軟軟軟軟軟軟 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 軟軟軟 951644 軟軟軟 951623 軟軟軟 951703 軟軟軟 951632 軟軟軟 951736 軟軟軟 951645 軟軟軟 951751 軟軟軟 951626 軟軟軟 951758 軟軟軟 Summarized from.: Sullivan, J. and Beach, R., 2010, International Journal of Project Management, 28, p. 765-775.

軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

Embed Size (px)

Citation preview

Page 1: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

軟體專案管理報告

IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY:A CONCEPTUAL MODEL

951606 范雅筑 951644 李源裕951623 江小琪 951703 洪嘉昌951632 陳葦芸 951736 陳啟天951645 王俐尹 951751 李洹宇951626 王佩婷 951758 謝孟樸

Summarized from.: Sullivan, J. and Beach, R., 2010, International Journal of Project Management, 28, p. 765-775.

Page 2: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

INTRODUCTION

951645 王俐尹

Page 3: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

INTRODUCTION

Management information system (IS) projects have been studied for many years, and numerous recommendations have been made to improve performance.

ERP systems are highly integrated, complex, cross-functional systems, which support business processes across an entire organisation.

Page 4: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

INTRODUCTION(CON.)

High reliability organisations (HRO) operate in environments where the potential for disaster is high, the pressure to meet expectations is persistent and the consequences for failure are publicly visible.

Page 5: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

INTRODUCTION(CON.)

That projects can also be considered as ‘‘particular kinds of organisations” (ibid) reinforces our view that these ‘project-based organisations’ might benefit from an improved understanding of how high operational reliability is achieved.

Page 6: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

INTRODUCTION(CON.)

The aims of this phase were to: (a) provide the theoretical foundations for

researching the factors that contribute to operational reliability in IS project environments.

Page 7: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

INTRODUCTION(CON.)

(b) develop a framework to facilitate a comparative analysis of organisational activities and the synthesis of empirical data gathered in subsequent stages of the research.

(c) extend knowledge of those organisational characteristics that contribute to successful project outcomes/reliable operational performance.

Page 8: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

HIGH RELIABILITY ORGANISATIONS

951644 李源裕

Page 9: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

HIGH RELIABILITY ORGANISATIONS

Some organisations have been very successful in the implementation of complex systems

HRO is capable of developing and/or applying sophisticated technologies

HRO is the way that these organisations deal with failure and recovery

Page 10: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

HOW HRO WORK

high reliability is possible and that organizations possess attributes that can enhance reliability

design reward systems to recognize the costs of failure

Page 11: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

ATTRIBUTES

The HRO places a higher priority on reliability than any other objective

It places a high priority on effective performance and avoiding disasters through processes of collective learning

Page 12: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

CHARACTERIZATION

high technical competence high performance and oversight a propensity to constantly search for

improvements a propensity to constantly search for

improvements

Page 13: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

CHARACTERIZATION (CONT.)

operate under high pressure use incentives and share expectations to

enhance reliability maintain hazard-driven operational flexibility

to ensure safety promote a culture of reliability avoid cost effective trade-offs and trial and

error learning

Page 14: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

HRO MATRIX

using a two dimensional matrix

technological risk

Reliability

Page 15: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

HRO MATRIX

Page 16: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

EXAMPLE

television weather reporter be plotted in quadrant 1

low reliability and low technological risk

metropolitan water supplier be classified into quadrant 3

high reliability and low technological risk

Page 17: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

EXAMPLE(CONT.)

United States Military at the right side of quadrant 3 and in

quadrant 4

Chernobyl and Three Mile Island nuclear power plants during their respective crises

quadrant 2

Page 18: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

FRAMEWORK

profit-seeking organisations might place a different emphasis on reliability compared to non-profit organisations

service organisations (high consumer contact) may avoid technological risk in preference for proven technologies compared to manufacturers

Page 19: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

RISK

951626 王佩婷

Page 20: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

PRIMARY RISKS FACED BY THE HRO

The primary risks faced by the HRO are those that : may result in significant property damage or loss

of life those associated with failure to meet the

expectations of stakeholders for safe and effective performance

Page 21: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

So they refer to these as

operational and

stakeholder risks

Page 22: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

OPERATIONAL RISK FACTORS

Grabowski and Roberts have suggested that HRO risk factors involve ‘‘high consequence.”

In extreme cases, they include uncertain or hazardous operating environments,

‘‘a situation that invokes a sense of dread”

Page 23: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

OPERATIONAL RISK FACTORS (CONT.)

