217
Land Restoration / Reclamation Monitoring of 76 Opencast Coal Mines Projects of CIL producing more than 5 mcm (Coal+OB) annually based on Satellite Data for the Year 2021 Y E A R 2 0 2 1

Report on Land Restoration / Reclamation of 52 Opencast Mines of

Embed Size (px)

Citation preview

Land Restoration / Reclamation Monitoring of 76 Opencast Coal

Mines Projects of CIL producing more than 5 mcm (Coal+OB) annually based on Satellite Data for the Year 2021

Y

E

A

R

2

0

2

1

CMPDI

Job No 561410027 1

Land Restoration / Reclamation Monitoring of 76 Opencast Coal Mines Projects of CIL producing more than 5 mcm (Coal+OB) annually based on Satellite Data for the Year

2021

March- 2022

Remote Sensing Cell Geomatics Division

CMPDI, Ranchi

CMPDI

Job No 561410027 2

CONTENTS

Executive Summary 3 1.0 Background 9 2.0 Objective 10 3.0 Methodology 10 4.0 Work plan 13 5.0 Land Reclamation in WCL 15 6.0 Land Reclamation in SECL 50 7.0 Land Reclamation in NCL 104

8.0 Land Reclamation in MCL 130

9.0 Land Reclamation in CCL 169 10.0 Land Reclamation in ECL 206

CMPDI

Job No 561410027 3

Executive Summary

1.0 Project Land restoration / reclamation monitoring of 76 opencast coal mines in different subsidiaries of Coal India Ltd. (CIL) producing 5 million cu.m. and more (Coal+OB) per year based on satellite data of year 2021 on annual basis.

2.0 Objective Objective of the land restoration / reclamation monitoring is to

assess the area under backfilling, plantation, social forestry, active mining area, water bodies, distribution of wasteland, agricultural land and forest in the leasehold area of the projects. This will help in assessing the progressive status of mined land reclamation and to take up remedial measures, if any, required for environmental protection.

3.0 Salient Findings

In the year 2021, amongst projects of different subsidiaries of Coal India Ltd. taken up for monitoring, WCL has included 4 more mines. CCL has included 8 more mines, SECL has included more 11 mines and MCL has included 2 more mine for monitoring from this year as per directive received from CIL. Some of these additional mines were previously monitored under Less than 5 mcm (Coal+OB) Category and some mines are new additions Hence, total of 76 mines were selected for monitoring this year instead of 51 mines that were monitored in the year 2020.

Out of the total mine leasehold area of 863.83 Km2 of the 76 OC projects considered for monitoring during 2021-22; total excavated area is 302.65 Km2; out of which 136.23 Km2 area (45.01%) is under backfilling (Technical Reclamation), 53.02 Km2 area (17.52%) has been planted (Biologically Reclaimed) and 113.40 Km2 area (37.47%) is under active mining. It is evident from the analysis that 189.25 Km2 (62.53%) area out of the total excavated area of 302.65 Km2 of the 76 OC projects is already under reclamation and balance 113.40 Km2 (37.47%) area is under active mining. Company wise details are given in Table - 1 & Fig-1.

On comparing the status of land reclamation carried out in year 2020-21 with respect to years 2021-22 in the 76 Opencast projects of different CIL subsidiaries, it is evident from the analysis of the satellite data of the year 2021 that area under land reclamation has increased from 173.95 Km2 (Yr. 2020-21) to

CMPDI

Job No 561410027 4

189.25 Km2 (Yr. 2021-22), which includes both area under plantation (Biological Reclamation) and areas under backfilling (Technical Reclamation). This increase of 15.30 Km2 area of land reclamation in last one year is the result of the efforts made by CIL’s subsidiary companies towards land reclamation. Year wise comparison in land reclamation in different subsidiaries is given in Fig.2.

It has been observed that in all the subsidiaries of Coal India Limited (CIL), technical reclamation has shown an increasing trend. As compared to the analysis done in the year 2020, it has been found that there has been an overall increase of 12.91 Km2 in area under technical reclamation commutatively in the year 2021.

It has been observed that in WCL, SECL, NCL, CCL & ECL area under biological reclamation has increased in comparison to previous year whereas in MCL area under biological reclamation has reduced marginally in the leasehold areas of the opencast projects selected for this study (Refer Table-1).

In has been also observed that in subsidiaries like WCL, SECL, MCL, CCL & ECL, total area under plantation (Green Cover) which includes plantation over backfill, plantation over overburden dumps and plantation done under social forestry etc. has increased as compared to previous year. However, in NCL, there has been marginal decrease in area under green cover due to additional dump on vegetated area in Jhingurdah project. In NCL, leasehold boundaries of all the projects taken up of monitoring are updated with latest available EC boundaries which has resulted change in position and area of the projects impacting area under plantation and vegetation. Overall 18.09% of the total leasehold area of all the subsidiaries of CIL commutatively is under Green Cover as per the analysis of satellite data of the year 2021.

Analysis of the results based on satellite data of the year 2021 also indicate that all subsidiaries of CIL, whose projects were under monitoring indicate an increasing trend for area under reclamation. It has been observed that total area under reclamation has increased from 173.95 Km2 (62.16%) in 2020 to 189.25 Km2 (62.53%) in the year 2021.

Commutative Status of Land Reclamation monitoring based on satellite data of the year 2021 is indicated in the Pie Chart in the

CMPDI

Job No 561410027 5

Fig. 1. Subsidiary wise status of Land Reclamation Monitoring of the projects monitored based on satellite data of the year 2021 is shown in form of Bar Chart at Fig 2. Comparison of Area under Reclamation in different subsidiaries of Coal India Limited between the years 2020 to 2021 has been shown in form of Bar- Chart in Fig 3.

CMPDI

Job No 561410027 6

Table-1

Company wise Land Reclamation Status in OC projects of CIL based on Satellite Data of year 2021 (Projects producing more than 5 mcm of Coal+OB annually)

(Area in Sq. km)

Note: In reference of the above Table, different parameters are classified as follows:

1. Area under Biological Reclamation includes areas under plantation done on backfilled area only. 2. Area under Technical Reclamation includes area under barren backfilled only 3. Area under Active mining includes coal quarry site, quarry filled with water etc. 4. Social Forestry and Plantation on external OB dump are not included in Biological Reclamation and are put under separate categories as shown in the table. 5. (%) calculated in the above table is in respect of total excavated area except for “Total area under plantation” where (%) is calculated in terms of leasehold area. 6. Total no. of projects taken up for monitoring in the Year 2021 has increased to 76 from 51 in the Year 2020. 7. Data indicated against Year 2020 in the above Table cannot be compared with the Data indicated in the Report submitted to CIL for the year 2020 as there has been addition of data for the projects which were

previously monitored under less than 5 mcm category in phase wise manner but has been included for annual monitoring from the year 2021 in different subsidiaries of CIL.

1 2

2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021

1 WCL (14) 139.19 150.99 9.00 10.53 3.39 3.84 13.85 14.37 8.92 9.75 19.81 20.63 32.20 35.00 26.16 27.96 12.39 14.37

27.95% 30.09% 10.53% 10.97% 61.52% 58.94% 18.79% 18.52% 38.48% 41.06%

2 SECL (19) 182.82 199.51 30.33 35.10 18.17 18.83 11.21 11.70 8.93 9.56 21.24 21.46 69.74 75.39 38.31 40.09 48.50 53.93

43.49% 46.56% 26.05% 24.98% 30.46% 28.47% 20.96% 20.09% 69.54% 71.53%

3 NCL (10) 179.03 179.03 34.70 36.00 11.03 11.23 18.18 18.17 20.67 20.45 30.13 32.44 75.86 79.67 49.88 49.85 45.73 47.23

45.74% 45.19% 14.54% 14.10% 39.72% 40.72% 27.86% 27.84% 60.28% 59.28%

4 MCL (16) 174.87 179.75 25.26 27.29 8.37 8.24 3.18 3.30 4.00 4.07 20.39 23.49 54.02 59.02 15.55 15.61 33.63 35.53

46.76% 46.24% 15.49% 13.96% 37.75% 39.80% 8.89% 8.68% 62.25% 60.20%

5 CCL (15) 116.03 113.86 15.20 18.01 7.00 7.98 5.29 5.04 5.03 4.69 9.95 10.50 32.15 36.49 17.32 17.71 22.20 25.99

47.28% 49.36% 21.77% 21.87% 30.95% 28.78% 14.93% 15.55% 69.05% 71.22%

6 ECL (02) 40.69 40.69 8.83 9.30 2.67 2.90 0.50 0.61 1.48 1.50 5.03 4.88 16.53 17.08 4.65 5.01 11.50 12.20

53.42% 54.45% 16.15% 16.98% 30.43% 28.57% 11.43% 12.31% 69.57% 71.43%

TOTAL (76) 832.63 863.83 123.32 136.23 50.63 53.02 52.21 53.19 49.03 50.02 106.55 113.40 280.50 302.65 151.87 156.23 173.95 189.25

43.96% 45.01% 18.05% 17.52% 37.99% 37.47% 18.24% 18.09% 62.01% 62.53%

Sl.

No.

Project

(Nos.)

Total Leasehold

Area

Reclamation Activities under Progress

Area under Active

Mining

Total Excavated

Area

Total Area under

Plantation (% Green Cover

Generated in

Leasehold)

Total Area under

Reclamation

Technical

Reclamation

Biological

ReclamationOther Plantations

Area under BackfillingPlantation on Backfilled

Areas

Plantation on

External OB Dumps

Social Forestry,

Avanue Plantation Etc.

9 (=4+5+8) 10 (=5+6+7) 11(=4+5)

(% is calculated with respected to Excavated Area as applicable)

3 4 5 6 7 8

CMPDI

Job No 561410027 7

Fig.1 : Pie Chart showing Status of Land Reclamation in CIL Subsidiaries

Under Technical Reclamation

45.01%

Biologically Reclaimed 17.52%

Area under active Mining 37.47% Under Technical

ReclamationBiologically Reclaimed

Area under active Mining

150.

99

199.

51

179.

03

179.

75

113.

86

40.6

9

35.0

0

75.3

9

79.6

7

59.0

2

36.4

9

17.0

8

14.3

7

53.9

3

47.2

3

35.5

3 25.9

9

12.2

0

0

50

100

150

200

250

WCL SECL NCL MCL CCL ECL

Leasehold Area Excavated Area Area under Reclamation

CIL SUBSIDIARIES

AR

EA(S

q.K

ms.

)

Fig. 2 : Company wise Land Reclamation Status in the Year 2021

SUBSIDIARIWISE STATUS OF LAND RELMATION IN THE YEAR 2021

STATUS OF LAND RECLAMATION IN THE LEASEHOLD OF 76 OPENCAST MINES

UNDER MONITORING BASED ON SATELLITE DATA OF THE YEAR 2021 (Pier Chart indicated distribution of Total Excavated Area Only)

(As per Digital Image Processing of Satellite Data of the year 2021)

LEGEND

CMPDI

Job No 561410027 8

Fig. 3 : Comparision fo Area under Land Reclamation between 2019 to 2021

Fig. 4 : Comparision fo Area under Green Cover in subsidiaries between 2019 to 2021

0

15

30

45

60

WCL SECL NCL MCL CCL ECL

11.1

7

37.8

1

46.6

6

31.0

0

15.0

1

10.6

8

12.3

9

48.5

0

45.7

3

33.6

3

22.2

0

11.5

0

14.3

7

53.9

3

47.2

3

35.5

3

25.9

9

12.2

0

COMPARISION OF AREA UNDER LAND RECLAMATION BETWEEN THE YEARS 2019 TO 2021 IN DIFFRENT SUBSIDIARIES OF COAL INDIA LIMITED

2019

2020

2021

CIL SUBSIDIARIES

AR

EA

UN

DE

R R

EC

LA

MA

TIO

NIN

SQ

.KM

S.

0

15

30

45

60

WCL SECL NCL MCL CCL ECL

25.2

1

34.4

5

51.9

1

14.8

7

12.9

8

4.22

26.1

6

38.3

1

49.8

8

15.5

5

17.3

2

4.65

27.9

6

40.0

9

49.8

5

15.6

1

17.7

1

5.01

COMPARISION OF AREA UNDER GREEN COVER BETWEEN THE YEARS 2019 TO 2021 IN DIFFRENT SUBSIDIARIES OF COAL INDIA LIMITED

2019

2020

2021

CIL SUBSIDIARIES

AR

EA

UN

DE

R R

EC

LA

MA

TIO

NIN

SQ

.KM

S.

(For 76 Opencast Projects under monitoring based on Satellite Data )

CMPDI

Job No 561410027 9

1.0 Background

1.1 Land is the most important natural resource which embodies soil, water, flora, fauna

and total ecosystem. All human activities are based on the land which is the scarcest

natural resource in our country. Mining is a site specific industry and it could not be

shifted anywhere else from the location where mineral occurs. It is a fact that surface

mining activities do effect the land environment due to ground breaking. Therefore,

there is an urgent need to reclaim and restore the mined out land for its productive use

for sustainable development of mining. This will not only mitigate environmental

degradation, but would also help in creating a more congenial environment for land

acquisition by coal companies in future.

Keeping above in view, Coal India Ltd. (CIL) issued a work order vide letter no.

CIL/WBP/Env/2009/2428 dated 29.12.2009 to Central Mine Planning & Design Institute

(CMPDI), Ranchi, for monitoring land reclamation. status of all the opencast coal mines

having production of more than 5 million m3 per annum (coal + OB taken together per

annum) based on remote sensing satellite data, regularly on annual basis for

sustainable development of mining. Further, a revised work order was issued vide letter

no. CIL/WBP/Env/2011/4706 dated 12.10.2012 from Coal India Limited for the period

2012-13 to 2016-17 which was subsequently followed by another work order vide letter

no. CIL/WBP/Env/2017/DP/8477 dated 21.09.2017 from Coal India Limited for the

period 2017-18 to 2021-22 for land reclamation monitoring of opencast projects and

vegetation cover monitoring of 19 major coalfields. According to this work order, all

mines in CIL with output capacity of 5 million cu. m (coal +OB) shall be monitored every

year and all mines below this capacity shall be monitored at an interval of 3 years. All

coalfields in CIL shall also be monitored at an interval of 3 years as per a defined plan.

The result of land reclamation status of all such mines to be put on the website of CIL

(www.coalindia.in), CMPDI (www.cmpdi.co.in) and the concerned coal companies in

public domain. Detail report to be submitted to Coal India and respective subsidiaries.

CMPDI

Job No 561410027 10

1.2 Land reclamation monitoring of all opencast coal mining projects would also comply the

statutory requirements of Ministry of Environment, Forest & Climate Change

(MoEF&CC), GoI. Such monitoring would not only facilitate in taking timely mitigation

measures against environmental degradation but would also enable coal companies to

utilize the reclaimed land for larger socio-economic benefits in a planned way.

1.3 CMPDI undertook the above study and the present report is embodying the findings in

nutshell carrying out for the 76 opencast projects of different subsidiaries producing 5

million cubic m. coal +OB or more in the year 2021-22. This study is being carried out

in since year 2008 on annual basis and progressive changes in the status of land

reclamation have been assessed. It is to be noted that BCCL has excluded this

previous year for more than 5 Million Cubic m. (Coal+OB) monitoring category.

2.0 Objective

Objective of the land reclamation/restoration monitoring is to assess the area of

backfilled, plantation, OB dumps, social forestry, active mining area, settlements and

water bodies, distribution of wasteland, agricultural land and forest land in the leasehold

area of the project. This is an important step taken up for assessing the progressive

status of mined land reclamation and for taking up remedial measures, if any, required

for environmental protection.

3.0 Methodology

There are number of steps involved between raw satellite data procurement and

preparation of final map. National Remote Sensing Centre (NRSC) Hyderabad, being

the nodal agency for satellite data supply in India, provides only raw digital satellite

data, which needs further digital image processing for extracting the information and

map preparation before uploading the same in the website. Methodology for land

reclamation monitoring is given in fig 3. Following steps are involved in land reclamation

/restoration monitoring:

CMPDI

Job No 561410027 11

Fig.3: Methodology for Land Reclamation Monitoring

3.1 Data Procurement: After browsing the data quality and date of pass on internet,

supply order for data is placed to NRSC. Secondary data like leasehold boundary, topo

sheets are procured for creation of vector database.

3.2 Satellite Data Processing: Satellite data are processed using ERDAS IMAGINE

Professional v2014 s/w / PCI Geomatica digital image processing s/w. Methodology

involves the following major steps:

Rectification & Geo-referencing: Inaccuracies in digital imagery may occur due to

‘systematic errors’ attributed to earth curvature and rotation as well as ‘non-

systematic errors’ attributed to satellite receiving station itself. Raw digital images

contain geometric distortions, which make them unusable as maps. Therefore, geo-

referencing is required for correction of image data using ground control points (GCP)

to make it compatible to SoI topo-sheet.

Validation

through

Ground

Truthing

Report

Preparation

Data Source Secondary DataBasic Data

IRS – P6

(LISS - IV)

Topographical

Maps

(Scale 1:50,000)

Creation of Vector

Database

(Drainage, Road, Railway

network, Block boundary,

Forest Boundary etc.)

Signature

Generation

Pre-Field

ClassificationIntegration of

Raster & Vector

database in GISFinal land Reclamation

map

Training Set

Refinement

Pass

Fail

Geocoded FCC

Generation

Methodology for Land Reclamation Monitoring

Pre-processing,

geometric correction,

rectification & geo -

refrencing

Image

Enhancement

Training set

Identification

IRS – R2

LISS4FMX

CMPDI

Job No 561410027 12

Image enhancement:

To improve the interpretability of the raw data, image enhancement is necessary.

Local operations modify the value of each pixel based on brightness value of

neighbouring pixels using ERDAS IMAGINE Professional v2014 s/w / PCI Geomatica

digital image processing s/w and enhance the image quality for proper interpretation.

Training set selection

Training set requires to be selected, so that software can classify the image data

accurately. The image data are analysed based on the interpretation keys. These

keys are evolved from certain fundamental image-elements such as tone/colour, size,

shape, texture, pattern, location, association and shadow. Based on the image-

elements and other geo-technical elements like land form, drainage pattern and

physiography; training sets were selected/identified for each land use/cover class.

Field survey was carried out by taking selective traverses in order to collect the

ground information (or reference data) so that training sets are selected accurately in

the image. This was intended to serve as an aid for classification.

