Tenth Report Subj.Commtt.-2013-14 - Tripura Legislative

Embed Size (px)

Citation preview

TABLE OF CONTENTS

Pages 1. COMPOSITION OF THE

SUBJECT COMMITTEE - I : (ii)

2. INTRODUCTION : (iii)

3. REPORT

i) Education (School) : 1-11

ii) Education (Higher) : 12-19

iii) Power : 20-36

iv) Transport : 37-42

v) Animal Resources Development : 43-53

vi) Youth Affairs & Sports : 54-60

vii) Forest : 61-66

viii) Agriculture : 67-83

ix) Horticulture & Soil Conservation : 84-97

x) Co-operation : 98-105

xi) Health & Family Welfare : 106-116

xii) Public Works (R & B) : 117-124

xiii) Public Works (W.R) : 125-131

xiv) Public Works (D.W & S) : 132-139

xv) Fisheries : 140-145

xvi) Social Welfare & Social Education : 146-161

(i)

COMPOSITION OF THE COMMITTEE ( 2013-2015 )

CHAIRMAN

Shri Sudhan Das

MEMBERS

2. Shri Narayan Chandra Choudhury. 3. Shri Mano Ranjan Acharjee. 4. Shri Manindra Chandra Das. 5. Shri Keshab Deb Barma. 6. Shri Ramendra Narayan Deb Barma. 7. Shri Shyamal Chakraborty. 8. Shri Jitendra Sarkar. 9. Shri Pranajit Singha Roy.

SECRETARIAT Shri S. Bhattacharjee Secretary. Smt. L. Deb Barma Deputy Secretary. Smt. S. Deb Barma Under Secretary. Shri S. Chakraborty Office Superintendent. Shri S. Debnath U.D. Assistant.

Shri M. Deb Barma U.D. Assistant.

(ii)

INTRODUCTION

I, the Chairman of the Subject Committee-I having been authorised by the Committee do present the Tenth Report of the Committee on the Demands for Grants for the Financial Year 2013-2014 relating to the following Departments of the State Government ; Demands for Grants relating to the Departments of Education (School)/ Education (Higher)/ Power/ Transport/Animal Resources Development/ Youth Affairs & Sports / Forest/ Agriculture / Horticulture & Soil Conservation / Co-operation/ Health & Family Welfare / Public Works (R & B, W.R. and D.W. & S.) / Fisheries and Social Welfare & Social Education. 2. In pursuance Rule 300A(1) of the Rules of Procedure and Conduct of Business in the Tripura Legislative Assembly, the Committee was constituted by the Hon’ble Speaker for a two-year period 2013-2015 tenure of which will expire on 25.04.2015.

3. The Subject Committee-I plays a very important role in streamlining the proposed Demands of the Departments in the Budget and its Recommendations in the Report helps to utilise the Fund in developmental and welfare programme to a very realistic and great extent.

4. The Committee examined the Demand Nos. 40, 39, 14,11, 29, 42,30, 27, 28, 12, 16, 52, 13, 15, 51, 26 and 41 for Grants for the Financial Year 2013-2014 in its Sittings held on the 4th, 6th, 7th and 8th May, 2013. 5. In the Sitting held on the 10th May, 2013 the Committee considered the draft Report on these Demands for Grants and adopted the same with Recommendations for presentation to the House on the 13th May, 2013. 6. The Committee placed on record its thanks to the Additional

Chief Secretary in-charge of the Finance Department/Principal

Secretaries/Secretaries/Joint Secretary, Finance Department and other

Officers of the Government and the Secretary,Officers and Staff of the

Assembly Secretariat for their sincere and tireless service rendered to the

Committee during the examination of Demands for Grants and preparation of

this Report.

(iii)

THE REPORT ON THE DEMAND NO. 40 OF THE SCHOOL EDUCATION DEPARTMENT

FOR THE FINANCIAL YEAR 2013-14.

The Budget Proposal under Demand No. 40 relates to School Education Department, Government of Tripura for the Financial Year 2013-2014 and the Revised Budget for the Financial Year 2012-2013 are as follows :-

(Rs. in Lakh)

Particulars Revised Estimate

2012-2013

Budget Estimates for 201 3-2014 Demand Fund for Total

T.S.P. S.C.P. a)Non-Plan 78183.79 92419.00 --- --- 92419.00 b) Plan 18894.70 6931.48 4266.05 2774.22 13971.75 c) C.S.S. 9488.98 5514.72 2681.82 1469.50 9666.04 d) N.E.C --- --- --- --- --- Total 106567.47 104865.20 6947.87 4243.72 116056.79

Now, the aforesaid Budget Proposal is under examination of the Subject

Committee-I of the Tripura Legislative Assembly for recommendation to the Demands for Grants.

The Committee in its meeting held on 4th May, 2013 examined the Budget

proposals in details having discussion with the Principal Secretary of the Department who appeared before the Committee on summon.

First of all, the Principal Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2012-13 and stated as follows :-

Sl. No.

Recommendations Action taken

i. Teaching quality has to be effectively increased & for that the Department may constitute a Committee with the eminent retired teachers to evaluate the situation & recommendation for upliftment of standard of quality of Teaching.

In each bloc, there is one Bloc Resource Centre under which a number of Cluster Resource Centres are functioning. In both BRCs and CRCs there are well-trained resource persons engaged under SSA, a good number of them being experienced retired teachers. The main objectives of BRCs and CRCs are to provide resource supports to the teachers for quality improvement by regular visits to different schools under them as per monthly targets. Besides Departmental officers are also

-1-

visiting schools as per monthly targets fixed for them for the purpose of quality improvement.

ii. Office of the School Inspectors’ performance is to be upgraded and for that experienced teachers may be engaged. Supervision of the Schools to be done regularly.

Already, as recommended by the Subject Committee, some teachers were posted in different Inspector of Schools for overall improvement of performance of the Inspectorate of Schools.

iii. Boundary wall to all Girls’ Schools & Schools situated nearby roads are to be covered with boundary walls in phase manner.

During 2012-13, there was a target for construction of boundary wall in 50 schools against which fund for construction of boundary wall in 41 schools including girls and schools located on the roadside was placed. Construction of boundary walls in 41 no. schools is under progress.

iv. The kitchen and dining place for mid-day-meal to be made hygienic and Department to formulate proposal for the same along with Drinking Water & Sanitation in every School and it should be maintained regularly.

The guidelines of the mid-day-meal contains instruction of developing good habit among the children to maintain cleanliness and hygiene while taking meals. Washing hands properly and cleaning dishes before and after taking meal is a must for every child. Moreover, similar instruction was issued to the cooks to cover their heads with scarp while preparing, cooking and serving meals and also to use cooking and serving utensils after proper cleaning. MTA in each school is entrusted with the responsibility to supervise and monitor proper maintenance of hygiene in connection with mid-day-meal.

v. Database of teachers be maintained by the Department even with the help of a private agency to facilitate effective transfer & posting with a definite norms so that equal distribution of teachers to Towns and villages may be maintained.

Database has already been created of all employees including teachers of this Department at district and state level. Updating the database for 2013-14 is under process for redeployment of teachers in schools of rural and urban areas based on teacher student ratio as per RTE Act 2009 to maintain balance in teacher distribution.

vi. Set up a English Medium High School for each Bloc in the State.

As per commitment made by the State Govt. in Budget Speech of the Hon’ble Finance Minister in 2012-13, the School Education Department has already taken decision to set up 21 English medium schools in

-2-

different block areas with the approval of Finance Department. As instructed by the Finance Department, creation of posts of the required teachers is under process.

vii. Nigh-Guards has to be posted in every High School

661 posts of Night Guard was created during 2008-09. For filling up of the above posts, the Directorate of Higher Education, Tripura was requested to sponsor the names of selected persons being the nodal Department of the Education Department. But, the School Education Department has not yet received the list of selected candidates from the Directorate of Higher Education. In this connection, it is stated that at present there is no continuation of the above 661 created posts. For revalidation/continuation of the posts, a file has already been moved to the Finance Department. After getting revalidation / continuation of the above 661 posts of Night Guard from the Finance Department, Tripura and also on receipt of names of selected candidates from the Directorate of Higher Education, necessary steps for providing Night Guard in the High Schools will be taken by this Department.

Achievement made during the Year 2012-13 Sl. No. Name of the Scheme Achievement made during 2012-13

i. Starting /Up-gradation of Schools • Starting of new J.B School- 34 (under SSA)

• Up-gradation of J.B to S.B School-03(01 under SSA)

• Up-gradation of S.B to High School-10

• Up-gradation of High to H.S School-12

ii. Opening of Science Stream 11 iii. Infrastructural Development Works for infrastructural development of

26 HS Schools, 4 High Schools, 2 S.B Schools, 32 J.B Schools, 5 Hostels have been taken up under SPA/SCA.

-3-

iv. Sarva Shiksha Abhiyan • Enrolment of identified Out-of-School Children- 1116.

• Enrolment of Children with Special Needs (CWSN)- 3758

• 5-days Orientation Teacher Training at BRC level-15021

• One-day CRC level training-13298 • 10-day training of Resource Persons-

803 • Training to Community Leaders-

12059 • Residential Special Training for Out-

of-School Children-517 • Non-Residential Special Training for

Out-of-School Children (including Reang Migrant children)-3979

• Establishment of Hostel for Girls under KGBV programme (Dasda Block)-01

• Engagement of Block Resource Person-328

• Engagement of Cluster Resource Person-332

• Construction of Addl. Classroom-177. • Construction of Separate Girls toilet-

138 • Construction of Boys toilet- 12. • New Primary School building-04. • Store cum HM room-94

v. RMSA (i) During 2011-12, as many as 41 nos of SB Schools were up-graded to High Schools. RMSA Tripura had engaged 170 nos. of PG Teachers out of 205 posts of PGTs. All the posts could not be filled up due to non-availability of ST candidates. (ii) Against 41 up-graded schools during 2011-12, one post against each of Lab. Asst. and L.D.Clerk for the schools were proposed to be recruited. Out of 82 posts, only 69 posts could possible to be recruited. In all cases 100 Point Rosters were maintained scrupulously West South North Dhalai Total Lab. Asst. 12 06 09 06 33 L.D. Clerk 12 08 09 07

-4-

36

(i) RMSA provided Annual grant @ Rs. 50,000/- to every High & Higher Secondary Schools.

(ii) For proper monitoring and management of the RMSA programme, the RMSA Rajya Mission is being organizing training programme with the School Management and Development Committee members.

vi. MDM • Mid-Day-Meal covered for 577517 students (I to VIII)

• 10815 nos. Cook cum helpers engaged under MDM scheme. They are being paid Rs.1000/- per month for 10 months (Rs.900/- as Central share and Rs.100/- as State share).

• 564 nos. Self help groups have been engaged for running of MDM Scheme.

• 615 Kitchen sheds Sanctioned and released (Central and State share) to the All the DEO’s.

vii. IEDSS • 20 nos. Resource rooms @ Rs.2.00 lac per unit have been constructed and work for rest 1 (one) is in progress.

• Out of 30 nos. toilet with ramps, 28 nos. have already been constructed and work for rest 2 (two) are in progress (Unit cost Rs.1.50 lac).

• Initiative have been taken up to train 98 nos. secondary teachers in special education under PGPD course.

• Equipments for 20 nos. Resource rooms procured @Rs.0.70 lac per unit.

viii. State Grant-in-aid Madrasssa • Construction of 3 nos. 100 seated hostels have been taken up under SPA.

• For the 1st time 23 nos. Madarassa students have appeared in Madrassa Fazil (H.S) exam under TBSE.

• The result of Madrassa Madhyamik Exam of 2012 was about 76%.

• TBSE has prepared a new madrassa syllabus for class-I to XII.

• Barnarayan Islamia Sr. Madrassa has been up-graded to High Madrassa and

-5-

Darul Uloom Jr. Madrassa, Udaipur has been up-graded to Sr. Madrassa.

• Deptt. of Higher Education, Govt. of Tripura has been approached to introduced BA (Arabic) and Kamil (Graduate Theological course) in Govt. colleges in Tripura. Higher Education already started the process.

ix. SPQEM • Construction of 20 nos. SPQEM Madrassa building have been taken up through the various Inspector of Schools under SPA.

• Monthly honorarium of the graduate teachers working under SPQEM Madrassa has been enhanced at the rate Rs. 2000/- per month.

• Mid-Day-Meal programme has been introduced in all SPQEM Madarssas.

x. SBM • Identified total potential learners under Dhalai District- 44,773

• Engagement of volunteers-2,507 • Setting up of literacy centres- 2,710 • Distribution of basic primer- 30,000 • 1st assessment test held 17-03-2013. • Appeared learner- 20,730 • Fund received from Govt. of India-

82.21 lakhs • Fund received from State Plan-37.50

lakhs.

xi. State Adult Literacy Programme (SALP) 2nd phase

• Started on 8th September, 2012 in seven district except Dhalai district.

• Identified learners 1.02 lakhs • Engagement of Volunteers 5747. • Setting up of literacy centres- 5442 • Distribution of basic primer- 90,800 • Fund received from State Plan-113.00

lakhs. xii. Scheme for providing free text books

to the BPL students reading in Class-IX-X and XI-XII

Total Rs. 2,96,03,000/- has been provided for free text books to 52,925 nos. of students belonging BPL family reading in class-IX- X and Rs39,16,800/- has been provided to 9,792 nos. of BPL students reading in class-XI-XII for the same. Besides during 2012-13 rate of free text book has been enhanced and present rates are as follows: Class-XI Arts stream- Rs. 855/- per student.

-6-

Science stream- Rs. 1718/- per student. Commerce stream- Rs. 856/- per student. Class-XII Arts stream- Rs. 706/- per student. Science stream- Rs. 1485/- per student. Commerce stream- Rs. 645/- per student.

xiii. ICT At present computer Education in 350 High & H/S school is going on. Another 50 High & H/S School will be covered immediately. Besides G.O.I has approved another 282 High & H/S Schools for computerization. In the year 2010-11 & fund in this regard also received. The process for tender etc. are in progress. The rest uncovered Schools will be covered in faced manner & in this reference planning is going on.

Plan/programme and any project to be implemented during the Financial Year 2013-14

Sl. No.

Name of the Scheme Target 2013-14

i. Starting /Up-gradation of Schools • Setting up of 30 new JB schools. • Up-gradation of 25 JB to SB schools. • Up-gradation of 5 High to HS schools. • Setting up of 2 residential schools in 23

miles of Chawmanu Block and Santipur of Dasda Block(Vandarima).

ii. Opening of Science Stream • Opening of science stream in 10 nos.

HS School. iii. Sarva Shiksha Abhiyan • Special training for mainstreaming of

Out of School children. • School Uniform grant for SC, ST, BPL

Boys student and Girls student. • 5 days Refresher in-service teachers

training at BRC level for 9279 teachers.

• One day monthly cluster level meeting at CRC level (10 months) for 18011 resource persons.

• Refreshers residential training for all RPs, MTs, BRC & CRC faculties and

-7-

coordinators (10 days) for 779 teachers and resource persons)

• Inclusive Education for 3830 CWSN. • 3-day Non-Residential training of

Community Leaders for 22550 no. SMC members.

• Construction of 25 Primary School building.

• Construction of 697 addl. Classroom. • Construction of 183 no. separate girls

toilet. • Construction of 30 no. CWSN friendly

toilet. • Construction of 05 no. drinking water. • Construction of 81 ramp with handrail

for CWSN. • Construction of 90 handrail in existing

ramp for CWSN.

iv. RMSA (i) During 2013-14 as many as 29 SB Schools are proposed to be up-graded to High Schools subject to approval by the PAB.

(ii) For strengthening of existing 28 Govt. schools, funds have been proposed to MHRD subject to approval by the PAB.

(iii) Fund have been proposed for construction of 15 Teachers quarters subject to approval by the PAB.

(iv) Funds have also been proposed for engagement of staff for new schools subject to approval by the PAB.

(v) Proposal for construction of 5 nos. of 100 bedded Girls’ hostels in 5 EBBs has been sent to MHRD. This is also subject to approval by the PAB.

(vi) For quality interventions, funds have been sought for following items :- (a) Excursion trip for students with in

the State. (b) Study tour for students outside the

state. (c) Study tour for teachers outside the

state. (d) Science exhibition at district level. (e) Book fair at district level.

v. MDM • Mid-Day-Meal will be covered for

591669 students (I - VIII)

-8-

• 10815 nos. Cook cum helpers engaged under MDM scheme. They are being paid Rs.1000/- per month for 10 months (Rs.900/- as Central share and Rs.100/- as State share).

• 564 nos. Self help groups have been engaged for running of MDM Scheme.

• 530 units Kitchen sheds will be sanctioned during the year 2013-14.

• The GOI have been sanctioned Rs.77.05 lakhs for 1541 units Kitchen devices for Primary and Upper primary.

• The GOI have been sanctioned Rs.34.50 lakhs for LPG cylinder for using Mid-Day-Meal Programme.

vi. IEDSS • 4 nos. secondary schools would be developed into model inclusive schools in 4 districts @ Rs.50,000/- per school.

• Provision of ramps for 60 schools @ Rs.0.386 lac and 60 nos. disabled friendly toilet @Rs.1.754 lac during 2013-14.

• Recruitment 4 special educators in 4 model inclusive schools.

• Recruitment of 9 stenographers @Rs.10,000 per month. (1 at state level & 8 at district level)

• Recruitment of 1 co-ordinator at state level @Rs.20,000/- per month.

• Stipend to 971 nos. children with disability @Rs.600/- per year as per project proposal

vii. SPQEM • Filling up of 71 nos. vacant posts in

SPQEM Madrassa. • Proposal for construction of for 25 nos.

Madrasa buildings. • Proposal for bringing more privately

managed Madrasa/Muktabs of untouched area under SPQEM / Grand-in-Aid scheme.

• Complete survey of SPQEM Madrassa where there is no permanent building.

• 5-days refresher course for all existing SPQEM Madrassa teaches thorough SSA.

viii. SALP • Target has been fixed to achieve 100%

-9-

literacy in the state through State Adult Literacy Programme by 8th September, 2013.

ix. Scheme for providing free text books to the BPL students reading in Class-IX-X and XI-XII

• Supply of free textbooks to 60,000 BPL students who are reading in classes-IX & X and 27,890 BPL students reading in classes XI & XII.

x. Other Infrastructural Development • Improvement of basic infrastructure in

20 Madrassas. • Construction of 2(two) hostels for

Muslim students • Construction of 50 school buildings • Construction of 10 Inspectorate offices.

After careful examination of the Budget proposal and appreciation of

submission placed by the Principal Secretary of the Department, the Committee

makes the following recommendations:-

RECOMMENDATIONS

i) Department to formulate a Mechanism for upliftme nt of the standard of quality of teaching.

ii) School Inspector at bloc level be engaged along with its office. School Inspector be provided with the power of Teac her adjustment within his jurisdiction.

iii) Boundary wall to rest schools be completed spe cially of the road-side phase-wise and all girls’ school.

iv) Mid-day-meal cost be moderate rate and maintena nce of hygienic condition should be ensured. The wages of the Cook to be increased.

v) Night-guards be posted on priority basis in scho ols where valuables are available specially High & Higher Secondary Sch ools.

vi) Department to provide adequate necessary furnit ure in all the schools in phase manner. The Department to work out the need and obtain additional fund. The Finance Department to a llocate fund for the same.

-10-

vii) The Department to consider rendering financial assistance upto 50% to the private English medium school to extend the facility to interested students in the Bloc level. The Finance Department to effectively consider allocation of fund to fulfil t he target.

viii) S.C. & S.T. Hostels are to be maintained prop erly by the Department and for that also to supply adequate furniture, ute nsils etc. The Finance Department to release fund in all Hostels’ there should be Hostel Superintendent with Quarters and Hostels’ st udent be provided with periodical coaching. Their shall be m onthly health check-up of those students.

After examination of the Budget proposals and appreciation of

submission of the Representative of the Committee recommends the Budget

proposals under Demand No. 40 for grants by the House alongwith the

Recommendations.

( Shri Sudhan Das ) Dated,Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly

-11-

THE REPORT ON THE DEMAND NO. 39 DEPARTMENT OF THE HIGHER EDUCATION

FOR THE FINANCIAL YEAR 2013-2014.

The Budget Proposal under Demand No. 39 relates to the Higher Education Department, Government of Tripura for the Financial Year 2013-2014 and the Revised Budget for the Financial Year 2012-2013 are as follows :-

(Rs. in Lakh)

Particulars Revised Estimate

2012-2013

Budget Estimates for 2013 -14 Demand Fund for Total

T.S.P. S.C.P. a) Non-Plan 8705.00 10028.00 -- -- 10028.00 b) Plan 9257.14 2724.44 1624.18 890.68 5239.30 c) C.S.S. 3224.66 ----- ---- --- ----- d) N.E.C 145.34 ----- ---- ---- ----- Total 21332.14 12752.44 1624.18 890.68 15267.30

Now, the aforesaid Budget Proposal is under examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendation to the Demands for Grants.

The Committee in its meeting held on 4th May, 2013 examined

the Budget proposals in details having discussion with the Secretary of the Department who appeared before the Committee on summon.

First of all, the Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2012-13 and stated as follows :-

Sl. No.

Recommendations Action Taken

1.

Recruitment of faculties for the Colleges has to be completed as early as possible.

I) Altogether there are 661 sanctioned posts

of Asstt. Professors in GDCs. During 2012-13

steps were taken to fill up 132 posts through

TPSC. But only 38 persons could be recruited.

There are 92 posts of Asstt. Professors in

reserved category, for

which the Department has processed proposal

to dereserve posts and fill up vacancies of

-12-

teachers for some of the major subjects for

which SC/ST candidates are not available.

II) Appointment of Principal in IASE has been

made & for recruitment to the vacant posts of

Asstt. Professor in IASE, TPSC has been moved.

III) Action has already been taken for filling up

the vacant posts of Principal, and 6(six) nos. of

Asstt. Professors at S.D. Barman Govt. Music

College.

IV) Proposal initiated for direct recruitment of

Principal Govt. Art College. For the vacant 2(two)

nos. of Asstt. Professors falling in reserved

category, no suitable candidate could be found by

TPSC.

V) Out of 3(three) vacant posts of Asstt. Professor

for Govt. Law College, only one person could be

selected and appointed.

VI) For filling up 4(four) posts of diploma level

Technical Institutions, 3(three) posts could be

filled up.

2. M.Tech. course in TIT to be introduced in phased manner.

The Degree level programme of TIT was started

initially by utilising the building of Polytechnic

Institute at Narsingarh. For starting Degree

Engineering College, two project proposals were

submitted to the Ministry of DONER. (Phase –I at

an estimated cost of Rs. 9.60 crores and Phase- II

costing Rs.118.00 crores). On completion of one

building under 1st phase, 2(two) Branches of

Degree Engineering have been accommodated.

Funds for phase II projects has not yet been

sanctioned by DONER, Ministry. However, State

Govt has released fund in advance. Phase –II

construction work has been entrusted to NBCC

Ltd. This apart, it will also be necessary to fill up

the sanctioned posts in the rank of Professor and

-13-

Asstt. Professor through TPSC. TPSC was moved

for selection of candidates for filling up 4(four)

posts of Professor. TPSC has informed that no

eligible candidate for the above post has applied.

In view of non-availability of suitable candidate as

well as infrastructure, M. Tech. course could not

be introduced. However, the Department would

continue its efforts to start M. Tech course as

soon as basic requirements are met.

Achievements made during the year 2012-13.

In the Budget 2012-13 provisions was made for Rs.4321.03 lakhs

under Plan in Demand No.39 / 19 / 20. The table below will indicate the

provisions proposed in R.E. 2012-13 corresponding to provisions to B.E. 2012-

13.

(Rs. in lakhs)

Demand No Particulars B.E. 2012-13 R.E.2012-13 (Proposed)

39

A. STATE PLAN

DIVISIBLE POOL 1322.00 1369.88

A. Salary 100.00 118.86

B. Non-Salary 1222.00 1251.02

Of which -

i. Supplies & Materials 50.00 110.00

ii. Electricity Charges 10.00 10.00

iii. State Share / State Contribution 1000.00 740.05

iv. Scholarship / Stipend 110.00 110.00

v. Major Works 113.10

vi. Minor Works 10.00 10.00

vii. Govt. Museum 11.00

8.87

-14-

viii. Land acquisition

ix. RRRLF / Societies 18.00

x. Others 42.00 120.00

NON-DIVISIBLE POOL

Of which -

i. TFC 2558.00 3610.95

ii. ACA 624.73

iii. SPA 1.00 2857.58

iv. SCA 1.00 794.00

Total (Div + Non-Div) 3882.00 9257.14

CSS 100.00 1608.00

NLCPR 170.00 1616.66

NEC 169.03 145.34

Grand Total: 4321.03 12627.14

The Finance Department released during 2012-13 (upto March

2013) Rs.5329.26 lakhs against State Plan Budget Provision of Rs.4221.03

lakhs. In addition another Rs.3370.00 lakhs has been released upto March 2013

against CSS / NLCPR / NEC projects. The amounts released does not however

includes the fund for Salary Components.

The fund released by Fin. Deptt. Against approved on-going State funded

[projects has been placed with the Implementing Agencies for execution of

the projects. Fund allocated to implementing agencies against approved on-

going Plan Projects are indicated below:

Sl No

Funding Source

Budget Provision

Fund released by F.D.

Fund placed with Agencies

Remarks

1 TFC 2558.00 1052.95 1052.95

2 ACA 0.00 624.73 624.73

3 SPA 1.00 2857.58 2857.16

4 SCA 1.00 794.00 794.00

5 CSS 100.00 1608.00 1608.00

6 NLCPR 170.00 1616.66 1616.66

7 NEC 169.03 145.34 145.34

Total: 2999.03 8699.26 8698.84

-15-

MAJOR ACHIEVEMENTS AND INITIATIVES OF THE HIGHER EDUCATION DEPARTMENT

� To provide higher education facility to the student of rural and hilly areas

of the State, six new General Degree Colleges at Mohanpur, Bishalgarh, Shantirbazar, Longtrai Valley, Kanchanpur and Teliamura have been set up during the academic session 2012-13.

� As a measure of implementation of Ten Years Perspective Plan the existing General Degree Colleges have been strengthened by construction of new academic and administrative buildings.

� Existing facilities in IASE and Govt. Law College under expansion in

order to augment intake capacity along with others modern facilities.

� A College for Teachers’ Education at Kumarghat is being set up to start classes from next academic session.

� 3 (three) Polytechnics at Fulkumari in Udaipur, Bagbassa in

Dharmanagar & Khumulwng in TTAADC area are in process of setting up to enhance the scope of technical education in uncovered Districts. Polytechnic at Udaipur would be started from next academic session..

� Construction of one new academic block in Tripura Institute of

Technology, Narsingarh has been completed. Phase-II construction work also started.

� Construction of new buildings for District Library at Dhalai and public

library at Chhailengta taken up. � Nineteen General Degree Colleges have been covered under NMEICT

Scheme for developing SMART Classes. � Setting up Indian Institute of Information Technology (IIIT) at Agartala

under PPP mode has been approved by the Govt. of India.

� Steps have been taken to modernize the Science laboratories in the

colleges under funding from NEC.

� Efforts are on to set up the State Museum at Ujjayanta Palace and also to make the Palace a significant tourist spot of art & culture of North East India. State Archive will also be shifted to the Palace complex.

The Plan / programme and any projects to be implemented during the year 2013-14 for consideration of the Committee during examination

During 2013-14 the following activities are targeted:- � Operationalisation of new Polytechnic at Udaipur and Bagbassa

-16-

� Taking up construction of IIIT at Bodhjungnagar

� Operationalisation of new building of Govt. Law College, B.Ed. College at Agartala and College of Teachers’ Education at Kumarghat

� Setting up of another 2 College of Teachers Education at

Santirbazar and Khowai � Setting up of separate Science College in the vacant Old Central

Jail Premises � Improvement of academic activities of Colleges by augmentation of

faculty strength and providing academic infrastructure

To achieve the above goal following provisions are proposed in the B.E. 2013-14 under Plan in Demand No. 39 / 19 / 20.

Demand No

Particulars R.E. 2012-13 B.E. 2013-14 (Proposed)

39

A. STATE PLAN

DIVISIBLE POOL 1369.88 1380.00

A. Salary 118.86 133.00

B. Non-Salary 1251.02 1247.00

Of which -

i. Supplies & Materials 110.00 150.00

ii. Electricity Charges 10.00 12.00

iii. State Share / State Contribution

740.05 850.00

iv. Scholarship / Stipend 110.00 110.00

v. Major Works 113.10

vi. Minor Works 10.00 10.00

vii. Govt. Museum 11.00 40.00

viii. Land acquisition 8.87

ix. RRRLF / Societies 18.00 25.00

x. Others 120.00 50.00

NON-DIVISIBLE POOL

Of which -

i. TFC 3610.95 2644.00

ii. ACA 624.73 1.00

iii. SPA 2857.58 1212.30

iv. SCA 794.00 2.00

Total (Div + Non-Div) 9257.14 5239.30

CSS 1608.00

NLCPR 1616.66

NEC 145.34

Grand Total: 12627.14 5239.30

-17-

The Plan / programme and any project to be implemented during the year 2012-13 for consideration of the

Committee during examination.

During 2012-13 the following activities are targeted :-

1. Operationalisation of six new general degree colleges at Mohanpur, Bishalgarh, Santirbazar, Kanchanpur, LT Vally & Teliamura and Polytechnic at Udaipur

2. Increasing intake capacity of existing colleges by opening of under construction academic building to improve GER

3. Taking up construction of Tripura Institute of Technology Phase-II on availability of sanction from DoNER and receipt of fund

4. Recruitment of faculty in both general degree colleges and technical institutions for augmentation of faculty strength matching with growing student strength

To achieve the above goal following provisions are proposed in the B.E. 2012-13 under Plan in Demand No.39 / 19 / 20.

(Rs. in lakhs)

Demand No.

Particulars R.E. 2011-12

(Proposed)

B.E. 2012-13

(Proposed)

A. STATE PLAN 39 Divisible Pool 769.96 1322.00

39 A. Salary 87.00 100.00

39 B. Non Salary 682.96 1222.00

39 Of which

39 i. Supplies & materials 45.00 50.00

39 ii. Electricity charges 12.50 10.00

39 iii. State Share / State Contribution 411.60 1000.00

39 iv. Scholarship / Stipend 109.00 110.00

39 v. Major Works 29.06 0.00

39 vi. Minor works 35.00 10.00

39 vii. Others 40.80 42.00

39

39 Non-Divisible Pool 8113.92 2560.00

39 Of which

39 i. TFC 3260.00 2558.00

39 ii. ACA 1801.80 0.00

39 iii. SPA 2049.12 1.00

39 iv. SCA 1003.00 1.00

39

39 Total (Div + Non -Div) 8883.88 3882.00

39

39 CSS 1707.50 100.00

39 NLCPR 2934.72 170.00

39 NEC 169.03 169.03

39 Grand Total: 13695.13 4321.03

-18-

After careful examination of the Budget proposal and

appreciation of submission placed by the Secretary of the Department, the

Committee make the following recommendations :-

RECOMMENDATIONS

i) Infrastructural facilities of College education has to be developed and for that the Finance Department to allocate ade quate fund, where necessary.

ii) In Sub-Divisional level quarters for Principal, Assistant Professors are to be constructed in phased manner. Similarly, College Hostels are also to be provided in those Co lleges.

iii) The Department to make another endeavour first to fill-up the sanctioned posts of Assistant Professor from amongs t the S.C.& S.T. candidates, if not found may go for dereservat ion.

After examination of the Budget proposals and appreciation of

submission of the Representative of the Committee recommends the Budget

proposals under Demand No.39 for grants by the House alongwith the

Recommendations.

( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly

-19-

THE REPORT ON THE DEMAND NO.14 OF THE POWER DEPARTMENT FOR

THE FINANCIAL YEAR 2013-14.

The Budget Proposal under Demand No.14 relates to Power

Department, Govt. of Tripura for the Financial Year 2013 – 2014 and the revised

Budget for the Financial Year 2012 -2013 are as follows :-

( Rs. in Lakh ) PARTICULARS

REVISED

ESTIMATES 2012 - 2013

BUDGET ESTIMATES FOR 2013 - 2014 DEMAND FUND FOR

TOTAL

T.S.P S.C.P 1) Non Plan 4118.21 4330.50 -- -- 4330.50 2) Plan 8111.10 1020.52 310.31 170.17 1501.00 3) C.S.S 1500.00 1000.00 500.00 500.00 2000.00 4) NEC 1500.00 1000.00 500.00 500.00 2000.00

Total 15229.31 7351.02 1310.31 1170.17 9831.50

Now, the aforesaid Budget Proposal is under examination of the

Subject Committee-I of the Tripura Legislative Assembly for recommendation to

the House for Grants.

The Committee in its meeting held on 4th May, 2013 examined the

Budget Proposals in details having discussion with the Secretary of the

Department who appeared on the part of the Department on summon.

First of all, the Secretary informed the Committee about the action

taken in respect of the recommendations made by the Committee during the

year 2012-13 and stated as follows :-

-20-

RECOMMENDATIONS

Sl.

No

Relevant

Para No. /

Page No.

of the

report

Recommendations of

the Committee

Implementation /

action taken on the recommendations

1 2 3 4

1 Page - 48

Para - (i)

TSECL to take up

with PGCIL to

complete the work

of earlier, West &

South by 30th June.

TSECL is continuously pursuing and

taking review meeting with PGCIL to

expedite implementation of RGGVY

Project Works in erstwhile West &

South District and 90% (approx)

works of these project have already

been completed as on 31-3-2013.

Details of progress is given in the table

below:

Item Target Achievement % of achievement

electrified Village

33 33 100%

Electrified Village

492 458 93.09%

33/11 KV sub-station (Nos.)

3 3 100%

33 KV Line (Km)

36.62 36.62 100%

11 KV Line (Km)

510 326.24 63.97%

11/0.4 KV DT (Nos.)

1170 976 83.42%

LT Line (Km) 1090.65 806.47 73.94%

service connection

(Nos.)

65703 60967 92.79%

2 Page - 48

Para - (ii)

Finance

Department to give

plan support to

completed the

Rukhia 21 MW new

power project.

TSECL proposed for sanction of fund for an

amount of Rs. 85 Crores for construction of

additional unit of 21 MW new Power Project

at Rokhia. In the year 2010-11 an amount of

Rs.9.85 Cr. was received and in the year 2012-

13 an amount of Rs.28.39 Cr. was received

under SPA. Out of the above fund of Rs.38.24

Cr. expenditure for an amount of Rs.24.05 Cr.

has already been incurred and U.C. also

submitted. Balance fund of Rs.14.19 Cr. is

received in the last part of March–2013

expenditure of which has already been

incurred. Proposal has been initiated to the

State Government for release of balance fund

-21-

Rs.46.76 Cr. which will be required for

completion of the project. It is expected that

the project will be completed by July-2013.

3 Page - 48

Para - (iii)

To give allotment of

Non-Plan budget

allocation to meet

up the subsidy to

common consumer.

Rs.40.00 (Forty) Crores has been received

during the year 2012-13 and after adjusting

the above subsidy, the tariff was determined

as per Tariff Order of the Tripura Electricity

Regulatory Commission.

4 Page - 48

Para - (iv)

To provide budget

allotment for

extension work in

the uncovered area.

Under the scheme SPA Rs.22.50 Cr. was

received during the FY 2012-13 and an

amount of Rs.11.25 Cr. has already been spent

and U.C. also submitted. Expenditure of

balance Rs.11.25 Cr. also been incurred and

UC will be submitted shortly.

Achievements during 2012-13.

Sl. No. Name of work Present Status

1 Construction of 1 X 21 MW GTG Unit at Rokhia under SPA Scheme.

Construction works of 1 X 21 MW GTG Unit at Rokhia

(Unit No. IX), funded by State Government is in

advance stage and expected to be completed during

July – 2013.

Transmission Schemes

Rs. In lakh.

Sl.

No

Name of

scheme/works

Sanctioned

Cost

Release of

fund by FD,

(up to 31st

March'2013)

UC issued up

to

31/03/2013

Remarks

A NLCPR 1 Transmission

project (Phase - I):

400 KV S/Stn. At

Surjamaninagar (to

be charged at 132

KV level) &

infrastructure

development , West

Tripura.

7995.79 2878.48 2878.48

Ist phase (132

KV & 33 KV)

completion by

Sept`2013.

2 Transmission

project (Phase - I):

Construction of 132

Kv D/C

Transmission line

from

Surjamaninagar to

950-81 342.28 342.28

Stringing in

progress and

expected to be

completed by

Aug”13.

(1)

-22-

79 Tilla Grid Sub

station.

3 Transmission

project (Phase - I):

Construction of 132

KV D/C

Transmission line

from

Surjamaninagar to

Budhjungnagar Sub

station.

738.53 265.87 265.87

Line charged

on 12.09.2012.

4 Transmission

project (Phase - I)

132 KV D/C line

from

Surjamaninagar to

Rokhia(30 KM and

site development

and Fdr. Bay at

Rokhia) in Tripura.

1261.00 453.96 0.00

Tender

evaluation in

progress.

5 Augmentation of

P.K. Bari Sub station

with 132 KV bay for

termination of 400

KV line.

400.59 144.21 0.00

DNIT under

process

Sl.

No

Name of

scheme/works Sanctioned

Cost

Release of

fund by FD,

(upto 31st

March'2013)

Expenditure

upto 31st

March'13

Remarks

B. SPA 1 Construction of 132 KV

D/C Transmission line

from Surjamaninagar to

Monarchak.

2803.00 2522.7 0.00

Work in

progress and

scheduled for

commissionin

g in June’14

(10 Km will

be completed

by July’13 for

evacuation of

power from

Monarchak

project)

2 Construction of 132 KV

D/C Transmission line

from Monarchak to

Rabindranagar Sub

station.

371.00 333.9 0.00

Work in

progress and

scheduled for

commissionin

g in June’13

-23-

3 Installation of 21 MW

GTG set at Rokhia (Unit

- IX).

8500.00 2405.06 4697.00

Erection of

main

equipments

started and

scheduled for

commissionin

g by Aug’13.

Sl.

No

Name of

scheme/w

orks

Year of

sanction

Approved

cost

Present

agreement

value

Release of

1st

installment

Actual fund

received by

TSECL

Expen

diture

upto

31st

March'

13.

Present

status

C NEC 1 Augment

ation of

sub

station

capacity

by

addition

of

1x20/25

MVA,

132/33

KV

Transfor

mer

along

with

associate

d civil

works at

Ambassa

, Dhalai

District,

Tripura.

2011-

12 442.00

321.31 (Phase - I)

150.00 150.00 55.00

Phase -

I:-All

the

materia

ls

reached

at site.

Equipm

ent

foundat

ion and

erectio

n works

are in

progres

s..

Phase -

II:-

DNIT

for Site

develop

ment

for

another

bay and

replace

ment of

some

old

breaker

s are in

progres

s.

Sl.

No

Name of

scheme/

works

Year

of

sancti-

on

Approved

cost

Present

agreement

value

Release

of 1st

installme

nt

Actual

fund

received

by TSECL

Expendit

ure upto

31st

March'13

Present

status

-24-

NEC 2 Augme

ntation

of sub

station

capacit

y by

additio

n of

1x20/2

5 MVA,

132/33

KV

Transfo

rmer

along

with

associat

ed civil

works

at

Mission

Tilla,

Dharma

nagar,N

orth

Tripura.

2011-12 382.42 287.42

(Phase - I) 110.00 0.00 0.00

Phase - I:-

All the

materials(ex

cept 132 KV

33 KV

Control &

Relay panel)

reached at

site.

Equipment

foundation

works are in

progress.Ph

ase - II:-

DNIT for Site

developmen

t works and

other left

out

materials

are in

progress..

3 Augme

ntation

by

additio

n of 15

MVA,

132/11

KV

Transfo

rmer

along

with

associat

ed

equipm

ents

and

civil

works

at

Udaipur

132 KV

sub

station,

South

Tripura.

2011

-12 360.98

263.68 (Phase - I)

130.00 130.00 40.00

Phase - I:-

Major

equipments

(except 132

KV Control &

Relay Panel,

Breaker)

reached at

site.

Transformer

reached at

site.

Equipment

foundation

and erection

works are in

progress.

Phase- II :-

DNIT fot site

devolopmen

t and

extension of

control

room

building are

in progress.

Sl.

N

o

Name of

scheme/

works

Year of

sanction

Approv

ed cost

Present

agreemen

t value

Rele

ase

of

1st

inst

allm

ent

Actual

fund

received

by TSECL

Expenditur

e upto 31st

March'13.

Present

status

NEC

4 Construction

of 132 KV

Single Circuit

line from

Ambassa, 132

KV SS to 33

KV SS at

Gandacherra

2012-13 1207 1087.61 - - -

(i).

Survey

complet

ed (ii).

Out of

147

nos.

tower

(line

length

44.91

Km),

tower

foundat

ion

casted

54 nos.

in non-

forest

land.

(iii)

Work is

present

ly held

up for

forest

clearan

ce

3. RGGVY

4 nos. projects under RGGVY were sanctioned by MOP, Govt. of

India for electrification of un-electrified villages, partially electrified villages

having population above 100 nos. Out of these 4 projects, 2 projects are

implemented by TSECL and other 2 by PGCIL. Again out of 4 projects, 1

project namely Dhalai was sanctioned in 10th Plan & other 3 were sanctioned

in 11th Plan. But with these sanction amount, only 40% electrification in

uncovered areas is possible. So, for electrification of balance portion of

uncovered areas, it is planned to cover under XII plan of RGGVY scheme.

-26-

In this respect, a new guideline for XII plan of RGGVY scheme is expected to

be published shortly by MOP, Govt. of India.

For 100% coverage of rural electrification, action will be taken

after issuance of new guideline for XII plan RGGVY by MOP, Govt. of India. As

per proposed draft guideline 12th Plan RGGVY will be considered on

habitations having population 50 and above and therefore the remaining

habitation (Below population 50) will be proposed for electrification under

non-conventional source.

An outlay of Rs.50.00 Crores (as matching loan) has been proposed for

works under RGGVY during Annual Plan (2013-14). Total present project

sanction cost for RGGVY project is Rs.197.29 Crores, fund received Rs.172.15

Crores and expenditure incurred Rs.153.10 crore. Progress of works under

RGGVY Scheme upto March – 2013 is given in under mentioned table

RGGVY Target & Achievement :

Item Target Achievement

during

2012-13

Achievement

up to March -

2013

66/11 KV sub-station

(Nos.)

2 2 2

66 KV Transmission Line

(Km)

3.9 3.9 3.9

33/11 KV sub-station

(Nos.)

6 4 5

33 KV Line (Km)

126.62 24.52 69.22

11 KV Line (Km)

1091.13 251.49 804.96

11/0.4 KV DT (Nos.)

1889 425 1593

LT Line (Km)

1896.06 482.80 1682.42

-27-

BPL service connection

(Nos.)

1,09,180 18,675 99,031

Status of Hamlet Electrification under RGGVY Scheme : 1. No. of total Hamlet = 9064 nos. 2. Hamlet Electrified through RGGVY Scheme

(up to March – 2013) = 790 nos. 3. No. of total Electrified Hamlet (as on 31.03.2013) = 7571 nos.

Budgeted Programme during 2012-13 Rs. in Cr. for above works.

Rs. In Cr.

Revised Estimate Fund Received

2012-13 2012-13

1. Plan (incl. SPA) � 81.11

71.00

2. NLCPR � 15.00

04.54

3. NEC � 15.00

00.00

Total � 111.11

75.55

-28-

Draft Annual Plan 2013-14 (Proposed)

Sl.

No.

Name of the scheme

/works

Annual Plan

2013-14

I Generation

A Hydel Generation

Renovation and

Modernasition of 3X5

MW GHEP (Life Extn.

Scheme)

200.00

Total of Hydel

Generation (A)

200.00

B Gas Thermal

Generation

1 Installation of 1X21

MW GT set at Rokhia

4,350.00

2 Combine Cycle

Project at Rokhia

100.00

Total of Gas Thermal

Generation (B)

4,450.00

C Diesel Generation

Capital Maintanenace

of DG Set at Agartala,

Udaipur, Ambassa,

Kailashahar,

Dharmanagar,

Belonia and

Subroom.

100.00

Total of Diesel

Generation (C)

100.00

Total of Generation

(A+B+C)

4,750.00

II Transmission &

Distribution

Scheme

A. Transmission

Sl.

No

Name of work CKT Km

i) 132 / 400 KV

Transmission Line

(In Km)

1 Surjamaninagar-

Rokhia

Double 23 600.00

-29-

2 LILO of P.K. Bari-

Ambassa at Manu

Double 4 200.00

3 Surjamaninagar-

Udaipur

Single 40

4 Kailasahar-

Dharmanagar

Double 22.5 1,223.50

5 Rokhia-

Rabindranagar

Double 25 300.00

6 Udaipur-Bagafa Double 28

7 Bagafa-Belonia Double 15

8 Rabindranagar-

Belonia

Double 40

9 Belonia-Sabroom

132 KV charged at 66

KV

42 1,692.00

10 Grid - Gumti via

Baramura 66 KV

Single 110 100.00

11 Re-strengthening 66

S/C Line from Grid to

Rabindranagar via

Badharghat

Single 55 100.00

12 Suryamaninagar - Udaipur

132 KV

Double 40

ii) 400/132/66 KV Sub

station

Voltage level Capacity

(MVA)

1 Rabindranagar Sub-stn 132

KV (on-going)

132/33 2x50 1,974.00

132/66 2x50

400/132/66 KV Sub

station

Voltage level Capacity

(MVA)

2 Udaipur 132/33 2x25 1,000.00

3 Manu 132/33 &

132/11

1x15 500.00

4 S/S Augmentation &

transformer replacement

a Kailashahar (Gournagar) 132/33 1x12.5

132/11 1x7.5

b Dhalabil (khowai) 132/33 1x20/25

-30-

c Mission Tilla

(Dharmanagar)

132/33 1x25

132/11 1x15

d Kamalpur 132/11 1x10

200.00 132/33 1x15

e Belonia 132/66 1x30

500.00 132/33 2x25

132/11 2x10

f Tepania (Udaipur) 66/11 2x10

g Bishramganj 66/11 2x10 299.00

h Jatanbari 66/11 &

66/33

2x10 200.00

i Tirthamukh 66/33 1x15 471.00

j Gakul Nagar 66/33 1x10

k Gamai Tilla 132/11 1x12.5/15 200.00

l Sabroom 66/11 1x10 200.00

m Ambassa 132/11 1x20/25

n System Automation 1,500.00

Total of Transmission 11,259.50

B Distridution Scheme

a 33/11 KV Sub-stn (380.6

MVA)

2,200.00

b 33 KV Line (855 KM)

c Renovation of AAAC/ACSR

conductor in 11 KV Line

with Arial Bunch Conductor

(ABC) within Kailashahar,

Udaipur, Agartala,

Dharmanagar, and Ambassa

Sub-Divn. Installation and

commissioning of 33/11 KV

GIS Sub-stn. within selected

pilot project area

1,000.00

Total of Distridution 3,200.00

Total of Transmission &

Distribution

14,459.50

-31-

III General

Human resource and IT

Management

225.00

Total of General 225.00

Grand Total 19,434.50

Additional new Projects proposed to be implemented during Annual

Plan 2012-13 & 12th 5 Yr. Plan 2012-17 (World Bank/NEC/SPA/NLCPR)

Transmission Scheme

Transmission

1 Surjamaninagar-Badharghat Double 8 265.00

2 Surjamaninagar to P.K. Bari

(400 KV)

Double 150 100.00

3 Bodhjungnagar-Jirania Single 18 400.00

4 LILO of Agartala-Khowai at

Hezamara

Double 5 255.00

400/132/66 KV Sub station

1 Surjamaninagar & Kumarghat

Sub-stn 400 KV (on-going)

400/132 3X100 200.00

2 Bodhjungnagar 132/33 2x25 880.00

3 S/S Augmentation &

transformer replacement

a 79 Tilla (Agartala) incl.

Augmentation of all 33 KV bays

132/33 2x25

200.00 132/11 1x15

b Badharghat 132/66, 1x20

200.00 132/11 2x10

c Jirania 132/33 2x25

300.00 132/11 1x10

d Hezamara 132/33 2x12.5

500.00 132/11 2x10

e Bagafa 132/33 2x25

500.00 132/66 1x30

132/11 2x10

(9)

-32-

f S/S Augmentation Udaipur 132/66 1x30 200.00

Total 4000.00

Information related to Flagship Programmes during

Annual Plan 2013-14

Sl.

No.

Name of the scheme /works

I. Rural electrification 5000.00

a) Under RGGVY Programme

Electrification work in un-electrified

and electrified Villages

11 KV Line

L.T. Line

11/0.43 KV Sub-station

33 KV Line

33/11 KV Sub-station

b) R-APDRP

Metering of Power Transformer, DT

meter and consumer meter

5000.00

Total of Flagship Programmes 10000.00

3. T & D Losses:-

Feeder metering of electrical energy upto the level of 11 KV in the

entire State have been completed. Most of the consumers have been provided

with functioning energy meters. However, 79,396 Nos. of defective meters

have been reported as on 31-3-2012. Defective meters are being replaced in a

continuous process.

All the Kutirjyoti connections are gradually being metered for proper

energy accounting. Out of 61,028 nos. of Kutirjyoti connection, 27,841 nos.

have already been provided with energy meters. All new connections

-33-

including special drive connections to BPL families are now being

extended with meters.

Computerized Energy Billing System has already been undertaken in

the State. This system shall provide information with regard to the total

energy sold to consumers total energy billed and total energy for which

Utility has been paid for. This system when fully operationalized shall identify

the commercial loss for non-billing and non-realization of billed amounts. In

this State out of a total consumers strength of 5.30 Lakh we have already

covered 5.15 lacs in the Computerized Energy Billing System.

In order to reduce the technical loss the following actions have been

taken :-

210 KM of 132 KV lines have been reconductored.

8 Nos. 33/11 KV new Sub-Stations have been commissioned under

APDRP.

821 Nos. of 11/’4 KV Distribution Sub-Station have been set up under

APDRP.

2759 Nos. Distribution Transformer Meters for transformer capacity

100 KVA and above have been installed.

Vigilance Wing of the Corporation is conducting raids throughout the

State for bringing into book the miscreants who indulge theft of electricity by

hooking and/or bypassing the energy meters. 1716 Nos. raids have been

conducted in the year 2011-12 and 29 Nos. F.I.Rs have been lodged. The State

Government has already set up 8 Nos. Special Courts for trying offences under

the Electricity Act, 2003.

In Tripura the T&D losses are gradually has come down as under:

2005-06 - 41.45%

2006-07 - 36.69%

2007-08 - 36.08%

2008-09 - 34.94%

2009-10 - 32.69%

2010-11 - 30.44%

2011-12 - 29.73%

2012-13 - 31.58%

-34-

TSECL proposes to reduce AT&C losses to 22% by end of twelfth Plan

period

The T&D losses along with commercial losses collectively known as

AT&C losses.

In order to reduce the technical loss the following actions have been

taken:

• 210 KM of 132 KV lines have been re-conductored.

• 8 Nos.33/11KV new Sub-Stations have been commissioned under APDRP.

• 821Nos. of 11/0.4 KV Distribution Sub-Station have been set up under

APDRP

• 2759 Nos. Distribution Transformer Meters for transformers of capacity

63 KVA and above have been installed.

• Ministry of Power, Govt. Of India sanctioned project areas covering 10,000

populations under R-APDRP aiming to achieve AT&C losses to 15%. The

DPR under Part-A of R-APDRP at a cost of Rs.35.19 Cr. has been sanctioned

and implementation of boundary metering / ring-fencing of project areas

are in progress in order to finalise base line data (AT&C loss). The

preparation of DPR under Part-B for strengthening of regular distribution

system has been submitted to PFC/MOP, GOI. Recently, 12 out of 16 Nos.

DPR have been sanctioned by the R-APDRP Steering Committee at a cost of

148.26 Cr. Balance 4 DPRs are expected to get sanction from the MOP, GOI

shortly. After investment for Part-B, the AT&C loss level would be reduced

to meet set the target.

• Vigilance Wing of the Corporation is conducting raids

throughout the State for bringing into book the miscreants who indulge in

theft of electricity by hooking and/or by passing the energy meters. 1,453

Nos. Raids have been conducted in the year 2010-11 and 41 Nos. FIRs has

been lodged. The State Government has already set up 8 Nos. Special

Courts for trying offences under the Electricity Act, 2003.

-35-

After careful examination of the Budget proposal and appreciation

of submission placed by the Secretary of the Department, the Committee make

the following recommendations :-

RECOMMENDATIONS

(i) The Department to complete construction of addi tional unit of 21 MW new power project at Rokhia. For that the Finance Department to allocate the rest fund immediately.

(ii) The Department to take effective step for furn ishing monthly consumption bills to consumers at due time regularl y.

(iii) The Department to ensure the check of power s tealing & unauthorised use of electricity.

(iv) Call-center and section office to be increased so that calls can be promptly attended. For that computerised bil ling and complaint system has to be introduced. The Departme nt to take step for increase of staff strength in the sec tion office and call center.

After examination of the Budget proposals and appreciation of submission of the Representative of the Committee recommends the Budget proposals under Demand No. 14 for grants by the House alongwith the Recommendations.

( Shri Sudhan Das ) Chairman

Subject Committee – I Tripura Legislative Assembly

Dated, Agartala,

the 10th May, 2013.

-36-

THE REPORT ON THE DEMAND NO. 11 OF THE TRANSPORT DEPARTMENT FOR THE FINANCIAL YEAR 2013-14.

The Budget Proposal under Demand No.11 relates to the Transport Department, Government of Tripura for the Financial Year 2013-2014 and the Revised Budget for the Financial Year 2012-2013 are as follows :- (Rs. in lakh)

Particulars Revised Estimate 2012-2013

Budget Estimates for 2013 -2014 Demand Fund for Total

T.S.P. S.C.P. a) Non-Plan 1908.70 1553.00 --- ---- 1553.00 b) Plan 1046.37 174.81 67.43 36.01 278.25 c) C.S.S 663.16 0.52 0.31 0.17 1.00 d) NEC 165.80 52.00 31.00 17.00 100.00 Total 3784.03 1780.33 98.74 53.18 1932.25

Now, the aforesaid Budget proposal is under examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendation to the Demands for Grants.

The Committee in its meeting held on 6th May, 2013 examined the Budget proposals in details having discussion with the Principal Secretary of the Department who appeared before the Committee on summon.

First of all, the Principal Secretary informed the Committee about the

action taken in respect of the recommendations made by the Committee during the year 2012-13 and stated as follows :-

Sl. No.

Recommendation of Subject Committee

Action taken by the Department

i) The earlier recommendation for City Bus stands good adding one Madhupur to Nagerjala via Ishanchandra Nagar.

i) TUTCL has been operating 53 buses in 8 scheduled routes. Due to shortage of bus it has not been possible to introduce service in the new route i.e. Madhupur to Nagerjala via Ishanchandra Nagar for the moment.

ii) The Department to take necessary step for conversion of vehicle to CNG giving emphasize to Government vehicle to make compulsory CNG to new Government vehicles also by giving preference on the CNG

ii) Finance Department has been requested to issue instruction to all Government Departments for purchasing CNG run vehicles while giving permission for purchase of new vehicles. All heads of Department have also been requested to convert their existing petrol run vehicles

-37-

vehicles on hiring. into CNG particularly those which are plying within West Tripura District. There are only 4 CNG refilling centres in the State. With the setting up of more new CNG refilling centres, emphasis will be given on hiring and purchase of CNG run vehicles.

iii) The Department to continue its persuasion towards Lay-Bye with PWD and BRO.

iii) Chief engineer PWD (R&B) informed that the land is available to construct the proposed Lay Bye in both the locations i.e., R.K.Nagar and near Don Bosco School, Nandannagar. The anticipated cost for setting up of the Lay Bye at R.K. Nagar would be around Rs. 90 lakhs. Estimate is under preparation. The estimated cost for setting up of another Lay Bye near Don Bosco School, Nandannagar is Rs.36.14 lakhs and tender for the work is being called.

iv)

Conduct survey for setting up Motor Stands to be taken up. Finance Department to consider release of adequate fund for the same specially for developing the existing Motor Stands. In this respect, MNREGA / BADP schemes can be used by DMs involving Transport Department. Finance Department to consider release of fund for land acquisition for the Motor Stand.

iv) Survey on motor stand is being conducted and compilation of final report is under process. In fact, various Departments like UDD, RDD and Transport Department have taken up construction of various motor stands in the State. Proposals for developing of existing Motor Stands and proposals for land acquisition in connection with setting up of new Motor Stands in the uncovered areas are being submitted to Finance Department for release of fund. Finance Department has been releasing fund within their available resources under State Plan. The Department has taken initiative to set up some new motor stands especially at Rupaichari, Kakraban, Baikhora, Jolaibari, Kalacherra and Mirza with the fund available with DM & Collectors under MGNREGA, BADP and other schemes.

v)

The Department to take appropriate action to those Car/Auto owners/Drivers demanding abnormal fare, mainly after evening time.

v) Enforcement drives are undertaken on regular basis especially at evening times to curb the trend of demanding abnormal fare by the drivers/owners. Actions are taken against the errant vehicle owners/drivers by imposing penalty under the existing provisions of M.V.Act & Rules jointly by SP(Traffic) and JTC.

-38-

vi) The Department to take up seriously towards control of speed of vehicles, specially light passenger vehicles, if necessary rule may be framed.

vi) Traffic wing of Police Department has been checking speed of vehicles by using radar gun at various locations. Motor Vehicle Inspectors are also conducting raids against the vehicles plying by violating prescribed speed limits. Spot fines are realized and prosecution reports are submitted against the vehicle owners/drivers who exceed the speed limit. However, campaign against the vehicles running beyond speed limit will be more effective with availability of such instruments like radar gun in adequate number. MoRTH has been requested to supply such instruments adequately to make the campaign more effective. ii) Displaying of speed limit boards by the side of national highway and state roads has been emphasized. iii) Awareness / counseling camps are organized in all the motor stands, higher secondary schools & colleges in addition to District and Sub-Divisional headquarters to disseminate awareness of the hazards related to over speeding of vehicles.

vii)

It is recommended that new permit be issued to the owners of vehicle out side Agartala Municipal area and also to issue permit to all new Sub-Divisions & Blocks as well as new roads constructed recently.

vii) STA has been issuing route permit in accordance with the recommendations given by the Subject Committee and emphasis is given to issue route permits with a view to connecting Sub-Divisions, Blocks and newly constructed roads.

viii)

PWD be persuaded for measured speed-breakers and also to avoid unnecessary speed-breaker mainly in the National Highways and State Highways.

viii) PWD(R & B) informed that Superintending Engineers (PWD) have constructed speed breakers on demand from local people on the PWD roads. PWD(R & B) further informed that other unspecified speed breakers have been removed from various locations of PWD roads and State roads. No specific information has been received from BRTF in this regard.

-39-

MAJOR ACHIEVEMENTS DURING THE YEAR 2012-13

•••• Construction work of Motor Stand in Dharmanagar is going on in full swing and it is expected to become operational by August, 2013.

•••• Construction of new motor stands at Kanchanpur, Sonamura and Khumulwng is

nearing completion and expected to be ready for public use during 2013-14. •••• Construction of the Interstate Truck Terminus at Madhabbari in Jirania is almost

complete except for culverts on the approach to the terminus. Construction of culverts has been taken up and the Terminus is expected to become operational by August, 2013. A revised DPR for an amount of Rs. 10.100 Crores (approx) has been submitted to the NEC for completion of some additional components of work of ISTT, Madhavbari which were not envisaged earlier.

•••• Construction of Motor Stand at Kalacherra is in progress. •••• Development of Motor Stand at Sabroom is in progress. •••• Acquisition of land for Santirbazar Motor Stand is in progress. •••• Development of Motor Stand at Kamalghat is in progress. •••• Agartala city bus services which was launched in October, 2010 is being extended

in a phased manner. 15 new diesel buses have been inducted into the fleet and procurement of 22 CNG buses is under process. Present strength of the fleet is 53.

•••• As per direction of the Hon’ble Supreme Court, High Security Registration Plates

has been introduced in the State. In the first phase it is implemented all over the State only for the newly purchased vehicles.

•••• Transport Department collects both tax and non-tax revenue which helps in

augmenting the resources of the State. The rates of taxes for different categories of vehicles have been revised after a long gap of 19 years. Provisions have been made in the agreements executed with the private partners/agencies for preparation of smart card based driving licenses/registration certificates and fixing of High Security Registration Plates for sharing of revenue collected by the agencies. These measures have resulted in significant increase in collection of revenue. A proposal for revising the fee structure for different categories of motor vehicles by amendment of the Tripura Motor Vehicle Rules is also under process.

•••• With the exponential increase in number of vehicles in the State, the demand for

trained/skilled drivers is growing rapidly. State Government is encouraging setting up of new driving training schools by private entrepreneurs for training of drivers. One Institute of Driving Training & Research centre is being set up near NIT in Jirania with financial assistance of Rs. 14.00 crores sanctioned by Govt. of India. A Memorandum of Understanding (MoU) has been executed between the State Govt. and TATA Motors for running this institute of PPP mode. Work order has already been given to the implementing agency for starting the construction.

-40-

•••• 9 (nine) new Smoke Emission Testing Centres have been opened in the uncovered Sub-Divisions of the State.

•••• For developing Howrah river and Gumati river as waterways for transportation of

passenger and goods as also for future linkage with the waterways of Bangladesh, M/s RITES Ltd. has been issued work order for preparation of DPR for development of waterways in the State and it has already completed survey works for preparation of the DPR. Ministry of Shipping sanctioned Rs. 82.725 lakhs to the State Government for preparation of the DPR.

PLAN/PROGRAMME AND PROJECTS TO BE IMPLEMENTED DURIN G THE FINANCIAL YEAR 2013-14.

1. Department has sent one DPR to NEC through Planning Department for sanction of fund for construction of 5000 MT Cold Storage in the premises of Inter State Truck Terminus at Madhavbari near Jirania under NEC scheme.

2. Department has sent DPRs to the Planning Department for sanction of

funds for (1) construction of Teliamura Motor Stand, (2) Development of Motor Stand at Rajarbag(Udaipur) under NLCPR scheme.

3. For construction of one DTO office at Udaipur fund is required under

State Plan. 4. 5 (five) ongoing works like (i) Inter State Truck Terminus at Madhavbari, (ii) construction of Sonamura Motor Stand, (iii) construction of Dharmanagar Motor Stand, (iv) construction of Khumulung Motor Stand, (v) construction of Kanchanpur Motor Stand, (vi) construction of Kalacherra Motor stand are likely to be completed during the current financial year. 5. Draft final report regarding DPR for development of Howrah river and

Gumati river as waterways shall be submitted by M/S RITES Ltd. by the end of May 2013.

6. New Motor Driving Schools will be opened in the uncovered Sub-

Divisions of the State during 2013-14. At present there are 26 Motor Driving Schools in the State.

7. Divisions during 2013-14.At present there are 23 Smoke Emission Test

centres in the State.

