Upload
khangminh22
View
0
Download
0
Embed Size (px)
Citation preview
Contract Number: AID 611-C-12-00003
December 2012
This report was produced for review by the United States Agency for International Development. It was prepared
by Creative Associates International.
READ TO SUCCEED EXIT STRATEGY
USAID Read to Succeed Project
Zambia
Contract #AID-611-C-12-00003
Exit Strategy
December 2012
_________________________________________
Submitted to:
Mei Mei Peng (COR)
USAID/Zambia
Submitted by:
Creative Associates International
5301 Wisconsin Avenue, NW, Suite 700
Washington, DC 20015
USA
RTS Exit Strategy Page 1
Table of Contents
I. INTRODUCTION ........................................................................................................................... 2
II. THE PROJECT .............................................................................................................................. 4
IR1: Decentralized education management practices to improve teacher accountability and sustain
learner performance modeled. This Intermediate Result (IR) has two Sub-IRs (SIR): ............................ 5
IR2: Performance assessment tools and their use strengthened to improve learner performance ............ 5
IR3: Increased school-based HIV/AIDS–mitigation, school G&C, equity enhancing support and
services ...................................................................................................................................................... 6
IR4: Increased engagement of universities and educational institutions in learner performance research
.................................................................................................................................................................. 6
III. RTS APPROACH ........................................................................................................................... 7
RTS Exit Strategy ....................................................................................................................................... 8
Principles of RTS’ Exit Strategy ............................................................................................................... 8
Forging close collaboration with the Ministry ...................................................................................... 8 Influencing policy .................................................................................................................................. 9 Building the capacity of the Ministry .................................................................................................... 9 Working within the government structures .......................................................................................... 9 Engaging staff: “Learning by doing” ..................................................................................................... 9 Building NGO, PTAs and School-Community Partnerships’ capacity .................................................. 10 Developing and outreach plan to generate demand .......................................................................... 10 Forging strategic collaborations ......................................................................................................... 10 Instituting accountability (external and internal monitoring) ............................................................ 10
Exit strategy Matrix showing how RTS plans to enhance sustainability in each of the components ..... 11
IV. Provincial plans to expand RTS into non-target districts ......................................................... 14
V. Annexes: Draft Provincial Rollout Plans .................................................................................... 15
Annex A: Northern Province RTS Activities Rollout Plan to Non Target Districts ............................... 16
Annex B: Luapula Province RTS Activities Rollout Plan to Non Target Districts ................................ 21
Annex C: Muchinga Province RTS Activities Rollout Plan to Non Target Districts ............................. 26
Annex D: Eastern Province RTS Activities Rollout Plan to Non Target Districts ................................. 29
Annex E: Northwestern Province RTS Activities Rollout Plan to Non Target Districts ........................ 31
Annex F: Western Province RTS Activities Rollout Plan to Non Target Districts ................................ 34
RTS Exit Strategy Page 2
Read To Succeed (RTS) Exit Strategy
I. INTRODUCTION
The project cycle, a popular development tool used by a number of cooperating partners,
provides a framework to induce development, but rarely makes accommodation for an exit
strategy that sustains development. This manifests itself in project benefits ending with whatever
impact the project has made, leaving ill-equipped local ministries or under-resourced NGOs to
meet local development needs and fill the gap of services terminated as a result of project close-
out. This “Exit Strategy” is developed to correct such a flaw by revising the project cycle
implementation stage to include deliberately and consciously planned actions to ensure
sustainability.
There are a number of reasons why projects funded from external sources should have an exit
strategy. Projects funded by development partners are time-bound. They have start and end dates.
In order to sustain successful project initiatives beyond their end date, a deliberate plan for exit-
strategy becomes a necessary measure. It is also important to plan for exit strategy at the early
stage of project as opposed to towards the end of the life of projects. Early recognition of the fact
that projects are time-bound is an early warning to host countries and provides lead time for
planning for sustainability.
The Exit Strategy describes our approach to ensure and provide long lasting benefits to the host
country as a result of Read to Succeed’s program interventions. It spells out our thinking on what
should happen to project outputs/outcomes at the end of the project and to explore which ones
should be sustained further and how. It demonstrates RTS’ commitment to make conscious and
deliberate efforts to ensure that continuity is achieved after project’s close-out.
We have addressed sustainability issues during the design stage by integrating aspects of
sustainability into our strategic planning and project concept. We are putting in place a
mechanism to support this effort. We are also developing some relevant tools to institute it.
Furthermore, we will ensure and promote sufficient stakeholders’ commitment by way of
generating demand. All cultural or societal considerations will be addressed by opening dialogue
with the local counterparts. In collaboration with the Ministry of Education, Science, Vocational
Training and Early Education (MESTVEE) and other stakeholders, we have articulated our
vision and defined our approach towards achieving this goal.
The goal of the exit strategy is not only to consolidate benefits achieved, but also to enable
further progress toward the Sixth National Development Plan (SNDP) objectives. We believe we
will have a system and capacity in place whereby the benefits expand beyond the original
beneficiaries and might be used as pilot or any other ways of replication or lessons learned. The
immediate step will be to work with target provinces to expand RTS’ interventions and good
practices from target districts to non-target districts. (Please refer to Annexes A –F for summary
of draft provincial plans to scale up RTS interventions).
RTS Exit Strategy Page 3
Therefore, the purpose of present Exit Strategy is to:
ensure project benefits continue following the close-out of RTS;
promote host-country counterparts and beneficiaries’ empowerment;
build local institutional and individual capacity;
support local ownership through analysis of what has been accomplished and generate
demand;
Develop agreed modalities to sustain, expand or improve the project’s impacts.
The development of RTS’ Exit Strategy went through a step-by-step process that ensured
authentic participation of key counterparts. From the outset, the inclusive and consultative nature
of the work planning process provided a forum for all stakeholders to address sustainability
issues. The RTS project team made it clear to key host country counterparts that the project is
time-bound (its life is five years); and therefore, incumbent upon them to assume responsibilities
while the project is still active in order to sustain it. The next step was for the project team to
take the draft annual work plan to the provinces for gound-truthing in a formal two-day
validation workshop. The workshop assessed the relevance, affordability, and resonance of RTS’
activities to government priorities. Last but not least, building on prior discussions and
consultations mentioned above, provinces were requested to respond to two questions to inform
their plans for sustainability:
1. How do they like RTS to operate in order to ensure sustainability in the target districts
and how they see their role in this process?
2. Assuming that RTS’ interventions and approaches would show positive impact on learner
performance (reading), how do they plan to scale them up to other non-target districts in
their respective provinces?
These questions triggered a lot of discussion and with the support of RTS staff; each province
came up with a range of recommendations. The process culminated in an extensive two-day
workshop in Lusaka in December. In attendance were Provincial Education Officers. At the end
of the workshop, the participants agreed on common actions that could ensure sustainability
across all the six provinces. Province specific approaches were also identified and jointly
deliberated.
The following are some of the common approaches incorporated in this sustainability plan
following the workshop.
Focus on institutional capacity building;
Work within the system (rather than creating a parallel structure);
Forge close working relationship with local counterparts (government offices, institutions
of higher learning, and local NGOs);
Embed RTS in government systems so that it becomes a catalytic agent, not leader;
Make project operation low cost and affordable; and
Build the capacity of counterparts to leverage public private sector resources;
RTS Exit Strategy Page 4
These approaches are expected to contribute to the transfer of project activities and resources to
the local implementing entity through a phase-over process for lasting impact.
Hence, the Exit Strategy addresses two interrelated issues:
i. It highlights major approaches and plans to ensure that project interventions are
sustained in target districts beyond the life of the project;
ii. It presents the provincial government plans to scale up project interventions to non-
project target districts with the help of RTS, but using resources other than RTS.
II. THE PROJECT
Funded by the U.S. Agency for International Development (USAID) and in partnership with the
Government of the Republic of Zambia (GRZ), RTS is a five-year initiative implemented by
Creative Associates International, in collaboration with leading international organizations:
Research Triangle Institute (RTI), Plan International, School-to-School International (STS),
University of Pittsburgh, O’Brien and Associates and a number of local resources organizations1.
RTS aims to improve school effectiveness in such a way that schools provide the environment
and services for students to acquire essential academic skills with particular focus in reading.
Accordingly, the main outcome of the project is improved student performance in reading.
WHAT IS READ TO SUCCEED TRYING TO ACCOMPLISH?
RTS will support the MESVTEE to improve reading achievement in government schools in six provinces
(Northern, Eastern, Western, Luapula, Muchinga and Northwestern) over a period of five years using
appropriate reading instruction, sound school management and leadership approaches, and assessment
tools that sustainably enhance reading skills in early grades (primary 1-4). RTS will support provincial,
district, and school management teams to strengthen the use of assessment to inform reading instruction,
learner support and the provision of related educational materials. RTS will work closely with the
Directorates of Teacher Education and Specialized Services, Standards and Curriculum as well as other
relevant directorates of MESVTEE to improve reading achievement in schools. RTS will also work with
the Examination Council of Zambia (ECZ) to utilize early grade reading assessments (EGRA) results for
decision making purposes at higher levels. The project will mobilize parent teachers associations (PTAs)
and leverage private sector resources in its efforts to improve reading. Over the next five years, RTS will
bolster successful aspects of previous reading interventions while addressing gaps. Furthermore, it will
contribute to an early warning tracking system of early grade reading achievement built on the ardent
linkage of assessment results to systematic oversight and management, and continuous teacher
professional development.