Classification and Accuracy assessment

Image classification is carried out using the maximum likelihood algorithm. The

classification proceeds through the following steps: (a) calculation of statistics [i.e.

signature generation] for the identified training areas, and (b) the decision boundary

of maximum probability based on the mean vector, variance, covariance and

correlation matrix of the pixels. After evaluating the statistical parameters of the

training sets, reliability test of training sets is conducted by measuring the statistical

separation between the classes that resulted from computing divergence matrix. The

overall accuracy of the classification was finally assessed with reference to ground

truth data.

Area calculation

The area of each land use class in the leasehold is determined using ERDAS

IMAGINE Professional v2014/ PCI Geomatica digital image processing s/w.

CMPDI

Job No 561410027 13

Overlay of Vector data base

Vector data base created based on secondary data. Vector layer like drainage,

railway line, leasehold boundary, forest boundary etc. are superimposed on the

image as vector layer in the Arc GIS database.

Pre-field map preparation

Pre-field map is prepared for validation of the classification result

3.3 Ground Truthing:

Selective ground verification of the land use classes are carried out in the field and

necessary corrections if required, are incorporated before map finalization.

3.4 Land reclamation database on GIS:

Land reclamation database is created on GIS platform to identify the temporal changes

identified from satellite data of different cut-off dates.

4.0 Work Plan

4.1 Total 76 opencast projects producing 5 million cubic m. and more (Coal + OB together)

during the year 2021-22 were taken up for the study. Based on the RESOURCESAT-

2 satellite data, land reclamation / mine closure monitoring was carried out using

ERDAS IMAGINE digital image processing s/w and Arc-Info GIS. Baseline data on

reclamation of these OC projects of CIL’s subsidiaries have been generated and the

same has been annually updated since year 2008.

4.2 Besides project wise land reclamation monitoring, coalfield wise vegetation cover

monitoring on regional scale has also been planned for the major 19 coalfields of India

at regular interval of three years using remote sensing satellite data to assess the

regional impact of coal mining and associated industrialization on the land use and

vegetation cover in the coalfield. Geo-environmental baseline data for Raniganj,

Jharia, East Bokaro, West Bokaro, Karanpura, Singrauli (Moher Sub-basin), Korba,

CMPDI

Job No 561410027 14

Bisrampur, Shohagpur, Mand-Raigarh, Talcher, Ib Valley, Wardha Valley, Bander,

Kamptee, Umrer, Pench Kanhan and Makum coalfields based on the satellite data

have been generated and will be monitored regularly at three years’ interval.

4.3 The list of subsidiary wise 76 opencast projects taken up for Land Reclamation

Monitoring based on satellite data of year 2021 is given in table below:

Subsidiary

(No. of Projects)

Opencast Projects

(5 million Cu.m. Coal +OB or more per annum)

WCL (14) Sasti, Padmapur, Durgapur, Mugoli, Umrer, Ukni, Niljai, New Majri,

MKD- III, Penganga, Yekona-I &II (Amal.), New Majri UG to OC,

Pauni-II (Expn.), MKD-I (Expn.)

SECL (19) Dipka, Gevra, Kusmunda, Manikpur, Saraipalli, Ambika, Jampali,

Baroud, Bijari, Chhal, Dhanpuri Amlai Group of Mines, Rajnagar,

Chirimiri, Mahan-II, Jagannathpur, Amadand, Batura, Amera &

Jamuna

NCL (10) Amlohri, Nigahi, Jayant, Dudhichua, Khadia, Krishnashila, Bina,

Kakri, Jhingurdah, Block-B

MCL (16) Ananta, Balram, Lingraj, Bharatpur, Bhubaneswari, Jagannath,

Hingula, Kaniha, Belpahar, Lakhanpur, Samleswari, Lajkura,

Siarmal , Basundhara West Extension, Garjanbahal & Kulda

CCL (15) Ashoka, Piparwar, KDH, Amrapali, Magadh, Rohini, Purnadih,

North Urimari, Rajrappa, Parej East, Tapin North, Kathara, Karo,

Konar Expansion & Selected Dhori

ECL (02) Sonepur-Bazari, Rajmahal

TOTAL (76)

4.4 Subsidiary wise report on land reclamation status of the above mentioned 76 OC

projects derived through Digital Image Processing of Satellite Data for the year 2021

are given in the following pages:

WESTERN COALFIELDS LIMITED

CMPDI

Job No 561410027 16

5.0 Land Reclamation Status in Western Coalfields Ltd.

5.1 Following 14 OC projects producing more than 5 million cubic m. (Coal + OB together)

of Western Coalfields Ltd. have been taken up for land reclamation monitoring based

on Satellite Data of the year 2021:

Sasti

Padmapur

Durgapur

Mugoli

Umrer

Ukni

Niljai

New Majri

MKD-III

Penganga

Yekona-I&II (Amal.)

New Majri UG to OC

Pauni-II (Expn.)

MKD-I(Expn.)

5.2 Project wise Land Reclamation status in WCL for the year 2021 is given in Table 5.1

and also shown graphically in Fig 5.1. Area statistics of different land use class present

in the mine leasehold boundaries of the above projects for the year 2021 are shown in

the Table - 5.2. It is important to mention here that leasehold boundaries of Yekona-

I&II (Amal), New Majri UG to OC and MKD-I (Expn.) projects have been modified as

per latest EC. Land use maps derived from satellite data are shown in Plate 5.1-5.14.

Year wise changes in the different land use classes based on satellite data are depicted

in Bar Charts in Fig. 5.2 - 5.15 for the last three years only.

CMPDI

Job No 561410027 17

5.3 Study reveals that 14.37 Km2 (41.06%) of excavated area has been under reclamation

in the above mentioned mines of WCL out of which 3.84 Km2 (10.97%) area has been

revegetated and 10.53 Km2 (30.09%) area is under backfilling. There is an overall

increase of 1.98 Km2 in area under reclamation in WCL in the year 2021 with respect

to the year 2020, out of which there is an increase of 1.53 Km2 in area under technical

reclamation (Barren Backfilling) and an increase of 0.45 Km2 in area under biological

reclamation (Plantation on Backfilled Areas) (Refer Table 5.1). In New Majri OC project

plantation on OB has been reduced by 0.36 Km2 on account of tree felling for the

purpose of coal mining.

5.4 Analysis of satellite data also indicates that total area under active mining has

increased from 19.81 Km2 (Yr.2020) to 20.63 Km2 (Yr.2021). In some OC project area

under active mining has reduced due to increase in area under backfilling.

5.5 After comparing the satellite data of year 2021 vs. 2020 study reveals that area under

backfilling has increased from 9.00 Km2 (Yr.2020) to 10.53 Km2 (Yr.2021). Area under

backfilling in Umrer OC project have been reduced due to rehandling of Quarry 2.

5.6 Total area under biological reclamation has increased from 3.39 Km2 (Yr.2020) to 3.84

Km2 (Yr.2021). There is no biological reclamation in Yekona-I&II (Amal.), New Majri UG

to OC, Pauni-II (Expn.), MKD-I and MKD-III OC

5.7 Analysis of satellite data also indicates that total area under plantation (Green Cover)

has increased from 26.16 Km2 (Yr.2020) to 27.96 Km2 (Yr.2021). The increase of 1.80

Km2 area under Green Cover areas may be attributed to continuous effort of WCL

towards environmental protection).

5.8 After comparing the satellite data of year 2021 vs. 2020, it is evident that total area

under plantation (Green Cover) in Sasti, Padmapur, Durgapur, Mugoli, Niljai,

Makardhokra-III and Penganga Opencast Projects has increased. It has been also

CMPDI

Job No 561410027 18

observed in some of the projects natural vegetation has also started growing on

stabilized old backfilled areas and overburden dumps due to high soil fertility.

5.9 On comparing the status of land reclamation for the year 2021 with respect to the year

2020 in different projects, it is evident that the total area under reclamation has

increased from 12.39 Km2 (Yr. 2020) to 14.37 Km2 (Yr. 2021).

5.10 Out of 14 projects of WCL, maximum area under reclamation is in Sasti Opencast

Project (85.53%) followed by Umrer OC (64.30%) and Mugoli OC (44.05%).

CMPDI

Job No 561410027 19

Project wise Land Reclamation Status in Opencast Projects of WCL

(> 5 million Cu. M. of Coal+OB) based on Satellite Data of the Year 2021

Note: In reference of the above Table, different parameters are classified as follows:

1. Area under Biological Reclamation includes areas under plantation done on backfilled area only. 2. Area under Technical Reclamation includes area under barren backfilled only 3. Area under Active mining includes coal quarry site, quarry filled with water. Area of Coal Dump has been excluded from Area under Active Mining in this table. 4. Social Forestry and Plantation on external OB dump are not included in Biological Reclamation and are put under separate categories as shown in the table. 5. (%) calculated in the above table is in respect of total excavated area except for “Total area under plantation” where (%) is in terms of leasehold area. 6. Leasehold Boundaries of Durgapur, Mugoli, Ukni and Niljai Opencast projects have been modified as per latest ECs.

1 2

2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021

1 Sasti 9.20 9.20 2.23 2.46 0.65 0.79 1.66 1.70 0.65 0.65 0.90 0.55 3.78 3.80 2.96 3.14 2.88 3.25

58.99% 64.74% 17.20% 20.79% 23.81% 14.47% 32.17% 34.13% 76.19% 85.53%

2 Padmapur 8.29 8.29 0.53 0.61 0.18 0.20 1.83 1.95 0.78 0.81 1.29 1.22 2.00 2.03 2.79 2.96 0.71 0.81

26.50% 30.05% 9.00% 9.85% 64.50% 60.10% 33.66% 35.71% 35.50% 39.90%

3 Durgapur 15.50 15.50 0.78 0.85 0.80 0.84 2.42 2.59 1.14 1.19 3.04 2.93 4.62 4.62 4.36 4.62 1.58 1.69

16.88% 18.40% 17.32% 18.18% 65.80% 63.42% 28.13% 29.81% 34.20% 36.58%

4 Mugoli 12.55 12.55 1.10 1.34 0.12 0.14 1.62 1.71 0.38 0.47 1.79 1.88 3.01 3.36 2.12 2.32 1.22 1.48

36.54% 39.88% 3.99% 4.17% 59.47% 55.95% 16.89% 18.49% 40.53% 44.05%5 Umrer 9.45 9.45 1.75 1.68 1.33 1.40 1.54 1.58 2.31 2.31 1.71 1.71 4.79 4.79 5.18 5.29 3.08 3.08

36.53% 35.07% 27.77% 29.23% 35.70% 35.70% 54.81% 55.98% 64.30% 64.30%

6 Ukni 12.85 12.85 0.30 0.48 0.00 0.00 1.56 1.64 0.68 0.72 2.07 1.97 2.37 2.45 2.24 2.36 0.30 0.48

12.66% 19.59% 0.00% 0.00% 87.34% 80.41% 17.43% 18.37% 12.66% 19.59%

7 Niljai 17.61 17.61 1.04 1.34 0.10 0.11 1.51 1.65 1.17 1.23 3.00 2.94 4.14 4.39 2.78 2.99 1.14 1.45

25.12% 30.52% 2.42% 2.51% 72.46% 66.97% 15.79% 16.98% 27.54% 33.03%

8 New Majri 7.74 7.74 1.05 1.13 0.21 0.36 1.68 1.32 1.35 1.47 2.43 2.28 3.69 3.77 3.24 3.15 1.26 1.49

28.46% 29.97% 5.69% 9.55% 65.85% 60.48% 41.86% 40.70% 34.15% 39.52%

9 MKD-III 9.23 9.23 0.07 0.31 0.00 0.00 0.00 0.00 0.05 0.07 1.10 1.02 1.17 1.33 0.05 0.07 0.07 0.31

5.98% 23.31% 0.00% 0.00% 94.02% 76.69% 0.54% 0.76% 5.98% 23.31%

10 Penganga 7.63 7.63 0.15 0.33 0.00 0.00 0.00 0.00 0.30 0.39 1.02 1.00 1.17 1.33 0.30 0.39 0.15 0.33

12.82% 24.81% 0.00% 0.00% 87.18% 75.19% 3.93% 5.11% 12.82% 24.81%

11 Yekona-I&II(Amal) 6.80 16.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.10 0.54 0.10 0.54 0.00 0.03 0.00 0.00

- 0.00% - 0.00% - 100.00% 0.00% 0.18% 0.00% 0.00%

12 New Majri UG to OC 4.79 7.06 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.33 0.57 0.75 0.57 0.75 0.05 0.33 0.00 0.00

- 0.00% - 0.00% - 100.00% 1.04% 4.67% 0.00% 0.00%

13 Pauni -II (Expn) 10.95 10.95 0.00 0.00 0.00 0.00 0.03 0.19 0.06 0.08 0.24 0.87 0.24 0.87 0.09 0.27 0.00 0.00

- 0.00% - 0.00% - 100.00% 0.82% 2.47% 0.00% 0.00%14 MKD -1 (Expn) OC 6.60 6.14 0.00 0.00 0.00 0.00 0.00 0.04 0.00 0.00 0.55 0.97 0.55 0.97 0.00 0.04 0.00 0.00

- 0.00% - 0.00% - 100.00% 0.00% 0.65% 0.00% 0.00%

Total 139.19 150.99 9.00 10.53 3.39 3.84 13.85 14.37 8.92 9.75 19.81 20.63 32.20 35.00 26.16 27.96 12.39 14.37

27.95% 30.09% 10.53% 10.97% 61.52% 58.94% 18.79% 18.52% 38.48% 41.06%

Total Area under

Reclamation

8

Sl.

No.Project

Other Plantations

Social Forestry, Avanue

Plantation Etc.

9 (=4+5+8)6 7

(Area in Sq. Kms.)

3

Area under Backfilling

Technical Reclamation

Plantation

Total Leasehold Area

4 11(=4+5)10 (=5+6+7)

Area under

Active Mining

Total Excavated

Area

Total Area under

Plantation (% Green Cover

Generated in Leasehold)

5

Plantation on Excavated /

Backfilled Area

Biological Reclamation

Plantation on External

Over Burden Dumps

Table 5.1

CMPDI

Job No 561410027 20

Figure : 5.1

CMPDI

Job No 561410027 21

Table 5.2

Project wise Area Statistics of Land Use / Cover in OC Mines (> 5 mcu.m.) of WCL based on Satellite data of the Year 2021

Area % Area % Area % Area % Area % Area % Area % Area % Area % Area % Area % Area % Area % Area % Area %

Dense Forest 0.00 0.00 0.00 0.00 1.27 8.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.27 0.84

Open Forest 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Forest 0.00 0.00 0.00 0.00 1.27 8.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.27 0.84

Scrubs 0.68 7.39 0.61 7.36 0.60 3.87 2.07 16.49 0.00 0.00 2.01 15.64 1.68 9.54 0.05 0.65 0.57 6.18 1.48 19.40 2.83 16.86 0.91 14.81 0.99 14.02 1.29 11.82 15.77 10.44

Social Forestry 0.65 7.07 0.81 9.77 1.19 7.68 0.47 3.75 2.31 24.44 0.72 5.60 1.23 6.98 1.47 18.99 0.07 0.76 0.39 5.11 0.03 0.18 0.00 0.00 0.33 4.67 0.08 0.77 9.75 6.46

Plantation on OB Dump 1.70 18.48 1.95 23.52 2.59 16.71 1.71 13.63 1.58 16.72 1.64 12.76 1.65 9.37 1.32 17.05 0.00 0.00 0.00 0.00 0.00 0.00 0.04 0.71 0.00 0.00 0.19 1.77 14.37 9.52

Plantation on Backfill 0.79 8.59 0.20 2.41 0.84 5.42 0.14 1.12 1.40 14.81 0.00 0.00 0.11 0.62 0.36 4.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.84 2.54

Total Plantation (Biological Reclamation) 3.14 34.13 2.96 35.71 4.62 29.81 2.32 18.49 5.29 55.98 2.36 18.37 2.99 16.98 3.15 40.70 0.07 0.76 0.39 5.11 0.03 0.18 0.04 0.71 0.33 4.67 0.27 2.54 27.96 18.52

Total Vegetation 3.82 41.52 3.57 43.06 6.49 41.87 4.39 34.98 5.29 55.98 4.37 34.01 4.67 26.52 3.20 41.34 0.64 6.93 1.87 24.51 2.86 17.04 0.95 15.52 1.32 18.69 1.56 14.36 45.00 29.80

Coal Quarry 0.55 5.98 1.01 12.18 2.43 15.68 1.88 14.98 1.58 16.72 1.81 14.09 2.83 16.07 2.16 27.91 1.02 11.05 0.77 10.09 0.40 2.38 0.93 15.19 0.71 10.06 0.48 4.35 18.56 12.29

Coal Dump 0.00 0.00 0.00 0.00 0.05 0.32 0.00 0.00 0.12 1.27 0.10 0.78 0.11 0.62 0.00 0.00 0.00 0.00 0.23 3.01 0.13 0.76 0.00 0.00 0.04 0.57 0.15 1.33 0.93 0.62

Advance Quarry Site 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.19 1.74 0.19 0.13

Quarry Filled With Water 0.00 0.00 0.21 2.53 0.45 2.90 0.00 0.00 0.01 0.11 0.06 0.47 0.00 0.00 0.12 1.55 0.00 0.00 0.00 0.00 0.01 0.06 0.04 0.65 0.00 0.00 0.05 0.47 0.95 0.63

Total Area under Active Mining 0.55 5.98 1.22 14.72 2.93 18.90 1.88 14.98 1.71 18.10 1.97 15.33 2.94 16.70 2.28 29.46 1.02 11.05 1.00 13.11 0.54 3.20 0.97 15.84 0.75 10.63 0.87 7.89 20.63 13.66

Barren OB Dump 0.78 8.48 2.06 24.85 1.51 9.74 2.15 17.13 0.17 1.80 3.03 23.58 3.72 21.12 0.46 5.94 2.50 27.09 1.53 20.05 0.44 2.62 0.12 1.88 0.89 12.61 1.85 16.89 21.21 14.05

Barren Backfilled Area 2.46 26.74 0.61 7.36 0.85 5.48 1.34 10.68 1.68 17.78 0.48 3.74 1.34 7.61 1.13 14.60 0.31 3.36 0.33 4.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.53 6.97

(Technical Reclamation)

Total Area 3.24 35.22 2.67 32.21 2.36 15.23 3.49 27.81 1.85 19.58 3.51 27.32 5.06 28.73 1.59 20.54 2.81 30.44 1.86 24.38 0.44 2.62 0.12 1.88 0.89 12.61 1.85 16.89 31.74 21.02