-41-

After careful examination of the Budget proposal and appreciation of submission

placed by the Principal Secretary of the Department, the Committee make the following

recommendations :-

RECOMMENDATIONS

i) The earlier i.e. 8 th Report’s recommendations for City Bus Stands good adding for facility to be extended upto Bishramganj.

ii) The earlier recommendations of CNG station to all District Head Quarters be installed in phase manner.

iii) The Department to continue its persuasion towards L ay-Bye with PWD and BRO.

iv) Conduct survey for setting up Motor Stands to be ta ken up. Finance Department to consider release of adequate fund for the same specially for developing the existing Moto r Stands at Sub-Division Bloc be extended. In this respect, MGNREGA/BADP schemes can be used by DMs involving Transport Department. Finance Department may consid er allocation of fund where Land acquisition is necess ary.

v) Department may consider feasibility of providing Me ter in the Auto beyond 5 K.M. in phase manner.

vi) It is recommended that new permit be issued to the owners of vehicle outside Agartala Municipal area and also to issue permit to all new Sub-Division & Blocs as well as n ew roads constructed recently upto Agartala.

vii) The renewal of Driving License, road permit etc.be done annually through Sub-Division- wise camps by the Department.

After examination of the Budget proposals and appreciation ofsubmission

of the Representative of the Committee recommends the Budget proposals under Demand No. 11 for grants by the House alongwith the Recommendations.

( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly

-42-

THE REPORT ON THE DEMAND NO. 29 OF THE ANIMAL RESOURCES DEVELOPMENT

DEPARTMENT FOR THE FINANCIAL YEAR 2013-14.

The Budget Proposal under Demand No.29 relates to the Animal

Resources Development Department, Government of Tripura for the Financial

Year 2013-2014 and the Revised Budget for the Financial Year 2012-2013 are

as follows :-

( Rs. in lakh)

Now, the aforesaid Budget proposal is under examination of the Subject

Committee-I of the Tripura Legislative Assembly for recommendations to the Demands for Grants.

The Committee in its meeting held on 6th May, 2013 examined the Budget

proposals in details having discussion with the Secretary of the Department who appeared before the Committee on summon.

First of all, the Principal Secretary informed the Committee about the

action taken in respect of the recommendations made by the Committee during the year 2012-13 and stated as follows :-

Sl. No

Relevant para/page No. of the Report.

Recommendation of the Committee

Reply of the Government on the recommendations.

01.

Page No.74 & Recommendation No.1.

Farm Development Committee to hold meetings in every two months and for that the responsibilities shall be with the Member Secretaries.

Farm Dev. Committee has already been constituted in all Government’s farm as per recommendation of the subject Committee and meetings are being held time to time as per recommendation of the Subject Committee.

Particulars Revised Estimate 2012-2013

Budget Estimates for 2013-14 Demand Fund for Total

T.S.P. S.C.P. a) Non-Plan 4036.44 4788.00 -- -- 4788.00 b) Plan 1991.55 833.04 496.62 272.34 1602.00 c) C.S.S. 1434.94 424.60 253.15 138.83 816.58 d) N.E.C 181.26 109.50 65.29 35.81 210.60 Total 7644.19 6155.14 815.06 446.98 7417.18

-43-

0 2. Page No.74 & Recommendation No .ii.

Mobile Service Unit shall be strengthened to cover remote areas.

Mobile Veterinary Service are rendered through Disease investigation Laboratories as well as by the local Veterinary Dispensaries and Veterinary Hospitals in the Districts and also through conductance of frequent vaccination camps, health camps and fertility management camps covering the remote areas of the State through out the year. For increasing the Cross Breed Cattle Population, mobile service of artificial insemination is also rendered through Door Step A.I.workers. Side by side a network of Govt. institutions(16 Nos. Veterinary Hospital,59 Nos. Veterinary Dispensary, 426 Nos.Sub-Centre & 11 Nos. A.I. Centre’s are functioning in the State to render service at farms, cow-side and also at the institution. In order to further strengthening of the mobile service dept. has taken steps to train up another 150 Nos. of new unemployed youth as Door Step AI worker. On the other hand, one Project has already been sanctioned by the Planning & Co-ordination dept. for procurement of Ambulatory Van for Vety. College, R.K.Nagar which will be utilized for providing mobile vety. service to remote areas.

03.

Page No.74 & Recommendation No.iii.

There shall be one Committee to monitor the function of brooder house and regular inspection by V.A.S.

Although BLBH were earlier run by SHG/unemployed youth under the supervision of Panchayat Samittee, with a few exception under the supervision of VAS of the respective Block HQ., subsequently, the entire BLBH activities are looked after by the VAS posted at block HQ or nearby and he is declared as Implementing Officer(IO).

04.

Page No.74 & Recommendation No. iv.

The Department to take suitable step to increase the quality of goat to strengthen steady supply of meat. Artificial insemination to be introduced in our State.

The Department has purchased and arranged rearing of indigenous Black Bengal species of goats in Composite Livestock Farm at Devipur, Sipahijala Distirict. For this purpose 272 nos. of goats were purchased from the local market during the year 2009-10(162 nos) ,2010-11(110 nos) Apart from above, process has already been started to purchase and procure more goats for rearing under the scheme ‘Revival of Goat breeding farm, Devipur under CSS

-44-

“Integrated Development of Small Ruminants during the year 2012-13 under which 159 nos. of goat already procured and another 159 nos will be procured soon. Department is considering to submit a proposal for A.I.in goat as a pilot project to Govt. of India.

05.

Page No.74 & Recommendation No .v.

The Department to arrange setting up of modern slaughter house positively by the Financial Year 2011-12. Small size slaughter/unit in all big markets are being setting up in the State by the meat businessmen in phase manner.

Dept. has already taken up a project on “Development of Demonstration unit on production of hygienic and wholesome meat for human consumption” funding under RKVY for scientific slaughtering of birds in all market of Agartala Municipality area. Regarding establishment of modern slaughter house Dept has already requested to AMC for taking necessary step.

06.

Page No.74 & Recommendation No.vi.

The Department to make endeavor to open livestock of cattle whereby the land can be utilized in PPP model. By involving the unemployed youth, SHG and Co-operative Societies the Department to formulate a 3 years plan to increase supply of milk up to Sub-Division level even by working out the possibility with buffalo life stock.

Dept. has already taken steps to increase strength of cattle at R.K.Nagar farm. 54 CB cows/ pregnant heifer has been inducted recently. Renovation work of both side cattle sheds have already been completed. Department has already prepared the next five year plan for increasing the milk production. In reference to the recommendation of the learned subject committee to increase the supply of milk in sub divisional level it is stated that mini and micro dairy are being setup by involving the unemployed youth & Self help group. For upgrading the buffalo population TLDA has already procured the buffalo semen and already supplied in the field for AI. Under RKVY scheme 600 cows bought from the outside the state has already been distributed by the TCMPUL among the member of milk co-operative societies to increase the milk production. Besides that Dept. has already introduced Heifer Rearing Scheme to boost up the milk production.

-45-

7. Page No.75 & recommendationNo.vii.

The Department to take suitable steps to set up a Dispensary covering 2/3 Panchayat and every Panchayat and village be covered with a Sub-Centre by phase manner.

In order to cover 2 Panchayat by a Vety. Sub-centre and more than 3 GP by a vety. Dispensary department obtained approval of the government to open 150 new Veterinary Sub-centre and 9 new Veterinary Dispensaries. Dept. has already opened of 42Veterinary Sub-Centre and 5 Veterinary Dispensaries till date ( up to 31 st March,2013) as per approval of the government mentioned above. Rest would be opened in phased manner. For opening of new institution, Besides that Dept is considering to increase the no. of Vety. Institution in the newly created Districts, Sub-Divisions and blocks. Dept. has already increased the cadre strength of T.V.C.through amendment. Also recruitment of 168 nos para vety staff is completed. Process of recruiting another 120 nos of para vety. Staff is underway.

08.

Page No.75 & Recommendation No. viii.

The Department to continue its action or artificial insemination and in Tribal area more emphasis to be given.

The Department of ARDD is continuing its artificial/ insemination activities. During the year 2012-13 total number of A.I. was 1.26842 lakh ( provisional). Our target for 2012-13 was 1.60 lakh and .targetted for AI for the year 2013-14 is 1.70 lakh. Department received fund from Govt. of India under NPCB for 8 nos. of cross bred breeding bull which will be distributed in TTAADC areas for natural services for the year 2012-13 and 2013-14 more 25 nos. and 50 nos. of crossbred breeding bull will be distributed in TTAADC areas to increase the crossbred population.

09.

Page No.75 & Recommendation No. ix.

The Department to aid the losers of bird flu under a definite scheme immediately after completion of 3 months in each spread over of the disease and the Department to encourage the villagers for country made hen and to introduce a new population of birds like Emo as in West Bengal to increase supply of meat in the market. Finance Department may arrange necessary fund for this programme. Dept may take expert view why Bird Flu turn acute frequently in our state.

Dept. had paid compensation instantly to the loser of bird during culling on the event of bird flu control & containment programme. Besides that Dept. has already set up two Block Level brooder House(BLBH) in each block from where 45 days age old birds are being distributed among the farmers under down stream scheme as well as under CSS Rural Backyard Poultry Scheme . Dept. will study the feasibility of Emu faming in the State. On request of the State Government of India sent a expert team to investigate the reasons for frequent occurrence of the bird flu in the state. Report of expert team is awaited by the Dept.

-46-

Annual Plan Of Animal Resources Development

Department (ARDD) For The Year 2013-14 .

The livestock sector plays a vital role in the rural economy and supports

small and marginal farmers both economically and nutritionally. Sixty-seven

percent small, marginal farmers and landless people own about 70% of livestock

in India. Besides providing high quality animal protein, livestock utilizes non -

edible agricultural bi-products and provides raw materials such as hides, skin,

bones, fat etc. The Animal Resources Development Department promotes

production of Animal origin food i.e. Milk, Meat & egg to meet the requirement of

the people of the state. The Department undertakes up-gradation of the local low

yielding stock of all species of economically important domesticated animals

through Artificial Insemination & other breeding practices apart from supply of

exotic germplasm of high yielding variety of livestock & birds from its breeding

farms. It also renders Veterinary services for Curative & Preventive health care

for animals & birds through its intensive network of Veterinary Hospitals,

Veterinary Dispensaries, Veterinary Sub-Centres, and Disease Investigation

Laboratories etc. for protection of Livestock health of the state.

In spite of hurdles in respect of high feed cost and scarcity of improved

variety of animal husbandry inputs, considerable interest has been developed

among both rural and urban people in taking up modern A.H. practices with high

yielding variety of livestock and birds such as piggery, broiler and dairy farming

as subsidiary as well as main economic activity. Around ten thousand families in

the state are directly or indirectly dependent on the broiler farming with

approximately Rs. 258 crore annual turn over. Similarly, a large number of tribal

and non-tribal youths are engaged in pig farming, which is profitable due to high

demand for pork. In addition, the department has initiated fodder and tapioca

cultivation to minimize the cost of feed for rearing improved variety livestock. For

improvement of dairy sector, the Gomati Cooperative Milk Union Ltd. has already

submitted a project under Integrated Dairy Development Project (IDDP-IV) to the

Government of India. In addition, a project has also been submitted to supply

milch ration to the farmers for enhancing milk production in the state under

NMPS (National Mission For Protein Supplement).

-47-

For augmenting production of animal origin food i.e. milk, meat & egg,

Dept of ARD has formulated strategies for implementation during XII five year

plans and identified thrust areas.

Thrust Area: Milk Sector:

• Massive awareness for Artificial Insemination and Cross Bred cow

rearing.

• Fertility camps for improving reproductive health and increase

conception rate.

• Mass De-worming programme & supply of Mineral Mixture.

• Popularization of castration through incentivisation.

• Milk yield competition, calf rally.

• Capacity building of farmers in management of high yielding CB cows

& calves.

• Development of Pasture and grass land in each block.

• Growing fodder crops during inter-cropping period.

• Supply of subsidized concentrate feed for CB cows and calves.

Meat Sector:

• Setting up of piggery units under RKVY.

• Strengthening of Govt. Pig Breeding Farms.

• Tapioca cultivation in farmers land rearing pigs under MGNREGA.

Egg Sector:

• Setting up of new BLBH under RKVY.

• Strengthening of existing BLBH.

• Strengthening of infrastructural facilities in Govt. Poultry Farms.

• Control of major poultry diseases through mass vaccination by

unemployed youths on self-sustaining basis in selected blocks.

Veterinary Service Sector:- • Expansion of Veterinary service network from 456 to 600 nos to ensure

one vety. centre per two Gram panchayets / ADC villages.

• Strengthening of infrastructure of veterinary College to its optimum

capacity, to facilitate research and human resources development.

Proposed activities and Financial target under State plan during, 2013-14.

-48-

( Rs. in Lakh ) 2013-14

Animal Husbandry . Direction & Adm. 453.03 Vety. Service & A.H 370.56 Cattle & Bufflow Dev. 389.73 Poultry Dev. 255.56 Sheep, Wool & Goat Dev. 39.04 Piggery Dev. 274.73 Other Livestock Dev. 9.52 Fodder & Feed Dev. 21.08 Extension & Traning 205.55 Admn. Invt. & Stat. 19.17 Sub Total of A.H 2037.96 Dairy Development: Direction & Adm. 4.04 Integrated Dairy project 0 Extension & Training 0 Asstt. to Co- Operative & other Bodies. 12.78 Sub Total of D.D 16.82 Total of State Plan:- 2054.78

Activity wise target and up-to-date achievement dur ing the Financial

Year 2012-13 and target for the Financial Year 2013 -14.

1. Milk Sector:

Sl No.

Name of Activities/ Scheme/ Programme

Physical Target-2012-13

Progress (Up-to Feb,2013)

Proposed Target for 2013-14

1

Intensification AI for increasing the number of crossbreed population (Nos. of AI)

1,60,000 1,15,802 1, 70,000

2. Heifer Rearing Scheme under State Plan(New) (Nos. CB Calf)

5000 4119 5000

3. Fertility camps for improving conception rate (Nos. camp)

200 214 200

4 Mass de-worming programme(Nos. cattle) 1,70,000 1,72,583 1,80,000

5 Organization of Awareness camp (Nos.)

1040 983 1040

6 Conducting Milk yield competition calf rally (Nos.)

90 81 100

7 Development of perennial fodder plot. (Nos. units) under

5114 1588 5500

-49-

MGNREGA including FRA

8. Setting up of Dairy Demo Unit 150 144 200

9.

Popularization of castration through incentivisation in tribal areas (nos. of Bull)

1000 492 1000

10

Setting up of Bulk milk cooling centre (BMC) for enhancing storage time and keeping quality of milk for proper marketing.

- - 2Nos.(1000 LPD)

2. Meat Sector:

Sl No.

Name of Activities/ Scheme/ Programme

Physical Target-2012-13

Progress (Up-to Feb,2013)

Proposed Target for 2013-14

1

Setting up of Beneficiary oriented piggery Demo unit for multiplication including FRA

425 unit 315 Unit 450 Unit

2 Demonstration unit on Goatery. 360 unit 322 unit -

3

Modernization and Strengthening of Pig Breeding Farm at Howaibari, under Khowai District

1 farm Work in progress -

3 Tapioca cultivation through MG-NREGA. including FRA

4532 Unit 1126 units 5000 unit

4. Production of piglet in Government farm 7825 8856 10000

3. Egg Sector:

Sl

No. Name of Activities/

Scheme/ Programme Physical Target-

2012-13 Progress (Up-to

Feb,2013) Proposed Target for

2013-14

1 Strengthening / Extension of Poultry Farm

1 Nos. farm 3700 Parent stock

procured(DPF Udaipur)

1 Farm

2 Strengthening of existing BLBH 32 Nos. 25 Nos. -

3 Promotion of Backyard poultry . 5400 Unit 5200 unit 5400 Unit

4. Construction of new BLBH in 40 block(Nos.) 40 38 -

5. Production of poultry egg and duck egg(in

lakh) - 0.72485 9.00

-50-

6. Production of DOC - 0.17864 3.00

7. Production of DOD - 0.05807 1.00

8. DOC distributed to BLBH - 1.65 Lakh 5.00

5.4.Animal Health Care service:

Sl No.

Name of Activities/ Scheme/ Programme

Physical Target-2012-13

Progress (Up-to Feb,2013)

Proposed Target for 2013-14

1. Treatment of Animal and Birds 7.00 Lakh 4.83 Lakh 7.00

2. Vaccination of animal and bird 60 Lakh 47.92 Lakh 60.00 Lakh

5.5. Infrastructure Development:

Sl No.

Name of Activities/ Scheme/ Programme

Physical Target-2012-

13

Progress (Up-to Feb,2013)

Proposed Target for 2013-14

1. Opening of Dy. Director office at Newly opened districts

- - 4 Nos.

2. Opening of District DI Laboratory at newly opened District.

- - -

3. Opening of block level Asstt. Director office. - - 3 Nos.

5.

Up-gradation of Veterinary Dispensary to veterinary Hospital cum Polyclinic

5 Nos. 1 Nos. 3 Nos.

6. Opening / Up-gradation of sub-centre to veterinary Dispensary

5 Nos. 1 No. 2Nos.

7. Opening of New sub-centre 15 Nos. - 5 Nos.

8. Construction of Veterinary College under NLCPR -

Administrative & Academic block

under construction

Rest of Administrative &

Academic block and hostel

9.

Construction of District office with Laboratory , Cold storage, Medicine store, Meeting Hall etc.

- - 4 Nos.

10. Construction of block level office. - - 8 Nos.

11. Construction and renovation of Veterinary Hospital & Dispensaries

37 Nos. 7 Nos. 22 nos.

12. Construction of Veterinary sub-centre 43 Nos. 8 nos. 47 Nos.

-51-

4.2 Physical Target of 2012-13 in respect of variou s monitorable parameters:

Item Unit Target: 2012-13

Animal Health Coverage

Lakh Nos. 7.00

Vaccination

Lakh Nos. 60.00

Artificial Insemination

Lakh Nos. 1.60

Fertility Camp

Nos. 1000

Development of fodder plots Nos. 1700

4.3. Scheme wise financial targets of Annual Plan 2 012-13 with details of State plan.

Scheme/ Project/ Item Financial Target: 2012 -13

2403- A.H 01- Direction & Adm. 02- 246.23

101-Vety. Service & A.H 345.90

102- Cattle & Bufflow Dev. 342.00

103- Poultry Dev. 210.20

104- Sheep, Wool & Goat Dev. 28.00

105- Piggery Dev. 239.30

106- Other Livestock Dev. 12.00

107- Fodder & Feed Dev. 16.00

109- Extension & Traning 144.72

113- Admn. Invt. & Stat. 740

Sub Total of 2403- A.H

1591.75

2404- DD 01- Direction & Adm.

2.25

102- Integrated Dairy project 0

109-Extension & Training 0 195- Asstt. to Co- Operative & other Bodies. 16.00 Sub Total of 2404- D.D 18.25 Total of State Plan: - 1630.00

-52-

After careful examination of the Budget proposal and appreciation of

submission placed by the Principal Secretary of the Department, the Committee

make the following Recommendations :-

RECOMMENDATIONS

i) The Department to arrange setting up of modern s laughter house at Municipal area of Agartala and the meat businessman at Battala Market be officially persuaded to maintain hygiene. In Sub-Division level also small size slaughter unit in all markets be ensured.

ii) The Department to take suitable steps to set up a Dispensary

covering 2/3 Panchayat and every Panchayat and vill age be covered with a Sub-Centre in phase manner and also to condu ct Mobile Dispensary.

iii) The Department to continue its action of artif icial insemination and in

Tribal area more emphasise to be given. iv) The Department to co-ordinate setting up of Min i-Dairy linking with

Bank loan to unemployed youths throughout the State . v) The earlier recommendation at Sl.No.3 of the nin th report of

monitoring of Brooder House and regular inspection by V.A.S. shall continue.

vi) Door step AI worker are to be engaged in vacant places.

After examination of the Budget proposals and appreciation of submission of the Representative of the Department the Committee recommends the Budget proposals under Demand No. 29 for grants by the House alongwith the Recommendations.

( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly

-53-

THE REPORT ON THE DEMAND NO - 42 OF THE YOUTH AFFAIRS & SPORTS DEPARTMENT

FOR THE FINANCIAL YEAR 2013-14.

The Budget proposal under Demand No.42 relates to the Youth

Affairs & Sports Department, Government of the Tripura for the Financial Year

2013-2014 and the Revised Budget for the Financial Year 2012- 2013 are as

follows :-

( Rs. in Lakh ) PARTICULARS

REVISED

ESTIMATES 2012 - 2013

BUDGET ESTIMATES FOR 2013 - 2014 DEMAND FUND FOR

TOTAL

T.S.P S.C.P

1) Non Plan 2545.80 2930.50 -- -- 2930.50 2) Plan 3009.20 179.00 115.60 65.40 360.00 3) C.S.S 648.40 338.54 212.00 115.00 665.54 4) NEC 8.00 5.00 --- --- 5.00

Total 6211.40 3453.04 327.60 180.40 3961.04 • Now, the Budget proposal is under scrutiny and examination of the

Subject Committee-I of Tripura Legislative Assembly for recommendations to the Demands for Grants.

• • The Committee in its meeting held on 6th May, 2013 examined the Budget

proposals in details having discussion with the Secretary of the Department who appeared before the Committee on summon.

• First of all, the Secretary informed the Committee about the action

taken in respect of the recommendations made by the Committee during the year

2012-13 and achievements during the year 2012-13 stated as follows :-

-54-

SL NO

Relevant SL No./Page No of the report.

Recommendation of the committee

Reply of the government on the recommendations

(1) (2) (3) 4 i. SL. 1

Page-87 Dasharath Deb Sports Complex work has to be completed and developed to a upto-date standard quality, the State Government to approach to the SAI and Central Government to organize some National game in the State of Tripura.

As per recommendation of the committee, SAI/GOI as well as ONGC Tripura Asset were requested by the Department to extend financial assistance to the State Govt. for all round development of DDSSC, Badharghat. ONGC has committed and provisioned of fund for an amount of Rs.24.32 Core and signed a MoU between Asset Manager, Tripura Asset, ONGC and Director of YAS. As per MoU ONGC authority has agreed to provide grant of Rs.24.32 crore for creation of Sports Infrastructure in the Dasaratha Dev State Sports Complex (DDSSC), Badharghat. Accordingly, Foundation Stone has been laid by the Hon’ble Chief Minister, Tripura on 09-04-2013. On the other hand the SAI has been requested to develop the DDSSC from their fund. But the SAI is yet to respond.

ii.. SL. 2 Page-87

Budget Provision for Panisagar Sports School’s furniture has to be made to start the School.

Adequate fund provision has been kept in the proposed BE-2013-14.

iii. SL. 3 Page-87

Amount of National Stipend has to be upgraded for National Awardees for which Finance Department to do needful.

With the approval of the Finance Department, the Sports Stipend has been increased from 600/- to 1,200/- PA for the National Awardees.

iv.. SL. 4 Page-87

Players who participate in National & Inter National level games has to be covered with Insurance for which there shall be Budget Provision.

This is under process.

v.. SL. 5 Page-87

For Dhalai & all new Districts Sports complex to be built.

For construction of Dhalai District Sports complex, fund has already been sanctioned by the MoDONER for Rs. 491.00 laksh, 1st installment for Rs.173.15 lakh. has also been released. Identification of land for new 4 Districts Sports Complex has been

-55-

completed. The CEO of THCB has been requested to prepare DPR for the new 4 District Sports Complex so that proposal to P&C Department as well as Govt. of India may be sent for sanction during this year 2013-14.

vi.. SL. 6 Page-87

Scout & Guide may be introduced in all Sub-Division for that Budget Provision has to be allotted.

Initiative has been taken for introducing Scouts & Guides in all Sub-Division. Fund provision has been increased in the proposed BE 3013-14, as compared to last years.

Achievement made during the year 2012-13 with the

following budgetary provisions. (Rs. in lakh)

BUDGET POSITION AT A GLANCE UNDER PLAN Particulars

Ceiling R.E. 2012-13 Expenditure up to March,20`13

PLAN NON-PLAN PLAN NON-PLAN

Salary 0 2516.80 0 2584.79

Non-Salary

241.68 29.00 241.40 29.00

ACA 109.41 0 109.41 0

SPA 2382.30 2109.14

SCA 275.81 275.81

CSS 475.25 0 474.24 0

NLCPR 173.15 0 173.15 0

NEC 8.00 0 3.00 0

Total 3665.60 2545.80 3386.15 2613.79

Infrastructure development : Department took much initiative for over all development of infrastructure as indicated below:- A. The following Major/Minor works have been completed during 2012-13.

1. Construction. of North Tripura Sports School at Panisagar. 2. Construction. of Dhalai District YAS Office cum Sports Hall at Ambassa. 3. Construction of Grand Stand at U.K. Academy Mini Stadium, Agartala. 4. Construction of Gallery with dressing room at U.K. Swimming Pool,

Agartala. 5. Construction of Sub-Divisional YAS Office at Khowai and Sabroom. 6. Extension of Conference Hall of existing Bhagat Singh Youth Hostel,

Agartala. 7. Construction of Gomati District YAS Office, Udaipur. 8. Vivekananda Maidan ( Astable ground) except Mukta Manch.

Sports persons of Tripura have bagged medals in various National level competitions like NE /

-56-

PYKKA & National Meet in various disciplines including School National :- Disciplines Gold Silver Bronze Total

26th NE Games 17 17 18 52

38 Women sports competition at Cuttak

05 00 00 05

Gymnastics (Senior National & Sub-Junior)

07 10 02 19

Sub-Jr. National Swimming 01 00 00 01

National Para Olympic Swimming 04 04 00 08

NE body building competition. 06 03 01 10 NE Chess competition. 02 00 02 04 Asian School Chess Championship 01 00 00 01 Commonwealth Chess Championship 00 00 01 01 Yoga Championship 01 03 02 06 5th National Rural Tournament. 01 00 02 03 Sub-Jr.Kick Boxing Championship. 02 01 04 07 Jr./ Senior Kick Boxing Championship.

03 01 01 05

51 National level Rural Trounament Gr.V

00 00 02 02

NE Judo Championship 00 07 11 07 School National. 02 06 06 14

Sub-Total= 52 52 52 156

Some remarkable performance have also been done by the sports persons of Tripura, they are as follows:-

a). Smt. Shainy Das, achieved 01(one) Gold from Asian School Chess Championship, held at Srilanka and 1 (one) Bronze form Commonwealth Chess Championship held at Chennai.

b). Smt. Dipa Karmakar, own 05 Gold medal from Sr. National Gymnastics & 05

Gold from women competition. C ). The under 17 boys School team achieved gold medal from the National

School Championship.

The Plan/Programme and any project to be implemented during the year 2013- 14 for consideration of the Committee during examination.

The Plan /Programme of the Department is (i) to provide opportunity to the youth

to find constructive channel for their unbounded energy, (ii) to improve personalities and

character, (iii) to boost sports and youth activities of the State by providing training for

improvement the performances of players of exceptional

-57-

qualities and (iv) Organization of Regional and National Level Sports and youth

activities with a view to exposing the youth of the State in the field of sports and youth

activities.

The Budget provision under PLAN and NON-PLAN of the Education (YAS) Department during the year 2013-14 are as follows:-

(Rs. in lakh) BUDGET POSITION AT A GLANCE UNDER PLAN

Agreed B.E. 2013-14 PL AN NON-PLAN

0 Total Salary / Wages 2894.00

Non-Salary 358.00 Total Non-Salary. 31.50

0

Grant to TSC 84.00 Electricity Charges 3.50

Electricity Charges 12.00

State Share 61.00 0

Scholarship / Stipend 10.00 0

Major works 1.00

Transfer to TTAADC 35.00

Cost of Ration 70.00

Sports Equipment 15.00

Youth Welfare Prog. 20.00

Games & Sports 30.00

Others 20.00

SPA 1.00

SCA 1.00

CSS 665.54

NEC 5.00 0

1030.54 2925.50

The thrust area of the Department in the outlaying Stations in the field are –

(i) Football, (ii) Athletics, (iii) Gymnastics, (iv) Swimming, (v) Yoga and (vi) Judo etc. The following are the continuing Plan Scheme of the State:-

a. Physical Education, b. Youth Welfare Programme for Students (Scouts & Guides activities) c. Youth Welfare Programme for Non-Students (Youth Festival and other Youth Activities). d. Sports and Games Organization of various sports programme of School students) e. Grants-in-aid (Grants for Tripura Council and TTAADC)

B The Deptt will continue execution of the following on going projects during

2013-14 (Under State Plan)

1. Construction of Sub-Divn. YAS Office, Bishalgarh

2. Construction of Sub-Divn. YAS Office, Santirbazar

-58-

3. Construction of Sub-Divn. YAS Office, Dharmanagar

C. The Deptt will continue execution of the following on going projects during 2013-14 (Under ACA / SPA/ NLCPR).

1. Up gradation of NSRCC Complex construction of Indoor and Gymnasium at Agartala

2 Up gradation of Bhagat Singh Youth Hostel, (350 Bedded Hostel at Khajurbagan).

3 Up gradation of Astable Ground ( 2nd phase work) Agartala

4 Construction of District Sports Complex, North Dist Kailashahar.

5 Construction of District Sports Complex, South Dist Udaipur.

6. Up gradation of Regional College of Physical Education, Panisagar

7 Development of Playground with earth-filling and Drainage System at RCPE, Panisagar.

8. Construction of District Sports Complex at Ambassa, Dhalai Tripura

9 Development of Playground opposite to Bholagiri Ashram, Agartala.

10.Construction of 4 (Four Storied ) building for multipurpose like as Judo, Weight Lifting, Yoga, Table Tennis etc. at NSRCC Complex.

11. Conversion of existing DYAS Office to 3(three) storied Girls Hostel for the Player.

D. The following projects have been sent to the P & C Department for

consideration during 2013-14.

1. Construction of gallery at Gardhang H/S School, Sabroom.

2. Up gradation of State Adventure Institute, Melaghar.

3. Construction of State Training Center for Scouts & Guides and Office

Building at State Head quarter, Arundhutinagar.

4. Construction of District Sports Complex at Belonia, South Tripura.

5. Construction of District Sports Complex at Sepahijala District at Bishramganj.

6. Construction of District Sports Complex at North District at Dharmanagar.

7. Construction of District Sports Complex at Khowai District.

8. Construction of Gallery alongwith Grand Stand for proposed Stadium at

Damdama, Madhusudan Degree College, Sabroom, South Tripura.

-59-

After careful examination of the Budget proposal and appreciation of submission placed by the Secretary of the Department, the Committee make the following recommendations :-

RECOMMENDATIONS

i. Dasharath Deb Sports Complex has to be of Nation al Standard quality and Department to achieve the goals as early as pos sible.

ii. The Department to pursue for taking over the po ssession of Assam Rifles field to encourage sports events in the Stat e. Player who participate in National and International level gam es has to be covered with insurance for which there shall be Budget prov ision.

iii. For Dhalai & all new Districts sports complex to be built.

iv. The State sports boys/girls who get chance in t he National level should

be provided with all possible amenities and for tha t Finance Department may provide fund if any, in the Revised Estimates.

v. Sports office at District, Sub-Division and Bloc level should be set-up in

phase manner.

vi. The vacant land lying at Rajnagar Bloc under So uth Rajnagar Panchayet near Piyar Bari Police station may be made use as s port Complex of National standard by providing gallery as may be po ssible.

vii. Physical Instructor should be appointed in all school in phase manner specially in the S.B, High and H. Secondary Schools .

viii. The Department to make endevour for supply of sports items to all Sub-Division extending the same to Bloc, Jila Parishad, Panchayat Samiti, Village Committee and Gram Panchayat and fund for t his to be increased.

ix. Residential coaching camps to be provided to Bl oc level annually in collaboration with Nagar Panchayat, Panchayat Samit i and Jila Parishad.

