CITY OF NORWALK PURCHASING DEPARTMENT
SEALED BIDS MUST BE RECEIVED BY THE OFFICE OF THE PURCHASING AGENT, 125 EAST AVENUE NORWALK, CT 06856 BY THE DATE AND TIME OF BID OPENING
PROJECT NUMBER: 3827
REQUESTING DEPARTMENT: Building Management
DATE OF BID ISSUANCE: 04/02/2018
TITLE OF BID:
COMMISSIONING SERVICES for the Addition and renovations to the Ponus Ridge Middle School, State Project No. 103-0246 EA/EC/CV
DATE OF BID OPENING: 04/12/2018
MANDATORY WALKTHROUGH: DATE, TIME AND LOCATION OF WALKTHROUGH
YES ( ) NO (X ) Not Applicable
TIME OF BID OPENING: 2:00 pm
BID DEPOSIT REQUIRED: IF YES, AMOUNT REQUIRED
YES ( ) NO ( X )
SUCCESSFUL BIDDERS ONLY: PERFORMANCE & PAYMENT BOND REQUIRED: IF YES, AMOUNT REQUIRED
YES ( ) NO (X )
SUCCESSFUL BIDDERS ONLY: MAINTENANCE BOND REQUIRED: IF YES, AMOUNT REQUIRED:
YES ( ) NO ( X )
ALL TERMS AND CONDITIONS, SPECIFICATIONS AND BID FORMS ARE ATTACHED HERETO.
NOTE: THE FOLLOWING DOCUMENTS WILL BE REQUIRED FOR A BID TO BE COMPLIANT
1. BIDDER’S INFORMATION AND ACKNOWLEDGEMENT FORM 2. BID FORMS, INCLUDING PRICING SHEETS AND ADDENDA ACKNOWLDEGMENT FORMS (ONE
ORIGINAL PLUS EIGHT (8) COPIES) 3. EXCEPTIONS (IF ANY)
Page 1, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
CITY OF NORWALK PURCHASING DEPARTMENT
NOTICE TO BIDDERS
1. ALL BIDS WILL BE OPENED PROMPTLY AT THE ADVERTISED TIME OF OPENING. THERE WILL BE NO DELAYS OR POSTPONEMENTS WHICH ARE NOT PUBLICLY ADVERTISED. ANY BID RECEIVED AFTER THE ADVERTISED TIME OF OPENING WILL NOT BE ACCEPTED.
2. IF A BIDDER USES A COURIER SERVICE FOR BID DELIVERY, IT SHALL BE THE BIDDER’S RESPONSIBILITY THAT THE BID REACHES THE PURCHASING DEPARTMENT BY THE DATE AND TIME SPECIFIED HEREIN.
3. ALL BIDS SUBMITTED TO THE CITY MUST BE IN A CLEARLY MARKED AND SEALED ENVELOPE.
4. OBLIGATION OF BIDDERS:
a. AT THE TIME OF OPENING BIDS, EACH BIDDER SHALL BE PRESUMED TO HAVE INSPECTED THE SITES AND TO HAVE MADE HIM/HERSELF THROUGLY FAMILIAR WITH THE PLANS AND CONTRACT DOCUMENTS, INCLUDING ALL ADDENDA. THE FAILURE OR OMISSION OF ANY BIDDER TO RECEIVE OR EXAMINE ANY FORM, INSTRUMENT OR DOCUMENT SHALL IN NO WAY RELIEVE ANY BIDDER FROM ANY OBLIGATION IN RESPECT TO THEIR BID.
b. EACH BIDDER MUST FULLY INFORM HIM/HERSELF OF THE CONDITONS RELATING TO THE WORK WHICH WILL BE PERFORMED. FAILURE TO DO SO WILL NOT RELIEVE THE SUCCESSFUL BIDDER OF HIS/HER OBLIGATION TO FURNISH ALL LABOR AND MATERIALS NECESSARY TO CARRY OUT THE PROVISIONS OF THE CONTRACT DOCUMENTS AND TO COMPLETE THE CONTEMPLATED WORK. INSASMUCH AS POSSIBLE, THE CONTRACTOR MUST, IN CARRYING OUT HIS/HER WORK, EMPLOY SUCH METHODS OR MEANS AS WILL NOT CAUSE ANY INTERRUPTIONS OR INTERFERENCE WITH THE WORK OF ANY OTHER CONTRACTOR.
5. TIME IS OF THE ESSENCE (IF APPLICABLE):
a. IF THE PROJECT IS NOT COMPLETED BY THE DATE SPECIFIED AS THE SUBSTANTIAL COMPLETION DATE IN THE CONTRACT ENTERED INTO BY THE CITY AND THE CONTRACTOR, THE CONTRACTOR WILL BE SUBJECT TO CONSEQUENTIAL AND/OR LIQUIDATED DAMAGES.
Page 2, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
CITY OF NORWALK PURCHASING DEPARTMENT
BIDDER’S INFORMATION AND ACKNOWLEDGMENT FORM
Bidder’s Name
Street Address City State Zip
Business Telephone:
Email Address:
Printed Name and Title of Individual Submitting Bid
The undersigned acknowledges that the terms, conditions and specifications of this bid are understood and unconditionally
accepted.
Signature Date
Page 3, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
CITY OF NORWALK PURCHASING DEPARTMENT
Exceptions: Note any vendor(s) responding to this proposal shall indicate any/all exceptions (if any) taken to language in this proposal. Exceptions must be declared below in order to be considered by the City:
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
Page 4, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
GENERAL INFORMATION
1. INTRODUCTION The City of Norwalk (The City) is soliciting proposals (Request For Proposal/RFP’s) from qualified Architects to provide comprehensive architectural and engineering design services and assist the Norwalk Facilities Construction Commission (NFCC) with the Ponus Ridge School – Additions and Alterations Projects in the City of Norwalk, CT. Your firm is invited to provide a proposal for this project. Following are the requirements that specifically apply to these projects.
PROJECT SITE(S): Ponus Ridge Middle School, 21 Hunters Lane, Norwalk, CT 06850
2. RFP DOCUMENTS
All RFP documents for this invitation are available over the internet at http://www.norwalkct.org. Adobe Acrobat reader is required to view this document. If you do not have this software you may download it for free from Adobe.
3. ADDENDA All addenda, if issued will be available over the internet at http://www.norwalkct.org. We strongly suggest that you check for any addenda a minimum of forty-eight hours in advance of the RFP deadline. It is the responsibility of the bidder to check for issuance of any addenda.
4. BIDDER’S LIST Bidder’s list for this solicitation will not be published.
5. QUESTIONS CONCERNING THIS RFP All questions concerning this solicitation must be directed, via e-mail, to Sharon Conners, Purchasing Officer, at [email protected]. The deadline for the submission of questions is 2:00 pm April 6, 2018.
6. SUBMISSION OF RFP All sealed RFPs should be submitted to the City of Norwalk’s Purchasing Department no later than April 12, 2018 at 2:00 pm at the address listed below:
Page 5, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
City of Norwalk Purchasing Department 125 East Avenue, Room 103 Norwalk, CT 06856-5125
7. SUMMARIES A list of the proposing firms will be available any time after 5:00 pm on the day of the RFP opening at http://www.norwalkct.org. RFP results will not be provided over the phone.
Page 6, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
TABLE OF CONTENTS
REQUEST FOR PROPOSAL
SECTION 1 – PROJECT SCOPE
1.0 QUESTIONS CONCERNING THIS RFP 1.1 SCOPE OF WORK - PROPOSAL OVERVIEW 1.2 SPECIAL INSTRUCTIONS
1.3 SCOPE OF SERVICES 1.4 PROPOSAL SUBMISSION FORMAT 1.5 CRITERIA FOR EVALUATING PROPOSALS 1.6 PROPOSAL REVIEW AND SELECTION PROCESS 1.7 SAMPLE CITY AGREEMENT 1.8 INSURANCE REQUIREMENTS
SECTION 2 - RESPONSE FORMS
2.1 FORM OF PROPOSALS 2.2 PROPOSAL RESPONSE FORM(S)
SUPPORTING MATERIALS
Ponus Ridge Middle School Exhibit A - Perkins Eastman Schematic Design Documents Dated February 2, 2018
Page 7, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
1.0 QUESTIONS CONCERNING THIS REQUEST FOR PROPOSAL (RFP) No alleged "verbal interpretation" shall be held valid. No oral interpretations shall be made to any respondent as to the meaning of any of these documents or to be effective to modify any of the provisions of this request. Every request for an interpretation shall be made in writing; or via e-mail, Sharon Conners ([email protected]); or by fax, at (203) 854-7817, addressed and forwarded to: Sharon Conners, Purchasing Officer City of Norwalk, 125 East Avenue, Room 103 P.O. Box 5125 Norwalk, Connecticut 06856-5125 Businesses, without fax or Internet access equipment, may contact the Purchasing Department directly at (203) 854-7712 for RFP information. All questions received as above provided, and the decision regarding each, will be arranged as addenda. Any related addenda will be published at least three (3) business days prior to the submission deadline and shall become a part of the contract. Prospective respondents may obtain a copy of the addenda, if any, online at the City’s website at http://www.norwalkct.org and, as determined to be appropriate by the Purchasing Department, by fax, e-mail, or overnight mail. Non-receipt of said addenda shall not excuse compliance with said addenda. It is the responsibility of each respondent to determine whether any addenda have been issued and if so, whether the respondent has received a copy of each. Addenda issued during the proposal period shall supersede any previous information.
