Table of Contents
Message of the Provincial Governor - i
Message of the Provincial Vice Governor - ii
ELA Resolution - iii
Vision and Mission Statement of the province - 1
Brief Profile of Agusan del Sur - 2 – 11
Situational Analysis
Economic Development Sector - 11 – 13 Social Development Sector - 13 – 23 Environmental Protection and Conservation - 23 – 29 Public Safety and Security - 29 – 33 Institutional/Transforming the Bureaucracy - 33 – 37
Goal, Objectives, and Strategies - 37 – 52
Priority Programs and Projects - 53 – 105
2014 Priority Programs and Projects - 53 – 72 2015 Priority Programs and Projects - 73 – 89 2016 Priority Programs and Projects - 90 – 105
CapDev Agenda (Table 7) - 106 – 144
Economic Development Sector - 106 – 120 Environmental Protection and Conservation - 121 – 125 Social Sector - 126 – 135 Public Safety and Security - 136 – 139 Institutional/Transforming the Bureaucracy - 140 – 144 Legislative Requirements - 145 – 170 Resource Mobilization Strategies - 171 - 177
Page | 1
Vision and Mission Statement
Vision
‘An Agri-industrialized, eco-tourism province of God centered, caring, healthy productive
and self-sustaining communities”
Mission
Improved quality of life of Southern Agusanons specially the Indigenous People
Page | 2
Brief Profile of Agusan del Sur
Physical
Location
Agusan del Sur occupies an accostal portion of Northeastern Mindanao, bounded on the North by Agusan del Norte, on the south by Compostela Valley, on the west by Misamis Oriental and Bukidnon, and on the East by Surigao del Sur. The province is landlocked and can be reached only by land transportation through the Davao–Butuan National Highway. Three minor roads also provide access for travelers coming from Tandag, Lianga, Barobo and Bislig City in Surigao del Sur and one road connects the southwestern part of the province with Asuncion, Compostela Valley province. All four roads, however intersects the National Highway at different points.
On external routes, the province could be reached through water transportation through Nasipit Port in Agusan del Norte to Cebu, Bohol and Manila, air transportation in Butuan to Cebu, or Butuan Manila, and Butuan to Davao.
Land Area
The province’s approximate area is 896,550 hectares or 8,965.50 sq.km. ranking as the fourth largest in the country. The three largest provinces are, first Palawan with an area of 14,896.3 sq.km, second, Isabela with an area of 10,664.5 sq.km, third Cagayan Valley with an area of 9,007.7 sq.km.
The municipalities of Loreto, La Paz, Esperanza, and San Luis are the four largest municipalities in land area comprising almost sixty percent of the province’s total land area. On the other hand, Sta. Josefa and Talacogon, are river towns have the smallest land area.
Political Subdivision
The seat of the provincial government is the Government Center situated in Barangay Patin-ay, Prosperidad. The center also host national agencies.
There are fourteen municipalities in the province, seven are located along the Philippine-Japan Friendship Highway or Agusan-Davao National Highway and are aptly termed as highway towns. These are the municipalities of Sibagat, Bayugan, Prosperidad, San Francisco, Rosario, Bunawan, and Trento. The municipalities of Sta. Josefa, Veruela, Talacogon, San Luis, and Esperanza are situated along the Agusan River. Along the Umayam and Adgaoan Rivers which are the tributaries of Agusan River are the municipalities of Loreto and La Paz, respectively. Towns along the rivers are called river towns.
Presently, there are 2 congressional districts of the province. District 1 covers the municipalities of Sibagat, Bayugan, Prosperidad, Talacogon, San Luis, and Esperanza. District 2 covers the municipalities of San Francisco, Rosario, Bunawan, Rosario, Trento, Sta. Josefa, Veruela, Loreto and La Paz
Page | 3
Agusan del Sur has 318 barangays, and is headed by an elected Barangay Captain.
Language and Dialects
Cebuano is dominantly spoken followed by Boholano and Illongo. Of the native tongue, Manobo dialect is the most popular. Other popular dialects are the Higaonon, Butuanon, Surigaonon and Kamayo. Most, however, can understand and talk in Filipino, the National Language.
English is usually used in conversations and in the government transactions. It is also used as the medium of instruction in schools.
Topography and Land Features
Agusan del Sur is an elongated basin formation with mountain ranges in the eastern and western sides forming a valley which occupies the central longitudinal section of the land. The Agusan River which flows from Compostela Valley in the south towards Agusan del Norte in the North runs almost in the middle of the valley and empties at Butuan Bay. The river has twelve major tributaries namely: Wawa, Andana, Gibong and Simulao River in the Eastern side, and Ojot, Pusilao, Kasilayan, Libang, Maasam, Adgaoan, Umayam and Ihaoan in the Western Side. These tributaries are fed by numerous streams and creeks. The southern half of the province from the municipality of Veruela is an area filled with many swamps and lakes, the biggest of which is Talacogon Lake.
Soil Type
Agusan del Sur is endowed with rich and fertile soil. Because of its soil fertility, varied crops will grow. Based on the Land Resource Evaluation Project conducted by the Bureau of Soils in 1983, Agusan del Sur soil types are characterized from deep to very deep, moderately deep to shallow and shallow to slightly acedic, strongly acidic, moderately acedic and neutral high fertility and low fertility. It has also varied colors dark-brown, brown dark yellow brown, very dark grayish brown, and reddish brown. Among soil types are clay, clayey, loam, loamy, silty loam, sandy, clayey loam, coarse loamy and clayey loamy. The clayey and loamy types are richer in nutrients than most sandy soils. The texture of the soil has a considerable effect on many factors which affect plant growth and agricultural management.
Climate and Rainfall
The province was once classified as typhoon-free, but due to the effect of Climate Change, the province climate has changed and part in the west side has shifted to type lV. Manifestation of the change was the occurrence of typhoon Sendong on December 16, 2011, and Typhoon Pablo in December 4, 2012. Billions of agricultural crops, lifelines, and infrastructures, were destroyed and death of 18 persons was reported.
The climate map of the Philippines based on modified corona classification shows that the province falls under type ll, but in 2008 when the climate map was
Page | 4
updated, portion of Agusan del Sur near Misamis Oriental and Bukidnon falls under type VI.
The type ll climate has no dry season with a very pronounced maximum rain period, and type Vl climate, rainfall is evenly distributed more or less throughout the year. Maximum rainfall generally occurs in December to February, and there is no single dry month. Areas characterized by this climate are along or very near in the eastern coast thus are open to the northeast monsoon.
Classification
Agusan del Sur is classified as a first class province. Its sources of income are derived from the tax revenues, Internal Revenue Allotment, operating and miscellaneous fees and others. Shown below is the classification by municipality
Table: 1 Classification, Area, Population (2010) by Municipality
Demography
Population Size, Density and Growth Rate
The total population of the province is increased by 17% or a total of 97,124 persons from 559,294 in the year 2000 to 656,418 in the year 2010.
The city of Bayugan is populated by 99,361 (Census 2010) giving the highest population share in the province of 15.1%. It is followed by the municipality of Properidad, the capital town with a population of 76,628 or 11.7% population share and San Francisco with a population of 70,986 or10.8% share. Most of the municipalities with high population are highway towns where transportation facilities specifically roads and bridges are in-placed. Moreover, the economic activities existing in the municipalities are vibrant.
Municipalitiy Municipal Class Area (in Ha.) 2010 Population
Sibagat 2nd 50,136 30,985
Bayugan 1st 53,939 99,361
Prosperidad 1st 56,133 76,628
San Francisco 1st 35,591 70,986
Rosario 3rd 29,601 38,280
Bunawan 3rd 43,309 37,482
Trento 1st 75,070 47,193
Sta. Josefa 4th 18,801 25,156
Veruela 3rd 33,208 40,457
Loreto 1st 138,940 39,474
La Paz 1st 109,973 28,562
Talacogon 3rd 33,084 37,224
San Luis 3rd 118,642 32,733
Esperanza 1st 100,118 51,897
Total 896,550 656,418
Page | 5
Table 2: Population, Annual Population Growth Rate and Density (CY 2000, 2010)
Source: NSO APGR & PSSource: NSO (2000 & 2010), ADS; Density – computed by PPDO, ADS
The following graph shows the comparison of population for year 2000 and 2010, by municipality.
Figure 1 - Population by Municipality (Y 2000 & 2007)
Source: NSO, Agusan del Sur
10,00020,00030,00040,00050,00060,00070,00080,00090,000
100,000110,000
Bay
uga
n C
ity
Pro
spe
rid
ad
San
Fra
nci
sco
Esp
era
nza
Tren
to
Ve
ruel
a
Lore
to
Tala
cogo
n
Sib
agat
Ro
sari
o
Bu
naw
an
San
Lu
is
Sta.
Jo
sefa
La P
az
Bayugan
City
Prosperidad
SanFranci
sco
Esperanza
Trento
Veruela
LoretoTalaco
gonSibaga
tRosari
oBunawan
SanLuis
Sta.Josefa
La Paz
2000 93,62 70,81 56,96 44,15 41,69 36,22 31,36 30,87 28,68 28,67 26,70 25,90 22,73 20,88
2010 99,36 76,62 70,98 51,89 47,19 40,45 39,47 37,22 30,98 38,28 37,48 32,73 25,15 28,56
Population by Municipality, 2000 & 2010
2000
2010
PROVINCE/ MUNICIPALITY/
CITY
POP’N 2000
POP’N 2010
POP’N SHARE 2010
%
APGR 2000-2010
DENSITY 2000
DENSITY 2010
BAYUGAN CITY 93,623 99,361 15.1 0.60 174 184 SIBAGAT 28,685 30,985 4.7 0.77 57 62 ESPERANZA 44,151 51,897 7.9 1.63 44 52 PROSPERIDAD 70,815 76,628 11.7 0.79 126 136 SAN FRANCISCO
56,968 70,986 10.8 2.22 160 199
ROSARIO 28,675 38,280 5.8 2.93 97 129 BUNAWAN 26,704 37,482 5.7 3.45 62 86 TRENTO 41,696 47,193 7.2 1.25 56 63 STA. JOSEFA 22,730 25,156 3.8 1.02 121 134 VERUELA 36,222 40,457 6.2 1.11 109 122 LORETO 31,365 39,474 6.0 2.33 23 28 LA PAZ 20.880 28,562 4.4 3.18 19 26 TALACOGON 30,879 37,224 5.7 1.89 93 112 SAN LUIS 25,901 32,733 5.0 2.37 22 28 AGUSAN DEL SUR 559,294 656,418 100 1.61 62 73
Page | 6
Table 3 shows the 2010 population by age bracket and by sex. The succeeding graph revealed that lower age bracket particularly along 0-14 years old are heavily populated. Ages 5-9 have the highest number of population, followed by 0-4 and 10-14. This indicates higher demand for social services specially for health and education services. Middle age group constitutes labor force but the graph shows that as ages go up, the population is declining. This would mean scarcity in the labor force. Out migration might be one cause of the declining population in which people look for a better job or other opportunities outside the municipality or province.
Table 3: Population by Age Group and by Sex (2010)
Source: NSO (2010); Computation- NSO Age and Sex Disaggregation – PPDO
Six (6) municipalities are noted to have increased its population in 2010. These are the municipalities of Bunawan, La Paz, San Luis, Trento and Loreto. The municipality of Bunawan top the rank with a net increase of 1.1% while San Luis has the lowest, with only 0.04% net. In general, the population of the province increased, however the increase is minimal and is not alarming.
Age 2010 Population Male Female
Agusan del Sur 656,418 339,958 316,460 0-4 92,239 47,770 44,469 5-9 98,194 50,855 47,339 10-14 92,053 47,674 44,379 15-19 71,933 37,254 34,679 20-24 54,121 28,029 26,092 25-29 46,162 23,907 22,255 30-34 43,241 22,394 20,847 35-39 38,929 20,161 18,768 40-44 32,216 16,685 15,531 45-49 24,410 12,642 11,768 50-54 18,601 9,633 8,968 55-59 14,441 7,479 6,962 60-64 12,234 6,383 5,941 65-69 7,867 4,074 3,793 70-74 4,927 2,552 2,375 75-79 2,582 1,337 1,245 80-84 1,336 692 644 85-89 607 315 292 90-94 153 79 74 95-99 67 35 32 100 & above 15 8 7
Page | 7
Table 4: Population shares, by municipality, 2000-2010
Municipality/City Pop’n 2000 % Share
Pop’n 2010 % Share
CumPop 2000 % Share
CumPop 2010 % Share
2000-2007 % change
Bayugan City 16.7 15.1 16.7 15.6 -1.1
Sibagt 5.1 4.7 21.87 20.53 -0.2
Esperanza 7.9 7.9 29.76 28.35 -0.1
Prosperidad 12.7 11.7 42.42 40.72 -0.3
San Francisco 10.2 10.8 52.61 51.04 0.1
Rosario 5.1 5.8 57.74 56.17 0.0
Bunawan 4.8 5.7 62.51 62.04 1.1
Trento 7.5 7.2 69.97 69.63 0.1
Sta. Josefa 4.1 3.8 74.03 73.72 0.0
Veruela 6.5 6.2 80.51 79.77 -0.4
Loreto 5.6 6.0 86.11 85.44 0.1
La Paz 3.7 4.4 89.85 89.58 0.4
Talacogon 5.5 5.7 95.37 95.01 -0.1
San Luis 4.6 5.0 100.00 100.00 0.4
Source: NSO, Agusan del Sur
2.2.2 Density and Urbanization
The municipality of San Francisco has the highest population density in the povince with a record of 199 persons/sq. km (Census 2010, Table 2). Seven municipalities have higher population density than the provincial average of 73p/sq.km. These are: Bayugan (184 p/sq.km), Prosperidad (136 p/sq.km), Sta. Josefa (134 p/sq.km.), Rosario (129 p/sk.km) Veruela (122 p/sq/km.), Talacogon (112 p/sq. km) and Bunawan with 86 p/sq. km. while the remaining 6 municipalities have lower densities than the province.
High density of San Francisco is accounted by the influx of people in the area simply due to its vast fertile soil suitable for rice, plantation crops, the promising mining industry and its accessibility to Butuan City – a fast growing city and a center of business in Caraga Region. However, the density of people occupying San Francisco is still less than that of Butuan City and Metro Manila which are the benchmark cities of the region and the country respectively.
San Francisco is strategically located and considered one of the business
centers in Agusan del Sur. This is also the junction area going to Surigao del Sur, Bislig City, Butuan City and Davao City. These attract some local and neighboring towns outside Agusan del Sur to movedin from their locale venturing chance in mining industry.
Generally, municipalities with high density are mostlyhighway towns while those with low density are river towns, with bigger areas and are usually affected by flood during rainy season.
The municipality of Bunawan has the highest growth in the province, with an average growth rate of 3.5% during the year 2000-2010. This is followed by La Paz with 3.18% and Rosario with 2.93% (refer to table 5). This is attributed to the
Page | 8
increasing economic activities in the area such as establishment of Palm Tree Plantation, establishment of Philsaga, operation of small mining industries and the construction of roads and bridges connecting the highway municipalities & barangays.
Economy Agusan del Sur has an Agriculture-based economy with rice and corn as
the major staple crops produced. Other crops produced in the province are vegetables, fruits, and industrial crops.
On Crop production, rice is increasing from 2007-2011 the rate of 41%; while
in corn production, there is a decreased in area planted but in production specially in yellow corn the rate of increase is 16.33%. All other major crops listed below have increased in production, and the increase is attributed to the increase in area planted and due to the construction of Farm-to-Market Roads to the agricultural production areas. Coconut registers a 4.65 decreased in production due to typhoon Pablo.as shown in table 5.
Table:5 Percentage Increase/Decrease in Area Planted and Production 2007-2011
Moreover, the employment in the province is still under primary sector
because it is basically an agriculture-based economy. Based on CBMS data 2009, the highest share of employment is under the Agriculture, Fishery and Forestry (AFF) constituting 57.4% followed by Services Sector of 33.9%.
Livestock and Poultry
The province is yearly investing in the production by buying high breed animals to upgrade and increase animal inventory to attain the per capita meat consumption of the populace. These are in a dispersal scheme and the rest are reared in the production center. Table below shows the inventory of livestock in the province.
Crops Area Planted % Increase/ Decrease
Production MT % Increase/ Decrease 2007 2011 2007 2011
Rice (effective area) (ef )
59,102
95,557
61.68
236,323
333,162
41
Corn (ef) 27,054 34,890 16.33 29,991 34,890 16.33 Rubber 768.00 907.1 18 11,731.11 15,077 26.26 Coconut 26,389 35,351 34% 42,940.75 40,950 (4.65) Oil Palm 16,113 18,896 17.27 313,775 Banana 7,524 13,253 76.14 60,183 62,226 3.39
Page | 9
Table: 6 Status of Livestock and Poultry Production (2010-2011) Livestock/Poultry (No. of Heads)
2010
2011
% Increase/ Decrease
Cattle 4,782 4,960 3.7 Carabao 28,470 31,663 11.21 Goat 23,266 24,465 5.15 swine 76,328 68,862 (9.78) Poultry (Birds) Chicken 405,705 422,565 4.16 Duck 71,289 70,931 (.50) Turkey 1,796 1,257 (30) Quail 4,016 3,561 (11.3) Geese 752 738 (1.9)
Source: Veterinary Services
Fish Production
The province is landlocked, hence marine fishes are supplied by neighboring provinces. The province has fresh water fishes cultured in a pond, nets in the municipality of Esperanza, Sta. Josefa, and Veruela. Fish catch from the municipal waters are mostly from the municipality of Bunawan, Loreto, La Paz, and Talacogon.
Table 7. Fish Production, Agusan del Sur, 2011
Source: PAO, Agusan del Sur
Falcata Production
Total production of Falcata in 2011 is 808,891.6 cubic meters with a total value of 2.3 B (PENRO-LGU). Harvested in an area of 4,493.84 hectares Most of these are processed outside the province, in Cagayan, Gingoog and Butuan.
On Industry and Services
Tourism
Tourism Industry is already among the focus of Local Executives. The province is blessed of having Agusan Marsh, lots of lakes that could be promoted for lake hopping, kayaking, and bird watching. The province has also falls, caves to be developed for tourism destinations, and Mount Diwata for Mountain Trekking.
Sources Production (MT) Aqua Culture 741.95 Fish Pond 491.45 Fish Cage 245.5 Rice Fish 5 Municipal Waters 1,854.36 Total 2,596.31
Page | 10
Mining
Mining industry has contributed 3.0 % in employment and a household income of 10%, but this is enjoyed by only few. The table below shows that gold ore extraction tax increases from 2007 to 2008, but decreases in 2009. However, calculation from 2007 to 2009, there was an increase of 114%, and from 2010 to 2012 there was an abrupt decrease of 71%. This shows that mining is not a staple source of revenue.
Table 8 Mineral Resources Extraction and Extraction Tax
Source: PENRO Manufacturing
The province is rich in agricultural crops, fishery, and planted forest
products, however there is a need to increase productivity in order to contribute to the Gross Value added (DVA) in manufacturing given its multiplier effect on the creation of jobs .
Two processing plant of Palm Oil is operating in the province, the
Filipinas Palm Oil Plantation Inc.(PFFI), and the Agusan Plantation Inc. (API). The cooking oil is already sold in the local market, in neighboring cities and in Metro Manila.
There are also processing of other products such as the corn coffee, banana chips, Calamansi juice, and Fruit Wine.
Services
On employment, community and Social Services shares the highest employment with 17% which includes government employees and other workers rendering services. The municipality of Bayugan has the highest of 3.6% followed by Prosperidad of 2.8%, and San Francisco of 2.5%.
On Income, the Services Sector has the highest share of income in the
province of 56.5% , followed by Industry of 29.8% then by AFF of 13.7%. Comparing 2005 and 2009 data, the Services Sector has slightly increased by 1.7% points, while the remaining sectors have slightly decreased, as shown on table below.
2007
2008
2009
2010
2011
2012
Volume Gold Ore
26,765.42 39,445.03 33,308.33 33,400.67 12,629.36 11,950.37
Extraction Tax (ET)
6,691,366 9,861,258 8,327,083.5 8,360,168 2,525,870 2,390,074.5
% Increase/Decrease in (ET)
2007-2009 114%
2010-2012 (71)%
Page | 11
Sector/Sub Sector 2005 2009 Change(% pts.)
AFF 13.8 13.7 -0.1
Agriculture 4.7 5.2 0.5
Fishery 2.7 2.3 -0.4
Forestry 6.4 6.2 -0.2
Industry 31.3 29.8 -1.5
Manufacturing 7.9 6.9 -1
Construction 6.5 6.1 -0.4
Elec., Gas & Water 6.2 6.7 0.5
Mining & Quarrying 10.7 10.0 -0.7
Services 54.8 56.5 1.7
Wholesale & retail 10.9 11.8 0.9
Transpo., storage & communication 7.8 7.8 -
Community & Social Services 14.3 13.3 -1
Finance 12.9 16.6 3.7
Others 8.9 6.9 -2
TOTAL 100% 100%
Source: CBMS, 2009 Share of the Total Household Income – PPDO, ADS
Table 9 Income and % Contribution by Sector/Sub Sector
Situational Analysis Economic Development Sector Agusan del Sur is endowed with rich agricultural land and other natural
resources. Its optimal use and development is accounted as driver for achieving growth for the betterment of the lives of the Agusanon.
The economy of the province is agriculture based, which posted an
employment rate of 57.4%. Being an agriculture-based economy, underemployment is high with a percentage of 38.95%.
On Crop production, rice is increasing from 2007-2011 the rate of 41%; while
in corn production, there is a decreased in area planted but in production specially in yellow corn the rate of increase is 16.33%. All other major crops listed below have increased in production, and the increase is attributed to the increase in area planted and due to the construction of Farm-to-Market Roads to the agricultural production areas. Coconut registers a 4.65 decreased in production due to typhoon Pablo.
Page | 12
On Livestock Table 10 Livestock and Poultry Production and % of Increase Decrease
Livestock/ Poultry
2009
2010
2011
%increase/ Decrease 2009-2011
Cattle 5,435 4,782 4,960 (8.7) Carabao 31,356 28,470 31,663 0.9 Goat 23,862 23,266 24,465 2.53 Swine 70,101 76,328 68,862 (1.7) Chicken 470,590 405,705 422,567 (10.20) Duck 74,903 71,289 70,991 (5.22)
In support to the full mechanization of the agriculture sector, to reduce delay
and increase production, and decrease post harvest loses; Pre and Post Harvest Facilities (PPHP) are provided.
To augment income of farmers, backyard Livestock and Poultry raising are introduced, others are taught to process their produce into semi- finished or finished forms to add value and create employment. Farmers are taught to treat farming as an enterprise. All of these efforts were demonstrated in the Convergence Development Program (CDP).
Convergence Development Program (CDP) is a well-designed program.
Under this program is the Diversified Farming System, however, the implementation of such project needs to be strengthened. Project Directors/technicians should supervise the implementation until all the output indicators are derived.
The Economic Sector identifies the following issues/challenges that needs to
be addressed.
1. Poverty as the core issue 2. Low Productivity which is attributed to:
Climate Change Adaptation Natural Calamities Weak Extension Delivery System Segmented Value Chain
3. Unemployment Inadequate Enterprise Development Inadequate Skills Development Support Undeveloped Eco-Tourism Promotion and Support Inadequate Tourism Promotion and Support
4. Accessibility and Connectivity Accessible Provincial Road Network Potable Water Roads electricity Communication Services
5. Low Income
Page | 13
Low Revenue Collection Indebtedness Less Investment Land Tenure
Social Development Sector
Health
Complex issues/concerns reflected in causal loop analysis are as follows: High Maternal Mortality Rate; High Infant Mortality Rate (under 5 years old); High Malnutrition Rate; Lifestyle-related diseases predominantly leading causes of morbidity and mortality; Low formal basic education performance indicators; dysfunctional families; limited participation in Moral & Spiritual activities which may lead to spiritual poverty; and presence of informal settlers. The underlying causes of those mentioned issues/concerns even long before are inadequate delivery of social services. These are supported with data from the 2010-2012 Annual Reports, and assessment of the proposed programs/projects in 2010-2013 Executive and Legislative Agenda (ELA) vis-à-vis funded in Annual Investment Plans (2011-2013).
Not all programs/projects identified and prioritized in 2010-2013 ELA
for the social sector were funded, only 71% or Php. 318 M. The Poverty Reduction Program & Education sectors have significantly increased its budget, the rest have decreased by more than half as shown in table 12.
Table: 11 Proposed Programs/Projects vis-avis Funded
PROGRAMS/PROJECTS
PROPOSED BUDGET IN 2010-2013
ELA
FUNDED IN 2011-
2013 AIPs
Increase/ decrease
1. POVERTY REDUCTION PROGRAM
18,000 43,850 25,850
2. HEALTH & NUTRITION 329,010 166,319 162,690
3. SOCIAL WELFARE 43,500 10,122 33,377
4. SPORTS DEVELOPMENT 16,400 1,800 14,600
5. EDUCATION 24,670 92,350 67,680
6. HOUSING & RESETTLEMENT 2,000 2000
7. MORAL RECOVERY, VALUES FORMATION PROGRAM
14,200 1200 13,000
Total (Social Sector) 447,780 317,641
Page | 14
The “means” and “end’ of each sub-sector in fulfilling their accountabilities to produce desired results for past three years in review are as follows:
Health and Nutrition Services
Health Facility
The province is served by twelve (12) hospitals; six (6) are government hospitals and the rest are privately owned clinic/hospitals. Out of six, five are operated and maintained by the Provincial Government.The level of care ranges from Level I-Level III. It is a center of quality and safety hospitals,accredited by Philhealth Insurance Corporation (PHIC) except Talacogon District Hospital, of which its accreditation is on process. The Fourteen (14) Rural Health Units are also accredited by Philippine Health Insurance Corporation (PHIC) of which nine are certified by TB DOTS. Out of the 314 barangays in the province, only 132 or 42% have Barangay Health Stations (BHS). There are 191 delapidated Health & Nutrition Post that needs immediate rehabilitation.
A total of 173 Botika ng Barangay (BnB) established in the province. The 161 BnB are sponsored by the Center for Health Development and Act for Peace while 12 BnB are funded by the Provicial Government under Convergence Development Program.
Service Capacity
The bed occupancy rate of the D.O. Plaza Memorial Hospital reached 120% and rendered services for in and out patients not only for the people of Agusan del Sur but also for the neighboring provinces like Surigao del Sur, Compostela Valley province and other transient patient. This hospital has served 16,160 in patients with an average length of stay of three (3) days, and 35,583 out patients in 2012. The Bunawan District Hospital is 73% and other hospitals ranges from 31% to 73% which is lower than the ideal rate of 80-85%.The allowed or authorized bed is from 10 to 100 beds and the maximum actual used of bed reached to 130.
The ideal hospital bed to population ratio is 1:1000, however for the past three years the province ratio is 1:2000-3000 patients. This resulted to overcrowding specifically in D.O. Plaza Memorial Hospital.
Each municipality/city in the province has 1 RHU/CHC having a ratio of 1 RHU:48,457 persons.The 132 barangay health stations are manned by a regular midwife per station. These widwives are assisted by by 2,153 active barangay health workers. The 191 barangay health post also managed by 390 Barangay Nutrition Scholars serving the populace.
Page | 15
Table- 12 Hospital Classification, Bed Capacity & Actual, Occupancy Rate 2011
Source: PHO Annual Report (2012)
Health Human Resources
Achieving the ideals ratios for medical personnel in government hospitals, Rural Health Units and Barangay Health Stations and Birthing Clinics continue to be a challenge of the province.
In 2012, the DOPMH has 13 Medical specialists doctors (including 4 consultants), 2 surgeons, 10 physicians, 101 nurses (36 regulars 65 casuals/JOs), 23 nursing attendants and 2 widwives. To meet the standard manpower requirement, a total of 30 doctors, 22 nurses should be hired/created.
For the secondary hospital, additional 11 doctors and 15 nurses are also needed in addition to the existing 3 doctors & 6 Contractual MOIII and 10 nurses. Same issues in primary hospital, they need additional 3 doctors and 21 nurses in addition to 1 existing doctor and 5 nurses.
Table 13 Health Manpower and Ratio to Population
Name of Hospital Classification Bed Capacity
Actual implementing
bed
Occupancy Rate
1. D.O. Plaza Memorial Hospital Tertiary 100 130 120%
2. Bunawan District Hospital Secondary 50 50 73%
3. Talacogon District Hospital Primary 10 10 31%
4. Esperanza Medicare Community Hospital
Primary 15 15 43%
5. Loreto Community Hospital Primary 10 10 50%
6. Bayugan Community Hospital Primary 15 15 70%
Manpower 2010 2011 2012 Provincial Officer II 1 1 1 Provincial Health Officer I 1 1 1
Municipal Health Officer 14 14 14 1:46,887 1:47,664 1:48,458
Public Health Nurse 30 29 29 1:21,881 1:23,010 1:23,393
Rural Health Midwife 149 149 145 1:4,405 1:4,478 1:4,679
Rural Sanitary Inspector 18 18 15 1:36,468 1:37,072 1:45,227
Public Health Dentist 8 10 12 1:80,052 1:66,730 1:56,534
Medical Technologist 18 18 18 1:36,468 1:37,072 1:37,689
Source: PHO and PPDO
Page | 16
As to personnel requirement in Public Health, table 14 shows that from 2010-2012,1MHO serving 46,887-48,458 people, it is almost doubled to a standard ratio of 1 MHO:20,000 population. In the case of physician, it is very high, hence there’s a need for more manpower specifically doctors. It is a fact that many of them have resigned and went abroad despite the provision of benefits and other incentives by the local government units. In some instances also, additional manpower would mean additional budget such that the local government units can no longer afford to hire more; added to that is also the fact that many of the LGUs have already exceeded the Personnel Service limitation.
Vital Health & Nutrition Indices
With the above mentioned work force providing health services, accomplishments showed an improvement over the years as shown in the Vital Health Indices as shown in table 15.
Table 14 Vital Health Indices (Agusan del Sur)
Health Indicators 2010 2011 2012
Maternal Mortality Rate 0.82 0.75 0.70
Crude Birth Rate 24.88 24.95 23.01
Crude Death Rate 2.49 2.53 3.02
Infant Mortality Rate 8.9 6.89 5.4
Under 5 Mortality Rate 10.94 10.15 6.98
Fully Immunized Children (FIC) 106 103 99
Mal-Nutrition Prevalence Rate 10.62 9.51 8.11
Contraceptive Prevalence Rate 69 65 59
Source: PHO 2010-2012 Annual Report
Social welfare
Quality social welfare services to marginalized and vulnerable group (children ages 3- 4 years old, out-of-school youth, women, persons with disability, senior citizen abused children & women, informal settlers and least privileged families and poor communities)
Increase the number of 3-5 year old children by 10% availed with Early Childhood Care & Development (ECCD) Program;
Increase number of social welfare facilities like DCC, indoor & outdoor play facilities for used of the ECCD and community centers or multi-purpose centers for used of the organized group of women, out-of-school youth, persons with disability, senior citizen;
Page | 17
Sport Development
To provide sports activities and development among youths and adults, the Office of the Provincial Sports Development Coordinator had conducted, participated and assisted sports competition and other activities from provincial, regional, national and international level. Among the competitions attended were: NCFP-12 Years Under National Chess OpenTournament, 1012 National Age Group Chess Championships, Caraga Regional Athletic Meet (CRAM), Batang Pinoy-Phil. Youth Games Mindanao Qualifying Legs , etc.