After examination of the Budget proposals and appreciation of submission of the Representative of the Committee recommends the Budget proposals under Demand No. 42 for grants by the House alongwith the Recommendations.

( Shri Sudhan Das) Chairman

Subject Committee - I Tripura Legislative Assembly

Dated, Agartala, the 10th May, 2013.

-60-

THE REPORT ON THE DEMAND NO. 30 OF THE FOREST DEPARTMENT FOR

THE FINANCIAL YEAR 2013-14.

The Budget Proposals under Demand No. 30 relates to Forest

Department, Government of Tripura for the Financial Year 2013–2014 and

Revised Budget for the Financial Year 2012 – 2013 are as follows:-

(Rs. in Lakh)

Particulars Revised

Estimate 2012-2013

Budget Estimates for 2013 -14 Demand Fund for Total

T.S.P. S.C.P. a) Non-Plan

4092.81 4691.00 -- -- 4691.00

b) Plan 9978.65 2619.67 3365.39 2895.94 8881.00 c) C.S.S. 609.54 405.32 248.17 146.51 8000.00 d) N.E.C 100.00 25.00 50.00 25.00 100.00 Total 14781.00 7740.99 3663.56 3067.45 14472.00

Now, the Budget Proposals is under examination of the Subject

Committee-I of the Tripura Legislative Assembly for recommendations to the

Demands for Grants.

The Committee in its meeting held on 7th May, 2013 examined the Budget

proposals in details having discussion with the Principal Chief Conservator of

Forest of the Department who appeared before the Committee on summon.

First of all, the PCCF & HOFF informed the Committee about the action

taken in respect of the recommendations made by the Committee during the year

2012-13 and stated as follows :-

Sl. No. Relevant

Para/ Page No. of the

report.

Recommendation of the Committee

Reply of the Government on the recommendation

1) Para-i) at

page

No.128

The Department to

continue the

Bamboo plantation

programme already

taken up for total

120.325 lakhs.

During the year 2012-13, the Forest Department

has raised different species of bamboo like Muli,

Mritinga, Barak, Jai, Dalu etc. over 7231.77 ha.

Special attempt had also been made to raise

different species of bamboo on RoFR-patta land

during 2012-13 as per demand of the

-61-

Department to

formulate a

programme for

usable special

species Bamboo.

beneficiaries. It is also proposed to invite RFRI,

Jorhat in developing bamboo resources in the

State.

2) Para-ii) at

Page

No.128.

The Department to

continue the special

drive for Bamboo

Industry Artigens

Training and to

develop Master

Trainers.

Two “Bamboo Mat Weaving Centre” one at

Bagafa Division and another at Ambassa Forest

Division besides one NTFP Centre of Excellence

Hatipara under JICA project are actively in

operation in Tripura. Local artisans were trained

in those weaving Centre on Agarbati stick

making and value addition to NTFP Forest

Produces to make them Mater Trainers among

the artisans.

3) Para-iii at

Page

No.128

By working out,

the Department to

formulate joint

scheme with

tourism

Corporation to

procure fund from

Central

Government for

developing Eco-

Park and Eco-

Tourism all over

the State and also

in the Capital

Complex area and

at Agartala.

Presently there are 25 Eco-Parks developed by

the Forest Department. To further develop the

Eco-Parks and Eco-Tourism Sector, the Forest

Department submitted project proposal for

Rs.1109.00 lakhs to the ICAT Department for

funding during 2012-13. The Department has

also received fund from TTDC for improvement

of the Eco-parks established by Forest

Department. The Forest Department has also

taken up greening of Capital Complex area at

Agartala.

4) Para-iv at

Page

No.128

In the Bamboo

Park the Forest

Department to

accumulate all

Tripura Bamboo Park is being established at

Budjangnagar Industrial Estate. It will be first

Bamboo Park in Tripura as well as in the

country. One Master Plan has been prepared for

-62-

plants in a single

area for

demonstration.

the park by Industries Department with estimated

cost of Rs.29.36 crores.There will be different

infrastructure facilities. Based on bamboo

technology, different firms viz- mechanized

bamboo stick and Agarbati stick, bamboo

flooring mat ply blind and carets, bamboo shoot

etc. State Government has adopted different

plans to contribute capital to establish the firm

from Government and Non-Government

Organization. The time limit for establishment of

Tripura Bamboo Park is 24(twenty four) months.

In the bamboo park in Tripura, many people will

get employment depended on bamboos.The

Forest Department has also taken up planting

programme keeping in view the growing demand

of bamboo raw materials in coming years.

5) Para-v of

Page

No.129

Commercial wood

like Teak, Karai,

Gamair, Garjan

shall be increased

to 30% of the

present one and

formulate a plan for

this program.

Forest Department implements various schemes/

programmes, namely, NAP, CAMPA, JiCA,

IGDC, etc for afforestation activities. In the

recent past plantations were raised largely with

misc. species. However, recommended by the

Hon’ble Subject Committee-I, TLA the field

level functionaries had duly been advised to mix

at least 30% commercial species in the regular

plantations.

6 Para-v of

Page

No.129

To develop shoot species of Bamboo plantation to meet the present demand of the market in all Range area this program be taken up specially to the commercial Bamboo plantation.

Bamboo shoot plays a vital role of the tribal of Tripura. Bamboo shoots of Muli, Barak, Mritinga are in high demands in the market. Special attempts were made by Forest Department for planting of Muli, Barak, Mritinga etc. species of bamboo on forest land for the Purpose. An exotic species D .asper which is suitable for bamboo shoots had also been tried from TCS (Tissue Culture Seedlings) on Pilot Project basis to study the feasibility in Tripura Condition.

-63-

The plan/programme and any project to be implemente d during the financial year 2013-14 for consideration of the Com mittee during

examination.

• The earlier CSS Projects like National Afforestatio n Programme (NAP), Intensification of Forest Management (IFM), River V alley Project (RVP), National Bamboo Mission (NBM), Central Zoo Autority (CZA), Project Elephant, Assistance to States for Development Nati onal Parks and Sanctuaries (ASDNP) etc. continued during 2012-13 a s per approved plan of works. • The Green India Mission Scheme of Government of Ind ia has been

implemented during 2012-13 in all States. Prelimina ry meetings/workshop was organized to apprise all Stat es Forest Departments about project formulation giving specia l emphasize on climate change scenario.

Point No ����ii) Achievement made during the year 2012-13

Physical & Financial Achievement upto March, 2013(P rovisional)

(Rs.in lakhs) Financial Major outputs

Major/Minor Head Of Accounts

Approved outlay Fund released by Fin.Dept during 2012-13

Financial Achievement during 2012-13 (Provisional)

BE RE

2406-Forestry & Wildlife(State Plan)

326.95 402.30 391.94 383.59 Creation of 2012-13Plantation over 18,113.98 ha ,nursery bed raised over61.78 lakhs, Creation of river bank plantation 124 ha, Road side plantation 109 Km, Creation of water harvesting structures- 575 ha , Agro forestry over 8270 ha under JICA/

2406-13th Finance Commission

2388.00 2443.17 1846.17 1835.30

-64-

IGDC project in RoFR land, Construction of buildings- 50 Nos, Payment of Office expenses, other charges etc.,

4406-Externally Aided Project(JICA)

2600.00 5633.18 4600.00 4600.00

4406-Externally Aided Project(IGDC)

800.00 1500.00 1500.00 1500.00

Total of State Plan :

6114.95 9978.65 8338.11 8318.89

CSS-Intensification of Forest Management (IFM)

195.78 533.76 332.43 332.43

CSS- River Velley Project (RVP)

116.13 24.13 24.12 24.12

CSS-Project Elephant

68.24 20.91 10.96 9.91

CSS-Asstt.to Dev.of National Parks andSanctuary

3.19 4.04 3.05 2.04

CSS-Development of Sepahijala Zoo(CZA)

61.13 26.70 26.70 0.00

Total of CSS 444.47 609.54 397.26 368.50 NEC-Bamboo Dev.of Socio Economic

181.00 0.00 0.00 0.00

-65-

After examination of the Budget proposals and appreciation of submission of the PCCF & HOFF Department the Committee recommends the Budget proposals under Demand No. 30 for Grants by the House alongwith the Recommendations:-

RECOMMENDATIONS

i) The Department to achieve the goal of programme for useable special species Bamboo and Develop Bamboo plantatio n encouraging private sector also with a specific yea rly target.

ii) Bamboo Industry Artigens Training be continued and to develop Master Trainers.

iii) JAICA Project performance are to be done involving Panchyat as well as Village Committees.

iv) Efforts are to be continued for developing ECO Park and ECO tourism.

v) Production of Teak, Karai, Gamair, Garjan etc. shal l be more increased.

vi) It shall be the obligation of the Forest Department to formulate a specific proposal for Elephant conservation by pr oviding source of food for Elephant in the deep forest alon gwith water resource. Similarly, food and water sources are to be provided by the Department in the forest sufficiently for Mo nkey. These are to be achieved to avoid confrontation of Eleph ant and Monkey with human society every year for long.

vii) Trishna and Sipahijalla are to be demarcated for pr oper reconciliation immediately.

viii) Road side plantations are to be given priority.

After examination of the Budget proposals and appreciation of submission of the Representative of the Committee recommends the Budget proposals under Demand No. 30 for Grants by the House alongwith the Recommendations.

( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly

-66-

THE REPORT ON THE DEMAND NO. 27 OF THE AGRICULTURE DEPARTMENT

FOR THE FINANCIAL YEAR 2013-14.

The Budget proposal under Demand No. 27 relates to Agriculture

Department, Government of Tripura for the Financial Year 2013-2014 and the

Revised Budget for the Financial Year 2012-2013 are as follows :-

(Rs. in Lakhs)

PARTICULARS

REVISED ESTIMATES 2012 - 2013

BUDGET ESTIMATES FOR 2013 - 2014

DEMAND FUND FOR

TOTAL T.S.P S.C.P

1) Non Plan 7455.23 8703.50 --- --- 8703.50 2) Plan 17377.50 10975.81 8363.27 4157.12 23496.20 3) C.S.S 1943.62 690.89 762.54 388.51 1841.94 4) N.E.C 94.50 469.40 --- --- 469.40 Total 26870.85 20839.60 9125.81 4545.63 34511.04

Now, the aforesaid Budget Proposal is under examination of the Subject

Committee-I of the Tripura Legislative Assembly for recommendations to the

Demands for Grants.

The Committee in its meeting held on 7th May, 2013 examined the Budget

Proposals in details having discussion with the Additional Chief Secretary of the

Department who appeared on summon.

First of all, the Additional Chief Secretary informed the Committee about

the action taken in respect of the recommendations made by the Committee

during the year 2012-13 and stated as follows :-

-67-

Sl.No.

Relevant

Para/ Page no.

of the report

Recommen

dations of

the

committee

Department reply

i)

Su

bje

ct C

om

mit

tee

- I

, P

ag

e-

97

To

endeavour

implementa

tion of

ATMA

project in

major way

The Central Sector Scheme "Support

to State Extension Reforms", popularly

known as ATMA, was introduced in the

State during 2005-06 in South & North

Tripura District. Dhalai and West Tripura

District were included during 2007-08.

Recently 4 (Four)new Districts are also

included under the scheme. Funding

pattern of the scheme is 90:10.

The scheme envisages in the capacity

building and skilled development of

farmers and the extension functionaries of

Agri & allied sectors. Based on the Strategic

Research and Extension Plan (SREP) of

each District, every year State Extension

Work Plan (SEWP) is prepared and

submitted to the Government of India,

where components like training, exposure

visits, demonstration, farms school,

promotion of farmers group for Agri.

entrepreneurship are included.

Two State level Training Institute has

been established at Lembucherra, besides

4(four) nos. District Training Institute at

District Head Quarter of 4(four) District for

capacity building of farmers and extension

funcutionaries.

Farmers Advisiory Committee (FAC)

is constituted at Block Level for observing

the Plan Preparation and execution of the

programmes.

Some of the major achievement during 2012

presented below:

Item Target Achievement

Training of the

officers and

extension

functionaries

550 nos.

participant

532 nos.

participants

Exposure visit of

extension

functionaries and

farmers

50 nos.

participants

48 nos.

participants

Training of farmers 19390 nos. 15890 nos.

participants participants

Demonstration 2950 nos. 2100 nos.

Farms school 188 nos. 129 nos.

Organisation of

field days 41 nos. 20 nos.

Farmers Scientist

interaction 8 nos. 8 nos.

District Level

Krishi Mela 8 nos. 6 nos.

Information

dissemination

through short film

- 7 nos.

ACTION PROGRAMME FOR 2013-14

Item

Training of the officers and

extension functionaries

2250 nos.

participants

Exposure visit of extension

functionaries and farmers

6975 nos.

participants

Training of farmers 51750 nos.

participants

Demonstration 7875 nos.

Farms school 135 nos.

Organisation of field days 90 nos.

Farmers Scientist interaction 16 nos.

Development of Technology

package on electronic forms 80 nos.

District Level Krishi Mela 8 nos.

ii)

Su

bje

ct C

om

mit

tee

- I

, p

ag

e -

97

Department

to take step

to cover all

peasent-

family

under the

Kishan

Credit Card

(KCC)

scheme

Total nos. of farmer in the state is around

4.79 lakhs (3.58 lakhs + 1.21 lakhs Patta

holders) of which total 401227 Nos. Kishan

Credits Cards have been distributed to the

farmers with a credit disbursement of

Rs.72887.95 Lakhs during the last 13 years.

As per norms a KCC is vaild for 3(three)

years, i.e. 267110 nos. are granted as alive

card (2010-11 to 2012-13). Now it denotes

that out of the total farmers 211890 nos.

are eligible for new KCC. (4.79 lakhs - 2.67

lakhs).Year wise position of KCC sanctioned

an amount disbursed since inception in the

state as follows:

Year KCC issued

(nos.)

Amount

disburse

d (Rs. in

lakhs)

Loan

per

KCC

(Rs. in

lakhs)

2000 1214 135.87 0.11

-69-

-

2001

2001

-

2002

3072 378.33 0.12

2002

-

2003

5696 562.51 0.10

2003

-

2004

8039 848.21 0.11

2004

-

2005

12647 1515.97 0.12

2005

-

2006

11978 2041.20 0.17

2006

-

2007

14343 1978.21 0.14

2007

-

2008

19198 3304.61 0.17

2009

-

2009

27474 5401.11 0.20

2009

-

2010

30456 9520.70 0.31

2010

-

2011

50294 7988.26 0.16

2011

-

2012

114883 17531.17 0.15

2012

-

2013

101933 21681.80 0.21

Total 401227 72887.95 0.18

The target for issuing KCC during 2013-14

is suggested at 1.00 lakhs.

-70-

iii)

Su

bje

ct C

om

mit

tee

- I

, p

ag

e -

97

Department

should take

necessary

step to

introduce

modern

machine in

the

Agricultural

field,

training &

demonstrat

ion to be

done

regularly.

In the recent past a modern machine

namely Paddy Power Weeder with floating

skid is placed in different selected

Agriculture Sector for demonstration of

same in Paddy cultivation practice related

with weeding. In addition, Mannual Dal

Mill, Maize Sheller, Seed Treatment Drum,

Tree Prunner, Power Sprayer, Brush Cutter

and Cono Weeder have been procurred

which will be demonstrated shortly.

Regarding training to the farmers,

both inside the State and outside the State

are taken up. In recent past 14 nos. farmers

are completed a training programme for 15

days duration in connection with modern

farm machinery at North Eastern Region

Farm Machinery Training and Testing

Institute, Biswanath Chariali, Assam.

Another training programme was

conducted on 16/03/2012 at Nutan Nagar

Agro. Service Center on Farm machinery

where 30 nos. farmers participated.

Regarding future plan, both Inside

and outside the State programme will be

taken up on the following subjects on

receipt of fund under the scheme

"Promotion and Strengthening of

Agricultural Mechanization Through

Training, Testing and Demonstration".

1. Operation, maintenance and

management of Power Tiller.

2. Operation, maintenance of Plant

Protection Equipments.

3. Operation, maintenance of Improved

harvesting and Threshing machine.

4. Operation, maintenance of hand Pump.

5. Package of Agriculture machinery for

Paddy cultivation.

6. Package for Agriculture machinery for

Maize cultivation.

7. package for Agriculture machinery for

Oilseed and Pulse crop.

v)

Su

bje

ct C

om

mit

tee

- I

, pa

ge

- 9

7

The system

of

procureme

mnt of

Diesel for

Power

Tillers and

Pumps sets

of farmers

to be made

simpler in

consultatio

n with

Food

Department

and also to

take up

with Food

Department

to give

some

subsidy to

Diesel.

Indian Oil Corporation informed that they

have already opened 4(Four) nos. KISHAN

SEVA KENDRA (Retail outlet of Diesel etc)

and 3(Three) more nos. will be opened

shortly.

On the proposal for fixation of

subsidy as well as modalities to disburse

subsidy amount, matter has been taken up

with the Food Department. But the matter

is yet to be finalized.

v)

Subject

Committee - I,

page - 97

Sinking of

500 nos.

deep tube

wells of

small bore

for

irrigation in

small faring

land under

RKVY

scheme

During the Financial year 2012-13,

413 nos. of SBDTW have been sanctioned

by Government under SPA, out of which

272 nos. was sunked and 59 nos. has been

commissioned as on 31/03/2013.

Remaining works will be completed by May

2013.

District wise SBDTW to be installed

are as below:

1. North Tripura District : 40 Nos.

2. Unokothi District : 35 nos.

3. Dhalai District: 53 nos.

4. Khowai District :60 nos.

5. West Tripura District ; 55 nos.

6. Sipahijala District: 50 nos.

7. Gomti District: 60 nos.

8. South Tripura District ; 60 nos.

-72-

vi.

Su

bje

ct C

om

mit

tee

- I

, pa

ge

- 9

7

Setting up

of modern

markets for

selling

Agricultural

and

Horticultur

al produces

of farmers.

In Big

Markets of

the State

there shall

be some

cold storage

for

preserving

vegetable,

fish and

meat and

for that

Governmen

t of India

may be

approached

.

1. One Mini Cold Storage (Cool

Chamber) having capacity 25.00 MT has

been set up at Bishramganj Wholesale

Assembling Market for preservation of

vegetable, fish, meat and potato. Now it is

in test and trail run condition.

2. Tender for establishment of two

more Mini Cool Chamber having capacity

25.00 MT each for Sonamura Wholesale

Assembling Market having provision for

preservation vegetables & fruits and Nalua

Primary Market for vegetables and Betle

leaf has been invited.

3. TTAADC has establishing Cool

Chabmer having capacity of 25.00 MT at

Machli bazar for preservation for Potato,

vegetables, fish & meat.

4. During 2013-14, three nos. similar

capacity cool chamber for preservation of

vegetables & fruits will be constructed at

Kalibazar, Teliamura and Khayerpur

market under HMNEH scheme.

5. Two nos. similar capacity cool

chamber at Barkhatal & Padmabil has been

considered to be constructed by TTAADC

for preservation of vegetables, fruits, fish

etc. during the year 2013-14.

vii.

Su

bje

ct C

om

mit

tee

- I

, p

ag

e -

97

Use of Bio-

fertilizer

has to be

increased

and subsidy

to

appropriate

level has to

be

maintained.

Bio-fertilizer production scenario of

Tripura is given below:

S

l

.

N

o

.

Number of Production

Unit

Annual

Production

Capacity

Productio

n during

2012-13

1

3 nos. units operated

by State Government

through PPP mode

1200 MT @

400 MT in

each unit

588.932

MT

2

2 nos. units operated

by Private

Sector(Presently one

is non-operative)

1500 MT in 2

units

270.000

MT

Total : 858.932MT

Bio-fertilizer is being provided to SRI farmers @ 12

kg per hac without any cost since 2006-07.

Proposal placed to Government for approval to

provide Bio-fertilizer at 50% cost to non SRI

farmers 1(one) lakhs hac which is likely to be

implemented from 2013-14.

BUDGET ESTIMATE AND ACTION PLAN FOR 2013-14 OF STATE PLAN

/CSS/MACRO MANAGEMENT/ ACA/NLCPR/SPA ETC.UNDER

AGRICULTURE.

Demand No. 27 relates to Agriculture Department, Govt. of Tripura. Budget

Estimate for the year 2013-14 are as follows :

A. STATE PLAN , CSS & NEC etc.

(Rs. In Lakhs)

Sl.

No.

Name of

Scheme R.E. 2012-13

B.E. for 2013-14 Remarks

Demand

27

Demand

19

Demand

20

Total

1. State Plan 1725.80 3607.40 2412.66 1249.44 7269.50 Salary & Wages :

Rs. 366.00 lakhs.

Non-Salary : Rs.

6903.50 lakhs

2. RKVY (Plan) 6800.00 2642.70 3067.97 1289.33 7000.00

3. CSS/ Macro

Management

1693.62 648.95 762.54 388.51 1800.00

4. NABARD 210.00 234.01 217.64 133.35 585.00

5. AIBP 8000.00 4080.00 2495.00 1425.00 8000.00

6. NLCPR 50.00 41.94 00 00 41.94

7 SPA 641.70 411.70 170.00 60.00 641.70

8. NEC 00 469.40 00 00 469.40

SUB-TOTAL 19121.12 12136.10 9125.81 4545.63 25807.54

B. NON-PLAN

Sl.

No.

Name of

Scheme

R.E. 2012-13 B.E. for 2013-14 Remarks

Demand

27

Demand

19

Demand

20

Total

1. Non-Plan 7365.28 8640.00 00 00 8640.00 Salary

-74-

Sl.

No.

Name of

Scheme

R.E. 2012-13 B.E. for 2013-14 Remarks

Demand

27

Demand

19

Demand

20

Total

(Salary

&Wages

component)

&Wages

component

2. Others 89.95 63.50 00 00 63.50

SUB-TOTAL 7455.23 8703.50 00 00 8703.50

C. SUSPENSE ACCOUNT

Sl.

No.

Name of

Scheme

R.E. 2012-

13

B.E. for 2013-14 Remarks

Demand

27

Demand

19

Demand

20

Total

1. Suspense

Account

7000.00 6000.00 00 00 6000.00

SUB-TOTAL 7000.00 6000.00 00 00 6000.00

Total of Agri (A+B+C) 33576.35 26839.60 9125.81 4545.63 40511.04

(Major Head of Account wise details are given in ANNEXURE)

An amount of Rs. 31608.04 lakhs has been allocated in the Budget Estimate

2013-14 in favour of Agriculture under State Plan/RKVY/NABARD

LOAN/SPA/AIBP/CSS/Macro Management /ACA/NLCPR/ Non-plan etc. other than Salary

and wages.

Achievement made during the year 2012-13 relating to Agriculture

Department

Sl. No.

Name of Scheme R.E. for the year 2012-13

Fund released during 2012-

13

Expenditure incurred during

2012-13 A State Plan

1. Salary and Wages 466.00 502.83 502.83

2. Non-Salary 1259.80 1250.11 1243.85

-75-

Sl. No.

Name of Scheme R.E. for the year 2012-13

Fund released during 2012-

13

Expenditure incurred during

2012-13 3. RKVY 6800.00 5667.55 5568.99

RIDF(NABARD LOAN) 210.00 210.00 157.21

ACA/SPA 641.70 641.70 641.70

4. CSS 151.37 155.24 153.81

5. Macro Management 1542.25 1538.38 1367.09

6. NLCPR 50.00 00 00

SUB-TOTAL 11121.12 9965.81 9635.48

B Non-Plan

1. Salary and Wages 7365.28 6870.14 6870.14

Non-Salary 89.95 89.91 89.28

SUB-TOTAL 7455.23 6960.05 6959.42

C Suspense Account 7000.00 3209.04 3204.86

GRAND TOTAL 25576.35 20134.90 19799.76

IMPORTANT ACHIEVEMENTS OF THE DEPARTMENT DURING FINANCIAL YEAR 2012-13.

The Government of India awarded the State with “COMMANDATION

AWARD” during the year 2011-12 for the efforts made to increase

production & productivity of food grains during 2010-11, utilization of funds

under NFSM(Rice)during 2011-12 and popularization of SRI in paddy

cultivation and the same was given in the month of January , 2013.

For increasing productivity, about 87,978 hectares area has been

covered under SRI method of paddy cultivation during 2012-13 against

86,630 hectares during 2011-12. Optimum level of 33% SRR in Paddy is

maintained in the state for last couple of years and continued during 2012-13

also.

The State is now producing surplus quantity of HYV paddy and

Mustard seeds. The State is exporting Certified HYV Paddy and Mustard

seeds through National Seed Corporation Ltd. and distributing to other

states. Per hectare NPK Use would be 65 kg in 2012-13 from 55 kg in 2011-

12. Efforts are being made to build up a buffer stock of fertilizers in the state

to avert any shortages during peak season.

National Food Security Mission (NFSM-Rice) programme started its

implementation in Tripura from Boro season of 2011-12 only in erstwhile

Dhalai and North Tripura District. All the Eight Districts of the State have

been covered under the National Food Security Mission (NFSM-Rice) from

2012-13 with an allocation of Rs 21.78 crore. Major thrust is given on Cluster

Demon on SRI Paddy in 6000 ha @ 10 ha in each cluster with an amount of

Rs 4.50 crore, Distribution of Quality seed of HYV and Hybrid @ Rs 5 / Kg and

Rs 20 / Kg respectively with an amount of Rs 1.96 crore, Support for

-76-

Micronutrient, IPM and Liming material with an amount of Rs 10.14 crore,

Support for irrigation through Mini Deep Tube-well and Pump Set , Support

for Farm Implements and Farmers Training etc. with an amount of Rs 4.62

crore.

Besides existing 5(five) nos. Department run cold storages,

construction works of more 5(five) nos. at Dharmanagar, Udaipur, Ambassa,

Amarpur and Belonia are in progress. Process are being in progress for

construction of one more cold storage at Khowai.

Three Big market at Bachaibari, Valurchar and Machmara has been

taken up during 2012-13 under RIDF, NABARD and work is in progress.

Beside this big market at Sonamura whole sale market, Sonamura retail

market and Khayerpur market has already been taken during 2012-13 and

work is in progress. 13(Thirteen) nos. rural hutt at Dimatali, Mirza, Dalogaon,

East Haru, Halihali, Bagmara, Binanhazaripara, Kalabagan, Birchandranagar,

Demdum, Santipara, Kemtali & Nalua has been taken up during 2012-13 &

work are in progress.

The 1st and 2nd batch of Student @ 17 nos. in each batch from college

of Agriculture, Lembucherra have passed out in 2011 and 2012 respectively.

Out of 34 nos. pass out student, 25-nos. of students were qualified for the

P.G. courses through National level Entrance Examination and now studying

in different leading universities in India.

About 1,01,933 nos. Kisan Credit Cards has been distributed during

2012-13 and Rs. 216.82 crore was disbursed up to March, 2013.

It was targeted to bring 25,000 hectares of forest land area which

rights were vested with tribal forest dwellers are proposed to be brought

under Agricultural crops over a period of three years. Up to 2012-13, about

20,000 hectares of area were covered under FRA in Agriculture.

IMPORTANT PROJECTS, SCHEMES/PROGRAMMES PLANNED TO BE IMPLEMENTED IN 2013-14:

The target for production of food grain has been proposed to be

pegged at 8.17 Lakh tons during the year 2013-14 against the anticipated

production of 7.25 Lakh tons in 2012-13. The requirement of food grain is

8.66 Lakh tons during 2013-14 for the projected population of 38.35 Lakhs.

Special thrust will be given to cover 41,000 ha. area under Aush

paddy, 70,000 ha. under Boro paddy, 7,700 ha under Maize, 17,862 ha under

pulses and 12451 ha oilseed. An area of about 1, 00,000 hectare area to be

covered under SRI including 10,000 ha. under Hybrid paddy. To boost up the

-77-

food grain production, an area of 1, 00,000 ha would be covered through

ICM.

Crop diversification in fallow land which accounts for about 84,000

hectares and 60,000 hectares during pre-kharif and rabi seasons respectively

needs to be brought under cultivation through effective cropping sequence

like Vegetables, Potato, Pulses, Oilseeds, Fodder etc. so that farmers can earn

a good income. Special thrust will also be given on crop diversification to

utilize fallow land during pre-Kharif and pre-Rabi season through pulses and

oilseeds cultivation during 2013-14.

Crop-wise addl. area to be brought in Seasonal Fallow land during

2013 -14 is proposed as under:

Pulses: 3280 hac. (Moong- 700 ha, Lentil-1500 ha Arhar-160 ha, Urad

- 300 ha, Rajmash-200 ha, Field Pea-420 ha),

Oilseeds: 2290 hac. (Groundnut-480 ha, Sesamum- 500 ha, Mustard -

750 ha, Soyabean – 310 ha , and Flax /Linseeds – 250 ha.).

In addition 4000 ha. Pulses area targeted to be covered under RoFR.

An area of 10,000 ha. pulses cultivation under Shifting Agriculture as mixed

crop targeted to be covered during 2013-14 from which net area under

pulses would be about 2000 ha.

Thrust will also be given on oilseed cultivation of 3000 ha area in

RoFR land and 2500 ha. in Shifting Agriculture.

Thus, total targeted area under pulses during the year 2013-14 would

be 17862 ha. against existing area of 8582 ha (2011-12). and oilseed 12451

ha. against existing area of 4661 ha(2011-12).

Seed Replacement Rate across the Farm household at the optimum

level (i.e. for Paddy-33%, for Pulses and Oilseeds -50%) should be continued.

Special attempt shall be made to cover those farmers, who are not replacing

their seeds on time.

Production of Certified HYV seeds are proposed to be continued in the

Government Farms as well as in farmers’ fields through Registered Growers’

Programme with proper seed testing, seed processing, storage facilities.

Increased labour costs make it imperative to go in for farm

mechanization of all agricultural operations, such as sowing, weeding and

threshing. Mechanization in agriculture is essential for minimizing cost of

-78-

production. Additive subsidy for some machinery/equipment like Mini

Tractor, Power Weeder, Transplanter, Seed Drill, Drum Seeder, Mini-

combined Harvester and other labour saving equipments etc. is proposed for

small and marginal farmers dovetailing all sources of funds including the

Sate Plan. The Government will have to pioneer development of appropriate

SHGs/Farmers’ Groups/ Farmers’ Club for providing custom hiring services

of agricultural machinery and equipments to the farmers. Custom Hiring

Service/Agro Service Centre of farm machinery and implements may be set

up at block level to help the farmers reducing the cost of cultivation. Group

approach through appropriate SHGs/Farmers’ Groups/ Farmers’ Club may

also be considered through subsidy/financial assistance. Identified

equipment may be supplied to the Groups on subsidy with dovetailing PDF

Funds.

The state is having 554 Primary Rural Markets, of which Wholesale

Assembling Markets are 84 and Regulated Markets are 21 guided by Tripura

Agricultural Produce Markets Act. Efforts will be continued to develop

infrastructure of the existing markets including Rural Haats.

Micro nutrient deficiency especially in the form of Zinc and Boron can

be effectively addressed by way of application of Zinc Sulphate and Borax as

per doses recommended for specific crops. The small and marginal farmers

of the state are not coming forward for use in their crop field. The

distribution of the same is proposed to be made by way of providing subsidy

by dovetailing funds from different schemes and programmes including the

State Plan for 40,000 hectares area during 2013-14.Efforts to bring One lakh

eligible farmers under KCC will be continued during current year.

Jhumias will be assisted in practicing improved method of Jhum

cultivation. In addition, it is proposed to bring 5,000 hectares of forest land

under Agricultural crops during 2013-14 which rights were vested with

tribal forest dwellers under Forest Right Act.

