2020 ROWACQU 0.020 0.020 2020 NFA 0.307 0.307 CONINSP STBG LG URB 2021 CONINSP 0.077 0.077 2021 NFA 2.560 2.560 CONST STBG LG URB 2021 CONST 0.640 0.640 2021 NFA LOCAL 800526 BROADWAY PEDESTRIAN AND TRAFFIC SIGNAL IMPROVEMENTS: CHAMBER ST TO ROBINSON AVE (ROUTE 9W). INSTALLATION OF NEW TRAFFIC CONTROL MEASURES INCLUDING SIGNALS AND PEDESTRIAN CROSSINGS. CITY OF NEWBURGH, ORANGE COUNTY. 3.684 0.100 3.584 0.000 0.000 AQC:A10P TOTAL 4YR COST : ORANGE TPC : $3.3-$5.6 M 0.160 STBG FLEX 0.160 CONINSP 2020 CONINSP 0.040 0.040 2020 NFA 1.600 STBG FLEX 1.600 CONST 2020 CONST 0.400 0.400 2020 NFA 0.120 STBG FLEX 0.120 DETLDES 2020 DETLDES 0.030 0.030 2020 NFA 0.100 STBG FLEX 0.100 ROWACQU 2020 ROWACQU 0.025 0.025 2020 NFA NYSDOT 800531 NY 17K @ VALLEY CENTRAL SCHOOL: PROJECT WILL SIGNALIZE THE INTERSECTION OF STATE ROUTE 17K AT THE ENTRANCE OF VALLEY CENTRAL HIGH SCHOOL IN THE TOWN OF MONTGOMERY IN ORANGE COUNTY. MAY INCLUDE ADDING A LEFT TURN LANE. 2.475 2.475 0.000 0.000 0.000 AQC:D2Z TOTAL 4YR COST : ORANGE TPC : $2-$4 M 2.000 NHPP 2.000 CONINSP 2020 CONINSP 0.500 0.500 2020 NFA 20.000 NHPP 20.000 CONST 2020 CONST 5.000 5.000 2020 NFA NYSDOT 801846 ROUTE 28/ESOPUS CREEK BRIDGE REPLACEMENT - FLOOD MITIGATION - HAMLET OF MT. TREMPER, TOWN OF SHANDAKEN, ULSTER COUNTY - BIN 1091290 27.500 27.500 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST : ULSTER TPC : $32-$50 M 0.001 STBG FLEX 0.001 DETLDES 2020 DETLDES 0.001 0.001 2020 NFA 0.162 STBG FLEX 0.162 ROWACQU 2020 ROWACQU 0.041 0.041 2020 NFA 0.306 0.306 CONINSP STBG FLEX 2022 CONINSP 0.077 0.077 2022 NFA 3.057 3.057 CONST STBG FLEX 2022 CONST 0.764 0.764 2022 NFA COUNTY DPW 805111 COUNTY ROUTES 7 & 8 (TOURING ROUTE 299) SHOULDER WIDENING: WALLKILL RIVER TO ROUTE 44/55, TOWNS OF NEW PALTZ AND GARDINER. ULSTER COUNTY 4.409 0.205 0.000 4.204 0.000 AQC:N/A TOTAL 4YR COST : ULSTER TPC : $4.6-$7.5 M

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 1 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.080 STBG LG URB 0.080 ROWACQU2020ROWACQU 0.020 0.020 2020NFA

0.307 0.307 CONINSPSTBG LG URB 2021CONINSP 0.077 0.077 2021NFA

2.560 2.560 CONSTSTBG LG URB 2021CONST 0.640 0.640 2021NFA

LOCAL

800526

BROADWAY PEDESTRIAN AND TRAFFIC SIGNAL IMPROVEMENTS: CHAMBER ST TO ROBINSON AVE (ROUTE 9W). INSTALLATION OF NEW TRAFFIC CONTROL MEASURES INCLUDING SIGNALS AND PEDESTRIAN CROSSINGS. CITY OF NEWBURGH, ORANGE COUNTY.

3.684 0.100 3.584 0.000 0.000 AQC:A10P TOTAL 4YR COST :ORANGE TPC : $3.3-$5.6 M

0.160 STBG FLEX 0.160 CONINSP2020CONINSP 0.040 0.040 2020NFA

1.600 STBG FLEX 1.600 CONST2020CONST 0.400 0.400 2020NFA

0.120 STBG FLEX 0.120 DETLDES2020DETLDES 0.030 0.030 2020NFA

0.100 STBG FLEX 0.100 ROWACQU2020ROWACQU 0.025 0.025 2020NFA

NYSDOT

800531

NY 17K @ VALLEY CENTRAL SCHOOL: PROJECT WILL SIGNALIZE THE INTERSECTION OF STATE ROUTE 17K AT THE ENTRANCE OF VALLEY CENTRAL HIGH SCHOOL IN THE TOWN OF MONTGOMERY IN ORANGE COUNTY. MAY INCLUDE ADDING A LEFT TURN LANE.

2.475 2.475 0.000 0.000 0.000 AQC:D2Z TOTAL 4YR COST :ORANGE TPC : $2-$4 M

2.000 NHPP 2.000 CONINSP2020CONINSP 0.500 0.500 2020NFA

20.000 NHPP 20.000 CONST2020CONST 5.000 5.000 2020NFA

NYSDOT

801846

ROUTE 28/ESOPUS CREEK BRIDGE REPLACEMENT - FLOOD MITIGATION - HAMLET OF MT. TREMPER, TOWN OF SHANDAKEN, ULSTER COUNTY - BIN 1091290

27.500 27.500 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $32-$50 M

0.001 STBG FLEX 0.001 DETLDES2020DETLDES 0.001 0.001 2020NFA

0.162 STBG FLEX 0.162 ROWACQU2020ROWACQU 0.041 0.041 2020NFA

0.306 0.306 CONINSPSTBG FLEX 2022CONINSP 0.077 0.077 2022NFA

3.057 3.057 CONSTSTBG FLEX 2022CONST 0.764 0.764 2022NFA

COUNTY DPW

805111

COUNTY ROUTES 7 & 8 (TOURING ROUTE 299) SHOULDER WIDENING: WALLKILL RIVER TO ROUTE 44/55, TOWNS OF NEW PALTZ AND GARDINER. ULSTER COUNTY

4.409 0.205 0.000 4.204 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $4.6-$7.5 M

Page 2: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 2 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

1.000 NHPP 1.000 CONINSP2020CONINSP 0.110 0.110 2020NFA

10.000 NHPP 10.000 CONST2020CONST 1.100 1.100 2020NFA

NYSDOT

806252

PROJECT WILL CORRECT PAVEMENT DEFICIENCIES ON INTERSTATE 84 FROM THE TACONIC STATE PARKWAY TO THE BOWEN ROAD OVERPASS AND THE ACCESS AND EXIT RAMPS OF THE TWO REST AREAS WITHIN THAT SEGMENT. TOWN OF EAST FISHKILL, DUTCHESS COUNTY & TOWN OF KENT, PUTNAM COUNTY.

12.210 12.210 0.000 0.000 0.000 AQC:A10Z TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M

0.270 NHPP 0.270 CONINSP2020CONINSP 0.030 0.030 2020NFA

2.700 NHPP 2.700 CONST2020CONST 0.300 0.300 2020NFA

NYSDOT

806253

I84 EMERGENCY PAVEMENT REPAIR: BRIDGE APPROACHES ORANGE COUNTY: PROJECT WILL CORRECT PAVEMENT DEFICIENCIES THAT EXIST AT THE APPROACHES TO 7 BRIDGES ON INTERSTATE 84 IN THE TOWNS OF WAWAYANDA, MONTGOMERY, NEWBURGH AND GREENVILLE IN ORANGE COUNTY.

3.300 3.300 0.000 0.000 0.000 AQC:A10Z TOTAL 4YR COST :ORANGE TPC : $3.3-$5.6 M

MISC 1.500 1.500 2020NFANYSDOT

806509

ROUTE 17 TRANSPORTATION SCOPING/PLANNING AND ENVIRONMENTAL LINKAGE (PEL) STUDY

1.500 1.500 0.000 0.000 0.000 AQC:C3 TOTAL 4YR COST :ORANGE TPC : $4.6-$7.5 M

1.940 NHPP 1.940 PRELDES2020PRELDES 0.485 0.485 2020NFA

0.920 0.920 DETLDESNHPP 2023DETLDES 0.230 0.230 2023NFA

0.880 0.880 ROWACQUNHPP 2023ROWACQU 0.220 0.220 2023NFA

0.060 0.060 ROWINCDNHPP 2023ROWINCD 0.015 0.015 2023NFA

NYSDOT

810352

WAREHOUSE LANE ACCESS IMPROVEMENTS. THIS PROJECT WILL CONSTRUCT A ROAD CONNECTING ROUTE 119 AT THE I-287 EXIT 1 EASTBOUND OFF-RAMP TO ROUTE 9A AT WAREHOUSE LANE. VILLAGE OF ELMSFORD, TOWN OF GREENBURGH, WESTCHESTER COUNTY.

4.750 2.425 0.000 0.000 2.325 AQC:NON TOTAL 4YR COST :WESTCHESTER TPC : $21-$31 M

0.560 0.560 DETLDESNHPP 2022DETLDES 0.140 0.140 2022NFA

0.040 0.040 ROWACQUNHPP 2022ROWACQU 0.010 0.010 2022NFA

0.600 0.600 CONINSPNHPP 2023CONINSP 0.150 0.150 2023NFA

4.000 4.000 CONSTNHPP 2023CONST 1.000 1.000 2023NFA

NYSDOT

810630

SPRAIN BROOK PARKWAY NB/PAYNE STREET BRIDGE REPLACEMENT. THIS PROJECT WILL REPLACE THE NORTHBOUND SPRAIN BROOK PARKWAY BRIDGE OVER PAYNE STREET WITH A SPAN BRIDGE. THIS PROJECT IS LOCATED IN THE TOWN OF GREENBURGH IN WESTCHESTER COUNTY. BIN 1070482.

6.500 0.000 0.000 0.750 5.750 AQC:A19 TOTAL 4YR COST :WESTCHESTER TPC : $6-$9.4 M

Page 3: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 3 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.960 NHPP 0.960 CONINSP2020CONINSP 0.240 0.240 2020NFA

6.400 NHPP 6.400 CONST2020CONST 1.600 1.600 2020NFA

NYSDOT

810632

SPRAIN BROOK PKWY/PAYNE ST MSES WALL REPAIR. PROJECT WILL ADDRESS THE WEAKENING OF THE MECHANICALLY STABILIZED EARTH SYSTEM (MSES) WALL TO ELIMINATE STABILITY CONCERNS REGARDING THE SPRAIN BROOK PARKWAY BRIDGES OVER PAYNE STREET. TOWN OF GREENBURGH, WESTCHESTER COUNTY.

9.200 9.200 0.000 0.000 0.000 AQC:A2 TOTAL 4YR COST :WESTCHESTER TPC : $7.5-$12 M

0.240 NHPP 0.240 CONINSP2020CONINSP 0.060 0.060 2020NFA

2.400 NHPP 2.400 CONST2020CONST 0.600 0.600 2020NFA

NYSDOT

813128

PREVENTATIVE MAINTENANCE INITIATIVE PAVING: ROUTE 22 FROM THE INTERSTATE 90 INTERCHANGE TO ROUTE 295. TOWN OF CANAAN, COLUMBIA COUNTY.

3.300 3.300 0.000 0.000 0.000 AQC:A10Z TOTAL 4YR COST :COLUMBIA TPC : $2-$4 M

0.116 STBG FLEX 0.116 ROWACQU2020ROWACQU 0.029 0.029 2020NFA

0.058 0.058 CONINSPSTBG FLEX 2021CONINSP 0.014 0.014 2021NFA

0.622 0.622 CONSTSTBG FLEX 2021CONST 0.155 0.155 2021NFA

LOCAL

817747

ROUTE 209 SIDEWALK IMPROVEMENTS. THIS PROJECT WILL INSTALL SIDEWALK ON BOTH SIDES OF ROUTE 209 LINKING TO KERHONKSON ELEMENTARY SCHOOL; HAMLET OF KERHONKSON, TOWN OF WAWARSING, ULSTER COUNTY

0.994 0.145 0.849 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $0.6-$1.5 M

0.280 NHPP 0.280 CONINSP2020CONINSP 0.070 0.070 2020NFA

2.800 NHPP 2.800 CONST2020CONST 0.700 0.700 2020NFA

NYSDOT

817749

ROUTE 209/FANTINE KILL BRIDGE SUPERSTRUCTURE REPLACEMENT; BIN 1095450; TOWN OF WAWARSING & VILLAGE OF ELLENVILLE, ULSTER COUNTY

3.850 3.850 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $3.3-$5.6 M

0.062 STBG FLEX 0.062 CONINSP2020CONINSP 0.016 0.016 2020NFA

0.520 STBG FLEX 0.520 CONST2020CONST 0.130 0.130 2020NFA

NYSDOT

823951

ROUTE 9W AT OAK TREE RD TRAFFIC SIGNAL REPLACEMENT. THIS PROJECT WILL REPLACE A TRAFFIC SIGNAL TO MITIGATE CONGESTION AT THE INTERSECTION OF ROUTE 9W AT OAK TREE ROAD IN THE TOWN OF ORANGETOWN, ROCKLAND COUNTY.

0.728 0.728 0.000 0.000 0.000 AQC:D2 TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M

0.480 NHPP 0.480 CONINSP2020CONINSP 0.120 0.120 2020NFA

4.800 NHPP 4.800 CONST2020CONST 1.200 1.200 2020NFA

NYSDOT

823954

PREVENTATIVE MAINTENANCE INITIATIVE PAVING - ROUTE 9W FROM THE ORANGE/ULSTER COUNTY LINE TO CHAPEL HILL ROAD. TOWNS OF MARLBOROUGH AND LLOYD, ULSTER COUNTY.

6.600 6.600 0.000 0.000 0.000 AQC:A10Z TOTAL 4YR COST :ULSTER TPC : $6-$9.4 M

Page 4: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 4 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.014 HPP 0.014 ROWACQU2020ROWACQU 1.730 1.730 2020NFA

0.049 0.049 CONINSPHPP 2021CONINSP 0.072 0.072 2021NFA

0.639 0.639 CONSTHPP 2021CONST 0.167 0.167 2021NFA

LOCAL

839200

VILLAGE OF BREWSTER MAIN ST & RTE 6 RELATED CONSTRUCTION & IMPROVEMENTS. INTERSECTION OF RT 6 & PEACEABLE HILL RD -INTERSECTION OF RTE 6 & HILLSIDE PARK (1.36 MILES). PROVIDE SIDEWALKS & HANDICAP RAMPS. NY262 HPP#79. VILLAGE BREWSTER & TOWN SOUTHEAST.

2.671 1.744 0.927 0.000 0.000 AQC:C2 TOTAL 4YR COST :PUTNAM TPC : $2-$4 M

0.240 CMAQ 0.240 DETLDES2020DETLDES 0.060 0.060 2020NFA

0.080 STBG FLEX 0.080 DETLDES2020DETLDES 0.020 0.020 2020NFA

0.800 STBG FLEX 0.800 ROWACQU2020ROWACQU 0.200 0.200 2020NFA

0.400 0.400 CONINSPCMAQ 2021CONINSP 0.100 0.100 2021NFA

4.000 4.000 CONSTCMAQ 2021CONST 1.000 1.000 2021NFA

NYSDOT

839325

ROUTE 376 AT CR 94 (ALL ANGELS HILL RD) AND CR 104 (NEW HACKENSACK RD): PROJECT WILL IMPROVE THE EXISTING SIGNAL CONTROLLED INTERSECTION AT ROUTE 376, ALL ANGELS HILL ROAD, AND NEW HACKENSACK ROAD. TOWN OF WAPPINGER, DUTCHESS COUNTY. PROJECT IS A STATEWIDE CMAQ SELECTION. CMAQ FUNDS DO NOT COUNT AGAINST REGIONAL PLANNING TARGET.

6.900 1.400 5.500 0.000 0.000 AQC:D1Z TOTAL 4YR COST :DUTCHESS TPC : $6-$9.4 M

0.408 STBG FLEX 0.408 CONINSP2020CONINSP 0.102 0.102 2020NFA

4.080 STBG FLEX 4.080 CONST2020CONST 1.020 1.020 2020NFA

NYSDOT

850223

PMI PAVING: ROUTES 303 AND 17: PROJECT WILL REPAVE AND INCLUDE PEDESTRIAN IMPROVEMENTS AS WARRANTED ALONG ROUTE 303, FROM THE NJ LINE TO RAIL TRAIL BRIDGE UNDERPASS, IN THE TOWN OF ORANGETOWN, ROCKLAND COUNTY AND ROUTE 17 IN THE VILLAGE OF HARRIMAN IN THE TOWN OF MONROE AND THE VILLAGE OF WOODBURY IN THE TOWN OF WOODBURY AND THE TOWN OF TUXEDO IN ORANGE COUNTY.

5.610 5.610 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.970 0.970 CONINSPNHPP 2021CONINSP 0.243 0.243 2021NFA

6.465 6.465 CONSTNHPP 2021CONST 1.616 1.616 2021NFA

ROCKLAND

875458

CONGERS ROAD RECONSTRUCTION (CR 80-BREWERY ROAD TO STRAWTOWN ROAD- 1.0 MILES): PROVIDE TURNING LANES AT BREWERY ROAD, CAIRNSMUIR ROAD AND STRAWTOWN ROAD; RECONSTRUCT DRAINAGE SYSTEMS AND INSTALL CURB AND SIDEWALK. TOWN OF CLARKSTOWN. ROCKLAND COUNTY.

9.294 0.000 9.294 0.000 0.000 AQC:D4 TOTAL 4YR COST :ROCKLAND TPC : $7.5-$12 M

Page 5: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 5 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.520 0.520 CONINSPSTBG LG URB 2022CONINSP 0.130 0.130 2022NFA

2.951 2.951 CONSTSTBG LG URB 2022CONST 0.738 0.738 2022NFA

ROCKLAND

875459

SMITH ROAD (CR 60-PASCACK ROAD TO NORTH MIDDLETOWN ROAD). RECONSTRUCT 1.1 MILES OF SMITH ROAD; RECONSTRUCT DRAINAGE SYSTEMS AND INSTALL CURB AND SIDEWALK. TOWN OF CLARKSTOWN, ROCKLAND COUNTY

4.339 0.000 0.000 4.339 0.000 AQC:A10 TOTAL 4YR COST :ROCKLAND TPC : $3.3-$5.6 M

0.035 STBG LG URB 0.035 CONINSP2020CONINSP 0.009 0.009 2020NFA

0.810 STBG LG URB 0.810 CONST2020CONST 0.202 0.202 2020NFA

0.155 STBG LG URB 0.155 DETLDES2020DETLDES 0.039 0.039 2020NFA

ORANGE

875598

HERITAGE TRAIL EXTENSION: HARTLEY RD TO DOWNTOWN MIDDLETOWN (SEGMENT 2), THIS PROJECT WILL CONSTRUCT 4.5 MILES OF A PEDESTRIAN/BICYCLE TRAIL THAT WILL TRAVEL FROM HARTLEY ROAD TO DOWNTOWN MIDDLETOWN IN ORANGE COUNTY. LIKELY IMPROVEMENTS INCLUDE THE RESURFACING OF FIVE EXISTING RAILROAD TRESTLES, CONSTRUCTION OF ONE NEW FOOTBRIDGE, INSTALLATION OF A PARKING AREA, CLEARING OF AN OBSTRUCTED RAILROAD TUNNEL, AND SAFE STREET CROSSINGS IN URBAN AREAS. THIS TRAIL SEGMENT WILL BE THE MIDDLE SEGMENT OF THREE TRAIL SEGMENTS WHICH COMPRISE THE WESTERN PART OF THE HERITAGE TRAIL THAT WILL EXTEND FROM GOSHEN TO THE TOWN OF WALLKILL. TOWNS OF GOSHEN & WAWAYANDA; CITY OF MIDDLETOWN. NY DEMO #635

1.250 1.250 0.000 0.000 0.000 AQC:C2P TOTAL 4YR COST :ORANGE TPC : $2-$4 M

0.080 STBG LG URB 0.080 DETLDES2020DETLDES 0.020 0.020 2020NFA

0.001 STBG LG URB 0.001 ROWACQU2020ROWACQU 0.001 0.001 2020NFA

0.320 0.320 CONINSPSTBG LG URB 2021CONINSP 0.080 0.080 2021NFA

2.000 2.000 CONSTSTBG LG URB 2021CONST 0.500 0.500 2021NFA

PUTNAM

875604

SODOM ROAD BRIDGE REPLACEMENT OVER EAST BRANCH OF CROTON RIVER TO INCLUDE APPROACH WORK, PAVEMENT MARKINGS, BRIDGE RAILINGS, AND GUIDERAILS - BIN 2224030. TOWN OF SOUTHEAST, PUTNAM COUNTY

3.002 0.102 2.900 0.000 0.000 AQC:A19 TOTAL 4YR COST :PUTNAM TPC : $2-$4 M

Page 6: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 6 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.400 STBG LG URB 0.400 DETLDES2020DETLDES 0.015 0.015 2020NFA

1.200 STBG LG URB 1.200 ROWACQU2020ROWACQU 0.300 0.300 2020NFA

2.500 2.500 CONSTCMAQ 2021CONST 0.625 0.625 2021NFA

1.200 1.200 CONINSPSTBG LG URB 2021CONINSP 0.300 0.300 2021NFA

9.119 9.119 CONSTSTBG LG URB 2021CONST 2.325 2.325 2021NFA

PUTNAM

875609

FAIR ST FROM ROUTE 52 TO JOHN SIMPSON RD IMPROVEMENTS. PROJECT INCLUDES PAVEMENT REHABILITATION, DRAINAGE AND INTERSECTIONS IMPROVEMENTS AT THE SIMPSON ROAD, HILL, AND DALE, AND CR 60 BRIDGE REPLACEMENT OVER MIDDLE BRANCH CROTON (PIN 8756.03). TOWN OF CARMEL, PUTNAM COUNTY.

17.984 1.915 16.069 0.000 0.000 AQC:A10 TOTAL 4YR COST :PUTNAM TPC : $15-$25 M

0.217 STBG LG URB 0.217 DETLDES2020DETLDES 0.054 0.054 2020NFA

0.217 STBG LG URB 0.217 PRELDES2020PRELDES 0.054 0.054 2020NFA

0.048 STBG LG URB 0.048 ROWINCD2020ROWINCD 0.012 0.012 2020NFA

0.121 0.121 ROWACQUSTBG LG URB 2021ROWACQU 0.030 0.030 2021NFA

0.400 0.400 CONINSPSTBG LG URB 2022CONINSP 0.100 0.100 2022NFA

2.400 2.400 CONSTSTBG LG URB 2022CONST 0.600 0.600 2022NFA

LOCAL

875663

MANSION STREET OVER THE FALLKILL CREEK (BIN 2262750). BRIDGE REPLACEMENT. CITY OF POUGHKEEPSIE, DUTCHESS COUNTY.

4.253 0.602 0.151 3.500 0.000 AQC:A19Z TOTAL 4YR COST :DUTCHESS TPC : $3.3-$5.6 M

0.160 STBG LG URB 0.160 CONINSP2020CONINSP 0.040 0.040 2020NFA

0.740 STBG LG URB 0.740 CONST2020CONST 0.185 0.185 2020NFA

C/ PORT JERVIS

875664

ROUTE 6/NEVERSINK BRIDGE REHABILITATION. INCLUDING REHAB OF THE FLOORBEAMS AND EXTENSIVE STEEL REPAIR. BIN 2003050. CITY OF PORT JERVIS, ORANGE COUNTY

1.125 1.125 0.000 0.000 0.000 AQC:A19Z TOTAL 4YR COST :ORANGE TPC : $0.6-$1.5 M

0.239 CMAQ 0.239 ROWACQU2020ROWACQU 0.060 0.060 2020NFA

0.198 0.198 CONINSPCMAQ 2022CONINSP 0.049 0.049 2022NFA

1.978 1.978 CONSTCMAQ 2022CONST 0.494 0.494 2022NFA

ORANGE

875705

ORANGE COUNTY HERITAGE TRAIL SEGMENT 3, BIKEWAY CONSTRUCTION OF 2.7 MILES OF A BICYCLE/PEDESTRIAN PATH ON THE ABANDONED RAILROAD RIGHT-OF-WAY FROM THE CITY OF MIDDLETOWN TO HOWELLS. CITY OF MIDDLETOWN, TOWN OF WALLKILL, ORANGE COUNTY.

3.018 0.299 0.000 2.719 0.000 AQC:C2P TOTAL 4YR COST :ORANGE TPC : $2-$4 M

Page 7: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 7 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.082 CMAQ 0.082 DETLDES2020DETLDES 0.020 0.020 2020NFA

0.033 CMAQ 0.033 ROWACQU2020ROWACQU 0.008 0.008 2020NFA

0.565 STBG LG URB 0.565 CONINSP2020CONINSP 0.141 0.141 2020NFA

5.095 STBG LG URB 5.095 CONST2020CONST 1.274 1.274 2020NFA

LOCAL

875707

MIDDLETOWN TRAFFIC OPERATIONS STAGE 1: UPGRADE INTERSECTIONS ON CR 67, ROUTE 17M AND MONHAGEN AVE TO IMPROVE LEVEL OF SERVICE AND UPGRADE CURBS FOR PROPER DRAINAGE, SIDEWALKS AND PAVEMENT FOR SAFETY. CITY OF MIDDLETOWN, ORANGE COUNTY.

7.218 7.218 0.000 0.000 0.000 AQC:D1P TOTAL 4YR COST :ORANGE TPC : $6-$9.4 M

0.660 STBG LG URB 0.660 CONST2020CONST 0.165 0.165 2020NFA

C/ PORT JERVIS

875708

EAST MAIN STREET: CR 15 TO MAPLE AVE. ALIGNMENT WORK AND NEW/IMPROVED PEDESTRIAN FACILITY. CITY OF PORT JERVIS ORANGE COUNTY. COMBINED WITH 875664

0.825 0.825 0.000 0.000 0.000 AQC:A19Z TOTAL 4YR COST :ORANGE TPC : $0.6-$1.5 M

0.291 STBG FLEX 0.291 CONINSP2020CONINSP 0.073 0.073 2020NFA

1.401 STBG FLEX 1.401 CONST2020CONST 0.350 0.350 2020NFA

COUNTY DPW

875713

ROUTE 213 EXTENSION (CR 4)/TONGORE CREEK: BRIDGE REPLACEMENT; WAS 8T9747; BIN 3041140, TOWN OF OLIVE, ULSTER COUNTY

2.115 2.115 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $2-$4 M

0.344 STBG LG URB 0.344 CONINSP2020CONINSP 0.086 0.086 2020NFA

3.437 STBG LG URB 3.437 CONST2020CONST 0.859 0.859 2020NFA

LOCAL

875730

FISHKILL AVENUE FROM BEACON CITY LINE TO MAIN STREET: PROJECT WILL RESURFACE, REPLACE SIGNALS, REHAB DRAINAGE, CURBS & SIDEWALKS TO BRING TO STATE OF GOOD REPAIR. CITY OF BEACON, DUTCHESS COUNTY

4.726 4.726 0.000 0.000 0.000 AQC:A10Z TOTAL 4YR COST :DUTCHESS TPC : $4.6-$7.5 M

0.100 STBG LG URB 0.100 ROWACQU2020ROWACQU 0.025 0.025 2020NFA

0.216 0.216 CONINSPSTBG LG URB 2021CONINSP 0.054 0.054 2021NFA

1.440 1.440 CONSTSTBG LG URB 2021CONST 0.360 0.360 2021NFA

PUTNAM

875765

DREWVILLE ROAD (CR 36) SUPERSTRUCTURE REPLACEMENT OVER WEST BRANCH CROTON RIVER. PROJECT WILL REPLACE THE BRIDGE THAT CARRIES DREWVILLE RD OVER THE WEST BRANCH OF THE CROTON RIVER. TOWN OF CARMEL, PUTNAM COUNTY - BIN 3345550.

2.195 0.125 2.070 0.000 0.000 AQC:A19 TOTAL 4YR COST :PUTNAM TPC : $2-$4 M

Page 8: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 8 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.106 STBG LG URB 0.106 DETLDES2020DETLDES 0.027 0.027 2020NFA

0.106 STBG LG URB 0.106 PRELDES2020PRELDES 0.027 0.027 2020NFA

0.013 STBG LG URB 0.013 ROWINCD2020ROWINCD 0.003 0.003 2020NFA

0.019 0.019 ROWACQUSTBG LG URB 2021ROWACQU 0.005 0.005 2021NFA

0.120 0.120 CONINSPSTBG LG URB 2022CONINSP 0.030 0.030 2022NFA

1.166 1.166 CONSTSTBG LG URB 2022CONST 0.292 0.292 2022NFA

PUTNAM

875766

HORTON HOLLOW ROAD BRIDGE REPLACEMENT OVER CANOPUS CREEK. PROJECT WILL REPLACE THE BRIDGE IN KIND OVER CANOPUS CREEK . -BIN 2223990. TOWN OF PUTNAM VALLEY, PUTNAM COUNTY

1.914 0.282 0.024 1.608 0.000 AQC:A19 TOTAL 4YR COST :PUTNAM TPC : $1.2-$2.5 M

0.089 0.089 DETLDESSTBG FLEX 2021DETLDES 0.022 0.022 2021NFA

0.089 0.089 PRELDESSTBG FLEX 2021PRELDES 0.022 0.022 2021NFA

0.012 0.012 ROWINCDSTBG FLEX 2021ROWINCD 0.003 0.003 2021NFA

0.020 0.020 ROWACQUSTBG FLEX 2022ROWACQU 0.005 0.005 2022NFA

0.096 0.096 CONINSPSTBG-OFF 2023CONINSP 0.024 0.024 2023NFA

0.741 0.741 CONSTSTBG-OFF 2023CONST 0.185 0.185 2023NFA

PUTNAM

875767

FARMERS MILLS ROAD (CR 42)/SEVEN HILLS LAKE OUTLET DECK REPLACEMENT WITH A WIDER BRIDGE THAT WILL BE SUPPORTED ON PILES. (BIN 3345630). TOWN OF KENT, PUTNAM COUNTY

1.308 0.000 0.237 0.025 1.046 AQC:A19 TOTAL 4YR COST :PUTNAM TPC : $1.2-$2.5 M

Page 9: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 9 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.147 STBG-OFF 0.147 DETLDES2020DETLDES 0.632 0.632 2020NFA

0.147 STBG-OFF 0.147 PRELDES2020PRELDES 0.037 0.037 2020NFA

0.005 STBG-OFF 0.005 ROWINCD2020ROWINCD 0.001 0.001 2020NFA

0.035 0.035 ROWACQUSTBG-OFF 2021ROWACQU 0.009 0.009 2021NFA

0.090 0.090 CONINSPSTBG-OFF 2022CONINSP 0.023 0.023 2022NFA

0.810 0.810 CONSTSTBG-OFF 2022CONST 2.523 2.523 2022NFA

ROCKLAND

875768

BRIDGE REPLACEMENT IN KIND: WILLIAM STREET BRIDGE/SPARKILL CREEK REPLACEMENT AND RECONSTRUCT APPROACHES. TOWN OF ORANGETOWN, ROCKLAND COUNTY. BIN 3346070

4.459 0.969 0.044 3.446 0.000 AQC:A19 TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M

0.092 STBG FLEX 0.092 DETLDES2020DETLDES 0.023 0.023 2020NFA

0.070 STBG FLEX 0.070 PRELDES2020PRELDES 0.017 0.017 2020NFA

0.010 STBG FLEX 0.010 ROWINCD2020ROWINCD 0.002 0.002 2020NFA

0.010 0.010 ROWACQUSTBG FLEX 2021ROWACQU 0.002 0.002 2021NFA

0.185 0.185 CONINSPSTBG FLEX 2022CONINSP 0.047 0.047 2022NFA

0.529 0.529 CONSTSTBG FLEX 2022CONST 0.132 0.132 2022NFA

COUNTY DPW

875771

CAPE AVENUE/BEERKILL BRIDGE REHABILITATION. BIN 3347440. VILLAGE OF ELLENVILLE & TOWN OF WAWARSING, ULSTER COUNTY.

1.119 0.214 0.012 0.893 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $0.6-$1.5 M

0.161 STBG LG URB 0.161 CONINSP2020CONINSP 0.040 0.040 2020NFA

1.608 STBG LG URB 1.608 CONST2020CONST 0.402 0.402 2020NFA

LOCAL

875780

TELLER AVENUE FROM MAIN STREET TO WOLCOTT AVENUE PAVEMENT RECONSTRUCTION. CITY OF BEACON, DUTCHESS COUNTY.