Total Area Under Mine Operation 3.79 41.20 3.89 46.92 5.29 34.13 5.37 42.79 3.56 37.67 5.48 42.65 8.00 45.43 3.87 50.00 3.83 41.50 2.86 37.48 0.98 5.82 1.09 17.72 1.64 23.24 2.72 24.78 52.37 34.68

Waste Lands 0.92 10.00 0.42 5.07 1.46 9.42 0.42 3.35 0.09 0.95 1.02 7.94 1.74 9.88 0.28 3.62 0.20 2.17 1.76 23.07 0.66 3.93 0.32 5.32 0.51 7.22 0.73 6.67 10.53 6.97

Fly Ash Pond / Sand Body 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.08 1.33 0.05 0.71 0.15 1.40 0.28 0.19

Total Wasteland 0.92 10.00 0.42 5.07 1.46 9.42 0.42 3.35 0.09 0.95 1.02 7.94 1.74 9.88 0.28 3.62 0.20 2.17 1.76 23.07 0.66 3.93 0.40 6.65 0.56 7.93 0.88 8.07 10.81 7.16

Reservoir, nallah, ponds 0.06 0.65 0.12 1.45 0.05 0.32 0.00 0.00 0.25 2.65 0.00 0.00 0.03 0.17 0.01 0.13 0.03 0.33 0.11 1.44 0.11 0.66 0.04 0.53 0.04 0.57 0.23 2.08 1.08 0.72

Total Waterbodies 0.06 0.65 0.12 1.45 0.05 0.32 0.00 0.00 0.25 2.65 0.00 0.00 0.03 0.17 0.01 0.13 0.03 0.33 0.11 1.44 0.11 0.66 0.04 0.53 0.04 0.57 0.23 2.08 1.08 0.72

Crop Lands 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.96 10.40 0.00 0.00 5.08 30.26 0.77 12.49 0.96 13.60 0.59 5.41 8.36 5.54

Fallow Lands 0.00 0.00 0.00 0.00 1.62 10.45 2.04 16.25 0.00 0.00 1.78 13.85 2.14 12.15 0.00 0.00 3.36 36.40 0.88 11.53 7.05 42.01 2.88 46.99 2.46 34.84 4.88 44.60 29.09 19.27

Total Agriculture 0.00 0.00 0.00 0.00 1.62 10.45 2.04 16.25 0.00 0.00 1.78 13.85 2.14 12.15 0.00 0.00 4.32 46.80 0.88 11.53 12.13 72.27 3.65 59.48 3.42 48.44 5.47 50.01 37.45 24.8

Urban Settlement 0.09 0.98 0.00 0.00 0.39 2.52 0.12 0.96 0.15 1.59 0.00 0.00 0.34 1.93 0.34 4.39 0.00 0.00 0.00 0.00 0.01 0.06 0.01 0.10 0.07 0.99 0.02 0.05 1.54 1.02

Rural Settlement 0.00 0.00 0.00 0.00 0.05 0.32 0.03 0.24 0.00 0.00 0.02 0.16 0.20 1.14 0.00 0.00 0.00 0.00 0.03 0.39 0.03 0.16 0.00 0.00 0.00 0.00 0.00 0.00 0.36 0.24

Industrial Settlement 0.52 5.65 0.29 3.50 0.15 0.97 0.18 1.43 0.11 1.16 0.18 1.40 0.49 2.78 0.04 0.52 0.21 2.28 0.12 1.57 0.01 0.06 0.00 0.00 0.01 0.14 0.07 0.65 2.38 1.58

Total Settlement 0.61 6.63 0.29 3.50 0.59 3.81 0.33 2.63 0.26 2.75 0.20 1.56 1.03 5.85 0.38 4.91 0.21 2.28 0.15 1.97 0.05 0.28 0.01 0.10 0.08 1.13 0.09 0.70 4.28 2.83

Grand Total 9.20 100.00 8.29 100.00 15.50 100.00 12.55 100.00 9.45 100.00 12.85 100.00 17.61 100.00 7.74 100.00 9.23 100.00 7.63 100.00 16.79 100.00 6.14 100.00 7.06 100.00 10.95 100.00 150.99 100.00

MKD-III PengangaYekona-I&II

(Amal)MKD-I (Expn.)

New Majri Ug

to OCSasti Padmapur Durgapur

(Area in Sq.Km)

TotalUkni Niljai New Majri

Pauni -II

(Expn)

SE

TTLE

ME

NTS

AC

TIV

E M

ININ

GR

EC

LAIM

ED

WAS

TELA

ND

SW

ATE

RB

OD

IES

AG

RIC

ULT

UR

EFO

RES

TSSC

RU

BSPL

ANTA

TIO

N

Mugoli Umrer

CMPDI

Job No 561410027 22

Plate – 5.1

CMPDI

Job No 561410027 23

Plate – 5.2 Plate – 5.2

CMPDI

561410027 24

Plate – 5.3

CMPDI

Job No 561410027 25

Plate – 5.4

CMPDI

Job No 561410027 26

Plate – 5.5

CMPDI

Job No 561410027 27

Plate – 5.6

CMPDI

Job No 561410027 28

Plate – 5.7

CMPDI

Job No 561410027 29

Plate – 5.8

CMPDI

Job No 561410027 30

Plate – 5.9

CMPDI

Job No 561410027 31

Plate – 5.10

CMPDI

Job No 561410027 32

Plate – 5.11

CMPDI

Job No 561410027 33

Plate – 5.12

CMPDI

Job No 561410027 34

Plate – 5.13

CMPDI

Job No 561410027 35

Plate – 5.14

CMPDI

Job No 561410027 36

Figure - 5.2

Figure - 5.3

CMPDI

Job No 561410027 37

Figure - 5.4

Figure - 5.5

CMPDI

Job No 561410027 38

Figure - 5.6

Figure - 5.7

CMPDI

Job No 561410027 39

Figure - 5.8

Figure - 5.9

CMPDI

Job No 561410027 40

Figure – 5.10

Figure - 5.11

CMPDI

Job No 561410027 41

Figure - 5.12

Figure - 5.13

CMPDI

Job No 561410027 42

Figure - 5.14

Figure - 5.15

CMPDI

Job No 561410027 43

Photograph -5.1: Plantation on Internal OB/Backfill (Sasti OCP)

Photograph – 5.2: Plantation on External OB dump (Padmapur OCP)

CMPDI

Job No 561410027 44

Photograph – 5.3: Plantation on External OB dump of (Durgapur OCP)

Photograph – 5.4: Plantation on Embankment (Mugoli OCP)

CMPDI

Job No 561410027 45

Photograph – 5.5: Plantation on External OB Dump in Umrer OCP

Photograph – 5.6: Social Forestry (Ukni OCP)

CMPDI

Job No 561410027 46

Photograph – 5.7: Social Forestry (Niljai OCP)

Photograph – 5.8: Plantation on OB Dump in New Majri OCP

CMPDI

Job No 561410027 47

Photograph – 5.9: Avenue Plantation (Makardhokra-III OCP)

Photograph – 5.10: Social Forestry (Penganga OCP)

CMPDI

Job No 561410027 48

Photograph – 5.11: Social Forestry (Yekona-I&II (Amal.) OCP)

Photograph – 5.12: Social Forestry (New Majri UG to OC)

CMPDI

Job No 561410027 49

Photograph – 5.13: Social Forestry (Pauni-II (Expn.)OCP)

Photograph – 5.14: Social Forestry (MKD-I OCP)

SOUTH EASTERN COALFIELDS IMITED

CMPDI

Job No 561410027 51

6.0 Land Reclamation Status in South Eastern Coalfields Limited

6.1 Following nineteen opencast projects of SECL producing 5 million cubic m. or more

(Coal+OB) together were taken up for land reclamation monitoring based on satellite

data during the year 2021-22:

Dipka

Gevra

Kusmunda

Manikpur

Chirimiri

Rajnagar

Dhanpuri

Jamuna

Saraipali

Bijari

Chhal

Mahan- II

Amadand

Amera

Batura

Jampali

Ambika

Jagannathpur

6.2 Project wise Land Reclamation status of the above 19 projects of SECL for the year

2021 is given in Table 6.1 & 6.2 and also shown graphically in Fig 6.1. Area statistics

of different land use cover / class present in the mine leasehold boundaries of the above

projects for the year 2021 are shown in the Table –6.3. Land use / cover maps derived

from satellite data are shown in Plate 6.1 - 6.19. Year wise changes in the different land

use / cover classes in last three years based on satellite data are depicted in Bar Charts

in Fig. 6.2 - 6.20.

CMPDI

Job No 561410027 52

6.3 Study reveals that in the above mentioned 19 projects of SECL under more than 5 mcm

(Coal+OB) per annum category, out of total 75.39 Km2 excavated area; 53.93 Km2 area

(71.53%) is under reclamation, out of which 35.10 Km2 (46.56%) area is under

technical reclamation and 18.83 Km2 (24.98%) area is already under biological

reclamation.

6.4 After analyzing the satellite data of the year 2021, it is evident that area under land

reclamation for the selected eight (08) projects of SECL under Group A (Table 6.1) viz

Dipka, Gevra, Kusmunda, Manikpur, Chirimiri, Rajnagar, Dhanpuri Amlai Group of

Mines and Jamuna has increased from 41.03 Km2 (70.70%) in the year 2020 to 43.49

Km2 (72.76%) in the year 2021 in a period of one year. There is an increase of 2.46

Km2 of area under reclamation in projects under Group A, out of which 2.18 Km2 area

is under technical reclamation and 0.28 Km2 area is under Biological reclamation.

6.5 Study indicates that although there has been overall a substantial increase of 2.18 Km2

of area under technical reclamation (Barren Backfilling) for the mines under Group A

(Table 6.1) during the year 2021, but for projects like Chirimiri, Rajnagar & Jamuna

OCPs, area under technical reclamation has gone down slightly as compared to the year

2020 as more areas are coming under Biological Reclamation

6.6 Similarly, it has been also observed that in projects like Gevra, Kusmunda & Dhanpuri

Amlai Group of mines, the area under Biological Reclamation has been slightly reduced

which may have resulted due to biotic interference or due to OB dumping on vegetated

backfilled area in view of constrain of dumping space.

6.7 Total Green Cover generated in the leasehold of the eight projects of Group A has

increased from 35.40 Km2 (26.38%) in the year 2020 to 36.12 Km2 (28.91%) in the year

2021 in a period of one year. There has been an increase of 0.72 Km2 of Green Cover

in the leasehold of eight projects of Group A, however in projects like Kusmunda,

CMPDI

Job No 561410027 53

Manikpur and Dhanpuri Amlai Group of mines there has been a slight reduction in area

under Green Cover. In Kusmunda, a planted OB Dump on western side of OCP has

been rehandled to make space for Coal Stock whereas in Manikpur OCP, the leasehold

boundaries of the project has been modified as per EC notified area which has resulted

in loss of Green Cover area. In Dhanpuri Amlai Group of mines there has been

infrastructure development within the leasehold boundary resulting in loss of area under

Green Cover.

6.8 In projects under Group B (Table-6.1), viz Saraipali, Baroud, Bijari, Chhal and Mahan

II, area under land reclamation has increased from 5.51 Km2 (64.52%) in the year 2020

to 6.47 Km2 (70.63%) in the year 2021. There is an increase of 0.96 Km2 of area under

reclamation in projects under Group B, out of which 0.86 Km2 area is under technical

reclamation and 0.10 Km2 area is under Biological reclamation.

The projects under Group B (Table-6.1) were previously monitored under Less than

5mcm (Coal+OB) per annum category at an interval of three years. The previous cycle

of Land Reclamation monitoring of these projects was done in 2020-21.

6.9 It has been observed that there has been overall an increase of 0.86 Km2 of area under

technical reclamation (Barren Backfilling) for the mines under Group B(Table-6.1)

during the year 2021. The overall status of Technical Reclamation in Projects under

Group B is indicating positive trend.

6.10 It has been also observed that there has been overall an increase of 0.10 Km2 of area

under biological reclamation (Plantation on Backfilled areas) for the mines under Group

B during the year 2021. The overall status of Biological Reclamation in Projects under

Group B is indicating positive trend.

6.11 Total Green Cover generated in the leasehold of the five projects of Group B(Table-

6.1) has increased from 1.71 Km2 (5.92%) in the year 2020 to 1.89 Km2 (5.97%) in the

CMPDI

Job No 561410027 54

year 2021 in a period of one year. There has been an increase of 0.18 Km2 of Green

Cover in the leasehold of five projects of Group B.

6.12 In two projects under Group C (Table 6.2) viz Amera and Amadand, area under Land

Reclamation has increased from 1.96 Km2 (61.83%) in the year 2020 to 2.69 Km2

(72.31%) in the year 2021. There is an increase of 0.73 Km2 of area under reclamation

in projects under Group C (Table-6.2), out of which 0.64 Km2 area is under technical

reclamation and 0.09 Km2 area is under Biological reclamation.

The projects under Group C were previously monitored under Less than 5mcm

(Coal+OB) per annum category at an interval of three years. The previous cycle Land

Reclamation monitoring of these projects was done in 2018-19.

6.13 It has been observed that there has been overall an increase of 0.64 Km2 of area under

technical reclamation (Barren Backfilling) for the mines under Group C (Table-6.2)

during the year 2021. The overall status of Technical Reclamation in Projects under

Group C is (Table-6.1) indicating positive trend.

6.14 It has been also observed that there has been overall an increase of 0.09 Km2 of area

under biological reclamation (Plantation on Backfilled areas) for the mines under Group

C (Table-6.2) during the year 2021. The overall status of Biological Reclamation in

Projects under Group C is indicating positive trend.

6.15 Total Green Cover generated in the leasehold of the two projects of Group C has

increased from 1.20 Km2 (6.07%) in the year 2020 to 1.50 Km2 (7.62%) in the year 2021

in a period of one year. There has been an increase of 0.30 Km2 of Green Cover in the

leasehold of two projects of Group C.

6.16 In four projects under Group D (Table 6.2) viz Batura, Ambika, Jampali and

Jagannathpur, area under Land Reclamation is 1.28 Km2 (46.72%) in the year 2021 out

CMPDI

Job No 561410027 55

of which 1.09 Km2 area is under technical reclamation and 0.19 Km2 area is under

Biological reclamation. Total Green Cover generated in the leasehold of the four

projects of Group D is 0.58 Km2 (2.50%) in the year 2021.

The projects under Group D are being monitored for Land Reclamation for the first time,

therefore, no comparative analysis has been done.

6.17 Out of 19 projects of SECL, Jamuna OCP ranks on top for land reclamation (88.07%)

followed by Rajnagar (85.66%) and Chirimiri (84.83%) in the year 2021-22.

CMPDI

Job No 561410027/(SECL) 56

Table – 6.1 Project wise Land Reclamation Status in Opencast Projects of SECL

(> 5 million Cu. M. of Coal+OB) based on Satellite Data of the Year 2021

1 2 3 4

2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021

1 Dipka 19.99 19.99 2.94 3.69 0.77 1.00 1.60 1.81 1.59 1.67 3.30 2.92 7.01 7.61 3.96 4.48 3.71 4.69

41.94% 48.49% 10.98% 13.14% 47.08% 38.37% 19.81% 22.41% 52.92% 61.63%

2 Gevra 41.84 41.84 8.80 9.19 2.60 2.55 4.15 4.28 2.94 3.18 5.29 5.35 16.69 17.09 9.69 10.01 11.40 11.74

52.73% 53.77% 15.58% 14.92% 31.70% 31.30% 23.16% 23.92% 68.30% 68.70%

3 Kusmunda 16.72 16.72 3.28 3.72 1.32 1.27 1.94 1.92 1.60 1.58 2.56 2.78 7.16 7.77 4.86 4.77 4.60 4.99

45.81% 47.88% 18.44% 16.34% 35.75% 35.78% 29.07% 28.53% 64.25% 64.22%

4 Manikpur** 19.44 10.20 1.50 1.55 0.77 0.78 1.34 1.26 0.47 0.37 1.98 1.99 4.25 4.32 2.58 2.41 2.27 2.33

35.29% 35.88% 18.12% 18.06% 46.59% 46.06% 25.29% 23.63% 53.41% 53.94%

5 Chirimiri 5.44 5.44 1.38 1.34 1.04 1.12 0.00 0.00 0.15 0.15 0.45 0.44 2.87 2.90 1.19 1.27 2.42 2.46

48.08% 46.21% 36.24% 38.62% 15.68% 15.17% 21.88% 23.35% 84.32% 84.83%

6 Rajnagar 7.30 7.30 2.05 1.95 3.16 3.23 0.00 0.00 0.26 0.26 0.91 0.96 6.12 6.14 3.42 3.49 5.21 5.18

33.50% 31.76% 51.63% 52.61% 14.87% 15.64% 46.85% 47.81% 85.13% 84.36%

7 Dhanpuri Amlai Group of Mines 14.59 14.59 3.15 3.87 2.44 2.40 1.80 1.80 0.18 0.18 1.72 1.05 7.31 7.32 4.42 4.38 5.59 6.27

43.09% 52.87% 33.38% 32.79% 23.53% 14.34% 30.29% 30.02% 76.47% 85.66%

8 Jamuna 8.85 8.85 0.70 0.67 5.13 5.16 0.00 0.00 0.15 0.15 0.79 0.79 6.62 6.62 5.28 5.31 5.83 5.83

10.57% 10.12% 77.49% 77.95% 11.93% 11.93% 59.66% 60.00% 88.07% 88.07%

Sub Total (A) 134.17 124.93 23.80 25.98 17.23 17.51 10.83 11.07 7.34 7.54 17.00 16.28 58.03 59.77 35.40 36.12 41.03 43.49

41.01% 43.47% 29.69% 29.30% 29.30% 27.24% 26.38% 28.91% 70.70% 72.76%

9 Saraipali 2.79 2.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.20 0.20 0.20 0.20 0.00 0.01 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 0.00% 0.36% 0.00% 0.00%

10 Baroud 11.11 11.11 1.73 2.13 0.42 0.44 0.27 0.34 0.03 0.03 0.86 0.65 3.01 3.22 0.72 0.81 2.15 2.57

57.48% 66.15% 13.95% 13.66% 28.57% 20.19% 6.48% 7.29% 71.43% 79.81%

11 Bijari 2.73 2.73 0.00 0.15 0.00 0.00 0.00 0.00 0.04 0.04 0.35 0.32 0.35 0.47 0.04 0.04 0.00 0.15

0.00% 31.91% 0.00% 0.00% 100.00% 68.09% 1.47% 1.47% 0.00% 31.91%

12 Chhal 12.07 12.07 1.84 2.12 0.12 0.17 0.00 0.00 0.43 0.43 0.92 0.76 2.88 3.05 0.55 0.60 1.96 2.29

63.89% 69.51% 4.17% 5.57% 31.94% 24.92% 4.56% 4.97% 68.06% 75.08%

13 Mahan II 2.97 2.97 1.06 1.09 0.34 0.37 0.03 0.03 0.03 0.03 0.70 0.76 2.10 2.22 0.40 0.43 1.40 1.46

50.48% 49.10% 16.19% 16.67% 33.33% 34.23% 13.47% 14.48% 66.67% 65.77%

Sub Total (B) 28.88 31.67 4.63 5.49 0.88 0.98 0.30 0.37 0.53 0.54 3.03 2.69 8.54 9.16 1.71 1.89 5.51 6.47

54.22% 59.93% 10.30% 10.70% 35.48% 29.37% 5.92% 5.97% 64.52% 70.63%

(A)

Sl.

