“PANEVĖŽIO MIESTPROJEKTAS”, UAB Respublikos str. 15, LT-35185, Panevėžys, phone (8 45) 582667, e-mail:
www.pmp.lt
Builder: MINISTRY OF NATIONAL DEFENCE
OF THE REPUBLIC OF LITHUANIA
Client: INFRASTRUCTURE DEVELOPMENT DEPARTMENT UNDER
THE MINISTRY OF NATIONAL DEFENCE
Contract name
(subject matter):
Services of Construction Design and Project Execution Supervision
of Special Purpose Building (I, IV Supply Class Warehouse) at
General Silvestras Žukauskas Training Area, Švenčionys distr.
muni., Pabradė Eldership
Project name:
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
Building name: Special Purpose Building
Building address
(site location): Mažalotė vill. 9, Pabradė eldership, Švenčionys distr.
Construction type: CONSTRUCTION OF A NEW BUILDING (S)
Intended use: SPECIAL PURPOSE BUILDING
Building category: SPECIAL BUILDING
Project stage: TECHNICAL DESIGN (TP)
Project No.: P/6875 Project part GENERAL CONSIDERATIONS (BD)
Building No. 01 File ID: Volume I File revision 0
Position
Name, surname, certificate No.
Signature
DIRECTOR VYTAUTAS SUKACKAS
PROJECT MANAGER MARIJUS PONOMARIOVAS
Certificate No. 27845
Panevėžys, June of 2017
LIST OF FILES OF TECHNICAL DESIGN FOR THE CONSTRUCTION OF
THE SPECIAL PURPOSE BUILDING (WAREHOUSE)
AT THE GENERAL SILVESTRAS ŽUKAUSKAS TRAINING AREA,
MAŽALOTĖ VILL. 9, PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
Row
No.
File number File name, ID Notes
VOLUME I GENERAL CONSIDERATIONS (BD)
VOLUME II SITE PLAN (SP)
VOLUME III ARCHITECTURE (SA)
VOLUME IV STRUCTURES (SK)
VOLUME V WATER SUPPLY AND WASTE WATER
UTILITIES (VN)
VOLUME VI HEATING, VENTILATION AND AIR
CONDITIONING (ŠVOK)
VOLUME VII GAS PIPELINE (D)
VOLUME VIII ELECTRICAL ENGINEERING (E)
VOLUME IX ELECTRONIC COMMUNICATIONS (ER)
VOLUME X FIRE ALARM (GSS)
VOLUME XI PROCESS CONTROL AND AUTOMATION
(PVA)
VOLUME XII HEAT PRODUCTION AND SUPPLY (ŠT)
VOLUME XIII CONSTRUCTION COST ESTIMATION (KS)
LIST OF THE CONTENT OF THE FILE DOCUMENTS
Document ID No. of
pages Revision Document name Notes
a b c d e
P/6875-01-TP 2 0 General Characteristics of the Building
P/6875-01-TP-BD-BAR 9 0 Explanatory Note
P/6875-01-TP-BD-BTS 10 0 General Technical Specifications
1 Report on the Coordination of the Solutions
of the Project Parts
ANNEXES
1 Copy of the Qualification Certificate of the
Project Manager
1 Order regarding the Appointment of the
Project Manager
12/01/2016, No. 21VL-8 8 Program Task
19/04/2017,
No. 1P-14 3 Building Design Task
17/02/2017,
No. TS17-05499 3 Conditions for Connection of ESO
03/11/2000, No. 3779-86 1 Order of the Governor of Vilnius District of
the Republic of Lithuania
01/12/2016, reg. No.
86/8887 22
Extract from the Central Databank of the
Register of Real Property
01/12/2016, reg. No.
10/325516 15
Extract from the Central Databank of the
Register of Real Property
01/12/2016, reg. No.
10/356714 4
Extract from the Central Databank of the
Register of Real Property
10/08/2000 2 Act of the Marking of the Land Site
Boundaries
1 Land Site Plan, Scale 1:10 000
27/01/2017 2 Topographic Engineering Plan (prepared by
“Geodeziniai tyrinėjimai”, UAB)
04/2017 30 Geological Engineering Research
(“Geoconsulting”, UAB)
0 06/2017 FOR THE CONSTRUCTION PERMIT, TENDER
REVISION DATE OF ISSUE REVISION STATUS. REASON FOR AMENDMENT (IF APPLICABLE)
QUAL. CERT.
DOC. NO.
“PANEVĖŽIO MIESTPROJEKTAS”, UAB
NAME OF THE BUILDING PROJECT CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
27845 PM MARIJUS PONOMARIOVAS DOCUMENT NAME
LIST OF THE CONTENT OF THE FILE DOCUMENTS OF THE PART OF THE
BUILDING PROJECT
Revision
27845 SPM MARIJUS PONOMARIOVAS 0
LT
CLIENT
INFRASTRUCTURE DEVELOPMENT DEPARTMENT UNDER THE MINISTRY OF NATIONAL DEFENCE
DOCUMENT ID
P/6875 – 01 – TP – BD – BSŽ
Page Pages
1 2
1 List of the Licenced Design Software used
to Prepare the Project
P/6875-01-TP-SP_B-01 1 0 Site Plan, Scale 1:500
P/6875-01-TP-SP_B-02 1 0 Site Delineation Plan, Scale 1:500
P/6875-01-TP-SP_B-03 1 0 Site Management Plan, Scale 1:500
P/6875-01-TP-SP_B-04 1 0 Site Level Plan, Scale 1:500
P/6875-01-TP-SP_B-05 1 0 Summary Report of Infrastructure
Networks, Scale 1:500
P/6875-01-TP-SA_B-01 1 0 First Floor Plan, Scale 1:100
P/6875-01-TP-SA_B-02 1 0 Roof Plan, Scale 1:100
P/6875-01-TP-SA_B-03 1 0 Facades between Axles 1-21; 21-1; E-A; A-
E and section A-A, Scale 1:100
P/6875-01-TP-ŠV_B-03 1 0 Fundamental Schemes of the Supply of the
Heating and Coolant to the Ventilation Units
P/6875-01-TP-E_B-05 1 0 Main Electricity Networks Calculation
Scheme
P/6875-01-TP-ER_B-01 1 0 Fundamental Scheme of Phone-Computer
Network
P/6875-01-TP-GSS_B-01 1 0 Fundamental Scheme of Fire Detection and
Fire Alarm System
P/6875-01-TP-PVA_B-01 1 0 Fundamental Scheme of the Boiler Room
Automation
P/6875-01-TP-PVA_B-02 1 0 Fundamental Scheme of the Fire Water
Supply Automation
P/6875-01-TP-ŠT_B-01 1 0 Boiler Room Functional Scheme
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – BD – BSŽ
Page Pages Revision
2 2 0
GENERAL CHARACTERISTICS OF THE BUILDING
Name Unit of
measurement Quantity Notes
I. SITE
1.1. Site area m2 22 211 544
1.2. Intensity of the Site Developing % 0,05
1.3. Density of the Site Developing % 0,06
II. BUILDINGS
1. Special Purpose Building (2.16.)
2. Total Area of the Building.* m2 1090,60
3. Volume of the Building.* m3 6730
4. Number of Floors.* u. 1
5. Height of the Building.* m 6,70
6. Energy Efficiency Class. A
III. ENGINEERING NETWORKS
4.1. Water Supply Networks:
4.1.1. Length* m 350/13/4
4.1.2. Pipe Diameter (only for Pipelines) mm 1100/50/200
4.2. Domestic Wastewater Networks:
4.2.1. Length* m 16
4.2.2. Pipe Diameter (only for Pipelines) mm 160
4.3. Rainwater Drainage Networks:
4.3.1. Length* m 6/260/95
4.3.2. Pipe Diameter (only for Pipelines) mm 250/200/110
4.4. Gas Pipeline Networks:
4.4.1. Length* m 20/95
4.4.2. Pipe Diameter (only for Pipelines) mm 25/40x3,7
4.5. Electricity Networks:
4.5.1. Length* m 40/200/125
4.5.2. Number of Power Grid Conductors and Cross-
section u.; mm2 4x50/5x4/12x1,5
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE BUILDING P/6875-01-TP-BD
(WAREHOUSE) AT GENERAL SILVESTRAS ŽUKAUSKAS TRAINING Page 1 Pages 2 REVISION 0 2017
AREA, MAŽALOTĖ VILL. 9, PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
Name Unit of
measurement Quantity Notes
4.6. Electronic Communications
4.6.1. Length m 175/175
4.6.2. Number of Power Grid Conductors and
Cross-section u.; mm2 10x2x0,6
Communications
Cable
12 SM
9/125 µm Optical Cable
* Characteristics marked with an asterisk are calculated in accordance with the rules for the collection of cadastral
measurements and cadastral data, which are approved by the Minister of Agriculture of the Republic of Lithuania.
After the completion of the construction and having carried out the cadastral measurements, these characterises
may have minor deviations.
Building Project Manager
Marijus Ponomariovas, Qualification Certificate No. 27845 (signature)
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE BUILDING P/6875-01-TP-BD
(WAREHOUSE) AT GENERAL SILVESTRAS ŽUKAUSKAS TRAINING Page 2 Pages 2 REVISION 0 2017
AREA, MAŽALOTĖ VILL. 9, PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
GENERAL EXPLANATORY NOTE
1. Basis for the Project Preparation
The Project “Construction Project for the Special Purpose Building (Warehouse) at General
Silvestras Žukauskas Training Area, Mažalotė vill. 9, Pabradė Eldership, Švenčionys Distr.” is being
carried out under the commission of the Client, the Infrastructure Development Department under the
Ministry of National Defence.
This Project for the new special purpose building is being prepared in accordance with:
1. Standards regulating the design.
2. Land site plan (prepared by the State Land Management Institute, PI).
3. Program task (12/01/2016, No. 21VL-8).
4. Building design task approved by the Client (19/04/2017, No. 1P-14).
5. Data of the Register of Real Property (reg. No. 86/8887; reg. No. 10/325516; reg. No.
10/356714).
6. Conditions for Connection of ESO of 17/02/2017, No. TS17-05499.
7. Topographic Engineering Plan of the central training area of Pabradė, Švenčionys Distr. Muni.
(prepared by “Geodeziniai tyrinėjimai”, UAB, 27/01/2017).
8. Geological Engineering Research carried out by “Geoconsulting”, UAB (Special Purpose
Building at General Silvestras Žukauskas Training Area, Švenčionys Distr. Muni., Pabradė
Eldership, Meškerinė vill., REPORT ON GEOLOGICAL ENGINEERING RESEARCH.
Klaipėda, April of 2017).
9. Design proposals.
10. Tender material as well as any other correspondence with the Builder.
Site location: Mažalotė vill. 9, Pabradė Eldership, Švenčionys Distr.
Construction type: Construction of a new building (in accordance with STR 1.01.08:2002)
Building purpose: Special purpose building (in accordance with STR 1.01.03:2017)
Building category: Special building (in accordance with STR 1.01.03:2017)
Main intended use Other, type of the use of land site – territories for the purposes of national
of the land: defence.
Fire resistance of the building: The intended use – the special – buildings for special purposes (barracks,
prisons, remand prisons, police, fire station services, shelters, border
inspection posts, technical surveillance towers and other) P. 2.16. (in
accordance with the Basic Requirements for Fire Safety).
Unique Site No.: 8638-0004-0008
0 06/2017 FOR THE CONSTRUCTION PERMIT, TENDER
REVISION DATE OF ISSUE REVISION STATUS. REASON FOR AMENDMENT (IF APPLICABLE)
QUAL. CERT.
DOC. NO.
“PANEVĖŽIO MIESTPROJEKTAS”, UAB
NAME OF THE BUILDING PROJECT CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
27845 PM MARIJUS PONOMARIOVAS DOCUMENT NAME
GENERAL EXPLANATORY NOTE
Revision
27845 SPM MARIJUS PONOMARIOVAS 0
LT
CLIENT
INFRASTRUCTURE DEVELOPMENT DEPARTMENT UNDER THE MINISTRY OF NATIONAL DEFENCE
DOCUMENT ID
P/6875 – 01 – TP – BD – BAR
Page Pages
1 9
List of the Main Normative Construction Documents,
Under which the Technical Design has been Prepared
STR 1.01.02:2016
STR 1.01.03:2017
STR 1.01.04:2015
STR 1.01.08:2002
STR 1.04.04:2017
STR 1.05.01:2017
STR 1.06.01:2016
STR 1.12.06:2002
STR 2.01.01(1):2005
STR 2.01.01(2):1999
STR 2.01.01(3):1999
STR 2.01.01(4):2008
STR 2.01.01(5):2008
STR 2.01.01(6):2008
STR 2.01.02:2016
STR 2.01.06:2009
STR 2.01.07:2003
STR 2.01.10:2007
STR 2.02.07:2012
STR 2.02.02:2004
STR 2.05.02:2008
STR 2.05.03:2003
STR 2.05.04:2003
STR 2.05.05:2005
STR 2.05.08:2005
STR 2.05.09:2005
STR 2.05.13:2004
STR 2.05.20:2006
STR 2.05.21:2016
STR 2.06.04:2014
Normative Technical Documentation for Construction
Classification of Buildings
Assessment, Verification and Declaration of the Constancy of Performance of
Construction Products without Harmonised Technical Specifications. Designation of
Testing Laboratories and Certification Bodies. National Technical Evaluations and
Designation and Publication of Technical Assessment Bodies
Types of Construction
Structure Design, Project Expertise
Documents allowing Construction. Completion of Construction. Suspension of
Construction. Elimination of Results of Arbitrary Construction. Elimination of Results
of Construction resulting from Illegal Issuance of Documents allowing Construction
Construction Works. Supervision of the Building Construction
The Purpose and Life Span of Construction Works
Essential Building Requirement. Mechanical Resistance and Stability
Essential Building Requirements. Fire Safety
Essential Building Requirements. Hygiene, Health, Environmental Protection
Essential Building Requirements. Exploitation Safety.
Essential Building Requirement. Noise Protection.
Essential Building Requirement. Energy Economy and Heat Retention.
Design and Certification of Energy Performance of Buildings
Protection of Buildings against Lightning. External Protection of Buildings against
Lightning
Building Internal and External Environmental Protection from Noise
External Plastered Thermal Insulation Composite Systems
Warehouse, Manufacturing and Industrial Buildings. Main Requirements
Public Structures
Building Structures. Roofs.
Basis for Structural Design.
Effects and Loads.
Concrete and Reinforced Concrete Structures Design
Steel Structural Design. Main Provisions
Masonry Structural Design
Building Structures. Floors
Windows and External Entrance Doors
Geotechnical Design. General Requirements
Streets and Roads of Local Importance. General Requirements.
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – BD – BAR
Page Pages Revision
2 9 0
STR 2.07.01:2003
STR 2.09.02:2005
HN 32:2004
HN 33:2011
HN 42:2009
HN 56:2004
HN 69:2003
HN 98:2014
LR EM 2012-01-02
Order No.1-1
LR EM 2012-02-03
Order No.1-22
LR EM 2011-02-03
Order No.1-28
LR EM 2013-03-05
Order No.1-52
LR EM 2011-12-20
Order No.1-309
LR EM 2011-05-27
Order No.1-134
LR EM 2011-12-20
Order No.1-309
LR EM 2014-12-11
Order No.1-312
LR ENM 2010-03-29
Order No.1-93
LR KAM 2015-08-10
Order No.V-809
LR EM 2011-06-17
Order No.1-160
LR EM 2016-09-19
Order No.1-249
2015-04-08, NR.1-102
LR EM 2012-01-02
Order No.1-2
LST 1516:2015
LST EN 54
LST EN 1838:2013
LST EN 12464-1:2011
LST EN 50173-2:2008
LST EN 50174-2:2009
LST EN 50174-3:2014
Order No. 1-66 of the
Director of FRD under
MoI of 22/02/2007
(Version of the Order
No. 1-168 as of
22/05/2009)
Water Supply and Wastewater Removal Plant. Building Engineering Systems. Field
Engineering Networks.
Heating, Ventilation, Air Conditioning
Work with Display Screen Equipment. Health and Safety Requirements
Acoustic Noise. Noise Thresholds in Residential and Public Buildings and Their
Environment
Microclimate in Residential and Public Buildings
Military Territory. Rules on Building Setting up and Maintenance
Thermal Comfort and Sufficient Thermal Environment in Workplaces. Standard
Values of the Parameters and Measurement Requirements
Natural and Artificial Lighting of Workplaces. Limit Values and General
Requirements for Measuring
Power Electrical Equipment Installation Rules
General Rules for Electrical Equipment Installation
Lighting Electrical Equipment Installation Rules
Rules for Installation of Electrical Equipment of Special Facilities and Technological
Processes
Rules for Installation of Electric Lines and Installations
Rules for Installation of Relay Protection and Automation of Electrical Equipment
Rules for Installation, Marking, Maintenance and Usage of Electronic Communications
Infrastructure
Methods for Determination of Computational Electrical Loads
Electrical Networks Safety Rules
Requirements for Installation of Communications and Computer Networks
Rules for Installation of Heat Supply Networks and Heating Substations
Rules for Installation of Boiler Room Equipment
Rules for Installation and Safe Exploitation of Steam and Hot Water Boilers
Rules for Installation of Gas Systems in Buildings
Building Project. General Requirements for Formalising
Fire Detection and Fire Alarm Systems
Lighting Applications. Emergency Lighting
Lighting and Illumination. Part 1. For Indoor Workplaces
Information Technologies. Generic Cabling Systems. Part 2. Office Premises
Information Technologies. Cabling Installation. Part 2. Installation Planning and
Practices Inside Buildings
Information Technologies. Cabling Installation. Part 3. Installation Planning and
Practices Outside Buildings
Fire Detection and Fire Alarm Systems. Design and Installation Rules
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – BD – BAR
Page Pages Revision
3 9 0
Order No. 64 of the
Director of FRD under
MoI of 18/02/2005
(Version of the Order
No. 1-223 as of
27/07/2010)
Order No. 1-338 of the
Director of FRD under
MoI of 07/12/2010
Order No. 1-66 of the
Director of FRD under
MoI of 22/02/2007
(Version of the Order
No. 1-168 as of
22/05/2009)
KPT SDK 07
17/01/2011 1-14
TD-LI-81, Rev. 2Alb.
-1,2,3
RSN 37 – 90
Under the Order No. 1-
162 as of 17/05/2016
18/01/2005, No. 4-17
06/10/2016, No. 1-277
06/10/2000, No. 349
03/10/2003, No. 4-366
01/07/2002, IX-1004
14/07/1999, No. 217
RSN 26-90
Order No. 1-168 as of
22/05/2009
Order No. 1-168 as of
22/05/2009
02/04/2007 D1-193
30/03/2010, No. 1-100
RSN 156-94
Order No. 4-170 as of
05/05/2007
09/03/2011
LST 1516:2015
General Fire Safety Rules
Main Requirements for Fire Safety
Rules for Design and Installation of Indoor Fire Water Supply System
Regulations for the Construction of Standardised Pavements of Road Structures.
Fire Safety Rules for Public Buildings.
Order No. 19 of the Commander of the Armed Forces of the Republic of Lithuania of
12/01/2001 “Regarding the Preparation of Sheets on Furniture and Economic
Inventory of the Divisions of the Lithuanian Armed Forces”
Typical Parts of Industrial Production Units
Rules for the Inlets of Underground Engineering Networks into Buildings and
Ventilation of Recessed Premises
Rules for Installation of Distribution Gas Pipelines
Rules for Installation of Thermal Insulation of Equipment
Rules for Exploitation of Liquefied Petroleum Gas Systems
Pressure Equipment Technical Regulation
Pressure Pipelines Exploitation Rules
Special Land and Forestry Exploitation Conditions (Approved by the Decision No.
343 of the Government of the Republic of Lithuania as of 1992).
Occupational Safety and Health Instructions for Electric Arc Welder
Occupational Safety and Health Instructions for Excavator Operator
Occupational Safety and Health Instructions for Workers Working with Movable
Electrical Equipment and Machinery
Fire Safety Instructions for Fire-Related Works
Law on Waste Management (relevant version)
Waste Management Rules
Water Consumption Rates.
Rules for Design and Installation of Indoor Fire Water Supply System
Rules for Design and Installation of Outdoor Fire Water Supply Networks and
Buildings
Storm Water Management Regulation
Safety Rules for the Exploitation of Electrical Equipment
Fire Safety Rules for Ventilation Systems
Rules for Design and Installation of Smoke and Heat Control Systems
Building Climatology
Rules for Installation of Thermal Insulation of Heat Transmission Networks
Regulation (EU) No. 305/2011 of the European Parliament and Council
Building Design. General Requirements for Formalising
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – BD – BAR
Page Pages Revision
4 9 0
2. Current Situation
The territory under management is at the 1st military cantonment of the General Silvestras
Žukauskas Training Area located on the south part of the site. The territory reserved for the designed
building is East of the road passing through the military cantonment, to the South of the sanitary units and
to the North of the tent camp. A forested territory extends to the East of the managed territory. There are
no buildings in the territory, 146 coniferous trees are growing there, which will be cut down.
3. Intended Construction Works
The location of the designed building is stipulated in accordance with the preliminary scheme of the
territory of the 1st military cantonment of the General Silvestras Žukauskas Training Area of the
Lithuanian Armed Forces.
Access to the designed building is stipulated to be from the road located to the West of the building.
The cargo lot with the asphalt concrete designed around the building can be accessed from the two
designed roads. There are two exits leading from the lot. One is on the southern part and another one on
the eastern part of the lot.
The lot around the building is designed to be of such scale so that the oversized vehicles could easily
fit and conveniently manoeuvre at the ramps. For protection purposes, low kerbs are designed on the part
of the larger lot.
The designed building is located in the central part of the managed territory. Asphalt concrete
pavement is designed around the building.
Chernozem is spread and grass is sown in the part of the territory under management, which is not
taken up by surfaces or building.
When installing new surface troughs, the vertical subgrade according to the height plan is
performed, subject to the current surfaces and terrain, the trough bases are compacted. The excess soil
from the removal of the natural soil is used for the layout of the lawn.
The site level plan was accepted with regard to the current site relief, adjacencies and possibilities
to connect to the existing engineering networks. When foreseeing appropriate slopes of the territories by
the vertical subgrade of the relief, the drainage of the surface waters is ensured.
The objective of the facade solutions of the designed building is to give the building an appearance
which would clearly express its typology and would match other buildings located in the nearby urban
area.
Light grey plaster is used for the finishing of the external walls and the plinth. Reveals of all
windows, doors and gates are painted using light grey colour. The finishing of the vertical surfaces of the
ramp is not designed. The colour of the roof over the ramp’s profiled flooring is stipulated to be light
green.
Asphalt concrete pavement is intended around the building and the ramp, stairs are to be installed
by the ramp.
The premises are designed taking into account the needs of the premises according to the functions
submitted by the Client.
Single-storey building consisting of an administrative block (premises for work purposes) with
permanent workplaces and sanitary premises and two warehouse blocks surrounding it (special purpose
premises) is designed.
The access to the administrative block is intended to be from the south side of the building. It leads
to the corridor leading to the premises of the shooting range exploitation unit, rest room, changing rooms
of men and women, men and women toilets as well as the premises for cleaning equipment. Changing
rooms of men and women lead to the men and women showers.
The first (western) warehouse block is comprised of two warehouse premises for equipment with
equipment maintenance and repair premises and warehouse premises for paper targets between them.
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – BD – BAR
Page Pages Revision
5 9 0
Gates are intended between these two premises. Equipment maintenance and repairs premises lead to the
battery charging premises, and the technical premises can be accessed through it, where electric forklift
is being stored. There is also an electrical intake room in this warehouse block with the entrance from the
southern side of the building as well as a boiler room with the entrance from the northern side of the
building.
The second (eastern) warehouse block is comprised of two warehouse premises intended for the
storage of bottled water and dried food rations as well as of twelve warehouse premises of equal size for
the storage of material assets and goods on euro pallets.
The access to all the premises adapted to the electric forklift is from the yard through the gates with
doors.
In order to protect the ramp structures from mechanical damages, which can occur if a vehicle hits
the ramp, rubber ramp protection is used; for the protection of the gates – vertical security bollards, for
the protection of the pillars and corners of the building – metal rack guards are used.
A new warehouse building is designed to be of one floor with a surrounding ramp. The awning is
to be installed above the ramp around the entire building. Structural scheme of the building is a framework
of prefabricated reinforced concrete and metal trusses with expanded clay concrete blocks aggregate and
metal pillars of the awning as well as beams. The roof of the building is matching. The building has no
basement.
The building will be divided using deformation-thermal seams.
The designed object is supplied with drinkable water from the current supply networks, and the
wastewater is drained to the centralised networks.
Domestic and rainwater sewage systems as well as cold, hot and circulation water supply systems
are intended to be installed in the designed building. Water in the building will be used for domestic-
household purposes. The water for the heating of the building and for household use will be treated in
heating substation. Water metering unit with shut-off valves and cold water meters are to be installed in
the electrical intake room. The water is supplied from the existing water well. Fire water will be supplied
from the fire water tanks under design. Towel dryers are intended to be set up in the shower rooms.
Domestic sewage will be drained to the drains designed in the yard. Drain traps with stainless steel
grids and anti-drying siphons are to be installed so that it would not pass the smell from the sewage system.
Rainwater drainage from the roof of the building – internal. Roof gullies on the roof of the building
are intended to be with electric heating. Rainwater sewage will be drained to the designed networks in the
yard, and later on will be infiltrated into the soil. Cleanouts will be installed for the cleaning of the
networks. Rainwater sewage from the awning is to be drained by external gutters.
Water for internal and external fire-fighting will be supplied from the fire water tanks.
Internal fire hose reel systems of the building will be installed near emergency exits, no further that
3 m from the door apertures, in the lobbies, corridors, thoroughfares and other easily accessible locations,
though it will not obstruct the evacuation of the people.
Adjustable two-pipe collector heating system ensuring thermal comfort is intended to be installed.
Water-based air heaters are designed to be installed in the warehouse premises, and equipment
technical maintenance and minor repairs premises. Air supply/extraction and air supply systems are
designed. Ventilation units of all systems are to be installed in the attic.
Hot water for heating of the building and for domestic use will be treated in gas boiler room. The
boiler room is attributed to the 1st category, it is automated, without permanent staff on duty. The fuel –
LPG steam phase, with gas stored in two underground reservoirs. Two suspended gas boilers are to be
installed. Gas pipelines are intended to be connected from the underground gas pipeline brought to the
wall of the boiler room.
The boiler room is naturally illuminated, hinged window is to be installed. Air supply is intended
through the door grilles, and a ventilation duct is to be installed for the extraction of the air.
Heating, ventilation and hot water supply systems will be installed, which will be powered from the
local boiler room. The boiler room will be set up on the first floor of the building with a separate entrance
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – BD – BAR
Page Pages Revision
6 9 0
directly from outside. Two wall-mounted gas-fired steam boilers are designed for the supply of the heating
to the building. Exhaust system is to be assembled for the transportation of combustion air and combustion
products. Heat supply system for ventilation convectors (ventilation) is connected directly from the
collector. Electronic high efficiency pump is designed for the circulation in the system as well as the
closing and balancing valves, and monitoring measuring devices. A volumetric boiler with a spiral tubular
water-water type heat exchanger is designed for the production of hot water. All necessary shut-off and
control fittings, protective installations and monitoring-measuring devices are designed in the boiler room.
Power and lighting networks, distribution and protective installations, lightning protection,
electronic communication systems are intended to be installed in the building as well as fire detection and
alarm system in all fire risk premises, and the systems of the boiler room and fire water supply are intended
to be automated.
4. Data on the Intended Economic Activities
Production activities are not intended in the designed building. A special purpose building is
designed. Direct use of natural resources is not intended. Pollution of environmental components (water,
air, soil, subsoil, biological diversity, landscape) which would be affected by the intended economic
activities during the construction and exploitation of the building is not stipulated. The intended economic
activities related to the construction works of the building will not have any substantial effect on other
environmental components, surrounding population and nearby territories during the construction works.
Construction waste accumulated during the construction works is intended to be disposed in compliance
with the environmental requirements by entering into the agreement with the specialised company.
5. Mechanical Durability and Stability
Loads and effects have been calculated in accordance with STR 2.05.04:2003 “Effects and Loads”.
Assigned volumetric weight characteristic values of the supporting structures:
- reinforced concrete – 28,0 kN/m³;
- expanded clay block masonry – 6,9 kN/m³;
- metal – 78,5 kN/m³.
Other permanent load characteristic values can be found in the SK part of the Project.
6. Hygiene, Health and Environmental Protection
The new building under construction and any activities carried out there have no adverse impact on
the environment. The Contractor will recycle and hand over the construction waste accumulated during
the construction to the waste managers before the completion of the construction.
Solid economic waste is stored in containers and removed in orderly manner by special vehicles.
Materials and products intended to be used in the building comply with the quality, sanitary and
aesthetic requirements.
The Contractor creates appropriate conditions on the site for the personnel’s work and rest. Sanitary,
hygiene and rest rooms are to be established. In case demolition works are necessary during the
construction of the new building, demolition works are to be carried out without causing any adverse
impact on the environment. Solid economic waste accumulated during the construction works are stored
in the available containers and are removed in orderly manner by special vehicles.
The work area must be illuminated using artificial electric lighting which complies with the valid
standards when working at night time or the works must be organised to be carried out in the daylight.
Initial waste accounting journal and the accounting of the construction waste accumulated and
handed over for management must be kept on the site, the amount of waste must be indicated, and initial
waste accounting reports must be submitted to the Regional Department for Environmental Protection of
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – BD – BAR
Page Pages Revision
7 9 0
the Ministry of Environment, in the territory of which the construction, reconstruction, repairs or
demolition of the building is being carried out, in accordance with the procedure laid down in the Waste
Management Rules. Accounting documentation of the construction waste shall be stored in accordance
with the requirements of the Waste Management Rules. Data on the removal of the construction waste
shall be recorded in the Construction Works Log.
Accumulated waste suitable for recycling and structures (materials) suitable for re-use must be
sorted on the site, and other type of waste – secondary raw materials, hazardous waste – must be sorted
as well.
Non-hazardous construction waste can be stored on the site no longer than one year after its
appearance; however, no longer than the completion of the construction works. Hazardous construction
waste shall be stored in accordance with the requirements laid down in the Waste Management Rules no
longer than 3 months after its appearance; however, no longer than the completion of the construction
works so that it would not cause risk to the environment and human health.
Documents, evidencing that construction waste has been handed over to the waste manager, shall
be submitted to the Commission of Construction Completion or a certificate of the builder (Client) on the
usage of the untreated construction waste shall be presented.
In order not to damage the natural environment during the exploitation of the designed object, a
series of measures to ensure its protection is foreseen.
Upon commencing of the construction works it is foreseen to remove the fertile natural soil from
the site areas used for construction, store it in a territory not used for the construction, and later to use it
for planting purposes.
The works of restoration of territories, which were damaged during the construction of outdoor
engineering networks, should be carried out in the following order:
1. The natural soil is removed from the engineering networks construction strip and loaded into piles
in its temporary storage area;
2. After the engineering networks have been laid, the trenches are poured over and the strip of the
territory under management is levelled with a bulldozer and the surface of the subgrade strip is
properly joined with the relief of the adjacent territories;
3. On the levelled strip of ground under management, the fertile soil brought from the temporary
storage area is spread in a layer of 10 cm with an additional 10 cm of chernozem. This layer is
levelled and harrowed and the newly prepared soil, which replaced the former lawns, is sown with
a mixture of grass.
7. Noise Protection
When designing the ventilation systems, such devices have been chosen, so that the noise and
vibration caused by them would not exceed the permitted hygiene limits established for a human being.
For that purpose the fans are connected to the ducts using elastic connecting joints, electric motor speed
is selected to be as lowest as possible, and duct silencers are intended to be installed.
The class of the acoustic comfort of the building is not to be solved in the scope of this project.
8. Fire Safety
The building is attributed to the P.2.16 (the intended use – the special – buildings for special
purposes (barracks, prisons, remand prisons, police, fire station services, shelters, border inspection posts,
technical surveillance towers and other)) building group (in accordance with the Basic Requirements for
Fire Safety).
The level of the fire resistance of the building – II.
The precise solutions are available in the SA part of the Project.
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – BD – BAR
Page Pages Revision
8 9 0
9. Energy Economy and Heat Retention
Projected values of the coefficient U (W/m2K) of the heat transfer through the building’s partitions:
- structure of the matching roof 0, 11
- plastered facade 0, 14
- plinth part of the wall 0, 16
- wall between heated and unheated premises 0, 15
- floor on the ground 0, 10
- windows 0, 10 / 1, 40
- gates 1, 20
Energy efficiency class of the building – A.
Intended design solutions fully comply with the requirements of the normative documents.
10. Exploitation Safety
The entity of the intended solutions of the Project ensures the prevention of any accidents when
exploiting and maintaining the building.