2.211 2.211 0.000 0.000 0.000 AQC:A10Z TOTAL 4YR COST :DUTCHESS TPC : $2-$4 M

Page 10: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 10 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.023 STBG FLEX 0.023 CONINSP2020CONINSP 0.006 0.006 2020NFA

0.211 STBG FLEX 0.211 CONST2020CONST 0.053 0.053 2020NFA

0.355 STBG LG URB 0.355 CONINSP2020CONINSP 0.089 0.089 2020NFA

2.645 STBG LG URB 2.645 CONST2020CONST 0.661 0.661 2020NFA

TN OF LLOYD

875781

TILLSON AVE: FROM ROUTE 9W TO ROUTE 44/55: SAFETY ALIGNMENT WORK. TOWN OF LLOYD, HAMLET OF HIGHLAND, ULSTER COUNTY

4.043 4.043 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $3.3-$5.6 M

0.176 STBG FLEX 0.176 CONINSP2020CONINSP 0.044 0.044 2020NFA

1.760 STBG FLEX 1.760 CONST2020CONST 0.440 0.440 2020NFA

ULSTER CO

875804

KINGSTON RAIL TRAIL: CITY OF KINGSTON, TOWN OF ULSTER, AND TOWN OF HURLEY, ULSTER COUNTY NY; CONSTRUCT 1.7M OF BICYCLE/PEDESTRIAN TRAIL LINKED TO HURLEY RAIL TRAIL, CITY OF KINGSTON, TOWNS OF ULSTER AND HURLEY IN ULSTER COUNTY.

2.420 2.420 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $2-$4 M

0.004 CMAQ 0.004 ROWACQU2020ROWACQU 0.001 0.001 2020NFA

0.083 0.083 CONINSPSTBG LG URB 2022CONINSP 0.021 0.021 2022NFA

1.082 1.082 CONSTSTBG LG URB 2022CONST 0.270 0.270 2022NFA

ORANGE

875875

TRAFFIC SIGNAL UPGRADES - CITY OF NEWBURGH: INSTALLATION OF TRAFFIC-ACTUATED SIGNAL CONTROLLERS, AND DETECTION EQUIPMENT WHERE NECESSARY, AT SIGNALIZED INTERSECTIONS. CITY OF NEWBURGH, ORANGE COUNTY.

1.461 0.005 0.000 1.456 0.000 AQC:D1P TOTAL 4YR COST :ORANGE TPC : $1.2-$2.5 M

0.041 0.041 DETLDESCMAQ 2021DETLDES 0.010 0.010 2021NFA

0.052 0.052 ROWACQUCMAQ 2021ROWACQU 0.013 0.013 2021NFA

0.017 0.017 ROWINCDCMAQ 2021ROWINCD 0.004 0.004 2021NFA

0.527 0.527 CONINSPCMAQ 2022CONINSP 0.131 0.131 2022NFA

2.335 2.335 CONSTCMAQ 2022CONST 0.584 0.584 2022NFA

LOCAL

875899

PELHAM ROAD TRAFFIC SIGNALS: REPLACEMENT OF 9 TRAFFIC SIGNALS ALONG PELHAM ROAD FROM PELHAM MANOR TO MAIN STREET; CONNECT EXISTING SIGNALS WITH THE TRAFFIC SIGNAL COORDINATION SYSTEM. CITY OF NEW ROCHELLE, WESTCHESTER COUNTY.

3.714 0.000 0.137 3.577 0.000 AQC:NON TOTAL 4YR COST :WESTCHESTER TPC : $3.3-$5.6 M

Page 11: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 11 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

1.348 1.348 CONINSPCMAQ 2021CONINSP 0.510 0.510 2021NFA

5.722 5.722 CONSTCMAQ 2021CONST 3.568 3.568 2021NFA

LOCAL

875900

THE REPLACEMENT AND MODIFICATION OF 38 SIGNALIZED INTERSECTIONS ON MAIN STREET AND HUGUENOT STREET AND CONVERSION OF HUGUENOT STREET AND MAIN STREET BETWEEN PINTARD AVE AND PRATT ST FROM ONE-WAY TO TWO-WAY OPERATION. CITY OF NEW ROCHELLE. WESTCHESTER COUNTY.

11.148 0.000 11.148 0.000 0.000 AQC:NON TOTAL 4YR COST :WESTCHESTER TPC : $9.5-15.5 M

0.095 0.095 DETLDESCMAQ 2023DETLDES 0.025 0.025 2023NFA

0.092 0.092 PRELDESCMAQ 2023PRELDES 0.028 0.028 2023NFA

0.008 0.008 ROWINCDCMAQ 2023ROWINCD 0.003 0.003 2023NFA

LOCAL

875902

WEBSTER AVENUE TRAFFIC SIGNALS: REPLACEMENT OF 11 TRAFFIC SIGNALS FROM MAIN STREET TO EASTCHESTER ROAD; CONNECT TO THE EXISTING TRAFFIC SIGNAL COORDINATION SYSTEM. CITY OF NEW ROCHELLE.

0.251 0.000 0.000 0.000 0.251 AQC:NON TOTAL 4YR COST :WESTCHESTER TPC : $3.3-$5.6 M

0.078 0.078 DETLDESCMAQ 2021DETLDES 0.020 0.020 2021NFA

0.078 0.078 PRELDESCMAQ 2021PRELDES 0.020 0.020 2021NFA

0.016 0.016 ROWINCDCMAQ 2021ROWINCD 0.004 0.004 2021NFA

0.451 0.451 ROWACQUCMAQ 2022ROWACQU 0.113 0.113 2022NFA

0.080 0.080 CONINSPCMAQ 2023CONINSP 0.020 0.020 2023NFA

0.823 0.823 CONSTCMAQ 2023CONST 0.206 0.206 2023NFA

PUTNAM

875906

MAHOPAC FALLS TRAILWAY: DESIGN & CONSTRUCTION OF A 1.5 MILE PAVED BICYCLE/PEDESTRIAN TRAIL FROM BALDWIN PLACE (TERMINUS OF PUTNAM BIKEWAY I) TO MYRTLE AVENUE IN MAHOPAC FALLS ALONG ABANDONED RAILROAD LINE IN THE TOWN OF CARMEL. PUTNAM COUNTY

1.909 0.000 0.216 0.564 1.129 AQC:C2 TOTAL 4YR COST :PUTNAM TPC : $1.2-$2.5 M

0.008 CMAQ 0.008 ROWACQU2020ROWACQU 0.673 0.673 2020NFA

0.104 0.104 CONINSPCMAQ 2021CONINSP 2.346 2.346 2021NFA

0.936 0.936 CONSTCMAQ 2021CONST 2.554 2.554 2021NFA

ROCKLAND

875907

PASCACK ROAD @ LAWRENCE STREET, ADD A LEFT TURN LANE ON SOUTHBOUND PASCACK APPROACH, DRAINAGE IMPROVEMENTS AND INSTALL SIDEWALK. TOWN OF CLARKSTOWN, ROCKLAND COUNTY.

6.621 0.681 5.940 0.000 0.000 AQC:D1 TOTAL 4YR COST :ROCKLAND TPC : $6-$9.4 M

Page 12: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 12 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.001 0.001 DETLDESSTBG FLEX 2022DETLDES 0.001 0.001 2022NFA

0.062 0.062 ROWACQUSTBG FLEX 2022ROWACQU 0.015 0.015 2022NFA

TN OF WAWARSING

875925

DELAWARE & HUDSON CANAL/ONTARIO & WESTERN RAILROAD TRAIL: TOWN OF ROCHESTER LINE TO EASTERN STATE CORRECTIONAL FACILITY. IMPROVEMENTS TO THE KERHONKSON CANAL HERITAGE TRAIL. TOWN OF WAWARSING, ULSTER COUNTY.

0.079 0.000 0.000 0.079 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $0.6-$1.5 M

0.020 STBG-OFF 0.020 ROWACQU2020ROWACQU 0.005 0.005 2020NFA

0.160 0.160 CONINSPSTBG-OFF 2021CONINSP 0.040 0.040 2021NFA

1.200 1.200 CONSTSTBG-OFF 2021CONST 0.300 0.300 2021NFA

VL OF ELLENVILLE

875927

CLINTON AVENUE/NORTH GULLY BRIDGE REHABILITATION, BIN 2262980. PROJECT WILL REHABILITATE THE BRIDGE CARRYING CLINTON AVENUE OVER NORTH GULLY IN THE VILLAGE OF ELLENVILLE, ULSTER COUNTY.

1.725 0.025 1.700 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $1.2-$2.5 M

0.135 HPP 0.135 CONINSP2020CONINSP 0.639 0.639 2020NFA

2.463 HPP 2.463 CONST2020CONST 4.766 4.766 2020NFA

ROCKLAND

875964

WEST SHORE RIVER LN RR CROSSING & IMPROVEMENTS (BEAR MTN MAINTENANCE RD - ANDRE AVE): SAFETY MEASURES TO IMPROVE SAFETY & DESIGNATION OF QUIET ZONES FOR THE 13 PUBLIC AND 7 PRIVATE RR/ROADWAY INTERSECTIONS (NY 299 HPP#443, NY421 #1611, NY578 #3256) ROCKLAND COUNTY

8.003 8.003 0.000 0.000 0.000 AQC:A1 TOTAL 4YR COST :ROCKLAND TPC : $6-$9.4 M

0.160 0.160 DETLDESCMAQ 2021DETLDES 0.040 0.040 2021NFA

0.240 0.240 PRELDESCMAQ 2021PRELDES 0.060 0.060 2021NFA

0.064 0.064 ROWACQUCMAQ 2021ROWACQU 0.016 0.016 2021NFA

0.016 0.016 ROWINCDCMAQ 2021ROWINCD 0.004 0.004 2021NFA

0.400 0.400 CONINSPCMAQ 2023CONINSP 0.100 0.100 2023NFA

1.920 1.920 CONSTCMAQ 2023CONST 0.480 0.480 2023NFA

ROCKLAND

875966

GERMONDS RD: PALISADES INTERSTATE PKWY (PIP) RAMPS INTERSECTION RECONSTRUCTION: MIDDLETOWN ROAD/LITTLE TOR ROAD. INCLUDES CHANNELIZED LANES & TURN LANE FROM NB PIP RAMP. PROJECT PART OF ROCKLAND COUNTY SIGNAL RETIMING STUDY. TOWN OF CLARKSTOWN.

3.500 0.000 0.600 0.000 2.900 AQC:D1 TOTAL 4YR COST :ROCKLAND TPC : $3.3-$5.6 M

Page 13: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 13 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.009 0.009 DETLDESCMAQ 2021DETLDES 0.003 0.003 2021NFA

0.009 0.009 PRELDESCMAQ 2021PRELDES 0.003 0.003 2021NFA

LOCAL

875973

WILMOT ROAD SIGNALS: GRAND BLVD - GOLDEN HORSE SHOPPING CENTER. REPLACE TRAFFIC SIGNAL CONTROLLERS W/ UPGRADES FOR DETECTION AT INTERSECTION OF GRAND BLVD, BARAUD RD & THE GOLDEN HORSE SHOPPING CTR DRIVEWAY WITH WILMONT RD. CITY OF NEW ROCHELLE.

0.024 0.000 0.024 0.000 0.000 AQC:D2 TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M

0.056 STBG LG URB 0.056 ROWACQU2020ROWACQU 0.014 0.014 2020NFA

0.735 0.735 CONINSPSTBG LG URB 2021CONINSP 0.184 0.184 2021NFA

4.165 4.165 CONSTSTBG LG URB 2021CONST 1.041 1.041 2021NFA

ROCKLAND

875977

WEST WASHINGTON AVE. (CR 30): OLD PASCACK ROAD TO HIGHLAND AVENUE. REHABILITATION AND REPLACEMENT IN KIND OF THE WEST WASHINGTON BRIDGE OVER PASCACK BROOK. TOWN OF ORANGETOWN, ROCKLAND COUNTY

6.195 0.070 6.125 0.000 0.000 AQC:A19 TOTAL 4YR COST :ROCKLAND TPC : $4.6-$7.5 M

0.001 STBG LG URB 0.001 DETLDES2020DETLDES 0.001 0.001 2020NFA

0.300 STBG LG URB 0.300 ROWACQU2020ROWACQU 0.075 0.075 2020NFA

0.321 0.321 CONINSPSTBG LG URB 2021CONINSP 0.080 0.080 2021NFA

2.680 2.680 CONSTSTBG LG URB 2021CONST 0.670 0.670 2021NFA

LOCAL

875983

WASHINGTON STREET OVER THE FALLKILL CREEK (BIN 2262670). REHABILITATION OF EXISTING HISTORIC STONE ARCH BRIDGE TO MAINTAIN FUTURE SERVICEABILITY AND ADDRESS YELLOW FLAG CONDITIONS. CITY OF POUGHKEEPSIE, DUTCHESS COUNTY.

4.128 0.377 3.751 0.000 0.000 AQC:A19Z TOTAL 4YR COST :DUTCHESS TPC : $3.3-$5.6 M

0.008 HPP 0.008 CONINSP2020CONINSP 0.002 0.002 2020NFA

0.217 HPP 0.217 CONST2020CONST 0.054 0.054 2020NFA

0.126 STBG LG URB 0.126 CONINSP2020CONINSP 0.032 0.032 2020NFA

0.066 STBG LG URB 0.066 CONST2020CONST 0.016 0.016 2020NFA

LOCAL

876002

WARWICK BIKE ROUTE AND PEDESTRIAN TRAIL TO PROVIDE A DESIGNATED BIKE ROUTE AND AN OFF ROAD PEDESTRIAN TRAIL BETWEEN THE APPALACHIAN TRAIL AND THE WARWICK COUNTY PARK. SAFETEA-LU HIGH PRIORITY PROJECT. TOWN OF WARWICK, ORANGE COUNTY. #1046 NY DEMO # 356

0.521 0.521 0.000 0.000 0.000 AQC:C2P TOTAL 4YR COST :ORANGE TPC : < $0.75 M

Page 14: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 14 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.001 HPP 0.001 DETLDES2020DETLDES 0.001 0.001 2020NFA

0.008 HPP 0.008 ROWACQU2020ROWACQU 0.002 0.002 2020NFA

0.008 0.008 CONINSPHPP 2021CONINSP 0.002 0.002 2021NFA

0.270 0.270 CONSTHPP 2021CONST 0.068 0.068 2021NFA

LOCAL

876016

MEARNS AVENUE: 600 FEET NORTH OF BERRY HILL RD. TO DEAD END. RECONSTRUCTION OF CURBING AND SIDEWALKS ON THE EAST SIDE OF THE ROAD AND ROADWAY RESURFACING. VILLAGE OF HIGHLAND FALLS, ORANGE COUNTY. SAFETEA-LU HIGH PRIORITY PROJECT #2019 & #477. NY305. NY298.

0.360 0.012 0.348 0.000 0.000 AQC:A10P TOTAL 4YR COST :ORANGE TPC : < $0.75 M

0.125 STBG LG URB 0.125 DETLDES2020DETLDES 0.031 0.031 2020NFA

CITY OF KINGSTON

876027

ABEEL STREET: DOCK STREET TO HUDSON STREET (STAGE 1). THIS PROJECT WILL RECONSTRUCT ABEEL STREET BETWEEN DOCK STREET AND HUDSON STREET IN THE CITY OF KINGSTON, ULSTER COUNTY.

0.156 0.156 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : < $0.75 M

0.144 0.144 CONSTHPP 2021CONST 0.036 0.036 2021NFACONINSP 0.015 0.015 2021NFA

LOCAL

876047

EXPANSION OF THE TOWN OF BEEKMAN HIGHWAY GARAGE, TOWN OF BEEKMAN, DUTCHESS COUNTY. EARMARK NY#1870 (NY446).

0.195 0.000 0.195 0.000 0.000 AQC:K1Z TOTAL 4YR COST :DUTCHESS TPC : < $0.75 M

0.100 0.100 CONINSPHPP 2022CONINSP 0.040 0.040 2022NFA

1.800 1.800 CONSTHPP 2022CONST 0.450 0.450 2022NFA

LOCAL

876094

ROUTE 6 TRAFFIC CALMING. CONKLIN AVE ON WEST TO LEXINGTON AVE ON EAST. COMPLETE SIDEWALK NETWORK & PROVIDE ENHANCED BUS SHELTERS, PROVIDE RAISED, LANDSCAPE CENTER ISLANDS AT CERTAIN INTERSECTIONS. TOWN CORTLANDT WESTCHESTER COUNTY. NY 738 2008 SECTION 129, PL110-161

2.390 0.000 0.000 2.390 0.000 AQC:C2 TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M

0.100 0.100 CONSTCMAQ 2022CONST 0.025 0.025 2022NFA

LOCAL

876098

MIDDLETOWN TRAFFIC OPERATIONS STAGE 2: UPGRADE INTERSECTIONS ON ROUTE 17M, ROUTE 211, AND MONHAGEN AVE TO IMPROVE LEVEL OF SERVICE AND UPGRADE CURBS FOR PROPER DRAINAGE, SIDEWALKS AND PAVEMENT FOR SAFETY. CITY OF MIDDLETOWN, ORANGE COUNTY.

0.125 0.000 0.000 0.125 0.000 AQC:D1P TOTAL 4YR COST :ORANGE TPC : < $0.75 M

Page 15: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 15 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.398 STBG FLEX 0.398 CONINSP2020CONINSP 0.099 0.099 2020NFA

3.006 STBG FLEX 3.006 CONST2020CONST 0.752 0.752 2020NFA

0.001 STBG FLEX 0.001 DETLDES2020DETLDES 0.001 0.001 2020NFA

0.082 STBG FLEX 0.082 ROWACQU2020ROWACQU 0.020 0.020 2020NFA

LOCAL

876099

HIGHWAY RECONSTRUCTION COUNTY ROUTE 18: DAMITA DRIVE TO NYS ROUTE 217. TOWN OF CLAVERACK, COLUMBIA COUNTY.

4.359 4.359 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :COLUMBIA TPC : $3.3-$5.6 M

0.074 0.074 CONINSPHPP 2021CONINSP 1.158 1.158 2021NFA

0.736 0.736 CONSTHPP 2021CONST 0.452 0.452 2021NFA

LOCAL

876104

STREETSCAPE, ROADWAY, PEDESTRIAN, AND PARKING IMPROVEMENTS AT THE INTERSECTION OF MEADOW LANE, CHESTNUT LANE, WILLOW DRIVE AND LIBERTY AVENUE FOR THE COLLEGE OF NEW ROCHELLE CAMPUS. CITY OF NEW ROCHELLE. NY 686 HPP#309 (FORMERLY PIN: 8TROCH)

2.420 0.000 2.420 0.000 0.000 AQC:A10 TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M

0.033 SAFE RT SCH 0.033 CONINSP2020 0.466 SAFE RT SCH 0.466 CONST2020

LOCAL

876116

WARWICK VALLEY CENTRAL SCHOOL DISTICT PEDESTRIAN IMPROVEMENTS. PROJECT WILL INSTALL 0.8 MILE OF SIDEWALK ALONG WEST STREET AT THE WARWICK VALLEY MIDDLE SCHOOL FROM ST. STEPHENS LANE TO POND HILL ROAD IN THE VILLAGE OF WARWICK, ORANGE COUNTY.

0.499 0.499 0.000 0.000 0.000 AQC:C2P TOTAL 4YR COST :ORANGE TPC : < $0.75 M

0.080 HPP 0.080 DETLDES2020DETLDES 0.020 0.020 2020NFA

0.080 HPP 0.080 PRELDES2020PRELDES 0.020 0.020 2020NFA

0.080 HPP 0.080 ROWACQU2020ROWACQU 0.020 0.020 2020NFA

0.016 HPP 0.016 ROWINCD2020ROWINCD 0.004 0.004 2020NFA

0.160 0.160 CONINSPHPP 2021CONINSP 0.040 0.040 2021NFA

0.926 0.926 CONSTHPP 2021CONST 0.231 0.231 2021NFA

LOCAL

876120

IMPROVE EAST END ROADS: LIBERTY STREET REHABILITATION BETWEEN CLINTON STREET AND NORTH STREET. CITY OF NEWBURGH, ORANGE COUNTY. NY548 HPP #2880

1.677 0.320 1.357 0.000 0.000 AQC:A10P TOTAL 4YR COST :ORANGE TPC : $1.2-$2.5 M

Page 16: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 16 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.010 TAP LG URBAN 0.010 CONINSP2020CONINSP 0.002 0.002 2020NFA

0.192 TAP LG URBAN 0.192 CONST2020CONST 0.048 0.048 2020NFA

VILLAGE OF NEW PALTZ876122

CONSTRUCT NEW SIDEWALKS AND CURBING ON PROSPECT, CHURCH AND H.W. DUBOIS DRIVE; REPLACE DETERIORATED BLUE STONE SIDEWALK AND CURBING HUGUENOT STREET. VILLAGE OF NEW PALTZ, ULSTER COUNTY.

0.252 0.252 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : < $0.75 M

0.060 STBG-OFF 0.060 ROWACQU2020ROWACQU 0.015 0.015 2020NFA

0.144 0.144 CONINSPSTBG-OFF 2021CONINSP 0.036 0.036 2021NFA

1.200 1.200 CONSTSTBG-OFF 2021CONST 0.300 0.300 2021NFA

ORANGE

876140

WALSH ROAD OVER QUASSIAC CREEK BRIDGE REPLACEMENT, CITY OF NEWBURGH, ORANGE COUNTY.

1.755 0.075 1.680 0.000 0.000 AQC:A19Z TOTAL 4YR COST :ORANGE TPC : $2-$4 M

0.001 CMAQ 0.001 DETLDES2020DETLDES 0.001 0.001 2020NFA

0.256 0.256 CONINSPCMAQ 2021CONINSP 0.064 0.064 2021NFA

2.080 2.080 CONSTCMAQ 2021CONST 0.520 0.520 2021NFA

LOCAL

876142

KIRYAS JOEL PARK AND RIDE LOT EXPANSION PROJECT INVOLVES THE ADDITION OF APPROXIMATELY 200 SPACES TO THE EXISTING PARK-AND-RIDE LOT LOCATED AT THE INTERSECTION OF BAKERTOWN ROAD AND HIGHLAND MILLS ROAD (COUNTY ROUTE 105), AS WELL AS LIGHTING AND A BUS SHELTER. ORANGE COUNTY.

2.922 0.002 2.920 0.000 0.000 AQC:NON TOTAL 4YR COST :ORANGE TPC : $2-$4 M

0.024 STBG FLEX 0.024 ROWACQU2020ROWACQU 0.006 0.006 2020NFA

0.400 0.400 CONINSPSTBG FLEX 2022CONINSP 0.100 0.100 2022NFA

2.480 2.480 CONSTSTBG FLEX 2022CONST 0.620 0.620 2022NFA

LOCAL

876143

COUNTY ROUTE 7A RECONSTRUCTION AND PRESERVATION. TOWN OF COPAKE COLUMBIA COUNTY. PROJECT WILL ADDRESS SAFETY IMPROVEMENT AND MAINTAIN STATE OF GOOD REPAIR.

3.630 0.030 0.000 3.600 0.000 AQC:N/A TOTAL 4YR COST :COLUMBIA TPC : $3.3-$5.6 M

0.180 0.180 DETLDESSTBG FLEX 2023DETLDES 0.045 0.045 2023NFA

0.180 0.180 PRELDESSTBG FLEX 2023PRELDES 0.045 0.045 2023NFA

0.024 0.024 ROWINCDSTBG FLEX 2023ROWINCD 0.006 0.006 2023NFA

LOCAL

876144

COUNTY ROUTE 25A OVER KINDERHOOK CREEK: PROJECT WILL REPLACE OR SIGNIFICANTLY REHABILITATE THE STRUCTURE CARRYING COUNTY ROUTE 25A OVER THE KINDERHOOK CREEK IN THE TOWN OF STUYVESANT, COLUMBIA COUNTY.

0.480 0.000 0.000 0.000 0.480 AQC:N/A TOTAL 4YR COST :COLUMBIA TPC : $3.3-$5.6 M

Page 17: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 17 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.116 STBG LG URB 0.116 CONINSP2020CONINSP 0.029 0.029 2020NFA

0.595 STBG LG URB 0.595 CONST2020CONST 0.149 0.149 2020NFA

LOCAL

876149

ADA ACCESSIBLE SIDEWALKS AND RAMPS IN THE CITY OF MIDDLETOWN: SIDEWALKS AND CURBS WILL BE UPGRADED TO MEET THE AMERICANS WITH DISABILITIES ACT GUIDELINES ON FRANKLIN ST (HIGHLAND AVE TO UNION ST), GROVE ST (WICKHAM AVE TO RAILROAD AVE), RAILROAD AVE (BOWLING ALLEY TO GROVE ST), WICKHAM AVE (HIGHLAND AVE TO NORTH ST), WICKHAM AVE (PROSPECT ST TO PRINCE ST), WEST MAIN ST (HIGHLAND AVE TO UNION ST), DOLSON AVE (BENNITT ST TO CITY LINE), ORCHARD ST (EAST MAIN ST TO NORTH ST), AND HIGHLAND AVE & W MAIN ST (WICKHAM AVE ON BOTH ENDS). CITY OF MIDDLETOWN, ORANGE COUNTY. TRANSFERRED EARMARKS: NY400, NY439 (PROGRAM CODE RPS9)

0.889 0.889 0.000 0.000 0.000 AQC:C2Z TOTAL 4YR COST :ORANGE TPC : $2-$4 M

0.001 STBG-OFF 0.001 DETLDES2020DETLDES 0.001 0.001 2020NFA

0.028 STBG-OFF 0.028 ROWACQU2020ROWACQU 0.007 0.007 2020NFA

0.040 0.040 CONINSPSTBG-OFF 2021CONINSP 0.260 0.260 2021NFA

0.620 0.620 CONSTSTBG-OFF 2021CONST 2.080 2.080 2021NFA

LOCAL

876155

FERRY STREET BRIDGE OVER CSX & AMTRAK REPLACEMENT BIN 2223000. PROJECT IS TO REMOVE AND REPLACE THE 69 FOOT SINGLE SPAN BRIDGE THAT CARRIES FERRY STREET OVER THE CSX/AMTRAK TRAIN TRACKS. CITY OF HUDSON IN COLUMBIA COUNTY. (FORMERLY PIN: 8T0723)

3.037 0.037 3.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :COLUMBIA TPC : $2-$4 M

0.128 NHPP 0.128 CONINSP2020CONINSP 0.032 0.032 2020NFA

1.093 NHPP 1.093 CONST2020CONST 0.273 0.273 2020NFA

LOCAL

876160

SNAKE HILL ROAD/CSX RIVER LINE SUPERSTRUCTURE REPLACEMENT. THIS PROJECT WILL REPLACE THE SUPERSTRUCTURE OF THE EXISTING BRIDGE THAT CARRIES SNAKE HILL ROAD OVER THE CSX TRANSIT RIVER LINE LOCATED IN THE TOWN OF CLARKSTOWN, ROCKLAND COUNTY. PURPOSE - DUE TO DETERIORATION TO BRING TO STATE OF GOOD REPAIR. BRIDGE NY PROJECT. FUNDED IS 95% FEDERAL USING 15% TOLL CREDIT WITH A 5% LOCAL MATCH. BIN 3345780

1.526 1.526 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M

0.080 STBG-OFF 0.080 CONINSP2020CONINSP 0.004 0.004 2020NFA

0.599 STBG-OFF 0.599 CONST2020CONST 0.032 0.032 2020NFA

0.001 STBG-OFF 0.001 DETLDES2020 0.024 STBG-OFF 0.024 ROWACQU2020

ROWACQU 0.001 0.001 2020NFA

TN OF SHANDAKEN

876161

PECK HOLLOW RD OVER THE PECK HOLLOW STREAM BRIDGE REPLACEMENT TO BRING TO STATE OF GOOD REPAIR. BIN 2270000. BRIDGE NY AWARD. FUNDING IS 95% FEDERAL USING 15% TOLL CREDIT WITH A 5% LOCAL MATCH. TOWN OF SHANDAKEN, ULSTER COUNTY.

0.741 0.741 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $0.6-$1.5 M

Page 18: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 18 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.001 STBG-OFF 0.001 DETLDES2020DETLDES 0.001 0.001 2020NFA

0.001 STBG-OFF 0.001 ROWACQU2020 0.153 0.153 CONINSPSTBG-OFF 2021

CONINSP 0.038 0.038 2021NFA 0.881 0.881 CONSTSTBG-OFF 2021

CONST 0.220 0.220 2021NFA

ULSTER CO

876175

BRIDGE REPLACEMENT: FANTINEKILL BRIDGE (BIN 3347600) CARYING SAMSONVILLE RD (CR3) OVER THE MOMBACCUS CREEK IN THE TOWN OF ROCHESTER, ULSTER COUNTY. SUB PIN FROM UCTC BLOCK BRIDGE PROGRAM PIN 8T0714.

1.295 0.003 1.292 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $1.2-$2.5 M

0.001 STBG-OFF 0.001 DETLDES2020DETLDES 0.001 0.001 2020NFA

0.001 STBG-OFF 0.001 ROWACQU2020 0.153 0.153 CONINSPSTBG-OFF 2021

CONINSP 0.038 0.038 2021NFA 0.894 0.894 CONSTSTBG-OFF 2021

CONST 0.223 0.223 2021NFA

ULSTER CO

876176

BRIDGE REPLACEMENT: WOLVEN BRIDGE CARRYING ZENA ROAD (CR30) (BIN 3346510) OVER THE SAWKILL CREEK IN THE TOWN OF WOODSTOCK, ULSTER COUNTY. SUB PIN FROM UCTC BLOCK BRIDGE PROGRAM PIN 8T0714.

1.311 0.003 1.308 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $1.2-$2.5 M

0.036 TAP LG URBAN 0.036 CONINSP2020CONINSP 0.009 0.009 2020NFA

0.240 TAP LG URBAN 0.240 CONST2020CONST 0.060 0.060 2020NFA

LOCAL

876179

LAKE STREET AND STAGE ROAD PEDESTRIAN IMPROVEMENTS: INCLUDE CHANNELIZATION OF EXISTING SKEWED INTERSECTION TO SHORTEN PEDESTRIAN CROSSING DISTANCE; INSTALLATION OF ADA COMPLIANT CURB RAMPS; HIGH VISIBILITY CROSSWALKS; AND REPLACEMENT OF EXISTING FLASHING SIGNAL WITH RAPID FLASHING BEACONS (RFB) TO PROVIDE HIGHER LEVEL WARNING TO DRIVERS TO YIELD TO PEDESTRIANS. VILLAGE OF MONROE, ORANGE COUNTY.

0.345 0.345 0.000 0.000 0.000 AQC:C2Z TOTAL 4YR COST :ORANGE TPC : < $0.75 M

0.138 TAP FLEX 0.138 CONINSP2020CONINSP 0.034 0.034 2020NFA

1.150 TAP FLEX 1.150 CONST2020CONST 0.288 0.288 2020NFA

0.088 TAP FLEX 0.088 ROWACQU2020ROWACQU 0.022 0.022 2020NFA

ULSTER CO

876182

ULSTER COUNTY MIDTOWN LINEAR PARK: CONSTRUCTION OF A 0.8 MILE PAVED PEDESTRIAN/BICYCLE FACILITY FROM THE EAST SIDE OF CORNELL STREET TO WESTBROOK LANE ALONG THE COUNTY OWNED U&D ROW IN THE CITY OF KINGSTON, ULSTER COUNTY.

1.720 1.720 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $1.2-$2.5 M

Page 19: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 19 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.209 TAP FLEX 0.209 CONINSP2020CONINSP 0.052 0.052 2020NFA

1.300 TAP FLEX 1.300 CONST2020CONST 0.700 0.700 2020NFA

LOCAL

876183

THE MANVILLE ROAD CORRIDOR IMPROVEMENTS PROJECT WILL REMOVE A FREE RIGHT TURN FROM MEMORIAL PLAZA ONTO MANVILLE ROAD TO IMPROVE PEDESTRIAN SAFETY WHEN CROSSING MANVILLE ROAD. A RAISED PLANTED MEDIAN ON MANVILLE ROAD BETWEEN WASHINGTON AND TOMPKINS AVENUES WILL PROVIDE PEDESTRIAN REFUGE. CURB EXTENSIONS BETWEEN WHEELER AND TOMPKINS AVENUES WILL REDUCE THE CROSSING DISTANCE FOR PEDESTRIANS. SELECT SIDEWALK TREATMENTS AND THE EXPANDED PARK SPACE IN MEMORIAL PLAZA WILL EXPAND AND ENHANCE THE HIGHLY UTILIZED PUBLIC SPACE NEAR THE TRAIN STATION. LOCATED IN THE VILLAGE OF PLEASANTVILLE, WESTCHESTER COUNTY.

2.261 2.261 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M

0.020 TAP SM URBAN 0.020 ROWACQU2020ROWACQU 0.005 0.005 2020NFA

0.101 0.101 CONINSPTAP SM URBAN 2021CONINSP 0.025 0.025 2021NFA

1.089 1.089 CONSTTAP SM URBAN 2021CONST 0.272 0.272 2021NFA

CITY OF KINGSTON

876184

HENRY ST PEDESTRIAN IMPROVEMENTS: THIS PROJECT WILL UPGRADE THE EXISTING SIDEWAKS ON HENRY STREET FROM BROADWAY TO WALL STREET IN THE VACINITY OF THE GEORGE WASHINGTON ELEMENTARY SCHOOL TO ADDRESS ADA COMPLIANCE AND ENHANCE PEDESTRIAN ACCESSIBILITY. THE PROJECT WILL ADD BICYCLE INFRASTRUCTURE, HIGH VISIBILITY CROSSWALKS AND BICYCLE PARKING. CITY OF KINGSTON, ULSTER COUNTY.