Education
Education Facility
Quality basic education for all has been the prime goal of the province. As of 2012, the Department of Education Division (DepEd) of Agusan del Sur has a total 442 schools with kindergarten, 483 public elementary schools out of which, 417 are complete elementary, 19 incomplete elementary, 20 complete primary and 27 incomplete primary.
The total number of teachers, principals, head teachers, and locally-funded teachers are as follows: the kindergarten is four hundred forty (440) of which eighty nine (89) are Kindergarten regular teachers and three hundred fifty one (351) are volunteer which are subsidized by DepEd; the elementary level is 3,190 while the secondary level is 980. The School Division is now composed of 34 School Districts.
Service Delivery
In coordination with the Department of Education-Division of Agusan del Sur initiated and institutionalized the “Pagtuon Alang sa Masanag na Kaugmaon Project “which means” Study for a Bright Future”.
Aside from Pagtuon Project, a lot of special education programs/ projects were assisted by the Provincial Government to wit: operation and maintenance of public school; construction and repair of school buildings; provision of facilities and eequipment; educational research; purchase of books/periodicals and sport development through Special Education Fund.
Pagtuon Project
The Pagtuon Project aims to promote the value of reading for elementary and secondary students of the division. This program coincides with the program of the Department of Education named “Every Child a Reader. The specific objectives is to bridge the gap between pupils/students and the library; induce more voluntary reading among the learners; provide better access to library facilities, computer and speech laboratories; minimize the incidents of illiteracy in
Page | 18
the province.This project started in 2001. Below are sub-projects and activities under for past three years in review:
Library Centers
This component involves the establishment of school library centers with furniture and fixtures and provision of varied/colorful books to elementary and secondary schools. The center primarily aims to develop the love of reading among pupils/students and enhance reading proficiency.
The books are donated by the Books for the Barrios Foundation, which came directly from the United States of America. The Provincial Government pays for the freight and handling from the source to the school. The Municipla/Barangay Local Government Unit and the Parent Teacher Community Association are responsible for the establishment of the Library.
To date, out of 96 secondary schools, 93 have libraries and out of 483 elementary schools, 244 have libraries/ accessed the project.
To ensure the functionality of the Pagtuon Library Centers, each has assigned librarian. Also,“Supervised Library Work” is incorporated in class programs in the elementary level. Teacher advisers are obliged to guide their pupils to go to libraray do reading and library work everyday as part of their daily routine. In secondary level, school librarian are assigned to manage the libraray and its materials.
Speech Laboratories
There were three Model of Excellence School provided with speech laboratories namely; Agusan del Sur Pilot School (ADSPILS), Trento West Central SPED Center and Pisaan Elementary School. Also, elementary school provided by speech laboratory is Philippine Normal University-Center for Teacher Learning. Three Secondary Schools has provided with speech laboratories,the Agusan del Sur Science High School, Esperanza National High School and Bunawan National High School.
Computerization
A total of 154 personal computer and netbook were provided to Model of Excellence School heads.
Model of Excellence (MOE)Project
The Provincial Government envisions to establish at least one MOE school per municipality. It is an intervention of raising and enhancing the academic performance of the pupils. One intervention that made this school as MOE is improving its school physical and provision of library center and computer and speech laboratories. Currently, there are Thirty Two (32) MOE schools in the province. Expected benefits gained to this project are pupils gain self confidence as they are equipped with basic skills on oral and written communication; improve rapport among children in school; develop the love of reading and gain knowledge on basic computer operation.
Special Education Project
Operation and maintenance of public school specifically on providing allowances for volunteer registered teachers has the biggest share in Special
Page | 19
Education Fund Budget, the least is the research program as as shown in the figure below.
Figure 2. Percentage allocation of Special Education Fund
Basic Education Performance Indices
Kindergarten
The gross enrolment in preschool is 15,916 learners and the school aged population is 15740, this translated to a gross enrolment rate of 101.12 %. On the other hand, the net enrolment of kindergarten is 12,682, thus having a net enrolment rate of 80.57 % in SY 2011-2012.
Elementary
Based on the data presented on participation rate/Net Enrolment Ratio (NER) , it is observed that there is an erratic/fluctuating trend of children going to school. Year 2010-2011 has a very high NER because of the Conditional Cash Transfer(CCT) for the Pantawid Pamilyang Pilipino Program (4Ps) aside from initiatives and strategies of Deped It can also be seen that for the period in review, an average of 26.35% of the pupils aging 6-12years old are not in school for the elementary level while an average of 59.10% of students aging 13-16 years old are not in school. It is also noticeable that more female pupils/students are in school compared to the males.
This trend can be attributed to several factors like: seasonal work in the farming fields, children helped their parents in the farm, and some taking care of their younger siblings, insufficient income of the family, transfer of residence, illnesses, and in some very remote areas, there are noticeable cases of children simply not interested to go to school because they just seemingly enjoyed being free and do other things they wanted or interested to do.
Based on the 2010 population of children 6-12 years old which is 136,609, it is projected that by 2017, it will reach 153,520 while 13-16 years old in 2010 which is 65,638 becomes 73,763 in 2017.
1%
23%
10%
14%
52%
Research program School Building & equipment
Sports development Citizenship development
Teachers
Page | 20
Both Gross Enrollement Rate (GER) and Net Enrollement Rate (NER) in the Elementary Level for the three consecutive years is fluctuating. SY 2010-2011 posted the highest NER.
Figure 3 Net Enrolment Ratio (Elem. Level) SY 2009 to SY 2011-2012
Secondary
From the data shown in Fig. 5, it can be seen that secondary schools SY 2012-2013 has a gross enrolment of 40,692 and the total learners in the community is 66,449 (NSO data). This data is translated a gross enrolment rate of 61.24 %. Same with elementary education it is fluctuating and SY 2010-2011 posted the highest NER. Factors attributed are economic crisis that spurred students to stop schooling and work to help sustain the needs of the family; peace and order, like contonuos recruitment of students by armed groups and family social problems that tend families to move to other places outside the province.
Figure 5 Gross & Net Enrolment Ratio (Secondary)
0.00%50.00%
100.00%150.00%200.00%250.00%300.00%350.00%
Gross EnrolmentRatio
Net EnrolmentRatio
SY 2011-2012 118.63% 96.93%
SY 2010-2011 117.90% 102.40%
SY 2009-2010 96.33% 86.94%
59.00%59.50%60.00%60.50%61.00%61.50%62.00%62.50%63.00%63.50%
Net EnrolmentRatio
Gross EnrolmentRatio
Page | 21
Table 15– Net Enrolment Ratio 2009- 2012(Secondary Level)
Source: DepEd Agusan Sur
Cohort Survival Rate
The figure below shows that there is an increasing trend in the cohort survival rate for the elementary level of education. It is noticeable that more and more pupils enrolled in grade 1 are able to reach grade 6 after 5 years. This means that the holding power of the school through various strategies and interventions jointly supported by the parents and the community proved to be successful in some ways. The recorded rate of 57.41 in SY 2007-2008 is lower than the regional rate of 65.8(DepEdCaraga Report) in the same period.
The Cohort Survival Rate in both the elementary and secondary level is affected by yearly drops-outs. This is due to absenteeism that eventually resulted to drop-outs and in certain cases, dropping out due to transfer of residence. Some other factors affecting this indicator are child labor, malnutrition, family conflict and low income of the family that cannot sustain their living.
Figure 6 Cohort Survival Rate, Elementary Level
Source:DepEd Agusan Sur
0
20
40
60
80
100
2008-2009 2009-2010 2010-2011 2011-2012 2012-2013
Male 56.13 49.92 61.03 50.06 70.33
Female 62.58 60.71 72.67 65.04 81.51
Cohort Survival Rate (Elementary Level)
Male
Female
School Year
Net Enrolment Ratio (NER)
Male Female TOTAL Gender Parity Index
2009 – 2010 50.12 56.92 53.49 1.14
2010 - 2011 46.79 54.58 50.59 1.17
2011 - 2012 38.05 56.92 43.09 1.27
Page | 22
Table 16– Cohort Survival Rate (Elementary Level)
Source: DepEd Agusan Sur
Table 17 - Cohort Survival Rate (Elementary)
Source: DepEd Agusan Sur
The secondary cohort survival rate has a fluctuating trend over the years in review. It showed only a bit of increase/decrease despite several interventions by the Department of Education, the local government units, NGOs and foreign donors.
The situation of the education sector in the province remains to be very challenging on how to increase the literacy rate, participation rates and cohort survival rates as important education indicators including how to decongest the classes in schools with high classroom-pupil ratio by constructing additional classrooms and facilities.
It is a fact that the demand for education increases when health conditions improve and the levels of income rises. The efforts of the province toward increasing/improving health and poverty situation of the population will be complemented with a better educational services and facilities-thus resulting to higher demands for competent teachers, construction/rehabilitation of classrooms and its facilities including water and sanitation in the schools. Furthermore, the construction/rehabilitation of roads/bridges/dikes leading to the schools is also vital to sustain the programs and projects that are contributory to the improvement of the education indicators. Efforts along a well-meaning partnership with all sectors will also be strengthened.
School Year
Cohort Survival Rate
Male Female Average
2008-2009 56.13% 62.58% 59.217%
2009-2010 49.92% 60.71% 54.86%
2010-2011 61.03% 72.67% 66.40%
2011-2012 50.06% 65.04% 56.80%
2012-2013 70.33% 81.51% 75.51%
2008-2009 59.21
2009-2010 54.86
2010-2011 66.40
2011-2012 56.80
2012-2013 75.51
Page | 23
Figure 7 – Cohort Survival Rate, Secondary
Source: DepEd
Sport Development
To provide sports activities and development among youths and young adults, the Office of the Provincial Sports Development Coordinator had conducted, participated and assisted sports competition and other activities from provincial, regional, national and international level. Among the competitions attended were: NCFP-12 Years Under National Chess OpenTournament, 1012 National Age Group Chess Championships, Caraga Regional Athletic Meet (CRAM), Batang Pinoy-Phil. Youth Games Mindanao Qualifying Legs , etc
Environmental Protection and Conservation
Land Classification
Agusan del Sur has a total land area of 896,550 hectares in which 24% or 216,043 hectares are alienable and disposable (A & D), while 76% or 680,507 are forestlands. However, there are areas which are already built-up according to their actual land uses like commercial, industrial, and institutional, but the status remains forestland. It’s a big challenge for the province to reclassify these areas into alienable and disposable through the Act of Congress.
Forestlands
Forestlands are classified into production forest and protection forest. Production forests are those areas which can be planted with trees and are harvestable such as falcata, and gmelina. Protection forests are those areas with elevation of 50% slope or 1000 meters above sea level elevation. These are considered protected areas due to its very steep slopes, and prone to soil erosion.Cutting of trees in these areas arestrictly prohibited by law.
0
20
40
60
80
100
2008-2009
2009-2010
2010-2011
2011-2012
2012-2013
Male 56.59 56.61 65.53 58.90 67.20
Female 61.05 60.03 68.04 65.53 83.76
Cohort Survival Rate, 2008-2013 (Secondary Level)
Male
Female
Page | 24
Production Forests
There are 369,607.21 hectares of production forest in the province. Within the production forest there are 33 approved Community Based Forest Management Agreement (CBFMA) and one (1) is still on the process for approval. It has a total area of 61,056.55 hectares situated in the forest areas of the different municipalities like Esperanza, Prosperidad, Bunawan, Loreto, Talacogon, Sibagat, Bayugan, Sta. Josefa, and Veruela. Moreover, there are also nine (9) Industrial Forestry Management Agreements (IFMAs) hectares. The IFMA, and the CBFMA are spearheaded by the DENR in partnerships with the concerned LGUs.
Protected Area
A total of 272,553.00 hectares are classified as protected areas, the 244,028.70 are located within the timberland, while 28,524. hectares are within alienable and disposable lands. Aside from these, there are also protected areas declared by the National Integrated Protected Areas System (NIPAS) Act or Republic Act 7586 enacted in June 1992. These are the proclaimed watersheds with 16,855 hectares and the Agusan Marsh with a total area of 40,940 hectares. Originally, the area of Agusan Marsh when the NIPAS Act was enacted was only 19,176.56 hectares.
There are areas considered for protection located within the A & D lands. These are the buffer zones of rivers and roads with 9, 336 hectares, fault lines with 3,479 hectares, and Network of Production Areas for Agricultural Development (NPAAD) with 14,,825 hectares. NPAAD areas are strictly non-convertible to other uses for food security purposes. These are either irrigated areas or potential areas for irrigation.
In the timberland, in the Provincial Development Physical Framework Plan (PDPFP) 66,870.0 hectares are allotted for utilities, infrastructures and tourisms.
Hazard and Disaster Prone Area
In Agusan del Sur, there are Six (6) types of natural hazard which include flooding, rain-induced landslide, Typhoon Earthquake, Earthquake induced Landslide, and Liquefaction
The most prone municipality in soil erosion hazard is Loreto which covers 76,320 hectares, and ranked third in fault line hazard with 603 hectares. Talacogon ranked first in flooding hazard with affected areas of 14,494 hectares; second is Bunawan with 14,059 hectares; and third is San Francisco with 12,810 hectares.
On earthquake, Veruela ranked first affecting 932 hectares, followed by La Paz with 625 hectares.
Existing Structures and Mechanisms
The Provincial Environment and Natural Resources Office under the Provincial Government of Agusan del Sur is responsible in the sustainable management and development of environment and natural resources within the
Page | 25
devolved and co-managed areas and ensures implementation of devolved functions, plans, programs and projects as well as strategies for the protection, safeguarding, utilization and conservation of the environment and natural resources within its territorial jurisdiction.
To achieve these mandates, the following are the major programs and projects implemented by this sector:
l. Forest Management and Development
The Forest Management and Development Division is mandated to implement, and enforce forest preservation and protection and resource development policies, programs and projects. In addition, this division is responsible and accountable for safeguarding and protection of the natural resources in collaboration with the national agencies as mandated under DAO 30 Series of 1992 and RA 7160.
Sustainable Small Scale Watershed Management
The care and management of small watersheds is a function of the local government unit (LGU). A total of 10,005 hectares of watersheds are already declared by the LGU. There are seven watersheds declared by the LGUs as of 2012 and three are still on the process.
Table 18 Locally Declared Watersheds
Name of Watershed
Status Location Total Area in Has.
Duangan Watershed
Brgy. Declaration and adopted by the Municipality
Esperanza
18
Taonaga Watershed
Barangay Declaration Prosperidad
630.72
Maputi Watershed
Municipal Declaration Rosario 2,760
Masabong Watershed
Brgy. Declaration and adopted by the Municipality
Rosario
608
Dumagooc Watershed
Muncipal Declaration Trento 5,313
El Rio Small Watershed
Local Declaration on Process
El Rio Sibagat 31
Sinobong Watershed
Local Declaration on Process
Sinobong, Veruela 264
Imelda Watershed
Brgy. Declaration Imelda, Bunawan 61
Page | 26
Sayon Watershed Municipal Declaration on process
Sayon, Sta. Josefa 123.46
Grace-Olive Watershed
Barangay Declaration Grace State and Mt. Olive, Bayugan City
197
In 2012, it has conducted social preparation in partnership with NGO thru Memorandum of Agreement, conducted ocular inspection of the proposed watershed, identified beneficiaries and validated the project site as part of the pre-implementation phase of the project. On the other hand, it hass conducted one (1) site delineation surand facilitated the enactment and approval of the small scale watershed. There were 7,150 assorted fruit tree seedlings distributed to the beneficiaries, and extended financial assistance for the construction of two (2) water intake boxes.
Sagip-Upland Development
This project involves the adoption and promotion of agro forestry approach in the respective land of the farmers and provision of technical assistance. It aims to mobilize upland farmers as partners in the ecological protection, conservation, and socio-economic upliftment of upland communities. There are nine (9) existing Sagip Upland projects in the province.
Upland Sustainable Agri-forestry Development (USAD)
The province has 179 barangays located in the uplands. As a strategy in
developing the upland barangays and prevent or limit the community in engaging the extraction of natural resources in the forestland, USAD is one of the best strategies.
Together with the USAD Team, it has conducted program orientation to two (2) barangays, validated 100 sites, conducted two (2) technology trainings, and facilitated the passing of barangay resolutions expressing support to the USAD Program. Moreover, it has delivered 31,000 cacao seedlings to Magkiangkang, Bayugan City, and 25,000 budded rubber seedlings in Sta. Irene, Prosperidad. However, there were 9,695 budded rubber seedlings damaged which are subject for replacement by the supplier.
Forest Enforcement And Support to Revenue Generation
Enforcement of forest laws has been undertaken by the PENRO-LGU as a source of local revenue. In revenue generation, it has increased the collection in Verification Inventory Fee( VIF)from P20,881,538.60 in 2011 to P23,544,934.22 plus P9,799,482.32 thru the MENRO issuing the Order of Payments which took effect last March 2012, thus having a total gross VIF collection in the amount of P33,344,416.6 or an increase of 41.62%.The issuance of an Executive Order No. 30 series of 2011 authorizing the MENRO to issue
Page | 27
Order of Payments has contributed to the increase in collection. Likewise, Environmental Tax collected was P1,383,932.00 in 2011, and P1,721,200.17 in 2012 thus showing an increase of 24.37%. Such increase was attributed by the increase in payment per cubic from P35.00 to P50.00 based on the Revenue Code.
II. Mines and Geo-Sciences
Mines and Geo-Sciences Management Division is mandated to
implement Small-Scale Mining Laws. Rules and Regulations devolved to PGAS as per Department Administrative Order (DAO) No. 30 dated June 30, 1992. It is also mandated to support revenue generation relative to the utilization of mineral and energy resources and other programs and projects related to Mineral Resources Management, Utilization and Protection.
This division is also involved in the implementation of Upland Sustainable
Agri-Forestry Development (USAD) Program covering the barangays of Bayugan 3, and Wasian of the municipality of Rosario. Among activities undertaken in 2012 were: conducted site validation and consultation with the indigenous people and the BLGU, conducted USAD orientation and facilitated the preparation of Memorandum of Agreement. However, out of the 100 targeted enrollees only five (5) were able to provide counterpart of the program.
In addition to USAD activities, it has facilitated and maintained Coco Seed
Nut Propagation with total seedlings of 7,500. III. Environmental Management and Regulation The Environmental Management and Regulatory Division (EMRD) shall
implement and enforce all devolved functions particularly on waste and pollution control management, environmental compliance and shall conduct land survey, area verification, and review and evaluate land including boundary conflict settlements.
In the implementation of Ecological Solid Waste Management (ESWM)
Act or Republic Act 9003, barangay Patin-ay was chosen as the pilot project in terms of BLGU-led ESWM. Activities undertaken were: conducted IEC on RA 9003 specifically the mandatory segregation at household level and provision of waste sack hangers every household and encouraged the establishments of MRF by purok as collection point.
In addition, the province thru PENRO has extended financial support in
the acquisition of one (1) Baling Machine for the municipality of Rosario and one (1) for Bunawan. However, the baling machine foBunawan was not delivered last December 2012 due to typhoon Pablo. The delivery is re- scheduled in 2013.
Page | 28
IV. Biodiversity Management
The Biodiversity Management and Ecotourism Division is mandated to implement the devolved protected areas and wildlife management functions and identified key Biodiversity Areas in the Eastern Mindanao Key Biodiversity Framework, prepares plans and programs for its protection, conservation, and management of identified significant sites in co-management approach.
As of 2012, it has conducted an assessment and survey of the Ugnop Cave inside and outside of the cave, and prepared an assessment report and also the Putting Buhangin Cave boundary landscape survey. Moreover, it has also conducted one (1) Biodiversity Monitoring System (BMS).
Under the Community Awareness on Conservation and Environment (CARE) project, it has provided silver marking tablets with inscribed features of Barangay Mabuhay, Prosperidad, recognizing Mangkono as adopted species for barangay protection and proliferation commitment.
In support to Agusan Marsh Wildlife Sanctuary, it facilitated the installation of five (5) floating signages at strategic sites of Lake Mambagongon.
Assisting the PENRO in the enforcement of laws is the Agusandel Sur Environment Sustainable Development Council (ASESDC). Issues/Problems:
Based on the causal loop, the following are the issues/problems confronting this sector:
Environment degradation due to illegal mining, denuded forest, improper solid
waste disposal;
Contamination of river systems;
Siltation/sedimentation of river systems;
Disposal of mining wastes from neighboring provinces;
Scarcity and quality of drinking water;
Exploitation of potential ecotourism sites;
Conversion of forestland into agricultural plantations;
Rampant forest exploitation;
Damages to crops, livestock, properties, and infrastructures caused by
flood and typhoon;
Illegal fishing;
Occurrence of diseases and illnesses due to mining and flooding;
Lack of manpower to enforce environmental laws;
Lack of IEC on environmental and tourism laws, policies, and regulations;
Page | 29
Limited funded for NRM rehabilitation;
Tribal conflict/disputes relative to NRM rehabilitation;
Overlapping tenurial instruments;
Lack of knowledge to implement ecosystems-based approach;
Lack of knowledge to integrate and focus on IP programs and projects:
Public Safety and Security
The main goal of the sector is to ensure zero casualties and to protect
the lives and property of individual from any type of hazard; the natural and the
human made hazard.
There are about six (6) natural hazards that the province is experiencing;
these are flood and rain-induced landslides for hydrometeorologic hazard and
geologic hazards like earthquake or ground-shaking, earthquake-induced
landslides and liquefaction and the latest that hit the province is the typhoon
hazard.
Flooding is the yearly natural hazard that Agusan del Sur is experiencing
due to its geographical location. Historically, there were 9 flood occurrences every
year; out of which, 3 flood occurrences were observed by local folks as high.
However, the province has no capability to measure the depth and no official
records to back-up the claim.
At the center of the province lies the Agusan River which absorbed waters
from the 12 tributaries and the Agusan Marsh. The Agusan Marsh serves as the
catch basin of the Agusan-Davao plain in Eastern Mindanao, draining the Diwata
Mountain ranges of Agusan del Norte and Agusan del Sur in the east, the mountain
ranges of Bukidnon in the west and the hills of Compostela Valley in the south, with
about 59 lakes within, it acts as the retarding basin for floodwaters that regularly
inundate the Agusan Valley during the northeast monsoon.
Other hazard like Rain-induced landslide is also experienced especially
those municipalities located along the rivers and slope greater than 18%. The most
affected municipality is Sibagat, along the national road. Most affected are the
motorist due to the damage of carriageway. It also affects the economy of the
province since the affected area is the external road of the province. Some areas
experienced only minor damage on road shoulder in the internal circulation. Prime
Page | 30
agricultural land is less affected since there is no major crop within the high
susceptibility area.
Agusan del Sur is no longer a typhoon free province, since it was badly hit
by typhoon Sendong on December 16, 2011, and Typhoon Pablo on December
4, 2012. Typhoon Pablo hardly hit six (6) municipalities namely Bunawan, Trento,
Sta. Josefa, Veruela, Loreto, and La Paz. As recorded, a total of 248 barangays
and 58,412 families were affected in the entire province. Damages in houses reach
to an estimated cost of Php 444,850,259.00. Damages to infrastructure that
includes irrigation facilities, roads and bridges, flood control and drainage, power,
public buildings/facilities, day care centers, health centers, and school buildings
totalled to Php 615,867,500. On agriculture, the estimated value amounted to
Php1.91B covering 16,700 hectares of agricultural lands. Agricultural crops
damaged include rice, corn, rubber, banana, oil palm and coconut. The overall
estimated damage caused by typhoon Pablo amounted to 2.8 Billion
When typhoon Pablo hit the province, The Provincial Disaster Risk
Reduction Management Office (PDRRMO) provided relief operations to all affected
families/individuals, by providing food, medicine and temporary shelter. Aside from
the Provincial Government, international organizations, national agencies, local
government units, non-government organizations, religious groups, civil society
organizations, business groups and private persons came to help the victims.
PDRRMO conducted trainings on quick response and established local emergency
response team in every barangay, hence when calamity/disaster strike, they have
provided quick response.
As a developing province, we are faced with different types of crimes. The
trend is slowing down with the crime on murder topping the list. In 2012, the
province is served by 509 police force on a ratio of 1:1,290 with the municipality of
Prosperidad having the highest ratio of 1 policeman to 2,994 population while the
municipality of LaPaz has the lowest ratio of 1 policeman to 1,170 population.
Basing on the standards of 1:500 or 1:1,000 population for urban/rural, the province
should have atleast 656 police force to cater the total population. Data below
shows the number of cases of crimes committed and the number of police force by
municipality. Cases of crimes were either filed in court, settled amicably, or on
going process.
Page | 31
Table 19 Crimes Committed Particulars Number of Cases
2009 2010 2011 2012 2013 (Jan-June)
Murder 134 108 121 133 79
Homicide 50 42 35 38 12
Physical injuries 1122 197 134 77 43
Rape 15 5 3 30 34
Robbery 149 61 42 56 32
Theft 453 108 46 15 13
Others
Carnapping 55 11 18 19 4
Cattle rustling 19 3 1 1 1
Total 1997 535 400 369 218
Source: PNP, ADS year: 2013
As to protection from fire hazards, the province is served by nine (9)
fire stations situated in nine (9) Municipalities and one city with only 20 fire trucks
as of 2012, and only 50 firemen. Bayugan having the most number of firemen
recorded at 13 in 2012 and Talacogon with only 5. A total of 19 conflagration
recorded based on Provincial Fire Office (PFO) report. The province should have
Table 20 Number of Police by Minicipality
Province/Municipality Population (2012 projected)
Total Number Of Police Ratio
Bayugan City 100,550 40 2,514
Sibagat 31,467 23 1,368
Esperanza 53,602 23 2,331
Prosperidad 77,847 26 2,994
San Francisco 74,179 36 2,061
Rosario 40,557 24 1,690
Bunawan 40,112 22 1,823
Trento 48,376 22 2,199
Sta. Josefa 25,671 21 1,222
Veruela 41,362 23 1,798
Loreto 41,332 22 1,879
La Paz 30,409 26 1,170
Talacogon 38,642 25 1,546
San Luis 34,302 21 1,633
Provincial Public Safety Company (PPSC)
99
Police Provincial Office 56
Agusan del Sur 656,418 509 1,290
Source: PNP ADS, year: 2012
Page | 32
about 339 number of firemen and 24 Fire trucks to meet the standard of 1 firemen
for a 2,000 population and 1 fire truck per 28,000 population or 14 firemen per fire
truck.
The Provincial Correctional and Security Office (PCSO) provide the
services to the 199 inmates (as of September 20, 2013) at the provincial
correctional service. Each one of the inmates has different behaviors. The facility
had encountered untoward incident in the previous years hence capacitating the
organic personnel aimed at improving the delivery of custodial and security
services of the province is necessary.
The facility has an existing 15 dilapidated (iron cells and roofing)
detention cell with a room area of 30 square meter (5x6 meter). Room facilities
include comfort room and dining area, catering more than twelve (12) inmates. The
existing condition of the correctional facility is congested. There is a need to
rehabilitate the correctional facilities and to provide security measures to avoid
another untoward incident.
On the other hand, public safety is sometimes threatened by some
insurgency problems in the province particularly in hard-to-reach barangays or in
Table 21 Number of Fire Men and Fire Truck
Province/Municipality Population
(2012 projected)
Firemen Fire Truck
Bayugan 100,550 13 3 Bunawan 40,112 - 1 Esperanza 53,602 6 1 La Paz 30,409 - 1 Loreto 41,332 6 1 Prosperidad 77,847 10 3 Rosario 40,557 6 1 San Francisco 74,179 11 3 San Luis 34,302 - 1 Sta. Josefa 25,671 7 1 Sibagat 31,467 - 1 Talacogon 38,642 5 1 Trento 48,376 10 2 Veruela 41,362 - OPM-Prov’l. Office 6 - Agusan del Sur 656,418 80 20
Source: BFM , year: 2012
Page | 33
the boundaries of our neighboring provinces. These are in anyway not so alarming
but somehow will also be taken cared through preventive measures.
Issues and Problems
1. 49,962 Households affected by flood (Disaster Report)
No relocation site for victim of calamities and high risk areas
2. Siltation of Waterways
3. Poor Implementation of RA 10121 (An act strengthening the Philippine Disaster Risk
Reduction and Management System, Act of 2010)
Poor IEC
CCA-DRR Not Mainstreamed in LDPs
Lack of Community Capacities
Lack of Disaster equipment
Inadequate evacuation centers for Internally Displaced Persons (IDPs)
4. Improper waste disposal
5. Poor drainage system
6. No financial tools (insurances)
7. 176 CNN barangays
8. 528 crime incidence (PNP report)
9. Presence of Drug Pushers and Users
10. Congested correctional facilities
11. 19 conflagration (PFO report)
12. Presence of IP conflicts
Institutional/Transforming the Bureaucracy
Paradigm structural reforms are required in transforming the bureaucracy.
Over the years, the importance and the role of the support offices in the
implementation of PGAS programs, projects and activities, systems and processes,
strategies and capacity building has not been fully understood. Consequently, the
provincial government faces difficulty to implement institutional reforms in
governance.
Page | 34
Governance reform, however, cannot be implemented successfully by a
leap of faith. The bureaucracy in PGAS itself has to be a part of the reform process.
To make the reform results tangible and sustainable, the bureaucracy requires a
restructuring of development thrust, which in effect must address capacity
challenges along the course of action.
Getting a clear picture of these challenges, diagnosing the sector’s role
albeit not directly involved in the implementation of PGAS programs and projects,
are vital to provide the necessary support for the other sectors in carrying out their
respective mandates.
Using the causal loop analysis, the offices under the Transforming the
Bureaucracy has identified several issues and problems which lead to Poor Service
Delivery (central problem). The web of its interconnectedness is very complex,
thus the account is focused to the issues considered as key factors that impede
achieving the strategic direction of the Province where support for the efficient and
effective service delivery is critical.
Organizational Development:
Transforming the bureaucracy involves organizational development. The
enormity of the reform areas which includes, among others, structure and staffing,
and capacity intervention as defined in the HRD plans overwhelmed the financial
capacity of the provincial government. The implementation of SP Ordinances Nos.
36 and 90, Series of 2009 and 2011 respectively, for the separation package and
funding of positions, as indicated in the proposed budget, requires substantial
financial resources. This does not include the funding requirement for the capacity
development intervention needed by the institution to capacitate the employees for
improved service delivery
Given the huge amount required, implementation of these reform agenda
is very low that it will require years to fully achieve the desired state.
Systems and Processes:
Establishing sound Systems and Processes is another area observed to
institute good governance where transparency and accountability is adhered.
Page | 35
These include establishing innovative processes as well as strict enforcement of an
established system. Foremost of the systems and processes that must be
enhanced are as follows:
Streamlining the number of signatories to fast track transaction flow. Too
much bureaucratic procedure has contributed the delay of
programs/projects implementation;
Property management system for accuracy of inventory and establish
proper accountability;
Enhancement of the Real Property Tax Information System into a web-
based system
Enhancement of the e-procurement system
Standardized PMEG monitoring tool
Enhancement of all other electronic systems to protect security breach
and avoid un authorize access that may result to manipulation of data.
Planning and Budgeting
Planning and budgeting is one of the capacity areas that PGAS
departments must have a good skill. This technical ability, however, must be
compensated with analytical skills.
Budget proposals in previous years greatly exceeded the projected
revenue of the provincial government. A clear manifestation that assessment and
analysis conducted of the existing situation in order to come-up with strategic PPAs
with consideration to the financial capacity of PGAS was unsatisfactory.