No.Name of the Project

Technical Reclamation

Plantation Activities

Area under Active MiningTotal Excavated

Area

Total Area under

Plantation in the

leaseholds

(%Green Cover Generated)

Total Area Under

ReclamationBiological Reclamation Other Plantation

Area under Backfilling

(B)

5

Total Leasehold Area

9

Plantation on Excavated/

Backfilled Area

Plantation on

External OB Dump

Social Forestry, Avenue

Plantation Etc.

6 7 8 10(=5+6+9) 11(=6+7+8) 12(=5+6)

CMPDI

Job No 561410027/(SECL) 57

Table – 6.2

Note: In reference of the above Table, different parameters are classified as follows: 1. Area under Biological Reclamation includes Areas under Plantation done on Backfilled Area Only. 2. Area under Technical Reclamation includes Area under Barren Backfilling only 3. Area under Active Mining Includes Coal Quarry, Advance Quarry Site, Quarry filled with water etc., if any. 4. Social Forestry and Plantation on External OB Dumps are not included in Biological Reclamation and are put under separate categories as shown in the Table above. 5. (%) calculated in the above Table is in respect to Total Excavated Area except for “” Total Area under Plantation”’ where % is in terms of “Leasehold Area”’.

Group Description:

Group A include mines which were already under monitoring under more than 5 mcm category.

Group B includes mines which were previously monitored in 2020-21 under less than 5mcm but has been included in more than 5mcm category in 2021

Group C includes mines which were studied in 2018-19 under less than 5 mcm category and have been included into more than 5 mcm category in 2021

Group D includes mines which are being monitored for the first time.

1 2 3 4

2018 2021 2018 2021 2018 2021 2018 2021 2018 2021 2018 2021 2018 2021 2018 2021 2018 2021

(C)

14 Amera 6.72 6.64 1.05 1.10 0.06 0.15 0.08 0.08 0.45 0.45 0.43 0.30 1.54 1.55 0.59 0.68 1.11 1.25

68.18% 70.97% 3.90% 9.68% 27.92% 19.35% 8.78% 10.24% 72.08% 80.65%

15 Amadand 13.05 13.05 0.85 1.44 0.00 0.00 0.00 0.18 0.61 0.64 0.78 0.73 1.63 2.17 0.61 0.82 0.85 1.44

52.15% 66.36% 0.00% 0.00% - 47.85% 33.64% 4.67% 6.28% 52.15% 66.36%

Sub Total (C) 19.77 19.69 1.90 2.54 0.06 0.15 0.08 0.26 1.06 1.09 1.21 1.03 3.17 3.72 1.20 1.50 1.96 2.69

59.94% 68.28% 1.89% 4.03% 38.17% 27.69% 6.07% 7.62% 61.83% 72.31%

(D)

16 Batura - 9.43 - 0.00 - 0.00 - 0.00 - 0.05 - 0.00 - 0.00 - 0.05 - 0.00

0.00% 0.00% 0.00% 0.53% 0.00%

17 Ambika - 1.34 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00 - 0.00

0.00% 0.00% 0.00% 0.00% 0.00%

18 Jampali - 5.83 - 0.87 - 0.19 - 0.00 - 0.19 - 0.97 - 2.03 - 0.38 - 1.06

42.86% 9.36% 0.00% 6.52% 52.22%

19 Jagannathpur - 6.62 - 0.22 - 0.00 - 0.00 - 0.15 - 0.49 - 0.71 - 0.15 - 0.22

30.99% 0.00% 69.01% 2.27% 30.99%

Sub Total (D) - 23.22 - 1.09 - 0.19 - 0.00 - 0.39 - 1.46 - 2.74 0.58 - 1.28

39.78% 6.93% 0.00 53.28% 2.50% 46.72%

182.82 199.51 30.33 35.10 18.17 18.83 11.21 11.70 8.93 9.56 21.24 21.46 69.74 75.39 38.31 40.09 48.50 53.93

43.49% 46.56% 26.05% 24.98% 30.46% 28.47% 20.96% 20.09% 69.54% 71.53%

(% is calculated with respect to excavated area as applicable)

(Area in Sq km)

Sl.

No.Name of the Project

Technical Reclamation

Plantation Activities

Area under Active MiningTotal Excavated

Area

Total Area under

Plantation in the

leaseholds

(%Green Cover Generated)

Total Area Under

Reclamation

Biological Reclamation Other Plantation

Area under Backfilling

Total SECL (A+B+C+D)

5

Total Leasehold Area

9

Plantation on Excavated/

Backfilled Area

Plantation on

External OB Dump

Social Forestry, Avenue

Plantation Etc.

6 7 8 10(=5+6+9) 11(=6+7+8) 12(=5+6)

CMPDI

Job No 561410027/(SECL) 58

Fig.6.1: Project wise Land reclamation status in OC projects of SECL in the year-2021

CMPDI

Job No 561410027/(SECL) 59

Table 6.3 A

Project wise Area Statistics of Land Use / Cover in OC Mines (> 5 mcu.m.) of SECL based on Satellite data of the Year 2021

CMPDI

Job No 561410027/(SECL) 60

Table 6.3 B

CMPDI

Job No 561410027/(SECL) 61

Plate – 6.1

CMPDI

Job No 561410027/(SECL) 62

Plate – 6.2

CMPDI

Job No 561410027/(SECL) 63

Plate – 6.3

CMPDI

Job No 561410027/(SECL) 64

Plate – 6.4

CMPDI

Job No 561410027/(SECL) 65

Plate – 6.5

CMPDI

Job No 561410027/(SECL) 66

Plate – 6.6

CMPDI

Job No 561410027/(SECL) 67

Plate – 6.7

CMPDI

Job No 561410027/(SECL) 68

Plate – 6.8

CMPDI

Job No 561410027/(SECL) 69

Plate – 6.9

CMPDI

Job No 561410027/(SECL) 70

Plate – 6.10

CMPDI

Job No 561410027/(SECL) 71

Plate – 6.11

CMPDI

Job No 561410027/(SECL) 72

Plate – 6.12

CMPDI

Job No 561410027/(SECL) 73

Plate – 6.13

CMPDI

Job No 561410027/(SECL) 74

Plate – 6.14

CMPDI

Job No 561410027/(SECL) 75

Plate – 6.15

CMPDI

Job No 561410027/(SECL) 76

Plate – 6.16

CMPDI

Job No 561410027/(SECL) 77

Plate – 6.17

CMPDI

Job No 561410027/(SECL) 78

Plate – 6.18

CMPDI

Job No 561410027/(SECL) 79

Plate – 6.19

CMPDI

Job No 561410027 80

Figure 6.2

Figure 6.3

CMPDI

Job No 561410027 81

Figure 6.4

Figure 6.5

CMPDI

Job No 561410027 82

Figure 6.6

Figure 6.7

CMPDI

Job No 561410027 83

Figure 6.8

Figure 6.9

CMPDI

Job No 561410027 84

Figure 6.10

Figure 6.11

CMPDI

Job No 561410027 85

Figure 6.12

Figure 6.13

CMPDI

Job No 561410027 86

Figure 6.14

Figure 6.15

CMPDI

Job No 561410027 87

Figure 6.16

Figure 6.17

CMPDI

Job No 561410027 88

Figure 6.18

Figure 6.19

CMPDI

Job No 561410027 89

Figure 6.20

CMPDI

Job No 561410027 90

Photograph – 6.1: Plantation on OB Dumps in Dipka Opencast project

Photograph – 6.2: Plantation on Backfilled/OB Dumps in Dipka Opencast Project

CMPDI

Job No 561410027 91

Photograph – 6.3: Plantation in Gevra Opencast Project

Photograph – 6.4: New Plantation in Gevra Opencast Project

CMPDI

Job No 561410027 92

Photograph – 6.5: Overview of Kusmunda Opencast Project

Photograph – 6.6: Roadside Plantation in Kusmunda Opencast Project

CMPDI

Job No 561410027 93

Photograph –6.7: Plantation in Manikpur Opencast Project

Photograph – 6.8: Plantation on OB Dumps in Manikpur Opencast Project

CMPDI

Job No 561410027 94

Photograph – 6.9: Overview of Chirimiri Opencast Project

Photograph – 6.10: Plantation in Chirimiri Opencast Project

CMPDI

Job No 561410027 95

Photograph – 6.11: Plantation in Rajnagar Opencast Project

Photograph – 6.12: Plantation in Dhanpuri Opencast Project

CMPDI

Job No 561410027 96

Photograph – 6.13: Overview of Dhanpuri Amlai group of mines Project

Photograph – 6.14: Plantation in Jamuna Opencast Project

CMPDI

Job No 561410027 97

Photograph – 6.15: Mine overview of Saraipali Opencast Project

Photograph – 6.16: Plantation in Saraipali Opencast Project

CMPDI

Job No 561410027 98

Photograph – 6.17: Plantation in Baroud Opencast Project

Photograph – 6.18: OB Dump in Bijari Opencast Project

CMPDI

Job No 561410027 99

Photograph – 6.19: Backfilling in Chhal Opencast Project

Photograph – 6.20: Plantation in Chhal Opencast Project

CMPDI

Job No 561410027 100

Photograph – 6.21: Mahan- II Opencast Project

Photograph – 6.22: Plantation in Amera Opencast Project

CMPDI

Job No 561410027 101

Photograph – 6.23: Plantation in Amadand Opencast Project

Photograph – 6.24: Natural Vegetation in Proposed Batura Opencast Project

CMPDI

Job No 561410027 102

Photograph – 6.25: Plantation in proposed Ambika Opencast Project

Photograph – 6.26: Plantation in Jampali Opencast Project

CMPDI

Job No 561410027 103

Photograph – 6.27: Plantation in Jagannathpur Opencast Project

Photograph – 6.28: Overview of Jagannathpur Opencast Project

NORTHERN COALFIELDS LIMITED

CMPDI

Job No 561410027 105

7.0 Land Reclamation Status in Northern Coalfields Ltd.

7.1 Following 10 OC projects producing more than 5 million cubic m. (Coal + OB together)

of Northern Coalfields Ltd. have been taken up for land reclamation monitoring based

on satellite data of the year 2021:

Amlohri

Nigahi

Jayant

Dudhichua

Khadia

Krishnashila

Bina

Kakri

Jhingurdah

Block-B

7.2 Project wise Land Reclamation status in NCL for the year 2021 is given in Table 7.1 and

also shown graphically in Fig 7.1. Area statistics of different land use / cover classes

present in the mine leasehold of the above projects for the year 2021 are shown in the

Table – 7.2. Land use/cover maps derived from satellite data are shown in Plate 7.1 –

7.10. Land reclamation status of the above mentioned 10 projects were prepared

regularly since 2008. Year wise changes in the different land use classes based on

satellite data for the last three years are depicted in Bar Charts in Fig. 7.2 to 7.11.

7.3 Study reveals that out of total excavated area of 79.67 Km2, 47.23 Km2 (59.28%) of area

is under reclamation out of which 36.00 Km2 (45.19%) area is under backfilling

(Technical Reclamation) and 11.23 Km2 (14.10%) area has been revegetated

(Biological Reclamation). There is an increase of 1.50 Km2 for area under reclamation

CMPDI

Job No 561410027 106

in NCL in the year 2021 with respect to the year 2020. This increase is due to effort

towards environment by NCL.

7.4 After analyzing the satellite data of year 2021 vs. 2020, it is evident that area under

plantation (biological reclamation) has increased from 11.03 km2 in 2020 to 11.23 km2

in 2021, while reduced marginally in Krishnashila, Bina, & Block B projects due to

dumping on vegetated area.

7.5 Study also reveal that area under barren backfilling (Technical Reclamation) has

increased from 34.70 km2 in 2020 to 36.00 km2 in 2021. All the 10 projects of NCL

selected for monitoring are showing an increasing trend in technical reclamation except

Bina and Block B due to change in backfilled to external OB class.

7.6 It was also observed that total area under plantation (Green Cover) has decreased from

49.88 km2 in 2020 to 49.85 km2 in 2021 due to additional dumping in on vegetated areas

in Jhingurdah project. In the projects of NCL selected for monitoring Amlohri, Nigahi,

Dudhichua and Block – B OCPs are showing an increasing trend in Green Cover in their

leasehold (Refer Table-7.1), whereas Jayant, Krishnashila, Bina, Kakri, Jhingurdah are

showing a decreasing trend due to natural degradation.

7.7 Out of 10 projects of NCL, maximum land reclamation has been carried out in Khadia

(70.34%) followed by Bina (65.59%) and Jayant (63.20%). It may be noted that in view

of Jhingurdah OC Mine production from upper mineable seams are almost complete.

The data on Technical and Biological reclamation pertaining to Jhingurdah opencast

project has been reassessed keeping in view the information received from NCL. The

same has been updated from the year 2020 onwards in this report.

CMPDI

Job No 564607137 107

Summarized Land Reclamation Status in Opencast Projects of NCL based on Satellite Data of the year 2021

Note: In reference of the above Table, different parameters are classified as follows: 1. Area under Biological Reclamation includes Areas under Plantation done on Backfilled Area Only. 2. Area under Technical Reclamation includes Area under Barren Backfilling only 3. Area under Active Mining Includes Coal Quarry, Advance Quarry Site, Quarry filled with water etc.. 4. Social Forestry and Plantation on External OB Dumps are not included in Biological Reclamation and are put under separate categories as shown in the Table above.. 5. (%) calculated in the above Table is in respect to Total Excavated Area except for “Total Area under Plantation”’ where % is in terms of “Leasehold Area”. 6. The data on technical & biological reclamation pertaining to Jhingurdah OC has been reassessed keeping in view the information received from NCL. The same has been updated from the year 2020 onwards in this report.

1 2

2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021

1 Amlohri 21.75 21.75 3.77 4.05 0.80 0.73 0.94 1.04 3.79 3.77 3.51 4.23 8.08 9.01 5.53 5.54 4.57 4.78

43.52% 44.95% 10.11% 8.10% 46.37% 46.95% 30.64% 25.47% 56.56% 53.05%

2 Nigahi 30.11 30.11 5.55 5.38 1.64 1.95 2.99 3.01 3.65 3.64 3.85 4.78 11.04 12.11 8.28 8.60 7.19 7.33

46.33% 44.43% 20.09% 16.10% 33.58% 39.47% 31.13% 28.56% 65.13% 60.53%

3 Jayant 27.04 27.04 6.16 6.06 3.41 3.49 3.59 3.48 3.83 3.83 5.22 5.56 14.79 15.11 10.83 10.80 9.57 9.55

37.52% 40.11% 32.34% 23.10% 30.15% 36.80% 36.89% 39.94% 64.71% 63.20%

4 Dudhichua 23.62 23.62 5.60 5.74 1.29 1.31 1.77 1.78 0.42 0.42 4.56 4.71 11.45 11.76 3.48 3.51 6.89 7.05

46.33% 48.81% 13.73% 11.14% 39.94% 40.05% 18.64% 14.86% 60.17% 59.95%

5 Khadia 16.39 16.39 4.00 5.33 0.60 0.60 0.70 0.70 2.10 2.10 3.48 2.50 8.08 8.43 3.40 3.40 4.60 5.93

48.99% 63.23% 8.12% 7.12% 42.90% 29.66% 21.66% 20.74% 56.93% 70.34%

6 Krishnashila 8.51 8.51 2.01 2.12 0.52 0.51 1.30 1.30 0.06 0.06 1.81 1.78 4.34 4.41 1.88 1.87 2.53 2.63

41.79% 48.07% 7.46% 11.56% 50.75% 40.36% 25.76% 21.97% 58.29% 59.64%

7 Bina 17.98 17.98 4.77 4.75 1.74 1.73 1.05 1.05 3.42 3.33 2.93 3.40 9.44 9.88 6.21 6.11 6.51 6.48

47.37% 48.08% 19.58% 17.51% 33.04% 34.41% 35.54% 33.98% 68.96% 65.59%

8 Kakri 8.27 8.27 1.35 1.35 0.54 0.54 1.34 1.34 1.57 1.55 1.56 1.56 3.45 3.45 3.45 3.43 1.89 1.89

45.73% 39.13% 24.52% 15.65% 29.75% 45.22% 35.37% 41.48% 54.78% 54.78%

9 Jhingurdah 11.97 11.97 0.00 0.00 0.00 0.00 4.15 3.56 1.61 1.53 1.22 1.38 1.22 1.38 5.76 5.09 0.00 0.00

0.00% 0.00% 0.00% 0.00% 100.00% 100.00% 48.12% 42.52% 0.00% 0.00%

10 Block-B 13.39 13.39 1.49 1.22 0.49 0.37 0.35 0.91 0.22 0.22 1.99 2.54 3.97 4.13 1.06 1.50 1.98 1.59

35.47% 29.54% 12.07% 8.96% 52.46% 61.50% 6.15% 11.20% 49.87% 38.50%

TOTAL 179.03 179.03 34.70 36.00 11.03 11.23 18.18 18.17 20.67 20.45 30.13 32.44 75.86 79.67 49.88 49.85 45.73 47.23

45.74% 45.19% 14.54% 14.10% 39.72% 40.72% 42.37% 44.50% 27.86% 27.84% 60.28% 59.28%

(% is calculated with respected to Excavated Area as applicable)

Technical

Reclamation

Area under

Backfilling

Biological Plantation on

Excavated / Backfilled

Area

5

Total Area

under

Reclamation

Total Area under

Plantation

(% Green Cover

Generated in

Leasehold)

4

Other PlantationsTotal

Excavated

Area

Area under

Active Mining

Sl.