1.512 0.025 1.487 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $1.2-$2.5 M

0.001 TAP LG URBAN 0.001 DETLDES2020DETLDES 0.001 0.001 2020NFA

0.103 TAP LG URBAN 0.103 ROWACQU2020ROWACQU 0.026 0.026 2020NFA

0.077 0.077 CONINSPTAP LG URBAN 2021CONINSP 0.019 0.019 2021NFA

0.766 0.766 CONSTTAP LG URBAN 2021CONST 0.192 0.192 2021NFA

LOCAL

876190

ROUTE 9 NORTHBOUND PEDESTRIAN IMPROVEMENTS PROJECT WILL CONSTUCT AN AMERICANS WITH DISABILITITES ACT (ADA) COMPLIANT SIDEWALK SYSTEM WITH TREES AND LIGHTING ALONG 1,600 FEET OF ROUTE 9. TOWN OF HYDE PARK, DUTCHESS COUNTY. TAP AWARD PROJECT. DOES NOT COUNT AGAINST REGIONAL PLANNING TARGET.

1.185 0.131 1.054 0.000 0.000 AQC:C2Z TOTAL 4YR COST :DUTCHESS TPC : $1.2-$2.5 M

0.020 STBG-OFF 0.020 ROWACQU2020ROWACQU 0.005 0.005 2020NFA

0.101 0.101 CONINSPSTBG-OFF 2021CONINSP 0.025 0.025 2021NFA

0.957 0.957 CONSTSTBG-OFF 2021CONST 0.239 0.239 2021NFA

LOCAL

876195

PROJECT WILL REPLACE THE CAROL DRIVE OVER FISHKILL CREEK FULL TIMBER BRIDGE WITH A CLEAR SPAN STRUCTURE INCLUDING REPLACEMENT OF EXISTING BRIDGE PILINGS THAT ARE LOCATED WITHIN THE FISHKILL CREEK FLOODWAY WITH ABUTMENTS PLACED OUTSIDE THE FLOODWAY. BIN 2262780. TOWN OF EAST FISHKILL, DUTCHESS COUNTY.

1.347 0.025 1.322 0.000 0.000 AQC:A19Z TOTAL 4YR COST :DUTCHESS TPC : $1.2-$2.5 M

Page 20: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 20 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.033 STBG-OFF 0.033 ROWACQU2020ROWACQU 0.008 0.008 2020NFA

0.234 0.234 CONINSPSTBG-OFF 2021CONINSP 0.058 0.058 2021NFA

2.502 2.502 CONSTSTBG-OFF 2021CONST 0.626 0.626 2021NFA

LOCAL

876196

PROJECT WILL REPLACE THE EXISTING GARDEN STREET OVER FALL KILL CREEK BRIDGE, INCLUDING BOTH ABUTMENTS. BIN 2262680. CITY OF POUGHKEEPSIE, DUTCHESS COUNTY.

3.461 0.041 3.420 0.000 0.000 AQC:A19Z TOTAL 4YR COST :DUTCHESS TPC : $3.3-$5.6 M

0.160 CMAQ 0.160 ROWACQU2020ROWACQU 0.040 0.040 2020NFA

0.100 HSIP 0.100 ROWACQU2020ROWACQU 0.025 0.025 2020NFA

0.240 STBG LG URB 0.240 DETLDES2020DETLDES 0.060 0.060 2020NFA

0.480 STBG LG URB 0.480 ROWACQU2020ROWACQU 0.120 0.120 2020NFA

0.264 0.264 CONINSPCMAQ 2021CONINSP 0.066 0.066 2021NFA

2.376 2.376 CONSTCMAQ 2021CONST 0.594 0.594 2021NFA

PUTNAM

876197

STONELEIGH AVENUE @ DREWVILLE ROAD INTERSECTION IMPROVEMENTS. THIS PROJECT AT THE INTERSECTION OF STONELEIGH AVENUE AND DREWVILLE ROAD WILL PROVIDE SAFE ACCESS THROUGH THE INTERSECTION TO THE HOSPITAL, MODERNIZE THE SIGNALIZATION AND CREATE STORAGE. THIS PROJECT WILL ALSO INCLUDE THE ADDITION OF TURN LANES IN ORDER TO IMPROVE OVERALL TRAFFIC AND SAFETY CONDITIONS WHILE TREATING ROAD RUNOFF. THIS PROJECT IS LOCATED IN THE TOWN OF CARMEL, PUTNAM COUNTY.

4.525 1.225 3.300 0.000 0.000 AQC:D3 TOTAL 4YR COST :PUTNAM TPC : $3.3-$5.6 M

0.024 STBG FLEX 0.024 CONINSP2020CONINSP 0.006 0.006 2020NFA

0.116 STBG FLEX 0.116 CONST2020CONST 0.104 0.104 2020NFA

LOCAL

876198

ALBANY TURNPIKE (295) TRAFFIC SIGNALS: PROJECT WILL ONSTRUCT COORDINATED TRAFFIC SIGNALS, ONE LOCATED AT THE SOUTHERN BRIDGE APPROACH AND ONE AT THE INTERSECTION OF ALBANY TURNPIKE AND POHNDORF DRIVE TO ALLOW ALTERNATING ONE-WAY TRAFFIC TO CROSS THE EXISTING ONE-LANE BRIDGE OVER CSX RAILROAD. WORK WILL INCLUDE SOUTHBOUND ALBANY TURNPIKE ROAD TRAVEL LANE REALIGNMENT, BETWEEN THE SOUTHERN BRIDGE APPROACH AND STATE ROUTE 295. ADDITIONALLY, A CONNECTION BETWEEN THE EXISTING SIDEWALK AND A PAVED SURFACE WOULD BE CREATED FOR PEDESTRIANS. THE PROJECT IS LOCATED IN THE TOWN OF CHATHAM, COLUMBIA COUNTY.

0.250 0.250 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :COLUMBIA TPC : < $0.75 M

0.165 REC TRAILS 0.165 CONST2020CONST 0.041 0.041 2020NFA

0.016 REC TRAILS 0.016 DETLDES2020DETLDES 0.004 0.004 2020NFA

TOWN OF LLOYD

876200

HUDSON VALLEY RAIL TRAIL RESTORATION PROJECT: PROJECT WILL RENOVATE APPROXIMATELY 2 MILES OF THE HUDSON VALLEY RAIL TRAIL BETWEEN THE COMMERCIAL AVE TRAILHEAD PARKING AREA AND TONY WILLIAMS TOWN PARK. TOWN OF LLOYD, ULSTER COUNTY. OPRHP PROJECT # 175017.

0.226 0.226 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : < $0.75 M

Page 21: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 21 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.082 STBG FLEX 0.082 CONINSP2020CONINSP 0.021 0.021 2020NFA

0.817 STBG FLEX 0.817 CONST2020CONST 0.204 0.204 2020NFA

CITY OF KINGSTON

876202

WILBUR AVE REPAVING PROJECT. MILL 2.5” OF EXISTING ASPHALT, 1” TRUING, 1.5” TOP COURSE PAVING. PROJECT IS ALONG WILBUR AVENUE FROM GREENKILL AVE TO ABEEL STREET IN THE CITY OF KINGSTON, ULSTER COUNTY. SUB PIN FROM UCTC BLOCK REPAVING PROGRAM PIN 8T0715.

1.124 1.124 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $0.6-$1.5 M

0.243 HSIP 0.243 CONINSP2020 1.944 HSIP 1.944 CONST2020

C/POUGHKEEPSIE

876203

THE PROJECT WILL INSTALL PEDESTRIAN SAFETY IMPROVEMENTS AT SIGNALIZED INTERSECTIONS AND UNCONTROLLED CROSSWALKS ON HIGH CRASH CORRIDORS IN THE CITY OF POUGHKEEPSIE, DUTCHESS COUNTY. IMPROVEMENTS SUPPORT THE STATES PEDESTRIAN SAFETY ACTION PLAN (PSAP). 100% FEDERAL USING 10% TOLL CREDIT. THIS PROJECT WAS SELECTED IN THE LOCAL CALL FOR PSAP PROJECTS AND NO OFFSET NEEDED. DOES NOT COUNT AGAINST THE REGIONAL PLANNING TARGET.

2.187 2.187 0.000 0.000 0.000 AQC:A6Z TOTAL 4YR COST :DUTCHESS TPC : $2-$4 M

0.040 HSIP 0.040 CONINSP2020 0.320 HSIP 0.320 CONST2020 0.001 HSIP 0.001 ROWACQU2020

LOCAL

876204

ORANGE COUNTY PEDESTRIAN SAFETY IMPROVEMENTS: SIGNALIZED INTERSECTIONS, COUNTERMEASURES PROPOSED INCLUDE SIGNAL TIMING, COUNTDOWN TIMERS, HIGH VISIBILITY CROSSWALK MARKINGS, ACCESSIBLE PEDESTRIAN SIGNALS, NEW PEDESTRIAN SIGNALS, AND LEFT TURN PHASING. AT UNCONTROLLED CROSSWALKS, BASIC AND ENHANCED TREATMENT COUNTERMEASURES WILL INCLUDE IN-STREET PEDESTRIAN SIGNS, RAISED PEDESTRIAN REFUGE/ CURB EXTENSIONS, AND ADDITIONAL SIGNS AND MARKINGS IN ADVANCE OF CROSSWALKS IN VARIOUS MUNICIPALITIES IN ORANGE COUNTY. 100% FEDERAL USING 10% TOLL CREDIT. THIS PROJECT WAS SELECTED IN THE LOCAL CALL FOR PEDESTRIAN SAFETY ACTION PLAN (PSAP) PROJECTS AND NO OFFSET NEEDED. DOES NOT COUNT AGAINST THE REGIONAL PLANNING TARGET.

0.361 0.361 0.000 0.000 0.000 AQC:A6Z TOTAL 4YR COST :ORANGE TPC : < $0.75 M

Page 22: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 22 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.035 HSIP 0.035 DETLDES2020 0.035 HSIP 0.035 PRELDES2020 0.009 HSIP 0.009 ROWACQU2020 0.001 HSIP 0.001 ROWINCD2020 0.060 0.060 CONINSPHSIP 2021 0.408 0.408 CONSTHSIP 2021

LOCAL

876205

TOWN OF RAMAPO PEDESTRIAN SAFETY IMPROVEMENTS. AT SIGNALIZED INTERSECTIONS, IMPROVEMENT WILL INCLUDE TWO HIGH VISIBILITY CROSSWALKS, FOUR COUNTDOWN TIMERS, AND FOUR APS BUTTONS. AT UNCONTROLLED CROSSWALKS, ENHANCEMENTS INCLUDE THE BASIC TREATMENTS OF HIGH VISIBILITY CROSSWALKS, YIELD TO PEDESTRIAN SIGNS, AND SOLAR SIGNS. FOUR NEW CROSSWALKS ARE PROPOSED WITH THE ADDITION OF NEW CURB CUTS TO COMPLY WITH AMERICANS WITH DISABILITIES ACT. THE STATE CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER. 100% FEDERAL USING 10% TOLL CREDIT. THIS PROJECT WAS SELECTED IN THE LOCAL CALL FOR PSAP PROJECTS AND NO OFFSET NEEDED. DOES NOT COUNT AGAINST THE REGIONAL PLANNING TARGET. TOWN OF RAMAPO, ROCKLAND COUNTY

0.548 0.080 0.468 0.000 0.000 AQC:A6 TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M

0.060 HSIP 0.060 CONINSP2020 0.410 HSIP 0.410 CONST2020 0.001 HSIP 0.001 ROWACQU2020

CITY OF KINGSTON

876207

CITY OF KINGSTON, ULSTER COUNTY WILL IMPLEMENT SYSTEMATIC IMPROVEMENTS TO SIGNALIZED INTERSECTIONS AND UNCONTROLLED CROSSWALKS. IMPROVEMENTS ARE THE COUNTERMEASURES IDENTIFIED IN THE 2016 PEDESTRIAN SAFETY PLAN, AND THEY INCLUDE THE INSTALLATION OF HIGH VISIBILITY CROSSWALKS AND PEDESTRIAN CROSSING SIGNS AT AND, SOMETIMES, IN ADVANCE OF THE NEW CROSSWALK. RRFB AND CURB EXTENSIONS TO IMPROVE SAFETY. ADA-COMPLIANT RAMPS WILL BE INSTALLED AT LOCATIONS WHERE REQUIRED AS A RESULT OF THE BASIC TREATMENT. 100% FEDERAL USING 10% TOLL CREDIT. THIS PROJECT WAS SELECTED IN THE LOCAL CALL FOR PSAP PROJECTS AND NO OFFSET NEEDED. DOES NOT COUNT AGAINST THE REGIONAL PLANNING TARGET.

0.471 0.471 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : < $0.75 M

Page 23: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 23 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.001 HSIP 0.001 ROWACQU2020 0.046 0.046 CONINSPHSIP 2021 0.480 0.480 CONSTHSIP 2021

LOCAL

876208

VILLAGE OF PORT CHESTER PEDESTRIAN SAFETY IMPROVEMENTS. THE PROPOSED PROJECT WILL INVOLVE THE INSTALLATION OF A VARIETY OF NEW PEDESTRIAN FACILITIES AT CERTAIN INTERSECTIONS: CURB RAMPS, NEW COUNTDOWN TIMERS, THE ADDITION OF HIGH VISIBILITY CROSSWALK MARKINGS, AND AMERICANS WITH DISABILITIES ACT (ADA) ACCESSIBLE SIGNALS. THE PROJECT WILL ALSO INVOLVE MODIFICATION TO EXISTING FACILITIES SUCH AS STRIPING CERTAIN CROSSWALKS, RELOCATING SIGNAGE, MODIFYING COUNTDOWN TIMERS TO ALLOW PEDESTRIANS ADDITIONAL TIME TO CROSS ROADWAYS, AND RELOCATING STOP BARS. THE STATE CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER. 100% FEDERAL USING 10% TOLL CREDIT. THIS PROJECT WAS SELECTED IN THE LOCAL CALL FOR PSAP PROJECTS AND NO OFFSET NEEDED. DOES NOT COUNT AGAINST THE REGIONAL PLANNING TARGET. VILLAGE OF PORT CHESTER, WESTCHESTER COUNTY.

0.527 0.001 0.526 0.000 0.000 AQC:A6 TOTAL 4YR COST :WESTCHESTER TPC : < $0.75 M

0.001 HSIP 0.001 ROWACQU2020 0.200 0.200 CONINSPHSIP 2021 2.100 2.100 CONSTHSIP 2021

LOCAL

876209

CITY OF NEW ROCHELLE PEDESTRIAN SAFETY IMPROVEMENTS. PROJECT TO INSTALL PEDESTRIAN SIGNAL HEADS, AMERICANS WITH DISABILITIES ACT (ADA) COMPLIANT RAMPS, HIGH VISIBILITY CROSSWALKS AND COUNTDOWN TIMERS AT SIGNALIZED INTERSECTIONS THROUGHOUT THE CITY OF NEW ROCHELLE. THE STATE CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER. 100% FEDERAL USING 10% TOLL CREDIT. THIS PROJECT WAS SELECTED IN THE LOCAL CALL FOR PSAP PROJECTS AND NO OFFSET NEEDED. DOES NOT COUNT AGAINST THE REGIONAL PLANNING TARGET. WESTCHESTER COUNTY.

2.301 0.001 2.300 0.000 0.000 AQC:A6 TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M

Page 24: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 24 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.030 0.030 CONINSPHSIP 2021 0.720 0.720 CONSTHSIP 2021

WESTCHESTER

876210

WESTCHESTER COUNTY PEDESTRIAN SAFETY IMPROVEMENTS. AT SIGNALIZED INTERSECTIONS, COUNTERMEASURES PROPOSED INCLUDE SIGNAL TIMING, COUNTDOWN TIMERS, HIGH VISIBILITY CROSSWALK MARKINGS, ACCESSIBLE PEDESTRIAN SIGNALS, NEW PEDESTRIAN SIGNALS, AND LEFT TURN PHASING. AT UNCONTROLLED CROSSWALKS, BASIC AND ENHANCED TREATMENT COUNTERMEASURES WILL INCLUDE IN-STREET PEDESTRIAN SIGNS, RAISED PEDESTRIAN REFUGE/ CURB EXTENSIONS, AND ADDITIONAL SIGNS AND MARKINGS IN ADVANCE OF CROSSWALKS. THE STATE CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER. 100% FEDERAL USING 10% TOLL CREDIT. THIS PROJECT WAS SELECTED IN THE LOCAL CALL FOR PSAP PROJECTS AND NO OFFSET NEEDED. DOES NOT COUNT AGAINST THE REGIONAL PLANNING TARGET. WESTCHESTER COUNTY.

0.750 0.000 0.750 0.000 0.000 AQC:A6 TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M

0.105 STBG-OFF 0.105 DETLDES2020DETLDES 0.006 0.006 2020NFA

0.105 STBG-OFF 0.105 PRELDES2020PRELDES 0.006 0.006 2020NFA

0.005 STBG-OFF 0.005 ROWINCD2020 0.119 0.119 CONINSPSTBG-OFF 2021

CONINSP 0.006 0.006 2021NFA 1.139 1.139 CONSTSTBG-OFF 2021

CONST 0.060 0.060 2021NFA 0.005 0.005 ROWACQUSTBG-OFF 2021

LOCAL

876211

VALLEY VIEW ROAD/BASH BISH BROOK BRIDGE REHAB: PROJECT WILL REPLACE THE SUPERSTRUCTURE OF THE VALLEY VIEW ROAD BRIDGE OVER BASH BISH BROOK IN THE TOWN OF COPAKE IN COLUMBIA COUNTY. THIS IS A 2018 BRIDGE NY PROJECT. 95% FEDERAL USING 15% TOLL CREDIT AND 5% MATCH. BIN 3222390.

1.556 0.227 1.329 0.000 0.000 AQC:A19Z TOTAL 4YR COST :COLUMBIA TPC : $1.2-$2.5 M

0.005 NHPP 0.005 ROWACQU2020 0.295 0.295 CONINSPNHPP 2021

CONINSP 0.015 0.015 2021NFA 2.796 2.796 CONSTNHPP 2021

CONST 0.147 0.147 2021NFA

LOCAL

876212

HIGHLAND AVENUE OVER WALLACE STREET BRIDGE REPLACEMENT: PROJECT WILL REMOVE THE EXISTING SEVEN SPAN BRIDGE AND REPLACE IT WITH A SINGLE SPAN BRIDGE (OVER WALLACE STREET) WITH THE REMAINING AREA UTILIZING CONCRETE-FACED, REINFORCED EARTH RETAINING WALLS. VILLAGE OF OTISVILLE IN ORANGE COUNTY. THIS IS A 2018 BRIDGE NY PROJECT. 95% FEDERAL USING 15% TOLL CREDIT AND 5% MATCH. BIN 3364800

3.258 0.005 3.253 0.000 0.000 AQC:A19P TOTAL 4YR COST :ORANGE TPC : $3.3-$5.6 M

Page 25: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 25 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.160 NHPP 0.160 ROWACQU2020ROWACQU 0.040 0.040 2020NFA

0.124 0.124 CONINSPNHPP 2021CONINSP 0.031 0.031 2021NFA

1.135 1.135 CONSTNHPP 2021CONST 0.284 0.284 2021NFA

PUTNAM

876213

SPROUT BROOK ROAD OVER CANOPUS CREEK BRIDGE REPLACEMENT. THIS PROJECT WILL REPLACE THE BRIDGE CARRYING CR 15 SPROUT BROOK ROAD OVER CANOPUS CREEK IN THE TOWN OF PHILLIPSTOWN, PUTNAM COUNTY. TO INSTALL NEW WIDER ABUTMENTS, NEW WINGWALLS, AND WIDER DECK TO PROVIDE SHOULDERS FOR PEDESTRIANS AND BICYCLES. 2018 BRIDGE NY PROJECT. 95% FEDERAL USING 15% TOLL CREDIT WITH A 5% MATCH. BIN 3345690

1.774 0.200 1.574 0.000 0.000 AQC:A19 TOTAL 4YR COST :PUTNAM TPC : $2-$4 M

0.153 0.153 CONINSPSTBG LG URB 2021CONINSP 0.078 0.078 2021NFA

1.389 1.389 CONSTSTBG LG URB 2021CONST 0.572 0.572 2021NFA

ROCKLAND

876214

GRASSY POINT ROAD OVER MINISCEONGO CREEK BRIDGE REPLACEMENT. THIS PROJECT WILL REPLACE GRASSY POINT ROAD OVER MINISCEONGO CREEK BRIDGE IN THE TOWN OF STONY POINT, ROCKLAND COUNTY. COMPLETE REPLACEMENT OF THE EXISTING STRUCTURE WITH A MODERN STRUCTURE CAPABLE OF CARRYING ALL LEGAL LOADS. 2018 BRIDGE NY PROJECT. 95% FEDERAL USING 15% TOLL CREDIT WITH A 5% MATCH. BIN 3346300

2.192 0.000 2.192 0.000 0.000 AQC:A19 TOTAL 4YR COST :ROCKLAND TPC : $4.6-$7.5 M

0.065 0.065 CONINSPSTBG LG URB 2021CONINSP 0.003 0.003 2021NFA

0.581 0.581 CONSTSTBG LG URB 2021CONST 0.032 0.032 2021NFA

ROCKLAND

876215

CALLS HOLLOW RD OVER MINISCEONGO CREEK BRIDGE REHABILITATION. THIS PROJECT WILL REPAIR THE CALLS HOLLOW ROAD OVER MINISCEONGO CREEK BRIDGE IN THE TOWN OF HAVERSTRAW, ROCKLAND COUNTY. THE PROJECT WILL STABILIZE THE STEAM BANKS TO IMPROVE STREAM GEOMETRY FOR FLOW EFFICIENCY AND ENSURE SUSTAINABILITY OF THE BRIDGE AND ROADWAY. 2018 BRIDGE NY PROJECT. 95% FEDERAL USING 15% TOLL CREDIT WITH A 5% MATCH. BIN 3345900

0.681 0.000 0.681 0.000 0.000 AQC:A19 TOTAL 4YR COST :ROCKLAND TPC : $0.6-$1.5 M

0.005 STBG-OFF 0.005 ROWACQU2020 0.428 0.428 CONINSPSTBG-OFF 2021

CONINSP 0.023 0.023 2021NFA 3.568 3.568 CONSTSTBG-OFF 2021

CONST 0.188 0.188 2021NFA

ULSTER CO

876216

REHABILITATION OF THE BRIDGE CARRYING COUNTY ROUTE 18 OVER THE SHAWANGUNK KILL CREEK IN THE TOWN OF SHAWANGUNK. THIS PROJECT INCLUDES THE REMOVAL OF THE EXISTING SUPERSTRUCTURE AND BEARINGS ALONG WITH MINOR CONCRETE REPAIRS, AS NEEDED, AT THE PIER AND ABUTMENTS. BIN 3347510 IN THE TOWN OF SHAWANGUNK, ULSTER COUNTY. BRIDGE NY AWARDS. 95% FEDERAL USING 15% TOLL CREDIT WITH A 5% LOCAL MATCH

4.212 0.005 4.207 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $4.6-$7.5 M

Page 26: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 26 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.665 0.665 CONINSPNHPP 2021CONINSP 0.032 0.032 2021NFA

3.271 3.271 CONSTNHPP 2021CONST 0.323 0.323 2021NFA

0.009 0.009 ROWACQUNHPP 2021ROWACQU 0.032 0.032 2021NFA

LOCAL

876218

NYS ROUTE 119 OVER BRONX RIVER PARKWAY BRIDGE REHABILITATION. THIS PROJECT WILL REHABILITATE THE BRIDGE CARRYING NYS ROUTE 119 EAST OVER THE BRONX RIVER PARKWAY IN THE CITY OF WHITE PLAINS, WESTCHESTER COUNTY. TO UPDATE DRAINAGE, REPLACE THE SATURATED ARCH FILL, WATERPROOF BOTH ARCHES AND REPAIR DAMAGE DONE BY THE INTRUDING WATER. 2018 BRIDGE NY PROJECT. 95% FEDERAL USING 15% TOLL CREDIT WITH 5% MATCH. BIN 3348690

4.332 0.000 4.332 0.000 0.000 AQC:A19 TOTAL 4YR COST :WESTCHESTER TPC : $7.5-$12 M

0.024 STBG-OFF 0.024 ROWACQU2020ROWACQU 0.001 0.001 2020NFA

0.238 0.238 CONINSPSTBG-OFF 2021CONINSP 0.012 0.012 2021NFA

1.298 1.298 CONSTSTBG-OFF 2021CONST 0.219 0.219 2021NFA

LOCAL

876219

WAVERLY AVENUE OVER SHELDRAKE RIVER BRIDGE REPLACEMENT. THIS PROJECT WILL REPLACE THE EXISTING BRIDGE CROSSING INCLUDING ABUTMENTS AND WINGWALLS FOR THE BRIDGE CARRYING WAVERLY AVENUE OVER SHELDRAKE RIVER IN THE TOWN OF MAMARONECK IN WESTCHESTER COUNTY. IMPROVED ALIGNMENT OF THE REPLACEMENT BRIDGE ADJOINING ROADWAYS IS INTENDED TO BE EVALUATED TO CORRECT EXISTING SHIFT IN THE ROADWAY. 2018 BRIDGE NY PROJECT. 95% FEDERAL USING 15% TOLL CREDIT WITH A 5% MATCH. BIN 2225140

1.792 0.025 1.767 0.000 0.000 AQC:A19 TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M

0.162 0.162 CONINSPSTBG-OFF 2021CONINSP 0.008 0.008 2021NFA

1.655 1.655 CONSTSTBG-OFF 2021CONST 0.089 0.089 2021NFA

LOCAL

876220

PRESTON WAY OVER METRO NORTH RAILROAD BRIDGE REHABILITATION. THIS PROJECT WILL REHABILITATE THE EXISTING BRIDGE CARRYING PRESTON WAY OVER THE METRO NORTH RAILROAD HARLEM LINE IN THE VILLAGE OF MOUNT KISCO IN WESTCHESTER COUNTY. CONSTRUCTION INCLUDES CONCRETE REPAIRS OF EXISTING ABUTMENTS, PIERS, PIER CAPS, STRUCTURAL DECK ELEMENTS, WEARING SURFACE, CURBS, AND SIDEWALKS. 2018 BRIDGE NY PROJECT. 95% FEDERAL USING 15% TOLL CREDIT WITH A 5% MATCH. BIN 2265420

1.914 0.000 1.914 0.000 0.000 AQC:A19 TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M

0.123 0.123 CONINSPNHPP 2022CONINSP 0.006 0.006 2022NFA

1.227 1.227 CONSTNHPP 2022CONST 0.065 0.065 2022NFA

LOCAL

876221

HEATHCOTE ROAD OVER COUNTY ROUTE 143 BRIDGE REHABILITATION. THIS PROJECT WILL REHABILITATE THE BRIDGE CARRYING HEATHCOTE ROAD OVER COUNTY ROUTE 143 IN THE VILLAGE OF SCARSDALE IN WESTCHESTER COUNTY. CONSTRUCTION INCLUDES REHABILITATION TO DETERIORATED ABUTMENT WALLS, CENTER PIER SUPPORTS, BEARING PADS, STEEL PLATE GIRDERS, CAP BEAM, PAINT AND EXPANSION JOINT. 2018 BRIDGE NY PROJECT. 95% FEDERAL USING 15% TOLL CREDIT WITH A 5% MATCH. BIN 2265300

1.421 0.000 0.000 1.421 0.000 AQC:A19 TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M

Page 27: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 27 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.178 0.178 CONINSPNHPP 2021CONINSP 0.009 0.009 2021NFA

1.475 1.475 CONSTNHPP 2021CONST 0.077 0.077 2021NFA

LOCAL

876222

LUDLOW ST OVER METRO NORTH RAILROAD BRIDGE REHABILITATION. THIS PROJECT WILL REHABILITATE THE BRIDGE CARRYING LUDLOW STREET OVER METRO NORTH RAILROAD HUDSON LINE IN THE CITY OF YONKERS IN WESTCHESTER COUNTY. CONSTRUCTION INCLUDES REPLACEMENT OF ARMORED JOINTS, REPAIR OF DETERIORATED STRUCTURAL STEEL MEMBERS, REPAIR OF EXISTING BEARING PLATE, AND REINFORCED CONCRETE ABUTMENT REPAIR. 2018 BRIDGE NY PROJECT. 95% FEDERAL USING 15% TOLL CREDIT WITH A 5% MATCH. BIN 2254720

1.739 0.000 1.739 0.000 0.000 AQC:A19 TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M

0.000 0.000 CONINSPSTBG LG URB 2021CONINSP 2.440 2.440 2021NFA

0.000 0.000 CONSTSTBG LG URB 2021CONST 2.598 2.598 2021NFA

ROCKLAND

876225

TOWNLINE ROAD (CR42) CULVERT REPLACEMENT BETWEEN WORTHINGTON CT AND HARTSHORN LN TOWN OF ORANGETOWN ROCKLAND COUNTY

5.038 0.000 5.038 0.000 0.000 AQC:A2 TOTAL 4YR COST :ROCKLAND TPC : $7.5-$12 M

0.000 0.000 CONINSPSTBG LG URB 2021CONINSP 0.791 0.791 2021NFA

0.000 0.000 CONSTSTBG LG URB 2021CONST 1.134 1.134 2021NFA

ROCKLAND

876226

HUNGRY HOLLOW ROAD (CR71) CULVERT REPLACEMENT BETWEEN SPARROW AVENUE AND RAYMOND AVENUE TOWN OF RAMAPO ROCKLAND COUNTY

1.925 0.000 1.925 0.000 0.000 AQC:A2 TOTAL 4YR COST :ROCKLAND TPC : $3.3-$5.6 M

0.040 HPP 0.040 DETLDES2020DETLDES 0.010 0.010 2020NFA

0.040 HPP 0.040 PRELDES2020PRELDES 0.010 0.010 2020NFA

0.004 HPP 0.004 ROWACQU2020ROWACQU 0.001 0.001 2020NFA

0.004 HPP 0.004 ROWINCD2020ROWINCD 0.001 0.001 2020NFA

0.032 0.032 CONINSPHPP 2021CONINSP 0.008 0.008 2021NFA

0.240 0.240 CONSTHPP 2021CONST 0.060 0.060 2021NFA

LOCAL

876236

HURDS CORNER ROAD PAVING AND DRAINAGE, TOWN OF PAWLING, DUTCHESS COUNTY. SAFETEA LU SECTION 1704 HPP #1804, TRANSFERRED EARMARK: NY#440. PROGRAM CODE RPS1.

0.450 0.110 0.340 0.000 0.000 AQC:A10Z TOTAL 4YR COST :DUTCHESS TPC : < $0.75 M

Page 28: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 28 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.020 FTA 5307 0.020 DETLDES2020DETLDES 0.005 0.005 2020NFA

0.020 FTA 5307 0.020 PRELDES2020PRELDES 0.005 0.005 2020NFA

0.040 0.040 CONINSPFTA 5307 2021CONINSP 0.010 0.010 2021NFA

0.480 0.480 CONSTFTA 5307 2021CONST 0.120 0.120 2021NFA

PUTNAM

876243

ACCESS TO EMPIRE STATE TRAIL. PROJECT WILL DESIGN AND CONSTRUCT ACCESS POINTS TO THE EMPIRE STATE TRAIL AT ROUTE 312 AND ROUTE 311, PUTNAM COUNTY.