Risk factors exist in other forms such as introducing new technology where

failure to properly manage the technology might threaten the value of the company stock or drain resources from more profitable ventures

Page 24: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

OPERATIONAL RISK FACTORS (CONT.)

human activities : false assumptions about reality or the effects of political activity

when small anomalies evolve into significant problems risk factors can arise as effects of a ‘‘disaster incubation period”

Page 25: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

OPERATIONAL RISK FACTORS (CONT.)

Risk factors can be categorized into threegroups:

1. known risk 2. imagined risk 3. unknown risk

Page 26: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

STAKEHOLDER EXPECTATIONS An organisation’s stakeholders include its

managers,employees, regulatory and political entities and, increasingly,the general public and consumers

Stakeholder influence on project outcomes is well known and strategies to influence the behavioural characteristics of individuals to mitigate the effects in ‘‘sensitive projects” have been presented

Page 27: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

STAKEHOLDER EXPECTATIONS (CONT.)

The HRO requires a ‘‘high level of goal congruence and a shared sense of duty to the collective purpose”

Aboard US Navy aircraft carriers, each individual is expected to perform assigned tasks reliably as well as monitoring the larger picture

Page 28: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

STAKEHOLDER EXPECTATIONS (CONT.) In these organisations, the expectations of

individuals are so high that an organisational culture develops surrounding those expectations.

This is in stark contrast to the non-HRO where failure to meet expectations rarely invokes the same degree of anxiety from stakeholders.

The consequences of failure are related to stakeholder expectations in that failure to meet minor expectations will result in minimal consequences whilst major failures will result in more severe consequences.

Page 29: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

CAPABILITY

951623 江小琪

Page 30: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

CAPABILITY

• Capability can be defined in terms of resources and competences.

• The HRO places a higher priority on the adequacy of these resources.

• Competences include proprietary process knowledge, unique skills and experiences.

• The HRO must have significant reserves of these competences to adequately address the hazards of their environment.

Page 31: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

RESOURCES

• Reliability to be equal or greater in importance to efficiency and maintaining adequate resources is a prerequisite of reliability.

• Grabowski and Roberts suggest:– Over time large scale systems can become

degraded.• Higher operational costs than conventional

organizations.

Page 32: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

RESOURCES (CONT.)

Perrow drives toward efficiency (cost reduction or

increased profitability) increased the danger in complex systems.

Roberts in large scale HRO environments where resource

requirements can be significant.

Page 33: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

RESOURCES (CONT.)

The HRO also has a heightened awareness of investments in safety.

Many organizations understand that ‘‘expenditure on safety is a good investment.”

But the HRO is characterized by an operational ethos in which reliability rivals efficiency.

The cost of an accident far outweighs the cost of preventive measures.

Page 34: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

COMPETENCE FACTORS

Competences include the skills, procedures, knowledge and experience of an organization’s members.

These factors are difficult to quantify and tend to fluctuate over time.

In times of crisis, exceptional competence is often credited with averting disaster.

Page 35: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

COMPETENCE FACTORS (CONT.)

To attain ‘high reliability’ high levels of competence are necessary but even organizations with plentiful resources will occasionally experience system failure.

In essence, it is the competence factors that prevent disaster, not resources alone.

Page 36: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

COMPETENCE FACTORS (CONT.)

How these competences are nurtured and deployed within the organization will impact on the effectiveness of the system.

The matrix structure, frequently associated with project-based organizations, can be particularly useful in overcoming problems that are inter-functional in nature.

Page 37: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

COMPETENCE FACTORS -SAPIENTIAL AUTHORITY They also provide competence and

confidence building opportunities for individuals that can lead to the creation of sapiential authority .

Sapiential authority• knowledge and expertise • maturity (life knowledge) rather than hierarchical

position (structural or positional authority To be particularly useful when events

become critical .

Page 38: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

DISAGREEMENT

As previously mentioned, there is some disagreement as to whether all failures can be completely prevented in complex systems.

Perrow’s “Normal Accident Theory” accidents in complex technological systems must

be expected, that eventually enough circumstances will align themselves and failure will follow.

Page 39: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

EXAMPLE

A Thousand Heroes In 1989 United Airlines Flight 232

from Denver to Chicago suffered an explosion in one of the aircraft’s engines causing a loss of hydraulic power. 111 passengers died but 185

survived.