1 Camfed, FAWEZA, Copperbelt Health and Education Project, University of Zambia, and Room to Read
RTS Exit Strategy Page 5
To achieve the overall objective of improved educational achievement in reading by 2017, the
RTS team will work through four major intermediate results:
IR1: Decentralized education management practices to improve teacher accountability and
sustain learner performance modeled. This Intermediate Result (IR) has two Sub-IRs
(SIR):
SIR1.1: Improved teacher effectiveness and accountability
The purpose of this task is to address key factors that limit teacher effectiveness. While RTS
cannot rectify all adverse working conditions, it can provide the framework, support and
enabling school environment in which teachers are both able and motivated to adopt effective
instructional practices and professional behaviors. Focusing on reading instruction, RTS will
provide teachers with instructional tools (to teach phonemic awareness, phonics, fluency,
vocabulary and comprehension), classroom management, and student support skills to address
the full range of children’s learning needs within local context, particularly at-risk and
marginalized children, such as OVC, girls and children with disabilities; link teacher
accountability for results to effective teaching methodologies; and re-activate and expand
incentive and accountability mechanisms to ensure that teachers adopt and observe professional
behaviors, standards and requirements.
SIR1.2: Enhanced education leadership, management and accountability of head teachers and
district education managers
RTS will contribute to improved education leadership and management in three ways. It will
provide on-the-job, experiential learning for head teachers to complement the National In-
Service Teachers College (NISTCOL) management program and build capacity to lead efforts to
improve school effectiveness; provide tools and training for the District Education Board (DEB)
and District Education Support Team (DEST) to interact with schools in an atmosphere of
increased transparency and mutual accountability; and put in place a sustainable process by
which the school, its staff, students, parents and community can plan for and implement a learner
performance improvement plan.
IR2: Performance assessment tools and their use strengthened to improve learner
performance
The overall purpose of IR2 is to institutionalize the effective collection and use of assessment
data at the basic education level to enhance education quality and improve learner performance.
RTS will address current system limitations by proposing strategies that improve and expand the
collection of assessment information through Formative (Continuous) Assessment (CA) and the
use of data from both CA and the National Assessment (NA), particularly at the school and
district levels. We will assist the MESVTEE in improving, and developing as needed, strategies
and processes in the assessment of pupil learning and involve pre-service centers in the process
so new teachers are also prepared to use formative assessment or CA. This will include materials
development that schools and their communities can use to monitor learning outcomes and
RTS Exit Strategy Page 6
inform learner performance improvement plans. RTS will assist the development of additional
CA (formative assessment) instruments, including early grade reading assessment tools. It will
also help District Education Boards (DEBs), District Education Officers (DEOs) and school
personnel to integrate assessment results and other school performance data into district and
school reports, especially the school report cards. This will stimulate greater use of data to
monitor progress of subgroups and achievement gaps and inform policy and programming
decisions by permitting DEBs and schools to better understand learner performance in relation to
factors such as teacher behavior, instruction, class size, availability of materials and, community
characteristics.
IR3: Increased school-based HIV/AIDS–mitigation, school G&C, equity enhancing support
and services
The purpose of IR3 is to systematize the MESTVEE’s response and strengthen its capacity to
make schools centers of care and support and retain in schools the most vulnerable students –
girls and Orphaned and Vulnerable Children (OVC). The RTS team will build upon the
knowledge and good practices (mentoring, school health, guidance and counseling) from
previous successful programs and institutionalize services at the district and school levels to
support “the whole child”. We will:
Strengthen policies, systems and structures and enhance linkages among MESTVEE
directorates and between the MESTVEE and other ministries (e.g. Health, Youth and Sport)
to build sustainable prevention and support services and identify and disseminate best
practices, evaluate initiatives and disseminate results;
Ensure, where feasible, that all RTS schools have a male and a female Guidance and
Counseling (G&C) teacher actively identifying and guiding students in need of services, and
support school feeding, psychosocial counseling for OVC, and girls clubs;
Work with local school-community partnership committees, health care providers, and the
private sector (via PPPs) to support school-community partnerships for prevention of HIV
and pregnancy through awareness raising, school and community activities, and small grants
to create a supportive school environment for OVC and girls.
Foster the establishment of “mothers’ groups based on models currently used in the region to
strengthen support provided to girls and OVC and build their capacity to partner with school
leadership while empowering women to be activists.
IR4: Increased engagement of universities and educational institutions in learner
performance research
The purpose of IR4 is to: (a) strengthen the collaboration between the universities, Colleges of
Education (COE) and the MESTVEE so that research undertaken addresses priority issues in
school effectiveness to improve reading; (b) increase the capacity of local education institutions
to produce research that meets high standards and creates demand for their services; and (c) build
practical, problem-solving skills through participation in RTS research activities on school
effectiveness and literacy (reading). We will:
Promote a partnership between the MESTVEE and its various directorates and with Zambian
higher education institutions to create a shared research agenda and develop mechanisms and
RTS Exit Strategy Page 7
procedures to identify and respond to research needs on policy and practice related to viable
approaches to improving reading and learner performance.
Create a mechanism to enhance collaboration on joint research projects by MESVTEE, the
University of Zambia, other higher education institutions and COE.
Establish an internship program to develop the “next generation” of education researchers
and teaching professionals.
III. RTS APPROACH
Read to Succeed assumes that in order to improve learner performance, schools must provide
adequate and appropriate instructional services that enable pupils to learn better and faster. In
support of schools to provide such services, RTS will: i) train and mentor teachers to develop
skills to teach the five major component skills of reading instruction in alphabetic languages:
phonemic awareness, phonics, fluency, vocabulary, and comprehension, ii) build the capacity of
head teachers in instructional leadership and management, iii) promote evidence-based decision
making to guide instructional processes in teaching reading, iv) train teachers and increase the
use of classroom-based, teacher-led assessments to promote effective instruction, v) support the
promotion of local/mother tongue languages as media of instruction as well as the transition into
English and vi) increase community support to schools and provide psychosocial support to
Orphaned and Vulnerable Children (OVC).
In order to achieve its objectives, RTS will work with a cross-directorate of MESTVEE
structures to guide RTS interventions, policy dialogue and research. RTS will build teacher and
head teacher capacity by bringing expert trainers to trainees to reduce transaction costs and
information loss; reinforce teacher group meetings at the school and head teacher meetings at the
zone for action-research and exchange; and integrate districts, schools and communities into a
school effectiveness improvement process, using student tests, school report cards, and incentive
schemes. The project will develop user-friendly tools so schools and communities can use
assessment data; introduce teachers to continuous assessment methods, including EGRA and
enhance assessment instruments; and address policy, planning, and resource issues constraining
the implementation/use of learning assessments. RTS will help the MOE develop a research-
based learner protection model; operationalize the guidance and counseling structure; and engage
communities to provide HIV/AIDS mitigation services for OVC and girls. The project will assist
the MESTVEE to define a school effectiveness research agenda; work with higher education
institutions to enhance their research capacity; collaborate with a university consortium to
produce quality research; and establish an internship program to develop the “next generation” of
education researchers and teaching professionals.
Student learning improves when schools make changes in instruction and organization that
include explicit contributions from the full range of stakeholders – teachers, students, parents and
the broader community – to school improvement activities. RTS will develop a participatory
process model to be led by head teachers that supports schools to develop and implement learner
performance improvement plans, and incentivize schools to follow the process with a tiered
system of grants and competitive school innovation awards. This work will complement the
activities in IR3 that mobilize community support for the learner performance improvement
process with focused support for OVC and girls in school.
RTS Exit Strategy Page 8
Success of the school effectiveness improvement process in part will depend on schools and
communities being well informed about the process, grants and other incentives. RTS will use
radio, television, SMS and other media to publicize school improvement efforts, to inform
schools how to participate in the grants program and to announce and celebrate grant awards.
RTS will include grants for different purposes—Local NGOs, Zambian Universities and other
higher education institutions, PEOs, DEBs, and schools.
At the school level, RTS will work in public schools to integrate reading into school academic
performance improvement strategies with clearly defined management strategies, reading targets,
as well as instructional and assessment approaches. RTS will support school management teams
to proactively strengthen school-based teacher professional development with strong emphasis
on the use of reading assessments for evidence-based instruction. RTS will also work with
MESTVEE staff at the district and provincial levels to better link school based initiatives to
system level support. In line with its strong focus on assessment, RTS will work with the
national examinations authority, the Examination Council of Zambia (ECZ), to strengthen the
use of early grade reading assessments to inform decision making processes.
RTS Exit Strategy
RTS is MESTVEE’s program and as such operates under the Sixth National Development Plan
(SNDP) and its education strategy. This is an essential element and a pre-requisite for
government ownership of the program. Over the next five years, RTS plans to take the following
measures to increase sustainability of project initiatives and their impact.
