The Physical Environment
Overview Environment of Care
Emergency Management Life Safety Chapter
Q & AGeorge Mills, Sr. Engineer
Standard Interpretation Group
The Joint Commission
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Overview
Standards Improvement Initiative (SII)
SIG Engineering 2009 - 3
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Re-structuring Highlights
SII did not create any new requirementsDeeming language added for clarity
Replaced bulleted lists with expanded Elements of Performance
Enhance clarity and objectivity of standards and EPsRemoved words like “appropriate”
New numbering conventionsEC.02.04.03 EP 2 The organization inspects,
tests & maintains all life support equipment. These activities are documented. (See also EC.02.04.01 EPs 3 &4; PC.02.01,11 EP 2)
SIG Engineering 2009 - 4
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Re-structuring Environment of Care (EC)
Merging Safety & Security Training moved from HR to EC
Life Safety Chapter (LS)Compliance with the Life Safety CodeMoved ILSM from EC
Emergency Management (EM)Major changes in 2008 Hazard Vulnerability Analysis (HVA)Emergency Operations Plan (EOP)
SIG Engineering 2009 - 5
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
CMS Deeming Issue Joint Commission is required to reconcile
our Elements of Performance (EP) with CMS Conditions of Participation (COP)
COPs are the expectations of compliance CMS has related to Medicare/Medicaid reimbursements COPs are federal laws
To reconcile the Joint Commission has added 5 additional EPs
None of these are beyond the current expectations of the Joint Commission
SIG Engineering 2009 - 6
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
CMS Deeming Issue: Specifics EC.02.02.01 EP 14
Testing badges for exposure from radiology EC.02.02.01 EP 15
Free from ionizing hazards for patients & staff EC.02.04.03 EP 14
Staff maintain nuclear medicine equipment annually
EC.02.06.01 EP 20 Environment is clean, sanitary and free of
odors LS.01.01.01 EP 4
Maintain documentation of any inspections or approvals by AHJs related to fire safety
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Scoring
SIG Engineering 2009 - 8
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Scoring & Decision Process Scoring Scale
0 = Insufficient Compliance 1 = Partial Compliance 2 = Full Compliance
Requirement for Improvement (RFI) All findings of less than full compliance will
be cited as a RFI All RFIs require resolution through an
Evidence of Standards Compliance (ESC) This includes findings scored partial “Supplemental Findings” (2008 term) are
eliminated
SIG Engineering 2009 - 9
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
EP Scoring Categories
A: Structural requirements EP’s scored yes (2) or no (0) May address issues requiring full
complianceC: Based on number of times an EP is not met
Score 2: 0-1 instances of non-compliance Score 1: 2 instances of non-compliance Score 0: > 3 instances of non-compliance
Above is based on a sample of 10
NOTE: The ‘B’ Category has been eliminated
SIG Engineering 2009 - 10
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Example: Category A
EC.02.04.02 EP 2: The hospital inspects, tests &
maintains all life support equipment. These activities are documented.
Did you do it? Yes or No [100%]Is there documentation?
SIG Engineering 2009 - 11
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Example: Category C
EC.02.04.02 EP 3: The hospital inspects, tests & maintains all non-life support equipment identified on the medical inventory. These activities are documented.
How many times did you not do it? Is there documentation?
SIG Engineering 2009 - 12
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Criticality of Findings & Immediacy of Risk
The amount of time for submitting the ESC is based on the criticality of the finding and the immediacy of risk as follows:
Direct Impact 45 Within Days
Indirect Impact 60 Within Days
SIG Engineering 2009 - 13
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Criticality
Criticality defined as “the immediacy of risk to patient safety or quality of care as a result of noncompliance with a Joint Commission requirement.”
