Upload
independent
View
1
Download
0
Embed Size (px)
Citation preview
The number of foreigner workers in Malaysia ( Pasir Gudang, Johor )• Nurul Syifa’ Binti Izhar ( 2013870892 )• Umil Nadiah Binti Nor Hilal ( 2013916608 )
MAT530: INTRODUCTION TO
MATHEMATICAL MODELLING
INTRODUCTION• Foreigner is legal immigrants who have the permission of the
state which would be continued under the Act and Regulations
set.
• Foreign workers willing to work in 3D ( dirty , dangerous and
difficult ) with low wages .
ANDARAYA• Have 10 branches offices and 1 of them is
MULTI SARANA SDN BHD.
• Multi Sarana located at Johor.
Multi Sarana
Senai Pasir Gudang
Kota Tinggi
Pontian
( HQ )
• According to Multi Sarana Sdn. Bhd, the highest number of
foreign wokers is in 2015.
• The lowest number of foreign works is in 2014 with only 4
people.
The number of foreign workers in MULTI SARANA PASIR GUDANG
Year Month Day head count Nationality2012 September 22 7 Indonesian
October 2 7 Indonesian 30 6 Indonesian November 9 1 Indonesian 16 15 Pakistan 21 5 Pakistan 24 12 Indonesian 26 10 Indonesian 30 10 Indonesian 1 Pakistan December 1 9 Indonesian 7 3 Indonesian 8 7 Indonesian 9 4 Indonesian 15 6 Indonesian 18 2 Indonesian 20 2 Indonesian 28 4 Pakistan
Year Month Day head count Nationality
2013 March 8 15 Indonesian
14 9 Indonesian
April 4 14 Indonesian
May 1 8 Indonesian
8 1 Indonesian
June 3 1 Indonesian
20 10 Indonesian
26 4 Indonesian
July 17 3 Indonesian
20 3 Indonesian
October 24 2 Indonesian
2014 May 17 1 Indonesian
June 10 3 Indonesian
Year Month Day head count Nationality
2015 May 15 24 Indonesian 18 16 Indonesian June 10 1 Indonesian 12 17 Indonesian 15 25 Indonesian 17 21 Indonesian August 13 5 Bangladesh 19 4 Indonesian 24 2 Bangladesh September 7 9 Bangladesh October 16 5 Indonesian 30 3 Indonesian November 27 5 Indonesian
2016 January 8 24 Indonesian 11 24 Indonesian February 1 7 Indonesian 10 7 Indonesian 19 4 Indonesian March 4 2 Indonesian
LINEAR MODELn X Y X^2 XY Y(predicted) error
sum of squares error(E^2)
1 1 111 1 111 81.8 29.2 852.64
2 2 70 4 140 79.9 -9.9 98.01
3 3 4 9 12 78 -74 5476
4 4 137 16 548 76.1 60.9 3708.81
5 5 68 25 340 74.2 -6.2 38.44
SUM 15 390 55 1151 390 -1.42109E-14 10173.9
0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.50
20
40
60
80
100
120
140
160
f(x) = − 1.9 x + 83.7
NUMBER OF FOREIGNER WORKERS
YLinear (Y)Linear (Y)
X (YEAR)
NUMBER OF FOREIGNER WORKERS
Y= -1.9x + 83.7 RMSD=SQRT(E^2/n)
45.10853578
LINEAR MODEL - MANUAL• = • = • A = • = = -95 • = = 4185
• = = =83.7 • = = = -1.9• Y= 83.7 – 1.9x • RMSD = = = 45.10853578
• POLYNOMIAL MODEL
n X Y X^2 X^3 X^4 XYX^2
Y Y(predicted) error
sum of squares
error(E^2)
1 1 111 1 1 1 111 111 102.228 8.772 76.947984
2 2 70 4 8 16 140 280 69.684 0.316 0.099856
3 3 4 9 27 81 12 36 57.568
-53.56
8 2869.530624
4 4 137 16 64 256 548 2192 65.88 71.12 5058.0544
5 5 68 25 125 625 340 1700 94.62-
26.62 708.6244
SUM 15 390 55 225 979 1151 4319 389.98 0.02 8713.257264
0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.50
20
40
60
80
100
120
140
160
f(x) = 10.2142857142857 x² − 63.1857142857143 x + 155.2
NUMBER OF FOREIGNER WORKERS
YPolynomial (Y)
X (YEAR)
NUMBER OF FOREIGNER WORKERS
POLYNOMIAL MODEL - MANUAL• = • V = • A = = 700• = = 108640 • = -44230
• = = 7150
• = = = 155.2 • = = = -63.186 • = = = 10.214• Y= 10.214 – 63.186x +155.2 • RMSD = = = 41.74507699
y = 10.214x2 - 63.186x + 155.2 RMSD=SQRT(E^2/n)
41.74507699
• EXPONENTIAL MODELa1
a0 =
y= a0 +a1x
Linearize the expected function :Y = aUnknown : a, bln y = ln aln y = ln a + ln ln y = ln a + bx ln ln y = ln a + bx
•where : – Y= ln yi
– a0=ln a– a1=b– x=xi
n X y Y=ln y X^2 XYy
PREDICT ERRORERROR
SQUARE
1 1 111 4.71 1 4.71 -7.85 12.56
157.79825278634
6
2 2 70 4.25 4 8.50 -6.76 11.00
121.08403902950
9
3 3 4 1.39 9 4.16 -6.11 7.5056.249392097227
4 4 137 4.92 16 19.68 -5.66 10.58
111.90216098654
2
5 5 68 4.22 25 21.10 -5.31 9.5290.721398966127
total 15 390 19.48 55 58.14 -31.68 51.17 537.76
0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.50.00
1.00
2.00
3.00
4.00
5.00
6.00
f(x) = 3.64392704061791 exp( − 0.00729995947302124 x )
NUMBER OF FOREIGNER WORKERS
Y=ln yExponential (Y=ln y)
X (YEAR)
NUMBER OF FOREIGNER WORKERS
CONCLUSIONTYPES OF MODEL
EQUATION SSE
LINEARY= -1.9x + 83.7
10173.9
POLYNOMIAL y = 10.214x2 - 63.186x + 155.2
8713.26
EXPONENTIAL Y = 3.6439 537.76