0.700 0.050 0.650 0.000 0.000 AQC:A1 TOTAL 4YR COST :PUTNAM TPC : $0.6-$1.5 M

0.200 STBG-OFF 0.200 MISC2020MISC 0.050 0.050 2020NFA

0.200 0.200 MISCSTBG-OFF 2021MISC 0.050 0.050 2021NFA

0.200 0.200 MISCSTBG-OFF 2022MISC 0.050 0.050 2022NFA

0.200 0.200 MISCSTBG-OFF 2023MISC 0.050 0.050 2023NFA

ROCKLAND

876244

BRIDGE CAPITAL MAINTENANCE - ANNUAL CAPITAL MAINTENANCE CONTRACT TO REPAIR JOINT BEARING AND CONCRETE, ETC. ROCKLAND COUNTY

1.000 0.250 0.250 0.250 0.250 AQC:A2 TOTAL 4YR COST :ROCKLAND TPC : $0.6-$1.5 M

0.250 0.250 PRELDESSTBG LG URB 2022PRELDES 0.063 0.063 2022NFA

0.050 0.050 ROWINCDSTBG LG URB 2022ROWINCD 0.013 0.013 2022NFA

0.250 0.250 DETLDESSTBG LG URB 2023DETLDES 0.063 0.063 2023NFA

ROCKLAND

876245

INTERSECTION IMPROVEMENT COUNTY ROUTE 29 AND ZUKOR RD. PROJECT WILL REPLACE STOP AND YIELD CONTROL INTERSECTION WITH MODERN ROUNDABOUT. THIS PROJECT WILL NOT ONLY IMPROVE TRAFFIC FLOW AND AIR QUALITY, BUT IT WILL PROVIDE A COST EFFECTIVE TRANSPORTATION SYSTEM GATEWAY ENHANCEMENT AT THE NORTHERN END OF NEW CITY. ROCKLAND COUNTY

0.689 0.000 0.000 0.376 0.313 AQC:D1 TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M

Page 29: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 29 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.064 TAP FLEX 0.064 DETLDES2020DETLDES 0.016 0.016 2020NFA

0.256 TAP FLEX 0.256 PRELDES2020PRELDES 0.064 0.064 2020NFA

0.004 TAP FLEX 0.004 ROWINCD2020ROWINCD 0.001 0.001 2020NFA

0.004 0.004 ROWACQUTAP FLEX 2021ROWACQU 0.001 0.001 2021NFA

0.154 0.154 CONINSPTAP FLEX 2022CONINSP 0.038 0.038 2022NFA

1.418 1.418 CONSTTAP FLEX 2022CONST 0.355 0.355 2022NFA

LOCAL

876246

TOWN OF CRAWFORD:RTE 52 PEDESTRIAN SAFETY PROJECT: PROJECT WILL CONSTRUCT SIDEWALKS AND AMERICANS WITH DISABILITIES ACT (ADA) COMPLIANT RAMPS, AND PEDESTRIAN TRAFFIC CONTROLLER AT THE INTERSECTION OF NEW YORK STATE ROUTE 52 AND BONIFACE DRIVE AND A BOX CULVERT EXTENTION ON THE NORTH SIDE OF NEW YORK STATE ROUTE 52 IN FRONT OF THE VALLEY SUPREME SHOPPING CENTER IN THE HAMLET OF PINE BUSH. TOWN OF CRAWFORD, ORANGE COUNTY.

2.375 0.405 0.005 1.965 0.000 AQC:C2Z TOTAL 4YR COST :ORANGE TPC : $2-$4 M

0.220 TAP LG URBAN 0.220 DETLDES2020DETLDES 0.055 0.055 2020NFA

0.220 TAP LG URBAN 0.220 PRELDES2020PRELDES 0.055 0.055 2020NFA

0.008 TAP LG URBAN 0.008 ROWINCD2020ROWINCD 0.002 0.002 2020NFA

0.020 0.020 ROWACQUTAP LG URBAN 2021ROWACQU 0.005 0.005 2021NFA

0.220 0.220 CONINSPTAP LG URBAN 2022CONINSP 0.055 0.055 2022NFA

1.506 1.506 CONSTTAP LG URBAN 2022CONST 0.376 0.376 2022NFA

TOWN OF NEW PALTZ876248

HENRY W DUBOIS DRIVE BIKE & PEDESTRIAN LANE: PROJECT WILL IMPROVE HENRY W DUBOIS DRIVE (HWD) BY CREATING BUFFERED BIKE LANES (ONE-DIRECTIONAL, ON THE NORTH AND SOUTH SIDE) AND SIDEWALK (ON ONE SIDE ONLY). TOWN OF NEW PALTZ, ULSTER COUNTY.

2.742 0.560 0.025 2.157 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $2-$4 M

0.096 SAFE RT SCH 0.096 DETLDES2020DETLDES 0.024 0.024 2020NFA

0.077 SAFE RT SCH 0.077 PRELDES2020PRELDES 0.019 0.019 2020NFA

0.001 SAFE RT SCH 0.001 ROWINCD2020 0.001 0.001 ROWACQUSAFE RT SCH 2021 0.080 0.080 CONINSPSAFE RT SCH 2022

CONINSP 0.020 0.020 2022NFA 0.539 0.539 CONSTSAFE RT SCH 2022

CONST 0.135 0.135 2022NFA

LOCAL

876250

WALLKILL: TWIN TOWERS MIDDLE SCHOOL SIDEWALK PROJECT: PROJECT WILL CONSTRUCT APPROXIMATELY 1,000 FEET SIDEWALKS AND CURBS ALONG CARPENTER AVENUE AND WISNER AVENUE IN THE TOWN OF WALLKILL LOCATED IN ORANGE COUNTY.

0.992 0.217 0.001 0.774 0.000 AQC:C2Z TOTAL 4YR COST :ORANGE TPC : $0.6-$1.5 M

Page 30: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 30 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.080 TAP FLEX 0.080 DETLDES2020DETLDES 0.020 0.020 2020NFA

0.108 TAP FLEX 0.108 PRELDES2020PRELDES 0.027 0.027 2020NFA

0.187 0.187 CONINSPTAP FLEX 2022CONINSP 0.047 0.047 2022NFA

1.560 1.560 CONSTTAP FLEX 2022CONST 0.390 0.390 2022NFA

LOCAL

876253

NYSOPRHP:HARLEM VALLEY RAIL TRAIL @ RT 22: PROJECT WILL CONSTRUCT A MULTI-USE TRAIL AND BRIDGE CROSSING FROM ORPHAN FARM ROAD TO BLACK GROCERY ROAD APPROXIMATELY ONE MILE IN LENGTH. THE WORK WILL COMPLETE A CRITICAL MISSING LINK IN THE HARLEM VALLEY RAIL TRAIL. TOWN OF COPAKE, COLUMBIA COUNTY. 2018 TAP/CMAQ SELECTION. DOES NOT COUNT AGAINST REGIONAL PLANNING TARGET.

2.419 0.235 0.000 2.184 0.000 AQC:C2Z TOTAL 4YR COST :COLUMBIA TPC : $2-$4 M

0.405 TAP FLEX 0.405 DETLDES2020DETLDES 0.101 0.101 2020NFA

0.218 TAP FLEX 0.218 PRELDES2020PRELDES 0.055 0.055 2020NFA

0.312 0.312 CONINSPTAP FLEX 2022CONINSP 0.078 0.078 2022NFA

2.655 2.655 CONSTTAP FLEX 2022CONST 1.122 1.122 2022NFA

CITY OF KINGSTON

876254

KINGSTON:FLATBUSH & FOXHALL AVE ACCESSIBILITY IMPROVEMENTS: PROJECT WILL CONSTRUCT AND REHABILITATE SIDEWALKS, INSTALL CROSSWALKS AND AMERICANS WITH DISABILITIES ACT (ADA) COMPLIANT CURB RAMPS, IMPROVE TWO INTERSECTIONS AND TWO RAILROAD CROSSINGS FOR PEDESTRIANS, AND INSTALL BICYCLE INFRASTRUCTURE ON FLATBUSH AND FOXHALL AVENUES. CITY OF KINGSTON, ULSTER COUNTY.

4.946 0.779 0.000 4.167 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $4.6-$7.5 M

0.051 TAP FLEX 0.051 DETLDES2020DETLDES 0.013 0.013 2020NFA

0.051 TAP FLEX 0.051 PRELDES2020PRELDES 0.013 0.013 2020NFA

0.002 TAP FLEX 0.002 ROWINCD2020ROWINCD 0.001 0.001 2020NFA

0.003 0.003 ROWACQUTAP FLEX 2021ROWACQU 0.001 0.001 2021NFA

0.051 0.051 CONINSPTAP FLEX 2022CONINSP 0.013 0.013 2022NFA

0.514 0.514 CONSTTAP FLEX 2022CONST 0.128 0.128 2022NFA

TOWN OF LLOYD

876255

LLOYD:HIGHLAND STREETSCAPE IMPROVEMENTS: PROJECT WILL CONSTRUCT AND IMPROVE SIDEWALKS AND CROSSWALKS USING AMERICANS WITH DISABILITIES ACT (ADA) GUIDELINES AS WELL AS ADDING WAYFINDING SIGNAGE TO THE CONNECTION BETWEEN HIGHLAND HAMLET AND THE HUDSON VALLEY RAIL TRAIL - NOW PART OF THE EMPIRE STATE TRAIL. TOWN OF LLOYD, ULSTER COUNTY.

0.841 0.131 0.004 0.706 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $0.6-$1.5 M

0.800 0.800 CONSTSTP ENHANCE 2021CONST 0.671 0.671 2021NFA

LOCAL

878028

LAWRENCE STREET SIDEWALKS: SECOND STREET TO PASCACK ROAD. INSTALL 1200 LINER FEET (LF) OF NEW SIDEWALK FROM SECOND STREET TO PASCACK RD & 720 LF OF NEW SIDEWALK ALONG PASCACK RD-CLARKSTOWN RD. TOWN OF CLARKSTOWN, ROCKLAND COUNTY TEP-#85064

1.471 0.000 1.471 0.000 0.000 AQC:C2 TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M

Page 31: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 31 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.041 STP ENHANCE 0.041 CONINSP2020CONINSP 0.010 0.010 2020NFA

0.456 STP ENHANCE 0.456 CONST2020CONST 0.114 0.114 2020NFA

0.001 STP ENHANCE 0.001 DETLDES2020DETLDES 0.001 0.001 2020NFA

0.050 STP ENHANCE 0.050 ROWACQU2020ROWACQU 0.013 0.013 2020NFA

LOCAL

878046

TOWN OF CRAWFORD PEDESTRIAN IMPROVEMENTS: NYS RTE 302 FROM EDMUNDS LANE TO ULSTERVILLE RD IN THE HAMLET OF PINEBUSH. CONSTRUCTION & INSTALLATION OF SIDEWALK, ADA CURB RAMPS, CROSSWALKS, DRIVEWAY APRONS & DRAINAGE IMPROVEMENTS. TOWN OF CRAWFORD & HAMLET OF PINE PUSH, ORANGE COUNTY.

0.686 0.686 0.000 0.000 0.000 AQC:C2P TOTAL 4YR COST :ORANGE TPC : $0.6-$1.5 M

CONINSP 0.541 0.541 2021NFA 2.321 2.321 CONSTSTP ENHANCE 2021

CONST 1.303 1.303 2021NFA

LOCAL

878052

REVITALIZATION OF WEST NYACK PHASE 2 STEETSCAPE IMPROVEMENTS. STRAWTOWN/SICKLETOWN ROAD FROM DEMONEST AVE. NORTH TO ROUTE 59 OVERPASS. WORK INCLUDES SIDEWALKS, CURBING, PAVERS, LIGHTING, BIKE RACKS & LANDSCAPING. TOWN OF CLARKSTOWN, ROCKLAND COUNTY TEP 20

4.165 0.000 4.165 0.000 0.000 AQC:C2 TOTAL 4YR COST :ROCKLAND TPC : $3.3-$5.6 M

6.000 NHPP 6.000 CONINSP2020 40.000 NHPP 40.000 CONST2020

NYSDOT

880862

REHABILITATION OF THE WURTS STREET BRIDGE OVER DOCK STREET AND THE ROUNDOUT CREEK BIN 1007350. TOWN OF ESOPUS, CITY OF KINGSTON IN ULSTER COUNTY. CONSTRUCTION IS 100% FEDERAL WITH THE USE OF TOLL CREDITS.

46.000 46.000 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $40-$60 M

0.040 0.040 DETLDESSTBG FLEX 2022DETLDES 0.010 0.010 2022NFA

0.240 0.240 CONINSPSTBG FLEX 2023CONINSP 0.060 0.060 2023NFA

2.400 2.400 CONSTSTBG FLEX 2023CONST 0.600 0.600 2023NFA

NYSDOT

880935

GUIDERAIL REPLACEMENT: PROJECT WILL REPLACE OR REPAIR DEFICIENT OR OBSOLETE GUIDERAIL ALONG FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER AND WESTCHESTER COUNTIES.

3.350 0.000 0.000 0.050 3.300 AQC:A11 TOTAL 4YR COST :MULTI TPC : $2-$4 M

3.200 NHPP 3.200 MISC2020MISC 0.800 0.800 2020NFA

3.200 3.200 MISCNHPP 2021MISC 0.800 0.800 2021NFA

NYSDOT

881033

HIGHWAY EMERGENCY LOCAL PATROL (HELP) FREEWAY INCIDENT MANAGEMENT. PROJECT INCLUDES PAY FOR THE CONTRACT OPERATORS, THE TRUCKS, ALL EQUIPMENT ON BOARD, GASOLINE, AND OTHER OPERATIONAL NEEDS AT VARIOUS LOCATIONS IN THE HUDSON VALLEY.

8.000 4.000 4.000 0.000 0.000 AQC:A6 TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M

Page 32: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 32 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.480 NHPP 0.480 OPER2020OPER 0.120 0.120 2020NFA

0.480 0.480 OPERNHPP 2022OPER 0.120 0.120 2022NFA

NYSDOT

881034

HIGHWAY EMERGENCY LOCAL PATROLS (HELP) MONITORING & DISPATCH SERVICES. THIS PROJECT INCLUDES FIELD OBSERVATION; PAPERWORK MONITORING; DISPATCH SERVICES; PREPARATION OF MONTHLY, QUARTERLY, & ANNUAL ACTIVITY REPORTS; & INVESTIGATION OF COMPLAINTS.

1.200 0.600 0.000 0.600 0.000 AQC:A6 TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M

0.136 STBG FLEX 0.136 CONINSP2020CONINSP 0.034 0.034 2020NFA

0.904 STBG FLEX 0.904 CONST2020CONST 0.226 0.226 2020NFA

0.344 STBG LG URB 0.344 CONINSP2020CONINSP 0.086 0.086 2020NFA

2.296 STBG LG URB 2.296 CONST2020CONST 0.574 0.574 2020NFA

NYSDOT

881204

SIGNAL IMPROVEMENTS INSTALL TRAFFIC SIGNALS &/OR UPGRADE/MODIFY EXISTING SIGNALS THROUGHOUT VARIOUS MUNICIPALITIES ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF DUTCHESS, ULSTER AND WESTCHESTER.

4.600 4.600 0.000 0.000 0.000 AQC:D2 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

1.269 NHPP 1.269 CONINSP2020CONINSP 0.141 0.141 2020NFA

11.020 NHPP 11.020 CONST2020CONST 1.224 1.224 2020NFA

NYSDOT

881290

BRIDGE REHABILITATION: PROJECT WILL REPLACE OR REHAB THE EXISTING DECK, INSTALL NEW BRIDGE RAILING AS WELL AS INCLUDE STEEL REPAIR AND SUBSTRUCTURE CONCRETE REPAIR ON FOUR STRUCTURES IN ORANGE COUNTY. BINS: 1052511, 1052512, 1052501, AND 1052502. TOWN OF WAWAYANDA, ORANGE COUNTY.

13.654 13.654 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :ORANGE TPC : $12.5-$19 M

0.090 NHPP 0.090 CONINSP2020CONINSP 0.022 0.022 2020NFA

0.749 NHPP 0.749 CONST2020CONST 0.187 0.187 2020NFA

0.189 STBG FLEX 0.189 CONINSP2020CONINSP 0.047 0.047 2020NFA

1.578 STBG FLEX 1.578 CONST2020CONST 0.395 0.395 2020NFA

NYSDOT

881318

ADA SIDEWALKS AND RAMPS NORTHERN WESTCHESTER. THIS PROJECT WILL BUILD OR REPAIR SIDEWALKS AND RAMPS ON STATE HIGHWAY RIGHT-OF-WAY TO ASSURE COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT. THIS WORK WILL TAKE PLACE IN VARIOUS LOCATIONS ALONG THE FOLLOWING ROUTES: ROUTE 6, ROUTE 9, ROUTE 133, ROUTE 117, ROUTE 120, ROUTE 129, ROUTE 134, ROUTE 35, AND ROUTE 128 THROUGHOUT NORTHERN WESTCHESTER COUNTY. WESTCHESTER COUNTY.

3.257 3.257 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M

1.120 NHPP 1.120 CONINSP2020CONINSP 0.280 0.280 2020NFA

11.200 NHPP 11.200 CONST2020CONST 2.800 2.800 2020NFA

NYSDOT

881341

REPAIR REHAB/REPLACE BRIDGES TO CORRECT OR PREVENT PROBLEMS RELATED TO THE DETERIORATION OF A VARIETY OF BRIDGE COMPONENTS THROUGHOUT VARIOUS MUNICIPALITIES IN DUTCHESS, PUTNAM AND ULSTER COUNTIES. BINS 1005220, 1032300, 1005190, 5502509, 1041050.

15.400 15.400 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

Page 33: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 33 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.058 STBG FLEX 0.058 CONINSP2020CONINSP 0.014 0.014 2020NFA

0.480 STBG FLEX 0.480 CONST2020CONST 0.120 0.120 2020NFA

NYSDOT

881345

GEOTECH SUBSURFACE EXPLORATIONS CONTRACT: PROJECT WILL EXPLORE SUBSURFACE SOIL CONDITIONS TO PROVIDE DATA NEEDED IN ADVANCE OF HIGHWAY & BRIDGE DESIGN ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER (FORMERLY PIN: 8T0630)

0.672 0.672 0.000 0.000 0.000 AQC:C5 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

DETLDES 0.015 0.015 2020NFA 0.062 0.062 CONINSPSTBG FLEX 2021

CONINSP 0.016 0.016 2021NFA 0.520 0.520 CONSTSTBG FLEX 2021

CONST 0.130 0.130 2021NFA

NYSDOT

881346

GEOTECH SUBSURFACE EXPLORATIONS CONTRACT: PROJECT WILL EXPLORE SUBSURFACE SOIL CONDITIONS TO PROVIDE DATA NEEDED IN ADVANCE OF HIGHWAY & BRIDGE DESIGN ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER (FORMERLY PIN: 8T0708)

0.743 0.015 0.728 0.000 0.000 AQC:C5 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

DETLDES 0.015 0.015 2021NFA 0.062 0.062 CONINSPSTBG FLEX 2022

CONINSP 0.016 0.016 2022NFA 0.520 0.520 CONSTSTBG FLEX 2022

CONST 0.130 0.130 2022NFA

NYSDOT

881347

GEOTECH SUBSURFACE EXPLORATIONS CONTRACT: PROJECT WILL EXPLORE SUBSURFACE SOIL CONDITIONS TO PROVIDE DATA NEEDED IN ADVANCE OF HIGHWAY & BRIDGE DESIGN ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER (FORMERLY PIN: 8T0709)

0.743 0.000 0.015 0.728 0.000 AQC:C5 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

1.350 HSIP 1.350 MISC2020MISC 0.150 0.150 2020NFA

NYSDOT

881349

BIENNIAL ACCIDENT INVESTIGATION (HSIP): THIS PROJECT CONSISTS OF INVESTIGATING ACCIDENT LOCATIONS TO IDENTIFY THOSE THAT WILL BE SPECIFICALLY TARGETED FOR SAFETY IMPROVEMENTS IN REGION 8 COUNTIES: COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER, WESTCHESTER (FORMERLY PIN: 8T0477).

1.500 1.500 0.000 0.000 0.000 AQC:A6 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

1.350 1.350 MISCHSIP 2022MISC 0.150 0.150 2022NFA

NYSDOT

881350

BIENNIAL ACCIDENT INVESTIGATION (HSIP): THIS PROJECT CONSISTS OF INVESTIGATING ACCIDENT LOCATIONS TO IDENTIFY THOSE THAT WILL BE SPECIFICALLY TARGETED FOR SAFETY IMPROVEMENTS IN REGION 8 COUNTIES: COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER (FORMERLY PIN: 8T0478)

1.500 0.000 0.000 1.500 0.000 AQC:A6 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 34: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 34 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

ROWINCD 0.030 0.030 2020NFA 0.080 NHPP 0.080 DETLDES2020

DETLDES 0.020 0.020 2020NFA 0.160 NHPP 0.160 ROWACQU2020

ROWACQU 0.040 0.040 2020NFA 0.144 0.144 CONINSPNHPP 2021

CONINSP 0.036 0.036 2021NFA 1.200 1.200 CONSTNHPP 2021

CONST 0.300 0.300 2021NFA

NYSDOT

881353

SYSTEM REPAIR: PROJECT WILL REPAIR OR REHABILITATE STATE HIGHWAY INFRASTRUCTURE ELEMENTS THAT ARE BEYOND THE MEANS OF THE DEPARTMENTS MAINTENANCE FORCES SUCH AS RETAINING WALLS ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER.

2.010 0.330 1.680 0.000 0.000 AQC:A2 TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.048 STBG FLEX 0.048 CONINSP2020CONINSP 0.012 0.012 2020NFA

0.800 STBG FLEX 0.800 CONST2020CONST 0.200 0.200 2020NFA

0.040 STBG FLEX 0.040 DETLDES2020DETLDES 0.010 0.010 2020NFA

0.080 STBG FLEX 0.080 ROWACQU2020ROWACQU 0.020 0.020 2020NFA

NYSDOT

881354

RT 213 SIDEWALK & ROAD SETTLEMENT REPAIR - ROSENDALE. PROJECT WILL ADDRESS SLOPE SETTLEMENT ISSUES AND WILL RESURFACE THE PAVEMENT AND RESTORE THE SIDEWALK ON ROUTE 213 DIRECTLY EAST AND WEST OF BINNEWATER ROAD IN THE TOWN OF ROSENDALE IN ULSTER COUNTY. (FORMERLY PIN: 8T0680)

1.210 1.210 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $1.2-$2.5 M

0.120 STBG FLEX 0.120 PRELDES2020PRELDES 0.030 0.030 2020NFA

0.024 STBG FLEX 0.024 ROWINCD2020ROWINCD 0.006 0.006 2020NFA

0.040 STBG FLEX 0.040 SCOPING2020SCOPING 0.010 0.010 2020NFA

0.080 0.080 DETLDESSTBG FLEX 2021DETLDES 0.020 0.020 2021NFA

0.160 0.160 ROWACQUSTBG FLEX 2021ROWACQU 0.040 0.040 2021NFA

0.144 0.144 CONINSPSTBG FLEX 2022CONINSP 0.036 0.036 2022NFA

1.200 1.200 CONSTSTBG FLEX 2022CONST 0.300 0.300 2022NFA

NYSDOT

881355

SYSTEM REPAIR: PROJECT WILL REPAIR OR REHABILITATE HIGHWAY INFRASTRUCTURE ELEMENTS THAT ARE BEYOND THE MEANS OF THE DEPARTMENT MAINTENANCE FORCES SUCH AS RETAINING WALLS IN REGION 8 COUNTIES: COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER, WESTCHESTER (FORMERLY PIN: 8T0710). WORK WILL BE DONE ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS.

2.210 0.230 0.300 1.680 0.000 AQC:A2 TOTAL 4YR COST :MULTI TPC : $2-$4 M

Page 35: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 35 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

DETLDES 0.100 0.100 2021NFA 0.400 0.400 CONINSPNHPP 2021

CONINSP 0.100 0.100 2021NFA 4.000 4.000 CONSTNHPP 2021

CONST 1.000 1.000 2021NFA

NYSDOT

881356

BRIDGE PAINTING: PROJECT WILL PAINT STEEL SURFACES ON BRIDGES TO PROTECT AGAINST NORMAL ENVIRONMENTAL EFFECTS OF CORROSION, ACID RAIN, AND DEICING AGENTS. WORK WILL TAKE PLACE ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES.

5.600 0.000 5.600 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

DETLDES 0.100 0.100 2022NFA 0.400 0.400 CONINSPNHPP 2022

CONINSP 0.100 0.100 2022NFA 4.000 4.000 CONSTNHPP 2022

CONST 1.000 1.000 2022NFA

NYSDOT

881357

BRIDGE PAINTING: PROJECT WILL PAINT STEEL SURFACES ON BRIDGES TO PROTECT AGAINST NORMAL ENVIRONMENTAL EFFECTS OF CORROSION, ACID RAIN, AND DEICING AGENTS. VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES.

5.600 0.000 0.000 5.600 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

DETLDES 0.100 0.100 2020NFA 0.432 NHPP 0.432 CONINSP2020

CONINSP 0.108 0.108 2020NFA 4.320 NHPP 4.320 CONST2020

CONST 1.080 1.080 2020NFA

NYSDOT

881360

BRIDGE PAINTING: PROJECT WILL CONSIST OF PAINTING STEEL SURFACES ON BRIDGES TO PROTECT AGAINST NORMAL ENVIRONMENTAL EFFECTS OF CORROSION, ACID RAIN, & DEICING AGENTS ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES (FORMERLY PIN: 8T0707)

6.040 6.040 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.072 NHPP 0.072 CONINSP2020CONINSP 0.018 0.018 2020NFA

0.600 NHPP 0.600 CONST2020CONST 0.150 0.150 2020NFA

NYSDOT

881361

BRIDGE WASHING/DECK SEALING: PROJECT CONSISTS OF CLEANING/WASHING BRIDGES &SEALING DECKS AS NEEDED. WORK WILL REMOVE DEBRIS FROM THE BRIDGES & PROTECT THEM AGAINST CORROSIVE SUBSTANCES ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER (FORMERLY PIN: 8T0626)

0.840 0.840 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

DETLDES 0.014 0.014 2020NFA 0.096 0.096 CONINSPSTBG FLEX 2021

CONINSP 0.024 0.024 2021NFA 0.800 0.800 CONSTSTBG FLEX 2021

CONST 0.200 0.200 2021NFA

NYSDOT

881363

BRIDGE WASHING/DECK SEALING: PROJECT WILL CONSIST OF CLEANING/WASHING BRIDGES &SEALING DECKS AS NEEDED. WORK WILL REMOVE DEBRIS FROM THE BRIDGES & PROTECT THEM AGAINST CORROSIVE SUBSTANCES. ON VARIOUS FEDRAL AID ELIGIBLE BRIDGES IN THE COUNTIES COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER (FORMERLY PIN: 8T0704)

1.134 0.014 1.120 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 36: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 36 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

DETLDES 0.014 0.014 2021NFA 0.096 0.096 CONINSPSTBG FLEX 2022

CONINSP 0.024 0.024 2022NFA 0.800 0.800 CONSTSTBG FLEX 2022

CONST 0.200 0.200 2022NFA

NYSDOT

881364

BRIDGE WASHING/DECK SEALING: PROJECT WILL CONSIST OF CLEANING/WASHING BRIDGES &SEALING DECKS AS NEEDED. WORK WILL REMOVE DEBRIS FROM THE BRIDGES & PROTECT THEM AGAINST CORROSIVE SUBSTANCES. ON VARIOUS FEDERAL AID ELIGIBLE BRIDGES IN THE COUNTIES OF COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER (FORMERLY PIN: 8T0705)

1.134 0.000 0.014 1.120 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.016 0.016 DETLDESSTBG FLEX 2022DETLDES 0.004 0.004 2022NFA

0.096 0.096 CONINSPSTBG FLEX 2023CONINSP 0.024 0.024 2023NFA

0.800 0.800 CONSTSTBG FLEX 2023CONST 0.200 0.200 2023NFA

NYSDOT

881365

BRIDGE WASHING/ DECK SEALING: PROJECT CLEAN/WASH BRIDGES AND SEALING DECKS AS NEEDED. THIS WORK WILL REMOVE DEBRIS FROM THE BRIDGES AND PROTECT THEM AGAINST CORROSIVE SUBSTANCES. VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES.

1.140 0.000 0.000 0.020 1.120 AQC:A19Z TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

DETLDES 0.014 0.014 2023NFANYSDOT

881366

BRIDGE WASHING/ DECK SEALING: PROJECT CLEAN/WASH BRIDGES AND SEALING DECKS AS NEEDED. THIS WORK WILL REMOVE DEBRIS FROM THE BRIDGES AND PROTECT THEM AGAINST CORROSIVE SUBSTANCES. VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES.

0.014 0.000 0.000 0.000 0.014 AQC:A19 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.064 0.064 PRELDESNHPP 2023PRELDES 0.016 0.016 2023NFA

NYSDOT

881367

BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE CORRECTIVE AND PREVENTATIVE MAINTENANCE ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES. (FORMERLY PIN: 8T0625)

0.080 0.000 0.000 0.000 0.080 AQC:A19 TOTAL 4YR COST :MULTI TPC : $32-$50 M

2.240 NHPP 2.240 CONINSP2020CONINSP 0.560 0.560 2020NFA

22.400 NHPP 22.400 CONST2020CONST 5.600 5.600 2020NFA

0.096 NHPP 0.096 DETLDES2020DETLDES 0.024 0.024 2020NFA

NYSDOT

881368

BRIDGE REHABILITATION/REPLACEMENTS: THIS PROJECT WILL UNDERTAKE CORRECTIVE AND PREVENTATIVE MAINTENANCE ACTIONS TO EXTEND THE SERVICE LIFE OF FOUR BRIDGES IN THE CITY OF YONKERS AND TOWNS OF GREENBURGH AND MOUNT PLEASANT IN WESTCHESTER COUNTY. BINS 5500749, 1070500, 5501520, 5501670. (FORMERLY PIN: 8T0702)

30.920 30.920 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :WESTCHESTER TPC : $26-$40 M

Page 37: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 37 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.096 NHPP 0.096 DETLDES2020DETLDES 0.024 0.024 2020NFA

0.064 NHPP 0.064 PRELDES2020PRELDES 0.016 0.016 2020NFA

2.100 2.100 CONINSPNHPP 2021CONINSP 0.525 0.525 2021NFA

21.000 21.000 CONSTNHPP 2021CONST 5.250 5.250 2021NFA

NYSDOT

881369

BRIDGE REHABILITATION: THIS PROJECT WILL UNDERTAKE CORRECTIVE AND PREVENTATIVE MAINTENANCE ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES. (FORMERLY PIN: 8T0703)

29.075 0.200 28.875 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $26-$40 M

0.064 NHPP 0.064 PRELDES2020PRELDES 0.016 0.016 2020NFA

0.096 0.096 DETLDESNHPP 2021DETLDES 0.024 0.024 2021NFA

2.300 2.300 CONINSPNHPP 2022CONINSP 0.575 0.575 2022NFA

22.300 22.300 CONSTNHPP 2022CONST 5.575 5.575 2022NFA

NYSDOT

881370

BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE CORRECTIVE AND PREVENTATIVE MAINTENANCE ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES.

30.950 0.080 0.120 30.750 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $26-$40 M

0.064 0.064 PRELDESNHPP 2021PRELDES 0.016 0.016 2021NFA

0.096 0.096 DETLDESNHPP 2022DETLDES 0.024 0.024 2022NFA

1.900 1.900 CONINSPNHPP 2023CONINSP 0.475 0.475 2023NFA

19.000 19.000 CONSTNHPP 2023CONST 4.750 4.750 2023NFA

NYSDOT

881371

BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE CORRECTIVE AND PREVENTATIVE MAINTENANCE ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES.

26.325 0.000 0.080 0.120 26.125 AQC:A19 TOTAL 4YR COST :MULTI TPC : $21-$31 M

PRELDES 0.125 0.125 2023NFANYSDOT

881373

BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE CORRECTIVE AND PREVENTATIVE MAINTENANCE ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES.(FORMERLY PIN: 8T0623)

0.125 0.000 0.000 0.000 0.125 AQC:A19 TOTAL 4YR COST :MULTI TPC : $15-$25 M

Page 38: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 38 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

DETLDES 0.250 0.250 2020NFA 0.928 0.928 CONINSPNHPP 2021

CONINSP 0.232 0.232 2021NFA 9.280 9.280 CONSTNHPP 2021

CONST 2.320 2.320 2021NFA

NYSDOT

881374

BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE CORRECTIVE AND PREVENTATIVE MAINTENANCE ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES.(FORMERLY PIN: 8T0623)

13.010 0.250 12.760 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

PRELDES 0.125 0.125 2020NFADETLDES 0.250 0.250 2021NFA

1.600 1.600 CONINSPNHPP 2022CONINSP 0.400 0.400 2022NFA

16.000 16.000 CONSTNHPP 2022CONST 4.000 4.000 2022NFA

NYSDOT

881375

BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE CORRECTIVE AND PREVENTATIVE MAINTENANCE ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES.(FORMERLY PIN: 8T0623)

22.375 0.125 0.250 22.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $21-$31 M

PRELDES 0.125 0.125 2021NFADETLDES 0.250 0.250 2022NFA

1.200 1.200 CONINSPNHPP 2023CONINSP 0.300 0.300 2023NFA

12.000 12.000 CONSTNHPP 2023CONST 3.000 3.000 2023NFA

NYSDOT

881376

BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE CORRECTIVE AND PREVENTATIVE MAINTENANCE ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES.

16.875 0.000 0.125 0.250 16.500 AQC:A19 TOTAL 4YR COST :MULTI TPC : $15-$25 M

PRELDES 0.125 0.125 2022NFADETLDES 0.250 0.250 2023NFA

NYSDOT

881377

BRIDGE REHABILITATION: PROJECT WILL UNDERTAKE CORRECTIVE AND PREVENTATIVE MAINTENANCE ACTIONS TO EXTEND THE SERVICE LIFE OF BRIDGES ON FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES.