Page 40: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

CAPABILITY TO MITIGATE RISK

&THE CONCEPTUAL MODEL

951736 陳啟天

Page 41: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

5.CAPABILITY TO MITIGATE RISK

some organisations must carry excess capability to mitigate exceptional operational risks.

lower capability is required by those whose perceived risk and consequences of failure are lower.

the HRO must ‘‘avoid errors or failure because the potential cost is unacceptable to society”

Page 42: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

6.THE CONCEPTUAL MODEL

Organisations that reliably manage complex systems maintain a balance between those factors that represent a threat to the system and those that mitigate them.

HRO is able to consistently achieve this balance over long periods of time.

Page 43: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

6.THE CONCEPTUAL MODELA conceptual appear to facilitate high operational reliability.

Page 44: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

ABOUT THIS MODEL

Five interacting forces: expectations, risk factors, resources, competence factors, and consequences.

Page 45: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

6.1 RESOURCE AND EXPECTATIONS

adequate resources are essential to support complex systems in the HRO.

cutting back resources and emphasising efficiency is detrimental to reliability.

Page 46: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

A MODEL ABOUT RELATIONSHIP BETWEEN EXPECTATIONS AND RESOURCES

The bidirectional nature of this relationship is represented in the model as dotted lines.

whilst the variable relative strength (or weakness) of these components is represented as triangles.

Page 47: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

A MODEL ABOUT RELATIONSHIP BETWEEN EXPECTATIONS AND RESOURCES

Page 48: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

THE CONCEPTUAL MODEL

951758 謝孟樸

Page 49: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

THE CONCEPTUAL MODEL

Five factors Resource 、 Expectation 、 Consequence 、 C

ompetence factor 、 RiskRelationship Resource and expectations Expectations and consequences Consequences and competence factors Competence factors and risks

Page 50: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

EXPECTATIONS AND CONSEQUENCES

Factors of Influence consequence Resources are reduced Ability insufficiency External political influences Environment opposition

Page 51: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

EXPECTATIONS AND CONSEQUENCES

Page 52: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

EXPECTATIONS AND CONSEQUENCES

Direct proportion - Weight of expectations increase, Weight of consequence

increase

Fear ( Fears of the consequences of not meeting expectations )

Inverse proportion - Weight of expectations decrease, Weight of consequence

increase

Security ( Security of flies )

Page 53: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

CONSEQUENCES AND COMPETENCE FACTORS

Unbalance Consequences System’s failure Develop slowly lead to new procedures

Page 54: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

CONSEQUENCES AND COMPETENCE FACTORS

HRO’s mechanism Learn from mistakes Avoid repetitions Have exceptional organisational learning

capability

Page 55: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

COMPETENCE FACTORS AND RISKS

Factors of increases risk Exceed development ability Exceed Design limit Exhibited groupthink Exist political pressure Less competent

Page 56: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

COLUMBIA DISASTER

951606 范雅筑

Page 57: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

ORIGIN OF CLUMBIA DISASTER

On February 1, 2003, the space shuttle Columbia disintegrated on re-entry into the earth’s atmosphere, killing all seven astronauts.

Page 58: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

CAUSES FOR THE DISASTER

Technical causes for the disaster A piece of protective foam strikes the leading edge of

the wing on lift-off. Administrative and organizational contributors.

Unknown risk : NASA unaware that a foam strike could cause catastrophic damage to the shuttle.

Knowledge management : With staffing levels of the Shuttle program declining NASA had no plan in place for retaining the knowledge of key personnel.

Page 59: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

ERRORS OF THE SHUTTLE PROGRAM (1)

Unrealistic expectations held by Congress. NASA had also failed to imagined risks and the

possibility of unknown risks that would have led to contingency plans.

Areas of capability were insufficient. the mishandling of the foam strike

Page 60: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

ERRORS OF THE SHUTTLE PROGRAM(2)

The operational program was perceived to be a ‘‘mature and reliable system.” caused the focus of the program to be erroneously

transitioned from development to operational Years of inadequate funding

forced NASA to ‘‘ do more with less. ”

Page 61: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

RECOMMENDATIONS FOR A NEW MODE Be more efficient

reduce costs Management with considerably less NASA oversight.

• Outsourcing an obvious thing to do because the risks

were believed to be known and under control.

Consolidate shuttle operations under a single-business entity. even the eventual privatization of the Space Shuttle

Program.