A. State Plan (Divisible Pool) : An amount of Rs. 7269.50 lakhs has

been provided under State Plan for implementation of Crop Husbandry

including administrative cost like cost of fuel, stationary articles, electricity

charge, publication etc. In respect of development activities the major

programme taken are Subsidy on sale of fertilizer and seeds of different

crops, internal carrying of Agri inputs, Bonus for seed production

-79-

programme through Registered Growers, Running cost of existing cold

storage, dehumidified Godown and seed processing plant etc, State share of

CSS schemes, participation in different Exhibition/fair/mela, cost of

equipments for soil testing laboratories including mobile soil testing van,

glassware and chemicals for different laboratories, stipend, market

development and maintenance of existing buildings of Agriculture

department, construction of S.A. office, V.L.W stores etc. This is including Rs.

300.00 lakhs kept as transfer of fund to TTAADC for implementation of

different development programme, renovation of existing V.L.W. Stores

including market development.

B. RKVY (Plan) Rs. 7000.00 Lakhs.: Department of Agriculture is the

Nodal Department in respect of RKVY scheme. Department of ARDD,

Fisheries, Horticulture TTAADC, KVKs are also implementing agency. Fund

placed to the different implementing agencies as required according to their

programme approved by the SLSC.

During the year 2012-13 implementing agency wise fund placement

are as below:

a) Agriculture : Rs. 4082.81 lakhs.

b) Horticulture ; Rs. 365.75 Lakhs.

c) Fisheries : Rs. 554.39 Lakhs.

d) TTAADC : Rs. 228.87 Lakhs.

e) KVK. Rs. 79.75 Lakhs.

f) ARDD: Rs. 355.95 Lakhs.

TOTAL : Rs. 5667.82 Lakhs.

The Agriculture Department has taken the following programme

under RKVY during 2012-13:

Name of the Project Fund

Placed

Expenditure

Incurred as on

31.03.13

Agriculture Department

Normal RKVY

System of Rice Intensification

(SRI) 3276.06 3147.06

-80-

Name of the Project Fund

Placed

Expenditure

Incurred as on

31.03.13

Providing Support for Hybrid

Paddy Cultivation 60.00 60.00

Maximizing Productivity of Jhum

Cropping system 338.00 338.00

Other Administrative Cost 34.95 34.95

Liabilities against Boro season of

SRI during 2011-12 100.74 100.74

Assistance for critical inputs for

Aush Paddy 135.64 135.64

Assistance for Agriculture Crop

Production in FRA areas 76.00 76.00

College of Agriculture (For

Chemical re-agents/equipments) 11.42 11.42

Sub-total Normal RKVY 4032.81 3903.81

Sub-Schemes

Rain-fed Area Dev. Programme

(RADP) 50.00 50.00

Total Agriculture 4082.81 3953.81

C. CSS & Macro Management in Agriculture: An amount of Rs. 1800.00

Lakhs has been kept for implementation of different CSS schemes and

Macro Management in Agriculture that are being implemented by the

Department of Agriculture, Govt. of Tripura. Central Sector Schemes

being implemented by the Department of Agriculture are as below:

1. Mini Mission II of Technology Mission of Cotton (75:25) for

development of cotton cultivation in Tripura . Major programmes

under this scheme are distribution of Seed, Implements, Training

and FFS etc.

2. Mini Mission II of Jute Technology (90:10). Major programmes

under this scheme are distribution of Seed, Implements, Training,

and construction of Jute retting tank etc.

3. Scheme for Establishment of An Agency for Reporting Agri

Statistics (EARAS) (100% CSS). Main objective of the scheme is

plot to plot survey on land utilization and reporting to GOI.

-81-

4. Scheme of Quality Seed (100%). Main activities of the scheme is to

create infrastructure facilities for processing and storage of seed,

distribution of seed on subsidy, training etc.

5. Scheme of Organic farming (100% CSS). Main objective of the

scheme is crop demonstration on organic farming, training etc.

6. Training Testing & Demo. of farm mechanization.

D. SPA: An amount of Rs. 641.70 Lakhs has been kept under SPA during

the year 2013-14 for creation of irrigation facilities by installation of

Small Bore Deep Tube wells with submersible pump and development

of Markets .

E. NLCPR : An amount of Rs. 41.94 Lakhs has been kept under NLCPR

during the year 2013-14 for construction of buildings of College of

Agrculture, Tripura.

F. Non-Plan : An amount of Rs. 8640.00 Lakhs has been kept under Non-

Plan during the year 2013-14 for Salary and Wages component. Beside

this an amount of Rs.25.00 Lakhs has been kept under Non-Plan other

than Salary and Wages during the year 2013-14 for other activities.

After careful examination of the Budget proposal and appreciation of submission placed by the Principal Secretary of the Department, the Committee make the following Recommendations :-

RECOMMENDATIONS

i) Implementation of ATMA Project to be efficiently looked into by the Department.

ii) Kishan Credit Card (KCC) scheme to the uncovere d peasant families to be extended.

iii) Introduction of Modern Machine in the field of State Agriculture, training and demonstration to continue.

iv) Use of Power Tillers and Pump sets by farmers a re to be encouraged by the Department with subsidy to Diesel in consultation with Food Department.

v) The number of sale markets and cold storages as well as cold chambers are to be increased with specific target.

-82-

vi) VLW store-cum Office in each Panchayat be set-u p in phase manner, Superintendent Office at Bloc level and Sec tor Office be setup.

vii) Minimum 5(five) farmers in a group depending u pon 10 acres of quantum of Land are to be provided with Power Tille rs with loan in subsidy.

viii) The Department to ensure timely supply of see ds to farmers.

After Examination of the Budget proposal and appreciation of the

Budget proposals and appreciation of submission of the representative of the

Committee recommends the Budget proposals under Demand No. 27 for Grants

by the House alongwith the Recommendations.

( Shri Sudhan Das ) Dated, Agartala, Chairman the10th May, 2013. Subject Committee- I Tripura Legislative Assembly

-83-

THE REPORT ON THE DEMAND NO. 28 OF THE AGRICULTURE (HORTICULTURE)

DEPARTMENT FOR THE YEAR 2013-14.

The Budget proposal under Demand No. 28 for Grants for the Financial Year 2013-2014 and the Revised Budget for the Financial Year 2012-2013 relates to the Horticulture & Soil Conservation Department, Government of Tripura are as follows :- ( Rs. in Lakh )

Now, the Budget proposal is under scrutiny and examination of the

Subject Committee-I of Tripura Legislative Assembly for recommendations to

the Demands for Grants.

The Committee in its meeting held on 7th May, 2013 examined the

Budget proposals in details having discussion with the Additional Chief

Secretary of the Department who appeared before the Committee on

summon.

First of all, the Additional Chief Secretary informed the Committee

about the action taken in respect of the recommendations made by the

Committee during the Financial Year 2012-13 and stated as follows :-

Particulars Revised Budget for 2012-2013

Budget Estimates for 2013-2014 Demand Fund for Total

T.S.P. S.C.P 1. Non-Plan

1855.22 2102.00 --- --- 2102.00

2. Plan 1674.98 1041.02 1142.72 541.26 2725.00 3. C.S.S 400.00 --- --- --- --- 4. N.E.C

--- --- --- --- ---

Total 3930.20 3143.02 1142.72 541.26 4827.00

-84-

Sl. No.

Relevant Para/ Page No. of the Report

Recommendations of the Committee

Reply of the Government on the Recommendations

i Page No. - 104

Commercial production of Mango, Orange, Musambi has to be increased by procurement of much more seedlings.

1. Necessary efforts have been taken

to increase area & production of

Mango, Orange and Mosambi in

the State. During the year 2012-13

an area of 1226 ha, 653 ha, & 279

ha have additionally been brought

under cultivation with Mango,

Orange & Mosambi respectively.

2. Further action has already been

taken for procurement and supply

of required planting materials to

cover 1035 ha Mango, 430 ha

Orange & 275 ha Mosambi.

ii Page No. - 105

Tripura variety of ‘Sabri Banana’ has to be protected and also increase its production by using modern technology.

1. As part of protection and

promotion of Tripura variety of

‘Sabri Banana’, the protocol for

micro propagation of the original

type is under process, in

collaboration with the National

Research Centre for Banana,

Tirichirapalli , Tamil Nadu.

2. Further molecular marking will

also be tried, in collaboration with

the suitable laboratories outside.

3. To increase production of ‘Sabri

Banana’, Horticultural Research

Complex’ Nagicherra has been

given target to produce 50,000

tissue cultured plantlets.

4. During the year 2012-13, an area

of 1369 ha have additionally been

brought under cultivation with

Banana( T.C=100 ha & Sucker=

1269 ha)

5. During the year 2013-14, an area

of 50 ha will be brought under

High Density Plantation & 650 ha

with normal spacing of Banana.

-85-

iii

Page No. - 105 A separate Biotechnology Lab to be established only for Banana and other fruits tissue culture and also examine the feasibility of obtaining fund from Govt. of India.

1. The Directorate of Horticulture &

Soil Conservation, Tripura is

running a Tissue Culture Lab. at

Horticultural Research Complex,

Nagicherra with the production

capacity of 50,000 plantlets per

annum.

2. A new T.C. Laboratory, has been

set up at HRC, Nagicherra with the

fund of RKVY for production of

about 2.5 lakh plant lets per

annum.

iv Page No. - 105

All Orchards of our State to be brought for rezumination, Department to take plan with improved variety plants of commercial value and examine SSG and any grower’s society may be involved.

1. Action has already been taken to

develop 33 Govt. Orchards with

the following activities under the

fund of RKVY(Rs.330.95 Lakh):

* Replanting of mother block : 374.71 ha * Development of nursery area : 22.91 ha * Excavation of WHR : 32 Nos. * Development of irrigation

facilities : 30.50 ha

* Installation of mini deep / shallow tube well : 24 Nos. * Poly shed / green house : 30 Nos. * Potting shed : 15 Nos. * Labour shed : 5 Nos. * Over head Tank : 5 Nos.

2. Consultations are underway for

involving suitable SHGs/Growers’

Societies in the production

programme of the orchards.

-86-

v Page No. - 105

Special emphasize to

be given to bring under

more land of Forest

Dweller’s Right Act by

horticulture production.

1. To create additional source of

income for the patta holders in

FRA areas- during 2012-13, 4477

ha area has been brought under

cultivation with Horti Plantation

which have benefitted 12012

families.

2. During 2013-14, 2300 ha area has

been targeted to cover with

different horticultural crops in

FoRA areas under State plan &

MGNREGA with identified 13

perennial & semi perennial

horticultural crops viz Mango,

Litchi, Guava, Mosambi, Orange,

Lime/ Lemon, Jackfruit, Coconut,

Arecanut, Cashewnut, Banana,

Papaya, & Pineapple.

MAJOR PHYSICAL ACHIEVEMENT UNDER STATE PLAN/CSS/ NON PLAN

PROGRAMME DURING 2012-13.

To boost up the Horticultural & Soil Conservation activities, a sum of Rs. 3264.20 lakh has been earmarked in the Revised Estimate(R.E) for 2012-13 under State Plan /Non Plan /CSS

State Plan : Rs.1008.98 Lakh

Non Plan : Rs.1855.22Lakh

CSS (NWDPRA) : Rs. 400.00 Lakh

1. Direction & Administration (Plan) : An amount of Rs. 211.08 lakh was kept for Salary

(Rs. 148.58 Lakh ) & non Salary etc.( Rs. 62.50 Lakh) under the Scheme for Direction &

Achievement made during the year 2012 - 13

-87-

Administration under 2401 & 2402 Head of Account. Out of which Rs 143.211 lakh

expenditure was booked under salary and Rs 56.06 Lakh spent under Non- salary .

2. Horti Research Activities : An amount of Rs. 32.847 lakh was spent out of total provision of Rs 33.00 Lakh for conducting 40 nos. trials / experiments on fruits, plantation crops, spices & vegetables , production of TPS-230 Kg, production of foundation seeds of vegetable- 2 Ha, besides conducting crop specific training to nos. field functionaries etc.(166 Nos).

3. Production of elite planting material and Development of progeny Orchards: An amount of Rs. 90.55 lakh was earmarked to produce 16.04 lakh quality planting materials in the Departmental orchards, maintenance of functioning 49 Nos departmental Orchards &farm . An expenditure of Rs 89.231 lakh made during the year .

4. Horti Development Activities : An amount of Rs 278.102 lakh was utilized out of Rs.

279.95 lakh earmarked for the following major activities:

� Assistance for cultivation of vegetable including in the land of FRA area : 1032 ha

area were brought under cultivation of different summer vegetable under state

plan.

� Assistance for cultivation of spices including in the land of FRA area : 126.2 ha area

were brought under cultivation of different summer vegetable under state plan

� Distribution of Seed Mini kits: 5565 Nos Mini kits of improved / Hybrid summer vegetables comprising of summer Cauliflower, Bhindi and summer Radish were distributed among the progressive vegetables growers in the state which covered 556.5 ha area.

� Cultivation of watermelon: Assistance was provided to 620 progressive Water melon cultivators which covered 62 ha.

� Assistance for cultivation of TPS tuber let and production of potato : Assistance was provided to the growers for production of TPS Tuber let in an area of 92.68 ha and production of potato through TPS tuberlet /certified seed potato in 279 ha area.

� Crop cutting experiment: Crop cutting experiment was conducted in 1174 nos. farmers field of Pine apple, Cabbage& Cauliflower .

5. Soil and water management : An expenditure of Rs 18.95 lakh was made out of fund

released amount of Rs.21.50 lakh and achievement made for removal of sand /

desiltation of affected cultivated land(92 ha) construction of check dam (48 Nos)and

re-excavation of peripheral channel(46 Nos).

6. NWDPRA( Centrally Sponsored Schemes, Macro-management ) :- An amount of Rs. 400.00 lakh was utilized for the activities like training, soil conservation measures, dry land horticulture, afforestation, agro forestry ,Water Harvesting Structure, farm ponds, clerance of drainage channel , livelihood support and production system & micro enterprise etc. in 79 nos. of NWDPRA Projects during 2012-13.

7. Non-Plan Activities: An amount of Rs. 1855.22 was earmarked for different component of non plan viz. salary, non salary, repairing and maintenance,

-88-

beautification of new secretariat, assembly , procurement of coconut seedling etc under 2401 & 2402 during 2012-13 and utilized Rs 1761.047 as per release of fund.

8. Outside budget i. Horticulture Mission for NE& Himalayan Region ( HMNEH):

Rs 4480.00 lakh was received during the year 2012-13 for different activities like

setting of Private & public sector nurseries-11 Nos ,area expansion under Fruits-2487

ha. , vegetable-4425 ha, flower-247 ha & spices-600 ha, Rejuvenation of old orchards-

500 ha, creation of water source-230 Nos ,promotion of INM/IPM-460 ha, Vermi

compost unit-340 Nos, , Human Resource development-5425 Nos etc.

ii. Integrated Watershed Management Programme :

An amount of Rs.2401.79 Lakh was released by GOI for different activities like- institutional arrangement & capacity building , watershed development works, livelihood activities for asset less persons, entry point activities etc. 109 nos. entry point activities, 129 ha. Watershed Dev. works , 456 nos. livelihood activities, 379nos. Production systems & microenterprise & 389 nos. institutional arrangements and capacity building were achieved during the year.

STATEMENT SHOWING THE MAJOR HEAD OF ACCOUNT/DEMAND WISE

ACHIEVEMENT DURING THE YEAR 2012-2013.

(Rs. in Lakh)

SL No. Name of the Schemes

RE 2012-

13

Release 2012-13

Expenditure during 2012-13

D- 19 D- 20 D-28 Total

1 2 3 4 5 6 7 8 1) Divisible Pool.

A 2401 – Horticulture.

i. Direction & Adm.(

Salary) 128.580 135.793 0.00 19.396 116.397 135.793

ii Direction &

Adm.(Non- Salary) 52.00 52.00 14.034 7.713 25.594 47.341

iii. Horti. Research atNagicherra

33.00 33.00 10.23 5.607 17.01 32.847

iv

Production of planting mat, & Dev. of

Progeny Orchard 90.55 90.55 28.077 15.40 45.754 89.231

v. Dev. of Horti. in

Tripura 279.95 279.95 85.143 47.399 145.56 278.102

Sub-Total of A (2401) 584.08 591.293 137.484 95.515 350.315 583.314

B 2402 – Soil

Conservation.

i. Direction & Adm.(

salary) 20.00 7.418 0.00 0.00 7.418 7.418

ii Direction & Adm.(

Non-salary) 10.50 10.50 2.498 1.641 4.58 8.719

-89-

ACHIEVEMENT ON C.S.S. (MACRO MANAGEMENT) DURING THE YEAR 2011-2012.

(Rs. in Lakh)

iii. Soil & Water Management

inTripura. 21.50 21.50 6.66 3.09 9.20 18.95

Sub-Total of B (2402) 52.00 39.418 9.158 4.731 21.198 35.087 Total of 2401+ 2402 * 636.08 630.711 146.642 100.246 371.513 618.401

C 5456-PSU(THCL) 76.00 76.00 23.56 12.92 39.52 76.00

D State share & Contribution.

295.90 295.90 95.70 50.32 143.88 289.90

E Major Work 6.00 6.00 0.00 0.00 6.00 6.00

Sub- Total of C,D & E 371.90 371.90 371.90 63.24 189.40 371.90

Total of Divisible Pool. 1007.98 1002.611 265.902 163.486 560.913 990.301

1 2 3 4 5 6 7

82) Non-Divisible Pool

i. W.D.P.S.C.A 1.00

Total of Non-Divisible Pool

1.00

Total of State – Plan. 1008.98 1002.611 265.902 163.486 560.913 990.301 Non-Plan i. 2401 & 2402-(Salary). 1717.04 1629.716 1629.716 1629.716

ii. 2401& 2402 ( Non-

Salary) 80.18 80.18 80.18 80.18

iii Minor Work 43.00 43.00 43.00 43.00

iv Procurement of

Seedling 15.00 15.00 15.00 15.00

Total of Non-Plan. 1855.22 1767.896 1761.047 1761.047 Grand Total=Plan &N-

Plan. 2864.20 2770.507 265.902 163.486 2321.96 2751.348

SL No.

Name of the Scheme

Released

(2012-2013)

Released (2012-2013)

Expenditure during 2012-13

Total. D-19 D-

20 D- 28

1 National Watershed Dev. Project for Rain fed Areas (N.W.D.P.R.A)

400.00 400.00

124.825 68.54 206.44 399.805

Total. 400.00 400.00 124.825 68.54 206.44 399.805

-90-

PROPOSED ACTION PLAN FOR 2013-14.

To boost up the Horticultural & Soil Conservation activities, a sum of Rs. 4827.00 lakh has been earmarked in the budget estimate for 2013-14 under State Plan & Non Plan.

State Plan : Rs. 2725.00Lakh

Non Plan : Rs. 2102.00 Lakh

1. Direction & Administration (Plan) : An amount of Rs.170.00 Lakh has been kept for Salary/Wages (` 175.00 Lakh) and non Salary including electricity (Rs. 73.00 Lakh) under the Scheme for Direction & Administration.

2. Horti Research Activities : An amount of Rs. 50.00 lakh have been earmarked to conduct trails (50 Nos.) on introduction, acclimatization, cultivation , evaluation of different Horti crops & Production of hybrid TPS(250 Kg). Besides, programme like Production of foundation seed of promising vegetables (2Ha), mushroom spawn(Rs. 0.20 Lakh) and crop specific training of field functionaries(400 Nos.) at HRC, Nagicherra are also earmarked.

3. Production of elite planting material and Development of progeny Orchards: An amount of Rs. 150.00lakh has been earmarked to produce 20 lakh quality planting materials in the Departmental orchards and maintenance of 49 Govt Orchards/farms along with local procurement of 40,000 seed coconut from identified mother plants for raining coconut seedlings.

4. Horti Development Activities : An amount of Rs. 1100.00 lakh has been earmarked for the following major activities : � New area expansion of fruits and plantation Crops : 2300 ha area has been

earmarked to bring additionally through different fruits and plantation crops in FRA areas through convergence of fund with MGNREGA .

� High Density Planting of Banana: 50 ha has been targeted for HDP banana during the year.

� Distribution of Coconut Seedlings: 3500 units of coconut seedlings @10 Nos / unit would be distributed in the farmers to raise plantation in the embankment of fishery ponds in the state.

� Assistance for production of Vegetable - Besides, 735.00 ha of land would also be additionally brought under different vegetables in upland and seasonal fellow.

The Plan/ Programme and any project to be implemented during the year 2013 – 14 for consideration of the Committee during examination.

-91-

� Assistance for production of TPS Tuber let & Potato: Assistance would be extended to progressive potato growers to produce TPS tuber let in 100.00 ha area and assistance would be provided to new potato growers to produce potato in 200 ha area through TPS Tuberlet/certified seed potato in non-traditional areas .

� Assistance for production of Root & Tuber Crop (Other than potato): To encourage the farmers provision has kept for assisting farmers to grow 650 ha Root & Tuber Crops in upland & seasonal fallow.

� Assistance for production of spices Crop: Assistance would be provided to progressive growers of 100.00 ha spices crop in upland/FRA areas.

� Intercrop in Upland/FRA areas: To generate intermediate income from the new plantation areas, farmers would be assisted to grow 1000 ha intercrop with different vegetables and spices.

� Staggering production of pineapple: 1000 ha has been earmarked for Staggering production of pineapple.

� Assistance for cultivation of betel vine: Assistance would be provided to progressive growers of betel vine to an area of 50.00 ha.

� Distribution of vegetable seed minikits: To bring more area as well as to increase production of vegetables, 700 seed minikits would be distributed among the progressive cultivators which will cover70 ha area in the state.

� Assistance for cultivation of Water melon: 1000 units of water melon seed

materials would be provided to progressive growers to cover 100 ha area in the state.

� Crop cutting experiments: Crop cutting experiments (1500 nos.) of pine apple, cabbage, cauliflower, brinjal, tomato etc. would be made for proper yield estimation of these crops.

� Organization of Vegetable Show: - Like previous years, to encourage the farmers in growing quality vegetables in the state, 22 nos. Sub division level Vegetable Show is proposed to be organized during the year.

� Beautification / maintenance activities: Development & maintenance of Rabindra Kanan, VIP Bungalows, New Capital Complex and New assembly garden etc. activities are earmarked.

5. Soil Conservation activities: An amount of Rs. 50.00 lakh is kept for development of

degraded land-137 Ha, Execution of gully control / check dam etc-135Nos &

excavation/re-excavation of peripheral channel -170 Ha.

6. WDPSCA: A budget provision has been kept for Rs 600.00 lakh under WDPSCA with the balance fund proposed to be released for 33 nos. of watershed projects under WDPSCA of Non-Divisible pool . The activities include training, soil &moisture conservation measures, agronomic conservation practices, soil conservation structure, water bodies, dry land horticulture, afforestation, agro forestry, sand removal, clearance of drainage channel, livelihood support and production system & micro enterprise etc.

-92-

7. Non-Plan Activities: An amount of Rs. 2102.00 Lakh is earmarked for different component of non plan viz. salary, non salary, minor work ,subsidy, others etc under 2401 & 2402 during 2013-14.

8. Outside Budget: i. Horticulture Mission for NE& Himalayan Region ( HMNEH):

Rs 4900.00 Lakh has been proposed during the year 2013-14 for different activities like

setting of Private & public sector nurseries-20 Nos ,area expansion under Fruit Crops-

4105 ha, vegetable including TPS -5050 ha, flower-225 ha & spices-365ha, Rejuvenation

of old orchards-575 ha, creation of water source -163 Nos ,promotion of INM/IPM-1341

ha, Vermi compost unit-682 unit, Horticulture Mechanization-100 Nos, Human Resource

development-8850 Nos., seminar etc.

ii. Integrated Watershed Management Programme :

An amount of Rs4891.00 Lakh has been proposed to GOI for different activities like, institutional arrangement & capacity building , watershed development works, livelihood activities for asset less persons, entry point activities etc. 192 nos. entry point activities, 1214 ha. Watershed Dev. works , 1316 nos. livelihood activities, 825nos. Production systems & microenterprise & 815 nos. institutional arrangements and capacity building etc activities have been kept during the year.

FINANCIAL PROGRAMME-2013-14 BUDGET ESTIMATE FOR 2013-14 OF STATE PLAN/ NON PLAN/CSS

(Rs. in lakh)

SL No. Name of the Schemes

RE 2012-2013

BE for 2013 – 14

D- 19 D- 20 D-28 Total

1) DIVISBLE POOL A 2401 –Crop Husbandry( Horticulture).

i. Direction & Adm.(Salary &wages) 128.580 49.60 27.20 83.20 160.00

ii Direction & Adm.( Non-salary) 52.00 28.10 6.70 20.20 55.00 iii. Horti. Research at Nagicherra 33.00 15.52 8.56 25.92 50.00

iv. Production of planting materials & production of planting materials

90.55 67.20 20.40 62.40 150.00

v. Dev. of Horti. in Tripura 279.95 382.37 176.89

540.74

1100.00

Sub-Total of A (2401) 584.08 542.79 239.75

732.46 1515.00

B 2402 – Soil Conservation.

-93-

Non-Plan-2013-14 ( Rs. In Lakh )

i. Direction & Adm.( Salary &wages)

20.00 3.10 1.70 5.20 10.00

ii Direction & Adm.( Non-Salary) 10.50 9.03 2.21 6.76 18.00

iii. Soil & Water Management inTripura.

21.50 22.40 6.80 20.80 50.00

Sub-Total of B (2402) 52.00 34.53 10.71 32.76 78.00 Total of 2401&2402 636.08 577.32 250.46 765.22 1593.00 C 5465- PSU THCL 76.00 29.00 16.00 47.00 92.00 D 32-State share / Contribution. 295.90 134.54 73.78 225.68 434.00

E 53-Major Work 6.00 1.86 1.02 3.12 6.00 Total of Divisible Pool. 1007.98 742.72 341.26 1041.0

2 2125.00

NON_DIVISIBLE POOL G Shifting Cultivation(WDPSCA) 1.00 600.00 000.00 0.00 600.00

Total of State Plan 1008.98

1342.72 341.26

1041.02 2725.00

SL No. Name of the Schemes

RE 2012-2013

BE-13-14 Remarks

D- 19 D- 20 D-28 Total

3) NON-PLAN i. 2401&2402, Dir. &

Adm.(Salary &wages). 1717.04

1975.00 1975.00

ii 2401&2402-, Dir. & Adm.(Non Salary).

80.18 17.00 17.00

iii Minor Work 43.00 10.00 10.00 iv Procurement of seedling 15.00 0.00 0.00 v. Subsidy 0.00 100.00 100.00 Total of Non-Plan. 1855.22 2102.00 2102.00 Grand Total=Plan &Non-Plan. 2864.20 1342.72 341.26 3143.02 4827.00

-94-

TOTAL ACHIEVEMENT UNDER HORTICULTURE (including all sources)

Achievement during 2012 -13 Action plan for 2013 -14 (projected) A. Plantations created

A. Plantation to be created State Plan with MGNREGA

-

2300 ha

RKVY - 50 ha Tech. Mission - 2487 ha Tech. Mission - 4105 ha MGNREGA - 3969 ha State Plan - 250 ha Total - 6456 ha Total - 6705 ha

B. Rejuvenation / Maintenance B. Rejuvenation / Maintenance

Tech. Mission - 500 ha Tech. Mission - 575 ha Total - 500 ha Total - 575 ha

C. Planting materials produced C. Planting materials to be produced Total prodn. -

16.042

D. Area Expansion of vegetables D. Area Expansion of vegetables

Total - 5875.5 Toal - 5935ha

E. Root& Tuber including Potato-

1513Ha

E. Root &tuber crop including Potato1670Ha

F. Assistance for Spices F. Assistance Spices

Total - 726.20 ha Total - 815 ha

-95-

G. Research activities

G. Research activities

Adaptive trials - 40 Nos Adaptive trials - 50 Nos Prodn. of TPS - 230 Kg Prodn. Of TPS - 250 Kg Prodn. of foundation seeds

- 2Ha

Prodn. of foundation seeds

- 2 Ha Crops specific training for staff - 166 Nos

Crops specific training for staff - 400 Nos

H. Others

H. Others

Estb. of Horti. Nursery - 11 Nos Estb. of Horti. Nursery - 20 Nos

New area under flower - 247 ha New area under flower - 225 ha

Community tank - 230 Nos Community tank - 163 Nos Vermi Compost unit - 340 Nos Vermi Compost unit - 682 Nos

Hort. Equipments - 100 Nos Training of farmers - 5425 Nos Training of farmers - 8850 Nos

-96-

After careful examination of the Budget proposal and appreciation of

submission placed by the Additional Chief Secretary of the Department, the

Committee make the following recommendations :-

RECOMMENDATIONS

i) The Department to further encourage commercial p roduction of Musambi, Banana and specially Orange and variety of Mango for that new plantations are to be increased.

ii) Production of “ Sabri ” banana with modern tec hnology are to be encouraged.

iii) Specific Bio-Technology Lab is required in Tri pura. The Department to consider setting-up of such Lab.

iv) The Department to continue its performance wide ly for rezuvenation with improved variety plants involving SSG and Growers’ society.

v) Horticulture production be activated more under land of Forest Dwellers’ Right Act, 2005.

vi) The Department to ensure timely supply of seed to the farmers according to their actual need.

After examination of the Budget proposals and appreciation of submission

of the Representative of the Committee recommends the Budget proposals

under Demand No. 28 for grants by the House alongwith the Recommendations.

( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly

-97-

THE REPORT ON THE DEMAND NO.12

OF THE CO-OPERATION DEPARTMENT FOR THE FINANCIAL YEAR 2013-2014.

The Budget proposal under the Demand No.12 relates to the

Co-operation Department, Government of Tripura for the Financial Year

2013-2014 and the Revised Budget for the Financial year 2012-2013 are

as follows :-

(Rs.in lakhs) PARTICULARS

REVISED

ESTIMATES 2012 - 2013

BUDGET ESTIMATES FOR 2013 - 2014 DEMAND FUND FOR

TOTAL

T.S.P S.C.P 1) Non Plan 1080.43 1181.77 --- --- 1181.77 2) Plan 893.38 409.19 246.81 135.00 791.00 3) C.S.S --- --- --- --- --- 4) NEC --- --- --- --- ---

Total 1973.81 1590.96 246.81 135.00 1972.77

Now, the aforesaid Budget proposal is under examination of the

Subject Committee-I of the Tripura Legislative Assembly for recommendation to

the Demands for Grants.

The Committee in its meeting held on 7th May, 2013 examined the

Budget proposals in details having discussion with the Secretary of the

Department who appeared before the Committee summon.

First of all, the Secretary informed the Committee about the action

taken in respect of the recommendations made by the Committee during the year

2012-2013 and stated as follows :-

-98-

Sl.No

. Recommendations of the subject

Committee-I Action Taken Report on the

Recommendations 1.

2.

3.

4.

5.

Department to make the persons concerned to enlighten awareness amongst Board Members & Officials in view of Baidyanathan Package. To make increase of the programme of funding should be twice than the earlier For better profit the Department to approach and prepare DPR for entire Department and to approach Central Govt. Finance Department to ensure release of fund of Rs.10 lakhs for Computerization. Cooperative Bank or the Finance Deptt. may find out ways to provide soft loan towards societies for consumer goods marketing. Department to formulate specific target to increase PACS atleast upto 50 nos. and also to revive the position of LAMPS to make it profitable. Finance Department to release fund in phased manner for completion of work of DRCS Office at Kailashahar.