1.1 SCOPE OF WORK - PROPOSAL OVERVIEW The City of Norwalk, through the Norwalk Facilities Construction Commission (NFCC), its permanent Building Committee and responsible for implementing all City construction projects is soliciting proposals from qualified Commissioning Service firms/CxAs for the purposes of assisting the NFCC, Board of Education and the Building Advisory Committee with regard to the Ponus Ridge Middle School. Project Description: Ponus Ridge Middle School was constructed in1956. The building façade is constructed of brick veneer air space and painted CMU on the interior. Major improvements were implemented in 2007 such as the existing exterior windows were replaced, new HVAC equipment was installed, new building controls installed, and
Page 8, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
associated electrical system upgrades; new lighting in the corridors was installed, new ceilings in corridors were installed, new emergency lighting in various locations, various doors, door hardware, and doors and frames were replaced, there were miscellaneous ADA toilet room updates, six (6) science classrooms were renovated and VAT flooring was removed and replaced with VCT tile. The roof was replaced around 2003 and is a ballasted roof system. The project consists of 35,005 square feet of new building additions to the existing 104,365 square feet. The new building total will be 139,370 square feet. The Architect, working with the Construction Manager (CM), will develop a phasing plan for the building alterations. The existing education program will be expanding from a 6-8 grade to a Pre-K – 8 grade program. The additions will consist primarily of Pre-K to grade 3 classrooms as well as a two story science classroom addition. There is also a proposed cafeteria/kitchen in an attempt to separate the older students from the younger students and reduce the amount of “lunch waves”. The existing classrooms will be renovated due to the reprogramming that will occur as a result of the grade re-configuration. It is anticipated that specific areas of the existing school will undergo more significant renovations while other areas will only be subject to minor renovations. Please refer to the Schematic Design documents enclosed for more specific information in Exhibit A. Anticipated Milestone Schedule: Ponus Ridge Middle School
1. Date for completion of bid documents for State Approval– November 15, 2018
2. Completion of State Approval to Bid – January 2019 3. Trade contract bid opening– Early February, 2019 4. Approval of CM GMP Amendment –Mid March, 2019 5. Anticipated Start of Construction April, 2019 6. Substantial completion for occupancy – July, 2020 7. Complete all construction activities – August, 2020
If your firm has an interest in providing these services, below are the requirements that specifically apply to this RFP. 1.2 SPECIAL INSTRUCTIONS
A. CxA’s responding to this RFP must have sufficient staff to assure timely project completion. The architect’s Project Manager must be experienced in educational facilities work and the public bidding environment, with emphasis
Page 9, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
on public school facilities projects. Key consultants must also assign experienced personnel who are knowledgeable in this type of project.
B. Respondents must complete the Proposal Response Form (Section 2.2) for all
phases of the project.
C. Respondents are hereby notified that all proposal submissions and information contained therein and attached thereto shall become public information upon selection of the successful CxA.
D. The successful CxA must perform services related to this project from an office located in the Connecticut area. Respondents must identify the location of said office in the proposal submitted.
E. Comprehensive responses to the issues raised in the RFP are expected. Additional information, not specifically requested, will be considered if provided.
F. The City of Norwalk reserves the right to reject any or all proposals for any reason it determines to be in its best interests or, in the alternative, to abandon the selection process in whole or in part.
G. Candidates are required to include Forms SF 330 in their proposal.
H. Candidates should submit one (1) original and eight (8) copies of their proposal submission to the Purchasing Department by the due date indicated in the Project Notice.
I. Candidates must be available for interviews upon request of the City of
Norwalk. Based on responses to the RFP the City of Norwalk reserves the right to shortlist candidates for presentations/interviews. The firm’s proposed Principal-in-Charge and Project Manager for the project should be available to attend. Please see Section 1.6 for the proposal review and selection process schedule.
1.3 SCOPE OF SERVICES:
The bidder awarded the Contract (the “CxA”) is required to provide Commissioning Services during design, construction, approval/acceptance, and post-occupancy, and to be in compliance with Connecticut Standard Guidelines for High Performance Buildings. The CxA will provide The City of Norwalk (“The City”) with documented assurance that mechanical, electrical, plumbing, fire protection, controls, technology, and other systems have been installed in compliance with the contract documents and specified performance guidelines. The Commissioning Services shall include the following:
Page 10, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
I. Design Phase: A. Develop a design phase commissioning plan including a management strategy and list
of features and systems to be commissioned (MEP systems and the building envelope). An initial draft of the plan shall be submitted for review and comment by The City.
B. Contract document review. Includes reviews of both complete design development documents and complete construction documents (100%) prior to issuing the construction documents for bid. Perform review and verify incorporation of mid- design corrections. Comply with the requirements of High Performance Building Standards Enhanced Commissioning.
C. Assist, review and approve development and updating of the Owner Project Requirements (OPR) and the Design Record documentation by Design Team members specifically the Basis of Design (BOD) Narrative for inclusion into the commissioning plan. (At minimum per the State of Connecticut High Performance Building Standards (HPBS) - Mandatory Requirements in section 16a-38k-3(a)).
D. Develop full commissioning specifications and include all commissioned equipment. Coordinate and integrate into the specifications of the Architect and Engineer of Record. The commissioning specification will include but is not limited to the following: a detailed description of the responsibilities of all parties, details of the commissioning process; reporting and documentation requirements including formats; alerts to coordination issues, deficiency resolution; construction checklist and startup requirements; the systems to be commissioned; the functional testing process; specific functional test requirements, including testing conditions and acceptance criteria for each piece of equipment being commissioned. (At minimum per the State of Connecticut High Performance Building Standards (HPBS) - Mandatory Requirements in section 16a-38k-3(a)).
E. Schedule and facilitate a controls integration and pre-balancing meeting with the Engineer of Record, Program Manager, Construction Manager, Facilities/Maintenance Staff and Subcontractors to discuss and resolve integration issues between equipment, systems and disciplines to ensure integration issues and responsibilities are clearly defined.
F. Participate in meetings pertaining to Connecticut High Performance activities during project design and issue commissioning progress reports as required by the High Performance Building Guidelines.
II. Bid Phase:
A. Attend construction pre-bid meeting(s) to answer questions regarding commissioning activities.
III. Review of Construction Documents
A. The CxA shall thoroughly review the Construction Documents.
Page 11, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
B. The CxA shall present a documented evaluation/assessment to the architect of record and all sub-consultants of the proposed systems, evaluating ease of operation and maintenance, and economical practicality, within 45 days of written notice to proceed from the Program Manager.
C. The CxA shall provide written comments and on-site discussion with the Project’s design team (the “Design Team”), Owner, and the Program Manager to review its comments.
IV. Commissioning Plan:
A. The CxA shall prepare a detailed commissioning plan for the construction, acceptance, and post- occupancy phases of this Project. This informational document will include, but not be limited to the following:
1. Outline the commissioning responsibilities of the CxA, the Town engineer, the Program Manager, Design Team, construction manager for the Project, and the trade contractors.
2. The plan will identify the systems and building envelope features to be commissioned.
3. The plan will explain the method of verification and documentation to be used.
4. The plan will contain a preliminary schedule for the commissioning of systems.
B. The CxA will present the plan to the owner, Town engineer, Program Manager, construction manager, design team. Appropriate modifications resulting from team input will be incorporated into the plan and resubmitted for approval as the final plan.
C. The CxA shall coordinate the commissioning work with the Construction Manager on an ongoing basis to ensure commissioning activities are incorporated into the master schedule.
D. The CxA shall issue four (4) hard copies and four (4) electronic copies of the final commissioning plan within 14 days following written approval of the above parties.
E. The CxA shall conduct a post-occupancy review and meeting with the owner at the following interval: ten (12) months.
V. Review Submittals:
A. The CxA shall review mechanical and electrical submittals and shop drawings provided by the Contractors.
B. This review will be done to determine adherence to the design intent and to familiarize the CxA with the specific equipment that the Contractor will be
Page 12, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
installing on the Project. This will allow the CxA to tailor its pre-functional test check-off sheets and functional test procedures to the specific equipment.
C. Any discrepancies with the design documents shall be brought to the attention of the Design Team, the Owner/Town Engineer, and the Program Manager. The resolution of conflicts will be the responsibility of the Owner, Program Manager and Design Team, with input provided by the CxA.
VI. Review of Controls Software:
A. The CxA shall review the controls contractor’s shop drawings, sequence of operations, and control logic. The review will familiarize the CxA with the control logic and specific types of instruments that the contractor will use to meet the design criteria.
B. The CxA shall also review the lines of software code that the contractor is intending to use in the Direct Digital Control (DDC) system.
C. The CxA shall also confirm the integration of the DDC system with other systems. (I.e. Fire alarm, security, etc.)
VII. Develop Contractor Commissioning Log Books, Pre-functional Test Check-
off Sheets and Verification of Completion Forms: A. After review of Contractor submittals and control software, the CxA shall develop
pre-functional test check-off sheets and Verification of Completion forms for all equipment to be commissioned.
B. These forms will be provided during a meeting conducted by the CxA to the Construction Manager in the form of commissioning log books for further distribution to the appropriate contractor(s). The forms will be utilized to document the completion of the installation. (The Construction Manager shall verify the accuracy and completeness of the subcontractors’ documentation and notify the CxA when systems are prepared for testing, balancing, and functional testing).
VIII. On-site Construction Observation and Meeting Attendance:
A. The CxA shall attend all commissioning meetings and periodic Owner/Town Engineer, Program Manager, Design Team, Construction Manager, and contractors’ meetings.
B. The CxA shall provide a minimum of monthly on-site construction observation visits. As work moves closer to completion, visits may increase to weekly or daily as commissioning testing gets underway. The CxA shall verify access is provided to all equipment to enable service, repair, maintenance, or replacement.
Page 13, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
C. Site visits will acquaint the CxA with construction progress, and increase familiarity with systems to be tested and commissioned. The CxA will immediately report any discrepancies between construction and design documents.
D. Site visits will be scheduled to provide adequate opportunity to observe heating, ventilation, and air conditioning (HVAC) pipe testing and flushing, duct pressure testing and cleaning.
E. On-site visits will enable the CxA to more accurately schedule the commissioning process to interface with the completion of construction.
F. Each site visit shall be documented with a written report that will be distributed to the Owner/Town Engineer, the Program Manager, the Design Team, and the Construction Manager. The report will include a discrepancy/recommendation log, to be updated after each site visit.
G. Attend Building Committee meetings as requested.
IX. Development of Functional Test Procedures: A. CxA shall develop functional test procedures for systems to be commissioned
based on review of design criteria and construction documentation. B. Functional test procedures shall provide a detailed procedure of how the system
shall be tested and a record sheet for recording test results. C. Test procedures shall be as specific and exact as possible to ensure the test can be
easily repeated by more than one tester and the same results obtained. D. The CxA shall review test procedures with the Owner/Town Engineer, the
Program Manager, the Design Team, the Construction Manager, and contractor(s) at a presentation meeting conducted by the CxA. If required, the test procedures will be modified and then approved by the aforementioned parties.
E. The CxA shall issue the final functional test procedures to the Owner/Town Engineer, the Program Manager, the Design Team, and the Construction Manager (one (1) hard copy and one (1) electronic copy each).
F. Functional test procedures shall be provided for all systems including, but not limited to, the following. Failure to include an item in this list shall not alleviate the CxA’s obligation to test all systems identified throughout project design. • All air handling units and associated heating and cooling coils, economizers,
thermostats, etc. • All exhaust fans, all return fans • All motorized dampers including demand controlled ventilators • All variable air volume (VAV) terminal units and associated reheat coils • Chillers and all associated chilled water and condenser water pumps, etc.
Page 14, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
• Boiler, boiler combustion air fan, all associated pumps, tanks, condensate pumps, etc.
