TABLE OF CONTENTS
Pages 1. COMPOSITION OF THE
SUBJECT COMMITTEE - I : (ii)
2. INTRODUCTION : (iii)
3. REPORT
i) Education (School) : 1-11
ii) Education (Higher) : 12-19
iii) Power : 20-36
iv) Transport : 37-42
v) Animal Resources Development : 43-53
vi) Youth Affairs & Sports : 54-60
vii) Forest : 61-66
viii) Agriculture : 67-83
ix) Horticulture & Soil Conservation : 84-97
x) Co-operation : 98-105
xi) Health & Family Welfare : 106-116
xii) Public Works (R & B) : 117-124
xiii) Public Works (W.R) : 125-131
xiv) Public Works (D.W & S) : 132-139
xv) Fisheries : 140-145
xvi) Social Welfare & Social Education : 146-161
(i)
COMPOSITION OF THE COMMITTEE ( 2013-2015 )
CHAIRMAN
Shri Sudhan Das
MEMBERS
2. Shri Narayan Chandra Choudhury. 3. Shri Mano Ranjan Acharjee. 4. Shri Manindra Chandra Das. 5. Shri Keshab Deb Barma. 6. Shri Ramendra Narayan Deb Barma. 7. Shri Shyamal Chakraborty. 8. Shri Jitendra Sarkar. 9. Shri Pranajit Singha Roy.
SECRETARIAT Shri S. Bhattacharjee Secretary. Smt. L. Deb Barma Deputy Secretary. Smt. S. Deb Barma Under Secretary. Shri S. Chakraborty Office Superintendent. Shri S. Debnath U.D. Assistant.
Shri M. Deb Barma U.D. Assistant.
(ii)
INTRODUCTION
I, the Chairman of the Subject Committee-I having been authorised by the Committee do present the Tenth Report of the Committee on the Demands for Grants for the Financial Year 2013-2014 relating to the following Departments of the State Government ; Demands for Grants relating to the Departments of Education (School)/ Education (Higher)/ Power/ Transport/Animal Resources Development/ Youth Affairs & Sports / Forest/ Agriculture / Horticulture & Soil Conservation / Co-operation/ Health & Family Welfare / Public Works (R & B, W.R. and D.W. & S.) / Fisheries and Social Welfare & Social Education. 2. In pursuance Rule 300A(1) of the Rules of Procedure and Conduct of Business in the Tripura Legislative Assembly, the Committee was constituted by the Hon’ble Speaker for a two-year period 2013-2015 tenure of which will expire on 25.04.2015.
3. The Subject Committee-I plays a very important role in streamlining the proposed Demands of the Departments in the Budget and its Recommendations in the Report helps to utilise the Fund in developmental and welfare programme to a very realistic and great extent.
4. The Committee examined the Demand Nos. 40, 39, 14,11, 29, 42,30, 27, 28, 12, 16, 52, 13, 15, 51, 26 and 41 for Grants for the Financial Year 2013-2014 in its Sittings held on the 4th, 6th, 7th and 8th May, 2013. 5. In the Sitting held on the 10th May, 2013 the Committee considered the draft Report on these Demands for Grants and adopted the same with Recommendations for presentation to the House on the 13th May, 2013. 6. The Committee placed on record its thanks to the Additional
Chief Secretary in-charge of the Finance Department/Principal
Secretaries/Secretaries/Joint Secretary, Finance Department and other
Officers of the Government and the Secretary,Officers and Staff of the
Assembly Secretariat for their sincere and tireless service rendered to the
Committee during the examination of Demands for Grants and preparation of
this Report.
(iii)
THE REPORT ON THE DEMAND NO. 40 OF THE SCHOOL EDUCATION DEPARTMENT
FOR THE FINANCIAL YEAR 2013-14.
The Budget Proposal under Demand No. 40 relates to School Education Department, Government of Tripura for the Financial Year 2013-2014 and the Revised Budget for the Financial Year 2012-2013 are as follows :-
(Rs. in Lakh)
Particulars Revised Estimate
2012-2013
Budget Estimates for 201 3-2014 Demand Fund for Total
T.S.P. S.C.P. a)Non-Plan 78183.79 92419.00 --- --- 92419.00 b) Plan 18894.70 6931.48 4266.05 2774.22 13971.75 c) C.S.S. 9488.98 5514.72 2681.82 1469.50 9666.04 d) N.E.C --- --- --- --- --- Total 106567.47 104865.20 6947.87 4243.72 116056.79
Now, the aforesaid Budget Proposal is under examination of the Subject
Committee-I of the Tripura Legislative Assembly for recommendation to the Demands for Grants.
The Committee in its meeting held on 4th May, 2013 examined the Budget
proposals in details having discussion with the Principal Secretary of the Department who appeared before the Committee on summon.
First of all, the Principal Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2012-13 and stated as follows :-
Sl. No.
Recommendations Action taken
i. Teaching quality has to be effectively increased & for that the Department may constitute a Committee with the eminent retired teachers to evaluate the situation & recommendation for upliftment of standard of quality of Teaching.
In each bloc, there is one Bloc Resource Centre under which a number of Cluster Resource Centres are functioning. In both BRCs and CRCs there are well-trained resource persons engaged under SSA, a good number of them being experienced retired teachers. The main objectives of BRCs and CRCs are to provide resource supports to the teachers for quality improvement by regular visits to different schools under them as per monthly targets. Besides Departmental officers are also
-1-
visiting schools as per monthly targets fixed for them for the purpose of quality improvement.
ii. Office of the School Inspectors’ performance is to be upgraded and for that experienced teachers may be engaged. Supervision of the Schools to be done regularly.
Already, as recommended by the Subject Committee, some teachers were posted in different Inspector of Schools for overall improvement of performance of the Inspectorate of Schools.
iii. Boundary wall to all Girls’ Schools & Schools situated nearby roads are to be covered with boundary walls in phase manner.
During 2012-13, there was a target for construction of boundary wall in 50 schools against which fund for construction of boundary wall in 41 schools including girls and schools located on the roadside was placed. Construction of boundary walls in 41 no. schools is under progress.
iv. The kitchen and dining place for mid-day-meal to be made hygienic and Department to formulate proposal for the same along with Drinking Water & Sanitation in every School and it should be maintained regularly.
The guidelines of the mid-day-meal contains instruction of developing good habit among the children to maintain cleanliness and hygiene while taking meals. Washing hands properly and cleaning dishes before and after taking meal is a must for every child. Moreover, similar instruction was issued to the cooks to cover their heads with scarp while preparing, cooking and serving meals and also to use cooking and serving utensils after proper cleaning. MTA in each school is entrusted with the responsibility to supervise and monitor proper maintenance of hygiene in connection with mid-day-meal.
v. Database of teachers be maintained by the Department even with the help of a private agency to facilitate effective transfer & posting with a definite norms so that equal distribution of teachers to Towns and villages may be maintained.
Database has already been created of all employees including teachers of this Department at district and state level. Updating the database for 2013-14 is under process for redeployment of teachers in schools of rural and urban areas based on teacher student ratio as per RTE Act 2009 to maintain balance in teacher distribution.
vi. Set up a English Medium High School for each Bloc in the State.
As per commitment made by the State Govt. in Budget Speech of the Hon’ble Finance Minister in 2012-13, the School Education Department has already taken decision to set up 21 English medium schools in
-2-
different block areas with the approval of Finance Department. As instructed by the Finance Department, creation of posts of the required teachers is under process.
vii. Nigh-Guards has to be posted in every High School
661 posts of Night Guard was created during 2008-09. For filling up of the above posts, the Directorate of Higher Education, Tripura was requested to sponsor the names of selected persons being the nodal Department of the Education Department. But, the School Education Department has not yet received the list of selected candidates from the Directorate of Higher Education. In this connection, it is stated that at present there is no continuation of the above 661 created posts. For revalidation/continuation of the posts, a file has already been moved to the Finance Department. After getting revalidation / continuation of the above 661 posts of Night Guard from the Finance Department, Tripura and also on receipt of names of selected candidates from the Directorate of Higher Education, necessary steps for providing Night Guard in the High Schools will be taken by this Department.
Achievement made during the Year 2012-13 Sl. No. Name of the Scheme Achievement made during 2012-13
i. Starting /Up-gradation of Schools • Starting of new J.B School- 34 (under SSA)
• Up-gradation of J.B to S.B School-03(01 under SSA)
• Up-gradation of S.B to High School-10
• Up-gradation of High to H.S School-12
ii. Opening of Science Stream 11 iii. Infrastructural Development Works for infrastructural development of
26 HS Schools, 4 High Schools, 2 S.B Schools, 32 J.B Schools, 5 Hostels have been taken up under SPA/SCA.
-3-
iv. Sarva Shiksha Abhiyan • Enrolment of identified Out-of-School Children- 1116.
• Enrolment of Children with Special Needs (CWSN)- 3758
• 5-days Orientation Teacher Training at BRC level-15021
• One-day CRC level training-13298 • 10-day training of Resource Persons-
803 • Training to Community Leaders-
12059 • Residential Special Training for Out-
of-School Children-517 • Non-Residential Special Training for
Out-of-School Children (including Reang Migrant children)-3979
• Establishment of Hostel for Girls under KGBV programme (Dasda Block)-01
• Engagement of Block Resource Person-328
• Engagement of Cluster Resource Person-332
• Construction of Addl. Classroom-177. • Construction of Separate Girls toilet-
138 • Construction of Boys toilet- 12. • New Primary School building-04. • Store cum HM room-94
v. RMSA (i) During 2011-12, as many as 41 nos of SB Schools were up-graded to High Schools. RMSA Tripura had engaged 170 nos. of PG Teachers out of 205 posts of PGTs. All the posts could not be filled up due to non-availability of ST candidates. (ii) Against 41 up-graded schools during 2011-12, one post against each of Lab. Asst. and L.D.Clerk for the schools were proposed to be recruited. Out of 82 posts, only 69 posts could possible to be recruited. In all cases 100 Point Rosters were maintained scrupulously West South North Dhalai Total Lab. Asst. 12 06 09 06 33 L.D. Clerk 12 08 09 07
-4-
36
(i) RMSA provided Annual grant @ Rs. 50,000/- to every High & Higher Secondary Schools.
(ii) For proper monitoring and management of the RMSA programme, the RMSA Rajya Mission is being organizing training programme with the School Management and Development Committee members.
vi. MDM • Mid-Day-Meal covered for 577517 students (I to VIII)
• 10815 nos. Cook cum helpers engaged under MDM scheme. They are being paid Rs.1000/- per month for 10 months (Rs.900/- as Central share and Rs.100/- as State share).
• 564 nos. Self help groups have been engaged for running of MDM Scheme.
• 615 Kitchen sheds Sanctioned and released (Central and State share) to the All the DEO’s.
vii. IEDSS • 20 nos. Resource rooms @ Rs.2.00 lac per unit have been constructed and work for rest 1 (one) is in progress.
• Out of 30 nos. toilet with ramps, 28 nos. have already been constructed and work for rest 2 (two) are in progress (Unit cost Rs.1.50 lac).
• Initiative have been taken up to train 98 nos. secondary teachers in special education under PGPD course.
• Equipments for 20 nos. Resource rooms procured @Rs.0.70 lac per unit.
viii. State Grant-in-aid Madrasssa • Construction of 3 nos. 100 seated hostels have been taken up under SPA.
• For the 1st time 23 nos. Madarassa students have appeared in Madrassa Fazil (H.S) exam under TBSE.
• The result of Madrassa Madhyamik Exam of 2012 was about 76%.
• TBSE has prepared a new madrassa syllabus for class-I to XII.
• Barnarayan Islamia Sr. Madrassa has been up-graded to High Madrassa and
-5-
Darul Uloom Jr. Madrassa, Udaipur has been up-graded to Sr. Madrassa.
• Deptt. of Higher Education, Govt. of Tripura has been approached to introduced BA (Arabic) and Kamil (Graduate Theological course) in Govt. colleges in Tripura. Higher Education already started the process.
ix. SPQEM • Construction of 20 nos. SPQEM Madrassa building have been taken up through the various Inspector of Schools under SPA.
• Monthly honorarium of the graduate teachers working under SPQEM Madrassa has been enhanced at the rate Rs. 2000/- per month.
• Mid-Day-Meal programme has been introduced in all SPQEM Madarssas.
x. SBM • Identified total potential learners under Dhalai District- 44,773
• Engagement of volunteers-2,507 • Setting up of literacy centres- 2,710 • Distribution of basic primer- 30,000 • 1st assessment test held 17-03-2013. • Appeared learner- 20,730 • Fund received from Govt. of India-
82.21 lakhs • Fund received from State Plan-37.50
lakhs.
xi. State Adult Literacy Programme (SALP) 2nd phase
• Started on 8th September, 2012 in seven district except Dhalai district.
• Identified learners 1.02 lakhs • Engagement of Volunteers 5747. • Setting up of literacy centres- 5442 • Distribution of basic primer- 90,800 • Fund received from State Plan-113.00
lakhs. xii. Scheme for providing free text books
to the BPL students reading in Class-IX-X and XI-XII
Total Rs. 2,96,03,000/- has been provided for free text books to 52,925 nos. of students belonging BPL family reading in class-IX- X and Rs39,16,800/- has been provided to 9,792 nos. of BPL students reading in class-XI-XII for the same. Besides during 2012-13 rate of free text book has been enhanced and present rates are as follows: Class-XI Arts stream- Rs. 855/- per student.
-6-
Science stream- Rs. 1718/- per student. Commerce stream- Rs. 856/- per student. Class-XII Arts stream- Rs. 706/- per student. Science stream- Rs. 1485/- per student. Commerce stream- Rs. 645/- per student.
xiii. ICT At present computer Education in 350 High & H/S school is going on. Another 50 High & H/S School will be covered immediately. Besides G.O.I has approved another 282 High & H/S Schools for computerization. In the year 2010-11 & fund in this regard also received. The process for tender etc. are in progress. The rest uncovered Schools will be covered in faced manner & in this reference planning is going on.
Plan/programme and any project to be implemented during the Financial Year 2013-14
Sl. No.
Name of the Scheme Target 2013-14
i. Starting /Up-gradation of Schools • Setting up of 30 new JB schools. • Up-gradation of 25 JB to SB schools. • Up-gradation of 5 High to HS schools. • Setting up of 2 residential schools in 23
miles of Chawmanu Block and Santipur of Dasda Block(Vandarima).
ii. Opening of Science Stream • Opening of science stream in 10 nos.
HS School. iii. Sarva Shiksha Abhiyan • Special training for mainstreaming of
Out of School children. • School Uniform grant for SC, ST, BPL
Boys student and Girls student. • 5 days Refresher in-service teachers
training at BRC level for 9279 teachers.
• One day monthly cluster level meeting at CRC level (10 months) for 18011 resource persons.
• Refreshers residential training for all RPs, MTs, BRC & CRC faculties and
-7-
coordinators (10 days) for 779 teachers and resource persons)
• Inclusive Education for 3830 CWSN. • 3-day Non-Residential training of
Community Leaders for 22550 no. SMC members.
• Construction of 25 Primary School building.
• Construction of 697 addl. Classroom. • Construction of 183 no. separate girls
toilet. • Construction of 30 no. CWSN friendly
toilet. • Construction of 05 no. drinking water. • Construction of 81 ramp with handrail
for CWSN. • Construction of 90 handrail in existing
ramp for CWSN.
iv. RMSA (i) During 2013-14 as many as 29 SB Schools are proposed to be up-graded to High Schools subject to approval by the PAB.
(ii) For strengthening of existing 28 Govt. schools, funds have been proposed to MHRD subject to approval by the PAB.
(iii) Fund have been proposed for construction of 15 Teachers quarters subject to approval by the PAB.
(iv) Funds have also been proposed for engagement of staff for new schools subject to approval by the PAB.
(v) Proposal for construction of 5 nos. of 100 bedded Girls’ hostels in 5 EBBs has been sent to MHRD. This is also subject to approval by the PAB.
(vi) For quality interventions, funds have been sought for following items :- (a) Excursion trip for students with in
the State. (b) Study tour for students outside the
state. (c) Study tour for teachers outside the
state. (d) Science exhibition at district level. (e) Book fair at district level.
v. MDM • Mid-Day-Meal will be covered for
591669 students (I - VIII)
-8-
• 10815 nos. Cook cum helpers engaged under MDM scheme. They are being paid Rs.1000/- per month for 10 months (Rs.900/- as Central share and Rs.100/- as State share).
• 564 nos. Self help groups have been engaged for running of MDM Scheme.
• 530 units Kitchen sheds will be sanctioned during the year 2013-14.
• The GOI have been sanctioned Rs.77.05 lakhs for 1541 units Kitchen devices for Primary and Upper primary.
• The GOI have been sanctioned Rs.34.50 lakhs for LPG cylinder for using Mid-Day-Meal Programme.
vi. IEDSS • 4 nos. secondary schools would be developed into model inclusive schools in 4 districts @ Rs.50,000/- per school.
• Provision of ramps for 60 schools @ Rs.0.386 lac and 60 nos. disabled friendly toilet @Rs.1.754 lac during 2013-14.
• Recruitment 4 special educators in 4 model inclusive schools.
• Recruitment of 9 stenographers @Rs.10,000 per month. (1 at state level & 8 at district level)
• Recruitment of 1 co-ordinator at state level @Rs.20,000/- per month.
• Stipend to 971 nos. children with disability @Rs.600/- per year as per project proposal
vii. SPQEM • Filling up of 71 nos. vacant posts in
SPQEM Madrassa. • Proposal for construction of for 25 nos.
Madrasa buildings. • Proposal for bringing more privately
managed Madrasa/Muktabs of untouched area under SPQEM / Grand-in-Aid scheme.
• Complete survey of SPQEM Madrassa where there is no permanent building.
• 5-days refresher course for all existing SPQEM Madrassa teaches thorough SSA.
viii. SALP • Target has been fixed to achieve 100%
-9-
literacy in the state through State Adult Literacy Programme by 8th September, 2013.
ix. Scheme for providing free text books to the BPL students reading in Class-IX-X and XI-XII
• Supply of free textbooks to 60,000 BPL students who are reading in classes-IX & X and 27,890 BPL students reading in classes XI & XII.
x. Other Infrastructural Development • Improvement of basic infrastructure in
20 Madrassas. • Construction of 2(two) hostels for
Muslim students • Construction of 50 school buildings • Construction of 10 Inspectorate offices.
After careful examination of the Budget proposal and appreciation of
submission placed by the Principal Secretary of the Department, the Committee
makes the following recommendations:-
RECOMMENDATIONS
i) Department to formulate a Mechanism for upliftme nt of the standard of quality of teaching.
ii) School Inspector at bloc level be engaged along with its office. School Inspector be provided with the power of Teac her adjustment within his jurisdiction.
iii) Boundary wall to rest schools be completed spe cially of the road-side phase-wise and all girls’ school.
iv) Mid-day-meal cost be moderate rate and maintena nce of hygienic condition should be ensured. The wages of the Cook to be increased.
v) Night-guards be posted on priority basis in scho ols where valuables are available specially High & Higher Secondary Sch ools.
vi) Department to provide adequate necessary furnit ure in all the schools in phase manner. The Department to work out the need and obtain additional fund. The Finance Department to a llocate fund for the same.
-10-
vii) The Department to consider rendering financial assistance upto 50% to the private English medium school to extend the facility to interested students in the Bloc level. The Finance Department to effectively consider allocation of fund to fulfil t he target.
viii) S.C. & S.T. Hostels are to be maintained prop erly by the Department and for that also to supply adequate furniture, ute nsils etc. The Finance Department to release fund in all Hostels’ there should be Hostel Superintendent with Quarters and Hostels’ st udent be provided with periodical coaching. Their shall be m onthly health check-up of those students.
After examination of the Budget proposals and appreciation of
submission of the Representative of the Committee recommends the Budget
proposals under Demand No. 40 for grants by the House alongwith the
Recommendations.
( Shri Sudhan Das ) Dated,Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly
-11-
THE REPORT ON THE DEMAND NO. 39 DEPARTMENT OF THE HIGHER EDUCATION
FOR THE FINANCIAL YEAR 2013-2014.
The Budget Proposal under Demand No. 39 relates to the Higher Education Department, Government of Tripura for the Financial Year 2013-2014 and the Revised Budget for the Financial Year 2012-2013 are as follows :-
(Rs. in Lakh)
Particulars Revised Estimate
2012-2013
Budget Estimates for 2013 -14 Demand Fund for Total
T.S.P. S.C.P. a) Non-Plan 8705.00 10028.00 -- -- 10028.00 b) Plan 9257.14 2724.44 1624.18 890.68 5239.30 c) C.S.S. 3224.66 ----- ---- --- ----- d) N.E.C 145.34 ----- ---- ---- ----- Total 21332.14 12752.44 1624.18 890.68 15267.30
Now, the aforesaid Budget Proposal is under examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendation to the Demands for Grants.
The Committee in its meeting held on 4th May, 2013 examined
the Budget proposals in details having discussion with the Secretary of the Department who appeared before the Committee on summon.
First of all, the Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2012-13 and stated as follows :-
Sl. No.
Recommendations Action Taken
1.
Recruitment of faculties for the Colleges has to be completed as early as possible.
I) Altogether there are 661 sanctioned posts
of Asstt. Professors in GDCs. During 2012-13
steps were taken to fill up 132 posts through
TPSC. But only 38 persons could be recruited.
There are 92 posts of Asstt. Professors in
reserved category, for
which the Department has processed proposal
to dereserve posts and fill up vacancies of
-12-
teachers for some of the major subjects for
which SC/ST candidates are not available.
II) Appointment of Principal in IASE has been
made & for recruitment to the vacant posts of
Asstt. Professor in IASE, TPSC has been moved.
III) Action has already been taken for filling up
the vacant posts of Principal, and 6(six) nos. of
Asstt. Professors at S.D. Barman Govt. Music
College.
IV) Proposal initiated for direct recruitment of
Principal Govt. Art College. For the vacant 2(two)
nos. of Asstt. Professors falling in reserved
category, no suitable candidate could be found by
TPSC.
V) Out of 3(three) vacant posts of Asstt. Professor
for Govt. Law College, only one person could be
selected and appointed.
VI) For filling up 4(four) posts of diploma level
Technical Institutions, 3(three) posts could be
filled up.
2. M.Tech. course in TIT to be introduced in phased manner.
The Degree level programme of TIT was started
initially by utilising the building of Polytechnic
Institute at Narsingarh. For starting Degree
Engineering College, two project proposals were
submitted to the Ministry of DONER. (Phase –I at
an estimated cost of Rs. 9.60 crores and Phase- II
costing Rs.118.00 crores). On completion of one
building under 1st phase, 2(two) Branches of
Degree Engineering have been accommodated.
Funds for phase II projects has not yet been
sanctioned by DONER, Ministry. However, State
Govt has released fund in advance. Phase –II
construction work has been entrusted to NBCC
Ltd. This apart, it will also be necessary to fill up
the sanctioned posts in the rank of Professor and
-13-
Asstt. Professor through TPSC. TPSC was moved
for selection of candidates for filling up 4(four)
posts of Professor. TPSC has informed that no
eligible candidate for the above post has applied.
In view of non-availability of suitable candidate as
well as infrastructure, M. Tech. course could not
be introduced. However, the Department would
continue its efforts to start M. Tech course as
soon as basic requirements are met.
Achievements made during the year 2012-13.
In the Budget 2012-13 provisions was made for Rs.4321.03 lakhs
under Plan in Demand No.39 / 19 / 20. The table below will indicate the
provisions proposed in R.E. 2012-13 corresponding to provisions to B.E. 2012-
13.
(Rs. in lakhs)
Demand No Particulars B.E. 2012-13 R.E.2012-13 (Proposed)
39
A. STATE PLAN
DIVISIBLE POOL 1322.00 1369.88
A. Salary 100.00 118.86
B. Non-Salary 1222.00 1251.02
Of which -
i. Supplies & Materials 50.00 110.00
ii. Electricity Charges 10.00 10.00
iii. State Share / State Contribution 1000.00 740.05
iv. Scholarship / Stipend 110.00 110.00
v. Major Works 113.10
vi. Minor Works 10.00 10.00
vii. Govt. Museum 11.00
8.87
-14-
viii. Land acquisition
ix. RRRLF / Societies 18.00
x. Others 42.00 120.00
NON-DIVISIBLE POOL
Of which -
i. TFC 2558.00 3610.95
ii. ACA 624.73
iii. SPA 1.00 2857.58
iv. SCA 1.00 794.00
Total (Div + Non-Div) 3882.00 9257.14
CSS 100.00 1608.00
NLCPR 170.00 1616.66
NEC 169.03 145.34
Grand Total: 4321.03 12627.14
The Finance Department released during 2012-13 (upto March
2013) Rs.5329.26 lakhs against State Plan Budget Provision of Rs.4221.03
lakhs. In addition another Rs.3370.00 lakhs has been released upto March 2013
against CSS / NLCPR / NEC projects. The amounts released does not however
includes the fund for Salary Components.
The fund released by Fin. Deptt. Against approved on-going State funded
[projects has been placed with the Implementing Agencies for execution of
the projects. Fund allocated to implementing agencies against approved on-
going Plan Projects are indicated below:
Sl No
Funding Source
Budget Provision
Fund released by F.D.
Fund placed with Agencies
Remarks
1 TFC 2558.00 1052.95 1052.95
2 ACA 0.00 624.73 624.73
3 SPA 1.00 2857.58 2857.16
4 SCA 1.00 794.00 794.00
5 CSS 100.00 1608.00 1608.00
6 NLCPR 170.00 1616.66 1616.66
7 NEC 169.03 145.34 145.34
Total: 2999.03 8699.26 8698.84
-15-
MAJOR ACHIEVEMENTS AND INITIATIVES OF THE HIGHER EDUCATION DEPARTMENT
� To provide higher education facility to the student of rural and hilly areas
of the State, six new General Degree Colleges at Mohanpur, Bishalgarh, Shantirbazar, Longtrai Valley, Kanchanpur and Teliamura have been set up during the academic session 2012-13.
� As a measure of implementation of Ten Years Perspective Plan the existing General Degree Colleges have been strengthened by construction of new academic and administrative buildings.
� Existing facilities in IASE and Govt. Law College under expansion in
order to augment intake capacity along with others modern facilities.
� A College for Teachers’ Education at Kumarghat is being set up to start classes from next academic session.
� 3 (three) Polytechnics at Fulkumari in Udaipur, Bagbassa in
Dharmanagar & Khumulwng in TTAADC area are in process of setting up to enhance the scope of technical education in uncovered Districts. Polytechnic at Udaipur would be started from next academic session..
� Construction of one new academic block in Tripura Institute of
Technology, Narsingarh has been completed. Phase-II construction work also started.
� Construction of new buildings for District Library at Dhalai and public
library at Chhailengta taken up. � Nineteen General Degree Colleges have been covered under NMEICT
Scheme for developing SMART Classes. � Setting up Indian Institute of Information Technology (IIIT) at Agartala
under PPP mode has been approved by the Govt. of India.
� Steps have been taken to modernize the Science laboratories in the
colleges under funding from NEC.
� Efforts are on to set up the State Museum at Ujjayanta Palace and also to make the Palace a significant tourist spot of art & culture of North East India. State Archive will also be shifted to the Palace complex.
The Plan / programme and any projects to be implemented during the year 2013-14 for consideration of the Committee during examination
During 2013-14 the following activities are targeted:- � Operationalisation of new Polytechnic at Udaipur and Bagbassa
-16-
� Taking up construction of IIIT at Bodhjungnagar
� Operationalisation of new building of Govt. Law College, B.Ed. College at Agartala and College of Teachers’ Education at Kumarghat
� Setting up of another 2 College of Teachers Education at
Santirbazar and Khowai � Setting up of separate Science College in the vacant Old Central
Jail Premises � Improvement of academic activities of Colleges by augmentation of
faculty strength and providing academic infrastructure
To achieve the above goal following provisions are proposed in the B.E. 2013-14 under Plan in Demand No. 39 / 19 / 20.
Demand No
Particulars R.E. 2012-13 B.E. 2013-14 (Proposed)
39
A. STATE PLAN
DIVISIBLE POOL 1369.88 1380.00
A. Salary 118.86 133.00
B. Non-Salary 1251.02 1247.00
Of which -
i. Supplies & Materials 110.00 150.00
ii. Electricity Charges 10.00 12.00
iii. State Share / State Contribution
740.05 850.00
iv. Scholarship / Stipend 110.00 110.00
v. Major Works 113.10
vi. Minor Works 10.00 10.00
vii. Govt. Museum 11.00 40.00
viii. Land acquisition 8.87
ix. RRRLF / Societies 18.00 25.00
x. Others 120.00 50.00
NON-DIVISIBLE POOL
Of which -
i. TFC 3610.95 2644.00
ii. ACA 624.73 1.00
iii. SPA 2857.58 1212.30
iv. SCA 794.00 2.00
Total (Div + Non-Div) 9257.14 5239.30
CSS 1608.00
NLCPR 1616.66
NEC 145.34
Grand Total: 12627.14 5239.30
-17-
The Plan / programme and any project to be implemented during the year 2012-13 for consideration of the
Committee during examination.
During 2012-13 the following activities are targeted :-
1. Operationalisation of six new general degree colleges at Mohanpur, Bishalgarh, Santirbazar, Kanchanpur, LT Vally & Teliamura and Polytechnic at Udaipur
2. Increasing intake capacity of existing colleges by opening of under construction academic building to improve GER
3. Taking up construction of Tripura Institute of Technology Phase-II on availability of sanction from DoNER and receipt of fund
4. Recruitment of faculty in both general degree colleges and technical institutions for augmentation of faculty strength matching with growing student strength
To achieve the above goal following provisions are proposed in the B.E. 2012-13 under Plan in Demand No.39 / 19 / 20.
(Rs. in lakhs)
Demand No.
Particulars R.E. 2011-12
(Proposed)
B.E. 2012-13
(Proposed)
A. STATE PLAN 39 Divisible Pool 769.96 1322.00
39 A. Salary 87.00 100.00
39 B. Non Salary 682.96 1222.00
39 Of which
39 i. Supplies & materials 45.00 50.00
39 ii. Electricity charges 12.50 10.00
39 iii. State Share / State Contribution 411.60 1000.00
39 iv. Scholarship / Stipend 109.00 110.00
39 v. Major Works 29.06 0.00
39 vi. Minor works 35.00 10.00
39 vii. Others 40.80 42.00
39
39 Non-Divisible Pool 8113.92 2560.00
39 Of which
39 i. TFC 3260.00 2558.00
39 ii. ACA 1801.80 0.00
39 iii. SPA 2049.12 1.00
39 iv. SCA 1003.00 1.00
39
39 Total (Div + Non -Div) 8883.88 3882.00
39
39 CSS 1707.50 100.00
39 NLCPR 2934.72 170.00
39 NEC 169.03 169.03
39 Grand Total: 13695.13 4321.03
-18-
After careful examination of the Budget proposal and
appreciation of submission placed by the Secretary of the Department, the
Committee make the following recommendations :-
RECOMMENDATIONS
i) Infrastructural facilities of College education has to be developed and for that the Finance Department to allocate ade quate fund, where necessary.
ii) In Sub-Divisional level quarters for Principal, Assistant Professors are to be constructed in phased manner. Similarly, College Hostels are also to be provided in those Co lleges.
iii) The Department to make another endeavour first to fill-up the sanctioned posts of Assistant Professor from amongs t the S.C.& S.T. candidates, if not found may go for dereservat ion.
After examination of the Budget proposals and appreciation of
submission of the Representative of the Committee recommends the Budget
proposals under Demand No.39 for grants by the House alongwith the
Recommendations.
( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly
-19-
THE REPORT ON THE DEMAND NO.14 OF THE POWER DEPARTMENT FOR
THE FINANCIAL YEAR 2013-14.
The Budget Proposal under Demand No.14 relates to Power
Department, Govt. of Tripura for the Financial Year 2013 – 2014 and the revised
Budget for the Financial Year 2012 -2013 are as follows :-
( Rs. in Lakh ) PARTICULARS
REVISED
ESTIMATES 2012 - 2013
BUDGET ESTIMATES FOR 2013 - 2014 DEMAND FUND FOR
TOTAL
T.S.P S.C.P 1) Non Plan 4118.21 4330.50 -- -- 4330.50 2) Plan 8111.10 1020.52 310.31 170.17 1501.00 3) C.S.S 1500.00 1000.00 500.00 500.00 2000.00 4) NEC 1500.00 1000.00 500.00 500.00 2000.00
Total 15229.31 7351.02 1310.31 1170.17 9831.50
Now, the aforesaid Budget Proposal is under examination of the
Subject Committee-I of the Tripura Legislative Assembly for recommendation to
the House for Grants.
The Committee in its meeting held on 4th May, 2013 examined the
Budget Proposals in details having discussion with the Secretary of the
Department who appeared on the part of the Department on summon.
First of all, the Secretary informed the Committee about the action
taken in respect of the recommendations made by the Committee during the
year 2012-13 and stated as follows :-
-20-
RECOMMENDATIONS
Sl.
No
Relevant
Para No. /
Page No.
of the
report
Recommendations of
the Committee
Implementation /
action taken on the recommendations
1 2 3 4
1 Page - 48
Para - (i)
TSECL to take up
with PGCIL to
complete the work
of earlier, West &
South by 30th June.
TSECL is continuously pursuing and
taking review meeting with PGCIL to
expedite implementation of RGGVY
Project Works in erstwhile West &
South District and 90% (approx)
works of these project have already
been completed as on 31-3-2013.
Details of progress is given in the table
below:
Item Target Achievement % of achievement
electrified Village
33 33 100%
Electrified Village
492 458 93.09%
33/11 KV sub-station (Nos.)
3 3 100%
33 KV Line (Km)
36.62 36.62 100%
11 KV Line (Km)
510 326.24 63.97%
11/0.4 KV DT (Nos.)
1170 976 83.42%
LT Line (Km) 1090.65 806.47 73.94%
service connection
(Nos.)
65703 60967 92.79%
2 Page - 48
Para - (ii)
Finance
Department to give
plan support to
completed the
Rukhia 21 MW new
power project.
TSECL proposed for sanction of fund for an
amount of Rs. 85 Crores for construction of
additional unit of 21 MW new Power Project
at Rokhia. In the year 2010-11 an amount of
Rs.9.85 Cr. was received and in the year 2012-
13 an amount of Rs.28.39 Cr. was received
under SPA. Out of the above fund of Rs.38.24
Cr. expenditure for an amount of Rs.24.05 Cr.
has already been incurred and U.C. also
submitted. Balance fund of Rs.14.19 Cr. is
received in the last part of March–2013
expenditure of which has already been
incurred. Proposal has been initiated to the
State Government for release of balance fund
-21-
Rs.46.76 Cr. which will be required for
completion of the project. It is expected that
the project will be completed by July-2013.
3 Page - 48
Para - (iii)
To give allotment of
Non-Plan budget
allocation to meet
up the subsidy to
common consumer.
Rs.40.00 (Forty) Crores has been received
during the year 2012-13 and after adjusting
the above subsidy, the tariff was determined
as per Tariff Order of the Tripura Electricity
Regulatory Commission.
4 Page - 48
Para - (iv)
To provide budget
allotment for
extension work in
the uncovered area.
Under the scheme SPA Rs.22.50 Cr. was
received during the FY 2012-13 and an
amount of Rs.11.25 Cr. has already been spent
and U.C. also submitted. Expenditure of
balance Rs.11.25 Cr. also been incurred and
UC will be submitted shortly.
Achievements during 2012-13.
Sl. No. Name of work Present Status
1 Construction of 1 X 21 MW GTG Unit at Rokhia under SPA Scheme.
Construction works of 1 X 21 MW GTG Unit at Rokhia
(Unit No. IX), funded by State Government is in
advance stage and expected to be completed during
July – 2013.
Transmission Schemes
Rs. In lakh.
Sl.
No
Name of
scheme/works
Sanctioned
Cost
Release of
fund by FD,
(up to 31st
March'2013)
UC issued up
to
31/03/2013
Remarks
A NLCPR 1 Transmission
project (Phase - I):
400 KV S/Stn. At
Surjamaninagar (to
be charged at 132
KV level) &
infrastructure
development , West
Tripura.
7995.79 2878.48 2878.48
Ist phase (132
KV & 33 KV)
completion by
Sept`2013.
2 Transmission
project (Phase - I):
Construction of 132
Kv D/C
Transmission line
from
Surjamaninagar to
950-81 342.28 342.28
Stringing in
progress and
expected to be
completed by
Aug”13.
(1)
-22-
79 Tilla Grid Sub
station.
3 Transmission
project (Phase - I):
Construction of 132
KV D/C
Transmission line
from
Surjamaninagar to
Budhjungnagar Sub
station.
738.53 265.87 265.87
Line charged
on 12.09.2012.
4 Transmission
project (Phase - I)
132 KV D/C line
from
Surjamaninagar to
Rokhia(30 KM and
site development
and Fdr. Bay at
Rokhia) in Tripura.
1261.00 453.96 0.00
Tender
evaluation in
progress.
5 Augmentation of
P.K. Bari Sub station
with 132 KV bay for
termination of 400
KV line.
400.59 144.21 0.00
DNIT under
process
Sl.
No
Name of
scheme/works Sanctioned
Cost
Release of
fund by FD,
(upto 31st
March'2013)
Expenditure
upto 31st
March'13
Remarks
B. SPA 1 Construction of 132 KV
D/C Transmission line
from Surjamaninagar to
Monarchak.
2803.00 2522.7 0.00
Work in
progress and
scheduled for
commissionin
g in June’14
(10 Km will
be completed
by July’13 for
evacuation of
power from
Monarchak
project)
2 Construction of 132 KV
D/C Transmission line
from Monarchak to
Rabindranagar Sub
station.
371.00 333.9 0.00
Work in
progress and
scheduled for
commissionin
g in June’13
-23-
3 Installation of 21 MW
GTG set at Rokhia (Unit
- IX).
8500.00 2405.06 4697.00
Erection of
main
equipments
started and
scheduled for
commissionin
g by Aug’13.
Sl.
No
Name of
scheme/w
orks
Year of
sanction
Approved
cost
Present
agreement
value
Release of
1st
installment
Actual fund
received by
TSECL
Expen
diture
upto
31st
March'
13.
Present
status
C NEC 1 Augment
ation of
sub
station
capacity
by
addition
of
1x20/25
MVA,
132/33
KV
Transfor
mer
along
with
associate
d civil
works at
Ambassa
, Dhalai
District,
Tripura.
2011-
12 442.00
321.31 (Phase - I)
150.00 150.00 55.00
Phase -
I:-All
the
materia
ls
reached
at site.
Equipm
ent
foundat
ion and
erectio
n works
are in
progres
s..
Phase -
II:-
DNIT
for Site
develop
ment
for
another
bay and
replace
ment of
some
old
breaker
s are in
progres
s.
Sl.
No
Name of
scheme/
works
Year
of
sancti-
on
Approved
cost
Present
agreement
value
Release
of 1st
installme
nt
Actual
fund
received
by TSECL
Expendit
ure upto
31st
March'13
Present
status
-24-
NEC 2 Augme
ntation
of sub
station
capacit
y by
additio
n of
1x20/2
5 MVA,
132/33
KV
Transfo
rmer
along
with
associat
ed civil
works
at
Mission
Tilla,
Dharma
nagar,N
orth
Tripura.
2011-12 382.42 287.42
(Phase - I) 110.00 0.00 0.00
Phase - I:-
All the
materials(ex
cept 132 KV
33 KV
Control &
Relay panel)
reached at
site.
Equipment
foundation
works are in
progress.Ph
ase - II:-
DNIT for Site
developmen
t works and
other left
out
materials
are in
progress..
3 Augme
ntation
by
additio
n of 15
MVA,
132/11
KV
Transfo
rmer
along
with
associat
ed
equipm
ents
and
civil
works
at
Udaipur
132 KV
sub
station,
South
Tripura.
2011
-12 360.98
263.68 (Phase - I)
130.00 130.00 40.00
Phase - I:-
Major
equipments
(except 132
KV Control &
Relay Panel,
Breaker)
reached at
site.
Transformer
reached at
site.
Equipment
foundation
and erection
works are in
progress.
Phase- II :-
DNIT fot site
devolopmen
t and
extension of
control
room
building are
in progress.
Sl.
N
o
Name of
scheme/
works
Year of
sanction
Approv
ed cost
Present
agreemen
t value
Rele
ase
of
1st
inst
allm
ent
Actual
fund
received
by TSECL
Expenditur
e upto 31st
March'13.
Present
status
NEC
4 Construction
of 132 KV
Single Circuit
line from
Ambassa, 132
KV SS to 33
KV SS at
Gandacherra
2012-13 1207 1087.61 - - -
(i).
Survey
complet
ed (ii).
Out of
147
nos.
tower
(line
length
44.91
Km),
tower
foundat
ion
casted
54 nos.
in non-
forest
land.
(iii)
Work is
present
ly held
up for
forest
clearan
ce
3. RGGVY
4 nos. projects under RGGVY were sanctioned by MOP, Govt. of
India for electrification of un-electrified villages, partially electrified villages
having population above 100 nos. Out of these 4 projects, 2 projects are
implemented by TSECL and other 2 by PGCIL. Again out of 4 projects, 1
project namely Dhalai was sanctioned in 10th Plan & other 3 were sanctioned
in 11th Plan. But with these sanction amount, only 40% electrification in
uncovered areas is possible. So, for electrification of balance portion of
uncovered areas, it is planned to cover under XII plan of RGGVY scheme.
-26-
In this respect, a new guideline for XII plan of RGGVY scheme is expected to
be published shortly by MOP, Govt. of India.
For 100% coverage of rural electrification, action will be taken
after issuance of new guideline for XII plan RGGVY by MOP, Govt. of India. As
per proposed draft guideline 12th Plan RGGVY will be considered on
habitations having population 50 and above and therefore the remaining
habitation (Below population 50) will be proposed for electrification under
non-conventional source.
An outlay of Rs.50.00 Crores (as matching loan) has been proposed for
works under RGGVY during Annual Plan (2013-14). Total present project
sanction cost for RGGVY project is Rs.197.29 Crores, fund received Rs.172.15
Crores and expenditure incurred Rs.153.10 crore. Progress of works under
RGGVY Scheme upto March – 2013 is given in under mentioned table
RGGVY Target & Achievement :
Item Target Achievement
during
2012-13
Achievement
up to March -
2013
66/11 KV sub-station
(Nos.)
2 2 2
66 KV Transmission Line
(Km)
3.9 3.9 3.9
33/11 KV sub-station
(Nos.)
6 4 5
33 KV Line (Km)
126.62 24.52 69.22
11 KV Line (Km)
1091.13 251.49 804.96
11/0.4 KV DT (Nos.)
1889 425 1593
LT Line (Km)
1896.06 482.80 1682.42
-27-
BPL service connection
(Nos.)
1,09,180 18,675 99,031
Status of Hamlet Electrification under RGGVY Scheme : 1. No. of total Hamlet = 9064 nos. 2. Hamlet Electrified through RGGVY Scheme
(up to March – 2013) = 790 nos. 3. No. of total Electrified Hamlet (as on 31.03.2013) = 7571 nos.
Budgeted Programme during 2012-13 Rs. in Cr. for above works.
Rs. In Cr.
Revised Estimate Fund Received
2012-13 2012-13
1. Plan (incl. SPA) � 81.11
71.00
2. NLCPR � 15.00
04.54
3. NEC � 15.00
00.00
Total � 111.11
75.55
-28-
Draft Annual Plan 2013-14 (Proposed)
Sl.
No.
Name of the scheme
/works
Annual Plan
2013-14
I Generation
A Hydel Generation
Renovation and
Modernasition of 3X5
MW GHEP (Life Extn.
Scheme)
200.00
Total of Hydel
Generation (A)
200.00
B Gas Thermal
Generation
1 Installation of 1X21
MW GT set at Rokhia
4,350.00
2 Combine Cycle
Project at Rokhia
100.00
Total of Gas Thermal
Generation (B)
4,450.00
C Diesel Generation
Capital Maintanenace
of DG Set at Agartala,
Udaipur, Ambassa,
Kailashahar,
Dharmanagar,
Belonia and
Subroom.
100.00
Total of Diesel
Generation (C)
100.00
Total of Generation
(A+B+C)
4,750.00
II Transmission &
Distribution
Scheme
A. Transmission
Sl.
No
Name of work CKT Km
i) 132 / 400 KV
Transmission Line
(In Km)
1 Surjamaninagar-
Rokhia
Double 23 600.00
-29-
2 LILO of P.K. Bari-
Ambassa at Manu
Double 4 200.00
3 Surjamaninagar-
Udaipur
Single 40
4 Kailasahar-
Dharmanagar
Double 22.5 1,223.50
5 Rokhia-
Rabindranagar
Double 25 300.00
6 Udaipur-Bagafa Double 28
7 Bagafa-Belonia Double 15
8 Rabindranagar-
Belonia
Double 40
9 Belonia-Sabroom
132 KV charged at 66
KV
42 1,692.00
10 Grid - Gumti via
Baramura 66 KV
Single 110 100.00
11 Re-strengthening 66
S/C Line from Grid to
Rabindranagar via
Badharghat
Single 55 100.00
12 Suryamaninagar - Udaipur
132 KV
Double 40
ii) 400/132/66 KV Sub
station
Voltage level Capacity
(MVA)
1 Rabindranagar Sub-stn 132
KV (on-going)
132/33 2x50 1,974.00
132/66 2x50
400/132/66 KV Sub
station
Voltage level Capacity
(MVA)
2 Udaipur 132/33 2x25 1,000.00
3 Manu 132/33 &
132/11
1x15 500.00
4 S/S Augmentation &
transformer replacement
a Kailashahar (Gournagar) 132/33 1x12.5
132/11 1x7.5
b Dhalabil (khowai) 132/33 1x20/25
-30-
c Mission Tilla
(Dharmanagar)
132/33 1x25
132/11 1x15
d Kamalpur 132/11 1x10
200.00 132/33 1x15
e Belonia 132/66 1x30
500.00 132/33 2x25
132/11 2x10
f Tepania (Udaipur) 66/11 2x10
g Bishramganj 66/11 2x10 299.00
h Jatanbari 66/11 &
66/33
2x10 200.00
i Tirthamukh 66/33 1x15 471.00
j Gakul Nagar 66/33 1x10
k Gamai Tilla 132/11 1x12.5/15 200.00
l Sabroom 66/11 1x10 200.00
m Ambassa 132/11 1x20/25
n System Automation 1,500.00
Total of Transmission 11,259.50
B Distridution Scheme
a 33/11 KV Sub-stn (380.6
MVA)
2,200.00
b 33 KV Line (855 KM)
c Renovation of AAAC/ACSR
conductor in 11 KV Line
with Arial Bunch Conductor
(ABC) within Kailashahar,
Udaipur, Agartala,
Dharmanagar, and Ambassa
Sub-Divn. Installation and
commissioning of 33/11 KV
GIS Sub-stn. within selected
pilot project area
1,000.00
Total of Distridution 3,200.00
Total of Transmission &
Distribution
14,459.50
-31-
III General
Human resource and IT
Management
225.00
Total of General 225.00
Grand Total 19,434.50
Additional new Projects proposed to be implemented during Annual
Plan 2012-13 & 12th 5 Yr. Plan 2012-17 (World Bank/NEC/SPA/NLCPR)
Transmission Scheme
Transmission
1 Surjamaninagar-Badharghat Double 8 265.00
2 Surjamaninagar to P.K. Bari
(400 KV)
Double 150 100.00
3 Bodhjungnagar-Jirania Single 18 400.00
4 LILO of Agartala-Khowai at
Hezamara
Double 5 255.00
400/132/66 KV Sub station
1 Surjamaninagar & Kumarghat
Sub-stn 400 KV (on-going)
400/132 3X100 200.00
2 Bodhjungnagar 132/33 2x25 880.00
3 S/S Augmentation &
transformer replacement
a 79 Tilla (Agartala) incl.
Augmentation of all 33 KV bays
132/33 2x25
200.00 132/11 1x15
b Badharghat 132/66, 1x20
200.00 132/11 2x10
c Jirania 132/33 2x25
300.00 132/11 1x10
d Hezamara 132/33 2x12.5
500.00 132/11 2x10
e Bagafa 132/33 2x25
500.00 132/66 1x30
132/11 2x10
(9)
-32-
f S/S Augmentation Udaipur 132/66 1x30 200.00
Total 4000.00
Information related to Flagship Programmes during
Annual Plan 2013-14
Sl.
No.
Name of the scheme /works
I. Rural electrification 5000.00
a) Under RGGVY Programme
Electrification work in un-electrified
and electrified Villages
11 KV Line
L.T. Line
11/0.43 KV Sub-station
33 KV Line
33/11 KV Sub-station
b) R-APDRP
Metering of Power Transformer, DT
meter and consumer meter
5000.00
Total of Flagship Programmes 10000.00
3. T & D Losses:-
Feeder metering of electrical energy upto the level of 11 KV in the
entire State have been completed. Most of the consumers have been provided
with functioning energy meters. However, 79,396 Nos. of defective meters
have been reported as on 31-3-2012. Defective meters are being replaced in a
continuous process.
All the Kutirjyoti connections are gradually being metered for proper
energy accounting. Out of 61,028 nos. of Kutirjyoti connection, 27,841 nos.
have already been provided with energy meters. All new connections
-33-
including special drive connections to BPL families are now being
extended with meters.
Computerized Energy Billing System has already been undertaken in
the State. This system shall provide information with regard to the total
energy sold to consumers total energy billed and total energy for which
Utility has been paid for. This system when fully operationalized shall identify
the commercial loss for non-billing and non-realization of billed amounts. In
this State out of a total consumers strength of 5.30 Lakh we have already
covered 5.15 lacs in the Computerized Energy Billing System.
In order to reduce the technical loss the following actions have been
taken :-
210 KM of 132 KV lines have been reconductored.
8 Nos. 33/11 KV new Sub-Stations have been commissioned under
APDRP.
821 Nos. of 11/’4 KV Distribution Sub-Station have been set up under
APDRP.
2759 Nos. Distribution Transformer Meters for transformer capacity
100 KVA and above have been installed.
Vigilance Wing of the Corporation is conducting raids throughout the
State for bringing into book the miscreants who indulge theft of electricity by
hooking and/or bypassing the energy meters. 1716 Nos. raids have been
conducted in the year 2011-12 and 29 Nos. F.I.Rs have been lodged. The State
Government has already set up 8 Nos. Special Courts for trying offences under
the Electricity Act, 2003.
In Tripura the T&D losses are gradually has come down as under:
2005-06 - 41.45%
2006-07 - 36.69%
2007-08 - 36.08%
2008-09 - 34.94%
2009-10 - 32.69%
2010-11 - 30.44%
2011-12 - 29.73%
2012-13 - 31.58%
-34-
TSECL proposes to reduce AT&C losses to 22% by end of twelfth Plan
period
The T&D losses along with commercial losses collectively known as
AT&C losses.
In order to reduce the technical loss the following actions have been
taken:
• 210 KM of 132 KV lines have been re-conductored.
• 8 Nos.33/11KV new Sub-Stations have been commissioned under APDRP.
• 821Nos. of 11/0.4 KV Distribution Sub-Station have been set up under
APDRP
• 2759 Nos. Distribution Transformer Meters for transformers of capacity
63 KVA and above have been installed.
• Ministry of Power, Govt. Of India sanctioned project areas covering 10,000
populations under R-APDRP aiming to achieve AT&C losses to 15%. The
DPR under Part-A of R-APDRP at a cost of Rs.35.19 Cr. has been sanctioned
and implementation of boundary metering / ring-fencing of project areas
are in progress in order to finalise base line data (AT&C loss). The
preparation of DPR under Part-B for strengthening of regular distribution
system has been submitted to PFC/MOP, GOI. Recently, 12 out of 16 Nos.
DPR have been sanctioned by the R-APDRP Steering Committee at a cost of
148.26 Cr. Balance 4 DPRs are expected to get sanction from the MOP, GOI
shortly. After investment for Part-B, the AT&C loss level would be reduced
to meet set the target.
• Vigilance Wing of the Corporation is conducting raids
throughout the State for bringing into book the miscreants who indulge in
theft of electricity by hooking and/or by passing the energy meters. 1,453
Nos. Raids have been conducted in the year 2010-11 and 41 Nos. FIRs has
been lodged. The State Government has already set up 8 Nos. Special
Courts for trying offences under the Electricity Act, 2003.
-35-
After careful examination of the Budget proposal and appreciation
of submission placed by the Secretary of the Department, the Committee make
the following recommendations :-
RECOMMENDATIONS
(i) The Department to complete construction of addi tional unit of 21 MW new power project at Rokhia. For that the Finance Department to allocate the rest fund immediately.
(ii) The Department to take effective step for furn ishing monthly consumption bills to consumers at due time regularl y.
(iii) The Department to ensure the check of power s tealing & unauthorised use of electricity.
(iv) Call-center and section office to be increased so that calls can be promptly attended. For that computerised bil ling and complaint system has to be introduced. The Departme nt to take step for increase of staff strength in the sec tion office and call center.
After examination of the Budget proposals and appreciation of submission of the Representative of the Committee recommends the Budget proposals under Demand No. 14 for grants by the House alongwith the Recommendations.
( Shri Sudhan Das ) Chairman
Subject Committee – I Tripura Legislative Assembly
Dated, Agartala,
the 10th May, 2013.
-36-
THE REPORT ON THE DEMAND NO. 11 OF THE TRANSPORT DEPARTMENT FOR THE FINANCIAL YEAR 2013-14.
The Budget Proposal under Demand No.11 relates to the Transport Department, Government of Tripura for the Financial Year 2013-2014 and the Revised Budget for the Financial Year 2012-2013 are as follows :- (Rs. in lakh)
Particulars Revised Estimate 2012-2013
Budget Estimates for 2013 -2014 Demand Fund for Total
T.S.P. S.C.P. a) Non-Plan 1908.70 1553.00 --- ---- 1553.00 b) Plan 1046.37 174.81 67.43 36.01 278.25 c) C.S.S 663.16 0.52 0.31 0.17 1.00 d) NEC 165.80 52.00 31.00 17.00 100.00 Total 3784.03 1780.33 98.74 53.18 1932.25
Now, the aforesaid Budget proposal is under examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendation to the Demands for Grants.
The Committee in its meeting held on 6th May, 2013 examined the Budget proposals in details having discussion with the Principal Secretary of the Department who appeared before the Committee on summon.
First of all, the Principal Secretary informed the Committee about the
action taken in respect of the recommendations made by the Committee during the year 2012-13 and stated as follows :-
Sl. No.
Recommendation of Subject Committee
Action taken by the Department
i) The earlier recommendation for City Bus stands good adding one Madhupur to Nagerjala via Ishanchandra Nagar.
i) TUTCL has been operating 53 buses in 8 scheduled routes. Due to shortage of bus it has not been possible to introduce service in the new route i.e. Madhupur to Nagerjala via Ishanchandra Nagar for the moment.
ii) The Department to take necessary step for conversion of vehicle to CNG giving emphasize to Government vehicle to make compulsory CNG to new Government vehicles also by giving preference on the CNG
ii) Finance Department has been requested to issue instruction to all Government Departments for purchasing CNG run vehicles while giving permission for purchase of new vehicles. All heads of Department have also been requested to convert their existing petrol run vehicles
-37-
vehicles on hiring. into CNG particularly those which are plying within West Tripura District. There are only 4 CNG refilling centres in the State. With the setting up of more new CNG refilling centres, emphasis will be given on hiring and purchase of CNG run vehicles.
iii) The Department to continue its persuasion towards Lay-Bye with PWD and BRO.
iii) Chief engineer PWD (R&B) informed that the land is available to construct the proposed Lay Bye in both the locations i.e., R.K.Nagar and near Don Bosco School, Nandannagar. The anticipated cost for setting up of the Lay Bye at R.K. Nagar would be around Rs. 90 lakhs. Estimate is under preparation. The estimated cost for setting up of another Lay Bye near Don Bosco School, Nandannagar is Rs.36.14 lakhs and tender for the work is being called.
iv)
Conduct survey for setting up Motor Stands to be taken up. Finance Department to consider release of adequate fund for the same specially for developing the existing Motor Stands. In this respect, MNREGA / BADP schemes can be used by DMs involving Transport Department. Finance Department to consider release of fund for land acquisition for the Motor Stand.
iv) Survey on motor stand is being conducted and compilation of final report is under process. In fact, various Departments like UDD, RDD and Transport Department have taken up construction of various motor stands in the State. Proposals for developing of existing Motor Stands and proposals for land acquisition in connection with setting up of new Motor Stands in the uncovered areas are being submitted to Finance Department for release of fund. Finance Department has been releasing fund within their available resources under State Plan. The Department has taken initiative to set up some new motor stands especially at Rupaichari, Kakraban, Baikhora, Jolaibari, Kalacherra and Mirza with the fund available with DM & Collectors under MGNREGA, BADP and other schemes.
v)
The Department to take appropriate action to those Car/Auto owners/Drivers demanding abnormal fare, mainly after evening time.
v) Enforcement drives are undertaken on regular basis especially at evening times to curb the trend of demanding abnormal fare by the drivers/owners. Actions are taken against the errant vehicle owners/drivers by imposing penalty under the existing provisions of M.V.Act & Rules jointly by SP(Traffic) and JTC.
-38-
vi) The Department to take up seriously towards control of speed of vehicles, specially light passenger vehicles, if necessary rule may be framed.
vi) Traffic wing of Police Department has been checking speed of vehicles by using radar gun at various locations. Motor Vehicle Inspectors are also conducting raids against the vehicles plying by violating prescribed speed limits. Spot fines are realized and prosecution reports are submitted against the vehicle owners/drivers who exceed the speed limit. However, campaign against the vehicles running beyond speed limit will be more effective with availability of such instruments like radar gun in adequate number. MoRTH has been requested to supply such instruments adequately to make the campaign more effective. ii) Displaying of speed limit boards by the side of national highway and state roads has been emphasized. iii) Awareness / counseling camps are organized in all the motor stands, higher secondary schools & colleges in addition to District and Sub-Divisional headquarters to disseminate awareness of the hazards related to over speeding of vehicles.
vii)
It is recommended that new permit be issued to the owners of vehicle out side Agartala Municipal area and also to issue permit to all new Sub-Divisions & Blocks as well as new roads constructed recently.
vii) STA has been issuing route permit in accordance with the recommendations given by the Subject Committee and emphasis is given to issue route permits with a view to connecting Sub-Divisions, Blocks and newly constructed roads.
viii)
PWD be persuaded for measured speed-breakers and also to avoid unnecessary speed-breaker mainly in the National Highways and State Highways.
viii) PWD(R & B) informed that Superintending Engineers (PWD) have constructed speed breakers on demand from local people on the PWD roads. PWD(R & B) further informed that other unspecified speed breakers have been removed from various locations of PWD roads and State roads. No specific information has been received from BRTF in this regard.
-39-
MAJOR ACHIEVEMENTS DURING THE YEAR 2012-13
•••• Construction work of Motor Stand in Dharmanagar is going on in full swing and it is expected to become operational by August, 2013.
•••• Construction of new motor stands at Kanchanpur, Sonamura and Khumulwng is
nearing completion and expected to be ready for public use during 2013-14. •••• Construction of the Interstate Truck Terminus at Madhabbari in Jirania is almost
complete except for culverts on the approach to the terminus. Construction of culverts has been taken up and the Terminus is expected to become operational by August, 2013. A revised DPR for an amount of Rs. 10.100 Crores (approx) has been submitted to the NEC for completion of some additional components of work of ISTT, Madhavbari which were not envisaged earlier.
•••• Construction of Motor Stand at Kalacherra is in progress. •••• Development of Motor Stand at Sabroom is in progress. •••• Acquisition of land for Santirbazar Motor Stand is in progress. •••• Development of Motor Stand at Kamalghat is in progress. •••• Agartala city bus services which was launched in October, 2010 is being extended
in a phased manner. 15 new diesel buses have been inducted into the fleet and procurement of 22 CNG buses is under process. Present strength of the fleet is 53.
•••• As per direction of the Hon’ble Supreme Court, High Security Registration Plates
has been introduced in the State. In the first phase it is implemented all over the State only for the newly purchased vehicles.
•••• Transport Department collects both tax and non-tax revenue which helps in
augmenting the resources of the State. The rates of taxes for different categories of vehicles have been revised after a long gap of 19 years. Provisions have been made in the agreements executed with the private partners/agencies for preparation of smart card based driving licenses/registration certificates and fixing of High Security Registration Plates for sharing of revenue collected by the agencies. These measures have resulted in significant increase in collection of revenue. A proposal for revising the fee structure for different categories of motor vehicles by amendment of the Tripura Motor Vehicle Rules is also under process.
•••• With the exponential increase in number of vehicles in the State, the demand for
trained/skilled drivers is growing rapidly. State Government is encouraging setting up of new driving training schools by private entrepreneurs for training of drivers. One Institute of Driving Training & Research centre is being set up near NIT in Jirania with financial assistance of Rs. 14.00 crores sanctioned by Govt. of India. A Memorandum of Understanding (MoU) has been executed between the State Govt. and TATA Motors for running this institute of PPP mode. Work order has already been given to the implementing agency for starting the construction.
-40-
•••• 9 (nine) new Smoke Emission Testing Centres have been opened in the uncovered Sub-Divisions of the State.
•••• For developing Howrah river and Gumati river as waterways for transportation of
passenger and goods as also for future linkage with the waterways of Bangladesh, M/s RITES Ltd. has been issued work order for preparation of DPR for development of waterways in the State and it has already completed survey works for preparation of the DPR. Ministry of Shipping sanctioned Rs. 82.725 lakhs to the State Government for preparation of the DPR.
PLAN/PROGRAMME AND PROJECTS TO BE IMPLEMENTED DURIN G THE FINANCIAL YEAR 2013-14.
1. Department has sent one DPR to NEC through Planning Department for sanction of fund for construction of 5000 MT Cold Storage in the premises of Inter State Truck Terminus at Madhavbari near Jirania under NEC scheme.
2. Department has sent DPRs to the Planning Department for sanction of
funds for (1) construction of Teliamura Motor Stand, (2) Development of Motor Stand at Rajarbag(Udaipur) under NLCPR scheme.
3. For construction of one DTO office at Udaipur fund is required under
State Plan. 4. 5 (five) ongoing works like (i) Inter State Truck Terminus at Madhavbari, (ii) construction of Sonamura Motor Stand, (iii) construction of Dharmanagar Motor Stand, (iv) construction of Khumulung Motor Stand, (v) construction of Kanchanpur Motor Stand, (vi) construction of Kalacherra Motor stand are likely to be completed during the current financial year. 5. Draft final report regarding DPR for development of Howrah river and
Gumati river as waterways shall be submitted by M/S RITES Ltd. by the end of May 2013.
6. New Motor Driving Schools will be opened in the uncovered Sub-
Divisions of the State during 2013-14. At present there are 26 Motor Driving Schools in the State.
7. Divisions during 2013-14.At present there are 23 Smoke Emission Test
centres in the State.