No.

(Projects producing more than 5 mcm of Coal+OB annaully)

(Area in Sq. Kms.)

Total

Leasehold

Area(2021)

3

Status of Land Reclamation in Northern Coalfields Limited based on Satellite Data for the Year 2021

TABLE-1

Plantation

Social Forestry,

Avanue

Plantation Etc.

Plantation on

External Over

Burden Dumps

11(=4+5)10 (=5+6+7)9 (=4+5+8)876

Project

Total

Leasehold

Area(2020)

Table 7.1

CMPDI

Job No 564607137 108

Fig.7.1: Land reclamation status in Opencast Projects of NCL in the Year 2021

CMPDI

Job No 564607137 109

Table 7.2

Project wise Area Statistics of Land Use / Cover in OC Mines (> 5 mcu.m.) of NCL based on Satellite data of the Year 2021

Area % Area % Area % Area % Area % Area % Area % Area % Area % Area % Area %

Dense Forest 0.59 2.71 0.16 0.53 0.00 0.00 1.61 6.81 0.12 0.73 0.21 2.47 0.34 1.89 0.00 0.00 0.03 0.25 0.12 0.90 3.18 1.78

Open Forest 0.13 0.60 2.88 9.57 0.02 0.07 2.56 10.84 1.51 9.24 0.83 9.68 1.04 5.74 0.01 0.12 0.17 1.42 0.47 3.51 9.62 5.37

Total Forest 0.72 3.31 3.04 10.10 0.02 0.07 4.17 17.65 1.63 9.97 1.04 12.15 1.38 7.63 0.01 0.12 0.20 1.67 0.59 4.41 12.80 7.15

Scrubs 0.28 1.29 0.59 1.96 0.42 1.55 2.26 9.57 0.13 0.79 0.33 3.91 0.50 2.78 0.17 2.06 1.63 13.62 1.26 9.41 7.57 4.23

Social Forestry 3.77 17.33 3.64 12.09 3.83 14.16 0.42 1.78 2.10 12.81 0.06 0.71 3.33 18.52 1.55 18.74 1.53 12.78 0.22 1.64 20.45 11.42

Plantation on External OB Dump 1.04 4.78 3.01 10.00 3.48 12.87 1.78 7.54 0.70 4.27 1.30 15.28 1.05 5.84 1.34 16.20 3.56 29.73 0.91 6.80 18.17 10.15

Plantation on Backfill / Excavated Area 0.73 3.36 1.95 6.48 3.49 12.91 1.31 5.55 0.60 3.66 0.51 5.99 1.73 9.62 0.54 6.53 0.00 0.00 0.37 2.76 11.23 6.27

(Biological Reclamation)

Total Area under Plantation (Green Cover) 5.54 25.47 8.60 28.57 10.80 39.94 3.51 14.87 3.40 20.74 1.87 21.98 6.11 33.98 3.43 41.47 5.09 42.51 1.50 11.20 49.85 27.84

Total Vegetation 6.54 30.07 12.23 40.63 11.24 41.56 9.94 42.09 5.16 31.50 3.24 38.04 7.99 44.39 3.61 43.65 6.92 57.80 3.35 25.02 70.22 39.22

Coal Quarry 2.04 9.38 2.51 8.34 4.86 17.97 3.63 15.37 1.19 7.26 0.99 11.63 2.12 11.79 1.12 13.54 1.23 10.28 1.71 12.77 21.40 11.95

Coal Dump 0.06 0.28 0.16 0.53 0.34 1.26 0.01 0.04 0.13 0.79 0.02 0.24 0.06 0.33 0.02 0.24 0.01 0.08 0.28 2.09 1.09 0.61

Advance Quarry Site 2.08 9.56 1.97 6.54 0.28 1.04 1.02 4.32 1.12 6.83 0.75 8.81 1.15 6.40 0.36 4.35 0.00 0.00 0.33 2.46 9.06 5.06

Quarry Filled With Water 0.05 0.23 0.14 0.46 0.08 0.30 0.05 0.21 0.06 0.37 0.02 0.24 0.07 0.44 0.06 0.73 0.14 1.17 0.22 1.64 0.89 0.50

Total Area under Active Mining 4.23 19.45 4.78 15.87 5.56 20.57 4.71 19.94 2.50 15.25 1.78 20.92 3.40 18.96 1.56 18.86 1.38 11.53 2.54 18.96 32.44 18.12

Barren OB Dump 3.93 18.07 2.62 8.70 0.69 2.55 1.48 6.27 1.54 9.39 0.78 9.17 0.26 1.45 0.62 7.50 2.93 24.48 2.65 19.79 17.50 9.77

Area under Barren Backfilling 4.05 18.62 5.38 17.87 6.06 22.41 5.74 24.30 5.33 32.51 2.12 24.91 4.75 26.42 1.35 16.32 0.00 0.00 1.22 9.11 36.00 20.11(Technical Reclamation)

Total Area under Technical Reclamation 4.05 18.62 5.38 17.87 6.06 22.41 5.74 24.30 5.33 32.51 2.12 24.91 4.75 26.42 1.35 16.32 0.00 0.00 1.22 9.11 36.00 20.11

Total Area under Mining Operations 12.21 56.14 12.78 42.44 12.31 45.53 11.93 50.51 9.37 57.15 4.68 55.00 8.41 46.83 3.53 42.68 4.31 36.01 6.41 47.86 85.94 48.00

Waste Lands 0.51 2.34 1.30 4.32 0.86 3.17 1.00 4.23 0.66 4.03 0.32 3.78 0.55 3.06 0.37 4.48 0.37 3.09 1.75 13.09 7.69 4.30

Fly Ash Pond / Sand Body 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Wasteland 0.51 2.34 1.30 4.32 0.86 3.17 1.00 4.23 0.66 4.03 0.32 3.78 0.55 3.06 0.37 4.48 0.37 3.09 1.75 13.09 7.69 4.30

Reservoir, nallah, ponds 0.18 0.83 0.13 0.43 0.46 1.71 0.06 0.25 0.01 0.06 0.06 0.71 0.14 0.78 0.01 0.12 0.02 0.17 0.06 0.45 1.13 0.63

Total Waterbodies 0.18 0.83 0.13 0.43 0.46 1.71 0.06 0.25 0.01 0.06 0.06 0.71 0.14 0.78 0.01 0.12 0.02 0.17 0.06 0.45 1.13 0.63

Crop Lands 1.15 5.30 0.07 0.23 0.04 0.15 0.14 0.59 0.01 0.06 0.00 0.00 0.00 0.00 0.08 0.97 0.09 0.75 0.13 0.97 1.71 0.96

Fallow Lands 0.41 1.88 0.15 0.50 0.01 0.04 0.25 1.06 0.01 0.06 0.00 0.00 0.00 0.00 0.03 0.36 0.02 0.17 1.44 10.75 2.32 1.30

Total Agriculture 1.56 7.18 0.22 0.73 0.05 0.19 0.39 1.65 0.02 0.12 0.00 0.00 0.00 0.00 0.11 1.33 0.11 0.92 1.57 11.72 4.03 2.25

Urban Settlement 0.39 1.79 3.03 10.06 1.76 6.51 0.03 0.13 0.82 5.00 0.04 0.47 0.47 2.61 0.53 6.41 0.14 1.17 0.01 0.07 7.22 4.03

Rural Settlement 0.19 0.87 0.00 0.00 0.05 0.18 0.00 0.00 0.00 0.00 0.00 0.00 0.06 0.33 0.00 0.00 0.00 0.00 0.00 0.00 0.30 0.17

Industrial Settlement 0.17 0.78 0.42 1.39 0.31 1.15 0.27 1.14 0.35 2.14 0.17 2.00 0.36 2.00 0.11 1.33 0.10 0.84 0.24 1.79 2.50 1.40

Total Settlement 0.75 5.80 3.45 11.45 2.12 7.84 0.30 1.27 1.17 7.14 0.21 2.47 0.89 4.94 0.64 7.74 0.24 2.01 0.25 1.86 10.02 5.60

Grand Total 21.75 100.00 30.11 100.00 27.04 100.00 23.62 100.00 16.39 100.00 8.51 100.00 17.98 100.00 8.27 100.00 11.97 100.00 13.39 100.00 179.03 100.00

SC

R

UB

S

TABLE -2

Status of Land Use / Reclamation in OC Mines producing more than 5 mcm (Coal+OB) annually of Northern Coalfields Ltd. based on Satellite data of the Year 2021(Area in Sq Km)

AMLOHRI NIGAHI JAYANT DUDHICHUA KHADIA KRISHNASHILA BINA KAKRI JHINGURDAH BLOCK-B TOTAL

FO

RE

ST

SA

GR

ICU

LT

UR

ES

ET

TLE

ME

NT

SS

FP

LA

NT

AT

ION

AR

EA

UN

DE

R A

CT

IVE

MIN

ING

TE

CH

N.

RE

CLA

IMA

TIO

NW

AS

TE

LA

ND

SW

AT

ER

BO

DI

ES

CMPDI

Job No 561410027 110

Plate 7.1

CMPDI

Job No 561410027 111

Plate 7.2

CMPDI

Job No 561410027 112

Plate 7.3

CMPDI

Job No 561410027 113

Plate 7.4

CMPDI

Job No 561410027 114

Plate 7.5

CMPDI

Job No 561410027 115

Plate 7.6

CMPDI

Job No 561410027 116

Plate 7.7

CMPDI

Job No 561410027 117

Plate 7.8

CMPDI

Job No 561410027 118

Plate 7.9

CMPDI

Job No 561410027 119

Plate 7.10

CMPDI

Job No 561410027 120

Figure 7.2

Figure 7.3

CMPDI

Job No 561410027 121

Figure 7.4

Figure 7.5

CMPDI

Job No 561410027 122

Figure 7.6

Figure 7.7

CMPDI

Job No 561410027 123

Figure 7.8

Figure 7.9

CMPDI

Job No 561410027 124

Figure 7.10

Figure 7.11

CMPDI

Job No 561410027 125

Photograph 7.1: Amlohri OCP- New Plantation growing on the slopes of OB

Photograph 7.2: Nigahi OCP- Plantation growing on the slopes of OB done

CMPDI

Job No 561410027 126

Photograph 7.3: Jayant OCP- Plantation done on Jayant OCP

Photograph 7.4: Dudhichua OCP- Plantation done on Dudhichua OCP

CMPDI

Job No 561410027 127

Photograph 7.5: Khadia OCP- Plantation done on KHADIA OCP

Photograph 7.6: Krishnashila OCP- Plantation done on Krishnashila OCP

CMPDI

Job No 561410027 128

Photograph 7.7: Bina OCP- Plantation done on Bina OCP

Photograph 7.8: Kakri OCP- Plantation done on Kakri OCP

CMPDI

Job No 561410027 129

Photograph 7.9: Additional dumping on Planted area at Jhingurdah OCP

Photograph 7.10: Block-B OCP- Plantation done on Block-B OCP

MAHANADI COALFIELDS LIMITED

CMPDI

Job No 561410027/(MCL) 131

8.0 Land Reclamation Status in Mahanadi Coalfields Limited

8.1 Following Sixteen (16) opencast projects of MCL producing more than 5 million cubic

meter and more (Coal + OB) were taken up for land reclamation monitoring based on

satellite data of the year 2021.

Ananta

Balram

Lingaraj

Bharatpur

Bhubaneswari

Jagannath

Hingula

Kaniha

Belpahar

Lakhanpur

Samleswari

Lajkura

Siarmal

Basundhara West Extension

Garjanbahal

Kulda

8.2 Project wise Land Reclamation status in MCL for the year 2021 is given in Table 8.1

and also shown graphically in Fig 8.1A and 8.1B. Area statistics of different land use

/ cover classes present in the mine leasehold of the above projects for the year 2021-

22 are shown in the Table -8.2 (in two parts). Land use maps derived from satellite

data are shown in Plate 8.1 – 8.16. Year wise changes in the different land use

classes based on satellite data are depicted in Bar Charts in Fig. 8.2–8.17 for the last

three years only.

CMPDI

Job No 561410027/(MCL) 132

8.3 From the year 2021-2022 Kulda and Kaniha OCP have been considered in more than

5mcm (Coal+OB) category and will be monitored each year. Previously they were in

less than 5 mcm (Coal+OB) category and were monitored in an interval of 3 years.

The leasehold boundaries of Lingaraj and Kaniha projects have been modified as

provided by respective projects (Refer Table 8.1).

8.4 Study reveals that out of total 59.02 Km2 excavated area; 35.53 Km2 area (60.20%)

is under reclamation. Out of which 8.24 Km2 (13.96%) area has been re-vegetated

and 27.29 Km2 (46.24%) area is under backfilling. (under Technical Reclamation).

8.5 Total Area under active mining has increased from 20.39 (Yr. 2020) to 23.49 (Yr.

2021). Though in Belpahar project it has reduced due to increase in area under

backfilling. Area under backfilling in Balram project has been reduced marginally due

to increase in mine water.

8.6 Analysis of satellite data indicates that plantation on backfill has reduced in Balram,

Bharatpur, Hingula, Belpahar and Samleswari because of fresh backfilling activities.

8.7 Plantation on External OB dump has marginally reduced in Belpahar and Samleswari

OCP due to construction of silo and road. Area of Social forestry has reduced

marginally in some projects due to mine advancement.

8.8 Study also reveals that area under barren backfilling (Technical Reclamation) has

increased from 25.26 Km2 in 2020 to 27.29 Km2 in 2021.

8.9 It was also observed that overall total area under plantation (Green Cover) has

increased from 15.55 Km2 in 2020 to 15.61 Km2 in 2021 (Refer all Total in Table 8.1).

Green Cover has reduced in some projects of MCL due to change in mine boundary

and reduction in plantation and social forestry in the leasehold areas resulted from

mining activities.

CMPDI

Job No 561410027/(MCL) 133

8.10 On comparing the status of land reclamation for the year 2021 with respect to the

year 2020 in different projects, it is evident that area of land reclamation has

increased from 33.63 Km2 (Yr. 2020) to 35.53 Km2 (Yr.2021).

8.11 In Kulda OCP and Bharatpur OCP plantation has been done on internal OB dump but

because of low height of the plants its signature is not available/visible in satellite image

of 2021.

8.12 Out of 16 projects of MCL, Jagannath OC ranks on top for land reclamation (74.07%)

followed by Samleswari OC (73.99%) and Balram OC (73.18%).

8.13 The Kaniha and Kulda OC projects were previously monitored under Less than 5mcm

(Coal+OB) per annum category at an interval of three years. The previous cycle of land

reclamation monitoring of Kaniha OCP was done in 2018-19 and for Kulda OCP the

previous cycle of monitoring was 2020-21.

CMPDI

Job No 561410027/(MCL) 134

Table – 8.1 Project wise Land Reclamation Status in Opencast Projects of MCL based on Satellite Data of the year 2021

Note: In reference to the above Table-1, different parameters are classified as follows:

1. Area under Biological Reclamation includes Area under Plantation done on Backfilled Area only. 2. Area under Technical Reclamation includes Area under Barren Backfilling only. 3. Area under Active Mining includes Coal Quarry, Advance Quarry Site, Quarry Filled with Water, if any. Areas under coal dump have been excluded from Active Mining in this table. 4. Social Forestry and Plantation on External OB Dumps are not included in Biological Reclamation and are put under separate categories as shown in the Table above. 5. (%) calculated in the above Table is in respect to Total Excavated Area except for “Total Area under Plantation” where % is in terms of “Leasehold Area” 6. The leasehold boundaries of Lingaraj and Kaniha project have been modified as provided by the projects. 7. Kaniha and Kulda, having the capacity > 5 mcm (Coal+OB), are included for annual satellite monitoring.