• All heat exchangers and associated pressure relief valves (PRVs) • All energy recovery ventilation systems including enthalpy difference
requirements between outdoor air and return air. • Cooling towers, Chilled water system, Refrigeration Systems • Domestic water heating system • Computer room air conditioning units and associated split system condensers • All unit heaters, cabinet heaters, etc. • Building automation system, including CO2 sensors, and component failure
alarms • Direct Digital Controls and system interlocks, including occupancy sensors • Emergency generator and associated transfer switches • Lighting and Day Lighting control systems • Fire protection systems and equipment; fire alarm system interfaces with
HVAC systems • Renewable Energy Systems • Security Systems • Telecommunications Systems • Observation of the Infrared testing for electrical gear and panel boards
X. Develop Commissioning Schedule:
A. The CxA shall develop a commissioning schedule for all required project systems. B. The schedule will be coordinated with the construction completion schedule, and
will identify contractor and manufacturer start-up tests for major equipment. C. CxA will present the schedule to the Owner/Town Engineer, Program Manager,
Design Team, Construction Manager, and contractor(s) for review and approval. D. The CxA shall maintain and update the schedule as needed, and coordinate with
balancing.
XI. Preparation and Testing, Adjusting, and Balancing (TAB) of HVAC/R Systems:
A. CxA shall determine when balancing may be conducted. B. CxA shall review the completed balance report and independently spot check
balancing readings to verify compliance with the submitted report. The CxA shall confirm the required rate of outdoor air flow is being delivered to the breathing zone within each space.
Page 15, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
C. CxA will bring any discrepancies to the attention of the Owner, Program Manager, Design Team, and Construction Manager for review. The CxA shall facilitate discussions with the project team to resolve any discrepancies identified during its review.
D. A copy of the final balancing report will be included in the final commissioning report.
E. Any smoke control testing by other agencies having authority will be witnessed and documented by the CxA.
F. Coordinate and witness start-up of hydronic systems to verify cleaning, flushing and chemical treatment have been completed prior to the start of water balancing.
XII. Perform Functional Test Procedures and Document Results:
A. The CxA shall commission those systems as outlined in the commissioning plan through the performance of the functional test procedures.
B. Testing will be scheduled based on the commissioning schedule, the completion of the work, and the system testing and balancing. The CxA will review the test results/reports, including, but not limited to, the efficiency test reports for heating, hot water systems, and cooling systems
C. During the testing, a weekly report of progress and results will be provided to the Owner/Town Engineer, the Program Manager, the Design Team, the Construction Manager, and the Contractor(s). Additionally, a running discrepancy/recommendation log will be provided and updated weekly. The CxA shall retest after corrections have been made and track all corrections.
D. If systems do not comply with testing standards, the CxA shall provide recommended solutions for review by the owner, Program Manager, design team, construction manager, and Contractor(s). The CxA shall facilitate discussions with the group to arrive at a solution.
E. All test results will be documented and included in the final commissioning report.
F. Seasonal peak testing will be performed in the appropriate peak season.
XIII. Review Operation and Maintenance (O&M) Manuals, Warranties, As-built Documentation:
A. CxA shall review O&M manuals for, but not limited to, completeness, accuracy, and compliance with the construction contract. The CxA shall provide comments and feedback to the Construction Manager within 15 days following receipt of the O & M manuals.
B. The CxA shall verify completeness from an operational standpoint and include commissioning information.
Page 16, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
C. CxA shall confirm construction documents are updated regularly by the Construction Manager. Deficiencies are to be reported to the CM and Program Manager, and tracked until remedied.
D. The CxA shall review all HVAC system and electrical equipment warranties to verify client agency's responsibilities are clearly identified.
XIV. Provide Operations Staff Systems Training:
A. The CxA shall coordinate training of the facility’s maintenance personnel to include: System configuration, control sequences, special systems, safety, and alarms/trouble codes.
B. Videoed training will be conducted after the O&M manuals have been distributed to the facility’s maintenance personnel.
C. The CxA shall facilitate and ensure all training specified in the project construction documents is properly carried out by the Contractor(s).
XV. Final Commissioning Report:
A. The CxA shall provide and present a final commissioning report to include the following:
1. Summary of commissioning process. 2. A final evaluation of system compliance with the design intent, including
any discrepancies and recommendations for modifications. 3. All functional test procedures and their final record sheets. 4. Final discrepancy/recommendation log listing final status of each item. 5. Final Testing, Adjusting, and Balancing report.
B. The CxA shall submit five (5) copies of the final commissioning report within 60 days after completion of the services itemized in subsections I through XIV above. The final report shall include all information required by the State of Connecticut High Performance Building Standards (HPBS) 16a - 38k.
C. CxA will distribute one hard copy and one electronic format copy each to the owner, Program Manager, Construction Manager, State Department of Administrative Services DAS / OSCG, and the commissioner of the State DEEP.
XVI. Warranty Period Review:
During the warranty period the CxA shall retest any systems that had testing deferred during the initial functional testing and shall conduct seasonal testing.
Page 17, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
1.4 PROPOSAL SUBMISSION FORMAT
All responses to this RFP must be in sealed envelopes and marked with the RFP reference title, the RFP number, and due date and time. The Candidate’s name and address must appear on the envelope. Proposals should put forth full, accurate, and complete but concise information as required by this request. The City shall not be liable for costs incurred in the preparation of the response to this RFQ or in connection with any presentation before a Selection Committee. Firms should create their submissions in 8½” x 11” document size using a minimum 12 point font size, double sided. Proposals should be prepared simply and economically, providing a straightforward, concise description of the applicant's ability to meet the requirements of the RFP. Fancy bindings, colored displays, promotional materials, and so forth are not desired. Emphasis should be on completeness and clarity of content. The City reserves the right to reject proposals/parts thereof or to solicit new proposal and award contracts as it deems tin its best interest. All proposals will remain property of the City. In addition to the Proposal Response Form, the proposal should include:
1. Title Page (1page): This should include your company name, address, telephone and fax numbers, and person to contact regarding this proposal with e-mail address.
2. Executive Summary (1 page): Provide a brief history of your firm, company structure, and identify key qualities or services provided that distinguishes your firm from other CxA firms. Outline the firm’s experience with similar current or completed public school building projects and include Form SF330.
3. Scope of Services: Identify specific services that will be provided by the CxA and any other recommended services in addition to those identified herein for consideration and possible incorporation. List any services or consultants that are specifically excluded from this proposal. List the name and address of any consulting firm(s) that may be used on this project with a brief description of their qualifications and your prior association with them, if any. Include Form SF330 for key consultants.
4. Project Team Organization and Staffing: Provide an organizational chart for the proposed staff for this project, including any consultants. Identify the Principal of the firm who will be responsible for this project and include resumes of all key project team members. In addition;
a. Provide a brief description (no more than 1 page per project) of similar projects in which the key personnel may have worked together as a team. Include previous assignment information such as title, length of time on job, references and contact information.
The City reserves the right to interview and specify key staff members on this project.
Page 18, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
5 Describe your project approach (no more than 2 pages) and how your staff and consultants will be organized and utilized both during design and construction phases.
6. Provide three references that will be able to verify the quality of the firm’s services, technical ability and proposed key staff, with title, position, their relationship to the project, and telephone numbers.
7. All candidates must be available for interview.
Candidates are advised that the selection of CxA by the Norwalk Facilities Construction Commission will be made in full compliance with the Freedom of Information laws and regulations.
1.5 CRITERIA FOR EVALUATING PROPOSAL SUBMISSIONS Proposal submissions will be evaluated based on the following criteria:
1. The key personnel to be assigned to the project and their present workload.
2. The firm’s qualifications, experience, and demonstrated familiarity with building projects in general and specifically new construction projects of a similar, size, scope, and nature.
3. The firm’s experience, and demonstrated familiarity with the Connecticut High Performance Building Standards (HPBS).
4. The project team’s experience with projects of similar nature and scope.
5. Previous oversight experience in projects involving construction of new school facilities.
6. The proposed project approach and how staff and consultants will be organized and utilized both during design and construction phases.
7. Quality of references from previous clients.
8. Proposal Response Forms, and fees.
The City reserves its rights to examine any other criteria and take the same under consideration and to reject any firm or proposal despite its compliance with these criteria if it determines that to do so would be in its best interests.
1.6 PROPOSAL REVIEW AND SELECTION PROCESS
Following the initial review of the proposal by the selection committee, candidates may be short-listed. If necessary, these semi-finalists may be invited to make a presentation to the selection committee. All candidates must be available for interviews. The proposed timeline for this project is as follows:
Page 19, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
Time Date
Advertise RFP April 2, 2018 Pre-Proposal Conference
Questions Deadline 2:00 PM April 6, 2018 Deadline for Proposal Submissions 2:00 PM April 12, 2018 Evaluations April 13,2018 Interviews
Recommendation of Award May 2018 RFP Update to Firms
Page 20, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
1.7 SAMPLE AGREEMENT “The following document is the City’s standard professional engineering contract. Please be advised that the substantive terms and requirements outlined therein may be revised only with the approval of Norwalk’s Corporation Counsel.”
AGREEMENT
BY AND BETWEEN CITY OF NORWALK
AND «VendorName» FOR
«Project» THIS AGREEMENT, entered into this _____ day of ____________, 2018__, by and between the CITY OF NORWALK, a municipal corporation organized and existing under the laws of the State of Connecticut, acting herein by Harry W. Rilling, its Mayor, duly authorized (hereinafter referred to as the “City”), and «VendorName», a professional engineering firm licensed to practice in the State of Connecticut under the provisions of Section 20-306a of the General Statutes of the State of Connecticut, and having offices at «VendorAddress1» «VendorAddress2», «VendorCity», «VendorState» «VendorZip», acting herein by «VendorContactFirstName» «VendorContactMiddleName», «VendorContactLastName», its duly authorized «VendorContactTitle» (hereinafter referred to as the "Engineer"). WITNESSETH THAT: WHEREAS, the City has determined that it needs professional engineering services to provide commissioning services, in connection with the construction of the New South Norwalk School and the renovation of the Ponus Middle School (hereinafter, the “Project”); and WHEREAS, the City has selected the Engineer based on the Engineer’s representations that it is qualified and capable of performing the necessary services in a professional and timely manner, in order to meet the City’s needs and requirements; and WHEREAS, the Engineer has agreed to perform the required services in accordance with the terms set forth herein, in a diligent, professional and timely manner.