-41-
After careful examination of the Budget proposal and appreciation of submission
placed by the Principal Secretary of the Department, the Committee make the following
recommendations :-
RECOMMENDATIONS
i) The earlier i.e. 8 th Report’s recommendations for City Bus Stands good adding for facility to be extended upto Bishramganj.
ii) The earlier recommendations of CNG station to all District Head Quarters be installed in phase manner.
iii) The Department to continue its persuasion towards L ay-Bye with PWD and BRO.
iv) Conduct survey for setting up Motor Stands to be ta ken up. Finance Department to consider release of adequate fund for the same specially for developing the existing Moto r Stands at Sub-Division Bloc be extended. In this respect, MGNREGA/BADP schemes can be used by DMs involving Transport Department. Finance Department may consid er allocation of fund where Land acquisition is necess ary.
v) Department may consider feasibility of providing Me ter in the Auto beyond 5 K.M. in phase manner.
vi) It is recommended that new permit be issued to the owners of vehicle outside Agartala Municipal area and also to issue permit to all new Sub-Division & Blocs as well as n ew roads constructed recently upto Agartala.
vii) The renewal of Driving License, road permit etc.be done annually through Sub-Division- wise camps by the Department.
After examination of the Budget proposals and appreciation ofsubmission
of the Representative of the Committee recommends the Budget proposals under Demand No. 11 for grants by the House alongwith the Recommendations.
( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly
-42-
THE REPORT ON THE DEMAND NO. 29 OF THE ANIMAL RESOURCES DEVELOPMENT
DEPARTMENT FOR THE FINANCIAL YEAR 2013-14.
The Budget Proposal under Demand No.29 relates to the Animal
Resources Development Department, Government of Tripura for the Financial
Year 2013-2014 and the Revised Budget for the Financial Year 2012-2013 are
as follows :-
( Rs. in lakh)
Now, the aforesaid Budget proposal is under examination of the Subject
Committee-I of the Tripura Legislative Assembly for recommendations to the Demands for Grants.
The Committee in its meeting held on 6th May, 2013 examined the Budget
proposals in details having discussion with the Secretary of the Department who appeared before the Committee on summon.
First of all, the Principal Secretary informed the Committee about the
action taken in respect of the recommendations made by the Committee during the year 2012-13 and stated as follows :-
Sl. No
Relevant para/page No. of the Report.
Recommendation of the Committee
Reply of the Government on the recommendations.
01.
Page No.74 & Recommendation No.1.
Farm Development Committee to hold meetings in every two months and for that the responsibilities shall be with the Member Secretaries.
Farm Dev. Committee has already been constituted in all Government’s farm as per recommendation of the subject Committee and meetings are being held time to time as per recommendation of the Subject Committee.
Particulars Revised Estimate 2012-2013
Budget Estimates for 2013-14 Demand Fund for Total
T.S.P. S.C.P. a) Non-Plan 4036.44 4788.00 -- -- 4788.00 b) Plan 1991.55 833.04 496.62 272.34 1602.00 c) C.S.S. 1434.94 424.60 253.15 138.83 816.58 d) N.E.C 181.26 109.50 65.29 35.81 210.60 Total 7644.19 6155.14 815.06 446.98 7417.18
-43-
0 2. Page No.74 & Recommendation No .ii.
Mobile Service Unit shall be strengthened to cover remote areas.
Mobile Veterinary Service are rendered through Disease investigation Laboratories as well as by the local Veterinary Dispensaries and Veterinary Hospitals in the Districts and also through conductance of frequent vaccination camps, health camps and fertility management camps covering the remote areas of the State through out the year. For increasing the Cross Breed Cattle Population, mobile service of artificial insemination is also rendered through Door Step A.I.workers. Side by side a network of Govt. institutions(16 Nos. Veterinary Hospital,59 Nos. Veterinary Dispensary, 426 Nos.Sub-Centre & 11 Nos. A.I. Centre’s are functioning in the State to render service at farms, cow-side and also at the institution. In order to further strengthening of the mobile service dept. has taken steps to train up another 150 Nos. of new unemployed youth as Door Step AI worker. On the other hand, one Project has already been sanctioned by the Planning & Co-ordination dept. for procurement of Ambulatory Van for Vety. College, R.K.Nagar which will be utilized for providing mobile vety. service to remote areas.
03.
Page No.74 & Recommendation No.iii.
There shall be one Committee to monitor the function of brooder house and regular inspection by V.A.S.
Although BLBH were earlier run by SHG/unemployed youth under the supervision of Panchayat Samittee, with a few exception under the supervision of VAS of the respective Block HQ., subsequently, the entire BLBH activities are looked after by the VAS posted at block HQ or nearby and he is declared as Implementing Officer(IO).
04.
Page No.74 & Recommendation No. iv.
The Department to take suitable step to increase the quality of goat to strengthen steady supply of meat. Artificial insemination to be introduced in our State.
The Department has purchased and arranged rearing of indigenous Black Bengal species of goats in Composite Livestock Farm at Devipur, Sipahijala Distirict. For this purpose 272 nos. of goats were purchased from the local market during the year 2009-10(162 nos) ,2010-11(110 nos) Apart from above, process has already been started to purchase and procure more goats for rearing under the scheme ‘Revival of Goat breeding farm, Devipur under CSS
-44-
“Integrated Development of Small Ruminants during the year 2012-13 under which 159 nos. of goat already procured and another 159 nos will be procured soon. Department is considering to submit a proposal for A.I.in goat as a pilot project to Govt. of India.
05.
Page No.74 & Recommendation No .v.
The Department to arrange setting up of modern slaughter house positively by the Financial Year 2011-12. Small size slaughter/unit in all big markets are being setting up in the State by the meat businessmen in phase manner.
Dept. has already taken up a project on “Development of Demonstration unit on production of hygienic and wholesome meat for human consumption” funding under RKVY for scientific slaughtering of birds in all market of Agartala Municipality area. Regarding establishment of modern slaughter house Dept has already requested to AMC for taking necessary step.
06.
Page No.74 & Recommendation No.vi.
The Department to make endeavor to open livestock of cattle whereby the land can be utilized in PPP model. By involving the unemployed youth, SHG and Co-operative Societies the Department to formulate a 3 years plan to increase supply of milk up to Sub-Division level even by working out the possibility with buffalo life stock.
Dept. has already taken steps to increase strength of cattle at R.K.Nagar farm. 54 CB cows/ pregnant heifer has been inducted recently. Renovation work of both side cattle sheds have already been completed. Department has already prepared the next five year plan for increasing the milk production. In reference to the recommendation of the learned subject committee to increase the supply of milk in sub divisional level it is stated that mini and micro dairy are being setup by involving the unemployed youth & Self help group. For upgrading the buffalo population TLDA has already procured the buffalo semen and already supplied in the field for AI. Under RKVY scheme 600 cows bought from the outside the state has already been distributed by the TCMPUL among the member of milk co-operative societies to increase the milk production. Besides that Dept. has already introduced Heifer Rearing Scheme to boost up the milk production.
-45-
7. Page No.75 & recommendationNo.vii.
The Department to take suitable steps to set up a Dispensary covering 2/3 Panchayat and every Panchayat and village be covered with a Sub-Centre by phase manner.
In order to cover 2 Panchayat by a Vety. Sub-centre and more than 3 GP by a vety. Dispensary department obtained approval of the government to open 150 new Veterinary Sub-centre and 9 new Veterinary Dispensaries. Dept. has already opened of 42Veterinary Sub-Centre and 5 Veterinary Dispensaries till date ( up to 31 st March,2013) as per approval of the government mentioned above. Rest would be opened in phased manner. For opening of new institution, Besides that Dept is considering to increase the no. of Vety. Institution in the newly created Districts, Sub-Divisions and blocks. Dept. has already increased the cadre strength of T.V.C.through amendment. Also recruitment of 168 nos para vety staff is completed. Process of recruiting another 120 nos of para vety. Staff is underway.
08.
Page No.75 & Recommendation No. viii.
The Department to continue its action or artificial insemination and in Tribal area more emphasis to be given.
The Department of ARDD is continuing its artificial/ insemination activities. During the year 2012-13 total number of A.I. was 1.26842 lakh ( provisional). Our target for 2012-13 was 1.60 lakh and .targetted for AI for the year 2013-14 is 1.70 lakh. Department received fund from Govt. of India under NPCB for 8 nos. of cross bred breeding bull which will be distributed in TTAADC areas for natural services for the year 2012-13 and 2013-14 more 25 nos. and 50 nos. of crossbred breeding bull will be distributed in TTAADC areas to increase the crossbred population.
09.
Page No.75 & Recommendation No. ix.
The Department to aid the losers of bird flu under a definite scheme immediately after completion of 3 months in each spread over of the disease and the Department to encourage the villagers for country made hen and to introduce a new population of birds like Emo as in West Bengal to increase supply of meat in the market. Finance Department may arrange necessary fund for this programme. Dept may take expert view why Bird Flu turn acute frequently in our state.
Dept. had paid compensation instantly to the loser of bird during culling on the event of bird flu control & containment programme. Besides that Dept. has already set up two Block Level brooder House(BLBH) in each block from where 45 days age old birds are being distributed among the farmers under down stream scheme as well as under CSS Rural Backyard Poultry Scheme . Dept. will study the feasibility of Emu faming in the State. On request of the State Government of India sent a expert team to investigate the reasons for frequent occurrence of the bird flu in the state. Report of expert team is awaited by the Dept.
-46-
Annual Plan Of Animal Resources Development
Department (ARDD) For The Year 2013-14 .
The livestock sector plays a vital role in the rural economy and supports
small and marginal farmers both economically and nutritionally. Sixty-seven
percent small, marginal farmers and landless people own about 70% of livestock
in India. Besides providing high quality animal protein, livestock utilizes non -
edible agricultural bi-products and provides raw materials such as hides, skin,
bones, fat etc. The Animal Resources Development Department promotes
production of Animal origin food i.e. Milk, Meat & egg to meet the requirement of
the people of the state. The Department undertakes up-gradation of the local low
yielding stock of all species of economically important domesticated animals
through Artificial Insemination & other breeding practices apart from supply of
exotic germplasm of high yielding variety of livestock & birds from its breeding
farms. It also renders Veterinary services for Curative & Preventive health care
for animals & birds through its intensive network of Veterinary Hospitals,
Veterinary Dispensaries, Veterinary Sub-Centres, and Disease Investigation
Laboratories etc. for protection of Livestock health of the state.
In spite of hurdles in respect of high feed cost and scarcity of improved
variety of animal husbandry inputs, considerable interest has been developed
among both rural and urban people in taking up modern A.H. practices with high
yielding variety of livestock and birds such as piggery, broiler and dairy farming
as subsidiary as well as main economic activity. Around ten thousand families in
the state are directly or indirectly dependent on the broiler farming with
approximately Rs. 258 crore annual turn over. Similarly, a large number of tribal
and non-tribal youths are engaged in pig farming, which is profitable due to high
demand for pork. In addition, the department has initiated fodder and tapioca
cultivation to minimize the cost of feed for rearing improved variety livestock. For
improvement of dairy sector, the Gomati Cooperative Milk Union Ltd. has already
submitted a project under Integrated Dairy Development Project (IDDP-IV) to the
Government of India. In addition, a project has also been submitted to supply
milch ration to the farmers for enhancing milk production in the state under
NMPS (National Mission For Protein Supplement).
-47-
For augmenting production of animal origin food i.e. milk, meat & egg,
Dept of ARD has formulated strategies for implementation during XII five year
plans and identified thrust areas.
Thrust Area: Milk Sector:
• Massive awareness for Artificial Insemination and Cross Bred cow
rearing.
• Fertility camps for improving reproductive health and increase
conception rate.
• Mass De-worming programme & supply of Mineral Mixture.
• Popularization of castration through incentivisation.
• Milk yield competition, calf rally.
• Capacity building of farmers in management of high yielding CB cows
& calves.
• Development of Pasture and grass land in each block.
• Growing fodder crops during inter-cropping period.
• Supply of subsidized concentrate feed for CB cows and calves.
Meat Sector:
• Setting up of piggery units under RKVY.
• Strengthening of Govt. Pig Breeding Farms.
• Tapioca cultivation in farmers land rearing pigs under MGNREGA.
Egg Sector:
• Setting up of new BLBH under RKVY.
• Strengthening of existing BLBH.
• Strengthening of infrastructural facilities in Govt. Poultry Farms.
• Control of major poultry diseases through mass vaccination by
unemployed youths on self-sustaining basis in selected blocks.
Veterinary Service Sector:- • Expansion of Veterinary service network from 456 to 600 nos to ensure
one vety. centre per two Gram panchayets / ADC villages.
• Strengthening of infrastructure of veterinary College to its optimum
capacity, to facilitate research and human resources development.
Proposed activities and Financial target under State plan during, 2013-14.
-48-
( Rs. in Lakh ) 2013-14
Animal Husbandry . Direction & Adm. 453.03 Vety. Service & A.H 370.56 Cattle & Bufflow Dev. 389.73 Poultry Dev. 255.56 Sheep, Wool & Goat Dev. 39.04 Piggery Dev. 274.73 Other Livestock Dev. 9.52 Fodder & Feed Dev. 21.08 Extension & Traning 205.55 Admn. Invt. & Stat. 19.17 Sub Total of A.H 2037.96 Dairy Development: Direction & Adm. 4.04 Integrated Dairy project 0 Extension & Training 0 Asstt. to Co- Operative & other Bodies. 12.78 Sub Total of D.D 16.82 Total of State Plan:- 2054.78
Activity wise target and up-to-date achievement dur ing the Financial
Year 2012-13 and target for the Financial Year 2013 -14.
1. Milk Sector:
Sl No.
Name of Activities/ Scheme/ Programme
Physical Target-2012-13
Progress (Up-to Feb,2013)
Proposed Target for 2013-14
1
Intensification AI for increasing the number of crossbreed population (Nos. of AI)
1,60,000 1,15,802 1, 70,000
2. Heifer Rearing Scheme under State Plan(New) (Nos. CB Calf)
5000 4119 5000
3. Fertility camps for improving conception rate (Nos. camp)
200 214 200
4 Mass de-worming programme(Nos. cattle) 1,70,000 1,72,583 1,80,000
5 Organization of Awareness camp (Nos.)
1040 983 1040
6 Conducting Milk yield competition calf rally (Nos.)
90 81 100
7 Development of perennial fodder plot. (Nos. units) under
5114 1588 5500
-49-
MGNREGA including FRA
8. Setting up of Dairy Demo Unit 150 144 200
9.
Popularization of castration through incentivisation in tribal areas (nos. of Bull)
1000 492 1000
10
Setting up of Bulk milk cooling centre (BMC) for enhancing storage time and keeping quality of milk for proper marketing.
- - 2Nos.(1000 LPD)
2. Meat Sector:
Sl No.
Name of Activities/ Scheme/ Programme
Physical Target-2012-13
Progress (Up-to Feb,2013)
Proposed Target for 2013-14
1
Setting up of Beneficiary oriented piggery Demo unit for multiplication including FRA
425 unit 315 Unit 450 Unit
2 Demonstration unit on Goatery. 360 unit 322 unit -
3
Modernization and Strengthening of Pig Breeding Farm at Howaibari, under Khowai District
1 farm Work in progress -
3 Tapioca cultivation through MG-NREGA. including FRA
4532 Unit 1126 units 5000 unit
4. Production of piglet in Government farm 7825 8856 10000
3. Egg Sector:
Sl
No. Name of Activities/
Scheme/ Programme Physical Target-
2012-13 Progress (Up-to
Feb,2013) Proposed Target for
2013-14
1 Strengthening / Extension of Poultry Farm
1 Nos. farm 3700 Parent stock
procured(DPF Udaipur)
1 Farm
2 Strengthening of existing BLBH 32 Nos. 25 Nos. -
3 Promotion of Backyard poultry . 5400 Unit 5200 unit 5400 Unit
4. Construction of new BLBH in 40 block(Nos.) 40 38 -
5. Production of poultry egg and duck egg(in
lakh) - 0.72485 9.00
-50-
6. Production of DOC - 0.17864 3.00
7. Production of DOD - 0.05807 1.00
8. DOC distributed to BLBH - 1.65 Lakh 5.00
5.4.Animal Health Care service:
Sl No.
Name of Activities/ Scheme/ Programme
Physical Target-2012-13
Progress (Up-to Feb,2013)
Proposed Target for 2013-14
1. Treatment of Animal and Birds 7.00 Lakh 4.83 Lakh 7.00
2. Vaccination of animal and bird 60 Lakh 47.92 Lakh 60.00 Lakh
5.5. Infrastructure Development:
Sl No.
Name of Activities/ Scheme/ Programme
Physical Target-2012-
13
Progress (Up-to Feb,2013)
Proposed Target for 2013-14
1. Opening of Dy. Director office at Newly opened districts
- - 4 Nos.
2. Opening of District DI Laboratory at newly opened District.
- - -
3. Opening of block level Asstt. Director office. - - 3 Nos.
5.
Up-gradation of Veterinary Dispensary to veterinary Hospital cum Polyclinic
5 Nos. 1 Nos. 3 Nos.
6. Opening / Up-gradation of sub-centre to veterinary Dispensary
5 Nos. 1 No. 2Nos.
7. Opening of New sub-centre 15 Nos. - 5 Nos.
8. Construction of Veterinary College under NLCPR -
Administrative & Academic block
under construction
Rest of Administrative &
Academic block and hostel
9.
Construction of District office with Laboratory , Cold storage, Medicine store, Meeting Hall etc.
- - 4 Nos.
10. Construction of block level office. - - 8 Nos.
11. Construction and renovation of Veterinary Hospital & Dispensaries
37 Nos. 7 Nos. 22 nos.
12. Construction of Veterinary sub-centre 43 Nos. 8 nos. 47 Nos.
-51-
4.2 Physical Target of 2012-13 in respect of variou s monitorable parameters:
Item Unit Target: 2012-13
Animal Health Coverage
Lakh Nos. 7.00
Vaccination
Lakh Nos. 60.00
Artificial Insemination
Lakh Nos. 1.60
Fertility Camp
Nos. 1000
Development of fodder plots Nos. 1700
4.3. Scheme wise financial targets of Annual Plan 2 012-13 with details of State plan.
Scheme/ Project/ Item Financial Target: 2012 -13
2403- A.H 01- Direction & Adm. 02- 246.23
101-Vety. Service & A.H 345.90
102- Cattle & Bufflow Dev. 342.00
103- Poultry Dev. 210.20
104- Sheep, Wool & Goat Dev. 28.00
105- Piggery Dev. 239.30
106- Other Livestock Dev. 12.00
107- Fodder & Feed Dev. 16.00
109- Extension & Traning 144.72
113- Admn. Invt. & Stat. 740
Sub Total of 2403- A.H
1591.75
2404- DD 01- Direction & Adm.
2.25
102- Integrated Dairy project 0
109-Extension & Training 0 195- Asstt. to Co- Operative & other Bodies. 16.00 Sub Total of 2404- D.D 18.25 Total of State Plan: - 1630.00
-52-
After careful examination of the Budget proposal and appreciation of
submission placed by the Principal Secretary of the Department, the Committee
make the following Recommendations :-
RECOMMENDATIONS
i) The Department to arrange setting up of modern s laughter house at Municipal area of Agartala and the meat businessman at Battala Market be officially persuaded to maintain hygiene. In Sub-Division level also small size slaughter unit in all markets be ensured.
ii) The Department to take suitable steps to set up a Dispensary
covering 2/3 Panchayat and every Panchayat and vill age be covered with a Sub-Centre in phase manner and also to condu ct Mobile Dispensary.
iii) The Department to continue its action of artif icial insemination and in
Tribal area more emphasise to be given. iv) The Department to co-ordinate setting up of Min i-Dairy linking with
Bank loan to unemployed youths throughout the State . v) The earlier recommendation at Sl.No.3 of the nin th report of
monitoring of Brooder House and regular inspection by V.A.S. shall continue.
vi) Door step AI worker are to be engaged in vacant places.
After examination of the Budget proposals and appreciation of submission of the Representative of the Department the Committee recommends the Budget proposals under Demand No. 29 for grants by the House alongwith the Recommendations.
( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly
-53-
THE REPORT ON THE DEMAND NO - 42 OF THE YOUTH AFFAIRS & SPORTS DEPARTMENT
FOR THE FINANCIAL YEAR 2013-14.
The Budget proposal under Demand No.42 relates to the Youth
Affairs & Sports Department, Government of the Tripura for the Financial Year
2013-2014 and the Revised Budget for the Financial Year 2012- 2013 are as
follows :-
( Rs. in Lakh ) PARTICULARS
REVISED
ESTIMATES 2012 - 2013
BUDGET ESTIMATES FOR 2013 - 2014 DEMAND FUND FOR
TOTAL
T.S.P S.C.P
1) Non Plan 2545.80 2930.50 -- -- 2930.50 2) Plan 3009.20 179.00 115.60 65.40 360.00 3) C.S.S 648.40 338.54 212.00 115.00 665.54 4) NEC 8.00 5.00 --- --- 5.00
Total 6211.40 3453.04 327.60 180.40 3961.04 • Now, the Budget proposal is under scrutiny and examination of the
Subject Committee-I of Tripura Legislative Assembly for recommendations to the Demands for Grants.
• • The Committee in its meeting held on 6th May, 2013 examined the Budget
proposals in details having discussion with the Secretary of the Department who appeared before the Committee on summon.
• First of all, the Secretary informed the Committee about the action
taken in respect of the recommendations made by the Committee during the year
2012-13 and achievements during the year 2012-13 stated as follows :-
-54-
SL NO
Relevant SL No./Page No of the report.
Recommendation of the committee
Reply of the government on the recommendations
(1) (2) (3) 4 i. SL. 1
Page-87 Dasharath Deb Sports Complex work has to be completed and developed to a upto-date standard quality, the State Government to approach to the SAI and Central Government to organize some National game in the State of Tripura.
As per recommendation of the committee, SAI/GOI as well as ONGC Tripura Asset were requested by the Department to extend financial assistance to the State Govt. for all round development of DDSSC, Badharghat. ONGC has committed and provisioned of fund for an amount of Rs.24.32 Core and signed a MoU between Asset Manager, Tripura Asset, ONGC and Director of YAS. As per MoU ONGC authority has agreed to provide grant of Rs.24.32 crore for creation of Sports Infrastructure in the Dasaratha Dev State Sports Complex (DDSSC), Badharghat. Accordingly, Foundation Stone has been laid by the Hon’ble Chief Minister, Tripura on 09-04-2013. On the other hand the SAI has been requested to develop the DDSSC from their fund. But the SAI is yet to respond.
ii.. SL. 2 Page-87
Budget Provision for Panisagar Sports School’s furniture has to be made to start the School.
Adequate fund provision has been kept in the proposed BE-2013-14.
iii. SL. 3 Page-87
Amount of National Stipend has to be upgraded for National Awardees for which Finance Department to do needful.
With the approval of the Finance Department, the Sports Stipend has been increased from 600/- to 1,200/- PA for the National Awardees.
iv.. SL. 4 Page-87
Players who participate in National & Inter National level games has to be covered with Insurance for which there shall be Budget Provision.
This is under process.
v.. SL. 5 Page-87
For Dhalai & all new Districts Sports complex to be built.
For construction of Dhalai District Sports complex, fund has already been sanctioned by the MoDONER for Rs. 491.00 laksh, 1st installment for Rs.173.15 lakh. has also been released. Identification of land for new 4 Districts Sports Complex has been
-55-
completed. The CEO of THCB has been requested to prepare DPR for the new 4 District Sports Complex so that proposal to P&C Department as well as Govt. of India may be sent for sanction during this year 2013-14.
vi.. SL. 6 Page-87
Scout & Guide may be introduced in all Sub-Division for that Budget Provision has to be allotted.
Initiative has been taken for introducing Scouts & Guides in all Sub-Division. Fund provision has been increased in the proposed BE 3013-14, as compared to last years.
Achievement made during the year 2012-13 with the
following budgetary provisions. (Rs. in lakh)
BUDGET POSITION AT A GLANCE UNDER PLAN Particulars
Ceiling R.E. 2012-13 Expenditure up to March,20`13
PLAN NON-PLAN PLAN NON-PLAN
Salary 0 2516.80 0 2584.79
Non-Salary
241.68 29.00 241.40 29.00
ACA 109.41 0 109.41 0
SPA 2382.30 2109.14
SCA 275.81 275.81
CSS 475.25 0 474.24 0
NLCPR 173.15 0 173.15 0
NEC 8.00 0 3.00 0
Total 3665.60 2545.80 3386.15 2613.79
Infrastructure development : Department took much initiative for over all development of infrastructure as indicated below:- A. The following Major/Minor works have been completed during 2012-13.
1. Construction. of North Tripura Sports School at Panisagar. 2. Construction. of Dhalai District YAS Office cum Sports Hall at Ambassa. 3. Construction of Grand Stand at U.K. Academy Mini Stadium, Agartala. 4. Construction of Gallery with dressing room at U.K. Swimming Pool,
Agartala. 5. Construction of Sub-Divisional YAS Office at Khowai and Sabroom. 6. Extension of Conference Hall of existing Bhagat Singh Youth Hostel,
Agartala. 7. Construction of Gomati District YAS Office, Udaipur. 8. Vivekananda Maidan ( Astable ground) except Mukta Manch.
Sports persons of Tripura have bagged medals in various National level competitions like NE /
-56-
PYKKA & National Meet in various disciplines including School National :- Disciplines Gold Silver Bronze Total
26th NE Games 17 17 18 52
38 Women sports competition at Cuttak
05 00 00 05
Gymnastics (Senior National & Sub-Junior)
07 10 02 19
Sub-Jr. National Swimming 01 00 00 01
National Para Olympic Swimming 04 04 00 08
NE body building competition. 06 03 01 10 NE Chess competition. 02 00 02 04 Asian School Chess Championship 01 00 00 01 Commonwealth Chess Championship 00 00 01 01 Yoga Championship 01 03 02 06 5th National Rural Tournament. 01 00 02 03 Sub-Jr.Kick Boxing Championship. 02 01 04 07 Jr./ Senior Kick Boxing Championship.
03 01 01 05
51 National level Rural Trounament Gr.V
00 00 02 02
NE Judo Championship 00 07 11 07 School National. 02 06 06 14
Sub-Total= 52 52 52 156
Some remarkable performance have also been done by the sports persons of Tripura, they are as follows:-
a). Smt. Shainy Das, achieved 01(one) Gold from Asian School Chess Championship, held at Srilanka and 1 (one) Bronze form Commonwealth Chess Championship held at Chennai.
b). Smt. Dipa Karmakar, own 05 Gold medal from Sr. National Gymnastics & 05
Gold from women competition. C ). The under 17 boys School team achieved gold medal from the National
School Championship.
The Plan/Programme and any project to be implemented during the year 2013- 14 for consideration of the Committee during examination.
The Plan /Programme of the Department is (i) to provide opportunity to the youth
to find constructive channel for their unbounded energy, (ii) to improve personalities and
character, (iii) to boost sports and youth activities of the State by providing training for
improvement the performances of players of exceptional
-57-
qualities and (iv) Organization of Regional and National Level Sports and youth
activities with a view to exposing the youth of the State in the field of sports and youth
activities.
The Budget provision under PLAN and NON-PLAN of the Education (YAS) Department during the year 2013-14 are as follows:-
(Rs. in lakh) BUDGET POSITION AT A GLANCE UNDER PLAN
Agreed B.E. 2013-14 PL AN NON-PLAN
0 Total Salary / Wages 2894.00
Non-Salary 358.00 Total Non-Salary. 31.50
0
Grant to TSC 84.00 Electricity Charges 3.50
Electricity Charges 12.00
State Share 61.00 0
Scholarship / Stipend 10.00 0
Major works 1.00
Transfer to TTAADC 35.00
Cost of Ration 70.00
Sports Equipment 15.00
Youth Welfare Prog. 20.00
Games & Sports 30.00
Others 20.00
SPA 1.00
SCA 1.00
CSS 665.54
NEC 5.00 0
1030.54 2925.50
The thrust area of the Department in the outlaying Stations in the field are –
(i) Football, (ii) Athletics, (iii) Gymnastics, (iv) Swimming, (v) Yoga and (vi) Judo etc. The following are the continuing Plan Scheme of the State:-
a. Physical Education, b. Youth Welfare Programme for Students (Scouts & Guides activities) c. Youth Welfare Programme for Non-Students (Youth Festival and other Youth Activities). d. Sports and Games Organization of various sports programme of School students) e. Grants-in-aid (Grants for Tripura Council and TTAADC)
B The Deptt will continue execution of the following on going projects during
2013-14 (Under State Plan)
1. Construction of Sub-Divn. YAS Office, Bishalgarh
2. Construction of Sub-Divn. YAS Office, Santirbazar
-58-
3. Construction of Sub-Divn. YAS Office, Dharmanagar
C. The Deptt will continue execution of the following on going projects during 2013-14 (Under ACA / SPA/ NLCPR).
1. Up gradation of NSRCC Complex construction of Indoor and Gymnasium at Agartala
2 Up gradation of Bhagat Singh Youth Hostel, (350 Bedded Hostel at Khajurbagan).
3 Up gradation of Astable Ground ( 2nd phase work) Agartala
4 Construction of District Sports Complex, North Dist Kailashahar.
5 Construction of District Sports Complex, South Dist Udaipur.
6. Up gradation of Regional College of Physical Education, Panisagar
7 Development of Playground with earth-filling and Drainage System at RCPE, Panisagar.
8. Construction of District Sports Complex at Ambassa, Dhalai Tripura
9 Development of Playground opposite to Bholagiri Ashram, Agartala.
10.Construction of 4 (Four Storied ) building for multipurpose like as Judo, Weight Lifting, Yoga, Table Tennis etc. at NSRCC Complex.
11. Conversion of existing DYAS Office to 3(three) storied Girls Hostel for the Player.
D. The following projects have been sent to the P & C Department for
consideration during 2013-14.
1. Construction of gallery at Gardhang H/S School, Sabroom.
2. Up gradation of State Adventure Institute, Melaghar.
3. Construction of State Training Center for Scouts & Guides and Office
Building at State Head quarter, Arundhutinagar.
4. Construction of District Sports Complex at Belonia, South Tripura.
5. Construction of District Sports Complex at Sepahijala District at Bishramganj.
6. Construction of District Sports Complex at North District at Dharmanagar.
7. Construction of District Sports Complex at Khowai District.
8. Construction of Gallery alongwith Grand Stand for proposed Stadium at
Damdama, Madhusudan Degree College, Sabroom, South Tripura.
-59-
After careful examination of the Budget proposal and appreciation of submission placed by the Secretary of the Department, the Committee make the following recommendations :-
RECOMMENDATIONS
i. Dasharath Deb Sports Complex has to be of Nation al Standard quality and Department to achieve the goals as early as pos sible.
ii. The Department to pursue for taking over the po ssession of Assam Rifles field to encourage sports events in the Stat e. Player who participate in National and International level gam es has to be covered with insurance for which there shall be Budget prov ision.
iii. For Dhalai & all new Districts sports complex to be built.
iv. The State sports boys/girls who get chance in t he National level should
be provided with all possible amenities and for tha t Finance Department may provide fund if any, in the Revised Estimates.
v. Sports office at District, Sub-Division and Bloc level should be set-up in
phase manner.
vi. The vacant land lying at Rajnagar Bloc under So uth Rajnagar Panchayet near Piyar Bari Police station may be made use as s port Complex of National standard by providing gallery as may be po ssible.
vii. Physical Instructor should be appointed in all school in phase manner specially in the S.B, High and H. Secondary Schools .
viii. The Department to make endevour for supply of sports items to all Sub-Division extending the same to Bloc, Jila Parishad, Panchayat Samiti, Village Committee and Gram Panchayat and fund for t his to be increased.
ix. Residential coaching camps to be provided to Bl oc level annually in collaboration with Nagar Panchayat, Panchayat Samit i and Jila Parishad.