4 Levels of Criticality1. Immediate Threat to Life (ITL)
PDA until resolved2. Situational Decision Rules
Based on specific situations at time of survey 3. Direct Impact Requirements
Noncompliance may create an immediate risk to patient safety or quality of care
4. Indirect Impact Requirements Based on planning and evaluation or care processes
SIG Engineering 2009 - 14
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
2009 Scoring Decision Model
ITLPDA until resolved
“Situational” Decision Rules
CON & PDA
Direct Impact Requirements “Implementation” Based Requirements
(Short Resolution Timeframe)
Indirect Impact Requirements “Planning” and “Evaluation” Based Requirements
(Longer Resolution Timeframe)
Immediacy of risk to patient care and the organization’s
certification status
Lower
Higher
Timeline for resolution of non-compliant findings
Shorter
Longer
SIG Engineering 2009 - 15
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
ITL
“Situational” Decision Rules
Direct Impact Requirements
Indirect Impact Requirements
Immediate Threat to Life Situations, identified during survey, which have or may potentially have a serious adverse effect on patient health and safety.The Joint Commission President can issue an expedited Preliminary Denial of Accreditation (PDA) decision.PDA remains until corrective action is demonstrated, via an on-site validation review.PDA changes to Conditional Accreditation which includes a follow-up review to assess sustained implementation of corrective action.Examples:
Inoperable fire alarm system Lack of Master Alarms for
Medical Gas System
2009 Scoring Decision Model
SIG Engineering 2009 - 16
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
2009 Scoring Decision Model
ITL
“Situational” Decision Rules
Direct Impact Requirements
Indirect Impact Requirements
Situational Decision Rules Situations in which a decision of PDA or CON is recommended to the Accreditation Committee Demonstration of resolution through submission of Evidence of Standards Compliance (ESC).Onsite review to validate implementation of corrective action. Examples:
Failure to implement corrective action in response to accepted PFI
unlicensed facility
SIG Engineering 2009 - 17
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
2009 Scoring Decision Model
ITL
“Situational” Decision Rules
Direct Impact Requirements
Indirect Impact Requirements
Direct Impact RequirementsNon-compliance results in direct impact on quality of care and patient safety“Implementation” based requirementsNon-compliant requirements must be addressed via ESC submission process
Short time-frame (45 days)Decision is pending submission of ESC within established timeframeFailure to resolve results in progressively more adverse decision (e.g., Provisional, Conditional, PDC)Example:
Inspects, tests & maintains Life Support Systems
SIG Engineering 2009 - 18
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
2009 Scoring Decision Model
ITL
“Situational” Decision Rules
Direct Impact Requirements
Indirect Impact Requirements
Indirect Impact RequirementsInitially less immediacy of risk; failure to resolve non-compliance increases risk“Planning” and “Evaluation” based requirementsNon-compliant requirements must be addressed via ESC submission process
Longer time-frame (60 days)Decision is pending submission of ESC within established timeframeFailure to resolve = progressively more adverse certification decision (e.g., Provisional, Conditional, PDC)Examples:
Piping used for AASS is not used to support any other item
Hospital provides storage space to meet patient needs
SIG Engineering 2009 - 19
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Direct Impact Count Environment of Care
38 Direct Impact Life Safety Chapter
7 Administrative (LS.01)20 Healthcare (LS.02)56 Total (62 ‘z’ items in 2008)
Emergency Management 3 Direct Impact
SIG Engineering 2009 - 20
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Internal Intensive Review Quantitative measure for identifying organization
whose survey findings should be subject to a more intensive review by Central Office
Bands of screening points have been established to adjust for differences in size and complexity
HAP Screening Points: # Non-compliant Surveyor Days Direct Impact Stds
1 – 4 75 – 6 87 – 9 910 – 13 11> 14 13
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Survey Process
SIG Engineering 2009 - 22
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Life Safety Code Specialist
LSCS Background Facilities or Environment of Care based Prefer CHFM certification
LSCS Agenda On-Site one day (typically on day 1 or day 2) Interfaces with survey team member(s)
LSCS Focus EC.02.03.05 Fire Protection Systems EC.02.05.07 Emergency Power EC.02.05.09 Medical Gas and Vacuum LS.01.01.01 Life Safety Code LS.01.02.01 Interim Life Safety Measures (ILSM)
SIG Engineering 2009 - 23
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Life Safety Code Specialist Update
Other EC “Observations” May also survey
LD.04.01.05 EP 4 LD.03.03.01 EP 4 LD.04.04.01 EP 2
Greater than 750,000 sq ft second survey day for the LSCS
Greater than 1.5 million sq ft third survey day for the LSCS [PROPOSED for 2009]
Critical Access Hospitals ONLY: Survey EC, LS and EM
SIG Engineering 2009 - 24
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Observed but Corrected on SiteFirst and foremost, Surveyors, Reviewers, and LSCS must
use their professional judgment. Draw upon your critical thinking skills that have been honed throughout your careers. Findings that are appropriately documented as "Observed but Corrected On-Site" have the following characteristics:
The deficiencies are easily corrected and do not pose a significant threat to patient safety.