0.375 0.000 0.000 0.125 0.250 AQC:A19 TOTAL 4YR COST :MULTI TPC : $21-$31 M

0.096 STBG FLEX 0.096 CONINSP2020CONINSP 0.024 0.024 2020NFA

0.800 STBG FLEX 0.800 CONST2020CONST 0.200 0.200 2020NFA

NYSDOT

881379

BRIDGE JOB ORDER CONTRACT: PROJECT WILL CONSIST OF MAKING REPAIRS & PERFORMING OTHER MAINTENANCE-RELATED ACTIVITIES, AS NEEDED, TO PRESERVE THE SAFETY & INTEGRITY OF BRIDGES ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER. (FORMERLY PIN: 8T0698)

1.120 1.120 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 39: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 39 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.008 STBG FLEX 0.008 DETLDES2020DETLDES 0.002 0.002 2020NFA

0.096 0.096 CONINSPSTBG FLEX 2021CONINSP 0.024 0.024 2021NFA

0.800 0.800 CONSTSTBG FLEX 2021CONST 0.200 0.200 2021NFA

NYSDOT

881380

BRIDGE JOB ORDER CONTRACT: PROJECT WILL CONSIST OF MAKING REPAIRS & PERFORMING OTHER MAINTENANCE-RELATED ACTIVITIES, AS NEEDED, TO PRESERVE THE SAFETY & INTEGRITY OF BRIDGES ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER. (FORMERLY PIN: 8T0699)

1.130 0.010 1.120 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.008 0.008 DETLDESSTBG FLEX 2021DETLDES 0.002 0.002 2021NFA

0.096 0.096 CONINSPSTBG FLEX 2022CONINSP 0.024 0.024 2022NFA

0.800 0.800 CONSTSTBG FLEX 2022CONST 0.200 0.200 2022NFA

NYSDOT

881381

BRIDGE JOB ORDER CONTRACT: PROJECT WILL MAKE REPAIRS OTHER MAINTENANCE-RELATED ACTIVITIES, AS NEEDED, TO PRESERVE THE SAFETY & INTEGRITY OF BRIDGES ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES.

1.130 0.000 0.010 1.120 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.008 0.008 DETLDESSTBG FLEX 2022DETLDES 0.002 0.002 2022NFA

0.096 0.096 CONINSPSTBG FLEX 2023CONINSP 0.024 0.024 2023NFA

0.800 0.800 CONSTSTBG FLEX 2023CONST 0.200 0.200 2023NFA

NYSDOT

881382

BRIDGE JOB ORDER CONTRACT: PROJECT WILL MAKE REPAIRS OTHER MAINTENANCE-RELATED ACTIVITIES, AS NEEDED, TO PRESERVE THE SAFETY & INTEGRITY OF BRIDGES ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES.

1.130 0.000 0.000 0.010 1.120 AQC:A19 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.440 STBG FLEX 0.440 CONINSP2020CONINSP 0.110 0.110 2020NFA

4.400 STBG FLEX 4.400 CONST2020CONST 1.100 1.100 2020NFA

NYSDOT

881388

BIENNIAL LONG LINES: THIS PROJECT CONSISTS OF APPLYING EPOXY AND PREFORMED PAVEMENT MARKINGS ON FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES (FORMERLY PIN: 8T0618)

6.050 6.050 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.440 0.440 CONINSPSTBG FLEX 2021CONINSP 0.110 0.110 2021NFA

4.400 4.400 CONSTSTBG FLEX 2021CONST 1.100 1.100 2021NFA

0.024 0.024 DETLDESSTBG FLEX 2021DETLDES 0.006 0.006 2021NFA

NYSDOT

881389

BIENNIAL LONG LINES: PROJECT WILL APPLY EPOXY AND PREFORMED PAVEMENT MARKINGS ON STATE HIGHWAYS. THIS WORK WILL IMPROVE TRAFFIC SAFETY BY ENSURING THAT THE MARKINGS MAINTAIN THEIR PROPER DELINEATION AND REFLECTIVITY PROPERTIES. THIS WORK WILL TAKE PLACE IN VARIOUS MUNICIPALITIES ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER.

6.080 0.000 6.080 0.000 0.000 AQC:A11 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

Page 40: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 40 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.264 STBG FLEX 0.264 CONINSP2020CONINSP 0.066 0.066 2020NFA

2.200 STBG FLEX 2.200 CONST2020CONST 0.550 0.550 2020NFA

NYSDOT

881390

BIENNIAL SPECIAL MARKINGS: WORK WILL APPLY EPOXY & PREFORMED PAVEMENT MARKINGS (SUCH AS STOP BARS, CROSSWALK LINES, ARROWS, ETC.) ON FEDERAL AID ELIGIBLE ROUTES IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES (FORMERLY PIN: 8T0695)

3.080 3.080 0.000 0.000 0.000 AQC:A11 TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.264 0.264 CONINSPSTBG FLEX 2021CONINSP 0.066 0.066 2021NFA

2.200 2.200 CONSTSTBG FLEX 2021CONST 0.550 0.550 2021NFA

0.024 0.024 DETLDESSTBG FLEX 2021DETLDES 0.006 0.006 2021NFA

NYSDOT

881391

BIENNIAL SPECIAL PAVEMENT MARKINGS: PROJECT APPLY EPOXY AND PREFORMED PAVEMENT MARKINGS ON STATE HIGHWAYS. THIS WORK WILL IMPROVE TRAFFIC SAFETY BY ENSURING THAT THE MARKINGS MAINTAIN THEIR PROPER DELINEATION AND REFLECTIVITY PROPERTIES. WORK WILL TAKE PLACE ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER.

3.110 0.000 3.110 0.000 0.000 AQC:A11 TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.018 HSIP 0.018 DETLDES2020DETLDES 0.002 0.002 2020NFA

0.108 0.108 CONINSPHSIP 2021CONINSP 0.012 0.012 2021NFA

0.900 0.900 CONSTHSIP 2021CONST 0.100 0.100 2021NFA

NYSDOT

881395

SPECIAL SURFACE TREATMENT: THIS PROJECT WILL RESURFACE VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES THAT ARE IN NEED OF CORRECTIVE PAVEMENT TREATMENT. THIS IS A SPECIAL SURFACE TREATMENT PROJECT FOR WHICH CANDIDATE LOCATIONS WILL BE CHOSEN AT THE POINT OF PROJECT INITIATION. CANDIDATE LOCATIONS WILL BE HIGH ACCIDENT LOCATIONS THAT ARE TYPICALLY RELATED TO WET WEATHER OR SLIPPERY PAVEMENT ACCIDENTS. (FORMERLY PIN: 8T0694)

1.140 0.020 1.120 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.018 0.018 DETLDESHSIP 2021DETLDES 0.002 0.002 2021NFA

0.108 0.108 CONINSPHSIP 2022CONINSP 0.012 0.012 2022NFA

0.900 0.900 CONSTHSIP 2022CONST 0.100 0.100 2022NFA

NYSDOT

881396

THIS PROJECT WILL RESURFACE FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES THAT ARE IN NEED OF CORRECTIVE PAVEMENT TREATMENT. THIS IS A SPECIAL SURFACE TREATMENT PROJECT FOR WHICH CANDIDATE LOCATIONS WILL BE CHOSEN AT THE POINT OF PROJECT INITIATION. CANDIDATE LOCATIONS WILL BE HIGH ACCIDENT LOCATIONS THAT ARE TYPICALLY RELATED TO WET WEATHER OR SLIPPERY PAVEMENT ACCIDENTS.

1.140 0.000 0.020 1.120 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 41: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 41 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.018 0.018 DETLDESHSIP 2022DETLDES 0.002 0.002 2022NFA

0.108 0.108 CONINSPHSIP 2023CONINSP 0.012 0.012 2023NFA

0.900 0.900 CONSTHSIP 2023CONST 0.100 0.100 2023NFA

NYSDOT

881397

THIS PROJECT WILL RESURFACE FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES THAT ARE IN NEED OF CORRECTIVE PAVEMENT TREATMENT. THIS IS A SPECIAL SURFACE TREATMENT PROJECT FOR WHICH CANDIDATE LOCATIONS WILL BE CHOSEN AT THE POINT OF PROJECT INITIATION. CANDIDATE LOCATIONS WILL BE HIGH ACCIDENT LOCATIONS THAT ARE TYPICALLY RELATED TO WET WEATHER OR SLIPPERY PAVEMENT ACCIDENTS.

1.140 0.000 0.000 0.020 1.120 AQC:A10 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.144 STBG FLEX 0.144 CONINSP2020CONINSP 0.036 0.036 2020NFA

1.200 STBG FLEX 1.200 CONST2020CONST 0.300 0.300 2020NFA

NYSDOT

881400

CRACK SEALING: PROJECT CONSISTS OF CLEANING &SEALING PAVEMENT CRACKS ON VARIOUS STATE HIGHWAYS. WORK WILL IMPROVE & PRESERVE THE INTEGRITY OF THE PAVEMENT BY PREVENTING WATER INFILTRATION. VARIOUS FEDERAL AID ELIGIBLE STRUCTURES IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES.(FORMERLY PIN: 8T0691)

1.680 1.680 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.004 STBG FLEX 0.004 DETLDES2020DETLDES 0.001 0.001 2020NFA

0.144 0.144 CONINSPSTBG FLEX 2021CONINSP 0.036 0.036 2021NFA

1.200 1.200 CONSTSTBG FLEX 2021CONST 0.300 0.300 2021NFA

NYSDOT

881401

CRACK SEALING: PROJECT CONSISTS OF CLEANING & SEALING PAVEMENT CRACKS ON VARIOUS STATE HIGHWAYS. WORK WILL IMPROVE & PRESERVE THE INTEGRITY OF THE PAVEMENT BY PREVENTING WATER INFILTRATION. VARIOUS FEDERAL AID ELIGIBLE STRUCTURES IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES.(FORMERLY PIN: 8T0692)

1.685 0.005 1.680 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.004 0.004 DETLDESSTBG FLEX 2021DETLDES 0.001 0.001 2021NFA

0.144 0.144 CONINSPSTBG FLEX 2022CONINSP 0.036 0.036 2022NFA

1.200 1.200 CONSTSTBG FLEX 2022CONST 0.300 0.300 2022NFA

NYSDOT

881402

CRACK SEALING: CLEANING &SEALING PAVEMENT CRACKS ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES. WORK WILL IMPROVE & PRESERVE THE INTEGRITY OF THE PAVEMENT BY PREVENTING WATER INFILTRATION.

1.685 0.000 0.005 1.680 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 42: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 42 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.004 0.004 DETLDESSTBG FLEX 2022DETLDES 0.001 0.001 2022NFA

0.144 0.144 CONINSPSTBG FLEX 2023CONINSP 0.036 0.036 2023NFA

1.200 1.200 CONSTSTBG FLEX 2023CONST 0.300 0.300 2023NFA

NYSDOT

881403

CRACK SEALING: CLEANING &SEALING PAVEMENT CRACKS ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES. WORK WILL IMPROVE & PRESERVE THE INTEGRITY OF THE PAVEMENT BY PREVENTING WATER INFILTRATION.

1.685 0.000 0.000 0.005 1.680 AQC:A10 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.320 NHPP 0.320 CONINSP2020CONINSP 0.080 0.080 2020NFA

3.200 NHPP 3.200 CONST2020CONST 0.800 0.800 2020NFA

NYSDOT

881406

PREVENTIVE MAINTENANCE INITIATIVE PAVING: THREE SEGMENTS OF US ROUTE 44 FROM MOUNTAIN VIEW ROAD TO VICTORY LANE, FROM THOMAS AVENUE TO BOWER ROAD, AND FROM QUAKER HILL ROAD TO PLEASANTVIEW ROAD. TOWNS OF POUGHKEEPSIE AND PLEASANT VALLEY, DUTCHESS COUNTY.

4.400 4.400 0.000 0.000 0.000 AQC:A10Z TOTAL 4YR COST :DUTCHESS TPC : $3.3-$5.6 M

0.120 NHPP 0.120 DETLDES2020DETLDES 0.030 0.030 2020NFA

3.500 3.500 CONINSPNHPP 2021CONINSP 0.875 0.875 2021NFA

35.000 35.000 CONSTNHPP 2021CONST 8.750 8.750 2021NFA

NYSDOT

881407

PREVENTIVE MAINTENANCE INITIATIVE PAVING - PROJECT WILL RESURFACE FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER TO RESTORE THE RIDING SURFACE AND PRESERVE THE PAVEMENT STRUCTURE. (FORMERLY PIN: 8T0690)

48.275 0.150 48.125 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $40-$60 M

0.120 0.120 DETLDESNHPP 2021DETLDES 0.030 0.030 2021NFA

2.880 2.880 CONINSPNHPP 2022CONINSP 0.720 0.720 2022NFA

28.800 28.800 CONSTNHPP 2022CONST 7.200 7.200 2022NFA

NYSDOT

881408

PREVENTIVE MAINTENANCE INITIATIVE PAVING - PROJECT WILL RESURFACE FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER TO RESTORE THE RIDING SURFACE AND PRESERVE THE PAVEMENT STRUCTURE.

39.750 0.000 0.150 39.600 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $32-$50 M

0.120 0.120 DETLDESNHPP 2022DETLDES 0.030 0.030 2022NFA

2.400 2.400 CONINSPNHPP 2023CONINSP 0.600 0.600 2023NFA

24.000 24.000 CONSTNHPP 2023CONST 6.000 6.000 2023NFA

NYSDOT

881409

PREVENTIVE MAINTENANCE INITIATIVE PAVING - PROJECT WILL RESURFACE FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER TO RESTORE THE RIDING SURFACE AND PRESERVE THE PAVEMENT STRUCTURE.

33.150 0.000 0.000 0.150 33.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $32-$50 M

Page 43: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 43 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.016 STBG FLEX 0.016 DETLDES2020DETLDES 0.004 0.004 2020NFA

0.096 0.096 CONINSPSTBG FLEX 2021CONINSP 0.024 0.024 2021NFA

0.800 0.800 CONSTSTBG FLEX 2021CONST 0.200 0.200 2021NFA

NYSDOT

881422

STORMWATER MANAGEMENT PRACTICE SERIAL NUMBER MAINTENANCE BY CONTRACT: PROJECT WILL UNDERTAKE CORRECTIVE & CYCLICAL MAINTENANCE WORK ON FACILITIES & STRUCTURES DESIGNED TO COLLECT, STORE & TREAT STORM WATER. VARIOUS FEDERAL AID ELIGIBLE ROADWAYS IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES. (FORMERLY PIN: 8T0683)

1.140 0.020 1.120 0.000 0.000 AQC:A2 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.016 0.016 DETLDESSTBG FLEX 2022DETLDES 0.004 0.004 2022NFA

0.096 0.096 CONINSPSTBG FLEX 2023CONINSP 0.024 0.024 2023NFA

0.800 0.800 CONSTSTBG FLEX 2023CONST 0.200 0.200 2023NFA

NYSDOT

881423

STORMWATER MANAGEMENT PRACTICE SERIAL NUMBER MAINTENANCE BY CONTRACT: PROJECT WILL UNDERTAKE CORRECTIVE & CYCLICAL MAINTENANCE WORK ON FACILITIES & STRUCTURES DESIGNED TO COLLECT, STORE & TREAT STORM WATER. VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES.

1.140 0.000 0.000 0.020 1.120 AQC:A2 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.040 NHPP 0.040 DETLDES2020DETLDES 0.010 0.010 2020NFA

0.120 0.120 CONINSPNHPP 2021CONINSP 0.030 0.030 2021NFA

1.000 1.000 CONSTNHPP 2021CONST 0.250 0.250 2021NFA

NYSDOT

881424

CATCH BASINS: PROJECT WILL REPAIR/REPLACE STORMWATER CATCH BASINS TO ENSURE THAT THE DRAINAGE SYSTEM FUNCTIONS AS ORIGINALLY DESIGNED ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES (FORMERLY PIN: 8T0682)

1.450 0.050 1.400 0.000 0.000 AQC:A2 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

DETLDES 0.050 0.050 2021NFA 0.120 0.120 CONINSPSTBG FLEX 2022

CONINSP 0.030 0.030 2022NFA 1.000 1.000 CONSTSTBG FLEX 2022

CONST 0.250 0.250 2022NFA

NYSDOT

881426

CATCH BASINS: PROJECT WILL REPAIR/REPLACE STORMWATER CATCH BASINS TO ENSURE THAT THE DRAINAGE SYSTEM FUNCTIONS AS ORIGINALLY DESIGNED ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES

1.450 0.000 0.050 1.400 0.000 AQC:A2 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.040 0.040 DETLDESSTBG FLEX 2022DETLDES 0.010 0.010 2022NFA

0.120 0.120 CONINSPSTBG FLEX 2023CONINSP 0.030 0.030 2023NFA

1.000 1.000 CONSTSTBG FLEX 2023CONST 0.250 0.250 2023NFA

NYSDOT

881427

CATCH BASINS: CATCH BASINS: PROJECT WILL REPAIR OR REPLACE STORM WATER CATCH BASINS TO ENSURE THAT THE DRAINAGE SYSTEM FUNCTIONS AS ORIGINALLY DESIGNED. WORK WILL TAKE PLACE ON FEDERAL AID ELIGIBLE ROUTES IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER AND WESTCHESTER COUNTIES.

1.450 0.000 0.000 0.050 1.400 AQC:A11 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 44: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 44 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.120 0.120 CONINSPNHPP 2022CONINSP 0.030 0.030 2022NFA

1.000 1.000 CONSTNHPP 2022CONST 0.250 0.250 2022NFA

0.040 0.040 DETLDESNHPP 2022DETLDES 0.010 0.010 2022NFA

NYSDOT

881428

CATCH BASINS: PROJECT WILL REPAIR/REPLACE STORMWATER CATCH BASINS TO ENSURE THAT THE DRAINAGE SYSTEM FUNCTIONS AS ORIGINALLY DESIGNED ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES

1.450 0.000 0.000 1.450 0.000 AQC:A2Z TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.032 0.032 DETLDESSTBG FLEX 2021DETLDES 0.008 0.008 2021NFA

0.240 0.240 CONINSPSTBG FLEX 2022CONINSP 0.060 0.060 2022NFA

2.000 2.000 CONSTSTBG FLEX 2022CONST 0.500 0.500 2022NFA

NYSDOT

881436

ADA SIDEWALK & RAMPS: EASTERN ORANGE: PROJECT WILL BUILD OR REPAIR SIDEWALKS AND RAMPS ON STATE HIGHWAY RIGHT-OF-WAY TO ASSURE COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT. THIS WORK WILL TAKE PLACE IN VARIOUS MUNICIPALITIES AS NEEDED IN EASTERN ORANGE COUNTY.

2.840 0.000 0.040 2.800 0.000 AQC:C2Z TOTAL 4YR COST :ORANGE TPC : $2-$4 M

0.226 NHPP 0.226 DETLDES2020DETLDES 0.056 0.056 2020NFA

0.344 NHPP 0.344 PRELDES2020PRELDES 0.086 0.086 2020NFA

0.080 NHPP 0.080 ROWACQU2020ROWACQU 0.020 0.020 2020NFA

0.024 NHPP 0.024 ROWINCD2020ROWINCD 0.006 0.006 2020NFA

0.206 0.206 CONINSPNHPP 2021CONINSP 0.052 0.052 2021NFA

1.680 1.680 CONSTNHPP 2021CONST 0.420 0.420 2021NFA

NYSDOT

881451

CULVERT REPLACEMENTS ON STATE HIGHWAYS IN THE TOWNS OF NEW PALTZ AND GARDINER, ULSTER COUNTY; AND THE VILLAGE OF MONTGOMERY, AND TOWNS OF GREENVILLE, NEWBURGH, WAWAYANDA, HAMPTONBURGH, AND BLOOMING GROVE, ORANGE COUNTY. (FORMERLY PIN: 8T0232)

3.200 0.842 2.358 0.000 0.000 AQC:A2P TOTAL 4YR COST :MULTI TPC : $2-$4 M

PRELDES 0.010 0.010 2021NFADETLDES 0.050 0.050 2022NFAROWACQU 0.100 0.100 2022NFAROWINCD 0.030 0.030 2022NFA

0.360 0.360 CONINSPNHPP 2023CONINSP 0.090 0.090 2023NFA

3.600 3.600 CONSTNHPP 2023CONST 0.900 0.900 2023NFA

NYSDOT

881452

CULVERTS REHABILITATION/ REPLACEMENT ON FEDERAL AID ELIGIBLE ROUTES IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER AND WESTCHESTER COUNTIES (FORMERLY PIN: 8T0712)

5.140 0.000 0.010 0.180 4.950 AQC:A2 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

Page 45: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 45 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.540 NHPP 0.540 CONINSP2020CONINSP 0.135 0.135 2020NFA

3.600 NHPP 3.600 CONST2020CONST 0.900 0.900 2020NFA

NYSDOT

881459

GUIDE SIGNS: HUTCHINSON RIVER PARKWAY THIS PROJECT WILL REPLACE OR UPGRADE GUIDE SIGNS THAT HAVE REACHED THE END OF THEIR SERVICE LIFE ON THE HUTCHINSON RIVER PARKWAY IN VARIOUS MUNICIPALITIES IN WESTCHESTER COUNTY AND THE BOROUGH OF BRONX IN NEW YORK CITY.

5.175 5.175 0.000 0.000 0.000 AQC:C13 TOTAL 4YR COST :WESTCHESTER TPC : $4.6-$7.5 M

0.360 0.360 PRELDESSTBG FLEX 2022PRELDES 0.090 0.090 2022NFA

0.080 0.080 ROWINCDSTBG FLEX 2022ROWINCD 0.020 0.020 2022NFA

0.240 0.240 DETLDESSTBG FLEX 2023DETLDES 0.060 0.060 2023NFA

0.160 0.160 ROWACQUSTBG FLEX 2023ROWACQU 0.040 0.040 2023NFA

NYSDOT

881462

SIGNAL IMPROVEMENTS; INSTALL TRAFFIC SIGNALS &/OR UPGRADE/MODIFY EXISTING SIGNALS WHERE WARRANTED BY PRIORITY ORDER. VARIOUS FEDERAL AID ELIGIBLE ROADWAYS IN COULUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER AND WESTCHESTER COUNTIES (FORMERLY PIN: 8T0214)

1.050 0.000 0.000 0.550 0.500 AQC:D2 TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.016 0.016 DETLDESSTBG FLEX 2021DETLDES 0.004 0.004 2021NFA

0.192 0.192 CONINSPSTBG FLEX 2022CONINSP 0.048 0.048 2022NFA

1.600 1.600 CONSTSTBG FLEX 2022CONST 0.400 0.400 2022NFA

NYSDOT

881465

GUIDERAIL REHAB/REPLACE: PROJECT WILL REHABILITATE OR REPLACE DAMAGED OR NON-FUNCTIONAL GUIDERAIL AND BRIDGE RAIL ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN VARIOUS MUNICIPALITIES THROUGHOUT THE COUNTIES OF COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER.

2.260 0.000 0.020 2.240 0.000 AQC:A9 TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.096 NHPP 0.096 CONINSP2020CONINSP 0.024 0.024 2020NFA

0.800 NHPP 0.800 CONST2020CONST 0.200 0.200 2020NFA

0.096 STBG FLEX 0.096 CONINSP2020CONINSP 0.024 0.024 2020NFA

0.800 STBG FLEX 0.800 CONST2020CONST 0.200 0.200 2020NFA

NYSDOT

881467

GUIDERAIL REHAB/REPLAC: REPLACE OR REHABILITATE DAMAGED OR NON-FUNCTIONAL GUIDERAIL ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, ROCKLAND, ULSTER & WESTCHESTER COUNTIES (FORMERLY PIN: 8T0225)

2.240 2.240 0.000 0.000 0.000 AQC:A9 TOTAL 4YR COST :MULTI TPC : $2-$4 M

Page 46: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 46 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.016 NHPP 0.016 DETLDES2020DETLDES 0.004 0.004 2020NFA

0.192 0.192 CONINSPSTBG FLEX 2021CONINSP 0.048 0.048 2021NFA

1.600 1.600 CONSTSTBG FLEX 2021CONST 0.400 0.400 2021NFA

NYSDOT

881469

GUIDERAIL REHABILITATION/ REPLACEMENTS: PROJECT WILL CONSIST OF REPLACING OR REHABILITATING DAMAGED OR NON-FUNCTIONAL GUIDERAIL AND MEDIAN BARRIERS ON STATE HIGHWAYS, THUS IMPROVING ROADWAY SAFETY. VARIOUS FEDERAL AID ELIGIBLE ROADWAYS IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES (FORMERLY PIN: 8T0676)

2.260 0.020 2.240 0.000 0.000 AQC:A9 TOTAL 4YR COST :MULTI TPC : $2-$4 M

DETLDES 0.050 0.050 2022NFA 0.058 0.058 CONINSPSTBG FLEX 2022

CONINSP 0.014 0.014 2022NFA 0.480 0.480 CONSTSTBG FLEX 2022

CONST 0.120 0.120 2022NFA

NYSDOT

881473

SIGNAL UPGRADES: THE UPGRADING OF TRAFFIC SIGNAL DETECTION EQUIPMENT TO FULL WORKING CONDITION, WILL IMPROVE THE EFFICIENCY OF TRAFFIC SIGNALS, LEADING TO BETTER TRAFFIC FLOW & REDUCED VEHICLES EMISSIONS ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES

0.722 0.000 0.000 0.722 0.000 AQC:D2 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.322 NHPP 0.322 CONINSP2020CONINSP 0.080 0.080 2020NFA

3.214 NHPP 3.214 CONST2020CONST 0.804 0.804 2020NFA

NYSDOT

881475

RUSTIC RAIL REPLACEMENT ON SPRAIN BROOK PARKWAY; RUSTIC, SELF-OXIDIZING GUIDERAIL WILL BE REPLACED WITH GALVANIZED RAIL ALONG THE SPRAIN BROOK PARKWAY IN THE TOWNS OF GREENBURGH AND MOUNT PLEASANT AND THE CITY OF YONKERS IN WESTCHESTER COUNTY. (FORMERLY PIN: 8T0552) CONSTRUCTION FUNDS DO NOT COUNT AGAINST THE REGIONAL PLANNING TARGET.

4.420 4.420 0.000 0.000 0.000 AQC:A9 TOTAL 4YR COST :WESTCHESTER TPC : $3.3-$5.6 M

0.080 0.080 DETLDESSTBG FLEX 2023DETLDES 0.020 0.020 2023NFA

NYSDOT

881476

BIENNIAL SIGN CONTRACT: PROJECT WILL REPLACE OR UPGRADE WHICH HAVE EXCEEDED THEIR USEFUL LIFE OR INSTALL NEW SIGNAGE AS NEEDED ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER AND WESTCHESTER COUNTIES.

0.100 0.000 0.000 0.000 0.100 AQC:C13 TOTAL 4YR COST :MULTI TPC : < $0.75 M

Page 47: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 47 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.018 0.018 DETLDESHSIP 2023DETLDES 0.002 0.002 2023NFA

NYSDOT

881478

THIS PROJECT WILL RESURFACE FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER COUNTIES THAT ARE IN NEED OF CORRECTIVE PAVEMENT TREATMENT. THIS IS A SPECIAL SURFACE TREATMENT PROJECT FOR WHICH CANDIDATE LOCATIONS WILL BE CHOSEN AT THE POINT OF PROJECT INITIATION. CANDIDATE LOCATIONS WILL BE HIGH ACCIDENT LOCATIONS THAT ARE TYPICALLY RELATED TO WET WEATHER OR SLIPPERY PAVEMENT ACCIDENTS. (FORMERLY PIN: 8T0694)

0.020 0.000 0.000 0.000 0.020 AQC:A10 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.024 0.024 DETLDESSTBG FLEX 2023DETLDES 0.006 0.006 2023NFA

NYSDOT

881479

BIENNIAL SPECIAL MARKINGS: BIENNIAL SPECIAL MARKINGS: PROJECT WILL APPLY EPOXY AND PREFORMED PAVEMENT MARKINGS ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER AND WESTCHESTER COUNTIES.

0.030 0.000 0.000 0.000 0.030 AQC:A10 TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.440 0.440 CONINSPSTBG FLEX 2023CONINSP 0.110 0.110 2023NFA

4.400 4.400 CONSTSTBG FLEX 2023CONST 1.100 1.100 2023NFA

0.024 0.024 DETLDESSTBG FLEX 2023DETLDES 0.006 0.006 2023NFA

NYSDOT

881481

BIENNIAL LONG LINES: PROJECT CONSISTS OF APPLYING EPOXY AND PREFORMED PAVEMENT MARKINGS ON STATE HIGHWAYS. VARIOUS FEDERAL AID ELIGIBLE ROADWAYS IN THE COUNTIES OF COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER.

6.080 0.000 0.000 0.000 6.080 AQC:A11 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.040 0.040 DETLDESSTBG FLEX 2023DETLDES 0.010 0.010 2023NFA

NYSDOT

881482

GUIDERAIL REHAB/REPLACE: PROJECT WILL REHABILITATE OR REPLACE DAMAGED OR NON-FUNCTIONAL GUIDERAIL AND BRIDGE RAIL ON FEDERAL AID ELIGIBLE STATE HIGHWAYS IN VARIOUS MUNICIPALITIES THROUGHOUT THE COUNTIES OF COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER.

0.050 0.000 0.000 0.000 0.050 AQC:A9 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.008 0.008 DETLDESSTBG FLEX 2023DETLDES 0.002 0.002 2023NFA

NYSDOT

881483

BRIDGE JOB ORDER CONTRACT: PROJECT WILL CONSIST OF MAKING REPAIRS AND PERFORMING OTHER MAINTENANCE-RELATED ACTIVITIES, AS NEEDED, TO PRESERVE THE SAFETY AND INTEGRITY OF BRIDGES ON STATE HIGHWAYS. VARIOUS FEDERAL AID ELIGIBLE ROADWAYS THROUGHOUT THE COUNTIES OF COLUMBIA, DUTCHESS, ORANGE, ROCKLAND, WESTCHESTER, PUTNAM AND ULSTER.

0.010 0.000 0.000 0.000 0.010 AQC:A19 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 48: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 48 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.400 0.400 CONINSPNHPP 2023CONINSP 0.100 0.100 2023NFA

4.000 4.000 CONSTNHPP 2023CONST 1.000 1.000 2023NFA

0.080 0.080 DETLDESNHPP 2023DETLDES 0.020 0.020 2023NFA

NYSDOT

881485

BRIDGE PAINTING: PROJECT WILL PAINT STEEL SURFACES ON BRIDGES TO PROTECT AGAINST NORMAL ENVIRONMENTAL EFFECTS OF CORROSION, ACID RAIN, AND DEICING AGENTS. WORK WILL TAKE PLACE ON FEDERAL AID ELIGIBLE STATE HIGHWAYS IN VARIOUS MUNICIPALITIES IN THE COUNTIES OF COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER AND WESTCHESTER.

5.600 0.000 0.000 0.000 5.600 AQC:A19 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.120 0.120 PRELDESSTBG FLEX 2021PRELDES 0.030 0.030 2021NFA

0.080 0.080 DETLDESSTBG FLEX 2022DETLDES 0.020 0.020 2022NFA

0.020 0.020 CONINSPSTBG FLEX 2023CONINSP 0.005 0.005 2023NFA

0.100 0.100 CONSTSTBG FLEX 2023CONST 0.025 0.025 2023NFA

NYSDOT

881487

SYSTEM REPAIR: PROJECT WILL REPAIR OR REHABILITATE HIGHWAY INFRASTRUCTURE ELEMENTS THAT ARE BEYOND THE MEANS OF THE DEPARTMENTS MAINTENANCE FORCES SUCH AS RETAINING WALLS ON FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER AND WESTCHESTER COUNTIES.

0.400 0.000 0.150 0.100 0.150 AQC:A2 TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.120 0.120 PRELDESSTBG FLEX 2022PRELDES 0.030 0.030 2022NFA

0.080 0.080 DETLDESSTBG FLEX 2023DETLDES 0.020 0.020 2023NFA

0.160 0.160 ROWACQUSTBG FLEX 2023ROWACQU 0.040 0.040 2023NFA

0.024 0.024 ROWINCDSTBG FLEX 2023ROWINCD 0.006 0.006 2023NFA

NYSDOT

881488

SYSTEM REPAIR: PROJECT WILL REPAIR OR REHABILITATE HIGHWAY INFRASTRUCTURE ELEMENTS THAT ARE BEYOND THE MEANS OF THE DEPARTMENTS MAINTENANCE FORCES SUCH AS RETAINING WALLS ON FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES.

0.480 0.000 0.000 0.150 0.330 AQC:A2 TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.120 0.120 DETLDESNHPP 2023DETLDES 0.030 0.030 2023NFA

NYSDOT

881489

PREVENTIVE MAINTENANCE INITIATIVE PAVING - PROJECT WILL RESURFACE FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE COUNTIES OF COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER TO RESTORE THE RIDING SURFACE AND PRESERVE THE PAVEMENT STRUCTURE.

0.150 0.000 0.000 0.000 0.150 AQC:A10 TOTAL 4YR COST :MULTI TPC : $32-$50 M

Page 49: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 49 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

DETLDES 0.005 0.005 2023NFANYSDOT

881490

CRACK SEALING: PROJECT WILL CLEAN AND SEAL PAVEMENT CRACKS ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. THIS WORK WILL IMPROVE AND PRESERVE THE INTEGRITY OF THE PAVEMENT BY PREVENTING WATER INFILTRATION. IN THE COUNTIES OF COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER.