I hereby confirm, that the design solutions comply with the requirements of the laws, legislations,
project preparation documentation as well as normative construction requirements, normative building safety
and purpose documentation requirements, do not breach the interests of the state, the integration of the
disabled, the public or any third parties.
Living and operating conditions of the third parties are not worsened in case the building is
constructed and exploited in accordance with the design solutions.
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – BD – BAR
Page Pages Revision
9 9 0
GENERAL TECHNICAL SPECIFICATIONS
1. GENERAL PROVISIONS
In order for the buildings and structures to be properly constructed and appropriate to be exploited
in accordance with the solutions stipulated in the Project, the Contractor shall carry out the work, which
includes completion of materials and equipment, delivery to the Site, construction, assembly as well as
necessary inspections and tests.
The Contractor undertakes to carry out the works in the appropriate order using usual work methods
and experienced workforce.
All structures, products, materials and equipment shall be certified or acknowledged to be suitable
for use in the procedure established in Lithuania, and shall have a conformity assessment document as well
as meet the requirements of the Project.
The Contractor shall be responsible for obtaining of all permits from the public authorities and other
institutions, except for the document allowing the construction.
The Contractor shall enable the state maintenance supervisory authorities and the representatives of
the technical maintenance and project execution supervision to carry out inspections as well as shall remedy
identified deficiencies.
The Contractor shall comply with all normative requirements and rules of the Republic of Lithuania,
which are applicable to the building.
Crucial works and structures, indicated in the Technical Specifications, shall be taken over by the
Builder or the authorised representative of the Builder (manager of technical maintenance) formalising it
in the certificate, and the building shall be recognised as suitable for exploitation after the construction
works in the procedure established in the Republic of Lithuania.
The Contractor and subcontractors shall have all necessary certificates and licences (if necessary).
The Contractor shall coordinate the employment of any subcontractors with the Builder. The
approval of the Builder for the replacement of subcontractors during the construction works shall be
obtained.
2. BUILDING MATERIALS, PRODUCTS AND EQUIPMENT
All products, equipment, materials and additives shall comply with the ones indicated in the Project
documentation and shall be new.
The Contractor shall be able to replace the materials and products with the ones of similar or
analogous parameters and quality after its coordination with the managers of the project execution
supervision and technical maintenance as well as after the correction of the Technical Design, but the
Contractor shall be liable for the examination of comparability.
Any costs for the additional inspection and design related to the replacement of the materials with
analogous ones shall be reimbursed by the Contractor.
All materials, products and equipment shall be provided with the following:
- the details of the manufacturer, and the identification mark of the company;
0 06/2017 FOR THE CONSTRUCTION PERMIT, TENDER
REVISION DATE OF ISSUE REVISION STATUS. REASON FOR AMENDMENT (IF APPLICABLE)
QUAL. CERT.
DOC. NO.
“PANEVĖŽIO MIESTPROJEKTAS”, UAB
NAME OF THE BUILDING PROJECT CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
27845 PM MARIJUS PONOMARIOVAS DOCUMENT NAME
TECHNICAL SPECIFICATIONS
Revision
27845 SPM MARIJUS PONOMARIOVAS 0
LT
CLIENT
INFRASTRUCTURE DEVELOPMENT DEPARTMENT UNDER THE MINISTRY OF NATIONAL DEFENCE
DOCUMENT ID
P/6875 – 01 – TP – BD_TS
Page Pages
1 10
- specifications with the translation to Lithuanian language if the manufacturer is not a company of
the Republic of Lithuania;
- reference to whether it is intended for the interior or exterior;
- manufacturing date.
Project execution and technical maintenance managers shall have the right to refuse any material or
equipment without any additional costs to the Client in case it does not comply with the requirements of
the Specifications. In such case, the Contractor shall provide other materials and equipment which comply
with the Specifications.
All products and materials shall comply with the quality requirements set forth in the specifications
and drawings. All supplied products and materials shall be accompanied by the declarations of conformity.
The delivery of the products and materials shall be coordinated with the time schedule of the
construction works. The Contractor shall be responsible for the submission of the notifications regarding
defects. Any claims shall be filed to the supplier of the goods.
Products and building materials shall be stored on the Site in such a way as not to impair their
quality. The requirements for storage and the manufacturer's valid guidelines of each material and product
shall be observed.
Products and material shall be store on the construction site in suitable premises in such a way that
each material is placed properly and is easily accessible for inspection.
Materials, products and equipment damaged or otherwise impaired due to the operations on the
construction site shall be replaced by new ones at the Contractor's expense.
The Contractor shall take full responsibility for any loss or damage to materials and products.
3. TECHNICAL DOCUMENTATION
In case of any discrepancies or contradictions between the Project documents, the order of relevance
of the documents is as follows: Technical Specifications, Explanatory Notes, Drawings or Schemes, Lists
of Costs; however, the Contractor shall draw the Builder’s attention to any major discrepancies.
In case of any modifications in the regulations, legal documents, standards, and etc. during the
construction, the specifications and the drawing shall be considered as more relevant; however, the
Contractor shall notify the Builder of any such discrepancies before the commencement of works.
The Contractor himself shall not have any right to deviate from the drawings or specifications, make
any modifications in the technical design, carry out any additional works or change any building materials.
Such authorisation shall be issued only by the authorised representative of the Builder or the Builder himself
after the coordination of it with the manager of project execution supervision. The Builder shall be informed
about any modifications and additional works in writing before making any such alterations.
Drawing and other documentation shall be prepared in Lithuanian language.
The Contractor shall prepare and later on revise (update) the documentation set of the execution of
works. These documents shall be kept at the object at all times. Two copies of this set shall be presented to
the representative of the Builder (technical maintenance manager) before the commencement of the system
testing. After the construction works the Contractor shall prepare and submit to the Builder documentation
of the execution construction works with all modifications, additions, and etc. as well as adjustments in
kind.
Before the commencement of works the Contractor shall prepare the project for building
technologies in accordance with the solutions of the technical design. The prepared project for the building
technologies of the object, which shall indicate the terms and measures, ensuring the execution of the
construction works in accordance with the requirements of the project and the contract, for individual work,
shall be coordinated with the Builder.
The Contractor shall prepare the instructions for the use and maintenance, complying with the
Builder’s requirements and detailed enough for the Builder to be able to carry out proper maintenance,
dismantling, assembly, adjustments and repairs of the building and its systems, and submit to the Builder
upon the completion of works.
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – SA_TS
Page Pages Revision
2 10 0
The content of the instructions shall be as follows:
• Description of the safe exploitation;
• Technical dossiers of the equipment;
• Technical and usage details of the equipment;
• Documents of the inspection and tests results;
• Description of the technical service;
• Warranty obligations;
• Certificates and relevant authorisations to use in Lithuania;
• Lists of suppliers and subcontractors with their phone and fax numbers, and e-mail addresses.
The abovementioned documentation shall be submitted to the Builder upon handing-over in paper
format (1 copy). Foreign documentation shall be translated to Lithuanian language.
4. EXECUTION AND ORGANISATION OF CONSTRUCTION WORKS
4.1. General Principles
All works shall be carried out applying commonly used and requested work methods, employing
experienced and properly prepared specialists.
Construction works shall not be commenced without the Work Project approved by the Builder,
which shall comply with the solutions of the technical design.
Any equipment, technology, additives and construction methods shall comply with the requirements
of operational safety of the Republic of Lithuania.
In case the Contractor wishes to use a method which is different from the one indicated in the Project
documentation, the Contractor shall obtain the authorisation from the technical maintenance manager. The
change of work method shall not diminish the Contractor's responsibility at any level. Any costs for any re-
design due to the change of method shall be reimbursed by the Contractor.
The Contractor shall be responsible for the coordination of works with suppliers and subcontractors
on the Site. The Contractor shall prepare the work plan before the commencement of works and shall
coordinate it with the Client, and during the execution of works he shall ensure that the works are being
carried out properly and in accordance with the Project plan. Any works which are being carried out
repeatedly due to the negligence on this matter shall not be additionally reimbursed.
Managers and employees of the Contractor and subcontractors shall be trained in the set procedure.
All works shall be carried out in accordance with the solutions indicated in the project
documentation and instructions provided by the manufacturer as well as applying appropriate work
methods, and according to the useful know-how.
Work conditions and other factors affecting the execution of works shall be stipulated in advance.
It is essential to assess the order of the works, so that subsequent works would not impair the quality
of previously carried out works.
All measurements and sizes shall be established and indicated in such a manner that it is easy to use
them. Centre lines and altitudes shall be fixedly marked on immovable structures. The accuracy of the
measurements shall be verified.
The Contractor shall comply with all the provided requirements for construction errors.
The Contractor shall assess the possibility of accumulation of errors and shall ensure that they are
not adding up in one direction only.
The construction works shall comply with the measurement standards applicable in Lithuania.
All researches and tests stipulated in the technical specifications, regulations and standards of the
Republic of Lithuania shall be carried out.
The results shall be kept on the Site and later on submitted to the parties concerned for introduction.
In case the test results are worse than indicated in the requirements, the Contractor shall immediately
notify all parties concerned. In case the results are unsatisfactory and they have a direct impact on the work
results, the Contractor shall immediately notify the parties concerned about that, and organise a meeting for
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – SA_TS
Page Pages Revision
3 10 0
the adoption of the decisions regarding future organisation of works. If necessary, safety measures shall be
taken in order to prevent any damage or danger. Concealing of any test results shall constitute an
aggravating circumstance.
The Contractor shall provide all measures, instruments and carry out all works necessary for the
abovementioned tests and inspections.
Upon the Builder’s request, samples of products and materials referred to in the Specifications shall
be presented in the form acceptable to him before the commencement of works for approval.
The Contractor shall inform the technical maintenance manager on the Site when the quality of the
materials and works in various stages can be inspected before installing further structures or works.
Unfinished and completed parts of structures shall be protected against damage during further
works. They shall be protected against mechanical impact, dirt, corrosion, rain, moisture, snow, ice,
freezing, excessive heat and rapid drying.
Repairs shall be allowed only in cases, when such procedure is not weakening the structure and does
not damage the appearance.
In case a certain element to be repaired is made of profiled components, the damaged part can be
replaced with the new one. If the repaired element must be painted, the extent of painting shall be
coordinated with the Client.
When carrying out the works the Contractor shall:
a) arrange the supply and storage of water for any needs. Necessary supply of water for sanitary
and technical needs shall be arranged during the entire period of works until taking-over of them.
The Contractor shall arrange the accounting of water and settlement for consumption.
b) arrange the supply of electricity for any needs, its accounting and settlement for consumption.
Necessary supply of electricity shall be arranged during the entire period of works until taking-
over of them. It includes the assembly, exploitation, technical maintenance and re-assembly of
the equipment at the object until taking-over of the works.
c) arrange necessary illumination of the whole object as well as security and keeping watch on the
object until taking-over of it. It includes all necessary illumination equipment ensuring sufficient
illumination of the object and its immediate surroundings. The level of illumination shall comply
with the normative requirements.
The Contractor shall take care of any temporary buildings and access roads necessary for the
execution of works.
Operational safety measures shall comply with the normative requirements for safety technology in
construction. The Contractor shall follow the operational safety requirements during the construction until
the taking-over of the object in order to prevent incidents and accidents. The Contractor shall be responsible
for the operational safety at the object.
4.2. Execution of Works and Control
The Contractor shall coordinate the terms of construction works with the Builder and the engineer
of technical maintenance.
When carrying out the construction works:
- it shall be complied with normative requirements for safe work;
- structures of temporary fences shall be installed, places for the instalment shall be coordinated
with the engineer of technical maintenance. Temporary fences shall be installed and removed at
the expense of the Contractor.
The Contractor shall prepare the technological design basing on the solutions of the technical design,
which shall be coordinated with the Builder and the engineer of technical maintenance.
4.3. Other Aspects
Preparations for works
The submitted summary shall be interpreted together with the explanatory material and drawings of
other parts as well as the technical specifications provided in the tender documentation.
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – SA_TS
Page Pages Revision
4 10 0
The Contractor shall assess the works and ensure that all works necessary for the completion of the
object are included in the proposal.
The Site shall be prepared before the commencement of the construction works. First of all, the
construction territory shall be fenced, indicated engineering networks which could obstruct the execution
of the works shall be dismantled. The transferring of the remaining underground communications which
obstruct the construction shall be coordinated with the organisations which own these communications.
Temporary metering cabinet for the connection of the temporary electrical cable and laying out of all
necessary temporary communications shall be installed.
Water supply
The Contractor shall arrange the supply and storage of water for any needs. Necessary supply of
water for sanitary and technical needs shall be arranged during the entire period of works until taking-over
of them. It includes the assembly, exploitation, technical maintenance and re-assembly of the equipment at
the object as well as protection of all temporary pipelines from freezing. The Contractor shall arrange the
accounting of water and settlement for consumption.
Wastewater
The Contractor shall arrange the disposal of all wastewater at the object during the entire period of
works until taking-over of them. It includes the assembly, exploitation, technical maintenance and re-
assembly of wastewater equipment at the object as well as necessary protection of all temporary sewage
pipelines from freezing.
Electric power supply
The Contractor shall arrange the supply of electricity for any needs on the Site, its accounting and
settlement for consumption. Necessary supply of electricity shall be arranged during the entire period of
works until taking-over of them. It includes the assembly, exploitation, technical maintenance and re-
assembly of the equipment at the object until taking-over of the works.
Telephone and fax connection
The Contractor shall arrange separate telephone and fax lines for personal needs. All costs and
applications to the supplier of these services shall be included in the proposal.
Illumination and security
The Contractor shall arrange necessary illumination of the object as well as security and keeping
watch on the object until taking-over of it.
Temporary buildings
The Contractor shall arrange all temporary buildings necessary for the execution of works.
Operational safety
Operational safety measures shall comply with the normative requirements for operational safety in
construction. The Contractor shall follow the operational safety requirements during the construction until
the taking-over of the object in order to prevent incidents and accidents. The Contractor shall be responsible
for the operational safety at the object. General principles are indicated in part 5.
Authorisations
The Contractor shall obtain all necessary authorisations and approvals for the execution of the
constructions, except for the document permitting constructions.
Regulations and standards
Design and construction works, materials, testing, assembling and production methods shall comply
with the regulations and standards applicable in the Republic of Lithuania.
The successful tenderer shall submit the information about the materials and equipment intended to
be used or samples of such materials or equipment to the technical supervisor in timely manner. The
equipment and materials used on the Site shall be certified.
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – SA_TS
Page Pages Revision
5 10 0
Fire safety
Water for fire-fighting shall be used from the nearby water supply networks. Fire station (panel with
fire extinguishers and other fire protection inventor) shall be installed on the Site. The Contractor shall be
responsible for the fire safety of the object during the constructions.
Environmental protection
The Contractor shall be responsible for the environmental protection at the object and shall take all
the necessary measures in order not to breach any normative requirements for environmental protection.
5. OCCUPATIONAL SAFETY
5.1. General Principles
All occupational safety issues require following DT 5-00 “Rules for Safety and Health in
Construction”, STR 1.07.02:2005 “Ground Works”, “General Provisions for Workplace Establishment”,
“Provisions for Workplace Establishment in Construction”, “Safety and Health Instructions for Crane
Operator of Tracked, Wheeled, Car and Car-Type Cranes with Spec. Chassis”, “Safety and Health
Instructions for Lifting Crane Supervisor”, and other valid occupational safety documentation.
The Builder (Client) or the building project manager, the building construction manager, when more
than one contractor is included in the constructions, shall assign one or several safety and health
coordinators who shall ensure that all occupational safety and health requirements are provided, and shall
coordinate and control the fulfilment of the occupational safety and health requirements laid down in the
normative legislation during the construction works.
Before the commencement of the construction in the territory of the operating school, the Contractor
of the construction and the Head of the Company shall formalise a certificate-authorisation, which shall
indicate the measures, ensuring occupational safety.
The Builder (Client) or the building construction manager shall submit a prior notice on the
commencement of the construction to the territorial division of the State Labour Inspectorate no later than
10 calendar days before the commencement of the construction works.
Workers shall be introduced to the requirements of the technological design before the
commencement of works, a briefing shall be conducted, and the workers shall be provided with work
clothing, footwear, helmets, safety belts and other necessary equipment. Appointment-authorisation shall
be issued for the execution of works in hazardous areas, which are constantly exposed to the risk factors or
may be exposed to (may occur), regardless of the nature of the work under execution.
The building construction manager shall install (organise) a stand with information about the
building under construction near the construction land plot (Site).
All mechanisms, vehicles and equipment used in the construction shall be accompanied by the
dossier of the manufacturer, shall be in good working order and used for their intended purpose in
accordance with the recommendations of the manufacturer. They also shall comply with all requirements
laid down in the normative legislation.
When excavators are used for digging up the soil, workers are not allowed to work closer than 5
meters from the excavator swing radius. The excavator must be placed at least 2 meters from the excavation
edge with the excavator bucket lowered to the ground during the work breaks. The boom must be directed
precisely towards the moving direction when a single-bucket excavator is on the move, and the bucket must
be lowered 0, 5 – 0, 7 meters to the ground. The excavator must not move with the bucket full of soil. In
addition, it is forbidden to use the bucket of the excavator for lifting the oversized blocks of soil, logs,
beams, bundles of boards, and etc. Soil is to be poured into the vehicles only from the side or the back of
the excavator bodywork. When pouring the soil into the vehicle, workers are not allowed to stand in the
swing radius of the bucket.
Ground works in the existing underground communications areas are allowed only after receiving
a written authorisation from the organisations to which these communications belong. Routes of
underground communications shall be marked on the ground surface before digging up the soil. The
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – SA_TS
Page Pages Revision
6 10 0
construction manager shall manage and supervise the ground works in such area, and after the soil is dug
nearby electrical cables or any other lines of engineering networks, the representative of the organisations
responsible for such communications shall be present when carrying out the works. Digging up of electrical
cables and other engineering networks is allowed only using shovels and working really carefully.
In case any underground communications unmarked in the drawings are found, the soil shall not be
dug until a written authorisation from the organisation to which such communication belongs is obtained.
Digging up of wet sand, loess or bulk soil is not allowed before the reinforcement of the walls of
excavation. The construction manager shall constantly supervise the works when digging extremely damp
or wet soil, since the angle of natural fall of the soil alters upon the change of the humidity of the soil;
therefore, the slope of the excavations may slip down and fall upon the people working in the excavation.
The construction manager shall inspect the excavation and determine the condition of the soil before each
the beginning of each shift. If necessary, he shall take any measures to protect the workers against any
possible accidents at work.
Before lifting any structures, each element shall be inspected and appropriately prepared for that.
Marking of the element, the condition of the hooking elements, and fastening of the structure in the design
position shall be examined during the inspection.
Structures shall be suspended in accordance with the suspension schemes, provided in the
technological scheme.
Enclosed scaffolds shall be used for the mounting of structures.
The work supervisor shall directly manage the works when lifting non-standard loads without any
lifting loops, holes or marks indicating their lifting positions.
Removable suspension devices for structures and containers shall be marked, and their lifting
capacity and the testing date shall be indicated.
Structures shall be lifted only after the inspection of their level of security for hanging. For that
purpose a hitched structure shall be lifted to 30-40 cm height and inspected.
Rope guy lines are used for restraining lifted structures from swinging and spinning.
People are not allowed to stand on the structures which are being lifted, moved or lowered. The
structures shall not be left suspended or unfastened after the work or its interruption.
Structures shall be lifted and lowered smoothly, without any jolting.
Structure assembly–disassembly works shall not be carried out in the presence of the wind speed of
15 m/s or higher, in case of glazed frost, dense fog, during a storm or at the nigh time without illumination.
A team of installers shall be provided with reliable technological equipment (guy lines, struts,
installing tools). Movable installing ladders, landings and scaffolds shall be in good technical condition.
Potential risk factor areas shall be marked using warning signs. Pathways in the workplace and on
the entrance to it shall be installed at least of 0, 6 m of width and at least of 1, 8 m of height. Pathways and
workplaces in the height of 1, 3 m or higher shall be enclosed using temporary fences. Ladders with fences
or stairs shall be installed in the pathways with the slope of more than 20°. In case there are no fences,
safety belts shall be used. Routes, pathways and workplaces, where assembly – disassembly works are
being carried out, shall be illuminated with at least 30 lx, they shall not be obstructed and constantly cleaned.
Stepladders with handrails shall be installed for going up and down the trenches and pits.
Upon fulfilment of his obligations the employer shall implement all the measures ensuring that the
temporary work at height is being carried out safely, as if working under ergonomic conditions (not at
height). Pursuing this objective the employer shall choose such work equipment, which provide the best
guarantee for safe working conditions. Collective protection equipment shall be preferred over personal
protection equipment. Parameters of work equipment shall correspond to the nature of the work which is
to be carried out as well as possible load, and conditions for the workers to be able to move safely shall be
ensured. The most appropriate and the safest measures for accessing the temporary workplaces at height
shall be selected having regard to the frequency and duration of their use as well as the established lifting
height. In case of imminent danger, the selected measure shall be adapted for evacuation. Passage in either
direction between a means of access and platforms, scaffold decks or stairs must not give rise to any
additional risks of falling.
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – SA_TS
Page Pages Revision
7 10 0
Ladders for the work at height shall be used only when the use of safer devices is inappropriate due
to the low risk and short duration of use or due to any other features of the Site, laid down in the
Construction Project, which cannot be changed by the employer.
Depending on the type of selected work equipment, necessary measures, reducing the risk which is
posed by such type of work equipment and their use to the workers, shall be applied. If necessary, measures
preventing falling shall be installed. They shall be sufficiently firm and adapted to prevent from falling or
holding up when falling, and, to the possible extent, to be able to protect the workers from injury in case of
a fall.
Temporary work at height shall be carried out only when meteorological conditions do not pose any
risk to the safety and health of the workers.
In case there is no document with the calculations of the characteristics of the scaffolds available
before using scaffolds or in case the positioning of the intended structural elements is not provided in such
a document, the calculations of the solidity and stability of the scaffolds shall be carried out, except the
cases when the scaffolds are installed in accordance with the general references to the recognised standards.
Having regard to the complexity of the selected scaffolds, the work supervisor shall prepare the
project for their assembly, use and disassembly. A typical project supplemented with detailed instructions
for the construction of scaffolds, the assembly, disassembly and changing of their elements may be used.
Supporting components of the scaffolds shall be protected against slipping by attaching them to the
supporting surface using a special device or other measures preventing slipping; the surface supporting the
scaffolds and their load shall be sufficiently firm. The scaffolds shall be stable. Wheeled scaffolds shall be
protected against moving accidentally during work at a height.
The dimensions, form and layout of scaffolding decks must be appropriate to the nature of the work
to be performed and suitable for the loads to be carried and ensure safe work and passage. Scaffolding decks
must be assembled in such a way that their components cannot move in normal use. There cannot be any
dangerous gaps between separate deck components and vertical collective safeguards.
When the scaffolds are not prepared for use, i.e. when the scaffolds are being assembled, repaired,
dissembled or changed, they shall be marked using general warning signs in accordance with the
requirements of the provisions of the Use of Safety and Health Protection Signs in the Workplace (Official
Gazette, 1999, No. 104-3014), and they shall be fenced in order to prevent the workers from accessing the
hazardous area.
The scaffolds shall be assembled, repaired or relocated only under the supervision of the work
supervisor. Only such workers shall carry out this work, who are specifically trained to carry out these
works in the established procedure. These workers shall be introduced to:
1) the project for the assembly, disassembly or change (reassembly) of the selected scaffolds;
2) the safety requirements when assembling, using, disassembling or reassembling the scaffolds;
3) the used measures protecting people or items from falling;
4) the safety measures which must be followed in case of the change in meteorological conditions,
which can affect the scaffold compliance with safety requirements;
5) the permitted scaffold loads;
6) any other risk which can be related to the works of assembly, disassembly or reassembly of the
scaffolds, as well as to the potential risks when using scaffolds.
7) The supervisor and the persons carrying out the works shall be provided with the project for the
assembly and disassembly of the scaffolds with the instructions for assembly, use and
disassembly.
Areas for the disassembly-dismantling of the building structures shall be fenced using warning
barriers at the distance of at least 5 m from the edges of the disassembling structures.
Welding machines, electric cables, gas hoses, gas cylinders, and devices for connection of electric
welding apparatus to a power supply shall be in good working order and safe to use. Only an electrician or
a welder himself shall connect the electric welding apparatus to a power supply provided that he has
appropriate qualification and authorisation of responsible persons. Welding works at height are allowed to
be carried out only using scaffolds or tower platforms.
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – SA_TS
Page Pages Revision
8 10 0
If electric devices (drills, saws, and etc.) are to be used, they shall be in good working order. Electric
devices shall be protected from the outside in such a manner that no other bodies or water can access them,
and that a person is prevented from direct contact of parts carrying electrical current. The class of devices
shall comply with the conditions of their use (outside, hazardous and extremely hazardous premises).
Domestic premises (for resting, eating, changing, cleaning up, and etc.) shall be installed at the
construction object. First-aid-kit shall be available in the domestic premises. Primary fire-fighting measures
prepared in accordance with the applicable standards shall be available at the object.
Specific measures ensuring occupational safety are stipulated and described in the work technology
project.
5.2. The List of Potentially Hazardous Workplaces on the Site:
1. Works are being carried out at least 5 m from the ground, flooring or the deck surface, when
the main protection measure from falling is safety belt.
2. Excavation of soil in the excavations lower than 1, 5 m.
3. Work in the mechanism operation areas.
4. Work with operating electrical equipment, the alternating current of which is 50 Hz, voltage of
the alternating current – more than 42V, and of the direct current – more than 110V.
5. Fire-fighting, elimination of the results of emergency and natural disasters.
5.3. The List of Works with Noxious Substances and Dangerous Equipment:
1. Gas welding and cutting works.
2. Electric welding.
3. Fastening of structures and components using foam gun.
4. Painting works in enclosed premises using bitumen and stove varnish, nitrocellulose paint and
lacquer containing benzoyl, toluene, compound alcoholic and harmful chemical substances as
well as the components of such paint.
5. Work with gas flame equipment when carrying out coil coating or its repairs.
5.4. Hazardous Areas on the Site:
1. Near non-insulated equipment parts carrying electrical current.
2. Unfenced areas at height, when the height is more than 1, 3 m.
3. Where the concentration of hazardous and/or noxious substances in the air of the workplace
may exceed the limits.
4. Areas near the buildings under construction and the structures or equipment which are being
assembled (disassembled).
5. Areas with the works of assembly (disassembly) of structures or equipment carried out above.
6. Areas with the loads being lifted and transported with lifting cranes above.
7. Where machinery or parts of them and work equipment is on the move.
6. COMPLETION OF THE BUILDING CONSTRUCTION
The Contractor shall organise the completion of the building construction in accordance with STR
1.11.01:2010 “Completion of Construction” and shall invite the Builder in order to obtain the certificate of
the completion of the building construction.
The Contractor shall prepare the documentation indicated in STR 1.11.01:2010 “Completion of
Construction” as well as any other necessary documentation and submit it to the Commission of the
Completion of the Building Construction.
Upon handing over of the works the Contractor shall provide the sets of the certificates of all used
materials, structures and equipment, technical dossiers and other information, certificates of the covered
works, supplementary drawings and any other documentation, which the state supervisory authorities and
organisations issuing technical conditions will request in accordance with the laws and regulations of the
Republic of Lithuania.
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – SA_TS
Page Pages Revision
9 10 0
During the construction works the Contractor shall obtain and continuously keep a logbook of the
construction works of the form established in Lithuania.
The Contractor shall submit the set of exploitation and maintenance instructions for further
exploitation of the building and external equipment.
All subcontractors and their material and equipment are subject to the abovementioned requirements.
Documentation shall be complied in files and managed under the content.
All instructions for use and drawings shall be in Lithuanian language.
Covered building structures, components and construction works shall be presented to the Builder
for acceptance and appropriate entries into the logbook of the construction works shall be made. In case of
failure to do so, the Builder shall have the right to request that the covering material or its parts are removed.
The costs resulting from the failure to comply with the procedures shall be covered by the Contractor even
in such case when the covered work is properly completed.
The Contractor shall assume administrative, civil and criminal liability established by the laws of
the Republic of Lithuania for consequences of poorly performed construction works during the construction
period and the building warranty period established in the Contract (starting with the date of the recognition
of the building as suitable for exploitation), but not shorter than:
1) 5 years for construction, electricity and mechanical works performed on buildings, structures;
2) 10 years for installation works of concealed building elements;
The Contractor undertakes to repair the defects caused by inadequate quality of works, poor
structures, and inappropriate materials urgently during the warranty period at its own expense.
Defects which may cause inconvenience or additional damage shall be rectified immediately. In
case defects are found or occurred during the exploitation of the building, the Builder shall inform the
Contractor about them in writing and shall indicate the term for the remedy of defects. The final inspection
shall be carried out one year after the moment of taking over of the building. The liabilities of the Contractor
shall include the remedy of all defects and deterioration, except those caused by inappropriate exploitation.
All remedy works shall be carried out by the Contractors or the suppliers under the proper
supervision of the Contractor.
All works shall be carried out in accordance with the project requirements, appropriate work
methods and quality standards.
The Contractor shall ensure the warranty service of the installed equipment during the warranty
period of such installed equipment on standard business hours. The warranty service shall include all repair,
unit change, transportation and loading costs, related to the travelling due to the provision of the services
during the period indicated in the Tender Proposal.
Final cleaning works include:
- cleaning of the floor in accordance with the manufacturer’s instructions;
- removing of protective packaging of the heating radiators;
- cleaning of toilet fittings, water supply pipes, valves, drainage holes on the floor and odour
collectors;
- cleaning of the heating radiators and pipes, hot water valves;
- cleaning of the fittings;
- lubrication of hinges, locks and latches with oil, if there was no opportunity to oil them when
installing;
- cleaning of the windows;
- complete management of the territory of the object or any other territory the Contractor was
allowed to use.
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
P/6875 – 01 – TP – SA_TS
Page Pages Revision
10 10 0
Project – “Construction Project for the Special Purpose Building (Warehouse) at General Silvestras
Žukauskas Training Area, Mažalotė vill. 9, Pabradė Eldership, Švenčionys Distr.”
Client – Infrastructure Development Department under the Ministry of National Defence Designer – “Panevėžio miestprojektas”, UAB Project Manager – Marijus Ponomariovas
REPORT ON THE COORDINATION OF THE SOLUTIONS OF THE PROJECT PARTS
Order
No. Project Components SPM/Qual. Certif. No. Signature
1. General Considerations (BD) Marijus Ponomariovas /
Qual. Certif. No. 27845 /Signature/
2. Site Plan (SP) Arvydas Narkevičius /
Qual. Certif. No. A1291 /Signature/
3. Architecture (SA) Arvydas Narkevičius /
Qual. Certif. No. A1291 /Signature/
4. Structures (SK) Sofija Jučytė /
Qual. Certif. No. 4049 /Signature/
5. Water Supply and Waste Water Utilities
(VN)
Regina Podėnienė /
Qual. Certif. No. 4099 /Signature/
6. Heating, Ventilation and Air Conditioning
(ŠVOK)
Lina Janulevičienė /
Qual. Certif. No. 17859 /Signature/
7. Gas Pipeline (D) Regina Podėnienė /
Qual. Certif. No. 4099 /Signature/
8. Electrical Engineering (E) Vilmantas Štaupas /
Qual. Certif. No. 12135 /Signature/
9. Electronic Communications (ER) Vilmantas Štaupas /
Qual. Certif. No. 12135 /Signature/
10. Fire Alarm (GSS) Vilmantas Štaupas /
Qual. Certif. No. 12135 /Signature/
11. Process Control and Automation (PVA) Vilmantas Štaupas /
Qual. Certif. No. 12135 /Signature/
12. Heat Production and Supply (ŠG) Lina Janulevičienė /
Qual. Certif. No. 17859 /Signature/
13. Construction Cost Estimation (KS) Vita Vienažindienė /
Qual. Certif. No. 12537 /Signature/
/Emblem of organisation/ STATYBOS PRODUKCIJOS
SERTIFIKAVIMO CENTRAS
State Enterprise “Statybos produkcijos sertifikavimo centras”, company code 110068926, Linkmenų str. 28, LT-08217 Vilnius
QUALIFICATION
CERTIFICATE
No. 27845
Marijus Ponomariovas
Personal number 38011230682
The right to hold the position of the manager of the special building project and the manager
of the supervision of the execution of the special building project is granted.
Buildings: residential and non-residential buildings; transport communications: roads (streets);
engineering networks: water supply, heating supply, waste water utilities; other engineering
structures.