After examination of the Budget proposals and appreciation of submission of the Representative of the Committee recommends the Budget proposals under Demand No. 42 for grants by the House alongwith the Recommendations.
( Shri Sudhan Das) Chairman
Subject Committee - I Tripura Legislative Assembly
Dated, Agartala, the 10th May, 2013.
-60-
THE REPORT ON THE DEMAND NO. 30 OF THE FOREST DEPARTMENT FOR
THE FINANCIAL YEAR 2013-14.
The Budget Proposals under Demand No. 30 relates to Forest
Department, Government of Tripura for the Financial Year 2013–2014 and
Revised Budget for the Financial Year 2012 – 2013 are as follows:-
(Rs. in Lakh)
Particulars Revised
Estimate 2012-2013
Budget Estimates for 2013 -14 Demand Fund for Total
T.S.P. S.C.P. a) Non-Plan
4092.81 4691.00 -- -- 4691.00
b) Plan 9978.65 2619.67 3365.39 2895.94 8881.00 c) C.S.S. 609.54 405.32 248.17 146.51 8000.00 d) N.E.C 100.00 25.00 50.00 25.00 100.00 Total 14781.00 7740.99 3663.56 3067.45 14472.00
Now, the Budget Proposals is under examination of the Subject
Committee-I of the Tripura Legislative Assembly for recommendations to the
Demands for Grants.
The Committee in its meeting held on 7th May, 2013 examined the Budget
proposals in details having discussion with the Principal Chief Conservator of
Forest of the Department who appeared before the Committee on summon.
First of all, the PCCF & HOFF informed the Committee about the action
taken in respect of the recommendations made by the Committee during the year
2012-13 and stated as follows :-
Sl. No. Relevant
Para/ Page No. of the
report.
Recommendation of the Committee
Reply of the Government on the recommendation
1) Para-i) at
page
No.128
The Department to
continue the
Bamboo plantation
programme already
taken up for total
120.325 lakhs.
During the year 2012-13, the Forest Department
has raised different species of bamboo like Muli,
Mritinga, Barak, Jai, Dalu etc. over 7231.77 ha.
Special attempt had also been made to raise
different species of bamboo on RoFR-patta land
during 2012-13 as per demand of the
-61-
Department to
formulate a
programme for
usable special
species Bamboo.
beneficiaries. It is also proposed to invite RFRI,
Jorhat in developing bamboo resources in the
State.
2) Para-ii) at
Page
No.128.
The Department to
continue the special
drive for Bamboo
Industry Artigens
Training and to
develop Master
Trainers.
Two “Bamboo Mat Weaving Centre” one at
Bagafa Division and another at Ambassa Forest
Division besides one NTFP Centre of Excellence
Hatipara under JICA project are actively in
operation in Tripura. Local artisans were trained
in those weaving Centre on Agarbati stick
making and value addition to NTFP Forest
Produces to make them Mater Trainers among
the artisans.
3) Para-iii at
Page
No.128
By working out,
the Department to
formulate joint
scheme with
tourism
Corporation to
procure fund from
Central
Government for
developing Eco-
Park and Eco-
Tourism all over
the State and also
in the Capital
Complex area and
at Agartala.
Presently there are 25 Eco-Parks developed by
the Forest Department. To further develop the
Eco-Parks and Eco-Tourism Sector, the Forest
Department submitted project proposal for
Rs.1109.00 lakhs to the ICAT Department for
funding during 2012-13. The Department has
also received fund from TTDC for improvement
of the Eco-parks established by Forest
Department. The Forest Department has also
taken up greening of Capital Complex area at
Agartala.
4) Para-iv at
Page
No.128
In the Bamboo
Park the Forest
Department to
accumulate all
Tripura Bamboo Park is being established at
Budjangnagar Industrial Estate. It will be first
Bamboo Park in Tripura as well as in the
country. One Master Plan has been prepared for
-62-
plants in a single
area for
demonstration.
the park by Industries Department with estimated
cost of Rs.29.36 crores.There will be different
infrastructure facilities. Based on bamboo
technology, different firms viz- mechanized
bamboo stick and Agarbati stick, bamboo
flooring mat ply blind and carets, bamboo shoot
etc. State Government has adopted different
plans to contribute capital to establish the firm
from Government and Non-Government
Organization. The time limit for establishment of
Tripura Bamboo Park is 24(twenty four) months.
In the bamboo park in Tripura, many people will
get employment depended on bamboos.The
Forest Department has also taken up planting
programme keeping in view the growing demand
of bamboo raw materials in coming years.
5) Para-v of
Page
No.129
Commercial wood
like Teak, Karai,
Gamair, Garjan
shall be increased
to 30% of the
present one and
formulate a plan for
this program.
Forest Department implements various schemes/
programmes, namely, NAP, CAMPA, JiCA,
IGDC, etc for afforestation activities. In the
recent past plantations were raised largely with
misc. species. However, recommended by the
Hon’ble Subject Committee-I, TLA the field
level functionaries had duly been advised to mix
at least 30% commercial species in the regular
plantations.
6 Para-v of
Page
No.129
To develop shoot species of Bamboo plantation to meet the present demand of the market in all Range area this program be taken up specially to the commercial Bamboo plantation.
Bamboo shoot plays a vital role of the tribal of Tripura. Bamboo shoots of Muli, Barak, Mritinga are in high demands in the market. Special attempts were made by Forest Department for planting of Muli, Barak, Mritinga etc. species of bamboo on forest land for the Purpose. An exotic species D .asper which is suitable for bamboo shoots had also been tried from TCS (Tissue Culture Seedlings) on Pilot Project basis to study the feasibility in Tripura Condition.
-63-
The plan/programme and any project to be implemente d during the financial year 2013-14 for consideration of the Com mittee during
examination.
• The earlier CSS Projects like National Afforestatio n Programme (NAP), Intensification of Forest Management (IFM), River V alley Project (RVP), National Bamboo Mission (NBM), Central Zoo Autority (CZA), Project Elephant, Assistance to States for Development Nati onal Parks and Sanctuaries (ASDNP) etc. continued during 2012-13 a s per approved plan of works. • The Green India Mission Scheme of Government of Ind ia has been
implemented during 2012-13 in all States. Prelimina ry meetings/workshop was organized to apprise all Stat es Forest Departments about project formulation giving specia l emphasize on climate change scenario.
Point No ����ii) Achievement made during the year 2012-13
Physical & Financial Achievement upto March, 2013(P rovisional)
(Rs.in lakhs) Financial Major outputs
Major/Minor Head Of Accounts
Approved outlay Fund released by Fin.Dept during 2012-13
Financial Achievement during 2012-13 (Provisional)
BE RE
2406-Forestry & Wildlife(State Plan)
326.95 402.30 391.94 383.59 Creation of 2012-13Plantation over 18,113.98 ha ,nursery bed raised over61.78 lakhs, Creation of river bank plantation 124 ha, Road side plantation 109 Km, Creation of water harvesting structures- 575 ha , Agro forestry over 8270 ha under JICA/
2406-13th Finance Commission
2388.00 2443.17 1846.17 1835.30
-64-
IGDC project in RoFR land, Construction of buildings- 50 Nos, Payment of Office expenses, other charges etc.,
4406-Externally Aided Project(JICA)
2600.00 5633.18 4600.00 4600.00
4406-Externally Aided Project(IGDC)
800.00 1500.00 1500.00 1500.00
Total of State Plan :
6114.95 9978.65 8338.11 8318.89
CSS-Intensification of Forest Management (IFM)
195.78 533.76 332.43 332.43
CSS- River Velley Project (RVP)
116.13 24.13 24.12 24.12
CSS-Project Elephant
68.24 20.91 10.96 9.91
CSS-Asstt.to Dev.of National Parks andSanctuary
3.19 4.04 3.05 2.04
CSS-Development of Sepahijala Zoo(CZA)
61.13 26.70 26.70 0.00
Total of CSS 444.47 609.54 397.26 368.50 NEC-Bamboo Dev.of Socio Economic
181.00 0.00 0.00 0.00
-65-
After examination of the Budget proposals and appreciation of submission of the PCCF & HOFF Department the Committee recommends the Budget proposals under Demand No. 30 for Grants by the House alongwith the Recommendations:-
RECOMMENDATIONS
i) The Department to achieve the goal of programme for useable special species Bamboo and Develop Bamboo plantatio n encouraging private sector also with a specific yea rly target.
ii) Bamboo Industry Artigens Training be continued and to develop Master Trainers.
iii) JAICA Project performance are to be done involving Panchyat as well as Village Committees.
iv) Efforts are to be continued for developing ECO Park and ECO tourism.
v) Production of Teak, Karai, Gamair, Garjan etc. shal l be more increased.
vi) It shall be the obligation of the Forest Department to formulate a specific proposal for Elephant conservation by pr oviding source of food for Elephant in the deep forest alon gwith water resource. Similarly, food and water sources are to be provided by the Department in the forest sufficiently for Mo nkey. These are to be achieved to avoid confrontation of Eleph ant and Monkey with human society every year for long.
vii) Trishna and Sipahijalla are to be demarcated for pr oper reconciliation immediately.
viii) Road side plantations are to be given priority.
After examination of the Budget proposals and appreciation of submission of the Representative of the Committee recommends the Budget proposals under Demand No. 30 for Grants by the House alongwith the Recommendations.
( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly
-66-
THE REPORT ON THE DEMAND NO. 27 OF THE AGRICULTURE DEPARTMENT
FOR THE FINANCIAL YEAR 2013-14.
The Budget proposal under Demand No. 27 relates to Agriculture
Department, Government of Tripura for the Financial Year 2013-2014 and the
Revised Budget for the Financial Year 2012-2013 are as follows :-
(Rs. in Lakhs)
PARTICULARS
REVISED ESTIMATES 2012 - 2013
BUDGET ESTIMATES FOR 2013 - 2014
DEMAND FUND FOR
TOTAL T.S.P S.C.P
1) Non Plan 7455.23 8703.50 --- --- 8703.50 2) Plan 17377.50 10975.81 8363.27 4157.12 23496.20 3) C.S.S 1943.62 690.89 762.54 388.51 1841.94 4) N.E.C 94.50 469.40 --- --- 469.40 Total 26870.85 20839.60 9125.81 4545.63 34511.04
Now, the aforesaid Budget Proposal is under examination of the Subject
Committee-I of the Tripura Legislative Assembly for recommendations to the
Demands for Grants.
The Committee in its meeting held on 7th May, 2013 examined the Budget
Proposals in details having discussion with the Additional Chief Secretary of the
Department who appeared on summon.
First of all, the Additional Chief Secretary informed the Committee about
the action taken in respect of the recommendations made by the Committee
during the year 2012-13 and stated as follows :-
-67-
Sl.No.
Relevant
Para/ Page no.
of the report
Recommen
dations of
the
committee
Department reply
i)
Su
bje
ct C
om
mit
tee
- I
, P
ag
e-
97
To
endeavour
implementa
tion of
ATMA
project in
major way
The Central Sector Scheme "Support
to State Extension Reforms", popularly
known as ATMA, was introduced in the
State during 2005-06 in South & North
Tripura District. Dhalai and West Tripura
District were included during 2007-08.
Recently 4 (Four)new Districts are also
included under the scheme. Funding
pattern of the scheme is 90:10.
The scheme envisages in the capacity
building and skilled development of
farmers and the extension functionaries of
Agri & allied sectors. Based on the Strategic
Research and Extension Plan (SREP) of
each District, every year State Extension
Work Plan (SEWP) is prepared and
submitted to the Government of India,
where components like training, exposure
visits, demonstration, farms school,
promotion of farmers group for Agri.
entrepreneurship are included.
Two State level Training Institute has
been established at Lembucherra, besides
4(four) nos. District Training Institute at
District Head Quarter of 4(four) District for
capacity building of farmers and extension
funcutionaries.
Farmers Advisiory Committee (FAC)
is constituted at Block Level for observing
the Plan Preparation and execution of the
programmes.
Some of the major achievement during 2012
presented below:
Item Target Achievement
Training of the
officers and
extension
functionaries
550 nos.
participant
532 nos.
participants
Exposure visit of
extension
functionaries and
farmers
50 nos.
participants
48 nos.
participants
Training of farmers 19390 nos. 15890 nos.
participants participants
Demonstration 2950 nos. 2100 nos.
Farms school 188 nos. 129 nos.
Organisation of
field days 41 nos. 20 nos.
Farmers Scientist
interaction 8 nos. 8 nos.
District Level
Krishi Mela 8 nos. 6 nos.
Information
dissemination
through short film
- 7 nos.
ACTION PROGRAMME FOR 2013-14
Item
Training of the officers and
extension functionaries
2250 nos.
participants
Exposure visit of extension
functionaries and farmers
6975 nos.
participants
Training of farmers 51750 nos.
participants
Demonstration 7875 nos.
Farms school 135 nos.
Organisation of field days 90 nos.
Farmers Scientist interaction 16 nos.
Development of Technology
package on electronic forms 80 nos.
District Level Krishi Mela 8 nos.
ii)
Su
bje
ct C
om
mit
tee
- I
, p
ag
e -
97
Department
to take step
to cover all
peasent-
family
under the
Kishan
Credit Card
(KCC)
scheme
Total nos. of farmer in the state is around
4.79 lakhs (3.58 lakhs + 1.21 lakhs Patta
holders) of which total 401227 Nos. Kishan
Credits Cards have been distributed to the
farmers with a credit disbursement of
Rs.72887.95 Lakhs during the last 13 years.
As per norms a KCC is vaild for 3(three)
years, i.e. 267110 nos. are granted as alive
card (2010-11 to 2012-13). Now it denotes
that out of the total farmers 211890 nos.
are eligible for new KCC. (4.79 lakhs - 2.67
lakhs).Year wise position of KCC sanctioned
an amount disbursed since inception in the
state as follows:
Year KCC issued
(nos.)
Amount
disburse
d (Rs. in
lakhs)
Loan
per
KCC
(Rs. in
lakhs)
2000 1214 135.87 0.11
-69-
-
2001
2001
-
2002
3072 378.33 0.12
2002
-
2003
5696 562.51 0.10
2003
-
2004
8039 848.21 0.11
2004
-
2005
12647 1515.97 0.12
2005
-
2006
11978 2041.20 0.17
2006
-
2007
14343 1978.21 0.14
2007
-
2008
19198 3304.61 0.17
2009
-
2009
27474 5401.11 0.20
2009
-
2010
30456 9520.70 0.31
2010
-
2011
50294 7988.26 0.16
2011
-
2012
114883 17531.17 0.15
2012
-
2013
101933 21681.80 0.21
Total 401227 72887.95 0.18
The target for issuing KCC during 2013-14
is suggested at 1.00 lakhs.
-70-
iii)
Su
bje
ct C
om
mit
tee
- I
, p
ag
e -
97
Department
should take
necessary
step to
introduce
modern
machine in
the
Agricultural
field,
training &
demonstrat
ion to be
done
regularly.
In the recent past a modern machine
namely Paddy Power Weeder with floating
skid is placed in different selected
Agriculture Sector for demonstration of
same in Paddy cultivation practice related
with weeding. In addition, Mannual Dal
Mill, Maize Sheller, Seed Treatment Drum,
Tree Prunner, Power Sprayer, Brush Cutter
and Cono Weeder have been procurred
which will be demonstrated shortly.
Regarding training to the farmers,
both inside the State and outside the State
are taken up. In recent past 14 nos. farmers
are completed a training programme for 15
days duration in connection with modern
farm machinery at North Eastern Region
Farm Machinery Training and Testing
Institute, Biswanath Chariali, Assam.
Another training programme was
conducted on 16/03/2012 at Nutan Nagar
Agro. Service Center on Farm machinery
where 30 nos. farmers participated.
Regarding future plan, both Inside
and outside the State programme will be
taken up on the following subjects on
receipt of fund under the scheme
"Promotion and Strengthening of
Agricultural Mechanization Through
Training, Testing and Demonstration".
1. Operation, maintenance and
management of Power Tiller.
2. Operation, maintenance of Plant
Protection Equipments.
3. Operation, maintenance of Improved
harvesting and Threshing machine.
4. Operation, maintenance of hand Pump.
5. Package of Agriculture machinery for
Paddy cultivation.
6. Package for Agriculture machinery for
Maize cultivation.
7. package for Agriculture machinery for
Oilseed and Pulse crop.
v)
Su
bje
ct C
om
mit
tee
- I
, pa
ge
- 9
7
The system
of
procureme
mnt of
Diesel for
Power
Tillers and
Pumps sets
of farmers
to be made
simpler in
consultatio
n with
Food
Department
and also to
take up
with Food
Department
to give
some
subsidy to
Diesel.
Indian Oil Corporation informed that they
have already opened 4(Four) nos. KISHAN
SEVA KENDRA (Retail outlet of Diesel etc)
and 3(Three) more nos. will be opened
shortly.
On the proposal for fixation of
subsidy as well as modalities to disburse
subsidy amount, matter has been taken up
with the Food Department. But the matter
is yet to be finalized.
v)
Subject
Committee - I,
page - 97
Sinking of
500 nos.
deep tube
wells of
small bore
for
irrigation in
small faring
land under
RKVY
scheme
During the Financial year 2012-13,
413 nos. of SBDTW have been sanctioned
by Government under SPA, out of which
272 nos. was sunked and 59 nos. has been
commissioned as on 31/03/2013.
Remaining works will be completed by May
2013.
District wise SBDTW to be installed
are as below:
1. North Tripura District : 40 Nos.
2. Unokothi District : 35 nos.
3. Dhalai District: 53 nos.
4. Khowai District :60 nos.
5. West Tripura District ; 55 nos.
6. Sipahijala District: 50 nos.
7. Gomti District: 60 nos.
8. South Tripura District ; 60 nos.
-72-
vi.
Su
bje
ct C
om
mit
tee
- I
, pa
ge
- 9
7
Setting up
of modern
markets for
selling
Agricultural
and
Horticultur
al produces
of farmers.
In Big
Markets of
the State
there shall
be some
cold storage
for
preserving
vegetable,
fish and
meat and
for that
Governmen
t of India
may be
approached
.
1. One Mini Cold Storage (Cool
Chamber) having capacity 25.00 MT has
been set up at Bishramganj Wholesale
Assembling Market for preservation of
vegetable, fish, meat and potato. Now it is
in test and trail run condition.
2. Tender for establishment of two
more Mini Cool Chamber having capacity
25.00 MT each for Sonamura Wholesale
Assembling Market having provision for
preservation vegetables & fruits and Nalua
Primary Market for vegetables and Betle
leaf has been invited.
3. TTAADC has establishing Cool
Chabmer having capacity of 25.00 MT at
Machli bazar for preservation for Potato,
vegetables, fish & meat.
4. During 2013-14, three nos. similar
capacity cool chamber for preservation of
vegetables & fruits will be constructed at
Kalibazar, Teliamura and Khayerpur
market under HMNEH scheme.
5. Two nos. similar capacity cool
chamber at Barkhatal & Padmabil has been
considered to be constructed by TTAADC
for preservation of vegetables, fruits, fish
etc. during the year 2013-14.
vii.
Su
bje
ct C
om
mit
tee
- I
, p
ag
e -
97
Use of Bio-
fertilizer
has to be
increased
and subsidy
to
appropriate
level has to
be
maintained.
Bio-fertilizer production scenario of
Tripura is given below:
S
l
.
N
o
.
Number of Production
Unit
Annual
Production
Capacity
Productio
n during
2012-13
1
3 nos. units operated
by State Government
through PPP mode
1200 MT @
400 MT in
each unit
588.932
MT
2
2 nos. units operated
by Private
Sector(Presently one
is non-operative)
1500 MT in 2
units
270.000
MT
Total : 858.932MT
Bio-fertilizer is being provided to SRI farmers @ 12
kg per hac without any cost since 2006-07.
Proposal placed to Government for approval to
provide Bio-fertilizer at 50% cost to non SRI
farmers 1(one) lakhs hac which is likely to be
implemented from 2013-14.
BUDGET ESTIMATE AND ACTION PLAN FOR 2013-14 OF STATE PLAN
/CSS/MACRO MANAGEMENT/ ACA/NLCPR/SPA ETC.UNDER
AGRICULTURE.
Demand No. 27 relates to Agriculture Department, Govt. of Tripura. Budget
Estimate for the year 2013-14 are as follows :
A. STATE PLAN , CSS & NEC etc.
(Rs. In Lakhs)
Sl.
No.
Name of
Scheme R.E. 2012-13
B.E. for 2013-14 Remarks
Demand
27
Demand
19
Demand
20
Total
1. State Plan 1725.80 3607.40 2412.66 1249.44 7269.50 Salary & Wages :
Rs. 366.00 lakhs.
Non-Salary : Rs.
6903.50 lakhs
2. RKVY (Plan) 6800.00 2642.70 3067.97 1289.33 7000.00
3. CSS/ Macro
Management
1693.62 648.95 762.54 388.51 1800.00
4. NABARD 210.00 234.01 217.64 133.35 585.00
5. AIBP 8000.00 4080.00 2495.00 1425.00 8000.00
6. NLCPR 50.00 41.94 00 00 41.94
7 SPA 641.70 411.70 170.00 60.00 641.70
8. NEC 00 469.40 00 00 469.40
SUB-TOTAL 19121.12 12136.10 9125.81 4545.63 25807.54
B. NON-PLAN
Sl.
No.
Name of
Scheme
R.E. 2012-13 B.E. for 2013-14 Remarks
Demand
27
Demand
19
Demand
20
Total
1. Non-Plan 7365.28 8640.00 00 00 8640.00 Salary
-74-
Sl.
No.
Name of
Scheme
R.E. 2012-13 B.E. for 2013-14 Remarks
Demand
27
Demand
19
Demand
20
Total
(Salary
&Wages
component)
&Wages
component
2. Others 89.95 63.50 00 00 63.50
SUB-TOTAL 7455.23 8703.50 00 00 8703.50
C. SUSPENSE ACCOUNT
Sl.
No.
Name of
Scheme
R.E. 2012-
13
B.E. for 2013-14 Remarks
Demand
27
Demand
19
Demand
20
Total
1. Suspense
Account
7000.00 6000.00 00 00 6000.00
SUB-TOTAL 7000.00 6000.00 00 00 6000.00
Total of Agri (A+B+C) 33576.35 26839.60 9125.81 4545.63 40511.04
(Major Head of Account wise details are given in ANNEXURE)
An amount of Rs. 31608.04 lakhs has been allocated in the Budget Estimate
2013-14 in favour of Agriculture under State Plan/RKVY/NABARD
LOAN/SPA/AIBP/CSS/Macro Management /ACA/NLCPR/ Non-plan etc. other than Salary
and wages.
Achievement made during the year 2012-13 relating to Agriculture
Department
Sl. No.
Name of Scheme R.E. for the year 2012-13
Fund released during 2012-
13
Expenditure incurred during
2012-13 A State Plan
1. Salary and Wages 466.00 502.83 502.83
2. Non-Salary 1259.80 1250.11 1243.85
-75-
Sl. No.
Name of Scheme R.E. for the year 2012-13
Fund released during 2012-
13
Expenditure incurred during
2012-13 3. RKVY 6800.00 5667.55 5568.99
RIDF(NABARD LOAN) 210.00 210.00 157.21
ACA/SPA 641.70 641.70 641.70
4. CSS 151.37 155.24 153.81
5. Macro Management 1542.25 1538.38 1367.09
6. NLCPR 50.00 00 00
SUB-TOTAL 11121.12 9965.81 9635.48
B Non-Plan
1. Salary and Wages 7365.28 6870.14 6870.14
Non-Salary 89.95 89.91 89.28
SUB-TOTAL 7455.23 6960.05 6959.42
C Suspense Account 7000.00 3209.04 3204.86
GRAND TOTAL 25576.35 20134.90 19799.76
IMPORTANT ACHIEVEMENTS OF THE DEPARTMENT DURING FINANCIAL YEAR 2012-13.
The Government of India awarded the State with “COMMANDATION
AWARD” during the year 2011-12 for the efforts made to increase
production & productivity of food grains during 2010-11, utilization of funds
under NFSM(Rice)during 2011-12 and popularization of SRI in paddy
cultivation and the same was given in the month of January , 2013.
For increasing productivity, about 87,978 hectares area has been
covered under SRI method of paddy cultivation during 2012-13 against
86,630 hectares during 2011-12. Optimum level of 33% SRR in Paddy is
maintained in the state for last couple of years and continued during 2012-13
also.
The State is now producing surplus quantity of HYV paddy and
Mustard seeds. The State is exporting Certified HYV Paddy and Mustard
seeds through National Seed Corporation Ltd. and distributing to other
states. Per hectare NPK Use would be 65 kg in 2012-13 from 55 kg in 2011-
12. Efforts are being made to build up a buffer stock of fertilizers in the state
to avert any shortages during peak season.
National Food Security Mission (NFSM-Rice) programme started its
implementation in Tripura from Boro season of 2011-12 only in erstwhile
Dhalai and North Tripura District. All the Eight Districts of the State have
been covered under the National Food Security Mission (NFSM-Rice) from
2012-13 with an allocation of Rs 21.78 crore. Major thrust is given on Cluster
Demon on SRI Paddy in 6000 ha @ 10 ha in each cluster with an amount of
Rs 4.50 crore, Distribution of Quality seed of HYV and Hybrid @ Rs 5 / Kg and
Rs 20 / Kg respectively with an amount of Rs 1.96 crore, Support for
-76-
Micronutrient, IPM and Liming material with an amount of Rs 10.14 crore,
Support for irrigation through Mini Deep Tube-well and Pump Set , Support
for Farm Implements and Farmers Training etc. with an amount of Rs 4.62
crore.
Besides existing 5(five) nos. Department run cold storages,
construction works of more 5(five) nos. at Dharmanagar, Udaipur, Ambassa,
Amarpur and Belonia are in progress. Process are being in progress for
construction of one more cold storage at Khowai.
Three Big market at Bachaibari, Valurchar and Machmara has been
taken up during 2012-13 under RIDF, NABARD and work is in progress.
Beside this big market at Sonamura whole sale market, Sonamura retail
market and Khayerpur market has already been taken during 2012-13 and
work is in progress. 13(Thirteen) nos. rural hutt at Dimatali, Mirza, Dalogaon,
East Haru, Halihali, Bagmara, Binanhazaripara, Kalabagan, Birchandranagar,
Demdum, Santipara, Kemtali & Nalua has been taken up during 2012-13 &
work are in progress.
The 1st and 2nd batch of Student @ 17 nos. in each batch from college
of Agriculture, Lembucherra have passed out in 2011 and 2012 respectively.
Out of 34 nos. pass out student, 25-nos. of students were qualified for the
P.G. courses through National level Entrance Examination and now studying
in different leading universities in India.
About 1,01,933 nos. Kisan Credit Cards has been distributed during
2012-13 and Rs. 216.82 crore was disbursed up to March, 2013.
It was targeted to bring 25,000 hectares of forest land area which
rights were vested with tribal forest dwellers are proposed to be brought
under Agricultural crops over a period of three years. Up to 2012-13, about
20,000 hectares of area were covered under FRA in Agriculture.
IMPORTANT PROJECTS, SCHEMES/PROGRAMMES PLANNED TO BE IMPLEMENTED IN 2013-14:
The target for production of food grain has been proposed to be
pegged at 8.17 Lakh tons during the year 2013-14 against the anticipated
production of 7.25 Lakh tons in 2012-13. The requirement of food grain is
8.66 Lakh tons during 2013-14 for the projected population of 38.35 Lakhs.
Special thrust will be given to cover 41,000 ha. area under Aush
paddy, 70,000 ha. under Boro paddy, 7,700 ha under Maize, 17,862 ha under
pulses and 12451 ha oilseed. An area of about 1, 00,000 hectare area to be
covered under SRI including 10,000 ha. under Hybrid paddy. To boost up the
-77-
food grain production, an area of 1, 00,000 ha would be covered through
ICM.
Crop diversification in fallow land which accounts for about 84,000
hectares and 60,000 hectares during pre-kharif and rabi seasons respectively
needs to be brought under cultivation through effective cropping sequence
like Vegetables, Potato, Pulses, Oilseeds, Fodder etc. so that farmers can earn
a good income. Special thrust will also be given on crop diversification to
utilize fallow land during pre-Kharif and pre-Rabi season through pulses and
oilseeds cultivation during 2013-14.
Crop-wise addl. area to be brought in Seasonal Fallow land during
2013 -14 is proposed as under:
Pulses: 3280 hac. (Moong- 700 ha, Lentil-1500 ha Arhar-160 ha, Urad
- 300 ha, Rajmash-200 ha, Field Pea-420 ha),
Oilseeds: 2290 hac. (Groundnut-480 ha, Sesamum- 500 ha, Mustard -
750 ha, Soyabean – 310 ha , and Flax /Linseeds – 250 ha.).
In addition 4000 ha. Pulses area targeted to be covered under RoFR.
An area of 10,000 ha. pulses cultivation under Shifting Agriculture as mixed
crop targeted to be covered during 2013-14 from which net area under
pulses would be about 2000 ha.
Thrust will also be given on oilseed cultivation of 3000 ha area in
RoFR land and 2500 ha. in Shifting Agriculture.
Thus, total targeted area under pulses during the year 2013-14 would
be 17862 ha. against existing area of 8582 ha (2011-12). and oilseed 12451
ha. against existing area of 4661 ha(2011-12).
Seed Replacement Rate across the Farm household at the optimum
level (i.e. for Paddy-33%, for Pulses and Oilseeds -50%) should be continued.
Special attempt shall be made to cover those farmers, who are not replacing
their seeds on time.
Production of Certified HYV seeds are proposed to be continued in the
Government Farms as well as in farmers’ fields through Registered Growers’
Programme with proper seed testing, seed processing, storage facilities.
Increased labour costs make it imperative to go in for farm
mechanization of all agricultural operations, such as sowing, weeding and
threshing. Mechanization in agriculture is essential for minimizing cost of
-78-
production. Additive subsidy for some machinery/equipment like Mini
Tractor, Power Weeder, Transplanter, Seed Drill, Drum Seeder, Mini-
combined Harvester and other labour saving equipments etc. is proposed for
small and marginal farmers dovetailing all sources of funds including the
Sate Plan. The Government will have to pioneer development of appropriate
SHGs/Farmers’ Groups/ Farmers’ Club for providing custom hiring services
of agricultural machinery and equipments to the farmers. Custom Hiring
Service/Agro Service Centre of farm machinery and implements may be set
up at block level to help the farmers reducing the cost of cultivation. Group
approach through appropriate SHGs/Farmers’ Groups/ Farmers’ Club may
also be considered through subsidy/financial assistance. Identified
equipment may be supplied to the Groups on subsidy with dovetailing PDF
Funds.
The state is having 554 Primary Rural Markets, of which Wholesale
Assembling Markets are 84 and Regulated Markets are 21 guided by Tripura
Agricultural Produce Markets Act. Efforts will be continued to develop
infrastructure of the existing markets including Rural Haats.
Micro nutrient deficiency especially in the form of Zinc and Boron can
be effectively addressed by way of application of Zinc Sulphate and Borax as
per doses recommended for specific crops. The small and marginal farmers
of the state are not coming forward for use in their crop field. The
distribution of the same is proposed to be made by way of providing subsidy
by dovetailing funds from different schemes and programmes including the
State Plan for 40,000 hectares area during 2013-14.Efforts to bring One lakh
eligible farmers under KCC will be continued during current year.
Jhumias will be assisted in practicing improved method of Jhum
cultivation. In addition, it is proposed to bring 5,000 hectares of forest land
under Agricultural crops during 2013-14 which rights were vested with
tribal forest dwellers under Forest Right Act.