Ensuring that all RTS interventions are low cost and affordable;
Remaining within the existing government structure;
Realigning all RTS activities with provincial and district plans;
Doing what counterparts wants the project to do;
Assisting provinces to identify different sources of resources (PPP, other
development partners, increased public funding for education, etc.);
Assisting the counterparts to scale up RTS activities to non-target districts;
Demonstrating success and create greater demand for nation-wide rollout; and
Promoting demand and grass-roots support to RTS interventions from communities,
teachers, students and head teachers.
RTS ensures the above mentioned measures of sustainability through the following principles
and activities
Principles of RTS’ Exit Strategy
Forging close collaboration with the Ministry
Our strategy is to work with the Ministry to define from the outset the project’s objectives and
the expectations of the Ministry in supporting the structures and systems that sustain the
achievement of these objectives. We will propose each activity in consideration of its cost to the
Ministry, and we will work with the Ministry to plan and budget for extended costs. As such, we
RTS Exit Strategy Page 9
will propose activities that respond to the Ministry’s needs and where targets are realistic, and
costs affordable and hence can be sustained after the project ends.
Influencing policy
Projects are not meant to be implemented in a vacuum. They should be able to support host
governments and other relevant institutions’ existing policies that respond to their developmental
needs and strategies. It is, therefore, incumbent upon the projects to align their objectives and
activities with the host government’s sector strategy and provide support towards its
achievement. Furthermore, projects should encourage that targets are estimated for government
replication and roll out. We will collaborate with the STEP UP Zambia, Time to Learn and other
cooperating partners active in policy reforms to create an enabling environment for program
efforts to be sustained. We will work with the Ministry to identify policy constraints and
“bottlenecks” that continue to impede the implementation of education programs, including of
RTS’ interventions. We will support the Ministry’s policy dialogue and annual work process to
raise these issues, get policy decisions and accompanying budgets for post-RTS years.
Building the capacity of the Ministry
Building the necessary human technical capital is critical to sustainability. Human capital
formation enables host governments to improve organizational culture and ensure efficiency,
transparency, and accountability. It also boosts motivation, enhances staff morale, and inspires
change. It is also critical to furthering leadership, promoting participation, and creating
opportunities for innovation. We will provide highly targeted, capacity building packages (Head
teachers and district officials) to ensure that appropriate technical skills and knowledge are at the
disposal of the Ministry, school-community partnership committee, and other stakeholders. In
this package, we will provide technical support, training and mentoring, and the provision of ICT
support to facilitate the processing of data in the area of assessment. We will strengthen the
capacity of ministry officials at all levels to engage with the private sector and with communities
to develop partnerships to provide support for schools, teachers and learners for the longer term.
Through our PPP program, we will leverage private sector support for education projects.
Working within the government structures
We will work exclusively through ministry structures and systems. We will strengthen and
reinforce the already strong array of existing ministry materials, systems, and institutions to
provide training for teachers and head teachers rather than introducing new, large-scale
initiatives. We will utilize existing pedagogies and materials that have proven successful in
Zambia and seek to institutionalize their use rather than “re-invent the wheel”.
Engaging staff: “Learning by doing”
RTS’ approach to building the Ministry’s capacity to sustain project initiatives is “learning-by-
doing.” We will integrate a five-step process that builds sustainability into the program from the
beginning. First, we will reinforce existing systems and local education institutions. Second, we
will engage ministry staff in every project activity. Third, we will strengthen the capacity of the
Ministry to engage with the private sector and with communities to develop partnerships to
support education. Fourth, we will build the capacity of PTAs and/or school-community
partnership committees to support and help sustain interventions at the community and school
levels. Fifth, we will work with the Ministry to identify and mitigate policy constraints and
“bottlenecks” that impede continued implementation of RTS’ interventions.
RTS Exit Strategy Page 10
We will engage ministry staff in every project activity in a manner that supports their leadership
as they acquire and use the know-how and tools to adapt project support to their various
situations and objectives. We will embed staff in MESTVEE offices so that project staff can
better understand the constraints on their colleagues in improving learner performance and
ministry staff can work hand in hand with the RTS team to address them. Ministry staff will be
trained, for example, in the use of assessment data to improve learner performance, not just its
collection.
Building NGO, PTAs and School-Community Partnerships’ capacity
We will build the capacity of local NGOs to support and sustain interventions at the school and
community levels. Grants Under Contract (GUC) will enable these organizations to not only
provide services for RTS’ implementation but also to strengthen their institutional capacity to
deliver such support services in the future. NGOs’ programming will be harmonized with the
Ministry’s goals and objectives.
Developing and outreach plan to generate demand
We will develop an outreach plan that is aimed at enhancing possibilities for increasing
provincial, district, and communities’ understanding and ownership of RTS. Through outreach
we will improve visibility and understanding of project achievements to garner support and buy-
in. We will create awareness of the project’s impact, publicize and celebrate successes achieved
by communities and other stakeholders, and respond to requirements and requests of host
government counterparts for information through regular reporting, production of
communications materials, photos and videos, and event planning.
We will consider motivation factors and look for incentives for every actor in activities we
propose to implement. A critical incentive in school-based activities is support and pressure from
the community to improve conditions and programs in the school. We will include a key role for
communities in supporting school and learner performance improvement plans – both learning in
the classroom and improving the school environment for girls and boys. We are proposing
recognition and awards programs for teachers, head teachers, schools and districts that
respectively reward them for concrete demonstrations of innovation and improvements in school
effectiveness and student learning. We believe that this approach of linking accountability for
results to well-defined performance goals and objectives at all levels will provide an incentive to
improve.
Forging strategic collaborations
We will plan meticulously to forge collaboration with USAID-supported sister projects and other
cooperating partners to bring about the desired policy reforms and changes. This will contribute
to capacity building, greater public awareness, additional funding, and can even encourage
changes in public policy. Through this, we will ensure synergy and sustainability. The more
coordinated development partners’ efforts are, the more they attract the attention of policy
makers and civic society and the more they can influence policy.
Instituting accountability (external and internal monitoring)
We’ll incorporate tools and mechanisms that could hold host government agencies accountable
to certain standards, norms, and targets. We will make sure that monitoring is perceived as a
RTS Exit Strategy Page 11
continuous process and ensure that program progress is measurable. We will thus formulate a
monitoring framework. This framework will ensure that progress is assessed against certain
realistic and measurable social indicators. We will develop tools to measure the attainment of
these indicators.
RTS will assist provinces and districts to gradually take responsibilities for RTS initiated
activities: Starting from project year 1, RTS will request significant participation and support
from target provinces to ensure that they understand the approach and the process of planning
and implementation of RTS related activities. In project year 2, we hope to see an increased
capacity and understanding at all levels of governance and more involvement even though
activities are still initiated and facilitated by RTS. Learning from target districts, counterparts are
supported and encouraged to initiate similar activities in non-target districts in each of the focus
provinces. Taking responsibility for RTS activities in the target districts as well as expansion to
non-target districts will continue to grow throughout the life of the project ensuring sustainability
of RTS initiated activities beyond the five year period. Please refer to the table below.
Project Year 1 Project Year 2 Project Year 3 Project Year 4 Project Year 5 RTS will take the
major task of
facilitating events,
but ensure
counterparts
participation. 10%
resource contribution
and involvement of
counterparts in each
of the major activities
RTS and counterparts
will plan together and
organize events
together; We will work
towards to and would
like see a 20%-30%
counterparts taking
leadership in each of the
major activity areas
including resource
allocations
RTS and
counterparts will
equally plan and
organize events
including sharing
resources. We
would like to see a
60:40 share of
responsibility
between RTS and
government
Counterparts start to take
major roles in the planning
and implementation of
activities. RTS start to
spend more time
supporting the province to
scale up RTS activities to
non-RTS target districts.
Share of responsibility:
RTS 30% ; government
70%
Consolidation of
efforts and handover
of major
responsibilities to
counterparts.
Exit strategy Matrix showing how RTS plans to enhance sustainability in each of the
components
RTS deliverables as required by technical approach in relation to Exit Strategy
Activities by IR Exist strategy approaches and activities IR1: Decentralized education
management practices to improve
teacher accountability and sustain
learner performance modeled
Establish a common goal with host country counterparts;
Work with MESVTEE at national, provincial, district, zonal
and school levels to establish a teacher support system using
existing government structures;
Help define roles and responsibilities of various education
governance structures and institutionalize them;
Put host country counterparts on the driver’s seat all the time,
be it a small activity or large
SIR1.1: Improved teacher effectiveness
and accountability; Materials Development: use government mechanism, experts,
procedures to develop all materials;
Implementation: Deliver all services through existing service
delivery structures (SPRINT, GRACE, SIMON, etc.)
Monitoring and Evaluation: Set teacher effectiveness
standards and work with standards officers at all levels to
RTS Exit Strategy Page 12
develop monitoring instruments and their use thereof;
Mentoring: Provide on-going mentoring and build capacity of
host country counterparts;
Easy and cost-effective: Make all tools as easy as possible and
low-cost that the country can afford to sustain
SIR1.2: Enhanced education leadership,
management and accountability of head
teachers and district education managers
Link school-based support to system level support: RTS will
work with MESVTEE staff at the district and provincial levels
to better link school-based initiatives to system level support.