Director /Signature/ Robertas Encius
/Seal: The Republic of Lithuania * Vilnius * State enterprise * SPSC * Statybos produkcijos
sertifikavimo centras/
Issued on the 28th of October, 2016
First issued on the 29th of November, 2011 Qualification certificate register is published on www.spsc.lt
1715
2
PRIVATE LIMITED LIABILITY COMPANY “PANEVĖŽIO MIESTPROJEKTAS”
ORDER
REGARDING THE APPOINTMENT OF THE PROJECT MANAGER
21st of November, 2016 No. V-15/2
Panevėžys
Marijus Ponomariovas (qualification certificate No. 27845) is hereby appointed to be the
Manager of the Technical Project for the Construction of the Special Purpose Building (I, IV Supply
Class Warehouse) at General Žukauskas Training Area, Švenčionys Distr. Muni., Pabradė Eldership, in
accordance with the Contract for the Services of Construction Design and Project Execution Supervision
of the 2nd of November, 2016.
The obligations and rights of the Building Project Manager are described in STR 1.05.06:2010
“Building Design”.
Director /Signature/ Vytautas Sukackas
I have read:
M. Ponomariovas /Signature/
WORK GROUP FOR PREPARATION OF THE PROGRAM TASK, FORMED UNDER
THE ORDER NO. V-1095 OF THE MINISTER OF NATIONAL DEFENCE OF THE
29TH OF OCTOBER, 2015
APPROVE
Vice-Minister for Resources,
Finance, Infrastructure and
Communications
Ramūnas Usonis (name, surname)
/Signature/ (signature)
PROGRAM TASK
FOR PREPARATION OF THE DESIGN PROPOSALS FOR THE CONSTRUCTION OF
THE WAREHOUSE (AT GENERAL SILVESTRAS ŽUKAUSKAS TRAINING AREA,
ŠVENČIONYS DISTR. MUNI., PABRADĖ ELDERSHIP)
12th of January, 2016 No. 21 VL-8
Vilnius
(city)
1. Project name: Construction Project for the Special Purpose Building at General Silvestras
Žukauskas Training Area, Švenčionys Distr. Muni., Pabradė Eldership, Meškerinė vill.”
2. Total area:
2.1. of the building under reconstruction – N/A.;
2.2. of the reconstructed building – N/A.;
2.3. of the building under major repair works – N/A.;
2.4. area of the new building under construction – approximately 920 m2, precise measurements
of the area will be established after the preparation of the design proposals.
3. Legal registration of the object:
3.1. document for the site delimitation – Decision No. 237 of the Board of Švenčionys Distr.
as of 28/09/2000;
3.2. Agreement on Lease of the State-Owned Land – the state-owned land is being used on a
fiduciary basis in accordance with the Resolution No. 545 of the Government of the Republic of
Lithuania of 12/05/2000 and the Order No. 3779-86 of the County Governor of 03/11/2000;
3.3. marking of the land plot registered in the Register of Real Property and the rights to it –
unique No. 8638-0004-0008, register No. 86/8887;
3.4. marking of the building registered in the Register of Real Property and the rights to it –
N/A.
4. Basis for the Program Task:
4.1. Guidance for the Planning of National Defence System for 2016-2021;
4.2. Order No. V-1095 “Regarding the Formation of the Work Group for Preparation of the
Design Tasks, Related to the Construction of the Buildings of the General Silvestras Žukauskas
Training Area of the Lithuanian Armed Forces” as of the 29th of October, 2015.
5. Number of employees requiring a workplace – 10.
6. Maximum number of people in the building – 30, of which:
2
6.1. 25 men;
6.2. 5 women.
7. Working premises (Annex No. 2):
7.1. facilities for the shooting ranges exploitation unit No. 11:
7.1.1. workplaces – 10;
7.1.2. computer workstations – 4;
7.1.3. sets of furniture No. 4 – 10 units;
7.1.4. printer – 1 piece.
8. Specialised premises (Annex No. 2):
8.1. Warehouse premises No. 1 of approximately 180 m2, where the following shall be
intended:
8.1.1. metal shelving appropriate for the storage of 100 pieces of equipment. Shelving shall be
designed to have 3 (three) shelves with an option to alter the height of the shelves every 5 cm.
Dimensions of one piece of the equipment to be stored (length L x width W x height H) – 1500 x 700
x 500 mm, weight – approximately 160 kg. The equipment is intended to be loaded manually and
stored on the floor, on the 1st and the 2nd shelves. The top (the 3rd) shelf is to be a spare one for the
storage of oversized or currently unforeseen equipment, loading it using electric forklift;
8.1.2. electric installation (220V) for charging the batteries of lifters (50 outlets in the perimeter
of the premises);
8.2. Warehouse premises No. 2 of approximately 144 m2, where the following shall be
intended:
8.2.1. metal shelving appropriate for the storage of 100 pieces of equipment. Shelving shall be
designed to have 3 (three) shelves with an option to alter the height of the shelves every 5 cm or less.
Dimensions of one piece of the equipment to be stored (L x W x H) – 750 x 400 x 300 mm, weight –
approximately 20 kg. The equipment is intended to be loaded manually and stored on the floor, on
the 1st and the 2nd shelves. The top (the 3rd) shelf is to be a spare one for the storage of oversized or
currently unforeseen equipment, loading it using electric forklift;
8.2.2. to provide for electric installation (220V) for charging the batteries of lifters (100 outlets
in the perimeter of the premises);
8.3. Warehouse premises No. 3 of approximately 50 m2, where metal shelving for the storage
of paper targets shall be intended. Shelving shall be designed to have 3 (three) shelves with an option
to alter the height of the shelves every 5 cm or less. Dimensions of the packaging of paper targets to
be stored (L x W x H) – 1000 x 1000 x 300 mm, weight – up to 20 kg;
8.4. Warehouse premises No. 4 of approximately 72 m2, where metal shelving (taking up
approximately 30 percent of the warehouse area) with adjustable shelves for the storage of bottled
water, and a place to store goods on euro pallets (taking up approximately 50 percent of the warehouse
area) shall be intended;
8.5. Warehouse premises No. 5 of approximately 72 m2, where metal shelving (taking up
approximately 30 percent of the warehouse area) with adjustable shelves for the storage of dry food
rations, and a place to store goods on euro pallets (taking up approximately 50 percent of the
warehouse area) shall be intended;
8.6. Warehouse premises No. 6 (12 units) of approximately 20 m2 each, where metal shelving
(taking up approximately 30 percent of the warehouse area) with adjustable shelves for the storage
of the material valuables of the unit, and a place to store goods on euro pallets (taking up
approximately 50 percent of the warehouse area) shall be intended;
8.7. Equipment technical maintenance and minor repairs premises No. 7 (non-permanent
workplaces) of approximately 84 m2 parallel to the warehouse premises No. 1 and No. 2. 2 (two)
workplaces (non-permanent), where the following shall be intended:
8.7.1. electric installation for connection of at least 10 pieces of domestic devices, power
ventilation systems;
3
8.7.2. necessary inventory:
8.7.2.1. work tables with metal table tops and lockable metal drawers (1960 x 600 x 890 mm)
– 2 pieces;
8.7.2.2. lockable cabinets for tools (1000 x 435 x 1090 mm) – 2 pieces;
8.7.2.3. cabinets for tools on wheels with lockable metal drawers (765 x 465 x 825) – 4 pieces;
8.7.2.4. a trolley for the equipment (L x W) 1500 x 800 mm, permitted load 400 kg, with metal
corrugated surface – 2 pieces;
8.8. Technical premises No. 8 of approximately 20 m2 with separate entrance from outside,
where electrical input and a place for the storage of the fire-fighting and economic inventory as well
as electric forklift shall be intended;
8.9. Battery charging premises No. 10 of approximately 8 m2 parallel to the Equipment
technical maintenance and minor repairs premises No. 7, where the following inventory shall be
provided:
8.9.1. shelving appropriate for the storage of 30 pieces of alkaline batteries (100 Ah);
8.9.2. battery charger(-s) suitable for simultaneous charging of 20 pieces of alkaline batteries
(100 Ah);
8.10. Sanitary unit for employees No. 9.
9. Stored valuables, equipment according to the groups:
9.1. Target lifters and control modules;
9.2. Paper targets;
9.3. Bottled water (on euro pallets);
9.4. Dry rations (on euro pallets);
9.5. Dry rations (in boxes);
9.6. Radio stations, mobile modules of battle management systems;
9.7. Protection nets, camouflage nets, wheel chains for wheeled/tracked vehicles;
9.8. Additional protection for armoured vehicles (metal sheets);
9.9. Sets of 10-person tents and outdoor beds;
9.10. Euro pallets;
9.11. Barb wire;
9.12. Timber (logs up to 3 m of length);
9.13. Other valuables of the unit, which do not require specific conditions for storage.
10. Requirements for the setting up of the building:
10.1. General requirements:
10.1.1. to intend the sloping roof and external walls of the building to be installed using
prefabricated and prefabricated modular structures;
10.1.2. to intend the installation of the premises with regard to the purpose of the premises,
stored material valuables and intended activities there;
10.1.3. to intend a necessary amount of industrial sectional (power-operated) roller gates with
technical means for the access to the services by bulky, heavy and light vehicles having regard to the
layout of the warehouse premises in the building/s and the location on the Site. To intend an
emergency opening method in the event of a power supply interruption;
10.1.4. to intend separate entrances to the warehouse premises near the access gates to the
warehouse premises;
10.1.5. to foresee that electric forklift (1,9 x 1,2 m) with lifting power up to 2 t, lifting height
up to 3 m, will be used for loading/unloading;
10.1.6. to intend the possibility to serve all warehouse premises with the electric forklift, to
plan lockable gates/doors on the route of the forklift between the warehouse premises;
10.1.7. not to plan any thresholds on the entrances/exits to/from the premises;
10.2. Requirements for the premises:
4
10.2.1. relative air humidity in the storage premises of target lifters, equipment and their control
modules No. 1 and No. 2 and paper targets storage premises No. 3 shall not be more than 30 %;
10.2.2. relative air humidity in the premises (except for the ones mentioned in the clause 10.2.1)
shall not be more than 70 %;
10.2.3. to intend the floors in the premises which are resistant to physical effects (vehicle is
described in the clause 10.1.5);
10.2.4. to intend coverings with regard to the purpose of the premises: hermetic, not accumulating
dust and moisture;
10.2.5. to intend wired fire alarm system with the option to control it from the premises of the
staff on duty in the barrack building (Annex No. 1).
10.3. Requirements for the access:
10.3.1. to plan a cargo lot with hard (concrete) pavement, designed to provide access to the
wheeled vehicles. Maximum axle load for a single wheeled (four-axle) vehicle – up to 6 t;
10.3.2. to intend loading/unloading ramp of 1 m of height near the building with the availability
to approach/departure on/off the ramp and resistant to physical effects as well as providing great
manoeuvring options for the vehicle described in the clause 10.1.5;
10.3.3. to intend the access road to the building of hard concrete pavement, coordinating it with
the construction solutions of the stage I;
10.3.4. to foresee the possibility to install an additional heating system in the premises for the
storage of the material valuables No. 6 in accordance with a separate project.
11. Installation of security systems – will be implemented in accordance with a separate project.
12. Installation of the radio and television – N/A.
13. Means of communication – to intend a telephone connection in the working premises,
described in the clause 7, in accordance with the table:
Order
No. User
Number of telephones
local connected to KATT
1. Specialists of the shooter range
exploitation unit - 1
Total: - 1
14. Computerisations of workplaces – to intend the computer network in the working premises,
described in the clause 7, in accordance with the table:
Order
No. User
Number of computers
connected to the unit
network (LAN)
connected to the NDS
network (WAN)
1. Specialists of the shooter range
exploitation unit 2 2
Total: 2 2
15. Category of the electric power supply:
15.1. current – III;
15.2. required – III.
16. Specific requirements for the installation of the engineering systems of the building:
16.1. to intend all engineering systems, necessary for the functioning of the building and safe
exploitation with regard to the purpose of the building, safety requirements, activities and
requirements for the premises;
5
16.2. to intend a separate energy resources accounting for the warehouse building;
16.3. to foresee the possibility to connect autonomous power supply source (diesel generator);
16.4. to intend air ventilation system, which shall ensure and maintain regulatory air quality in
accordance with the purpose of the premises, microclimate, energy supply, and the features of
exploitation regime. Natural ventilation system shall be applied when designing the ventilation
system;
16.5. to foresee the heating supply source and the heating system for the building (except for
the warehouse premises No. 6) after the assessment of the most economic option in respect of the
exploitation;
16.6. to plan the illumination of the building premises;
16.7. to provide for electric installation and energy-saving lamps.
17. Specific requirements for the engineering buildings, ensuring the functioning of the
building:
17.1. to assess the engineering networks currently present in the territory, their capacities, and
to foresee the possibility to connect the engineering systems of the building to them;
17.2. to intend the laying out of communication channels with intermediate manholes every 50
m to the premises of the staff on duty in the barrack building (Annex No. 1);
17.3. to plan the illumination of the accesses and entrances to the building during the hours of
darkness. To intend the control of the illumination to be by the light sensor and lighting control switch
at the premises of the staff on duty;
17.4. to provide for the protection of the building and equipment against lightning and static
electric charge. All electrically conductive parts of technological devices must be grounded,
regardless of whether other protective measures against static charge are being used;
17.5. to provide for the management of the territory surrounding the building;
17.6. to renew the pavements of the transport communications in the area of the territory under
management;
17.7. to provide for rainwater drainpipes from the building and the territory around the building;
17.8. to provide for the management of the pavements, damaged during the construction works.
18. The need to carry out geological engineering and geotechnical researches – to carry out
all researches as defined in STR 1.04.02:2011 “Geological Engineering and Geotechnical
Researches”.
19. Content of the Design Proposals:
19.1. description of the designed building and its adjacencies as well as conditions: location of
the building construction, terrain, type of construction, purpose of the building, category of the
building, other necessary data;
19.2. short description of the construction site: buildings located on the site, engineering
networks and equipment, greenery, geological and hydrogeological conditions, sanitary and
ecological situation, surrounding buildings;
19.3. description of current engineering systems and evaluation of their usage options;
19.4. description of the engineering networks and transport communications present on the
construction site, and evaluation of their usage options;
19.5. short description and substantiation of the necessary to be carried out/ carried out
researches;
19.6. description of the planning solution of the building (premises) in functional
(technological) terms, and the plans (schemes) of the building (premises);
19.7. description of future foundations, floors, ceilings, claddings, roof, retaining walls and
other load-bearing structures of the building, and their schemes;
6
19.8. construction products intended to be used for the floors, walls, partitions, doors, roof, and
the finishing of the building and other building elements;
19.9. information about heating, ventilation and air conditioning systems intended to be
installed in the building, and their principal schemes;
19.10. short description of the intended electrical engineering, electronic communications and
security (fire) alarms solutions in the building, and their schemes;
19.11. information about the intended engineering systems solutions;
19.12. description of the site management, transport communications and other buildings, and
the principal schemes of the layout as well as the description of the future impact on the environment;
19.13. indicative, substantiated price of the construction of the building (buildings).
20. Legislation defining specific requirements for the setting up of the building in NDS:
20.1. Order No. V-1074 of the Minister of Health of the Republic of Lithuania of the 23rd of
September, 2015 “Regarding the Amendment of the Order No. V-568 of the Minister of Health of
the Republic of Lithuania of the 11th of August, 2004 “Regarding the Lithuanian Hygiene Norm HN
56:2004 “Military Territory. Rules on Building Setting up and Maintenance””;
20.2. Order No. 19 of the Commander of the Armed Forces of the Republic of Lithuania of
12/01/2001 “Regarding the Preparation of Sheets on Furniture and Economic Inventory of the
Divisions of the Lithuanian Armed Forces”;
20.3. Order No.V-809 of the Minister of National Defence of the Republic of Lithuania of
10/08/2015 “Regarding the Approval of the Requirements for Installation of Communications and
Computer Networks and Repealing of the Order No. V-237 of the Minister of National Defence of
the Republic of Lithuania of 02/03/2001 “Regarding the Requirements for Installation of
Communications and Computer Networks””.
ATTACHED:
1. Scheme of the Territory of the 1st Military Cantonment of GSŽTA (Annex No. 1), 1 page.
2. Principal Scheme of the Warehouse (Annex No. 2), 1 page.
Notes:
1. To intend demolition of the buildings, if necessary, in the area of the construction of the building.
2. The solutions upon preparing the design proposals shall be coordinated with the Client and the
designing company, which prepares the technical projects of the 1st development stage for the site
management of the territory of the 1st military cantonment of the General Silvestras Žukauskas
Training Area of the Lithuanian Armed Forces and the construction of outdoor engineering networks
and buildings.
Team Manager /Signature/ Major Vidas Šilaika (signature) (name, surname)
COORDINATED
Program Coordinator
Colonel Danas Mockūnas (name, surname)
(signature)
…… of December, 2015
Annex No. 1
PROGRAM TASK FOR PREPARATION OF THE DESIGN PROPOSAL FOR THE
CONSTRUCTION OF THE WAREHOUSE (AT GENERAL SILVESTRAS ŽUKAUSKAS
TRAINING AREA, ŠVENČIONYS DISTR. MUNI., PABRADĖ ELDERSHIP)
SCHEME OF THE TERRITORY OF THE 1ST MILITARY CANTONMENT OF GSŽTA
PRELIMINARY SCHEME FOR THE DEVELOPMENT OF THE 1ST MILITARY CANTONMENT OF
GSŽ TRAINING AREA
Premises of the
staff on duty (in the
building 51O1b)
Intended
warehouse
location
Headquarters
Canteen
Sanitary units
Warehouse (MILES)
Warehouse (administrative)
Barracks (150 + MED)
Gas storage facility
Wastewater treatment equipment
Water borehole
CURRENTLY EXPLOITED BUILDINGS
Barracks
Formation square
Technology fleet
Hangar for heavy tracked equipment
Carwash with the place for a gas station
Ammunition/explosives storage place
Warehouse (for companies)
Warehouse (DFR/water)
Warehouse (targets/lifters)
Garage with repair shop
Pass checkpoint
Outdoor camp (1000 soldiers)
Multifunctional headquarter staff training building
Sports complex
Vehicle parking lots
Intended new routes
HELIPAD
Fence
PLANNED INFRASTRUCTURE
For administration For training
An
nex N
o.
2
PR
OG
RA
M T
AS
K F
OR
PR
EP
AR
AT
ION
OF
TH
E D
ES
IGN
PR
OP
OS
AL
FO
R T
HE
CO
NS
TR
UC
TIO
N O
F T
HE
WA
RE
HO
US
E (
AT
GE
NE
RA
L S
ILV
ES
TR
AS
ŽU
KA
US
KA
S
TR
AIN
ING
AR
EA
, Š
VE
NČ
ION
YS
DIS
TR
. M
UN
I.,
PA
BR
AD
Ė E
LD
ER
SH
IP)
PR
INC
IPA
L S
CH
EM
E O
F T
HE
WA
RE
HO
US
E
RA
MP
VE
HIC
LE
AC
CE
SS
LO
T
RO
AD
INFRASTRUCTURE DEVELOPMENT DEPARTMENT
UNDER THE MINISTRY OF NATIONAL DEFENCE
APPROVE
Director of the Infrastructure Development
Department under the Ministry of National
Defence
/Signature/
Lt. Col. Vidas Šilaika
BUILDING DESIGN TASK
19th of April, 2017 No. 1P-14
Vilnius
1. Building (Project) name – Construction Project for the Special Purpose Building
(Warehouse) at General Silvestras Žukauskas Training Area, Mažalotė vill. 9, Pabradė Eldership,
Švenčionys Distr.
2. Stages of the Building Project preparation – technical and work projects.
3. The scope of the design services – according to the Contract for the Services of Construction
Design and Project Execution Supervision No. 16P-49 (5.5) of the 2nd of November, 2016.
The content of the Technical Project and the level of detail (completeness) of the solutions of its
parts shall comply with the requirements of the Annex No. 8 of STR 1.04.04:2017 “Structure Design,
Project Expertise”.
The content of the Work Project and the level of detail (completeness) of the solutions of its parts
shall comply with the requirements of the Annex No. 9 of STR 1.04.04:2017 “Building Design”.
4. Prepared (received) Building Project preparation documents:
4.1. Program Task for Preparation of the Design Proposals for the Construction of the Warehouse
(at General Silvestras Žukauskas Training Area, Švenčionys Distr. Muni., Pabradė Eldership) No.
21VL-8 of the 12th of January, 2016 (hereinafter – the Program Task);
4.2. Extract from the Central Databank of the Register of Real Property. Register No. 86/8887.
Unique No. of the land site 8638-0004-0008;
4.3. Land Site Plan.
4.4. Topographic Image of January of 2017, Scale 1:500;
4.5. Letter of the Logistics Command of the Lithuanian Armed Forces No. S-83 “Regarding the
Submission of Information” of the 7th of February, 2017;
4.6. Letter of the Infrastructure Development Department under the Ministry of National Defence
No. IS-222 (1.19) “Regarding the Conditions for Connection” of the 21st of February, 2017 with the
attached document (Conditions for Connection No. TS17-05499 of the 17th of February, 2017);
4.7. Letter of the Infrastructure Development Department under the Ministry of National Defence
No. IS-476 (1.19) “Regarding the Design Proposals” of the 10th of April, 2017, under which the
prepared Design Proposals have been approved;
4.8. Geological engineering researches carried out in 2017;
4.9. Design Proposals No. P/6875-01-PP prepared in February of 2017 (hereinafter – the Design
Proposals).
5. The requirements of the Builder (technical specifications): the design solutions shall
comply with the requirements of the Program Task and the essential solutions of the coordinated
Design Proposals No. P/6875-01-PP.
5.1. Functional (purpose) and use (exploitation) indicators:
5.1.1. Main intended use of the building – special;
5.1.2. Number of floors in the building – 1;
2
5.1.3. Area of the building development, general area and volume – in accordance with the
Design Proposals;
5.1.4. Stored valuables, equipment according to the groups – in accordance with clause 9 of the
Program Task;
5.1.5. Number of employees requiring a workplace – 10;
5.1.6. Maximum number of people in the building – 30, of which: 25 men, 5 women;
5.1.7. Category of the electric power supply – III;
5.1.9. Type of Construction – construction of a new building;
5.1.10. Category of the building – Special Building.
5.2. Requirements for setting up of the building (its parts, engineering networks and other
structures located in the territory): indicated in the documents attached to this Building Design Task.
It is necessary to provide for the fixing, reconstruction of the coverings and engineering structures,
which might be damaged during the construction works, when preparing technical and work projects.
The connection of the building to the modular transformer substation shall be designed as well as the
modular transformer substation and its connection to the overhead electric line of 10 kV.
5.3. Security requirements for the protected territory: none.
5.4. Requirements for the protection of immovable cultural properties: none.
5.5. Technical, architectural, quality and other solution requirements according to the
parts of the Building Project:
5.5.1. The content of the Technical Project and the level of detail (completeness) of the solutions
of its parts shall comply with the requirements of the Annex No. 8 of STR 1.04.04:2017 “Structure
Design, Project Expertise”.
5.5.2. Lists of the Amounts of Costs shall be included in the content of each individual project
part (prepared in accordance with the requirements of STR 1.01.04:2017 “Structure Design, Project
Expertise”, with the references of each position of the lists to the specific ID of the part of the technical
specifications);
5.5.3. The requirements indicated in the Program Task must be followed when preparing
architectural, structural and other solutions;
5.5.4. To ensure the fulfilment of the need for engineering networks and engineering systems,
which corresponds to the needs of the people exploiting the building as well as the conditions of the
stored/protected valuables, and the fulfilment of the requirements laid down in the normative technical
documents of the construction and the normative building safety and purpose documents;
5.5.5. The designed buildings shall comply with the essential building requirements;
5.5.6. The Technical Project shall be prepared in compliance with the specific requirements
issued by the municipality;
5.5.7. Technical specifications (technical requirements) of all the construction and installation
works intended to be carried out in the building as well as the used materials, products (bought), goods
and equipment shall be included in the content of each individual project part with the references to
the normative documents, by establishing and indicating warranty terms for the equipment used in the
building, which are not related to the requirements of the part 1 of article 4 of the law of the Republic
of Lithuania (except for the devices, which are concealed in the building structures).
5.6. Order of the building design and construction – in accordance with the Annex No. 3
“Timetable for the Execution of the Contract” of the Contract.
5.7. Coordination of the Building Project with the NDS units and other subjects:
5.7.1. the Client;
5.7.2. future user of the building;
5.7.3. other institutions in the procedure laid down in the legislation of the Republic of Lithuania.
5.8. Requirements for formalisation, completion and submission of the Building Project to
the Builder:
5.8.1. The Project shall be formalised and completed in the procedure laid down in LST 1516;
3
5.8.2. to submit 2 copies of each file of the prepared Technical Project in paper form (additionally
1 copy in PDF format on the digital media (CD)) for the general expertise;
5.8.3. of the revised Technical Project according to the notes of the general expertise:
5.8.3.1. files of the general considerations – 3 copies of each in paper form;
5.8.3.2. files of the construction cost estimation – 3 copies of each in paper form;
5.8.3.3. files of all other revised parts of the Technical Project – 5 copies of each in paper form;
5.8.3.4. parts (solutions) of the revised Technical Project – 2 copies of each on the digital media
(CD). Of which 1 copy, formed in accordance with requirements of STR 1.05.01:2017 “Documents
allowing Construction. Completion of Construction. Suspension of Construction. Elimination of
Results of Arbitrary Construction. Elimination of Results of Construction resulting from Illegal
Issuance of Documents allowing Construction” (for obtaining of the document allowing construction);
5.8.4. files, formed in accordance with STR 1.01.04:2017 “Structure Design, Project Expertise”
within 10 (ten) days from the moment the Client informs the Designer about completed construction
works, with all amendments, supplements and corrections of the building project, carried out during
the period of all construction works (by preparing a new document (-s) of the revised Design Solutions)
– 4 copies of each in paper form (additionally 1 copy of the solutions of the technical work project on
the digital media);
6. Data on the equipment selected or owned by the Builder: not available.
7. Other requirements and data: not available.
ATTACHED:
1. Copy of the Program Task with the documents attached to it, 8 pages in total.
Head of the Construction Organisation Division
of the Infrastructure Development Department
under the Ministry of National Defence /Signature/ Arūnas Bėta (signature) (name, surname)
/Stamp: “Panevėžio miestprojektas”, UAB
Project Manager and
Project Execution Supervision Manager
Marijus Ponomariovas
Building Project Manager /Signature/ Certificate No. 27845/
(signature) (name, surname) (certificate No., date)
“Energijos Skirstymo
Operatorius”, AB
Headquarters Contact details
“Energijos skirstymo operatorius” Client information phone 1802 Company code 304151376
Aguonų str. 24 Tel. (8 5) 277 7524 VAT code: LT100009860612
03212 Vilnius, Lithuania Fax. (8 5) 277 7514 Registrar “Centre of Registers”, PI
www.esco.lt E-mail: [email protected]
CONDITIONS FOR CONNECTION NO. TS17-05499 Prepared: 17/02/2017,
Valid until: 16/02/2020
Client: GARRISON BASE SERVICE OF THE LOGISTICS COMMAND OF THE LITHUANIAN
ARMED FORCES
Contact data of the Client: Mindaugo str. 26, Vilnius, 03215, +37065216584,
Name of the Object: Warehouse structure/building/premises
Address of the Object: Meškerinė Vill., Pabradė Eldership, Švenčionys Distr. Muni.
Investment project No.: E1N7705499
Data of the Client’s
Application No. 17-05499
Category of the Security of Electrical
Power Supply
Type of Extension
Cord (single-phase,
three-phase) I II III
Current permissible power to
be used (kW): - - -
New permissible power to be
used (kW): - - 350 Three-phase
Total permissible power to
be used (kW): - - 350 Three-phase
1. These Conditions for Connection are issued for the connection of the Client’s Object, located in
Meškerinė Vill., Pabradė Eldership, Švenčionys Distr. Muni., to the distribution system of “ESO”, AB.
Optimal connection point has been selected for the connection of the electrical equipment of the Object,
having regard to the technical and economic indicators.
2. The border of the exploitation of the property and assets is determined to be on the connection
terminals of the user’s cables by the current measurement transformers.
3. Actions of the Client in carrying out the connection of the Object:
3.1. To prepare a Project for connection of the electrical equipment in accordance with the technical
solutions indicated in the clause 4 of these Conditions for Connection. The Project shall comply with the
requirements of STR “Building Design” as well as the requirements of the Strategy for Technological
Development of the Network of the Company and the Company for technical and work projects, which
are published on the website www.eso.lt. You can apply to the design companies having appropriate
qualification for the preparation of the Project. You can contact the customer service by phone 1802, via
E-mail [email protected] or go to the most conveniently accessed Company’s Customer Service Centre “Gilė”
(addresses of the Customer Services Centres – www.eso.lt. Contacts / Customer Service Centres “Gilė”)
regarding the technical information necessary for the preparation of the Project and the contact of the
responsible personnel in the Company. Refer the number of these Conditions and the municipality in
which the designed object is located when applying.
3.2. To submit the prepared Project (printed in 2 copies, digital version of it saved on CD or USB flash
drive (drawings and schemes in DWG files in AUTOCAD-2007 form, other documents in PDF files))
to the most conveniently accessed Company’s Customer Service Centre “Gilė” (addresses of the
Customer Services Centres – www.eso.lt. Contacts / Customer Service Centres “Gilė”).
3.3. To sign the Connection Services Agreement and pay the connection services fee, indicated in the
Agreement. You can sign the Agreement on the website www.manogile.lt or at the most conveniently
“Energijos Skirstymo
Operatorius”, AB
Headquarters Contact details
“Energijos skirstymo operatorius” Client information phone 1802 Company code 304151376
Aguonų str. 24 Tel. (8 5) 277 7524 VAT code: LT100009860612
03212 Vilnius, Lithuania Fax. (8 5) 277 7514 Registrar “Centre of Registers”, PI
www.esco.lt E-mail: [email protected]
accessed Company’s Customer Service Centre “Gilė” (addresses of the Customer Services Centres –
www.eso.lt. Contacts / Customer Service Centres “Gilė”). After the Company receives the signed
Connection Services Agreement and the payment indicated the Connection Services Agreement, it will
organise the selection of the contractor and will provide the connection service approximately within 60
calendar days after the signing of the Connection Works Contract Agreement with the contractor winning
public procurement. Term for the provision of the connection service may change with respect to the
technical solution of the prepared Project, seasonal nature of the works or in case of alteration of the
provisions of the requirements of the legislation.
3.4. To install the electric line (hereinafter – the Input) from the internal electric distribution board of the
Object to the commercial metering cabinet, which shall be installed as defined in clause 4 of these
Conditions for Connection, in accordance with the requirements of the General Rules for the Installation
of Electrical Equipment. You can contact the companies with appropriate qualification for the
installation of the Input.
3.5. To perform an assessment of the technical condition of the electricity network of the Object and the
input up to the property borders with the Company. The Client shall submit the scheme of the electricity
network of the Object, resistance measurement protocols as well as any other regulatory documents to
the State Energy Inspectorate (hereinafter – SEI). Electricity network of the Object is ready to be
connected to the electricity network of the electricity operator when an inspector of SEI, in case there
are no fault to be found, authorises it by issuing a certificate on the assessment of the technical condition
of the installed electrical equipment. More information is available on the website www.vei.lt
3.6. It is recommended to install local technical measures (voltage stabilisers, self-contained power
sources and etc.), reducing voltage fluctuations, and short and long power interruptions, for all electrical
equipment for which especially stable electricity supply or transmission, i.e. greater stability of
electricity supply or transmission (voltage) than it is established in the provisions of the standard LST
EN 50160 “On Voltage Characteristics of Electricity Supplied by Public Distribution Systems”, is
necessary due to the complex industrial processes. Installation of the technical measures is established
by the provisions of the clause 86 of the Rules for Electricity Supply and Consumption, approved by the
Order No. 86 of the Minister of Energy of the 4th of December, 2013, “Consumer (Except for Residential
Consumers) shall Install Technical Measures, Necessary for Safe Suspension of Technological Processes
and Preventing Potential Damages or Maximum Reduction of Loss”. More information is available on
www.eso.lt.
4. Technical solutions for electricity network on the side of “Energijos skirtsymo operatorius”, AB
4.1. To install modular terminal transformer (hereinafter – MTT) of 1x630 kVA on the load centre. The
following shall be installed in the MTT:
4.1.1. Electric switchgear of 10 kV with a single linear cage by installing linear power separator of 10
kV, power separator with fuses in the power transformer cage of 10 kV;
4.1.2. one power transformer of 630 kVA;
4.1.3. a switchgear of 0, 4 kV with dedicated buses;
4.1.4. to design a knife-switch fuse box with fuses of 630 A and current measurement transformers of
600/5 A on that part of a bus section, from which the object of a new consumer will be connected;
4.1.5. to design at least two knife-switch fuse boxes of necessary parameters for the connection of the
consumer’s object;
4.1.6. to intend two reserve locations for the installation of knife-switch fuse boxes on that part of a bus
section, which is going to be without the meters.