The correction should not require any organizational planning or forethought
The practice is correct but the policy needed amending to coincide with the practice, so the policy was amended
Corrections to a form that was missing an element or piece of information and the change would not impact the process
SIG Engineering 2009 - 25
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Correct Use of “Observed but Corrected on Site” Gap in ceiling tile that is repositioned Stretcher or gurney blocking medical gas shut-
off valves that could easily be moved Food cart parked in front of a fire extinguisher
but can be easily moved Partially burned out exit light that is corrected
on discovery A few cigarette butts on the roof near a piece
of equipment Refrigerator logs missing a few dates, but
temperatures before and after missing dates are within range—no evidence of any trends (could be applied to other types of logs)
SIG Engineering 2009 - 26
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
When NOT to allow “Corrected on Site” Penetrations in a rated barrier A policy is written or amended during survey that
requires change in practice, education of staff and/or implementation
Adding a suicide risk assessment to an assessment form (would require careful consideration of the population served, education of the staff in terms of conducting the assessment, etc)
Multiple fire doors fail to latch Refrigerator logs with temperatures out of range
and no apparent action to correct or determination if medications or food are appropriate for use
SIG Engineering 2009 - 27
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Time Defined
For the Physical Environment the Joint Commission has defined time in the Introduction of the EC chapter:
Daily, weekly, monthly and quarterly are calendar references
Semi-annual is 6 months from last occurrence +/- 20 days
Annual is 12 months from last occurrence +/- 30 days
SIG Engineering 2009 - 28
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Does Every mean Every ? EC.02.03.05
EP 2 Every 6 months the hospital tests valve tamper switches and water-flow devices. The completion date of the test is documented. Every 6 months +/- 20 days
EP 12 Every 12 months the hospital tests visual and audible alarms, including speakers. The completion date of the test is documented. Every 12 months +/- 30 days
At least monthly the hospital inspects portable fire extinguishers. The completion dates of the inspections are documented. Tested within the calendar month
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Environment of Care
SIG Engineering 2009 - 30
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Environment of Care: Structure Plan (EC.01.01.01) Implement
Safety and Security (EC.02.01.01, 02.01.03) Hazardous Materials and Wastes (EC.02.02.01) Fire Safety (EC.02.03.01, 02.03.03, 02.03.05)Medical Equipment (EC.02.04.01, 02.04.03) Utilities (EC.02.05.01, 02.05.03, 02.05.05, 02.05.07, 02.05.09)
Other Physical Environment Requirements (EC.02.06.01, 02.06.05)
Staff Demonstrate Competence (EC.03.01.01) Monitor and Improve (EC.04.01.01, 04.01.03, 04.01.05)
SIG Engineering 2009 - 31
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Environment of Care: Issues
EC.01.01.01: The hospital plans activities to minimize risks in the environment of care. Note: One or more persons can be assigned to
manage risks associated with the management plans described in this standard.
EP 3 The hospital has a written plan for managing: environmental safety of everyone who enters the hospitals facilities
EP 4 The hospital has a written plan for managing: security of everyone who enters the hospitals facilities
SIG Engineering 2009 - 32
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
EC.02.01.01 EPs 1 & 3
1 The hospital identifies safety & security risks associated with the environment of care. Risks are identified from internal sources such as ongoing monitoring of the environment, results of root cause analysis, results of annual proactive risk assessments of high risk processes, and from credible external sources such as Sentinel Event Alerts.
3 The hospital takes actions to minimize or eliminate identified safety and security risks in the physical environment.
SIG Engineering 2009 - 33
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Medical EquipmentEC.04.01.01 The hospital manages medical
equipment risks. EP 1 The hospital solicits input from individuals
who operate and service equipment when it selects and acquires equipment.