A. State Plan (Divisible Pool) : An amount of Rs. 7269.50 lakhs has
been provided under State Plan for implementation of Crop Husbandry
including administrative cost like cost of fuel, stationary articles, electricity
charge, publication etc. In respect of development activities the major
programme taken are Subsidy on sale of fertilizer and seeds of different
crops, internal carrying of Agri inputs, Bonus for seed production
-79-
programme through Registered Growers, Running cost of existing cold
storage, dehumidified Godown and seed processing plant etc, State share of
CSS schemes, participation in different Exhibition/fair/mela, cost of
equipments for soil testing laboratories including mobile soil testing van,
glassware and chemicals for different laboratories, stipend, market
development and maintenance of existing buildings of Agriculture
department, construction of S.A. office, V.L.W stores etc. This is including Rs.
300.00 lakhs kept as transfer of fund to TTAADC for implementation of
different development programme, renovation of existing V.L.W. Stores
including market development.
B. RKVY (Plan) Rs. 7000.00 Lakhs.: Department of Agriculture is the
Nodal Department in respect of RKVY scheme. Department of ARDD,
Fisheries, Horticulture TTAADC, KVKs are also implementing agency. Fund
placed to the different implementing agencies as required according to their
programme approved by the SLSC.
During the year 2012-13 implementing agency wise fund placement
are as below:
a) Agriculture : Rs. 4082.81 lakhs.
b) Horticulture ; Rs. 365.75 Lakhs.
c) Fisheries : Rs. 554.39 Lakhs.
d) TTAADC : Rs. 228.87 Lakhs.
e) KVK. Rs. 79.75 Lakhs.
f) ARDD: Rs. 355.95 Lakhs.
TOTAL : Rs. 5667.82 Lakhs.
The Agriculture Department has taken the following programme
under RKVY during 2012-13:
Name of the Project Fund
Placed
Expenditure
Incurred as on
31.03.13
Agriculture Department
Normal RKVY
System of Rice Intensification
(SRI) 3276.06 3147.06
-80-
Name of the Project Fund
Placed
Expenditure
Incurred as on
31.03.13
Providing Support for Hybrid
Paddy Cultivation 60.00 60.00
Maximizing Productivity of Jhum
Cropping system 338.00 338.00
Other Administrative Cost 34.95 34.95
Liabilities against Boro season of
SRI during 2011-12 100.74 100.74
Assistance for critical inputs for
Aush Paddy 135.64 135.64
Assistance for Agriculture Crop
Production in FRA areas 76.00 76.00
College of Agriculture (For
Chemical re-agents/equipments) 11.42 11.42
Sub-total Normal RKVY 4032.81 3903.81
Sub-Schemes
Rain-fed Area Dev. Programme
(RADP) 50.00 50.00
Total Agriculture 4082.81 3953.81
C. CSS & Macro Management in Agriculture: An amount of Rs. 1800.00
Lakhs has been kept for implementation of different CSS schemes and
Macro Management in Agriculture that are being implemented by the
Department of Agriculture, Govt. of Tripura. Central Sector Schemes
being implemented by the Department of Agriculture are as below:
1. Mini Mission II of Technology Mission of Cotton (75:25) for
development of cotton cultivation in Tripura . Major programmes
under this scheme are distribution of Seed, Implements, Training
and FFS etc.
2. Mini Mission II of Jute Technology (90:10). Major programmes
under this scheme are distribution of Seed, Implements, Training,
and construction of Jute retting tank etc.
3. Scheme for Establishment of An Agency for Reporting Agri
Statistics (EARAS) (100% CSS). Main objective of the scheme is
plot to plot survey on land utilization and reporting to GOI.
-81-
4. Scheme of Quality Seed (100%). Main activities of the scheme is to
create infrastructure facilities for processing and storage of seed,
distribution of seed on subsidy, training etc.
5. Scheme of Organic farming (100% CSS). Main objective of the
scheme is crop demonstration on organic farming, training etc.
6. Training Testing & Demo. of farm mechanization.
D. SPA: An amount of Rs. 641.70 Lakhs has been kept under SPA during
the year 2013-14 for creation of irrigation facilities by installation of
Small Bore Deep Tube wells with submersible pump and development
of Markets .
E. NLCPR : An amount of Rs. 41.94 Lakhs has been kept under NLCPR
during the year 2013-14 for construction of buildings of College of
Agrculture, Tripura.
F. Non-Plan : An amount of Rs. 8640.00 Lakhs has been kept under Non-
Plan during the year 2013-14 for Salary and Wages component. Beside
this an amount of Rs.25.00 Lakhs has been kept under Non-Plan other
than Salary and Wages during the year 2013-14 for other activities.
After careful examination of the Budget proposal and appreciation of submission placed by the Principal Secretary of the Department, the Committee make the following Recommendations :-
RECOMMENDATIONS
i) Implementation of ATMA Project to be efficiently looked into by the Department.
ii) Kishan Credit Card (KCC) scheme to the uncovere d peasant families to be extended.
iii) Introduction of Modern Machine in the field of State Agriculture, training and demonstration to continue.
iv) Use of Power Tillers and Pump sets by farmers a re to be encouraged by the Department with subsidy to Diesel in consultation with Food Department.
v) The number of sale markets and cold storages as well as cold chambers are to be increased with specific target.
-82-
vi) VLW store-cum Office in each Panchayat be set-u p in phase manner, Superintendent Office at Bloc level and Sec tor Office be setup.
vii) Minimum 5(five) farmers in a group depending u pon 10 acres of quantum of Land are to be provided with Power Tille rs with loan in subsidy.
viii) The Department to ensure timely supply of see ds to farmers.
After Examination of the Budget proposal and appreciation of the
Budget proposals and appreciation of submission of the representative of the
Committee recommends the Budget proposals under Demand No. 27 for Grants
by the House alongwith the Recommendations.
( Shri Sudhan Das ) Dated, Agartala, Chairman the10th May, 2013. Subject Committee- I Tripura Legislative Assembly
-83-
THE REPORT ON THE DEMAND NO. 28 OF THE AGRICULTURE (HORTICULTURE)
DEPARTMENT FOR THE YEAR 2013-14.
The Budget proposal under Demand No. 28 for Grants for the Financial Year 2013-2014 and the Revised Budget for the Financial Year 2012-2013 relates to the Horticulture & Soil Conservation Department, Government of Tripura are as follows :- ( Rs. in Lakh )
Now, the Budget proposal is under scrutiny and examination of the
Subject Committee-I of Tripura Legislative Assembly for recommendations to
the Demands for Grants.
The Committee in its meeting held on 7th May, 2013 examined the
Budget proposals in details having discussion with the Additional Chief
Secretary of the Department who appeared before the Committee on
summon.
First of all, the Additional Chief Secretary informed the Committee
about the action taken in respect of the recommendations made by the
Committee during the Financial Year 2012-13 and stated as follows :-
Particulars Revised Budget for 2012-2013
Budget Estimates for 2013-2014 Demand Fund for Total
T.S.P. S.C.P 1. Non-Plan
1855.22 2102.00 --- --- 2102.00
2. Plan 1674.98 1041.02 1142.72 541.26 2725.00 3. C.S.S 400.00 --- --- --- --- 4. N.E.C
--- --- --- --- ---
Total 3930.20 3143.02 1142.72 541.26 4827.00
-84-
Sl. No.
Relevant Para/ Page No. of the Report
Recommendations of the Committee
Reply of the Government on the Recommendations
i Page No. - 104
Commercial production of Mango, Orange, Musambi has to be increased by procurement of much more seedlings.
1. Necessary efforts have been taken
to increase area & production of
Mango, Orange and Mosambi in
the State. During the year 2012-13
an area of 1226 ha, 653 ha, & 279
ha have additionally been brought
under cultivation with Mango,
Orange & Mosambi respectively.
2. Further action has already been
taken for procurement and supply
of required planting materials to
cover 1035 ha Mango, 430 ha
Orange & 275 ha Mosambi.
ii Page No. - 105
Tripura variety of ‘Sabri Banana’ has to be protected and also increase its production by using modern technology.
1. As part of protection and
promotion of Tripura variety of
‘Sabri Banana’, the protocol for
micro propagation of the original
type is under process, in
collaboration with the National
Research Centre for Banana,
Tirichirapalli , Tamil Nadu.
2. Further molecular marking will
also be tried, in collaboration with
the suitable laboratories outside.
3. To increase production of ‘Sabri
Banana’, Horticultural Research
Complex’ Nagicherra has been
given target to produce 50,000
tissue cultured plantlets.
4. During the year 2012-13, an area
of 1369 ha have additionally been
brought under cultivation with
Banana( T.C=100 ha & Sucker=
1269 ha)
5. During the year 2013-14, an area
of 50 ha will be brought under
High Density Plantation & 650 ha
with normal spacing of Banana.
-85-
iii
Page No. - 105 A separate Biotechnology Lab to be established only for Banana and other fruits tissue culture and also examine the feasibility of obtaining fund from Govt. of India.
1. The Directorate of Horticulture &
Soil Conservation, Tripura is
running a Tissue Culture Lab. at
Horticultural Research Complex,
Nagicherra with the production
capacity of 50,000 plantlets per
annum.
2. A new T.C. Laboratory, has been
set up at HRC, Nagicherra with the
fund of RKVY for production of
about 2.5 lakh plant lets per
annum.
iv Page No. - 105
All Orchards of our State to be brought for rezumination, Department to take plan with improved variety plants of commercial value and examine SSG and any grower’s society may be involved.
1. Action has already been taken to
develop 33 Govt. Orchards with
the following activities under the
fund of RKVY(Rs.330.95 Lakh):
* Replanting of mother block : 374.71 ha * Development of nursery area : 22.91 ha * Excavation of WHR : 32 Nos. * Development of irrigation
facilities : 30.50 ha
* Installation of mini deep / shallow tube well : 24 Nos. * Poly shed / green house : 30 Nos. * Potting shed : 15 Nos. * Labour shed : 5 Nos. * Over head Tank : 5 Nos.
2. Consultations are underway for
involving suitable SHGs/Growers’
Societies in the production
programme of the orchards.
-86-
v Page No. - 105
Special emphasize to
be given to bring under
more land of Forest
Dweller’s Right Act by
horticulture production.
1. To create additional source of
income for the patta holders in
FRA areas- during 2012-13, 4477
ha area has been brought under
cultivation with Horti Plantation
which have benefitted 12012
families.
2. During 2013-14, 2300 ha area has
been targeted to cover with
different horticultural crops in
FoRA areas under State plan &
MGNREGA with identified 13
perennial & semi perennial
horticultural crops viz Mango,
Litchi, Guava, Mosambi, Orange,
Lime/ Lemon, Jackfruit, Coconut,
Arecanut, Cashewnut, Banana,
Papaya, & Pineapple.
MAJOR PHYSICAL ACHIEVEMENT UNDER STATE PLAN/CSS/ NON PLAN
PROGRAMME DURING 2012-13.
To boost up the Horticultural & Soil Conservation activities, a sum of Rs. 3264.20 lakh has been earmarked in the Revised Estimate(R.E) for 2012-13 under State Plan /Non Plan /CSS
State Plan : Rs.1008.98 Lakh
Non Plan : Rs.1855.22Lakh
CSS (NWDPRA) : Rs. 400.00 Lakh
1. Direction & Administration (Plan) : An amount of Rs. 211.08 lakh was kept for Salary
(Rs. 148.58 Lakh ) & non Salary etc.( Rs. 62.50 Lakh) under the Scheme for Direction &
Achievement made during the year 2012 - 13
-87-
Administration under 2401 & 2402 Head of Account. Out of which Rs 143.211 lakh
expenditure was booked under salary and Rs 56.06 Lakh spent under Non- salary .
2. Horti Research Activities : An amount of Rs. 32.847 lakh was spent out of total provision of Rs 33.00 Lakh for conducting 40 nos. trials / experiments on fruits, plantation crops, spices & vegetables , production of TPS-230 Kg, production of foundation seeds of vegetable- 2 Ha, besides conducting crop specific training to nos. field functionaries etc.(166 Nos).
3. Production of elite planting material and Development of progeny Orchards: An amount of Rs. 90.55 lakh was earmarked to produce 16.04 lakh quality planting materials in the Departmental orchards, maintenance of functioning 49 Nos departmental Orchards &farm . An expenditure of Rs 89.231 lakh made during the year .
4. Horti Development Activities : An amount of Rs 278.102 lakh was utilized out of Rs.
279.95 lakh earmarked for the following major activities:
� Assistance for cultivation of vegetable including in the land of FRA area : 1032 ha
area were brought under cultivation of different summer vegetable under state
plan.
� Assistance for cultivation of spices including in the land of FRA area : 126.2 ha area
were brought under cultivation of different summer vegetable under state plan
� Distribution of Seed Mini kits: 5565 Nos Mini kits of improved / Hybrid summer vegetables comprising of summer Cauliflower, Bhindi and summer Radish were distributed among the progressive vegetables growers in the state which covered 556.5 ha area.
� Cultivation of watermelon: Assistance was provided to 620 progressive Water melon cultivators which covered 62 ha.
� Assistance for cultivation of TPS tuber let and production of potato : Assistance was provided to the growers for production of TPS Tuber let in an area of 92.68 ha and production of potato through TPS tuberlet /certified seed potato in 279 ha area.
� Crop cutting experiment: Crop cutting experiment was conducted in 1174 nos. farmers field of Pine apple, Cabbage& Cauliflower .
5. Soil and water management : An expenditure of Rs 18.95 lakh was made out of fund
released amount of Rs.21.50 lakh and achievement made for removal of sand /
desiltation of affected cultivated land(92 ha) construction of check dam (48 Nos)and
re-excavation of peripheral channel(46 Nos).
6. NWDPRA( Centrally Sponsored Schemes, Macro-management ) :- An amount of Rs. 400.00 lakh was utilized for the activities like training, soil conservation measures, dry land horticulture, afforestation, agro forestry ,Water Harvesting Structure, farm ponds, clerance of drainage channel , livelihood support and production system & micro enterprise etc. in 79 nos. of NWDPRA Projects during 2012-13.
7. Non-Plan Activities: An amount of Rs. 1855.22 was earmarked for different component of non plan viz. salary, non salary, repairing and maintenance,
-88-
beautification of new secretariat, assembly , procurement of coconut seedling etc under 2401 & 2402 during 2012-13 and utilized Rs 1761.047 as per release of fund.
8. Outside budget i. Horticulture Mission for NE& Himalayan Region ( HMNEH):
Rs 4480.00 lakh was received during the year 2012-13 for different activities like
setting of Private & public sector nurseries-11 Nos ,area expansion under Fruits-2487
ha. , vegetable-4425 ha, flower-247 ha & spices-600 ha, Rejuvenation of old orchards-
500 ha, creation of water source-230 Nos ,promotion of INM/IPM-460 ha, Vermi
compost unit-340 Nos, , Human Resource development-5425 Nos etc.
ii. Integrated Watershed Management Programme :
An amount of Rs.2401.79 Lakh was released by GOI for different activities like- institutional arrangement & capacity building , watershed development works, livelihood activities for asset less persons, entry point activities etc. 109 nos. entry point activities, 129 ha. Watershed Dev. works , 456 nos. livelihood activities, 379nos. Production systems & microenterprise & 389 nos. institutional arrangements and capacity building were achieved during the year.
STATEMENT SHOWING THE MAJOR HEAD OF ACCOUNT/DEMAND WISE
ACHIEVEMENT DURING THE YEAR 2012-2013.
(Rs. in Lakh)
SL No. Name of the Schemes
RE 2012-
13
Release 2012-13
Expenditure during 2012-13
D- 19 D- 20 D-28 Total
1 2 3 4 5 6 7 8 1) Divisible Pool.
A 2401 – Horticulture.
i. Direction & Adm.(
Salary) 128.580 135.793 0.00 19.396 116.397 135.793
ii Direction &
Adm.(Non- Salary) 52.00 52.00 14.034 7.713 25.594 47.341
iii. Horti. Research atNagicherra
33.00 33.00 10.23 5.607 17.01 32.847
iv
Production of planting mat, & Dev. of
Progeny Orchard 90.55 90.55 28.077 15.40 45.754 89.231
v. Dev. of Horti. in
Tripura 279.95 279.95 85.143 47.399 145.56 278.102
Sub-Total of A (2401) 584.08 591.293 137.484 95.515 350.315 583.314
B 2402 – Soil
Conservation.
i. Direction & Adm.(
salary) 20.00 7.418 0.00 0.00 7.418 7.418
ii Direction & Adm.(
Non-salary) 10.50 10.50 2.498 1.641 4.58 8.719
-89-
ACHIEVEMENT ON C.S.S. (MACRO MANAGEMENT) DURING THE YEAR 2011-2012.
(Rs. in Lakh)
iii. Soil & Water Management
inTripura. 21.50 21.50 6.66 3.09 9.20 18.95
Sub-Total of B (2402) 52.00 39.418 9.158 4.731 21.198 35.087 Total of 2401+ 2402 * 636.08 630.711 146.642 100.246 371.513 618.401
C 5456-PSU(THCL) 76.00 76.00 23.56 12.92 39.52 76.00
D State share & Contribution.
295.90 295.90 95.70 50.32 143.88 289.90
E Major Work 6.00 6.00 0.00 0.00 6.00 6.00
Sub- Total of C,D & E 371.90 371.90 371.90 63.24 189.40 371.90
Total of Divisible Pool. 1007.98 1002.611 265.902 163.486 560.913 990.301
1 2 3 4 5 6 7
82) Non-Divisible Pool
i. W.D.P.S.C.A 1.00
Total of Non-Divisible Pool
1.00
Total of State – Plan. 1008.98 1002.611 265.902 163.486 560.913 990.301 Non-Plan i. 2401 & 2402-(Salary). 1717.04 1629.716 1629.716 1629.716
ii. 2401& 2402 ( Non-
Salary) 80.18 80.18 80.18 80.18
iii Minor Work 43.00 43.00 43.00 43.00
iv Procurement of
Seedling 15.00 15.00 15.00 15.00
Total of Non-Plan. 1855.22 1767.896 1761.047 1761.047 Grand Total=Plan &N-
Plan. 2864.20 2770.507 265.902 163.486 2321.96 2751.348
SL No.
Name of the Scheme
Released
(2012-2013)
Released (2012-2013)
Expenditure during 2012-13
Total. D-19 D-
20 D- 28
1 National Watershed Dev. Project for Rain fed Areas (N.W.D.P.R.A)
400.00 400.00
124.825 68.54 206.44 399.805
Total. 400.00 400.00 124.825 68.54 206.44 399.805
-90-
PROPOSED ACTION PLAN FOR 2013-14.
To boost up the Horticultural & Soil Conservation activities, a sum of Rs. 4827.00 lakh has been earmarked in the budget estimate for 2013-14 under State Plan & Non Plan.
State Plan : Rs. 2725.00Lakh
Non Plan : Rs. 2102.00 Lakh
1. Direction & Administration (Plan) : An amount of Rs.170.00 Lakh has been kept for Salary/Wages (` 175.00 Lakh) and non Salary including electricity (Rs. 73.00 Lakh) under the Scheme for Direction & Administration.
2. Horti Research Activities : An amount of Rs. 50.00 lakh have been earmarked to conduct trails (50 Nos.) on introduction, acclimatization, cultivation , evaluation of different Horti crops & Production of hybrid TPS(250 Kg). Besides, programme like Production of foundation seed of promising vegetables (2Ha), mushroom spawn(Rs. 0.20 Lakh) and crop specific training of field functionaries(400 Nos.) at HRC, Nagicherra are also earmarked.
3. Production of elite planting material and Development of progeny Orchards: An amount of Rs. 150.00lakh has been earmarked to produce 20 lakh quality planting materials in the Departmental orchards and maintenance of 49 Govt Orchards/farms along with local procurement of 40,000 seed coconut from identified mother plants for raining coconut seedlings.
4. Horti Development Activities : An amount of Rs. 1100.00 lakh has been earmarked for the following major activities : � New area expansion of fruits and plantation Crops : 2300 ha area has been
earmarked to bring additionally through different fruits and plantation crops in FRA areas through convergence of fund with MGNREGA .
� High Density Planting of Banana: 50 ha has been targeted for HDP banana during the year.
� Distribution of Coconut Seedlings: 3500 units of coconut seedlings @10 Nos / unit would be distributed in the farmers to raise plantation in the embankment of fishery ponds in the state.
� Assistance for production of Vegetable - Besides, 735.00 ha of land would also be additionally brought under different vegetables in upland and seasonal fellow.
The Plan/ Programme and any project to be implemented during the year 2013 – 14 for consideration of the Committee during examination.
-91-
� Assistance for production of TPS Tuber let & Potato: Assistance would be extended to progressive potato growers to produce TPS tuber let in 100.00 ha area and assistance would be provided to new potato growers to produce potato in 200 ha area through TPS Tuberlet/certified seed potato in non-traditional areas .
� Assistance for production of Root & Tuber Crop (Other than potato): To encourage the farmers provision has kept for assisting farmers to grow 650 ha Root & Tuber Crops in upland & seasonal fallow.
� Assistance for production of spices Crop: Assistance would be provided to progressive growers of 100.00 ha spices crop in upland/FRA areas.
� Intercrop in Upland/FRA areas: To generate intermediate income from the new plantation areas, farmers would be assisted to grow 1000 ha intercrop with different vegetables and spices.
� Staggering production of pineapple: 1000 ha has been earmarked for Staggering production of pineapple.
� Assistance for cultivation of betel vine: Assistance would be provided to progressive growers of betel vine to an area of 50.00 ha.
� Distribution of vegetable seed minikits: To bring more area as well as to increase production of vegetables, 700 seed minikits would be distributed among the progressive cultivators which will cover70 ha area in the state.
� Assistance for cultivation of Water melon: 1000 units of water melon seed
materials would be provided to progressive growers to cover 100 ha area in the state.
� Crop cutting experiments: Crop cutting experiments (1500 nos.) of pine apple, cabbage, cauliflower, brinjal, tomato etc. would be made for proper yield estimation of these crops.
� Organization of Vegetable Show: - Like previous years, to encourage the farmers in growing quality vegetables in the state, 22 nos. Sub division level Vegetable Show is proposed to be organized during the year.
� Beautification / maintenance activities: Development & maintenance of Rabindra Kanan, VIP Bungalows, New Capital Complex and New assembly garden etc. activities are earmarked.
5. Soil Conservation activities: An amount of Rs. 50.00 lakh is kept for development of
degraded land-137 Ha, Execution of gully control / check dam etc-135Nos &
excavation/re-excavation of peripheral channel -170 Ha.
6. WDPSCA: A budget provision has been kept for Rs 600.00 lakh under WDPSCA with the balance fund proposed to be released for 33 nos. of watershed projects under WDPSCA of Non-Divisible pool . The activities include training, soil &moisture conservation measures, agronomic conservation practices, soil conservation structure, water bodies, dry land horticulture, afforestation, agro forestry, sand removal, clearance of drainage channel, livelihood support and production system & micro enterprise etc.
-92-
7. Non-Plan Activities: An amount of Rs. 2102.00 Lakh is earmarked for different component of non plan viz. salary, non salary, minor work ,subsidy, others etc under 2401 & 2402 during 2013-14.
8. Outside Budget: i. Horticulture Mission for NE& Himalayan Region ( HMNEH):
Rs 4900.00 Lakh has been proposed during the year 2013-14 for different activities like
setting of Private & public sector nurseries-20 Nos ,area expansion under Fruit Crops-
4105 ha, vegetable including TPS -5050 ha, flower-225 ha & spices-365ha, Rejuvenation
of old orchards-575 ha, creation of water source -163 Nos ,promotion of INM/IPM-1341
ha, Vermi compost unit-682 unit, Horticulture Mechanization-100 Nos, Human Resource
development-8850 Nos., seminar etc.
ii. Integrated Watershed Management Programme :
An amount of Rs4891.00 Lakh has been proposed to GOI for different activities like, institutional arrangement & capacity building , watershed development works, livelihood activities for asset less persons, entry point activities etc. 192 nos. entry point activities, 1214 ha. Watershed Dev. works , 1316 nos. livelihood activities, 825nos. Production systems & microenterprise & 815 nos. institutional arrangements and capacity building etc activities have been kept during the year.
FINANCIAL PROGRAMME-2013-14 BUDGET ESTIMATE FOR 2013-14 OF STATE PLAN/ NON PLAN/CSS
(Rs. in lakh)
SL No. Name of the Schemes
RE 2012-2013
BE for 2013 – 14
D- 19 D- 20 D-28 Total
1) DIVISBLE POOL A 2401 –Crop Husbandry( Horticulture).
i. Direction & Adm.(Salary &wages) 128.580 49.60 27.20 83.20 160.00
ii Direction & Adm.( Non-salary) 52.00 28.10 6.70 20.20 55.00 iii. Horti. Research at Nagicherra 33.00 15.52 8.56 25.92 50.00
iv. Production of planting materials & production of planting materials
90.55 67.20 20.40 62.40 150.00
v. Dev. of Horti. in Tripura 279.95 382.37 176.89
540.74
1100.00
Sub-Total of A (2401) 584.08 542.79 239.75
732.46 1515.00
B 2402 – Soil Conservation.
-93-
Non-Plan-2013-14 ( Rs. In Lakh )
i. Direction & Adm.( Salary &wages)
20.00 3.10 1.70 5.20 10.00
ii Direction & Adm.( Non-Salary) 10.50 9.03 2.21 6.76 18.00
iii. Soil & Water Management inTripura.
21.50 22.40 6.80 20.80 50.00
Sub-Total of B (2402) 52.00 34.53 10.71 32.76 78.00 Total of 2401&2402 636.08 577.32 250.46 765.22 1593.00 C 5465- PSU THCL 76.00 29.00 16.00 47.00 92.00 D 32-State share / Contribution. 295.90 134.54 73.78 225.68 434.00
E 53-Major Work 6.00 1.86 1.02 3.12 6.00 Total of Divisible Pool. 1007.98 742.72 341.26 1041.0
2 2125.00
NON_DIVISIBLE POOL G Shifting Cultivation(WDPSCA) 1.00 600.00 000.00 0.00 600.00
Total of State Plan 1008.98
1342.72 341.26
1041.02 2725.00
SL No. Name of the Schemes
RE 2012-2013
BE-13-14 Remarks
D- 19 D- 20 D-28 Total
3) NON-PLAN i. 2401&2402, Dir. &
Adm.(Salary &wages). 1717.04
1975.00 1975.00
ii 2401&2402-, Dir. & Adm.(Non Salary).
80.18 17.00 17.00
iii Minor Work 43.00 10.00 10.00 iv Procurement of seedling 15.00 0.00 0.00 v. Subsidy 0.00 100.00 100.00 Total of Non-Plan. 1855.22 2102.00 2102.00 Grand Total=Plan &Non-Plan. 2864.20 1342.72 341.26 3143.02 4827.00
-94-
TOTAL ACHIEVEMENT UNDER HORTICULTURE (including all sources)
Achievement during 2012 -13 Action plan for 2013 -14 (projected) A. Plantations created
A. Plantation to be created State Plan with MGNREGA
-
2300 ha
RKVY - 50 ha Tech. Mission - 2487 ha Tech. Mission - 4105 ha MGNREGA - 3969 ha State Plan - 250 ha Total - 6456 ha Total - 6705 ha
B. Rejuvenation / Maintenance B. Rejuvenation / Maintenance
Tech. Mission - 500 ha Tech. Mission - 575 ha Total - 500 ha Total - 575 ha
C. Planting materials produced C. Planting materials to be produced Total prodn. -
16.042
D. Area Expansion of vegetables D. Area Expansion of vegetables
Total - 5875.5 Toal - 5935ha
E. Root& Tuber including Potato-
1513Ha
E. Root &tuber crop including Potato1670Ha
F. Assistance for Spices F. Assistance Spices
Total - 726.20 ha Total - 815 ha
-95-
G. Research activities
G. Research activities
Adaptive trials - 40 Nos Adaptive trials - 50 Nos Prodn. of TPS - 230 Kg Prodn. Of TPS - 250 Kg Prodn. of foundation seeds
- 2Ha
Prodn. of foundation seeds
- 2 Ha Crops specific training for staff - 166 Nos
Crops specific training for staff - 400 Nos
H. Others
H. Others
Estb. of Horti. Nursery - 11 Nos Estb. of Horti. Nursery - 20 Nos
New area under flower - 247 ha New area under flower - 225 ha
Community tank - 230 Nos Community tank - 163 Nos Vermi Compost unit - 340 Nos Vermi Compost unit - 682 Nos
Hort. Equipments - 100 Nos Training of farmers - 5425 Nos Training of farmers - 8850 Nos
-96-
After careful examination of the Budget proposal and appreciation of
submission placed by the Additional Chief Secretary of the Department, the
Committee make the following recommendations :-
RECOMMENDATIONS
i) The Department to further encourage commercial p roduction of Musambi, Banana and specially Orange and variety of Mango for that new plantations are to be increased.
ii) Production of “ Sabri ” banana with modern tec hnology are to be encouraged.
iii) Specific Bio-Technology Lab is required in Tri pura. The Department to consider setting-up of such Lab.
iv) The Department to continue its performance wide ly for rezuvenation with improved variety plants involving SSG and Growers’ society.
v) Horticulture production be activated more under land of Forest Dwellers’ Right Act, 2005.
vi) The Department to ensure timely supply of seed to the farmers according to their actual need.
After examination of the Budget proposals and appreciation of submission
of the Representative of the Committee recommends the Budget proposals
under Demand No. 28 for grants by the House alongwith the Recommendations.
( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly
-97-
THE REPORT ON THE DEMAND NO.12
OF THE CO-OPERATION DEPARTMENT FOR THE FINANCIAL YEAR 2013-2014.
The Budget proposal under the Demand No.12 relates to the
Co-operation Department, Government of Tripura for the Financial Year
2013-2014 and the Revised Budget for the Financial year 2012-2013 are
as follows :-
(Rs.in lakhs) PARTICULARS
REVISED
ESTIMATES 2012 - 2013
BUDGET ESTIMATES FOR 2013 - 2014 DEMAND FUND FOR
TOTAL
T.S.P S.C.P 1) Non Plan 1080.43 1181.77 --- --- 1181.77 2) Plan 893.38 409.19 246.81 135.00 791.00 3) C.S.S --- --- --- --- --- 4) NEC --- --- --- --- ---
Total 1973.81 1590.96 246.81 135.00 1972.77
Now, the aforesaid Budget proposal is under examination of the
Subject Committee-I of the Tripura Legislative Assembly for recommendation to
the Demands for Grants.
The Committee in its meeting held on 7th May, 2013 examined the
Budget proposals in details having discussion with the Secretary of the
Department who appeared before the Committee summon.
First of all, the Secretary informed the Committee about the action
taken in respect of the recommendations made by the Committee during the year
2012-2013 and stated as follows :-
-98-
Sl.No
. Recommendations of the subject
Committee-I Action Taken Report on the
Recommendations 1.
2.
3.
4.
5.
Department to make the persons concerned to enlighten awareness amongst Board Members & Officials in view of Baidyanathan Package. To make increase of the programme of funding should be twice than the earlier For better profit the Department to approach and prepare DPR for entire Department and to approach Central Govt. Finance Department to ensure release of fund of Rs.10 lakhs for Computerization. Cooperative Bank or the Finance Deptt. may find out ways to provide soft loan towards societies for consumer goods marketing. Department to formulate specific target to increase PACS atleast upto 50 nos. and also to revive the position of LAMPS to make it profitable. Finance Department to release fund in phased manner for completion of work of DRCS Office at Kailashahar.