“Energijos Skirstymo
Operatorius”, AB
Headquarters Contact details
“Energijos skirstymo operatorius” Client information phone 1802 Company code 304151376
Aguonų str. 24 Tel. (8 5) 277 7524 VAT code: LT100009860612
03212 Vilnius, Lithuania Fax. (8 5) 277 7514 Registrar “Centre of Registers”, PI
www.esco.lt E-mail: [email protected]
4.2. To install a commercial metering cabinet (hereinafter – CMC) of necessary parameters with
electricity meters as well as the automated electricity metering system controller on the external wall of
the MTT (at the place which is easily accessible to the Client and “ESO”, AB personnel).
4.3. To intend cable lines of necessary cross-sectional dimension for the connection of the CMC to the
current measurement transformers.
4.4. To connect the MTT from the overhead line L-300 (hereinafter – OL) of 10 kV from Pabradė TS
(hereinafter – TS) by connecting it between the supports No. 305/18-20. To install vertical overhead line
separator in the current or newly established support. To lay a 10 kV cable line of 50 mm2 cross-sectional
dimension for the connection.
NOTE: Technical conditions TS16-45381 for power increase have been issued. It must be assessed
when preparing the Project, since the location and the conditions of the connection may change.
5. Other information
5.1. You can observe the process of electricity connection on the self-service website www.manogile.lt,
in the tab “Applications and Requests” (orig. Paraiškos ir prašymai), of “Energijos skirtsymo
operatorius”, AB.
More relevant information regarding further steps in connection of electrical equipment as well as other
services provided by “Energijos skirtsymo operatorius”, AB is available on www.eso.lt or you can call
a customer service phone 1802 for more information.
The calls are subject to the taxes in accordance with the rate or payment plan applied by your service
provider.
Approved by Senior Engineer KUNDROTAS TOMAS /Signature/
Prepared by Engineer STANKEVIČIUS MINDAUGAS /Signature/
THE REPUBLIC OF LITHUANIA [ ORDER ]
GOVERNOR OF
VILNIUS COUNTY
03/11/2000 No. 3779-86
Regarding the Specification of the Land Plot Areas Vilnius
Granted to the Ministry of National Defence
and the Alteration of the Main Intended Land Use
in the District of Švenčionys
In accordance with the articles 6, 30, 31, 43 of the Law on Land of the Republic of Lithuania,
Decision No. 545 “Regarding the Military Training Areas and Military Training Territories of the
Lithuanian Armed Forces” of the Government of the Republic of Lithuania of 12/05/2000, Decision No.
205 “Regarding the Procedure for Land Evaluation” of the Government of the Republic of Lithuania of
24/02/1999, Decision No. 1073 “Regarding the Determination and Alteration of the Main Intended Land
Use” of the Government of the Republic of Lithuania of 29/09/1999, Decision No. 1278 “Regarding the
Approval of the Procedure for Establishment, Registration and Repealing of the Servitude of Land” of the
Government of the Republic of Lithuania of 27/09/1995, and the Resolution No. 237 of Švenčionys
District Board of 28/09/2000,
I HEREBY ORDER:
1. To specify the total area – 2221.1544 ha, of which: forestry land – 1237.9546 ha, and the land
for other uses – 983.1998 ha, of the land site No. 1 of the Ministry of National Defence (Central Training
Area of the Lithuanian Armed Forces), located in Švenčionys District, Pabradė Eldership, Mažalotė
Village, after geodetic measurements of the land have been carried out by the State Land Management
Institute, PI.
2. Upon the request of the Ministry of National Defence to allow to change the main intended
land use of seventy six state land plots No. 1-76 with the total area of 1237.9546 ha in Švenčionys District,
Pabradė Eldership, Mažalotė Village granted to the Ministry – from the forestry land to the land for other
uses (for the use of the Central Training Area of the Lithuanian Armed Forces).
Non-indexed value of the land plot for other uses No. 1 of total area of 2221.1544 ha – LTL
9722529.0.
3. To determine that the land plot is not being used for agricultural activities, but for other special
purpose: for the exploitation of administrative-industrial and other purpose buildings, and training area.
The percentage of the development of the land plot, the height of the development and other requirements
and conditions – in accordance with the detailed plans of individual territories of the training area.
4. To the ministry of National Defence:
4.1. to follow the requirements of the clauses I, II, VI, XXVI, XXVII, XXVIII, XXIX, XXX,
XXXV, XLIV (XL, XLI Molinė Reserve Area), and XVII of the Decision No. 343 of the Government of
the Republic of Lithuania of 12/05/1992 (revision of the Decision No. 1640 of 29/12/1995 and the
Decision No. 531 of 06/05/1995 of the Government of the Republic of Lithuania);
4.2. to establish a servitude in two road Meškerinė-Švenčionėliai sections of local significance: in
the first one, the area of which is 0.9857 ha, identified in the land site plan, scale 1:1000, by numbers and
letters 247-248-A-13-358-357-367-366-365-364-C-180-D-E-F-G-347-346-H-1, and in the second one,
the area of which is 0.4720 ha, identified in the land site plan, scale 1:10000, by numbers and letters 117-
117-J-K-86-L-M-N-116, permitting a free pass to other persons;
4.3. to follow the procedure laid down in the decisions of the Government of the Republic of
Lithuania when carrying out the construction works.
The County Governor A. Vidūnas
/Seal: Administration of the Governor of Vilnius County * For Documents/
8860184
/Translation from Lithuanian/
STATE ENTERPRISE THE CENTRE OF REGISTERS
Vinco Kudirkos Str. 18-3, 03105 Vilnius, tel. (8 5) 2688 262, fax (8 5) 2688 311, E-mail: [email protected]
EXTRACT FROM THE CENTRAL DATABANK OF THE REGISTER OF REAL PROPERTY
01/12/2016 14:23:28 1. Property registered in the Register of Real Property:
Register No.:
Type of Register:
Formation date:
Address:
Register administrator:
86/8887
Land plot with buildings
16/11/2000
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill. 9
Vilnius Branch of the State Enterprise Centre of Register 2. Immovable items: 2.1.
Unique No. of the item:
Land plot cadastral number and cadastral area
name:
Main use purpose of the item:
Land plot use:
Land plot area:
Forest land are:
Road area:
Built-up area:
Extent of water bodies:
Area of other land:
Agricultural land ratio:
Measurement type:
Indexed value of the land plot:
Indexed value of the land plot without forest:
Indexed value of the forest:
Indexed value of the forest stands:
Value of the land plot:
Value of the plot without forest land and stands:
Value of the forest land and stands:
Value of the forest stands:
Cadastral record date:
Land Plot
8638-0004-0008
8638/0004:8 Meškerinė Vill.
Other
Territories for the purposes of national defence
2221.1544 ha
1237.9546 ha
4.7818
29.4268 ha
7.5264 ha
941.4648 ha
34.9
Land plot formed during cadastral measurements
EUR 5455131
EUR 2107779
EUR 3347352
EUR 1424683
EUR 2815839
EUR 1317362
EUR 1498477
EUR 296809
16/11/2000
2.2.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Building – Personal Hygiene Building
8695-9011-6498
Services
42L1g
2000
100%
Municipal central heating
Municipal water supply
Municipal wastewater removal
Not available
Metal with framework
Metal
1
377.97 m2
362.08 m2
1480 m3
407.00 m2
EUR 35671
0 %
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
EUR 35671
EUR 7134
Reinstatement value
23/08/2000
23/08/2000
2.3.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Building – Technical Station
4400-1455-5664
Other
46H1p
2000
100%
Municipal central heating
Municipal water supply
Municipal wastewater removal
Not available
Blocks
Metal
1
142.53 m2
91.79 m2
535 m3
184.00 m2
EUR 52745
0 %
EUR 52745
EUR 10549
Reinstatement value
07/12/2000
07/12/2000
2.4.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Building – Personal Hygiene Building
8695-9011-6489
Services
47L1g
2001
100%
Municipal central heating
Municipal water supply
Municipal wastewater removal
Not available
Metal with framework
Metal
1
376.07 m2
332.30 m2
1491 m3
411.00 m2
EUR 35871
0 %
EUR 35871
EUR 3587
Reinstatement value
08/03/2001
08/03/2001
2.5.
Unique No. of the item:
Main use purpose of the item:
Building – Special Purpose Building
4400-2836-3706
Special
Plan notation:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
60O2/p
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.6.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
4400-2836-4483
Special
65O1/p
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.7.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
4400-2836-2901
Special
67O0/t
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.8.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
4400-2836-4207
Special
68O1/p
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.9.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
4400-2836-4394
Special
69O2/p
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.10.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Total area:
Main area:
Volume:
Cadastral record date:
Building – Garage with Repair Shop
4400-2224-3698
Garage
Permitted to carry out construction works
Under formation
2011
0 %
903.16 m2
839.54 m2
5940 m3
28/06/2011
2.11.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-2978
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.12.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
4400-2836-2989
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.13.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-2990
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.14.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-3020
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.15.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-3275
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.16.
Unique No. of the item:
Main use purpose of the item:
Condition:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-3320
Special
Permitted to carry out construction works
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Under formation
2013
0 %
09/10/2013
2.17.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-3331
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.18.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-3542
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.19.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
4400-2836-3575
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.20.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-3604
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.21.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-3742
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.22. Building – Special Purpose Building
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-3810
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.23.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-3820
Special
Permitted to carry out construction works
Under formation
2013
09/10/2013
2.24.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
4400-2836-3886
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.25.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
4400-2836-3900
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.26.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-3912
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.27.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
4400-2836-3920
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.28. Building – Special Purpose Building
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-4236
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.29.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
4400-2836-4250
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.30.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-4283
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.31.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-4430
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.32.
Unique No. of the item:
Main use purpose of the item:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-4518
Special
Under formation
2013
0 %
09/10/2013
2.33.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-4530
Special
Permitted to carry out construction works
Under formation
2013
Completeness percentage:
Cadastral record date:
0 %
09/10/2013
2.34.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-4572
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.35.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
4400-2836-4661
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.36.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Cadastral record date:
Building – Special Purpose Building
4400-2836-4672
Special
Permitted to carry out construction works
Under formation
2013
0 %
09/10/2013
2.37.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Building category:
Completeness percentage:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Other Engineering Structures – Pavement
4400-2760-3823
Other engineering structures (yard equipment)
b1, b2, b3
2012
2013
1st group, non-complex
100%
EUR 14568
0 %
EUR 14568
EUR 1019
Reinstatement value
23/07/2013
23/07/2013
2.38.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Length:
Material:
Gas Networks - Low-Pressure Gas Pipeline Route
4400-2760-3601
Gas networks
D, r5, r6
2012
2013
100%
157.41 m
Polyethylene
Gas pipeline standing:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Input
EUR 18536
0 %
EUR 18536
EUR 18536
Reinstatement value
23/07/2013
23/07/2013
2.39.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Length:
Gas pipeline standing:
Cadastral record date:
Gas Networks – Liquefied Gas Networks
4400-2224-3798
Gas networks
Permitted to carry out construction works
Under formation
2011
0 %
140.00 m
Input
28/06/2011
2.40.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Length:
Material:
Water supply line standing:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Water Supply Networks – Cold Water Supply Route
4400-2760-3689
Water supply networks
V1
2012
2013
100%
234.62 m
Polyethylene
Input
EUR 17870
0 %
EUR 17870
EUR 17870
Reinstatement value
23/07/2013
23/07/2013
2.41.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Length:
Water supply line standing:
Cadastral record date:
Water Supply Networks – Water Supply Networks
4400-2224-3700
Water supply networks
Permitted to carry out construction works
Under formation
2011
0 %
185.00 m
Input
28/06/2011
2.42.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Length:
Material:
Wastewater line standing:
Wastewater Removal Networks – Rainwater Drainage Route
4400-2760-3789
Wastewater removal networks
KL
2012
2013
100%
31.26 m
Poly(vinyl chloride)
Output
Wastewater line type:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Collective
EUR 1376
0 %
EUR 1376
EUR 1376
Reinstatement value
23/07/2013
23/07/2013
2.43.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Length:
Material:
Wastewater line standing:
Wastewater line type:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Wastewater Removal Networks – Domestic Sewage Route
4400-2760-3712
Wastewater removal networks
KF1, KF2
2012
2013
100%
189.67 m
Poly(vinyl chloride)
Output
Collective
EUR 9036
0 %
EUR 9036
EUR 9036
Reinstatement value
23/07/2013
23/07/2013
2.44.
Unique No. of the item:
Main use purpose of the item:
Condition:
Status:
Year of commencement of construction:
Completeness percentage:
Length:
Wastewater line type:
Cadastral record date:
Wastewater Removal Networks – Domestic Sewage Networks
4400-2224-3776
Wastewater removal networks
Permitted to carry out construction works
Under formation
2011
0 %
168.00 m
Collective
28/06/2011
2.45. Appurtenance:
Belonging part:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Building – Club House
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
4400-0779-0630
Leisure
48K1p
1985
1985
100%
Municipal central heating
Municipal water supply
Municipal wastewater removal
Not available
Bricks
Metal
1
217.55 m2
191.69 m2
834 m3
198.00 m2
Coordinate X:
Coordinate Y:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
6104974.07
619027.17
EUR 90941
5 %
EUR 86307
EUR 21606
Mass valuation
18/01/2006
18/01/2006
Building – Barracks of the Central Training Area with a
2.46. Appurtenance:
Belonging part:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Coordinate X:
Coordinate Y:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
General Practitioner’s Room
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
4400-1251-3503
Special
51O1b
2006
2007
100%
Municipal central heating
Municipal water supply
Municipal wastewater removal
Not available
Blocks
Metal
1
1997.77 m2
1228.64 m2
9527 m3
2388.00 m2
6100850
614577
EUR 1443177
0 %
EUR 1443177
EUR 173193
Reinstatement value
15/11/2007
15/11/2007
2.47. Appurtenance:
Belonging part:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Other Engineering Structures – Access Road with a Lot
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
4400-1300-2450
Other engineering structures
d
2007
2007
100%
EUR 65744
0 %
EUR 65744
EUR 7878
Reinstatement value
15/11/2007
15/11/2007
2.48. Appurtenance: Other Engineering Structures – Water Gutter
Belonging part:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
4400-1300-2481
Other engineering structures
l
2007
2007
100%
EUR 614
0 %
EUR 614
EUR 74
Reinstatement value
15/11/2007
15/11/2007
2.49. Appurtenance:
Belonging part:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Other Engineering Structures – Fire Water Tank
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
4400-1300-2516
Other engineering structures
r
2007
2007
100%
EUR 5995
0 %
EUR 5995
EUR 718
Reinstatement value
15/11/2007
15/11/2007
2.50. Appurtenance:
Belonging part:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Other Engineering Structures – Arbour
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
4400-1251-3772
Other engineering structures (yard equipment)
52l1ž
2007
2007
100%
EUR 163
0 %
EUR 163
EUR 20
Reinstatement value
15/11/2007
15/11/2007
2.51. Appurtenance:
Belonging part:
Description/notes:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Other Engineering Structures – Lot
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
Area (1236 m2)
4400-1993-9943
Other engineering structures (yard equipment)
a1, p1, p2
2002
2004
Completeness percentage:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
100%
EUR 85148
25 %
EUR 64006
EUR 2563
Reinstatement value
20/11/2009
20/11/2009
2.52. Appurtenance:
Belonging part:
Description/notes:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Length:
Material:
Gas pipeline standing:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Gas Networks – High-Pressure Gas Pipeline
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
Length of the pipeline (361.56 m), four gas tanks (r1, r2, r3, r4)
4400-1993-9954
Gas networks
1-2
2002
2004
100%
361.56 m
Steel
Distributive (district)
EUR 35623
17 %
EUR 30120
EUR 30120
Reinstatement value
20/11/2009
20/11/2009
2.53. Appurtenance:
Belonging part:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Length:
Material:
Gas pipeline standing:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Gas Networks – Gas Supply Pipeline
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
4400-1317-5054
Gas networks
1-7
2007
2007
100%
98.91 m
Steel
Distributive (district)
EUR 1969
0 %
EUR 1969
EUR 1969
Reinstatement value
23/11/2007
23/11/2007
2.54. Appurtenance:
Belonging part:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Water Supply Networks – Water Supply Network Pipeline
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
4400-1317-4979
Water supply networks
V
2007
2007
100%
Length:
Material:
Water supply line standing:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
131.00 m
Plastic
Distributive (district)
EUR 9152
0 %
EUR 9152
EUR 9152
Reinstatement value
23/11/2007
23/11/2007
2.55. Appurtenance:
Belonging part:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Length:
Material:
Water supply line standing:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Water Supply Networks – Cold Water Supply Pipeline
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
4400-1993-9976
Water supply networks
1-5
2002
2004
100%
394.80 m
Polyethylene
Distributive (district)
EUR 49815
20 %
EUR 39678
EUR 39678
Reinstatement value
20/11/2009
20/11/2009
2.56. Appurtenance:
Belonging part:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Length:
Material:
Wastewater line standing:
Wastewater line type:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Wastewater Removal Networks – Wastewater Network Pipeline
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
4400-1317-4835
Wastewater removal networks
KF
2007
2007
100%
140.08 m
Plastic
Distributive (district)
Collective
EUR 9731
0 %
EUR 9731
EUR 9731
Reinstatement value
23/11/2007
23/11/2007
2.57. Appurtenance:
Belonging part:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Wastewater Removal Networks – Wastewater Network Pipeline
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
4400-1317-4946
Wastewater removal networks
KF
2007
Year of completion of construction:
Completeness percentage:
Length:
Material:
Wastewater line standing:
Wastewater line type:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
2007
100%
128.76 m
Plastic
Distributive (district)
Collective
EUR 7559
0 %
EUR 7559
EUR 7559
Reinstatement value
23/11/2007
23/11/2007
2.58. Appurtenance:
Belonging part:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Length:
Material:
Wastewater line standing:
Wastewater line type:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Wastewater Removal Networks – Sanitary Sewer Pipeline
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
4400-1994-0008
Wastewater removal networks
1-3
1970
2004
100%
729.30 m
Poly(vinyl chloride)
Distributive (district)
Collective
EUR 61110
17 %
EUR 50973
EUR 50973
Reinstatement value
20/11/2009
20/11/2009
2.59. Appurtenance:
Belonging part:
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Depth:
Material:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Drilled Water Well (Borehole) – Artesian Borehole No. 39741
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
4400-1993-9998
Water Supply Networks
art
2004
2004
100%
78 m
Poly(vinyl chloride)
EUR 15205
25 %
EUR 11411
EUR 11411
Reinstatement value
20/11/2009
20/11/2009
2.60. Appurtenance:
Belonging part:
Description/notes:
Unique No. of the item:
Sewage Treatment Plant – Sewage Treatment Devices
1/1 belongs to the land plot No. 8638-0004-0008, described in
cl. 2.1.
With sanitary sewer pipeline (length 127.80 m)
4400-1994-0020
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Completeness percentage:
Material:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Wastewater removal networks
6, 4-5
2002
2004
100%
Poly(vinyl chloride)
EUR 43733
17 %
EUR 36203
EUR 36203
Reinstatement value
20/11/2009
20/11/2009
3. Appurtenances of the item from the other register: no records
4. Ownership:
4.1.
Owner:
Item:
Basis for registration:
Record valid:
Ownership Right
REPUBLIC OF LITHUANIA, Entity ID No. 111105555
Other structures No. 4400-2760-3823, described in cl. 2.37.
Gas networks No. 4400-2760-3601, described in cl. 2.38.
Water supply networks No. 4400-2760-3689, described in cl. 2.40.
Wastewater removal networks No. 4400-2760-3712, described
in cl. 2.43.
Wastewater removal networks No. 4400-2760-3789, described
in cl. 2.42.
Declaration on Completion of Construction/Alteration of Use
Purpose No. 4 of 02/10/2014
From 07/10/2014
4.2.
Owner:
Item:
Basis for registration:
Record valid:
Ownership Right
REPUBLIC OF LITHUANIA, Entity ID No. 111105555
Other structures No. 4400-1993-9943, described in cl. 2.51.
Gas networks No. 4400-1993-9954, described in cl. 2.52.
Water supply networks No. 4400-1993-9976, described in cl. 2.55.
Wastewater removal networks No. 4400-1994-0008, described
in cl. 2.58.
Borehole No. 4400-1993-9998, described in cl. 2.59.
Sewage Treatment Plant No. 4400-1994-0020, described in cl.
2.60.
Certificate on Recognition of the Building as Suitable for
Exploitation No. 100-149 of 21/12/2004
From 22/12/2009
4.3.
Owner:
Item:
Basis for registration:
Record valid:
Ownership Right
REPUBLIC OF LITHUANIA, Entity ID No. 111105555
Building No. 8695-9011-6498, described in cl. 2.2.
Certificate on Acceptance of the Building for Exploitation No.
100-593 of 04/09/2000
Order No. 232 of 01/03/2001
Handing-Over Certificate of 02/04/2001
From 20/10/2009
4.4.
Owner:
Item:
Basis for registration:
Ownership Right
REPUBLIC OF LITHUANIA, Entity ID No. 111105555
Building No. 8695-9011-6498, described in cl. 2.4.
Certificate on Acceptance of the Building for Exploitation No.
100-49 of 23/03/2001
Order No. 1088 of 10/07/2002
Record valid:
Order No. V-557 of 16/06/2008
From 20/10/2009
4.5.
Owner:
Item:
Basis for registration:
Record valid:
Ownership Right
REPUBLIC OF LITHUANIA, Entity ID No. 111105555
Building No. 4400-1251-3503, described in cl. 2.46.
Other structures No. 4400-1251-3772, described in cl. 2.50.
Other structures No. 4400-1300-2450, described in cl. 2.47.
Other structures No. 4400-1300-2481, described in cl. 2.48.
Other structures No. 4400-1300-2516, described in cl. 2.49.
Gas networks No. 4400-1317-5054, described in cl. 2.53.
Water supply networks No. 4400-1317-4979, described in cl. 2.54.
Wastewater removal networks No. 4400-1317-4835, described
in cl. 2.56.
Wastewater removal networks No. 4400-1317-4946, described
in cl. 2.57.
Certificate on Recognition of the Building as Suitable for
Exploitation No. STN-04-080117-0002 of 17/01/2008
Order No. V-231 of 19/03/2008
From 12/01/2009
4.6.
Owner:
Item:
Basis for registration:
Record valid:
Ownership Right
REPUBLIC OF LITHUANIA, Entity ID No. 111105555
Building No. 4400-1455-5664, described in cl. 2.3.
Certificate on Recognition of the Building as Suitable for
Exploitation No. 100-943 of 29/12/2000
Order No. 377 of 22/03/2001
Handing-Over Certificate
From 17/12/2007
4.7.
Owner:
Item:
Basis for registration:
Record valid:
4.8.
Owner:
Item:
Basis for registration:
Record valid:
Ownership Right
REPUBLIC OF LITHUANIA, Entity ID No. 111105555
Building No. 4400-0779-0630, described in cl. 2.45.
Order No. 306 of the Incorporator of 24/03/2000
Handing-Over Certificate No. 11 of 07/08/2000
Certificate on Recognition of the Building as Suitable for
Exploitation No. (100)-164 of 31/12/2004
From 07/08/2006
Ownership Right
REPUBLIC OF LITHUANIA, Entity ID No. 111105555
Land plot No. 8638-0004-0008, described in cl. 2.1.
Resolution No. 545 of the Government of the Republic of
Lithuania of 12/05/2000
Order No. 3779-86 of the County Governor of 03/11/2000
From 16/11/2000
5. The trust right of the State and Municipal Land:
5.1. The trust right of the State Land
Trustee: Ministry of National Defence of the Republic of Lithuania,
Entity ID No. 188602751
Item: Land plot No. 8638-0004-0008, described in cl. 2.1.
Basis for registration: Resolution No. 545 of the Government of the Republic of
Lithuania of 12/05/2000
Order No. 3779-86 of the County Governor of 03/11/2000
Record valid: From 16/11/2000
6. Other property rights:
6.1.
Trustee:
Item:
Basis for registration:
Record valid:
Property Trust Right
Lithuanian Armed Forces, Entity ID No. 188732677
Other structures No. 4400-2760-3823, described in cl. 2.37.
Gas networks No. 4400-2760-3601, described in cl. 2.38.
Water supply networks No. 4400-2760-3689, described in cl. 2.40.
Wastewater removal networks No. 4400-2760-3712, described
in cl. 2.43.
Wastewater removal networks No. 4400-2760-3789, described
in cl. 2.42.
Declaration on Completion of Construction/Alteration of Use
Purpose No. 4 of 02/10/2014
From 07/10/2014
6.2.
Trustee:
Item:
Basis for registration:
Record valid:
Property Trust Right
Lithuanian Armed Forces, Entity ID No. 188732677
Other structures No. 4400-1993-9943, described in cl. 2.51.
Gas networks No. 4400-1993-9954, described in cl. 2.52.
Water supply networks No. 4400-1993-9976, described in cl. 2.55.
Wastewater removal networks No. 4400-1994-0008, described
in cl. 2.58.
Borehole No. 4400-1993-9998, described in cl. 2.59.
Sewage Treatment Plant No. 4400-1994-0020, described in cl.
2.60.
Certificate on Recognition of the Building as Suitable for
Exploitation No. 100-149 of 21/12/2004
From 23/12/2009
6.3.
Trustee:
Item:
Basis for registration:
Record valid:
Property Trust Right
Lithuanian Armed Forces, Entity ID No. 188732677
Building No. 8695-9011-6489, described in cl. 2.4.
Certificate on Acceptance of the Building for Exploitation No.
100-49 of 23/03/2001
Order No. 1088 of 10/07/2002
Order No. V-557 of 16/06/2008
From 10/20/2009
6.4.
Trustee:
Item:
Basis for registration:
Record valid:
Property Trust Right
Lithuanian Armed Forces, Entity ID No. 188732677
Building No. 8695-9011-6498, described in cl. 2.2.
Certificate on Acceptance of the Building for Exploitation No.
100-593 of 04/09/2000
Order No. 232 of 01/03/2001
Handing-Over Certificate of 02/04/2001
From 10/20/2009
6.5.
Trustee:
Item:
Basis for registration:
Property Trust Right
Lithuanian Armed Forces, Entity ID No. 188732677
Building No. 4400-1251-3503, described in cl. 2.46.
Other structures No. 4400-1251-3772, described in cl. 2.50.
Other structures No. 4400-1300-2450, described in cl. 2.47.
Other structures No. 4400-1300-2481, described in cl. 2.48.
Other structures No. 4400-1300-2516, described in cl. 2.49.
Gas networks No. 4400-1317-5054, described in cl. 2.53.
Water supply networks No. 4400-1317-4979, described in cl. 2.54.
Wastewater removal networks No. 4400-1317-4835, described
in cl. 2.56.
Wastewater removal networks No. 4400-1317-4946, described
in cl. 2.57.
Certificate on Recognition of the Building as Suitable for
Record valid:
Exploitation No. STN-04-080117-0002 of 17/01/2008
Order No. V-231 of 19/03/2008
From 12/01/2009
6.6.
Trustee:
Item:
Basis for registration:
Record valid:
Property Trust Right
Second Investigation Department under the Ministry of
National Defence of the Republic Of Lithuania, Entity ID No.
188651524
Building No. 4400-1455-5664, described in cl. 2.3.
Certificate on Recognition of the Building as Suitable for
Exploitation No. 100-943 of 29/12/2000
Order No. 377 of 22/03/2001
Handing-Over Certificate
From 17/12/2007
6.7.
Trustee:
Item:
Basis for registration:
Record valid:
Property Trust Right
Lithuanian Armed Forces, Entity ID No. 188732677
Building No. 4400-0779-0630, described in cl. 2.45.
Order No. 306 of the Incorporator of 24/03/2000
Handing-Over Certificate No. 11 of 07/08/2000
Certificate on Recognition of the Building as Suitable for
Exploitation No. (100)-164 of 31/12/2004
From 07/08/2006
6.8.
Item:
Basis for registration:
Description:
Record valid:
Road Servitude (Serving)
Land plot No. 8638-0004-0008, described in cl. 2.1.
Order No. 3779-86 of the County Governor of 03/11/2000
Permit other persons to use the road in the section of the road
Meškerinė-Švenčionėliai of local significance, the area of which
is 0.4720 ha, identified in the land site plan, scale 1:10000, by
numbers and letters 117-118-J-K-86-L-M-N-116.
From 16/11/2000
6.9.
Item:
Basis for registration:
Description:
Record valid:
Road Servitude (Serving)
Land plot No. 8638-0004-0008, described in cl. 2.1.
Order No. 3779-86 of the County Governor of 03/11/2000
Permit other persons to use the road in the section of the road
Meškerinė-Švenčionėliai of local significance, the area of which
is 0.9857 ha, identified in the land site plan, scale 1:10000, by
numbers and letters 247-248-A-13-358-357-367-366-365-364-C-
180-D-E-F-G-347-346-H-I.
From 16/11/2000
7. Legal facts:
7.1.
Item:
Basis for registration:
Description:
Record valid:
Immovable Item is Registered in the Register of Immovable
Cultural Properties
Department of Cultural Heritage under the Ministry of Culture,
Entity ID No. 188692688
Land plot No. 8638-0004-0008, described in cl. 2.1.
Letter No. 01-7-127 of 31/01/1995
Notice No. 709 of the Department of Cultural Heritage of
15/12/2008.
From 17/12/2008
8. Notes: no records
9. Special conditions for the use of land and forest:
9.1. XLI. Botanical Reserves
Item:
Basis for registration:
Record valid:
9.2.
Item:
Basis for registration:
Record valid:
9.3.
Item:
Basis for registration:
Record valid:
9.4.
Item:
Basis for registration:
Record valid:
9.5.
Item:
Basis for registration:
Record valid:
9.6.
Item:
Basis for registration:
Record valid:
9.7.
Item:
Basis for registration:
Record valid:
9.8.
Item:
Basis for registration:
Area:
Record valid:
9.9.
Item:
Basis for registration:
Record valid:
9.10.
Item:
Basis for registration:
Record valid:
9.11.
Item:
Basis for registration:
Record valid:
9.12.
Land plot No. 8638-0004-0008, described in cl. 2.1.
Order No. 3779-86 of the County Governor of 03/11/2000
From 16/11/2000
XLIV. Ichthyologic Reserves
Land plot No. 8638-0004-0008, described in cl. 2.1.
Order No. 3779-86 of the County Governor of 03/11/2000
From 16/11/2000
XXXV. Landscape Reserves
Land plot No. 8638-0004-0008, described in cl. 2.1.
Order No. 3779-86 of the County Governor of 03/11/2000
From 16/11/2000
XXX. Swamps and Springs
Land plot No. 8638-0004-0008, described in cl. 2.1.
Order No. 3779-86 of the County Governor of 03/11/2000
From 16/11/2000
XXIX. Surface Water Protection Areas and Coastal Protection
Strips
Land plot No. 8638-0004-0008, described in cl. 2.1.
Order No. 3779-86 of the County Governor of 03/11/2000
From 16/11/2000
XXVIII. Water Bodies
Land plot No. 8638-0004-0008, described in cl. 2.1.
Order No. 3779-86 of the County Governor of 03/11/2000
From 16/11/2000
Protected Plantings of Trees and Shrubs, Growing Non-Forest
Land
Land plot No. 8638-0004-0008, described in cl. 2.1.
Order No. 3779-86 of the County Governor of 03/11/2000
From 16/11/2000
XXVI. Restrictions for Forest Use
Land plot No. 8638-0004-0008, described in cl. 2.1.
Order No. 3779-86 of the County Governor of 03/11/2000
1237.9546 ha
From 16/11/2000
XVII. State Geodetic Points Protection Zones
Land plot No. 8638-0004-0008, described in cl. 2.1.
Order No. 3779-86 of the County Governor of 03/11/2000
From 16/11/2000
VI. Power Lines Protection Zones
Land plot No. 8638-0004-0008, described in cl. 2.1.
Order No. 3779-86 of the County Governor of 03/11/2000
From 16/11/2000
II. Road Protection Zones
Land plot No. 8638-0004-0008, described in cl. 2.1.
Order No. 3779-86 of the County Governor of 03/11/2000
From 16/11/2000
I. Communication Lines Protection Zones
Item:
Basis for registration:
Record valid:
Land plot No. 8638-0004-0008, described in cl. 2.1.
Order No. 3779-86 of the County Governor of 03/11/2000
From 16/11/2000
10. Item registration and cadastre notes:
10.1.
Item:
Basis for registration:
Record valid:
New has been Formed (Item Registration)
Other structures No. 4400-2760-3823, described in cl. 2.37.
Gas networks No. 4400-2760-3601, described in cl. 2.38.
Water supply networks No. 4400-2760-3689, described in cl. 2.40.
Wastewater removal networks No. 4400-2760-3712, described
in cl. 2.43.
Wastewater removal networks No. 4400-2760-3789, described
in cl. 2.42.
Cadastre Data File of the Immovable Item of 23/07/2013
Declaration on Completion of Construction/Alteration of Use
Purpose No. 4 of 02/10/2014
From 06/10/2014
10.2.
Item:
Basis for registration:
Record valid:
Document Allowing Construction has been Issued (Cadastre
Note)
Administration of Švenčionys District Municipality, Entity ID
No. 188766722
Other structures No. 4400-2836-2901, described in cl. 2.7.