Training has been provided to the staff of all the 268 LAMPS/PACS for maintenance of books and accounts as per the Common Accounting System. Training to the six Master trainers on ‘Business Development Plan”’ has been provided from BIRD, Lucknow, These Master Trainers provide training to the staff of LAMPS/PACS to prepare ‘Business Development Plan’. Further, refresher programs are conducted from time to time to enlighten the staff as well the BOD’s of LAMPS/PACS. Proposal has been formulated for Computerization of the department for incorporation in the Project proposal under 14th Finance Commission. Cooperative Bank provides soft loan to societies for consumer activities For augmentation of business activities of LAMPS/PACS, the Department provides training on ‘Business Development Plan’. Moreover, Grants-in-aid are provided to LAMPS/PACS from the Department to ease the burden on these societies incurred against administrative expenses. Finance Department has released an amount of Rs. 20.00 lakhs during 2012-2013 for construction of office building of DRCS, Kailashahar, An amount of Rs. 20.00 lakhs is provisioned in the BE – 2013-2014 for the aforesaid purpose. So far, an amount of Rs.

-99-

6.

7.

8.

Fertilizer since playing a vital role in production agriculture, horticulture & plantation activity like rubber & tea ,the Department to take appropriate steps in this regard and MARKFED to strengthen activity in Fertilizer business. The services of Fixed pay/ Casual/ Contingent/ DRW employees who have completed the period of 10(ten) years of service under the MARKFED and other organization of the Cooperation Department should be initiate for regularization as per standing decision of the State Govt. as is followed in the case of State Govt. employees. For this purpose the State Govt. decision should be adopted by the MARKFED and other society. Department to tale suitable steps that the position of Aitorma revives and made an action plan to complete the work as early as possible.

35.64 lakhs has been placed to the Implementing Agency against the administrative approval of Rs. 66.88 lakhs Construction has been completed upto ground floor. T MARKFED deals in fertilizer business such as urea, SSP, RP. MOP and distributes throughout the State. But due to paucity of fund ,T MARKFED is not in a position to invest any significant part on Fertilizer business. T MARKFED has already regularized the services of 11 Fixed employees and 10 DRWs totaling 21 in no. For revival of TSCCF Ltd. an MOU has been signed with SHRISTI INFRASTRUCTURE based on the PPP model. The work of construction of 4th & 5th floor of the multi-storied Complex in the premises of Aitorma in the sakuntala Road is under way.

-100-

A PROFILE ON ACHIEVEMENT FOR THE YEAR 2012A PROFILE ON ACHIEVEMENT FOR THE YEAR 2012A PROFILE ON ACHIEVEMENT FOR THE YEAR 2012A PROFILE ON ACHIEVEMENT FOR THE YEAR 2012----2013 OF THE 2013 OF THE 2013 OF THE 2013 OF THE

DEPARTMENT OF COOPERATION UNDER STATE PLAN:DEPARTMENT OF COOPERATION UNDER STATE PLAN:DEPARTMENT OF COOPERATION UNDER STATE PLAN:DEPARTMENT OF COOPERATION UNDER STATE PLAN:

. (Rs. in Lakhs)

Sl.No Name of the Scheme Outlay 1. Credit Cooperatives 74.50 2. Consumer Cooperatives 178.15 3. Marketing Cooperatives 95.00 4. Direction & Administration 65.34 5. Education, Research & Training 25.00 6. Other Cooperatives 99.00 7. Construction 20.00 8. Implementation of Integrated

Coop. Development Project in South Tripura District.

338.00

Total :- 894.99 N.B. (An amount of Rs. 39.88 lakhs was envisaged in the RE 2012-2013 as salary (State Plan) and an expenditure of Rs. 43.36 lakhs was incurred resulting in an increase of Rs. 3.48 lakhs against the RE 2012-2013 provision) .Besides, an amount of Rs. 0.02 lakhs was saved against the Direction & Administration ( State Plan).

CREDIT SECTOR :CREDIT SECTOR :CREDIT SECTOR :CREDIT SECTOR :

The credit cooperatives consists of LAMPS/PACS/TSCB/ACUB /TCARDB Ltd providing institutional credit advance mainly in the form of agri and non-agri loan to its members. The agricultural inputs are also supplied by the credit cooperatives throughout the State. Further, the Banks namely TSCB Ltd, TCARDB Ltd & ACUB Ltd have been functioning as financing agencies for grass root Cooperative Societies in the State primarily in terms of lending Short & Long term loans.

During the Annual Plan 2012-13, an amount of Rs.74.50 lacs has been received from Finance Department for credit cooperatives out of which Rs 14.50 lakhs has been sanctioned for Share capital to ACUB/TCARDB Ltd. The stated amount has been incurred in full.

EDUCATION TRAINING AND RESERCHEDUCATION TRAINING AND RESERCHEDUCATION TRAINING AND RESERCHEDUCATION TRAINING AND RESERCH

Training and awareness programme form a vital element for development of

human resources and can hardly be ignored. Tripura State Cooperative Union undertakes the responsibility of imparting cooperative education and training (CCMT) to the general members, elected representatives and employee of various Cooperatives as well as Govt officials so that they can contribute effectively to the development of Cooperatives. The Union also conducts exhibition, propaganda, seminar, workshop & Cooperative Week with financial assistance from State Govt. & from National Cooperative Union of India (NCUI), New Delhi.

During the Annual Plan 2012-13, an amount of Rs.25.00 lacs has been awarded to TSCU as grant and was incurred in full.

-101-

MARKETING SECTOR :MARKETING SECTOR :MARKETING SECTOR :MARKETING SECTOR :

Marketing societies procure jute, Mesta, potato and minor forest products from

the members. Being an Apex level society T-MARKFED is functioning as a lead society for procurement of Jute, Mesta, Potato and minor forest produce at the village level through PACS/LAMPS.

In order to strengthen the business activities of marketing societies an amount of Rs 95.00 lakhs has been awarded to TMARKFED and 14 nos PMCS. During the year 2012-13 an amount of Rs 19.50 lakhs has been incurred towards Repairing of godown to LAMPS/PACS/PMCS .

CONSUMER SECTOR :CONSUMER SECTOR :CONSUMER SECTOR :CONSUMER SECTOR :

The Tripura State Coop. Cons. Federation Ltd (TSCCF) has been functioning as

an Apex Level Society in the Consumer Sector. The TSCCF deals in Consumer articles, distribution of LPG, supply of medicines at whole sale and retail rates and stationery article in different Govt, offices. During the financial year 2012-13, an amount of Rs.178.15 lacs has been provided in the form of Share Capital to TSCCF and Primary consumer Cooperative Societies. The amount placed under consumer sector was incurred in full.

OTOTOTOTHER COOPERATIVESHER COOPERATIVESHER COOPERATIVESHER COOPERATIVES

Other Cooperatives include Rickshaw Puller Cooperative Societies, Labour

Cooperatives, Press Cooperatives, Housing Cooperatives, and Cobbler Cooperatives etc. who are financially supported by the Department for economic amelioration of their members. An amount of Rs.99.00 lacs has been incurred as Share capital to other cooperative for the year 2012-2013 against the stated amount of Rs. 99.00 lakhs..

DIRECTION & ADMINISTRATIONDIRECTION & ADMINISTRATIONDIRECTION & ADMINISTRATIONDIRECTION & ADMINISTRATION

Under the Direction & administration schemes total an amount of Rs.65.34 lakhs

has been incurred towards expenditures involving travel expenses, electricity charges, rent & cost of fuel etc. An excess amount of Rs. 3.48 lakhs was incurred against salary and savings of Rs. 0.02 lakhs occurred against the scheme Direction & administration

PLAN/PROGRAMME /PROJECT TO BE IMPLEMENTED DURING THE YEAR PLAN/PROGRAMME /PROJECT TO BE IMPLEMENTED DURING THE YEAR PLAN/PROGRAMME /PROJECT TO BE IMPLEMENTED DURING THE YEAR PLAN/PROGRAMME /PROJECT TO BE IMPLEMENTED DURING THE YEAR

2013201320132013----2014201420142014

IMPLEMENTATION OF ICD PROJECT IN SOUTH TRIPURA DIST RICT .

The ICD Project in South Tripura district envisage a total outlay of Rs.1480.24 lacs which includes subsidy of Rs.420.23 lacs & loan of Rs.1060.01 lacs to be fully reimbursable from NCDC. The Scheme is aimed at socio-economic upliftment of small and marginal farmers and other weaker sections of the society by adopting an integrated approach. For implementation of Integrated Coop. Dev. Project in South Tripura District , an amount of Rs.338.00 lakhs has been incurred during the year 2012-13 and the entire amount is placed to TSCB Ltd as Project Implementing Agency(PIA). In the Budget Estimate 2013-14 an amount of Rs.158.00 lakhs has been provisioned.

-102-

ANNUAL PLAN OF THE DEPARTMENT OF COOPERATION FOR THE YEAR ANNUAL PLAN OF THE DEPARTMENT OF COOPERATION FOR THE YEAR ANNUAL PLAN OF THE DEPARTMENT OF COOPERATION FOR THE YEAR ANNUAL PLAN OF THE DEPARTMENT OF COOPERATION FOR THE YEAR 2013201320132013----2014 UNDER STATE PLAN2014 UNDER STATE PLAN2014 UNDER STATE PLAN2014 UNDER STATE PLAN

The Department of Co-operation is implementing various scheme like

Direction & Administration, Grant-in-aid to PACS, Grant-in-aid to LAMPS,

Transfer fund to TTAADC, Grant-in-aid to TSCU, Share capital assistance to

TSCCF / Primary consumers, Share capital to TCARDB, Share capital to ACUB,

Share capital to Tripura MARKFED, Share capital to PMCS, Share capital to

other co-operatives, ICD project in South Tripura and Construction ( Major &

Minor works ) etc. In the Budget 2013-14 an amount of Rs.791 lakhs has been

provisioned which is reproduced below in terms of sectoral outlay:-

( Rs. in lakhs) Sl.No. Name of the Scheme Outlay

1. Credit Co-operatives 142.50

2. Consumer Co-operatives 180.00

3. Marketing Co-operatives 97.90 4. Direction & Administration 72.60

5. Education, Research & Training 30.00 6. Other Co-operatives 80.00 7. Implementation of Interacted Coop.

Development Project in South Tripura 158.00

8. Construction(Major & Minor works) 30.00 Total:- 791.00

The Credit Cooperatives such as LAMPS/PACS/TSCB/TCARDB /ACUB

Ltd. provide opportunities for becoming self-reliant and thus help in getting

gainful employment. The institutional credit advanced by the credit societies

mainly in the form of agri and non-agri loan to its members. During the year

2013-14 an amount of Rs. 142.50 lakhs has been provisioned as Grant-in-aid to

Credit Cooperatives. As Share capital assistance to TCARDB & ACUB Ltd. an

amount of Rs. 14.50 lacs has been provisioned.

Under Consumer Sector, Share capital to TSCCF Ltd. /Primary

Consumers has been earmarked for an amount of Rs. 180.00 lakhs during the

year 2013-14. Consumer Cooperatives deal in consumer goods, distribution of

-103-

LPG, S.K.Oil, medicines and other items at a reasonable rate. Advance of share

capital to consumer cooperatives act as a fillip to the furtherance of its business

activities.

Marketing Societies procure Jute, Mesta, Potato and Minor Forest

Produce for distribution. Besides, it also uses the services of Cold Storage for

getting better remuneration. An amount of Rs. 97.90 lacs has been envisaged as

share capital to marketing societies which includes share capital to T MARKFED

& 14 PMCS in the State. This also includes repairing of godowns. During the

year 2013-14 an amount of Rs.22.40 lacs has been envisaged as Repairing of

godown to PACS/LAMPS/PMCS.

For meeting the Salary and other administrative expenses of the

Department such as cost of fuel, T.A., D.A. etc. an amount of Rs. 72.60 lacs has

been provisioned in the budget estimate for the year 2013-2014.

Training and awareness programme form a vital element for development

of human resources and can hardly be ignored. Tripura State Cooperative Union

undertakes the responsibility of imparting cooperative education and training

(CCMT). During the year 2013-14, an amount of Rs. 30.00 lakhs has provisioned

as grant in aid to Tripura State Cooperative Union for the above stated purpose.

Other Cooperatives such as rickshaw pullers Cooperative, Cobbler

Cooperatives, Labour Cooperatives, Women Cooperatives, and Multi-purpose

Cooperatives suffer due to lack of funds. This financial constraint act as a

deterrent to furtherance of their business activities. In realization of the above, an

amount of Rs. 80.00 lakhs has been provisioned in the budget estimate for the

year 2013-14.

This apart, special attention has been given to provide financial assistance

to Women Cooperatives in the State under the scheme share capital to other

cooperatives / primary consumer cooperatives.

-104-

After careful examination of the Budget proposal and appreciation of

submission placed by the Secretary of the Department, the Committee make the

following recommendations:-

RECOMMENDATIONS

i) Endeavour of coputerisation should be continued as per last year recommendation. ii) Soft Loans to the uncovered societies be contin ued.

iii) PACS’ and LAMPS’ position to be developed to m ake it more

profitable.

iv) The Department to more strengthen activity in f ertiliser business.

v) The Department to organize awareness/training pr ogramme with the Manager, Board of Directors, Managing Director, Pre sident and Secretary of the Registered Co-operative Societies. The Department to consider increase to the salary of Manager as we ll as increase in the share-capital.

After examination of the Budget proposal and appreciation of

submission of the Representative of the Committee recommends the

Budget Proposals under Demand No. 12 for Grants by the House

alongwith the recommendations.

( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly

-105-

THE REPORT ON THE DEMAND NOS. 16 AND 52 OF THE HEALTH & FAMILY WELFARE DEPARTMENT

FOR THE FINANCIAL YEAR 2013-2014. The Budget Proposal under Demand Nos.16 and 52 relating to the Health

& Family Welfare Department, Government of Tripura for the Financial Year

2013-2014 and the Revised Budget for the Financial Year 2012-2013 are as

follows:-

Demand No. 16

( Rs. in Lakh )

Particulars

Revised Estimates 2012-2013

Budget Estimates for 2013 -2014 Demand

Fund for Total

T.S.P S.C.P

a) Non-Plan 8869.27 11548.57 --- --- 11548.57 b) Plan 16956.01 5135.42 3441.60 2485.98 11063.00

c) C.S.S. 1315.22 2.00 --- --- 2.00 d) N.E.C. 2140.48 369.20 --- --- 369.20 Total : - 29280.98 17055.19 3441.60 2485.98 22982.77

Demand No. 52

( Rs. in Lakh ) Particulars

Revised Estimates 2012-2013

Budget Estimates for 2013 -2014 Demand

Fund for Total T.S.P S.C.P

a) Non-Plan 14716.48 16842.00 --- --- 16842.00 b) Plan 10804.53 4588.41 2931.86 1605.13 9125.40

c) C.S.S. 2254.00 1336.51 727.66 435.83 2500.00 Total : - 27775.01 22766.92 3659.52 2040.96 28467.40

Now, the aforesaid Budget Proposal is under examination of the Subject

Committee-I of the Tripura Legislative Assembly for recommendations to the

Demands for Grants.

-106-

The Committee in its meeting held on 8th May, 2013 examined the Budget

proposals in details having discussion with the Additional Chief Secretary of the

Department who appeared before the Committee on summon.

First of all, the Additional Chief Secretary informed the Committee about

the action taken in respect of the recommendations made by the Committee

during the year 2012-2013 and stated as follows :-

Sl. No

Relevant Para No/

Page No. of the Report.

Recommendation of the Committee

Reply of the Govt. on the recommendations.

1 2 3 4

1 Para-i of Page-54

1. Installation of MRI machine at Dr. B. R. Ambedkar Hospital has to be finalized without any further delay.

1. For installation of whole body imaging including Diffusion, Perfusion, Tensor, Angiography etc; a specification for 1.5 Tesla MRI systems was finalized obtaining view of Expert from PGI Chandigarh. Sealed Expression of Interest was invited on 28-03-2012 by giving press advertisement in the All India Press for establishment of the said specified MRI system in TMC & Dr. BRAM Teaching Hospital under PPP Model. But no response received as yet from any party/ organization. No further progress in this issue.

2 Para-ii of Page-54

2. Health Department is to open a Cardiac wing and Nephrology unit in the Dr. BR Ambedkar Hospital so that heart disease and nephro patients may be promptly attended and Spine Surgery unit at Dr. BR Ambedkar Hospital to be upgraded without any more delay.

2. The proposals received from different agencies of the outside States to open a Cardiac Wing and Nephrology Unit are now still under consideration of the higher authority. For separate Spine Surgical Unit, at present adequate space is not available. It may be considered on completion of the New Building under construction. Construction of new hospital building is now in good progress.

3 Para-iii of Page-54

3. Health Department is to take up with the

3. GBP Hospital & AGMC- 1(one) Deep Tube-well having capacity of

-107-

DWS (PWD) to ensure safe water to GBP, IGM and BRM Hospital along with a mechanism of damage of tank and wastage of water meant for the said Hospital.

20,00 Gallon per hour along with iron Removal Plan is installed one in GBP Hospital and other under AGMC at a total cost of 32.44 lakh. Work has been completed and the entire amount is placed to PWD (DWS). Supply safe drinking water is now improved considerably. In Tripura Medical College (TMC) an amount of Rs.118.57 lakh has been placed to DWS for providing safe drinking water. The sinking of deep tube well is completed. Commissioning & installation of Iron Removal Plant is in progress.

IGM Hospital: Construction of 3(three) Nos. of RCC filters have been completed in IGM Hospital and tested but not yet handed-over.

4 Para-iv of Page-56

4. Finance Department to consider allocation of additional fund especially for AMC of all sorts of machines of the Hospital. Finance Department also to provide additional fund towards minor repairing and purchase of new machine, if necessary, in phased manner.

4. Budgetary provision as per requirement especially for AMC of all sorts of machines of the Hospitals has been made.

5 Para-v of Page-54

5. Blood Bank for all old Sub-Divisions where not existing at present in the financial year 2012-13 have to be established.

5. (1) The following Sub-Divisional Hospitals are having Blood Bank. (i) Dharmanagar SD Hospital, (ii) BSM Hospital, Kamalpur 5(2) And the following SD Hospitals are having Blood Storage Centre: (i) Melaghar SD Hospital, (ii) Khowai SD Hospital, (iii) Sabroom SD Hospital, (iv) Belonia SD Hospital, (v)Amarpur SD Hospital, (vi)Kanchanpur SD Hospital & (vii)Gandachara SD Hospital. 5(3) The following Hospitals are not having Blood Bank/ Blood Storage Centre:

(i) Bishalghar SD Hospital. Equipments & nstruments

for establishment of Blood Storage

-108-

Centre have been completed. Manpower training also has been completed. Formal permission for starting the Blood Storage Centre will be issued very shortly. (ii) LTV SD Hospital- civil construction for the Blood Storage Centre is in good progress. Manpower training has been completed. Procurement of machinery equipments is in progress.

6 Para-vi of

Page-55 6. The Department to arrange preferably a Doctor in all Sub-Centre to visit and treat patients there once in a month on a specific date and time at the earliest.

6. Sub-Centre, the most pepheral and first contact point between the primary health care system and the community is required to be manned by at least one Auxiliary Nurse, Mid-wife (ANM)/ Female Health Worker and one Male Health Worker as per recommended staffing structure under Indian Public Health Standards (IPHS). Now there are 828 functional Sub-Centre, 182 are under construction. There is no provision for providing medical officer for Sub-Centre. Patients are treated by medical officers at Health Camps held in jurisdiction of different sub-Centre.

7 Para-vii of Page-55

7. The Department to take steps to improve supervision of duty and behaviour of medical staff to the patients and cleanliness in the Hospitals of AGMC, IGM and TMC and other Hospitals.

7. All concerned Heads of Office are requested to implement the recommendation and they are taking up necessary action. Regular monitoring is done on the behaviour of Hospital Staff. For improvement of cleanliness in GBP, AGMC, & IGM Hospitals the work has been outsourced. Since then the cleanliness of these Hospitals found to be be improved considerably. The works of the outsourcers are strictly monitored. Newly commissioned three District Hospitals namely Unakoti, Gomati & Dhalai District Hospitals have been outsourced for sweeping & cleaning. It has also been decided in the Department to outsource the sweeping & cleaning of all Sub-

-109-

Divisional Hospitals. Sweeping & cleaning activities

of TMC & Dr. BRAM Teaching Hospital are already outsourced and status is satisfactory.

8 Para-viii of Page-55

8.Disaster management Unit be extended to District and Sub-Division level

8. (i) Disaster Management/ Crisis Management Team exist in all the Districts & Sub-Divisions. (ii) QRT also exists in all the Districts & Sub-Divisions. (iii) CMO is the District Nodal Officer and SDMO is the Sub-Divisional Nodal Officer for Disaster Management. (iv) The Department has trained 40 nos. of Master Trainers on Disaster Management & now they are imparting training on Disaster Management in the respective Districts/ Sub-Divisions.

9 Para-ix of Page-55

9. The Department is to examine the possibility to appoint a Doctor for Asharambari Health Centre as a special case.

9. There is no provision of posting of Doctor in Sub-Centre. At present the Department is not in a position to post Doctors in all functioning 83 PHCs. At this stage appointment of a Doctor in Asharambari Health Sub-Centre may not be possible.

10 Para-x of Page-55

10. The earlier recommendation to set up Dental, Ayurvedic & Homoeopathic Colleges one each in the State to be pursued.

10. The recommendation for establishment of Dental College in Tripura, Ayurvedic College at Udaipur and Homoeopathic College at Kailashahar under PPP Model: - (i) Dental College in Tripura- NIT was invited. The issue is sent to the Secretary (Health) on 19-04-2013 for decision. (ii) Ayurvedic College at Udaipur- NIT was invited. The issue is sent to the Secretary (Health) on 12-04-2013 for decision. (iii) Homoeopathic College at Kailashahar- NIT was invited. The issue is sent to the Secretary (Health) on 11-04-2013 for decision and a is in process.

-110-

PHYSICAL ACHIEVEMENT DURING 2012-13 (UP TO JANUARY 2013) • Construction and commissioning of new Health Sub-Centre: 123. • Construction and commissioning of new Primary Health Centre: 11. • Up-gradation of PHC to CHC: 06. • Three District Hospitals have been commissioned. • Construction of Quarters for Melaghar, BSM (Kamalpur) and Gandacherra

Sub-divisional Hospitals have been completed. • Construction of Accident and Trauma Centre are nearing completion. • Up-gradation of IGM Hospital (G+6 Block) is nearing completion. • Post Graduate Courses started in 13 Disciplines in Agartala Govt. Medical

College, Agartala. • Constructions of quarters for three District Hospitals are in progress. • Procurement of Machinery & Equipment, Medicine and Furniture etc in

progress. • Establishment of Dental College, Homeopathic Medical College, and

Ayurvedic Medical College under PPP Model are in process. • Up-gradation works for Kanchanpur and Amarpur Sub-divisional Hospitals

are in process.

MAJOR ACTIVITIES PROPOSED DURING 2013-14.

Sl. No.

Proposal Justification

1 Sub-Centre: Completion of construction of 245 Nos of health Sub Centre

State Government has decided to establish one Health Sub-Centre (HSC) in each Gram Panchayet / ADC Village. There are 1038 Gram Panchayet / ADC Village in the State. State Government has also decided not to establish HSC in location where Health facilities like PHC, CHC etc are present. Such number is 30. Thus requirement is 1008. Present status is 828.

2 Primary Health Centre: (a) Construction of 3 new Primary Health Centre

State Government has decided to establish total 125 Primary Health Centre in the State. Present strength is 83. 23 PHCs are under construction. 3 (three) more have been proposed during 2013-14 to overcome the shortage in phases.

(b) Completion of ongoing construction of 23 Primary Health Centr e

-111-

(c) Construction of Quarters for 13 PHCs

There are no proper accommodation facilities for the essential Staffs like Doctors, Nurses, Para-medics etc in Primary Health Centre. To provide accommodation for the essential staffs for emergency and better health care, this proposal is proposed.

3 Community Health Centre: (a) Construction of 2 new Community Health Centre

State Government has decided to establish a Community Health Centre (CHC) in each Block. Requirement is 45. Present status is 18. To overcome the shortage in phases, 2 (two) CHCs have been proposed.

(b) Completion of ongoing construction of 4 CHCs

State Government has decided to establish a Community Health Centre (CHC) in each Block. Requirement is 45. Present status is 18. To overcome the shortage in phases, 4 (four) CHCs are under construction.

4 Sub-divisional Hospitals: (a) Completion of construction works of Teliamura and Shantirbazar Sub-divisional Hospitals.

Teliamura and Shantirbazar are newly created Sub-divisions and there are no Sub-divisional Hospitals in these Sub-divisions. State Government decision is to establish Sub-divisional Hospital in all Sub-division to provide better health care. In this line the proposal is proposed.

(b) Completion of up-gradation work of Sub-divisional Hospitals at Kanchanpur and Amarpur

These two Sub-divisional Hospitals are very old and buildings of these Hospitals are in dilapidated condition. State Government has decided to demolish these old buildings and construct new building with 100 bedded capacities. In this line the proposal is proposed.

(c) Completion of construction works of Quarters for Sub-divisional

These Sub-divisional Hospitals are not having proper

-112-

Hospitals at Dharmanagar, LTV, Khowai and Subroom Sub-divisional Hospitals.

accommodation facilities for the essential Staffs like Doctors, Nurses, Para-medics etc. To provide accommodation for the essential staffs for emergency and better health care, this proposal is proposed.

5 District Hospitals: (a) Starting of construction works of Sipahijala District Hospital at Bishramganj

Sipahijala is a newly created district and there is no District Hospital in this newly created District. State Government decision is to establish one District Hospital in all Districts to provide better health care. Moreover, population of this district is mainly Tribal. In this line the proposal is proposed.

(b) Completion of construction works of quarters for three District Hospitals.

These three District Hospitals are not having proper accommodation facilities for the essential Staffs like Doctors, Nurses, Para-medics etc. To provide accommodation for the essential staffs for emergency and better health care, this proposal is proposed.

6 State Hospitals: (a) Starting of up-gradation works of

IGM Hospital – (i) G+7 Block on Western Side, (ii) Administrative Block, (iii) Nursing Institute, (iv) Kitchen, Canteen, and Laundry Block.

This is one of the State Hospitals situated in the heart of the city. Out of six State Hospitals, two have been converted to Medical College Hospitals. Previously, this Hospital was catering only two Departments like Paediatrics and Obstetrics & Gynaecology. Now, in the new scenario on establishment of Medical Colleges, demand has arisen to equip this Hospital with all Departments. This is the reason for up-gradation of this Hospital.

(b) Starting of up-gradation works of Cancer Hospital (B+G+5 Block) –Phase-II.

Cancer Hospital: Patient load of Cancer Hospital is increasing day by day. This increase of patient load may be due to proper screening and case detection. To provide proper treatment facilities to the cancer patient, this up-gradation is required. In this line

-113-

the proposal is proposed.

(c) Central Blood Bank at GB Pant

Hospital Complex.

State Government has decided to establish a Central Blood Bank where all modern facilities of Blood Bank will be available to provide all components of Blood to the patients with proper screening and tests in the time of needs. In this line the proposal is proposed.

7 Medical College / Education:

(a) Completion of construction works of New Teaching Hospital (NTH) –Block-I at GB Pant Hospital at Agartala.

Bed capacity of G.B. Pant Hospital (Teaching Hospital of Agartala Govt. Medical College) is 592. Bed capacity of this Hospital required to be enhanced to provide proper treatment facilities as well as to introduce Post Graduate Courses in all Disciplines. This is the reason for construction of these Hospital Blocks.

(b) Starting of construction works of

(i) New Teaching Hospital (NTH) –Block-II at GB Pant Hospital at Agartala

(c) Starting Post Graduate Courses

in all Disciplines in Agartala Government Medical College at Agartala

There is a shortage of Specialist Medical Officers in the State. To overcome this shortage, introduction of Post Graduate Courses in all Disciplines in Agartala Government Medical College, Agartala and Tripura Medical College, Hapania is essential. For introduction of Post Graduate Courses in above mentioned two Medical Colleges, ancillary facilities like side Lab. Library, Teaching room etc are to be constructed and capacity are to be increased. Machinery & Equipment are to be procured.

(d) Starting Post Graduate Courses in all Disciplines in Tripura Medical College at Hapania.

(e) Establishment of Dental College

There is shortage of Dental Surgeon in the State. And there is no Dental College in the State.

-114-

There is an only one Dental College in Assam in entire North Eastern region which cannot cover the demand of the Region. To overcome this shortage, establishment of a Dental College in the State is most essential.

(f) Establishment of Ayurvedic

Medical College

There is shortage of Ayurvedic Medical Officer in the State and there is no Ayurvedic College in the State. To overcome this shortage, establishment of an Ayurvedic College in the State is most essential.

(g) Establishment of Homeopathic Medical College

There is shortage of Homeopathic Medical Officer in the State and there is no Homeopathic College in the State. To overcome this shortage, establishment of a Homeopathic College in the State is most essential.

(h) Establishment of Regional Nursing College

There is a B.Sc. Nursing College in the Complex of Tripura Medical College with 60 intake capacity run by Society constituted by State Government. State Government has decided to upgrade this Nursing College to a Regional Nursing College with 100 intake capacity to overcome the shortage of State as well as of North Eastern States.

After careful examination of the Budget proposal and appreciation of

submission placed by the Additional Chief Secretary of the Department, the

Committee make the following recommendations :-

RECOMMENDATIONS

i) MRI Machine at Dr. B.R. Ambedkar Hospital to be installed within 31.03.2014.

-115-

ii) Cardiac wing and Nephrology Unit at Dr. B.R. A mbedkar Hospital be opened as early as possible with upgradation of Spi ne Surgery Unit.

iii) Blood Bank/Blood storage Unit to the uncovered Sub-Divisions are to be achieved at the earliest.

iv) The Department to consider functioning of new P HCs with bed for 24 hours.

v) The Department to examine effectively the feasib ility of referring patient from State Hospital to ILS making it reimbu rsible according to rule.

vi) The Department to consider providing of quarter s attached to all the PHC.

vii) To improve supervision of duty and behavior o f medical staff to patient there shall be some mechanism of the Depart ment to ensure the same. The Department also to maintain constant endeavor for cleanness of AGMC & GBP, IGM and TMC and other Hosp itals.

viii) The Department to effectively consider the in crease of honorariam to the Asha Karmi.

ix) Urmai, Dasarath Bari, Telkajla, Ghrantali consi sting of 18,500 people should be provided with one PHC by 2013-2014. The D epartment may examine the feasibility of the same.

x) The Department to find out the locations of old Dispensaries such as Asharambari, Krishnapur, Charilam and Radhanagar w here people are habituated with the facility of Doctors but now not in existence are to be provided with the similar facility or PHC .

xi) Facility of Smart Card to be extended to the PH C level having adequate infrastructure.

xii) The Department to formulate a mechanism whereb y the patient party may get a scope to interact to the visiting Doctor extending upto District Hospital in phase manner.

xiii) C.C.TV to Medical Hospital, State Hospital and Dist rict Hospital to be installed in phase manner. After examination of the Budget proposals and appreciation of

submission of the Representative of the Department, the Committee recommends the Budget proposals under Demand Nos. 16 and 52 for Grants by the House alongwith the Recommendations.

( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013 Subject Committee- I Tripura Legislative Assembly

-116-

THE REPORT ON THE DEMAND NO. 13 OF THE PUBLIC WORKS (R & B) DEPARTMENT

FOR THE FINANCIAL YEAR 2013-2014.