EP 2 The hospital maintains either a written inventory of all medical equipment or a written inventory of selected equipment categorized by physical risk associated with use (including all life support equipment) and equipment incident history. The hospital evaluates new types of equipment before initial use to determine whether they should be included in the inventory. (see also EC.01.01.01 EP 7)
SIG Engineering 2009 - 34
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Utilities Management
EC.02.05.01 EP 3 The hospital identifies in writing inspection
and maintenance activities for all operating components of utility systems on the inventory. (See also EC.02.05.05 EPs 3 – 5 and EC.02.05.09 EP 1)
NOTE: Hospitals may use different approaches to maintenance. For example, activities such as predictive maintenance, reliability-centered maintenance, interval based inspections, corrective maintenance, or metered maintenance may be selected to ensure dependable performance.
SIG Engineering 2009 - 35
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Utilities Management
EC.02.05.07 EP 4 Twelve times a year, at intervals of
not less than 20 days and not more than 40 days, the hospital tests each generator for at least 30 continuous minutes. The completion date of the tests is documented.
SIG Engineering 2009 - 36
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Utilities Management
EC.02.05.01, EP 4 The [organization] defines in writing
intervals for inspecting, testing, and maintaining all operating components of the utility systems on the inventory based upon criteria such as manufacturers’ recommendations, risk levels, and current hospital experience.
SIG Engineering 2009 - 37
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Built Environment Interior spaces meet the needs of the patient
population and are safe and suitable to the care, treatment and services provided
Lighting is suitable for care, treatment and services
Hospital maintains ventilation, temperature and humidity levels suitable to the care, treatment and services provided
Interior spaces accommodate the use of equipment, such as wheelchairs, necessary to the activities of daily living
SIG Engineering 2009 - 38
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Design Criteria When planning for new, altered, or
renovated space the hospital uses one of the following design criteria:State rules & regulationsAIA Guidelines for Design and
Construction of Hospitals and Health Care Facilities (2001 edition)
Other reputable standards and guidelines that provide equivalent design criteria
SIG Engineering 2009 - 39
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
PRA EC.02.06.03Preconstruction Risk Assessment
(PRA)Construction or renovation in occupied
healthcare facilities can result in environmental problems such as:NoiseVibration Creation or spread of contaminantsDisruption of essential servicesEmergency ProceduresAir quality
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Life Safety Chapter
SIG Engineering 2009 - 41
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Life Safety Chapter Based on the Life Safety Code®
NFPA 101-2000 Format to be consistent with NFPA CMS K-Tags reconciled Three occupancies
Healthcare Ambulatory Residential
Exception language accepted Annual Life Safety Assessment will occur as part
of Periodic Performance Review
SIG Engineering 2009 - 42
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Life Safety Chapter Removed optional Building
Maintenance Program (BMP) Standards & Elements of Performance LS.01.01.01 Administrative LS.01.02.01 Interim Life Safety
Measures LS.02 - .04
LS.02 Healthcare LS.03 Ambulatory LS.04 Residential
LS.04.01 < 16 Rooming & Lodging LS.04.02 > 17 Hotel & Dormitory
SIG Engineering 2009 - 43
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
LS .02 .01 .34
LS .02 .01 .3 4
Life Healthcare Building Protection FireSafety Type Alarm
EPs are sequentially listed Exception language accepted Interim Life Safety Measures (ILSM) applies to LSC deficiencies
Construction and non-construction
SIG Engineering 2009 - 44
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Life Safety ProcessOverview: When an [organization] finds that
it is out of compliance with Standards LS.02.01.10 through LS.04.02.05, the hospital either resolves the deficiencies immediately or manages it through one of the following options: a maintenance management process
that documents the deficiency and corrective resolution within 45 days; or
a Plan For Improvement derived from the Statement of Conditions™; or
a Life Safety Code Equivalency approved by The Joint Commission.
SIG Engineering 2009 - 45
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Life Safety Chapter
LS.01.01.01 (Administrative)EP 3When the hospital plans to resolve a
deficiency through a Plan for Improvement (PFI), the hospital meets the time frame identified in the PFI accepted by The Joint Commission.