Training has been provided to the staff of all the 268 LAMPS/PACS for maintenance of books and accounts as per the Common Accounting System. Training to the six Master trainers on ‘Business Development Plan”’ has been provided from BIRD, Lucknow, These Master Trainers provide training to the staff of LAMPS/PACS to prepare ‘Business Development Plan’. Further, refresher programs are conducted from time to time to enlighten the staff as well the BOD’s of LAMPS/PACS. Proposal has been formulated for Computerization of the department for incorporation in the Project proposal under 14th Finance Commission. Cooperative Bank provides soft loan to societies for consumer activities For augmentation of business activities of LAMPS/PACS, the Department provides training on ‘Business Development Plan’. Moreover, Grants-in-aid are provided to LAMPS/PACS from the Department to ease the burden on these societies incurred against administrative expenses. Finance Department has released an amount of Rs. 20.00 lakhs during 2012-2013 for construction of office building of DRCS, Kailashahar, An amount of Rs. 20.00 lakhs is provisioned in the BE – 2013-2014 for the aforesaid purpose. So far, an amount of Rs.
-99-
6.
7.
8.
Fertilizer since playing a vital role in production agriculture, horticulture & plantation activity like rubber & tea ,the Department to take appropriate steps in this regard and MARKFED to strengthen activity in Fertilizer business. The services of Fixed pay/ Casual/ Contingent/ DRW employees who have completed the period of 10(ten) years of service under the MARKFED and other organization of the Cooperation Department should be initiate for regularization as per standing decision of the State Govt. as is followed in the case of State Govt. employees. For this purpose the State Govt. decision should be adopted by the MARKFED and other society. Department to tale suitable steps that the position of Aitorma revives and made an action plan to complete the work as early as possible.
35.64 lakhs has been placed to the Implementing Agency against the administrative approval of Rs. 66.88 lakhs Construction has been completed upto ground floor. T MARKFED deals in fertilizer business such as urea, SSP, RP. MOP and distributes throughout the State. But due to paucity of fund ,T MARKFED is not in a position to invest any significant part on Fertilizer business. T MARKFED has already regularized the services of 11 Fixed employees and 10 DRWs totaling 21 in no. For revival of TSCCF Ltd. an MOU has been signed with SHRISTI INFRASTRUCTURE based on the PPP model. The work of construction of 4th & 5th floor of the multi-storied Complex in the premises of Aitorma in the sakuntala Road is under way.
-100-
A PROFILE ON ACHIEVEMENT FOR THE YEAR 2012A PROFILE ON ACHIEVEMENT FOR THE YEAR 2012A PROFILE ON ACHIEVEMENT FOR THE YEAR 2012A PROFILE ON ACHIEVEMENT FOR THE YEAR 2012----2013 OF THE 2013 OF THE 2013 OF THE 2013 OF THE
DEPARTMENT OF COOPERATION UNDER STATE PLAN:DEPARTMENT OF COOPERATION UNDER STATE PLAN:DEPARTMENT OF COOPERATION UNDER STATE PLAN:DEPARTMENT OF COOPERATION UNDER STATE PLAN:
. (Rs. in Lakhs)
Sl.No Name of the Scheme Outlay 1. Credit Cooperatives 74.50 2. Consumer Cooperatives 178.15 3. Marketing Cooperatives 95.00 4. Direction & Administration 65.34 5. Education, Research & Training 25.00 6. Other Cooperatives 99.00 7. Construction 20.00 8. Implementation of Integrated
Coop. Development Project in South Tripura District.
338.00
Total :- 894.99 N.B. (An amount of Rs. 39.88 lakhs was envisaged in the RE 2012-2013 as salary (State Plan) and an expenditure of Rs. 43.36 lakhs was incurred resulting in an increase of Rs. 3.48 lakhs against the RE 2012-2013 provision) .Besides, an amount of Rs. 0.02 lakhs was saved against the Direction & Administration ( State Plan).
CREDIT SECTOR :CREDIT SECTOR :CREDIT SECTOR :CREDIT SECTOR :
The credit cooperatives consists of LAMPS/PACS/TSCB/ACUB /TCARDB Ltd providing institutional credit advance mainly in the form of agri and non-agri loan to its members. The agricultural inputs are also supplied by the credit cooperatives throughout the State. Further, the Banks namely TSCB Ltd, TCARDB Ltd & ACUB Ltd have been functioning as financing agencies for grass root Cooperative Societies in the State primarily in terms of lending Short & Long term loans.
During the Annual Plan 2012-13, an amount of Rs.74.50 lacs has been received from Finance Department for credit cooperatives out of which Rs 14.50 lakhs has been sanctioned for Share capital to ACUB/TCARDB Ltd. The stated amount has been incurred in full.
EDUCATION TRAINING AND RESERCHEDUCATION TRAINING AND RESERCHEDUCATION TRAINING AND RESERCHEDUCATION TRAINING AND RESERCH
Training and awareness programme form a vital element for development of
human resources and can hardly be ignored. Tripura State Cooperative Union undertakes the responsibility of imparting cooperative education and training (CCMT) to the general members, elected representatives and employee of various Cooperatives as well as Govt officials so that they can contribute effectively to the development of Cooperatives. The Union also conducts exhibition, propaganda, seminar, workshop & Cooperative Week with financial assistance from State Govt. & from National Cooperative Union of India (NCUI), New Delhi.
During the Annual Plan 2012-13, an amount of Rs.25.00 lacs has been awarded to TSCU as grant and was incurred in full.
-101-
MARKETING SECTOR :MARKETING SECTOR :MARKETING SECTOR :MARKETING SECTOR :
Marketing societies procure jute, Mesta, potato and minor forest products from
the members. Being an Apex level society T-MARKFED is functioning as a lead society for procurement of Jute, Mesta, Potato and minor forest produce at the village level through PACS/LAMPS.
In order to strengthen the business activities of marketing societies an amount of Rs 95.00 lakhs has been awarded to TMARKFED and 14 nos PMCS. During the year 2012-13 an amount of Rs 19.50 lakhs has been incurred towards Repairing of godown to LAMPS/PACS/PMCS .
CONSUMER SECTOR :CONSUMER SECTOR :CONSUMER SECTOR :CONSUMER SECTOR :
The Tripura State Coop. Cons. Federation Ltd (TSCCF) has been functioning as
an Apex Level Society in the Consumer Sector. The TSCCF deals in Consumer articles, distribution of LPG, supply of medicines at whole sale and retail rates and stationery article in different Govt, offices. During the financial year 2012-13, an amount of Rs.178.15 lacs has been provided in the form of Share Capital to TSCCF and Primary consumer Cooperative Societies. The amount placed under consumer sector was incurred in full.
OTOTOTOTHER COOPERATIVESHER COOPERATIVESHER COOPERATIVESHER COOPERATIVES
Other Cooperatives include Rickshaw Puller Cooperative Societies, Labour
Cooperatives, Press Cooperatives, Housing Cooperatives, and Cobbler Cooperatives etc. who are financially supported by the Department for economic amelioration of their members. An amount of Rs.99.00 lacs has been incurred as Share capital to other cooperative for the year 2012-2013 against the stated amount of Rs. 99.00 lakhs..
DIRECTION & ADMINISTRATIONDIRECTION & ADMINISTRATIONDIRECTION & ADMINISTRATIONDIRECTION & ADMINISTRATION
Under the Direction & administration schemes total an amount of Rs.65.34 lakhs
has been incurred towards expenditures involving travel expenses, electricity charges, rent & cost of fuel etc. An excess amount of Rs. 3.48 lakhs was incurred against salary and savings of Rs. 0.02 lakhs occurred against the scheme Direction & administration
PLAN/PROGRAMME /PROJECT TO BE IMPLEMENTED DURING THE YEAR PLAN/PROGRAMME /PROJECT TO BE IMPLEMENTED DURING THE YEAR PLAN/PROGRAMME /PROJECT TO BE IMPLEMENTED DURING THE YEAR PLAN/PROGRAMME /PROJECT TO BE IMPLEMENTED DURING THE YEAR
2013201320132013----2014201420142014
IMPLEMENTATION OF ICD PROJECT IN SOUTH TRIPURA DIST RICT .
The ICD Project in South Tripura district envisage a total outlay of Rs.1480.24 lacs which includes subsidy of Rs.420.23 lacs & loan of Rs.1060.01 lacs to be fully reimbursable from NCDC. The Scheme is aimed at socio-economic upliftment of small and marginal farmers and other weaker sections of the society by adopting an integrated approach. For implementation of Integrated Coop. Dev. Project in South Tripura District , an amount of Rs.338.00 lakhs has been incurred during the year 2012-13 and the entire amount is placed to TSCB Ltd as Project Implementing Agency(PIA). In the Budget Estimate 2013-14 an amount of Rs.158.00 lakhs has been provisioned.
-102-
ANNUAL PLAN OF THE DEPARTMENT OF COOPERATION FOR THE YEAR ANNUAL PLAN OF THE DEPARTMENT OF COOPERATION FOR THE YEAR ANNUAL PLAN OF THE DEPARTMENT OF COOPERATION FOR THE YEAR ANNUAL PLAN OF THE DEPARTMENT OF COOPERATION FOR THE YEAR 2013201320132013----2014 UNDER STATE PLAN2014 UNDER STATE PLAN2014 UNDER STATE PLAN2014 UNDER STATE PLAN
The Department of Co-operation is implementing various scheme like
Direction & Administration, Grant-in-aid to PACS, Grant-in-aid to LAMPS,
Transfer fund to TTAADC, Grant-in-aid to TSCU, Share capital assistance to
TSCCF / Primary consumers, Share capital to TCARDB, Share capital to ACUB,
Share capital to Tripura MARKFED, Share capital to PMCS, Share capital to
other co-operatives, ICD project in South Tripura and Construction ( Major &
Minor works ) etc. In the Budget 2013-14 an amount of Rs.791 lakhs has been
provisioned which is reproduced below in terms of sectoral outlay:-
( Rs. in lakhs) Sl.No. Name of the Scheme Outlay
1. Credit Co-operatives 142.50
2. Consumer Co-operatives 180.00
3. Marketing Co-operatives 97.90 4. Direction & Administration 72.60
5. Education, Research & Training 30.00 6. Other Co-operatives 80.00 7. Implementation of Interacted Coop.
Development Project in South Tripura 158.00
8. Construction(Major & Minor works) 30.00 Total:- 791.00
The Credit Cooperatives such as LAMPS/PACS/TSCB/TCARDB /ACUB
Ltd. provide opportunities for becoming self-reliant and thus help in getting
gainful employment. The institutional credit advanced by the credit societies
mainly in the form of agri and non-agri loan to its members. During the year
2013-14 an amount of Rs. 142.50 lakhs has been provisioned as Grant-in-aid to
Credit Cooperatives. As Share capital assistance to TCARDB & ACUB Ltd. an
amount of Rs. 14.50 lacs has been provisioned.
Under Consumer Sector, Share capital to TSCCF Ltd. /Primary
Consumers has been earmarked for an amount of Rs. 180.00 lakhs during the
year 2013-14. Consumer Cooperatives deal in consumer goods, distribution of
-103-
LPG, S.K.Oil, medicines and other items at a reasonable rate. Advance of share
capital to consumer cooperatives act as a fillip to the furtherance of its business
activities.
Marketing Societies procure Jute, Mesta, Potato and Minor Forest
Produce for distribution. Besides, it also uses the services of Cold Storage for
getting better remuneration. An amount of Rs. 97.90 lacs has been envisaged as
share capital to marketing societies which includes share capital to T MARKFED
& 14 PMCS in the State. This also includes repairing of godowns. During the
year 2013-14 an amount of Rs.22.40 lacs has been envisaged as Repairing of
godown to PACS/LAMPS/PMCS.
For meeting the Salary and other administrative expenses of the
Department such as cost of fuel, T.A., D.A. etc. an amount of Rs. 72.60 lacs has
been provisioned in the budget estimate for the year 2013-2014.
Training and awareness programme form a vital element for development
of human resources and can hardly be ignored. Tripura State Cooperative Union
undertakes the responsibility of imparting cooperative education and training
(CCMT). During the year 2013-14, an amount of Rs. 30.00 lakhs has provisioned
as grant in aid to Tripura State Cooperative Union for the above stated purpose.
Other Cooperatives such as rickshaw pullers Cooperative, Cobbler
Cooperatives, Labour Cooperatives, Women Cooperatives, and Multi-purpose
Cooperatives suffer due to lack of funds. This financial constraint act as a
deterrent to furtherance of their business activities. In realization of the above, an
amount of Rs. 80.00 lakhs has been provisioned in the budget estimate for the
year 2013-14.
This apart, special attention has been given to provide financial assistance
to Women Cooperatives in the State under the scheme share capital to other
cooperatives / primary consumer cooperatives.
-104-
After careful examination of the Budget proposal and appreciation of
submission placed by the Secretary of the Department, the Committee make the
following recommendations:-
RECOMMENDATIONS
i) Endeavour of coputerisation should be continued as per last year recommendation. ii) Soft Loans to the uncovered societies be contin ued.
iii) PACS’ and LAMPS’ position to be developed to m ake it more
profitable.
iv) The Department to more strengthen activity in f ertiliser business.
v) The Department to organize awareness/training pr ogramme with the Manager, Board of Directors, Managing Director, Pre sident and Secretary of the Registered Co-operative Societies. The Department to consider increase to the salary of Manager as we ll as increase in the share-capital.
After examination of the Budget proposal and appreciation of
submission of the Representative of the Committee recommends the
Budget Proposals under Demand No. 12 for Grants by the House
alongwith the recommendations.
( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly
-105-
THE REPORT ON THE DEMAND NOS. 16 AND 52 OF THE HEALTH & FAMILY WELFARE DEPARTMENT
FOR THE FINANCIAL YEAR 2013-2014. The Budget Proposal under Demand Nos.16 and 52 relating to the Health
& Family Welfare Department, Government of Tripura for the Financial Year
2013-2014 and the Revised Budget for the Financial Year 2012-2013 are as
follows:-
Demand No. 16
( Rs. in Lakh )
Particulars
Revised Estimates 2012-2013
Budget Estimates for 2013 -2014 Demand
Fund for Total
T.S.P S.C.P
a) Non-Plan 8869.27 11548.57 --- --- 11548.57 b) Plan 16956.01 5135.42 3441.60 2485.98 11063.00
c) C.S.S. 1315.22 2.00 --- --- 2.00 d) N.E.C. 2140.48 369.20 --- --- 369.20 Total : - 29280.98 17055.19 3441.60 2485.98 22982.77
Demand No. 52
( Rs. in Lakh ) Particulars
Revised Estimates 2012-2013
Budget Estimates for 2013 -2014 Demand
Fund for Total T.S.P S.C.P
a) Non-Plan 14716.48 16842.00 --- --- 16842.00 b) Plan 10804.53 4588.41 2931.86 1605.13 9125.40
c) C.S.S. 2254.00 1336.51 727.66 435.83 2500.00 Total : - 27775.01 22766.92 3659.52 2040.96 28467.40
Now, the aforesaid Budget Proposal is under examination of the Subject
Committee-I of the Tripura Legislative Assembly for recommendations to the
Demands for Grants.
-106-
The Committee in its meeting held on 8th May, 2013 examined the Budget
proposals in details having discussion with the Additional Chief Secretary of the
Department who appeared before the Committee on summon.
First of all, the Additional Chief Secretary informed the Committee about
the action taken in respect of the recommendations made by the Committee
during the year 2012-2013 and stated as follows :-
Sl. No
Relevant Para No/
Page No. of the Report.
Recommendation of the Committee
Reply of the Govt. on the recommendations.
1 2 3 4
1 Para-i of Page-54
1. Installation of MRI machine at Dr. B. R. Ambedkar Hospital has to be finalized without any further delay.
1. For installation of whole body imaging including Diffusion, Perfusion, Tensor, Angiography etc; a specification for 1.5 Tesla MRI systems was finalized obtaining view of Expert from PGI Chandigarh. Sealed Expression of Interest was invited on 28-03-2012 by giving press advertisement in the All India Press for establishment of the said specified MRI system in TMC & Dr. BRAM Teaching Hospital under PPP Model. But no response received as yet from any party/ organization. No further progress in this issue.
2 Para-ii of Page-54
2. Health Department is to open a Cardiac wing and Nephrology unit in the Dr. BR Ambedkar Hospital so that heart disease and nephro patients may be promptly attended and Spine Surgery unit at Dr. BR Ambedkar Hospital to be upgraded without any more delay.
2. The proposals received from different agencies of the outside States to open a Cardiac Wing and Nephrology Unit are now still under consideration of the higher authority. For separate Spine Surgical Unit, at present adequate space is not available. It may be considered on completion of the New Building under construction. Construction of new hospital building is now in good progress.
3 Para-iii of Page-54
3. Health Department is to take up with the
3. GBP Hospital & AGMC- 1(one) Deep Tube-well having capacity of
-107-
DWS (PWD) to ensure safe water to GBP, IGM and BRM Hospital along with a mechanism of damage of tank and wastage of water meant for the said Hospital.
20,00 Gallon per hour along with iron Removal Plan is installed one in GBP Hospital and other under AGMC at a total cost of 32.44 lakh. Work has been completed and the entire amount is placed to PWD (DWS). Supply safe drinking water is now improved considerably. In Tripura Medical College (TMC) an amount of Rs.118.57 lakh has been placed to DWS for providing safe drinking water. The sinking of deep tube well is completed. Commissioning & installation of Iron Removal Plant is in progress.
IGM Hospital: Construction of 3(three) Nos. of RCC filters have been completed in IGM Hospital and tested but not yet handed-over.
4 Para-iv of Page-56
4. Finance Department to consider allocation of additional fund especially for AMC of all sorts of machines of the Hospital. Finance Department also to provide additional fund towards minor repairing and purchase of new machine, if necessary, in phased manner.
4. Budgetary provision as per requirement especially for AMC of all sorts of machines of the Hospitals has been made.
5 Para-v of Page-54
5. Blood Bank for all old Sub-Divisions where not existing at present in the financial year 2012-13 have to be established.
5. (1) The following Sub-Divisional Hospitals are having Blood Bank. (i) Dharmanagar SD Hospital, (ii) BSM Hospital, Kamalpur 5(2) And the following SD Hospitals are having Blood Storage Centre: (i) Melaghar SD Hospital, (ii) Khowai SD Hospital, (iii) Sabroom SD Hospital, (iv) Belonia SD Hospital, (v)Amarpur SD Hospital, (vi)Kanchanpur SD Hospital & (vii)Gandachara SD Hospital. 5(3) The following Hospitals are not having Blood Bank/ Blood Storage Centre:
(i) Bishalghar SD Hospital. Equipments & nstruments
for establishment of Blood Storage
-108-
Centre have been completed. Manpower training also has been completed. Formal permission for starting the Blood Storage Centre will be issued very shortly. (ii) LTV SD Hospital- civil construction for the Blood Storage Centre is in good progress. Manpower training has been completed. Procurement of machinery equipments is in progress.
6 Para-vi of
Page-55 6. The Department to arrange preferably a Doctor in all Sub-Centre to visit and treat patients there once in a month on a specific date and time at the earliest.
6. Sub-Centre, the most pepheral and first contact point between the primary health care system and the community is required to be manned by at least one Auxiliary Nurse, Mid-wife (ANM)/ Female Health Worker and one Male Health Worker as per recommended staffing structure under Indian Public Health Standards (IPHS). Now there are 828 functional Sub-Centre, 182 are under construction. There is no provision for providing medical officer for Sub-Centre. Patients are treated by medical officers at Health Camps held in jurisdiction of different sub-Centre.
7 Para-vii of Page-55
7. The Department to take steps to improve supervision of duty and behaviour of medical staff to the patients and cleanliness in the Hospitals of AGMC, IGM and TMC and other Hospitals.
7. All concerned Heads of Office are requested to implement the recommendation and they are taking up necessary action. Regular monitoring is done on the behaviour of Hospital Staff. For improvement of cleanliness in GBP, AGMC, & IGM Hospitals the work has been outsourced. Since then the cleanliness of these Hospitals found to be be improved considerably. The works of the outsourcers are strictly monitored. Newly commissioned three District Hospitals namely Unakoti, Gomati & Dhalai District Hospitals have been outsourced for sweeping & cleaning. It has also been decided in the Department to outsource the sweeping & cleaning of all Sub-
-109-
Divisional Hospitals. Sweeping & cleaning activities
of TMC & Dr. BRAM Teaching Hospital are already outsourced and status is satisfactory.
8 Para-viii of Page-55
8.Disaster management Unit be extended to District and Sub-Division level
8. (i) Disaster Management/ Crisis Management Team exist in all the Districts & Sub-Divisions. (ii) QRT also exists in all the Districts & Sub-Divisions. (iii) CMO is the District Nodal Officer and SDMO is the Sub-Divisional Nodal Officer for Disaster Management. (iv) The Department has trained 40 nos. of Master Trainers on Disaster Management & now they are imparting training on Disaster Management in the respective Districts/ Sub-Divisions.
9 Para-ix of Page-55
9. The Department is to examine the possibility to appoint a Doctor for Asharambari Health Centre as a special case.
9. There is no provision of posting of Doctor in Sub-Centre. At present the Department is not in a position to post Doctors in all functioning 83 PHCs. At this stage appointment of a Doctor in Asharambari Health Sub-Centre may not be possible.
10 Para-x of Page-55
10. The earlier recommendation to set up Dental, Ayurvedic & Homoeopathic Colleges one each in the State to be pursued.
10. The recommendation for establishment of Dental College in Tripura, Ayurvedic College at Udaipur and Homoeopathic College at Kailashahar under PPP Model: - (i) Dental College in Tripura- NIT was invited. The issue is sent to the Secretary (Health) on 19-04-2013 for decision. (ii) Ayurvedic College at Udaipur- NIT was invited. The issue is sent to the Secretary (Health) on 12-04-2013 for decision. (iii) Homoeopathic College at Kailashahar- NIT was invited. The issue is sent to the Secretary (Health) on 11-04-2013 for decision and a is in process.
-110-
PHYSICAL ACHIEVEMENT DURING 2012-13 (UP TO JANUARY 2013) • Construction and commissioning of new Health Sub-Centre: 123. • Construction and commissioning of new Primary Health Centre: 11. • Up-gradation of PHC to CHC: 06. • Three District Hospitals have been commissioned. • Construction of Quarters for Melaghar, BSM (Kamalpur) and Gandacherra
Sub-divisional Hospitals have been completed. • Construction of Accident and Trauma Centre are nearing completion. • Up-gradation of IGM Hospital (G+6 Block) is nearing completion. • Post Graduate Courses started in 13 Disciplines in Agartala Govt. Medical
College, Agartala. • Constructions of quarters for three District Hospitals are in progress. • Procurement of Machinery & Equipment, Medicine and Furniture etc in
progress. • Establishment of Dental College, Homeopathic Medical College, and
Ayurvedic Medical College under PPP Model are in process. • Up-gradation works for Kanchanpur and Amarpur Sub-divisional Hospitals
are in process.
MAJOR ACTIVITIES PROPOSED DURING 2013-14.
Sl. No.
Proposal Justification
1 Sub-Centre: Completion of construction of 245 Nos of health Sub Centre
State Government has decided to establish one Health Sub-Centre (HSC) in each Gram Panchayet / ADC Village. There are 1038 Gram Panchayet / ADC Village in the State. State Government has also decided not to establish HSC in location where Health facilities like PHC, CHC etc are present. Such number is 30. Thus requirement is 1008. Present status is 828.
2 Primary Health Centre: (a) Construction of 3 new Primary Health Centre
State Government has decided to establish total 125 Primary Health Centre in the State. Present strength is 83. 23 PHCs are under construction. 3 (three) more have been proposed during 2013-14 to overcome the shortage in phases.
(b) Completion of ongoing construction of 23 Primary Health Centr e
-111-
(c) Construction of Quarters for 13 PHCs
There are no proper accommodation facilities for the essential Staffs like Doctors, Nurses, Para-medics etc in Primary Health Centre. To provide accommodation for the essential staffs for emergency and better health care, this proposal is proposed.
3 Community Health Centre: (a) Construction of 2 new Community Health Centre
State Government has decided to establish a Community Health Centre (CHC) in each Block. Requirement is 45. Present status is 18. To overcome the shortage in phases, 2 (two) CHCs have been proposed.
(b) Completion of ongoing construction of 4 CHCs
State Government has decided to establish a Community Health Centre (CHC) in each Block. Requirement is 45. Present status is 18. To overcome the shortage in phases, 4 (four) CHCs are under construction.
4 Sub-divisional Hospitals: (a) Completion of construction works of Teliamura and Shantirbazar Sub-divisional Hospitals.
Teliamura and Shantirbazar are newly created Sub-divisions and there are no Sub-divisional Hospitals in these Sub-divisions. State Government decision is to establish Sub-divisional Hospital in all Sub-division to provide better health care. In this line the proposal is proposed.
(b) Completion of up-gradation work of Sub-divisional Hospitals at Kanchanpur and Amarpur
These two Sub-divisional Hospitals are very old and buildings of these Hospitals are in dilapidated condition. State Government has decided to demolish these old buildings and construct new building with 100 bedded capacities. In this line the proposal is proposed.
(c) Completion of construction works of Quarters for Sub-divisional
These Sub-divisional Hospitals are not having proper
-112-
Hospitals at Dharmanagar, LTV, Khowai and Subroom Sub-divisional Hospitals.
accommodation facilities for the essential Staffs like Doctors, Nurses, Para-medics etc. To provide accommodation for the essential staffs for emergency and better health care, this proposal is proposed.
5 District Hospitals: (a) Starting of construction works of Sipahijala District Hospital at Bishramganj
Sipahijala is a newly created district and there is no District Hospital in this newly created District. State Government decision is to establish one District Hospital in all Districts to provide better health care. Moreover, population of this district is mainly Tribal. In this line the proposal is proposed.
(b) Completion of construction works of quarters for three District Hospitals.
These three District Hospitals are not having proper accommodation facilities for the essential Staffs like Doctors, Nurses, Para-medics etc. To provide accommodation for the essential staffs for emergency and better health care, this proposal is proposed.
6 State Hospitals: (a) Starting of up-gradation works of
IGM Hospital – (i) G+7 Block on Western Side, (ii) Administrative Block, (iii) Nursing Institute, (iv) Kitchen, Canteen, and Laundry Block.
This is one of the State Hospitals situated in the heart of the city. Out of six State Hospitals, two have been converted to Medical College Hospitals. Previously, this Hospital was catering only two Departments like Paediatrics and Obstetrics & Gynaecology. Now, in the new scenario on establishment of Medical Colleges, demand has arisen to equip this Hospital with all Departments. This is the reason for up-gradation of this Hospital.
(b) Starting of up-gradation works of Cancer Hospital (B+G+5 Block) –Phase-II.
Cancer Hospital: Patient load of Cancer Hospital is increasing day by day. This increase of patient load may be due to proper screening and case detection. To provide proper treatment facilities to the cancer patient, this up-gradation is required. In this line
-113-
the proposal is proposed.
(c) Central Blood Bank at GB Pant
Hospital Complex.
State Government has decided to establish a Central Blood Bank where all modern facilities of Blood Bank will be available to provide all components of Blood to the patients with proper screening and tests in the time of needs. In this line the proposal is proposed.
7 Medical College / Education:
(a) Completion of construction works of New Teaching Hospital (NTH) –Block-I at GB Pant Hospital at Agartala.
Bed capacity of G.B. Pant Hospital (Teaching Hospital of Agartala Govt. Medical College) is 592. Bed capacity of this Hospital required to be enhanced to provide proper treatment facilities as well as to introduce Post Graduate Courses in all Disciplines. This is the reason for construction of these Hospital Blocks.
(b) Starting of construction works of
(i) New Teaching Hospital (NTH) –Block-II at GB Pant Hospital at Agartala
(c) Starting Post Graduate Courses
in all Disciplines in Agartala Government Medical College at Agartala
There is a shortage of Specialist Medical Officers in the State. To overcome this shortage, introduction of Post Graduate Courses in all Disciplines in Agartala Government Medical College, Agartala and Tripura Medical College, Hapania is essential. For introduction of Post Graduate Courses in above mentioned two Medical Colleges, ancillary facilities like side Lab. Library, Teaching room etc are to be constructed and capacity are to be increased. Machinery & Equipment are to be procured.
(d) Starting Post Graduate Courses in all Disciplines in Tripura Medical College at Hapania.
(e) Establishment of Dental College
There is shortage of Dental Surgeon in the State. And there is no Dental College in the State.
-114-
There is an only one Dental College in Assam in entire North Eastern region which cannot cover the demand of the Region. To overcome this shortage, establishment of a Dental College in the State is most essential.
(f) Establishment of Ayurvedic
Medical College
There is shortage of Ayurvedic Medical Officer in the State and there is no Ayurvedic College in the State. To overcome this shortage, establishment of an Ayurvedic College in the State is most essential.
(g) Establishment of Homeopathic Medical College
There is shortage of Homeopathic Medical Officer in the State and there is no Homeopathic College in the State. To overcome this shortage, establishment of a Homeopathic College in the State is most essential.
(h) Establishment of Regional Nursing College
There is a B.Sc. Nursing College in the Complex of Tripura Medical College with 60 intake capacity run by Society constituted by State Government. State Government has decided to upgrade this Nursing College to a Regional Nursing College with 100 intake capacity to overcome the shortage of State as well as of North Eastern States.
After careful examination of the Budget proposal and appreciation of
submission placed by the Additional Chief Secretary of the Department, the
Committee make the following recommendations :-
RECOMMENDATIONS
i) MRI Machine at Dr. B.R. Ambedkar Hospital to be installed within 31.03.2014.
-115-
ii) Cardiac wing and Nephrology Unit at Dr. B.R. A mbedkar Hospital be opened as early as possible with upgradation of Spi ne Surgery Unit.
iii) Blood Bank/Blood storage Unit to the uncovered Sub-Divisions are to be achieved at the earliest.
iv) The Department to consider functioning of new P HCs with bed for 24 hours.
v) The Department to examine effectively the feasib ility of referring patient from State Hospital to ILS making it reimbu rsible according to rule.
vi) The Department to consider providing of quarter s attached to all the PHC.
vii) To improve supervision of duty and behavior o f medical staff to patient there shall be some mechanism of the Depart ment to ensure the same. The Department also to maintain constant endeavor for cleanness of AGMC & GBP, IGM and TMC and other Hosp itals.
viii) The Department to effectively consider the in crease of honorariam to the Asha Karmi.
ix) Urmai, Dasarath Bari, Telkajla, Ghrantali consi sting of 18,500 people should be provided with one PHC by 2013-2014. The D epartment may examine the feasibility of the same.
x) The Department to find out the locations of old Dispensaries such as Asharambari, Krishnapur, Charilam and Radhanagar w here people are habituated with the facility of Doctors but now not in existence are to be provided with the similar facility or PHC .
xi) Facility of Smart Card to be extended to the PH C level having adequate infrastructure.
xii) The Department to formulate a mechanism whereb y the patient party may get a scope to interact to the visiting Doctor extending upto District Hospital in phase manner.
xiii) C.C.TV to Medical Hospital, State Hospital and Dist rict Hospital to be installed in phase manner. After examination of the Budget proposals and appreciation of
submission of the Representative of the Department, the Committee recommends the Budget proposals under Demand Nos. 16 and 52 for Grants by the House alongwith the Recommendations.
( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013 Subject Committee- I Tripura Legislative Assembly
-116-
THE REPORT ON THE DEMAND NO. 13 OF THE PUBLIC WORKS (R & B) DEPARTMENT
FOR THE FINANCIAL YEAR 2013-2014.