The Budget Proposal under Demand No.13 relates to Public Works

( R & B ) Department, Government of Tripura for the Financial Year 2013-2014

and the Revised Budget Estimates for the Financial Year 2012-2013 are as

follows :-

(Rs.in Lakh) Particulars Revised

Estimate 2012-2013

Budget Estimates for 201 3-14 Demand Fund for Total

T.S.P. S.C.P. a) Non-Plan 27283.21 35896.00 -- -- 35896.00 b) Plan 32185.32 14389.33 9128.93 4816.99 28335.25 c) C.S.S. 2500.00 1560.00 930.00 510.00 3000.00 d) N.E.C 4000.00 2340.00 1395.00 765.00 4500.00 Total 65968.53 54185.33 11453.93 6091.99 71731.25

Now, the aforesaid Budget proposals are under examination of the

Subject Committee– I of the Tripura Legislative Assembly for recommendations

to the Demands for Grants.

The Committee in its meeting held on 8th May, 2013 examined the Budget

proposals in details having discussion with the Principal Secretary & Chief

Engineer of the Department as summon.

First of all, the Principal Secretary informed the Committee about the

action taken in respect of the recommendations made by the during the year

2012-13 stated as follows :-

SL. No.

Relevant Para/ Page No. of the

report

Recommendation of the Committee

Reply of the Government on the recommendations

1 1 Page-9 In the PLAN budget provision should be made adequate for construction of RCC bridges as per the target of the Department.

Following provisions were made in RE of 2012-13 for the bridges. NABARD- Rs. 131.50 Crores SCA- Rs. 6.31 Crores ACA- Rs. 7.21 Crores In

-117-

addition, a portion of fund from 5054-OTPMGSY was also utilized for small span RCC bridges /culverts. About 61 bridges and 26 RCC Box/ Slab culverts have been completed during 2012-13. At present work of about 80 bridges in progress in the state. It is expected that the number of timber bridges will come down 40 by March/ 2014.

2 2 Page-9 The works under PMGSY of 40% upgradation already be taken up in the Budget provision should be made available by the Finance Deptt.

The BE for 2012-13 was only Rs. 10.00 Crores, though it was raised to Rs. 17.50 Crores in the RE against demand of about Rs. 60.00 Crores. Due to inadequate provision of fund against this Head, the target as fixed for the 2012-13 could not be achieved in spite of issuance of work orders etc. Adequate provision in BE of 2013-14 is required to meet up the target as these existing roads are important and required to be maintained for movement of vehicular traffic.

3 3 Page 9 Matching grant for the maintenance work to be made available by the Finance Department under 13th Finance Commission grant programme

As per guidelines of 13th FC, minimum provision of NPRE for 2012-13 should have been Rs.104.13 Crores for claim of the grant during 2013-14. But FD met up the demand of NPRE with provision of salary during 2012-13 against the same Head of Account.

4 4 Page 9 Preference should be given to

i. Khowai to Manik Bhandar

ii. Manik Bhandar to

Kailasahar

The total length of road is 33.00 KM and entire length is black top. Surface condition for a length of 10.50 KM is not at satisfactory level for which normal and periodical repairs as per relevant system of PWD are being carried out from time to time to maintain the road trafficable. The length of road from Manik Bhandar to Kailasahar via Saikarbari, Panchamnagar & Rajnagar Choumuhani is 39.22 KM. The length of road from Saikarbari to Rajnagar Choumuhani is 26.05 KM and

-118-

iii. Barkathal to GB

Hospital Within the financial year (2012-13). Finance Department may sanction adequate fund for these roads

a portion where land slides occurs for about 500 Metres length, have been damaged. Except that portion, the entire stretch is black top with average carriageway width 3.75 Metres. The distance for portion from Panchamnagar to Kailasahar is 13.17 Km and entire road is black top with average carriageway width 5.5 Metres. At present the road is being used for vehicular movement. Barkathal to GB: Portion from Barkathal to Abhicharan (3.00 KM) and Abhicharan to Lefunga ( 5.00 KM) is black top and motorable. In the portion from Lefunga to Gamchakobra ( 3.0 KM), pot holes have been developed for which repair works have been taken up. The portion from Gamchakobra to Beltala ( 4.5 KM) is brick soled for which improvement by metalling/ carpeting alongwith cross drainage works under NABARD scheme have been taken up. The portion from Beltala to GB hospital (2.0KM) is black top and fit for movement of vehicular traffic.

5 5 Page 9 Killa to Ompi road should be taken up as early as possible

Total length of road is 22.50 KM and status is: Carpet road- 11.00 KM Soled Road- 05.00 KM Katcha road- 6.50 KM The portion of katcha road was done by Block. Priority has been attached to complete the rest portion of 11.50 Km by blacktop surface if adequate fund is made available in the BE of 2013-14.

6 6 Page 10 Quality of the work under PMGSY to be checked regularly by PWD

There is three tier monitoring in PMGSY works one at PIU level, one by State Quality Monitor (SQM) and other by National Quality Monitor (NQM). SQMs are nominated

-119-

from officials of state PWD (R&B). In addition a mobile laboratory is established for each work and on necessity; support of central laboratory is taken for quality management system. In addition another mechanism already developed comprising representatives of NBCC/ HSCL, local Panchayet and PWD for proper monitoring of quality and extent of maintenance required on the completed roads under new connectivity and such repair works are moving accordingly and payment to this effect also are released by PMGSY cell of PWD on the basis of their recommendation.

ACTION PLAN WITH PHYSICAL TARGET OF DIFFERENT SCHEMES FOR THE YEAR 2013-14 UNDER STATE PLAN

Major/Minor

Head of Department

Name of Schemes/

Projects/Items

Components Unit Physical Target

(2013-14)

Physical Target for TSP and

SCCP

TSP SCCP

5054 CO on raods

OTPMGSY Imp of State Roads KM 250.00 100.00 50.00

Imp of roads under 40% renewal of PMGSY KM 50.00 20.00 10.00

Box/ Slab Culverts

Nos 10.00 3.00 1.00

4059 Buildings Building functional

Building Nos 4.00 1.00 0.00

4216- Buildings

Housing

Residential Accommodation (Staff Quarters, Barrack etc) Nos 50.00 18.00 10.00

5054 CO on raods

NABARD Major Bridges Nos 40.00 15.00 10.00

Minor Bridges/ Culverts Nos 35.00 11.00 5.00

Balley Bridges Nos 5.00 3.00 0.00 5054 CO on roads ACA RCC bridges

Nos 2.00 1.00 0.00

-120-

5054 CO on roads

E & I Improvement of roads KM 5.00 5.00 0.00

5054 CO on roads

CRF Improvement of roads KM 5.00 0.00 0.00

5055 CO on roads

SPA Improvement of roads KM 5.00 0.00 0.00

Flagship Programme / Bharat Nirman (Rural Roads) & PMGSY Introduction:-

The Pradhan Mantri Gram Sadak Yojana (PMGSY), was lanched by the Govt. of India to Provide connectivity to unconnected rural Habitations as part of a poverty reduction strategy. The primary objective of the programme is to provide connectivity, by way of an all-weather road (with necessary culverts and cross-dranage structures, which is oprerable through the year), to the elegible unconnected habitations in the rural areas. Government of India is endeavoring to set high and uniform technical and management standards and facilating policy development and planning at State level in order to ensure sustainable management of the rural roads network. In the first phase, habitations (hamlets) of population of 1000 (500 in the case of hill States, tribal and desert areas) and above will be covered under Bharat Nirman. In the second phase habitations of population of 500(250 in the case of Hill States, tribal and desert areas) will be covered.

The Bharat Nirman has three components viz (a) New connectivity (b) upgradtion (60%) and (c) Renewal (40%). Cost for construction of rural roads under New Connectivity and improvement of rural roads under upgradation (60%) is to be borne by MoRD. The state is to bear the cost for improvement of rural roads under Renewal (40%) and initial five years mtc. for the work under New Connectivity, Upgradation and Renewal. In addition State is to be bear the additional amount beyond the sanctioned cost under New Connectivity & Upgradation if any and cost for Bridges more than 50m on prorata basis.

Status as on 31.03.2013.

Type of work Total Scope

(in Km)

Work Sanctioned

Length ( In Km)

MoRD Sanctioned

Amount (in Crore)

Fund released (Rs. In Crore)

Work Completed

(in Km)

Work in progress (in Km)

Up to date

Expenditure (Rs.in Crore)

-121-

New connectivity

2982.93 2981.6 1699.924

1597.75

2448.310 486.905

1501.593

Upgradation (60%)

1067.2 258.04 159.54 94.741 163.299

Stage-II constrction

255.994 122.204 52.396 56.458 64.246

Total 4306.12 3361.844 1911.86 1597.75 2599.509 714.45 1501.593

Type of work Total Scope (in Km)

Work taken up (in Km)

Amount Sanctioned

by state (Rs. In Crore)

Fund released (Rs. In Crore)

Work Completed (in Km)

Work in progress (in Km)

Up to date

Expenditure

(Rs.in Crore)

Renewal (40%) 700.93 511.071 268.18 158.116 367.08 143.991 167.55

Under 40% Renewal, work taken up for 511.0718 Km of tendered value amounting to Rs. 283.77 Crore. Now, 367.08 Km carpetting is completed upto March'2013. At present balance work for an amount of Rs.100.00 Crore is going on in full swing at different stages. During 2013-14 financial year, it is targetted to complete 143.00Km for which Rs. 100.00 crore is required.

Target verses Achivement during the year 2012-13 and Tentative Achievement Plan during the year 2013-14 is given Annexure-"A".

Habitation Details

Category of habitations

Unconnected habitations as on

01-04-2000. Sanctioned work

Connected up to March,2013

1000+ 169 168 160

500-499 606 609 549

250-499 1185 1113 807

Less than 250 2630 2118 1361

Total 4590 4008 2877

-122-

Recently Govt. of India has allowed the State for submission of DPRs for providing connectivity to the habitations having population 250 - 499. State is eligible to submit proposal for 277 no roads having length 968.53 Km. which will provide connectivity to 216 nos. 250+ and 620 nos. less than 250 habitations. Out of that State has submitted DPRs for 197 no. roads and 7 long span bridges with total length of 579.30 km. for sanction. As a result following habitations will be benefited: i) 158 of 250+ habitations and 117 less than 250 category habitations (incidentally) by constructing 130 roads and 5 long span bridges. ii) 313 of less than 250 category habitations under cluster proposition by constructing 67 roads and 2 long span bridges. The sanction is expected to be conveyed soon.

Target verses Achivement during the year 2012-13 and Tentative Achievement plan during the year 2013-14:

Target during the year2012-13 Achivement during the year

2012-13 (up to March, 2013)

Component

New connectivity

Upgradation (60%)

Renewal (40%) New connectivity

Upgradation (60%)

Renewal

(40%)

Length(in Km) 288.00 187.00 250.00 214.108 23.29

27.918

Expenditure (Rs. In Crore)

210.00 145.00 140.00 264.552 23.3

9

Habitation

1000+ 18 13

500-999

50 35

Tentative Action plan during the year2013-14

Component New connectivity

Upgradation (60%) Renewal (40%)

Length(in Km) 513.31 85.981 143.991

Expenditure (Rs. In Crore)

440.0 80.0

Habitation

1000+ 5

500-999

36

-123-

After careful examination of the Budget proposal and appreciation of submission placed by the Principal Secretary of the Department, the Committee makes the following recommendations :-

RECOMMENDATIONS

i) Construction of R.C.C. Bridges to uncovered area s has to be taken up by the Department and for that Plan Budget provision should be made available.

ii) The Department to take up with the Finance Depa rtment for 40% upgradation of Budget provision under PMGSY.

iii) Khowai to Manik Bhandar and Manik Bhandar to K ailashahar road to be made smooth trafficable as a whole along with Barkathal to G.B.Hospital road. Similar position be taken for Killa to Ompi road. For that Finance Department to effectively consider allocation of adequate fund, if necessary, in the Revised Estimates of the current Financial Year.

iv) The Department to maintain its constant supervi sion to the quality of works under PMGSY for that the Finance D epartment be approached to release of necessary fund in the R evised Estimates of 2013-2014.

v) In new Sub-Division of Bloc Head Quarter there s hall be staff quarters. For that the Department to take up action Plan.

vi) The Department to take effective step for expan sion of road from Fire Bridgade to Kalibari connecting Airport r oad via Durga Chowmuhani alongwith Bholagiri road.

vii) The Department to arrange specific fund for ea rly construction of MLAs’ Hostel. For that the Department may take u p the same with Finance Department and Planning Departmen t.

After examination of the Budget proposals and appreciation of submission

of the Representative of the Department, the Committee recommends the Budget proposals under Demand No. 13 for grants by the House alongwith the Recommendations.

( Shri Sudhan Das ) Dated, Agartala Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly

-124-

THE REPORT ON THE DEMAND NO. 15

OF THE PUBLIC WORKS (WATER RESOURCES) DEPARTMENT FOR THE FINANCIAL YEAR 2013-2014.

The Budget Proposal undrr Demand No. 15 relates to P.W.(

Water Resources ) Department, Government of Tripura for the Financial Year

2013-2014 and the Revised Budget for the Financial Year 2012-2013 are as

follows :-

(Rs. in lakh)

Particulars Revised Estimate

2012-2013

Budget Estimates for 201 3-2014 Demand Fund for Total

T.S.P. S.C.P. a) Non-Plan 6756.88 7624.11 --- --- 7624.11 b) Plan 10886.30 5341.44 3184.32 1746.24 10272.00 c) C.S.S. 2034.97 1375.70 775.00 425.00 2575.70 Total 19678.15 14341.25 3959.32 2171.24 20471.81

The aforesaid Budget Proposal is under consideration and

examination of the subject committee-I of the Tripura Legislative Assembly for

recommendations to the Demands for Grants.

The Committee in its meeting held on 8th May, 2013 examined the

Budget proposal in details having discussion with the Principal Secretary of the

department who appeared on summon.

First of all, the Principal Secretary informed the Committee about the

action taken in respect of the recommendations made by the Committee during

the year 2012-13 stated as follows :-

-125-

Sl. No.

Relevant Para/ page No. of the

report

Recommendations of the Committee

Reply of the Government on the recommendations

1. Page No.26; Sl No. i of the recom- mendations

Liabilities of the Department in the plan head to bear by Finance Department and may release fund of Rs. 10 crores in phased manner.

The Department had taken up the matter with Finance Department by initiating Note detailing the position of liabilities, reasonable requirement and minimum requirement. During the year 2012-13, Finance Department has provided an additional fund for an amount of Rs. 5 crore.

2. Page No.26; Sl No. ii of the recom- mendations

To facilitate storage of rain water the Department to continue the recomm- endation like the last year in the next financial year (2012-13) also.

During 2012-13, 1st installment of fund has been sanctioned for 9(nine) nos. of new Minor Irrigation Storage Projects.

3.

Page No.26; Sl No. iii of the recom- mendations

Mini Bore well with of 5 H.P. motor has to be utilized for irrigation by increasing the number to cover more area.

Mini Bore wells are being constructed by Agriculture Department. During the year 2012-13, Rs. 10 crore has been sanctioned in favour of Agriculture Department under SPA for 413 nos. of Mini Bore well.

4. Page No.26; Sl No. iv of the recom- mendations

To repair the machine of existing of irrigation scheme. For this purpose Finance Department is to release a fund in phased manner.

During the year 2012-13, Finance Department has provided an additional fund for amount of Rs. 5 crore.

5. Page No.26; Sl No. v of the recom- mendations

Manu Medium Irrigation Scheme has to be completed and the Department to take up all suitable steps in this regard.

Department is continuning its endevour to smoothen the land problem hindrances coming in the way of progress of this work. Much improvement has yet not come.

6. Page No.27; Sl No. vi of the recom- mendations

DPR for utilization of water by harvesting of rain water of Howrah river has to be prepared by as per CWC norm and to implement it Panchayat Samitee and BAC of Jirania and

DPR for 2 (two) projects for Development of flow in the Howrah river in the dry season has already been got prepared by the CWC.The two projects are:-

i) Champaicherra Dam Project at Champaibari

ii) Howrah Dam Project at Champaknagar

Major social issues for implementation of

-126-

Madai Block to discuss and District Administration also to be consulted in this regard.

this project is land submergence. It is a sensitive issue. Last year, during 2012-13, much could not be done. Fresh initiative will be taken during this financial year,2013-14.

Physical Achievements during 2012-13 (upto Feb.2013)

• In this year till now new 10 nos LI, 26 nos D.T.W, 2 nos. HPLI

have been commissioned. (List of the commissioned schemes are

enclosed in separate sheet)

• 5 nos. LI schemes and 10 nos. DTW schemes are ready for

commissioning.

• Good progress has been made for more 7 nos. LI, 1 no. DTW,

6 nos. Diversion and 5 Nos storage project.

• Sufficient materials have been procured for the projects

already taken up.

• The work of the Khowai Medium irrigation project has been

completed.

• The remaining works of the Gumti Medium Irrigation

Project is nearing completion.

• The remaining works of Manu Medium Irrigation Project is in

progress.

• 1060 ha. has been brought under irrigation by PWD(WR).

• 2.00 Km of Anti-erosion works has been completed.

-127-

LIST OF SCHEMES COMMISSIONED DURING THE YEAR 2012-13 AS ON 28.02.2013

Sl.

No. Name of Block Name of District Name of Panchayat Name of schemes

1 2 3 4 5

1 Jirania West Tripura Dhupcharra L.I. Scheme at Khilling para over

Dhupcherra

2 Boxanagar Sephahijalla Valuarchar L.I. Scheme at Valuarchar Purbapara

near the Land of Bimal Das

3 Melaghar Sephahijalla Mohanbhog L.I. Scheme at Near Mohanbhog R.C.C

.Bridge

4 Karbook Gomati Paschim Ekchari L.I. Scheme at Shibharipara

5 Amarpur Gomati Birgonj L.I. Scheme at Sarbang Kalibari

6 Salema Dhalai Debbari L.I. Scheme at North Dabbari F-II.

7 Dumbur-

nagar Dhalai Jagabandhupara L.I scheme at J.B .Para

8 Dumbur- nagar Dhalai Dalapati L.I. Scheme at Mailan Singh

9 Gournagar Unakuti Kaulikura L.I. Scheme at Madhya Kaulikura

10 Dasda North Tripura Shibnagar L.I.Scheme at Shibnagar F-II

1 Durga

Chowmuhani. Dhalai Halahali High Power L.I at Halahali.

2 Damcherra North Tripura East

Narendranagar High Power L.I at Narendranagar

1 Khowai Khowai Uttar Singicherra DTW Scheme at Near old Panchyat

Office.

2 Khowai Khowai Gournagar DTW Scheme at Uttar Gournagar

3 Khowai Khowai Sonatala DTW Scheme at Ram Mohan Pally

4 Khowai Khowai Purba Singhicherra DTW Scheme at Near House of Sri

Sachindra Das.

6 Mohanpur West Tripura Purba Bhamutia DTW scheme at Rangutia(Bamutia)

7 Mohanpur West Tripura Mohanpur D.T.W. Scheme at Jagatpur

8 Mohanpur West Tripura Satdubia D.T.W. Scheme at D.M Colony, Kalkalia

9 Mohanpur West Tripura Narshingarh D.T.W. Scheme at Bhagalpur

10 Mandai West Tripura Purba

Dinabandhunagar

D.T.W Scheme at Begrambari near TSR

camp

11 Jirania West Tripura Paschim Noabadi D.T.W Scheme at Kalitilla.

-128-

12 Padmabill Khowai Akhrabari DTW scheme at Sri Akhra Bari Para .

13 Matabari Gomati Salgara DTW scheme at Ghoratilla Math

1 2 3 4 5

14 Matabari Gomati Holakhet DTW scheme at Pawramura math

15 Matabari Gomati DTW scheme at Maidabari Math-60.

16 Matabari Gomati Tepania DTW scheme at Dhalidepa

17 Matabari Gomati Purba Mogpuskarini DTW scheme at Noatiapara

18 Killa Gomati Bagma DTW scheme at Chandraipara Math

19 Kakraban Gomati Rani DTW scheme at Bhadhuri Pathar

20 Jolaibari South Tripura Uttar Hichacherra DTW scheme at North Hichacherra near

the House of M.Mog.

21 Bagafa South Tripura DTW scheme at Surpara (Santir bagar)

22 Bagafa South Tripura Bhikhora DTW scheme at Mularaibarighat

23 Sathchand South Tripura Paschim Jalefa DTW scheme at Near Jalafa Market

(Paschim)

24 Ambassa Dhalai Purba Nalicherra DTW scheme at Bashu deb Para

25 Dumburnagar Dhalai Paschim Potacherra DTW scheme at West Potacherra

26 Jampuijalla Sephahijalla Kendraicherra DTW scheme at Narayanpur

-129-

Action plan for 2013-14

• To complete the Spillover continuing schemes of 2012-13

(L.I-26, DTW-60, M.I Storage-19, Diversion-9 Nos.).

• To take up new 8 nos L.I, 16 nos DTW, 4 nos M.I Storage

Scheme.

• Emphasis will be given to complete the remaining works of

Gumti and Manu irrigation projects.

• Action Plan for new irrigation coverage during the year is

5070 ha.(AIP)

• 6.00 Km of new Anti-erosion works would be done.

After careful examination of the Budget proposal and appreciation of

submission placed by the Principal Secretary of the Department, the Committee

make the following recommendations :-

RECOMMENDATIONS

i) The Department to approach Finance Department to release rest fund to the liabilities in Plan Head.

ii) Mini-Bore Well with 5 HP Motor has to be utiliz ed for irrigation to be extended to uncovered area in collaboration with Agriculture Department.

iii) The Department’s obligation to maintain the m achine of existing irrigation scheme and for which Finance Department may effectively consider to release fund.

-130-

iv) The Department to continue its endeavor for uti lisation of rain water of Howrah River.

v) The Department to take suitable step for storage of rain water to utilize the same in need for irrigation.

vi) Deep-Tube Wells to be provided specially in the areas where other water sources are not available.

vii) The Department to prepare a master plan for ac hieving depth of Howrah river specially and similarly other importan t rivers of the State.

After examination of the Budget proposals and appreciation of

submission of the representative of the recommends the Budget proposals under

Demand No.15 for Grants by the House alongwith the recommendations.

( Shri Sudhan Das ) Dated, Agartala , Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly

-131-

THE REPORT ON THE DEMAND NO. 51 OF THE PUBLIC WORKS ( D.W & S ) DEPARTMENT

OF THE FINANCIAL YEAR 2013-2014.

The Budget Proposal under Demand No.51 relates to the Public

Works ( D.W & S ) Department, Government of Tripura for the Financial Year

2013- 2014 and the Revised Budget for the Financial Year 2012 -2013 are as

follows :-

(Rs.in lakh)

Particula rs Revised Estimate

2012-2013

Budget Estimates for 201 3-14 Demand Fund for Total

T.S.P. S.C.P. a) Non-Plan 2189.20 4467.00 --- --- 4467.00 b) Plan 11164.74 4229.42 2521.39 1382.69 8133.50 c) C.S.S. 938.58 1.04 0.62 0.34 2.00 Total 14292.52 8697.46 2522.01 1383.03 12602.50

Now, the aforesaid Budget Proposal is under examination of the

Subject Committee-I of the Tripura Legislative Assembly for recommendations to

the Demands for Grants.

The Committee in its meeting held on 8th May, 2013 examined the

Budget proposals in details having discussion with the Secretary of the

Department who appeared before the Committee on summon.

First of all, the Secretary informed the Committee about the action taken in

respect of the recommendations made by the Committee and during the year 2012-13

stated as follows :-

-132-

Sl.No. Recommendation

of the Committee Reply of the Recommendation of the Subject Committee

1

Mini-Deep-Tube Wells of small bore have to be increased to double (1000 Nos) of the target of the Department.

As suggested by the Subject Committee 981 Nos. SBTW has been taken (Completed 619 Nos, Progress- 131, W/O-231. which is the all most double of the target.

2

Remodeling of water pipe line specially in the Agartala Urban area has to be done immediately keeping facility of installation pipe line to the both sides of the road which will also facilitate the inhabitants to take water line easily. Finance Department to consider allocation of adequate fund for this.

As suggested by the Subject Committee, for improvement of Water supply system in AMC area, DWS Department has extended 4444.50 mtr new pipe line & 1578.50 mtr. pipe line has been remolded. One Four lac gallon capacity RCC OHT is in progress at Shisu Bihar School for improvement of water pressure in Ramnagar, Joynagar, Krishnanagar etc. area. This works has been taken up under SPA Fund of the State Govt. However, laying of pipeline in both side of the road could not be taken up as UDD has taken up new project for overall development of water supply system in AMC area. In addition to that UDD has planed for construction of ground water treatment plant, OHT, DTW, Laying of pipe line under JNNURM Project for North & East Zone (Part), for Central, South & East Zone under ADB Project. Under the above stated 2 (two) Project following works will be taken up. (i) DTW-48 Nos. (ii) GWTP-11 Nos. (iii) OHT-26 Nos. (iv) Replacement of DTW-22 Nos. (v) Laying of Pipe Line-592 KM. In the mean time 168 KM new Pipeline has been laid in the North & East (Part) Zone. Work-in-progress for 5(five) Nos. OHT, 2 (Two) Nos. GWTP. In the Central Zone 6(Six) Nos. replacement DTW and in South Zone 16(Sixteen) Nos. replacement DTW has been Sunk. If the whole project under JNNURM & ADB completed there will be substantial improvement of water supply system in AMC area.

3 ICDS & School specially morning School to be provided with Drinking Water and Sanitation facility by urgent basis within the current Financial Year (2012-13) positively.

Drinking Water :- School covered-4447 out of total 4447, AWC covered- 8749 Nos out of total 9660. Balance 891 Nos. AWC will be covered during financial year 2013-14. Sanitation: - All School covered with Toilets, AWC covered with toilets 8593 Nos. out of 9660 Nos.

4 To make available of water supply through pipes line in all habitations of the state.

5744 Habitations covered with piped water supply where 3044 Habitations are full covered, 2700 Habitations partly covered out of 8132 Habitations. Balance 2388 Habitations are not covered. Action plan is prepared for coverage.

-133-

STATE PLAN FOR RE 2012-13 & BE - 2013-2014

Name of the Department P.W.D. (DW&S)

Dem No. Particulars

51 DIVISIBLE POOL

51 A: SALARY

51 B: NON-SALARY

51 Of which

(i) PSUs

(ii) Local bodies

51 (iii) Electricity Charges

(iv) Advertisement

51 (v) State Share / State's Contribution

51 (vi) State Share / State's Contribution for Sanitation

51 (vii) Scholarship / Stipend

51 (viii) Minor Works

51 (ix) Maintenance (Water Treatment & Supply)

51 (x) Machinerry & Equipments

51 (xi) Major Works

51 (xii) Alam

51 (xiii) State Laboratory

(xiv) Advance Central Share for Nirmal Bharat Abhiyan

Others

51 NON-DIVISIBLE POOL

51 Of which

(i) PMGY

-134-

(ii) EFC/ TFC

51 (iii) SPA

51 (iv) SCA

51 (v) Grant under Art. 275(1)

51 (vi) RSVY

51 (vii) Backward District Area Fund

51 (viii) BADP

51 (ix) Slum Dev.

51 (x) AIBP

51 (xi) Shifting Cultivation

51 Total (Div. + Non -Div.)

51 C S S

51 N L C P R

51 N E C

NON-PLAN FOR RE 2012-13 & BE - 2013-2014

Name of the Department P.W.D. (DW&S)

Dem No. Particulars

51 1. TOTAL SALARY

Of which

51 (i) Wages

51 2. TOTAL NON - SALARY

1 Sinking of DTW

(a) Rural 198 NOs

140 Nos

Abondoned-27 Nos, In Progress = 19 Nos.

(b) Urban 1No

s 1

Nos

Of which

-135-

2

Commissioning of DTW

(a) Rural 1148 Nos

188 nos

97 Nos

Ready for Comm. = 16 Nos. In Progress = 62 Nos.

(b) Urban 124 Nos

0 Nos

0 Nos

3 Iron Removal Plant

(a)

Rural - I) NRWDP II) NLCPR

517 Nos

127 Nos

39 Nos

Ready for Comm. = 3 Nos. In Progress = 17 Nos.

90 Nos

26 Nos

Ready for Comm. = 6 Nos. In Progress = 28 Nos.

(b) Urban 59

Nos 0

Nos 0

Nos

4 Over Head Tank

(a) Rural 79 Nos

1 Nos

1 Nos

(b) Urban 52

NOs 6

Nos 2

Nos In progress = 4 Nos.

5

Water Treatment Plant

(a) Rural 30 nos

30 Nos

11 Nos

Ready for Comm. = 1 Nos. In Progress = 13 Nos.

(b) Urban 14

NOs 2

nos 0

Nos In Progress = 1 Nos.

(c ) NLCPR 3

Nos 2

Nos In Progress = 1 Nos.

6

Small Bore Tube Well

(a) Rural 1063 Nos

981 Nos

619 Nos

In Progress = 131 Nos.

(b) Urban 17

NOs 1

Nos 0

Nos

In Progress = 01 No.

-136-

7

Spot Sources (Mark-II/III, OHP, RCC well, Sanitary well etc.)

(a) Rural 22175 Nos

1184

Nos

1598 Nos

In Progress =147 Nos.

(b) Urban 1801 Nos

0 Nos

0 Nos

8 Laying of Pipe Line

(a) Rural 7531.27 KM

785.50KM

746.94 KM

In Progress = 69.78 Km.

(b) Urban 1335.52 KM

150.00 KM

85.82 KM

9

Rural Habitation Coverage

(a) Quantity 7292 Nos

1634

Nos

1062 Nos

(b) Quality 2907 Nos

796 Nos

240 Nos

10

School & AWC Coverage

(a) School (Rural)

3456 Nos

692 Nos

692 Nos

(b) School (Urban)

289 Nos

0 Nos

289 Nos

(a) AWC (Rural)

6342 Nos

1827

Nos

1622 Nos

In Progress = 344 Nos.

(b) AWC (Urban)

535Nos

20Nos

0 Nos

51 (i) Repayment of Loan

51 (ii) Interest

51 (iii) Electricity Charges

51 (iv) Advertisement

51 (v) Scholarship/ Stipend

-137-

51 (vi) SRE

51 (vii) MOP/MOPF

51 (viii) Social Pension

51 (ix) Minor Works

51 (x) Diet/ Ration

51 (xi) Grants-in-aid for Pump Operators

51 (xi) Reang Refugees

51 (xi) Advocate fee/ Expences for witness

51 (xi) Others

Total (1+2)

-138-

After careful examination of the Budget proposal and appreciation of

submission placed by the Secretary of the Department, the Committee makes

the following recommendations :-

RECOMMENDATIONS

i) Uncovered ICDS Center and Schools to be provided with drinking water and sanitation facility within current Financ ial Year.

ii) Pipe lines are to be extended to the uncovered areas for supply of water and replace damage lines by new one.

iii) Mini-Deep-Tube Wells of small bore have to be set up to the uncovered areas.

iv) Iron Removal Plants to be properly maintained a nd repaired time to time to keep those functional throughout the yea r. Such Plans are to be provided to the places where Deep Tube-we lls are not available.

v) There shall be Toilet with water supply in every market of the State.

vi) MGNREGA rate has to be provided to operators of the water supply (IRP) by increasing their wages and to incre ase adequate number of additional separated staff. At the conclusion the Committee recommends the budget allocation

under Demand No. 51 for the Year 2013 – 2014 for grants by the House taking

into consideration the recommendations in this report.

( Shri Sudan Das ) Dated, Agartala , Chairman the 10th May, 2013. ubject Committee- I Tripura Legislative Assembly

-139-

THE REPORT ON THE DEMAND NO. 26 OF THE FISHERIES DEPARTMENT FOR

THE FINANCIAL YEAR 2013-2014.