Institutionalization of SLPIP: Over the life of the project, RTS
and target districts will work together and with head teachers
to institutionalize the School Learner Performance
Improvement Plan and its implementation.
Strategic plans as mandatory requirements: Require all
schools and districts to develop strategic plans and review
processes.
Strengthen District Head Teachers’ Associations with
Secretariat.
Develop Head Teachers’ Leadership Manual for Continuous
Leadership Development.
SIR1.2. 1: Head Teacher and Senior
Manager CPD and support program
strengthened
Help establish a strong head teacher support system by the
districts.
Develop a common understanding around the roles and
responsibilities of head teachers and link them to
accountability for learner performance.
Advocate and link head teachers’ accountability for learner
performance as a critical basis for their career development
and promotions.
Work with MESVTEE and strengthen Open Appraisal
Systems of Head Teachers.
SIR1.2.3: School Effectiveness
Improvement process in place in schools Institutionalize school effectiveness improvement process and
school learner performance improvement plans as tools to
assess school and head teachers’ performance.
SIR1.2.4: School Effectiveness
Improvement supported by districts Build capacity of district standard officers and systematize the
teacher and head teacher support system.
Work with MESVTEE to link District Monitoring function by
Standards Officers to school targets of learner performance.
IR2: Performance assessment tools and
their use strengthened to improve
learner performance
Our main exit strategy is to build local capacity and strengthen
systems (NEC, standards officers, etc.) at all education
governance and institutionalize procedures.
SIR2.1: Assessment policies, strategies,
and procedures to promote teaching and
learning strengthened
Support the MESVTEE National Assessment and CA
(formative assessment) technical committees;
Integrate assessment issues in teacher professional
development activities;
Institutionalize periodical district, provincial and national
pupil performance review meetings;
Supporting the development and implementation of
assessment guidelines.
SIR2.2: Assessment instruments
(including EGRA) expanded and
improved
Equip District Resource Center Coordinators and Zonal In-
service Coordinators with simple, user friendly assessment
tools for easy implementation.
SIR2.3: Assessment data effectively used
by districts, schools and communities Develop and supply schools with assessment analysis
templates;
Support standard officers to train head teachers and teachers
RTS Exit Strategy Page 13
and in monitoring progresses.
IR3: Increased school-based
HIV/AIDS–mitigation, school G&C,
equity enhancing support and services
Work with MESVTEE and closely coordinate its efforts with
all relevant stakeholders in the education system as well as
with other ministries.
SIR2.1: School health policies and
framework harmonized Schools adopt and utilize HIV/AIDS and SHN policies
harmonized frameworks.
Formation of School Health and Nutrition Committees at
school and district level to oversee and advocate interventions.
Strengthen linkages between schools and Ministry of Health,
and other relevant institutions.
SIR2.2: School guidance & counseling
system operationalized Legalize, institutionalize and strengthen School Guidance and
Counseling position at district level;
Develop annual guidance and counseling work plans
integrated into the overall district education plans;
Trained Guidance and Counseling personnel appointed at each
school;
Guidance and counseling rooms secured in each school;
Support and strengthen regular school guidance and
counseling formal meetings at zonal, district, provincial and
national levels.
SIR2.3: School-community established
(SIR1.1) partnerships to support school
effectiveness and students strengthened
Strengthen School Community Partnerships in school
governance and provide them with management guidelines;
Review and help integrate School-Community Partnerships in
the GRZ decentralization process;
Foster linkages between PTAs and CBOs to support school
effectiveness improvement processes;
Prepare community members to become conversant with the
policies such as the re-entry policy and the Anti-Gender based
violence act and the child rights Act and support their
implementation;
Work closely with traditional and church leaders to become
champions and advocates of HIV/AIDS prevention, GBV, and
learner improvement performance in their
chiefdoms/churches.
IR4: Increased engagement of
universities and educational institutions
in learner performance research
Work with other projects to advocate for MESVTEE role in
coordinating education research agenda.
SIR4.1: MOE research agenda and
review system established Establish a research coordinating body within the MESVTEE
to review and establish education research agenda every year
and manage implementation.
SIR4.2: University and college research
network functioning Build local tertiary intuitions’ capacity to take a lead role in
managing the Higher Education Institutions’ Research
Network (HERNet).
SIR4.3: Read to Succeed internship
program established Establish a long term partnership between private sector,
higher education institutions and the MESVTEE to support
and run internship program.
RTS Exit Strategy Page 14
IV. PROVINCIAL PLANS TO EXPAND RTS INTO NON-TARGET
DISTRICTS
The goal of the Exit Strategy is not restricted to consolidate benefits achieved in the twelve target
districts, but also to enable further progress toward expanding project initiatives that show
positive impact on learner performance to the larger Zambia basic education system. We believe
we will have a system and capacity in place whereby the benefits expand beyond the original
beneficiaries and might be used as pilot or any other ways of replication of lessons learned at the
national level. The immediate step will be to work with target provinces to expand RTS’
interventions and good practices from target districts to non-target districts.
Building on what has already been accomplished by the STEP UP Zambia Project in each
province to develop provincial strategic plan, Provincial Education Offices and RTS project staff
were engaged in the process of drawing a rollout plan for non-target districts. Even though there
are many similarities than differences, each province was tasked with producing province
specific plan. The plans, once finalized, will provide clear guidance on how provinces plan to
take RTS activities from target districts to non-target districts. The plans will define strategies,
resources, time frame, and reading targets with standard performance and monitoring measures.
(Please refer to Annexes A –F for summary of draft provincial plans to scale up RTS interventions).
It is important to acknowledge that the provinces are at different stages of the planning process.
Some provinces have already produced fairly detailed draft plan, while others still need to work
on the details. It is, however, encouraging to note that all target provinces showed strong interest
and commitment to work with RTS and expand lessons learned in the target districts to non-
target districts.
The table below presents the summary of provincial rollout plans reflecting timeframes and targets S.
No.
Provinces
# of
districts at
the
moment
RTS
Target
Districts
Non-
Target
districts
Rollout timeframe Estimated
Targets 2013 2014 2015 2016
1 Northern 8 2 6 2 (RTS) +
orientation
3 3 8 91,000*
2 Luapula 7 2 5 2 (RTS)+2 2 1 7 216,000*
3 Muchinga 7 2 5 2 (RTS)+5 7 **
4 Eastern 7 2 5 2 (RTS)+5 7 63,650*
5 Northwestern 7 2 5 2 (RTS) +
orientation
2 3 7 170,006*
6 Western 7 2 5 2 RTS 5 7 106,020*
Total 43 12 31 12 (RTS)+12 12 7 43
*targets are taken from Provincial strategic plans developed with the help of the USAID/Zambia Step Up Zambia Project. It
indicates the number of pupils who will breakthrough by end of 2014.A more detailed target setting will have to be done at
district level for the follow on targets through 2016 in each province.
** Muchinga province indicated targets expressed in % leading to 100% of pupils in grade one to breakthrough by 2016.
RTS Exit Strategy Page 16
Annex A: Northern Province RTS Activities Rollout Plan to Non Target Districts
MINISTRY OF EDUCATION, SCIENCE, VOCATIONAL TRAINING
AND EARLY EDUCATION
NORTHERN PROVINCE RTS ACTIVITIES ROLE OUT PLAN: 2013 – 2016
1. Introduction
It is generally agreed that the levels of reading in the province have been down for quite some
time now and further acknowledge that as a result of this there is poor performance and low
reading in government schools. The attitude of teachers has also been cited as the major problem
affecting performance in schools. Children at lower level of primary school are not properly
assessed. The assessment system that is available now is not done in a most effective manner in
order to monitor children’s performance in reading. The use of assessment tools such as weekly
and monthly test is rarely used in schools. The training that the teachers have undergone appears
to be inadequate to live up to the expected performance that is required from them in order to
teach reading. Inadequate teaching and learning materials has been identified as a challenge to
reading. Schools have no tools to monitor children’s progress in reading thus information/data on
reading levels at primary schools is not usually available. NBTL approach started well but has
not been sustainable owing to the fact that lack of materials and skills to implement is not
available.
As a Ministry, we are dedicating ourselves to ensuring that reading levels are improved in all the
districts in Northern Province. This will be realized by working with Read To Succeed Project.
This partnership will ensure that schools provide adequate instructional services that will enable
children in Primary Schools to learn how to read better and faster. From the onset the ministry
will take a leading role in all RTS activities for supporting reading instruction. Therefore, this
plan will serve as a guide to ensure RTS activities in the two districts are sustained as well as
rolled out to other parts of the province resulting into a holistic approach of all districts in the
province.
2. Overall Approach
2.1 Roll Out Plan
The Province has committed itself in taking a leading role in ensuring that it owns the
program. In the roll out plan, the Province intends to stagger the program starting from the
year 2013 through 2016.
For the roll out plan to succeed, there is need for the Province to include RTS activities in the
2013 Provincial Annual Work Plan and Budgets (AWPB). This is aimed at ensuring that
continuity of the RTS activities is guaranteed. This plan is aimed at improving the reading
levels and ultimately increases the number of children who are able to read and write. The
RTS Exit Strategy Page 17
order of districts to be captured in the training program will follow the pattern outlined
below. Time Frame
2013 2014 2015 2016
Kasama Luwingu
Mbala
Mpulungu Kaputa
Chilubi
Sensitization process of RTS
& Orientation of Districts
and implementation of some
minor activities.