Capacity Development:
Institutional capacity is very broad, and includes a range of skills in all
parts of PGAS bureaucracy. Simultaneous improvement in the various aspects of
institutional capacity create positive synergies that will redound to a sound
implementation of systems, processes, programs and projects as well.
In broad sense, capacity development of the province is concerned with the
following:
Page | 36
Human resource development: equipping PGAS employees the
necessary skills and knowledge (based on individual needs) to enable
them to perform effectively
Organizational development: strengthening management structures,
processes and procedures, not only within PGAS but also the
management of relationships between the institution and stakeholders
Policy Support:
Different development programs of the province may need specific policy
to support or reinforce its implementation. It has been noted that PGAS
departments, especially those implementing development programs and project,
must identify the needed policy support. Depending on the issue, the development
of a policy must involve the expertise of the stakeholders that will use the policy
and be affected by it. In the process, quality legislation or policy is not only
assured but also its buy-in.
On the other hand, the development of a Legislative Feedback Mechanism
is essential to monitor not only on the compliance of the enacted policies but also
its responsiveness in addressing development issue.
Revenue Generation and Resource Mobilization:
Reducing poverty requires strong PGAS financial management, multi-year
expenditure programming, and expenditure monitoring. The need to raise revenue
to support the development thrust of the province call for good for tax
administration. It is in this context that the province must deliberately attempt to
increase productivity of the economic sector to substantially expand and raise the
revenue base of the province. .
Communication Plan
In the past years, deliberate effort to communicate PGAS development
initiatives was deficient due to the absence of a Communication Plan.
Consequently, buy-in/support of PGAS development programs and projects by
Page | 37
internal and external stakeholders were minimal. For this reason, partnership and
collaboration was not strongly forged which lead the downturn of the delivery of
basic services.
lll GOAL, OBJECTIVES AND STRATEGIES Goals : Reduce Poverty by 12.5%
Economy
Sub-Sector: Agriculture Objectives:
Full manpower complement based on SP Ordinance # 36 and # 90;
Each facility has technical project-in-charge to give more focus on
Management and operation;
Appointment of full time and of permanent status C/MCDO;
Improved Level of expertise in specific commodity;
Trained in all identified priority commodities;
Improved level expertise;
All personnel trained to serve as Pool of Trainers province wide;
Trained on M & E;
Enhanced process to make it consumer-friendly established Manual
of operation
Improvement on documentation-print (process, beneficiaries,
Output outcome)
M&E based on appropriate tool;
Feed backing mechanism in placed;
Updated data based;
SM-BSC aligned to ELA
Strengthened corrdination.
Sub-Sector: Veterinary
Permanent technical staff to handle the Program;
Organized and federate cattle raisers associations/group;
Reduced the gap on the demand of beef in the province;
Page | 38
Re-organized existing goat association and federate goat
Associations in the province;
Reduce the gap on the demand of pork in the province;
Permanent plant operator and plant technician to operate
The LN2 plant;
Provide genetically improved boar for sufficient supply of
semen;
Permanent farm foreman/technical staff and animal keeper
to handle the farm program;
Sufficient farm equipment, tools and vehicle to be used;
Organized and federate poultry raisers in the province;
Monitoring & Evaluation with proper documentation and assessment;
Strict monitoring and collection of repayment of loaned animals;
Reduce the gap on the demand of native chicken in the province.
Produced sufficient amount of goats milk;
Rehabilitate non-functional digester;
Install high density polyethylene to demo farms as show window;
Installation of polyethylene to stakeholders (TPED)
Establish Meat Processing Laboratory in Agusan del Sur;
Establish new building for Veterinary Office and facilities.
Sub-Sector: Tourism
Full implementation of SP Ordinance Creation of the Provincial
Tourism Office;
Improve Knowledge and skills on product planning & product
Development, tourism resource assessment, attraction on theme
Park operation, feasibility study for tourism site development,
History & heritage establishment and M&E.
Improved systems, processes and procedures especially on M & E;
Improvement in data generation, analysis and utilization, feed
Backing and utilization;
Improved ELA, SM-BSC alignment;
Bega falls developed/declared as ecotourism destination in
Caraga in 2016
Agusan del Sur Heritage Center Established and functional.
Page | 39
Sub-Sector: Entrepreneurship Marketing and Enterprise Development Program Increase number of Entrepreneurs from 28 to 150 in 2016;
Increase jobs generated from 1,547 to 3,000 by 2016;
Leverage other funding sources that could be used to fund micro-
Financing projects;
Establish micro-financing program that would cater sole proprietor
Peoples organization aqnd cooperatives;
Increase product developed from 20 to 120 by 2016;
Increase number of entrepreneurs accessing markets from 26 to 120
by 2013;
Increase number of entrepreneurs attending product disposition
Activities from 31 to 120 by 2016.
Investment Promotions Program
Maintain harmonized data from 13 municipalities;
Increase number of road shows conducted from 5 municipalities to
13 municipalities by 2016;
Increase number of project packaged and endorse from 0 to 3
By 2016;
100% compliance and implementation;
Increase number of investments settlements from 5 to 11 in 2016;
Properly coordinate and facilitated PBI meetings in a timely
Manner.
Economic Enterprise Rehabilitate a total of 7,668 linear meter distribution lines which
would serve 922 consumers/household in Purok 1,2,3,4,5,7,8
And provincial capitol site by 2016;
Minimize leakage of water up to 85% of the total system loss;
Rehabilitation of PLC main building and receiving area
Rehabilitation of PLC warehouse and kitchen;
Maintenance of true to type rubber budwood garden;
Maintenance of rubber demo farm.
Page | 40
Administrative Unit Unified office for all divisions of PEEDO
Funding and filling up of 78 plantilla position as mandated by Ord.
36 & 90
Hiring of DMO IV, DMO III
Sub-Sector: Employment
Increase number of student-emp[loyees by 21%;
Increase number of qualified applicants deployed, 36% for local
Employment & 20% for overseas employment;
Increase the number of FNPLP beneficiaries by 36%;
Acquire a permanent government-owned shelter for would be OFWs,
OFWs & Agusanons;
Increase number of skills & entrepreneurial Development Trainings
to be conducted for youth & women;
Filling up of vacant position and request for funding of the proposed
Positions & augmentation of personnel;
Popularized SM-BSC to anchor to ELA- AIP
Sub-Sector: Infrastructure
Reduce the current gap by rehabilitating 51 km per year from 2014
to 2016 in good and fair condition;
Can replicate by installing additional 75 units of upgraded Biosand
Water Filter Facilityat the end of 2016
Install additional 50 units of rain collector per year from 2014 - 2016
Implement the prepared number of POWs;
Implement the completion of the NCAC
Implement the Calamity Preventive projects, (eg. Revetment & Land
Erosion Control)
Vacant position must be filled up
Appoint deserving casual employees into regular position
Enhance to cater new advancement
Incorporate data and recommend community planning and designing
of road projects;
Of Projects should undergo CPES;
Page | 41
Regular submission of evaluation and accomplishment reports;
Ensure all rehabilitated and constructed roads to be in good and
Fair condition;
Regular coordination meeting to address arising issues in project
Implementation;
Ensure annual conduct of inventory;
Ensure appropriate design data required on various projects is
Generated;
Ensure to address the current need of Provincial Road Network;
Maintain the ususl adoption of Guiding Rules and Regulations;
Strengthen Coordination and Collaboration;
Strengthen Partnership and counterparting;
Social Services Health
Quality patient care;
Meet DOH standard in manpower;
Quality preventive care service;
Reduce MMR from 78 to 69/100,000 Live Birth (LB)
100% fully immunized children coverage;
Reduce IMR from 7.06 to 5/1000 LB;
Increase % of HH with access to safe water from 85% to 88% ;
Increase % of HH with sanitary toilet from 87% to 90%;
Reduce prevalence rate of malnutrition from 8.11% to 5%;
Reduce API from 0.53% to 0/1000 population
Social Welfare
Improve/Rehabilitate existing social welfare facilities;
Increase participation of client by type to join the organized
vulnerable groups;
Set-up income in producing ventures or livelihood program
For women group, out-of-school youth, persons with disability,
Senior citizen and least privileged families;
Page | 42
Provide financial or emergency assistance to displaced families
During calamity;
Increase participation of families in social awareness, responsible
Parenthood and community responsibility.
Education
Increase the literacy rate in the province;
Increase 10% enrolment by year from SY 2013-2014 to 2015-2016
Provide adequate classrooms & facilitate for the educational and
Physical development of elementary pupils & secondary students;
Upgrade quality of instruction in the elementary level.
Sports
Promotion of the physical wel-l being of the population especially
the PGAS employees;
Provide adequate facilities for the physical development of the
Community residents
Environment Protection and Conservation Responsible Mining
To enforce all small scale mining related laws and regulations;
To regulate all small sale mining operations and increase declaration
of two (2) additional Minahan ng Bayan.
Fresh Water Ecosystem Protection of fresh Water Ecosystem
To protect rivers and creeks from silts;
To reduce siltation and sedimentation of rivers and creeks from
Trento to Talacogon-Agusan River;
To popularize the ecological and social importance of Agusan
Marsh;
To educate the elementary and secondary students relative to the
Ecological and social importance of Agusan Marsh (30 schools);
Page | 43
To preserve and conserve the archeological, historical, cultural
And scientific sites and artifacts;
To conduct archeological, historical, cultural and scientific studies;
To protect all spring water sources;
To identify and declare all spring sources as protected.
Urban Ecosystem Management Ecological Solid Waste Management
To achieve a healthy environment through proper implementation
Ecological solid waste management program;
To reduce, reuse/recycle and utilize the 50% of the 83.93 cu.m. of
Waste generated daily;
Forest Ecosystem Management Sustainable Small Watershed/Protected Area Development Program
To address the forest/watershed denudation the following are the goals and
objectives:
To protect the locally declared watershed;
To increase the locally declared watersheds by 30% (3,000 has.)
from 2014-2016;
To preserve forest through enrolment carbon trading program;
To conduct forest profiling for 250,000 hectares.
Sagip – Upland Program
To prevent soil erosion in 18% slope and above areas;
To minimize soil erosion.
Tree Park development Program
To promote aesthetic value, recreation benefits and indigenous
Genetic base preservation;
To establish tree parks in 11 municipalities;
Page | 44
Protection of Potential environment and Tourism Significant Site
To protect and conserve natural significant sites;
To declare nine (9) significant sites as protected area.
Kinaiyahan Ampingan ug panalipdan Program
To promote Kinaiyahan Ampingan Panalipdan Program;
Peace and Security
Goal: To ensure zero casualty
Objectives:
1. 10% reduced/decreased of Households affected by flood in 3 Years; Identified and acquired relocation sites
2. Dredged waterways 3. Proper implementation of RA 10121 (An act strengthening the
Philippine Disaster Risk Reduction and Management System -Act of 2010
Increase awareness of communities on disaster preparedness, prevention and mitigation;
Mainstream DRR/CCA in Local Development and land-use Planning;
Strengthen/enhance capacity of communities Provide adequate equipment Provide Functional evacuation center
5. Functional drainage system
6. Insured crops/livestock/properties/ INFRA
7. Decrease in CNN barangays
8. Decrease in crime incidence in 3 years 9. Decrease in the number Pushers and Users 10. Provide adequate correctional facilities 11.10% decrease in conflagration 12. Minimize IP conflicts
Page | 45
Institutional/Transforming the Bureacracy
Goal The major goals of the cluster are to develop a professionalized
and responsive bureaucracy, reinforce the value of self-reliance;
improved accountability and transparency in governance, and increase
local revenue collection.
STRATEGIES:
Economy
Sub-Sector: Agriculture
Upland Sustainable Agri-Forestry Development ( USAD) Program
Rubber Delopment Project
Expansion, Operation and Maintenance of Budwood Garden; Rubber Plantation Demo Farm; Rubber Plantation establishment; Advocacy of New Technology Capacity Development and Exposure Tours.
Coffee and Cacao Production Project Caca0-plantation establishment provision of planting materials @ 625 seedlings per hectare Capacity Development and Advocacy; Coffee plantation establishment –provision of planting materials @ 625 seedlings per hectare; Rejuvenation of old trees; Capacity Development and Advocacy.
Banana Production Projects
Provision of plantlets and fertilizer inputs PBTL - 18,000 plantlets (28 has.) ASSCAT= Others = Capacity Development and Advocacy
Boosted Utilization of Grains in Agusan del Sur (BUGAS) Production Support
Provision of fertilizer Inputs and granules Provision of Upland colored rice seeds
Page | 46
Establishment of corn techno demo Community seed banking
Farm Mechanization Program
Provision of Packet farm equipment (power tiller-thresher) Rehabilitation of non- functional facilities. Establishment of RPC Construction of MPDP Establishment of Organic Rice Mill Provision of Farm tractors Provision of Corn Mill Establishment of Village-type corn processing facility Small-scale irrigation projects Farmers Field School
Vegetable Growing Projects
Provision of vegetable seeds Capacity Development and Advocacy
PRUTAS
Provision of planting materials Capacity Development and Advocacy Indigenous Fruit trees Seedling Nursery Cutflower Production Project Provision of planting materials and garden nets Capacity development and Advocacy
Organic Agriculture Program
Advocacy and Popularization Organic Fertilizer Production Provision of shredder machine Institutionalization of ADSOFPAI Ang Agri-pinoy Karon FITS Center for Rubber SIOPAO
Operation and Maintenance of Provincial Fish Hatchery Conversion of existing research ponds to breeding ponds Procurement of additional breeders Improve operation and management protocol Sustain collaboration and networking with BFAR for possible
Project support interventions
Intensified and Maintenance of Trichoderma Production Laboratory
Acquaculture related Training for fishery technicians Collaboration and Networking
Page | 47
Operation and Maintenance of Trichoderma Production Laboratory
Improve laboratory facilities and equipment Improve operation and management protocol
Vermi-compost Production Center
Procurement of additional Vermi-worms Acquisition of additional shedder machine
Operation
Filling-up of 3 Agri-ll vacant positions Augment regular staff to the division Funding/Filling up of 3 Lab Aide and 1 Farm Worker positions Funding Filling up of 4 CDS ll vacant position Funding/filling up of Engineer IV and lll positions Filling-up of Computer Operator ll vacant position Funding/Filling-up of Admin ll & l vacant position Continuous training, attendance to Annual Convention and Field
exposure to state-of-the art facilities. Prioritize/Schedule attendance to mandatory training Prioritize/schedule attendance to M&E training
Management System
Process audit, formulation/revision of Manual of operation Training of concerned personnel on proper documentation Training of concerned personnel on proper M&. Use of Standardized tool Communication Plan
Enabling Policies
Lobby for the increase of MOOE Regulation through SP Resolution/Ordinances Adoption by C/MLGU thru appropriate local legislation
Knowledge & Learning SIOPAO
Hiring of Info Mgt. Specialist, or upgrading of Computer Operator II position to Computer Operator III Promotion at various for a Sustain Web Housing.
Page | 48
Leadership SM-BSC
Revision as to approved ELA Coaching Mentoring to individual personnel Team Building Periodic Assessment
Sub-Sector : Veterinary
Hiring/creation of plantilla; Provision of farm equipment, tools and vehicles; Provision of good quality goats for dairy purposes; Training and advance studies on animal and dairy goats milk
Production and management: refresher course on animal Production;
Culling and replacement of old goats; Development of a systematic Monitoring, Evaluation & Assessment; Close monitoring and documentation especially on kids produced; Compliance of borrowers MOA; Development of a system for more intensive exposure on
established farms; Organization of goat raiser”s association/Federation; Active participation on meetings and budgettings; Organization of cattle raisers associations; Increase the production rate of existing cattle; Genetically improved boars will be acquired DA-RFU XIII Organization of poultry raisers association; Increase the production rate of the existing native chickens; Increase the production rate of the existing pigs; Develop a system for more intensive exposure on established farms;
Sub-Sector: Tourism
Tourism/Ecotourism Develop Program Filling up positions as approved and as stipulated in the HRMD
Plan; Trainings related to tourism product planning & development,
tourism resource assessment, attraction on theme park operations, Feasibility study for tourism site development, history & heritage Establishment & M & E;
M & E training; Memorandum of Agreement/Understanding; Training on data generation, analysis, utilization, documentation,
research and benchmarking; Strengthen partnerships and coordination with MLGU, NGAs and
Private sector. Regular meetings/consultation; Full implementation of EO based on the roles of partner agency;
Page | 49
Sub-Sector: Economic Enterprise and Development
Livelihood Enhancement and assistance Program (LEAP); Micro financing Program; Product Development and Innovative Technologies; Market Linkage and Product Disposition; Improved Investments Promotions Promotion Local Economic Development; Implementation of the ADS Investments Incentive Code; PWS Distribution/Transmission line Rehabilitation Project including
Utilization of MRDP Pipelines; PLC Renovation Project; ARC Rubber Development Project Construction of PEEDO office bldg. and abductional training venues
and QC for water system; Implementation of HRMD Plan and Ordinance 36 & 90 Lobby for the funding of plantilla positions; Implementation of the Cap Dev. Plan Strengthen networking in sourcing out of funds; Training on geotagging; Provision of transport support; Establishment of the Knowledge management system; Collaboration to other stockholders.
Sub-Sector: Employment Services
Implement RA 7323, increase fund allocation; Conduct of Jobs fair; Implement RA 10022, Increase Fund allocation, Maximum utilization;
of DLMYEMC (Ordinance No. 77 series of 2012); Purchase of House and Lot in Manila as temporary shelter for
deployed OFWs (occupied since 1993 by would be OFWs); Skills & Entrepreneurial Dev’t. Trainings; Filling up of vacant position and request for funding of the proposed
Positions; Request for filling up the vacant position; Periodic monitoring, evaluation; Coordinate with Prov’l. Legal Office for the MOA; Capability Development; Networking Collaboration
Social Sector
Health
Filling up of approved vacant position & create additional staff; Financial Support to TOWS Financial Support to TOWS With returned agreements
Page | 50
Conduct of Refresher course & Increase Logistic support ( Financial support)
Increase budget allocation for TEV, gas and fuel consumption Purchase vehicle for Public Health Service Revisit existing tool Conduct regular program reviews/Quarterly/Inter-local Health
Zone meeting For inclusion in the proposed Provincial Health Code Lobby to M/B LCE to complement manpower /support & require
mandatory submission of data , report as scheduled Member of special bodies Regular Coordination For Orientation/Cascading to Municipalities
Education
To provide support in the provision/repair of school buildings &
facilities in upland communities and newly established school; To provide financial support to volunteer teachers assign in newly
opened school and with high number of enrollees; To access funds in the provision of books/e books and other
reading materials, equipment like computer & etc through “Pagtuon Project”
Scholarship program Functional School Board ; Conduct at least quarterly
Social Welfare
Social Marketing on ECCD program Establishment of standard day care centers Advocacy on establishment of supervised neighborhood sites play
(snp) Provision of DCC indoor and outdoor facilities Training/sessions on responsible parenthood Capacity development for service providers Monitoring of ECCD Implementation Provision of honorarium to self-helped day care workers Assistance to Individual In Crisis Situation Emergency Assistance Shelter assistance
Sports
Creation of sports position/item Capacity e Development on planning Implementation and
leadership Capacity Development On Sports Development. Logistics supports (additional) Upgrade sports facilities and equipment Lobbying to Budget Committee Hearing and Submission of SM-
BSC
Page | 51
Cap Developmentt. on handling sports training and coaching
MRVF
Mentoring/coaching Enhancement seminar on procurement for responsible personnel Resolution to make a legal policy with disciplinary sanction. Lobby/request approval of the governor for additional personnel Lobby/request approval of the governor for additional personnel Conduct enhancement seminar on MRVF
Environmental Protection and Conservation
Local declaration of small watersheds (5,000 has and below); Enrolment to carbon trading; Forest profiling; Small rubber-base farming system; Identification and declaration of municipal and barangay tree park; Identification of natural significant sites as protected areas; Development of environmental ethics in all levels of education
system (pre-school, elementary, secondary, and college); Reactivate and strengthen Save Agusan Task Force with funding
and IRR; Declaration of Minahanng Bayan; Establishmnet of centralized mineral processing are; River bank easement reforestationRiver desiltation; Information, Education Campaign (IEC);
Integration of Agusan Marsh Environmental concerns in school curriculum;
Implementation of Co-Management Program on protection and conservation of AgusanMarsh;Establishment of billboards and signages within Agusan Marsh as protected areas;
Creation of BantayAgusan Marsh Task Force; Environmental Social Fencing Program; Archeological, historical, cultural, and scientific studies; Proper placement of the collected artifacts and information Identification and declaration of spring water sources as protected
area. Establishment of Provincial Eco-park Land Fill; Establishment of Provincial Capitol MRF; Enactment of No Plastic and Styro Ordinance;
on ecological solid waste management; Provision of technical assistance on 10-Year Ecological Solid Waste
Management Plan; Revision of Provincial Environment Code.
Public Safety
1 . Identification of flood prone areas and Establishment of flood control structures; identification of appropriate mitigating measures
Updating of Flood/landslide prone areas
Page | 52
Identification of relocation sites and sourcing out of funds
2. Desilting/Dredging of waterways (rivers, creeks, Canals) Reforestation Project
3 .Massive Orientation of RA 10121 Communication Plan/Quad Media/Social Marketing Mainstream of DRR/CCA in Development Plans Involvement of community in disaster preparedness programs /provision of
appropriate training/Organization of Volunteer Groups Inventory and acquisition of equipments and training of personnel Inventory of evacuation centers Formulation of evacuation plan per barangay - Camp Management
4. IEC/Advocacy in coordination with Solid Waste Management Board. 5. Periodic Cleaning of Drainage/canal
6. Produce IEC materials to encourage hazard insurance coverage Create directory of available financial windows
7.Conflict Resolution & management (Consultation/Forum/Dialogue)
Initiate coordination/meetings/dialogue among concerned agencies Harmonization of programs/ beneficiaries with AFP thru COPD program
Crime Prevention Programs 1. IEC on Anti-Drugs / Apprehension of Pushers and Users
2. Expansion/Improvement of correctional facilities 3. IEC/Fire Prevention Program /Acquisition of Fire Trucks 4. Initiate Coordination meetings/dialogue among concern agencies
Institution/Transforming Bureaucracy
Establishes and manages of plans, programs and activities on human resources management and development. Employ complementary, demand-driven interventions that focus on strengthening systems, mechanisms, process and support policies that support the realization of the internal change agenda that will enable PGAS to be responsive in the changing environment. Reinforcing the culture of performance and innovation is one area of the reform agenda to professionalize the bureaucracy.
For the pro-active legislation, intensify evidence-based policy making by involving all stakeholders that will use or might be affected by it.
In the area of improve accountability and transparency, broadening public
participation and partnership in local programming, implementation and monitoring shall be encouraged.
Meanwhile, local revenue will be broaden and intensified to raise collection
to support the development programs and projects of the province. The implementation of a web-based Real Property Tax Information System will be the priority areas for implementation.
Page | 53
Priority Programs and Projects (2014)
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
ECONOMIC SECTOR
I. INFRASTRUCTURE
1.1 Provincial Roads 1.1.1 Road Rehabilitation PEO
120,854,000 333,076,000
453,930,000
It will benefit 21, 893 HHs in 7 municipalities
1.1.2 Road/Bridge Maintenance PEO 60,000,000
60,000,000
II. USAD
2.1 Rubber Development Project PAVO/ PEEDO 100,000
1,216,600 1,316,600
Improved cultivation practices of existing 9,405 has.; developed new 1,550 has. of recommended true-to-type clone thru pgas initiative; & developed new 3,050 has. recommended true-to-type clone by partner players.
2.2 Establishment of Rubber processing facilities
PAVO/ PEEDO 3,375,000
3,375,000
2.3 Cacao and Coffee Production Project
PAVO 50,500
198,000 248,500
Additional income that can potentially uplift 330 hh above poverty threshold.
2.4 Banana Production Project PAVO 17,500
381,600 399,100
Additional income that can potentially uplift 150 hh above poverty threshold.
2.5 Vegetable Growing Project ( Adopt Barangay Approach in partnership of 4Ps program)
PAVO 300,000
100,000 400,000
Additional income that can potentially uplift 4,500 hh above poverty threshold.
Page | 54
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
ECONOMIC SECTOR
2.6 Fruit Tree Production project PAVO 50,000
315,000 365,000
Additional income that can potentially uplift 150 hh above poverty threshold.
2.7 Cutflower Production Project PAVO 91,500 91,500
Replication to Sibagat area with a potential of uplifting 150 hh above poverty threshold (Bgry. Kolambugan area)
2.8. Rehabilitation of Provincial Seedling Nursery
PAVO 315,000
315,000
2.9 Cutflower Production Facilities PAVO 341,500
341,500
III. Agusan del Sur Lowland Sustainable Agriculture (ALSA) Program
3.1 Micro - Insurance Project PAVO 2,000,000
2,000,000
resiliency and protection of 4,500 Hh (farmers) against calamities
3.2 Farm Mechanization Program PAVO 14,103,000
75,330,000
89,433,000
Additional income for 480 hh derived from the saved post harvest losses and additional of 2,080 hh derived from improved pre and post production
3.3 Upland/Coloured Rice Production Project
PAVO 4,898,000
4,898,000
Provide a good access on seeds and technology assistance for 1,500 hh in the production of upland rice.
3.4 Upland Coloured Rice Marketing Project (Livelihood Project)
PAVO 2,500,000
2,500,000
3.5 Organic Agriculture Program PAVO 5,000,000
1,000,000 6,000,000
Additional income for 1,482 hh derived from reduced farm production cost.
Page | 55
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
ECONOMIC SECTOR
IV. Improvement of Agricultural Support Facilities
PAVO 300,000
300,000
600,000
Improved capability and capacity of existing facilities
V. Institutional and Social Marketing Program for Coops, POs and Non-government Organizations
5.1 Organizing and Strengthening support
PAVO 1,000,000
1,000,000
capacitate groups especially in the organizational and management aspects. It is surmized that these areas our weakest point is so far as project sustainability is concerned.
5.2 Micro-financing PAVO 2,000,000
2,000,000
Can provide to 300 hh a good access for capitalization.
5.3 Marketing support for priority crops
PAVO Will provide strong and stable linkage for market of priority crops thereby gaining additional margin of income derived from equitable market price.
5.4 Support to Barangay Agricultural Workers
PAVO 1,908,000
1,908,000
Readilly accessed extension support at the doorstep of every farmer in the barangay level rendered by a resident agricultural worker in augmentation to services delivered by P/MLGU personnel.
5.5 Livelihood Enhancement for Agricultural Development
PAVO 300,000
300,000
Additional income that can potentially uplift 150 hh above poverty threshold.
5.6 Assistance to Gawad Saka Scheme
PAVO 114,000
114,000
Page | 56
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
ECONOMIC SECTOR
5.7 Support Fund to Prov'l. Agriculture Fishery Council
PAVO 50,000
50,000
5.8 Support to Farmer's Information and Technology
PAVO 300,000 300,000
VI. Extension Support Services
6.1 Farmers Field School Acquired more knowledge on farm technology to increase production
> FFS on Rice Production PAVO 900,000
900,000
> FFS on Corn Production PAVO 180,000
180,000
6.2 University - on - the - Air
> UOA for Corn Production PAVO 50,000
50,000
> Ang Agri - Pinoy Karon PAVO 90,000
90,000
VII. Rehabilitation of Fish Hatchery Production Facilities
PAVO 500,000
500,000
VIII. LIVESTOCK AND POULTRY PRODUCTION PROGRAM
8.1 Improvement of Provincial Stock Farm Facilities
PAVO 1,500,000
1,500,000
8.2 Support to Maintenance of LN2 Plant Facilities
PAVO 232,980
232,980
8.3 Provincial Poultry Breeding Facilities
PAVO 150,000
150,000
8.4 Upgrading of Swine artificial insemenation Facilities
PAVO 530,000
530,000
8.5 Support to Organic Swine Production
PAVO 34,499.80 34,500
Page | 57
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
ECONOMIC SECTOR
8.6 Support to Agusan del Sur Free Range Poultry Production
PAVO 273,740.20 273,740
8.7 Support to Agusan del Sur Goat Program
PAVO 287,000.00 287,000
8.8 Repair of bio - gas Digester PAVO 75,000
75,000
8.9 Construction of Livestock & Poultry Incubation Center
PEO/PVO/ PEEDO 5,000,000
5,000,000
8.10 Laboratory Equipment 1,000,000
1,000,000
8.11 Genetic Improvement Program
PAVO 700,000
700,000
IX. MARKETING AND ENTERPRISE DEVELOPMENT PROGRAM
9.1 Livelihood Enhancement Assistance Program
PEEDO 850,000
850,000
150 entreprenuers have access to microfinancing
9.2 Micro-financing PEEDO 2,000,000
2,000,000
9.3 Market linkaging and product disposition
PEEDO 90,000
90,000
9.4 Support to Demo Farm PEEDO 500,000
500,000
X. INVESTMENT PROMOTION
10.1 Support to Investment Promotion
PEEDO/PAVO/ PENRO
1,000,000
1,000,000
Increase number of investment from 5 to 15. facilitation of hydro plant, 1 palm oil
10.2 Support to Provincial Board of Investment
PEEDO 500,000 500,000
XI. ECONOMIC ENTERPRISE
11.1 Rehabilitation of Potable Water System
PEEDO 2,300,000
2,300,000
Improved services to cover more hhs in patin-ay
Page | 58
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
ECONOMIC SECTOR
11.2 Maintenance Budwood Garden
PEEDO -
To support the target of PAVA: 9,405 has.; developed new 1,550 has. of recommended true-to-type clone thru pgas initiative; & developed new 3,050 has. recommended true-to-type clone by partner players.