The Budget proposal under Demand No.26 relating to the Fisheries

Department, Government of Tripura for the Financial Year 2013-2014 and the

Revised Budget for the Financial Year 2012-2013 are as follows :-

(Rs in lakh)Rs in lakh)Rs in lakh)Rs in lakh)

Particulars

Revised Estimates 2012-2013

Budget Estimates for 201 3-2014 Demand

Fund for Total T.S.P S.C.P

a) Non-Plan 1726.75 2100.50 --- --- 2100.50 b) Plan 1464.63 711.22 484.83 273.95 1470.00 c) C.S.S. 256.29 302.16 --- --- 302.16 d) N.E.C. 229.50 --- --- 229.50 Total : - 3557.67 3343.38 484.83 273.95 4102.16 Now, the aforesaid Budget Proposal is under examination of the Subject

Committee-I of the Tripura Legislative Assembly for recommendations to the

Demands for Grants.

The Committee in its meeting held on 8th May, 2013 examined the Budget

proposals in details having discussion with the Principal Secretary of the

Department who appeared before the Committee on summon.

First of all, the Secretary informed the Committee about the action taken in

respect of the recommendations made by the Committee during the year 2012-

2013 and stated as follows :-

-140-

Sl .

No.

Relevant Page No. of

the report.

Recommendation

of the Committee

Action taken by the Deptt on the

Recommendation

1 2 3 4 i) 1st Para of the

Recommendation at Page 110

The Committee retains the earlier recommen - dation of training of youth, educated persons to make the fisheries cultivation a commercial fish culture.

Training to youths and fish farmers is a continuous practice being attended to regularly by the Deptt. During 2012-13, the Deptt. organized 45 nos. Workshop at 45 Blocks with youths and fish farmers of the concerned blocks, wherein interaction have been made on possibilities of increase in fish production including required technologies. Besides, 7170 farmers/ SHGs / JFMCs members have been covered under various training programme out of plan fund.

ii) 2nd para of the Recommendation at Page 110

Prawn, Pabda and Chital production has to be increased through educated farmers where the Deptt. to encourage by adding technological support

Intensified efforts are being made in the Govt. hatcheries for production of seed of prawn, pabda and chital fish to enable distribution of those seed among the farmers for culture. Necessary input support alongwith training has also been provided to a good no of educated farmers to encourage culture of high value fish. Seed produced have been supplied to selected beneficiaries to popularise culture of these species.

iii) 3 rd para of the Recommendation at Page 111

The Finance Deptt. to release adequate fund for construction of fish market & development of aquaculture village in the state.

As recommended by the Committee the Department had submitted required projects for funding under NMPS a sub-scheme of RKVY during 2012-13 and accordingly received approval for construction of 8(eight) nos. of new fish market shed @ 1 (one) in each district. Similarly, received required fund for development of 8(eight) nos. Model -Aquaculture village in 8(eight) districts. Programme will be implemented in 2013-14.

-141-

iv)

4th Para of the Reco- mmendation at Page 111

Production of Singhi, Magur, Koi through major cultivation has to be increased to meet demand.

1(one) magur hatchery has been established recently in 2012-13 at Muhuripur and another one under construction at Gandacherra is also going to be completed by May 2013. Now the Deptt has taken initiation to utilize the hatcheries during coming season for breeding of Shingi& Magur fish. Accordingly necessary training for production of seed and its culture to departmental staff as well as interested progressive farmers with the help of resource person from CIFA is going to be undertaken during the coming season. Once seed production is successful, the same would be supplied among progressive farmers to popularise their culture.

Major achievements made during the year 2012-13.

The Fishery sector of the State continued to show high rate of growth in 2011-12.The Action Plan outlined in the last Subject Committee meeting , thus, also could be fulfilled. Total fish production of 53350.24 tons could be achieved against the set target of 53080 tons during 2011-12, exhibiting 8.37% growth over last year. The per ha. productivity of fish from culture resources & per capita availability of fish from local production could also be increased to 2434 kg. and 15.06 kg respectively during 2011-12, as against 2324 kg & 14.12kg. in 2010-11 With the limited state plan budgetary fund including the fund received from Central sources, the Deptt. continued its efforts on implementation of various developmental schemes in 2012-13, and as a result, the production of fish is expected to cross 57,000 tons with availability of 16 kg/capita fish at the end of the year (2012-13). The statistical data in detail regarding production of fish & fish seed etc. for the year 2012-13 would be available after door to door survey to be conducted by the Deptt. in the month of May,2013. Amongst other, some of the achievements made during 2012-13 are as follows :- i) Towards scientific utilization of available culture resources demonstration of various

technologies have been provided to 1087 farmers.

ii) Encouraged 590 farmers for use of their non perennial water bodies in scientific manner.

iii) 243.79 ha. big water bodies (2-5 ha each)have been brought under extensive fish culture.

iv) 30.00 ha. area of big water bodies (above 5 ha) have been brought under pen culture.

v) Extended benefit to 8112 farmers towards intensification of scientific fish culture in

small water bodies

-142-

vi )Towards entrepreneurship Development in pisciculture activities, inputs for fish culture have

been provided to 98 fisheries based SHGs covering an area of 97.80 ha.

vii) 775 fish farmers of rural pockets have been covered under Demonstration on

production of quality fish seed & 295 farmers for production of stunted growth fingerling

viii) Organized 45 workshop with about 4,500 farmers and encouraged them for adoption of

scientific fish culture.

ix) Benefit in the form of balance fish feed have been extended to 2 nd category farmers (

present production above 1500 Kg /ha but less than 3000Kg /ha)for higher production in 1180

ha area.

x) Stocked 27.00 lakhs fingerlings in open water bodies of Dumbur reservoir and other lakes, rivulets for enhancement of production as well as productivity of open water bodies. xi) 7170 Nos. farmer covered for effective training on various pisciculture technologies for skill development. xii) Towards popularizing “Aerator ” for quantum increase in fish productivity through hi-tech fish culture 300 nos. aerator are being supplied under different programmes. xiii) Assistance provided to 20 MSS Ltd. in the form of Managerial Subsidy. Besides, provided basic inputs to 53 nos. of Societies for adoption of fish culture in 52.92 ha area. xiv) 3105.88 ha. additional water areas have been brought under scientific pisciculture including the water areas in forest land during 2012-13, involving fish farmers/JFMC/SHGs/Patta holders. xv) For the purpose of conservation of Pabda & popularization of its culture practice, about 34000 nos. Pabda seed, produced in the Govt. hatcheries, were distributed among the farmers. xvi) Created/reclaimed about 1000 ha. (provisional) water bodies towards resource

development.

xvii) Provided 3 IMC, FRP hatcheries to 3 SHGs & installed 1 FRP hatchery at Govt farm and

up graded two hatcheries for facilitating production of fish seed.

xviii) Established 2 (two) nos. soil & testing laboratory in 2 (two) blocks for prescribing proper

Manuring schedule to the farmers for scientific culture.

3. The plan/programme and projects to be implemented during the year 2013-14 for

consideration of the committee during examination.

a) Activities proposed The activities proposed in the Annual action plan during the year

2013-14 for development of Fishery sector in the State & to achieve the set production

target of

61950 tons with per capita availability of 17 kg/annum are as follows:-

• Increase in productivity.

• Demonstration on feed based system with floating pelleted feed.

-143-

• Mass demonstration on low cost, medium cost, Integrated fish culture

and Hi-tech Intensive culture Technologies for the different categories of

farmers.

• Encouragement to the farmers on production of seed of high values

species with their culture.

• Supply of basic inputs for scientific fish culture in small water bodies.

• Popularization of rearing & culture of stunted growth

fingerlings.Utilization non–perennial water bodies for fish production on

scientific line.

• Encouragement to produce seeds and culture of high value

species.Intensification of integrated fish farming among the farmers.

• Ranching in open water bodiesPopularization of hi-tech fish culture

among the progressive fish farmers.

• Supply of fishery inputs in newly created water bodies of forest and non

forest areas.

• Entrepreneurship development among educated youths/SHGs through

input & technological assistance.

• Encouraging seed growers of remote areas for producing quality fish

seed.

• Distribution of fishing materials to the fishermen.

• Supply of pisciculture inputs to facilitate bringing the water areas

created /reclaimed during last year under fish culture

• Reclamation of existing water bodies of private farmers.

• Construction of new tanks.

After careful examination of the Budget proposal and appreciation of

submission placed by the Secretary of the Department, the Committee make the

following recommendations :-

RECOMMENDATIONSRECOMMENDATIONSRECOMMENDATIONSRECOMMENDATIONS

i) Farmers/SHGs/JFMCs members as well as unemployed youth be imparted with necessary training to make fisheries cultivation and commercial fish culture.

-144-

ii) The Department to continue its efforts towards increase of Prawn, Pabda, Chital as well as other high value fish.

iii) The Department to take effective suitable step to increase fish production at Dumbur Lake. The Department also to t ake effective steps to increase fish production at Rudra Sagar La ke of Melagarh and Khowrabil at Kailashahar.

iv) The Department to make endeavour for fish produ ction in the natural water bodies of the khas land in consultati on with the concerned authority of these lands and also encoura ge private sector by rendering assistance and for that Finance Department may allocate adequate fund, if necessary, in the Re vised Estimates of 2013-2014.

v) The Department to increase share capital for run ning Matsyajibi Samabai Samiti and also to consider increase in the wages to Managers of those Samitis.

vi) N.C.D.C scheme to be introduced for Matsyajibi Samabai Samitis to encourage them in the field of fish production.

vii) For temporary storage of fish there shall be c old chamber in big fish markets. The Department to take action accordi ngly in phase manner.

After examination of the Budget proposals and appreciation of

submission of the Representative of the Department, the Committee

recommends the Budget proposals under Demand No.26 for grants by the

House alongwith the Recommendations.

( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly

-145-

THE REPORT ON THE DEMAND NO. 41 OF THE SOCIAL EDUCATION & SOCIAL WELFARE

DEPARTMENT FOR THE FINANCIAL YEAR 2013-2014.

The Budget Proposal under Demand No.41 relates to Social

Education & Social Welfare Department, Government of Tripura for the Financial

Year 2013-2014 and the Revised Budget for the Financial Year 2012 -2013 are

as follows :-

( Rs. in lakh ).

Particulars Revised Estimate 2012-13

Budget Estimate for 2013 -14 Total Demand Fund For

1) Non-Plan 5686.84 11631.85 --- --- 11631.85

2) Plan 18815.60 8516.38 4758.79 2650.65 15925.82

3) CSS Plan 20760.71 13959.76 7777.19 3934.01 25670.96

Total:- 45263.15 34107.99 12535.98 6584.66 53228.63

Now, the aforesaid Budget Proposal is under examination of the Subject

Committee–I of the Tripura Legislative Assembly for recommendations to the

Demands for Grants.

The Committee in its meeting held on 8th May, 2013 examined the Budget

Proposals in details having discussion with the Principal Secretary of the

Department who appeared on the part of the Department on summon.

First of all, the Principal Secretary informed the Committee about the

action taken in respect of the recommendations made by the Committee during

the year 2012-13 and stated as follows :-

Relevant Para/page No of the

report

Recommen dation of the committee

Reply of the Government on the recommendation.

1 P/80. CDPO Office being the main

one the department to complete the construction of

As per ecommendation of

the Subject mmittee-1 file was moved to the

-146-

the rest by financial year

2012-13 and for which finance department release

fund.

Finance Department

(Budget Branch) with request to examine the

recommendation of the Subject Committee-1

and arrange for providing necessary

fund for construction of rest 14 CDPO Office

building. But the Finance Department

has returned the file with advise to move the

file to the Planning (P &

C) Department for sanction of fund for

construction of rest CDPO Office building

under SPA. Accordingly detailed project

report(DPR) has been sent to the Planning (P

& C ) Department for sanction of fund under

SPA for construction of 14 nos CDPO office @

20.00 lakhs each vide letter No.F.65(64)-

SWE/PLAN/2012 dated

5.5.2012 But sanction is yet to be received

from the Planning (P & C ) Department .

2.

P/80. Pension rate of all pension holders be increased to

Rs.500/- per month. Department may take the

proposal to the Finance

Department. Finance Department may take

necessary steps.

On the basis of the recommendation of the

Subject Committee-1 the Department has

sent the proposal to the

Finance Department (General Branch) with

request to increase the rate of pension from

Rs.400/- per month to Rs.500/- per month

vide file No.65(32)-SWE/PLAN/ 2012 dated

17.4.2012, The Finance Department has

-147-

returned the file stating

that pension has been increased from

Rs.300/- to Rs.400/- per month in respect of

Tripura Rickshaw puller and Tripura Cobbler

Pension scheme. Moreover the Govt.

has introduced the following new pension

scheme during 2012-13:-

a. State Old Age

Pension @ Rs.400/- PM.

b. State Widow Pension scheme.

@ Rs.400/- PM. c. Pension to

persons who lost 100% eye sight

under APL families @

Rs.500/- PM. d. 80% and above

disability Pension under APL

families Rs.400/-

PM. e. Motor Shramik

Pension@ Rs.400/- PM.

f. Barber Worker Pension @

s.400/- PM. g. Handloom Worker

Pension @ Rs.400/- PM.

h. Laundry Worker Pension @

Rs.400/- PM. i. Fishermen

Pension @

Rs.400/- PM.

3

P/80

Drinking water, sanitation

It has been decided by

-148-

shall have to be kept under

constant supervision and the Department to maintain

monitoring of the same.

the Govt. to provide

drinking water and sanitation facilities in all

AWCs by DWS Deptt. Accordingly they have

taken up the works. By now 6366 Anganwadi

centre have been covered sanitation

facilities and 7656 AWCs covered with

drinking water facilities. The Deptt has also

issued instruction to the

CDPOs to take all out efforts for maintaining

the sources already created and in case

there is any problem it may be brought to the

notice of the DISE concerned who in turn

will take up the issue with the DWS Deptt.

4 P/80. Medical check up under

NRHM Scheme should be taken up to the children

quarterly. This should be emphasized.

NRHM and Health Department are looking

after the Medical Check up of the Children of

AWCs. Anganwadi Workers are organizing monthly mother and child

health day in all AWCs where regular weighting

of children and mothers are under taken. Health

Care facilities have been provided to 378790 children & 103065

Mothers. Moreover 8304 VHND Days & MCH Days

have been organized at Anganwadi Centre level. 25 Shishu Matri Days are

also organized by the CDPOs. 9355521 IFA

Tablets are also distributed among the mothers and children.

Children are being Immunized at Anganwadi

centre level.

-149-

5

.

P/80. There shall be chart of

important personalities of both Central and State & to

distribute to all Anganwadi Centres to discuss on those

particulars days in their memory.

The Department has

not yet prepared any chart of important

personalities of both Central and State for

distribution to the AWCs. However, the

department has published a

departmental calendar in 2012 in which

important dates has been specified for

observation in the

Anganwadi Centres. Moreover, the

importance of 6 services of ICDS has

also been indicated in thuis calendar. The

calendar has been distributed to all AWCs.

6 P/80 The Training system for

Anganwadi workers / Helpers should be continued.

For imparting training

of the Anganwadi workers and Anganwadi

Helpers, the Department of Social

Welfare & Social Education has drawn an

action plan for training like previous years.

Accordingly, necessary fund has been provided

from Govt. of India and regular training

programme has been running in 4 district in

Anganwadi Training

Centre and one Anganwadi Training

Centre run by NGOs at A.D.Nagar, Agartala to

improve the quality for delivery of services of

the workers. The Deptt. has up grated the

AWWs training centre located at Narsingarh.

-150-

The Deptt had

organized 670 Block/Sector level

training programme for AWWs & AWHs during

the year 2012-13. At present, the status of

trained and un-trained ICDS functionaries is as

follows,

JOB Refresher

CDPO 51 20

Supervisor

(ICDS)

171 177

AWW 6309 5406

AWH 0 4953

MAJOR ACHIEVEMENT MADE BY THE EDUCATION(SOCIAL WELF ARE &

SOCIAL EDUCATION) DEPARTMENT DURING THE YEAR 2012-1 3.

SOCIAL SECURITY & WELFARE A.

1. Pension has been provided to 134 beneficiaries under Rickshaw

Puller Pension scheme.

2. 32 Cobblers got pension under Cobblers Pension scheme.

3. 152550 Old Age persons received state share under IGNOAPS.

4. 1543 beneficiaries got state share of pension under IGNDPS.

5. 8828 beneficiaries have been provided pension under State

old age pension scheme.

6. 172 beneficiaries have been provided pension under Motor

shramik Pension scheme.

7. 154 beneficiaries have been provided pension under Laundry

Worker Pension scheme.

8. 186 beneficiaries have been provided pension under Barber

Worker Pension scheme.

9. 306 beneficiaries have been provided pension under Handloom

Worker Pension scheme.

10. 413 beneficiaries have been provided pension under Fishermen

Pension scheme.

-151-

WOMEN WELFARE

1. 47155 women have been provided pension under widow and

deserted women pension scheme.

2. 7432 Widows have been provided state share of pension under

IGNWPS.

3. Incentive has been provided to 20782 Girl child.

4. International women day 2012 was organized at State, District

and Block level.

5. Anti Dowry week have been observed.

6. 1952 Widow have been provided pension under State Widow

Pension Scheme.

7. 957 Un-married women of 45 years and above(BPL) have been

provided pension.

8. 20 Working women have been provided hostel facility in the

working women hostel

9. 2528 Pregnant women and nursing mothers have been covered

under IGMSY.

CHILD WELFARE

1. 40 Tribal children have been given shelter in the Ampura Boys

Home.

2. 30 Over age inmates have been provided rehabilitation

package with skill training.

3. 500 Children different homes have been given incentives

under ICPS.

4. 309723 children has been provided SNP.

5. 86189 mothers have been covered under SNP Programme.

6. 64352 AGs have been covered under SABLA nutrition

programme.

7. 44837 AGs have been covered under SABLA non-nutrition

programme.

WELFARE OF HANDICAPPED

1. 15 physically challenged students have been provided

Scholarship.

2. 40 Blind student (girls) have been provided hostel facility and

Education in IVH(Girls).

3. 40 Deaf & Dumb children got education in ISR.

-152-

4. 37 Blind student (Boys) have been provided hostel facility and

Education in IVH(Boys).

5. 574 Disabled persons provided hostel facility in the disabled rest

house run by the Department.

6. 1581 beneficiaries received pension under 100% blind pensions

Scheme.

7. 1549 disable persons got pension under 60% and above

disability pension scheme.

8. 1228 beneficiaries have been provided pension under 80% and

above disable pension scheme(APL).

9. 386 beneficiaries have been provided pension under 100%

blind pension scheme (APL).

CORRECTIONAL SERVICES

1. 24 fallen & victimized women have been provided shelter in the

Protective Home.

2. 25 Juvenile Delinquent children have been provided shelter in

the Juvenile Home.

NATIONAL SOCIAL ASSISTANCE PROGRAMME

1. 136187 Old age persons of 60-79 years and 16363 old age

Persons of 80 years and above benefited under IGNOAPS.

2. 7432 Widows benefited under IGNWPS.

3. 2558 physically challenged persons got benefit under IGNDPS.

4. 1778 families have been provided benefit under NFBS.

5. 14552 Old Age Persons got benefit under Annapurna.

ANNUAL WORK REPORT IN RESPECT OF DEMAND NO.41.19. & 20 OF THE EDUCATION (SOCIAL WELFARE & SOCIAL EDUCATION) DEPAR TMENT

UNDER STATE PLAN FOR THE YEAR 2013-14. (Rs. in Lakhs)

Sl. No

Particulars/Items Demand wise provision in Budget Estimate for 2013-14

Total

Physical Target for 2013-14.

41

19

20

1 2 3 4 5 6 7 1 Salary 888.16 529.48 290.36 1708.00 For payment of

Honorarium to 9911 AWWs & 9911 AWHs.

2 Grants to TSSWB 93.60 55.80 30.60 180.00 For payment of Salaries, Pension to

-153-

72 staff of Erstwhile Border Area Project under TSSWB.

3. Indira Gandhi National Old Age Pension (state share)

1903.80 1135.00 622.40 3661.20 152550 Old age pensioner @ Rs.200/- per head per month being state contribution.

4 Pension to persons who lost 100% eye sight under IGNDPS

52.03 31.01 17.00 100.04 Pension @ Rs.800/- per head per month for 1042 persons who have lost 100% eye sight under IGNDPS.

5 Scholarship/Stipend 1.00 0 0 1.00 For providing Stipend/ Scholarship to Blind and Handicapped students.

6 Transfer fund to TTAADC

0 80.00 0 80.00 Transfer grant to TTAADC for developmental activities.

7 Indira Gandhi National Widow Pension Scheme (State share)

139.14 82.94 45.48 267.56 For payment of State Share of pension under to 7432 under IGNWPS @ Rs.200/- per head per month.

8 Indira Gandhi National Disability Pension Scheme (State Share)

28.08 16.74 9.18 54.00 For payment of State Share of pension under to 1543 under IGNDPS @ Rs.200/- per head per month.

9 Homes 15.13 4.87 0 20.00 For running 4 Homes namely Ampura Boys Home, Institute for Visual Handicapped(Girls) Home, Protective Home, Juvenile Home.

10 Electricity Charges 9.50 0.50 0 10.00 For payment of Electricity bill of Homes/Institutions.

11 Others 49.50 0.50 0 50.00 For maintenance of House Rent , Office Expenses, Cost of Fuel, training etc.

12 Minor Work 10.00 0 0 10.00 Repair/renovation of Deptt. Building.

13 State share/State contribution

1979.08 1151.01 631.21 3761.30 Being the State Share for running

-154-

Supplementary Nutrition Programme, ICDS prog, Sabla, ICPS, NMEW etc.

14 Capacity building for the Women

50.00 0 0 50.00 It is new scheme for capacity building of women

15 Capacity building for the Physically challenged persons

30.00 0 0 30.00 It is new scheme for capacity building for physically challenged persons.

16 Construction(SPA) 581.40 0 0 581.40 For construction of departmental building.

17 NSAP 0 0 0 0 a) National Old age

Pension Scheme (central Share).

2196.41 1379.12 844.38 4419.91 136187 (60-79 years) Old age pensioner @ Rs.200/- per head per month & 16363 (80 years and above) @ Rs.500/- per head per month as Central Share.

b) National Family Benefit Scheme. (Central)

104.00 62.00 34.00 200.00 For giving financial assistance to 2000 families @ Rs.20000/- per family due to death for bread earner of the family.

c) Indira Gandhi National Widow Pension Scheme (central Share).

335.60 200.06 109.72 645.38 For payment of Central Share of pension to7432 Widows under IGNWPS @ Rs.300/- per head per month.

d) Indira Gandhi National Disability Pension Scheme (central Share).

49.95 29.76 16.32 96.03 For payment of Central share of pension to 2585 Disable persons under IGNDPS@ Rs.300/-per head per month.

Grant Total 8516.38 4758.79 2650.65 15925.82

-155-

ANNUAL WORK REPORT IN RESPECT OF DEMAND NO.41. OF T HE EDUCATION (SOCIAL WELFARE & SOCIAL EDUCATION) DEPAR TMENT UNDER

NON- PLAN FOR THE YEAR 2013-14.

(Rs. in Lakhs) Sl. No.

Particulars/Items Demand No.41

Physical Target for 2013-14.

1 2 3 4 1. Salary 5359.32 Director-1,Dy.Commissioner-1,

Dy.Director-5, Programme Officer-4, Chief Supt.-1,SRO-1, DISE-4,Sup(RFLP)-3, SUP(Home))-7,SEO-10,Blind Edo.-5, Tutor of Home-6,Asstt.Nurse-6,Senior Com-2,OS-5,Head Clerk-/Account-32,UDC-62,LDC-134,Jr SEO-893,Driver-13,Storekepper-6, SM-841,ClassIV/Gardener-269,Helper-13, Cook-14,Sweeper-9,Helper Gr.-II - 5,NG-24, Pupetmen-1,Projector Operator-1.

2. Grants to TTAADC (Salary)

1524.68 For payment of Salaries to the deputed staff of this Deptt. to TTAADC( Jr.SEO.-242, SM-148,Group D-3,PTI-124,ALT-181,PTW-2).

3. Grants to TSSWB/ Mahila Commission

60.00 1.Being 50% state share of Tripura State Social Welfare Board including Honorarium of Chairperson. 2. Establishment cost of Tripura Commission for Women including Honorarium of Chairperson.

4. Homes 83.76 For running 7 Homes namely Khilpara Boys Home, Ramnagar Boys Home, Girls Unit-I, Girls Unit-2, Mahila Ashram, Foundling Home, Infirmary, and 2 Institutions namely Institute for Visual Handicapped(Boys), Institute for Speech Rehabilitation covering 447 inmates.

5. Electricity Charge 10.00 Electricity charge for 7 Homes and 2 Institutions and Office of the CDPO, DISE,& Directorate.

6. Repair of Public Building 20.00 Maintenance of Department Building.

7. Social Pension 229.50 For payment of BHP to 4531 beneficiaries @ Rs.400/- per month , Bidi Shramik pension to 97

-156-

beneficiaries @ Rs.400/- per month and Unemployment allowance to 35 beneficiaries @ Rs.1000/- per month.

8 Allowance for the persons having 60% and above disability

130.65 Allowance @ Rs.400/- per head per month for 1549 disable persons who are having 60% and above disability.

9 Pension to persons who lost 100% eye sight under BPL

66.00 Pension @ Rs.1000/- per head per month for 539 persons who have lost 100% eye sight.

10 Pension to Widow & Deserted Women

2263.44 Pension @ Rs.400/- per head per month for 47155 Widows and deserted Women.

11 Tripura Rickshaw Puller Pension scheme

8.82 For payment of pension to 134 Rickshow Pullers @Rs.400/- per head per month.

12 Tripura Cobblers Pension scheme

5.00 For payment of pension to 32 Cobblers @ Rs.400/- per head per month.

13 Tripura Scheme for Girls Child scheme

1000.13 For payment of Incentive to 20782 girls Child @ Rs.300/- per head per month.

14 State Old age pension Scheme

423.75 For payment of pension to 8828 State old age persons @Rs.400/- per head per month

15 State widow pension Scheme

93.70 For payment of pension to 1952 State widow persons @Rs.400/- per head per month.

16 Un-married Women pension under BPL families

82.95 For payment of pension to 957 Un-married women persons @Rs.400/- per head per month.

17 Pension to persons who lost 100% eye sight under APL families

30.00 For payment of pension to 386 100% eye sight under APL families @Rs.500/- per head per month.

18 Allowance for the persons having 80% and above disability under APL families

82.95 For payment of pension to 1228 80% and above disability under APL families @Rs.400/- per head per month.

19 Motor Shramik Pension Scheme

24.00 For payment of pension to 172 Motor shramik @Rs.400/- per head per month.

20 Laundry Worker Pension Scheme

14.40 For payment of pension to 154 Laundry worker @Rs.400/- per head per month.

21 Barber Worker Pension Scheme

16.80 For payment of pension to 186 Barber worker @Rs.400/- per head per month.

22 Handloom Worker Pension Scheme

24.00 For payment of pension to 306 Handloom worker @Rs.400/- per head per month.

23 Fishermen Pension Scheme 48.00 For payment of pension to 413

-157-

Fishermen @ Rs.400/- per head per month.

24 Others 30.00 For payment of House Rent of 2 DISE Office,1 CDPO Office, Office expenses for the office of the DISE of 4 District, SWO Office and Directorate Office, For running of Vehicle of 4 DISE Office, SWO, Office and Directorate Office. For payment of T.E. to Official Staffs, For payment of O.T. to the Driver.

Grand Total:- 11631.85

ANNUAL WORK REPORT IN RESPECT OF DEMAND NO.41. OF T HE EDUCATION SOCIAL WELFARE & SOCIAL EDUCATION) DEPART MENT UNDER

CSS- PLAN FOR THE YEAR 2013-14.

Rs.In Lakhs

Particulars.

RE 2012-13

BE 2013-14

41 19 20 Physical Target for 2013-14

1 2 3 4 1 ICDS

(GENERAL)

10241.50 12695.79 6189.37 4425.14 2101.92 Actual Provision of Salary of existing employees of 3-Deputy Director, 4-Programme Officer of District Cell, Project Level and 56-CDPOs,436 Supervisors, 9911 AWWs,9911 AWHs, 130-Clerks, Driver-10, 55-Group-D, Nutritionist-1, PSE-1 & SEW-1 and Non-Salary item of TA,Electric,BLC, Centre Contingency, Telephone, Rent,P.Oil,Hiring Vehicle, IEC,Flexi Fund, Uniforms, Printing, Furniture, PSE Kits, Medicine Kits, Weighing Scale under

-158-

ICDS(General) as per scheme guideline.

2 SNP 6543.42 9063.62 4703.87 2818.94 1540.81 Providing supplementary nutrition to 377016 Nos enrolled children ( 6 months - 6 years), 103725 enrolled PM & LM , 669 nos severely under weight children and 8400 nos adolescent girls @ Rs.6/- , 7/-,9/-,7/- per day respectively as per new norms revised by GOI which will be implementaed from 2013-14. Prtovision of cost of rice for SNP.

3 Training 100.48 100.48 100.48 0 0 Provision for imparting training of ICDS Functionaries i.e. Job Course for 20 AWW, Orientation Course for 40 AWW, Refresher Course for 50 AWW & 40 AWH. Supervisor Job Course- 5 Nos, Refresher Course-5 Nos.Block Level training for Infant & Young Child feeding (IYCF) 56 Nos. Block level training for WHO Growth Chart -56 Nos and Block Level ICDS Training -56 Nos.

4 KSY 30.80 30.80 15.95 10.45 4.4 Provision of implementation of KSY in 28 ICDS Project @ Rs.110000/- Per Anum ( 110000 X 28).

-159-

5 IGMSY 217.19 217.19 217.19 0 0 Provision has been kept for 6255 beneficiaries. Flexi Fund amounting to 2.5 % of total annual Exp. Training & Capacity building 3 % and IEC , Contingency 2% both for State & District cell

6 Sabla (Nutrition)

1527.96 1516.92 783.58 473.59 259.75 Provision for 107161 beneficiaries @ Rs.5/- per head for 300 days.

7 Sabla (Non-Nutrition)

159.60 106.40 30.2 49.07 27.13 Non-reccuring Expenditure @Rs.3.80 lakhs for 28 Projects

TOTAL SABLA

1687.56 1623.32 813.78 522.66 286.88

8 CONSTRUCTION

1725.00 1725.00 1725.00 0 0 Construction of 11 Nos CDPO Office, 1 No State Level Training Center (MLTC), 1000 Nos Kitchen cum Store of AWCs, 150 Nos damage AWCs and 100 Nos new constrtuction of AWCs and recurring & non-recurring exp of state level training centre.

TOTAL ICDS

20545.95 25456.20 13765.64 7777.19 3934.01

9 NMEW 16.38 16.38 16.38 0 0

10 ICPS 198.38 198.38 198.38 0 0

TOTAL CSS

20760.71 25670.96 13980.40 7777.19 3934.01

-160-

After examination of the Budget proposals and appreciation of

submission of the Representative of the Department Committee recommends the

Budget proposals under Demand No. 41 for grants by the House alongwith the

Recommendations.

RECOMMENDATIONS

i) The Department to continue its persuasion with P lanning Department for release of adequate fund for constru ction of 14(fourteen) CDPO offices.

ii) The Department to ensure extending drinking wat er, sanitation to uncovered AWCs. For that the Department to effec t supply of 40(forty) Ltrs. capacity Filters in all AWCs.

iii) Training programme be extended to uncovered ar eas, specially to the newly created 4(four) Districts by opening training center.

iv) Pension rate to the pension holders/ beneficiar ies should be increased considering price raise in the market.

v) The Department to set up new AWCs in the uncover ed areas as early as possible.

( Shri Sudhan Das ) Dated, Agartala, Chairman the 10th May, 2013. Subject Committee- I Tripura Legislative Assembly