45
結結結結結結結結結結結結結結結結結結結結結結 結結結結結結結結結結結結結結結結結結結結結結 USING AHP AND FUZZY MATHEMATICAL PROGRAMMING FOR PROJECT PORTFOLIO SELECTION 結結結 結結結 結結結結 結結結 結結結結 結結結 結結結結結結 結結結結結結結 結結結結結結 結結結結結結結 Graduate Program of Industrial Management 碩碩碩碩碩碩碩碩碩碩

學 生 賴佳琪 指導教授 林高正

Embed Size (px)

DESCRIPTION

南台科技大學 工業管理研究所 Graduate Program of Industrial Management 碩士學位論文提案口試. 結合層級分析與模糊數學規劃的專案組合選擇方法 U SING AHP AND F UZZY M ATHEMATICAL P ROGRAMMING FOR P ROJECT P ORTFOLIO S ELECTION. 學 生 賴佳琪 指導教授 林高正. 內容大綱. 緒 論 文獻探討 相對效益數值為明確之專案組合選擇模式 後續研究與預期成果. 緒 論. 研究動機 研究目的 - PowerPoint PPT Presentation

Citation preview

  • USING AHP AND FUZZY MATHEMATICAL PROGRAMMINGFOR PROJECT PORTFOLIO SELECTION Graduate Program of Industrial Management

    **

    **

    (1/2)e- **

    ** (2/2)

    (1/3)Baker and Freeland (1975) **

    (2/3) (AHP/ANP) ()LINDOLINGO**

    (3/3) **

    **

    **

    (1/4)Archer & Ghasemzadeh (1999) ()**

    (2/4) **

    (3/4) (i) (ii) (iii) (iv) (v) **

    (4/4) (Time-dependent) **

    **

    **Sharpe and Keelin (1998)

    ** (Ordinal measure) (Cardinal measure) AHP/ANP

    (1/2) (Analytic Hierarchy Process, AHP) Saaty (1986) AHP (Reciprocal comparison) (Homogeneity) (Independence) (Expectations) **

    (2/2)AHP (LLSM) (GPM) GPM **

    ** ( Lee and Kim, 2000)

    () () ( )

    **

    (1/2) (Vagueness) Zadeh (1965) 0 1 **

    (2/2)Dubois and Prade (1997) (Similarity) (Preference) (Uncertainty) **

    (1/2)

    **

    (2/2)Zadeh min max min max Zadeh min max (Maximin) **

    (1/2) (Sample space) vs. (Pattern space) s- (s-algebra) vs. (Discrete topology) vs. Pos S (Possibility measure) **

    (2/2) Nec Pos **

    **

    Archer and Ghasemzadeh (1999) **

    ** (1/3) () ()

    (2/3)**

    (3/3) ()**

    **(1/4)

    ** (2/4)

    **(3/4) ( -)

    (3-2)-(3-4) (3-2)

    **

    0-1 (3-9)

    (Liu, 1998; Liu and Iwamura, 1998)

    (4/4)

    ** (1/4)

    ** (2/4) 35 150 250

    ** (3/4)

    ** (4/4)

    5 (g, b) (1, 1), (1, 0.95), (1, 0.8), (0.9, 0.85), (0.9, 0.7)

    ** (1/3) AHP LLSM GPM

    ** (2/3)

    ** (3/3) () AHP/ANP

  • **

  • Liu and Iwamura (1998) maximax Liu (1998) minimax (Klir and Yuan, 1995) maximax 0 minimax (Gray and Larson, 2008)*