11.3 Ground Improvement of Naliyagan Cultural Center (Phase III)
PEEDO 10,000,000
10,000,000
XII. EMPLOYMENT FACILITATION PROGRAM
12.1 Special Program for Employment of Students (SPES)
PESO 2,200,000
2,200,000
Support summer job for students from poor families
12.2 Jobs Fair PESO 500,000
500,000
Avenue for local job seekers to get employment locally and abroad: 2 jo150 job fairs with minimum of job seekiers
12.3 OFW fly now pay later /Assistance to OFW Applicants (FNPLP)
PESO 1,100,000
1,100,000
Financial assistance to workers seeking overseas employment
12.4 Purchase of House and Lot in Manila for OFW and Southern Agusanon
PESO 6,300,000
6,300,000
Provide free bileting to agusanons
12.5 Skills Training and Entreprenueurial Development
PESO 1,000,000
1,000,000
Improved skill to local entreprenuers
12.6 Support to ordinance No. 77's 2012 Establishing the Datu Lipus Makapandong Youth and Migrant
PESO 500,000
500,000
Page | 59
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
XIII. ECO-TOURISM DEVELOPMENT
13.1 Bega Falls Eco-Tourism Development (Phase II)
PTO 1,500,000
1,500,000
3 local tourism plans and sites developed
13.2 Support to Provincial Tourism Council
PTO 100,000
100,000
Sub total 160,845,514
422,042,000
5,440,000
-
-
-
85,502,920
673,828,420
ENVIRONMENT
I. Sustainable Small Watershed / Protected Areas Development Program
1.1 Declaration of Small Watershed (5,000 below)
PENRO 300,000
300,000
Covers 3,000 has in 6 municipalities
1.2 Rainforestation project within watersheds
PENRO 500,000
500,000
Restoration of forest biodiversity and improved water quality and supply
II. Forest profiling for enrollment to Carbon Trading (market-based incentive program)
PENRO 250,000
250,000
250,000 has profiled: identification of vegatation classification. Preservation of forest land in which the farmers can have income from carbon trading incentives
III. USAD - CADT AREAS Areas to be covered above 18% slope with poverty incidence of 45% above: Esperanza, San Luis, Sibagat, Veruela, Loreto and La Paz covering a total of 150 hectares or 150 HHs
3.1 Small Rubber-based farming system (Integrated farming in CADT areas)
PENRO/PAVO 2,000,000
2,000,000
IV. Tree Park Development Program
4.1 Identification and declaration of municipal and barangay tree park
PENRO 150,000
150,000
Developed 8 tree parks for genetic based conservation
Page | 60
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
V. Protection of Potential Environmental and Tourism Significant Sites
5.1 Identification, assessment and declaration of significant sites as protected areas and Eco-tourism sites
PENRO/PTO 600,000
600,000
19 waterfalls, 15 lakes and 11 caves
VI. Kinaiyahan Ampingan ug Panalipdan Program
6.1 Development of environmental ethics in all levels of educational system (pre-school, elem, high school & college.
PENRO 500,000
500,000
Inculcating the importance of protecting the environment we borrowed from the future generations. It will be piloted in 3 municipalities
VII. Responsible mining program
7.1 Declaration of Minahan Ng Bayan PENRO 250,000
250,000
Increased 30% collection of ESMF: from 25M (2012 baseline) to 35M which benefits 500 miners
7.2 Establishment of centralized mineral processing area
PENRO 250,000
250,000
Registratiion of 118 unregistered ball/rod mills and 16 Canbon Inpulp Processing
VIII. Desiltation and River Bank Protection of Agusan River Program ( From Trento- Talacogon)
8.1 Community Consultation and mapping
PENRO/PEO/PDRRMO 250,000
250,000
It will prevent flooding to agricultural areas. It can benefit 29,000 low land rice farmers who regularly experienced crop failure due to flooding out of the total 36,000 rice farmers.
IX. Co-Management Program on protection and Conservation of Agusan Marsh (Wetland Project)
Page | 61
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
9.1 Environmental Social Fencing Program
PENRO 500,000
500,000
9 barangays within wetland areas are given livelihood assistance
9.2 Archeological, historical, cultural & scientific studies
PENRO/PTO 235,000
235,000
Support the tourism program of the province, agusanons and students
9.3 Integration of Agusan Marsh Environmental Concerns in School Curriculum
PENRO 300,000
300,000
Inculcating the students the importance of agusan marsh biodiversity as recognized during the RAMSAR convention
X. Protection of Source of Drinking Water
10.1 Identification & declaration of spring water sources as protected area.
PENRO/PHO 100,000
100,000
3 spring water source declared
XI. Ecological Solid Waste Management Program
11.1 Establishment of Provincial Eco-Park Landfill
PENRO/PEO/PGSO 2,500,000
2,500,000
established 1 provincial eco-park landfill that will cater 5 MLGUs
11.2 Establishment of Provincial Capitol MRF
PENRO/PEO/PGSO 300,000
300,000
Caters 33 offices in PGAS
XII. Seedling Production for Tree Farming and Rainforestration Program Support
PENRO 250,000
250,000
90, 000 seedling or 30,000 annually that will support the rainforestation of watershed and treefarming
XIII. Support to Small Scales Tree Farmings
PENRO 100,000 100,000
XIV. Provincial Capitol Greening Program (new)
PENRO/PGSO 950,000
950,000
Aesthetic development of the governemtn center to become a people's hub
Page | 62
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
XV. CAD Titling Process Program PENRO 1,500,000
1,500,000
Target of 202,000 has that will cater 36.65% of the total IPs in the province or 241,184
XVI. Reclassification of Timberland into A and D (on-going)
PENRO/PASTO 100,000
100,000
Once reclassified, the projected local revenue is 3.8M (grassland category)
XVII. Support to ADS Environment & Sustainable Dev't. Council
PENRO 300,000.00 300,000
Sub-total 2,500,000
-
4,450,000
-
4,835,000
-
400,000
12,185,000
12,185,000
SOCIAL SECTOR
I. UPGRADING OF PHYSICAL FACILITIES, EQUIPMENT AND INSTRUMENT
1.1 Upgrading of BnB for depressed barangays
PHO 1,000,000
1,000,000
Increased access to quality affordable medicines in depressed brgys (Sinubong and Del Monte in Veruela)
1.2 Procurement of 1 unit hospital ambulance (DOPMH)
DOPMH 1,600,000
1,600,000
Improved delivery of health services
1.3 Procurement of 1 unit ultrasound machine (Talacogon District Hospital)
PHO/ TDH 600,000
600,000
1.4 Procurement of X-ray machine of Esperanza Municipal Community Hospital
PHO/ EMCH 2,500,000
2,500,000
1.5 Procurement of Hospital Equipment
PHO 31,765,000
31,765,000
1.6 Procurement of Mobile X-Ray with C-Arm
DOPMH
1.7 Completion of Half-Way House of Talacogon District Hospital
TDH
PPAs IMPLEMENTING TOTAL DESIRED OUTCOME
Page | 63
OFFICE 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
1.8 Completion of DOPMH PEO/ DOPMH 11,000,000
39,000,000
50,000,000
It will cater 100 patients with target to have 80% occupancy rate. It will also project good governance through provision of health services
1.9 Construction of drainage facility and elevated water tank for Hospital Dietary Section DOPMH
PEO/ DOPMH 1,150,000
1,150,000
Probation of efficient water facility for patients
1.10 Construction of X-ray room for Esperanza Com. Medicare Hospital
PEO/ ECMH 1,500,000
1,500,000
Efficient delivery of health services
1.11 Construction of waste holding area with septic vault of Esperanza Hospital
PEO/ EMCH 2,500,000
2,500,000
Sanitation and mitigation of diseases
1.12 Completion of 2-storey building of Bunawan District Hospital
PEO/ BDH 3,600,000
3,600,000
Increase bed-capacity to cater more patients
1.13 Construction of 50-bed in patient of DOPMH
DOPMH 28,000,000
28,000,000
It will cater more patients with target to have 80% occupancy rate. It will also project good governance through provision of health services
1.14 Construction of 50-bed communicalbe/ISO building of DOPMH
DOPMH 10,000,000
10,000,000
It will cater more patients with target to have 80% occupancy rate. It will also project good governance through provision of health services
1.15 Const. of Waste Area with Septic Vault
LoMH 350,000
350,000
1.16 Rehabilitation of Dining Hall/Kitchen of Loreto Mun. Hospital
LoMH 700,000
700,000
Page | 64
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
1.17 Procurement of One (1) unit Ambulance (Esperanza Municipal Hospital)
EMCH 1,600,000
1,600,000
1.18 Ground Improvement of EMCH (Concreting of Hospital access road)
EMCH 1,053,651
1,053,651
1.19 Compl. of Halfway House (Phase 2)
TDH 1,500,000
1,500,000
II. SUPPORT TO EDUCATION
2.1 Pagtuon Program for Oplan Balik Eskwela Campaign
PGO 1,500,000
1,500,000
Provision of books to far flung schools
2.2 Gawad Datu Lipus Makapandong Huwarang Guro Award
PGO 1,500,000
1,500,000
Teaching excellence recognition of outstanding teachers
2.3 Provincial Academic Enhancement Training and Workshop
PGO 750,000
750,000
Enhanced teaching methodology of teachers
2.4 Development of Instructional Materials (IMs) for pre-school learners
PGO 500,000
500,000
Costumized teaching materials that can be mass produced by the parents
2.5 Advocacy to promote the "Gulayan sa Eskwela" in support to Nutrition Program
PGO 72,000
72,000
To be piloted in 6 elementary schools to encourage pupils eat nutritious foods
III. EARLY CHILDHOOD CARE DEVELOPMENT
3.1 Provision of outdoor/indoor facilities of Day Care Centers
PSWDO 550,000
550,000
in support to the 20 standard ECC for 3 years, intended for increasing enrollment for children age 3-5
3.2 Capability building and honorarium support to Day Care Workers and Neighborhood Play Volunteers
PSWDO 140,250
140,250
Page | 65
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
3.3 Establishment of Supervised Neighborhood Play Sites including provision of materials for SNP
PSWDO 250,000
250,000
In support to increase enrollment of learning children
3.4 Construction of five (5) Standard Day Care Center (DCC)
PEO/PSWDO 3,000,000
3,000,000
10% increase enrollment of children age 3-5 or 2,065 out 26,054 of the targeted 6 municipalities
IV. Support to Social Welfare
4.1 Support to Individual in Crisis Situation
PSWDO 500,000 500,000
4.2 Grants and Donation PSWDO 5,000,000 5,000,000
4.3 Assistance to Self-Helped Day Care Workers (PSWDO)
PSWDO 3,184,900 3,184,900
4.4 Support to Anti-Sex/Child Trafficking Program
PSWDO 200,000 200,000
4.5 Support to People with Disability PSWDO 250,000 250,000
4.6 Support to Early Childhood Care and Development
PSWDO 400,000 400,000
4.7 Assistance to Elderly or Senior Citizens
PSWDO 5,000,000 5,000,000
4.8 Support to Local Council for the Protection of Children
PSWDO 150,000 150,000
4.9 Support to Youth Development PSWDO 250,000 250,000
4.10 Support to Regional Rehabilitation Center for Youth
PSWDO 250,000 250,000
4.11 Assistance to Women Development
PSWDO 200,000 200,000
4.12 Assistance to Women's Federation
PSWDO 200,000 200,000
Page | 66
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
V. SUPPORT TO PUBLIC HEALTH DELIVERY SYSTEM
5.1 Maternal and Child Health
5.1.1 Conduct of Maternal/Underfive Mortality Review
PHO 180,000
180,000
5.1.2 Support to Maternal and Child health Program
PHO 150,000
150,000
5.2 Expanded Program Immunization
5.2.1 Provision of Facilities/Equipment for Immunization Program
PHO 150,000
150,000
5.2.2 PIR with middle manager PHO 30,000
30,000
5.3 Health and Nutrition
5.3.1 Provision of equipment for Nutrition Program(salter weighing scale)
PHO 150,000
150,000
5.3.2 Strengthening of PNC/MNC/BNC
PHO 150,000
150,000
5.3.3 Provincial Nutrition Council
PHO 50,000
50,000
5.4 Communicable / Non- Communicable Diseases Prevention Control
5.4.1 Rehabilitation/ Provision of Facilities/ equipment for Disease Prevention and Control Program
PHO 1,500,000
1,500,000
5.4.2 Procurement of equipment for dengue disease control
PHO 360,000
360,000
Decrease incidents of dengue
Page | 67
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
5.5 Health Promotion
5.5.1 Conduct of monthly special health events
PHO 60,000
60,000
5.5.2 Reproduction of FHSIS tables
PHO 50,000
50,000
5.5.3 PIR on health programs implementation
PHO 250,000
250,000
5.6 Counterpart Funds for Womens Health Program
PHO 350,000
350,000
5.7 Assistance to Barangay Health Workers
PHO 5,867,100 5,867,100
5.8Assistance to BHW (retirement) PHO 500,000 500,000
5.9 Assistance to Outreach Program/Activities
PHO 500,000 500,000
VI. Moral Recovery Values Formation Services
6.1 Training and Seminars MRVFS 2,300,000
2,300,000
Moral and spiritual growth southern agusanon
VII. Support to Water and Sanitation
7.1 Installation of rain water collector and construction of upgraded biosand filters
PEO 10,000,000
10,000,000
it will cater 3,884 HHs in 6 MLGUs
7.2 Procurement of potable biological testing equipment for water analysis
PHO 1,000,000
1,000,000
To support the ugrading the developed springs
7.3 Ugrading of developed springs (2 units/year)
PHO 250,000
250,000
Improved potability of water source
7.4 Construction of Sanitary Toilets (200 units per year)
PEO/PHO 1,200,000
1,200,000
Municipalities with less # of Household with sanitary toilets: Sibagat, San Luis, La Paz, Talacogon, Trento
Page | 68
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
VIII. Sport Services
8.1 Repair of Sports Facilities PEO/SPORTS 500,000
500,000
Prevent futher deterioration that may incurr costly repairs
8.2 Repair of gates of the D.O. Plaza Sports Complex
PEO/SPORTS 300,000
300,000
Security of sports facilities
8.3 Support to Physical Fitness and Sport Dev't.-Local
SPORTS 2,500,000
2,500,000
IDEAL-IDINAUS SPORTS 500,000
500,000
Support to Physical Fitness and Sport Dev't. Nat'l.
SPORTS 500,000
500,000
Provincial Sports Dev't. Council SPORTS 40,000
40,000
IX. Support to Housing and Resettlement
9.1 Purchase and Development of land for the relocation of informal settlers and relocation of victims of calamities
PSWDO 1,500,000
1,500,000
Sub-total 33,963,651
115,265,000
-
5,122,000
-
-
39,802,250
194,152,901
PUBLIC SAFETY AND SECURITY
I. Acquisition of Relocation Site PDRRM 1,000,000
1,000,000
6 relocation site in flood prone barangays
II. Updating of Maps of flood/landslide prone areas (GIS)
PDRRM 200,000
200,000
Accurate data on flood prone areas
III. Mainstreaming DRR-CCA in Local Development Plans
PDRRM 100,000
100,000
Alignment of plans to mitigate the ill effects of climate change
IV. Community disaster preparedness programs
PDRRM 100,000
100,000
Awareness of the populace for emergency response during calamities
V. Acquisition of Disaster Equipment PDRRM For more effective and efficient response to
Page | 69
emergencies
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
a) High angle rescue equipment 500,000
500,000
b) 15K liters capacity fire truck 8,000,000
8,000,000
c) 6 Plastic boats (2 per year) 500,000
500,000
d) Fire extinguishers (50 units) 200,000
200,000
Safety and security of correctional facility
VI. Acquisition of new security firearms
PCSO 1,000,000
1,000,000
People become more responsive during calamities
VII. Formulation of evacuation plan of disaster prone per barangay (Camp Management)
PDRRM 400,000
400,000
Ensuring peace and order in the province
VIII. Conflict Resolution & Management Program
PGO 500,000
500,000
IX. IEC on Crime Prevention Programs
PGO 10,000
10,000
X. IEC Anti-Drugs Campaign PGO 10,000
10,000
PGAS employees have the necessary skill to react effectively in times of disasters
XI. DRRM orientation for PGAS employees
PDRRMO It will prevent flooding to agricultural areas. It can benefit 29,000 low land rice farmers who regularly experienced crop failure due to flooding out of the total 36,000 rice farmers.
XII. Flood Control Project
12.1.Implementation of flood control facility
PEO/PDRRMO 30,000,000
30,000,000
12.2 Dredging of Patin-ay Creek PEO/PDRRM0 6,500,000
6,500,000
Page | 70
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
XIII. Periodic cleaning of drainage/canal
PEO/PDRRMO 500,000
500,000
Prevent flooding to rural centers
XIV. Construction of Evacuation Center in flood prone areas
PEO/PDRRMO 1,000,000
1,000,000
Safety of populace in 6 flood prone barangays
XV. Repair and Repainting of Government Center Perimeter Fence
PEO 3,000,000
3,000,000
Security of government facilities/project good governance.
XVI. Repair of correctional facility fence
PEO/PCSMO 3,000,000
3,000,000
Safety and security of correctional facility
XVII. Construction of Separate Detention Cell for minors
PEO/PCSMO 500,000 500,000
XVIII. Const./Rehabilitation of Multi-Purpose Hall
PEO/PCSMO 500,000
500,000
XIX. Support to Peace and Development
PCSMO 838,000
838,000
XX.Support to Inmates PCSMO 4,762,500
4,762,500
Sub-total 7,500,000
-
-
-
-
45,520,000
10,100,500
63,120,500
63,120,500
TRANSFORMING THE BUREAUCRACY
I. Support to Development Projects PEO/PGO
30,000,000 30,000,000
II. Municipal/Barangay Development Projects
M/BLGU/PGO 37,000,000
37,000,000
Support to priority development projects of the MLGUs and BLGUs
III. Institutionalization of the Integrated M&E System
PPDO 260,000
260,000
Evaluation and assessment of PPAs are reliable
IV. Updating and implementation of the HRMD Plan
PHRMO/PBO/and all sectors
4.1 Structure/Staffing Covers the implementation of Ord Nos. 36 and 92 (PGAS reorg)
4.1.1 Funding of positions 81,580,174
81,580,174
Page | 71
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
4.1.2 Separation Package 46,553,585
46,553,585
4.2 HRMD Systems 3,430,000
3,430,000
Implementation of HR plans
4.3 CapDev (Training/ Seminar) 3,773,143.00 3,773,143
4.4 Health and Wellness 2,000,000
2,000,000
enhanced KSA of employees
V. Systems and Processes/Internet/FMIS,HRMIS,ePS etc)
PIMO and concerned departments
2,504,000
2,504,000
Development and enhancement of PGAS electronic systems
VI. Development and Management of PGAS Communication Plan
PPIO 150,000
150,000
Buy-in of PGAS plans to stakeholders
VII. Codification of Ordinances SP 500,000
500,000
Omnibus enactment of ordinances by category
VIII. Legislative feedback mechanism
SP 200,000
200,000
Development of tools to solicit issues and recommendations
IX. Alignment of provincial and city/municipal development plans
PPDO 300,000
300,000
PLGUs and MLGUs plans are harmonized
X. Rehabilitation of Broadcast Equipments (DXDA & PTV)
PPIO 2,000,000
2,000,000
XI. Establishment of service vehicle maintenance shop policy
PGSO/PEO 100,000
100,000
Cater wheel alignment and change oil
XII. Upgrading of PGAS IT equipment
PGO/PIMO 7,829,600
7,829,600
XIII. Plan Assessment PPDO 500,000
500,000
XIV. Support to Infrastructure PEO 20,000,000
20,000,000
XV.Preliminary & Detailed Engineering Services
PEO 3,000,000 3,000,000
XVI. Supervision and Contract Management
PEO 2,500,000 2,500,000
Page | 72
PPAs IMPLEMENTING
OFFICE
TOTAL DESIRED OUTCOME 2014
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
XVII. Repair/Maint of PGAS Gov't. Buildings
PEO 2,000,000 2,000,000
XVIII Maint. Of PGAS Electrical System and Air Conditioning)
PEO 1,000,000 1,000,000
XIX. Maint. Of Gov't. Center Drainage System
PEO 1,000,000 1,000,000
XX. Counterpart for Special Projects PGAS 25,000,000 25,000,000
XXI. Ground and Building Maintenance
PGSO 1,750,000 1,750,000
XXII. Preservation for Financial Documents
PAcctngO 600,000 600,000
XXIII. Acquisition of Accountable Forms
PASTO 1,000,000 1,000,000
XXIV. Tax Information Campaign PASTO 270,000 270,000
Sub-total 37,000,000
-
-
-
-
-
239,800,502
276,800,502
Total 241,809,165
537,307,000
9,890,000
5,122,000
4,835,000
45,520,000
375,606,172
1,220,087,323
Page | 73
Priority Programs and Projects (2015)
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
ECONOMIC SECTOR
I. INFRASTRUCTURE
1.1 Provincial Roads 1.1.1 Road Rehabilitation PEO
150,000,000 190,000,000
340,000,000
It will benefit 21, 893 HHs in 7 municipalities
1.1.2 Road/Bridge Maintenance
PEO 60,000,000
60,000,000
II. USAD
2.1 Rubber development project
PAVO/PEEDO 12,225,000
120,000
12,345,000
Improved cultivation practices of existing 9,405 has.; developed new 1,550 has. of recommended true-to-type clone thru pgas initiative; & developed new 3,050 has. recommended true-to-type clone by partner players.
2.2 Cacao and Coffee Production Project
PAVO 2,440,000
65,000
2,505,000
Additional income that can potentially uplift 330 hh above poverty threshold.
2.3 Banana Production Project
PAVO 1,220,000
20,000
1,240,000
Additional income that can potentially uplift 150 hh above poverty threshold.
2.4 Vegetable Growing Project ( Adopt Barangay Approach in partnership of 4Ps program)
PAVO 1,250,000
330,000
1,580,000
Additional income that can potentially uplift 4,500 hh above poverty threshold.
2.5 Fruit Tree Production project
PAVO 345,000
60,000
405,000
Additional income that can potentially uplift 150 hh above poverty threshold.
Page | 74
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
2.6 Cutflower Production Project
PAVO 355,000
355,000
Replication to Sibagat area with a potential of uplifting 150 hh above poverty threshold (Bgry. Kolambugan area)
III. Agusan del Sur Lowland Sustainable Agriculture (ALSA) Program
3.1 Micro - Insurance Project
PAVO 1,200,000
1,200,000
resiliency and protection of 4,500 Hh (farmers) against calamities
3.2 Farm Mechanization Program
PAVO 1,940,000
22,350,000
24,290,000
Additional income for 480 hh derived from the saved post harvest losses and additional of 2,080 hh derived from improved pre and post production
3.3 Upland/Coloured Rice Production Project
PAVO 1,000,000
4,898,000
5,898,000
Provide a good access on seeds and technology assistance for 1,500 hh in the production of upland rice.
3.4 Upland/Coloured Rice Marketing Project
PAVO 5,000,000
5,000,000
Additional income for the above 1,500 hh derived from marketed high value upland rice.
3.5 Organic Agriculture Program
PAVO 1,000,000
2,000,000
3,000,000
Additional income for 1,482 hh derived from reduced farm production cost.
IV. Institutional and Social Marketing Program for Coops, POs and Non-government Organizations
Page | 75
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
4.1 Organizing and Strengthening support
PAVO 350,000
350,000
capacitate groups especially in the organizational and management aspects. It is surmized that these areas our weakest point is so far as project sustainability is concerned.
4.2 Micro-financing PAVO 2,000,000
2,000,000
Can provide to 300 hh a good access for capitalization.
4.3 Marketing support for priority crops
PAVO 2,000,000
2,000,000
Will provide strong and stable linkage for market of priority crops thereby gaining additional margin of income derived from equitable market price.
4.4 Support to Barangay Agricultural Workers
1,908,000
1,908,000
Readilly accessed extension support at the doorstep of every farmer in the barangay level rendered by a resident agricultural worker in augmentation to services delivered by P/MLGU personnel.
4.5 Livelihood Enhancement for Agricultural Development
PAVO 300,000
300,000
Additional income that can potentially uplift 150 hh above poverty threshold.
5.6 Assistance to Gawad Saka Scheme
PAVO 114,000
114,000
5.7 Support Fund to Prov'l. Agriculture Fishery Council
PAVO 50,000
50,000
5.8 Support to Farmer's Information and Technology
PAVO 300,000 300,000
V. Extension Support Services
Page | 76
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
5.1 Farmers Field School Acquired more knowledge on farm technology to increase production > FFS on Rice Production PAVO
900,000
900,000
> FFS on Corn Production PAVO 180,000
180,000
5.2 University - on - the - Air
> UOA for Corn Production PAVO 50,000
50,000
> Ang Agri - Pinoy Karon PAVO 90,000
90,000
VI. LIVESTOCK AND POULTRY PRODUCTION PROGRAM
6.1 Provincial Stock Farm Improvement
PAVO 1,000,000
1,000,000
6.2 Genetic Improvement Program
PAVO 149,318
149,318
6.3 Expansion of PAO Building (PAVO)
PAVO - PEO 5,000,000
5,000,000
VII. MARKETING AND ENTERPRISE DEVELOPMENT PROGRAM
7.1 Livelihood Enhancement Assistance Program
PEEDO 1,000,000
1,000,000
150 entreprenuers have access to microfinancing
7.2 Micro-financing PEEDO 1,000,000
1,000,000
7.3 Market linkaging and product disposition
PEEDO 100,000
100,000
9.4 Support to Demo Farm PEEDO 500,000
500,000
VIII. INVESTMENT PROMOTION
PEEDO/PAVO/ PENRO
2,000,000
2,000,000
Increase number of investment from 5 to 15. facilitation of hydro plant, 1 palm oil
Page | 77
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
7.2 Support to Provincial Board of Investment
PEEDO 500,000 500,000
IX. ECONOMIC ENTERPRISE -
9.1 Potable Water System Rehabilitation including MRDP pipelines
PEEDO 1,000,000
1,000,000
Improved services to cover more hhs in patin-ay
9.2 Maintenance Budwood Garden
PEEDO 925,000
925,000
To support the target of PAVA: 9,405 has.; developed new 1,550 has. of recommended true-to-type clone thru pgas initiative; & developed new 3,050 has. recommended true-to-type clone by partner players.
X. EMPLOYMENT FACILITATION PROGRAM
10.1 Special Program for Employment of Students (SPES)
PESO 1,100,000
1,100,000
Support summer job for students from poor families
10.2 Jobs Fair PESO 500,000
500,000
Avenue for local job seekers to get employment locally and abroad: 2 jo150 job fairs with minimum of job seekiers
10.3 OFW fly now pay later
PESO 1,100,000
1,100,000
Financial assistance to workers seeking overseas employment
10.4 Skills Training and Entreprenueurial Development
PESO 1,000,000
1,000,000
Improved skill to local entreprenuers
XI. ECO-TOURISM DEVELOPMENT
Page | 78
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
11.1 Development Eco-tourism plans and Sites
PTO 1,500,000
1,500,000
3 local tourism plans and sites developed
11.2 Completion of ADS Heritage Center and ground improvement (landscaping)
PTO 3,000,000
3,000,000
Necessary facilities for placement of artifacts are acquired
Sub total 184,200,000
221,512,318
4,100,000
-
-
-
77,622,000
487,434,318
ENVIRONMENT
I. Sustainable Small Watershed / Protected Areas Development Program
Declaration of Small Watershed (5,000 below)
PENRO 300,000
300,000
Covers 3,000 has in 6 municipalities
Rainforestation project within watersheds
PENRO 500,000
500,000
Restoration of forest biodiversity and improved water quality and supply
II. Forest profiling for enrollment to Carbon Trading (market-based incentive program)
PENRO 500,000
500,000
250,000 has profiled: identification of vegatation classification. Preservation of forest land in which the farmers can have income from carbon trading incentives
III. USAD - CADT AREAS Areas to be covered above 18% slope with poverty incidence of 45% above: Esperanza, San Luis, Sibagat, Veruela, Loreto and La Paz covering a total of 150 hectares or 150 HHs
Small Rubber-based farming system (Integrated farming in CADT areas)
PENRO/PAVO 2,000,000
2,000,000
IV. Tree Park Development Program
Page | 79
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
Identification and declaration of municipal and barangay tree park
PENRO 200,000
200,000
Developed 8 tree parks for genetic based conservation
V. Protection of Potential Environmental and Tourism Significant Sites
Identification, assessment and declaration of significant sites as protected areas and Eco-tourism sites
PENRO/PTO 600,000
600,000
19 waterfalls, 15 lakes and 11 caves
VI. Kinaiyahan Ampingan ug Panalipdan Program
Development of environmental ethics in all levels of educational system (pre-school, elem, high school & college.
PENRO 500,000
500,000
Inculcating the importance of protecting the environment we borrowed from the future generations. It will be piloted in 3 municipalities
VII. Responsible mining program
Declaration of Minahan Ng Bayan
PENRO 250,000
250,000
Increased 30% collection of ESMF: from 25M (2012 baseline) to 35M which benefits 500 miners
Establishment of centralized mineral processing area
PENRO 250,000
250,000
Registratiion of 118 unregistered ball/rod mills and 16 Canbon Inpulp Processing
VIII. Desiltation and River Bank Protection of Agusan River Program ( From Trento- Talacogon)
-
Page | 80
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
-Community Consultation and mapping
PENRO/PEO/PDRRMO 150,000
150,000
It will prevent flooding to agricultural areas. It can benefit 29,000 low land rice farmers who regularly experienced crop failure due to flooding out of the total 36,000 rice farmers.
IX. Co-Management Program on protection and Conservation of Agusan Marsh (Wetland Project)
Environmental Social Fencing Program
PENRO 500,000
500,000
9 barangays within wetland areas are given livelihood assistance
Archeological, historical, cultural & scientific studies
PENRO/PTO 600,000
600,000
Support the tourism program of the province, agusanons and students
Integration of Agusan Marsh Environmental Concerns in School Curriculum
PENRO 500,000
500,000
Inculcating the students the importance of agusan marsh biodiversity as recognized during the RAMSAR convention
X. Protection of Source of Drinking Water
Identification & declaration of spring water sources as protected area.