Page 21, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
NOW, THEREFORE, the City and the Engineer, for the consideration and based on the terms and conditions of this Agreement, hereby agree as follows: Article 1. Employment of the Engineer 101. The City hereby engages the Engineer and the Engineer hereby agrees to perform the services hereinafter set forth in Article 2. The principal in charge of the services to be performed hereunder by the Engineer pursuant to this Agreement shall be _______________, ______________ or such other qualified person designated by the Engineer in writing and approved by the City. 102. The City’s Facillities Manager, or his designated representative (hereinafter the “Director”), will oversee the performance of the Project under this Agreement on behalf of the City. The Building Management Department of the City shall be referred to herein as the "Department." 103. A. The City intends to secure the professional services of the Engineer’s duly authorized, licensed and competent employees, acceptable to the City. Failure of the Engineer for any reason to make such employees available to the extent necessary to complete the Project in compliance with this Agreement in a reasonably skillful, professional, and prompt manner shall be cause for termination of this Agreement. All persons engaged in the commissioning services required under this Agreement shall either themselves be properly authorized, licensed, and permitted under State law to perform such services or shall be directly supervised by such an individual, as set forth in Chapter 391 of the Connecticut General Statutes. B. The Engineer shall not subcontract any of the services to be performed by it under this Agreement without the express, prior written approval of the Director, which approval shall not be unreasonably withheld. C. In the event that the City approves of the hiring of subcontractors or subconsultants to perform services related to the Project, the Engineer shall cooperate as fully as possible with the City in the interests of the Project; shall be fully responsible to the City for the acts and omissions of its subcontractors and subconsultants as it is for the acts
Page 22, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
and omissions of its direct employees; and shall require each subcontractor to agree in writing to observe and be bound by all obligations and conditions of this Agreement to which the Engineer is bound. Article 2. Scope of Services 201. A. The scope and details of the services to be performed by the Engineer under this Agreement are outlined in the City’s Request for proposals and the Engineer’s Proposal, dated _______________ which documents are attached hereto and made a part of this Agreement as Exhibits A and B, respectively, (hereinafter the Services). B. The Engineer shall not commence performance of any such Services, nor shall it incur any charges in connection therewith, until such time as it receives written authorization from the Director to do so. Upon receipt of such notice to proceed, the Engineer shall immediately commence its performance and diligently perform same in order to complete the Project by the date set forth in Article 4 hereof. C. The City may, from time to time, request changes in the Services to be performed by the Engineer hereunder. Any such change, including any increase or decrease in the Services to be performed and the corresponding amount of compensation to be paid therefor shall be mutually agreed upon by and between the City and the Engineer, and shall be incorporated in a written amendment to this Agreement signed by both parties. 202. The Engineer covenants and agrees that it will perform its Services under this Agreement in accordance with the generally prevailing standards of care and practices of its profession. The Engineer assumes full and complete responsibility for the accuracy of all products of its Services and that of any subconsultants utilized under this Agreement. It shall so indicate this by having the signature and the Connecticut Professional Engineer's Seal of each engineer used to perform Services hereunder affixed on the title sheet(s) of all plans and/or documents. The Engineer shall also be responsible for verifying the accuracy of all information and documents provided to it by the City upon which it may rely upon in performing its Services hereunder. 203. A. In performing the Services required under this Agreement, all documents submitted by the Engineer in
Page 23, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
connection with the Project shall conform to all applicable provisions of Federal, State and local laws and regulations, especially those requirements implemented and enforced by governing bodies having authority over the Project. B. The Engineer shall indemnify, defend and save harmless the City from and against any damages, claims, actions and losses arising from its Services performed in connection with the Project, in particular, those services which do not conform to applicable provisions of laws, requirements and guidelines, relevant standards, regulations and the generally prevailing standards of the Engineering profession. The provisions of this paragraph shall survive the expiration or termination of this Agreement and shall in no way be limited by reason of any insurance coverage. Failure of the Engineer’s performance of the Services to conform to applicable laws, regulations and professional standards shall be considered negligence on the part of and a breach by the Engineer for purposes of this Agreement. 204. In performing the Services, the Engineer shall meet with staff representatives of the Department as often as reasonably necessary and shall also be available upon request to meet and consult with members and staff of various departments of the City, and with other persons or entities, including Federal and/or State officials. 205. Unless otherwise specified in the Agreement, all written materials required to be submitted under this Agreement shall be submitted in one (1) copy. With respect to full-size plans and drawings, the Engineer shall submit one (1) signed and sealed black line print thereof sealed and with original Engineer’s signature. In addition, the Engineer shall provide all documents, both written and drawings, in electronic format. 206. All of the materials prepared by the Engineer under this Agreement, including any partially completed documents, shall be sole and exclusive property of the City. The Engineer shall label all drawings and documents accordingly. The City shall use materials prepared by the Engineer under this Agreement solely for the purpose of bidding and construction for the Project. The Engineer, only upon prior written approval by the City, may publish materials prepared under this Agreement.
Page 24, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
207. The Engineer agrees that it shall preserve all of its records and accounts concerning the performance and implementation of this Agreement for a period of eight (8) years after final payment is made under this Agreement. If any litigation, claim or audit, directly or indirectly pertaining to the Project or the Engineer’s Services in connection therewith, is started before the expiration of the eight (8) year period, the records shall be retained until all litigations, claims or audit findings involving the records have been finally resolved. 208. Additional Services A. Additional Services beyond those described in paragraph 201 of this Agreement shall be performed by the Engineer only with the prior written authorization of the Director and pursuant to a written Amendment to this Agreement signed by the parties hereto. The City shall not be liable to the Engineer for the cost of any Additional Services unless performed outside of or without such a signed Amendment. Additional Services under this Agreement may include, but are not limited to the following: 1. Providing special overnight courier service, and reproduction of design and construction documents in excess of the number of copies required herein. 2. Preparation of special presentation materials such as detailed presentation models or renderings. 3. Special testing services. 4. Services not described in Exhibit A. The Engineer agrees that, should the scope of the Services be reduced, such reduction will be reflected in a commensurate reduction of the amount of compensation paid to the Engineer hereunder. Article 3: City’s Responsibilities 301. The City shall provide the Engineer with all information in its possession regarding requirements for the Project and shall use its best efforts to obtain such other information as
Page 25, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
may be needed by the Engineer to perform the Services required under this Agreement. If necessary, the City shall assist the Engineer in obtaining any other information necessary for the Project. However, the City shall not be responsible for and shall not warrant the accuracy or content of any of the information or data set forth in the documents that it provides or assists the Engineer in obtaining. The Engineer expressly agrees that it shall make no claim against the City for any alleged damages arising out of the information or data provided or obtained by the City. The Engineer shall be responsible at its own expense to make all reasonable and necessary field inspections and to perform such other tasks needed to verify all information provided or obtained by the City. Article 4. Time Provisions 401. This Agreement shall commence upon its execution and shall remain in full force and effect unless earlier terminated, until the completed construction of the Infrastructure Work has been accepted by the City, which acceptance shall not be unreasonably withheld. 402. The City may, by a signed written statement, extend the time for performance of the Services hereunder beyond the period stipulated above when the Engineer has been delayed for reasons beyond its control. Article 5. Compensation 501. A. The City shall compensate the Engineer for the satisfactory performance of the professional services set forth in Article 2 based on the itemized fee summary set forth on page 3 of Exhibit A. The total amount of fees payable under this Agreement shall not exceed ______________________ DOLLARS AND 00/100 ($______________.00). The maximum amount will not be revised unless there is a substantial change in the scope or character of the work to be performed by the Consulting Engineer which would justify a revision of this figure and such change is set out in a signed, written amendment to this Agreement. B. In addition to professional fees, the City shall reimburse the Engineer for certain direct expenses incurred in connection with the performance of the Services hereunder. Reimbursable costs directly related to the Engineer’s Services
Page 26, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
shall only be paid by the City if incurred with the specific, prior written approval of the Director for each expense. Article 6. Method of Compensation 601. For the Services performed under this Agreement, the City shall pay the Engineer on the basis of an itemized invoice, certified by a principal of the Engineer, setting forth the Services performed, the percentage of completion of the Project that has been accomplished by the Services covered by the invoice, and the compensation due the Engineer based upon the calculation of payment set forth in Section 501. The City may, prior to making any payment under this Section, require the Engineer to submit such additional information as is reasonable. 602. After completion of all components of the Project, the Engineer shall submit an invoice for one hundred percent (100%) completion of engineering Services under this Agreement. Compensation previously paid shall be adjusted to reflect additions or deductions based upon final accounting of all invoices for work performed in accordance with the provisions of Section 501. Payment of such adjustments shall not be deemed to require an amendment to this Agreement, with the one exception that the maximum payment specified in Section 501 shall not be exceeded without an amendment to this Agreement. Acceptance by the Engineer of final payment for the Services performed under this Agreement shall constitute a full and complete release of the City, its officers and agents, of all claims, demands and liabilities to the Engineer related to this Agreement. Article 7. Insurance 701. The Engineer agrees to obtain at its own cost and expense all insurance required by the attached Insurance Rider and to keep the same in continuous effect for a period of three (3) years following the date on which the Director indicates the termination of the Engineer's responsibilities hereunder. Before commencing the Services, the Engineer shall furnish to the City a certificate of insurance, and shall thereafter provide renewal certificates, as appropriate, evidencing such coverage written by a company or companies acceptable to the City. Each insurance policy shall be endorsed to name the City of Norwalk as an additional insured party and shall provide that the insurance company providing
Page 27, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
coverage shall notify the City by certified mail at least thirty (30) days prior to the effective termination of the policy or policies providing coverage. No change in the coverage provided hereunder shall be made without the prior written approval of the Director. All insurance shall be taken out and maintained at no cost or expense to the City and the Engineer shall be responsible for the full amount of any deductible. Failure of the Engineer to maintain insurance coverage in accordance with the terms of the Agreement shall constitute a violation of the Agreement and shall subject the Engineer to liquidated damages in the amount of ten percent (10%) of the total contract price, subject to the continued commercial availability of such insurance. Article 8. Indemnification 801. The Engineer expressly agrees to that it shall at all times indemnify, defend and save harmless and that it shall require its own contractors, subcontractors, officers, agents, principals, representatives, consultants and employees (the Engineer’s Parties) to indemnify, defend and save harmless the City of Norwalk and its respective officers, agents and employees, from and against any and all demands; claims; damages; losses; litigation; financial costs and expenses, including counsel's fees; and compensation related to personal injuries (including death), any damage to property, real or personal, and any other loss, expense or aggrievement directly or indirectly arising from, related to or connected with the Project and the Work to be performed hereunder by the Engineer, its employees, agents, subcontractors, material suppliers, or anyone directly or indirectly employed by any of them. The Engineer shall and does hereby assume and agree to pay for the defense of all such claims, demands, suits, proceedings and litigation. The provisions of this paragraph shall survive the expiration or early termination of this Agreement; shall be separate and independent of any other provision or requirement of this Agreement; and shall not be limited by reason of any insurance coverage provided hereunder. The City may withhold from any payment due or to become due to the Engineer an amount sufficient in its judgment to protect and indemnify the City, its officers, agents, servants and employees from and against any and all
Page 28, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
such claims and liabilities described above. The Engineer and the Engineer’s Parties’ duties under this section shall remain fully in effect and binding in accordance with the terms and conditions of this Agreement and any extension thereof, without being lessened or compromised in any way, even where the Engineer and the Engineer’s Parties are alleged or found to have merely contributed in part to the actions or omissions giving rise to the claims and/or where the City is alleged or is found to have contributed to the actions or omissions giving rise to the claims. Nothing in this provision, or elsewhere in this CONTRACT, shall be deemed to relieve the Engineer of its duty to defend the City or any Indemnified Party, as specified in this Contract, pending a determination of the respective liabilities of the Engineer, the City, or any Indemnified Party, by legal proceeding or agreement. In furtherance to but not in limitation of the indemnity provisions in this Agreement, Engineer hereby expressly and specifically agrees that its obligation to indemnify, defend and save harmless the City as provided in this Agreement shall not in any way be affected or diminished by any statutory or constitutional immunity it enjoys from suits by its own employees or from limitations of liability or recovery under workers' compensation laws. Article 9. General Provisions 901. The City may at any time, and for any reason, direct the discontinuance of the Services contemplated under this Agreement. Such direction shall be in writing and shall specify the period during which the Services shall be discontinued. The Services shall be resumed on the dates specified in such direction, or upon such other date as the City may thereafter specify in writing. The period during which such Services are discontinued shall be deemed added to the time for performance. In the event that the City directs the discontinuance of the Services hereunder for a period of time in excess of one (1) year, through no fault of the Engineer, the parties may negotiate an adjustment in the fees payable hereunder due to a rise in the cost of performance. Discontinuance of Services under this Article shall not give rise to any claim against the City.