Other structures No. 4400-2836-2978, described in cl. 2.11.
Other structures No. 4400-2836-2989, described in cl. 2.12.
Other structures No. 4400-2836-2990, described in cl. 2.13.
Other structures No. 4400-2836-3020, described in cl. 2.14.
Other structures No. 4400-2836-3275, described in cl. 2.15.
Other structures No. 4400-2836-3320, described in cl. 2.16.
Other structures No. 4400-2836-3331, described in cl. 2.17.
Other structures No. 4400-2836-3542, described in cl. 2.18.
Other structures No. 4400-2836-3575, described in cl. 2.19.
Other structures No. 4400-2836-3604, described in cl. 2.20.
Other structures No. 4400-2836-3706, described in cl. 2.5.
Other structures No. 4400-2836-3742, described in cl. 2.21.
Other structures No. 4400-2836-3810, described in cl. 2.22.
Other structures No. 4400-2836-3820, described in cl. 2.23.
Other structures No. 4400-2836-3886, described in cl. 2.24.
Other structures No. 4400-2836-3900, described in cl. 2.25.
Other structures No. 4400-2836-3912, described in cl. 2.26.
Other structures No. 4400-2836-3920, described in cl. 2.27.
Other structures No. 4400-2836-4207, described in cl. 2.8.
Other structures No. 4400-2836-4236, described in cl. 2.28.
Other structures No. 4400-2836-4250, described in cl. 2.29.
Other structures No. 4400-2836-4283, described in cl. 2.30.
Other structures No. 4400-2836-4394, described in cl. 2.9.
Other structures No. 4400-2836-4430, described in cl. 2.31.
Other structures No. 4400-2836-4483, described in cl. 2.6.
Other structures No. 4400-2836-4518, described in cl. 2.32.
Other structures No. 4400-2836-4530, described in cl. 2.33.
Other structures No. 4400-2836-4572, described in cl. 2.34.
Other structures No. 4400-2836-4661, described in cl. 2.35.
Other structures No. 4400-2836-4672, described in cl. 2.36.
Permit to Build a New Building, Reconstruct a Building,
Renovate (Modernise) a Building No. LNS-04-131009-00097 of
09/10/2013
From 10/12/2013
10.3.
Permit issued by:
Item:
Basis for registration:
Record valid:
Construction Permit Issued (Cadastral Note)
Administration of Švenčionys District Municipality, Entity ID
No. 188766722
Building No. 4400-2224-3698, described in cl. 2.10.
Gas networks No. 4400-2224-3798, described in cl. 2.39.
Water supply networks No. 4400-2224-3700, described in cl. 2.41.
Wastewater removal networks No. 4400-2224-3776, described
in cl. 2.44.
Permit to Build a New Building, Reconstruct a Building,
Renovate (Modernise) a Building No. LNS-04-131009-00097 of
28/6/2011
From 04/10/2011
10.4.
Item:
Basis for registration:
Record valid:
Cadastral Measurements carried out by (Cadastral Note)
Vilnius Branch of the State Enterprise Centre of Register,
Entity ID No. 124208338
Other structures No. 4400-1993-9943, described in cl. 2.51.
Gas networks No. 4400-1993-9954, described in cl. 2.52.
Water supply networks No. 4400-1993-9976, described in cl. 2.55.
Wastewater removal networks No. 4400-1994-0008, described
in cl. 2.58.
Borehole No. 4400-1993-9998, described in cl. 2.59.
Sewage Treatment Plant No. 4400-1994-0020, described in cl.
2.60.
Licence No. G-734-(623) of 27/08/2008
Qualification Certificate No. 2M-ME-201 of 03/09/2008
Cadastre Data File of the Immovable Item of 20/11/2009
From 22/12/2009
10.5.
Item:
Basis for registration:
Record valid:
New has been Formed (Item Registration)
Other structures No. 4400-1993-9943, described in cl. 2.51.
Gas networks No. 4400-1993-9954, described in cl. 2.52.
Water supply networks No. 4400-1993-9976, described in cl. 2.55.
Wastewater removal networks No. 4400-1994-0008, described
in cl. 2.58.
Borehole No. 4400-1993-9998, described in cl. 2.59.
Sewage Treatment Plant No. 4400-1994-0020, described in cl.
2.60.
Certificate on Recognition of the Building as Suitable for
Exploitation No. 100-149 of 21/12/2004
From 22/12/2009
10.6.
Item:
Basis for registration:
Record valid:
New has been Formed (Item Registration)
Building No. 8695-9011-6489, described in cl. 2.4.
Certificate on Acceptance of the Building for Exploitation No.
100-49 of 23/03/2001
From 16/10/2009
10.7.
Item:
Basis for registration:
Record valid:
New has been Formed (Item Registration)
Building No. 8695-9011-6498, described in cl. 2.2.
Certificate on Acceptance of the Building for Exploitation No.
100-593 of 04/09/2000
From 16/10/2009
10.8.
Item:
Cadastral Measurements carried out by (Cadastral Note)
“SA kadastras”, UAB, Entity ID No. 300125149
Building No. 4400-1251-3503, described in cl. 2.46.
Other structures No. 4400-1251-3772, described in cl. 2.50.
Other structures No. 4400-1300-2450, described in cl. 2.47.
Basis for registration:
Record valid:
Other structures No. 4400-1300-2481, described in cl. 2.48.
Other structures No. 4400-1300-2516, described in cl. 2.49.
Cadastre Data File of the Immovable Item of 15/11/2007
From 08/01/2009
10.9.
Item:
Basis for registration:
Record valid:
Cadastral Measurements carried out by (Cadastral Note)
“Kagema”, UAB, Entity ID No. 126312798
Gas networks No. 4400-1317-5054, described in cl. 2.53.
Water supply networks No. 4400-1317-4979, described in cl. 2.54.
Wastewater removal networks No. 4400-1317-4835, described
in cl. 2.56.
Wastewater removal networks No. 4400-1317-4946, described
in cl. 2.57.
Cadastre Data File of the Immovable Item of 23/11/2007
From 08/01/2009
10.10.
Item:
Basis for registration:
Record valid:
New has been Formed (Item Registration)
Building No. 4400-1251-3503, described in cl. 2.46.
Other structures No. 4400-1251-3772, described in cl. 2.50.
Other structures No. 4400-1300-2450, described in cl. 2.47.
Other structures No. 4400-1300-2481, described in cl. 2.48.
Other structures No. 4400-1300-2516, described in cl. 2.49.
Other structures No. 4400-1317-5054, described in cl. 2.53.
Water supply networks No. 4400-1317-4979, described in cl. 2.54.
Wastewater removal networks No. 4400-1317-4835, described
in cl. 2.56.
Wastewater removal networks No. 4400-1317-4946, described
in cl. 2.57.
Certificate on Recognition of the Building as Suitable for
Exploitation No. STN-04-080117-0002 of 17/01/2008
From 08/01/2009
10.11.
Item:
Basis for registration:
Record valid:
Formed when Constructing (Item Registration)
Building No. 4400-1455-5664, described in cl. 2.3.
Certificate on Recognition of the Building as Suitable for
Exploitation No. 100-943 of 29/12/2000
From 14/12/2007
11. Register comments and references:
The land plot is not being used for agricultural activities but for other special purpose (for the exploitation of
administrative-industrial, and other purpose buildings and training area). Cadastral measurements of the items (unique
No. 4400-2760-3823, 4400-2760-3789, 4400-2760-3712, 4400-2760-3689, 4400-2760-3601) have been carried out by a
surveyor Mantas Andrijauskas, Surveyor’s Qualification Certificate No. 2M-M-1304, on 23/07/2013. The address has
been entered in accordance with the data of the Register of Addresses as of 15/11/2011.
12. Other information:
Archive file No.: 86/9344
13. Information about qualification of data valid for the transaction: no records
01/12/2016 14:23:28
Document printed by: RITA ZURBIENĖ
/Translation from Lithuanian/
STATE ENTERPRISE THE CENTRE OF REGISTERS
Vinco Kudirkos Str. 18-3, 03105 Vilnius, tel. (8 5) 2688 262, fax (8 5) 2688 311, E-mail: [email protected]
EXTRACT FROM THE CENTRAL DATABANK OF THE REGISTER OF REAL PROPERTY
01/12/2016 14:24:55 1. Property registered in the Register of Real Property:
Register No.:
Type of Register:
Formation date:
Address:
Register administrator:
10/325516
Structures
14/06/1999
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill. 9
Vilnius Branch of the State Enterprise Centre of Register 2. Immovable items: 2.1.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Building – Headquarters
8695-9011-6012
Special
1O2p
1959
100%
Municipal central heating
Municipal water supply
Municipal wastewater removal
Not available
Bricks
Bitumen
2
1329.07 m2
1158.40 m2
5317 m3
713.00 m2
EUR 406561
EUR 273611
EUR 41968
Reinstatement value
06/12/2000
06/12/2000
2.2.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Building – Woodworking Workshop
8695-9011-6023
Production, industrial
2P1p
1983
100%
Not available
Not available
Not available
Not available
Bricks
Asbestos-cement
1
38.37 m2
38.37 m2
153 m3
47.00 m2
EUR 6974
35 %
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
EUR 4533
EUR 1133
14/06/1999
14/06/1999
2.3.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Warehouse
8695-9011-6034
Warehouse
3F1p
1979
100%
Not available
Not available
Not available
Not available
Bricks
Asbestos-cement
1
368.87 m2
368.87 m2
980 m3
426.00 m2
EUR 47601
24 %
EUR 36176
EUR 5426
06/12/2000
06/12/2000
2.4.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Warehouse
8695-9011-6045
Warehouse
4F1p
1984
100%
Not available
Not available
Not available
Not available
Bricks
Grass coating
1
40.58 m2
40.58 m2
150 m3
61.00 m2
EUR 7805
18 %
EUR 6400
EUR 1600
14/06/1999
14/06/1999
2.5.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Building – Vegetable Storage Facility
8695-9011-6056
Warehouse
5F1p
1984
100%
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Not available
Not available
Not available
Not available
Bricks
Grass coating
1
96.07 m2
96.07 m2
347 m3
116.00 m2
EUR 18055
18 %
EUR 14806
EUR 3701
14/06/1999
14/06/1999
2.6.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Warehouse
8695-9011-6067
Warehouse
6F1p
1984
100%
Not available
Not available
Not available
Not available
Bricks
Bitumen
1
79.58 m2
79.58 m2
251 m3
93.00 m2
EUR 10430
18 %
EUR 8553
EUR 2138
14/06/1999
14/06/1999
2.7.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Building – Sauna
8695-9011-6078
Services
7L1p
1985
100%
Not available
Not available
Not available
Not available
Bricks
Asbestos-cement
1
10.31 m2
10.31 m2
30 m3
14.00 m2
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
EUR 2859
17 %
EUR 2373
EUR 593
14/06/1999
14/06/1999
2.8.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Command Post
8695-9011-6089
Other
8H2p
1962
100%
Not available
Not available
Not available
Not available
Bricks
Asbestos-cement
2
25.68 m2
25.68 m2
89 m3
22.00 m2
EUR 10759
44 %
EUR 6025
EUR 1506
14/06/1999
14/06/1999
2.9.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Ammunition Supply Point
8695-9011-6090
Warehouse
9F1p
1962
100%
Not available
Not available
Not available
Not available
Bricks
Asbestos-cement
1
9.35 m2
9.35 m2
29 m3
13.00 m2
EUR 1229
44 %
EUR 688
EUR 172
14/06/1999
14/06/1999
2.10.
Unique No. of the item:
Main use purpose of the item:
Building – Warehouse with Administrative Premises and
Workshop
8695-9011-6101
Warehouse
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Year of commencement of reconstruction:
Year of completion of reconstruction:
Building category:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Coordinate X:
Coordinate Y:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination method:
Average market value determination date:
Cadastral record date:
Energy efficiency class of the building (part of
it):
Estimated thermal energy consumption for the
heating of the building (part of it):
10F1p
1962
1962
2012
2013
Non-special
100%
Municipal central heating
Municipal water supply
Municipal wastewater removal
Liquefied
Bricks
Bitumen
1
703.53 m2
611.69 m2
3279 m3
581.00 m2
6100895
614353
EUR 240385
3 %
EUR 233144
EUR 35044
Reinstatement value
23/07/2013
23/07/2013
B
110.06 kWh/m2/m.
2.11.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Command Post
8695-9011-6112
Other
11H2p
1962
100%
Not available
Not available
Not available
Not available
Bricks
Asbestos-cement
2
25.89 m2
25.89 m2
89 m3
22.00 m2
EUR 10759
44 %
EUR 6025
EUR 1506
14/06/1999
14/06/1999
2.12.
Unique No. of the item:
Main use purpose of the item:
Building – Ammunition Supply Point
8695-9011-6123
Warehouse
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
12F1p
1962
100%
Not available
Not available
Not available
Not available
Bricks
Asbestos-cement
1
9.35 m2
9.35 m2
29 m3
13.00 m2
EUR 1229
44 %
EUR 688
EUR 172
14/06/1999
14/06/1999
2.13.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Command Post
8695-9011-6134
Other
13H2p
1962
100%
Not available
Not available
Not available
Not available
Bricks
Asbestos-cement
2
26.00 m2
26.00 m2
89 m3
22.00 m2
EUR 10759
44 %
EUR 6025
EUR 1506
14/06/1999
14/06/1999
2.14.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Building – Ammunition Supply Point
8695-9011-6145
Warehouse
14F1p
1962
100%
Not available
Not available
Not available
Not available
Bricks
Asbestos-cement
1
9.40 m2
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
9.40 m2
31 m3
13.00 m2
EUR 1314
44 %
EUR 736
EUR 184
14/06/1999
14/06/1999
2.15.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Gas Station
8695-9011-6156
Other
15H1ž
1997
100%
Not available
Not available
Not available
Not available
Wood with framework
Asbestos-cement
1
3.61 m2
3.61 m2
10 m3
4.00 m2
EUR 15417
EUR 15417
EUR 3854
14/06/1999
14/06/1999
2.16.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Garage
8695-9011-6167
Garage
16G1ž
1977
100%
Not available
Not available
Not available
Not available
Wood with framework
Asbestos-cement
1
47.63 m2
47.63 m2
112 m3
51.00 m2
EUR 8150
60 %
EUR 3260
EUR 815
14/06/1999
14/06/1999
2.17.
Unique No. of the item:
Building – Garage
8695-9011-6178
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Garage
17G1ž
1977
100%
Not available
Not available
Not available
Not available
Wood with framework
Asbestos-cement
1
92.74 m2
92.74 m2
394 m3
99.00 m2
EUR 26381
40 %
EUR 15829
EUR 3957
14/06/1999
14/06/1999
2.18.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Garage
8695-9011-6189
Garage
18G1ž
1977
100%
Not available
Not available
Not available
Not available
Wood with framework
Asbestos-cement
1
41.48 m2
41.48 m2
143 m3
47.00 m2
EUR 11825
35 %
EUR 7686
EUR 1921
14/06/1999
14/06/1999
2.19.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Building – Garage
8695-9011-6192
Garage
19G1ž
1977
100%
Not available
Not available
Not available
Not available
Wood with framework
Asbestos-cement
1
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
46.94 m2
46.94 m2
149 m3
50.00 m2
EUR 10843
60 %
EUR 4337
EUR 1084
14/06/1999
14/06/1999
2.20.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Barracks
8695-9011-6201
Special
20O1p
1984
100%
Municipal central heating
Not available
Not available
Not available
Bricks
Asbestos-cement
1
162.65 m2
142.45 m2
509 m3
196.00 m2
EUR 48510
4 %
EUR 46570
EUR 11643
14/06/1999
14/06/1999
2.21.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Condition:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Barracks
8695-9011-6234
Special
23O1p
Physically damaged
1984
32 %
Not available
Not available
Not available
Not available
Bricks
Not available
1
79.57 m2
79.57 m2
216 m3
90.00 m2
EUR 14001
90 %
EUR 1400
EUR 350
14/06/1999
14/06/1999
2.22.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of commencement of construction:
Year of completion of construction:
Year of commencement of reconstruction:
Year of completion of reconstruction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Coordinate X:
Coordinate Y:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Canteen
8695-9011-6278
Catering
27M1p
1966
1966
2004
2004
100%
Municipal central heating
Municipal water supply
Municipal wastewater removal
Not available
Bricks
Metal
1
1337.22 m2
1008.91 m2
5821 m3
1606.00 m2
6100788.26
614459.58
EUR 546223
1 %
EUR 540721
EUR 162187
25/06/2004
25/06/2004
2.23.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Pump Station
8695-9011-6289
Other
28H1p
1966
100 %
Not available
Not available
Not available
Not available
Bricks
Grass coating
1
9.82 m2
9.82 m2
51 m3
21.00 m2
EUR 9285
50 %
EUR 4643
EUR 1161
14/06/1999
14/06/1999
2.24.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Building – Pass Checkpoint
8695-9011-6445
Other
43H1p
1962
100 %
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Municipal central heating
Not available
Not available
Not available
Bricks
Asbestos-cement
1
9.38 m2
9.38 m2
60 m3
25.00 m2
EUR 7825
30 %
EUR 5478
EUR 822
27/11/2000
27/11/2000
2.25.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Command Post
8695-9011-6456
Special
44O1p
1962
100%
Municipal central heating
Not available
Not available
Not available
Bricks
Bitumen
1
76.04 m2
76.04 m2
325 m3
79.00 m2
EUR 40644
45 %
EUR 22354
EUR 3353
29/11/2000
29/11/2000
2.26.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Gas:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Building – Warehouse
8695-9011-6467
Warehouse
45F1p
1962
100%
Not available
Not available
Not available
Not available
Bricks
Bitumen
1
194.53 m2
194.53 m2
734 m3
229.00 m2
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
EUR 35652
45 %
EUR 19609
EUR 2941
29/11/2000
29/11/2000
2.27.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Walls:
Number of floors:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Warehouse
8695-9011-6301
Auxiliary agricultural
30F1ž
1983
100%
Not available
Not available
Not available
Wood with framework
1
44 m3
18.00 m2
EUR 774
67 %
EUR 255
EUR 64
14/06/1999
14/06/1999
2.28.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Walls:
Number of floors:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Warehouse
8695-9011-6312
Auxiliary agricultural
31F1ž
1983
100%
Not available
Not available
Not available
Wood with framework
1
55 m3
22.00 m2
EUR 965
67 %
EUR 318
EUR 80
14/06/1999
14/06/1999
2.29.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Water supply:
Wastewater removal:
Walls:
Number of floors:
Volume:
Building – Transformer
8695-9011-6401
Auxiliary agricultural
40H1g
1962
100%
Not available
Not available
Not available
Metal with framework
1
13 m3
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
5.00 m2
EUR 1344
45 %
EUR 739
EUR 185
14/06/1999
14/06/1999
2.30.
Description/notes:
Unique No. of the item:
Main use purpose of the item:
Year of completion of construction:
Completeness percentage:
Reinstatement costs (construction value):
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Other Engineering Structures – Yard Structures
(artesian well, outdoor WC – 2 units)
8695-9011-6423
Other engineering structures
1966
100%
EUR 10785
EUR 5839
EUR 1460
14/06/1999
14/06/1999
2.31.
Unique No. of the item:
Main use purpose of the item:
Year of completion of construction:
Completeness percentage:
Reinstatement costs (construction value):
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Other Engineering Structures – Relay Communications Mast
of 114 m of height
8695-9011-6478
Other engineering structures
2000
100%
EUR 132496
EUR 132496
EUR 26499
07/12/2000
07/12/2000
3. Appurtenances of the item from the other register: no records
4. Ownership:
4.1.
Owner:
Item:
Basis for registration:
Record valid:
Ownership Right
REPUBLIC OF LITHUANIA, Entity ID No. 111105555
Building No. 8695-9011-6101, described in cl. 2.10.
Order No. 306 of the Incorporator of 24/03/2000
Handing-Over Certificate of 07/08/2000
Certificate on Completion of Construction No. SUA-00-
140625-00213
From 07/10/2014
4.2.
Owner:
Item:
Basis for registration:
Record valid:
Ownership Right
REPUBLIC OF LITHUANIA, Entity ID No. 111105555
Other structures No. 8695-9011-6478, described in cl. 2.31.
Certificate on Recognition of the Building as Suitable for
Exploitation No. 100-944 of 29/12/2000
From 03/07/2001
4.3.
Owner:
Item:
Basis for registration:
Record valid:
Ownership Right
REPUBLIC OF LITHUANIA, Entity ID No. 111105555
Building No. 8695-9011-6034, described in cl. 2.3.
Building No. 8695-9011-6445, described in cl. 2.24.
Building No. 8695-9011-6456, described in cl. 2.25.
Building No. 8695-9011-6467, described in cl. 2.26.
Order No. 306 of the Incorporator of 24/03/2000
From 22/06/2001
4.4.
Owner:
Item:
Basis for registration:
Record valid:
Ownership Right
REPUBLIC OF LITHUANIA, Entity ID No. 111105555
Building No. 8695-9011-6012, described in cl. 2.1.
Building No. 8695-9011-6023, described in cl. 2.2.
Building No. 8695-9011-6045, described in cl. 2.4.
Building No. 8695-9011-6056, described in cl. 2.5.
Building No. 8695-9011-6067, described in cl. 2.6.
Building No. 8695-9011-6078, described in cl. 2.7.
Building No. 8695-9011-6089, described in cl. 2.8.
Building No. 8695-9011-6090, described in cl. 2.9.
Building No. 8695-9011-6112, described in cl. 2.11.
Building No. 8695-9011-6123, described in cl. 2.12.
Building No. 8695-9011-6134, described in cl. 2.13.
Building No. 8695-9011-6145, described in cl. 2.14.
Building No. 8695-9011-6156, described in cl. 2.15.
Building No. 8695-9011-6167, described in cl. 2.16.
Building No. 8695-9011-6178, described in cl. 2.17.
Building No. 8695-9011-6189, described in cl. 2.18.
Building No. 8695-9011-6192, described in cl. 2.19.
Building No. 8695-9011-6201, described in cl. 2.20.
Building No. 8695-9011-6278, described in cl. 2.22.
Building No. 8695-9011-6289, described in cl. 2.23.
Building No. 8695-9011-6301, described in cl. 2.27.
Building No. 8695-9011-6312, described in cl. 2.28.
Building No. 8695-9011-6401, described in cl. 2.29.
Other structures No. 8695-9011-6423, described in cl. 2.30.
Order No. 306 of the Incorporator of 24/03/2000
Handing-Over Certificate of 07/08/2000
From 23/08/2000
5. The trust right of the State and Municipal Land: no records
6. Other property rights:
6.1.
Trustee:
Item:
Basis for registration:
Record valid:
Property Trust Right
Lithuanian Armed Forces, Entity ID No. 188732677
Building No. 8695-9011-6101, described in cl. 2.10.
Order No. 306 of the Incorporator of 24/03/2000
Handing-Over Certificate of 07/08/2000
Certificate on Completion of Construction No. SUA-00-
140625-00213
From 07/10/2014
6.2.
Trustee:
Item:
Basis for registration:
Record valid:
Property Trust Right
Cyber Security and Information Technology Department
under the Ministry of National Defence, Entity ID No.
191823126
Other structures No. 8695-9011-6478, described in cl. 2.31.
Order No. V-168 of 27/02/2003
Handing-Over Certificate No. 25 of 07/05/2003
From 11/09/2008
6.3.
Trustee:
Item:
Basis for registration:
Record valid:
Property Trust Right
Lithuanian Armed Forces, Entity ID No. 188732677
Building No. 8695-9011-6034, described in cl. 2.3.
Building No. 8695-9011-6445, described in cl. 2.24.
Building No. 8695-9011-6456, described in cl. 2.25.
Building No. 8695-9011-6467, described in cl. 2.26.
Order No. 306 of the Incorporator of 24/03/2000
From 22/06/2001
6.4.
Trustee:
Item:
Basis for registration:
Record valid:
Property Trust Right
Lithuanian Armed Forces, Entity ID No. 188732677
Building No. 8695-9011-6012, described in cl. 2.1.
Building No. 8695-9011-6023, described in cl. 2.2.
Building No. 8695-9011-6045, described in cl. 2.4.
Building No. 8695-9011-6056, described in cl. 2.5.
Building No. 8695-9011-6067, described in cl. 2.6.
Building No. 8695-9011-6078, described in cl. 2.7.
Building No. 8695-9011-6089, described in cl. 2.8.
Building No. 8695-9011-6090, described in cl. 2.9.
Building No. 8695-9011-6112, described in cl. 2.11.
Building No. 8695-9011-6123, described in cl. 2.12.
Building No. 8695-9011-6134, described in cl. 2.13.
Building No. 8695-9011-6145, described in cl. 2.14.
Building No. 8695-9011-6156, described in cl. 2.15.
Building No. 8695-9011-6167, described in cl. 2.16.
Building No. 8695-9011-6178, described in cl. 2.17.
Building No. 8695-9011-6189, described in cl. 2.18.
Building No. 8695-9011-6192, described in cl. 2.19.
Building No. 8695-9011-6201, described in cl. 2.20.
Building No. 8695-9011-6278, described in cl. 2.22.
Building No. 8695-9011-6289, described in cl. 2.23.
Building No. 8695-9011-6301, described in cl. 2.27.
Building No. 8695-9011-6312, described in cl. 2.28.
Building No. 8695-9011-6401, described in cl. 2.29.
Other structures No. 8695-9011-6423, described in cl. 2.30.
Order No. 306 of the Incorporator of 24/03/2000
Handing-Over Certificate of 07/08/2000
From 23/08/2000
7. Legal facts: no records
8. Notes: no records
9. Special conditions for the use of land and forest: no records
10. Item registration and cadastre notes:
10.1.
Item:
Basis for registration:
Record valid:
Reconstruction (Item Registration)
Building No. 8695-9011-6101, described in cl. 2.10.
Cadastre Data File of the Immovable Item of 23/07/2013
Certificate on Completion of Construction No. SUA-00-
140625-00213
From 29/09/2014
10.2.
Item:
Basis for registration:
Record valid:
Term:
Energy Performance Certificate for the Building (part of it)
has been Issued (Cadastre Note)
Building No. 8695-9011-6101, described in cl. 2.10.
Notice No. SN-0224-0269/0 of the Construction Products
Certification Centre of 08/07/2014
From 08/07/2014
From 30/09/2013 to 30/09/2023
10.3.
Item:
Basis for registration:
Increased area:
Record valid:
Enlarged when Reconstructing (Item Registration)
Building No. 8695-9011-6278, described in cl. 2.22.
Certificate on Recognition of the Building as Suitable for
Exploitation No. 100-149 of 21/12/2004
874.67 m2
From 21/12/2005
11. Register comments and references:
10F1p (b. p. 10H3p). Cadastral measurements of the immovable item 10F1p (unique No. 8695-9011-6101) have been
carried out by a surveyor Mantas Andrijauskas, Surveyor’s Qualification Certificate No. 2M-M-1304, on 23/07/2013.
The address has been entered in accordance with the data of the Register of Addresses as of 15/11/2011.
12. Other information:
Land plot, where the structures are located,
Cadastral No.:
Archive file No.:
8638/0004:8
86/5559
13. Information about qualification of data valid for the transaction: no records
01/12/2016 14:24:55
Document printed by: RITA ZURBIENĖ
/Translation from Lithuanian/
STATE ENTERPRISE THE CENTRE OF REGISTERS
Vinco Kudirkos Str. 18-3, 03105 Vilnius, tel. (8 5) 2688 262, fax (8 5) 2688 311, E-mail: [email protected]
EXTRACT FROM THE CENTRAL DATABANK OF THE REGISTER OF REAL PROPERTY
01/12/2016 14:26:01 1. Property registered in the Register of Real Property:
Register No.:
Type of Register:
Formation date:
Address:
Register administrator:
10/356714
Structures
04/12/2000
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Vilnius Branch of the State Enterprise Centre of Register 2. Immovable items: 2.1.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Shooting Range
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
8698-0010-3016
Special
1O1p
1980
100%
Brick masonry
Coil coating
1
940.14 m2
913.10 m2
4788 m3
1016.00 m2
EUR 232563
24 %
EUR 176748
EUR 26512
04/12/2000
04/12/2000
2.2.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Building – Command Post
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
8698-0010-3027
Special
2O1p
1980
100%
Electric radiators
Brick masonry
Coil coating
1
162.24 m2
86.54 m2
677 m3
111.00 m2
EUR 51044
16 %
EUR 42877
EUR 6431
04/12/2000
Cadastral record date:
04/12/2000
2.3.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Heating:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Headquarters
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
8698-0010-3038
Special
3O1p
1986
100%
Central heating from the district boiler room
Brick masonry
Coil coating
1
170.55 m2
140.99 m2
706 m3
221.00 m2
EUR 56046
20 %
EUR 44837
EUR 6725
04/12/2000
04/12/2000
2.4.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Walls:
Roof coating:
Number of floors:
Total area:
Main area:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Training Corps
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
8698-0010-3070
Special
6O1p
1985
100%
Brick masonry
Asbo-cement slate plates
1
56.47 m2
56.47 m2
189 m3
70.00 m2
EUR 18635
25 %
EUR 13976
EUR 2096
29/12/2000
29/11/2000
2.5.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Walls:
Number of floors:
Built-up area:
Reinstatement costs (construction value):
Building – Awning
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
8698-0010-3049
Auxiliary agricultural
4l1g
1986
100%
Metal with framework
1
425.00 m2
EUR 28678
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
35 %
EUR 18641
EUR 2796
04/12/2000
04/12/2000
2.6.
Unique No. of the item:
Main use purpose of the item:
Plan notation:
Year of completion of construction:
Completeness percentage:
Walls:
Number of floors:
Volume:
Built-up area:
Reinstatement costs (construction value):
Physical deterioration percentage:
Reinstatement value:
Average market value:
Average market value determination date:
Cadastral record date:
Building – Transformer
Švenčionys Distr. Muni., Pabradė Eldership, Mažalotė Vill.
Note. Address has not been allocated to the address object
8698-0010-3050
Auxiliary agricultural
5H1g
1980
100%
Tin plate
1
14 m3
5.00 m2
EUR 1497
45 %
EUR 823
EUR 124
04/12/2000
04/12/2000
3. Appurtenances of the item from the other register: no records
4. Ownership:
4.1.
Owner:
Item:
Basis for registration:
Record valid:
Ownership Right
REPUBLIC OF LITHUANIA, Entity ID No. 111105555
Building No. 8698-0010-3016, described in cl. 2.1.
Building No. 8698-0010-3027, described in cl. 2.2.
Building No. 8698-0010-3038, described in cl. 2.3.
Building No. 8698-0010-3070, described in cl. 2.4.
Building No. 8698-0010-3049, described in cl. 2.5.
Building No. 8698-0010-3050, described in cl. 2.6.
Order No. 306 of the Incorporator of 24/03/2000
From 15/06/2001
5. The trust right of the State and Municipal Land: no records
6. Other property rights:
6.1.
Trustee:
Item:
Basis for registration:
Record valid:
Property Trust Right
Lithuanian Armed Forces, Entity ID No. 188732677
Building No. 8698-0010-3016, described in cl. 2.1.
Building No. 8698-0010-3027, described in cl. 2.2.
Building No. 8698-0010-3038, described in cl. 2.3.
Building No. 8698-0010-3070, described in cl. 2.4.
Building No. 8698-0010-3049, described in cl. 2.5.
Building No. 8698-0010-3050, described in cl. 2.6.
Handing-Over Certificate No. 41 of 24/03/2000
Handing-Over Certificate No. 37 of 24/03/2000
Handing-Over Certificate No. 4 of 24/03/2000
Handing-Over Certificate No. 36 of 24/03/2000
Handing-Over Certificate No. 1 of 24/03/2000
Handing-Over Certificate No. 2 of 24/03/2000
Order No. 306 of the Incorporator of 24/03/2000
From 15/06/2001
7. Legal facts: no records
8. Notes: no records
9. Special conditions for the use of land and forest: no records
10. Item registration and cadastre notes: no records
11. Register comments and references: no records
12. Other information:
Archive file No.: 86/5816
13. Information about qualification of data valid for the transaction: no records
01/12/2016 14:26:01
Document printed by: RITA ZURBIENĖ
ACT
of the Marking of the Land Site Boundaries
Meškerinė 10/08/2000 place name date of the drawing of the act
1. Boundaries of the land site has been determined for the Client the Ministry of National
Defence, Pabradė Military Training Area
intending to carry out geodetic measurements of the land site.
2. Determination of the land site boundaries has been carried out and locations of the
boundary markers have been marked by the engineer: V. Kazlauskas
in accordance with: the land allocation plan
3. Address and the area of the land site: Vilnius County, Švenčionys District,
Pabradė Eldership 22211544 m2
4. Current (future) owner or user of the land site as well as owners or users of adjacent land
sites were invited to be present when determining the boundaries of the land site:
5. Coordination of the invited persons (with notes or without notes) as well as records on the
refusal to sign and the absent persons
/Stamp/ /Signature/ /Seal/ /Stamp/ /Signature/ /Seal/
/Signature/ /Signature/
6. Determined land site boundaries have been marked using permanent boundary markers
(228) and temporary boundary markers ( - ); other boundaries coincide with natural or man-
made objects.