PENRO/PHO 100,000
100,000
3 spring water source declared
XI. Ecological Solid Waste Management Program
Establishment of Provincial Eco-Park Landfill
PENRO/PEO/PGSO 2,500,000
2,500,000
established 1 provincial eco-park landfill that will cater 5 MLGUs
Establishment of Provincial Capitol MRF
PENRO/PEO/PGSO Caters 33 offices in PGAS
Page | 81
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
XII. Seedling Production for Tree Farming and Rainforestration Program Support
PENRO 250,000
250,000
90, 000 seedling or 30,000 annually that will support the rainforestation of watershed and treefarming
XIII. Provincial Capitol Greening Program (new)
PENRO/PGSO 100,000
100,000
Aesthetic development of the governemtn center to become a people's hub
XIV. CAD Titling Process Program
PENRO 2,000,000
2,000,000
Target of 202,000 has that will cater 36.65% of the total IPs in the province or 241,184
XV. Reclassification of Timberland into A and D (on-going)
PENRO/ PASTO 100,000
100,000
Once reclassified, the projected local revenue is 3.8M (grassland category)
XX. Support to ADS Environment & Sustainable Dev't. Council
PENRO 300,000 300,000
Sub-total 7,300,000
-
4,600,000
-
300,000
12,200,000
11,900,000
SOCIAL SECTOR
I. UPGRADING OF PHYSICAL FACILITIES, EQUIPMENT AND INSTRUMENT
1.1 Upgrading of BnB for depressed barangays
PHO 250,000
250,000
Increased access to quality affordable medicines in depressed brgys (Sinubong and Del Monte in Veruela)
1.2 Procurement of Hospital Equipment
PHO 3,700,000
3,700,000
1.3 Procurement of Mobile X-Ray with C-Arm
DOPMH 3,500,000
3,500,000
1.4 Completion of Half-Way House of Talacogon District Hospital
TDH 1,500,000
1,500,000
II. SUPPORT TO EDUCATION
Page | 82
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
2.1 Pagtuon Program for Oplan Balik Eskwela Campaign
PGO 1,500,000
1,500,000
Provision of books to far flung schools
2.2 Gawad Datu Lipus Makapandong Huwarang Guro Award
PGO 1,650,000
1,650,000
Teaching excellence recognition of outstanding teachers
2.3 Provincial Academic Enhancement Training and Workshop
PGO 825,000
825,000
Enhanced teaching methodology of teachers
2.4 Advocacy to promote the "Gulayan sa Eskwela" in support to Nutrition Program
PGO 72,000
72,000
To be piloted in 6 elementary schools to encourage pupils eat nutritious foods
2.5 Support to the implementation K-12
PGO/DEP-ED 5,000,000
5,000,000
10,000,000
III. EARLY CHILDHOOD CARE DEVELOPMENT
-
3.1 Provision of outdoor/indoor facilities of Day Care Centers
PSWDO 1,100,000
1,100,000
in support to the 20 standard ECC for 3 years, intended for increasing enrollment for children age 3-5
3.2 Capability building and honorarium support to Day Care Workers and Neighborhood Play Volunteers
PSWDO 380,500
380,500
3.3 Establishment of Supervised Neighborhood Play Sites including provision of materials for SNP
PSWDO 500,000
500,000
In support to increase enrollment of learning children
3.4 ConstructIon of Ten (10) Standard Day Care Center
PEO/PSWDO 6,000,000
6,000,000
10% increase enrollment of children age 3-5 or 2,065 out 26,054 of the targeted 6 municipalities
Page | 83
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
IV. Support to Social Welfare
4.1 Support to Individual in Crisis Situation
PSWDO 500,000 500,000
4.2 Grants and Donation PSWDO 5,000,000 5,000,000
4.3 Assistance to Self-Helped Day Care Workers (PSWDO)
PSWDO 3,184,900 3,184,900
4.4 Support to Anti-Sex/Child Trafficking Program
PSWDO 200,000 200,000
4.5 Support to People with Disability
PSWDO 250,000 250,000
4.6 Support to Early Childhood Care and Development
PSWDO 400,000 400,000
4.7 Assistance to Elderly or Senior Citizens
PSWDO 5,000,000 5,000,000
4.8 Support to Local Council for the Protection of Children
PSWDO 150,000 150,000
4.9 Support to Youth Development
PSWDO 250,000 250,000
4.10 Support to Regional Rehabilitation Center for Youth
PSWDO 250,000 250,000
4.11 Assistance to Women Development
PSWDO 200,000 200,000
4.12 Assistance to Women's Federation
PSWDO 200,000 200,000
V. SUPPORT TO PUBLIC HEALTH DELIVERY SYSTEM
-
5.1 Maternal and Child Health
-
Page | 84
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
5.1.1 Conduct of Maternal/Underfive Mortality Review
PHO 198,000
198,000
5.1.2 Provision of laboratory reagents
PHO 165,000
165,000
5.2 Expanded Program Immunization
-
5.2.1 Provision of supplies syringes/needles (S/N)
PHO 165,000
165,000
5.2.2 PIR with middle manager
PHO 33,000
33,000
5.3 Health and Nutrition -
5.3.1 Provision of supplies/equipment (salter weighing scale)
PHO 165,000
165,000
5.3.2 Strengthening of PNC/MNC/BNC
PHO 165,000
165,000
5.4 Communicable / Non- Communicable Diseases Prevention Control
5.4.1 Procurement of Drugs/Medicines/Supplies for Communicable/non communicable diseases prevention & control program (health lifestyle, NTP, STI, Surveillance, etc)
PHO 1,650,000
1,650,000
5.4.2 Procurement of chemical insecticide for Dengue
PHO 88,000
88,000
Decrease incidents of dengue
5.5 Health Promotion
Page | 85
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
5.5.1 Conduct of monthly special health events
PHO 66,000
66,000
5.5.2 Reproduction of FHSIS tables
PHO 50,000
50,000
5.5.3 PIR on health programs implementation
PHO 275,000
275,000
5.6 Counterpart Funds for Womens Health Program
PHO 350,000
350,000
5.7 Assistance to Barangay Health Workers
PHO 5,867,100 5,867,100
5.8Assistance to BHW (retirement)
PHO 500,000 500,000
5.9 Assistance to Outreach Program/Activities
PHO 500,000 500,000
VI. Moral Recovery Values Formation Services
6.1 Training and Seminars MRVFS 2,300,000
2,300,000
Moral and spiritual growth southern agusanon
VII. Support to Water and Sanitation
7.1. Installation of rain water collector and construction of biosand filters
PEO 10,000,000
10,000,000
it will cater 3,884 HHs in 6 MLGUs
7.2 Ugrading of developed springs (2 units/year)
PHO 250,000
250,000
Improved potability of water source
7.3 Construction of Sanitary Toilets (200 units per year)
PEO/PHO 1,200,000
1,200,000
Municipalities with less # of Household with sanitary toilets: Sibagat, San Luis, La Paz, Talacogon, Trento
Page | 86
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
VIII. Sport Services
8.1 Support to Physical Fitness and Sport Dev't.-Local
SPORTS 2,500,000
2,500,000
IDEAL-IDINAUS SPORTS 500,000
500,000
8.2 Support to Physical Fitness and Sport Dev't. Nat'l.
SPORTS 500,000
500,000
8.3 Provincial Sports Dev't. Council
SPORTS 40,000
40,000
IX. Support to Housing and Resettlement
9.1 Purchase and Development of land for the relocation of informal settlers and relocation of victims of calamities
PSWDO 1,500,000
1,500,000
Sub-total 31,233,000
10,000,000
-
4,047,000
-
-
30,309,500
75,589,500
PUBLIC SAFETY
I. Acquisition of Relocation Site
PDRRM 1,000,000
1,000,000
6 relocation site in flood prone barangays
II. Updating of Maps of flood/landslide prone areas (GIS)
PDRRM 200,000
200,000
Accurate data on flood prone areas
III. Mainstreaming DRR-CCA in Local Development Plans
PDRRM 100,000
100,000
Alignment of plans to mitigate the ill effects of climate change
IV. Community disaster preparedness programs
PDRRM 100,000
100,000
Awareness of the populace for emergency response during calamities
V. Acquisition of Disaster Equipment
PDRRM
Page | 87
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
a) High angle rescue equipment
500,000
500,000
For more effective and efficient response to emergencies
b) 6 Plastic boats (2 per year) 500,000
500,000
c) Fire extinguishers (50 units) 250,000
250,000
VI. Acquisition of new security firearms
PCSO 1,000,000
1,000,000
Safety and security of correctional facility
VII.Formulation of evacuation plan of disaster prone per barangay (Camp Management)
PDRRM 400,000
400,000
People become more responsive during calamities
VIII. Conflict Resolution & Management Program
PGO 500,000
500,000
Ensuring peace and order in the province
IX. IEC on Crime Prevention Programs
PDRRM 10,000
10,000
X. IEC Anti-Drugs Campaign PDRRM 10,000
10,000
XI. Implementation of flood control facility
PEO/DRRM 30,000,000
30,000,000
It will prevent flooding to agricultural areas. It can benefit 29,000 low land rice farmers who regularly experienced crop failure due to flooding out of the total 36,000 rice farmers.
XII. Periodic cleaning of drainage/canal
PEO/DRRM 500,000
500,000
Prevent flooding to rural centers
XIII. Construction of Evacuation Center in flood prone areas
PEO/DRRM 1,000,000
1,000,000
Safety of populace in 6 flood prone barangays
XIX. Support to Peace and Development
PCSMO 838,000
838,000
XX. Other Services (Inmates) PCSMO 4,762,500 4,762,500
Page | 88
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
Sub-total 1,250,000
-
-
-
-
33,320,000
7,100,500
41,670,500
INSTITUTION/TRANSFORMING THE BUREAUCRACY
I. Support to Development Projects
30,000,000
30,000,000
I. Municipal/ Barangay Development Projects
M/BLGU/PGO 27,000,000
27,000,000
Support to priority development projects of the MLGUs and BLGUs
II. Updating and implementation of the HRMD Plan
PHRMO/PBO/and all sectors
-
2.1 Structure/Staffing -
Covers the implementation of Ord Nos. 36 and 92 (PGAS
reorg) 2.1.1 Funding of positions 61,507,310
61,507,310
2.1.2 Separation Package 46,553,585
46,553,585
2.2 HRMD Systems 1,310,500
1,310,500
Implementation of HR plans
2.3 Health and Wellness 2,000,000
2,000,000
enhanced KSA of employees
III. Development and Management of PGAS Communication Plan
PPIO 1,500,000
1,500,000
Buy-in of PGAS plans to stakeholders
IV. Codification of Ordinances SP 500,000
500,000
Omnibus enactment of ordinances by category
V. Legislative feedback mechanism
SP 200,000
200,000
Development of tools to solicit issues and recommendations
VI. Alignment of provincial and city/municipal development plans
PPDO 200,000
200,000
PLGUs and MLGUs plans are harmonized
VII. Rehabilitation of Broadcast Equipments (DXDA & PTV)
PPIO 1,500,000
1,500,000
Page | 89
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2015
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
VIII. Establishment of service vehicle maintenance shop policy
PGSO/PEO 1,500,000
1,500,000
Cater wheel alignment and change oil
IX. Plan Assessment PPDO 500,000
500,000
XIV. Support to Infrastructure
PEO 20,000,000 20,000,000
XV.Preliminary & Detailed Engineering Services
PEO 3,000,000 3,000,000
XVI. Supervision and Contract Management
PEO 2,500,000.00 2,500,000
XVII. Repair/Maint of PGAS Gov't. Buildings
PEO 2,000,000.00 2,000,000
XVIII Maint. Of PGAS Electrical System and Air Conditioning)
PEO 1,000,000.00 1,000,000
XIX. Maint. Of Gov't. Center Drainage System
PEO 1,000,000.00 1,000,000
XX. Counterpart for Special Projects
PGAS 25,000,000.00 25,000,000
XXI. Ground and Building Maintenance
PGSO 1,750,000.00 1,750,000
XXII. Debt. Servicing PGO 12,857,651
12,857,651
Sub-total 39,857,651
-
-
-
-
-
203,521,396
243,379,047
Total 256,540,651
231,512,318
11,400,000
4,047,000
4,600,000
33,320,000
318,853,396
860,273,365
Page | 90
Priority Programs and Projects (2016)
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
ECONOMIC SECTOR
I. INFRASTRUCTURE
1.1 Provincial Roads 1.1.1 Road Rehabilitation
PEO 150,000,000
170,000,000
320,000,000
It will benefit 21, 893 HHs in 7 municipalities
1.1.2 Road/ Bridge Maintenance
PEO 60,000,000
60,000,000
II. USAD
2.1 Rubber development project
PAVO/PEEDO 7,590,000
150,000
7,740,000
Improved cultivation practices of existing 9,405 has.; developed new 1,550 has. of recommended true-to-type clone thru pgas initiative; & developed new 3,050 has. recommended true-to-type clone by partner players.
2.2 Cacao and Coffee Production Project
PAVO 2,462,000
75,000
2,537,000
Additional income that can potentially uplift 330 hh above poverty threshold.
2.3 Banana Production Project
PAVO 1,280,000
22,000
1,302,000
Additional income that can potentially uplift 150 hh above poverty threshold.
2.4 Vegetable Growing Project ( Adopt Barangay Approach in partnership of 4Ps program)
PAVO 1,375,000
365,000
1,740,000
Additional income that can potentially uplift 4,500 hh above poverty threshold.
2.5 Fruit Tree Production project
PAVO 380,000
75,000
455,000
Additional income that can potentially uplift 150 hh above poverty threshold.
2.6 Cutflower Production Project
PAVO 369,000
369,000
Replication to Sibagat area with a potential of uplifting 150 hh above poverty threshold (Bgry. Kolambugan area)
Page | 91
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
III. Agusan del Sur Lowland Sustainable Agriculture (ALSA) Program
3.1 Micro - Insurance Project
PAVO 1,200,000
1,200,000
resiliency and protection of 4,500 Hh (farmers) against calamities
3.2 Farm Mechanization Program
PAVO 2,040,000
20,050,000
22,090,000
Additional income for 480 hh derived from the saved post harvest losses and additional of 2,080 hh derived from improved pre and post production
3.3 Upland/Coloured Rice Production Project
PAVO 1,000,000
4,898,000
5,898,000
Provide a good access on seeds and technology assistance for 1,500 hh in the production of upland rice.
3.4 Upland/Coloured Rice Marketing Project (Livelihood Project)
PAVO 5,000,000
5,000,000
Additional income for the above 1,500 hh derived from marketed high value upland rice.
3.5 Organic Agriculture Program
PAVO 1,000,000
2,000,000
3,000,000
Additional income for 1,482 hh derived from reduced farm production cost.
IV. Institutional and Social Marketing Program for Coops, POs and Non-government Organizations
4.1 Organizing and Strengthening support
PAVO 350,000
350,000
capacitate groups especially in the organizational and management aspects. It is surmized that these areas our weakest point is so far as project sustainability is concerned.
4.2 Micro-financing PAVO 2,000,000
2,000,000
Can provide to 300 hh a good access for capitalization.
4.3 Marketing support for priority crops
PAVO 2,000,000
2,000,000
Will provide strong and stable linkage for market of priority crops thereby gaining additional margin of income derived from equitable market price.
Page | 92
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
4.4 Support to Barangay Agricultural Workers
PAVO 1,908,000
1,908,000
Readilly accessed extension support at the doorstep of every farmer in the barangay level rendered by a resident agricultural worker in augmentation to services delivered by P/MLGU personnel.
4.5 Livelihood Enhancement for Agricultural Development
PAVO 300,000
300,000
Additional income that can potentially uplift 150 hh above poverty threshold.
5.6 Assistance to Gawad Saka Scheme
PAVO 114,000
114,000
5.7 Support Fund to Prov'l. Agriculture Fishery Council
PAVO 50,000
50,000
5.8 Support to Farmer's Information and Technology
PAVO 300,000 300,000
V. Extension Support Services
5.1 Farmers Field School Acquired more knowledge on farm technology to increase production
> FFS on Rice Production PAVO 900,000
900,000
> FFS on Corn Production PAVO 180,000
180,000
6.2 University - on - the - Air
> UOA for Corn Production PAVO 50,000
50,000
> Ang Agri - Pinoy Karon PAVO 90,000
90,000
VI. LIVESTOCK AND POULTRY PRODUCTION PROGRAM
6.1 Provincial Stock Farm Improvement
PAVO 1,000,000
1,000,000
Page | 93
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
6.2 Provincial Poultry Breeding Program
PAVO 150,000
150,000
6.3 Upgrading of Swine artificial insemenation Facilities
PAVO 530,000
530,000
6.4 Genetic Improvement Program
PAVO 700,000
700,000
VII. MARKETING AND ENTERPRISE DEVELOPMENT PROGRAM
7.1 Livelihood Enhancement Assistance Program
PEEDO 1,000,000
1,000,000
150 entreprenuers have access to microfinancing
7.2 Micro-financing PEEDO 1,000,000
1,000,000
7.3 Market linkaging and product disposition
PEEDO 100,000
100,000
9.4 Support to Demo Farm
PEEDO 500,000
500,000
VIII. INVESTMENT PROMOTION
PEEDO/PAVO/ PENRO
1,000,000
1,000,000
2,000,000
Increase number of investment from 5 to 15. facilitation of hydro plant, 1 palm oil
8.2 Support to Provincial Board of Investment
PEEDO 500,000 500,000
IX. ECONOMIC ENTERPRISE -
9.1 Potable Water System Rehabilitation including MRDP pipelines
PEEDO 1,000,000
1,000,000
Improved services to cover more hhs in patin-ay
9.2 Maintenance Budwood Garden
PEEDO 965,000
965,000
To support the target of PAVA: 9,405 has.; developed new 1,550 has. of recommended true-to-type clone thru pgas initiative; & developed new 3,050 has. recommended true-to-type clone by partner players.
Page | 94
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
X. EMPLOYMENT FACILITATION PROGRAM
10.1 Special Program for Employment of Students (SPES)
PESO 1,100,000
1,100,000
Support summer job for students from poor families
10.2 Jobs Fair PESO 500,000
500,000
Avenue for local job seekers to get employment locally and abroad: 2 jo150 job fairs with minimum of job seekiers
10.3 OFW fly now pay later
PESO 1,100,000
1,100,000
Financial assistance to workers seeking overseas employment
10.4 Skills Training and Entreprenueurial Development
PESO
1,000,000
1,000,000
Improved skill to local entreprenuers
XI. ECO-TOURISM DEVELOPMENT
11.1 Development Eco-tourism plans and Sites
PTO 1,500,000
1,500,000
3 local tourism plans and sites developed
Sub total 177,641,000
199,855,000
3,100,000
-
-
-
73,622,000
454,218,000
ENVIRONMENT
I. Sustainable Small Watershed / Protected Areas Development Program
Declaration of Small Watershed (5,000 below)
PENRO 300,000
300,000
Covers 3,000 has in 6 municipalities
Rainforestation project within watersheds
PENRO 500,000
500,000
Restoration of forest biodiversity and improved water quality and supply
II. Forest profiling for enrollment to Carbon Trading (market-based incentive program)
PENRO 200,000
200,000
250,000 has profiled: identification of vegatation classification. Preservation of forest land in which the farmers can have income from carbon trading incentives
Page | 95
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
III. USAD - CADT AREAS -
Areas to be covered above 18% slope with poverty incidence of 45% above: Esperanza, San Luis, Sibagat, Veruela, Loreto and La Paz covering a total of 150 hectares or 150 HHs
Small Rubber-based farming system (Integrated farming in CADT areas)
PENRO/ PAVO 2,000,000
2,000,000
IV. Tree Park Development Program
-
Identification and declaration of municipal and barangay tree park
PENRO 200,000
200,000
Developed 8 tree parks for genetic based conservation
V. Protection of Potential Environmental and Tourism Significant Sites
-
Identification, assessment and declaration of significant sites as protected areas and Eco-tourism sites
PENRO/PTO 600,000
600,000
19 waterfalls, 15 lakes and 11 caves
VI. Kinaiyahan Ampingan ug Panalipdan Program
-
Development of environmental ethics in all levels of educational system (pre-school, elem, high school & college.
PENRO 500,000
500,000
Inculcating the importance of protecting the environment we borrowed from the future generations. It will be piloted in 3 municipalities
VII. Responsible mining program
-
Declaration of Minahan Ng Bayan
PENRO 250,000
250,000
Increased 30% collection of ESMF: from 25M (2012 baseline) to 35M which benefits 500 miners
Establishment of centralized mineral processing area
PENRO 250,000
250,000
Registratiion of 118 unregistered ball/rod mills and 16 Canbon Inpulp Processing
Page | 96
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
VIII. Desiltation and River Bank Protection of Agusan River Program ( From Trento- Talacogon)
-
-Community Consultation and mapping
PENRO/PEO/PDRRMO 150,000
150,000
It will prevent flooding to agricultural areas. It can benefit 29,000 low land rice farmers who regularly experienced crop failure due to flooding out of the total 36,000 rice farmers.
IX. Co-Management Program on protection and Conservation of Agusan Marsh (Wetland Project)
-
Environmental Social Fencing Program
PENRO 500,000
500,000
9 barangays within wetland areas are given livelihood assistance
Archeological, historical, cultural & scientific studies
PENRO/PTO 1,030,000
1,030,000
Support the tourism program of the province, agusanons and students
Integration of Agusan Marsh Environmental Concerns in School Curriculum
PENRO 500,000
500,000
Inculcating the students the importance of agusan marsh biodiversity as recognized during the RAMSAR convention
X. Protection of Source of Drinking Water
-
Identification & declaration of spring water sources as protected area.
PENRO/PHO 100,000
100,000
3 spring water source declared
XI. Ecological Solid Waste Management Program
-
Establishment of provincial eco-park landfill
PENRO/PEO/PGSO 2,500,000
2,500,000
established 1 provincial eco-park landfill that will cater 5 MLGUs
Page | 97
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
XII. Seedling Production for Tree Farming and Rainforestration Program Support
PENRO 250,000
250,000
90, 000 seedling or 30,000 annually that will support the rainforestation of watershed and treefarming
XIII. Provincial Capitol Greening Program (new)
PENRO/PGSO 150,000
150,000
Aesthetic development of the governemtn center to become a people's hub
XIV. CAD Titling Process Program
PENRO 1,500,000
1,500,000
Target of 202,000 has that will cater 36.65% of the total IPs in the province or 241,184
XV. Reclassification of Timberland into A and D (on-going)
PENRO/PASTO 100,000
100,000
Once reclassified, the projected local revenue is 3.8M (grassland category)
XVI. Support to ADS Environment & Sustainable Dev't. Council
PENRO 300,000.00 300,000
Sub-total 6,500,000
-
5,080,000
-
300,000
11,880,000
SOCIAL SECTOR
I. UPGRADING OF PHYSICAL FACILITIES, EQUIPMENT AND INSTRUMENT
1.1 Upgrading of BnB for depressed barangays
PHO 250,000
250,000
Increased access to quality affordable medicines in depressed brgys (Sinubong and Del Monte in Veruela)
II. SUPPORT TO EDUCATION
2.1 Pagtuon Program for Oplan Balik Eskwela Campaign
PGO 1,500,000
1,500,000
Provision of books to far flung schools
2.2 Gawad Datu Lipus Makapandong Huwarang Guro Award
PGO 1,815,000
1,815,000
Teaching excellence recognition of outstanding teachers
Page | 98
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
2.3 Provincial Academic Enhancement Training and Workshop
PGO 907,000
907,000
Enhanced teaching methodology of teachers
2.4 Advocacy to promote the "Gulayan sa Eskwela" in support to Nutrition Program
PGO 72,000
72,000
To be piloted in 6 elementary schools to encourage pupils eat nutritious foods
2.5 Support to the implementation K-12
PGO/DEP-ED 5,000,000
5,000,000
10,000,000
III. EARLY CHILDHOOD CARE DEVELOPMENT
3.1 Provision of outdoor/indoor facilities of Day Care Centers
PSWDO 550,000
550,000
in support to the 20 standard ECC for 3 years, intended for increasing enrollment for children age 3-5
3.2 Capability building and honorarium support to Day Care Workers and Neighborhood Play Volunteers
PSWDO 445,500
445,500
3.3 Establishment of Supervised Neighborhood Play Sites including provision of materials for SNP
PSWDO 235,000
235,000
In support to increase enrollment of learning children
3.4 ConstructIon of five (5) Standard Day Care Center
PEO/PSWDO 3,000,000
3,000,000
10% increase enrollment of children age 3-5 or 2,065 out 26,054 of the targeted 6 municipalities
IV. Support to Social Welfare
4.1 Support to Individual in Crisis Situation
PSWDO 500,000 500,000
4.2 Grants and Donation PSWDO 5,000,000 5,000,000
Page | 99
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
4.3 Assistance to Self-Helped Day Care Workers (PSWDO)
PSWDO 3,184,900 3,184,900
4.4 Support to Anti-Sex/Child Trafficking Program
PSWDO 200,000 200,000
4.5 Support to People with Disability
PSWDO 250,000 250,000
4.6 Support to Early Childhood Care and Development
PSWDO 400,000 400,000
4.7 Assistance to Elderly or Senior Citizens
PSWDO 5,000,000 5,000,000
4.8 Support to Local Council for the Protection of Children
PSWDO 150,000 150,000
4.9 Support to Youth Development
PSWDO 250,000 250,000
4.10 Support to Regional Rehabilitation Center for Youth
PSWDO 250,000 250,000
4.11 Assistance to Women Development
PSWDO 200,000 200,000
4.12 Assistance to Women's Federation
PSWDO 200,000 200,000
V. SUPPORT TO PUBLIC HEALTH DELIVERY SYSTEM
-
5.1 Maternal and Child Health
-
5.1.1 Conduct of Maternal/Underfive Mortality Review
PHO 217,800
217,800
Page | 100
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
5.1.2 Provision of laboratory reagents
PHO 181,500
181,500
5.2 Expanded Program Immunization
-
5.2.1 Provision of supplies syringes/needles (S/N)
PHO 181,500
181,500
5.2.2 PIR with middle manager
PHO 36,300
36,300
5.3 Health and Nutrition
-
5.3.1 Provision of supplies/equipment (salter weighing scale)
PHO 181,500
181,500
5.3.2 Strengthening of PNC/MNC/BNC
PHO 181,500
181,500
5.4 Communicable / Non- Communicable Diseases Prevention Control
-
5.4.1 Procurement of Drugs/Medicines/Supplies for Communicable/non communicable diseases prevention & control program (health lifestyle, NTP, STI, Surveillance, etc)
PHO 1,815,000
1,815,000
5.4.2 Procurement of chemical insecticide for Dengue
PHO 98,800
98,800
Decrease incidents of dengue
5.5 Health Promotion -
4.5.1 Conduct of monthly special health events
PHO 72,600
72,600
Page | 101
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
4.5.2 Reproduction of FHSIS tables
PHO 50,000
50,000
4.5.3 PIR on health programs implementation
PHO 302,500
302,500
5.6 Counterpart Funds for Womens Health Program
PHO 350,000
350,000
5.7 Assistance to Barangay Health Workers
PHO 5,867,100 5,867,100
5.8Assistance to BHW (retirement)
PHO 500,000 500,000
5.9 Assistance to Outreach Program/Activities
PHO 500,000 500,000
V. Moral Recovery Values Formation Services
5.1 Training and Seminars MRVFS 2,300,000
2,300,000
Moral and spiritual growth southern agusanon
VI. Support to Water and Sanitation
6.1 Installation of rain water collector and construction of biosand filters
PEO 10,000,000
10,000,000
it will cater 3,884 HHs in 6 MLGUs
6.2 Ugrading of developed springs (2 units/year)
PHO 250,000
250,000
Improved potability of water source
5.3.3 Construction of Sanitary Toilets (200 units per year)
PEO/PHO 1,200,000
1,200,000
Municipalities with less # of Household with sanitary toilets: Sibagat, San Luis, La Paz, Talacogon, Trento
IX. Support to Housing and Resettlement
Page | 102
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
9.1 Purchase and Development of land for the relocation of informal settlers and relocation of victims of calamities
1,500,000
1,500,000
Sub-total 24,208,300
5,000,000
-
4,294,000
-
-
26,643,200
60,145,500
PUBLIC SAFETY
I. Acquisition of Relocation Site
PDRRM 1,000,000
1,000,000
6 relocation site in flood prone barangays
II. Updating of Maps of flood/landslide prone areas (GIS)
PDRRM 200,000
200,000
Accurate data on flood prone areas
III. Mainstreaming DRR-CCA in Local Development Plans
PDRRM 100,000
100,000
Alignment of plans to mitigate the ill effects of climate change
IV. Community disaster preparedness programs
PDRRM 100,000
100,000
Awareness of the populace for emergency response during calamities
V. Acquisition of Disaster Equipment
PDRRM
a) High angle rescue equipment
500,000
500,000
For more effective and efficient response to emergencies
b) 6 Plastic boats (2 per year)
500,000
500,000
c) Fire extinguishers (50 units)
250,000
250,000
VI. Acquisition of new security firearms
PCSO 1,000,000
1,000,000
Safety and security of correctional facility
VII.Formulation of evacuation plan of disaster prone per barangay (Camp Management)
PDRRM 400,000
400,000
People become more responsive during calamities
VIII. Conflict Resolution & Management Program
PGO 500,000
500,000
Ensuring peace and order in the province
Page | 103
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
IX. IEC on Crime Prevention Programs
PDRRM 10,000
10,000
X. IEC Anti-Drugs Campaign
PDRRM 10,000
10,000
XI. Implementation of flood control facility
PEO/DRRM 30,000,000
30,000,000
It will prevent flooding to agricultural areas. It can benefit 29,000 low land rice farmers who regularly experienced crop failure due to flooding out of the total 36,000 rice farmers.
XII. Periodic cleaning of drainage/canal
PEO/DRRM 500,000
500,000
Prevent flooding to rural centers
XIII. Construction of Evacuation Center in flood prone areas
PEO/DRRM 1,000,000
1,000,000
Safety of populace in 6 flood prone barangays
XIX. Support to Peace and Development
PCSMO 838,000
838,000
XX. Other Services (Inmates)
PCSMO 4,762,500 4,762,500
Sub-total 1,250,000
-
-
-
-
33,320,000
7,100,500
41,670,500
TRANSFORMING THE BUREAUCRACY
I. Support to Development Projects
30,000,000
30,000,000
I. Municipal/Barangay development projects
PPDO/PGO 27,000,000
27,000,000
Support to priority development projects of the MLGUs and BLGUs
II. Updating and implementation of the HRMD Plan
PHRMO/PBO/and all sectors
2.1. Funding of positions PHRMO/PBO/and all sectors
42,992,804
42,992,804
Page | 104
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
2.2 HRMD Systems PHRMO/PBO/and all sectors
707,500
707,500
Implementation of HR plans
2.3 Health and Wellness 2,000,000
2,000,000
enhanced KSA of employees
III. Development and Management of PGAS Communication Plan
PPIO 1,500,000
1,500,000
Buy-in of PGAS plans to stakeholders
IV. Codification of Ordinances
SP 500,000
500,000
Omnibus enactment of ordinances by category
V. Legislative feedback mechanism
SP 200,000
200,000
Development of tools to solicit issues and recommendations
VI. Alignment of provincial and city/municipal development plans
PPDO 200,000
200,000
PLGUs and MLGUs plans are harmonized
VII. Rehabilitation of Broadcast Equipments (DXDA & PTV)
PPIO 1,500,000
1,500,000
VIII. Strategic planning PADMO/ PPDO 2,000,000
2,000,000
XIV. Support to Infrastructure
PEO 20,000,000 20,000,000
XV.Preliminary & Detailed Engineering Services
PEO 3,000,000 3,000,000
XVI. Supervision and Contract Management
PEO 2,500,000.00 2,500,000
XVII. Repair/Maint of PGAS Gov't. Buildings
PEO 2,000,000.00 2,000,000
XVIII Maint. Of PGAS Electrical System and Air Conditioning)
PEO 1,000,000.00 1,000,000
XIX. Maint. Of Gov't. Center Drainage System
PEO 1,000,000.00 1,000,000
XX. Counterpart for Special Projects
PGAS 25,000,000.00 25,000,000
Page | 105
PPAs IMPLEMENTING
OFFICE
Total DESIRED OUTCOME
2016
20% PDF EXTERNAL ESMF SEF VIF LDRRMF GF
XXII. Debt. Servicing PGO 12,857,651
12,857,651
Sub-total 39,857,651
-
-
-
-
-
136,100,304
175,957,955
Total 242,956,951
199,855,000
9,600,000
4,294,000
5,080,000
33,320,000
243,766,004
743,871,955
Page | 106
Table 7: CAPDEV AGENDA – ECONOMIC SECTOR
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
ECONOMIC SECTOR
SUB-SECTOR: ENGINEERING
I. INFRASTRUCTURE
1.1 Provincial Roads
Out of 631.34 kms. Of Provincial Road Network 204.98 kms. Is in good and fair condition with a gap of 426.36 kms.
To reduce the current gap by rehabilitating 51 km per year from 2014 until 2016 in good and fair condition.
1.1.1 Road Rehabilitation
Provincial road network rehabilitated
153 km. 120,854,000
150,000,000
150,000,000
PGAS - 20% PDF
PEO
333,076,000
190,000,000
170,000,000
External
Maintained 173.62 km. of road in good and fair condition
To continue road maintenance by increasing the number of km. being maintained for about 153 km for the year 2014-2016
1.1.2 Road/Bridge Maintenance
Roads in good condition and fair condition
326.62 km. 60,000,000
60,000,000
60,000,000
PGAS - GF PEO
Sub-total 513,930,000
400,000,000
380,000,000
II. USAD
9,405 hectares existing rubber areas provincewide; 2,925 hectares in six municipalities: No established source of quality planting materials
14,000 hectares provincewide; developed new 1,550 hectares of recommended true-to-type clone thru PGAS intiative, & developed new 3,050 hectares recommended true-to-type clone by partner players Established 5 hectares budwood garden
2.1 Rubber development project
Area planted budwood garden Demofarm
1, 550 hectares 2 hectares 5 hectares
1,216,600
PGAS - GF PAVO/PEEDO
12,225,000
7,590,000
PGAS - 20%
100,000
120,000
150,000
External - DA
Page | 107
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
No existing POs-operated Rubber Processing, however, there is one exsiting village type privately-owned processing facility
One village type rubber processing facility producing crumb.