Page 29, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
902. The City may at any time and for any reason terminate this Agreement for convenience by written notice specifying the termination date, which shall be not less than seven (7) days from the date such notice is given. In the event of such termination, Services shall be paid for in such amount as shall compensate the Engineer for the portion of the Services satisfactorily performed prior to termination. Such compensation shall not however, include unabsorbed home office overhead or lost profits. The Engineer’s compensation upon a termination for convenience shall be fixed by the City after consultation with the Engineer, and shall be subject to audit by the City's Comptroller. Termination under this section shall not give rise to any claim against the City for damages or for compensation in addition to that provided hereunder. 903. In the event the Director determines that there has been a material breach by the Engineer of any of the terms of the Agreement, or that the Engineer refuses or has failed to perform the required Services or any part thereof in a timely, professional and diligent manner as will ensure its completion in accordance with the requirements hereof, the City has the right, power and authority to terminate this Agreement for cause upon providing the Engineer three (3) days written notice. By the terms of this Agreement, the City may, but is not obligated to, provide the Engineer with a reasonable opportunity to cure the breach before the termination becomes effective. In the event the City terminates the Agreement for cause, the Engineer shall be obligated to pay the City for any losses, damages, costs and expenses, including attorneys' fees, sustained or incurred thereby. For the purpose of completing the Project, the City may, for itself or for any of its Engineers, take possession of and use or cause to be used any and all documents, plans and specifications or other items that may have been used or drawn up in connection with the performance of this Agreement. This right is in addition to any other right or remedy the City may otherwise have. In the event of a termination for cause, all costs, expenses, losses, damages, attorneys' fees, and any and all other charges incurred by the City under this Agreement shall be charged to the Engineer and deducted and/or paid by the City out of any monies due or payable or to become due or payable under this Agreement to the Engineer. If any such costs exceed the sum due or to become due to the Engineer, then, upon demand, the Engineer shall pay the excess amount to the
Page 30, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
City. In computing the amounts chargeable to the Engineer, the City shall not be held to a basis of the lowest prices for which the completion of the Services or any part thereof, but it shall charge to the Engineer, and the Engineer shall be liable for all sums actually paid and expenses actually incurred in affecting prompt completion of the Project hereunder. The City’s rights described herein are in addition to any other rights and remedies provided by law. Termination under this section shall not give rise to any claim against the City for damages or compensation in addition to that provided hereunder. 904. When the City shall have reasonable grounds for believing that: A. The Engineer will be unable to perform the Services required under this Agreement fully, professionally, and satisfactorily within the time fixed for performance; or
B. A meritorious claim exists or will exist against the Engineer or the City arising out of the negligent, willful or wanton acts, errors or omissions of the Engineer, its agents, servants or employees, or the Engineer’s breach of any provision of this Agreement;
then the City may withhold payment of any amount otherwise due and payable to the Engineer hereunder. Any amount so withheld may be retained by the City for such period as it may deem advisable to protect the City against any loss and may, after written notice to the Engineer, be applied in satisfaction of any claim herein described. This provision is intended solely for the benefit of the City, and no person shall have any right against the City or claim against the City by reason of the City’s failure or refusal to withhold monies. No interest shall be payable by the City on any amounts withheld under this provision. This provision is not intended to limit or in any way prejudice any other right of the City. 905. Engineer shall not assert any claim arising out of any act or omission by any agent, officer or employee of the City in the execution or performance of this Agreement, against any such agent, officer or employee individually. Such claims may be made against the City.
Page 31, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
906. No member of the governing body of the City, and no other officer, employee, or agent of the City shall have any personal interest, direct or indirect, in this Agreement, except as permitted by the Code of Ethics of the City of Norwalk. The Engineer covenants that no person having any such interest shall be employed in the performance of this Agreement. 907. This Agreement shall be construed in accordance with the laws of the State of Connecticut, and any action or suit at law in connection herewith shall be brought in the Superior Court of the State of Connecticut, Judicial District Stamford/Norwalk. 908. The Engineer shall comply with all applicable laws, ordinances and codes of any governmental body having jurisdiction over any matter related to this Agreement or the Services to be performed hereunder, and shall commit no trespass on any private property in performing any of the Services required by this Agreement. 909. During the performance of this Agreement, the Engineer agrees not to discriminate nor to permit any discrimination against any employee or applicant for employment because of race, color, religion, age, sex, gender identity or expression, marital status, national origin, sexual orientation, ancestry, present or past history of mental disability, intellectual disability, learning disability, physical disability including, but not limited to blindness, unless it is proven that the disability or characteristic prevents proper performance of the work involved. 910. This Agreement and its Exhibits constitute the entire understanding and agreement of the parties respecting the subject hereof and supersede any and all agreements, negotiations, commitments and writings reached by the parties prior to the execution of this Agreement, whether oral or written. No change or modification of this Agreement shall be valid unless it is in writing and signed by both parties hereto. 911. In case of conflict between the terms of this Agreement and the terms or requirements of documents mentioned herein, the stipulations contained in this Agreement shall govern.
Page 32, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
912. Each and every provision and clause required by law to be inserted in this Agreement shall be deemed to be inserted herein and the Agreement shall be read and enforced as though such provisions and clauses were included herein. If, through mistake or otherwise, any such provision is not inserted or is not correctly inserted, then, upon the written consent of the parties, this Agreement shall forthwith be physically amended to make such insertion. 913. The City and the Engineer each binds itself and its successors and assigns to the other party and to such party's successors and assigns with respect to all covenants of this Agreement. The Engineer shall not assign or transfer any interest in this Agreement without the prior written approval of the City. 914. If any provision of this Agreement is held invalid, the balance of the provisions of this Agreement shall not be affected thereby if the balance of the provisions of this Agreement would then continue to conform to the requirements of applicable laws. 915. The Engineer warrants that it has no interest in the Project which is the subject matter of this Agreement and will not acquire any interest, direct or indirect, that would conflict in any manner or degree with the performance of the Services and duties hereunder. The Engineer further warrants that, in the performance of this Agreement, no person having any such interest shall be employed by it. The Engineer represents and warrants that it has not employed or retained any person, other than a bona fide full time salaried employee working solely for the Engineer to solicit or secure this Agreement, and that it has not paid or agreed to pay any person (other than payments of fixed salary to a bona fide full time salaried employee working solely for the Engineer) any fee, commission, percentage, gift or other consideration, contingent upon or resulting from the award or making of this Agreement. The Engineer represents that no person or persons not named in the Engineer’s qualification and proposal, have any financial or personal interest in the Engineer’s performance hereunder. For the breach or violation of this provision, without limiting any other rights or remedies to which the City may be entitled or any civil or criminal penalty to which any
Page 33, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
violator may be liable, the City shall have the right, in its discretion, to terminate this Agreement without liability, and to deduct from the payments to be made pursuant to this Agreement, or otherwise to recover the full amount of such fee, commission, percentage, gift or consideration. 916. All notices of any nature referred to in this Agreement shall be in writing and sent by registered or certified mail, postage prepaid, to the respective addresses set forth below or to such other addresses as the respective parties hereto may designate in writing: To the City: Director Department of Public Works 125 East Avenue, P.O. Box 5125 Norwalk, CT 06856-5125 With a copy to: Office of Corporation Counsel City of Norwalk 125 East Avenue, Room 237 P.O. Box 5125 Norwalk, CT 06856-5125 To the Engineer: «VendorContactFirstName» «VendorContactMiddleName» «VendorContactLastName» «VendorContactTitle» «VendorName» «VendorAddress1» «VendorAddress2» «VendorCity», «VendorState» «VendorZip» 917. The Engineer represents to the City as follows: A. That it has, and has exercised, the required corporate power and authority and has complied with all applicable legal requirements necessary to adopt, execute and deliver this Agreement and to assume the responsibilities and obligations created hereunder on behalf of the Engineer; and B. That this Agreement is duly executed and delivered by a duly authorized representative, in accordance with such duly authorized representative's powers to bind the Engineer hereunder, and constitutes a valid and binding obligation enforceable in accordance with its terms, conditions and provisions.