1 2 3 4

2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021

1 Ananta 14.20 14.20 2.40 2.46 1.05 1.05 0.10 0.10 0.22 0.22 1.45 1.60 4.90 5.11 1.37 1.37 3.45 3.51

48.98% 48.14% 21.43% 20.55% 29.59% 31.31% 9.65% 9.65% 70.41% 68.69%

2 Balram 13.09 13.09 2.80 2.78 1.06 1.04 0.22 0.22 0.35 0.35 1.03 1.40 4.89 5.22 1.63 1.61 3.86 3.82

57.26% 53.26% 21.68% 19.92% 21.06% 26.82% 12.45% 12.30% 78.94% 73.18%

3 Lingaraj 7.26 11.73 1.70 1.90 0.15 0.15 0.32 0.52 0.33 0.44 2.19 2.67 4.04 4.72 0.80 1.11 1.85 2.05

42.08% 40.25% 3.71% 3.18% 54.21% 56.57% 11.02% 9.46% 45.79% 43.43%

4 Bharatpur 9.27 9.27 2.63 2.66 1.66 1.65 0.45 0.45 0.16 0.16 1.66 1.75 5.95 6.06 2.27 2.26 4.29 4.31

44.20% 43.89% 27.90% 27.23% 27.90% 28.88% 24.49% 24.38% 72.10% 71.12%

5 Bhubaneswari 6.58 6.58 1.86 2.15 0.01 0.02 0.00 0.01 0.15 0.13 1.77 2.17 3.64 4.34 0.16 0.16 1.87 2.17

51.10% 49.54% 0.27% 0.46% 48.63% 50.00% 2.43% 2.43% 51.37% 50.00%

6 Jagannath 5.54 5.54 0.84 1.00 1.79 1.80 0.00 0.00 0.17 0.17 0.97 0.98 3.60 3.78 1.96 1.97 2.63 2.80

23.33% 26.46% 49.72% 47.62% 26.94% 25.93% 35.38% 35.56% 73.06% 74.07%

7 Hingula 15.75 15.75 1.48 1.50 0.07 0.06 0.21 0.21 0.28 0.29 2.02 2.25 3.57 3.81 0.56 0.56 1.55 1.56

41.46% 39.37% 1.96% 1.57% 56.58% 59.06% 3.56% 3.56% 43.42% 40.94%

8 Belpahar 14.44 14.44 2.36 2.71 0.90 0.82 0.57 0.51 0.52 0.52 1.33 1.29 4.59 4.82 1.99 1.85 3.26 3.53

51.42% 56.22% 19.61% 17.01% 28.98% 26.76% 13.78% 12.81% 71.02% 73.24%

9 Lakhanpur 22.40 22.40 4.32 4.66 0.83 0.86 0.59 0.59 0.44 0.40 2.99 3.58 8.14 9.10 1.86 1.85 5.15 5.52

53.07% 51.21% 10.20% 9.45% 36.73% 39.34% 8.30% 8.26% 63.27% 60.66%

10 Samleswari 13.35 13.35 2.94 3.03 0.70 0.64 0.49 0.49 0.50 0.48 1.27 1.29 4.91 4.96 1.69 1.61 3.64 3.67

59.88% 61.09% 14.26% 12.90% 25.87% 26.01% 12.66% 12.06% 74.13% 73.99%

11 Lajkura 7.21 7.21 1.20 1.24 0.15 0.15 0.23 0.20 0.16 0.16 0.89 1.02 2.24 2.41 0.54 0.51 1.35 1.39

53.57% 51.45% 6.70% 6.22% 39.73% 42.32% 7.49% 7.07% 60.27% 57.68%

12 Siarmal 22.90 22.90 0.00 0.00 0.00 0.00 0.00 0.00 0.56 0.60 0.00 0.00 0.00 0.00 0.56 0.60 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.45% 2.62% − −

13 Basundhara W Extn. 3.23 3.23 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.03 0.00 0.00 0.00 0.00 0.03 0.03 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.93% 0.93% − −

14 Garjanbahal 6.54 6.54 0.03 0.14 0.00 0.00 0.00 0.00 0.02 0.03 0.47 0.58 0.50 0.72 0.02 0.03 0.03 0.14

6.00% 19.44% 0.00% 0.00% 94.00% 80.56% 0.31% 0.46% 6.00% 19.44%

161.76 166.23 24.56 26.23 8.37 8.24 3.18 3.30 3.89 3.98 18.04 20.58 50.97 55.05 15.44 15.52 32.93 34.47

48.19% 47.65% 16.42% 14.97% 35.39% 37.38% 9.55% 9.34% 64.61% 62.62%

2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021

15 Kulda 6.34 6.34 0.52 0.75 0.00 0.00 0.00 0.00 0.01 0.02 1.31 1.67 1.83 2.42 0.01 0.02 0.52 0.75

28.42% 30.99% 0.00% 0.00% 71.58% 69.01% 0.16% 0.32% 0.00% 30.99%

2018 2021 2018 2021 2018 2021 2018 2021 2018 2021 2018 2021 2018 2021 2018 2021 2018 2021

16 Kaniha 6.77 7.18 0.18 0.31 0.00 0.00 0.00 0.00 0.10 0.07 1.04 1.24 1.22 1.55 0.10 0.07 0.18 0.31

14.75% 20.00% 0.00% 0.00% 85.25% 80.00% 1.48% 0.97% 0.00% 20.00%

13.11 13.52 0.70 1.06 0.00 0.00 0.00 0.00 0.11 0.09 2.35 2.91 3.05 3.97 0.11 0.09 0.70 1.06

22.95% 26.70% 0.00% 0.00% 77.05% 73.30% 0.84% 0.67% 22.95% 26.70%

174.87 179.75 25.26 27.29 8.37 8.24 3.18 3.30 4.00 4.07 20.39 23.49 54.02 59.02 15.55 15.61 33.63 35.53

46.76% 46.24% 15.49% 13.96% 37.75% 39.80% 8.89% 8.68% 62.25% 60.20%

11(=6+7+8) 12(=5+6)5 6 7 8 9 10(=5+6+9)

Plantation on Social Forestry,

Total (B)

All Total (A+B)

Total (A)

Total Area Under

Plantation

(%Green Cover

Generated in

Total Area Under

Reclamation

(Area in Sq.km.)

Sl.

No.Project

Total

Leasehold

Area 2020

Total

Leasehold

Area 2021

Technical

Reclamation

PlantationArea Under

Active Mining

Total Excavated

Area Biological Reclamation Other Plantation

Area under Plantation on

CMPDI

Job No 561410027/(MCL) 135

Fig.8.1A & 8.1B : Land reclamation status in OC projects of MCL in the year 2021

14

.20

13

.09

11

.73

9.2

7

6.5

8

5.5

4

15

.75

7.1

8

5.1

1

5.2

2

4.7

2

6.0

6

4.3

4

3.7

8

3.8

1

1.5

5

3.5

1

3.8

2 2.0

5

4.3

1 2.1

7

2.8

0 1.5

6

0.3

1

0

2

4

6

8

10

12

14

16

18

ANANTA BALRAM LINGARAJ BHARATPUR BHUBANESWARI JAGANNATH HINGULA KANIHA

AR

EA

IN

SQ

. K

M.

OPENCAST PROJECTS

FIG 8.1A LAND RECLAMATION STATUS OF PROJECTS IN TALCHER CF, MCL, YEAR 2021

Leasehold

Excavated

Area Under Reaclamation

(Biological+ Technical)

14

.44 2

2.4

0

13

.35

7.2

1

22

.90

3.2

3

6.5

4

6.3

4

4.8

2

9.1

0

4.9

6

2.4

1

0.0

0

0.0

0

0.7

2

2.4

2

3.5

3

5.5

2 3.6

7

1.3

9

0.0

0

0.0

0

0.1

4

0.7

5

0

5

10

15

20

25

BELPAHAR LAKHANPUR SAMLESWARI LAJKURA SIARMAL BASUNDHARA W.

EXTN.

GARJANBAHAL KULDA

AR

EA

IN

SQ

. K

M.

OPENCAST PROJECTS

FIG 8.1B LAND RECLAMATION STATUS OF PROJECTS IN IB VALLEY CF, MCL, YEAR 2021

Leasehold

Excavated

Area Under Reaclamation

(Biological+ Technical)

CMPDI

Job No 561410027/(MCL) 136

Table 8.2A

Project wise Area Statistics of Land Use / Cover in OC Mines (> 5 mcu.m.) of MCL based on Satellite data of the Year 2021

Area % Area % Area % Area % Area % Area % Area % Area %

Dense Forest 1.01 7.11 0.00 0.00 0.00 0.00 0.01 0.11 0.00 0.00 0.00 0.00 1.15 7.30 0.00 0.00 2.17 2.60

Open Forest 1.15 8.10 0.57 4.35 0.29 2.47 0.00 0.00 0.22 3.35 0.03 0.54 1.60 10.16 0.00 0.00 3.86 4.63

Total Forest (A) 2.16 15.21 0.57 4.35 0.29 2.47 0.01 0.11 0.22 3.35 0.03 0.54 2.75 17.46 0.00 0.00 6.03 7.24

Scrubs (B) 1.92 13.52 2.22 16.96 1.65 14.07 0.47 5.07 0.39 5.93 0.30 5.42 3.05 19.37 0.73 10.17 10.73 12.88

Social Forestry 0.22 1.55 0.35 2.67 0.44 3.75 0.16 1.73 0.13 1.98 0.17 3.07 0.29 1.84 0.07 0.97 1.83 2.20

Plantation on External OB Dump 0.10 0.70 0.22 1.68 0.52 4.43 0.45 4.85 0.01 0.08 0.00 0.00 0.21 1.33 0.00 0.00 1.51 1.81

Plantation on Backfill/Excavated Area(Biological Reclamation) 1.05 7.39 1.04 7.94 0.15 1.28 1.65 17.80 0.02 0.30 1.80 32.49 0.06 0.38 0.00 0.00 5.77 6.92

Total Plantation (Green Cover) (C) 1.37 9.65 1.61 12.30 1.11 9.46 2.26 24.38 0.16 2.36 1.97 35.56 0.56 3.56 0.07 0.97 9.11 10.93

Total Vegetation (A+B+C) 5.45 38.38 4.40 33.61 3.05 26.00 2.74 29.56 0.77 11.63 2.30 41.52 6.36 40.38 0.80 11.14 25.87 31.04

Coal Dump 0.18 1.27 0.24 1.83 0.41 3.50 0.18 1.94 0.04 0.61 0.08 1.44 0.39 2.48 0.12 1.67 1.64 1.97

Coal Quarry 1.15 8.10 0.75 5.73 2.21 18.84 0.90 9.71 1.68 25.55 0.32 5.78 0.99 6.29 1.17 16.29 9.17 11.00

Advance Quarry Site 0.10 0.70 0.12 0.92 0.10 0.85 0.11 1.19 0.16 2.43 0.08 1.44 0.12 0.76 0.01 0.14 0.80 0.96

Quarry Filled with Water 0.35 2.46 0.53 4.05 0.36 3.07 0.74 7.98 0.33 5.02 0.58 10.47 1.14 7.24 0.06 0.84 4.09 4.91

Total Area under Active Mining 1.60 11.27 1.40 10.70 2.67 22.76 1.75 18.88 2.17 33.00 0.98 17.69 2.25 14.29 1.24 17.27 14.06 16.87

Barren OB dump 0.00 0.00 0.13 0.99 0.79 6.73 0.05 0.54 0.79 12.02 0.00 0.00 0.54 3.43 0.42 5.85 2.72 3.26

Area Under Backfilling(Technical Reclamation) 2.46 17.32 2.78 21.24 1.90 16.20 2.66 28.69 2.15 32.70 1.00 18.05 1.50 9.52 0.31 4.32 14.76 17.71

Total Area under Mine Operation 4.24 29.86 4.55 34.76 5.77 49.19 4.64 50.05 5.15 78.33 2.06 37.18 4.68 29.71 2.09 29.11 33.18 37.85

Waste Lands 1.95 13.73 1.07 8.17 1.33 11.34 0.79 8.52 0.32 4.87 0.42 7.58 1.81 11.49 1.00 13.93 8.69 10.43

Fly Ash Pond/Sand Body 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.11 1.99 0.06 0.38 0.00 0.00 0.17 0.20

Total Wastelands 1.95 13.73 1.07 8.17 1.33 11.34 0.79 8.52 0.32 4.87 0.53 9.57 1.87 11.87 1.00 13.93 8.86 10.63

Reservoir, nallah, ponds etc. 0.19 1.34 0.26 1.99 0.09 0.77 0.05 0.54 0.02 0.30 0.05 0.90 0.32 2.03 0.07 0.97 1.05 1.26

Total Waterbodies 0.19 1.34 0.26 1.99 0.09 0.77 0.05 0.54 0.02 0.30 0.05 0.90 0.32 2.03 0.07 0.97 1.05 1.26

Crop Lands 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.20 2.79 0.20 0.24

Fallow Lands 2.11 14.86 2.09 15.97 0.96 8.18 0.77 8.31 0.26 3.95 0.44 7.94 2.26 14.35 2.71 37.74 11.60 13.92

Total Agriculture 2.11 14.86 2.09 15.97 0.96 8.18 0.77 8.31 0.26 3.95 0.44 7.94 2.26 14.35 2.91 40.53 11.80 14.16

Urban Settlement 0.00 0.00 0.02 0.15 0.14 1.19 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.06 0.00 0.00 0.17 0.20

Rural Settlement 0.12 0.85 0.30 2.29 0.14 1.19 0.04 0.43 0.05 0.76 0.05 0.90 0.22 1.40 0.25 3.48 1.17 1.40

Industrial Settlement 0.14 0.99 0.40 3.06 0.25 2.13 0.24 2.59 0.01 0.15 0.11 1.99 0.03 0.19 0.06 0.84 1.24 1.49

Total Settlements 0.26 1.83 0.72 5.50 0.53 4.52 0.28 3.02 0.06 0.91 0.16 2.89 0.26 1.65 0.31 4.32 2.58 3.10

GRAND TOTAL 14.20 100.00 13.09 100.00 11.73 100.00 9.27 100.00 6.58 100.00 5.54 100.00 15.75 100.00 7.18 100.00 83.34 100.00

TOTAL

(Area in Sq. Kms.)

ANANTA BALRAM LINGARAJ BHARATPUR BHUBANESHWARI JAGANNATH HINGULA KANIHA

WA

TE

RA

GR

ICU

LT

UR

ES

ET

TL

EM

EN

TS

FO

RE

ST

SS

CR

UB

SP

LA

NT

AT

ION

AC

TIV

E M

ININ

GW

AS

TE

LA

ND

S

CMPDI

Job No 561410027/(MCL) 137

Table 8.2B

Area % Area % Area % Area % Area % Area % Area % Area % Area % Area %

Dense Forest 0.00 0.00 1.37 6.12 0.21 1.57 0.70 9.71 0.00 0.00 0.00 0.00 0.43 6.57 0.00 0.00 2.71 2.81 4.88 2.71

Open Forest 0.91 6.30 2.47 11.03 0.56 4.19 0.69 9.57 0.87 3.80 0.79 24.46 0.66 10.09 0.00 0.00 6.95 7.21 10.81 6.01

Total Forest (A) 0.91 6.30 3.84 17.14 0.77 5.77 1.39 19.28 0.87 3.80 0.79 24.46 1.09 16.67 0.00 0.00 9.66 10.02 15.69 8.73

Scrubs (B) 3.38 23.41 2.63 11.74 2.58 19.32 0.98 13.59 7.21 31.48 1.36 42.11 1.14 17.43 1.58 24.92 20.86 21.64 31.59 17.57

Social Forestry 0.52 3.60 0.40 1.79 0.48 3.59 0.16 2.22 0.60 2.62 0.03 0.93 0.03 0.46 0.02 0.32 2.24 2.32 4.07 2.26

Plantation on External OB Dump 0.51 3.53 0.59 2.63 0.49 3.67 0.20 2.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.79 1.86 3.30 1.83

Plantation on Backfill/Excavated Area(Biological Reclamation) 0.82 5.68 0.86 3.84 0.64 4.79 0.15 2.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.47 2.56 8.24 4.58

Total Plantation (Green Cover) (C) 1.85 12.81 1.85 8.26 1.61 12.06 0.51 7.07 0.60 2.62 0.03 0.93 0.03 0.46 0.02 0.32 6.50 6.74 15.61 8.68

Total Vegetation (A+B+C) 6.14 42.52 8.32 37.14 4.96 37.15 2.88 39.94 8.68 37.90 2.18 67.49 2.26 34.56 1.60 25.24 37.02 38.40 62.89 34.99

Coal Dump 0.11 0.76 0.12 0.54 0.19 1.42 0.07 0.97 0.00 0.00 0.00 0.00 0.25 3.82 0.07 1.10 0.81 0.84 2.45 1.36

Coal Quarry 0.97 6.72 2.77 12.37 1.00 7.49 0.85 11.79 0.00 0.00 0.00 0.00 0.43 6.57 1.33 20.98 7.35 7.62 16.52 9.19

Advance Quarry Site 0.15 1.04 0.55 2.46 0.13 0.97 0.14 1.94 0.00 0.00 0.00 0.00 0.12 1.83 0.19 3.00 1.28 1.33 2.08 1.16

Quarry Filled with Water 0.17 1.18 0.26 1.16 0.16 1.20 0.03 0.42 0.00 0.00 0.00 0.00 0.03 0.46 0.15 2.37 0.80 0.83 4.89 2.72

Total Area under Active Mining 1.29 8.93 3.58 15.98 1.29 9.66 1.02 14.15 0.00 0.00 0.00 0.00 0.58 8.87 1.67 26.35 9.43 9.78 23.49 13.07

Barren OB dump 0.19 1.32 0.02 0.09 0.07 0.52 0.18 2.50 0.00 0.00 0.00 0.00 0.41 6.27 0.58 9.15 1.45 1.50 4.17 2.32

Area Under Backfilling(Technical Reclamation) 2.71 18.77 4.66 20.80 3.03 22.69 1.24 17.20 0.00 0.00 0.00 0.00 0.14 2.14 0.75 11.83 12.53 13.00 27.29 15.18

Total Area under Mine Operation 4.30 29.78 8.38 37.41 4.58 34.30 2.51 34.81 0.00 0.00 0.00 0.00 1.38 21.10 3.07 48.43 24.22 24.28 57.40 31.93

Waste Lands 2.63 18.21 1.38 6.16 2.15 16.10 0.98 13.59 1.93 8.43 0.62 19.20 0.43 6.57 0.73 11.51 10.85 11.25 19.54 10.87

Fly Ash Pond/Sand Body 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.17 0.09

Total Wastelands 2.63 18.21 1.38 6.16 2.15 16.10 0.98 13.59 1.93 8.43 0.62 19.20 0.43 6.57 0.73 11.51 10.85 11.25 19.71 10.97

Reservoir, nallah, ponds etc. 0.25 1.73 0.27 1.21 0.19 1.42 0.07 0.97 0.22 0.96 0.02 0.62 0.06 0.92 0.11 1.73 1.19 1.23 2.24 1.25

Total Waterbodies 0.25 1.73 0.27 1.21 0.19 1.42 0.07 0.97 0.22 0.96 0.02 0.62 0.06 0.92 0.11 1.73 1.19 1.23 2.24 1.25

Crop Lands 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.74 7.60 0.00 0.00 0.00 0.00 0.00 0.00 1.74 1.80 1.94 1.08

Fallow Lands 0.55 3.81 3.71 16.56 1.05 7.86 0.54 7.49 9.62 42.01 0.39 12.07 2.20 33.64 0.77 12.14 18.83 19.53 30.43 16.93

Total Agriculture 0.55 3.81 3.71 16.56 1.05 7.86 0.54 7.49 11.36 49.61 0.39 12.07 2.20 33.64 0.77 12.14 20.57 21.34 32.37 18.01

Urban Settlement 0.02 0.14 0.00 0.00 0.003 0.02 0.08 1.11 0.02 0.09 0.00 0.00 0.00 0.00 0.00 0.00 0.12 0.13 0.29 0.16

Rural Settlement 0.17 1.18 0.12 0.54 0.21 1.57 0.03 0.42 0.69 3.01 0.02 0.62 0.07 1.07 0.01 0.16 1.32 1.37 2.49 1.39

Industrial Settlement 0.38 2.63 0.22 0.98 0.21 1.57 0.12 1.66 0.00 0.00 0.00 0.00 0.14 2.14 0.05 0.79 1.12 1.16 2.36 1.31

Total Settlements 0.57 3.95 0.34 1.52 0.423 3.17 0.23 3.19 0.71 3.10 0.02 0.62 0.21 3.21 0.06 0.95 2.56 2.66 5.14 2.86

GRAND TOTAL 14.44 100.00 22.40 100.00 13.35 100.00 7.21 100.00 22.90 100.00 3.23 100.00 6.54 100.00 6.34 100.00 96.41 100.00 179.75 100.00

WA

ST

EL

AN

DS

WA

TE

RA

GR

ICU

LT

UR

ES

ET

TL

EM

EN

TS

AC

TIV

E M

ININ

G

GARJANBAHALBELPAHAR LAKHANPUR SAMLESWARI LAJKURA SIARMAL BASUNDHARA W EXTN

FO

RE

ST

SS

CR

UB

S

(Area in Sq. Kms.)