2.2 Establishment of Rubber Processing Facilities
Crumb Rubber Processing Facility
1 unit 3,375,000
PGAS - 20% PDF
800 hectares cacao area provincewide with 1.7 MT average production per hectare; 1076 hectares coffee area provincewide with 1.2 MT average production per hectare
240 hectares increase in cacao production area; 90 hectares increase in coffee production area
2.3 Cacao and Coffee Production Project
Area planted: Cacao Coffee
240 hectares
90 hectares
2,440,000
2,462,000
PGAS - 20% PDF
PAVO
198,000
PGAS - GF
50,500
65,000
75,000
External - DA
8,136 hectares total area planted to banana provincewide; 3,745 in six municipalities
150 hectares increase in production area by 2016
2.4 Banana Production Project
Plantlets provided Bags of fertilizer/organic granules distributed
93,750 plantlets 1,500 bags
1,220,000
1,280,000
PGAS - 20% PDF
PAVO
381,600
PGAS - GF
17,500
20,000
22,000
External - DA
19,389 MT annual average production provincewide; 3,948 MT in six municipalities
10% or 3,600 MT increase in volume per year
2.5 Vegetable Growing Project ( Adopt Barangay Approach in partnership of 4Ps program)
Pouches of assorted vegetable seeds produced
22,000 pouches 1,250,000
1,375,000
PGAS - 20% PDF
PAVO
100,000
PGAS - GF
300,000
330,000
365,000
External - DA
Page | 108
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
2,146.5 MT total fruit production provincewide (durian, mangosteen, lanzones, rambutan)
At least 30% increase starting CY 2017 on production areas; 150 hectares new areas planted to fruit trees.
2.6 Fruit Tree Production project
> Seedlings produced > Indigenous Fruit Tree Seedling Nursery
> 26,700 seedlings planted to 150 hectares
345,000
380,000
PGAS - 20% PDF
PAVO
315,000
PGAS - GF
50,000
60,000
75,000
External - DA
1.6 million dozens of assorted cutflower production provincewide
Three hectares new cutflower production area in Sibagat involving 30 growers
2.7 Cutflower Production Project
Area planted per enrolee
100 sq. m. per enrolee
355,000
369,000
PGAS - 20% PDF
PAVO
91,500
PGAS - GF
2.8 Cutflower Production Facilities
Rain shelter 10 units 341,500
PGAS - 20% PAVO
2.9 Rehabilitation of Provincial Seedling Nursery
Seedling nursery 1 facility 315,000
PGAS - 20% PAVO
Sub-total
6,852,200
18,430,000
14,143,000
III. Agusan del Sur Lowland Sustainable Agriculture (ALSA) Program
-
-
-
4,000 farmers insured with PCIC
Resiliency and protection of 4,500 Hh (farmers) against calamities
3.1 Micro - Insurance Project
Farmers insured with PCIC
4,500 farmers 2,000,000
1,200,000
1,200,000
PGAS - GF PAVO
Page | 109
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
Additional income for 480 hh derived from the saved post harvest losses and additional of 2,080 hh derived from improved pre and post production
3.2 Farm Mechanization Program
14,103,000
1,940,000
2,040,000
PGAS - 20% PDF
PAVO DA
75,330,000
22,350,000
20,050,000
External - DA
1 unit thresher serving 29 hectares per cropping
1 unit serving 15-20 hectares per cropping
Provision of packet farm equipment (power tiller-thresher)
Packet farm equipment provided
48 packets
2 unit power tiller serving 31 hectares per cropping
I unit serving 15-20 hectares per cropping
3 FLGC established but no longer functional
3 functional and operational FLGC
Rehabilitation of non-functional facilities
Non-functional facilities rehabilitated
3 facilities
5 Rice Processing Center operational and functional
Establishment of RPC RPC established 5 units
1 MPDP serving 68 hectares per unit
1 MPDP serving 30 hectares per unit
Construction of MPDP MPDP constructed 39 units
No existing oranic rice mill 3 Organic Rice Mill Establishment of Organic Rice Mill
Organic Rice Mill established
3 units
15 units farm tractor in six municipalities serving 503 hectares per unit; gap 10 units
300 hectares per farm tractor; 50% of gap will be provided
Provision of farm tractors
Farm tractors provided
5 units
133 units of corn sheller in six municipalities at 57 hectares per unit; gap of 119 units
30 hectares per unit; 15 units will be provided
Provision of corn mill Corn mill established 15 units
One Corn Processing and Post Harvest Trading Center established and operational
One (1) village-type facility to be established in Loreto or La Paz
Establishment of village-type corn processing facility
Corn processing facility established
1 unit
28,829 hectares of rainfed areas
300 hectares will be irrigated Small-scale Irrigation Projects
Small irrigation projects
2 SWIP
30 STW
Page | 110
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
768 hectares planted to upland rice with 1.48 MT average per hectare
1000 hectares upland/colored rice production areas and 2 MT average per hectare
3.3 Coloured Rice Production Project
Bags of coloured rice seeds provided to farmers
1,000 bags 1,000,000
1,000,000
PGAS - 20% PDF
PAVO DA
4,898,000
4,898,000
4,898,000
External - DA
Lack of market outlets of upland coloured rice
2,000 MT upland/coloured rice marketed
3.4 Upland/Coloured Rice Marketing Project (Livelihood Project)
Bags of upland/coloured rice
2,000 MT 2,500,000
PGAS - ESMF
PAVO
5,000,000
5,000,000
PGAS - 20% PDF
379 farmers are organic farming practitioners covering 473 hectares
1000 organic farming practitioners covering 1,482 hectares
3.5 Organic Agriculture Program
Area planted with crops using organic farming
1,482 hectares 1,000,000
PGAS - GF PAVO
1,000,000
1,000,000
PGAS - 20% PDF
5,000,000
2,000,000
2,000,000
External - DA
Sub-total 104,831,000
39,388,000
37,188,000
No existing FITS (Farmers Information and Technology Services) Center
1 FITS Center IV. Improvement of Agricultural Support Facilities
Functional FITS Center 1 facility 300,000
-
-
PGAS - 20% PDF
PAVO
300,000
PGAS - GF
Sub-total 600,000
-
-
V. Institutional and Social Marketing Program for Coops, POs and Non-government Organizations
-
-
-
Page | 111
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
246 coops registered as of December 2012, however, 28 have been ordered dissolved; 5 have been issued with show cause order and 54 have been sent 2nd notice after having failed to submit required reports to CDA
Sustained and strengthened 159 cooperatives with increased number of members
5.1 Organizing and Strengthening support
Cooperative mandated trainings conducted
14 trainings 1,000,000
350,000
350,000
PGAS - GF PAVO
No funds allocated for micro financing
Provision of financial assistance for micro financing
5.2 Micro-financing P200,000 per coop & at least 20 members/coop @ P20,000/member can benefit the program
30 coops 2,000,000
2,000,000
2,000,000
PGAS - GF PAVO
Unavailability of trading post
Establishment of Trading Post with initial capital for palay trading
5.3 Marketing support for priority crops
4 trading post established
4 coops in four municipalities
-
2,000,000
2,000,000
PGAS - GF PAVO
No honorarium allocated for BAWs
Provision of funds for BAWs honorarium
5.4 Support to Barangay Agricultural Workers
Quality service to farmer-clienties at the barangay
316 BAWs 1,908,000
1,908,000
1,908,000
PGAS - GF PAVO
Five RBOs availed LEAD projects from DA and ATI with 200,000 project cost benefitting 60 members
Ten LEAD projects funded and implemented
5.5 Livelihood Enhancement for Agricultural Development
Projects funded and implemented
30 projects 300,000
300,000
300,000
External - DA
PAVO
Coops provided with livelihood projects
15 Coops
Page | 112
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
Seed growers coop as conduit to funds for certified seeds
1 Coop
5 Outstanding Achievers in the field of agriculture
5.6 Assistance to Gawad Saka Scheme
Outstanding Farmers awarded
5 farmers 114,000
114,000
114,000
PGAS - GF PAVO
5.7 Support Fund to Provincial Agriculture Fishery Council
50,000
50,000
50,000
PGAS - GF PAVO
5.8 Support to Farmer's Information and Technology
300,000
300,000
300,000
PGAS - GF PAVO
Sub-total 5,672,000
7,022,000
7,022,000
VI. Extension Support Services
-
-
-
1225 farmer - graduates of Farmers Field School on Rice Production provincewide
5% increase on number of farmer-recipients and area coverage inputs subsidy
6.1 Farmers Field School
Graduated farmersFFS Sites
1,260 farmers42 FFS sites
-
-
-
> FFS on Rice Production
900,000
900,000
900,000
External - DA
PAVO
> FFS on Corn Production
180,000
180,000
180,000
External - DA
PAVO
6.2 University - on - the – Air
-
-
-
> UOA for Corn Production
50,000
50,000
50,000
External - DA
PAVO
30 - minute radio program per week
45 - minute radio program > Ang Agri - Pinoy Karon
Radio program aired 84 airing time 90,000
90,000
90,000
External - DA
PAVO
Sub-total 1,220,000
1,220,000
1,220,000
VII.REHABILITATION OF FISH HATCHERY PRODUCTION FACILITIES
500,000
PGAS - 20% PDF
Page | 113
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
An average production of 2.0 million fingerlings and 1.8 million fingerlings distributed annually
Increase yearly production and distribution by 30% or 2.6 million and 2.3 million fingerlings respectively
Fingerlings produced/distributed
7.8 M fingerlings produced; 6.9 M fingerlings distributed
An average of 10% mortality rate from fry to fingerling stage
Reduce mortality rate by 3% Procurement of additional breeders
Insufficient budgetary allocation for operational cost
Increase budgetary allocation 100% since subsidy program from BFAR is only up to December 2013
Improved operation and management protocol
3 MT per hectare per year average production
10% in fishpond production or 535 MT total production
22% contribution to total inland fish production
30% increase in production per hectare or 3.3 MT
Sub-total 500,000
-
-
VIII. LIVESTOCK AND POULTRY PRODUCTION PROGRAM
Not enough farm equipments and logistics to cater the needs of the farm
Sufficient farm equipment, tools and vehicle to be used
8.1 Improvement of Provincial Stock Farm Facilities
Farm tools, Equipments and vehicles
> 1 unit mechanical chopper; 2 units wheel barrow, 1 unit 6 wheelers elf
1,500,000
1,000,000
1,000,000
PGAS - 20% PDF
PAVO
Mini-LN2 plant is operational but needs yearly maintenance (1 care taker - J.O)
Well-maintained mini LN2 plant with care taker
8.2 Support to Maintenance of LN2 Plant Facilities
maintained mini LN2; well-paid caretaker
1 232,980
PGAS - GF PAVO
Cannot cater the needs of native chicken demand of the province
The gap for the demand of native chicken for the entire province reduced
8.3 Provincial Poultry Breeding Facilities
Additional breeder base native chickens
428 heads 150,000
-
150,000
PGAS - 20% PDF
PAVO
Page | 114
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
Well maintained breeder chickerns and loaned out chickens with 1 caretaker
Continousnmaintenance of native chicken with 1 caretaker; fuel for M&E activities of loaned out chickens
8.4 Support to Agusan del Sur Free Range Poultry Production
Maintained native breeder chickens and monitored loaned out chickens; well-paid caretaker
273,740.2
PGAS - GF PAVO
No existing upgraded artificial insemination facilities
Upgraded Swine artificial insemination facilities
8.5 Upgrading of Swine artificial insemination facilities
Upgraded Swine artificial insemination facilities
1 facility 530,000
-
530,000
PGAS - 20% PDF
PAVO
Cannot meet the demand of pork in the entire province with the gap of 1.562 MT
Additional purchasing of breeder pigs, which is 24,886 heads to cope up the demand of pork
8.6 Support to Organic Swine Production
Additional organically grown breeder pigs purchased
30 heads 34,499.8
PGAS - GF PAVO
Monitoring and evaluation of loaned out goat with 1 coordinator
Continuous M&E of loaned out goat with 1 coordinator
8.7 Support to Agusan del Sur Goat Program
Monitoring and evaluation of loaned out goats
287,000.0
PGAS - GF PAVO
Six (6) total bio-gas digester of which 2 are rehab and 4 are functional
Bio-gas Digester produced methane gas which is an efficient source of electricity. Environment is also protected which minimized air pollution.
8.8 Repair of bio - gas Digester
Installed bio - gas digester
4 units 75,000
-
-
PGAS - 20% PDF
PAVO
No Livestock and Poultry Incubation Center
Produced processed meat and milk to supply the demand of the populace
8.9 Construction of Livestock & Poultry Incubation Center
Constructed Meat and Milk Laboratory
1 unit 5,000,000
PGAS - 20% PDF
PEO/PAVO/PEEDO
Existing office occupied is the old office of PGSO at Hon. Libarnes Building
PAVO office improved/expanded for the additional personnel from Veterinary Office.
8.10 Expansion of the PAO building (PAVO)
Office space improved 1 5,000,000
-
PGAS - GF PAVO/PEO
Page | 115
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
8.11 Laboratory Equipment
Laboratory equipment installed in the center > bowl chopper > smoke house > Stuffer > tie linker > Meat grinder > Meat mixer > Food cutter > gas range > utility troller > slicer > digital weighing scale
1 unit each equipment
1,000,000
-
-
External - DA
Existing boar cannot provide enough amount of semen for artificial insemination
Genetically improved boar can provide the enough amount of semen for AI
8.8 Genetic Improvement Program
Genetically improved boars will be acquired from DA-RFU XIII
2 boars 700,000
149,318
700,000
External - DA
PAVO
Sub-total 9,783,220
6,149,318
2,380,000
IX. MARKETING AND ENTERPRISE DEVELOPMENT PROGRAM
9.1 Livelihood Enhancement Assistance Program
850,000
1,000,000
1,000,000
PGAS - ESMF
PEEDO
28 entrepreneurs have availed the program from 2010-2012
Increase number of entrepreneurs from 28 to 90 by 2016
Self-sustaining entreprenuers
30 entrepreneurs/ year
1,547 estimated jobs generated
Increase jobs generated from 172 to 352 by 2016
Workers/entrepreneurs
60 workers/entrepre
neurs per year
Page | 116
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
No microfinance through conduit banks and coop, in collaboration with agriculture and products
Establishment of micro financing program that would cater sole proprietors, peoples organization and cooperatives
9.2 Micro-financing
Cooperative accessed funds
1 coop per year 2,000,000
1,000,000
1,000,000
PGAS - ESMF
PEEDO
26 beneficiaries were assisted for market linkaging; 28 entrepreneurs were able to participate during product disposition activities
Increased number of entrepreneurs/products accessing market from 26 to 90 by 2013; Increase number of entrepreneurs attending product disposition activities from 31 to 90 by 2016.
9.3 Market linkaging and product disposition
Products linked to potential market
30 products per year
90,000
100,000
100,000
PGAS - ESMF
PEEDO
9.4 Support to Demo Farm
500,000
500,000
500,000
PGAS - GF PEEDO
Sub-total 3,440,000
2,600,000
2,600,000
X. INVESTMENT PROMOTION
1,000,000
1,000,000
PGAS - GF PEEDO/PAVO/PENRO
2,000,000
1,000,000
ESMF
Page | 117
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
Harmonization of business profiles and data banking,and publishing of investment priority areas
Maintain harmonized data from 13 municipalities
Updated and harmonized data of municipalities
13 municipalities
Information drive/roadshow on the provision of ADS incentives code
Increase number of roadshows conducted from 5 municipalities to 13 by 2016
provincewide information campaign
13 municipalities
Support to Provincial Board of Investment
500,000
500,000
500,000
PGAS - GF PEEDO
Sub-total 1,500,000
2,500,000
2,500,000
XI. ECONOMIC ENTERPRISE
Dilapidated water distribution lines serving Purok 1,2,3,4 with a total 772 consumers/household serve, including the provincial government center
Rehabilitate a total of 7,668 linear meter distribution lines which would serve 922 consumers/household in Purok 1,2,3,4,5,6,7,8 and provincial capitol site by 2016
11.1 Rehabilitation of Potable Water System
Rehabilitated Distribution pipelines
3,216 l.m. 2,300,000
1,000,000
1,000,000
PGAS - 20% PDF
PEEDO
Severe leaking of distribution lines of PWS which would account to 20% system loss
Minimized leakage of water up to 85% of the total system loss
System's loss reduced up to 85%
11.2 Maintenance of Budwood Garden
925,000
965,000
PGAS - 20% PDF
11.3 Ground Improvement of Naliyagan Cultural Center (Phase III)
10,000,000
PEEDO PEO
Sub-total 12,300,000
1,925,000
1,965,000
Page | 118
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
XII. EMPLOYMENT FACILITATION PROGRAM
A total of 787 youth availed the SPES Program
Increased number of students employed by 21%
12.1 Special Program for Employment of Students (SPES)
Employed youth/OSY 1,000 Youth/OSYs 2,200,000
1,100,000
1,100,000
PGAS - GF PESO
2 Jobs Fair conducted Increased number of qualified applicants deployed; 36% for local emplyment & 20% for overseas employment
12.2 Jobs Fair Applicants deployed 50 jobseekers (local)
100 (overseas)
500,000
500,000
500,000
PGAS - GF PESO
31 OFWs availed the Fly Now Pay Later Plan
Increased the number of FNPLP beneficiaries by 38%
12.3 OFW fly now pay later
Deployed OFWs 50 OFWs 1,100,000
1,100,000
1,100,000
PGAS - GF PESO
Temporary Shelter for Agusanon would be OFWs, OFWs & jobseekers (occupied since 1993)
Acquired a permanent government owned shelter for would-be OFWs, OFWs and Agusanons
12.4 Purchase of House and Lot in Metro Manila for OFW and Southern Agusanon
House and lot in Manila as temporary shelter for deployed OFWs and Agusanons
1 shelter 6,300,000
-
-
PGAS - GF PESO
12.5 Skills Training and Entreprenueurial Development
1,000,000
1,000,000
1,000,000
PGAS - GF PESO
Skills Training: Therapeutic massage - 80 Beads making - 75 Recycled Paper Flower making - 155
Out of School Youth, OFW and Family left behind by 20%
Skilled OSY, unemployed women, OFW and family left behind
Skills Training: Therapeutic massage NCII - 1000 Beauty Care NCII - 100 Bartending NCII - 100 Barista NCII - 100 Housekeeping NCII - 100 Trendy Balloon - 100 Recyled Paper Flower Making - 100 Jewelry &
Page | 119
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
Accessory Making - 100 Personalized Souvenir Items - 100
Entrepreneurial Development: Start & Improve Your Business - 181 Financial Literacy - 100
Increased number of Trained Youth Entrepreneurs from 30 to 90 by 2016; Increased no. OFW trained with Financial Literacy by 20%.
Self-sustaining OSY/OFW, Family left behind
30 OSY, OFW & Family/year
12.6 Support to ordinance No. 77 Series 2012 Establishing the Datu Lipus Makapandong Youth and Migrant
500,000
PGAS - GF PESO
Sub-total 11,600,000
3,700,000
3,700,000
XIII. ECO-TOURISM DEVELOPMENT
Page | 120
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
Bega Falls Ecotourism Development Program: On going implementation of structural support facilities by Prosperidad with Provincial counterpart
Bega Falls developed and promoted tourism destination in Caraga by 2016
13.1 Bega Falls Eco-tourism Development (Phase 2)
1,500,000
PGAS - 20% PDF
PTO
13.2 Development Eco-tourism plans and Sites
Bega Falls packaged as Tourism Product
1 eco-tourism site 1,500,000
1,500,000
PGAS - 20% PDF
Support to Provincial Tourism Council
100,000
PGAS - GF PTO
Establishment of Agusan del Sur Heritage Center: On going construction of the building by the DPWH with counterpart funds from the Provincial Government
Agusan del Sur Heritage Center established and functional with complete facilities
13.2 Completion of ADS Heritage Center and Ground Improvement (landscaping)
> Electrification of Heritage Center > Heritage Center's ground improvement
> 1 project > 1 project
3,000,000
-
PGAS - 20% PDF
PTO
Sub-total 1,600,000
4,500,000
1,500,000
Total Economic 673,828,420
487,434,318
454,218,000
Page | 121
Table 7:CAPDEV AGENDA – ENVIRONMENT SECTOR
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev
Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
ENVIRONMENT SECTOR
Forest / watershed denudation
To protect the locally declared watershed areas.
Sustainable Small Watershed / Protected Areas Development Program
10 small watersheds covering total area of 10,005 hectares
Increase the locally declared watersheds by 30% (3,000 has.)
> Declaration of Small Watershed (5,000 below)
Small Watershed locally declared/ 3,000 hectarage declared 2014 - 1,000 has 2015 - 1,000 has 2016 - 1,000 has
2014 - 1,000 has 2015 - 1,000 has 2016 - 1,000 has
300,000.00
300,000.00
300,000.00
ESMF PENRO - LGU/ MLGU
/ BLGU
DENR/ MENRO
105 hectares rainforested/rehabilitated
150 hectarage rainforested/ rehabilitated 2014 - 50 has 2015 - 50 has 2016 - 50 has
2014 - 50 has 2015 - 50 has 2016 - 50 has
500,000.00
500,000.00
500,000.00
ESMF PENRO - LGU/ MLGU
/ BLGU / NGO
No profiled forest (0 hectares)
> Forest profiling for Carbon Trading (Market-based Incentive Program)
250,000 hectarage of forest profiled 2014 - 50,000 has 2015 - 100,000 has 2016 - 100,000 has
2014 - 50,000 has 2015 - 100,000 has 2016 - 100,000 has
250,000.00
500,000.00
200,000.00
ESMF PENRO - LGU/ MLGU
/ BLGU
DENR/ MENRO/ NGO/ NAMRIA
- Forest profiling as intial step using satellite image (new)
Upland erosions within 18%-30% slope (179 barangays) = 137 ha.
To lessen soil erosion in 18% slope and above areas.
USAD - IN CADT AREAS
137 has. Minimize soil erosions. > Small Rubber-based farming system (Integrated farming in CADT areas)
150 hectarage developed 2014 - 50 has 2015 - 50 has 2016 - 50 has
2014 - 50 has 2015 - 50 has 2016 - 50 has
2,000,000.00
2,000,000.00
2,000,000.00
Trust Fund - VIF
PENRO - LGU / PAO /
MLGU / BLGU
DENR/ MENRO/DA/NGO
Page | 122
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev
Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
Unappreciated ecological importance
To promote ecological aesthetic value, recreation benefits and indigenous genetic base preservation.
Tree Park Development Program
8 Tree Parks (Mabuhay, Maria, Sta. Irene, Patin-ay, PADS; Bentahon, EADS; Mt. Carmel, Bayugan City; New Visaya, TADS; Poblacion, SADS
Establish tree parks in every municipalities (11 municipalities)
> Identification and declaration of municipal and barangay tree park
11 tree parks identified and area developed 2014 - 3 2015 - 4 2016 - 4
2014 - 3 2015 - 4 2016 - 4
150,000.00
200,000.00
200,000.00
Trust Fund - VIF
PENRO - LGU / MLGU
/ BLGU
DENR/ MENRO
Encroachment and denudation of natural significant sites
To protect and conserve natural significant sites.
Protection of Potential Environmental and Tourism Significant Sites
4 Significant Sites Declare significant sites as protected areas (9 sites)
> Identification, assessment and declaration of significant sites as protected areas and Eco-tourism sites
9 significant sites declared as protected areas 2014 - 3 2015 - 3 2016 - 3
2014 - 3 2015 - 3 2016 - 3
600,000.00
600,000.00
600,000.00
Trust Fund - VIF
PENRO - LGU /
PTO / MLGU / BLGU
Laxity in the enforcement of forestry protection/
To promote Kinaiyahan Ampingan of Panalipdan Program
Kinaiyahan Ampingan ug Panalipdan Program
0 municipality with School level IEC
Educate the elementary and secondary students on environmental awareness and protection.
> Development of environmental ethics in all levels of educational system (pre-school, elem, high school & college. (new)
3 municipalities (all school levels) introduced with school based IEC 2014 - 1 2015 - 1 2016 - 1
2014 - 1 2015 - 1 2016 - 1
500,000.00
500,000.00
500,000.00
Trust Fund - VIF
PENRO-LGU / PSWDO in partnership with CCSO-
ADPHI
DENR/ MENRO/BLGU/DepEd/ NGO
Illegal small-scale mining (Rosario, Bunawan, San Francisco, Bayugan, Prosperidad)
To enforce all small scale mining related laws and regulations.
Responsible mining program
Page | 123
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev
Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
1 Minahan ng Bayan Declared Regulate all small scale mining operations and increase declaration of 2 additional Minahan ng Bayan.
> Declaration of Minahan Ng Bayan
3 Minahan ng Bayan areas documented and declared 2014 - 1 2015 - 1 2016 - 1
2014 - 12015 - 12016 - 1
250,000.00
250,000.00
250,000.00
ESMF PENRO-LGU / MLGU /
BLGU
MGB/PMRB/ EMB/ MENRO/ BLGUs
No centralized mineral processing area established
> Establishment of centralized mineral processing area
3 centralized mineral processing area established 2014 - 1 2015 - 1 2016 - 1
2014 - 1 2015 - 1 2016 - 1
250,000.00
250,000.00
250,000.00
ESMF PENRO-LGU / MLGU /
BLGU
Siltation and sedimentation of rivers and creeks
To protect rivers and creeks from silts.
Desiltation and River Bank Protection of Agusan River Program ( From Trento- Talacogon)
0 Reduce siltation and sedimentation of rivers and creeks.
-Community Consultation and mapping
20 barangay ordinances/ resolutions supported the project 2014 - 10 2015 - 5 2016 - 5
2014 - 10 2015 - 5 2016 - 5
250,000.00
150,000.00
150,000.00
ESMF PENRO-LGU / PEO /
PDRRMO
MGB/EMB/ MENROs/ BLGUs
Co-Management Program on protection and Conservation of Agusan Marsh
9 barangays introduced with livelihood
Environmental Social Fencing Program (new)
9 barangays introduced with livelihood 2014 - 3 2015 - 3 2016 - 3
2014 - 3 2015 - 3 2016 - 3
500,000.00
500,000.00
500,000.00
ESMF PENRO-LGU partnership with FDAFI and NGO
DENR/NGO/ MENROs/ NGO
Preserve and conserve the archaelogical, historical, cultural & scientific sites and artifacts
Archeological, historical, cultural & scientific studies (new)
3 archeological, historical, cultural and scientific studies 2014 - 1 2015 - 1 2016 - 1
2014 - 1 2015 - 1 2016 - 1
235,000.00
600,000.00
1,030,000.00
Trust Fund - VIF
PENRO-LGU /
PTO
DENR/NGO/ National Museum/ PTO/MTO
Page | 124
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev
Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
7 schools adopted the curriculum
Educate elementary and secondary students relative to the ecological and social importance of Agusan Marsh
Integration of Agusan Marsh Environmental Concerns in School Curriculum (new)
30 schools with Agusan Marsh Environmental Concerns integrated in the school curriculum 2014 - 10 2015 - 10 2016 - 10
2014 - 10 2015 - 10 2016 - 10
300,000.00
500,000.00
500,000.00
Trust Fund - VIF
PENRO-LGU in
partnership with CCSO-
ADPHI
Scarcity and quality of drinking water
To protect all spring water resources.
Protection of Source of Drinking Water
Identify & declare all spring water sources as protected.
> Identification & declaration of spring water sources as protected area.
3 spring water sources identified and declared into protected zone 2014 - 1 2015 - 1 2016 - 1
2014 - 1 2015 - 1 2016 - 1
100,000.00
100,000.00
100,000.00
Trust Fund - VIF
PENRO-LGU /
PTO / MLGU / BLGU
To properly implement ecological solid waste management program
Ecological Solid Waste Management Program
83.93 cu.m. solid waste generated in all municipalities per day
Reuse/recycle and utilize 50% of 83.93 cu.m. waste generated a day
> Establishment of provincial eco-park landfill
Provincial Eco-Park Landfill established
1 continuing project
2,500,000.00
2,500,000.00
2,500,000.00
PGAS - 20% PDF
PENRO-LGU /
PEO / MLGU / BLGU
EMB/ MENRO/ MLGU/ BLGU
3 Eco-parks, 6 Controlled, 5 Open dumpsites)
Practiced segregation of waste > Establishment of Provincial Capitol MRF
Provincial Capitol MRF established
2014-1 300,000.00
ESMF PENRO-LGU /
PEO/PGSO
15,000 seedlings per year Increase production into 30,000 seedling/year planting of trees identified in areas within provincial capitol.
Seedling Production for Tree Farming and Rainforestration Program Support
90,000 seedlings produced (30,000/year)
30,000 seedlings per year
250,000.00
250,000.00
250,000.00
ESMF PENRO-LGU MENROs/ BLGUs
Support to Small Scale
Tree Farming
100,000.00 PGAS -
GF
Page | 125
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev
Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
Low planting of trees in identified areas
Provincial Capitol Greening Program (new)
7,500 trees planted and maintained
7,500 trees 950,000.00
100,000.00
150,000.00
Trust Fund - VIF
PENRO-LGU / PGSO
PGSO/PEO
9 CADTs approved 15 CADTs approved CAD Titling Process Program
6 CADT applications submitted for approval
2014 - 2 2015 - 2 2016 - 2
1,500,000.00
2,000,000.00
1,500,000.00
ESMF PENRO-LGU / MLGU /
BLGU / NCIP / GIZ
NCIP/GIZ/MLGU/ IP Community
216,043 has. A & D 280,855 has A & D Reclassification of Timberland into A and D (on-going)
Proposed 64,812 hectares reclassified from timberland to A&D for 3 years
64,812 has. 100,000.00
100,000.00
100,000.00
ESMF PENRO-LGU / PASSO
DENR/ PASSO /NAMRIA/ MLGU
Support to ADS Environment & Sustainable Deve't. Council
300,000.00
300,000.00
300,000.00
PGAS -GF
12,185,000.00
12,200,000.00
11,880,000.00
Page | 126
Table 7: CAPDEV AGENDA – SOCIAL SECTOR
Current state of capacity
Desired state of capacity
Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
SOCIAL SECTOR
I. Upgrading of Physical Facilities, Equipment and Instrument
PHO PLGU/PHO
For implementation. Increased access to affordable quality affordable medicines in depressed brgys (Sinubong and Del Monte in Veruela)
1.1 Upgrading of BnB for depressed barangays
2 BnB upgraded 2 barangays (Sinubong and
Del Monte)
1,000,000.00
250,000.00
250,000.00
PGAS - 20%
PHO
Only 1 unit ambulance existing (sometimes defective)
Prompt referral of patients to Medical Center
1.2 Procurement of 1 unit hospital ambulance (DOPMH)
Hospital ambulance procured 1 unit 1,600,000.00
3,700,000.00
PGAS - 20%
PHO
No existing ultrasound machine
Improved maternal care services and prompt detection of high risk pregnant patients
1.3 Procurement of 1 unit ultrasound machine (Talacogon District Hospital)
Ultrasound Machine procured 1 unit 600,000.00
-
PGAS - 20%
TDH
For implementation. Improved diagnostic and hospital services.
1.4 Procurement of X-ray machine of Esperanza Municipal Community Hospital
X-ray machine procured 1 unit 2,500,000.00
-
External EMCH DOH
Some hospital equipment were defective and destroyed.
Provided quality effective and safe hospital equipment.
1.5 Procurement of Hospital Equipment
Hospital equipment procured Hospital equipment
31,765,000.00
-
External DOH
PR for approval of the governor
Improved diagnostic and hospital services.
1.6 Procurement of mobile x-ray with C-Arm
Mobile X-ray C-Arm procured 1 unit 3,500,000.00
External DOPMH DOH
Phase I Construction is on-going; Phase II not yet existing
Provided effective and quality maternal care services especially for the IP.
