9
© Minewater BV 2014 18 November 2014 René Verhoeven ([email protected]) Technical Manager Mijnwater BV Development of an intelligent hybrid sustainable energy infrastructure in the municipality Heerlen, the Netherlands Minewater 3.0 Low Carbon Heating Technology Showcase Pitch Heat Generation Session

© Minewater BV 2014 18 November 2014 René Verhoeven ([email protected]) Technical Manager Mijnwater BV Development of an intelligent hybrid sustainable

Embed Size (px)

Citation preview

Page 1: © Minewater BV 2014 18 November 2014 René Verhoeven (r.verhoeven@mijnwater.com) Technical Manager Mijnwater BV Development of an intelligent hybrid sustainable

© Minewater BV 2014

18 November 2014René Verhoeven ([email protected])

Technical Manager Mijnwater BV

Development of an intelligent hybrid sustainable energy infrastructure in the municipality Heerlen, the Netherlands

Minewater 3.0Low Carbon Heating Technology Showcase

Pitch Heat Generation Session

Page 2: © Minewater BV 2014 18 November 2014 René Verhoeven (r.verhoeven@mijnwater.com) Technical Manager Mijnwater BV Development of an intelligent hybrid sustainable

2

Conventional = 100% fossil + 100% losses

Minewater visionConventional energy supply

November 2014

Page 3: © Minewater BV 2014 18 November 2014 René Verhoeven (r.verhoeven@mijnwater.com) Technical Manager Mijnwater BV Development of an intelligent hybrid sustainable

3

Minewater visionDistrict heating with CHP

November 2014

Improvement = increase efficiency

Page 4: © Minewater BV 2014 18 November 2014 René Verhoeven (r.verhoeven@mijnwater.com) Technical Manager Mijnwater BV Development of an intelligent hybrid sustainable

4

Heat pump

New generation: exchange and storage = 2 to 5 times reuse with additional sustainable energy generation

Minewater visionSustainable energy supply

November 2014

Page 5: © Minewater BV 2014 18 November 2014 René Verhoeven (r.verhoeven@mijnwater.com) Technical Manager Mijnwater BV Development of an intelligent hybrid sustainable

5 November 2014

Minewater 3.0Design on use

Peak load 200 – 400 hours (10–20 days):Feed temperature 38 – 45 ˚CShort term storage (hour/day)

Base load 3600 hours (5 months):Feed temperature 30 – 38 ˚C

Mid/long-term storage (week/month/season)

Hot water demand < 2 hours/day:Heatloss HT-network 8760 hours/year > 35% total heat demand;

LT-network + booster HP < 5%

Page 6: © Minewater BV 2014 18 November 2014 René Verhoeven (r.verhoeven@mijnwater.com) Technical Manager Mijnwater BV Development of an intelligent hybrid sustainable

6 November 2014

Minewater 3.0Low-Ex, storage and exchange

Periods with extreme change in demand => though storage at

building and cluster level instand (passive) exchange of heat and cold

Peak load 200 – 400 hours (10–20 days):Feed temperature 38 – 45 ˚CShort-term storage (hour/dag)

Base load 3600 hours (5 months):Feed temperature 30 – 38 ˚C

Mid-term/long-term storage (week/month/season)

Page 7: © Minewater BV 2014 18 November 2014 René Verhoeven (r.verhoeven@mijnwater.com) Technical Manager Mijnwater BV Development of an intelligent hybrid sustainable

7 November 2014

MMinewater visionFinancial

Page 8: © Minewater BV 2014 18 November 2014 René Verhoeven (r.verhoeven@mijnwater.com) Technical Manager Mijnwater BV Development of an intelligent hybrid sustainable

8 November 2014

MMinewater visionDecentralized Sustainable Energy

42% DSE target Dutch Energy Agreement not yet filled in => hybride infrastructure with sustainable heat

Page 9: © Minewater BV 2014 18 November 2014 René Verhoeven (r.verhoeven@mijnwater.com) Technical Manager Mijnwater BV Development of an intelligent hybrid sustainable

9

OU CampusEnergy concept

Oktober 2014

0

20

40

60

80

100

1 24 47 70 93 116

139

162

185

208

231

254

277

300

323

346

T-storage [˚C]