PL

AN

TA

TIO

N

ALL TOTALTOTALKULDA

CMPDI

Job No 561410027/(MCL) 138

Plate 8.1

CMPDI

Job No 561410027/(MCL) 139

Plate 8.2

CMPDI

Job No 561410027/(MCL) 140

Plate 8.3

CMPDI

Job No 561410027/(MCL) 141

Plate 8.4

CMPDI

Job No 561410027/(MCL) 142

Plate 8.5

CMPDI

Job No 561410027/(MCL) 143

Plate 8.6

CMPDI

Job No 561410027/(MCL) 144

Plate 8.7

CMPDI

Job No 561410027/(MCL) 145

Plate 8.8

CMPDI

Job No 561410027/(MCL) 146

Plate 8.9

CMPDI

Job No 561410027/(MCL) 147

Plate 8.10

CMPDI

Job No 561410027/(MCL) 148

Plate 8.11

CMPDI

Job No 561410027/(MCL) 149

Plate 8.12

CMPDI

Job No 561410027/(MCL) 150

Plate 8.13

CMPDI

Job No 561410027/(MCL) 151

Plate 8.14

CMPDI

Job No 561410027/(MCL) 152

Plate 8.15

CMPDI

Job No 561410027/(MCL) 153

Plate 8.16

CMPDI

Job No 561410027 154

Figure 8.2

Figure 8.3

CMPDI

Job No 561410027 155

Figure 8.4

Figure 8.5

CMPDI

Job No 561410027 156

Figure 8.6

Figure 8.7

CMPDI

Job No 561410027 157

Figure 8.8

Figure 8.9

CMPDI

Job No 561410027 158

Figure 8.10

Figure 8.11

CMPDI

Job No 561410027 159

Figure 8.12

Figure 8.13

CMPDI

Job No 561410027 160

Figure 8.14

Figure 8.15

CMPDI

Job No 561410027 161

Figure 8.16

Figure 8.17

CMPDI

Job No 561410027 162

Photograph – 8.1: Plantation on Internal OB/Backfill (Ananta OC mine)

Photograph – 8.2: Plantation on Internal OB (Balram OC Mine)

CMPDI

Job No 561410027 163

Photograph – 8.3: Plantation on Internal OB/Backfill (Lingaraj OC Mine)

Photograph – 8.4: Plantation on Internal OB/Backfill (Bharatpur OC Mine)

CMPDI

Job No 561410027 164

Photograph – 8.5: Plantation on Internal OB/Backfill (Bhubaneswari OC Mine)

Photograph – 8.6: Plantation on External OB (Bhubaneswari OC Mine)

CMPDI

Job No 561410027 165

Photograph – 8.7: Plantation on Internal OB/Backfill (Jagannath OC Mine)

Photograph – 8.8: Plantation on Internal OB/Backfill (Hingula OC Mine)

CMPDI

Job No 561410027 166

Photograph-8.9: Avenue Plantation of Kaniha OC Mine

Photograph-8.10: Plantation on Internal OB/Backfill (Belpahar OC Mine)

CMPDI

Job No 561410027 167

Photograph-8.11: Plantation on Internal OB/Backfill (Lakhanpur OC Mine)

Photograph-8.12: Plantation on Internal OB/Backfill (Samleswari OC Mine)

CMPDI

Job No 561410027 168

Photograph-8.13: Plantation on Internal OB/Backfill (Lajkura OC Mine)

Photograph-8.14: Plantation on Internal OB/Backfill (Kulda OC Mine)

CENTRAL COALFIELDS LIMITED

CMPDI

Job No 561410027 170

9.0 Land Reclamation Status in Central Coalfields Ltd.

9.1 The following 15 OC projects of Central Coalfields Ltd. producing more than 5

million m3. (Coal + OB) annually, have been taken up for land reclamation

monitoring based on Satellite data of the year 2021.

No. Name of OC Project Coalfield Name

1 Ashok

North Karanpura (NK)

2 Piparwar

3 KDH

4 Amrapali

5 Magadh

6 Rohini *

7 Purnadih *

8 North Urimari * South Karanpura (SK)

9 Rajrappa Ramgarh

10 Parej East West Bokaro (WB)

11 Tapin North *

12 Kathara *

East Bokaro (EB) 13 Karo *

14 Konar Expansion *

15 Selected Dhori *

*Yearly monitoring started from (2021-22)

9.2 Area statistics of different land use/ cover classes present in the leasehold area

of the above 15 projects of CCL for the year 2021 are shown in Table 9.1. Land

use/ cover maps derived from satellite data are shown in Plate 9.1 – 9.15. Report

on land reclamation status of the above projects are also prepared. Year wise

changes in different land use/ cover classes in the last three years (wherever

applicable) based on satellite data are shown in Bar charts in Fig. 9.2 – 9.16.

CMPDI

Job No 561410027 171

9.3 Study based on Satellite data of the year 2021 reveals that, out of total excavated area

of 36.49 km2 , 25.99 km2 (71.22%) has come under reclamation in the above 15 OC

projects of CCL, out of which 18.01 km2 (49.36%) area is under backfilling (Technical

Reclamation) and 7.98 km2 (21.87%) area is under plantation (Biological Reclamation).

9.4 Study also reveals that the area under backfilling (Technical Reclamation) has increased

from 15.20 km2 in 2020 to 18.01 km2 in 2021.

9.5 Analysis of satellite data also indicates that the area under plantation (Biological

Reclamation) has increased from 7.00 km2 (Yr. 2020) to 7.98 km2 (Yr. 2021). This

increase in Biological Reclamation reflects continuous efforts on part of CCL in

continueing reclamation activities for environmental protection.

9.6 The total area under reclamation has increased from 22.20 km2 (69.05%) in 2020 to 25.99

km2 (71.22%) in 2021, out of the total excavated area.

9.7 It is also seen that the total area under plantation (Green Cover) which includes

plantation carried out on backfilled area, OB dumps as well as plantation done on social

forestry in all the 15 mines taken together of CCL has increased from 17.32 km2 in the

year 2020, to 17.71 km2 in the year 2021

9.8 Piparwar area of CCL has developed and maintained an eco-restoration park called

“Kayakalp Vatika” at Piparwar OCP, over the reclaimed (backfilled) land. Nearby, a new

eco park named ‘Chandra Shekhar Azad Vatika ‘ is also being developed from 2020.

9.10 Out of 15 projects of CCL taken for land reclamation monitoring in 2021-22, Parej East

OC ranks on top for land reclamation (86.98%) followed by KDH (85.60%), Piparwar OC

(82.73%), Ashok OC (82.14%), and Rajrappa OC (79.61%).

9.11 Eight (8) OC projects namely, Purnadih, Rohini, North Urimari, Tapin North, Kathara,

Karo, Konar Expansion and Seleceted Dhori were added to the list of yearly reclamation

CMPDI

Job No 561410027 172

monitoring from the year 2021-22. Earlier these projects were monitored in every three

year basis.

9.12 Amrapali OCP has successfully carried out plantation on OB dumps, and slopes of OB

dump through seed ball throwing.

CMPDI

Job No 561410027 173

TABLE – 9.1 Project wise Land Reclamation Status in OC projects of CCL based on Satellite Data of the Year 2021

1 2

2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021

1 Ashok 7.93 7.93 2.35 2.47 1.02 1.21 0.00 0.00 0.27 0.17 0.66 0.80 4.03 4.48 1.29 1.38 3.37 3.68

58.31% 55.13% 25.31% 27.01% 16.38% 17.86% 16.27% 17.40% 83.62% 82.14%

2 Piparwar 11.20 11.20 2.91 2.75 1.45 1.85 0.42 0.19 1.18 1.18 0.98 0.96 5.34 5.56 3.05 3.22 4.36 4.60

54.49% 49.46% 27.15% 33.27% 18.35% 17.27% 27.23% 28.75% 81.65% 82.73%

3 KDH 6.20 6.20 1.79 1.74 1.32 1.35 0.03 0.03 0.21 0.21 0.49 0.52 3.60 3.61 1.56 1.59 3.11 3.09

49.72% 48.20% 36.67% 37.40% 13.61% 14.40% 25.16% 25.65% 86.39% 85.60%

4 Amrapali 6.20 6.20 1.20 1.32 0.00 0.00 0.05 0.08 0.02 0.02 1.07 1.10 2.27 2.42 0.07 0.10 1.20 1.32

52.86% 54.55% 0.00% 0.00% 47.14% 45.45% 1.13% 1.61% 52.86% 54.55%

5 Magadh 17.69 17.69 0.55 0.60 0.00 0.00 0.10 0.10 0.00 0.00 0.78 0.92 1.33 1.52 0.10 0.10 0.55 0.60

41.35% 39.47% 0.00% 0.00% 58.65% 60.53% 0.57% 0.57% 41.35% 39.47%

6 Parej East 6.20 6.20 0.72 0.75 0.69 0.72 0.05 0.05 0.09 0.09 0.22 0.22 1.63 1.69 0.83 0.86 1.41 1.47

44.17% 44.38% 42.33% 42.60% 13.50% 13.02% 13.39% 13.87% 86.50% 86.98%

7 Rajrappa 19.82 19.82 2.37 2.40 1.3 1.27 3.02 3.02 2.02 2.02 0.80 0.94 4.47 4.61 6.34 6.31 3.67 3.67

53.02% 52.06% 29.08% 27.55% 17.90% 20.39% 31.99% 31.84% 82.10% 79.61%

8 Rohini 2.58 2.56 1.22 1.27 0.42 0.48 0.01 0.11 0.00 0.00 0.67 0.48 2.31 2.23 0.43 0.59 1.64 1.75

52.81% 56.95% 18.18% 21.52% 29.00% 21.52% 16.67% 23.05% 71.00% 78.48%

9 Purnadih 7.56 7.52 0.41 0.92 0.09 0.19 0.03 0.12 0.00 0.03 0.95 0.52 1.45 1.63 0.12 0.34 0.50 1.11

28.28% 56.44% 6.21% 11.66% 65.52% 31.90% 1.59% 4.52% 34.48% 68.10%

10 North Urimari 6.68 5.17 0.50 0.25 0.16 0.14 0.01 0.07 0.00 0.00 1.32 1.00 1.98 1.39 0.17 0.21 0.66 0.39

25.25% 17.99% 8.08% 10.07% 66.67% 71.94% 2.54% 4.06% 33.33% 28.06%

11 Tapin North 3.04 0.91 0.00 0.12 0.00 0.66 1.57 0.12 0.91

57.96% 0.00% 42.04% 3.95% 57.96%

12 Kathara 7.93 7.71 0.61 0.65 0.32 0.33 1.04 0.96 0.89 0.83 0.77 0.62 1.70 1.60 2.25 2.12 0.93 0.98

35.88% 40.63% 18.82% 20.63% 45.29% 38.75% 28.37% 27.50% 54.71% 61.25%

13 Karo 5.75 5.26 0.17 0.55 0.14 0.14 0.12 0.14 0.16 0.12 0.34 0.39 0.65 1.08 0.42 0.40 0.31 0.69

26.15% 50.93% 21.54% 12.96% 52.31% 36.11% 7.30% 7.60% 47.69% 63.89%

14 Konar Exp. 7.29 4.71 0.09 0.88 0.03 0.30 0.24 0.01 0.19 0.01 0.41 0.85 0.53 2.03 0.46 0.32 0.12 1.18

16.98% 43.35% 5.66% 14.78% 77.36% 41.87% 6.31% 6.79% 22.64% 58.13%

15 Sel Dhori 3.00 2.65 0.31 0.55 0.06 0.00 0.17 0.04 0.00 0.01 0.49 0.52 0.86 1.07 0.23 0.05 0.37 0.55

36.05% 51.40% 6.98% 0.00% 56.98% 48.60% 7.67% 1.89% 43.02% 51.40%

TOTAL 116.03 113.86 15.20 18.01 7.00 7.98 5.29 5.04 5.03 4.69 9.95 10.50 32.15 36.49 17.32 17.71 22.20 25.99

47.28% 49.36% 21.77% 21.87% 30.95% 28.78% 14.93% 15.55% 69.05% 71.22%

3

Area under

Backfilling

Social Forestry,

Avanue

Plantation Etc.

Plantation on

Excavated / Backfilled

Area

Other Plantations Total

Excavated

Area

PlantationTechnical

Reclamation

Plantation on

External

Over Burden

Biological Reclamation

11(=4+5)4 5

Table -1 Project wise Land Reclamation Status in Fifteen OC Projects of CCL based on Satellite Data of the Year 2021 (Projects producing more than 5 mcm of Coal + OB annaully) (Area in Sq. Kms.)(Area in Sq. Kms.)

Sl.

No.Project

6

Total Mine

Leasehold

Area

7 8

Area under

Active Mining

9 (=4+5+8)

(% is calculated with respected to Excavated Area as applicable)

10 (=5+6+7)

Total Area under

Reclamation

Total Area under

Plantation

(% Green Cover

Generated in

Leasehold)

CMPDI

Job No 561410027 174

Note: In reference of the above Table-9.1, different parameters are classified as follows:

1 Leasehold area as per the respective environmental clearance (EC) boundary

2 Yearly monitoring of Eight (8 )more Projects namely, Rohini, Purnadih, North Urimari, Kathara,Tapin North, Konar, Karo & Sel Dhori started from current year (2021-22)

3 Area under Biological Reclamation includes Area under Plantation done on Backfilled area only

4 Area under Technical Reclamation includes Area under Backfilling only

5 Area under Active Mining includes Coal Quarry, Quarry filled with water & Advance Quarry Site, if any. Coal dump is excluded

6 Social Forestry and Plantation on External OB dumps are not included in Biological Reclamation, and are put under separate categories

7 (%) calculated in the above table is in respect of total excavated area only, except for “Total area under Plantation” where % is in terms of Leasehold Area.

CMPDI

Job No 561410027 175

Fig. 9.1: Project wise Land Reclamation Status in Year 2021

0

2

4

6

8

10

12

14

16

18

207

.93

11

.20

6.2

0

6.2

0

17

.69

2.5

6

7.5

2

5.1

7 6.2

19

.82

3.0

4

7.7

1

5.2

6

4.7

1

2.6

5

4.4

8 5.5

6

3.6

1

2.4

2

1.5

2 2.2

3

1.6

3

1.3

9

1.6

9

4.6

1

1.5

7

1.6

1.0

8 2.0

3

1.0

7

3.6

8 4.6

0

3.0

9

1.3

2

0.6

0 1.7

5

1.1

1

0.3

9 1.4

7

3.6

7

0.9

1

0.9

8

0.6

9

1.1

8

0.5

5

LEASEHOLD AREA

EXCAVATED AREA

AREA UNDER RECLAMATION

OPENCAST PROJECTS

AR

EA IN

SQ

. KM

S.

PROJECT WISE STATUS OF LAND RECLAMATION IN 15 OCPs OF CCL FOR THE YEAR 2021

CMPDI

Job No 561410027 176

Area % Area % Area % Area % Area % Area % Area % Area % Area % Area % Area % Area % Area % Area % Area % Area %

Dense Forest 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.55 10.46 0.00 0.00 0.00 0.00 0.55 0.48

Open Forest 0.49 6.18 0.16 1.43 0.20 3.23 0.14 2.26 2.60 14.70 0.00 0.00 1.15 15.29 0.00 0.00 1.31 21.13 1.48 7.47 0.37 12.17 0.00 0.00 0.63 11.98 0.71 15.07 0.06 2.26 9.30 8.17

0.49 6.18 0.16 1.43 0.20 3.23 0.14 2.26 2.60 14.70 0.00 0.00 1.15 15.29 0.00 0.00 1.31 21.13 1.48 7.47 0.37 12.17 0.00 0.00 1.18 22.43 0.71 15.07 0.06 2.26 9.85 8.65

Scrubs(B) 1.19 15.01 1.23 10.98 0.75 12.10 0.81 13.06 2.75 15.55 0.11 4.30 2.03 26.99 1.25 24.18 1.84 29.68 4.52 22.81 0.34 11.18 0.53 6.87 1.25 23.76 1.02 21.66 0.34 12.83 19.96 17.53

Social Forestry 0.17 2.14 1.18 10.54 0.21 3.39 0.02 0.32 0.00 0.00 0.00 0.00 0.03 0.40 0.00 0.00 0.09 1.45 2.02 10.19 0.00 0.00 0.83 10.77 0.12 2.28 0.01 0.21 0.01 0.38 4.69 4.12

Plantation on OB Dump 0.00 0.00 0.19 1.70 0.03 0.48 0.08 1.29 0.10 0.57 0.11 4.30 0.12 1.60 0.07 1.35 0.05 0.81 3.02 15.24 0.12 3.95 0.96 12.45 0.14 2.66 0.01 0.21 0.04 1.51 5.04 4.43

Plantation on Backfill 1.21 15.26 1.85 16.52 1.35 21.77 0.00 0.00 0.00 0.00 0.48 18.75 0.19 2.53 0.14 2.71 0.72 11.61 1.27 6.41 0.00 0.00 0.33 4.28 0.14 2.66 0.30 6.37 0.00 0.00 7.98 7.01(Biological Reclamation)

1.38 17.40 3.22 28.75 1.59 25.65 0.10 1.61 0.10 0.57 0.59 23.05 0.34 4.52 0.21 4.06 0.86 13.87 6.31 31.84 0.12 3.95 2.12 27.50 0.40 7.60 0.32 6.79 0.05 1.89 17.71 15.55

3.06 38.59 4.61 41.16 2.54 40.97 1.05 16.94 5.45 30.81 0.70 27.34 3.52 46.81 1.46 28.24 4.01 64.68 12.31 62.11 0.83 27.30 2.65 34.37 2.83 53.80 2.05 43.52 0.45 16.98 47.52 41.74

Coal Quarry 0.72 9.08 0.51 4.55 0.16 2.58 0.98 15.81 0.73 4.13 0.22 8.59 0.20 2.66 0.89 17.21 0.13 2.10 0.48 2.42 0.46 15.13 0.36 4.67 0.33 6.27 0.55 11.68 0.28 10.57 7.00 6.15

Advance Quarry Site 0.07 0.88 0.00 0.00 0.06 0.97 0.02 0.32 0.02 0.11 0.02 0.78 0.02 0.27 0.08 1.55 0.03 0.48 0.10 0.50 0.08 2.63 0.00 0.00 0.04 0.76 0.30 6.37 0.00 0.00 0.84 0.74