Luwingu
Mbala
Mpulungu
Scaling up of activities
Kasama
Kaputa
Chilubi
Activity implementation scaled up
further.
Kasama Luwingu
Mbala
Mpulungu Kaputa
Chilubi
All districts to be
reached full
scale.
2.2 Roll Out Activities
Replication of the same activities that are being implemented with direct support from RTS
in the target districts will be rolled out in the remaining districts. The roll out plan of
activities will follow the cataract system. That is, in this case, the trainings will start from the
Province up to the school level in which the DEST, ZEST and the SEST will be trained as
trainers who will in turn train the teachers in schools. The same personnel trained as trainers
by RTS will be used.
2.3 Roll Out Structures
To ensure continuity of the program, there is need to capacity build personnel in non-targeted
districts. The Master trainers used in targeted districts will be used as facilitators in the non-
targeted districts. To ensure program continuity and sustainability, the SPRINT system
approach will be used.
2.4 Delivery Mechanism
Since the SPRINT system is institutionalized and is school-based with minimum or no cost at
all, this will be the best mechanism through which RTS activities could be delivered to non-
targeted schools.
2.5 Time Frame
The province has set a target of 91, 000 learners to breakthrough in reading by 2014. The
number is expected to increase progressively up to 2016. Each district will contribute to this
target based on the number of schools in that particular district.
.
RTS Exit Strategy Page 18
2.5.1 Time Frame – Targets by Year See matrix
Ministry of Education Science, Vocational Training and Early Education
Provincial Education Office, Kasama, Northern. Roll out Plan and Exit Strategy Ministry of Education/ Read To Succeed
Task Activities Delivery
Mechanism Indicator Target Time Frame
Person(s)
Responsi
ble
Implementation
Capacity: Able (A),
Not Able, (NA)
Response
SIR 1.1:(Task
1a) 2013 2014 2015 2016
Teacher
effectiveness and
accountability leading to
improved reading
instruction
Train Zone In-
service coordinator
and Zone Head Teachers at Zone
Centre schools in
teaching of reading skills and effective
use of assessment
Record cards for continuous
assessment
Grade meetings
at the Zone
Resource center and Teacher
Group
Meetings (TGMs)
# of teaching and
learning skills
sharpened and Performance
assessment plans
developed for use to improve learner
performance
2,000 Schools in 6
Districts
Kasama Luwingu Chilubi,
Mbala, Mpulungu
& Kaputa
500 Teachers
Effective and
Accountable to improved
reading
instruction
Kasama
(250)
Luwingu
(250)
500 Teachers
Effective and
Accountable to improved
reading
instruction
Mbala (250)
Mpulungu
(250)
500 Teachers
Effective and
Accountable to improved
reading
instruction
Kaputa (250)
Chilubi (250)
500 Teachers
Effective and
Accountable to improved reading
instruction
Kasama (100)
Luwingu (100)
Mbala (100) Mpulungu (100)
Kaputa (50)
Chilubi (50)
SEST,
ZEST and
PEST
Not Able: Despite
schools having the
capacity to organize in-service meetings using
existing structures but
require support from partners to share the
cost with the Province
for conducting Zone trainings
Task 1.1.2: Deliver
Continuing
Professional Development
(CPD)
Prepare common
Lesson plans to
improve teaching skills and
strengthen school-
based monitoring
Lesson Study
demonstrations
in real classroom
situations for all
Schools
# of common
Lesson plans
prepared for improved teaching
skills
4,000 common
Lesson plans
Developed by PEST
DEST and SEST
500 common
lesson
plans
1,250
Common
Lesson plans
1,250
Common
Lesson Plans
1,000
Common
Lesson plans
SEST,
DEST and
PEST
Able: Activities
conducted during
lessons
SIR1.2: Head Teacher and Senior
Manager CPD and
support program strengthened
Train new Head teachers and Senior
Managers in
SPRINT
Training to be conducted at
District
Resource Centres
# of new Head Teachers and
Senior Managers
trained in SPRINT system
1,500 new Head Teachers and
Senior Managers
6 PEST 6 DEST
6 ZEST
250 new Heads and
Senior
Managers 6 PEST
6 DEST
6 ZEST
500 new Heads and
Senior
Managers 6 PEST
6 DEST
6 ZEST
250 new Heads and
Senior
Managers 6 PEST
6 DEST
6 ZEST
500 new Heads and
Senior Managers
6 PEST 6 DEST
6 ZEST
PEST,DEST and
ZEST
Not able: funds to conduct training are
insufficient. (Province
and Districts to cost share with partners for
trainings)
Task3.2.1 Training
of teachers and
ESO on implementation of
School Guidance
and Counseling
Train School
Guidance Teachers,
Guidance Coordinator
DRCC and Eso
Special.
Training at
District
Resource Centres
# of Guidance
Teachers trained
to improve Learner support
for improved
performance
2,000 School
Guidance teachers
6ESO Special 6DRCC
6 PEST
250 School
Guidance
Teachers 6 ESO
Special
6 DRCC 6 PEST
250 School
Guidance
Teachers 6 ESO Special
6 DRCC
6 PEST
500 School
Guidance
Teachers 6 ESO Special
6 DRCC
6 PEST
500 School
Guidance
Teachers 6 ESO Special
6 DRCC
6 PEST
PEST,
DEST and
Guidance Teachers
Able: with funds to
support trainings
Task1.1.3:Motivat
e professional
Support Zone
Centre Schools to
CPD # of Heads and
teachers Changed
4,000 Heads and
teachers
1,000 Heads
and teachers
1,000 Heads
and teachers
1,000 Heads
and teachers
1,000 Heads and
teachers
DEST
ZEST
Able: Use of local
resoureces
RTS Exit Strategy Page 19
Task Activities Delivery
Mechanism Indicator Target Time Frame
Person(s)
Responsi
ble
Implementation
Capacity: Able (A),
Not Able, (NA)
Response
SIR 1.1:(Task
1a) 2013 2014 2015 2016
teacher behavior
and strengthen accountability for
improved results
implement effective
and interactive methods for
teaching reading
mindset to
enhance behavior for promoting
better results
professional
Motivated: 6 ZEST
6 DEST
6 PEST and 2 RTS Staff
monitor
PEST RTS
Sensitize communities on re-
entry policy for
pregnant girls
Hold stakeholders Meetings
Cluster schools within local
communities
with rampant problems of
pregnant girls
to continue sensitizing at
School level
# of girls re-entered to
contribute to
increased access for learning and
performance
# of sensitization meetings held.
1,000 communities
reached out in
each zone
200 communities
and Schools
6 PEST 6 DEST
300 communities
and Schools
6 PEST 6 DEST
200 communities
and Schools
6 PEST 6 DEST
300 communities and Schools
6 PEST
6 DEST
PEST and DEST
Able: communal feeding and transport
available only
allowances and fuel is required
Task3.3.1 Assist
Districts to establish local
School community
partnerships
Districts, Schools
and Communities develop local
community
partnership policies
Develop local
policies to strengthen
community
partnerships:
Districts hold
1meeting with community
every term
# of Districts to
establish local School
Community
Partnerships
created for
common understanding of
improved learner
performance to 30 girls
re-entered
termly
6 PEST and 2,400
local communities and Schools
6 DEST
600 local
communities and Schools
6PEST
6DEST
600 local
communities and Schools
6PEST
6DEST
600 local
communities and Schools
6PEST
6DEST
600 local
communities and Schools
6PEST
6DEST
PEST,DES
TZEST and SEST
Able: Districts to share
cost with RTS and partners such as
FAWEZA , CAMFED,
UNICEF
Political leaders
and other line Ministries
Task2.1.2: Review and revise policies,
strategies and
procedures for CA
Hold quarterly review meetings
Submission of monthly reports
and evidence-
based information for
CA from
Schools to Districts and
Province
# of review meetings held
annually
for corrective measures to
Improve learner
performance
2,000 Schools 6DEST
6PEST
hold review meetings
500 Teachers trained
6 ZEST
6 DEST 6 PEST
500 Teachers trained
6 ZEST
6 DEST 6 PEST
500 Teachers trained
6 ZEST
6 DEST 6 PEST
500 Teachers trained
6 ZEST
6 DEST 6 PEST
SEST ZEST
DEST
PEST
Able: Schools, Zones, Districts and
Province to organize
Review meetings
Task1.2.3 Strengthen the
School INSET
Monitoring System (SIMON)
Lesson study :lesson planning,
effective teaching
skills and monitoring
Intensify monitoring of
the School
Programe of In-service for the
# of lessons planned
effectively
and teachers monitored
90 Zones: 36,000 lessons
planned
effectively
9,000 Effective
Lessons
planned
9,000 Effective
Lessons
planned
9,000 Effective
Lessons
planned
9,000 Effective
Lessons
planned
PEST DEST
ZEST
SEST
Able: Using existing structures, and cost
share with partners for
PEST, DEST and ZEST to monitor
RTS Exit Strategy Page 20
Task Activities Delivery
Mechanism Indicator Target Time Frame
Person(s)
Responsi
ble
Implementation
Capacity: Able (A),
Not Able, (NA)
Response
SIR 1.1:(Task
1a) 2013 2014 2015 2016
Term
(SPRINT) by PEST, DEST,
ZEST and
SEST
2,800 teachers
Monitored
700
Teachers monitored
700
Teachers monitored
700
Teachers monitored
700
Teachers monitored
implementation of
SPRINT in Schools
Task2.3.3:Assist
Districts in
effectively using CA data
Train Districts to
create CA data
Record Systems and analyze results
regularly to provide
appropriate intervention
Computerized
data bases for
CA used to improve learner
performance
# of Districts
Trained to create
data bases: Kasama
Chilubi
Luwingu Mbala
Mpulung
Kaputa
6 ESO Generals,
6 PEST
6DEST and 2000 teachers
trained to establish
CA Data bases for improved learner
Performance
6 ESO
Generals,
6 PEST 6DEST and
500 teachers
trained to establish CA
Data bases
for improved learner
Performance
6 ESO
Generals,
6 PEST and 6DEST and
500 teachers
trained to establish CA
Data bases for
improved learner
Performance
6 ESO
Generals,
6 PEST and 6DEST and 500
teachers
trained to establish CA
Data bases for
improved learner
Performance
6 ESO Generals,
6 PEST and
6DESTand 500 teachers trained
to establish CA
Data bases for improved learner
Performance
PEST
RTS and
other partners
Able: Province and
Districts to plan for
Effective use of CA Data
IR3 (Task3): School-based HIV-
AIDS mitigating &
equity-enhancing
student support
and services
Train and provide material for
information
dissemination to
support
School-based HIV-AIDS and OVC
issues
School-based health and
equity services
# of HIV-AIDS and equity
services
established in
2,000 Basic
Schools in 6 Districts
6 Human Resource Officers,
6 Planning
officers,
6 PEST,
6DEST and 500 Guidance
Teachers trained
6 Human Resource
Officers, 6
Planning
Officers,
6 PEST, 6 DEST and
500
Guidance Teachers
trained
6 Human Resource
Officers, 6
Planning
Officers,
6 PEST, 6 DEST and
500
Guidance Teachers
trained
6 Human Resource
Officers, 6
Planning
Officers,
6 PEST, 6 DEST and
500
Guidance Teachers
trained
6 Human Resource
Officers, 6
Planning
Officers,
6 PEST, 6 DEST and
500
Guidance Teachers
trained
PEST DEST
ZEST
SEST
Able: Schools, Districts and Province
to plan and implement;
work with partners,
Ministry of Health and
Community Development.