SIG Engineering 2009 - 46
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Life Safety Chapter
LS.01.02.01 (ILSM) EP 3The hospital has a written Interim Life
Safety Measures (ILSM) policy that covers periods of construction or situations when the Life Safety Code deficiencies cannot be immediately corrected or when The Joint Commission has not granted an equivalency. The policy includes criteria for evaluating when and to what extent the hospital follows special measures to compensate for increased risk.
SIG Engineering 2009 - 47
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Life Safety Chapter LS.02.01.20 The organization maintains the integrity of
the means of egressEP 13 Exits, exit accesses, and exit
discharges are clear of obstructions or impediments to the public way, such as clutter (for example, equipment, carts, furniture), construction material, and snow and ice. (For full text and any exceptions, refer to: NFPA 101-2000, 18/19.2.3.3.)
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Emergency Management
SIG Engineering 2009 - 49
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Overview Is now an accreditation manual chapter All Standards and Elements of
Performance from 2008 are incorporated into the 2009 Emergency Management Chapter
No new Standards or Elements of Performance in 2009
This new chapter contains some standards that were in HR, EC and MS
Survey Process is similar to 2008
SIG Engineering 2009 - 50
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
History of Disasters
Hospital/Community Debriefings: Tropical Storm Allison-June 2001 Terrorist Attacks-September 2001 Power Outage- Summer 2003 S. California Wild Fires-Summer
2003 SARS (Asia/Toronto)-Spring 2003 Florida Hurricanes (Frances,
Charley, Jeanne) - Aug/Sept 2004 Hurricane Katrina, Rita, Wilma- Aug,
Sept & Oct 2005
G
SIG Engineering 2009 - 51
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Assessment Conclusions
Major Issues Began to Surface: Scalable approach emergency management Problems with Communication Inadequate emergency generator backup Faulty Incident Command Systems Lack of Involvement with Emergency
Operations Center (EOC) The extend of an organization’s planning is
dictated by the impact of their worst recent disaster
SIG Engineering 2009 - 52
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Conduct a Hazard Vulnerability Analysis
Documented Annual Review Site specific: one or many Organization and community partners
prioritize HVA Includes disclosing to community needs and
vulnerabilities HVA to plan mitigation HVA to plan preparedness
EP 8 Documented inventory of resources & assets Fuel Personal Protective Equipment (PPE) Water Medical/surgical supplies Other
SIG Engineering 2009 - 53
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Emergency Operations Plan Emergency Operations Plan (EOP)
describes response procedures Written plan Capabilities to self-sustain for up to 96
hours EOP describes
Recovery strategies Initiation and termination of response
and recovery phases Defines authorities Alternative care sites Actual implementation is documented
SIG Engineering 2009 - 54
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Six Critical Components
1. Communication [EM.02.02.01]
2. Resources & Assets [EM.02.02.03]3. Safety & Security [EM.02.02.05]4. Staff responsibilities [EM.02.02.07]5. Utilities Management
[EM.02.02.09]6. Patient, clinical & support activities
[EM.02.02.11]
SIG Engineering 2009 - 55
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Emergency Management Development
EM.02.02.01 Communication EP 14 establishes backup communication
systems and technologies for communication activities identified in EPs 1 - 13
EM.02.02.03 Resources & Assets EP 3 replenish non-medical supplies EP 6 process to monitor quantities of its
resources and assets during an emergency EM.02.02.05 Safety & Security
EPs 4 & 5 manage hazardous materials EPs 6 & 7 controls access and movement
SIG Engineering 2009 - 56
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Emergency Management Development
EM.02.02.07 Staff Roles & Responsibilities EP 3 Define staff assignments EP 7 Provide training for staff assignments
EM.02.02.09 Utilities Contingencies
EM.02.02.11 Patient Care Issues EP 3 Evacuation strategies EP 11 Evaluate advance preparedness based
on HVA EM.03.01.01 Annual Evaluation EM.03.03.03 Exercise Emergency Management
Plan EP 3 Escalating component
SIG Engineering 2009 - 57
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Surveying Emergency Management
Review of the organizations Emergency Operations Plan
Two themes: Discussion
Prefer to conduct in ICS This EM tracer will be based on a
review of the Hazard Vulnerability Analysis
• Top 3 issues Observations
Integrated with other survey tracers
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
2009
The Physical Environment
Questions&
Answers
George Mills, Sr. Engineer
Standard Interpretation Group
The Joint Commission
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Questions & Answers
Q We have rental beds coming in the facility at all hours for Bariatric patients. The beds are being ordered by the Doctors. The standard says that all medical equipment owned or otherwise shall be inspected before use. What can we do about this equipment?