1.7 Completion of Half-Way House of Talacogon District Hospital
Halfway House completed 1 unit 1,500,000.00
External TDH DOH
On-going construction
Improved access of patients to better hospital accomodation and service delivery
1.8 Completion of DOPMH
DOPMH completed 1 unit 11,000,000.00
PGAS - 20%
DOPMH/PEO DOH
Page | 127
Current state of capacity
Desired state of capacity
Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
39,000,000.00
External
Project proposal submitted to PPDO for review
Improved hospital utilities and clean environment
1.9 Construction of drainage facility and elevated water tank for Hospital Dietary Section
Drainage facility and elevated water tank constructed
1 drainage facility and 1 water tank
1,150,000.00
PGAS - 20%
DOPMH
For implementation. Improved hospital services
1.10 Construction of X-Ray room for Esperanza Community Medicare Hospital
X-Ray Room for EMCH 1 unit 1,500,000.00
External (DOH)
PEO/EMCH
For implementation. Improved hospital waste management
1.11 Construction of Waste Holding area with Septic Tank of Esperanza Hospital
Waste Holding Area with Septic Tank constructed
1 unit 2,500,000.00
External (DOH)
PEO/PHO/ EMCH
Ground floor still for completion.
Provided OPD accomodation of patients and service delivery efficiency.
1.12 Completion of 2-Storey building of Bunawan District Hospital
2-Storey building of BDH Completed
1 unit (completion of ground floor)
3,600,000.00
PGAS - 20%
BDH/PEO
On-going construction
Improved access of patients to better hospital accomodation and service delivery
1.13 Construction of 50-bed in patient of DOPMH
50-bed in patient constructed 1 unit 28,000,000.00
External (DOH)
DOPMH
Old building dilapidated; PPMP already approved by the Governor
Improved access of patients to better hospital accomodation and service delivery
1.14 Construction of 50-bed communicable/ISO building of DOPMH
50-bed communicable/ISO building constructed
1 unit 10,000,000.00
External (DOH)
DOPMH
Present number of septic vault cannot accommodate increasing amount of hospital waste.
Improved hospital waste management
1.15 Const. of Waste Area with Septic Vault
Waste Area with Septic Vault 1 unit 350,000.00
PGAS - 20%
LoMH
Dilapidated dining hall/kitchen
Improved dietary hospital services
1.16 Rehabilitation of Dining Hall/Kitchen of Loreto Mun. Hospital
Dining hall/kitchen rehabilitated
1 unit 700,000.00
PGAS - 20%
No ambulance Prompt referral of patients to Medical Center
1.17 Procurement of One (1) unit ambulance (Esperanza Municipal Hospital)
Ambulance procured 1 unit 1,600,000.00
PGAS - 20%
EMCH
Page | 128
Current state of capacity
Desired state of capacity
Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
Exit of hospital not passable
Easy access to hospital premises
1.18 Ground Improvement of EMCH (Concreting of Hospital access road)
Ground improved 1 project 1,053,651.00
PGAS - 20%
Phase 1 construction is still on-going; Phase 2 not yet implemented
Provided effective and quality maternal care services especially for the IP.
1.19 Const. of Halfway House (Phase 2)
Halfway House completed (Phase 2)
1unit 1,500,000.00
PGAS - 20%
Sub-total 139,418,651
8,950,000
250,000
II. Support to Education
Satisfactory but needs to be intensified; Less campaign ads
Additional media exposures
2.1 Pagtuon Program for Oplan Balik Eskwela Campaign and Dropout Reduction Program
Advocacy: Reproduction of Module FLO (Flexible Learning
Option
Upland, Wetland, and Conflict
Areas
1,500,000.00
1,500,000.00
1,500,000.00
PGAS - SEF
PGO
Less funding for Teachers' Rewards
More reward incentives; Promotions
2.2 Gawad Datu Lipus Makapandong Huwarang Guro Award
Hosting of World's Teacher Day; Awards Night; Search for
Most Outstanding Teacher
Province wide 1,500,000.00
1,650,000.00
1,815,000.00
PGAS - SEF
PGO
Pending activities; No funds or slow processing
Support from concerned offices
2.3 Provincial Academic Enhancement Training and Workshop
Teachers' Training; Benchmarking/Educational Trips; IM's production and
simulations
Province wide 750,000.00
825,000.00
907,000.00
PGAS - SEF
PGO
No funds Fast approval of funding 2.4 Development of Instructional Materials (IMs) for pre-school learners
Module Set 450 Elementary Schools
500,000.00
-
-
PGAS - SEF
PGO
Less info dissemination
More attractive incentives
2.5 Advocacy to promote the "Gulayan sa Eskwela in support to Nutrition Program
Piloted in elementary schools 6 elementary schools
72,000.00
72,000.00
72,000.00
PGAS - SEF
PGO
2.6 Support to the implementation of K-12
5,000,000.00
5,000,000.00
20% PDF PGO
5,000,000.00
5,000,000.00
External Dep/Ed
Sub-total 4,322,000
14,047,000
14,294,000
Page | 129
Current state of capacity
Desired state of capacity
Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
37,586 three to five years old children with Early Childhood Care and Development (ECCD) Experience
III. Early Childhood Care Development
Increased enrollment of children aged 3-5 in 20 DCCs
3.1 Provision of outdoor/indoor facilities of Day Care Centers
20 outdoor/indoor facilities provided to DCCs
20 standard ECCs with
outdoor/indoor facilities
550,000.00
1,100,000.00
550,000.00
PGAS - 20%
PSWDO
3.2 Capability building and honorarium support to Day Care Workers and Neighborhood Play Volunteers
40 ECCD service providers (DCW and SNP worker)
40 ECCD providers
140,250.00
380,500.00
445,500.00
PGAS - GF PSWDO
Increased enrollment of 3-5 years in 20 SNP sites
3.3 Establishment of Supervised Neighborhood Play Sites including provision of materials for SNP
20 SNP sites established and operational
20 SNP sites 250,000.00
500,000.00
235,000.00
PGAS - GF PSWDO
3.4 Construction of 20 standard Day Care Center (DCC)
20 standard DCC constructed 20 DCC 3,000,000.00
6,000,000.00
3,000,000.00
PGAS - 20%
PEO/PSWDO
Sub-total 3,940,250
7,980,500
4,230,500
IV. Support to Social Welfare
4.1 Support to individual in crises situation
Needy individuals provided assistance
900 individuals 500,000
500,000
500,000
PGAS - GF PSWDO
4.2 Grants and Donation Needy individuals provided assistance
3,000 individuals 5,000,000
5,000,000
5,000,000
PGAS - GF PSWDO
4.3 Assistance to Self-Helped Day Care Workers
Day Care Worker provided honorarium
620 Day Care Worker
3,184,900
3,184,900
3,184,900
PGAS - GF PSWDO
Page | 130
Current state of capacity
Desired state of capacity
Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
4.5 Support to Anti-Sex/Child Trafficking Program
meetings/advocacies/capability building conducted
> 12 meetings > 12 advocacies > 3 capability building
200,000
200,000
200,000
PGAS - GF PSWDO
4.5 Support to Persons with Disabilities (PWD)
> PWDs provided with assistive devices;
94 PWDs 250,000
250,000
250,000
PGAS - GF PSWDO
> PWDs provided with honorarium
14 PWDs
> Deserving PWDs provded with financial assistance for Income Generating Project (IGP)
15 PWDs
NDPR Week Celebration 1
4.6 Support to Early Childhood Care and Development
> DCW Session Mgt. Training > 620 DCW 400,000
400,000
400,000
PGAS - GF PSWDO
> Program Material Production
> Monitoring of DCC conducted
> Training of SNP workers 20
> Outdoor facilities installed 15
Day Care Worker's week celebration
1 celebration
Cap Dev Responsible Parenthood
4.7 Assistance to Elderly or Senior Citizens
Elderly Week Celebration 1 celebration 5,000,000
5,000,000
5,000,000
PGAS - GF PSWDO
4.8 Support to Local Council for the Protection of Children
> Cap Dev for stakeholders > LCPC assessed and monitored > Strengthened advocacies on gender-based violence
150,000
150,000
150,000
PGAS - GF PSWDO
4.9 Support to Youth Development
OSY a trained on Productivity Skills Dev;t.
225 OSY 250,000
250,000
250,000
PGAS - GF PSWDO
Page | 131
Current state of capacity
Desired state of capacity
Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
4.10 Support to Regional Rehabilitation Center for Youth
CICL/Residents 30 250,000
250,000
250,000
PGAS - GF PSWDO
4.11 Assistance to Women Development
Livelihood projects assessed and monitored
3 Associations provided with livelihood
200,000
200,000
200,000
PGAS - GF PSWDO
4.12 Assistance to Women's Federation
> Monthly meetings conducted> Assessed and monitored projects > Women leaders provided with honorarium> capacity building> Women's month celebration
> 12> 14 women> 3> 1
200,000
200,000
200,000
PGAS - GF PSWDO
Sub-total 15,584,900
15,584,900
15,584,900
V. Support to Public Health Delivery System
Maternal Mortality Rate - 76/100,000 LB; Infant Mortality Rate - 7.06/1000 LB; Underfive Mortality Rate - 10/1000 LB;
Reduced MMR to 69/100,000; Reduce IMR to 4/1000 LB; Reduce UFMR to 6.84/1000 LB;
5.1 Maternal and Child Health
5.1.1 Conduct of maternal/Underfive Mortality Review
14 maternal/under five mortality review conducted
14 Municipalities 180,000.00
198,000.00
217,800.00
PGAS - GF PHO
5.1.2 Support to Maternal and Child Health Program (MCH)
60% of eligible pregnant women with laboratory
examination
14 RHUS 150,000.00
165,000.00
181,500.00
PGAS - 20%
PHO
100% fully immunized children
Sustained 100% fully immunized children coverage
5.2 Expanded Program Immunization
5.2.1 Provision of Facilities/Equipment for immunization Program
18,623 eligible children vaccinated
14 RHUs 150,000.00
165,000.00
181,500.00
PGAS - 20%
PHO
5.2.2 PIR with middle manager
Quarterly PIR with middle managers conducted
14 Municipalities 30,000.00
33,000.00
36,300.00
PGAS - GF PHO
Page | 132
Current state of capacity
Desired state of capacity
Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
8.11% Malnutrition Prevalence Rate
Reduced prevalence rate of malnutrition to 5%
5.3 Health and Nutrition
5.3.1 Provision of equipment for Nutrition Program (salter weighing scale)
Damaged/Defective weighing scale replaced, 30 weighing
scale provided
30 units 150,000.00
165,000.00
181,500.00
PGAS - 20%
PHO
Improve Operation Timbang coverage and monitoring of
malnourished children (weight)
PHO
5.3.2 Strengthening of PNC/MNC/BNC
14 MNC strengthened 14 Municipalities 150,000.00
165,000.00
181,500.00
PGAS - GF PHO
Established PNC Functional PNC 5.3.3 Provincial Nutrition Council
Regular meetings conducted 4 meetings per year
50,000.00
PGAS - GF PHO
5.4 Communicable/Non-Communicable Diseases Prevention Control
71.60% of Hypertension/CVD, CDR - 75%; Incidence of HIV/STI cases - .008/1000
Reduced incidence of CVD/Healthy Lifestyle TB, HIV/STI, etc.
5.4.1 Rehabilitation/Provision of Facilities/equipment for Disease Prevention and Control Program
80% of cases identified treated 14 Municipalities 1,500,000.00
1,650,000.00
1,815,000.00
PGAS - 20%
PHO
Decreased incidents of dengue
5.4.2 Procurement of equipment for dengue disease control
Chemical insecticide provided 14 Municipalities 360,000.00
88,000.00
98,800.00
PGAS - 20%
PHO
1 misting spray procured; >
5 high risk area/municipality
5.5 Health Promotion
5.5.1 Conduct of monthly special health events
14 health events conducted 14 Municipalities 60,000.00
66,000.00
72,600.00
PGAS - GF PHO
5.5.2 Reproduction of FHSIS tables
14 sets of R/R forms distributed
14 RHUS 50,000.00
50,000.00
50,000.00
PGAS - GF PHO
Page | 133
Current state of capacity
Desired state of capacity
Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
5.5.3 PIR on health programs implementation
Bi-Annual PIR conducted 14 HRs/6 Hospitals
250,000.00
275,000.00
302,500.00
PGAS - GF PHO
5.6 Counterpart Funnds for Womens Health Program
350,000.00
350,000.00
350,000.00
PGAS - GF PHO
5.7 Assistance to Barangay Health Workers
5,867,100.00
5,867,100.00
5,867,100.00
PGAS - GF PHO
5.8 Assistance to BHW 500,000.00
500,000.00
500,000.00
PGAS - GF PHO
5.9 Assistance to Outreach Program/Activities
500,000.00
500,000.00
500,000.00
PGAS - GF PHO
Sub-total 10,297,100
10,237,100
10,536,100
VI. Moral Recovery Values Formation Services
119 seminars conducted in 2013 with 13,760 participants
25,723 participants trained in 3 years
6.1 Training and Seminars
trained participants 25,723 participants
2,300,000.00
2,300,000.00
2,300,000.00
PGAS - GF MRVFS
Sub-total 2,300,000
2,300,000
2,300,000
VI. Water and Sanitation Project
Completed the installation of the targeted 130 units of rain collector facility serving 650 HH; Installed 15 units of Upgraded Biosand Water Filter Facility for 2013
To install additional 50 units of rain collector per year from 2014-2016; Can replicate by installing additional 75 units of Upgraded Biosand Water Filter Facility at the end of 2016
6.1 Installation of rain collector and construction of biosand filters
Rain Collector
Upgraded Biosand
50
75
10,000,000.00
PGAS - GF PEO
10,000,000.00
10,000,000.00
PGAS - 20%
Page | 134
Current state of capacity
Desired state of capacity
Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
Non-existing in the hospital
Accredited/Licensed Level II Laboratory
6.2 Procurement of potable biological testing equipment for water analysis
Potable biological testing equipment for water procured
1 unit 1,000,000.00
-
PGAS - 20%
PHO
85% of HHs with access to safe water
Increased % of HH with access to safe water from 85% to 88%
6.3 Upgrading of developed springs (2 units per year)
Developed springs upgraded 2 units/year 250,000.00
250,000.00
250,000.00
PGAS - 20%
PHO
87% of HHs with sanitary toilet
Increased % of HH with sanitary toilet from 87% to 90%
6.4 Construction of Sanitary Toilets
Sanitary toilets constructed 200 units per year (Talacogon, San Luis, La Paz)
1,200,000.00
1,200,000.00
1,200,000.00
PGAS - 20%
PEO/PHO
Sub-total 12,450,000
11,450,000
11,450,000
15% (165) of 1,109 PGAS employees availed the indoor physical fitness exercises; 30-medals garnered in Regional, National and International Sports Competitions.
75% (830) out of 1,109 PGAS Employees availed the services in 3-years; Increased to 60-medals from 30-medals garnered in Regional, National & International participation .
VIII. Sports Services
8.1 Repair of Sports Facilities
Sports Facilities repaired 500,000.00
SEF SPORTS PEO
Dilapidated gates (9 gates)
Repaired gates to secure facilities
8.2 Repair of gates of the D.O. Plaza Sports Complex
D.O. Plaza Sports Complex repaired
300,000.00
SEF SPORTS PEO
8.3 Support to Physical Fitness and Sport Dev't. -Local
2,500,000.00
2,500,000.00
PGAS - GF SPORTS
IDEAL-IDINAUS 500,000.00
500,000.00
PGAS - GF SPORTS
Support to Physical Fitness and Sport Dev't. National
500,000.00
500,000.00
PGAS - GF SPORTS
Provincial Sports Dev't. Council
40,000.00
40,000.00
PGAS - GF SPORTS
Sub-total
Page | 135
Current state of capacity
Desired state of capacity
Capacity Development Interventions
Expected Output Target of CapDev Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
4,340,000 3,540,000 -
IX. Support to Housing and Resettlement
9.1 Purchase and Development of land for the relocation of informal settlers and relocation of victims of calamities
1,500,000.00
1,500,000.00
1,500,000.00
PGAS - 20%
PSWDO
Sub-total 1,500,000
1,500,000
1,500,000
Total - Social Sector 194,152,901
75,589,500
60,145,500
Page | 136
TABLE 7: CAPDEV AGENDA – PUBLIC SAFETY AND SECURITY
Current state of capacity
Desired state of capacity
Capacity Development Interventions
Expected Output Target
of CapDev
Funding Requirements Sources
of funding
Process owner/ Office
responsible
Source of support/ Technical Assistanc
e
2014 2015 2016
Public Safety and Security
1. 49,962 HHs affected by flood (Disaster Report)
10% reduced/decreased of HHs affected by flood in 3 yrs
Identification of flood prone areas and Establishment of flood control structures; identification of appropriate mitigative measures
Established flood control structures. Dredged waterways
30,000,000
30,000,000
30,000,000
LDRRMF PEO/ PDRRM
Dredging of Patin-ay Creek Derdged Patin-ay Creek
6,500,000
20% PDF PEO/ PDRRM
Updating of Flood/landslide prone areas
Updated Map (flood/Landslide prone areas) GIS
200,000
200,000
200,000
LDRRMF PDRRM
>no relocation site for victim of calamities and high risk areas
Identified and Acquired relocation sites
Identification of relocation sites and sourcing out of funds
Acquired two (2) relocation site per year
1,000,000
1,000,000
1,000,000
LDRRMF PDRRM
2. Poor Implementation of RA 10121
Proper implementation of RA 10121 (An act strengthening the Philippine Disaster Risk Reduction and Management System -Act of 2010)
Massive Orientation of RA 10121
Community Disaster Preparedness Programs
100,000
100,000
100,000
LDRRMF PDRRM
Page | 137
Current state of capacity
Desired state of capacity
Capacity Development Interventions
Expected Output Target
of CapDev
Funding Requirements Sources
of funding
Process owner/ Office
responsible
Source of support/ Technical Assistanc
e
2014 2015 2016
> CCA-DRR Not Mainstreamed in LDPs
Mainstream DRR/CCA in Local Development and land-use Planning
Mainstream of DRR/CCA in Development Plans
DRR-CCA Mainstream in PDPFP and CLUP/CDP
100,000
100,000
100,000
LDRRM PDRRM
> Lack of Disaster equipment
Provide adequate equipment
Inventory and acquisition of equipments and training of personnel
a.) High Angle rescue equipment, b.) 6 plastic boats, (2 per year) c. Fire extinguishers (50 units)
1,200,000
1,250,000
1,250,000
LDRRMF/ 20%PDF
PDRRM
> Inadequate evacuation centers for Internally Displaced Persons (IDPs)
Provide Functional evacuation center
Inventory of evacuation centers
Constructed Evacuation Center
1,000,000
1,000,000
1,000,000
LDRRMF PEO/DRRM
Formulation of evacuation plan per barangay - Camp Management
Formulated evacuation plan per barangay (Camp Management)
400,000
400,000
400,000
LDRRMF PDRRM/ PGO
3. Poor drainage system
Functional drainage system
H - Periodic Cleaning of Drainage/canal
# of Drainage system cleaned
500,000
500,000
500,000
LDRRMF PEO/ PDRRMO
4. 176 CNN barangays
Decrease in CNN barangays
Conflict Resolution & management (Consultation/Forum/Dialogue)
# of Conflict resolution/dialogue conducted
500,000
500,000
500,000
GF PGO
Harmonization of programs/ beneficiaries with AFP thru COPD program
Page | 138
Current state of capacity
Desired state of capacity
Capacity Development Interventions
Expected Output Target
of CapDev
Funding Requirements Sources
of funding
Process owner/ Office
responsible
Source of support/ Technical Assistanc
e
2014 2015 2016
Support to Peace and Development
838,000
5. 528 crime incidence (PNP report)
Decrease in crime incidence in 3 years
M - Crime Prevention Programs
IEC on crime prevention program
10,000
10,000
10,000
LDRRMF PGO
Number of Firearms acquired
1,000,000
1,000,000
1,000,000
GF PCSMO
Correctional facility fence repaired
3,000,000
GF PEO/ PCSMO
Government Center Perimeter Fence repaired and repainted
3,000,000
LDRRMF PEO
6. Congested correctional facilities
Provide adequate correctional facilities
Expansion/ Improvement of correctional facilities
Const. of One (1) unit Separate Detention Cell for minors
500,000
20%PDF PEO/PCSO
Const. of Multi-Purpose Hall
500,000
20%PDF PEO/PCSO
Support to Inmates
4,762,500
GF PCSMO
7. Presence of Drug Pushers and Users
Decrease in the number Pushers and Users
IEC on Anti-Drugs / Apprehension of Pushers and Users
IEC Materials produced and disseminated
10,000
10,000
10,000
LDRRMF PGO
Page | 139
Current state of capacity
Desired state of capacity
Capacity Development Interventions
Expected Output Target
of CapDev
Funding Requirements Sources
of funding
Process owner/ Office
responsible
Source of support/ Technical Assistanc
e
2014 2015 2016
8. 19 conflagration (PFO report)
10% decrease in conflagration
IEC/Fire Prevention Program /Acquisition of Fire Trucks
15 k. liters capacity fire trucks acquired
8,000,000
LDRRMF PDRRMO
9. Presence of IP conflicts
Minimize IP conflicts
Initiate Coordination meetings/dialogue among concern agencies
Conflict resolution/dialogue conducted
included in # 4 budget
GF PGO
Total Public Safety and Security 63,120,500
36,070,000
36,070,000
Page | 140
TABLE 7: CAPDEV AGENDA – TRANSFORMING BUREAUCRACY
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev
Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
TRANSFORMING BUREAUCRACY SECTOR
Some barangays have limited resources to implement priority programs and projects
Empowered MLGUs/BLGUs in the implementation of the high impact projects; Promote partnership and counterparting.
I. Municipal/Barangay development projects
Development Projects funded/implemented
450 projects 37,000,000
27,000,000
27,000,000
PGAS - 20 % PDF
PPDO/PGO
II. Support to Development Projects
30,000,000
30,000,000
30,000,000
PGAS - GF
Sub-total 67,000,000
57,000,000
57,000,000
Monitoring and Evaluation Framework is more focused on road related development projects. The Provincial Monitoring and Evaluation Group (PMEG) is covered by executive issuance. No Manual of Operations.
Legitimized M&E Manual of Operations that includes defined Integrated M&E System, roles and responsibilities of all concerned offices, functions of the Expanded PMEG with the required KSA, and other enabling policies.
III. Institutionalization of the Integrated M&E System
Projects monitored and Programs evaluated
80 projects 2 municipalities/ programs
260,000
-
-
PGAS - GF PPDO MLGU
Sub-total
260,000
-
-
IV. Updating and implementation of the HRMD Plan
4.1 Structure/Staffing
37.6% (188/500) funded from 2010-2013 pursuant to Ord. No. 36. S. 2009 (2010 - 7; 2011 - 44; 2012 - 94; 2013 - 43)
Remaining 312 positions are funded and filled until 2015
4.1.1 Funding of positions Positions funded 312 positions 81,580,174
61,507,310
42,992,804
PGAS - GF PBO, PHRMO
LFC
58.6% of the total redundant positions (344/590) abolished as a result of the reorganization program from 2010-2013
246 remaining redundant positions are abolished as a result of the separation package or promotion/placement of affected employees to positions in the new staffing pattern
4.1.2 Separation Package Redundant positions abolished are priotized for payment of separation package
246 positions 46,553,585
46,553,585
-
PGAS - GF PBO, PHRMO
LFC
Page | 141
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev
Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
HR systems are in-placed and functional but needs to be enhanced and systems on career pathing and succession planning and workplace learning and development needs to be formulated
HR systems are enhanced and system on career and succession planning and workplace learning and development are implemented
4.2 HRMD Systems 75% of Regular emplyees exceed targets by 15%
733 positions 3,430,000
1,310,500
707,500
PGAS - GF
Some PGAS personnel lack skills training
Skills, knowledge and attitude of PGAS personnel enhanced
4.3 CapDev (training)/Competency-based
Employees including permanent JO and casuals trained/capacitated
1,475 employees including
permanent JO and casual
3,773,143
-
-
PGAS - GF PHRMO
Employee Welfare Program are covered with an Executive Order; Institutionalized Health Care Plan; No comprehensive health care program and policy for employees; No monitoring and evaluation of the outcome and impact of the employee welfare programs
A comprehensive and Integrated (physical, social, emotional, spiritual) Health and Welness program for employees with M & E plan component institutionalized in PGAS
4.4 Health and Wellness Comprehensive Health and Wellness Program in PGAS
All Departments
2,000,000
2,000,000
2,000,000
PGAS - GF PHRMO, Sports, PHO, Moral
LCE, SP
Sub-total 137,336,902
111,371,396
45,700,304
Developed Information Systems have no proper documentation
Achieved of source codes, and technical and user's manual of all developed information systems
V. Systems and Processes No. of Enhanced PGAS systems and processes
16 systems 2,504,000
-
-
PGAS - GF PIMO and
concerned
departments
Sub-total 2,504,000
-
-
No Communication Plan formulated to inform the constituents regarding the development interventions of the government
One (1) ComPlan formulated targeting to market all future and existing PPAs of PGAS
VI. Development and Management of PGAS Communication Plan
Communication Plan formulated and implemented
All departments 150,000
1,500,000
1,500,000
PGAS - GF PPIO
Sub-total
Page | 142
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev
Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
150,000 1,500,000 1,500,000
Since the new set of provincial officials installed into office up to present, all ordinances enacted has not been updated and discarded to avoid conflicting or duplication of laws
Omnibus enactment of ordinances by category
VII. Codification of Ordinances
Ordinances coded All Ordinances 500,000
500,000
500,000
PGAS - GF SP
Sub-total 500,000
500,000
500,000
No proper tracking and monitoring as to the progress of the ordinances in its implementation
Enhanced tracking and monitoring mechanism
VIII. Legislative feedback mechanism
Amendments of Ordinances
14 LGUs 200,000
200,000
200,000
PGAS - GF SP
Sub-total 200,000
200,000
200,000
CLUPs are not yet updated except for 1 municipality
All CLUPs finalized, reviewed by PLUC and approved by the Sanggunian Panlalawigan
IX. Alignment of provincial and city/municipal development plans
No. of CLUPs finalized and approved
Province and 13 Municipalities and 1 city
300,000
200,000
200,000
PGAS - GF PPDO
Sub-total 300,000
200,000
200,000
Poor broadcast signal due to equipment wear and tear
Improved broadcast capacity for more informed constituents
X. Rehabilitation of Broadcast Equipment (DXDA & PTV)
Broadcast equipment rehabilitated> Increased transmitter power of DXDA and > PTV
> 10 KW> 5 KW 2,000,000
1,500,000
1,500,000
PGAS - GF PPIO
Sub-total 2,000,000
1,500,000
1,500,000
Existing service vehicle maintenace shop and policy needs to be enhanced
Cater wheel alignment and change oil of all PGAS service vehicle
XI. Establishment of service vehicle maintenance shop Policy
> Service vehicle shop established > Policy formulated and institutionalized
> 1 shop > 1 legal document
100,000
1,500,000
-
PGAS - GF PGSO/PEO
Page | 143
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev
Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
PIMO have deployed ICT Equipment which does not yet fully meet the standard set by ISO/IEC and TIA.