Page 34, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
918. The City's hiring practices strive to comply with all applicable federal regulations regarding employment eligibility and employment practices. Thus, all individuals and entities seeking to do work for the City are expected to comply with all applicable laws, governmental requirements and regulations, including the regulations of the United States Department of Justice pertaining to employment eligibility and employment practices. The City reserves the right at its discretion, but does not assume the obligation to require proof of valid citizenship or, in the alternative, proof of a valid green card for each person employed in the performance of Services for the City. By reserving this right the City does not assume any obligation or responsibility to enforce or ensure compliance with the applicable laws and/or regulations. By signing this Agreement the Engineer hereby certifies to the City of Norwalk that it is in compliance with all applicable regulations and laws governing employment practices. IN WITNESS WHEREOF, the parties have caused four (4) counterparts of this Agreement to be executed as of the day and year first above written. Signed, Sealed and Delivered in the Presence of: CITY OF NORWALK Witnesses’ Signatures _____________________________ By:______________________________ Name: Its Mayor Duly Authorized _____________________________ Name: Date Signed:___________________ Witnesses’ Signatures «VendorName» _____________________________ Name: _____________________________ By:______________________________
Page 35, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
Name: «VendorContactFirstName» «VendorAuthorizerMiddleName», «VendorContactLastName» Its «VendorAuthorizerTitle» Duly Authorized Date Signed:____________________ APPROVED AS TO FORM: OFFICE OF CORPORATION COUNSEL By:__________________________ APPROVED AS TO AVAILABILITY OF FUNDS: By:__________________________ Comptroller Date Signed:_________________
Page 36, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
INSURANCE RIDER The Engineer shall provide and maintain insurance coverage related to its Services in connection with the Project in compliance with the following requirements. The insurance required shall be written for not less than the scope and limits of insurance specified hereunder, or required by applicable federal, state and/or municipal law, regulation or requirement, whichever coverage requirement is greater. It is agreed and understood that the scope and limits of insurance specified hereunder are minimum requirements and shall in no way limit or preclude the City from requiring additional limits and coverage to be provided under the Engineer's policies. The insurance obligations under this agreement shall be (1) all the insurance coverage and/or limits carried by or available to the Architect; or (2) the minimum insurance coverage requirements and/or limits shown in this agreement, whichever is greater. Minimum Scope and Limits of Insurance: Workers' Compensation: With respect to all operations the Engineer performs, it shall carry workers' compensation insurance in accordance with the requirements of the laws of the State of Connecticut, and employer's liability limits of One Hundred Thousand Dollars ($100,000) coverage for each accident, One Hundred Thousand Dollars ($100,000) coverage for each employee by disease, Five Hundred Thousand Dollars ($500,000) policy limit coverage for disease. Commercial General Liability: With respect to all operations the Engineer performs it shall carry Commercial General Liability insurance providing for a total limit of One Million Dollars ($1,000,000) coverage per occurrence for all damages arising out of bodily injury, personal injury, property damage, products/completed operations, and contractual liability coverage for the indemnification obligations arising under this Agreement. The annual aggregate limit shall not be less than Two Million Dollars ($2,000,000). Automobile Liability: With respect to each owned, non-owned, or hired vehicles the Engineer shall carry Automobile
Page 37, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
Liability insurance providing One Million Dollars ($1,000,000) coverage per accident for bodily injury and property damage. Environmental Liability: If applicable based on the Engineer's Scope of Work, the Engineer is required to provide environmental and remediation insurance in the amount of Five Million Dollars ($5,000,000.00) per claim limit and Five Million Dollars ($5,000,000.00) annual aggregate limit. The policy shall be written on a follow form coverage wording to its underlying Schedule of insurance. The policy shall be written on a follow form coverage wording to its underlying Schedule of insurance. Errors and Omissions/Professional Liability: With respect to any damage caused by a negligent act, error, or omission of the Engineer, the Engineer shall carry minimum Five Million Dollars ($5,000,000) coverage per claim and in the aggregate. With respect to any damage caused by a negligent act, error, or omission of the Architect's subconsultants, the subconsultants shall carry minimum Two Million Dollars ($2,000,000) coverage per claim and in the aggregate. "Tail" Coverage: If any of the required liability insurance is on a "claims made" basis, "tail" coverage will be required at the completion of the Project for a duration of twenty-four (24) months, or the maximum time period reasonably available in the marketplace. Engineer shall furnish certification of "tail" coverage as described or continuous "claims made" liability coverage for twenty-four (24) months following Project completion. Continuous "claims made" coverage will be acceptable in lieu of "tail" coverage, provided its retroactive date is on or before the effective date of this Agreement. If continuous "claims made" coverage is used, Engineer shall be required to keep the coverage in effect for a duration of not less than twenty-four (24) months from the date of final completion of the Project. Acceptability of Insurers: The Engineer's policies shall be written by insurance companies licensed to do business in the State of Connecticut, with an AM Best rating of A-VII, or otherwise acceptable to the City. Subcontractors: The Engineer shall require all subcontractors to provide the same "minimum scope and limits of insurance" as required herein, with the exception of Errors and
Page 38, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
Omissions/Professional Liability insurance, unless Errors and Omissions/Professional Liability insurance is applicable to the Work performed by the subcontractor. All Certificates of Insurance shall be provided to the City's Corporation Counsel as required herein. Aggregate Limits: Any aggregate limits must be declared to and be approved by the City. It is agreed that the Engineer shall notify the City whenever fifty percent (50%) of the aggregate limits are eroded during the required coverage period. If the aggregate limit is eroded for the full limit, the Engineer agrees to reinstate or purchase additional limits to meet the minimum limit requirements stated herein. Any premium for such shall be paid by the Engineer. Deductibles and Self-Insured Retentions: Any deductible or self-insured retention must be declared to and approved by the City. All deductibles or self-insured retentions are the sole responsibility of the Engineer to pay and/or to indemnify. Notice of Cancellation or Nonrenewal: Each insurance policy required shall be endorsed to state that coverage shall not be suspended, voided, cancelled, or reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. Notwithstanding this requirement, the CONTRACTOR is primarily responsible for providing such written notice to the City thirty (30) days prior to any policy change or cancellation that would result in a change of the amount or type of coverage provided. In the event of any such change the CONTRACTOR shall provide comparable substitute coverage so that there is no lapse in applicable coverage or reduction in the amount of coverage available to the City related to the CONTRACTOR’s services. Waiver of Governmental Immunity: Unless requested otherwise by the City, the Engineer and its insurer shall waive governmental immunity as defense and shall not use the defense of governmental immunity in the adjustment of claims or in the defense of any suit brought against the City. Additional Insured: The liability insurance coverage, except Errors and Omissions, Professional Liability, or Workers' Compensation, if included, required for the performance of the Project shall include the City as an Additional Insured with
Page 39, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
respect to the Engineer's activities to be performed under this Agreement. Coverage shall be primary and non-contributory with any other insurance and self-insurance. Waiver of Subrogation: Engineer hereby waives the right to subrogate or seek recovery from City of Norwalk and its insurance carriers. Certificate of Insurance: As evidence of the insurance coverage required by this Agreement, the Engineer shall furnish Certificate(s) of Insurance to Corporation Counsel's Office prior to the Engineer's commencement of Services under this Agreement. The Certificate(s) will specify all parties who are endorsed on the policy as Additional Insureds (or Loss Payees). The Certificates and endorsements for each insurance policy are to be signed by a person authorized by the insurer to bind coverage on its behalf. Renewals of expiring Certificates shall be filed thirty (30) days prior to expiration. The City reserves the right to require complete, certified copies of all required policies at any time. All insurance documents required should be mailed to the City of Norwalk Corporation Counsel, P.O. Box 5125, Norwalk, Connecticut 06856-5125. Waiver of requirements: The Corporation Counsel may vary these insurance requirements at Corporation Counsel's sole discretion if Corporation Counsel determines that the City's interests will be adequately protected by the provision of different types or other amounts of coverage.
Page 40, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
1.8 INSURANCE REQUIREMENTS
The Commissioning Agent shall provide and maintain insurance coverage related to its Services in connection with the Project in compliance with the following requirements.
The insurance required shall be written for not less than the scope and limits of insurance specified hereunder, or required by applicable federal, state and/or municipal law, regulation or requirement, whichever coverage requirement is greater. It is agreed and understood that the scope and limits of insurance specified hereunder are minimum requirements and shall in no way limit or preclude the City from requiring additional limits and coverage to be provided under the Commissioning Agent's policies.