A Manage the equipment
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Questions & Answers
Q. Can you please address decorations on walls.
A. See NPFA 101-200018/19.7.5.410.2.5
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Questions & Answers
Q. Is it acceptable to identify smoke and fire wall penetrations on a life safety drawing for a single floor or area and then enter the deficiencies as a single PFI that references the life safety drawing for location and identification of the deficiency?
A. Possibly
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Questions & Answers
Q. During a recent mock survey, the Engineer surveyor advised that we should complete a SOC, Part 2 for every building within our system. We have off campus facilities that are wood structures, do not have sprinklers, and do not have fire alarms. This would require us to complete a Part 2 for these buildings. We consider these free standing business occupancies and have never completed a Part 2. In addition, this seems to contradict the Frequently
Ask Questions related to the eBBI where it is stated that “Freestanding business occupancies are not required to have en eBBI. Should we now complete a Part 2 for this type building?
A. You are correct
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Questions & Answers
Q. On a mock survey a surveyor quoted "Most of the elevators lobbies do not have the required one hour rated barrier isolating the elevators from occupied areas". LSC 7.2.13.3. My question : Why a barrier is needed in an elevator lobby, when their are two fire doors in the beginning of the two wings next to the lobby and building is 100 % sprinklered?
A. This LSC reference is about using the elevators for fire service evacuation
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Questions & Answers
Q. In an ongoing effort to become fully sprinkled here we added sprinkler heads in a space where we were storing records.
One of my fellow workers was told by CMS in a recent seminar that we could not have sprinkler heads over the records.
I was trying to meet NFPA guidelines for a hazardous space. But I was told CMS said that we either had to install a 200 gaseous system or have fully enclosed metal cabinets to store the records in. This is so that if there were an accidental discharge from
a sprinkler head that the records would not sustain any water damage.
A. The Joint Commission would allow you to add the sprinkler protection in these areas without other restrictions. You will need to address CMS directly or through ASHE’s
Advocacy
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Questions & AnswersQ. There are many redundant LS elements
of performance (EP's) whose only difference is the NFPA code they reference . For example: LS.03.01.50, EP 1 and LS.02.01.50, EP 4.
Both EP's have exactly the same verbiage but reference different NFPA 101-2000 standards, and all references direct you to NFPA 101-2000, 9.4.
LS.02 = HealthcareLS.03 = Ambulatory Healthcare
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Questions & Answers
Q. Environment of Care also has a few issues. Example: EC.02.03.05, EP's 4 and 5. If you are compliant with quarterly testing then it would stand to reason you are compliant with annual testing. Unless I am missing something, isn't EP 4 unnecessary?
EP 4 addresses the fire alarm systemEP 5 addresses notification of the fire
responders (i.e. remote fire dept.)
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Questions & Answers
Q. I was reporting an interim life safety issue in the electronic SOC. The cost was under $1000.50. Is this figure a set limit?
A. No, but some numerical value needs to be here
The $1000.50 is in the default message
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Questions & Answers
Q. JCAHO in EM 03.01.03 ep1, has changed to 2 drills a year with no guide lines to timing (no 4 month 8 month rules). With TJC going to deemed status they are going by CMMS guidelines and regulations. CMMS Physical Environment A-0703 still requires the 4 and 8 month rule. This is a concern. We have to stay with this guide line because we have 20 beds licensed long term. If other of our facilities have SNF beds they can potentially get into a problem on drills.