The Budget Proposal under Demand No.13 relates to Public Works
( R & B ) Department, Government of Tripura for the Financial Year 2013-2014
and the Revised Budget Estimates for the Financial Year 2012-2013 are as
follows :-
(Rs.in Lakh) Particulars Revised
Estimate 2012-2013
Budget Estimates for 201 3-14 Demand Fund for Total
T.S.P. S.C.P. a) Non-Plan 27283.21 35896.00 -- -- 35896.00 b) Plan 32185.32 14389.33 9128.93 4816.99 28335.25 c) C.S.S. 2500.00 1560.00 930.00 510.00 3000.00 d) N.E.C 4000.00 2340.00 1395.00 765.00 4500.00 Total 65968.53 54185.33 11453.93 6091.99 71731.25
Now, the aforesaid Budget proposals are under examination of the
Subject Committee– I of the Tripura Legislative Assembly for recommendations
to the Demands for Grants.
The Committee in its meeting held on 8th May, 2013 examined the Budget
proposals in details having discussion with the Principal Secretary & Chief
Engineer of the Department as summon.
First of all, the Principal Secretary informed the Committee about the
action taken in respect of the recommendations made by the during the year
2012-13 stated as follows :-
SL. No.
Relevant Para/ Page No. of the
report
Recommendation of the Committee
Reply of the Government on the recommendations
1 1 Page-9 In the PLAN budget provision should be made adequate for construction of RCC bridges as per the target of the Department.
Following provisions were made in RE of 2012-13 for the bridges. NABARD- Rs. 131.50 Crores SCA- Rs. 6.31 Crores ACA- Rs. 7.21 Crores In
-117-
addition, a portion of fund from 5054-OTPMGSY was also utilized for small span RCC bridges /culverts. About 61 bridges and 26 RCC Box/ Slab culverts have been completed during 2012-13. At present work of about 80 bridges in progress in the state. It is expected that the number of timber bridges will come down 40 by March/ 2014.
2 2 Page-9 The works under PMGSY of 40% upgradation already be taken up in the Budget provision should be made available by the Finance Deptt.
The BE for 2012-13 was only Rs. 10.00 Crores, though it was raised to Rs. 17.50 Crores in the RE against demand of about Rs. 60.00 Crores. Due to inadequate provision of fund against this Head, the target as fixed for the 2012-13 could not be achieved in spite of issuance of work orders etc. Adequate provision in BE of 2013-14 is required to meet up the target as these existing roads are important and required to be maintained for movement of vehicular traffic.
3 3 Page 9 Matching grant for the maintenance work to be made available by the Finance Department under 13th Finance Commission grant programme
As per guidelines of 13th FC, minimum provision of NPRE for 2012-13 should have been Rs.104.13 Crores for claim of the grant during 2013-14. But FD met up the demand of NPRE with provision of salary during 2012-13 against the same Head of Account.
4 4 Page 9 Preference should be given to
i. Khowai to Manik Bhandar
ii. Manik Bhandar to
Kailasahar
The total length of road is 33.00 KM and entire length is black top. Surface condition for a length of 10.50 KM is not at satisfactory level for which normal and periodical repairs as per relevant system of PWD are being carried out from time to time to maintain the road trafficable. The length of road from Manik Bhandar to Kailasahar via Saikarbari, Panchamnagar & Rajnagar Choumuhani is 39.22 KM. The length of road from Saikarbari to Rajnagar Choumuhani is 26.05 KM and
-118-
iii. Barkathal to GB
Hospital Within the financial year (2012-13). Finance Department may sanction adequate fund for these roads
a portion where land slides occurs for about 500 Metres length, have been damaged. Except that portion, the entire stretch is black top with average carriageway width 3.75 Metres. The distance for portion from Panchamnagar to Kailasahar is 13.17 Km and entire road is black top with average carriageway width 5.5 Metres. At present the road is being used for vehicular movement. Barkathal to GB: Portion from Barkathal to Abhicharan (3.00 KM) and Abhicharan to Lefunga ( 5.00 KM) is black top and motorable. In the portion from Lefunga to Gamchakobra ( 3.0 KM), pot holes have been developed for which repair works have been taken up. The portion from Gamchakobra to Beltala ( 4.5 KM) is brick soled for which improvement by metalling/ carpeting alongwith cross drainage works under NABARD scheme have been taken up. The portion from Beltala to GB hospital (2.0KM) is black top and fit for movement of vehicular traffic.
5 5 Page 9 Killa to Ompi road should be taken up as early as possible
Total length of road is 22.50 KM and status is: Carpet road- 11.00 KM Soled Road- 05.00 KM Katcha road- 6.50 KM The portion of katcha road was done by Block. Priority has been attached to complete the rest portion of 11.50 Km by blacktop surface if adequate fund is made available in the BE of 2013-14.
6 6 Page 10 Quality of the work under PMGSY to be checked regularly by PWD
There is three tier monitoring in PMGSY works one at PIU level, one by State Quality Monitor (SQM) and other by National Quality Monitor (NQM). SQMs are nominated
-119-
from officials of state PWD (R&B). In addition a mobile laboratory is established for each work and on necessity; support of central laboratory is taken for quality management system. In addition another mechanism already developed comprising representatives of NBCC/ HSCL, local Panchayet and PWD for proper monitoring of quality and extent of maintenance required on the completed roads under new connectivity and such repair works are moving accordingly and payment to this effect also are released by PMGSY cell of PWD on the basis of their recommendation.
ACTION PLAN WITH PHYSICAL TARGET OF DIFFERENT SCHEMES FOR THE YEAR 2013-14 UNDER STATE PLAN
Major/Minor
Head of Department
Name of Schemes/
Projects/Items
Components Unit Physical Target
(2013-14)
Physical Target for TSP and
SCCP
TSP SCCP
5054 CO on raods
OTPMGSY Imp of State Roads KM 250.00 100.00 50.00
Imp of roads under 40% renewal of PMGSY KM 50.00 20.00 10.00
Box/ Slab Culverts
Nos 10.00 3.00 1.00
4059 Buildings Building functional
Building Nos 4.00 1.00 0.00
4216- Buildings
Housing
Residential Accommodation (Staff Quarters, Barrack etc) Nos 50.00 18.00 10.00
5054 CO on raods
NABARD Major Bridges Nos 40.00 15.00 10.00
Minor Bridges/ Culverts Nos 35.00 11.00 5.00
Balley Bridges Nos 5.00 3.00 0.00 5054 CO on roads ACA RCC bridges
Nos 2.00 1.00 0.00
-120-
5054 CO on roads
E & I Improvement of roads KM 5.00 5.00 0.00
5054 CO on roads
CRF Improvement of roads KM 5.00 0.00 0.00
5055 CO on roads
SPA Improvement of roads KM 5.00 0.00 0.00
Flagship Programme / Bharat Nirman (Rural Roads) & PMGSY Introduction:-
The Pradhan Mantri Gram Sadak Yojana (PMGSY), was lanched by the Govt. of India to Provide connectivity to unconnected rural Habitations as part of a poverty reduction strategy. The primary objective of the programme is to provide connectivity, by way of an all-weather road (with necessary culverts and cross-dranage structures, which is oprerable through the year), to the elegible unconnected habitations in the rural areas. Government of India is endeavoring to set high and uniform technical and management standards and facilating policy development and planning at State level in order to ensure sustainable management of the rural roads network. In the first phase, habitations (hamlets) of population of 1000 (500 in the case of hill States, tribal and desert areas) and above will be covered under Bharat Nirman. In the second phase habitations of population of 500(250 in the case of Hill States, tribal and desert areas) will be covered.
The Bharat Nirman has three components viz (a) New connectivity (b) upgradtion (60%) and (c) Renewal (40%). Cost for construction of rural roads under New Connectivity and improvement of rural roads under upgradation (60%) is to be borne by MoRD. The state is to bear the cost for improvement of rural roads under Renewal (40%) and initial five years mtc. for the work under New Connectivity, Upgradation and Renewal. In addition State is to be bear the additional amount beyond the sanctioned cost under New Connectivity & Upgradation if any and cost for Bridges more than 50m on prorata basis.
Status as on 31.03.2013.
Type of work Total Scope
(in Km)
Work Sanctioned
Length ( In Km)
MoRD Sanctioned
Amount (in Crore)
Fund released (Rs. In Crore)
Work Completed
(in Km)
Work in progress (in Km)
Up to date
Expenditure (Rs.in Crore)
-121-
New connectivity
2982.93 2981.6 1699.924
1597.75
2448.310 486.905
1501.593
Upgradation (60%)
1067.2 258.04 159.54 94.741 163.299
Stage-II constrction
255.994 122.204 52.396 56.458 64.246
Total 4306.12 3361.844 1911.86 1597.75 2599.509 714.45 1501.593
Type of work Total Scope (in Km)
Work taken up (in Km)
Amount Sanctioned
by state (Rs. In Crore)
Fund released (Rs. In Crore)
Work Completed (in Km)
Work in progress (in Km)
Up to date
Expenditure
(Rs.in Crore)
Renewal (40%) 700.93 511.071 268.18 158.116 367.08 143.991 167.55
Under 40% Renewal, work taken up for 511.0718 Km of tendered value amounting to Rs. 283.77 Crore. Now, 367.08 Km carpetting is completed upto March'2013. At present balance work for an amount of Rs.100.00 Crore is going on in full swing at different stages. During 2013-14 financial year, it is targetted to complete 143.00Km for which Rs. 100.00 crore is required.
Target verses Achivement during the year 2012-13 and Tentative Achievement Plan during the year 2013-14 is given Annexure-"A".
Habitation Details
Category of habitations
Unconnected habitations as on
01-04-2000. Sanctioned work
Connected up to March,2013
1000+ 169 168 160
500-499 606 609 549
250-499 1185 1113 807
Less than 250 2630 2118 1361
Total 4590 4008 2877
-122-
Recently Govt. of India has allowed the State for submission of DPRs for providing connectivity to the habitations having population 250 - 499. State is eligible to submit proposal for 277 no roads having length 968.53 Km. which will provide connectivity to 216 nos. 250+ and 620 nos. less than 250 habitations. Out of that State has submitted DPRs for 197 no. roads and 7 long span bridges with total length of 579.30 km. for sanction. As a result following habitations will be benefited: i) 158 of 250+ habitations and 117 less than 250 category habitations (incidentally) by constructing 130 roads and 5 long span bridges. ii) 313 of less than 250 category habitations under cluster proposition by constructing 67 roads and 2 long span bridges. The sanction is expected to be conveyed soon.
Target verses Achivement during the year 2012-13 and Tentative Achievement plan during the year 2013-14:
Target during the year2012-13 Achivement during the year
2012-13 (up to March, 2013)
Component
New connectivity
Upgradation (60%)
Renewal (40%) New connectivity
Upgradation (60%)
Renewal
(40%)
Length(in Km) 288.00 187.00 250.00 214.108 23.29
27.918
Expenditure (Rs. In Crore)
210.00 145.00 140.00 264.552 23.3
9
Habitation
1000+ 18 13
500-999
50 35
Tentative Action plan during the year2013-14
Component New connectivity
Upgradation (60%) Renewal (40%)
Length(in Km) 513.31 85.981 143.991
Expenditure (Rs. In Crore)
440.0 80.0
Habitation
1000+ 5
500-999
36
-123-
After careful examination of the Budget proposal and appreciation of submission placed by the Principal Secretary of the Department, the Committee makes the following recommendations :-
RECOMMENDATIONS
i) Construction of R.C.C. Bridges to uncovered area s has to be taken up by the Department and for that Plan Budget provision should be made available.
ii) The Department to take up with the Finance Depa rtment for 40% upgradation of Budget provision under PMGSY.
iii) Khowai to Manik Bhandar and Manik Bhandar to K ailashahar road to be made smooth trafficable as a whole along with Barkathal to G.B.Hospital road. Similar position be taken for Killa to Ompi road. For that Finance Department to effectively consider allocation of adequate fund, if necessary, in the Revised Estimates of the current Financial Year.
iv) The Department to maintain its constant supervi sion to the quality of works under PMGSY for that the Finance D epartment be approached to release of necessary fund in the R evised Estimates of 2013-2014.
v) In new Sub-Division of Bloc Head Quarter there s hall be staff quarters. For that the Department to take up action Plan.
vi) The Department to take effective step for expan sion of road from Fire Bridgade to Kalibari connecting Airport r oad via Durga Chowmuhani alongwith Bholagiri road.
vii) The Department to arrange specific fund for ea rly construction of MLAs’ Hostel. For that the Department may take u p the same with Finance Department and Planning Departmen t.
After examination of the Budget proposals and appreciation of submission
of the Representative of the Department, the Committee recommends the Budget proposals under Demand No. 13 for grants by the House alongwith the Recommendations.
( Shri Sudhan Das ) Dated, Agartala Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly
-124-
THE REPORT ON THE DEMAND NO. 15
OF THE PUBLIC WORKS (WATER RESOURCES) DEPARTMENT FOR THE FINANCIAL YEAR 2013-2014.
The Budget Proposal undrr Demand No. 15 relates to P.W.(
Water Resources ) Department, Government of Tripura for the Financial Year
2013-2014 and the Revised Budget for the Financial Year 2012-2013 are as
follows :-
(Rs. in lakh)
Particulars Revised Estimate
2012-2013
Budget Estimates for 201 3-2014 Demand Fund for Total
T.S.P. S.C.P. a) Non-Plan 6756.88 7624.11 --- --- 7624.11 b) Plan 10886.30 5341.44 3184.32 1746.24 10272.00 c) C.S.S. 2034.97 1375.70 775.00 425.00 2575.70 Total 19678.15 14341.25 3959.32 2171.24 20471.81
The aforesaid Budget Proposal is under consideration and
examination of the subject committee-I of the Tripura Legislative Assembly for
recommendations to the Demands for Grants.
The Committee in its meeting held on 8th May, 2013 examined the
Budget proposal in details having discussion with the Principal Secretary of the
department who appeared on summon.
First of all, the Principal Secretary informed the Committee about the
action taken in respect of the recommendations made by the Committee during
the year 2012-13 stated as follows :-
-125-
Sl. No.
Relevant Para/ page No. of the
report
Recommendations of the Committee
Reply of the Government on the recommendations
1. Page No.26; Sl No. i of the recom- mendations
Liabilities of the Department in the plan head to bear by Finance Department and may release fund of Rs. 10 crores in phased manner.
The Department had taken up the matter with Finance Department by initiating Note detailing the position of liabilities, reasonable requirement and minimum requirement. During the year 2012-13, Finance Department has provided an additional fund for an amount of Rs. 5 crore.
2. Page No.26; Sl No. ii of the recom- mendations
To facilitate storage of rain water the Department to continue the recomm- endation like the last year in the next financial year (2012-13) also.
During 2012-13, 1st installment of fund has been sanctioned for 9(nine) nos. of new Minor Irrigation Storage Projects.
3.
Page No.26; Sl No. iii of the recom- mendations
Mini Bore well with of 5 H.P. motor has to be utilized for irrigation by increasing the number to cover more area.
Mini Bore wells are being constructed by Agriculture Department. During the year 2012-13, Rs. 10 crore has been sanctioned in favour of Agriculture Department under SPA for 413 nos. of Mini Bore well.
4. Page No.26; Sl No. iv of the recom- mendations
To repair the machine of existing of irrigation scheme. For this purpose Finance Department is to release a fund in phased manner.
During the year 2012-13, Finance Department has provided an additional fund for amount of Rs. 5 crore.
5. Page No.26; Sl No. v of the recom- mendations
Manu Medium Irrigation Scheme has to be completed and the Department to take up all suitable steps in this regard.
Department is continuning its endevour to smoothen the land problem hindrances coming in the way of progress of this work. Much improvement has yet not come.
6. Page No.27; Sl No. vi of the recom- mendations
DPR for utilization of water by harvesting of rain water of Howrah river has to be prepared by as per CWC norm and to implement it Panchayat Samitee and BAC of Jirania and
DPR for 2 (two) projects for Development of flow in the Howrah river in the dry season has already been got prepared by the CWC.The two projects are:-
i) Champaicherra Dam Project at Champaibari
ii) Howrah Dam Project at Champaknagar
Major social issues for implementation of
-126-
Madai Block to discuss and District Administration also to be consulted in this regard.
this project is land submergence. It is a sensitive issue. Last year, during 2012-13, much could not be done. Fresh initiative will be taken during this financial year,2013-14.
Physical Achievements during 2012-13 (upto Feb.2013)
• In this year till now new 10 nos LI, 26 nos D.T.W, 2 nos. HPLI
have been commissioned. (List of the commissioned schemes are
enclosed in separate sheet)
• 5 nos. LI schemes and 10 nos. DTW schemes are ready for
commissioning.
• Good progress has been made for more 7 nos. LI, 1 no. DTW,
6 nos. Diversion and 5 Nos storage project.
• Sufficient materials have been procured for the projects
already taken up.
• The work of the Khowai Medium irrigation project has been
completed.
• The remaining works of the Gumti Medium Irrigation
Project is nearing completion.
• The remaining works of Manu Medium Irrigation Project is in
progress.
• 1060 ha. has been brought under irrigation by PWD(WR).
• 2.00 Km of Anti-erosion works has been completed.
-127-
LIST OF SCHEMES COMMISSIONED DURING THE YEAR 2012-13 AS ON 28.02.2013
Sl.
No. Name of Block Name of District Name of Panchayat Name of schemes
1 2 3 4 5
1 Jirania West Tripura Dhupcharra L.I. Scheme at Khilling para over
Dhupcherra
2 Boxanagar Sephahijalla Valuarchar L.I. Scheme at Valuarchar Purbapara
near the Land of Bimal Das
3 Melaghar Sephahijalla Mohanbhog L.I. Scheme at Near Mohanbhog R.C.C
.Bridge
4 Karbook Gomati Paschim Ekchari L.I. Scheme at Shibharipara
5 Amarpur Gomati Birgonj L.I. Scheme at Sarbang Kalibari
6 Salema Dhalai Debbari L.I. Scheme at North Dabbari F-II.
7 Dumbur-
nagar Dhalai Jagabandhupara L.I scheme at J.B .Para
8 Dumbur- nagar Dhalai Dalapati L.I. Scheme at Mailan Singh
9 Gournagar Unakuti Kaulikura L.I. Scheme at Madhya Kaulikura
10 Dasda North Tripura Shibnagar L.I.Scheme at Shibnagar F-II
1 Durga
Chowmuhani. Dhalai Halahali High Power L.I at Halahali.
2 Damcherra North Tripura East
Narendranagar High Power L.I at Narendranagar
1 Khowai Khowai Uttar Singicherra DTW Scheme at Near old Panchyat
Office.
2 Khowai Khowai Gournagar DTW Scheme at Uttar Gournagar
3 Khowai Khowai Sonatala DTW Scheme at Ram Mohan Pally
4 Khowai Khowai Purba Singhicherra DTW Scheme at Near House of Sri
Sachindra Das.
6 Mohanpur West Tripura Purba Bhamutia DTW scheme at Rangutia(Bamutia)
7 Mohanpur West Tripura Mohanpur D.T.W. Scheme at Jagatpur
8 Mohanpur West Tripura Satdubia D.T.W. Scheme at D.M Colony, Kalkalia
9 Mohanpur West Tripura Narshingarh D.T.W. Scheme at Bhagalpur
10 Mandai West Tripura Purba
Dinabandhunagar
D.T.W Scheme at Begrambari near TSR
camp
11 Jirania West Tripura Paschim Noabadi D.T.W Scheme at Kalitilla.
-128-
12 Padmabill Khowai Akhrabari DTW scheme at Sri Akhra Bari Para .
13 Matabari Gomati Salgara DTW scheme at Ghoratilla Math
1 2 3 4 5
14 Matabari Gomati Holakhet DTW scheme at Pawramura math
15 Matabari Gomati DTW scheme at Maidabari Math-60.
16 Matabari Gomati Tepania DTW scheme at Dhalidepa
17 Matabari Gomati Purba Mogpuskarini DTW scheme at Noatiapara
18 Killa Gomati Bagma DTW scheme at Chandraipara Math
19 Kakraban Gomati Rani DTW scheme at Bhadhuri Pathar
20 Jolaibari South Tripura Uttar Hichacherra DTW scheme at North Hichacherra near
the House of M.Mog.
21 Bagafa South Tripura DTW scheme at Surpara (Santir bagar)
22 Bagafa South Tripura Bhikhora DTW scheme at Mularaibarighat
23 Sathchand South Tripura Paschim Jalefa DTW scheme at Near Jalafa Market
(Paschim)
24 Ambassa Dhalai Purba Nalicherra DTW scheme at Bashu deb Para
25 Dumburnagar Dhalai Paschim Potacherra DTW scheme at West Potacherra
26 Jampuijalla Sephahijalla Kendraicherra DTW scheme at Narayanpur
-129-
Action plan for 2013-14
• To complete the Spillover continuing schemes of 2012-13
(L.I-26, DTW-60, M.I Storage-19, Diversion-9 Nos.).
• To take up new 8 nos L.I, 16 nos DTW, 4 nos M.I Storage
Scheme.
• Emphasis will be given to complete the remaining works of
Gumti and Manu irrigation projects.
• Action Plan for new irrigation coverage during the year is
5070 ha.(AIP)
• 6.00 Km of new Anti-erosion works would be done.
After careful examination of the Budget proposal and appreciation of
submission placed by the Principal Secretary of the Department, the Committee
make the following recommendations :-
RECOMMENDATIONS
i) The Department to approach Finance Department to release rest fund to the liabilities in Plan Head.
ii) Mini-Bore Well with 5 HP Motor has to be utiliz ed for irrigation to be extended to uncovered area in collaboration with Agriculture Department.
iii) The Department’s obligation to maintain the m achine of existing irrigation scheme and for which Finance Department may effectively consider to release fund.
-130-
iv) The Department to continue its endeavor for uti lisation of rain water of Howrah River.
v) The Department to take suitable step for storage of rain water to utilize the same in need for irrigation.
vi) Deep-Tube Wells to be provided specially in the areas where other water sources are not available.
vii) The Department to prepare a master plan for ac hieving depth of Howrah river specially and similarly other importan t rivers of the State.
After examination of the Budget proposals and appreciation of
submission of the representative of the recommends the Budget proposals under
Demand No.15 for Grants by the House alongwith the recommendations.
( Shri Sudhan Das ) Dated, Agartala , Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly
-131-
THE REPORT ON THE DEMAND NO. 51 OF THE PUBLIC WORKS ( D.W & S ) DEPARTMENT
OF THE FINANCIAL YEAR 2013-2014.
The Budget Proposal under Demand No.51 relates to the Public
Works ( D.W & S ) Department, Government of Tripura for the Financial Year
2013- 2014 and the Revised Budget for the Financial Year 2012 -2013 are as
follows :-
(Rs.in lakh)
Particula rs Revised Estimate
2012-2013
Budget Estimates for 201 3-14 Demand Fund for Total
T.S.P. S.C.P. a) Non-Plan 2189.20 4467.00 --- --- 4467.00 b) Plan 11164.74 4229.42 2521.39 1382.69 8133.50 c) C.S.S. 938.58 1.04 0.62 0.34 2.00 Total 14292.52 8697.46 2522.01 1383.03 12602.50
Now, the aforesaid Budget Proposal is under examination of the
Subject Committee-I of the Tripura Legislative Assembly for recommendations to
the Demands for Grants.
The Committee in its meeting held on 8th May, 2013 examined the
Budget proposals in details having discussion with the Secretary of the
Department who appeared before the Committee on summon.
First of all, the Secretary informed the Committee about the action taken in
respect of the recommendations made by the Committee and during the year 2012-13
stated as follows :-
-132-
Sl.No. Recommendation
of the Committee Reply of the Recommendation of the Subject Committee
1
Mini-Deep-Tube Wells of small bore have to be increased to double (1000 Nos) of the target of the Department.
As suggested by the Subject Committee 981 Nos. SBTW has been taken (Completed 619 Nos, Progress- 131, W/O-231. which is the all most double of the target.
2
Remodeling of water pipe line specially in the Agartala Urban area has to be done immediately keeping facility of installation pipe line to the both sides of the road which will also facilitate the inhabitants to take water line easily. Finance Department to consider allocation of adequate fund for this.
As suggested by the Subject Committee, for improvement of Water supply system in AMC area, DWS Department has extended 4444.50 mtr new pipe line & 1578.50 mtr. pipe line has been remolded. One Four lac gallon capacity RCC OHT is in progress at Shisu Bihar School for improvement of water pressure in Ramnagar, Joynagar, Krishnanagar etc. area. This works has been taken up under SPA Fund of the State Govt. However, laying of pipeline in both side of the road could not be taken up as UDD has taken up new project for overall development of water supply system in AMC area. In addition to that UDD has planed for construction of ground water treatment plant, OHT, DTW, Laying of pipe line under JNNURM Project for North & East Zone (Part), for Central, South & East Zone under ADB Project. Under the above stated 2 (two) Project following works will be taken up. (i) DTW-48 Nos. (ii) GWTP-11 Nos. (iii) OHT-26 Nos. (iv) Replacement of DTW-22 Nos. (v) Laying of Pipe Line-592 KM. In the mean time 168 KM new Pipeline has been laid in the North & East (Part) Zone. Work-in-progress for 5(five) Nos. OHT, 2 (Two) Nos. GWTP. In the Central Zone 6(Six) Nos. replacement DTW and in South Zone 16(Sixteen) Nos. replacement DTW has been Sunk. If the whole project under JNNURM & ADB completed there will be substantial improvement of water supply system in AMC area.
3 ICDS & School specially morning School to be provided with Drinking Water and Sanitation facility by urgent basis within the current Financial Year (2012-13) positively.
Drinking Water :- School covered-4447 out of total 4447, AWC covered- 8749 Nos out of total 9660. Balance 891 Nos. AWC will be covered during financial year 2013-14. Sanitation: - All School covered with Toilets, AWC covered with toilets 8593 Nos. out of 9660 Nos.
4 To make available of water supply through pipes line in all habitations of the state.
5744 Habitations covered with piped water supply where 3044 Habitations are full covered, 2700 Habitations partly covered out of 8132 Habitations. Balance 2388 Habitations are not covered. Action plan is prepared for coverage.
-133-
STATE PLAN FOR RE 2012-13 & BE - 2013-2014
Name of the Department P.W.D. (DW&S)
Dem No. Particulars
51 DIVISIBLE POOL
51 A: SALARY
51 B: NON-SALARY
51 Of which
(i) PSUs
(ii) Local bodies
51 (iii) Electricity Charges
(iv) Advertisement
51 (v) State Share / State's Contribution
51 (vi) State Share / State's Contribution for Sanitation
51 (vii) Scholarship / Stipend
51 (viii) Minor Works
51 (ix) Maintenance (Water Treatment & Supply)
51 (x) Machinerry & Equipments
51 (xi) Major Works
51 (xii) Alam
51 (xiii) State Laboratory
(xiv) Advance Central Share for Nirmal Bharat Abhiyan
Others
51 NON-DIVISIBLE POOL
51 Of which
(i) PMGY
-134-
(ii) EFC/ TFC
51 (iii) SPA
51 (iv) SCA
51 (v) Grant under Art. 275(1)
51 (vi) RSVY
51 (vii) Backward District Area Fund
51 (viii) BADP
51 (ix) Slum Dev.
51 (x) AIBP
51 (xi) Shifting Cultivation
51 Total (Div. + Non -Div.)
51 C S S
51 N L C P R
51 N E C
NON-PLAN FOR RE 2012-13 & BE - 2013-2014
Name of the Department P.W.D. (DW&S)
Dem No. Particulars
51 1. TOTAL SALARY
Of which
51 (i) Wages
51 2. TOTAL NON - SALARY
1 Sinking of DTW
(a) Rural 198 NOs
140 Nos
Abondoned-27 Nos, In Progress = 19 Nos.
(b) Urban 1No
s 1
Nos
Of which
-135-
2
Commissioning of DTW
(a) Rural 1148 Nos
188 nos
97 Nos
Ready for Comm. = 16 Nos. In Progress = 62 Nos.
(b) Urban 124 Nos
0 Nos
0 Nos
3 Iron Removal Plant
(a)
Rural - I) NRWDP II) NLCPR
517 Nos
127 Nos
39 Nos
Ready for Comm. = 3 Nos. In Progress = 17 Nos.
90 Nos
26 Nos
Ready for Comm. = 6 Nos. In Progress = 28 Nos.
(b) Urban 59
Nos 0
Nos 0
Nos
4 Over Head Tank
(a) Rural 79 Nos
1 Nos
1 Nos
(b) Urban 52
NOs 6
Nos 2
Nos In progress = 4 Nos.
5
Water Treatment Plant
(a) Rural 30 nos
30 Nos
11 Nos
Ready for Comm. = 1 Nos. In Progress = 13 Nos.
(b) Urban 14
NOs 2
nos 0
Nos In Progress = 1 Nos.
(c ) NLCPR 3
Nos 2
Nos In Progress = 1 Nos.
6
Small Bore Tube Well
(a) Rural 1063 Nos
981 Nos
619 Nos
In Progress = 131 Nos.
(b) Urban 17
NOs 1
Nos 0
Nos
In Progress = 01 No.
-136-
7
Spot Sources (Mark-II/III, OHP, RCC well, Sanitary well etc.)
(a) Rural 22175 Nos
1184
Nos
1598 Nos
In Progress =147 Nos.
(b) Urban 1801 Nos
0 Nos
0 Nos
8 Laying of Pipe Line
(a) Rural 7531.27 KM
785.50KM
746.94 KM
In Progress = 69.78 Km.
(b) Urban 1335.52 KM
150.00 KM
85.82 KM
9
Rural Habitation Coverage
(a) Quantity 7292 Nos
1634
Nos
1062 Nos
(b) Quality 2907 Nos
796 Nos
240 Nos
10
School & AWC Coverage
(a) School (Rural)
3456 Nos
692 Nos
692 Nos
(b) School (Urban)
289 Nos
0 Nos
289 Nos
(a) AWC (Rural)
6342 Nos
1827
Nos
1622 Nos
In Progress = 344 Nos.
(b) AWC (Urban)
535Nos
20Nos
0 Nos
51 (i) Repayment of Loan
51 (ii) Interest
51 (iii) Electricity Charges
51 (iv) Advertisement
51 (v) Scholarship/ Stipend
-137-
51 (vi) SRE
51 (vii) MOP/MOPF
51 (viii) Social Pension
51 (ix) Minor Works
51 (x) Diet/ Ration
51 (xi) Grants-in-aid for Pump Operators
51 (xi) Reang Refugees
51 (xi) Advocate fee/ Expences for witness
51 (xi) Others
Total (1+2)
-138-
After careful examination of the Budget proposal and appreciation of
submission placed by the Secretary of the Department, the Committee makes
the following recommendations :-
RECOMMENDATIONS
i) Uncovered ICDS Center and Schools to be provided with drinking water and sanitation facility within current Financ ial Year.
ii) Pipe lines are to be extended to the uncovered areas for supply of water and replace damage lines by new one.
iii) Mini-Deep-Tube Wells of small bore have to be set up to the uncovered areas.
iv) Iron Removal Plants to be properly maintained a nd repaired time to time to keep those functional throughout the yea r. Such Plans are to be provided to the places where Deep Tube-we lls are not available.
v) There shall be Toilet with water supply in every market of the State.
vi) MGNREGA rate has to be provided to operators of the water supply (IRP) by increasing their wages and to incre ase adequate number of additional separated staff. At the conclusion the Committee recommends the budget allocation
under Demand No. 51 for the Year 2013 – 2014 for grants by the House taking
into consideration the recommendations in this report.
( Shri Sudan Das ) Dated, Agartala , Chairman the 10th May, 2013. ubject Committee- I Tripura Legislative Assembly
-139-
THE REPORT ON THE DEMAND NO. 26 OF THE FISHERIES DEPARTMENT FOR
THE FINANCIAL YEAR 2013-2014.