0.005 0.000 0.000 0.000 0.005 AQC:A10 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.032 0.032 DETLDESSTBG FLEX 2022DETLDES 0.008 0.008 2022NFA

0.240 0.240 CONINSPSTBG FLEX 2023CONINSP 0.060 0.060 2023NFA

2.000 2.000 CONSTSTBG FLEX 2023CONST 0.500 0.500 2023NFA

NYSDOT

881491

ADA SIDEWALK & RAMPS: WESTERN ORANGE: PROJECT WILL BUILD OR REPAIR SIDEWALKS AND RAMPS ON STATE HIGHWAY RIGHT-OF-WAY TO ASSURE COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT. THIS WORK WILL TAKE PLACE IN VARIOUS MUNICIPALITIES IN WESTERN ORANGE COUNTY.

2.840 0.000 0.000 0.040 2.800 AQC:C2Z TOTAL 4YR COST :ORANGE TPC : $2-$4 M

0.040 0.040 DETLDESNHPP 2023DETLDES 0.010 0.010 2023NFA

NYSDOT

881495

CATCH BASINS: PROJECT WILL REPAIR OR REPLACE STORM WATER CATCH BASINS TO ENSURE THAT THE DRAINAGE SYSTEM FUNCTIONS AS ORIGINALLY DESIGNED. THE WORK WILL TAKE PLACE ON FEDERAL AID ELIGIBLE STATE HIGHWAYS IN VARIOUS MUNICIPALITIES THROUGHOUT THE COUNTIES OF COLUMBIA, DUTCHESS, ULSTER, ROCKLAND, ORANGE, PUTNAM AND WESTCHESTER.

0.050 0.000 0.000 0.000 0.050 AQC:A2 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

DETLDES 0.015 0.015 2022NFA 0.062 0.062 CONINSPSTBG FLEX 2023

CONINSP 0.016 0.016 2023NFA 0.520 0.520 CONSTSTBG FLEX 2023

CONST 0.130 0.130 2023NFA

NYSDOT

881499

GEOTECH SUBSURFACE EXPLORATIONS CONTRACT: PROJECT WILL EXPLORE SUBSURFACE SOIL CONDITIONS TO PROVIDE DATA NEEDED IN ADVANCE OF HIGHWAY & BRIDGE DESIGN ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES.

0.743 0.000 0.000 0.015 0.728 AQC:C5 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

DETLDES 0.015 0.015 2023NFANYSDOT

881500

GEOTECH SUBSURFACE EXPLORATIONS CONTRACT: PROJECT WILL EXPLORE SUBSURFACE SOIL CONDITIONS TO PROVIDE DATA NEEDED IN ADVANCE OF HIGHWAY & BRIDGE DESIGN ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS. COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES.

0.015 0.000 0.000 0.000 0.015 AQC:C5 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 50: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 50 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.040 0.040 DETLDESSTBG FLEX 2021DETLDES 0.010 0.010 2021NFA

0.038 0.038 CONINSPSTBG FLEX 2022CONINSP 0.010 0.010 2022NFA

0.320 0.320 CONSTSTBG FLEX 2022CONST 0.080 0.080 2022NFA

NYSDOT

881505

WETLAND MITIGATION RECONSTRUCTION AND LANDSCAPE IMPROVEMENTS: PROJECT WILL TAKE CORRECTIVE ACTION TO RESTORE ENVIRONMENTAL FEATURES, SUCH AS STORM WATER CONTROL FACILITIES & LANDSCAPING, TO THEIR INTENDED FUNCTIONS AS CONSTRUCTED IN PREVIOUS PROJECTS. VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES.

0.498 0.000 0.050 0.448 0.000 AQC:A2 TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.040 0.040 DETLDESSTBG FLEX 2023DETLDES 0.010 0.010 2023NFA

NYSDOT

881506

WETLAND MITIGATION RECONSTRUCTION AND LANDSCAPE IMPROVEMENTS: PROJECT WILL TAKE CORRECTIVE ACTION TO RESTORE ENVIRONMENTAL FEATURES, SUCH AS STORM WATER CONTROL FACILITIES & LANDSCAPING, TO THEIR INTENDED FUNCTIONS AS CONSTRUCTED IN PREVIOUS PROJECTS. VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES.

0.050 0.000 0.000 0.000 0.050 AQC:A2 TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.120 STBG FLEX 0.120 CONINSP2020CONINSP 0.030 0.030 2020NFA

1.000 STBG FLEX 1.000 CONST2020CONST 0.250 0.250 2020NFA

NYSDOT

881510

CATCH BASINS: WESTCHESTER COUNTY. PROJECT WILL REPAIR OR REPLACE STORM WATER CATCH BASINS ALONG SEGMENTS OF THE SAW MILL RIVER PARKWAY (SMRP) AND FARRAGUT PARKWAY IN THE CITY OF YONKERS, TOWNS OF GREENBURGH, MOUNT PLEASANT, AND NEW CASTLE AND THE VILLAGE OF ARDSLEY, WESTCHESTER COUNTY.

1.400 1.400 0.000 0.000 0.000 AQC:A2 TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M

0.032 0.032 DETLDESSTBG FLEX 2022DETLDES 0.008 0.008 2022NFA

0.008 0.008 ROWINCDSTBG FLEX 2022ROWINCD 0.002 0.002 2022NFA

0.040 0.040 ROWACQUSTBG FLEX 2023ROWACQU 0.010 0.010 2023NFA

NYSDOT

881517

ADA SIDEWALKS & RAMPS: ULSTER COUNTY: PROJECT WILL BUILD OR REPAIR SIDEWALKS AND RAMPS ON STATE HIGHWAY RIGHT-OF-WAY TO ASSURE COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT. THIS WORK WILL TAKE PLACE IN VARIOUS MUNICIPALITIES AS NEEDED IN ULSTER COUNTY.

0.100 0.000 0.000 0.050 0.050 AQC:C2Z TOTAL 4YR COST :ULSTER TPC : $3.3-$5.6 M

0.400 STBG LG URB 0.400 MISC2020MISC 0.100 0.100 2020NFAMISC 0.500 0.500 2021NFAMISC 0.500 0.500 2022NFAMISC 0.500 0.500 2023NFA

WESTCHESTER

882145

WESTCHESTER COUNTY BUS STOP ENHANCEMENTS. COUNTY-WIDE BUS STOP IMPROVEMENTS. COUNTY WILL ENHANCE AND IMPROVE VARIOUS BUS STOPS THROUGHOUT COUNTY.

2.000 0.500 0.500 0.500 0.500 AQC:B7 TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M

Page 51: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 51 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

9.007 FTA 5307 9.007 MISC2020MISC 2.252 2.252 2020NFA

9.007 9.007 MISCFTA 5307 2021MISC 2.252 2.252 2021NFA

9.007 9.007 MISCFTA 5307 2022MISC 2.252 2.252 2022NFA

9.007 9.007 MISCFTA 5307 2023MISC 2.252 2.252 2023NFA

WESTCHESTER

882206

PREVENTIVE MAINTENANCE FUNDING TO EXTEND SERVICE LIFE OF WESTCHESTER COUNTY BEE-LINE BUS SYSTEM.

45.036 11.259 11.259 11.259 11.259 AQC:B3 TOTAL 4YR COST :WESTCHESTER TPC : $50-$85 M

MISC 1.600 1.600 2021NFAWESTCHESTER

882223

REPLACE (20) PARATRANSIT VAN AS PART OF THE REGULAR LIFECYCLE REPLACEMENT FOR THE BEE-LINE BUS SYSTEM.

1.600 0.000 1.600 0.000 0.000 AQC:B10 TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M

0.280 FTA 5307 0.280 MISC2020MISC 0.070 0.070 2020NFA

0.280 0.280 MISCFTA 5307 2021MISC 0.070 0.070 2021NFA

0.280 0.280 MISCFTA 5307 2022MISC 0.070 0.070 2022NFA

0.280 0.280 MISCFTA 5307 2023MISC 0.070 0.070 2023NFA

WESTCHESTER

882235

BEE-LINE PLANNING FUNDING FOR THE PLANNING ACTIVITIES TO MAINTAIN OPERATIONS AND MEET REQUIREMENTS FOR CONTINUED OPERATION OF THE WESTCHESTER COUNTY BEE-LINE BUS SYSTEM.

1.400 0.350 0.350 0.350 0.350 AQC:C3 TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M

0.094 FTA 5311 0.094 MISC2020MISC 0.094 0.094 2020NFA

0.094 0.094 MISCFTA 5311 2021MISC 0.094 0.094 2021NFA

0.094 0.094 MISCFTA 5311 2022MISC 0.094 0.094 2022NFA

0.094 0.094 MISCFTA 5311 2023MISC 0.094 0.094 2023NFA

PUTNAM

882246

SECTION 5311 OPERATING ASSISTANCE TO ENABLE AND SUSTAIN CONTINUED OPERATIONS OF PUTNAM AREA RAPID TRANSIT (PART).

0.752 0.188 0.188 0.188 0.188 AQC:B1 TOTAL 4YR COST :PUTNAM TPC : $0.6-$1.5 M

Page 52: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 52 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.500 FTA 5307 0.500 MISC2020MISC 0.125 0.125 2020NFA

1.000 1.000 MISCFTA 5307 2021MISC 0.250 0.250 2021NFA

2.500 2.500 MISCFTA 5307 2022MISC 0.625 0.625 2022NFA

WESTCHESTER

882297

MODERNIZATION OF THE BEE-LINE MAINTENANCE FACILITIES INCLUDES THE REPLACEMENT OF EQUIPMENT FOR FACILITIES THAT HAVE MET THEIR USEFUL LIFE SUCH AS: REPLACE BUILDING HVAC FACILITIES OR BUS RELATED MAINTENANCE EQUIPMENT AT VALHALLA AND YONKERS FACILITIES.

5.000 0.625 1.250 3.125 0.000 AQC:B8 TOTAL 4YR COST :WESTCHESTER TPC : $4.6-$7.5 M

0.344 STBG LG URB 0.344 MISC2020MISC 0.731 0.731 2020NFA

0.344 0.344 MISCSTBG LG URB 2021MISC 0.731 0.731 2021NFA

0.344 0.344 MISCSTBG LG URB 2022MISC 0.731 0.731 2022NFA

0.344 0.344 MISCSTBG LG URB 2023MISC 0.731 0.731 2023NFA

WESTCHESTER CO

882303

ROUTE 77 BUS SERVICE (FORMERLY KNOW AS TACONIC EXPRESS BUS SERVICE): COMMUTER BUS SERVICE BETWEEN SOUTHERN PUTNAM COUNTY / NORTHERN WESTCHESTER COUNTY (FDR PARK) AND WHITE PLAINS. FUNDS ARE FOR THE CAPITAL COST OF CONTRACTING.

4.300 1.075 1.075 1.075 1.075 AQC:B1 TOTAL 4YR COST :MULTI TPC : $6-$9.4 M

OPER 11.000 11.000 2020NFAOPER 11.000 11.000 2021NFAOPER 11.000 11.000 2022NFAOPER 11.000 11.000 2023NFA

NYSDOT

882349

HUDSON LINK TRANSIT SERVICE: PUBLIC BUS SERVICE DEVELOPED TO REPLACE THE TAPPAN ZEE EXPRESS BUS SERVICE. THE HUDSON LINK WILL SERVE THE I-287 CORRIDOR CROSSING THE GOVERNOR MARIO M. CUOMO BRIDGE BETWEEN ROCKLAND AND WESTCHESTER COUNTIES.

44.000 11.000 11.000 11.000 11.000 AQC:B1 TOTAL 4YR COST :MULTI TPC : $70-$130 M

0.560 CMAQ 0.560 MISC2020MISC 0.140 0.140 2020NFA

0.560 0.560 MISCCMAQ 2021MISC 0.140 0.140 2021NFA

0.560 0.560 MISCCMAQ 2022MISC 0.140 0.140 2022NFA

0.560 0.560 MISCCMAQ 2023MISC 0.140 0.140 2023NFA

WESTCHESTER

882376

WESTCHESTER EMPLOYEE COMMUTE OPTIONS PROGRAM: PROJECT STUDIES WESTCHESTER COUNTY COMMUTING ALTERNATIVES AND FOCUSES ON STRATEGIES INTENDED TO CHANGE THE TRAVEL BEHAVIOR OF COMMUTERS, INCLUDING MODE CHOICE, AND TIME AND DIRECTION OF TRAVEL. THE GOAL IS TO REDUCE CONGESTION, THEREBY IMPROVING MOBILITY AND IMPROVING AIR QUALITY. (FORMERLY PIN 880688).

2.800 0.700 0.700 0.700 0.700 AQC:C1 TOTAL 4YR COST :WESTCHESTER TPC : $3.3-$5.6 M

Page 53: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 53 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

1.056 STBG FLEX 1.056 MISC2020MISC 0.264 0.264 2020NFA

1.056 1.056 MISCSTBG FLEX 2021MISC 0.264 0.264 2021NFA

1.056 1.056 MISCSTBG FLEX 2022MISC 0.264 0.264 2022NFA

1.056 1.056 MISCSTBG FLEX 2023MISC 0.264 0.264 2023NFA

NYSDOT

882377

POUGHKEEPSIE-WHITE PLAINS COMMUTER BUS: WEEKDAY PEAK-HOUR SERVICE ALONG THE ROUTE 9 CORRIDOR SERVING RESIDENTS OF DUTCHESS, PUTNAM, AND WESTCHESTER COUNTIES.

5.280 1.320 1.320 1.320 1.320 AQC:B1 TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

0.224 STBG FLEX 0.224 OPER2020OPER 0.056 0.056 2020NFA

0.224 0.224 OPERSTBG FLEX 2021OPER 0.056 0.056 2021NFA

0.224 0.224 OPERSTBG FLEX 2022OPER 0.056 0.056 2022NFA

0.224 0.224 OPERSTBG FLEX 2023OPER 0.056 0.056 2023NFA

NYSDOT

882378

STAMFORD-WHITE PLAINS EXPRESS BUS (I-BUS): COMMUTER BUS SERVICE BETWEEN STAMFORD, CT AND WHITE PLAINS, WESTCHESTER COUNTY. (FORMERLY PIN: 882185)

1.120 0.280 0.280 0.280 0.280 AQC:B1 TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M

0.464 STBG LG URB 0.464 OPER2020OPER 0.116 0.116 2020NFA

0.464 0.464 OPERSTBG LG URB 2021OPER 0.116 0.116 2021NFA

0.464 0.464 OPERSTBG LG URB 2022OPER 0.116 0.116 2022NFA

0.464 0.464 OPERSTBG LG URB 2023OPER 0.116 0.116 2023NFA

NYSDOT

882379

HOUSATONIC AREA REGIONAL TRANSIT (HART) SHUTTLES: DANBURY, CT TO BREWSTER, RIDGEFIELD-KATONAH, & NEW FAIRFIELD TO SOUTHEAST NY TRAIN STATION BUS SERVICE. WEEKDAY SHUTTLE BUS SERVICE CO-FUNDED BY NYSDOT AND CONN DOT. OPERATED BY HOUSATONIC AREA TRANSIT ( (Formerly PIN: 882264)

2.320 0.580 0.580 0.580 0.580 AQC:B1 TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.288 STBG FLEX 0.288 OPER2020OPER 0.072 0.072 2020NFA

0.288 0.288 OPERSTBG FLEX 2021OPER 0.072 0.072 2021NFA

0.288 0.288 OPERSTBG FLEX 2022OPER 0.072 0.072 2022NFA

0.288 0.288 OPERSTBG FLEX 2023OPER 0.072 0.072 2023NFA

NYSDOT

882380

ULSTER COUNTY (KINGSTON)-POUGHKEEPSIE BUS SERVICE (FORMERLY PIN: 882324)

1.440 0.360 0.360 0.360 0.360 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 54: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 54 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

5.092 NHPP 5.092 OPER2020OPER 1.273 1.273 2020NFA

5.252 5.252 OPERNHPP 2021OPER 1.313 1.313 2021NFA

5.412 5.412 OPERNHPP 2022OPER 1.353 1.353 2022NFA

5.412 5.412 OPERNHPP 2023OPER 1.353 1.353 2023NFA

NYSDOT

882385

TRANSPORTATION MGMT CENTER OPERATIONS: ON-GOING COSTS TO OPERATE THE TMC, INCLUDING STAFF, SALARIES, OFFICE EXPENSES, SUPPLIES, MATERIALS, EQUIPMENT, ETC. (FORMERLY PIN 880691).

26.460 6.365 6.565 6.765 6.765 AQC:A7 TOTAL 4YR COST :WESTCHESTER TPC : $32-$50 M

3.200 3.200 MISCNHPP 2022MISC 0.800 0.800 2022NFA

3.200 3.200 MISCNHPP 2023MISC 0.800 0.800 2023NFA

NYSDOT

882386

HIGHWAY EMERGENCY LOCAL PATROL (HELP) FREEWAY INCIDENT MANAGEMENT. PROJECT INCLUDES PAY FOR THE CONTRACT OPERATORS, THE TRUCKS, ALL EQUIPMENT ON BOARD, GASOLINE, AND OTHER OPERATIONAL NEEDS AT VARIOUS LOCATIONS IN THE HUDSON VALLEY. (FORMERLY PIN: 881033)

8.000 0.000 0.000 4.000 4.000 AQC:A6 TOTAL 4YR COST :MULTI TPC : $9.5-15.5 M

0.240 NHPP 0.240 OPER2020OPER 0.060 0.060 2020NFA

0.240 0.240 OPERNHPP 2021OPER 0.060 0.060 2021NFA

0.240 0.240 OPERNHPP 2022OPER 0.060 0.060 2022NFA

0.240 0.240 OPERNHPP 2023OPER 0.060 0.060 2023NFA

NYSDOT

882387

HIGHWAY EMERGENCY LOCAL PATROLS (HELP) PROJECT HANDLES TECHNOLOGY NEEDS SUCH AS COMPUTER AIDED DISPATCH (CAD), WIRELESS COMMUNICATIONS, AUTOMATIC VEHICLE LOCATION (AVL), REAL TIME INFORMATION & INCIDENT MANAGEMENT. WESTCHESTER COUNTY. (FORMERLY PIN: 881036)

1.200 0.300 0.300 0.300 0.300 AQC:A7 TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M

0.300 STBG FLEX 0.300 OPER2020OPER 0.075 0.075 2020NFA

0.300 0.300 OPERSTBG FLEX 2021OPER 0.075 0.075 2021NFA

0.300 0.300 OPERSTBG FLEX 2022OPER 0.075 0.075 2022NFA

0.300 0.300 OPERSTBG FLEX 2023OPER 0.075 0.075 2023NFA

PUTNAM

882388

PUTNAM MOVES SHUTTLE NETWORK: OPERATIONAL ASSISTANCE FOR FEEDER BUS SERVICE BETWEEN CARMEL/MAHOPAC IN PUTNAM COUNTY AND METRO-NORTHS CROTON FALLS STATION IN NORTHERN WESTCHESTER COUNTY. (FORMERLY PIN: 882244)

1.500 0.375 0.375 0.375 0.375 AQC:B1 TOTAL 4YR COST :MULTI TPC : $2-$4 M

Page 55: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 55 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

6.400 STBG LG URB 6.400 MISC2020MISC 6.930 6.930 2020NFA

WESTCHESTER

882389

WESTECHESTER BEE-LINE CAD/AVL SYSTEMS INTEGRATION PROJECT. THIS PROJECT WILL UPGRADE AND ENHANCE THE CAD/AVL SYSTEM, DATA COMMUNICATIONS, AND SCHEDULING SYSTEMS TO IMPROVE OPERATIONS PLANNING AND DATA MANAGEMENT, ENHANCE CUSTOMER INFORMATION FOR THE BEE-LINE SYSTEM.

13.330 13.330 0.000 0.000 0.000 AQC:B4 TOTAL 4YR COST :WESTCHESTER TPC : $12.5-$19 M

0.220 STBG FLEX 0.220 OPER2020OPER 0.055 0.055 2020NFA

0.220 0.220 OPERSTBG FLEX 2021OPER 0.055 0.055 2021NFA

0.220 0.220 OPERSTBG FLEX 2022OPER 0.055 0.055 2022NFA

0.220 0.220 OPERSTBG FLEX 2023OPER 0.055 0.055 2023NFA

NYSDOT

882390

TRAILWAYS COMMUTER SERVICE: FEDERAL/STATE FUNDING TO BE PROVIDED TO TRAILWAYS BY NYSDOT UNDER THE CAPITAL COST OF CONTRACTING CONCEPT FOR COMMUTER SERVICE BETWEEN KINGSTON AND MANHATTAN WITH STOPS IN ROSENDALE & NEW PALTZ. TOTAL PROJECT COST INCLUDING FAR (Formerly PIN: 882323)

1.100 0.275 0.275 0.275 0.275 AQC:B1 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.280 STBG LG URB 0.280 OPER2020OPER 0.070 0.070 2020NFA

0.280 0.280 OPERSTBG LG URB 2021OPER 0.070 0.070 2021NFA

0.280 0.280 OPERSTBG LG URB 2022OPER 0.070 0.070 2022NFA

0.280 0.280 OPERSTBG LG URB 2023OPER 0.070 0.070 2023NFA

NYSDOT

882392

ROUTE 9W BUS SERVICE: OPERATING SUBSIDY FOR ALL-DAY BUS SERVICE BETWEEN THE ROUTE 9W CORRIDOR IN ROCKLAND COUNTY AND THE PORT AUTHORITY OF NY & NJ BUS TERMINAL ON 41ST STREET IN MANHATTAN. (FORMERLY PIN: 882367)

1.400 0.350 0.350 0.350 0.350 AQC:B1 TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.320 STBG FLEX 0.320 OPER2020OPER 0.080 0.080 2020NFA

0.320 0.320 OPERSTBG FLEX 2021OPER 0.080 0.080 2021NFA

0.320 0.320 OPERSTBG FLEX 2022OPER 0.080 0.080 2022NFA

0.320 0.320 OPERSTBG FLEX 2023OPER 0.080 0.080 2023NFA

NYSDOT

882394

NEWBURGH-BEACON SHUTTLE BUS SERVICE INCLUDING STEWART INTERNATIONAL AIRPORT. CITY OF BEACON, DUTCHESS COUNTY AND CITY OF NEWBURGH, ORANGE COUNTY. (FORMERLY PIN: 895007) (Formerly PIN: 882366)

1.600 0.400 0.400 0.400 0.400 AQC:B1P TOTAL 4YR COST :MULTI TPC : $2-$4 M

Page 56: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 56 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

1.600 1.600 MISCSTBG FLEX 2021MISC 0.400 0.400 2021NFA

1.600 1.600 MISCSTBG FLEX 2023MISC 0.400 0.400 2023NFA

METRO-NORTH

882396

HAVERSTRAW-OSSINING FERRY: CONTINUE THE LEASE OF EXISTING PARKING AND/OR IMPROVEMENTS TO EXISTING DOCK FACILITIES. ROCKLAND AND WESTCHESTER COUNTIES. (FORMERLY PIN: 882218)

4.000 0.000 2.000 0.000 2.000 AQC:B1 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

1.501 1.501 OPERSTBG FLEX 2021OPER 0.375 0.375 2021NFA

1.501 1.501 OPERSTBG FLEX 2023OPER 0.375 0.375 2023NFA

METRO-NORTH

882399

NEWBURGH-BEACON FERRY SERVICE OPERATIONS INCLUDING PARKING , LEASING OF THE VESSEL, AND DOCK IMPROVEMENTS. (Formerly PIN: 882315)

3.752 0.000 1.876 0.000 1.876 AQC:B1P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.640 CMAQ 0.640 OPER2020OPER 0.160 0.160 2020NFA

0.680 0.680 OPERCMAQ 2021OPER 0.170 0.170 2021NFA

0.680 0.680 OPERCMAQ 2022OPER 0.170 0.170 2022NFA

0.720 0.720 OPERCMAQ 2023OPER 0.180 0.180 2023NFA

ROCKLAND

882402

ROCKLAND COUNTY COMMUTE ALTERNATIVES: FOCUSES ON STRATEGIES INTENDED TO CHANGE THE TRAVEL BEHAVIOR OF COMMUTERS INCLUDING MODE CHOICE & THE DIRECTION/TIME OF TRAVEL, AND THEREBY REDUCE CONGESTION, IMPROVE MOBILITY & IMPROVE AIR QUALITY. (Formerly PIN: 882370)

3.400 0.800 0.850 0.850 0.900 AQC:NON TOTAL 4YR COST :ROCKLAND TPC : $4.6-$7.5 M

0.452 CMAQ 0.452 OPER2020OPER 0.113 0.113 2020NFA

0.452 0.452 OPERCMAQ 2021OPER 0.113 0.113 2021NFA

0.452 0.452 OPERCMAQ 2022OPER 0.113 0.113 2022NFA

0.452 0.452 OPERCMAQ 2023OPER 0.113 0.113 2023NFA

METRO-NORTH

882405

MTA METRO-NORTH RAILROAD MARKETING AND CONNECTING SERVICES PROGRAM: PROMOTES THE USE OF BUSES, CAR/VANPOOLING, FERRIES, ETC., TO ACCESS MAJOR METRO-NORTH RAIL CORRIDORS. PROGRAM ALSO INCLUDES FUNDING FOR UNI-TICKET USE. DUTCHESS, ORANGE, PUTNAM, ROCKLAND (Formerly PIN: 882369)

2.260 0.565 0.565 0.565 0.565 AQC:C1 TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.260 STBG FLEX 0.260 MISC2020MISC 0.065 0.065 2020NFA

NYSDOT

882407

NYSDOT WILL REIMBURSE THE TOWN OF ROSENDALE FOR THE CONSTRUCTION, LEASE, AND MAINTENANCE OF A PARK AND RIDE LOT ON ROUTE 32 IN THE TOWN OF ROSENDALE TO SERVE THE GROWING DEMAND FOR BUS AND RIDESHARING SERVICES. ULSTER COUNTY. (Formerly PIN: 846059)

0.325 0.325 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $0.6-$1.5 M

Page 57: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 57 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.240 CMAQ 0.240 OPER2020OPER 0.100 0.100 2020NFA

0.240 0.240 OPERCMAQ 2021OPER 0.100 0.100 2021NFA

0.240 0.240 OPERCMAQ 2022OPER 0.100 0.100 2022NFA

0.240 0.240 OPERCMAQ 2023OPER 0.100 0.100 2023NFA

NYSDOT

882409

COACH BUS MARKETING AND PARKING CONTRACT: COACH USA PROMOTES ITS BUS SERVICES IN ORANGE AND ROCKLAND COUNTIES AS WELL AS LEASES / MAINTAINS PARK & RIDE LOTS FOR TRAVELERS. (Formerly PIN: 882371)

1.360 0.340 0.340 0.340 0.340 AQC:B1 TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.480 NHPP 0.480 OPER2020OPER 0.120 0.120 2020NFA

0.480 0.480 OPERNHPP 2021OPER 0.120 0.120 2021NFA

0.480 0.480 OPERNHPP 2022OPER 0.120 0.120 2022NFA

0.480 0.480 OPERNHPP 2023OPER 0.120 0.120 2023NFA

NYSDOT

894007

ITS FIELD OPERATIONS: THIS PROJECT ENCOMPASSES THE TROUBLESHOOTING, DIAGNOSIS, REPAIR, OR DAMAGE ASSESSMENT OF THE VARIOUS COMPONENTS OF THE INTELLIGENT TRANSPORTATION SYSTEM (ITS). COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES.

2.400 0.600 0.600 0.600 0.600 AQC:A7 TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.800 NHPP 0.800 MISC2020MISC 0.200 0.200 2020NFA

0.800 0.800 MISCNHPP 2021MISC 0.200 0.200 2021NFA

0.800 0.800 MISCNHPP 2022MISC 0.200 0.200 2022NFA

0.400 0.400 MISCNHPP 2023MISC 0.100 0.100 2023NFA

NYSDOT

894009

ITS ENGINEERING SERVICES: PROJECT WILL PROVIDE INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PLANNING AND ENGINEERING SERVICES IN ORDER TO IMPROVE THE EFFICIENT USE OF STATE RESOURCES. PROJECT WILL TAKE PLACE IN COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER, AND WESTCHESTER COUNTIES.

3.500 1.000 1.000 1.000 0.500 AQC:A7 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

1.120 STBG LG URB 1.120 MISC2020MISC 2.380 2.380 2020NFA

1.120 1.120 MISCSTBG LG URB 2021MISC 2.380 2.380 2021NFA

1.120 1.120 MISCSTBG LG URB 2022MISC 2.380 2.380 2022NFA

1.120 1.120 MISCSTBG LG URB 2023MISC 2.380 2.380 2023NFA

WESTCHESTER CO

895005

WHITE PLAINS SHUTTLE BUS NETWORK: SHUTTLE BUS NETWORK SERVING REVERSE COMMUTE TRAVEL TO EMPLOYMENT CENTERS, DOWNTOWN WHITE PLAINS, ALONG THE CORRIDORS IN AND AROUND WHITE PLAINS AND BUS SERVICE TO THE OSSINING RAILROAD STATION. FUNDS ARE FOR THE CAPITAL COST OF CONTRACTING.

14.000 3.500 3.500 3.500 3.500 AQC:B1 TOTAL 4YR COST :WESTCHESTER TPC : $15-$25 M

Page 58: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 58 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.640 0.640 MISCCMAQ 2022MISC 0.160 0.160 2022NFA

3.030 3.030 MISCCMAQ 2023MISC 0.757 0.757 2023NFA

LOCAL

8BLK01

ORANGE COUNTY TRANSPORTATION COUNCIL CMAQ BLOCK. BLOCK FUNDING FOR FUTURE CMAQ PROJECTS IN ORANGE COUNTY (FORMERLY PIN: 8T0716)

4.587 0.000 0.000 0.800 3.787 AQC:J1Z TOTAL 4YR COST :ORANGE TPC : $7.5-$12 M

0.198 0.198 MISCSTBG-OFF 2021MISC 0.049 0.049 2021NFA

0.771 0.771 MISCSTBG-OFF 2022MISC 0.193 0.193 2022NFA

0.771 0.771 MISCSTBG-OFF 2023MISC 0.193 0.193 2023NFA

LOCAL

8BLK02

THIS PROJECT REPRESENTS A FUTURE BLOCK OF SURFACE TRANSPORTATION OFF SYSTEM BRIDGE FUNDING TO BE USED ON A PROJECT OR PROJECTS FOR ELIGIBLE STRUCTURES LOCATED IN THE JURISDICTIONAL AREA OF THE ORANGE COUNTY (FORMERLY PIN: 8T0726)

2.175 0.000 0.247 0.964 0.964 AQC:J1Z TOTAL 4YR COST :ORANGE TPC : $3.3-$5.6 M

0.022 STBG LG URB 0.022 MISC2020MISC 0.005 0.005 2020NFA

1.417 1.417 MISCSTBG LG URB 2021MISC 0.354 0.354 2021NFA

3.119 3.119 MISCSTBG LG URB 2022MISC 0.780 0.780 2022NFA

4.284 4.284 MISCSTBG LG URB 2023MISC 1.071 1.071 2023NFA

LOCAL

8BLK03

ORANGE COUNTY STBG LG URBAN BLOCK FUNDING FOR REPAVING OR MAINTENANCE PROJECTS ON FEDERAL AID ELIGIBLE ROADWAYS IN ORANGE COUNTY.

11.052 0.027 1.771 3.899 5.355 AQC:J1Z TOTAL 4YR COST :ORANGE TPC : $9.5-15.5 M

0.069 0.069 MISCSTBG-OFF 2022MISC 0.017 0.017 2022NFA

1.177 1.177 MISCSTBG-OFF 2023MISC 0.294 0.294 2023NFA

LOCAL

8BLK06

UCTC BLOCK PROGRAM FOR OFF SYSTEM BRIDGES TO INCLUDE ELEMENT SPECIFIC PROJECTS. (FORMERLY PIN: 8T0714)

1.557 0.000 0.000 0.086 1.471 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $2-$4 M

0.701 STBG-OFF 0.701 MISC2020MISC 0.175 0.175 2020NFA

0.701 0.701 MISCSTBG-OFF 2021MISC 0.175 0.175 2021NFA

0.701 0.701 MISCSTBG-OFF 2022MISC 0.175 0.175 2022NFA

0.701 0.701 MISCSTBG-OFF 2023MISC 0.175 0.175 2023NFA

LOCAL

8BLK07

THIS PROJECT IS A BLOCK PROJECT OF STBG OFF SYSTEM BRIDGE FUNDING FOR THE MAINTENANCE AND REHABILITATION OF STRUCTURES ON NON-FEDERAL AID ELIGIBLE ROADWAYS IN COLUMBIA COUNTY.

3.504 0.876 0.876 0.876 0.876 AQC:N/A TOTAL 4YR COST :COLUMBIA TPC : $3.3-$5.6 M

Page 59: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 59 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

3.412 HSIP 3.412 MISC2020MISC 0.379 0.379 2020NFA

4.761 4.761 MISCHSIP 2021MISC 0.529 0.529 2021NFA

3.413 3.413 MISCHSIP 2022MISC 0.379 0.379 2022NFA

0.677 0.677 MISCHSIP 2023MISC 0.075 0.075 2023NFA

NYSDOT

8HSIPB

REGION 8 HSIP BLOCK FUNDING FOR SAFETY IMPROVEMENTS ON FEDERAL AID ELIGIBLE STATE HIGHWAYS AS NEEDED THROUGHOUT COLUMBIA, DUTCHESS, ORANGE, PUTNAM, ROCKLAND, ULSTER & WESTCHESTER COUNTIES.