7. State and local geodetic points are present on the land site,
the characteristics of which are:
8. The following buildings, belonging to the owner (user) under the ownership right, are
located on the land site
9. The following buildings, belonging to other owners, are located on the land site
10. Current (future) owner or user of the land site:
10.1. agrees to the special conditions for the use of land and forest established for the land
site: clauses of the Decision No. 1640 of the Government of the Republic of Lithuania of
29/12/1995: II, VI, XVII, XXVII, XXVIII, XXIX, XXX, XXXV, XLII, and XLIV
10.2. agrees to the land servitudes established for the land site
1) To permit other persons to use the road (identified as 247-248-A-13-358-357-367-
366-365-364-C-180-D-E-F-G-347-346-H-I). The area of the servitude 9857 m2
2) To permit other persons to use the road (identified as 117-118-J-K-86-L-M-N-
116). The area of the servitude 4720 m2
10.3. has concluded written agreements with other persons regarding land servitudes, usage
of the shared objects and other conditions of the land ownership or use
10.4. guarantees the protection of the permanent boundary markers, and is familiar with the
provisions of article 47 of the Code of Administrative Offences of the Republic of Lithuania:
/Signature/ signature of the owner (user)
11. Other notes
12. The Act has been drawn in two copies: one copy is presented to the Client, and the
second one to the Land Management and Surveying Division of Švenčionys City (District)
of the County Governor's Administration together with the file of the measurement of the
land site boundaries and plan preparation.
Commander of the Central Training Area major Vidas Eidukas /Signature/ 10/08/2000 name, surname, signature, date
/Seal: LITHUANIAN ARMED FORCES * CENTRAL TRAINING AREA/
Geodetic measurements have been carried out by the specialist:
engineer V. Kazlauskas /Signature/ 10/08/2000
13. Land site boundaries have been marked and the land site plan prepared on the basis of
them comply with the requirements of the laws and the decisions of the Government of the
Republic of Lithuania for the formation of the land-use.
/Seal/ /Signature/ Head of the Land Management and Surveying Division of Švenčionys City (District)
LAND SITE M 1:10 000
SITE AREA 22211544 sq. m
GIVEN FOR THE USE OF PABRADĖ MILITARY TRAINING AREA
OF THE MINISTRY OF DEFENCE
Page 2
Lake Mažalotė
Page 3
Distance
Intervening users
Page 1
Page 1
Lake Varnakis
Distance
Territories, captured in a horizontal photo M1:2000
Servitutes:
See table below
Servitutes: 1) 247-248-A-B-358-357-367-366-365-364-C-180-D-E-F-G-347-346-H-I area 9857 sq.m 2) 117-118-J-K-86-L-M-N-116 area 4720 sq.m
/stamp/ COORDINATED Head of the Agriculture Department /signature/ /unreadable/ Čibirienė 14/02/2017
/stamp/ APPROVED: TEO LT, AB Network Operation Department Vilnius Network Operation Centre Division of Network Resources and Construction Signature: /signature/ 14/02/2017
Location of the object
/seal/ REPUBLIC OF LITHUANIA Closed joint stock company Geodeziniai Tyrinėjimai VILNIUS
/stamp/ Švenčionys district municipality /unreadable/ Senior expert for Territorial Planning and Architecture department /unreadable/ /signature/ Jonas Maciulevičius 14/02/2017
Electric cabinet Foundation
Coordinate system: LKS-94 Height system: LAS-07
POSITION SURNAME SIGNATURE UAB GEODEZINIAI TYRINĖJIMAI Kalvarijų g. 98-31, Vilnius. Phone/Fax: 2752134, Phone: 2754514 Director A. Černiauskas /signature/
Qualification certificate No. IGKV-342, issued on 27/06/2011 Object: Švenčionys distr. mun. Central Training Area of Pabradė Geodesist R. Zakaras /signature/
Qualification certificate No. IGKV-430, issued on 19/07/2011 DRAWING Engineering topographic plan M 1:500
CLIENT Object No. Scale Number of pages / No.
Date
17/127 1:500 1/1 27/01/2017
Coordinate system: LKS-94 Height system: LAS-07
POSITION SURNAME SIGNATURE UAB GEODEZINIAI TYRINĖJIMAI Kalvarijų g. 98-31, Vilnius. Phone/Fax: 2752134, Phone: 2754514 Director A. Černiauskas /signature/
Qualification certificate No. IGKV-342, issued on 27/06/2011 Object: Švenčionys distr. mun. Central Training Area of Pabradė Geodesist R. Zakaras /signature/
Qualification certificate No. IGKV-430, issued on 19/07/2011 DRAWING Engineering topographic plan M 1:500
CLIENT Object No. Scale Number of pages / No.
Date
17/127 1:500 1/1 27/01/2017
/seal/ REPUBLIC OF LITHUANIA Closed joint stock company Geodeziniai Tyrinėjimai VILNIUS
Photo /stamp/ APPROVED AB Energijos Skirstymo Operatorius 10/02/2017 Technology expert of the Technical Documentation Group Valentina Palionienė /signature/
Electric cabinet
Foundation
Location of the object
UAB "Geoconsulting" tel.: 8-612-84305, e-mail [email protected] www.geoconsulting.lt
Report Copy No. 1 Lithuanian Geological Survey Registration No 6809 - 2017
For the Client
Client: JSC ,,PANEVĖŽIO MIESTPROJEKTAS"
Object: Construction Project for the Special Purpose Building (Warehouse) at
General Silvestras Žukauskas Training Area, Meškerinė Village, Pabradė
Eldership, Švenčionys District
REPORT OF ENGINEERING GEOLOGICAL
SURVEY
Analysis stage: Design studies
Geotechnical category: Second
Report Revision Date: April, 2017.
Contractor: UAB ,,Geoconsulting"
Director Signature M. Stankevičius
Project manager Signature Engineer Geologist T. Skala
Round stamp
KLAIPĖDA, 2017
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
CONTENT
Summary of the analysis report ................................................................................................3
Explanatory note
1. Introduction ....................................................................................................................... 4
2. Methodology of Works ................................ ...................................................................... 4
3. General Data on the Construction Site ............................................................................... 6
4. Geological Structure .......................................................................................................... 7
5. Hydrogeological Conditions .............................................................................................. 7
6. Soil Composition and Engineering Geological Layers.................................................... ..8
7. Physical and Mechanical Properties of Soils ..................................................................... 9
8. Geological Processes and Phenomena ............................................................................. 10
9. Conclusions and Recommendations ................................................................................ 10
10. List of Literature .............................................................................................................. 11
Textual Annexes
1. Technical task of engineering geological surveys ............................................................ 13
2. Permission to Explore the Underground Resources No. 1062558 ..................................... 15
3. List of coordinates and altitudes of test points ................................................................. 16
4. Metrological verification of Geotechnical Testing (CPT) equipment ............................... 17
5. Laboratory test results ...................................................................................................... 20
6. Abbreviations, sizes, maks, and units of measurement used in the report.... ................... 23
Graphic Annexes
1. Diagram of the location of the research site in the area ............................................. 1 page
2. Plan with test sites ..................................................................................................... 1 page
3. Test borehole columns with geotechnical test CPT curves ....................................... 3 pages
4. Engineering geological sections ................................................................................ 2 pages
UAB "Geoconsulting" tel.: 8-612-84305, E.mail [email protected], www.geoconsulting.lt 2
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
Summary of the analysis report
JSC Geoconsulting conducted engineering geological surveys of a special-purpose building
site in the Švenčionys district municipality, Pabradė eldership, Meškerinė village, at General
Silvestras Zukauskas Polygon. The projected building is classified as a special category of
buildings.
In the course of the research, boreholes were drilled in 3 points, 3 dredged samples were
taken and geotechnical probing (CPT-TE1) was performed. The geological structure of the plot to
depth of 9.6 m consists of: plant layer (pdIV), fluvioglacial sediment (fIIIbl) of the upper
Pleistocene Baltic under measure. Surface groundwater aquifers were identified at study point No.
3. It occurred at a depth of 7.8 m from the ground (141.5 m abs.h.). Following the interpretation of
field and laboratory material, 8 engineering geological layers (IGS) are distinguished, the main
characteristics of which are given in Table 1.
Table 1. Characteristic values of the basic properties of the layers
IGS No. Soil
type
Stratigraphi
c Index Soil name qc, MPa k kN/m3 Idk v.d. k
°
Ek, MPa E0, MPa
1 Mg pd IV Ts 6.25 Cannot be used for building foundation
2
Cl
f III bl
M Sa 4.29 17.6 0.51 31.5 33.2 12.8
3 M Sa 6.85 18.4 0.63 34.2 44.2 30.4
4 M Sa 12.62 19.3 0.70 37.8 72.7 46.8
5 F Sa 16.37 20.3 0.78 39.3 109.3 56.0
6 grSa 8.11 18.8 0.53 35.1 63.1 33.9
7 Sa
grSa 16.08 19.5 0.70 39.1 85.8 55.0
8 grSa 29.18 20.5 0.94 42.6 127.1 83.9
Table 2. The complexity of the engineering geological conditions of the construction site under [1]
1. Geomorphological simple medium complex
Number of relief genetic types 1-2 3-4 >4 Technogenic terrain changes there is no small changes the terrain is heavily changed Groundsurface slope.0 <10 10-25 >25 Erosion, thermo sinkhole, suffosial and other negative forms of relief there is no Are few and small Are many and big
Distance to Inconsistent slopes and
eroded shores, m >100 100-50 <50
2. Geological simple medium complex
Genesis of subsoil layer (earth) pre-quaternary rocks, main morena, fluvioglacial, old alluvial, furrow
alluvial derivatives
hypergene morena, limnoglacial, marine, colic, alluvial derivatives
pre-sinkhole rocks, pre-quaternary rocks, side derivatives, wash alluvial, biogenic and technogenic deposits
Ground primers Gravel, sand, moraine clay and dust
(their varieties), rock
clay, strip clay, alluvial clay and dust, weather rock
sludge, sapropel, peat, quicksand,
technogenic derivatives Number of layers of different lithological types <3 3-5 >5
Pre-quaternary layers of rocks there is no can be are sinkholed or rotten
Relatively weak layers there is no occur in the upper part of the section
and a small thickness Occur deeper and of great thickness
Fluffy, alluvial or crack thicknesses there is no Planningly formed, compacted or
compressed cluttered, non-compacted or
compacted
The nature of cleavage horizontal and sub-horizontal
continuous layers
Incoherent non-heterogeneous
layers and lenses complex configuration layers, lenses, chips
Buried paleorelief forms there is no Can be there are buried paleo sketches
3. Hydrogeological simple medium complex Depth of ground water occurring level, m >3 2-3 <2
Possible groundwater change level amplitude, m <0,5 0,5-1 >1
Spread of aquifer layer uniform, continuous discrete, of uneven thickness complicated, complex
UAB "Geoconsulting" tel.: 8-612-84305, E.mail [email protected], www.geoconsulting.lt 3
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
Data on corrosive aggressiveness of groundwater water is not aggressive Set weak aggression water is aggressive
Drainage installations or
pipelines with water there is no
There are working, hydraulically tested
is unclear or is, disorderly or not
working Water conductivity of layer water supply small big or very unequal
Depth of hydrostatic pressure and hydrostatic pressure there is no compression layer
depth over 20 m, piezometric level deeper than 2 m from the ground
depth less than 20 m, piezometric depth is in less than 2 m depth
Groundwater interactions with
surface waters no interaction weak interaction
is a hydraulic interaction
Groundwater discharge zone, springs, sources there is no in an adjacent area on the same plot
4. Geodynamic simple medium complex
Seismicity according EMS 98 up to 3 points up to 6 points more than 6 points
Manifestations and phenomena of the sink hole process there is no there is no
is
Landslides, other damage
to slope stability there is no
stabilized active
Other geodynamic processes and phenomena there is no
local intense
Deformations of structures there is no in an adjacent area on the same plot
Note: The table graph that most accurately describes the plot conditions is highlighted.
Explanatory note
1. INTRODUCTION
JSC Geoconsulting conducted engineering geological surveys of a special-purpose
building site in the Švenčionys district municipality, Pabradė eldership, Meškerinė village, at
General Silvestras Zukauskas Polygon. The projected building is classified as a special category
of buildings.
The purpose of the research is to obtain objective information on the geological structure of
the site on which the building is being constructed, to draw up framework calculations,
distinguishing engineering geological layers (IGS) and to determine their intrinsic values.
Field works performed on February 27 of this year. Contractors:
• Engineer hydrogeologist Vaidas Piličiauskas - field works;
• Engineer geologist Tomas Skara - field work, interpretation of research material and
preparation of report;
• Engineer geologist Aurelija Bičkauskienė - preparation of report.
Territorial engineering geological conditions have been investigated at 3 locations indicated
by the customer (Graphic Annex 2), where borings were screwed, 3 soil samples and geotechnical
probing (CPT - TE1) were taken.
The description and methodology of the works are given in Chapter 2
2. METHODOLOGY OF WORKS
Test with conical penetrometer (CPT, TE1)
The CPT probe is primed with a stand-alone type penetrometer (compression force of
75kN, pulling force of 80kN, operating distance of 1200 mm, compression rate of 20 ± 5mm / s
during the CPT test), which is anchored on the ground with ground anchors.
During the CPT test, the following parameters recorded in the computer at intervals of 1
cm are measured directly: cone strength, lateral friction strength, water pressure (type u2, only
during TE2), probe inclination, pressure velocity and probe length. The Geomil system is used
for the measurements. The system consists of:
a) CPTU probe S10CFIIP.S15076 of substraction type (cone base area is 10 cm2, cone
angle is 60 °, cone diameter is 35.7 mm, side friction coupling area 150 cm2, maximum load per
cone l00 kN, maximum load for lateral friction 15 kN, maximum load for water pores pressure
UAB "Geoconsulting" tel.: 8-612-84305, E.mail [email protected], www.geoconsulting.lt 4
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
of 20 bar, allowed overload of all transducers is 150 % are, whose metrological verification is given
in Appendix 3
b) probing rods (diameter 32mm, length 1m);
(c) data recorder (depth-gauge, GME500 data interface, 30 m probing cable, Panasonic
CF-M34 outdoor computer);
d) Software (CPTest).
Tests were performed according to LST EN ISO 22476-1 [4].
Boring works, primary soil classification and sampling principles
Boreholes are drilled with driller VTX800 (diameter 90mm) with a range of closed-type drill
use. Drilling was carried out on passages of 1 – 2 m length. The borehole was visually inspected at
the test site and primary soil identification was performed determining the main fraction and
describing the secondary fractions [2]. In this way, the soil is assigned to one of the six types, most
commonly describing the basic geotechnical properties: boulders, chipping, gravel, sand, dust and
clay. If the primer consists of organic matter, it is classified as organic primer. A soil sample
corresponding to quality grade 2 to 5 [5] is taken from a propeller wing or by a special primer puller
from each different soil type and depth range selected for laboratory testing
Laboratory tests
Laboratory tests of soil samples were performed by Sweco hidroprojektas UAB laboratory.
The test results summary table is given in Textual Annex No 5. Depending on the type of primer
detected during primary identification, appropriate research methods for the accurate classification
of soils into classes have been selected.
• Granulometric composition (gravel, sand, dust and clay). Not provided for very coarse
soils;
• natural density, solid particle density (clay);
• natural, fluid and plastic moisture (clay);
• filtration coefficient (gravel and sand).
Report preparation
The survey report was prepared in accordance with the requirements of normative
documents [1, 5] and recommendations of published publications [6.1, 8]. Software used GME
CPTask v1.20, Cpet-it v.1.6.0.43, Microsoft Office (Word, Exel), Autocad2011LT. The geological
modeling methodology is described below
As mentioned in the introduction, one of the main aims of the IG design analysis is to
establish a substrate calculation scheme excluding engineering geological layers (IGS). Their
exclusion, in addition to the totality of geological features, is based on uniformity of composition,
physical condition and properties. Uniformity of composition is determined by primary soil
distribution into types correlating with laboratory tests (granulometric composition) and
geotechnical probing (CPT) data. The result of the correlation is the final grading of the soils
according to the granulometric composition [3] and the assignment to one of the soil types
according to the SBT index ICSBT [7]. It is this interface between the granulometric composition and
the SBT chart that allows the continuation of IG layers by physical condition and analysis of CPT
data array using mathematical statistics methods.
Following the IGS distribution according to the composition, the transition to geological
modeling is completed. According to the value of the conical strength, the primers are divided into
layers of different physical states (sands by density, dust and clay by strength) [9], the boundaries of
layers (ridge and pad) are adjusted by mathematical statistical methods. Model verification is
performed by combining test data from all test points in the Cpet-it program, statistical parameters
(mean, extreme values) for each IMS are calculated in the resulting data array.
From the CPT test results using the correlation dependencies described in the LST EN
1997-2 document [5] and their updated versions [6, 7], the following geotechnical parameters of the
IG layers were calculated.
UAB "Geoconsulting" tel.: 8-612-84305, E.mail [email protected], www.geoconsulting.lt 5
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
1. Specific gravity y (calculated for gravel, sand and dust soils):
=0.27[logRf]+0.36[log(qc/pa)]+1.236
2. Density Index ID (calculated for gravel and sand primers):
ID= √𝑄𝑐𝑛
𝑜
305𝑄𝐶 𝑄𝑂𝐶𝑅𝑄𝐴 , where 𝑄𝑐𝑛 = (𝑞𝑐/𝑝𝑎 ) /(𝜎𝑣0/𝑝𝑎)0,5
3. Primer density:
𝜌 =𝛾
𝑔
4. Effective internal friction angle𝜑 (calculated for gravel and sand primers):
𝜑 = 23 + 13,5 log 𝑞𝑐, [5]
6. Elasticity Young modulus E (calculated for gravel and sand primers):
E = 2.5qc for symmetrical foundation, E = 3.5qc for belt foundations [5]
Or
E = 𝛼𝐸 (𝑞𝑐 − 𝑠𝑣𝑜), where 𝛼𝐸 = 0.015[10(0,55𝑙𝑐+1,68)] [7]
7. The deformation module E0 is calculated according to these dependencies [6]:
For non-compressed and organic primer E0 - qc;
Very loose sand and gravel E0 = 1,5 qc;
Loose sand and gravel E0 = 3,0 qc;
For medium density and dense sand E0=7,8 ∙ 𝑞𝑐0,71
q; ;
Moraine fine primers (sandy clay dust or sandy dusty clay):
when qc < 2,5MPa, E0 - 10,0 qc;
when qc > 2,5MPa, Eo=12,0qc
For non-moraine dusty clay, sandy dusty clay E0 = 7,0 qc
For moraine clay or dusty sand (plastic primer) and non- moraine dust E0 = 5,0 qc
Clay-free impurities (Cl) E0 = 8,2 𝑞𝑐-3,l;
Note: The characteristic value of the conical strength qck is used in the formulas
8. Non-drained cohesion Cu (is calculated for dust and clay soils) [7]:
Cu= (qt - v) / Nkt, where Nkt, depending on plasticity, varies from 10 to 18
NOTES:
• for sand and gravel soils qc = qt [7];
• In calculating the properties of weak (paths, pathways, and soft plastic) dust and clay
soils, only the corrected cone strength qt value is used in formulas. [7];
• For calculating the properties of other (weak) dust and clay soils, qc values of conical
strength can be used in the formulas [7].
3. GENERAL DATA ON THE CONSTRUCTION SITE Natural conditions
The plot of the projected building is located in Meškerinė village, Švenčionys district.
Geomorphologically, the area under study belongs to the geomorphological area of the last icing
fluvioglacial plain in the Juzina fluvioglacial plain of the Northern Plain District. The absolute
altitudes of the terrain at the survey sites are 149.3 - 151.3 m.
UAB "Geoconsulting" tel.: 8-612-84305, E.mail [email protected], www.geoconsulting.lt 6
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
The slope of the earth's surface on the test plot does not exceed 10 °. There are no forms of
erosion, thermo sinkhole, suffosion, and other negative terrain on the plot. Distance to volatile
slopes and eroded shores is larger than 100 m.
Climate (based on LHMT data). The plot is located in the mid-latitude climate zone and
belongs to the South-Eastern Highlands District of Aukštaičiai, the southwestern subdivision of
the Atlantic continental forest area. Average annual air temperature is 6.1 - 6.7 ° C. Absolute
minimum temperature ~ 32.8 ° C, maximum 35.3 ° C. The amount of precipitation per year is
about 610 – 690 mm. The duration of the snow cover is about 90 - 105 days. The duration of solar
radiation is about 1690 -1770 hours. The most important processes that cause interregional climate
differences are intensification of turbulent air circulation and thermal convection in hilly terrain,
impact of local height and the formation of powerful temperature inversions in winter.
Normal seasonal frost depth for sandy soil up to l, 2 m, for clay - up to l, 5 m
4. GEOLOGICAL STRUCTURE
The geological structure of the plot to depth of 9.6 m consists of: vegetation layer (pdIV),
fluvioglacial sediment (fIIIbl) of the upper Pleistocene Baltic under measure.
The vegetation layer (pdIV) consists of soil, sand, dark brown. The complex is isolated at
all test points. Its thickness is 0.2
Fluvioglacial sediment (fIIIbl) of the upper Pleistocene Baltic under measure consists of
Medium coarse sand (MSa), light brown and brown, slightly wet - wet - watery;
Fine sand (FSa), light brown, moist,
Gravel sand (grSa), brown and gray, gray-brown, wet -watery
The complex is isolated at all test points. Its sole have not been reached. The thickness
tested is 9.4 m.
Summarizing the results of the survey it can be stated that the subsoil layer consists of
fluvioglacial sediments. Ground Soil is Medium Coarse Sand. There are 4 lithological soil types in
the territory. Relatively weak layers (IGS1-IGS2) occurred at various depths of up to 3.9 - 8.5 m
from the ground. Sub-horizontal solid layers and lenses are common in the section. Buried
paleorelief forms and pre- quaternary rocks were not found.
5. HYDROGEOLOGICAL CONDITIONS
Primer watery horizon is set in borehole No. 3. It occurred at a depth of 7.8 m from the
ground surface (141.5 m abs. h.). The water can be found in moderate gravel and gravelly sand.
Possible change of groundwater level is about 1.0 m. The average coarse and fine sand filtration
coefficient determined is respectively - 4.4 - 6.8 m / d and 2.3 m / d. There are no groundwater
interactions with surface waters and groundwater discharge in survey site.
UAB "Geoconsulting" tel.: 8-612-84305, E.mail [email protected] , www.geoconsulting.lt 7
April, 2017
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
Report of Engineering Geological Survey
6. SOIL COMPOSITION AND ENGINEERING GEOLOGICAL LAYERS
After the analysis of the research material, 8 engineering geological layers (IGS) were
identified, the descriptions of which are presented in Table 3
Table 3. Geological description of IGS.
IGS No. Geological description of the layer (according to LST EN ISO 14688-1)
IGS 1 Plant soil layer (Ts): soil, sandy, dark brown. The layer is separated at all test points. Its
thickness is 0.2 m
IGS 2 Medium coarse sand (MSa), light brown and brown, slightly wet - wet - watery, fluffy.
The layer is separated at all test points, at different depths. Its thickness is 1.6 - 2.2 m
IGS 3
Medium coarse sand (MSa), light brown and brown, slightly wet - wet, medium
density. The layer is separated at all test points, at different depths. Layer thickness 0.4
- 3.4m
IGS 4 Medium coarse sand (MSa), brown, slightly wet, dense. The layer is separated at the
test points no. 1 and No. 4. Layer thickness 0.7 - 1.6 m
IGS 5 Fine sand (FSa), light brown, wet, dense. The layer is identified at the test point No. 1.
Its thickness is 1.2 m
IGS 6 Gravel sand (grSa), brown, gray-brown, wet -watery, medium density. The layer is
separated at all test points. Its thickness is 0.3 - 0.7 m
IGS 7
Gravel sand (grSa), brown, gray-brown, wet-watery, dense. The layer is separated at all
test points. At the test point no.1, its sole did not reach.
The thickness studied is 0.9 m
IGS 8
Gravel sand (grSa), brown and gray, gray-brown, wet-watery, very
dense. The layer is isolated at the test points no. 2 and Nr. 3. his pad did not reach.
The thickness studied is 0.4 - 0.5 m.
UAB "Geoconsulting" tel.: 8-612-84305, E.mail [email protected] , www.geoconsulting.lt
8
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017
Construction Project 7. PHYSICAL AND MECHANICAL PROPERTIES OF SOILS
Table 4 shows the geotechnical probing values, basic statistical indicators, and the aggregate values of the physical and mechanical properties of the extracted
geological layer (IGSs).
Table 4. Summary table of geotechnical probe values, basic statistical indicators, aggregate values of physical and mechanical properties of soils
IGS No.
Soil Type
Stratigraphic Index
Soil name
qc, MPa n S qckmin, MPa
k,
kN/m3
k, Mg/m3
s,
Mg/m3
e,
vnt.d. w, % WL, % wp, % I, %
IL, vnt.d.
k, m/d Idk, v.d.
Ek, MPa
k,
°
E0, MPa
1 Ts pd IV Ts 6.25 48 3.86 5.32 Cannot be used for basic foundation
2
Sa
f III bI
MSa 4.29 843 0.74 4.25 17.6 1.79 2.67* - - - - - - 6.8* 0.51 33.2 31.5 12.8
3 MSa 6.85 1050 1.35 6.78 18.4 1.88 - - - - - - - - 0.63 44.2 34.2 30.4
4 MSa 12.62 232 1.33 12.48 19.3 1.97 2.66* - - - - - - 4.4* 0.70 72.7 37.8 46.8
5 FSa 16.37 121 2.04 16.06 20.3 2.07 2.67* - - - - - - 2.3* 0.78 109.3 39.3 56.0
6 grSa 8.11 133 1.20 7.93 18.8 1.92 - - - - - - - - 0.53 63.1 35.1 33.9
7 grSa 16.08 163 3.34 15.65 19.5 1.99 - - - - - - - - 0.70 85.8 39.1 55.0
8 grSa 29.18 66 3.79 28.40 20.5 2.09 - - - - - - - - 0.94 127.1 42.6 83.9
Note: Typical values are calculated at 95% confidence level
* - presented results of laboratory tests
UAB "Geoconsulting" tel.: 8-612-84305, el. paštas: [email protected], www.geoconsulting.lt 9
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
8. GEOLOGICAL PROCESSES AND PHENOMENA
From the modern physical and geological processes that are prevalent in the exploration
plot, it is necessary to evaluate the wind-induced drifting and the resulting hollows, valleys.
According to the danger of sinkhole suffusion, the area is classified as non-hazardous.
9. CONCLUSIONS AND RECOMMENDATIONS
1. The site of the Construction Project is located in Meškerinė village, Švenčionys district.
Geomorphologically, the area under study belongs to the Geomorphological Area of the Last
Glaciation Fluvioglacial Plain in the Juzina Fluvioglacial Plain District of the Northeast Plain
District
2. The absolute altitudes of relief in the investigations sites are 149.3 - 151.3 m.
3. From the modern physical and geological processes that are prevalent in the exploration plot, it
is necessary to evaluate the wind-induced drifting and the resulting hollows, valleys.
4. According to the danger of sink hole suffusion, the area is classified as non-hazardous.
5. The geological structure of the site to depth of 9.6 m consists of: plant layer (pdIV),
fluvioglacial sediment (fIIIbl) of the upper Pleistocene Baltic under measure.
6. Groundwater horizon aquifers are set in borehole No. 3. It occurred at a depth of 7.8 m from the
ground (141.5 m abs. h.). The possible change of groundwater level is about 1.0 m.
7. 8 engineering geological layers (IGS) were identified in the geological model of the site, which
conditions of occurring are shown in the lithological columns of the boreholes (graphical
annex No 3) and in the geological engineering sections (Graphical Annex No 4).
8. The estimated characteristic values of the physical mechanical properties of IGS soils are
given in Chapter 7 of the report (Table 4).
9. The IG layer on the site under analysis is inappropriate and No 2 is not recommended for
installing building foundation.
10. The geomorphological and geodynamic conditions of the construction site are simple and
geological and hydrogeological – complex.
11. During construction, finding that the geological model submitted does not correspond to the
actual situation, it is necessary to inform the contractor.
Engineer geologist A. Bičkauskienė
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 10
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
10. LIST OF LITERATURE
1. STR. 1.04,02:2011 „Engineering Geological and Geotechnical investigations, State news
2012-01-07, No. 5-144.
2. LST EN ISO 14688-1. Geotechnical investigations and testing. Soil identification and
classification. Part 1. Identification and description.
3. LST EN ISO 14688-2. Geotechnical investigations and testing. Soil identification and
classification. Part 2. Principles of classification.
4. LST EN ISO 22476-1. Geotechnical investigations and testing. Field tests. Part 1. Pressure test
using electric and piezoelectric cone
5. LST EN 1997-2. Eurocode 7. Geotechnical design. Part 2. Base investigations and testing.
6. T. Lunne, P.K. Robertson and J.J.M. Powell, Cone Penetration testing in Geotechnical
Practice. Originally London: Blackie Academic & Professional, then New York: Spon Press
and E&F Spon, 1997.
7. Guide to Cone Penetration Testing for Geotechnical Engineering. P.K. Robertson and K.L.
Cabal (Robertson). Gregg Drilling & Testing Inc. November 2012.
8. Foundations and fundamentals. D. Sližytė, J.Medzvieckas, R.Mackevičius. Textbook. Vilnius,
Technika" 2012.
9. Project Engineering Geological and Geotechnical Investigations Recommendations approved
by the Director of the Lithuanian Geological Survey under the Ministry of Environment on 16
November 2015 by Order No 1-222 "On the Approval of Design Engineering Geological and
Geotechnical Investigations Recommendations“.
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 11
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
Textual Annexes
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 12
April, 2017
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
Report of Engineering Geological Survey
Textual Annex No 1.1
TECHNICAL TASK
IGG investigations stage (underline): reconnaissance, design, additional - control.
The name of the designed building: CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE BUILDING (WAREHOUSE)
AT GENERAL SILVESTRAS ZUKAUSKAS TRAINING AREA,
MEŠKERINĖ VILLAGE, PABRADĖ ELDERSHIP, ŠVENČIONYS DISTRICT.................................
The address of the designed building (municipality eldership, settlement, street, building number): ŠVENČIONYS DISTRICT, PABRADĖ ELDERSHIP, MEŠKERINĖ VILLAGE.
Customer and / or designer data (name, address, phone, fax, email) „JSC „Panevėžio miestprojektas" Respublikos st. 15, 35185 Panevėžys. tel. 8-45 582667 , e-mail [email protected].....................................................................................
Type of construction (underline): new construction, reconstruction, overhaul, other ............
.....................................................................................................................................................
Purpose of the building (according to STR 1.01.09: 2003): Special purpose building .........
Building Category: Special Building .......................................................................................
Geotechnical category (in design studies) (underline): first, second, third.
Special Design Conditions for a Building (if any).................................................................
...there is no .......................... ....................................................................................................
Data about the parameters of the projected building: 105.0m long x 20.0 m wide
Predicted variants of foundation structures: piles, strip foundation of ramps
Loads and intensity of their transfer to the base
N = 250.0 kN / pile under the column; q = 25.0 kN / m2
Other settings ..................... ....................................................................................................
Construction site center coordinates (LKS-94): X 6100732,30 Y 614596,37
Building site boundaries and boundary coordinates
Number X Y
1 6100732,62 614538,97
2 6100784,91 614532,67
3 6100829,62 614651,14
5 6100779,28 614670,14
6 61007389,1 614593,00
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 13
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
Textual Annex No 1.2
Additionally set geotechnical parameters: 1. Static probing..............................................................................................................................
2. ........................................................................................................ .....................................
List of normative documents under which investigations are conducted: 1. Construction Technical Regulation. 1. STR. 1.04,02:2011 „Engineering Geological and Geotechnical investigations, 2. LST EN ISO 14688-1. Geotechnical investigations and testing. Soil identification and classification. Part 1. Identification and description (ISO 14688-2:2002). 3. LST EN ISO 14688-2. Geotechnical investigations and testing. Soil identification and classification. Part 2. Principles of classification (ISO 14688-2:2004). 4. LST EN ISO 22476-1:2012 . Geotechnical investigations and testing. Field tests. Part 1. Standard penetration test
Previously geological surveys carried out on the site:
1. ................................................................................................................................................
2. ..............................................................................................................................................
3. ...............................................................................................................................................
Other additional requirements 1. Provide geological sections according to the locations indicated in the master plan and the harmonized survey report in analog and digital DOC and DWG formats. 2. Make recommendations for foundation installation............................................. ...................................................................................................................................... ..........