Page 62: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

DIFFICULTIES IN INTERNAL ORGANIZATION

The organization culture of the 1960s was resistant to change and rigidly hierarchical.

Greater expectations to accommodate special interest projects without corresponding increases in resources.

There are many shortcomings of the organization and requiring remedial action.

Organizational learning at NASA.

Page 63: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

NORTHEAST BLACKOUT

951632 陳葦芸

Page 64: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

NORTHEAST BLACKOUT

On August 14, 2003

Midwest and Northeast United States as well as Ontario, Canada

Eastlake 5 came into contact with overgrown trees and shut down.

Page 65: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

NORTHEAST BLACKOUT(2) Some areas were without power for as long

as four days, and parts of Ontario endured rolling blackouts for over a week

It cost the United States and Canada billions of dollars in lost commerce

Page 66: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

NORTHEAST BLACKOUT(3)

NERC( The North American Electric Reliability Council) , a nongovernment agency, and its ten subordinate Regional Reliability Councils (RRCs) are responsible for the voluntary operating and planning standards that promote reliability within the power grid.

NERC does not have authority to enforce compliance for the standards that promote reliability within the power grid.

Page 67: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

MAINTAINING A HIGH DEGREE OF RELIABILITY WITH A SYSTEM NEED

Requires skilled operators

complex computer and communications systems

careful planning and design

Page 68: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

FIRSTENERGY’S PROBLEMS

FirstEnergy—a company that caused the blackout.

FirstEnergy’s substandard power generation and transmission capability had been in place for a long time before the blackout

The absence of any legally binding authority for enforcement contributed to non-compliance.

Page 69: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

FIRSTENERGY’S PROBLEMS(2) inadequate training

an inability to acquire and understand information concerning the status of the power grid

weakening infrastructure

ineffective policies and procedures

Page 70: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

CONCLUSION failure was inevitable, but it was preventable.

The most obvious problem was a lack of accountability.

Without consequences for non-compliance, the organizational learning relationship is ineffective.

Page 71: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

CONCLUSION(2) the model explains why an increased risk of

power grid deterioration combined with stagnant, or possibly atrophying competence would lead to disaster.

Page 72: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

CONCLUSION

951751 李洹宇

Page 73: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

HOW TO IMPLEMENT AND OPERATEA SYSTEM SUCCESSFUL

HRO oganizational characteristics

Tranfer to non-HRO

Page 74: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

FACILITATE THE STUDY 1

the literature relating to the HRO

the organisational characteristics

the environmental factors

Example: a failed examination

Page 75: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

FACILITATE THE STUDY 2

immediate & practical using

monitoring & measuring

it might be a long time

Page 76: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

MORE EFFECTIVE APPROACH

the magnitude of the failure ( the one-off nature of projects & the critical role information

systems)

identify any potential weaknesses early

researchers and project management professionals evaluate

Page 77: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

LIMITATIONS

951703 洪嘉昌

Page 78: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

LIMITATIONS OF THE STUDY

The above research has focussed on organisations in the United States.

in other countries and industries, the possibility that national culture may influence the utility of the model should not be ignored.

Page 79: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

EXAMPLE

Milliken and Mellahi have an underpinning assumption: The HRO can be transferred to other, less critical environments.

For example, organisations operating in less critical environments to the HRO or under different cultural conditions may not have the ability or volition to learn from their experiences or change behaviours.

Page 80: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

SHOULD KNOW BEFORE STUDY THE MODEL

The interrelationship between risk and capability is complex and multi-dimensional, it is not a simple two dimensional phenomenon like the conceptual model.

Page 81: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

SHOULD KNOW BEFORE STUDY THE MODEL(CONT.)

Basic factors of the conceptual model: Resource, Expectation, Consequence,

Competence factors and Risk factors.

Others factor in the real world: Strategy, Country, Culture, Politics, Social, ….etc.

Page 82: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

THE VALUE OF THE MODEL

The model does show the state, at a point in time, of the factors that enhance capability and allow risk to emerge.

The value of the model is therefore in its ability to provide a means of conceptualizing the dynamic relationships between the factors.

Example of relationships in the model: Consequences and competence factors Competence factors and risks factors

Page 83: 軟體專案管理報告 IMPROVING PROJECT OUTCOMES THROUGH OPERATIONAL RELIABILITY: A CONCEPTUAL MODEL 951606 范雅筑 951644 李源裕 951623 江小琪 951703 洪嘉昌 951632 陳葦芸

THANK YOU FOR YOUR ATTENTION!