Number of Zones: Mbala 21, Kasama 25, Chilubi 12, Mpulungu 10, Kaputa 12, Luwingu 19 (Mporokoso 20 & Mungwi 12)
RTS Exit Strategy Page 21
Annex B: Luapula Province RTS Activities Rollout Plan to Non Target Districts
MINISTRY OF EDUCATION, SCIENCE, VOCATIONAL TRAINING
AND EARLY EDUCATION
LUAPULA PROVINCE RTS ACTIVITIES ROLE OUT PLAN: 2013 – 2016
1. Introduction
With the low reading levels among children in Zambia, Luapula Province is no exception to this
phenomenon. This is evidenced by the current reading levels in the Province which are below
forty percent (40%). Children in lower grades face challenges that keep them from performing
well and participating fully in the learning process. Poor learning environment, weak school
management, insufficient skilled teachers to teach reading, have among other factors limited the
opportunity for children to learn how to read.
As a Ministry, we have committed ourselves to ensuring that reading levels are improved in all
the districts in Luapula Province. This will be realized by working with Read To Succeed
Project. This partnership will ensure that schools provide adequate instructional services that will
enable children in Primary Schools to learn how to read better and faster.
From the onset the ministry will take a leading role in all RTS activities for supporting reading
instruction. Therefore, this plan will serve as a guide to ensure RTS activities in the two districts
are sustained.
For the non-RTS districts, it will be the responsibility of the Province to align RTS activities
with the Provincial Strategic Plan on improvement of Learner Performance so that the activities
in the targeted districts are replicated in the non-targeted ones.
2. Overall Approach
2.1 Roll Out Plan
The Province has committed itself in taking a leading role in ensuring that it owns the
program. In the roll out plan, the Province intends to stagger the program. In 2013, Milenge
and Samfya districts will be targeted. In 2014, the Province intends to bring on board
Chienge and Nchelenge districts and finally roll out the program to Kawambwa district in
2015.
The combined monitoring program conducted by the Provincial Education Office and the
USAID officers from STEP UP Zambia and Read To Succeed revealed that Milenge and
Samfya Districts had the lowest reading levels of learners in the Province. Also, the
monitoring visit indicated that the two districts were not performing well in managerial and
supervisory skills in most of the Schools visited. Hence, the need to introduce the roll out
program to Milenge and Samfya districts first.
RTS Exit Strategy Page 22
For the roll out plan to succeed, there is need for the Province to include RTS activities in the
2013 Provincial Annual Work Plan and Budgets (AWPB). This is aimed at ensuring that
continuity of the RTS activities is guaranteed. In the following years, other districts will be
captured until all are catered for. This plan is aimed at improving reading levels and
ultimately increases the number of children who are able to read and write.
2.2 Roll Out Activities
Replication of the same activities that were done by RTS in the pilot districts will be
followed in the remaining districts. The roll out plan of activities will follow the cascade
system used during the PRP trainings. That is, in this case, the trainings will start from the
Province up to the school level in which the DEST, ZEST and the SEST will be trained as
trainers who will in turn train the teachers in schools. In short, the same personnel trained as
trainers by RTS will be used. The order of districts to be captured in the training program
will follow the pattern outlined in 2.1 above.
2.3 Roll Out Structures
To ensure continuity of the program, there is need to capacity build personnel in non-targeted
districts. The Master trainers used in targeted districts will be used as facilitators in the non-
targeted districts. To ensure that the program is sustained, the SPRINT system, a vehicle
through which all MESVTEE initiatives are delivered to schools, will be used.
2.4 Delivery Mechanism
Since the SPRINT system is institutionalized and is school-based with minimum or no cost at
all, this will be the best mechanism through which RTS activities could be delivered to non-
targeted schools
2.5 Time Frame and target
The province has set itself a target of 216, 000 learners to breakthrough in reading by 2014.
Since there are seven districts in Luapula Province, it is expected that in each district an
average total of 30, 000 learners should be able to breakthrough in reading by 2014.
2.5.1 Time Frame – By District by Year
The figures indicated in the table below are averages reached by dividing the total provincial
target by the number of districts in the province. This means that the total number of learners
who are expected to breakthrough in each district will depend on the size and the enrolment
figures per district. Further, each district and school will be given targets to be met each
year.