Client:
JSC „Panevėžio miestprojektas"
Director Vytautas SUKACKAS /signature/ 07-02- 2017
Project manager Marijus PONOMARIOVAS /signature/ 07-02- 2017
I got the assignment (research company representative)) /signature/ 23-02-2017
Name, surname, signature, date
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 14
April, 2017 Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area, Meškerinė Village, Pabradė Eldership, Švenčionys District
Report of Engineering Geological Surve Textual Annex No
Lithuanian Geological Survey
under the Ministry of Environment of the Republic of Lithuania
Order of 2013 October 9 No. I-149 Annex
(coat of arms)
LITHUANIAN GEOLOGICAL SURVEY
UNDER THE MINISTRY OF ENVIRONMENT ON THE REPUBLIC OF
LITHUANIA
PERMISSION
To explore the underground resources
09-10-2013 No 1062558
(date)
In accordance with the Law of the Republic of Lithuania for the underground resources,
it is permitted to:
JSC „Gęoconsulting“
(name of the legal entity / name of the natural person)
(Code (applicable to legal persons), registered office 141884781 (address) Klaipėda city municipality, Klaipėda city Žolynu st. 29-1)
since 09-10-2013 (the date of entry into force of the permit)
T o p e r f o r m :
hydrogeological mapping of underground natural resources, geochemical mapping of underground natural resources, ecogeological mapping of underground natural resources, engineering geological mapping of underground natural resources, geological (geotechnical) investigation, ecogeological survey.
Deputy Director,
acting Director
Signature Jonas Stankūnas
Round stamp LITHUANIAN GEOLOGICAL SURVEY
UNDER THE MINISTRY OF ENVIRONMENT ON THE REPUBLIC OF LITHUANIA
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 15
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
Textual Annex No 3
List of coordinates and altitudes of test points
Test point and its
number
Coordinates (LKS'94) Altitude, m
X Y Z
1 6100751 614558 150,7
2 6100798 614593 151,3
3 6100801 614654 1493
Coordinate system - state (LKS'94).
Height system - LAS07.
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 16
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
Textual Annex No 4.1
Calibration certificate
GS10CFII P.S15076 I 001 Geomil
equipment
Code number GS10CFII P.S15076 Client JSC Geoconsulting
Kind of cone Subtraction Zolynu st. 29-1
Calibration date 26 Nov 15 92325 Klaipeda
Print date 26 Nov 15 Lithuania
Channel 1
Range
Ac
Zero load reading
a-factor
Core resistance (Qc)
0...100 kN
1000mm2
206 mV
0,8
Channel 2
Range Ac
Zero load
reading b-factor
Offset
Lo0...100 kNvcal sleeve
friction (fs)
0...100kN mm2
15000 mm2
190 mV
0 80 mm
Channel 3
Range
Zero load reading
Pore pressure (u)
0...20 Bar
195 mV
Load (kN) Load (MPa) Output (mV) Load (kN) Load (MPa) Output (mV) Load (kN) Load (MPa) Output (mV)
0 0 0 0 0,000 0 0 0,0 0
10 10 849 10 0,667 870 2 0,2 837
20 20 1702 20 1,333 1748 4 0,4 1695
30 30 2550 30 2,000 2618 6 0,6 2538
40 40 3406 40 2667 3497 8 0,8 3381
50 50 4253 50 3,333 4367 10 1,0 4221
60 60 5111 60 4,000 5248 12 1,2 5061
70 70 5956 70 4,667 6118 14 1,4 5900
80 80 6809 80 5,333 6994 16 1,6 6737
90 90 7654 90 6,000 7860 18 1,8 7570
100 100 8504 100 6,667 8734 20 2,0 8400
90 50 7660 90 6,000 7867
80 80 6815 80 5,333 7000
70 70 5964 70 4,667 6125
60 60 5115 60 4,000 5254
50 50 4260 50 3,333 4375
40 40 3409 40 2,667 3502
30 30 2360 30 2,000 2634
20 20 1707 20 1,333 1755
10 10 851 10 0,667 876
0 0 1 0 0,000 2
Zero load error 0,01% Zero load error 0,02% Zero load error 0,02%
Max.linearity 0.15% Max.linearity 0.16% Max.linearity 0.25%
Max.hysteresis 0.12% Max.hysteresis 0.18%
Westbaan 240 – 2841 MC Moordrecht - The Netherlands
P.0. Box 450 ·2800 ALGouda ·The Netherlands
T. +31(0)172 427 800 ·F.+31(0) 172 427 801
lnfo@ geomil.com ·www.geomil.com
Bank Rabobank ·Account no. 1350.49.229
IBAN NL78 RABO 01350492 29 ·BIC RASONL2U
VAT no.NL812396212B01
Chamberof Commerce no.2435053
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 17
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
Textual Annex No 4.2
Calibration certificate
GS10CFII P.S15076 I 001 Geomil
equipment
Channel 4 Inclination X Channe5 Inclination Y Channel 6 None
Range -20…20* Range -20…20*
Angle (“) Output (mV) Angle (‘) Output (mV)
-20 2540 -20 2515
-15 2614 -15 2585
-10 2684 -10 2655
-5 2757 -5 2729
0 2832 0 2800
5 2905 5 2876
10 2987 10 2950
15 3057 15 3018
20 3126 20 3089
Calibration instrument(s)
Certificate number(s)
Date(s)
CW-921007.01 14203331 21-Aug-14
We declare that the electrical cone with serial number GS10CFllP.S15076 has been calibrated and that the
specifications are according to the ISO 22476-1: 2012 (Geotechnical investigation and testing - Field testing - Part 1:
Electrical cone and piezocone penetration test), Application Class l. The calibrations are traceable to national and
international standards.
Date
Calibrated by
26-Nov-15
Patricia Treffers
Date
Approved by
26-Nov-15
Awring Shaways
Signature / / Signature / /
Westbaan 240 – 2841 MC Moordrecht - The Netherlands
P.0. Box 450 ·2800 ALGouda ·The Netherlands
T. +31(0)172 427 800 ·F.+31(0) 172 427 801
lnfo@ geomil.com ·www.geomil.com
Bank Rabobank ·Account no. 1350.49.229
IBAN NL78 RABO 01350492 29 ·BIC RASONL2U
VAT no.NL812396212B01
Chamberof Commerce no.2435053
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 18
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
Textual Annex No 4.2
Sheet 60.10
Geomil
equipment
CALIBRATION CERTIFICATE
Certificate number: 500 / 131001-407 / 1
Client: DAB Geoconsulting
Zolynu st. 29-1 92325
Klaipeda LT
Item:
Type:
Serial number:
Data Acquisition System
GME-500 IP65
131001-407
Applied instruments: Type: Serial number:
Calibrator
Fluke 715
7869044
Certificate number:
Calibration date:
Calibrated by:
1055703
17-Jan-2013
Fluke CalNet®
Measuring results Channel Input-
Signal
(V)
Output-
Signal
(Counts) Deviation %
Channel Input-
Signal
(V)
Output-
Signal
(Counts) Deviation %
1 0.000 00000 0.0000 5 0.000 00000 0.0000 5.000 15000
0.0000 5.000 15000 0.0000 10.000 30000
0.0000 10.000 30000 0.0000 2 0.000
00000 0.0000 6 0.000 00000 0.0000
5.000 15000 0.0000 5.000 15000
0.0000 10.000 30000 0.0000 10.000 30000 0.0000
3 0.000 00000 0.0000 7 0.000 00000 0.0000 5.000 15000 0.0000 5.000 15000 0.0000
10.000 30000 0.0000 10.000 30000 0.0000 4 0.000 00000 0.0000 8 0.000 00000 0.0000
5.000 15000 0.0000 5.000 15000 0.0000 10.000 30000 0.0000 10.000 30000 0.0000
This certificate has been provided with the reservation, that no liability is accepted and that the applicant indemnifies GeoMil Equipment from any third party liability. We declare (hat above mentioned item has been calibrated and that its specifications are according to the prEN ISO 22476-1.11. Application Class 1 and NEN 5140, Class I. The calibrations are traceable to national and international standards.
Date: 9-Dec-13 Executed by:
Date: 9-Dec-13 Approved by:
M. Aarab M. Attayaibi
Westboan 240• 2841 MC Moordrccht - The Netherlands
P.O. Box 450 – 2800 AL Govda - The Netherlands T. +31 (0)172 427800-F. +31 {0)172 427 801
[email protected] - www.geomil.com
Bonk Rabobank • Account No. 13S0.49.229 IBAN NL78 RABO 0135 0492 29 - BIC RABONL2U VAT no. NL812396212B01 - Chamber of Commerce no. 24353053 All business transacted is subject to METAAWNIE' conditions
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 19
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
Textual Annex No 5.1
SWECO
Strazdo st. 22. LT-48488 Kaunas, Lietuva
Tel. (8-37) 221056, Fax. {8-37) 321501
E-mail [email protected]
PROTOCOL FOR LABORATORY TEST OF SOILS No. 2017040602
1 CLIENT:
JSC „Geoconsulting", Žolynų st. 29-1, LT- 92325 Klaipėda
(Order No 0228-02)
2 OBJECT: Construction Project for the Special Purpose Building (Warehouse) at General Silvestras
Zukauskas Training Area, Meškerinė Village, Pabradė Eldership, Švenčionys District
3 DATE OF SOIL TRANSMISSION:
28-02-2017
4 DATE OF LABORATORY TESTING:
2017-04-06
5 NUMBER OF SOIL SAMPLES:
Three (3) sandy soil samples were delivered
6. TESTS DONE UNDER:
• LST EN ISO 14688-2:2007 Geotechnical investigations and testing. Soil identification and classification.
Part 2. Principles of classification
• LST EN ISO 17892-4:2017 Geotechnical investigations and testing. Laboratory soil tests. Determination of
granulometric composition.
• LST CEN ISO/TS 17892-11:2005 Geotechnical investigations and testing. Laboratory soil tests. Water
permeability detection at constant and variable pressure.
• LST EN ISO 17892-1:2015 . Geotechnical investigations and testing. Laboratory soil tests. Moisture
detections.
• LST EN ISO 17892-3:2016 Geotechnical investigations and testing. Laboratory soil tests. Determination of
soil particle density
7. NOTES No
8. PROTOCOL ANNEXES:
• Table of Results of Laboratory Tests - 1 page
• Granulometric composition curves - 1 sheet
Compiled by: Head of Laboratory
Irena Jančiukienė Signature
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 20
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
Textual Annex No 5.3
SWECO
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area, Meškerinė Village, Pabradė Eldership, Švenčionys District
Granulometric composition distribution curves (LST EN ISO 17592-4 2017)
The name of the soil and Medium Sand Mark (MSa)
Perc
enta
ge o
f to
tal m
ass p
art
Boring
No Sample
No Sampling depth (m)
? ? ? ? C0 CC
1 1 1,4 - 1,6 0,1857 0,2481 0,3207 0,3647 2,2 1,0
The name of the soil and Medium Sand Mark (MSa)
Perc
enta
ge o
f to
tal m
ass p
art
Boring
No Sample
No Sampling depth (m)
? ? ? ? C0 CC
1 2 5,5 – 9,8 0,1319 0,2093 0,2859 0,3342 2,5 1,0
The name of the soil and fine Sand Mark (FSa)
Perc
enta
ge o
f to
tal m
ass p
art
Boring
No Sample
No Sampling depth (m)
? ? ? ? C0 CC
1 3 5,5 - 6,8 0,0707 0,1332 0,1633 0,1608 2,6 1,39
Compiled by: I. Jančiukienė Signature
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 22
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
Textual Annex No 6
Abbreviations, sizes, marks, and units of measurement used in the report
- Specific gravity. kN / m3
w - water specific gravity, kN / m3
- natural (mass) density, Mg / m3
s density of solid particles (mass), Mg / m3
e - porosity factor, unit size
w - natural moisture,%
wL - Flow Moisture,%
wp - moisture content of plasticity,%
Ip - plasticity index,%
IL - Flow rate, unit size
ID - density index, unit size
k - filtration factor, m / d
pa - atmospheric pressure, MPa
v0 - effective vertical tension, MPa
g - free fall acceleration, m / s2
E - Young's modulus, MPa
Eo-deformation modulus (total deformation modulus), MPa
Go - Shear Modulus (for small deformation zone), MPa
cu - undiluted bond, kPa, MPa
'- effective angle of internal friction, degrees
Ic - consistency index, unit size
qc - conical strength, MPa
qt - corrected cone strength, MPa
Qc - Normalized Conical Strength after Vertical Tension, unit size
Qt, - normalized corrected cone strength after vertical tension, unit size
Qcn - Normalized conical strength after evaluation of vertical stress and its dependence on soil type,
unit size
Qtn - Normalized Corrected Conical Strength Based on Vertical Tension and its Dependence on
soil type, unit size
fs - lateral friction strength, kPa
Rf - ratio of lateral friction strength to cone strength,%
ICSBT - SBT (Ground Behavior Type) Index, unit size
Qc - compression ratio
QOCR reconsolation factor
QA - sediment age factor
n - Sample
x - sample average
S - standard deviation
Gr. - Borehole
IGS engineering geological layer
x, y - coordinates (LKS 94), m
Abs.a. - Absolute height, m
GVG - depth of groundwater occurrence depth, m
GVL - groundwater level, m absolute height
PVL - piezometric level altitude, m
CPT - cone penetrometer test
Note: The character with the letter k indicates the characteristic value.
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 23
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
GRAPHIC ANNEXES
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 24
Construction Project for the Special Purpose Building (Warehouse)
at General Silvestras Zukauskas Training Area,
Meškerinė Village, Pabradė Eldership, Švenčionys District
April, 2017 Report of Engineering Geological Survey
Graphic Annex No 1
Diagram of the location of the research site in the area
JSC "Geoconsulting" tel.: 8-612-84305, E-mail [email protected], www.geoconsulting.lt 25
PLAN SYMBOLS
- borehole location, its No. and the mouth altitude - engineering geological section, its No.
- CPT test site, its No. and the mouth altitude
Height System - LAS'07, Coordinate System – LKS94
Position Name, surname Signature Client
UAB „Panevėžio miestprojektas“ Director M. Stankevičius Signature
Engineer geologist T. Skara Signature Object:
Construction Project for the Special Purpose Building (Warehouse) at General Silvestras Zukauskas Training Area, Meškerinė Village, Pabradė
Eldership, Švenčionys District
Brėžinys:
Plan with test sites
Contractor:
Permission
No Scale date
Graphic Annex
No..
1062558 1:500 2017.04.10 2
Borehole No1 With Geotechnical Test (CPT, TE1) curves Contractor:
UAB „Geoconsulting“ Tel. 8 612 84305, E-mail: [email protected] www.geoconsulting.lt
Object: Special Purpose Building (Warehouse) at General Silvestras Žukauskas
Training Area, Meškerinė Village, Pabradė Eldership, Švenčionys District
Drilling machine: VTX 800 Drilling method: screw, diameter 90mm SPTu probe: Geomil S10CFIIP.S15076 Eng. geologist: T. Skara
Date of research: 27/02/2017 Coordinate x, m: 6100751 Coordinate y, m: 614558 Abs. h., m: 150.7 Vertical scale 1:100
Borehole No2 With Geotechnical Test (CPT, TE1) curves Contractor:
UAB „Geoconsulting“ Tel. 8 612 84305, E-mail: [email protected] www.geoconsulting.lt
Object: Special Purpose Building (Warehouse) at General Silvestras Žukauskas
Training Area, Meškerinė Village, Pabradė Eldership, Švenčionys District
Drilling machine: VTX 800 Drilling method: screw, diameter 90mm SPTu probe: Geomil S10CFIIP.S15076 Eng. geologist: T. Skara
Date of research: 27/02/2017 Coordinate x, m: 6100798 Coordinate y, m: 614593 Abs. h., m: 151.3 Vertical scale 1:100
Borehole No3 With Geotechnical Test (CPT, TE1) curves
Contractor:
UAB „Geoconsulting“ Tel. 8 612 84305, E-mail: [email protected] www.geoconsulting.lt
Object: Special Purpose Building (Warehouse) at General Silvestras Žukauskas Training Area, Meškerinė Village, Pabradė Eldership, Švenčionys District Drilling machine: VTX 800 Drilling method: screw, diameter 90mm SPTu probe: Geomil S10CFIIP.S15076 Eng. geologist: T. Skara
Date of research: 27/02/2017 Coordinate x, m: 6100801 Coordinate y, m: 614654 Abs. h., m: 149.3 Vertical scale 1:100
Position Name, surname Signature Client
JSC „Panevėžio miestprojektas“ Director M. Stankevičius Signature
Engineer
geologist
A. Bičkauskienė Signature Object:
Construction Project for the Special Purpose Building (Warehouse) at
General Silvestras Zukauskas Training Area, Meškerinė Village, Pabradė
Eldership, Švenčionys District Drawing:
Engineering geological sections I-I‘, II-II‘. Contractor:
Permission
No Scale Date Graphic Annex No
1062558 V1:100,
H1:500 2017.04.10 4.1
Position Name, surname Signature Client
JSC „Panevėžio miestprojektas“ Director M. Stankevičius Engineer geologist A. Bičkauskienė Object:
Construction Project for the Special Purpose Building (Warehouse) at General Silvestras Zukauskas Training Area, Meškerinė Village,
Pabradė Eldership, Švenčionys District
Drawing:
Engineering geological section III-III‘.
Sutartiniai ženklai Contractor:
Permission
No. Scale Date Graphic annex No.
1062558 V1:100,
H1:500 10-04-2017 4.2
JSC „CAD360 GROUP UAB"
Žalgirio st.92, Vilnius LT- 09303, tel. (8 - 5) 2398111,
E-mail [email protected]
Company code 303353599.
VAT code. LT100008893714
Specialization Building Civil infrastructure Product Design & Manufacturing
WRITING
For use of legal software
21-03-2016, Vilnius
JSC CAD360 GROUP, Autodesk Inc. Corporation official representative in Lithuania,
confirms that JSC „PANEVĖŽIO MIESTPROJEKTAS“ (Company code 147693352) is
legally acquired and has the right to use this Autodesk Inc. company design software:
Software Serial / contract
number
Networking
Quantity
Autodesk AutoCAD Architecture 2012 361-44976080 Standalone 1
AutoCAD Architecture 2011 391-48576429 Standalone 1
Autodesk Robot Structural Analysis
Professional 2011 391-65977536 Standalone 1
AutoCAD Architecture 2008 344-77397612 Standalone 1
AutoCAD LT 2004 341-04307995 Standalone 1
AutoCAD LT 2005 342-11233471 Standalone 5
AutoCAD Architecture 2005 342-11233570 Standalone 1 1
AutoCAD Architecture 2004 341-16617988 Standalone 1
AutoCAD LT 2005 343-60351967 Standalone 5
Autodesk AutoCAD LT 2012 360-37467616 Standalone 1
AutoCAD LT 2016 Annual Subscription 110001203505 4
Software by Company Progman Oy:
Program Name Quantity Key
MAGICAD-Heatinq & Pipinq 2003.5 1 4386
MAGICAD-VENTIUTION 2003.5 1 4385
CAD360 GROUP UAB director Signature Renata Stulginskienė
COORDINATES OF THE EDGES OF THE
TERRITORY UNDER MANAGEMENT
SCHEME OF THE SITUATION
DESIGNED BUILDING
BOUNDARY OF THE
DESGINED LOT
BOUNDARY OF THE TERRITORY
UNDER MANAGEMENT
TREE TO BE CUT
49.\06 6100828,91
21
6100803,91
6100799
A •^150.97(
6100793,98
0789,7
152.701 me
6100781,94
E
1^,19 1^2.12
,J^2.17 6100771,79
6100765,70
iAĄmk,a
6100747,73 6100747,15
6100743,97
6100741,78
149.676
148.31
82/40-0339
48.84
.lffiTffil3
346
48.34
151.85
151.613 .151.
iii 317
1101973 50.82:7;
<150-9
; .149.109
SUTARTINIAI ŽYMĖJIMAI:
82/40-0359
No. PATALPA Plotas,
m²
101 Sandėlio patalpa (Nr. 2) 104,46
102 Elektros įvado patalpa 9,71
103 Įrangos techninės priežiūros ir smulkaus remonto
patalpa (Nr. 7) 83,90
104 Akumuliatorių krovimo patalpa (Nr. 10) 7,28
105 Techninė patalpa (Nr. 8) 19,14
106 Sandėlio patalpa (Nr. 1) 202,29
107 Katilinė 9,20
108 Sandėlio patalpa (Nr. 3) 44,62
109 Valymo inventoriaus patalpa 5,43
110 Vyrų WC 6,30
111 Vyrų dušai 3,61
112 Moterų WC 2,76
113 Vyrų persirengimo patalpa 7,00
114 Moterų dušas 1,71
115 Moterų persirengimo patalpa 4,66
116 Poilsio patalpa 11,51
117 Koridorius 20,88
118 Šaudyklų eksploatacijos skyriaus patalpa (Nr. 11) 38,17
119 Šaudyklų eksploatacijos skyriaus patalpa (Nr. 11) 38,17
120 Sandėlio patalpa (Nr. 4) 67,83
121 Sandėlio patalpa (Nr. 5) 67,71
122 Sandėlio patalpa (Nr. 6) 27,02
123 Sandėlio patalpa (Nr. 6) 27,99
124 Sandėlio patalpa (Nr. 6) 28,07
125 Sandėlio patalpa (Nr. 6) 27,99
126 Sandėlio patalpa (Nr. 6) 28,07
127 Sandėlio patalpa (Nr. 6) 27,99
128 Sandėlio patalpa (Nr. 6) 27,99
129 Sandėlio patalpa (Nr. 6) 28,07
130 Sandėlio patalpa (Nr. 6) 27,99
131 Sandėlio patalpa (Nr. 6) 28,07
132 Sandėlio patalpa (Nr. 6) 27,99
133 Sandėlio patalpa (Nr. 6) 27,02
VISO: 1090,60
12
74
0
40
00
60
00
60
00
40
00
55
50
5
55
0
25
0
30
0
25
0
10
0
10
0
11
90
0
45
50
2
50
0
48
50
EI
45
35
00
8
50
20
0
25
0
25
0
32
50
EI
45
10
0
11
90
0
20
00
1
00
0
EI
45
75
0
EI
45
81
50
35
50
20
0
38
50
2
50
0
18
00
EI
45
10
00
35
0
44
50
1
60
0
20
0
58
00
60
00
5
90
0
11
90
0
25
0
25
0
10
0
10
0
10
0
10
0
25
0
25
0
17
50
2
50
0
76
50
10
0
10
0
EI
45
54
50
2
00
0
20
0
97
00
EI
45
EI
45
19
00
19
00
9
00
10
00
15
0
15
0
15
0
15
0
15
0
15
50
1
80
0
19
00
2
00
0
19
00
2
00
0
90
0
25
0
10
00
9
00
10
00
9
00
1
25
0
90
0
10
00
9
00
7
50
25
0
25
0
38
50
1
00
0
17
00
1
00
0
19
50
1
75
0
58
50
5
85
0
20
0
10
0
35
0
35
0
55
00
5
50
0
EI
45
EI
45
11
90
0
11
90
0
25
0
25
0
11
40
0
58
50
5
85
0
10
0
20
0
10
0
57
50
5
75
0
58
50
5
85
0
25
0
20
0
25
0
56
00
5
60
0
58
50
5
85
0
10
0
20
0
10
0
57
50
5
75
0
58
50
5
85
0
25
0
20
0
25
0
56
00
5
60
0
58
50
5
85
0
10
0
20
0
10
0
57
50
5
75
0
58
50
5
85
0
25
0
20
0
25
0
56
00
5
60
0
12
74
0
A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
500 97590
2720 1500 5500 1500 3500 1500 4500 1500 4500 1500 4500 1500 4250 1500 1000 3250 1500 3650 1500 1500 1500 3200 1500 4500 1500 3050 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 1970
E E
D D
5450 2700 2450 5700 5450 5700 5450 800 4600 5450 550 5350 5700 5450 4520 4450 4700 4450 4700 4450
350 8800
300 300 250 300 8700
300 250 300 18800
300 250 300 300 107 300 116 350 200 300 350 300 300 5700
250 180 100 200 350 200 100 200 350 200 100 200 350 300
5800
EI 45
900 2450 650 1000 500 118 4600 150 150
115
114
122 123 124 125 126 127
3500 4800
103 100
3500 106 15300 113 6550 4620 4800 4800 4800 4800 4700
900 2600
C 101 120 121 C
3300 6550 4620 4800 4800 4800 4800 4700 100
1900 1450
108 111 150 117 4800
3000 2250 112
EI 45 EI 45 133 132 131 130 129 128
2800 2050 3500
119 EI 45 110 30-C0
102 104 105
3500 ±0,000=151,50m 350 100 350 100 350 350 300 350 200 200 EI 45 200 250 300 300 250 300 350 300 350 250 100
5450 2700 2450 3450 1950 5700 5450 800 1800 550 5350 5450 480 4520 4450 4700 4450 4700 4450 30-C0 109
B B
A A
1270 2500 3250 1500 1500 1000 2000 2500 750 1500 1250 2500 5950 2500 2750 1500 3800 2500 2950 1500 1750 1000 2150 1500 1500 1500 2700 2500 3500 2500 2550 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 1970
4000 6000 6000 6000 6000 6000 6000 6000 6000 850 6000 6000 6000 5000 5000 5000 5000 5000 5000 4000
97590
1 2 3 4 5 A
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
BREAKDOWN OF ROOMS:
NOTES:
1. Building ±0.000 = 151.50 m.
2. The highest altitude of a building - 157.45 m. 3. Dimensions in millimetres, altitudes – in meters.
4. Dimensions of filling elements for openings should be clarified for the
manufacturer at the site. Fire resistance and smoke classes of filling
elements for openings is acc.to the List of specification and quantities of
filling elements of openings and Fire Safety Sub-Design.
5. The specific materials and colours should be agreed with the
Architect of the Project.
0 2017-06 FOR THE CONSTRUCTION PERMIT, TENDER
Revision DATE OF ISSUE REVISION STATUS. REASON FOR AMENDMENT (IF APPLICABLE)
QUAL.
CERT.
DOC.
NO.
“PANEVĖŽIO
MIESTPROJEKTAS”
UAB
NAME OF THE BUILDING PROJECT
CONSTRUCTION PROJECT FOR THE SPECIAL
PURPOSE BUILDING (WAREHOUSE) AT GENERAL
SILVESTRAS ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ
VILL. 9, PABRADĖ ELDERSHIP, ŠVENČIONYS DISTRICT 27845 PM MARIJUS PONOMARIOVAS
A 1291 SPM ARVYDAS NARKEVIČIUS
DOCUMENT NAME
FIRST FLOOR PLAN, SCALE 1:100
Revision
ARCH MIGLĖ PAUŽAITĖ
0
LT
CLIENT
INFRASTRUCTURE DEVELOPMENT DEPARTMENT
UNDER THE MINISTRY OF NATIONAL DEFENCE
DOCUMENT ID
P/6875 - 01 - TP - SA_B - 01
Page Pages
1 1
No. ROOM Area, m2
110 Men’s WC’ 6.30 119 Shooting range operation department room (No. 11)
38.17 128 Storage room (No. 6) 27.99
101 Storage Room (No. 2) 104.46 111 Men’s shower 3.61 120 Storage room (No. 4) 67.83 129 Storage room (No. 6) 28.07
102 Switchboard Room 9.71 112 Women’s WC 2.76 121 Storage room (No. 5) 67.71 130 Storage room (No. 6) 27.99
103 Equipment maintenance and
minor repair room (No. 7)
83.90 113 Men’s changing room 7.00 122 Storage room (No. 6) 27.02 131 Storage room (No. 6) 28.07
104 Battery Room (No. 10) 7.28 114 Women’s shower 1.71 123 Storage room (No. 6) 27.99 132 Storage room (No. 6) 27.99
105 Technical Room (No. 8) 19.14 115 Women’s changing room 4.66 124 Storage room (No. 6) 28.07 133 Storage room (No. 6) 27.02
106 Storage Room (No. 1) 202.29 116 Rest room 11.51 125 Storage room (No. 6) 27.99 Total 1090.60
107 Boiler-House Room 9.20 117 Corridor 20.88 126 Storage room (No. 6) 28.07
108 Storage Room 44.62 118 Shooting range operation department room (No. 11)
38.17 127 Storage room (No. 6) 27.99
109 Cleaning Inventory Room 5.43
21
30
0
12
74
0
40
00
60
00
60
00
40
00
12
74
0
21
30
0
A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
106150
Rain pipe Rain pipe Rain pipe Rain pipe Rain pipe 97590 Rain pipe Rain pipe Rain pipe Rain pipe Rain pipe Rain pipe
E E
i=12.28% i=12.28% i=12,28% i=12.28% i=12.28% i=12.28% i=12.28% i=12.28%
D D i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2,5% i=2,5%
i=12,28% i=12.28%
Rainwater head Rainwater head Rainwater head Rainwater head Rainwater head Rainwater head Rainwater head Rainwater head Rainwater head Head
Building expansion joint
i=12,28% i=12.28% i=12.28% i=12.28% i=12.28% i=12.28% i=12.28% i=12.28%
Deflector Deflector Deflector Deflector Deflector Deflector Deflector Deflector
C C
Deflector Deflector Deflector Deflector Deflector Deflector Deflector Deflector
Heated hatch to access to the roof
i=12.28% i=12.28% i=12.28% i=12,28% i=12.28% i=12.28% i=12.28% i=12.28%
LK1
Rainwater head Rainwater head Rainwater head Rainwater head Rainwater head Rainwater head Rainwater head Rainwater head Rainwater Head
Rainwater head i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2.5% i=2,5%
i=2.5% i=2.5% i=12.28% i=12.28%
B B
i=12.28% i=12.28% i=12.28% i=12,28% i=12,28% i=12.28% i=12.28% i=12.28%
A A
Rain pipe Rain pipe Rain pipe Rain pipe Rain pipe Rain gutter Rain pipe Rain pipe Rain pipe Rain pipe Rain pipe
4000 6000 6000 6000 6000 6000 6000 6000 6000 850 6000 6000 6000 5000 5000 5000 5000 5000 5000 4000
97590
106150
1 2 3 4 5 A
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
NOTES:
1. Building ±0.000 = 151.50 m.
2. The highest altitude of a building - 157.45 m.
3. Dimensions in millimetres, altitudes – in meters.
4. The specific materials and colours should be agreed with the Architect of the Project.
0 2017-06 FOR THE CONSTRUCTION PERMIT, TENDER
Revision DATE OF ISSUE REVISION STATUS. REASON FOR AMENDMENT (IF APPLICABLE)
QUAL.
CERT.
DOC.
NO.
“PANEVĖŽIO
MIESTPROJEKTAS"
UAB
NAME OF THE BUILDING PROJECT
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9, PABRADĖ
ELDERSHIP, ŠVENČIONYS DISTRICT 27845 PM MARIJUS PONOMARIOVAS
A 1291 PSM ARVYDAS NARKEVIČIUS
DOCUMENT NAME
ROOF PLAN, SCALE 1:100
Rev.
ARCH MIGLĖ PAUŽAITĖ
0
LT
CLIENT
INFRASTRUCTURE DEVELOPMENT DEPARTMENT
UNDER THE MINISTRY OF NATIONAL DEFENCE
DOCUMENT ID
P/6875 - 01 - TP - SA_B - 02
Page Pages
1 1
+5.950 +5.950
+5.270 +5.270
+3.630
+2.400 +3.000
+2.400
+2.400
+3.630
+1.200
+1.800
+0.900
+1.200
±0.000
±0.000
-1.000
-1.000
104850
1 21
+5.950 +5.950
+5.270 +5.270
+3.630
+3.000
+2.400
+2.400
+3.630
+1.200
+0.900
+1.800
+1.200
±0.000
±0.000
-1.000
-1.000
104850
21 1
+5.950
+3.963
+3.630
+1.200
+5.950
+3.963
+3.630
+1.200
+5.950
+3.963
+3.630
+1.200
+5,950
+3,963
+3,630
+1,200
+5,950
+3,963
+3,630
+2.400
+1.800
+3.000
+3.700
+3.000
+5.950
+3.963
+3.630
LEGEND:
Cement-bonded particle boards
(Colour is the same as for facade plastered - RAL7047)
Facades plastered
(Colour is the same as for cement-bonded particle boards - RAL7047)
Profiled supporting floor
(Colour RAL 6021, analogue of Rukki - RR36)
Metal colons and ramp corner protection, painted
(colour RAL7046)
Concrete surface without finishing
NOTES:
1. Building ±0.000 = 151.50 m.
2. The highest altitude of a building - 157.45 m.
3. Dimensions in millimetres, altitudes – in meters.
4. Dimensions of filling elements for openings should be
clarified for the manufacturer at the site. Fire resistance and
smoke classes of filling elements for openings is acc.to the
List of specification and quantities of filling elements of
openings.
5. The specific materials and colours should be agreed
with the Architect of the Project.