The Budget proposal under Demand No.26 relating to the Fisheries
Department, Government of Tripura for the Financial Year 2013-2014 and the
Revised Budget for the Financial Year 2012-2013 are as follows :-
(Rs in lakh)Rs in lakh)Rs in lakh)Rs in lakh)
Particulars
Revised Estimates 2012-2013
Budget Estimates for 201 3-2014 Demand
Fund for Total T.S.P S.C.P
a) Non-Plan 1726.75 2100.50 --- --- 2100.50 b) Plan 1464.63 711.22 484.83 273.95 1470.00 c) C.S.S. 256.29 302.16 --- --- 302.16 d) N.E.C. 229.50 --- --- 229.50 Total : - 3557.67 3343.38 484.83 273.95 4102.16 Now, the aforesaid Budget Proposal is under examination of the Subject
Committee-I of the Tripura Legislative Assembly for recommendations to the
Demands for Grants.
The Committee in its meeting held on 8th May, 2013 examined the Budget
proposals in details having discussion with the Principal Secretary of the
Department who appeared before the Committee on summon.
First of all, the Secretary informed the Committee about the action taken in
respect of the recommendations made by the Committee during the year 2012-
2013 and stated as follows :-
-140-
Sl .
No.
Relevant Page No. of
the report.
Recommendation
of the Committee
Action taken by the Deptt on the
Recommendation
1 2 3 4 i) 1st Para of the
Recommendation at Page 110
The Committee retains the earlier recommen - dation of training of youth, educated persons to make the fisheries cultivation a commercial fish culture.
Training to youths and fish farmers is a continuous practice being attended to regularly by the Deptt. During 2012-13, the Deptt. organized 45 nos. Workshop at 45 Blocks with youths and fish farmers of the concerned blocks, wherein interaction have been made on possibilities of increase in fish production including required technologies. Besides, 7170 farmers/ SHGs / JFMCs members have been covered under various training programme out of plan fund.
ii) 2nd para of the Recommendation at Page 110
Prawn, Pabda and Chital production has to be increased through educated farmers where the Deptt. to encourage by adding technological support
Intensified efforts are being made in the Govt. hatcheries for production of seed of prawn, pabda and chital fish to enable distribution of those seed among the farmers for culture. Necessary input support alongwith training has also been provided to a good no of educated farmers to encourage culture of high value fish. Seed produced have been supplied to selected beneficiaries to popularise culture of these species.
iii) 3 rd para of the Recommendation at Page 111
The Finance Deptt. to release adequate fund for construction of fish market & development of aquaculture village in the state.
As recommended by the Committee the Department had submitted required projects for funding under NMPS a sub-scheme of RKVY during 2012-13 and accordingly received approval for construction of 8(eight) nos. of new fish market shed @ 1 (one) in each district. Similarly, received required fund for development of 8(eight) nos. Model -Aquaculture village in 8(eight) districts. Programme will be implemented in 2013-14.
-141-
iv)
4th Para of the Reco- mmendation at Page 111
Production of Singhi, Magur, Koi through major cultivation has to be increased to meet demand.
1(one) magur hatchery has been established recently in 2012-13 at Muhuripur and another one under construction at Gandacherra is also going to be completed by May 2013. Now the Deptt has taken initiation to utilize the hatcheries during coming season for breeding of Shingi& Magur fish. Accordingly necessary training for production of seed and its culture to departmental staff as well as interested progressive farmers with the help of resource person from CIFA is going to be undertaken during the coming season. Once seed production is successful, the same would be supplied among progressive farmers to popularise their culture.
Major achievements made during the year 2012-13.
The Fishery sector of the State continued to show high rate of growth in 2011-12.The Action Plan outlined in the last Subject Committee meeting , thus, also could be fulfilled. Total fish production of 53350.24 tons could be achieved against the set target of 53080 tons during 2011-12, exhibiting 8.37% growth over last year. The per ha. productivity of fish from culture resources & per capita availability of fish from local production could also be increased to 2434 kg. and 15.06 kg respectively during 2011-12, as against 2324 kg & 14.12kg. in 2010-11 With the limited state plan budgetary fund including the fund received from Central sources, the Deptt. continued its efforts on implementation of various developmental schemes in 2012-13, and as a result, the production of fish is expected to cross 57,000 tons with availability of 16 kg/capita fish at the end of the year (2012-13). The statistical data in detail regarding production of fish & fish seed etc. for the year 2012-13 would be available after door to door survey to be conducted by the Deptt. in the month of May,2013. Amongst other, some of the achievements made during 2012-13 are as follows :- i) Towards scientific utilization of available culture resources demonstration of various
technologies have been provided to 1087 farmers.
ii) Encouraged 590 farmers for use of their non perennial water bodies in scientific manner.
iii) 243.79 ha. big water bodies (2-5 ha each)have been brought under extensive fish culture.
iv) 30.00 ha. area of big water bodies (above 5 ha) have been brought under pen culture.
v) Extended benefit to 8112 farmers towards intensification of scientific fish culture in
small water bodies
-142-
vi )Towards entrepreneurship Development in pisciculture activities, inputs for fish culture have
been provided to 98 fisheries based SHGs covering an area of 97.80 ha.
vii) 775 fish farmers of rural pockets have been covered under Demonstration on
production of quality fish seed & 295 farmers for production of stunted growth fingerling
viii) Organized 45 workshop with about 4,500 farmers and encouraged them for adoption of
scientific fish culture.
ix) Benefit in the form of balance fish feed have been extended to 2 nd category farmers (
present production above 1500 Kg /ha but less than 3000Kg /ha)for higher production in 1180
ha area.
x) Stocked 27.00 lakhs fingerlings in open water bodies of Dumbur reservoir and other lakes, rivulets for enhancement of production as well as productivity of open water bodies. xi) 7170 Nos. farmer covered for effective training on various pisciculture technologies for skill development. xii) Towards popularizing “Aerator ” for quantum increase in fish productivity through hi-tech fish culture 300 nos. aerator are being supplied under different programmes. xiii) Assistance provided to 20 MSS Ltd. in the form of Managerial Subsidy. Besides, provided basic inputs to 53 nos. of Societies for adoption of fish culture in 52.92 ha area. xiv) 3105.88 ha. additional water areas have been brought under scientific pisciculture including the water areas in forest land during 2012-13, involving fish farmers/JFMC/SHGs/Patta holders. xv) For the purpose of conservation of Pabda & popularization of its culture practice, about 34000 nos. Pabda seed, produced in the Govt. hatcheries, were distributed among the farmers. xvi) Created/reclaimed about 1000 ha. (provisional) water bodies towards resource
development.
xvii) Provided 3 IMC, FRP hatcheries to 3 SHGs & installed 1 FRP hatchery at Govt farm and
up graded two hatcheries for facilitating production of fish seed.
xviii) Established 2 (two) nos. soil & testing laboratory in 2 (two) blocks for prescribing proper
Manuring schedule to the farmers for scientific culture.
3. The plan/programme and projects to be implemented during the year 2013-14 for
consideration of the committee during examination.
a) Activities proposed The activities proposed in the Annual action plan during the year
2013-14 for development of Fishery sector in the State & to achieve the set production
target of
61950 tons with per capita availability of 17 kg/annum are as follows:-
• Increase in productivity.
• Demonstration on feed based system with floating pelleted feed.
-143-
• Mass demonstration on low cost, medium cost, Integrated fish culture
and Hi-tech Intensive culture Technologies for the different categories of
farmers.
• Encouragement to the farmers on production of seed of high values
species with their culture.
• Supply of basic inputs for scientific fish culture in small water bodies.
• Popularization of rearing & culture of stunted growth
fingerlings.Utilization non–perennial water bodies for fish production on
scientific line.
• Encouragement to produce seeds and culture of high value
species.Intensification of integrated fish farming among the farmers.
• Ranching in open water bodiesPopularization of hi-tech fish culture
among the progressive fish farmers.
• Supply of fishery inputs in newly created water bodies of forest and non
forest areas.
• Entrepreneurship development among educated youths/SHGs through
input & technological assistance.
• Encouraging seed growers of remote areas for producing quality fish
seed.
• Distribution of fishing materials to the fishermen.
• Supply of pisciculture inputs to facilitate bringing the water areas
created /reclaimed during last year under fish culture
• Reclamation of existing water bodies of private farmers.
• Construction of new tanks.
After careful examination of the Budget proposal and appreciation of
submission placed by the Secretary of the Department, the Committee make the
following recommendations :-
RECOMMENDATIONSRECOMMENDATIONSRECOMMENDATIONSRECOMMENDATIONS
i) Farmers/SHGs/JFMCs members as well as unemployed youth be imparted with necessary training to make fisheries cultivation and commercial fish culture.
-144-
ii) The Department to continue its efforts towards increase of Prawn, Pabda, Chital as well as other high value fish.
iii) The Department to take effective suitable step to increase fish production at Dumbur Lake. The Department also to t ake effective steps to increase fish production at Rudra Sagar La ke of Melagarh and Khowrabil at Kailashahar.
iv) The Department to make endeavour for fish produ ction in the natural water bodies of the khas land in consultati on with the concerned authority of these lands and also encoura ge private sector by rendering assistance and for that Finance Department may allocate adequate fund, if necessary, in the Re vised Estimates of 2013-2014.
v) The Department to increase share capital for run ning Matsyajibi Samabai Samiti and also to consider increase in the wages to Managers of those Samitis.
vi) N.C.D.C scheme to be introduced for Matsyajibi Samabai Samitis to encourage them in the field of fish production.
vii) For temporary storage of fish there shall be c old chamber in big fish markets. The Department to take action accordi ngly in phase manner.
After examination of the Budget proposals and appreciation of
submission of the Representative of the Department, the Committee
recommends the Budget proposals under Demand No.26 for grants by the
House alongwith the Recommendations.
( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly
-145-
THE REPORT ON THE DEMAND NO. 41 OF THE SOCIAL EDUCATION & SOCIAL WELFARE
DEPARTMENT FOR THE FINANCIAL YEAR 2013-2014.
The Budget Proposal under Demand No.41 relates to Social
Education & Social Welfare Department, Government of Tripura for the Financial
Year 2013-2014 and the Revised Budget for the Financial Year 2012 -2013 are
as follows :-
( Rs. in lakh ).
Particulars Revised Estimate 2012-13
Budget Estimate for 2013 -14 Total Demand Fund For
1) Non-Plan 5686.84 11631.85 --- --- 11631.85
2) Plan 18815.60 8516.38 4758.79 2650.65 15925.82
3) CSS Plan 20760.71 13959.76 7777.19 3934.01 25670.96
Total:- 45263.15 34107.99 12535.98 6584.66 53228.63
Now, the aforesaid Budget Proposal is under examination of the Subject
Committee–I of the Tripura Legislative Assembly for recommendations to the
Demands for Grants.
The Committee in its meeting held on 8th May, 2013 examined the Budget
Proposals in details having discussion with the Principal Secretary of the
Department who appeared on the part of the Department on summon.
First of all, the Principal Secretary informed the Committee about the
action taken in respect of the recommendations made by the Committee during
the year 2012-13 and stated as follows :-
Relevant Para/page No of the
report
Recommen dation of the committee
Reply of the Government on the recommendation.
1 P/80. CDPO Office being the main
one the department to complete the construction of
As per ecommendation of
the Subject mmittee-1 file was moved to the
-146-
the rest by financial year
2012-13 and for which finance department release
fund.
Finance Department
(Budget Branch) with request to examine the
recommendation of the Subject Committee-1
and arrange for providing necessary
fund for construction of rest 14 CDPO Office
building. But the Finance Department
has returned the file with advise to move the
file to the Planning (P &
C) Department for sanction of fund for
construction of rest CDPO Office building
under SPA. Accordingly detailed project
report(DPR) has been sent to the Planning (P
& C ) Department for sanction of fund under
SPA for construction of 14 nos CDPO office @
20.00 lakhs each vide letter No.F.65(64)-
SWE/PLAN/2012 dated
5.5.2012 But sanction is yet to be received
from the Planning (P & C ) Department .
2.
P/80. Pension rate of all pension holders be increased to
Rs.500/- per month. Department may take the
proposal to the Finance
Department. Finance Department may take
necessary steps.
On the basis of the recommendation of the
Subject Committee-1 the Department has
sent the proposal to the
Finance Department (General Branch) with
request to increase the rate of pension from
Rs.400/- per month to Rs.500/- per month
vide file No.65(32)-SWE/PLAN/ 2012 dated
17.4.2012, The Finance Department has
-147-
returned the file stating
that pension has been increased from
Rs.300/- to Rs.400/- per month in respect of
Tripura Rickshaw puller and Tripura Cobbler
Pension scheme. Moreover the Govt.
has introduced the following new pension
scheme during 2012-13:-
a. State Old Age
Pension @ Rs.400/- PM.
b. State Widow Pension scheme.
@ Rs.400/- PM. c. Pension to
persons who lost 100% eye sight
under APL families @
Rs.500/- PM. d. 80% and above
disability Pension under APL
families Rs.400/-
PM. e. Motor Shramik
Pension@ Rs.400/- PM.
f. Barber Worker Pension @
s.400/- PM. g. Handloom Worker
Pension @ Rs.400/- PM.
h. Laundry Worker Pension @
Rs.400/- PM. i. Fishermen
Pension @
Rs.400/- PM.
3
P/80
Drinking water, sanitation
It has been decided by
-148-
shall have to be kept under
constant supervision and the Department to maintain
monitoring of the same.
the Govt. to provide
drinking water and sanitation facilities in all
AWCs by DWS Deptt. Accordingly they have
taken up the works. By now 6366 Anganwadi
centre have been covered sanitation
facilities and 7656 AWCs covered with
drinking water facilities. The Deptt has also
issued instruction to the
CDPOs to take all out efforts for maintaining
the sources already created and in case
there is any problem it may be brought to the
notice of the DISE concerned who in turn
will take up the issue with the DWS Deptt.
4 P/80. Medical check up under
NRHM Scheme should be taken up to the children
quarterly. This should be emphasized.
NRHM and Health Department are looking
after the Medical Check up of the Children of
AWCs. Anganwadi Workers are organizing monthly mother and child
health day in all AWCs where regular weighting
of children and mothers are under taken. Health
Care facilities have been provided to 378790 children & 103065
Mothers. Moreover 8304 VHND Days & MCH Days
have been organized at Anganwadi Centre level. 25 Shishu Matri Days are
also organized by the CDPOs. 9355521 IFA
Tablets are also distributed among the mothers and children.
Children are being Immunized at Anganwadi
centre level.
-149-
5
.
P/80. There shall be chart of
important personalities of both Central and State & to
distribute to all Anganwadi Centres to discuss on those
particulars days in their memory.
The Department has
not yet prepared any chart of important
personalities of both Central and State for
distribution to the AWCs. However, the
department has published a
departmental calendar in 2012 in which
important dates has been specified for
observation in the
Anganwadi Centres. Moreover, the
importance of 6 services of ICDS has
also been indicated in thuis calendar. The
calendar has been distributed to all AWCs.
6 P/80 The Training system for
Anganwadi workers / Helpers should be continued.
For imparting training
of the Anganwadi workers and Anganwadi
Helpers, the Department of Social
Welfare & Social Education has drawn an
action plan for training like previous years.
Accordingly, necessary fund has been provided
from Govt. of India and regular training
programme has been running in 4 district in
Anganwadi Training
Centre and one Anganwadi Training
Centre run by NGOs at A.D.Nagar, Agartala to
improve the quality for delivery of services of
the workers. The Deptt. has up grated the
AWWs training centre located at Narsingarh.
-150-
The Deptt had
organized 670 Block/Sector level
training programme for AWWs & AWHs during
the year 2012-13. At present, the status of
trained and un-trained ICDS functionaries is as
follows,
JOB Refresher
CDPO 51 20
Supervisor
(ICDS)
171 177
AWW 6309 5406
AWH 0 4953
MAJOR ACHIEVEMENT MADE BY THE EDUCATION(SOCIAL WELF ARE &
SOCIAL EDUCATION) DEPARTMENT DURING THE YEAR 2012-1 3.
SOCIAL SECURITY & WELFARE A.
1. Pension has been provided to 134 beneficiaries under Rickshaw
Puller Pension scheme.
2. 32 Cobblers got pension under Cobblers Pension scheme.
3. 152550 Old Age persons received state share under IGNOAPS.
4. 1543 beneficiaries got state share of pension under IGNDPS.
5. 8828 beneficiaries have been provided pension under State
old age pension scheme.
6. 172 beneficiaries have been provided pension under Motor
shramik Pension scheme.
7. 154 beneficiaries have been provided pension under Laundry
Worker Pension scheme.
8. 186 beneficiaries have been provided pension under Barber
Worker Pension scheme.
9. 306 beneficiaries have been provided pension under Handloom
Worker Pension scheme.
10. 413 beneficiaries have been provided pension under Fishermen
Pension scheme.
-151-
WOMEN WELFARE
1. 47155 women have been provided pension under widow and
deserted women pension scheme.
2. 7432 Widows have been provided state share of pension under
IGNWPS.
3. Incentive has been provided to 20782 Girl child.
4. International women day 2012 was organized at State, District
and Block level.
5. Anti Dowry week have been observed.
6. 1952 Widow have been provided pension under State Widow
Pension Scheme.
7. 957 Un-married women of 45 years and above(BPL) have been
provided pension.
8. 20 Working women have been provided hostel facility in the
working women hostel
9. 2528 Pregnant women and nursing mothers have been covered
under IGMSY.
CHILD WELFARE
1. 40 Tribal children have been given shelter in the Ampura Boys
Home.
2. 30 Over age inmates have been provided rehabilitation
package with skill training.
3. 500 Children different homes have been given incentives
under ICPS.
4. 309723 children has been provided SNP.
5. 86189 mothers have been covered under SNP Programme.
6. 64352 AGs have been covered under SABLA nutrition
programme.
7. 44837 AGs have been covered under SABLA non-nutrition
programme.
WELFARE OF HANDICAPPED
1. 15 physically challenged students have been provided
Scholarship.
2. 40 Blind student (girls) have been provided hostel facility and
Education in IVH(Girls).
3. 40 Deaf & Dumb children got education in ISR.
-152-
4. 37 Blind student (Boys) have been provided hostel facility and
Education in IVH(Boys).
5. 574 Disabled persons provided hostel facility in the disabled rest
house run by the Department.
6. 1581 beneficiaries received pension under 100% blind pensions
Scheme.
7. 1549 disable persons got pension under 60% and above
disability pension scheme.
8. 1228 beneficiaries have been provided pension under 80% and
above disable pension scheme(APL).
9. 386 beneficiaries have been provided pension under 100%
blind pension scheme (APL).
CORRECTIONAL SERVICES
1. 24 fallen & victimized women have been provided shelter in the
Protective Home.
2. 25 Juvenile Delinquent children have been provided shelter in
the Juvenile Home.
NATIONAL SOCIAL ASSISTANCE PROGRAMME
1. 136187 Old age persons of 60-79 years and 16363 old age
Persons of 80 years and above benefited under IGNOAPS.
2. 7432 Widows benefited under IGNWPS.
3. 2558 physically challenged persons got benefit under IGNDPS.
4. 1778 families have been provided benefit under NFBS.
5. 14552 Old Age Persons got benefit under Annapurna.
ANNUAL WORK REPORT IN RESPECT OF DEMAND NO.41.19. & 20 OF THE EDUCATION (SOCIAL WELFARE & SOCIAL EDUCATION) DEPAR TMENT
UNDER STATE PLAN FOR THE YEAR 2013-14. (Rs. in Lakhs)
Sl. No
Particulars/Items Demand wise provision in Budget Estimate for 2013-14
Total
Physical Target for 2013-14.
41
19
20
1 2 3 4 5 6 7 1 Salary 888.16 529.48 290.36 1708.00 For payment of
Honorarium to 9911 AWWs & 9911 AWHs.
2 Grants to TSSWB 93.60 55.80 30.60 180.00 For payment of Salaries, Pension to
-153-
72 staff of Erstwhile Border Area Project under TSSWB.
3. Indira Gandhi National Old Age Pension (state share)
1903.80 1135.00 622.40 3661.20 152550 Old age pensioner @ Rs.200/- per head per month being state contribution.
4 Pension to persons who lost 100% eye sight under IGNDPS
52.03 31.01 17.00 100.04 Pension @ Rs.800/- per head per month for 1042 persons who have lost 100% eye sight under IGNDPS.
5 Scholarship/Stipend 1.00 0 0 1.00 For providing Stipend/ Scholarship to Blind and Handicapped students.
6 Transfer fund to TTAADC
0 80.00 0 80.00 Transfer grant to TTAADC for developmental activities.
7 Indira Gandhi National Widow Pension Scheme (State share)
139.14 82.94 45.48 267.56 For payment of State Share of pension under to 7432 under IGNWPS @ Rs.200/- per head per month.
8 Indira Gandhi National Disability Pension Scheme (State Share)
28.08 16.74 9.18 54.00 For payment of State Share of pension under to 1543 under IGNDPS @ Rs.200/- per head per month.
9 Homes 15.13 4.87 0 20.00 For running 4 Homes namely Ampura Boys Home, Institute for Visual Handicapped(Girls) Home, Protective Home, Juvenile Home.
10 Electricity Charges 9.50 0.50 0 10.00 For payment of Electricity bill of Homes/Institutions.
11 Others 49.50 0.50 0 50.00 For maintenance of House Rent , Office Expenses, Cost of Fuel, training etc.
12 Minor Work 10.00 0 0 10.00 Repair/renovation of Deptt. Building.
13 State share/State contribution
1979.08 1151.01 631.21 3761.30 Being the State Share for running
-154-
Supplementary Nutrition Programme, ICDS prog, Sabla, ICPS, NMEW etc.
14 Capacity building for the Women
50.00 0 0 50.00 It is new scheme for capacity building of women
15 Capacity building for the Physically challenged persons
30.00 0 0 30.00 It is new scheme for capacity building for physically challenged persons.
16 Construction(SPA) 581.40 0 0 581.40 For construction of departmental building.
17 NSAP 0 0 0 0 a) National Old age
Pension Scheme (central Share).
2196.41 1379.12 844.38 4419.91 136187 (60-79 years) Old age pensioner @ Rs.200/- per head per month & 16363 (80 years and above) @ Rs.500/- per head per month as Central Share.
b) National Family Benefit Scheme. (Central)
104.00 62.00 34.00 200.00 For giving financial assistance to 2000 families @ Rs.20000/- per family due to death for bread earner of the family.
c) Indira Gandhi National Widow Pension Scheme (central Share).
335.60 200.06 109.72 645.38 For payment of Central Share of pension to7432 Widows under IGNWPS @ Rs.300/- per head per month.
d) Indira Gandhi National Disability Pension Scheme (central Share).
49.95 29.76 16.32 96.03 For payment of Central share of pension to 2585 Disable persons under IGNDPS@ Rs.300/-per head per month.
Grant Total 8516.38 4758.79 2650.65 15925.82
-155-
ANNUAL WORK REPORT IN RESPECT OF DEMAND NO.41. OF T HE EDUCATION (SOCIAL WELFARE & SOCIAL EDUCATION) DEPAR TMENT UNDER
NON- PLAN FOR THE YEAR 2013-14.
(Rs. in Lakhs) Sl. No.
Particulars/Items Demand No.41
Physical Target for 2013-14.
1 2 3 4 1. Salary 5359.32 Director-1,Dy.Commissioner-1,
Dy.Director-5, Programme Officer-4, Chief Supt.-1,SRO-1, DISE-4,Sup(RFLP)-3, SUP(Home))-7,SEO-10,Blind Edo.-5, Tutor of Home-6,Asstt.Nurse-6,Senior Com-2,OS-5,Head Clerk-/Account-32,UDC-62,LDC-134,Jr SEO-893,Driver-13,Storekepper-6, SM-841,ClassIV/Gardener-269,Helper-13, Cook-14,Sweeper-9,Helper Gr.-II - 5,NG-24, Pupetmen-1,Projector Operator-1.
2. Grants to TTAADC (Salary)
1524.68 For payment of Salaries to the deputed staff of this Deptt. to TTAADC( Jr.SEO.-242, SM-148,Group D-3,PTI-124,ALT-181,PTW-2).
3. Grants to TSSWB/ Mahila Commission
60.00 1.Being 50% state share of Tripura State Social Welfare Board including Honorarium of Chairperson. 2. Establishment cost of Tripura Commission for Women including Honorarium of Chairperson.
4. Homes 83.76 For running 7 Homes namely Khilpara Boys Home, Ramnagar Boys Home, Girls Unit-I, Girls Unit-2, Mahila Ashram, Foundling Home, Infirmary, and 2 Institutions namely Institute for Visual Handicapped(Boys), Institute for Speech Rehabilitation covering 447 inmates.
5. Electricity Charge 10.00 Electricity charge for 7 Homes and 2 Institutions and Office of the CDPO, DISE,& Directorate.
6. Repair of Public Building 20.00 Maintenance of Department Building.
7. Social Pension 229.50 For payment of BHP to 4531 beneficiaries @ Rs.400/- per month , Bidi Shramik pension to 97
-156-
beneficiaries @ Rs.400/- per month and Unemployment allowance to 35 beneficiaries @ Rs.1000/- per month.
8 Allowance for the persons having 60% and above disability
130.65 Allowance @ Rs.400/- per head per month for 1549 disable persons who are having 60% and above disability.
9 Pension to persons who lost 100% eye sight under BPL
66.00 Pension @ Rs.1000/- per head per month for 539 persons who have lost 100% eye sight.
10 Pension to Widow & Deserted Women
2263.44 Pension @ Rs.400/- per head per month for 47155 Widows and deserted Women.
11 Tripura Rickshaw Puller Pension scheme
8.82 For payment of pension to 134 Rickshow Pullers @Rs.400/- per head per month.
12 Tripura Cobblers Pension scheme
5.00 For payment of pension to 32 Cobblers @ Rs.400/- per head per month.
13 Tripura Scheme for Girls Child scheme
1000.13 For payment of Incentive to 20782 girls Child @ Rs.300/- per head per month.
14 State Old age pension Scheme
423.75 For payment of pension to 8828 State old age persons @Rs.400/- per head per month
15 State widow pension Scheme
93.70 For payment of pension to 1952 State widow persons @Rs.400/- per head per month.
16 Un-married Women pension under BPL families
82.95 For payment of pension to 957 Un-married women persons @Rs.400/- per head per month.
17 Pension to persons who lost 100% eye sight under APL families
30.00 For payment of pension to 386 100% eye sight under APL families @Rs.500/- per head per month.
18 Allowance for the persons having 80% and above disability under APL families
82.95 For payment of pension to 1228 80% and above disability under APL families @Rs.400/- per head per month.
19 Motor Shramik Pension Scheme
24.00 For payment of pension to 172 Motor shramik @Rs.400/- per head per month.
20 Laundry Worker Pension Scheme
14.40 For payment of pension to 154 Laundry worker @Rs.400/- per head per month.
21 Barber Worker Pension Scheme
16.80 For payment of pension to 186 Barber worker @Rs.400/- per head per month.
22 Handloom Worker Pension Scheme
24.00 For payment of pension to 306 Handloom worker @Rs.400/- per head per month.
23 Fishermen Pension Scheme 48.00 For payment of pension to 413
-157-
Fishermen @ Rs.400/- per head per month.
24 Others 30.00 For payment of House Rent of 2 DISE Office,1 CDPO Office, Office expenses for the office of the DISE of 4 District, SWO Office and Directorate Office, For running of Vehicle of 4 DISE Office, SWO, Office and Directorate Office. For payment of T.E. to Official Staffs, For payment of O.T. to the Driver.
Grand Total:- 11631.85
ANNUAL WORK REPORT IN RESPECT OF DEMAND NO.41. OF T HE EDUCATION SOCIAL WELFARE & SOCIAL EDUCATION) DEPART MENT UNDER
CSS- PLAN FOR THE YEAR 2013-14.
Rs.In Lakhs
Particulars.
RE 2012-13
BE 2013-14
41 19 20 Physical Target for 2013-14
1 2 3 4 1 ICDS
(GENERAL)
10241.50 12695.79 6189.37 4425.14 2101.92 Actual Provision of Salary of existing employees of 3-Deputy Director, 4-Programme Officer of District Cell, Project Level and 56-CDPOs,436 Supervisors, 9911 AWWs,9911 AWHs, 130-Clerks, Driver-10, 55-Group-D, Nutritionist-1, PSE-1 & SEW-1 and Non-Salary item of TA,Electric,BLC, Centre Contingency, Telephone, Rent,P.Oil,Hiring Vehicle, IEC,Flexi Fund, Uniforms, Printing, Furniture, PSE Kits, Medicine Kits, Weighing Scale under
-158-
ICDS(General) as per scheme guideline.
2 SNP 6543.42 9063.62 4703.87 2818.94 1540.81 Providing supplementary nutrition to 377016 Nos enrolled children ( 6 months - 6 years), 103725 enrolled PM & LM , 669 nos severely under weight children and 8400 nos adolescent girls @ Rs.6/- , 7/-,9/-,7/- per day respectively as per new norms revised by GOI which will be implementaed from 2013-14. Prtovision of cost of rice for SNP.
3 Training 100.48 100.48 100.48 0 0 Provision for imparting training of ICDS Functionaries i.e. Job Course for 20 AWW, Orientation Course for 40 AWW, Refresher Course for 50 AWW & 40 AWH. Supervisor Job Course- 5 Nos, Refresher Course-5 Nos.Block Level training for Infant & Young Child feeding (IYCF) 56 Nos. Block level training for WHO Growth Chart -56 Nos and Block Level ICDS Training -56 Nos.
4 KSY 30.80 30.80 15.95 10.45 4.4 Provision of implementation of KSY in 28 ICDS Project @ Rs.110000/- Per Anum ( 110000 X 28).
-159-
5 IGMSY 217.19 217.19 217.19 0 0 Provision has been kept for 6255 beneficiaries. Flexi Fund amounting to 2.5 % of total annual Exp. Training & Capacity building 3 % and IEC , Contingency 2% both for State & District cell
6 Sabla (Nutrition)
1527.96 1516.92 783.58 473.59 259.75 Provision for 107161 beneficiaries @ Rs.5/- per head for 300 days.
7 Sabla (Non-Nutrition)
159.60 106.40 30.2 49.07 27.13 Non-reccuring Expenditure @Rs.3.80 lakhs for 28 Projects
TOTAL SABLA
1687.56 1623.32 813.78 522.66 286.88
8 CONSTRUCTION
1725.00 1725.00 1725.00 0 0 Construction of 11 Nos CDPO Office, 1 No State Level Training Center (MLTC), 1000 Nos Kitchen cum Store of AWCs, 150 Nos damage AWCs and 100 Nos new constrtuction of AWCs and recurring & non-recurring exp of state level training centre.
TOTAL ICDS
20545.95 25456.20 13765.64 7777.19 3934.01
9 NMEW 16.38 16.38 16.38 0 0
10 ICPS 198.38 198.38 198.38 0 0
TOTAL CSS
20760.71 25670.96 13980.40 7777.19 3934.01
-160-
After examination of the Budget proposals and appreciation of
submission of the Representative of the Department Committee recommends the
Budget proposals under Demand No. 41 for grants by the House alongwith the
Recommendations.
RECOMMENDATIONS
i) The Department to continue its persuasion with P lanning Department for release of adequate fund for constru ction of 14(fourteen) CDPO offices.
ii) The Department to ensure extending drinking wat er, sanitation to uncovered AWCs. For that the Department to effec t supply of 40(forty) Ltrs. capacity Filters in all AWCs.
iii) Training programme be extended to uncovered ar eas, specially to the newly created 4(four) Districts by opening training center.
iv) Pension rate to the pension holders/ beneficiar ies should be increased considering price raise in the market.
v) The Department to set up new AWCs in the uncover ed areas as early as possible.
( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly
-161-