RTS Exit Strategy Page 23
Activity Matrix: Timeframe and Targets
Districts RTS areas of
activities
Responsibility
(which Unit in the PEO is
taking the lead)
Collaboration
(organizations and/or
projects collaborating
with PEO)
Outcomes
Reading Targets
(# of pupils to
target with
improved
reading)
Timeframe
2013 2014 2015 2016
District 1
(Milenge)
Teacher support Education Officer - Teacher
Education
RTS, STEP-UP,
UNICEF, JICA, FAWEZA
Improved Literacy skills,
Improved teacher performance through
Capacity building of teachers,
Resource mobilization, storage and distribution
4225 pupils 1225 1000 1000 1000
School
Management and
Leadership
Principal Education
Standards Officer (PESO)
RTS, STEP-UP,
UNICEF, JICA
Improved school management and supervisory skills,
Improved teacher and learner performance,
Guidance and
Counseling,
HIV/AIDS prevention and
Community
support
Senior Education Officer
(Guidance &
Administration)
RTS, STEP-UP,
UNICEF, JICA
Establishment of functional School Guidance
committees,
Provision of Guidance & Counseling Psycho social
Care and Support services to teachers and learners,
Research Senior Planning Officer RTS, STEP-UP, UNICEF, JICA, Mansa
College of Education
Identification of factors contributing to poor teacher and learner performance,
Recommendations for appropriate interventions identified,
District 2
(Samfya)
Teacher support Education Officer - Teacher
Education
RTS, STEP-UP,
UNICEF, JICA, FAWEZA
Improved Literacy skills,
Improved teacher performance through
Capacity building of teachers,
Resource mobilization, storage and distribution
7570 pupils 2570 2000 2000 1000
School
Management and Leadership
Principal Education
Standards Officer (PESO)
RTS, STEP-UP,
UNICEF, JICA
Improved school management and supervisory skills,
Improved teacher and learner performance,
Guidance and
Counseling,
HIV/AIDS prevention and
Community
support
Senior Education Officer
(Guidance &
Administration)
RTS, STEP-UP,
UNICEF, JICA
Establishment of functional School Guidance
committees,
Provision of Guidance & Counseling Psycho social
Care and Support services to teachers and learners,
Research Senior Planning Officer RTS, STEP-UP,
UNICEF, JICA, Mansa
College of Education
Identification of factors contributing to poor teacher
and learner performance,
RTS Exit Strategy Page 24
Districts RTS areas of
activities
Responsibility
(which Unit in the PEO is
taking the lead)
Collaboration
(organizations and/or
projects collaborating
with PEO)
Outcomes
Reading Targets
(# of pupils to
target with
improved
reading)
Timeframe
2013 2014 2015 2016
Recommendations for appropriate interventions
identified,
District 3
(Chienge)
Teacher support Education Officer - Teacher Education
RTS, STEP-UP, UNICEF, JICA,
FAWEZA
Improved Literacy skills,
Improved teacher performance through
Capacity building of teachers,
Resource mobilization, storage and distribution
3451 pupils 1000 1000 1000 451
School Management and
Leadership
Standards Principal Education Standards Officer
(PESO)
RTS, STEP-UP, UNICEF, JICA
Improved school management and supervisory skills,
Improved teacher and learner performance,
Guidance and Counselling,
HIV/AIDS
prevention and Community
support
Senior Education Officer (Guidance &
Administration)
RTS, STEP-UP, UNICEF, JICA
Establishment of functional School Guidance committees,
Provision of Guidance & Counseling Psycho social Care and Support services to teachers and learners,
Research Senior Planning Officer RTS, STEP-UP,
UNICEF, JICA, Mansa College of Education
Identification of factors contributing to poor teacher
and learner performance,
Recommendations for appropriate interventions
identified,
District 4
(Nchelenge)
Teacher support Education Officer - Teacher
Education
RTS, STEP-UP,
UNICEF, JICA,
FAWEZA
Improved Literacy skills,
Improved teacher performance through Capacity building of teachers,
Resource mobilization, storage and distribution
5762 pupils 2000 1762 1000 1000
School
Management and
Leadership
Principal Education
Standards Officer (PESO)
RTS, STEP-UP,
UNICEF, JICA
Improved school management and supervisory skills,
Improved teacher and learner performance,
Guidance and Counseling,
HIV/AIDS
prevention and Community
support
Senior Education Officer (Guidance &
Administration)
RTS, STEP-UP, UNICEF, JICA
Establishment of functional School Guidance Committees,
Provision of Guidance & Counseling Psycho social Care and Support Services to teachers and learners,
Research Senior Planning Officer RTS, STEP-UP, UNICEF, JICA, Mansa
College of Education
Identification of factors contributing to poor teacher and learner performance,
RTS Exit Strategy Page 25
Districts RTS areas of
activities
Responsibility
(which Unit in the PEO is
taking the lead)
Collaboration
(organizations and/or
projects collaborating
with PEO)
Outcomes
Reading Targets
(# of pupils to
target with
improved
reading)
Timeframe
2013 2014 2015 2016
Recommendations for appropriate interventions
identified,
District 5
(Kawambwa)
Teacher support Education Officer - Teacher
Education Officer - Teacher Education
RTS, STEP-UP,
UNICEF, JICA, FAWEZA
Improved Literacy skills,
Improved teacher performance through
Capacity building of teachers,
Resource mobilization, storage and distribution
4869 pupils 1869 1000 1000 1000
School
Management and
Leadership
Principal Education
Standards Officer (PESO)
RTS, STEP-UP,
UNICEF, JICA
Improved school management and supervisory skills,
Improved teacher and learner performance,
Guidance and
Counseling,
HIV/AIDS prevention and
Community
support
Senior Education Officer
(Guidance &
Administration)
RTS, STEP-UP,
UNICEF, JICA
Establishment of functional School Guidance
Committees,
Provision of Guidance & Counseling Psycho social
Care and Support Services to teachers and learners,
Research Senior Planning Officer RTS, STEP-UP, UNICEF, JICA, Mansa
College of Education
Identification of factors contributing to poor teacher and learner performance,
Recommendations for appropriate interventions identified,
RTS Exit Strategy Page 26
Annex C: Muchinga Province RTS Activities Rollout Plan to Non Target Districts
Muchinga Province RTS Activity Rollout Plan to non-target districts;
2013 -2016
Introduction
The general reading culture of reading amongst pupils in the Muchinga province has been below
average. This culture has been generally known to affect the learning outcomes, and particularly
the pupil learner performance. While this is prominent in every district in the province, various
causes have been known for such results; Prominent amongst causes for poor teaching and
learning outcomes are;
Poor teacher pupil contact time
Teacher absenteeism
Lack/inadequate targeted and focused instructional materials
Poor monitoring and evaluation systems
In response to the above challenges, the province is committed to work with Read To Succeed
Project to provide essential services to teachers, head teachers and students so that pupils read
better and faster. Read To Succeed project is planning to directly support two districts (Chinsali
and Isoka) over the next four years to model relevant interventions that potentially improve
reading in basic schools. However, the province believes that all districts deserve similar support.
The brief rollout plan defines how the province plans to take RTS interventions from the two
target districts to non-target districts.
This rollout plan has been developed by the provincial education officers in a meeting held in
Chinsali during the week of December 10th
followed by a 2-day workshop RTS and PEOs from
the six target provinces. Positive results were registered during the meeting in Chinsali with the
Provincial Education Officer on the suitability component. The following were agreed upon as
strategies for sustainability.
Effective orientation of key MESVTEE staff
Cost sharing
Effective implementation of Monitoring and Evaluation and reporting systems
Constant program review
Involvement of key and strategic staff
Continuous capacity building; training head teachers, DRCCs and other key staff
Make PEO/DEBS accountable
Systematic winning strategy
Effective community mobilization and creative grassroots demand
Mainstream RTS in the already existing effective reading models (e.g. NBTL or revised
version)
Engaging staff with exceptional skills in creating models of excellence
RTS Exit Strategy Page 27
Create effective feedback system
While the province agree and committed to work closely with RTS in the two target districts, it is
also determined to scale up successful activities to non-target districts. The following section
highlights how the province would like to rollout RTS activities in the non-target distinct.
Provincial Rollout Plan for Non-target districts– 2013-2016
During the consultative meetings, the following districts role out plan was agreed upon by the
provincial education office.
Chinsali and Isoka are already targeted to be covered by RTS.
The rest of the districts will be taken on by the Province with close collaboration from the
Read To Succeed Project without a major cost strain on RTS as a test on suitability and
exit strategy.
The MESVTEE will eventually take ownership of the entire program
Planned reading target in percentages
The following targets for schools were agreed upon;
Year 2013 - 80% of the total population of grade one pupils
Year 2014 – 85% of the total population of grade one pupils
Year 2015 – 95% of the total population of grade one pupils
Year 2016 – 100% of the total population of grade one pupils
Declarations/Statements made by Muchinga Province Education Staff
We do not need total dependence on donor driven activities, but we would like to move
towards a more sustainable approach
We do not need to bring in new models on reading, but rather, we shall utilize those
models that have already proved to be effective for the teachers and learners and are
already being tried by RTS in the target districts
As much as RTS would like to start with the initial 2 districts in Muchinga province, we
are going to begin implementing in the rest of the districts from the start
Our target percentage is 100% by 2016 and nothing less!
The Provincial education staff will work as a team; everyone participates and understands
everyone’s roles
We are happy with the RTS approach and entry model, and will fully support the project
Challenges
As a new province Muchinga has a number challenges. One of the major challenges encountered
was the lack of accommodation for staff. It will continue to pose a challenge for the staff moving
to take office in Chinsali district. This is mainly because of the numerous government staffs that
have been deployed to take office in the new provincial capital.
RTS Exit Strategy Page 28
The absence of banking and fuel facilities in the district will pose a big challenge as transactions
will have to be conducted in Nakonde, which is located about 210 kilometers away from
Chinsali. This will have a bearing on both financial resources and time.
Other programming and advocacy challenges reflected during the consultative meetings with
Education Ministry officials included the following;
Teacher retention
Teacher absenteeism
Lack of accountability by head teachers
Poor staffing levels
Inadequate and Poor teacher accommodation
Lack of sense of ownership and program appreciation and mainstreaming
Lack of teacher confidence
Detains of this plan will be developed with timeframe standards and targets by district and
schools
RTS Exit Strategy Page 29
Annex D: Eastern Province RTS Activities Rollout Plan to Non Target Districts
The Eastern Province Consultative Meeting on the Exit Strategy
Held on 10th
and 12th
Dec. 2012
INTRODUCTION
It has been noted with great sadness that reading levels were very low amongst pupils in the
province. As a result, learner performance has been adversely affected.
It is against this background that the province organized a provincial indaba involving a number
of stakeholders to discuss a way forward. It was at this forum where a 3 year Strategic Plan for
the province was formulated. The Eastern Province strategic plan has 6 main areas of focus.
They are as follows:
Leadership, Management and Supervision
Teacher preparedness
Assessment
Supporting Learners
Policy development and implementation
Monitoring teaching and learning
To ensure implementation of the Strategic Plan, targets were set at all levels. The province will
continue to realize and work towards meeting these targets. RTS interventions will support the
province in meeting the targets in the focus districts. The province will use RTS activities and
implement in the non-target districts.
Therefore, the coming in of the Read To Succeed project was a blessing for Eastern Province in
particular in that the project’s main objective is a cornerstone for improving reading levels
amongst pupils in our schools.