PGAS has a modernized and standardized ICT Equipment and Telecommunication Infrastructure
XII. Upgrading of PGAS IT equipment
PGAS IT equipment upgraded and maintained
> 278 desktop > 58 wifi accesspoints > 50 IP Phones > 2 redundant series suitcase & cabling, software
7,829,600
PGAS - GF PGO/PIMO
The ELA formulation is on-going
PPAs in the plan assessed and Strategic Planning Workshop conducted
XIII. Plan Assessment > Plan assessed; > Strategic Planning Workshop conducted
> 1 Plan; > 1 Workshop
500,000
500,000
PGAS - GF PPDO
XIV. Strategic Planning 2,000,000
PGAS - GF PADMO
XV. Support to Infrastructure
20,000,000
20,000,000
20,000,000
PGAS - GF PEO
XVI. Preliminary & Detailed Engineering Services
3,000,000
3,000,000
3,000,000
PGAS - GF PEO
XVII. Supervision and Contract Management
2,500,000
2,500,000
2,500,000
PGAS - GF PEO
XVIII. Repair/Maintenance of PGAS Gov't. Buildings
2,000,000
2,000,000
2,000,000
PGAS - GF PEO
XIX. Maintenance of PGAS Electrical System and Air Conditioning
1,000,000
1,000,000
1,000,000
PGAS - GF PEO
XX. Maintenance of Government Center Drainage System
1,000,000
1,000,000
1,000,000
PGAS - GF PEO
XXI. Counterpart for Special Projects
25,000,000
25,000,000
25,000,000
PGAS - GF PGAS
XXII. Ground and building maintenance
1,750,000
1,750,000
-
PGAS - GF PGSO
Page | 144
Current state of capacity Desired state of capacity Capacity Development Interventions
Expected Output Target of CapDev
Funding Requirement Source of Funds
Process owner / Office
responsible
Source of support / Technical Assistance
2014 2015 2016
XXIII. Preservation for Financial Documents
600,000
-
-
PGAS - GF PAcctngO
XXIV. Acquisition of Accountable Forms
1,000,000
-
-
PGAS - GF PASTO
XXV. Tax Information Campaigne
270,000
-
-
PGAS - GF PASTO
XXVI. Debt Servicing 12,857,651
12,857,651
Sub-total 66,549,600
71,107,651
69,357,651
Total - Transforming the Bureaucracy
276,800,502
243,379,047
175,957,955
Page | 145
LEGISLATIVE REQUIREMENTS SECTOR: ECONOMIC DEVELOPMENT SECTOR
Priority PPAs Legislative Requirements Time Frame
Responsible Committee 2014 2015 2016 Provincial Engineering Office
1. Road Rehabilitation > Maintenance of Provincial Roads 2. Building > Completion of DOPMH Priority 3. Flood Control > Implementation of flood control facility Priority - DRRM 4. Water > Installation of rain collector 5. Supervision > Conduct of DED activities 6. Construction of Provincial Veterinary Office 7. Construction of PEEDO Building Provincial Agriculture Office Upland Sustainable Agri-forestry Development (USAD) Program
Enactment of the Provincial Agriculture Code
Committee on Food Security and Agriculture
1. Rubber Development Project to be included in the Provincial Agri Code
1.1 Maintenance of existing budwood garden 1.2 Expansion of budwood garden 1.3 Rubber Demo Farm 1.4 Rubber Plantation Establishment > Support to Municipal Rubber Seedling Nursery
Page | 146
Priority PPAs Legislative Requirements Time Frame
Responsible Committee 2014 2015 2016 > Area covered (has.) 1.6 Capacity Development and Exposure Tours for Rubber stakeholders
1.7 Advocacy of new technology Rubber Development Project Total Cost 2. Cacao and Coffee Production Projects Enactment of the Provincial
Agriculture Code
2.1 Support to cacao production inputs > Cacao planting materials/seedlings > Fertilizer (complete) @ 1 bag/hectare > Area covered (hectares) 2.2 Support to coffee production inputs > Coffee planting materials/seedlings > Fertilizer (complete) @ 1 bag/hectare > Area covered (hectares) 2.3 Capacity Development and Advocacy Cacao and Coffee Production Project 3. Banana Production Project To be included in the Provincial
Agriculture Code
3.1 Support to banana production inputs > Banana plantlets/suckers > Fertilizer (complete) @ 1 bag/hectare > Area covered (hectares) 3.2 Capacity Development and Advocacy Banana Products Projects 4. Vegetable Growing project 4.1 Support to vegetable production inputs To be included in the Provincial
Agriculture Code
Page | 147
Priority PPAs Legislative Requirements Time Frame
Responsible Committee 2014 2015 2016 > Assorted vegetable seeds > Area covered (hectares) > Farmers served 4.2 Capacity Development and Advocacy for vegetable farmers
Vegetable Growing Project 5. PRUTAS Program 5.1 Support to fruit production inputs To be included in the Provincial
Agricuture Code
> Assexually propagated seedlings > Area covered (hectares) 5.2 Capacity Development and Advocacy Fruit Tree Production Project Total cost 6. Cutflower Production Project To be included in the Provincial
Agriculture Code
6.1 Support to cutflower production inputs > Planting materials > Garden nets > Fertilizers > Area covered (hectares) > Growers assisted 6.2 Capacity Development and Advocacy for cutflower growers
Cutflower Production Project Agusan del Sur Lowland Sustainable Agriculture (ALSA) Program
1. Micro - Insurance Project 2. Farm Mechanization program
Page | 148
Priority PPAs Legislative Requirements Time Frame
Responsible Committee 2014 2015 2016 2.1 Provision of packet farm equipment (power tiller-thresher)
Construction of MPDP Establishment of Rice Processing Complex (RPC) I, II and III Establishment of Organic Rice Mill Provision of corn shellers Provision of village type corn mills Establishment of village - type corn processing facility
Small- scale Irrigation Projects Farm Mechanization Program 3. Production Support Services 3.1 Support to Upland / Colored Rice Production Projects
to be included in the Provincial Agri Code
Marketing Support for Upland / Colored Rice
3.2 Provision of fertilizer inputs - foliar and granules
3.3 Provision of rodenticides 3.4 Community Seed Banking Production Support 4. Estension Support Services 4.1 Farmers Field School > FFS on Rice Production > FFS on Corn Production 4.2 University - on - the - Air > UOA for Corn Production
Page | 149
Priority PPAs Legislative Requirements Time Frame
Responsible Committee 2014 2015 2016 > Ang Agri - Pinoy Karon 4.3 Farmers Information Technology Service (FITS) Center for Rubber Extension Support 5. Organic Agriculture Program 5.1 Full conversion to organic agriculture practices
to be included in the Provincial Agri Code
Organic Agriculture Program Improvement of Agriculture Support Facilities Cooperative and Institutional Development 1. Conduct of cooperative mandated trainings 2. Micro - finance Program 3. Marketing Support for Priority Crops 4. Support to Barangay Agricultural Workers 5. Livelihood to Barangay Agricultural Workers Provincial Veterinary Office 1. BAKAS Program To be included in the Provincial
Agriculture Code
2. Provincial Stocks Farm improvement 3. Free Range Native Poultry Prod'n Program 4. Goat Multiplier Farm 5. Swine Upgrading Program 6. Repair of bio - gas Digester 7. Meat processing center 8. Genetic Improvement Program Provincial Economic and Enterprise Development Office
Page | 150
Priority PPAs Legislative Requirements Time Frame
Responsible Committee 2014 2015 2016 1. Marketing and Enterprise Development Program > Livelihood Enhancement Development Program
> Micro - financing Program > Market Linkage and Product Disposition 2. Investment Promotion Enactment of Revised Investment
Incentives Code / Committee on Ways and Means
> Establishment of Investment Promotions Center
3. Economic Enterprise > Potable Water System Rehabilitation including MRDP pipelines
> Provincial Learning Center Renovation > Maintenance of Budwood Garden at Pagkain ng Bayan
Public Employment Services Office 1. Employment Facilitation Program > Job Fair > OFW Fly Now Pay Later Program > Purchase of House and Lot in Manila for OFW and Southern Agusanon Temporary Shelter
A resolution allocating the amount of P6.3 million for the purchase of one (1) unit House and Lot in Manila for the Temporary Shelter of the OFWs and Southern Agusanons
/ Committee on Budget, Finance and Appropriations
2. Skills Training and Entrepreneurial Dev't Provincial Tourism Office 1. Bega Falls Eco - tourism Development Program 2. Establishment of ADS Heritage Center
Page | 151
LEGISLATIVE REQUIREMENTS SECTOR: ENVIRONMENTAL PROTECTION AND CONSERVATION SECTOR
Priority PPAs Legislative Requirements Time Frame
Responsible Committee 2014 2015 2016 Sustainable Small Watershed/Protected Areas Development Program
> Declaration of Small Watershed (5,000 below) Revision of 2007 Environment Code of Agusan del Sur (Prov'l. Ord. No. 03, Series of 2007)
/ Committee on Environment and Natural Resources
> Declaration of Small Watershed (5,000 below) To be included in the revised 2007 Environment Code of Agusan del Sur (Prov'l. Ord. No. 03, Series of 2007)
- Forest profiling as initial step using satellite image (new)
USAD - SAGIP-UPLAND > Small Rubber - based farming system (Integrated farming in CADT areas)
Tree Park Development Program > Indentification and declaration of municipal and barangay tree park
To be included in the revised 2007 Environment Code of Agusan del Sur (Prov'l. Ord. No. 03, Series of 2007)
> Indentificaiton, assessment and declaration of significant sites as protected areas and eco-tourism sites
An Ordinance identifying and declaring the significant sites as protected areas and eco-tourism sites in the province of Agusan del Sur, appropriating funds therefor and for other purposes
Committee on Tribal Communities and Tourism and Committee on Budget, Finance and Appropriations
Kinaiyahan Ampingan ug Panalipdan Program > Development of environmental ethics in all levels of educational system
To be included in the revised 2007 Environment Code of Agusan del Sur (Prov'l. Ord. No. 03, Series of 2007)
(pre-school, elem., high school & college.(new)
Page | 152
Priority PPAs Legislative Requirements Time Frame
Responsible Committee 2014 2015 2016 An Ordinance regulating the use and sale
of plastic bags and styro foam as packaging materials in all business establishments, such as malls, public markets, satellite markets, market stalls, restaurants, including the mobile, and transient vendors in the province of Agusan del Sur
/ Committee on Environment and Natural Resources
> Reactivate & strengthen Save Agusan Task Force with funding & IRR.
Responsible mining program > Declaration of Minahan Ng Bayan To be included in the revised 2007
Environment Code of Agusan del Sur (Prov'l. Ord. No. 03, Series of 2007)
> Establishment of centralized mineral processing area To be included in the revised 2007 Environment Code of Agusan del Sur (Prov'l. Ord. No. 03, Series of 2007)
Desiltation and River Bank Protection of Agusan River Program (From Trento-Talacogon)
- Community Consultation and mapping Integration of Agusan Marsh Environmental Concerns in School Curriculum (new)
To be included in the revised 2007 Environment Code of Agusan del Sur (Prov'l. Ord. No. 03, Series of 2007)
Co-Management Program on protection and Conservation of Agusan Marsh
Environmental Social Fencing Program (new) Archeological, historical, cultural & scientific studies (new)
Protection of Source of Drinking Water > Identification & declaration of spring water sources as protected area.
To be included in the revised 2007 Environment Code of Agusan del Sur
Page | 153
Priority PPAs Legislative Requirements Time Frame
Responsible Committee 2014 2015 2016 (Prov'l. Ord. No. 03, Series of 2007)
Ecological Solid Waste Management Program > Establishment of provincial eco-park landfill To be included in the revised 2007
Environmental Code of Agusan del Sur (Prov'l. Ord. No. 03, Series of 2007)
> Establishment of Provincial Capitol MRF To be included in the revised 2007 Environmental Code of Agusan del Sur (Prov'l. Ord. No. 03, Series of 2007)
Seedling Production for Tree Farming and Rainforestration Program Support
Provincial Capitol Greening Program (new) CAD Titling Process Program Reclassification of Timberland into A and D (on-going) Resolution requisting the Department of
Environment and Natural Resources (DENR) to expedite the reclassification of the 64, 812 hectares to Alienable and Disposable Lands in the province of Agusan del Sur
/ Committee on Environment and Natural Resources
Page | 154
LEGISLATIVE REQUIREMENTS SECTOR: SOCIAL DEVELOPMENT SECTOR
Priority PPAs Legislative Requirements Time Frame Responsi
ble Committe
e 2014 2015 2016 A. STAFFING REQUIREMENTS Provincial Health Office (PHO) - Funding of Created Plantilla Positions • Clerk/statistician • Driver I • MS II • NO IV • HEPO III • Community Organizer Officer I (4) • Computer Operator II • Process Server • Storekeeper II Hospitals D. O Plaza Memorial Hospital (DOPMH) - Filling up of Vacant Plantilla Positions: • 6 - Medical officer III • 1 - Medical Specialist IV • 1 - Electrician Foreman • 1 - Driver I - Creation of Plantilla Positions • 22 - Nurses • 1 - Pharmacist II
Page | 155
Priority PPAs Legislative Requirements Time Frame Responsi
ble Committe
e 2014 2015 2016 • 2 - Medical Technologist II - Outsourcing of Janitorial Services SECONDARY HOSPITAL Bunawan District Hospital - Creation of Plantilla Positions • 6 - Medical Officer III • 5 - Nurse I PRIMARY HOSPITALS (LMH, TDH, EMCH) Talacogon District Hospital - Funding of Created Position • 1 - Medical Specialist II • 1 - Medical Officer III • 5 - Nurse I • 1 - Radiology Technicial II • 1 - Administrative Officer II • 1 - Medical Records Officer II • 1 - Pharmacist II • 1 - Medical Technologist II • 1 - Cashier II Esperanza Medicare Community Hospital - Creation of Plantilla Positions • 1 - Medical Officer III • 1 - Nurse III/Acting Chief Nurse • 4 - Nurse I
Page | 156
Priority PPAs Legislative Requirements Time Frame Responsi
ble Committe
e 2014 2015 2016 • 1 - Radiology Technologist Loreto Community Hospital - Creation of Plantilla Positions • 1 - Medical Officer III • 4 - Nurse I Sports Office - Creation of Plantilla Positions • 2 - Sports and Games Regulation Officer (SG 14) Moral Recovery Values Formation Services - Filling up of Vacant Plantilla Positions: • 1- Community Affairs Officer IV • 1 - Community Affairs Officer II • 1 - Community Affairs Officer I • 1 - Driver Provincial Social Welfare & Development Office - Filling up of Vacant Plantilla Positions: • 1 - SWO IV • 1 - SWO II • 1 - CAO IV • 1 - CAO II • 1 - Administrative Officer II • 1 - Administrative Assistant II • 3 - Social Welfare Aide
Sub-total
Page | 157
Priority PPAs Legislative Requirements Time Frame Responsi
ble Committe
e 2014 2015 2016 B. UPGRADING OF PHYSICAL FACILITIES EQUIPMENT AND INSTRUMENTS Provincial Health Office (PHO) • Upgrading of BnB (Sinobong & Del Monte, Veruela) • Construction of Sanitary Toilet (200 units/year) • Upgrading of Developed Spring (2units/year) • Renovation of PHRC Building • Procurement of 2 units 4x4 vehicle • Improvement of Nutri Huts / mess hall (2 units/year) • Procurement of 1 unit Portable Biological Testing Equipment for water analysis • Procurement of 1 unit IEC Vehicle • Procurement of Office Equipment • Repair and Painting of PHO Building D.O. Plaza Memorial Hospital • Construction of Annex Building (Phase III) • Construction of 50 bed In-Patient • Construction of 50 bed communicable/ISO Building • Const. of Watchers Area • Const. of Maintenance Building • Const. of Septic Vault • Const.of Animal Bite Center • Const.of Covered pathway from Registration Unit to ISO Building • Construction of HOMIS Server Room
Page | 158
Priority PPAs Legislative Requirements Time Frame Responsi
ble Committe
e 2014 2015 2016 • Const. of Covered pathway from Main building to Nurse Dorm • Renovation of Medicare Nurse Station • Hospital Dietary Section - Const. of drainage facility - Const. of elevated water tank • Repair and Painting of hospital • Procurement of Hospital Equipment • Procurement of Mobile X-ray with C-arm • Procurement of Hospital Office Equipment • Procurement of 1 unit Hospital Ambulance • Procurement of Hospital Office Equipment Talacogon District Hospital • Construction of Perimeter Fence (Phase I) • Ground Improvement • Procurement of 1 unit of Ultrasound Machine • Establishment of Animal Bite Center • Completion of Half way house Esperanza Medicare Community Hospital • Establishment of Animal Bite Center • Procurement of X-ray Machine • Construction of X-ray Room • Construction of waste holding area w/ septic vault Bunawan District Hospital
Page | 159
Priority PPAs Legislative Requirements Time Frame Responsi
ble Committe
e 2014 2015 2016 • Completion of Oval Facility (rubberized) • Perimeter Fence (Phase III) Sports Office • Upgrading of Oval Facility (rubberized) • Rehabilitation of Grand Stand (Roofing) • Repair of 9 Gates of D.O. Plaza Sports Complex • Procurement of Pressurized Pumps and other accessories for swimming pool • Rehabilitation of Swimming Pool Bleachers (phase II) • Expansion of Fitness Gym • Construction of Swimming Pool for Children Provincial Social Welfare & Development Office • Construction of 20 Standard Day Care Center (5 unit) • Installation of 20 Indoor and Outdoor facilities
• Provision of Day Care Workers Honorarium
An Ordinance providing Honorarium to all Day Care Workers in the province of Agusan del Sur, providing funds therefor and for other purposes /
Committee on Women, Family Welfare, Social Welfare and Community Developm
Page | 160
Priority PPAs Legislative Requirements Time Frame Responsi
ble Committe
e 2014 2015 2016
ent and Committee on Budget, Finance and Appropriatons
Sub-total Provincial Health Office (PHO) • Conduct Refresher course/updates for BHWs/ BNS/ BnB Operators • Attendance to TOWS on health programs D.O. Plaza Memorial Hospital (DOPMH) • Hiring of Consultancy Services - 1 - Anesthesiologist
Sub-total Provincial Health Office (PHO)
• Inclusion of the following in the proposed Enactment of Provincial Health Code /
Committee on Health and Sanitation
Page | 161
Priority PPAs Legislative Requirements Time Frame Responsi
ble Committe
e 2014 2015 2016 Provincial Health Code > WHSMP - FBD policy For inclusion in the Provincial Health Code > Creation of STI/HIV AIDS Council For inclusion in the Provincial Health Code > Reconfiguration of ILHz from 5 to 4 For inclusion in the Provincial Health Code > Policy on Lactation breaks For inclusion in the Provincial Health Code > Adoption of Expanded Breastfeeding Promotion For inclusion in the Provincial Health Code
• Amendment of Rabies ordinance specifically on counterparting
Amending Provincial Ordinance No. 10, Series of 2003, re: counterparting scheme among barangays, city/municipalities on the provision of dog bites vaccines /
Committee on Health and Sanitation
scheme among barangay, municipalities and province
- Amendment of the Provincial Revenue Code on the increase of hospital rates
Amendment of Prov'l. Ord. No. 70, Series of 2011, the Revised Revenue Code of Agusan del Sur particularly on the Hospital Rates /
Committee on Ways and Means
• Ordinance on Avian Influenza
• Ordinance on promulgating rules & regulation on proper slaughter
Adopting DA-Administrative Order No. 28, Series of 2005, Implementing Rules and Regulations pursuant to Republic Act No. 9296, otherwise known as the "Meat Inspection Code of the Philippines" /
Committee on Food Security and Agriculture
slauhtering, distribution & sale of carcass of livestock & poultry
Page | 162
Priority PPAs Legislative Requirements Time Frame Responsi
ble Committe
e 2014 2015 2016 meat & their by- products in the PGAS
• Adoptation of RA on Quarantine of livestock & poultry products
Adopting Republic Act No. 8435 otherwise known as the "Agriculture and Fisheries and Modernization Act of 1997" (An Act Prescribing Urgent Related Measures to Modernize the Agriculture and Fisheries Sectors of the Country in Order to Enhance Their Profitability, and Prepare Said Sector for the Challenges of the Globalization Through and Adequete, Focused and Rational Delivery of Necessary Support, Appropriating Funds Therefor and For Other Purposes) /
Committee on Food Security and Agriculture
D.O. Plaza Memorial Hospital (DOPMH) • Inclusion in the Provincial Health Code of the ff:
- Consignment Scheme/Agreement for Medicines, Supplies and Equipment
An Ordinance Institutionalizing the Hospitals Consignment System in the Procurement of Medicines, Supplies and Equipment in the province of Agusan del Sur /
Committee on Health and Sanitation
- Income Retention in Secondary and Primary Hospital
An Ordinance Providing Guidelines on the Income Retention Scheme in Secondary and Primary Hospitals in the province of Agusan del Sur /
Committee on Health and Sanitation
Page | 163
Priority PPAs Legislative Requirements Time Frame Responsi
ble Committe
e 2014 2015 2016 Provincial Health Office (PHO) Support to Public Health Delivery System Maternal & Child Health
• Conduct of Maternal/Underfive Mortality Review to be included in the Provincial Health Code
• Provision of laboratory reagents Expande Program Immunization • Provision of supplies syringes/needles (S/N) • PIR with middle manager Nutrition • Provision of supplies/equipment - salter weighing scale • Strengthening of PNC/MNC/BNC Communicable / Non - Communicable Diseases Prevention Control • Procurement of Drugs/Medicines/Supplies for Communicable/non communicable diseases prevention & control program (Health lifestyle, NTP, STI, Surveilance, etc.) • Procurement of chemical insecticide for Dengue • Procurement for 1 misting spray machine for dengue disease control Health Promotion
Page | 164
Priority PPAs Legislative Requirements Time Frame Responsi
ble Committe
e 2014 2015 2016 • Conduct of monthly special health events • Reproduction of FHSIS tables • PIR on health programs implementation D.O. Plaza Memorial Hospital (DOPMH) • Procurement of Computer Hardwares (Hospital Operation Management Information System) Department of Education Support To Education • Assistance to PAGTUON PROGRAM - Support to Oplan Balik eskwela campaign (house to campaign, radio/television plugging, posters/tarpaulin) - Nutrition Month/ feeding program - Provincial literary competition/ academic compitition - World children's month/children's congress - Gawad Datu Lipus Makapandong Huwarang Guro awards - Provincial academic enhancement training & workshop - Provincial/national academic benchmarking exposure & trainings - Yearly additional creation of the model of exellence schools (PGAS sponsorship) - Support on international academic & non-academic participation of Agusanon students (all levels)
Page | 165
Priority PPAs Legislative Requirements Time Frame Responsi
ble Committe
e 2014 2015 2016 - Creation of IM's (all levels) training & workshop - Health & sports ( governor's cup ) - Governors football cup in support to the national armed forces of the Philippines program (football for peace) - Enhancing the science equipments & laboratory (all levels) - Development of Agusan Marsh literacy program • OPERATION & MAINTENANCE OF PUBLIC SCHOOLS - 1 Financial assistance to elementary & secondary teachers (225 teachers) - Education research - Sports development - Citizenship development - Support to special projects - CAPITAL OUTLAY Provincial Health Office (PHO) Record/report management • Reproduction of FHSIS reporting forms/tables Moral Recovery Values Formation Services • Spiritual Strengthening & Ecumenical Seminars/Trainings - PGAS - MLGU/BLGU employees, Officials and
Page | 166
Priority PPAs Legislative Requirements Time Frame Responsi
ble Committe
e 2014 2015 2016 Constituents - Teachers - Students - Pupils/Pre-school and Elementary - Parents - Religious Leaders - MRVF Staff/Personnel • Formulation of Module on Stewardship • Training of Trainers on Values Formation • Youth congress Sports Office • CapDev on handling Sports Training and Coaching
PHO • Regular Provincial/District Health Board Meeting
Page | 167
LEGISLATIVE REQUIREMENTS SECTOR: PUBLIC SAFETY AND SECURITY
Priority PPAs Legislative Requirements Time Frame Responsible Committee 2014 2015 2016
1. Flood Control Adoption of Presidential Decree 1067, otherwise known as the Water Code of the Philippines
Committee on Environment and Natural Resources
2. Acquisition of Relocation Site 3. Updating of Maps of Flood/landslide prone areas
(GIS)
4. Formulation of Communication Plan 5. Mainstreaming DRR-CCA in Local Development
Plans
6. Community disaster preparedness programs 7. Acquisition of Disaster Equipment a) High angle rescue equipment b) 15k liters capacity fire truck c) 6 Plastic boats (2 per year) d) Fire extinguisher (50 units) 8. Acquisition of new security firearms 9. Construction of Evacuation Center 10. Formulation of evacuation plan of disaster
prone per barangay ( Camp Management)
11. Periodic Cleaning of Drainage/Canals 12. Conflict resolution & Management Program 13. IEC on Crime Prevention Programs 14. IEC Anti-Drugs Campaign 15. Land development and construction of
Page | 168
Priority PPAs Legislative Requirements Time Frame Responsible Committee 2014 2015 2016
Provincial Jail 16. DRRM orientation for PGAS employees 17. Construction of Government Center Perimeter
Fence
Page | 169
LEGISLATIVE REQUIREMENTS SECTOR: TRANSFORMING BUREAUCRACY
Priority PPAs Legislative Requirements Time Frame Responsible Committee 2014 2015 2016
1. Barangay Development Projects 2. Institutionalization of the Integrated M&E System 3. Updating and implementation of the HRMD Plan 1. Structure/staffing 1.1 Funding of positions 1.2 Separation Package 2. HRMD System 3. CapDev (training) 4. Health and Wellness 4. Systems and processes . Executive Information System (EIS) . Financial Management Information System (FMIS) . Electronic Procurement . Human Resources Management Information System (HRMIS) . Job Order Payroll System . Property Management System (PMS) . Fuel Dispensing System (FDS) . Real Property Tax Information Management Information System (MEMIS) . Risk Assessment System (RAS) . Communication Record Tracking System (ComReTrack) . Archiving System . System Information of Provincial Agriculture Office (SIOPAO) . Geographic Information System (GIS)
Page | 170
Priority PPAs Legislative Requirements Time Frame Responsible Committee 2014 2015 2016
. Hospital Operation Management Information System (HOMIS) . Legislative Tracking System (LTS) . Natural Resources Database system 5. Development and Management ofPGAS Communication Plan 6. Codification of Ordinances Enactment of the Provincial
Administrative Code
/
Committee on Civil Service, Ordinance,Legal Matters and Style
Enactment of Code of General Ordinances /
Committee on Rules
7. Legislative feedback mechanism Adopting the Legislative Feedback Mechanism tool in the Office of the Sangguniang Panlalawigan
Jan. 2014
Committee on Rules
8. Harmonization of provincial and city/municipal development plans 9. Rehabilitation of Broadcast Equipments (DXDA & PTV) 10. Establishment of service vehicle maintenance shop and crafting of new policy on garage system 11. Construction of Archive 12. Construction of Local Finance Building 13. Construction of PPIO Building
Page | 171
VI. Resource Mobilization Strategies
Strategies for Resource Mobilization and Revenue Generation
o Resource mobilization thru access to non-traditional sources o LGU may create indebtedness, and avail of credit facilities to finance local infrastructure and other socio-economic
development projects in accordance with the approved local development plan and public investment program (Local Government Code of 1991 Section 296)
o LGU may avail of credit lines from government or private banking and lending institutions for the purpose of stabilizing local finances
o Provincial may likewise acquire property, plant and equipment and such necessary accessories under a suppliers credit, deferred payment plan or other financial schemes (Local Government code Section 28)
o Engaging Public-Private Sector Partnership
CERTIFIED STATEMENT OF RECEIPTS
Province of AGUSAN DEL SUR
General Fund
PARTICULARS PAST YEAR (ACTUAL)
2012 CURRENT YEAR (ESTIMATE) 2013
BUDGET YEAR (PROPOSED) 2014
BUDGET YEAR (PROPOSED) 2015
BUDGET YEAR (PROPOSED) 2016
a. Real Property Taxes
Current Year 8,282,321.76 8,374,240.34
7,068,109.40
7,459,156.63
7,850,203.85
Prior Years 3,439,602.33 2,477,898.87
2,539,820.04
2,601,741.21
2,663,662.37
Penalties 2,186,224.89 1,647,860.79
1,731,495.80
1,815,130.81
1,898,765.82
Page | 172
CERTIFIED STATEMENT OF RECEIPTS
Province of AGUSAN DEL SUR
General Fund
PARTICULARS PAST YEAR (ACTUAL)
2012 CURRENT YEAR (ESTIMATE) 2013
BUDGET YEAR (PROPOSED) 2014
BUDGET YEAR (PROPOSED) 2015
BUDGET YEAR (PROPOSED) 2016
Total 13,908,148.98 12,500,000.00
11,339,425.24
11,876,028.65
12,412,632.04
b. Business Taxes
Tax on Printing and Publication
12,284.15 5,711.89 5,743.54 5,775.19
5,806.84
Tax on Sand and Gravel and OQR
3,700,884.49 5,108,976.00 5,482,604.54 5,856,233.21
6,229,861.87
Amusement Taxes 50,515.12 50,000.00 19,179.46 17,424.89
15,670.32
Tax on Delivery Trucks and Vans
1,214,172.50 1,032,613.43 1,069,123.60 1,105,633.76
1,142,143.93
Total 4,977,856.26 6,197,301.32
6,576,651.14
6,985,067.05
7,393,482.96
c. Other Local Taxes
Tax on Transfer of Real Properties
1,303,477.95 488,911.19
470,830.45
452,749.70
434,668.96
Professional Tax 69,087.50 64,313.00
61,850.70
59,388.40
56,926.10
Environmental Tax 2,216,647.62 1,952,550.00
1,806,638.46
1,311,697.28
742,505.55
Total 3,589,213.07 2,505,774.19
2,339,319.61
1,823,835.38
1,234,100.61
Page | 173
CERTIFIED STATEMENT OF RECEIPTS
Province of AGUSAN DEL SUR
General Fund
PARTICULARS PAST YEAR (ACTUAL)
2012 CURRENT YEAR (ESTIMATE) 2013
BUDGET YEAR (PROPOSED) 2014
BUDGET YEAR (PROPOSED) 2015
BUDGET YEAR (PROPOSED) 2016
TOTAL 22,475,218.31 21,203,075.51
20,255,395.99
20,684,931.08
21,040,215.61
a. Regulatory Fees
Accreditation Fees 75,770.00 75,107.00
81,545.00
87,983.00
94,421.00
Envi. Sus. Mining Fees
26,163,394.00 25,000,000.00
25,000,000.00
25,000,000.00
25,000,000.00
Gold Ore Extraction Fees
4,315,630.36 1,200,000.00
1,873,573.59
1,880,315.35
1,887,057.12
Governor's Permit Fees
319,700.00 399,709.60 410,801.60
421,893.60
432,985.60
Registration Fees 9,760.00
VI/TF of PSOAIP 9,123,580.69
10,006,016.41
10,574,272.02
11,142,527.62
11,710,783.22
Total 40,007,835.05 36,680,833.01
37,940,192.21
38,532,719.57
39,125,246.94
b. Service/User Charges
Annotation Fees 237,711.30 300,000.00
300,000.00
300,000.00
300,000.00
Application Fees 2,164.00
Certifications 114,029.50 300,000.00
Page | 174
300,000.00 300,000.00 300,000.00
DXDA 1,166,145.73
1,249,861.13
1,186,986.64
1,124,112.16
1,061,237.68
Equipment Rental 4,100,969.56
5,000,000.00
5,000,000.00
5,000,000.00
5,000,000.00
History of Assumptions
113,310.00
Inspection Fees (PAC Resolutions)
200.00
Material Testing Fees 1,778,995.00
2,000,000.00
2,000,000.00
2,000,000.00
2,000,000.00
Photocopy/True copy Charges
135,590.00 200,000.00 200,000.00
200,000.00
200,000.00
Reproduction Charges
213,170.00 235,181.63 246,743.30
258,304.97
269,866.64
Research Fees 53,750.00 230,000.00
230,000.00
230,000.00
230,000.00
Secretary's Fees 282,265.00 322,922.20
282,572.63
242,223.07
201,873.50
Veterinary 622,895.00 257,864.35
289,526.69
321,189.03
352,851.37
Total
8,821,195.09 10,095,829.31 10,035,829.26 9,975,829.23 9,915,829.19
Page | 175
PARTICULARS PAST YEAR
(ACTUAL) 2012
CURRENT YEAR (ESTIMATE)
2013
BUDGET YEAR (PROPOSED)
2014
BUDGET YEAR (PROPOSED)
2015
BUDGET YEAR (PROPOSED) 2016
c. Other Receipts
Return of CAs/Sal. and Disallos.
28,048.40
Refund from MERALCO
40,081.31
Sales on Printed Documents
92,871.00
Incentive
338,517.10
300,000.00
300,000.00
300,000.00
300,000.00
Interest Income
400,286.73
1,500,000.00
1,500,000.00
1,500,000.00
1,500,000.00
Occupation Fees - Philsaga
417,022.50
PAES
158,300.00
Sale on Planting Materials
76,119.00
Miscellaneous Income
36,363.00
Rental - Other Facilities
189,672.46
809,068.56
914,397.11
1,019,725.66
1,125,054.20
Tilapia Fingelings
96,870.00
Sale of Waste Materials
250,000.00
1,000,000.00
1,000,000.00
1,000,000.00
Sale of Accountable Forms
1,000,000.00
780,000.00
780,000.00
780,000.00
Page | 176
Total 1,874,151.50
3,859,068.56
4,494,397.11
4,599,725.66
4,705,054.20
d. Government Hospitals
BDH 6,616,800.45
5,685,748.26
5,851,179.19
6,016,610.13
6,182,041.07
DOPMH 33,100,322.52
29,279,042.79
31,567,954.29
33,856,865.80
36,145,777.30
EMCH 1,123,386.00
485,645.70
408,548.09
331,450.49
254,352.88
L/TMH 186,653.80
196,624.26
173,789.43
150,954.61
128,119.78
LMH 640,100.75
696,796.08
675,130.38
653,464.68
631,798.99
Total 41,667,263.52
36,343,857.09
38,676,601.38
41,009,345.71
43,342,090.02
92,370,445.16
86,979,587.97
91,147,019.96
94,117,620.17
97,088,220.35
TOTAL - LOCAL
114,845,663.47
108,182,663.48
111,402,415.95
114,802,551.25
118,128,435.96
Page | 177
PARTICULARS PAST YEAR
(ACTUAL) 2012
CURRENT YEAR (ESTIMATE)
2013
BUDGET YEAR (PROPOSED)
2014
BUDGET YEAR (PROPOSED)
2015
BUDGET YEAR (PROPOSED)
2016
- EXTERNAL SOURCE
IRA 963,550,908.00
1,072,035,751.00
1,140,035,751.00
1,140,035,751.00
1,140,035,751.00
Share from National Wealth
6 614874.72 2,000,000.00
2,000,000.00
2,000,000.00
2,000,000.00
GF - DILG - LGU - LGSF
20,000,000.00
EC Grants 13,784,275.42
PBGS 1,200,000.00
Loan/Borrowings 33,836,402.99
TOTAL - EXTERNAL SOURCE
1,038,986,461.13
1,074,035,751.00
1,142,035,751.00
1,142,035,751.00
1,142,035,751.00
TOTAL - LOCAL AND EXTERNAL SOURCE
1,153,832,124.60
1,182,218,414.48
1,253,438,166.95
1,256,838,302.25
1,260,164,186.96