A. The Joint Commission has removed this criteria, but I have passed it on to DSSM for further review. Thanks.
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Questions & Answers
Q. Where does the information go in the electronic SOC that used to be called Plan for Improvement Long Form?
A. It is still there: see PFI, PFI MENU, Create New, Resolution, then click on Additional Information
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Questions & Answers
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Questions & Answers
Q. A personal concern and experience is that the EC .02.05.05 EP 6 only requires that auto transfer switches be tested and date recorded. I got cited and it has been an issue with a couple of others (one being a local acute hospital got the same hit) that the surveyors want transfer times documented. My form had the date and that the load was carried but he cited me anyway. Why are they allowing the surveyors to be more restrictive than the code states?
A. I will address this internally with the surveyors.
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
LS.02.01.70
The hospital prohibits portable space heaters within smoke compartments containing patient sleeting areas and treatment areas. (For full text and any exceptions, refer to NFPA 101-2000 18/19.7.8)
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
LS.02.01.70
NFPA 19.7.8 Portable space- heating Devices. Portable space-heating devices shall be prohibited in all health care occupancies.Exception: Portable space-heating
devices shall be permitted to be used in non-sleeping staff and employee areas where the heating elements if such devices do not exceed 212°F.
SIG Engineering 2009 - 74
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Fire Extinguisher: DatingMonth, day year and initials of inspector as per NFPA 10-
1998 EC.02.03.05 EP 15
4-3.4 Inspection Recordkeeping.
4-3.4.1 Personnel making inspections shall keep records of all fire extinguishers inspected, including those found to require corrective action.
4-3.4.2 At least monthly, the date the inspection was performed and the initials of the person performing the inspection shall be recorded.
4-3.4.3 Records shall be kept on a tag or label attached to the fire extinguisher, on an inspection checklist maintained on file, or in an electronic system (e.g., bar coding) that provides a permanent record.
SIG Engineering 2009 - 75
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
PFI: 6 Month Grace PeriodIf an organization realizes that they are running way
behind and are going to have trouble completing the PFI, they need to communicate with The Joint Commission before their planned completion date to make arrangements. But if they are on track to finish as they approach the planned completion date, and know they will run a little over and are sure they will be able to finish within 6 months, they can use that grace period.
Q. Does the Joint Commission still allow a 6 month grace period for completion of a PFI after the planned completion date posted in the eSOC?
A. Yes. See “Managing Compliance with the NFPA Life Safety Code in the introduction to the Life Safety Chapter: “All corrections must be completed within 6 months of the Projected Completion Date.”
SIG Engineering 2009 - 76
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
PFI modificationsQ. Can users of the PFI make changes to their PFIs
created since the previous survey, including planned completion dates up to the point that the eSOC is locked for the survey. Is this still true for 2009?
A. Provided the PFI item has not been accepted by a Joint Commission surveyor, the user may make modifications as needed to manage the process.
The View All screen of the PFI indicates modifications have been made, and Joint Commission surveyors may inquire regarding the modification.
SIG Engineering 2009 - 77
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Testing Requirements The Joint Commission Standards and Elements of
Performance identify for accredited organizations compliance requirements.
In the Environment of Care there are requirements for compliance with specific codes found in the National Fire Protection Association (NFPA) body of codes. The NFPA, which is consensus-based code
development body, has a convention of codes and annex material.
The codes are enforceable if adopted by an authority having jurisdiction (AHJ)
Annex material is not enforceable, as it is informational or explanatory material only.
SIG Engineering 2009 - 78
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
EC.02.05.09 Tank FarmQ. EC.02.05.09, EP 1 states the hospital
tests, inspects and maintains critical components of the piped medical gas systems. The bulk storage tank(s) and associated systems are critical components of the piped medical gas system but are not referenced in the scope of the EP.
A. This would be a new requirement according to SII guidelines. We would also like to address cylinder handling and storage issues in the future.
SIG Engineering 2009 - 79
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
10 Second Transfer: NFPA 99-2009 Resolution
Revise existing Section 4.4.4.1.1.1 to read:Maintenance of Alternate Power Source. The generator set or other alternate power source and associated equipment, including all appurtenant parts, shall be so maintained as to be capable of supplying service within the shortest time practicable and within the 10-second interval specified in 4.4.1.1.10 and 4.4.3.1.The 10-second criteria shall not apply during the monthly testing of an essential electrical system. If the 10-second criteria is not met during the monthly test, a process shall be provided to annually confirm the emergency systems capability to comply with 4.4.3.1.