The insurance obligations under this agreement shall be (1) all the insurance coverage and/or limits carried by or available to the Architect; or (2) the minimum insurance coverage requirements and/or limits shown in this agreement, whichever is greater. Minimum Scope and Limits of Insurance: Workers' Compensation: With respect to all operations the Commissioning Agent performs, it shall carry workers' compensation insurance in accordance with the requirements of the laws of the State of Connecticut, and employer's liability limits of One Hundred Thousand Dollars ($100,000) coverage for each accident, One Hundred Thousand Dollars ($100,000) coverage for each employee by disease, Five Hundred Thousand Dollars ($500,000) policy limit coverage for disease. Commercial General Liability: With respect to all operations the Commissioning Agent performs it shall carry Commercial General Liability insurance providing for a total limit of One Million Dollars ($1,000,000) coverage per occurrence for all damages arising out of bodily injury, personal injury, property damage, products/completed operations, and contractual liability coverage for the indemnification obligations arising under this Agreement. The annual aggregate limit shall not be less than Two Million Dollars ($2,000,000). Automobile Liability: With respect to each owned, non-owned, or hired vehicles the Commissioning Agent shall carry
Page 41, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
Automobile Liability insurance providing One Million Dollars ($1,000,000) coverage per accident for bodily injury and property damage. Errors and Omissions/Professional Liability: With respect to any damage caused by a negligent act, error, or omission of the Commissioning Agent, the Commissioning Agent shall carry minimum Five Million Dollars ($5,000,000) coverage per claim and in the aggregate. "Tail" Coverage: If any of the required liability insurance is on a "claims made" basis, "tail" coverage will be required at the completion of the Project for a duration of twenty-four (24) months, or the maximum time period reasonably available in the marketplace. Commissioning Agent shall furnish certification of "tail" coverage as described or continuous "claims made" liability coverage for twenty-four (24) months following Project completion. Continuous "claims made" coverage will be acceptable in lieu of "tail" coverage, provided its retroactive date is on or before the effective date of this Agreement. If continuous "claims made" coverage is used, Commissioning Agent shall be required to keep the coverage in effect for a duration of not less than twenty-four (24) months from the date of final completion of the Project. Acceptability of Insurers: The Commissioning Agent's policies shall be written by insurance companies licensed to do business in the State of Connecticut, with an AM Best rating of A-VII, or otherwise acceptable to the City. Subcontractors: The Commissioning Agent shall require all subcontractors to provide the same "minimum scope and limits of insurance" as required herein, with the exception of Errors and Omissions/Professional Liability insurance, unless Errors and Omissions/Professional Liability insurance is applicable to the Work performed by the subcontractor. All Certificates of Insurance shall be provided to the City's Corporation Counsel as required herein. Aggregate Limits: Any aggregate limits must be declared to and be approved by the City. It is agreed that the Commissioning Agent shall notify the City whenever fifty percent (50%) of the aggregate limits are eroded during the required coverage period. If the aggregate limit is eroded for the full limit, the Commissioning Agent agrees to reinstate or purchase additional limits to meet the minimum
Page 42, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
limit requirements stated herein. Any premium for such shall be paid by the Commissioning Agent. Deductibles and Self-Insured Retentions: Any deductible or self-insured retention must be declared to and approved by the City. All deductibles or self-insured retentions are the sole responsibility of the Commissioning Agent to pay and/or to indemnify. Notice of Cancellation or Nonrenewal: Each insurance policy required shall be endorsed to state that coverage shall not be suspended, voided, cancelled, or reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. Notwithstanding this requirement, the CONTRACTOR is primarily responsible for providing such written notice to the City thirty (30) days prior to any policy change or cancellation that would result in a change of the amount or type of coverage provided. In the event of any such change the CONTRACTOR shall provide comparable substitute coverage so that there is no lapse in applicable coverage or reduction in the amount of coverage available to the City related to the CONTRACTOR’s services. Waiver of Governmental Immunity: Unless requested otherwise by the City, the Commissioning Agent and its insurer shall waive governmental immunity as defense and shall not use the defense of governmental immunity in the adjustment of claims or in the defense of any suit brought against the City. Additional Insured: The liability insurance coverage, except Errors and Omissions, Professional Liability, or Workers' Compensation, if included, required for the performance of the Project shall include the City as an Additional Insured with respect to the Commissioning Agent's activities to be performed under this Agreement. Coverage shall be primary and non-contributory with any other insurance and self-insurance. Waiver of Subrogation: Commissioning Agent hereby waives the right to subrogate or seek recovery from City of Norwalk and its insurance carriers. Certificate of Insurance: As evidence of the insurance coverage required by this Agreement, the Commissioning Agent shall furnish Certificate(s) of Insurance to Corporation
Page 43, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
Counsel's Office prior to the Commissioning Agent's commencement of Services under this Agreement. The Certificate(s) will specify all parties who are endorsed on the policy as Additional Insureds (or Loss Payees). The Certificates and endorsements for each insurance policy are to be signed by a person authorized by the insurer to bind coverage on its behalf. Renewals of expiring Certificates shall be filed thirty (30) days prior to expiration. The City reserves the right to require complete, certified copies of all required policies at any time. All insurance documents required should be mailed to the City of Norwalk Corporation Counsel, P.O. Box 5125, Norwalk, Connecticut 06856-5125. Waiver of requirements: The Corporation Counsel may vary these insurance requirements at Corporation Counsel's sole discretion if Corporation Counsel determines that the City's interests will be adequately protected by the provision of different types or other amounts of coverage.
Page 44, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
SECTION 2 - RESPONSE FORMS
2.1 FORM OF PROPOSALS:
All responses to this RFP must be in sealed boxes and marked with the RFP reference title, the RFP number, and due date and time. The Candidate’s name and address must appear on the envelope. Proposals should put forth full, accurate, and complete but concise information as required by this request. The proposal should include, at minimum all items outlined in Section 1.4.
You may include any additional information that demonstrates your qualifications for this work.
Return one (1) signed original proposal and eight (8) copies to:
Norwalk Purchasing Department, Room 103,
125 East Avenue P.O. Box 5125, Norwalk, Connecticut 06856-5125
2.2 PROPOSAL RESPONSE FORM: RFP 3827 COMMISSIONING SERVICES
Firm Name -
Address -
Phone - Fax - Email -
Manager - Fed ID#
In submitting this proposal the undersigned declares that this is made without any connection with any persons making another bid or the same contract; that the bid is in all respects fair and without collusion, fraud or mental reservation; and that no official or the City, or any person in the employ of the City is directly or indirectly interested in said bid or in the supplies or work to which it relates, or in any portion of the profits thereof. The undersigned also hereby declares that he/she or they have carefully considered objectives of each element of this project, the desired end result, the environment in which services and or products are to perform and are satisfied as to all the quantities and conditions, and understands that in signing this proposal all right to plead any misunderstanding regarding the same is waived.
Page 45, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
The undersigned further understands and agrees that they will furnish and provide all the necessary material, machinery, implements, tools, labor, services, and other items of whatever nature, and to do and perform all the work necessary under the aforesaid conditions, to carry out the contract and to accept in full compensation therefore the amount of the contract as agreed to by the Commissioning Agent and the City.
2.2.1. PROPOSED FEES: Ponus Ridge Middle School – Additions & Renovations
A. Design Phase: Lump Sum in numbers and words,
$ Fee in words:
B. Bid Phase: Lump sum in numbers and words,
$ Fee in words:
C. Construction Document Review: Lump Sum in numbers and words,
$ Fee in words:
D. Commissioning Plan: Lump Sum in numbers and words,
$ Fee in words:
E. Mechanical and Electrical Submittal Review: Lump Sum in numbers and words,
$ Fee in words:
F. Controls Software Review: Lump Sum in numbers and words,
$ Fee in words:
G. Pre-Functional Test Sheets, Development & Commissioning Log Books: Lump Sum in numbers and words,
$ Fee in words:
H. On-Site Construction Observation/Meetings: Lump Sum in numbers and words,
$ Fee in words:
I. Perform Functional Test Procedures: Lump Sum in numbers and words,
$ Fee in words:
J. Develop Commissioning Schedule: Lump Sum in numbers and words,
$ Fee in words:
K. Preparation for Testing, Adjusting & Balancing Work: Lump Sum in numbers and words,
Page 46, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
$ Fee in words:
L. Perform Functional Test Procedures & Document Results: Lump Sum in numbers and words,
$ Fee in words:
M. Review Contractor’s Operation & Maintenance Manuals, Warranties As-Built Documentation: Lump Sum in numbers and words,
$ Fee in words:
N. Provide Operation Staff Systems Training: Lump Sum in numbers and words,
$ Fee in words:
O. Final Commissioning Report: Lump Sum in numbers and words,
$ Fee in words:
P. Warranty Period Review: Lump Sum in numbers and words,
$ Fee in words:
Q. Reimbursable Expenses: (Not to Exceed) Lump Sum in numbers and words,
$ Fee in words:
F. TOTAL FEE (A-Q)
$ Total Fee in words:
OFFICE LOCATION WHERE SERVICES ARE TO BE PERFORMED FROM
Page 47, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
Firm Name:
2.2.2. INSURANCE:
Agency Name -
Agency Address -
2.2.3. CERTIFICATION
Submitted by - -
Authorized Agent of Company (name and title) Date
Signature -
The above signatory acknowledges receipt of the following addenda issued during the bidding period and
understands that they are a part of the bidding documents (if applicable):
Addendum # Dated Addendum # Dated Addendum # Dated Addendum # Dated
Include this Section 2.2 with your detailed proposal and return one (1) original and eight (8) copies to:
City of Norwalk - Purchasing Department P.O. Box 5125, Norwalk, CT 06856-5125
Norwalk City Hall, 125 East Avenue, Room 103
Page 48, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
EXHIBIT A
Page 49, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
SCH
EMA
TIC
DES
IGN
MA
NU
AL
PON
US
RID
GE
SCH
OO
LI2
1H
UN
TER
SLA
NE
INO
RWA
LKC
ON
NEC
TIC
UT
0685
0ST
ATE
PRO
JEC
TN
UM
BE
R:
#TM
P-1
03-R
BT
SPE
RK
INS
EAST
MA
NPR
OJE
CT
NU
MB
ER
72O
5O.O
OO
FEB
RU
AR
Y2,
2018
OW
NER
ICIT
YO
FN
ORW
ALK
IC
ITY
OF
NO
RW
AL
KI
12
5E
AST
AV
EN
UE
,N
OR
WA
LK
,C
ON
NE
CT
ICU
T06856
OW
NER
’SPR
OJE
CT
MA
NA
GER
ICO
NST
RU
CT
ION
SOL
UT
ION
SG
RO
UP
I125
EA
STA
VE
NU
E,
NO
RW
AL
K.
CO
NN
EC
TIC
UT
06856
AR
CH
ITEC
TIP
ERK
INS
EAST
MA
NA
RC
HIT
ECTS
,D
PCI
422
SUM
ME
RST
RE
ET
,ST
AM
FOR
D,
CO
NN
EC
TIC
UT
06901
CO
NST
RU
CTI
ON
MA
NA
GER
INE
WFI
EL
DC
ON
STR
UC
TIO
N,
INC
OR
POR
AT
ED
I2
25
NE
WFI
EL
DA
VE
NU
E,
HA
RT
FOR
D,
CO
NN
EC
TIC
UT
06106
a—
Page 50, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
TAB
LEO
FC
ON
TE
NT
S
20.
Geo
tech
nica
lR
epor
t(p
lace
hold
er)
NO
RW
AL
KPO
NU
SR
IDG
ESC
HO
OL
21.
Sch
emat
icD
esig
nE
stim
ate
(pla
ceho
lder
)
1.E
xecu
tive
Sum
mar
yL
ette
r22
.P
roje
ctS
ched
ule
2.In
dex
ofS
chem
atic
Des
ign
Dra
win
gsan
dE
xhib
its
3.S
pac
eP
rogr
am
4.P
ropo
sed
Tec
hnic
alS
pec
ific
atio
ns
-T
able
ofC
onte
nts
5.C
onne
ctic
utH
igh
Per
form
ance
Bui
ldin
g
6.C
odes
Gov
erni
ngS
choo
lC
onst
ruct
ion
7.C
ivil/
Sit
eD
esig
n-
Nar
rati
ve
8.S
ite
Lan
dsc
ape
-N
arra
tive
9.A
rchi
tect
ural
Des
ign
—N
arra
tive
10.
Foo
dS
ervi
ce-
Nar
rati
ve
11.
Str
uctu
ral
Syst
ems
-N
arra
tive
12.
Mec
hani
cal
Syst
ems
-N
arra
tive
13.
Plu
mbi
ngS
yst
ems
-N
arra
tive
14.
Fire
Pro
tect
ion
Syst
ems
-N
arra
tive
15.
Ele
ctri
cal
Syst
ems
—N
arra
tive
16.
Tec
hnol
ogy
Syst
ems
-N
arra
tive
17.
Aco
usti
c-
Nar
rati
ve
18.
ME
PO
wne
rsP
roje
ctR
equir
emen
ts(O
PR)
EDO
49
and
Edu
cati
onS
peci
fica
tion
s
19.