Quarry Filled With Water 0.01 0.13 0.45 4.02 0.30 4.84 0.10 1.61 0.17 0.96 0.24 9.38 0.30 3.99 0.03 0.58 0.06 0.97 0.36 1.82 0.12 3.95 0.26 3.37 0.02 0.38 0.00 0.00 0.24 9.06 2.66 2.34

0.80 10.09 0.96 8.57 0.52 8.39 1.10 17.74 0.92 5.20 0.48 18.75 0.52 6.92 1.00 19.34 0.22 3.55 0.94 4.74 0.66 21.71 0.62 8.04 0.39 7.41 0.85 18.05 0.52 19.63 10.50 9.22

Coal Dump 0.00 0.00 0.00 0.00 0.05 0.81 0.06 0.97 0.32 1.81 0.01 0.39 0.06 0.80 0.04 0.77 0.00 0.00 0.08 0.40 0.04 1.32 0.11 1.43 0.23 4.37 0.07 1.49 0.05 1.89 1.12 0.98

Barren OB Dump 0.00 0.00 0.00 0.00 0.03 0.48 0.66 10.65 0.87 4.92 0.00 0.00 0.17 2.26 0.78 15.09 0.19 3.06 0.74 3.73 0.01 0.33 1.69 21.92 0.08 1.52 0.38 8.07 0.67 25.28 6.27 5.51

Area Under Backfilling 2.47 31.15 2.75 24.55 1.74 28.06 1.32 21.29 0.60 3.39 1.27 49.61 0.92 12.23 0.25 4.84 0.75 12.10 2.40 12.11 0.91 29.93 0.65 8.43 0.55 10.46 0.88 18.68 0.55 20.75 18.01 15.82(Technical Reclamation)

3.27 41.24 3.71 33.12 2.34 37.74 3.14 50.65 2.71 15.32 1.76 68.75 1.67 22.21 2.07 40.04 1.16 18.71 4.16 20.99 1.62 53.29 3.07 39.82 1.25 23.76 2.18 46.29 1.79 67.55 35.90 31.53

Waste Lands 0.42 5.30 0.83 7.41 0.28 4.52 1.15 18.55 1.98 11.19 0.06 2.34 0.42 5.59 0.51 9.86 0.30 4.84 1.14 5.75 0.37 12.17 0.53 6.88 0.66 12.55 0.15 3.18 0.26 9.81 9.06 7.96

Fly Ash Pond / Sand Body 0.00 0.00 0.00 0.00 0.04 0.65 0.02 0.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.32 0.00 0.00 0.00 0.00 0.06 0.78 0.00 0.00 0.00 0.00 0.00 0.00 0.14 0.12

0.42 5.30 0.83 7.41 0.32 5.16 1.17 18.87 1.98 11.19 0.06 2.34 0.42 5.59 0.51 9.86 0.32 5.16 1.14 5.75 0.37 12.17 0.59 7.65 0.66 12.55 0.15 3.18 0.26 9.81 9.20 8.08

Reservoir, Nallah, Ponds 0.09 1.13 0.18 1.61 0.07 1.13 0.05 0.81 0.13 0.73 0.04 1.56 0.07 0.93 0.03 0.58 0.05 0.81 0.02 0.10 0.00 0.00 0.05 0.65 0.07 1.33 0.01 0.21 0.00 0.00 0.86 0.76

0.09 1.13 0.18 1.61 0.07 1.13 0.05 0.81 0.13 0.73 0.04 1.56 0.07 0.93 0.03 0.58 0.05 0.81 0.02 0.10 0.00 0.00 0.05 0.65 0.07 1.33 0.01 0.21 0.00 0.00 0.86 0.76

Crop Lands 0.06 0.76 0.08 0.71 0.00 0.00 0.08 1.29 0.79 4.47 0.00 0.00 0.19 2.53 0.12 2.32 0.03 0.48 0.00 0.00 0.01 0.33 0.19 2.46 0.00 0.00 0.00 0.00 0.01 0.38 1.56 1.37

Fallow Lands 0.84 10.59 0.94 8.39 0.62 10.00 0.52 8.39 6.30 35.61 0.00 0.00 1.51 20.08 0.80 15.47 0.27 4.35 1.06 5.35 0.18 5.92 0.48 6.23 0.22 4.18 0.11 2.34 0.03 1.13 13.88 12.19

0.90 11.35 1.02 9.11 0.62 10.00 0.60 9.68 7.09 40.08 0.00 0.00 1.70 22.61 0.92 17.79 0.30 4.84 1.06 5.35 0.19 6.25 0.67 8.69 0.22 4.18 0.11 2.34 0.04 1.51 15.44 13.56

Urban Settlement 0.00 0.00 0.29 2.59 0.11 1.77 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.13 0.00 0.00 0.16 2.58 0.47 2.37 0.01 0.33 0.40 5.19 0.16 3.04 0.20 4.25 0.02 0.75 1.83 1.61

Rural Settlement 0.15 1.89 0.18 1.61 0.02 0.32 0.05 0.81 0.30 1.70 0.00 0.00 0.09 1.20 0.15 2.90 0.16 2.58 0.33 1.66 0.02 0.66 0.07 0.91 0.05 0.95 0.01 0.21 0.03 1.13 1.61 1.41

Industrial Settlement 0.04 0.50 0.38 3.39 0.18 2.90 0.14 2.26 0.03 0.17 0.00 0.00 0.04 0.53 0.03 0.58 0.04 0.65 0.33 1.66 0.00 0.00 0.21 2.72 0.02 0.38 0.00 0.00 0.06 2.26 1.50 1.32

0.19 2.40 0.85 7.59 0.31 5.00 0.19 3.06 0.33 1.87 0.00 0.00 0.14 1.86 0.18 3.48 0.36 5.81 1.13 5.70 0.03 0.99 0.68 8.82 0.23 4.37 0.21 4.46 0.11 4.15 4.94 4.34

Grand Total 7.93 100.00 11.20 100.00 6.20 100.00 6.20 100.00 17.69 100.00 2.56 100.00 7.52 100.00 5.17 100.00 6.20 100.00 19.82 100.00 3.04 100.00 7.71 100.00 5.26 100.00 4.71 100.00 2.65 100.00 113.86 100.00

TABLE - 2

Project wise Area Statistics of Land Use/ Cover Classes in OC Mines(> 5 m.cu.m) of CCL based on Satellite data of the Year 2021 (Area in Sq. Km)

ASHOK PIPARWAR KDH AMRAPALI MAGADH ROHINI PURNADIH

(E)

KONAR EXP SEL DHORI TOTAL

FO

RE

ST

S

Total Forest (A)

NORTH URIMARI PAREJ EAST RAJRAPPA TAPIN NORTH KATHARA KARO

PL

AN

TA

TIO

N

Total Plantation(C)

Total Vegetation(A+B+C)

AC

TIV

E

MIN

IN

G

Total Area under Active Mining(D)

SE

TT

LE

ME

NT

S

Total Settlements

Total Area under Mine Operation(D+E)

WA

ST

EL

AN

DS

WA

TE

RB

OD

Y Total Wasteland

Total Waterbodies

AG

RIC

UL

TU

RE

Total Agriculture

Table 9.2

Project wise Area Statistics of Land Use / Cover in OC Mines (> 5 mcu.m.) of CCL based on Satellite data of the Year 2021 (Area in Km2)

CMPDI

Job No 561410027 177

Plate 9.1

CMPDI

Job No 561410027 178

Plate 9.2

CMPDI

Job No 561410027 179

Plate 9.3

CMPDI

Job No 561410027 180

Plate 9.4

CMPDI

Job No 561410027 181

Plate 9.5

CMPDI

Job No 561410027 182

Plate 9.6

CMPDI

Job No 561410027 183

Plate 9.7

CMPDI

Job No 561410027 184

Plate 9.8

CMPDI

Job No 561410027 185

Plate 9.9

CMPDI

Job No 561410027 186

Plate 9.10

CMPDI

Job No 561410027 187

Plate 9.11

CMPDI

Job No 561410027 188

Plate 9.12

CMPDI

Job No 561410027 189

Plate 9.13

CMPDI

Job No 561410027 190

Plate 9.14

CMPDI

Job No 561410027 191

Plate 9.15

CMPDI

Job No 561410027 192

Figure 9.2

Figure 9.3

CMPDI

Job No 561410027 193

Figure 9.4

Figure 9.5

CMPDI

Job No 561410027 194

Figure 9.6

Figure 9.7

CMPDI

Job No 561410027 195

Figure 9.8

Figure 9.9

CMPDI

Job No 561410027 196

Figure 9.10

Figure 9.11

CMPDI

Job No 561410027 197

Figure 9.12

Figure 9.13

CMPDI

Job No 561410027 198

Figure 9.14

Figure 9.15

CMPDI

Job No 561410027 199

Figure 9.16

CMPDI

Job No 561410027 200

Photograph 9.1: Plantation on Backfilled area - Piparwar OCP

Photograph 9.2: Kayakalp Vatika, Eco Restoration Park Piparwar OCP

CMPDI

Job No 561410027 201

Photograph 9.3: Plantation on Backfilled Area - Ashok OCP

Photograph 9.4: Plantation on OB Dump Area - Amarpali OCP

CMPDI

Job No 561410027 202

Photograph 9.5: Plantation on OB Dump Area- Parej East OCP

Photograph 9.6: Plantation on Backfilled Area in Rajrappa OCP

CMPDI

Job No 561410027 203

Photograph 9.7: Plantation on Backfilled Area- Rohini OCP

Photograph 9.8: Plantation on Backfilled Area- Purnadih OCP

CMPDI

Job No 561410027 204

Photograph 9.9: Plantation on OB Dump Area- North Urimari OCP

Photograph 9.10: Plantation on External OB Dump- Tapin North OCP

CMPDI

Job No 561410027 205

Photograph 9.11: Social Forestry Plantation - Kathara OCP

Photograph 9.12: Plantation on Backfilled Area- Selected Dhori OCP

EASTERN COALFIELDS LIMITED

CMPDI

Job No 561410027 207

10.0 Land Reclamation Status in Eastern Coalfields Ltd.

10.1 Following two OC projects producing 5 million cubic m. or more (Coal + OB)

annually of Eastern Coalfields Ltd. have been taken up for land reclamation based

on Satellite Data of the year 2021.

Rajmahal OCP

Sonepur Bazari OCP

10.2 Both the projects were monitored earlier during the period of 2020 also, on annual

basis for assessing the progress of land reclamation.

10.3 Project wise Land Reclamation status in ECL for the year 2021 is given in Table-

1 and shown graphically in Fig 11.1 Area statistics of different land classes

present in OC projects for the year 2021 is given in Table 10.2. Land use/ cover

maps derived using the satellite data are given in Plate no. 10.1 & 10.2. Changes

in land use status are shown in Fig. 10.2 & 10.3.

10.4 Study based on Satellite data reveals that 12.20 km2 (71.43%) of excavated area

has come under reclamation in ECL, out of which 9.30 km2 (54.45%) area is under

backfilling (Technical Reclamation) and 2.90 Km2 (16.98%) area is under

plantation (Biological Reclamation).

10.5 On comparing the status of land reclamation for the year 2021 with respect to the

year 2020, it is seen from the analysis that the total area of land reclamation has

increased from 11.50 km2 (Yr. 2020) to 12.20 km2 (Yr. 2021).

10.6 After analyzing the data of the year 2021, it is seen that the total area under

plantation (Green Cover) which includes plantation carried out on backfilled area,

OB dumps and plantation under social forestry/ avenue plantation in the leasehold

area of two mines of ECL has increased from 4.65 km2 (Yr. 2020) to 5.01 km2 (Yr.

2021).

CMPDI

Job No 561410027 208

10.7 Of the two projects in ECL, Rajmahal OCP tops with 82.62% reclamation followed

by Sonepur Bazari OCP with 61.17 % reclamation.

CMPDI

Job No 561410027 209

Table–10.1

Project wise Land Reclamation Status in Opencast Projects of ECL based on Satellite Data

for the Year 2021 (Projects producing more than 5 mcm of Coal+OB annually)

Note: In reference to the above Table-1, different parameters are classified as follows: 1. Area under Biological Reclamation includes Area under Plantation done on Backfilled Area only. 2. Area under Technical Reclamation includes Area under Barren Backfilling only. 3. Area under Active Mining includes Coal Quarry, Advance Quarry Site, Quarry Filled with Water, if any. Coal Dump is excluded from Active Mining Area. 4. Social Forestry and Plantation on External OB Dumps are not included in Biological Reclamation and are put under separate categories as shown in the Table above. 5. (%) calculated in the above Table is in respect to Total Excavated Area except for “Total Area under Plantation” where % is in terms of “Leasehold Area”.

1 2

2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021 2020 2021

1 Rajmahal 17.75 17.75 4.75 4.80 1.80 1.95 0.06 0.09 0.60 0.60 1.42 1.42 7.97 8.17 2.46 2.64 6.55 6.75

59.60% 58.75% 22.58% 23.87% 17.82% 17.38% 13.86% 14.87% 82.18% 82.62%

2Sonepur

Bazari22.94 22.94 4.08 4.50 0.87 0.95 0.44 0.52 0.88 0.90 3.61 3.46 8.56 8.91 2.19 2.37 4.95 5.45

47.66% 50.51% 10.16% 10.66% 42.17% 38.83% 9.55% 10.33% 57.83% 61.17%

TOTAL 40.69 40.69 8.83 9.30 2.67 2.90 0.50 0.61 1.48 1.50 5.03 4.88 16.53 17.08 4.65 5.01 11.50 12.20

53.42% 54.45% 16.15% 16.98% 30.43% 28.57% 11.43% 12.31% 69.57% 71.43%

9 (=4+5+8) 10 (=5+6+7)

Area under

Backfilling

Plantation on

Excavated /

Backfilled Area

7 8

Total Area under

Plantation (%

Green Cover

Generated in

Leasehold Area)

(% is calculated with respected to Total Excavated Area as applicable)

Total Area

under

Reclamation

Biological

ReclamationOther Plantations

Plantation on

External Over

Burden Dumps

Social Forestry,

Avanue

Plantation Etc.

11(=4+5)3 4 5 6

Project wise Land Reclamation Status in two OC Projects of ECL based on Satellite Data of the Year 2021(Projects producing more than 5 mcm of Coal + OB annaully)

(Area in Sq. Kms.)

Sl.

No.Project

Total/ Mine

Lease hold

Area

Technical

Reclamation

Plantation

Area under

Active Mining

Total

Excavated

Area

CMPDI

Job No 561410027 210

Fig. 10.1: Project wise Land Reclamation Status in ECL in the year 2021

CMPDI

Job No 561410027 211

Table 10.2

Project wise Area Statistics of Land Use / Cover in OC Mines

(> 5 mcu.m.) of ECL based on Satellite data of the Year 2021

Area % Area % Area %

Dense Forest 0.00 0.00 0.00 0.00 0.00 0.00

Open Forest 0.00 0.00 0.32 1.39 0.32 0.79

Total Forest(A) 0.00 0.00 0.32 1.39 0.32 0.79

Scrubs(B) 2.12 11.94 3.63 15.82 5.75 14.13

Social Forestry 0.6 3.38 0.9 3.92 1.50 3.69

Plantation on OB Dump 0.09 0.51 0.52 2.27 0.61 1.50

Plantation on Backfill(Biological Reclamation) 1.95 10.99 0.95 4.14 2.90 7.13

Total Plantation ( C ) 2.64 14.87 2.37 10.33 5.01 12.31

Total Vegetation (A+B+C) 4.76 26.82 6.32 27.55 11.08 27.23

Coal Quarry 0.92 5.18 2.87 12.51 3.79 9.31

Advance Quarry Site 0.23 1.30 0.48 2.09 0.71 1.74

Quarry Filled With Water 0.27 1.52 0.11 0.48 0.38 0.93

Area under Active Mining (D) 1.42 8.00 3.46 15.08 4.88 11.99

Coal Dump 0.03 0.17 0.07 0.31 0.10 0.25

Barren OB Dump 0.25 1.41 3.00 13.08 3.25 7.99

Area Under Backfilling(Technical Reclamation) 4.80 27.04 4.50 19.62 9.30 22.86

Total Area under Mining Operation (D+E) 6.50 36.62 11.03 48.08 17.53 43.08

Waste Lands 1.55 8.73 1.32 5.75 2.87 7.05

Fly Ash Pond / Sand Body 0.00 0.00 0.00 0.00 0.00 0.00

Total Wasteland 1.55 8.73 1.32 5.75 2.87 7.05

Reservoir, Nallah, Ponds 0.08 0.45 0.29 1.26 0.37 0.91

Total Waterbodies 0.08 0.45 0.29 1.26 0.37 0.91

Crop Lands 0.65 3.66 0.02 0.09 0.67 1.65

Fallow Lands 2.80 15.77 2.98 12.99 5.78 14.20

Total Agriculture 3.45 19.44 3 13.08 6.45 15.85

Urban Settlement 0.43 2.42 0.44 1.92 0.87 2.14

Rural Settlement 0.75 4.23 0.17 0.74 0.92 2.26

Industrial Settlement 0.23 1.3 0.37 1.61 0.60 1.47

Total Settlement 1.41 7.94 0.98 4.27 2.39 5.87

Grand Total 17.75 100.00 22.94 100.00 40.69 100.00

WA

TE

RB

OD

IES

AG

RIC

UL

TU

RE

SE

TT

LE

ME

NT

SF

OR

ES

TS

PL

AN

TA

TIO

N

E

WA

ST

EL

AN

DS

AC

TIV

E M

IN

IN

GTABLE - 2

Project wise Area Statistics of Land Use/ Cover Classes in OC Mines (>5m.cu.m) of ECL

based on Satellite data of the Year 2021(Area in Sq Km)

RAJMAHAL SONEPUR BAZARI TOTAL

CMPDI

Job No 561410027 212

Plate 10.1

CMPDI

Job No 561410027 213

Plate 10.2

CMPDI

Job No 561410027 214

Figure 10.2

Figure 10.3

CMPDI

Job No 561410027 215

Photograph 10.1: Plantation on Backfilled area in Rajmahal OCP, ECL

Photograph 10.2: Plantation on OB dump in Sonepur Bazari OCP, ECL

Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.)

Gondwana Place, Kanke Road, Ranchi 834031, Jharkhand

Phone : (+91) 651 2230001, 2230002, 2230483, FAX (+91) 651 2231447, 2231851

Wesite : www.cmpdi.co.in, Email : [email protected]