SIG Engineering 2009 - 80
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
ATS TestingMaintenance shall be performed in accordance
with NFPA 110, Standard for Emergency and Standby Power Systems, Chapter 8.
Substantiation: When testing is performed using a test switch on an ATS, normal power is still available to the system. This presents a significant problem for systems with utility paralleling, closed transition, or in phase transfer to meet the 10-second criteria for picking up the essential load. The standard established the 10-second criteria for whenthe normal power is lost, and not as a testing criterion for the monthly load test.
SIG Engineering 2009 - 81
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Sleeping AccommodationsQ. A sleep center with 8 beds within an
otherwise Business occupancy. Is a sleep study considered "treatment",
and therefore should this be classified as a Lodging and Rooming House occupancy in the eBBI under the Residential Treatment Center heading in the eBBI?
A. No, this is a business occupancy, because the occupants are not rendered incapable of self preservation.
SIG Engineering 2009 - 82
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
MASTER ALARM PANEL: LS.02.01.34 EP 2
The master fire alarm control panel is located in a protected environment (an area enclosed with 1-hour fire-rated walls and ¾ hour fire rated doors) that is continuously occupied OR in an area with a smoke detector. NFPA 72-1999 1-5.6 & 3-8.4.1.3.3.2
SIG Engineering 2009 - 83
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
General Life Safety Interpretations
Rated doors must have legible labels on the door and jambsJambs prior to 1966 may not have a
rating labelMissing labels may be equivalized if
evidence of compliance is provided to central office
Alternative is to have third party testing agency re-label doors
Are ILSM in place where non-compliant door assemblies are found?
SIG Engineering 2009 - 84
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
General Life Safety Interpretations
Fire stop: existing application is acceptable if: It was installed in a manner consistent with
original design specifications It is in acceptable condition currently
If the firestop is cracking, etc, then it is to be removed and repaired using current technologies
Testing has confirmed foam alcohol based hand rub (ABHR) is equivalent to gel
JC does not accept the expanding foam used for insulation in any fire or smoke barrier
This product does have a UL label, for insulation properties
Easily ignited Toxic gases when burned
SIG Engineering 2009 - 85
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Non Flammable Medical Gas Storage: General Issues
<300 ft³: 12 ‘e’ cylinders per smoke compartment, in rack or appropriate holders
• Each ‘e’ cylinder is 24.96 ft³• Smoke Compartment is limited to 22,500 ft²
Between 300 and 3000 ft³ must be stored in a room that is limited construction with doors that can be locked
“In use” verses “in storage” On gurney is considered “in use” In rack is “in storage”
• limited to 12 racked, per smoke compartment “Empty” are NOT considered part of the 12 “in storage”
SIG Engineering 2009 - 86
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
Non-Flammable Gas Storage: NFPA 99-2005
NFPA 99-2005 edition has additional language regarding O2 storage requirements, specifically:
Storage of nonflammable gases:9.4.1 > 3000 cubic feet9.4.2 300 – 3000 cubic feet 9.4.3 0 - 300 cubic feetOther:5.1.3.3.2 design and construction5.1.3.3.3 ventilation of locations for manifolds5.1.3.3.3.2 ventilation for motor driven equipment5.1.3.3.3.3 ventilation for outdoors
NOTE: CMS also recognizes the above references
SIG Engineering 2009 - 87
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
General Life Safety IssuesFully sprinklered buildings Not required in elevator mechanical
rooms if state codes do not allow (i.e. Ohio, Massachusetts)
Ensure sprinkler piping is not used to support wiring or other material Score as life safety code deficiency
(LS.02.01.35 EP 4)Piping supports are not damaged
or loose (LS.02.01.35 EP 3)
SIG Engineering 2009 - 88
180
+ Q
&A
© C
opyr
ight
, The
Joi
nt C
omm
issi
on
SIG Support: 630 792 5900
Jerry Gervais, CHSP, CHFM
Engineer SIG
George Mills, MBA, FASHE, CEM, CHFM, CHSP
Senior Engineer SIG
John Maurer CHSP, CHFM
Engineer SIG
Open Position
Engineer SIG