±0.000
-1.000
±0.000
-1.000
±0.000
-1.000
±0,000
-1,000
±0,000
-1,000
-1,000
±0.000
±0.000
-1.000
0 2017-06
FOR THE CONSTRUCTION PERMIT, TENDER
Revision
QUAL.
DATE OF ISSUE REVISION STATUS. REASON FOR AMENDMENT (IF APPLICABLE)
20000 20000 4000 12000 4000
CERT.
DOC.
NO.
27845
“PANEVĖŽIO
MIESTPROJEKTAS“
UAB
PM MARIJUS PONOMARIOVAS
NAME OF THE BUILDING PROJECT
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE
BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS
ŽUKAUSKAS TRAINING AREA, MAŽALOTĖ VILL. 9,
PABRADĖ ELDERSHIP, ŠVENČIONYS DISTRICT
E A A E E D B A A 1291 PSM ARVYDAS NARKEVIČIUS
ARCH MIGLĖ PAUŽAITĖ
DOCUMENT NAME
FACADES BETWEEN AXES 1-21; 21-1; E-A; A-E
AND CROSS-SECTIONS A-A SCALE 1:100
Rev.
0
CLIENT
LT INFRASTRUCTURE DEVELOPMENT DEPARTMENT
DOCUMENT ID
P/6875 - 01 - TP - SA_B - 03
Page Pages
UNDER THE MINISTRY OF NAT IONAL DEFENCE 1 1
PRINCIPAL DIAGRAM OF HEATING SYSTEM
PRINCIPAL DIAGRAM OF HEAT CARRIER SUPPLY TO VENTILATION CALORIFIERS
From/to boiler house
Floors
Floors Floors
From/to boiler house for ventilation
From/to ventilation chamber R-2
From/to ventilation chamber R-1
From/to ventilation chamber R-3
R-2 chamber winding unit
R-1 chamber winding unit
R-3 chamber winding unit
27845 PV
Kval.patv.
dok. Nr.UAB „PANEVĖŽIO
MIESTPROJEKTAS"
Marijus Ponomariovas
Specialiosios paskirties pastato (sandėlio)Generolo Silvestro Žukausko poligone,
Mažalotės k. 9, Pabradės sen., Švenčionių r. statybos projektas
LapųLT
Užsakovas:
Infrastruktūros plėtros departamentas prie Krašto apsaugos miniterijos
PDV Vilmantas Štaupas
Lapas
Laida
012135
Laida Išleidimo data Laidos statusas. Keitimo priežastis (jei taikoma)0 2017-06 Statybos leidimui, konkursui
11
Magistralinių elektros tinklų skaičiavimo schema
P/6875-01-TP-E_B-05
Inlet
Name of panel, protection class, other
data
Equipped power, kWCalculation power, kWCalculation current, A
No of main route and groups
Automatiniojungiklio, kirtiklio,saugiklio vardinė
srovė, A
Kontaktorius,nuotėkio rėlė, ar kt.
Laidininko tipas,markė, skerspjūvis,gyslų skaičius, ilgis/Paklojimo būdas
Žymėjimas
Pir, kW
Psk, kW
Isk, A
Un, V
Įrenginio, ėmėjopavadinimas ir
vieta
80A
Al 4x50mm² L-40m PEHD D75 ΔU=0,61%From design MT 0.4kV SĮ Gr. 1
ĮSS1600x800x250mm, IP44, on plaster
2301,09
0,2
400
Reze
rvas
2300,91
0,2
Avar
inis -
evak
uacin
isap
šviet
imas
C6A
10
Cu 3x
1,5 m
m² E
30 P
VC D
20
C6A
9
Cu 3x
1,5 m
m² E
30 P
VC D
20 L-
45m
ΔU=0
,42%
230
Reze
rvas
14
C16A
15
C6A
GC-1
Gaisr
inės s
ignali
zacij
osce
ntralė
pat. 1
17
230/400V10-100A
Wh
Lizdas rezervinio autonominio maitinimo šaltinio(el. generatoriaus) pajungimui
4007,04
3,9
Gaisr
inio v
ande
ntiek
io va
ldymo
skyd
as pa
t. 107
2302,72
0,5
C16A
C6A
8
Cu 3x
2,5 m
m² P
VC D
25 L
-55m
ΔU=
0,77%
VAS-GVKS-1
Ryšių
komu
tacinė
spint
apa
t. 118
4003,61
2,0
Katili
nės v
aldym
o sky
das
pat. 1
07
16A
6
Cu 5x
4 mm²
PVC
D32
L-50
m ΔU
=0,29
%va
mzdž
iuose
sien
oje, a
tvira
i vam
zdžiu
ose
VAS-K
2303,62
0,8
Pasta
to pr
ieigų
apšv
ietim
as
2300,23
0,05
Foto
relė
su ju
tikliu
11
C10A
Cu 3x
1,5 m
m² P
VC D
20
12
C6A
K
FR LR
R A0
2300,23
0,05
Laiko
relė
Cu 5x
4 mm²
PVC
D32
L-50
m ΔU
=0,56
%In
tubes
in th
e wall
, ope
nly in
tube
s
vamz
džiuo
se si
enoje
, atvi
rai v
amzd
žiuos
e
vamz
džiuo
se si
enoje
, atvi
rai v
amzd
žiuos
e
vamz
džiuo
se si
enoje
, atvi
rai v
amzd
žiuos
e
40017,3
10,2
Apšv
ietim
o gali
os sk
ydas
pat. 1
02
40013,9
8,1
C25A
1
Cu 5x
4 mm²
PVC
D32
L-5m
ΔU=
0,14%
vamz
džiuo
se si
enoje
, atvi
rai v
amzd
žiuos
e
C20A
2Cu
5x6 m
m² P
VC D
40 L-
50m
ΔU=0
,78%
AJS-1 AJS-2
Apšv
ietim
o gali
os sk
ydas
pat. 1
17va
mzdž
iuose
sien
oje, a
tvira
i vam
zdžiu
ose
4005,43
3,2
Apšv
ietim
o gali
os sk
ydas
pat. 1
31
40010,64
5,9
C16A
3
Cu 5x
4 mm²
PVC
D32
L-75
m ΔU
=0,69
%va
mzdž
iuose
sien
oje, a
tvira
i vam
zdžiu
ose
C16A
4
Cu 5x
4 mm²
PVC
D32
L-15
m ΔU
=0,26
%
AJS-3 JS-A
Galio
s sky
das
pat. 1
03va
mzdž
iuose
sien
oje, a
tvira
i vam
zdžiu
ose
4006,86
3,8
Vėdin
imo s
kyda
s pa
t. 117
C16A
5
Cu 5x
4 mm²
PVC
D32
L-50
m ΔU
=0,55
%va
mzdž
iuose
sien
oje, a
tvira
i vam
zdžiu
ose
VS-1
C
4007,22
4,0
C10A
13
DI
Dujų
išgar
intoja
s (p
rie du
jų re
zervu
arų)
Cu 5x
4 mm²
PEH
D D4
0 L-7
5m Δ
U=0,8
6%in
a tre
nch i
n a tu
be
vamz
džiuo
se si
enoje
, atvi
rai v
amzd
žiuos
e
Cu 5x25mm² L-5m PVC D50
Pi=55,8kWPs=38,6kWIs=65,6AKp-0,7 cos-0,85
B+C class
16A30mA
600/5A Š1-0,4
1250800A
1 2
40080A
NH2
5 8 9
Š2-0,4
ConsumerOperator
400- A
NH2
3
400- A
NH2
4
Res.
place
630630A
NH3
ST 6 7
Res.
place
Res.
place
NH4Wh
AEEAS controller
BG
800/5A
ST
WhBG
KAS on MT wall
16
C20A
ARĮ
G
Petrol generator900x645x620mm~400V 10kVA 8kW(in a set with ARĮ)
4007,04
3,9
ARĮ
T1
MT 0,4kV SĮ
Equipped power, kWCalculation power, kWCalculation current, A
Nominal current of automatic switch, switcher, fuse, A
Contactor, leakage relay, etc.
Type, brand, cross-section, number
of cores, length of conductor/Method
of laying
Name and place of equipment and
taker
Marking
No of main route and groups
Socket for connection of reserve autonomous power source(el. generator)
In tu
bes
in th
e w
all,
open
ly in
tube
s
In tu
bes
in th
e w
all,
open
ly in
tube
s
In tu
bes
in th
e w
all,
open
ly in
tube
s
In tu
bes
in th
e w
all,
open
ly in
tube
s
In tu
bes
in th
e w
all,
open
ly in
tube
s
In tu
bes
in th
e w
all,
open
ly in
tube
s
In tu
bes
in th
e w
all,
open
ly in
tube
s
In tu
bes
in th
e w
all,
open
ly in
tube
s
In tu
bes
in th
e w
all,
open
ly in
tube
s
In tu
bes
in th
e w
all,
open
ly in
tube
s
Ligh
ting
pow
er p
anel
No1
02
No1
17
No1
31
No1
03
No1
17
No1
07
Ligh
ting
pow
er p
anel
Ligh
ting
pow
er p
anel
Pow
er p
anel
Vent
ilatio
n pa
nel i
n pr
emis
e
Boi
ler r
oom
con
trol p
anel
Com
mun
icat
ion
com
mut
atio
n ca
bine
t in
prem
ise
No
118
Em
erge
ncy
- eva
quat
ion
light
ing
Bui
ldin
g ac
cess
ar
eas
light
ing
Pho
to re
lay
with
sen
sor
Tim
e re
lay
Gas
eva
pora
tor
(at g
as re
serv
oirs
)
Fire
wat
er s
uppl
y sy
stem
co
ntro
l pan
el in
pre
mis
e N
o 10
7
Res
erve
Res
erve
Fire
ala
rm s
yste
mC
ontro
l pan
el in
pre
mis
e N
o 11
7
⁄⁄
⁄ ⁄ ⁄ ⁄ ⁄ ⁄
⁄⁄
⁄⁄
⁄⁄
⁄⁄
⁄⁄
⁄⁄
⁄⁄
⁄⁄
⁄⁄
⁄⁄
⁄⁄
⁄ ⁄ ⁄ ⁄⁄
⁄⁄
R1500R1500
R1500
R1500
R1500
7 8 9 14
8
2 3 4 5 6 10
6000
11 12 13 15 16 17 18 19
2 3 4 5 6 7 9 10 11 12 13 14 15 16 17 18 19
6000 6000 6000 6000 6000 6000 6000 850 6000 6000 6000 5000 5000 5000 5000 5000 500097590
1
1
20 21
20 21
40004000
A A
B B
D D
E E
4000
6000
4000
1274
0
119
117
116
115114
113
112111
110
109
108
101
103
102 104
106
R1500
105
120
133
A
A
C C
6000
118
107
R1500
R1500
R1500 R1500
121
132 131 130 129 128
122
R1500
123
R1500
124
R1500
125
R1500
126
R1500
127
R1500
R1500 R1500 R1500 R1500 R1500
1270 2500 3250 1500 1500 1000 2000 2500 750 1500 1250 2500 5950 2500 2750 1500 3800 2500 2950 1500 1750 1000 2150 1500 1500 1500 2700 2500 3500 2500 2550 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 1970
2720 1500 5500 1500 3500 1500 4500 1500 4500 1500 4500 1500 4250 15005001000 3250 1500 3650 1500 1500 1500 3200 1500 4500 1500 3050 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 1970
97590
1274
0
±0,000=151,50m
ceiling+3,00 +2.60
+2.60
+2.60
+2.60
+2.60
+2.60
+2.60
+2.60
+2.60
+2.60
+2.60
ceiling+3,00
lubos+3,00
AJS-2
AJS-3
AJS-1
ĮSS
InletAl 4x50mm² L-40mPEHD D50 iš MT
M1M4
M13 M14 M15 M16
M22M21M20M19M18M17
M5M6
M8 M9 M10 M11 M12
3K3K
3K3K
3K
2
2
2
2
2
2
2
2
M2
M3
M7
VAS-K
GC-1
KS-1OVŠ-11F 115W
OVŠ-21F 115W
1F 150W
OVŠ-31F 115W
OVŠ-41F 115W
OVŠ-51F 115W
OVŠ-61F 115W
OVŠ-71F 115W
R-21F 1,5kW
R-11F 1,5kW
R-31F 1,0kW
VAS-GV
VS-1
FeZn 25x4mmL-10m
FeZn 25x4mmL-10m
(žr. P/6875-01-TP-E_B-04)
JS-A
AJS-3/gr.8 AJS-3/gr.8
AJS-3/gr.4 AJS-3/gr.4 AJS-3/gr.4 AJS-3/gr.4
AJS-3/gr.5 AJS-3/gr.5 AJS-3/gr.5 AJS-3/gr.5
AJS-3/gr.6 AJS-3/gr.6 AJS-3/gr.6 AJS-3/gr.7 AJS-3/gr.7 AJS-3/gr.7
ĮSS/gr.3 Cu 5x4mm² L-75m PVC D32
AJS-1/gr.5AJS-1/gr.5AJS-1/gr.5
AJS-1/gr.5
AJS-1/gr.5
AJS-1/gr.6
AJS-1/gr.6
AJS-1/gr.6AJS-1/gr.6AJS-1/gr.6
AJS-1/gr.6
AJS-1/gr.7
AJS-1/gr.7
AJS-1/gr.7
AJS-1/gr.8 AJS-1/gr.8
AJS-1/gr.9AJS-1/gr.9
AJS-1/gr.10
AJS-1/gr.10
AJS-1/gr.10
AJS-1/gr.10
AJS-1/gr.10
AJS-1/gr.10
AJS-1/gr.10
AJS-1/gr.11AJS-1/gr.11
AJS-1/gr.11
AJS-1/gr.11
AJS-1/gr.11
AJS-1/gr.11 AJS-1/gr.11AJS-1/gr.11
AJS-1/gr.12
AJS-1/gr.12
AJS-1/gr.12
AJS-1/gr.12
AJS-1/gr.13 AJS-1/gr.13AJS-1/gr.13
AJS-1/gr.13
AJS-1/gr.14
AJS-1/gr.14
AJS-1/gr.14AJS-1/gr.14
AJS-1/gr.14
AJS-2/gr.4
AJS-2/gr.4
AJS-2/gr.4
AJS-2/gr.5
AJS-2/gr.5
AJS-2/gr.6
AJS-2/gr.6
AJS-2/gr.6
AJS-2/gr.6
AJS-2/gr.6
AJS-2/gr.7
AJS-2/gr.7
AJS-2/gr.7AJS-2/gr.7
AJS-2/gr.7
AJS-2/gr.8
AJS-2/gr.8 AJS-2/gr.8
AJS-2/gr.9
AJS-2/gr.9
AJS-2/gr.9
AJS-2/gr.9
Charging device3F 4,0kW
AJS-1/gr.7
JS-A/gr.2
JS-A/gr.2
JS-A/gr.1
JS-A/gr.5
2x Cu 5x4mm² L-125m1x Cu 12x1,5mm² L-125mPEHD D40
To gas evaporatorCu 5x4mm² L-75mPEHD D40
200x60mmL-40m
VS-1/gr.2
VS-1/gr.1
VS-1/gr.3
ĮSS/gr.2 Cu 5x6mm² L-50m PVC D40ĮSS/gr.5 Cu 5x4mm² L-50m PVC D32ĮSS/gr.8 Cu 3x2,5mm² L-55m PVC D25
ĮSS/gr.2 Cu 5x6mm² L-50m PVC D40ĮSS/gr.3 Cu 5x4mm² L-75m PVC D32ĮSS/gr.5 Cu 5x4mm² L-50m PVC D32ĮSS/gr.6 Cu 5x4mm² L-50m PVC D32ĮSS/gr.7 Cu 5x4mm² L-50m PVC D32ĮSS/gr.8 Cu 3x2,5mm² L-55m PVC D25ĮSS/gr.9 Cu 3x1,5mm² L-45m PVC D20
ĮSS/gr.6 Cu 5x4mm² L-50m PVC D32ĮSS/gr.7 Cu 5x4mm² L-50m PVC D32
~400V 10kVA su ARĮ(900x645x620mm)
SK1 SK2
⁄ ⁄ ⁄ ⁄ ⁄
⁄⁄⁄⁄⁄
FeZn 40x4mmL-7m (in trench)
External earthing contour (žr. P/6875-01-TP_B-04)
FeZn 40x4mmL-7m (in trench)
Nr. PATALPA Plotas,m²
101 Sandėlio patalpa (Nr. 2) 104,46
102 Elektros įvado patalpa 9,71
103 Įrangos techninės priežiūros ir smulkaus remontopatalpa (Nr. 7) 83,90
104 Akumuliatorių krovimo patalpa (Nr. 10) 7,28
105 Techninė patalpa (Nr. 8) 19,14
106 Sandėlio patalpa (Nr. 1) 202,29
107 Katilinė 9,20
108 Sandėlio patalpa (Nr. 3) 44,62
109 Valymo inventoriaus patalpa 5,43
110 Vyrų WC 6,30
111 Vyrų dušai 3,61
112 Moterų WC 2,76
113 Vyrų persirengimo patalpa 7,00
114 Moterų dušas 1,71
115 Moterų persirengimo patalpa 4,66
116 Poilsio patalpa 11,51
117 Koridorius 20,88
118 Šaudyklų eksploatacijos skyriaus patalpa (Nr. 11) 38,17
119 Šaudyklų eksploatacijos skyriaus patalpa (Nr. 11) 38,17
120 Sandėlio patalpa (Nr. 4) 67,83
121 Sandėlio patalpa (Nr. 5) 67,71
122 Sandėlio patalpa (Nr. 6) 28,07
123 Sandėlio patalpa (Nr. 6) 27,99
124 Sandėlio patalpa (Nr. 6) 28,07
125 Sandėlio patalpa (Nr. 6) 27,99
126 Sandėlio patalpa (Nr. 6) 28,07
127 Sandėlio patalpa (Nr. 6) 27,99
128 Sandėlio patalpa (Nr. 6) 27,99
129 Sandėlio patalpa (Nr. 6) 28,07
130 Sandėlio patalpa (Nr. 6) 27,99
131 Sandėlio patalpa (Nr. 6) 28,07
132 Sandėlio patalpa (Nr. 6) 27,99
133 Sandėlio patalpa (Nr. 6) 28,07
VISO: 1092,70
PATALPŲ EKSPLIKACIJA:
27845 PM
Qual.cert.
doc. No.UAB PANEVĖŽIO
MIESTPROJEKTAS
Marijus Ponomariovas
CONSTRUCTION PROJECT FOR THE SPECIAL PURPOSE BUILDING (WAREHOUSE) AT GENERAL SILVESTRAS ŽUKAUSKAS TRAINING
AREA, MAŽALOTĖ VILL. 9, PABRADĖ ELDERSHIP, ŠVENČIONYS DISTR.
PagesEN
Client:
Infrastructure Development Department under the Ministry of National Defence
PPM Vilmantas Štaupas
Page
Rev.
012135
Revision Date of issue Revision status Reason for amendment (if applicable)0 2017-06 For the construction permit, tender
11P/6875-01-TP-E_B-01
1st floor plan with power electric equipment and arterial netowrks M1:100
Remarks1. Mounting works have to be performed according to the requirements of general rules of Electric equipment installation mechanism.2. Place of equipment installation to be specified during mounting works performance.3. Cables have to be mounted in protective tubes, under plaster or over suspended ceiling.4. Height of electric sockets mounting is 1.0 m (in manufacture premises), 0.3m (in administrative premises).
Electric socket with earthing IP20, IP44
Triple electric socket with earthing IP20, IP44
VentilatorStatiorary el. equipment connection point
Triple electric socket with earthing for computers IP20
Cabele laid from undernearth (stand)
Cabele goes up (stand)
Cabele laid from above (stand)
Cabele goes down (stand)
Legend
Lighting - power panel
2 2
3K
Volumetric water heater
Three-phase electric socket
Weak currents (connection, alarm system) panel
Safety switch
Arterial electric networks calculation scheme
05
/signature/
/signature/
27845 PM
Qual.conf.
doc. NoUAB „PANEVĖŽIO
MIESTPROJEKTAS"
Marijus Ponomariovas
Construction project for a special purpose building (warehouse) at general Silvestras Žukauskas training area,
Mažalotė vill. 9, Pabradė Eldership, Švenčionys Distr.
PagesLT
Customer:
Infrastructure Development Department under the Ministry of National Defence
PPM Vilmantas Staupas
Page
Issue
012135
Issue Date of issue Issue status. Reason of amendment (if applied)0 2017-06 For construction permit, tender
11P/6875-01-TP-ER_B-01
Principal scheme of electronic communication
1
2
3
4
5
6
7
8
9
10
11
12
Switchboard KS-1Premise No118
24 p. networks commutatori
Earthing panel7x230V electric sockets unit
UPS 250VA
Cables arrangement panel
Ventilators panel
6 cat. 24xRJ45 commutation panel
12 SC ODF panelPanel with 1 LSA+ plinth
Cables arrangement panel
Telephone - computer network scheme
Optic
al ca
ble 12
SM
9/125
µm L-
175m
Telep
hone
cable
10x2
x0,6m
m L-
175m
In the designed and present RKKS(from the building 51O1b to server room)
printerKDV1
UT
P 6
cat.
3x5m
UT
P 6
cat.
3x10
m
UT
P 6
cat.
3x20
m
UT
P 6
cat.
3x25
m
UT
P 6
cat.
2x10
m
1-A-131-A-14
1-A-011-A-021-A-03
1-A-041-A-051-A-06
1-A-071-A-081-A-09
1-A-101-A-111-A-12
KDV2 KDV3 KDV4
1st
floor
Repeater in the building 51O1b
(in the watcher's premises)
S-1 FTP 4x2x0,5 L=190m
~230V
2x1,0mm² L-5m
GC-1
117 premise
FCP
loop 1 2x1,0mm² L-340m
1/1 1/2 1/3 1/4 1/5 1/6 1/7 1/8 1/9 1/10 1/11 1/12 1/13 1/14 1/15
D D D D D 1I/O D D D D D D D
117
109
117
117
117
113
107
107
116
115
118
119
119
120
121
1/16 1/17 1/18 1/19 1/20 1/21 1/22 1/23 1/24 1/25 1/26 1/27 1/28 1/29
D D D D D D D D D D D D
133 132 ramp 131 130 129 128 127 126 125 124 ramp 123 122
1/30 1/31 1/32 1/33 1/34 1/35 1/36 1/37 1/38 1/39 1/40 1/41 1/42 1/43 1/44
D D D D D D D D D D D D D D D
121 120 118 115 108 106 106 106 103 103 103 101 101 101 103
1/45
D
103
1/46
D
104
1/47
1I/O
102
1/48
D
102
1/49
ramp
1/50
D
105
1/51
D
106
1/52
D
106
1/53
D
108
1/54
D
110
Legend
GC
Fire alarm control panel
Fire alarm repeater
D
1I/O
Smoke detector Manual danger alarm
device
Interior sound alarm
Sound and fire alarm device
Inlet / outlet module
Outlet module purpose
1/8 - Boiler room control
1/47 - Ventilation shut-down
0 2017-06 For the construction permit, tender
Revision Date of issue Rev. status. Reason for amendment (if applicable)
Qual.
appr.
doc. No.
27845 PV
UAB PANEVĖŽIO
MIESTPROJEKTAS
Marijus Ponomariovas
Construction project for the special purpose building (warehouse)
in General Silvestras Žukauskas Training area, Mažalotė vill. 9, Pabradė eldership., Švenčionys district
Rev.
12135 PPM Vilmantas Štaupas Principal fire alarm drawing 0
Client:
EN
Infrastructure Development Department under the Ministry of National Defence
P/6875-01-TP-GSS_B-01
Page
1
Pages
1
Co
ntr
ol c
abin
et V
AS
-
K
DN
32
In
let
~230
V 2
.5kW
ĮSS/
gr.6
Cu
3x4
PV
C D
32 L
-
10m
T1
DN
20
Bo
iler
po
wer
su
ppl
y
Cu
3x1.
5 L-
10m
Bo
iler
on
, fau
lt
Cu
4x0.
75 L
-10m
Bo
iler
pu
mp
pow
er
sup
ply
Cu
3x1.
5 L-
10m
B
oile
r p
um
p f
ault
Cu
2x0,
75 L
-10m
DN
32
T
2
DN
20
DN
32
T
1
Bo
iler
po
wer
su
ppl
y
Cu
3x1.
5 L-
10m
Bo
iler
on
, fau
lt
Cu
4x0.
75 L
-10m
DN
25
DN
32
T
2
Bo
iler
pu
mp
pow
er s
up
ply
Cu
3x1.
5 L-
10m
B
oile
r p
um
p f
ault
Cu
2x0.
75 L
-10m
Sup
ply
wat
er m
eter
Cu
2x0.
75 L
-10m
DN
20
Hea
t ex
chan
ger
sup
ply
tem
pera
ture
Cu
2x0.
75 L
-10m
Act
ivat
ing
wat
er s
ofte
nin
g
Cu
2x0.
75 L
-10m
Po
wer
su
pp
ly f
or
the
wat
er s
oft
enin
g d
evic
e
Cu
3x1.
5 L-
10m
Val
ve a
ctu
ato
r co
ntr
ol
Cu
3x1.
0 L-
10m
Po
wer
su
pp
ly f
or
the
hea
tin
g
circ
uit
pum
p
Cu
3x1.
5 L-
10m
H
atin
g ci
rcui
t p
um
p fa
ult
Cu
2x0.
75 L
-10m
DN
25
Sup
ply
wat
er
tem
per
atur
e
Cu
2x0.
75 L
-10m
D
N32
DN
32
D
N40
Ret
urn
wat
er t
emp
erat
ure
Cu
2x0.
75 L
-10m
Po
wer
su
pp
ly f
or
the
ven
tila
tio
n
circ
uit
pum
p
Cu
3x1.
5 L-
10m
V
enti
lati
on
circ
uit
pum
p f
ault
Cu
2x0
.75
L-10
m s
up
ply
wat
er t
emp
erat
ure
Cu
2x0.
75 L
-10m
DN
32
DN
32
D
N40
DN
32
DN
32
DN
32
R
etu
rn w
ater
tem
per
atu
re
Cu
2x0.
75 L
-10m
Po
wer
su
pp
ly f
or
the
HW
ci
rcu
it p
ump
Cu
3x1.
5 L-
10m
H
W c
ircu
it p
um
p fa
ult
Cu
2x0
.75
L-10
m s
up
ply
wat
er t
emp
erat
ure
Cu
2x0.
75 L
-10m
DN
32
DN
40
DN
40
R
etu
rn w
ater
te
mp
erat
ure
Cu
2x0.
75 L
-10m
Ho
t w
ater
tem
pera
ture
Cu
2x0.
75 L
-10m
Do
or
ope
nin
g al
arm
Cu
2x0.
75 L
-5m
Fire
ala
rm
Cu
2x0.
75 L
-5m
Ou
tdo
or
air
tem
per
atur
e
Cu
2x0,
75 L
-5m
D
N2
5
DN
25
V
1
Fau
lt D
N4
0
Gas
leak
sen
sor
Cu
2x0,
75 L
-10m
V
1
T3
1
20%
DN
25
G
as c
ut-
off
val
ve
Cu
2x0,
75 L
-10m
40%
T
4
Low
HW
pre
ssu
re
Cu
2x0.
75 L
-10m
Po
wer
su
pp
ly f
or
the
HW
ci
rcu
lati
on
pu
mp
Cu
3x1.
5 L-
10m
H
W c
ircu
lati
on
pum
p fa
ult
Cu
2x0.
75 L
-10m
AI
DI
AO
DO
Bus
HL1
Voltage control
SA A-0-I
SA A-0-I
SA A-0-I
SA A-0-I
SA A-0-I
SA A-0-I
AI 9
DI 16
AO 1
DO 7
Bus 0
HL2
UPS K K K K K K K K GSM modem
Gas leak alarm
K
Fault
BT0
T
HOT WATER
CIRCULATION DN25
INTO HOT WATER SUPPLY
DN40
42B
K1
45kW
K2
45kW
TO/FROM THE
HEATING SYSTEM
DN40
32 32A
33 33A
T
TO/FROM VENTILATION
SYSTEM DN32
52 52A
Boiler 400 l
B1
43A DN40
T3
406
43
407
45 P2
P
K1.1 K2.1 D-3 D-4 BT3 53A T 53
TV-1 405 SR-1
BT6 BT4 T M
S-1 M
23
23A
S-2
M T
BT2
303
304
D-8
D-9
T
BT5
T
BT7
20 DN50 T1
A-6
S-5
43C
A-1
1 2 25
24
A-2
3 4
25A
24A
M
S-3
M
TR-1
301
30
D-5
302
A-8
M
S-6
501 502
50
A-4
M
S-4
401
402
43B
T BT8
T2
D-6
42A
T4
DN40
V1
DN25
DN25
9 11
T BT1
11A
503 D-7 46 44A
DN40 DN40 DN40
DN40
T1
16
12
10 8 T2
T1
T1 14
T2
P1
DN50
DN50
DN40
V1
44
404 A-5
42
KS-1
D-1 13
D-2
P SrR-3
409 A-7
26A
41
AP-1
408 DN20
V1
40 403
FROM COLD WATER SUPPLY
DN40
Legend
VAS – control automation cabinet Programmable regulator (controller) outlets:
AĮ – analog inlet
0 June 2017 For the construction permit, tender
Revision Date of issue Revision status. Reason for amendment (if applicable)
Qual. appr.
Construction project for the special purpose building (warehouse) in General Silvestras Žukauskas
Training Area, Mažalotė vill. 9, Pabradė eldership, Švenčionys distr.
VB – control panel or controller
S – pump motor
VMI – water softening device
TR – water valve actuator BT – water temperature sensor
AO – analog outlet DI –digital inlet
DO – digital outlet
doc.
No.
27845 PV
UAB PANEVĖŽIO
MIESTPROJEKTAS
Marijus Ponomariovas
Basic scheme of the boiler room automation
Revision
P - water pressure sensor SF - automatic
cut-off switch SA - A-0-R switch
K – intermediary relay or contactor
QS – inlet switch
12135 EN
PPM Vilmantas Štaupas Client:
Infrastructure Development Department under the
Ministry of National Defence
P/6875-01-TP-PVA_B-01 Page
1
0 Pages
1
El.
Net
wo
rk in
let
afte
r A
RI
See
the
E p
art
5x4
L-12
5m
(see
th
e E
par
t)
5x4
L-12
5m
(see
th
e E
par
t)
12x1
,5 L
-125
m
(see
th
e E
par
t)
3x1.
5 L-
5m
3x1.
5 L-
5m
3x0.
75 L
-5m
2x0,
8 L-
300m
20x0
,5 L
-190
m
3x1,
5 L-
5m L
ight
boar
d
‘Fir
e ex
tin
guis
hin
g
stat
ion
’
1st floor
GV-19 GV-20 GV-21 GV-22
GV-7 GV-8 GV-9 GV-10 GV-11 GV-12 GV-13 GV-14 GV-15 GV-16 GV-17 GV-18
Fire water tank 1
Fire water tank 2
V1 (supplement)
S-2
S-1
P-3.7kW
LJ
LJ
P1
TR-2 P
TR-1
GV-1 GV-2 GV-3 GV-4 GV-5 GV-6
V1 (supplement) LJ
LJ
IP
QS K K
SA A-0-I
K K SF
SA A-0-I
Automation cabinet VAS-GV
Legend
VAS – control automation cabinet
IP – indicator panel
P – pressure switch
LJ – level sensor GV – Button in the fire water tap cabinet
0 June 2017 For the construction permit, tender
Revision Date of issue Rev. status. Reason for amendment (if applicable)
Qual. appr.
Construction project for the special purpose building (warehouse) in General Silvestras Žukauskas
K – intermediary relay or contactor
SA –switch
KT – time relay
SF – automatic cut-off switch
doc. No. 27845
PV
UAB PANEVĖŽIO
MIESTPROJEKTAS Marijus Ponomariovas
Training Area, Mažalotės k. 9, Pabradė elderate., Švenčionys district
Revision
QS – inlet switch
TR – valve with an actuator 12135 PPM Vilmantas Štaupas Basic scheme of fire safety water supply automation
0
Client:
EN
Infrastructure Development Department
under the Ministry of National Defence
P/6875-01-TP-PVA_B-02
Page
1
Pages
1
T2
NOTES:
1. AIR BLEED VALVES MUST BE INSTALLED IN THE HIGHEST POINT AND THE
DRAINAGE VALVES – IN THE LOWEST POINT (ACCORDING TO THE ARRANGEMENT
OF EQUIPMENT AND PIPES IN THE BOILER ROOM).
2. SEE THE BOILER ROOM DEVICES ACCORDING TO THE POS. NO. IN THE LIST OF COSTS.
0 May 2017
REVISION DATE OF ISSUE
FOR THE CONSTRUCTION PERMIT, TENDER
REVISION STATUS. REASON FOR AMENDMENT (IF APPLICABLE)
Boiler room boundary
To, from the heating
system DN40 To, from the ventilation
Boiler 400 l
HOT WATER CIRCULATION DN25
To hot water supply DN40
From cold water supply DN40