Strategies identified for rollout
A number of suggestions related to the roll-out were raised and discussed. The following are
strategies that Eastern province plans to use to rollout RTS activities to non-target districts. The
rollout starts in all non-RTS target districts in 2013
Sensitization of all stakeholders on the roll-out strategies
Inclusion of project activities into the MESVTEE AWPBs
Collaborating with partners
Training of DRCCs and ESO (GIs) as Master Trainers for non-targeted districts
Training of all zonal Heads, Deputy Heads and ZICS
Training of Head Teachers, Deputy Heads, Senior Teachers and SICs
Training of all teachers in schools within the zones
Set reading targets in both Nyanja and English from grades 1-7
Develop standardized local monitoring tools to track reading levels in all schools
RTS Exit Strategy Page 30
Strengthen internal monitoring by school administrators
Strengthen guidance and counseling services in schools
Form guidance and counseling committees where they do not exist
Targets
In terms of the actual reading targets, the members agreed that there would be need for
individual districts to arrive at those. In addition to this, the Provincial Education Officer through
the Principal Education Standards Officer thanked Read To Succeed as a project for the
wonderful initiative of charting the roll-out well ahead of time as compared to the past projects
which dealt with the roll-out at the “Eleventh Hour”.
Detains of this plan will be developed with timeframe standards and targets by district and
schools.
RTS Exit Strategy Page 31
Annex E: Northwestern Province RTS Activities Rollout Plan to Non Target Districts
Ministry of Education, Science, Vocational Training and Early Education (MESVTEE)
North Western Province
Plan to scale up RTS activities to RTS non-target districts
North Western Province has for years, ranked among the lowest in national examination results
at all levels. Reading levels of pupils in early grades is not at all encouraging. While much has
been done to improve the quality of the education in the province, much still needs to be done
before pupils in the Northwestern Province enjoy quality education and get a fighting chance to
prepare for a future in a rapidly transforming country.
Spurred by the global commitments such as Education for All and MDGs, and in pursuit of their
development goals governments in Africa have over the last few decades understandably
directed much of their investment in education towards enhancing access to education.
Enrolment in Zambia has risen at least twofold since the launch of the “Educating Our Future”
policy and introduction of free primary education. This has impacted the student population of
the Northwestern Province as well. We celebrate achievement gained in expanding access in the
whole of Zambia including our province, but on the other hand, quality has become a serious
issue. In a national literacy and numeracy assessment of 2006, the province registered literacy
and numeracy levels at Grade Five of only 38% and 34% in English and Mathematics
respectively. The situation is worse the further one travels from the towns and business centers.
While there are many factors affecting the quality of education such as teacher-pupil ratio,
school infrastructure, the socio-economic background of the learner, community participation in
education and pupil book ratio, research shows that learning-focused school leadership and
management and the quality of instruction rank among the most important factors. The province
therefore, found many of the RTS activities very relevant and timely. Hence, the province will
fully support RTS’s efforts in implementing its activities in the selected two target districts while
planning to expand the coverage and take these activities to other project non-target districts.
To do so, the province will:
assume direct ownership of the implementation of the program while acknowledging PEO
and DEBS as the mandated bodies for the provision of education in the province
take the lead in all project implementation, but more importantly take initiatives and lead the
expansion of activities to non-target districts.
share the major part of the financial and human resources needed for the full implementation
of the program in non-target districts;.
draw and propagate lessons learned from the program for maximum social capital gains to
and for the furtherance of quality education in Zambia.
RTS Exit Strategy Page 32
Proposed sustainability measures
In collaboration with RTS, the North-western Provincial Education Office will take the
following actions to ensure that RTS’s successful activities are sustained beyond the life of the
project and to ensure that lessons learned in the two target districts are transferred to non-target
districts.
Streamline RTS interventions in the provincial annual work plan
Engage provincial staff in all RTS activities enhance learning by doing to ensure transfer
of skills
Strengthen linkages between schools to zones, districts and province in sharing feedback
and plan for actions
Strengthen operations of the Provincial Education Support Team (PEST) and the District
Education Support Teams (DESTs) to increase their support to schools
Build capacity of DRCCs and DESOs who are expected to provide continuous support to
teachers in their districts
Strengthen linkages with mines: Lumwana, Kansanshi, Kalengwa and Kalumbilo to
fundraise and increase resources to schools
Develop the capacity of Colleges of Education and insure that new teachers are trained in
better reading instruction to ensure that all teachers leaving colleges have the skill to
teach reading
Retrain all serving teachers in reading skills to reduce fears of running out of teachers
that were trained in reading skills
Utilize TGMs in strengthening teachers skills in teaching literacy and ensuring that every
grade teacher to give assessment reports
Implement school-based monitoring and evaluation system to ensure that teachers
practice the skills they gained in trainings
Promote pupil reading clubs with innovative ideas of local class competitions based on
awarding good performing individuals or institutions
Develop an annual budget to support the project implementation and build a standing
arrangement with local partners to fund the budget on yearly basis through the PPP
arrangements. In short, start building into the provincial, district and school budgets all
activities of RTS to ensure that they are well taken over before RTS project closes
Start local income generating initiatives at PEO, DEBS and schools that will provide
disposable income to support on-going project implementation and monitoring of reading
activities in schools
Train pupil and teacher peer educators on annual basis to run their own HIV/AIDS
prevention activities in schools to ensure that programs are owned by institutions as well
as replace those that leave, thus avoiding the cry of staff that were trained and later leave
schools on transfer, promotion or resignation
Non-Target Districts’ RTS rollout plan
The province is convinced that it needed to work very closely with RTS in the two target districts
before it plans to take activities to non-target districts. In 2013, all relevant officers and the PEO
will authentically participate in planning, implementation and monitoring of RTS in the two
RTS Exit Strategy Page 33
districts. While working with RTS in the target districts, the province will introduce RTS to two
non-target districts. In October 2013, the province will review lessons learned from the tow
target districts and incorporate promising activities into all non-target districts. The three step
process is as follow;
January - September 2013 – project implementation in target districts with a few trials in
two other districts
October 2013 – review of the project to show progress made and learn lessons from it
January 2014 – roll out of the project to remaining 3 districts
Reading Targets
By the end of 2014, all pupils in grades 1-4 in government basic schools in the North Western
Province are expected to gain better reading skills.
Detains of this plan will be developed with timeframe standards and targets by district and
schools
RTS Exit Strategy Page 34
Annex F: Western Province RTS Activities Rollout Plan to Non Target Districts
Ministry of Education, Science, Vocational Training and Early Education (MESVTEE)
Western Province, Provincial Education Office
Rollout Plan of RTS Activities to Non-Project Target Districts
In the Zambia, early grade reading is found to be a serious problem in the basic education
system. The Western Province is not an exception. As the results, students’ achievements on the
national and regional examinations have always been sources of concern. Anecdotal reports
indicate that the following are causes for pupils’ low performance:
Inadequately trained teachers, particularly in teaching literacy in early grades and
classroom management;
Inadequate introduction of literacy teaching in the Collages of Education to inform now
teachers before they join the teaching profession,
Inadequate resources to support teaching and learning in schools
Lack of accountability on the part of head teachers and teachers for students’ failure
Inadequate school support and services by districts
Poor school-based monitoring and evaluation
Lack of community and parental support
The introduction of the Read To Succeed Project by USAID Zambia is, therefore, timely and
relevant. The Province has started off well with RTS and committed to provide full support to its
implementation. Working closely with RTS, it will eventually make sure that all promising
project interventions are integrated into the provincial plans and sustained. Moreover, those
activities that show positive impact on student learning will be identified and shared with non-
project target districts.
The Western province is committed to take the following actions to ensure sustainability of
RTS’s interventions, provided they are effective in improving learner performance.
Incorporate of RTS activities in provincial annual work plan.
PEO taking a leading role in the implementation of RTS activities.
Work with RTS to orient key MESVTEE staff & build their capacity
Work with RTS and Step Up to improve mmonitoring and evaluation and reporting
systems; this is done through the development of assessment tools and strengthening
internal monitoring by school administration
Review and incorporate RTS/MESVTEE reading strategy in the teacher training colleges
Integration of early grade reading assessment in school based assessments.
Increased levels of responsibility and accountability PEO, DEBS, Zonal Heads, Heads,
and Section Heads & Teachers.
Make sure that project operation is low cost and affordable
Coordinate the efforts of the various development partners and implementing agencies
for effective use of limited resources in the province.
RTS Exit Strategy Page 35
Promote pupil reading clubs with innovative ideas of local class competitions based on
awarding good performing individuals or institutions
Use good of RTS trained Master Trainers to roll out RTS activities to non-target districts
Organize exchange visits to ‘Models schools or Centers of Excellence’ once they are
identified
Rollout to non-target districts
The Western province would like to take a cautious step to rollout RTS activities to non-target
districts.
i) In 2013, the province will work closely with RTS to learn more about strategies
and activities and determine if the interventions are sound;
ii) The province will then incorporate RTS activities in its annual work plan and
budget.
iii) Early 2014, the province will provide intensive orientation to district officers in
non-target districts and plan for RTS rollout
iv) In 2014, province will rollout RTS activities to the non-project target districts
Reading targets
Reading targets will be set by each of the districts during the planning process. It is anticipated
that all pupils in all basic schools in the province will benefit from the project.
Detains of this plan will be developed with timeframe standards and targets by district and