13.625 3.791 5.290 3.792 0.752 AQC:J1 TOTAL 4YR COST :MULTI TPC : $15-$25 M

1.830 CMAQ 1.830 MISC2020LOCAL

8T0713

MID HUDSON SOUTH BLOCK FUNDING FOR FUTURE CMAQ PROJECTS IN PUTNAM, ROCKLAND & WESTCHESTER COUNTIES

1.830 1.830 0.000 0.000 0.000 AQC:J1 TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

0.720 FTA 5307 0.720 MISC2020MISC 0.180 0.180 2020NFA

0.720 0.720 MISCFTA 5307 2021MISC 0.180 0.180 2021NFA

0.720 0.720 MISCFTA 5307 2022MISC 0.180 0.180 2022NFA

0.720 0.720 MISCFTA 5307 2023MISC 0.180 0.180 2023NFA

WESTCHESTER

8T97XP

WESTCHESTER PROJECT ADMINISTRATION: TO MAINTAIN OPERATIONS AND MEET REQUIREMENTS FOR CONTINUED OPERATION OF THE COUNTY/S TRANSIT SYSTEM.

3.600 0.900 0.900 0.900 0.900 AQC:B1 TOTAL 4YR COST :WESTCHESTER TPC : $4.6-$7.5 M

1.800 1.800 MISCFTA 5339 2021MISC 0.450 0.450 2021NFA

DUTCHESS

8TD009

PURCHASE THIRTEEN (13) MEDIUM-DUTY BUSES FOR THE DUTCHESS COUNTY PUBLIC TRANSIT SYSTEM.

2.250 0.000 2.250 0.000 0.000 AQC:B10P TOTAL 4YR COST :DUTCHESS TPC : $2-$4 M

1.800 1.800 MISCFTA 5339 2022MISC 0.450 0.450 2022NFA

DUTCHESS

8TD019

PURCHASE SIX (6) HEAVY-DUTY BUSES FOR THE DUTCHESS COUNTY PUBLIC TRANSIT SYSTEM.

2.250 0.000 0.000 2.250 0.000 AQC:B10P TOTAL 4YR COST :DUTCHESS TPC : $2-$4 M

Page 60: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 60 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.240 0.240 MISCFTA 5307 2023MISC 0.060 0.060 2023NFA

ROCKLAND

8TM008

DESIGN & ENGINEER FOR SIDEWALKS TO IMPROVE ACCESS TO PUBLIC TRANSIT USERS. SANATORIUM ROAD: ROUTE 45 TO BUILDING L. POMONA, ROCKLAND COUNTY

0.300 0.000 0.000 0.000 0.300 AQC:C2 TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M

0.800 FTA 5307 0.800 MISC2020MISC 0.200 0.200 2020NFA

0.800 0.800 MISCFTA 5307 2021MISC 0.200 0.200 2021NFA

0.400 0.400 MISCFTA 5307 2022MISC 0.100 0.100 2022NFA

0.400 0.400 MISCFTA 5307 2023MISC 0.100 0.100 2023NFA

ROCKLAND

8TM018

CAPITAL COST OF CONTRACTING FOR THE OPERATIONS OF TRANSPORT OF ROCKLAND (TOR). TO MAINTAIN OPERATIONS AND MEET REQUIREMENTS FOR CONTINUED OPERATION.

3.000 1.000 1.000 0.500 0.500 AQC:B1 TOTAL 4YR COST :ROCKLAND TPC : $3.3-$5.6 M

0.393 0.393 MISCFTA 5339 2021MISC 0.098 0.098 2021NFAMISC 13.050 13.050 2022NFA

WESTCHESTER

8TM033

PURCHASE SEVENTEEN (17) 30 FOOT REPLACEMENT HYBRID BUSES FOR WESTCHESTER COUNTY BEE-LINE SYSTEM TO IMPROVE EFFICIENCY IN OPERATIONS.

13.541 0.000 0.491 13.050 0.000 AQC:B10 TOTAL 4YR COST :WESTCHESTER TPC : $12.5-$19 M

0.164 FTA 5339 0.164 MISC2020MISC 0.042 0.042 2020NFA

0.164 0.164 MISCFTA 5339 2021MISC 0.042 0.042 2021NFA

0.164 0.164 MISCFTA 5339 2022MISC 0.042 0.042 2022NFA

0.164 0.164 MISCFTA 5339 2023MISC 0.042 0.042 2023NFA

ROCKLAND

8TM037

ROCKLAND COUNTY 5339 BLOCK BUS FACILITIES PROGRAM. THIS CAPITAL PROGRAM PROVIDES FUNDING TO REPLACE, REHABILITATE, AND PURCHASE BUSES AND RELATED EQUIPMENT, AND TO CONSTRUCT BUS-RELATED FACILITIES.

0.824 0.206 0.206 0.206 0.206 AQC:B10 TOTAL 4YR COST :ROCKLAND TPC : $0.6-$1.5 M

Page 61: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 61 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

2.000 CMAQ 2.000 MISC2020MISC 0.500 0.500 2020NFA

6.000 6.000 MISCCMAQ 2021MISC 1.500 1.500 2021NFA

1.249 1.249 MISCFTA 5339 2021MISC 0.312 0.312 2021NFAMISC 5.581 5.581 2021NFA

6.233 6.233 MISCCMAQ 2022MISC 1.558 1.558 2022NFA

14.000 14.000 MISCSTBG LG URB 2022MISC 3.500 3.500 2022NFA

2.000 2.000 MISCCMAQ 2023MISC 0.500 0.500 2023NFA

15.500 15.500 MISCSTBG LG URB 2023MISC 3.875 3.875 2023NFA

WESTCHESTER

8TM061

PURCHASE OF (108) 40 FOOT REPLACEMENT BUSES FOR WESTCHESTER COUNTY BEE-LINE SYSTEM. REPLACEMENT OF BUSES THAT HAVE REACH THEIR USEFUL LIFE. PROJECT IS USING FUNDS FROM THE STATE MODERNIZATION AND ENHANCEMENT PROGRAM.

64.308 2.500 14.642 25.291 21.875 AQC:B2 TOTAL 4YR COST :WESTCHESTER TPC : $70-$130 M

0.393 0.393 MISCFTA 5339 2023MISC 38.124 38.124 2023NFA

WESTCHESTER

8TM062

PURCHASE OF (95) 40 FOOT REPLACEMENT BUSES FOR WESTCHESTER COUNTY BEE-LINE SYSTEM. REPLACEMENT OF BUSES THAT HAVE REACHED THEIR USEFUL LIFE.

38.517 0.000 0.000 0.000 38.517 AQC:B2 TOTAL 4YR COST :WESTCHESTER TPC : $70-$130 M

0.393 0.393 MISCFTA 5339 2022MISC 0.098 0.098 2022NFAMISC 19.150 19.150 2023NFA

WESTCHESTER

8TM063

PURCHASE UP TO TWENTY-FOUR (24) 40 FOOT REPLACEMENT BUSES FOR WESTCHESTER COUNTY BEE-LINE SYSTEM TO REPLACE BUSES THAT HAVE REACHED THE END OF THEIR USEFUL LIFE.

19.641 0.000 0.000 0.491 19.150 AQC:B2 TOTAL 4YR COST :WESTCHESTER TPC : $15-$25 M

MISC 0.490 0.490 2020NFAPUTNAM

8TM064

PUTNAM COUNTY TRANSIT FACILITY - PARKING LOT PAVING AND GARAGE DOORS REPLACEMENT. PAVEMENT OF PARKING LOT TO MAINTAIN STATE OF GOOD REPAIR TO MAINTAIN THE TRANSIT FACILITIES. PROJECT WILL ALSO REPLACE 12 COMMERCIAL GARAGE DOORS. THE PROJECT IS USING STATE MODERNIZATION AND ENHANCEMENT PROGRAM FUNDING.

0.490 0.490 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :PUTNAM TPC : < $0.75 M

0.080 FTA 5307 0.080 MISC2020MISC 0.020 0.020 2020NFA

PUTNAM

8TM065

PUTNAM COUNTY PART BUS TRANSFER.THE 5 PART BUSES HAVE A TRANSFER PULSE POINT WHERE PASSENGERS CAN TRANSFER BETWEEN BUSES.

0.100 0.100 0.000 0.000 0.000 AQC:B7 TOTAL 4YR COST :PUTNAM TPC : < $0.75 M

Page 62: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 62 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.040 FTA 5307 0.040 MISC2020MISC 0.010 0.010 2020NFA

0.040 0.040 MISCFTA 5307 2021MISC 0.010 0.010 2021NFA

0.040 0.040 MISCFTA 5307 2022MISC 0.010 0.010 2022NFA

0.040 0.040 MISCFTA 5307 2023MISC 0.010 0.010 2023NFA

PUTNAM

8TM066

PUTNAM COUNTY PART BUS PURCHASES AS PART OF THE REGULAR LIFECYCLE REPLACEMENT FOR BUSES THAT HAVE REACHED THEIR USEFUL LIFE.

0.200 0.050 0.050 0.050 0.050 AQC:B2 TOTAL 4YR COST :PUTNAM TPC : < $0.75 M

0.034 FTA 5307 0.034 MISC2020MISC 0.008 0.008 2020NFA

0.034 0.034 MISCFTA 5307 2021MISC 0.008 0.008 2021NFA

PUTNAM

8TM068

PUTNAM COUNTY 5307 BLOCK. THE COUNTY WILL KEEP THIS AMOUNT OF FORMULA MONEY IN RESERVE FOR UNANTICIPATED TRANSIT NEEDS THAT MAY OCCURE OVER THE 5 YEAR PERIOD.

0.084 0.042 0.042 0.000 0.000 AQC:J1 TOTAL 4YR COST :PUTNAM TPC : < $0.75 M

MISC 2.500 2.500 2021NFAWESTCHESTER

8TM081

FAREBOX UPGRADE FOR THE BEE-LINE SYSTEM PURPOSE IS TO IMPROVE EFFICIENCY IN OPERATIONS. WESTCHESTER COUNTY.

2.500 0.000 2.500 0.000 0.000 AQC:B5 TOTAL 4YR COST :WESTCHESTER TPC : $2-$4 M

MISC 0.200 0.200 2021NFAROCKLAND

8TM093

REHAB/RENOVATE BUILDING T PARKING LOT IN POMONA. THIS PROJECT WILL REPAIR DRAINAGE, REPAVE, AND RESTRIPE BUILDING T PARKING LOT IN POMONA, NY TO A STATE OF GOOD REPAIR. PROJECT IS USING FUNDS FROM THE STATE MODERNIZATION AND ENHANCEMENT PROGRAM.

0.200 0.000 0.200 0.000 0.000 AQC:A10 TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M

MISC 0.160 0.160 2020NFAROCKLAND

8TM094

REHAB/RENOVATE PARKING LOT #2 NEAR NANUET RAILROAD STATION IN NANUET. PROJECT WILL REPACE AND RESTRIPE PARKING LOT TO A STATE OF GOOD REPAIR. PROJECT IS USING FUNDS FROM THE STATE MODERNIZATION AND ENHANCEMENT PROGRAM. ROCKLAND COUNTY.

0.160 0.160 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M

Page 63: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 63 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

1.174 FTA 5310 1.174 MISC2020MISC 1.174 1.174 2020NFA

LOCAL

8TM105

WESTCHESTER COUNTY DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION PARATRANSIT SERVICES - THIS PROJECT INCREASES MOBILITY FOR INDIVIDUALS WITH DISABILITIES BEYOND ADA REQUIREMENTS BY ASSURING CONTINUATION OF PARATRANSIT SERVICE TO ALL ELIGIBLE USERS WITHOUT REGARD TO PROXIMITY TO FIXED-ROUTE TRANSIT. THIS PROJECT WILL ALLOW THE COUNTY TO ACCOMMODATE INCREASING DEMAND ON ITS PARATRANSIT SERVICE. FFY 2016 AND FFY 2017 PROGRAM.

2.348 2.348 0.000 0.000 0.000 AQC:K1 TOTAL 4YR COST :WESTCHESTER TPC : $3.3-$5.6 M

MISC 2.000 2.000 2020NFAWestchester

8TM106

PURCHASE ELECTRIC VEHICLES FOR THE BEE-LINE FLEET. THIS PROJECT WILL INCLUDE VEHICLES AND CHARGING INFRASTRUCTURE, BOTH PLUG-IN AND OVERHEAD, NEEDED TO SUPPORT ELECTRIC VEHICLES. TWO VEHICLES WILL BE INTRODUCED IN THE INITIAL PHASE. WESTCHESTER COUNTY

2.000 2.000 0.000 0.000 0.000 AQC:B2 TOTAL 4YR COST :WESTCHESTER TPC : $1.2-$2.5 M

1.260 FTA 5307 1.260 MISC2020MISC 0.316 0.316 2020NFA

ROCKLAND

8TM108

PURCHASE THREE (3) 35 FT TRANSIT BUSES FOR TRANSPORT OF ROCKLAND (TOR) TO IMPROVE EFFICIENCY IN OPERATIONS. ROCKLAND COUNTY.

1.576 1.576 0.000 0.000 0.000 AQC:B10 TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M

1.260 FTA 5307 1.260 MISC2020MISC 0.316 0.316 2020NFA

ROCKLAND

8TM109

PURCHASE THREE (3) 40 FT TRANSIT BUSES FOR TRANSPORT OF ROCKLAND (TOR) TO IMPROVE EFFICIENCY IN OPERATIONS. ROCKLAND COUNTY

1.576 1.576 0.000 0.000 0.000 AQC:B10 TOTAL 4YR COST :ROCKLAND TPC : $1.2-$2.5 M

MISC 0.216 0.216 2020NFAPUTNAM

8TM111

PUTNAM COUNTY TRANSIT FACILITY - COMMERCIAL ROOF REPLACEMENT. THIS PROJECT WILL REMOVE AND REPLACE THE COMMERCIAL ROOF, PURPOSE IS TO MAINTAIN STATE OF GOOD REPAIR. THE PROJECT IS USING STATE MODERNIZATION AND ENHANCEMENT PROGRAM FUNDING.

0.216 0.216 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :PUTNAM TPC : < $0.75 M

Page 64: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 64 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.936 FTA 5307 0.936 MISC2020MISC 0.234 0.234 2020NFA

1.300 1.300 MISCFTA 5307 2021MISC 0.324 0.324 2021NFA

1.300 1.300 MISCFTA 5307 2022MISC 0.324 0.324 2022NFA

1.000 1.000 MISCFTA 5307 2023MISC 0.250 0.250 2023NFA

DUTCHESS

8TRD32

PREVENTIVE MAINTENANCE ACTIVITIES TO SUPPORT TRANSIT SERVICES FOR THE DUTCHESS COUNTY PUBLIC TRANSIT SYSTEM. DUTCHESS COUNTY.

5.668 1.170 1.624 1.624 1.250 AQC:B3Z TOTAL 4YR COST :DUTCHESS TPC : $7.5-$12 M

0.472 FTA 5307 0.472 MISC2020MISC 0.118 0.118 2020NFA

0.324 0.324 MISCFTA 5307 2021MISC 0.080 0.080 2021NFA

0.324 0.324 MISCFTA 5307 2022MISC 0.080 0.080 2022NFA

0.213 0.213 MISCFTA 5307 2023MISC 0.052 0.052 2023NFA

DUTCHESS

8TRD34

PROJECT ADMINISTRATION TO SUPPORT TRANSIT SERVICES FOR THE DUTCHESS COUNTY PUBLIC TRANSIT SYSTEM. DUTCHESS COUNTY.

1.663 0.590 0.404 0.404 0.265 AQC:B1Z TOTAL 4YR COST :DUTCHESS TPC : $2-$4 M

0.060 FTA 5307 0.060 MISC2020MISC 0.015 0.015 2020NFA

0.060 0.060 MISCFTA 5307 2021MISC 0.015 0.015 2021NFA

0.060 0.060 MISCFTA 5307 2022MISC 0.015 0.015 2022NFA

0.060 0.060 MISCFTA 5307 2023MISC 0.015 0.015 2023NFA

DUTCHESS

8TRD73

MOBILE COMMUNICATION SYSTEM WITH GPS CAPABILITY AND PURCHASE OF NEW ITS SCHEDULING SOFTWARE FOR THE DUTCHESS COUNTY PUBLIC TRANSIT SYSTEM. DUTCHESS COUNTY.

0.300 0.075 0.075 0.075 0.075 AQC:B6Z TOTAL 4YR COST :DUTCHESS TPC : $0.6-$1.5 M

0.050 FTA 5307 0.050 MISC2020MISC 0.050 0.050 2020NFA

0.050 0.050 MISCFTA 5307 2021MISC 0.050 0.050 2021NFA

0.050 0.050 MISCFTA 5307 2022MISC 0.050 0.050 2022NFA

0.050 0.050 MISCFTA 5307 2023MISC 0.050 0.050 2023NFA

DUTCHESS

8TRD84

OPERATING ASSISTANCE FOR DUTCHESS COUNTY PUBLIC TRANSIT TO PROVIDE TRANSIT SERVICE FOR RURAL AREAS OUTSIDE 3/4 MILE OF A FIXED ROUTE. DUTCHESS COUNTY.

0.400 0.100 0.100 0.100 0.100 AQC:B1Z TOTAL 4YR COST :DUTCHESS TPC : < $0.75 M

Page 65: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 65 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.064 FTA 5307 0.064 MISC2020MISC 0.016 0.016 2020NFA

DUTCHESS

8TRD88

PURCHASE TWO (2) TRANSIT SUPPORT VEHICLES FOR THE DUTCHESS COUNTY PUBLIC TRANSIT SYSTEM. DUTCHESS COUNTY

0.080 0.080 0.000 0.000 0.000 AQC:B2 TOTAL 4YR COST :DUTCHESS TPC : < $0.75 M

0.450 FTA 5339 0.450 MISC2020MISC 0.113 0.113 2020NFA

DUTCHESS

8TRD90

PURCHASE AND INSTALL NEW ENGINES, TRANSMISSIONS, BATTERIES, AND OTHER MAJOR VEHICLE SYSTEMS THAT ARE IN NEED OF REPLACEMENT FOR DUTCHESS COUNTY PUBLIC TRANSIT BUSES.

0.563 0.563 0.000 0.000 0.000 AQC:B5 TOTAL 4YR COST :DUTCHESS TPC : < $0.75 M

2.079 FTA 5307 2.079 MISC2020MISC 2.079 2.079 2020NFA

0.096 FTA 5311 0.096 MISC2020MISC 0.096 0.096 2020NFA

2.100 2.100 MISCFTA 5307 2021MISC 2.100 2.100 2021NFA

0.096 0.096 MISCFTA 5311 2021MISC 0.096 0.096 2021NFA

2.215 2.215 MISCFTA 5307 2022MISC 2.215 2.215 2022NFA

0.096 0.096 MISCFTA 5311 2022MISC 0.096 0.096 2022NFA

1.320 1.320 MISCFTA 5307 2023MISC 1.320 1.320 2023NFA

0.096 0.096 MISCFTA 5311 2023MISC 0.096 0.096 2023NFA

DUTCHESS

8TRD91

OPERATING ASSISTANCE FOR THE DUTCHESS COUNTY PUBLIC TRANSIT SYSTEM TO SUPPORT TRANSIT SERVICE IN DUTCHESS COUNTY.

16.196 4.350 4.392 4.622 2.832 AQC:B1Z TOTAL 4YR COST :DUTCHESS TPC : $21-$31 M

7.474 FTA 5337 7.474 MISC2020MISC 1.868 1.868 2020NFA

7.623 7.623 MISCFTA 5337 2021MISC 1.906 1.906 2021NFA

7.776 7.776 MISCFTA 5337 2022MISC 1.944 1.944 2022NFA

7.931 7.931 MISCFTA 5337 2023MISC 1.983 1.983 2023NFA

METRO-NORTH

8TRD93

DUTCHESS COUNTY 5337 BLOCK FOR STATE OF GOOD REPAIR GRANT. PROJECTS ARE LIMITED TO REPLACEMENT AND REHABILITATION, OR CAPTIAL PROJECTS REQUIRED TO MAINTAIN PUBLIC TRANSPORTATION SYSTEM IN A STATE OF GOOD REPAIR.

38.505 9.342 9.529 9.720 9.914 AQC:J1 TOTAL 4YR COST :DUTCHESS TPC : $40-$60 M

Page 66: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 66 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.371 FTA 5310 0.371 MISC2020MISC 0.093 0.093 2020NFA

0.379 0.379 MISCFTA 5310 2021MISC 0.095 0.095 2021NFAMISC 0.101 0.101 2021NFA

0.386 0.386 MISCFTA 5310 2022MISC 0.097 0.097 2022NFA

0.394 0.394 MISCFTA 5310 2023MISC 0.099 0.099 2023NFA

DUTCHESS

8TRD94

DUTCHESS COUNTY SECTION 5310 PROGRAM-VEHICLES TO PROVIDE TRANSPORTATION FOR ELDERLY AND PERSONS WITH DISABILITIES BY PRIVATE NOT-FOR-PROFIT AGENCIES

2.417 0.464 0.977 0.483 0.493 AQC:J1 TOTAL 4YR COST :DUTCHESS TPC : $2-$4 M

MISC 0.010 0.010 2020NFAMISC 0.010 0.010 2021NFAMISC 0.010 0.010 2022NFAMISC 0.010 0.010 2023NFA

DUTCHESS

8TRD99

PURCHASE OF TRANSIT AMENITIES SUCH AS BIKE RACKS, BENCHES, SIGNS, AND SHELTERS FOR DUTCHESS COUNTY PUBLIC TRANSIT SYSTEM

0.040 0.010 0.010 0.010 0.010 AQC:B5Z TOTAL 4YR COST :DUTCHESS TPC : < $0.75 M

0.680 FTA 5307 0.680 MISC2020MISC 0.170 0.170 2020NFA

0.176 0.176 MISCFTA 5307 2021MISC 0.044 0.044 2021NFA

0.144 0.144 MISCFTA 5307 2022MISC 0.036 0.036 2022NFA

0.160 0.160 MISCFTA 5307 2023MISC 0.040 0.040 2023NFA

ROCKLAND

8TRM18

FUNDING FOR ROCKLAND COUNTY TO MANAGE ALL FTA GRANTS AND FOR COST ASSOCIATED WITH ALL FEDERAL TRAINING.

1.450 0.850 0.220 0.180 0.200 AQC:B1 TOTAL 4YR COST :ROCKLAND TPC : $2-$4 M

0.080 FTA 5307 0.080 MISC2020MISC 0.020 0.020 2020NFAMISC 0.200 0.200 2020NFA

0.080 0.080 MISCFTA 5307 2022MISC 0.020 0.020 2022NFA

ROCKLAND

8TRM20

CONSTRUCTION AND REPLACEMENT OF STANDARD BUS SHELTERS FOR TRANSIT OPERATIONS. PROJECT WILL ALSO INCLUDE ADA COMPLIANT RAMPS AND DETECTABLE WARNING DEVICES. PROJECT IS USING FUNDS FROM THE STATE MODERNIZATION AND ENHANCEMENT PROGRAM.

0.400 0.300 0.000 0.100 0.000 AQC:B7 TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M

Page 67: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 67 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.700 FTA 5307 0.700 MISC2020MISC 0.175 0.175 2020NFA

0.700 0.700 MISCFTA 5307 2021MISC 0.175 0.175 2021NFA

0.700 0.700 MISCFTA 5307 2022MISC 0.175 0.175 2022NFA

0.700 0.700 MISCFTA 5307 2023MISC 0.175 0.175 2023NFA

ROCKLAND

8TRM21

PREVENTATIVE MAINTENANCE COST TO EXTEND SERVICE LIFE OF TRANSPORT OF ROCKLAND (TOR) BUSES.

3.500 0.875 0.875 0.875 0.875 AQC:B3 TOTAL 4YR COST :ROCKLAND TPC : $4.6-$7.5 M

0.080 FTA 5307 0.080 MISC2020MISC 0.020 0.020 2020NFA

0.080 0.080 MISCFTA 5307 2021MISC 0.020 0.020 2021NFA

0.080 0.080 MISCFTA 5307 2022MISC 0.020 0.020 2022NFA

0.080 0.080 MISCFTA 5307 2023MISC 0.020 0.020 2023NFA

PUTNAM

8TRM61

SECTION 5307 PROGRAM ADMINISTRATION TO MAINTAIN OPERATIONS AND MEET REQUIREMENTS FOR CONTINUED OPERATIONS OF PUTNAM AREA RAPID TRANSIT (PART) BUS SERVICE.

0.400 0.100 0.100 0.100 0.100 AQC:B1 TOTAL 4YR COST :PUTNAM TPC : < $0.75 M

0.160 FTA 5307 0.160 MISC2020MISC 0.040 0.040 2020NFA

0.160 0.160 MISCFTA 5307 2021MISC 0.040 0.040 2021NFA

0.160 0.160 MISCFTA 5307 2022MISC 0.040 0.040 2022NFA

0.160 0.160 MISCFTA 5307 2023MISC 0.040 0.040 2023NFA

ROCKLAND

8TRM69

TRANSPORTATION PLANNING CONSULTANT FUNDING TO MAINTAIN OPERATIONS AND MEET REQUIREMENTS FOR VARIOUS PROJECTS.

0.800 0.200 0.200 0.200 0.200 AQC:C3 TOTAL 4YR COST :ROCKLAND TPC : $0.6-$1.5 M

MISC 0.646 0.646 2020NFAROCKLAND

8TRM73

THE TOWN OF ORANGETOWN WILL INSTALL A PARK & RIDE FACILITY TO ACCOMMODATE UP TO 50 SPACES IN SPARKILL, NY. THE PROJECT WILL INCLUDE: PAVEMENT, SHRUBS, TREES, CURBING, DRAINAGE, LIGHTING, NEW BUS SHELTER & APPROPRIATE STRIPING & SIGNAGE. PROJECT IS USING FUNDS FROM THE STATE MODERNIZATION AND ENHANCEMENT PROGRAM.

0.646 0.646 0.000 0.000 0.000 AQC:K1 TOTAL 4YR COST :ROCKLAND TPC : $0.6-$1.5 M

Page 68: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 68 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.424 0.424 MISCCMAQ 2022MISC 0.106 0.106 2022NFA

LOCAL

8TRM86

ORANGETOWN DIESEL RETROFITS: INSTALL MOST APPROPRIATE/BEST AVAILABLE DIESEL RETROFIT TECHNOLOGY ON EVERY DIESEL POWERED, TOWN OWNED VEHICLE 8,500 POUNDS AND GREATER. TOWN OF ORANGETOWN, ROCKLAND COUNTY.

0.530 0.000 0.000 0.530 0.000 AQC:NON TOTAL 4YR COST :ROCKLAND TPC : < $0.75 M

0.333 FTA 5311 0.333 MISC2020MISC 0.333 0.333 2020NFA

0.343 0.343 MISCFTA 5311 2021MISC 0.343 0.343 2021NFA

0.353 0.353 MISCFTA 5311 2022MISC 0.353 0.353 2022NFA

0.363 0.363 MISCFTA 5311 2023MISC 0.363 0.363 2023NFA

ORANGE

8TRO30

SECTION 5311 OPERATING ASSISTANCE TO ENABLE AND SUSTAIN CONTINUED OPERATION OF SERVICE FOR BUS OPERATORS IN THE NON-URBANIZED AREAS OF ORANGE COUNTY.

2.784 0.666 0.686 0.706 0.726 AQC:B1P TOTAL 4YR COST :ORANGE TPC : $3.3-$5.6 M

2.307 FTA 5307 2.307 MISC2020MISC 2.307 2.307 2020NFA

2.376 2.376 MISCFTA 5307 2021MISC 2.376 2.376 2021NFA

2.447 2.447 MISCFTA 5307 2022MISC 2.447 2.447 2022NFA

2.521 2.521 MISCFTA 5307 2023MISC 2.521 2.521 2023NFA

ORANGE

8TRO33

SECTION 5307 FUNDING FOR OPERATING ASSISTANCE TO ENABLE AND SUSTAIN CONTINUED OPERATION OF SERVICE FOR BUS OPERATORS IN THE URBANIZED AREAS OF ORANGE COUNTY. PROJECT ADMINISTRATION UP TO 10% OF TOTAL PROJECT COST.

19.302 4.614 4.752 4.894 5.042 AQC:B1P TOTAL 4YR COST :ORANGE TPC : $21-$31 M

8.237 FTA 5307 8.237 MISC2020MISC 2.060 2.060 2020NFA

8.484 8.484 MISCFTA 5307 2021MISC 2.122 2.122 2021NFAMISC 2.318 2.318 2021NFA

8.739 8.739 MISCFTA 5307 2022MISC 2.184 2.184 2022NFA

9.001 9.001 MISCFTA 5307 2023MISC 2.250 2.250 2023NFA

ORANGE

8TRO48

SECTION 5307 FUNDING FOR ELIGIBLE PREVENTIVE MAINTENANCE/CAPITAL COST OF CONTRACTING FOR ORANGE COUNTY COMMUTER SERVICES. PROJECT ADMINISTRATION UP TO 10% OF TOTAL PROJECT COST.

54.666 10.297 22.195 10.923 11.251 AQC:B3P TOTAL 4YR COST :ORANGE TPC : $50-$85 M

Page 69: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 69 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.244 FTA 5307 0.244 MISC2020MISC 0.244 0.244 2020NFA

0.254 0.254 MISCFTA 5307 2021MISC 0.254 0.254 2021NFA

0.267 0.267 MISCFTA 5307 2022MISC 0.267 0.267 2022NFA

0.280 0.280 MISCFTA 5307 2023MISC 0.280 0.280 2023NFA

ORANGE

8TRO75

SECTION 5307 FUNDING FOR JARC SERVICES, WITH PROJECT ADMINISTRATION UP TO 10% OF TOTAL PROJECT COST. ORANGE COUNTY

2.090 0.488 0.508 0.534 0.560 AQC:B10P TOTAL 4YR COST :ORANGE TPC : $2-$4 M

0.925 0.925 MISCFTA 5307 2023MISC 0.232 0.232 2023NFA

ORANGE

8TRO77

PURCHASE FIVE (5) 12-PASSENGER DESIGN CAPACITY BUSES WITH WHEELCHAIR LIFT AND RELATED EQUIPMENT FOR DEMAND RESPONSIVE SERVICE IN ORANGE COUNTY/S URBANIZED AREAS-TOWNS OF HIGHLANDS, MONROE, AND WALLKILL WITH PROJECT COST UP TO 10% OF TOTAL PROJECT COST.

1.157 0.000 0.000 0.000 1.157 AQC:B10P TOTAL 4YR COST :ORANGE TPC : $0.6-$1.5 M

0.545 FTA 5311 0.545 MISC2020MISC 0.136 0.136 2020NFA

ORANGE

8TRO79

PURCHASE EIGHT (8) 20-PASSENGER DESIGN CAPACITY BUSES WITH WHEELCHAIR LIFT & RELATED EQUIPMENT FOR DEMAND RESPONSIVE SERVICE IN ORANGE COUNTYS NON-URBANIZED AREAS-TOWNS OF GOSHEN, MONTGOMERY, WARWICK & CITY OF PORT JERVIS.

0.681 0.681 0.000 0.000 0.000 AQC:B10P TOTAL 4YR COST :ORANGE TPC : $0.6-$1.5 M

0.914 FTA 5339 0.914 MISC2020MISC 0.228 0.228 2020NFA

0.914 0.914 MISCFTA 5339 2021MISC 0.228 0.228 2021NFA

0.969 0.969 MISCFTA 5339 2022MISC 0.242 0.242 2022NFA

0.998 0.998 MISCFTA 5339 2023MISC 0.250 0.250 2023NFA

ORANGE

8TRO81

ORANGE COUNTY 5339 BLOCK BUS FACILITIES PROGRAM. THIS CAPITAL PROGRAM PROVIDES FUNDING TO REPLACE, REHABILITATE, AND PURCHASE BUSES AND RELATED EQUIPMENT, AND TO CONSTRUCT BUS-RELATED FACILITIES. WITH PROGRAM ADMINISTRATION UP TO 10% OF TOTAL PROJECT COST.

4.743 1.142 1.142 1.211 1.248 AQC:B10P TOTAL 4YR COST :ORANGE TPC : $4.6-$7.5 M

Page 70: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 70 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

2.307 FTA 5307 2.307 MISC2020MISC 0.577 0.577 2020NFA

2.376 2.376 MISCFTA 5307 2021MISC 0.594 0.594 2021NFA

2.447 2.447 MISCFTA 5307 2022MISC 0.612 0.612 2022NFA

2.520 2.520 MISCFTA 5307 2023MISC 0.630 0.630 2023NFA

ORANGE CO

8TRO87

SECTION 5307 FUNDING FOR ADA PARATRANSIT TRANSPORTATION SERVICES IN THE ADA PARATRANSIT SERVICE AREAS OF ORANGE COUNTY WITH PROJECT ADMINISTRATION UP TO 10% OF TOTAL PROJECT COST.

12.063 2.884 2.970 3.059 3.150 AQC:B1Z TOTAL 4YR COST :ORANGE TPC : $15-$25 M

MISC 3.846 3.846 2020NFAORANGE CO

8TRO91

CAPITAL PURCHASES USING FUNDS FROM THE STATE MODERNIZATION AND ENHANCEMENT PROGRAM. ORANGE COUNTY.

3.846 3.846 0.000 0.000 0.000 AQC:B10Z TOTAL 4YR COST :ORANGE TPC : $9.5-15.5 M

0.126 0.126 MISCFTA 5307 2021MISC 0.032 0.032 2021NFA

ORANGE CO

8TRO94

ADA PARATRANSIT BUS SERVICES: PURCHASE TWO (2) 12-PASSENGER DESIGN CAPACITY BUSES WITH WHEELCHAIR LIFT AND RELATED EQUIPMENT FOR ADA PARATRANSIT SERVICE IN ORANGE COUNTY WITH PROGRAM ADMINISTRATION UP TO 10% OF TOTAL PROJECT COST.

0.158 0.000 0.158 0.000 0.000 AQC:B10Z TOTAL 4YR COST :ORANGE TPC : < $0.75 M

0.212 0.212 MISCFTA 5307 2023MISC 0.054 0.054 2023NFA

ORANGE CO

8TRO96

PURCHASE SEVEN (3) 16-PASSENGER DESIGN CAPACITY BUSES WITH WHEELCHAIR LIFT AND RELATED EQUIPMENT FOR DEMAND RESPONSIVE SERCVICE IN ORANGE COUNTY\\\\\\\'S URBANIZED AREAS - TOWNS OF MONROE, WALLKILL AND WARWICK, WITH PROGRAM ADMINISTRATION UP TO 10% OF TOTAL PROJECT COST.

0.266 0.000 0.000 0.000 0.266 AQC:B10Z TOTAL 4YR COST :ORANGE TPC : < $0.75 M

0.328 FTA 5307 0.328 MISC2020MISC 0.082 0.082 2020NFA

0.328 0.328 MISCFTA 5307 2021MISC 0.082 0.082 2021NFA

0.328 0.328 MISCFTA 5307 2022MISC 0.082 0.082 2022NFA

0.328 0.328 MISCFTA 5307 2023MISC 0.082 0.082 2023NFA

UCAT

8TRU14

PROJECT ADMINISTRATION FOR THE ULSTER COUNTY AREA TRANSPORTATION (UCAT) SYSTEM TO MAINTAIN OPERATIONS AND MEET REQUIREMENTS FOR CONTINUED OPERATIONS.

1.640 0.410 0.410 0.410 0.410 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $1.2-$2.5 M

Page 71: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 71 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.450 FTA 5307 0.450 MISC2020MISC 0.450 0.450 2020NFA

0.450 0.450 MISCFTA 5307 2021MISC 0.450 0.450 2021NFA

0.450 0.450 MISCFTA 5307 2022MISC 0.450 0.450 2022NFA

0.450 0.450 MISCFTA 5307 2023MISC 0.450 0.450 2023NFA

UCAT

8TRU50

ULSTER COUNTY AREA TRANSIT - OPERATING ASSISTANCE TO ENABLE AND SUSTAIN CONTINUED OPERATION OF SERVICE.

3.600 0.900 0.900 0.900 0.900 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $3.3-$5.6 M

0.120 FTA 5307 0.120 MISC2020MISC 0.030 0.030 2020NFA

UCAT

8TRU66

NORMAL FLEET BUS REPLACEMENT (ONE BUS). SCHEDULE, PLANNING AND DESIGN OF A STORAGE FACILITY FOR THE ULSTER COUNTY AREA TRANSPORTATION SYSTEM.

0.150 0.150 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : < $0.75 M

0.300 FTA 5307 0.300 MISC2020MISC 0.300 0.300 2020NFA

CITIBUS

8TRU67

OPERATIONS FOR CITY OF KINGSTON CITIBUS: PROJECT TO ENABLE AND SUSTAIN CONTINUED OPERATION OF SERVICE. ULSTER COUNTY.

0.600 0.600 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $0.6-$1.5 M

0.070 FTA 5307 0.070 MISC2020MISC 0.018 0.018 2020NFA

CITIBUS

8TRU68

CITY OF KINGSTON CITIBUS: PREVENTATIVE MAINTENANCE TO EXTEND SERVICE LIFE. ULSTER COUNY.

0.088 0.088 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : < $0.75 M

0.140 FTA 5307 0.140 MISC2020MISC 0.036 0.036 2020NFA

CITIBUS

8TRU69

CITY OF KINGSTON CITIBUS : PROJECT ADMINISTRATION TO MAINTAIN OPERATIONS AND MEET REQUIREMENTS FOR CONTINUED OPERATION. ULSTER COUNTY.

0.176 0.176 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : < $0.75 M

Page 72: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 72 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

2.206 FTA 5307 2.206 MISC2020MISC 0.552 0.552 2020NFA

2.206 2.206 MISCFTA 5307 2021MISC 0.552 0.552 2021NFA

2.206 2.206 MISCFTA 5307 2022MISC 0.552 0.552 2022NFA

2.206 2.206 MISCFTA 5307 2023MISC 0.552 0.552 2023NFA

LOCAL

8TRU75

UC CAPITAL COST OF CONTRACTING ULSTER COUNTY COMMUTER SERVICES. - ADIRONDACK TRAILWAYS.

11.032 2.758 2.758 2.758 2.758 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $12.5-$19 M

0.644 FTA 5307 0.644 MISC2020MISC 0.162 0.162 2020NFA

0.644 0.644 MISCFTA 5307 2021MISC 0.162 0.162 2021NFA

0.644 0.644 MISCFTA 5307 2022MISC 0.162 0.162 2022NFA

0.644 0.644 MISCFTA 5307 2023MISC 0.162 0.162 2023NFA

UCAT

8TRU76

PREVENTIVE MAINTENANCE FOR THE ULSTER COUNTY AREA TRANSPORTATION (UCAT) SYSTEM TO MAINTAIN OPERATIONS AND MEET REQUIREMENTS FOR CONTINUED OPERATIONS.

3.224 0.806 0.806 0.806 0.806 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $3.3-$5.6 M

0.575 FTA 5307 0.575 MISC2020MISC 0.144 0.144 2020NFA

0.126 0.126 MISCFTA 5307 2021MISC 0.032 0.032 2021NFA

UCAT

8TRU78

NORMAL FLEET BUS REPLACEMENT / ELECTRONIC FARE COLLECTION SYSTEM FOR THE ULSTER COUNTY AREA TRANSPORTATION (UCAT) SYSTEM. ULSTER COUNTY.

0.877 0.719 0.158 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $0.6-$1.5 M

0.375 0.375 MISCFTA 5307 2021MISC 0.094 0.094 2021NFA

1.125 1.125 MISCFTA 5307 2022MISC 0.282 0.282 2022NFA

0.379 0.379 MISCFTA 5307 2023MISC 0.094 0.094 2023NFA

UCAT

8TRU79

NORMAL FLEET BUS REPLACEMENT AND BUS WASH FACILITY FOR THE ULSTER COUNTY AREA TRANSPORTATION SYSTEM.

2.349 0.000 0.469 1.407 0.473 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $2-$4 M

Page 73: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 73 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

0.200 FTA 5310 0.200 MISC2020MISC 0.050 0.050 2020NFA

0.200 0.200 MISCFTA 5310 2021MISC 0.050 0.050 2021NFA

0.200 0.200 MISCFTA 5310 2022MISC 0.050 0.050 2022NFA

0.129 0.129 MISCFTA 5310 2023MISC 0.032 0.032 2023NFA

ULSTER

8TRU80

ULSTER COUNTY SECTION 5310 PROGRAM-VEHICLES AND OPERATING ASSISTANCE TO PROVIDE TRANSPORTATION FOR ELDERLY AND PERSONS WITH DISABILITIES BY PRIVATE NOT-FOR-PROFIT AGENCIES.

0.911 0.250 0.250 0.250 0.161 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $0.6-$1.5 M

0.200 FTA 5339 0.200 MISC2020MISC 0.050 0.050 2020NFA

0.200 0.200 MISCFTA 5339 2021MISC 0.050 0.050 2021NFA

0.200 0.200 MISCFTA 5339 2022MISC 0.050 0.050 2022NFA

0.200 0.200 MISCFTA 5339 2023MISC 0.050 0.050 2023NFA

ULSTER

8TRU81

5339 BUS FACILITIES PROGRAM ATTRIBUTABLE TO THE KINGSTON URBANIZED AREA. CAPITAL PROGRAM PROVIDES FUNDING TO REPLACE, REHABILITATE, AND PURCHASE BUSES AND RELATED EQUIPMENT, AND TO CONSTRUCT BUS-RELATED FACILITIES. ULSTER COUNTY.

1.000 0.250 0.250 0.250 0.250 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $0.6-$1.5 M

0.450 FTA 5339 0.450 MISC2020MISC 0.112 0.112 2020NFA

0.450 0.450 MISCFTA 5339 2021MISC 0.112 0.112 2021NFA

0.450 0.450 MISCFTA 5339 2022MISC 0.112 0.112 2022NFA

0.450 0.450 MISCFTA 5339 2023MISC 0.112 0.112 2023NFA

UCAT

8TRU82

5339 BUS FACILITIES PROGRAM ATTRIBUTABLE TO THE POUGHKEEPSIE--NEWBURGH, NY—NJ UA, ULSTER COUNTY APPORTIONMENT. CAPITAL PROGRAM PROVIDES FUNDING TO REPLACE, REHABILITATE AND PURCHASE BUSES AND RELATED EQUIPMENT AND TO CONSTRUCT BUS-RELATED FACILITIES.

2.248 0.562 0.562 0.562 0.562 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $2-$4 M

0.288 FTA 5307 0.288 DETLDES2020DETLDES 0.072 0.072 2020NFA

2.040 2.040 CONINSPFTA 5307 2021CONINSP 0.510 0.510 2021NFA

0.072 0.072 CONSTFTA 5307 2021CONST 0.018 0.018 2021NFA

LOCAL

8TRU95

ULSTER COUNTY CAPITAL COST OF CONTRACTING ULSTER COUNTY COMMUTER SERVICES. - ADIRONDACK TRAILWAYS MAINTENANCE FACILITY EXPANSION

3.000 0.360 2.640 0.000 0.000 AQC:N/A TOTAL 4YR COST :ULSTER TPC : $2-$4 M

Page 74: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 74 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

MISC 3.000 3.000 2020NFACONST 0.500 0.500 2022NFA

NYSBA

B0006

BEAR MOUNTAIN - BRIDGE APPROACH PAVING. DECK REPAIRS, MILL, PAVE AND NEW PAVEMENT MARKINGS TO MAINTAIN STATE OF GOOD REPAIR.

3.500 3.000 0.000 0.500 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

CONINSP 0.100 0.100 2020NFACONST 2.000 2.000 2020NFA

NYSTA

B07451

2021/22 ON-DEMAND BRIDGE REPAIR CONTRACT NEW YORK DIVISION: TO ADDRESS STRUCTURAL AND SAFETY DEFICIENCIES AS NEEDED. VARIOUS COUNTIES

2.100 2.100 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.063 0.063 CONINSPNHPP 2021CONINSP 0.016 0.016 2021NFA

0.700 0.700 CONSTNHPP 2021CONST 0.175 0.175 2021NFA

NYSTA

B07461

2020 BRIDGE WASHING: NEW ENGLAND THRUWAY(I-95): MAINTENANCE CLEANING FOR STEEL PRESERVATION FOR 50+ BRIDGES TO EXTEND SERVICE LIFE. WESTCHESTER COUNTY.

0.954 0.000 0.954 0.000 0.000 AQC:A2 TOTAL 4YR COST :WESTCHESTER TPC : $0.6-$1.5 M

CONINSP 3.600 3.600 2020NFACONST 60.000 60.000 2020NFA

NYSTA

H03431

CONCRETE PAVEMENT REPAIR AND SEAL JOINTS (MP NE 0.17 TO NE 14.1): I-95 PAVEMENT REPAIRS DUE TO EXCESSIVE WEAR. BRONX & WESTCHESTER COUNTIES.

63.600 63.600 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : $50-$85 M

CONINSP 1.332 1.332 2021NFACONST 22.200 22.200 2021NFA

NYSTA

H10451

PAVEMENT REHAB 1R MILL/INLAY: I-87; NYC LINE TO TAXTER ROAD (MP 0 - 11 )DUE TO EXCESSIVE WEAR. WESTCHESTER COUNTY

23.532 0.000 23.532 0.000 0.000 AQC:A10 TOTAL 4YR COST :WESTCHESTER TPC : $21-$31 M

CONST 6.000 6.000 2022NFANYSBA

K0002

BRIDGE REHABILITATION: KINGSTON-RHINECLIFF BRIDGE PAINTING- LEAD ABATEMENT AND RE-PAINTING OF THE WEST AND EAST APPROACH GIRDER SPANS. DUTCHESS AND ULSTER COUNTIES

6.000 0.000 0.000 6.000 0.000 AQC:A10P TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

CONST 3.000 3.000 2020NFANYSBA

K0003

REMOVE EXISTING DECK OVERLAY AND PAVE WITH NOVACHIP. KINGSTON-RHINECLIFF. DUTCHESS AND ULSTER COUNTIES.

3.000 3.000 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $2-$4 M

Page 75: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 75 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

CONST 2.000 2.000 2020NFANYSBA

K0004

KINGSTON-RHINECLIFF ELECTRICAL UPGRADE. PROJECT WILL REPLACE BRIDGE POWER AND LIGHTING CABLES. DUTCHESS AND ULSTER COUNTIES.

2.000 2.000 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

CONST 10.000 10.000 2023NFANYSBA

K0006

KINGSTON-RHINECLIFF PEDESTRIAN WALKWAY. PROJECT WILL PROVIDE A SAFE PEDESTRIAN CROSSING BETWEEN ULSTER AND DUTCHESS COUNTIES. WORK WILL FURNISH AND INSTALL CONCRETE BARRIER, PAVEMENT MARKINGS, AND APPROACH ROADWAY SIDEWALKS.

10.000 0.000 0.000 0.000 10.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $26-$40 M

CONST 2.000 2.000 2022NFANYSBA

M0002

BRIDGE MAINTENANCE PAINTING: POWER TOOL CLEAN AND SPOT PAINT STIFFENING TRUSS AND TOWERS OF THE MID-HUDSON BRIDGE.TO EXTEND SERVICE LIFE. DUTCHESS AND USLTER COUNTIES.

2.000 0.000 0.000 2.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

CONST 3.000 3.000 2021NFANYSBA

M0003

BRIDGE MAINTENANCE: MID-HUDSON BRIDGE MAIN SPAN OVERLAY: MILL AND FILL MAIN SPAN OVERLAY WITH ASPHALT WATER PROOFING MEMBRANE. DUTCHESS AND USLTER COUNTIES.

3.000 0.000 3.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $2-$4 M

CONST 3.000 3.000 2021NFANYSBA

M0005

BRIDGE MAINTENANCE: MID-HUDSON BRIDGE -EAST APPROACH VIADUCT SPANS. LEAD ABATEMENT OF APPROACH SPANS INCLUDING ARCH TRUSS OVER THE METRO-NORTH RAIL LINE. DUTCHESS AND ULSER COUNTIES.

3.000 0.000 3.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $2-$4 M

CONST 0.500 0.500 2020NFANYSBA

M0010

MID-HUDSON BRIDGE EAST ANCHORAGE REHABILITATION. DUTCHESS AND ULSTER COUNTIES.

0.500 0.500 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M

CONST 0.750 0.750 2020NFANYSBA

M0013

MID-HUDSON BRIDGE STAR BUILDING IMPROVEMENTS. PROJECT WILL IMPROVE LOADING DOCK W/ ROOF SYSTEM ADDITION. DUTCHESS AND ULSTER COUNTIES.

0.750 0.750 0.000 0.000 0.000 AQC:A19Z TOTAL 4YR COST :DUTCHESS TPC : $0.6-$1.5 M

Page 76: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 76 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

CONST 10.000 10.000 2020NFANYSBA

M0014

MID-HUDSON BRIDGE CURBING AND RAILING REPLACEMENTS. PROJECT WILL REMOVE AND REPLACE EXISTING BRIDGE CURBING AND BOX BEAM RAILING. DUTCHESS AND ULSTER COUNTIES.

10.000 10.000 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

5.704 CMAQ 5.704 MISC2020MISC 2.345 2.345 2020NFA

65.094 FTA 5307 65.094 MISC2020MISC 19.473 19.473 2020NFA

74.796 FTA 5337 74.796 MISC2020MISC 35.649 35.649 2020NFA

5.704 5.704 MISCCMAQ 2021MISC 3.514 3.514 2021NFA

65.094 65.094 MISCFTA 5307 2021MISC 16.898 16.898 2021NFA

74.796 74.796 MISCFTA 5337 2021MISC 33.233 33.233 2021NFA

5.704 5.704 MISCCMAQ 2022MISC 3.839 3.839 2022NFA

65.094 65.094 MISCFTA 5307 2022MISC 18.745 18.745 2022NFA

59.734 59.734 MISCFTA 5337 2022MISC 18.297 18.297 2022NFA

5.704 5.704 MISCCMAQ 2023MISC 1.542 1.542 2023NFA

65.094 65.094 MISCFTA 5307 2023MISC 26.314 26.314 2023NFA

74.796 74.796 MISCFTA 5337 2023MISC 21.638 21.638 2023NFA

METRO-NORTH

M808-01-XX

MISCELLANEOUS PROJECTS TO BE IDENTIFIED IN THE NEXT CAPITAL PROGRAM (2020 - 2024) TO MAINTAIN STATE OF GOOD REPAIR.

768.801 203.061 199.239 171.413 195.088 AQC:J1 TOTAL 4YR COST :SYSTEM-WIDE TPC : $0.9-$1.1 B

5.577 CMAQ 5.577 MISC2020MISC 128.868 128.868 2020NFA

5.577 5.577 MISCCMAQ 2021MISC 301.410 301.410 2021NFA

METRO-NORTH

M809-01-XX

CMAQ ELIGIBLE PROJECTS TO BE IDENTIFIED IN THE NEXT CAPITAL PROGRAM (2020 - 2024) TO MAINTAIN STATE OF GOOD REPAIR.

441.432 134.445 306.987 0.000 0.000 AQC:J1 TOTAL 4YR COST :SYSTEM-WIDE TPC : $397.7-$490.0 M

Page 77: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 77 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

CONST 5.000 5.000 2020NFAMISC 0.750 0.750 2020NFACONST 40.000 40.000 2021NFAMISC 1.500 1.500 2021NFACONST 35.000 35.000 2022NFAMISC 1.500 1.500 2022NFACONST 5.000 5.000 2023NFAMISC 0.750 0.750 2023NFA

NYSBA

N0008

NEWBURGH-BEACON BRIDGE NORTH SPAN DECK REPLACEMENT. WORK INCLUDES REPLACE DECK IN KIND , UPGRADE ELECTRICAL SYSTEM, INSTALL WATER PROOFING OVERLAY.

89.500 5.750 41.500 36.500 5.750 AQC:A19Z TOTAL 4YR COST :MULTI TPC : $70-$130 M

CONST 1.000 1.000 2020NFAMISC 0.250 0.250 2020NFA

NYSBA

N0012

NEWBURGH BEACON BRIDGE PEDESTRIAN WALKWAY REPAIRS. PROJECT WILL REMOVE AND REPLACE SIDEWALK STRINGERS AND PLATES ON THE SOUTH SPAN PEDESTRIAN WALKWAY. ORANGE AND DUTCHESS COUNTIES.

1.250 1.250 0.000 0.000 0.000 AQC:A19Z TOTAL 4YR COST :MULTI TPC : $2-$4 M

CONST 1.000 1.000 2020NFANYSBA

R0001

RIP VAN WINKLE BRIDGE - ELECTRICAL UPGRADE. COMPLETE BRIDGE ELECTRICAL WIRING REMOVAL, INSTALL NEW CONDUCTORS CABLES, NEW LOAD CENTERS AND TRANSFORMERS. COLUMBIA

1.000 1.000 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :COLUMBIA TPC : $0.6-$1.5 M

CONST 10.000 10.000 2022NFANYSBA

R0002

RIP VAN WINKLE BRIDGE - PAINTING: POWER TOOL CLEAN AND SPOT PAINTING OF PIER STEEL BENTS.

10.000 0.000 0.000 10.000 0.000 AQC:N/A TOTAL 4YR COST :COLUMBIA TPC : $7.5-$12 M

CONST 1.000 1.000 2020NFANYSBA

R0006

RIP VAN WRINKLE APPROACH PAVING AND NOVACHIP. PROJECT WILL MILL AND FILL APPROACH ROADWAY AND NOVACHIP OVERLAY MAIN BRIDGE.

1.000 1.000 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :COLUMBIA TPC : $0.6-$1.5 M

Page 78: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 78 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

CONINSP 0.650 0.650 2020NFAMISC 0.090 0.090 2020NFACONINSP 0.700 0.700 2021NFAMISC 0.090 0.090 2021NFACONINSP 0.750 0.750 2022NFAMISC 0.090 0.090 2022NFACONINSP 0.800 0.800 2023NFAMISC 0.090 0.090 2023NFA

NYSBA

S0001

BIENNIAL BRIDGE INSPECTION - GENERAL CONSULTANT: DETAILED INSPECTION OF APPROACHES, STRUCTURES, AND DECKS WITH HANDS ON INSPECTION OF ALL FRACTURE CRITICAL MEMBERS TO MAINTAIN STATE OF GOOD REPAIR. ODD YEAR: KRB & NBB(S) EVEN YEAR: RVWB, MHB AND BMB

3.260 0.740 0.790 0.840 0.890 AQC:A19 TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

CONINSP 0.150 0.150 2022NFANYSBA

S0002

PERIODIC UNDERWATER BRIDGE INSPECTIONS: DIVER AND, VIDEO TAPE INSPECTIONS OF ALL AUTHORITY IN WATER PIERS BELOW THE WATER SURFACE TO INCLUDE ANALYSIS & RECOMMENDATIONS BY PROFESSIONAL ENGINEERS, 5 YR CYCLE TO MAINTAIN STATE OF GOOD REPAIR

0.150 0.000 0.000 0.150 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : < $0.75 M

CONST 1.000 1.000 2020NFADETLDES 0.310 0.310 2020NFACONST 1.000 1.000 2021NFADETLDES 0.310 0.310 2021NFACONST 1.000 1.000 2022NFADETLDES 0.310 0.310 2022NFACONST 1.000 1.000 2023NFADETLDES 0.310 0.310 2023NFA

NYSBA

S0003

SYSTEMWIDE MISCELLANEOUS MAINTENANCE: POTHOLE REPAIRS, SPOT RESURFACING, GUIDE RAIL REPLACEMENT AND REPAIR, DRAINAGE AND SHOULDER UPGRADES WHERE AND WHEN NEEDED TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES

5.240 1.310 1.310 1.310 1.310 AQC:A19 TOTAL 4YR COST :MULTI TPC : $6-$9.4 M

CONST 0.500 0.500 2020NFACONST 0.500 0.500 2021NFACONST 0.500 0.500 2022NFACONST 0.500 0.500 2023NFA

NYSBA

S0004

CAPITAL MAINTENANCE PROJECTS: STANDBY READINESS CONTRACT FOR URGENT BRIDGE AND HIGHWAY REPAIRS. VARIOUS COUNTIES

2.000 0.500 0.500 0.500 0.500 AQC:A19 TOTAL 4YR COST :MULTI TPC : $2-$4 M

CONST 0.500 0.500 2020NFANYSBA

S0006

SYSTEMWIDE SUBSTRUCTURE REPAIRS. WORK INCLUDES PARTIAL DEPTH CONCRETE REPAIRS AND SEALING VARIOUS LOCATIONS

0.500 0.500 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :SYSTEM-WIDE TPC : < $0.75 M

Page 79: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 79 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

MISC 0.500 0.500 2020NFAMISC 0.750 0.750 2021NFAMISC 0.500 0.500 2022NFAMISC 0.500 0.500 2023NFA

NYSBA

S0007

SYSTEMWIDE - EQUIPMENT PURCHASES-AQUISITION OF MAJOR EXTRAORDINARY VEHICLES AND EQUIPMENT NECESSARY TO OPERATE AND MAINTAIN THE BRIDGE SYSTEM. VARIOUS LOCATIONS

2.250 0.500 0.750 0.500 0.500 AQC:B4 TOTAL 4YR COST :MULTI TPC : $2-$4 M

MISC 1.000 1.000 2020NFANYSBA

S0008

SYSTEMWIDE BRIDGE STEEL REPAIRS. WORK INCLUDES STEEL REPAIRS, CLEANING AND PAINTING OF BRIDGES TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS LOCATIONS

1.000 1.000 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

MISC 0.020 0.020 2020NFAMISC 0.020 0.020 2021NFAMISC 0.020 0.020 2022NFAMISC 0.020 0.020 2023NFA

NYSBA

SA-0001

SYSTEMWIDE - EQUIPMENT PURCHASES, ADMINISTRATION: OPERATING FUND EQUIPMENT PURCHASES (FURNITURE, ETC.)TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES.

0.080 0.020 0.020 0.020 0.020 AQC:B4 TOTAL 4YR COST :MULTI TPC : < $0.75 M

MISC 0.100 0.100 2020NFAMISC 0.050 0.050 2021NFAMISC 0.020 0.020 2022NFAMISC 0.020 0.020 2023NFA

NYSBA

SA-0002

SYSTEMWIDE - BUSINESS APPLICATION ENHANCEMENT: 1) DOCUMENT IMAGING & WORK FLOW; AND 2) BUSINESS APPLICATION ENHANCEMENT UPGRADE. VARIOUS COUNTIES

0.190 0.100 0.050 0.020 0.020 AQC:B4 TOTAL 4YR COST :MULTI TPC : < $0.75 M

MISC 0.030 0.030 2020NFAMISC 0.022 0.022 2021NFAMISC 0.030 0.030 2022NFAMISC 0.032 0.032 2023NFA

NYSBA

SI-0002

SYSTEMWIDE -PC UPGRADE (SYSTEM HARDWARE), ENHANCEMENTS TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES

0.114 0.030 0.022 0.030 0.032 AQC:A7 TOTAL 4YR COST :MULTI TPC : < $0.75 M

MISC 0.005 0.005 2020NFAMISC 0.005 0.005 2021NFAMISC 0.005 0.005 2022NFAMISC 0.005 0.005 2023NFA

NYSBA

SI-0003

MID-HUDSON-NECKLACE LIGHTS UPGRADES. UPGRADE TO MAINTAIN STATE OF GOOD REPAIR. DUTCHESS AND ULSTER COUNTIES.

0.020 0.005 0.005 0.005 0.005 AQC:A7P TOTAL 4YR COST :MULTI TPC : < $0.75 M

Page 80: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 80 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

MISC 0.015 0.015 2020NFAMISC 0.015 0.015 2021NFAMISC 0.015 0.015 2022NFAMISC 0.015 0.015 2023NFA

NYSBA

SI-0005

SYSTEMWIDE - ID CARD SYSTEM UPGRADES. UPGRADES TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES

0.060 0.015 0.015 0.015 0.015 AQC:A7 TOTAL 4YR COST :MULTI TPC : < $0.75 M

MISC 0.015 0.015 2020NFAMISC 0.015 0.015 2021NFAMISC 0.015 0.015 2022NFAMISC 0.015 0.015 2023NFA

NYSBA

SI-0010

SYSTEMWIDE -ITS COMPONENTS UPGRADES: EQUIPMENT PURCHASES OF MULTIPLEXER, MODEMS, AND CABINETS. TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES.

0.060 0.015 0.015 0.015 0.015 AQC:A7 TOTAL 4YR COST :MULTI TPC : < $0.75 M

MISC 0.121 0.121 2020NFAMISC 0.117 0.117 2021NFAMISC 0.165 0.165 2022NFAMISC 0.134 0.134 2023NFA

NYSBA

SI-0013

IT UPGRADES: ELECTRONIC DATA PROCESSING (EDP) UPGRADE-WINDOWS FILE SERVER AND WEB FILTER. SYSTEM ENHANCEMENTS TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES

0.537 0.121 0.117 0.165 0.134 AQC:A7 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

MISC 0.035 0.035 2020NFAMISC 0.035 0.035 2021NFAMISC 0.035 0.035 2022NFAMISC 0.035 0.035 2023NFA

NYSBA

SI-0015

ITS UPGRADES-DATA CABLING UPGRADES TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES

0.140 0.035 0.035 0.035 0.035 AQC:A7 TOTAL 4YR COST :MULTI TPC : < $0.75 M

MISC 7.000 7.000 2020NFAMISC 5.000 5.000 2021NFAMISC 5.000 5.000 2022NFA

NYSBA

SO-0003

SYSTEMWIDE - ALL ELECTRONIC TOLLING (AET): CONVERSION TO AET WITH ELECTRONIC TOLLING HARDWARE. VARIOUS COUNTIES

17.000 7.000 5.000 5.000 0.000 AQC:A7 TOTAL 4YR COST :MULTI TPC : $15-$25 M

MISC 0.100 0.100 2020NFAMISC 0.100 0.100 2021NFAMISC 0.100 0.100 2022NFAMISC 0.100 0.100 2023NFA

NYSBA

SO-0004

SYSTEMWIDE TOLL SYSTEM UPGRADE TO MAINTAIN STATE OF GOOD REPAIR. WORK INCLUDES REPLACE TOLL GATES & MONITORS. VARIOUS COUNTIES.

0.400 0.100 0.100 0.100 0.100 AQC:A19 TOTAL 4YR COST :MULTI TPC : < $0.75 M

Page 81: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 81 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

MISC 0.025 0.025 2020NFAMISC 0.025 0.025 2021NFAMISC 0.025 0.025 2022NFAMISC 0.025 0.025 2023NFA

NYSBA

SO-0007

LANE USE SIGNALS (LUS), MISCELLANEOUS ITS COMPONENTS REPLACEMENT TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES

0.100 0.025 0.025 0.025 0.025 AQC:A19 TOTAL 4YR COST :MULTI TPC : < $0.75 M

MISC 0.015 0.015 2020NFAMISC 0.015 0.015 2021NFAMISC 0.015 0.015 2022NFAMISC 0.015 0.015 2023NFA

NYSBA

SO-0008

SYSTEMWIDE PLAZA & CENTRAL SERVER UPGRADES- TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS LOCATIONS

0.060 0.015 0.015 0.015 0.015 AQC:B4 TOTAL 4YR COST :MULTI TPC : < $0.75 M

MISC 0.010 0.010 2020NFAMISC 0.010 0.010 2021NFAMISC 0.010 0.010 2022NFAMISC 0.010 0.010 2023NFA

NYSBA

SO-0011

IT UPGRADES: UPS (UN-INTERRUPTABLE POWER SYSTEM) SYSTEMWIDE MAINTENANCE & BATTERIES - MAIN UPS BATTERY REPLACEMENT TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES.

0.040 0.010 0.010 0.010 0.010 AQC:A19 TOTAL 4YR COST :MULTI TPC : < $0.75 M

MISC 0.005 0.005 2020NFAMISC 0.005 0.005 2021NFAMISC 0.005 0.005 2022NFAMISC 0.005 0.005 2023NFA

NYSBA

SO-0012

ANNUAL MAINTENANCE: SUICIDE CALL BOXES REPLACEMENT & UPGRADE TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES.

0.020 0.005 0.005 0.005 0.005 AQC:A19 TOTAL 4YR COST :MULTI TPC : < $0.75 M

MISC 0.015 0.015 2020NFANYSBA

SO-0033

SYSTEMWIDE - GASBOY FUEL DISPENSING UPGRADE. UPGRADES TO MAINTAIN STATE OF GOOD REPAIR. VARIOUS COUNTIES

0.015 0.015 0.000 0.000 0.000 AQC:A7 TOTAL 4YR COST :MULTI TPC : < $0.75 M

MISC 0.200 0.200 2020NFANYSBA

SO-0034

SYSTEMWIDE CAMERA REPLACEMENTS. REPLACEMENT OF CAMERAS THAT HAVE REACHED THEIR USEFUL LIFE. VARIOUS LOCATIONS.

0.200 0.200 0.000 0.000 0.000 AQC:A7 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 82: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ... · ** new york state department of transportation ** statewide transportation improvement program (stip) for region 08 total project

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Thursday, January 2, 2020 Page 82 of 82

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 08

TOTAL PROJECT COST

CONINSP 0.400 0.400 2020NFANYSBA

W0001

WALKWAY-OVER-THE-HUDSON BRIDGE INSPECTION: DETAILED INSPECTION OF THE BRIDGE STRUCTURE WITH HANDS ON INSPECTION OF ALL FRACTURE CRITICAL MEMBERS TO MAINTAIN STATE OF GOOD REPAIR. DUTCHESS AND ULSTER COUNTIES.

0.400 0.400 0.000 0.000 0.000 AQC:A19P TOTAL 4YR COST :MULTI TPC : < $0.75 M