Sch
emat
icD
esig
nD
raw
ings
and
Exh
ibit
s
Page 51, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
TA
BL
EO
FC
ON
TE
NT
S
NO
RW
ALK
PON
US
RID
GE
SCH
OO
L
1.E
xecu
tive
Sum
mar
yL
ette
r
2.In
dex
ofS
chem
atic
Des
ign
Dra
win
gsan
dE
xhib
its
3.S
pac
eP
rogr
am
4.P
ropo
sed
Tec
hnic
alS
pec
ific
atio
ns
-T
able
ofC
onte
nts
5.C
onne
ctic
utH
igh
Per
form
ance
Bui
ldin
g
6.C
odes
Gov
erni
ngS
choo
lC
onst
ruct
ion
7.C
ivil/
Sit
eD
esig
n-
Nar
rati
ve
8.S
ite
Lan
dsc
ape
-N
arra
tive
9.A
rchi
tect
ural
Des
ign
—N
arra
tive
10.
Foo
dS
ervi
ce-
Nar
rati
ve
11.
Str
uct
ura
lS
yst
ems
-N
arra
tive
12.
Mec
hani
cal
Syst
ems
-N
arra
tive
13.
Plu
mbi
ngS
yst
ems
-N
arra
tive
14.
Fire
Pro
tect
ion
Syst
ems
-N
arra
tive
15.
Ele
ctri
cal
Syst
ems
—N
arra
tive
16.
Tec
hnol
ogy
Syst
ems
—N
arra
tive
17.
Aco
usti
c-
Nar
rati
ve
18.
ME
PO
wne
rsP
roje
ctR
eqyJ
reir
ient
s(O
PR)
EDO
49
and
Edu
cati
onS
peci
fica
fion
s
19.
Sch
emat
icD
esig
nD
win
gs
and
Exh
ibit
s
/
20.
Geo
tech
nica
lR
epor
t(p
lace
hold
er)
21.
Sch
emat
icD
esig
nE
stim
ate
(pla
ceho
lder
)
22.
Pro
ject
Sch
edu
le
Page 52, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
EXEC
UTI
VE
SUM
MA
RY
INT
RO
DU
CT
ION
Per
kins
Eas
tman
team
isple
ased
tosu
bm
itou
rS
chem
atic
Des
ign
Sum
mar
yR
epor
tfo
rth
eal
tera
tion
and
expan
sion
ofth
eP
onus
Rid
geS
choo
llo
cate
dat
21
Hun
ters
Lan
e,N
orw
alk,
CT.
The
Pon
usR
idge
MS
was
iden
tifi
edas
the
“pri
me
and
only
prac
tica
lex
isti
ngsi
te”
for
the
crea
tion
ofa
new
PK-
eigh
tgra
de
“Cho
ice
orIn
tra
Dis
tric
tM
agne
t”S
choo
l.E
nvis
ione
das
aST
EM
—b
ased
prog
ram
/en
vir
onm
ent
the
Pon
usS
choo
l,w
hen
com
ple
ted,
will
beth
eC
ity’s
firs
tST
EM
scho
olw
ithan
enro
llm
ent
capa
city
of1,0
56
studen
ts.
Inad
diti
on,
the
scho
olw
illal
soco
ntai
nth
eC
ity’s
firs
tpu
rpos
e-bu
ilt
mat
hla
b,kn
own
as“T
each
toO
ne.”
Thi
sla
bw
illpr
ovid
esp
ace
and
equ
ipm
ent
for
adv
ance
dm
ath
curr
icul
umsp
ecif
ical
lydes
igned
for
each
stu
den
t.A
sa
STE
Men
vir
onm
ent
the
scho
olw
illbe
rich
inte
chno
logy
and
prov
ide
aco
hes
ive
edu
cati
on
alen
vir
onm
ent
with
capa
city
tote
ach
scie
nce
,en
gin
eeri
ng
and
mat
hin
anin
tegra
ted
fash
ion.
Thi
sre
port
isth
ere
sult
sof
sever
alm
onth
sof
mee
tings,
wor
ksho
ps,
dis
cuss
ions,
pre
sen
tati
on
san
dde
sign
effo
rts
asso
ciat
edw
ithdi
scov
erin
gan
educa
tional
appro
pri
ate,
cost
effe
ctiv
ean
d21
stce
ntur
yle
arni
ngan
dte
achin
gfa
cilit
y’fo
rth
eC
ityof
Nor
wal
k.It
repre
sents
our
bes
tco
llec
tive
thin
king
todat
e
SCH
OO
LH
IST
OR
Y
The
Pon
usR
idge
Sch
ool
was
purp
ose
buil
tto
prov
ide
the
City
ofN
orw
alk
ane
ighb
orho
odm
iddl
esc
hool
serv
ing
anem
ergin
gpo
pula
tion
ofne
wfa
mil
ies
and
hous
ing
dev
elopm
ent.
Con
stru
cted
in1956
the
scho
olre
pre
sente
dth
ela
test
arch
itec
tura
lst
yle
consi
stin
gof
alo
ngli
near
buil
ding
desi
gnde
eply
set
back
from
Hun
ter’
sL
ane.
Aon
e-w
ay“U
”sh
aped
driv
eway
prov
ides
acce
ssfr
ont
ofth
esc
hool
and
toth
ebu
sla
nean
dpa
rkin
gar
eas.
The
two
driv
eway
sfr
ame
ag
ener
ou
sgr
een
spac
euse
dfo
rm
ult
ipurp
ose
play
and
outd
oor
acti
viti
es.
The
long
setb
ack
prov
ide
gen
ero
us
“sta
ckin
g”sp
ace
for
both
bus
and
par
ent
traf
fic
ente
rin
gan
dle
avin
gth
esc
hool
prop
erty
.T
hesc
hool
ispo
siti
oned
atth
eto
pof
ast
eep
slope
exte
ndin
gdo
wn
toM
aher
Dri
veto
the
east
.T
heea
stsi
de
ofth
esc
hool
enjo
yslo
ngvi
ews
thro
ugh
the
heav
ily
fore
sted
slope
and
issc
reen
edfr
omne
ighb
orho
odre
sid
ence
sby
very
dee
pse
tbac
kon
east
,no
rth
and
south
sid
esof
the
scho
ol.
Ped
estr
ian
sidew
alks
connec
ting
the
fron
tof
the
scho
olto
Hun
ter’
sL
ane
prov
ide
studen
tsw
ithsa
few
alki
ngpa
thw
ays,
evok
ing
trad
itio
nal
neig
hbor
hood
scho
oltr
adit
ions.
The
buil
ding
’spr
ofil
eis
gene
rall
yon
ean
dtw
ost
ory,
with
the
two
stor
yel
emen
tsex
pre
ssed
assi
mpl
ebr
ick
boxe
sli
nked
byone
stor
yar
eas.
An
“L”
shap
edop
enai
rca
nopy
prov
ides
rain
prot
ecti
onfo
rst
ud
ents
arri
ving
atth
em
ain
entr
y.
Subse
quen
tto
the
orig
inal
const
ruct
ion,
the
neig
hbor
hood
popu
lati
onco
nti
nued
togr
owan
dan
addi
tion
was
con
stru
cted
in1976
conta
inin
gsc
ien
cela
bs,
libr
ary
med
iace
nte
r,au
xili
ary
gym
nasi
uman
dm
usic
room
.T
his
expa
nsio
nad
dre
ssed
dev
elopm
ent
ofcu
rric
ulum
and
popu
lati
onin
crea
ses.
Mor
ere
cent
ly,
in2
00
6th
esc
hool
under
wen
tva
riou
su
pd
ates
,in
clud
ing
acce
ssib
ilit
yim
prov
emen
ts,
haz
ardous
mat
eria
lab
atem
ent,
vent
ilat
ion
impr
ovem
ents
,ne
why
dron
icbo
iler
s,pa
rtia
lce
ilin
gan
dro
ofre
pla
cem
ent.
PRO
JEC
TD
ESI
GN
SUM
MA
RY
Dur
ing
the
late
fall
or2
01
7an
dea
rly
win
ter
of2018,
the
proj
ect
team
,ed
uca
tors
,ad
min
istr
ato
rsan
dC
ityre
pre
senta
tives
met
wee
kly
tore
fine
and
deve
lop
adee
pu
nd
erst
and
ing
the
educa
tional
prog
ram
and
mis
sion
goal
s.T
oth
isen
dse
ver
alpl
anop
tion
sw
ere
pre
sente
dth
atin
dica
ted
ava
riet
yof
spac
ela
yout
san
dex
pan
sions.
Insu
mm
ary
Opt
ions
Ath
roug
hH
indi
cate
dal
tern
ativ
ead
diti
onlo
cati
ons
incl
udin
gex
pan
sion
toth
eno
rth,
east
and
south
,w
ithpr
ogra
msp
ace
spli
tin
alte
rnat
ive
loca
tion
s.O
nean
dtw
ost
ory
opti
ons
wer
eal
sost
udie
d.
Aft
erm
uch
consi
der
atio
nof
the
opti
ons
and
dis
cuss
ion
sof
the
ben
efit
sof
each
,a
conso
lidat
edad
diti
onto
the
south
and
east
was
sele
cted
asth
em
ost
reas
on
able
and
prac
tica
lso
luti
on.
Kno
wn
asO
ptio
nG
,th
isop
tion
con
sist
sof
asi
ngle
stor
yad
diti
onac
com
modat
ing
the
low
ersc
hool
,g
rad
esPK
-5,
prov
ides
ane
wT
each
toO
nem
ath
lab,
and
expan
ds
and
ren
ov
ates
the
kitc
hen
and
expan
ds
the
cafe
teri
ato
mee
ten
roll
men
tin
crea
ses
and
enhan
ced
food
serv
ices
.
Inad
diti
onto
thes
eim
pro
vem
ents
Opt
ion
G,
also
incl
udes
anu
mb
erof
renovat
ions
incl
udin
gex
pan
sion
and
re-c
onst
ruct
ion
ofth
em
ain
offi
cead
min
istr
ativ
esu
ite,
ane
wnu
rses
’an
dguid
ance
offi
cesu
ite
inex
isti
ngsp
aces
,a
new
art
room
info
rmer
clas
sroom
s,re
conf
igur
edT
eam
Acl
assr
oom
s,an
dth
eco
nver
sion
ofth
eau
xili
ary
gym
into
a“m
ake
spac
e”T
echn
olog
yL
ab.
Sev
eral
addi
tion
alsp
aces
also
rece
ive
impro
vem
ents
incl
udin
ga
low
ersc
hool
Lea
rnin
gC
omm
ons,
and
the
const
ruct
ion
ofth
ree
new
scie
nce
labs
wit
hin
exis
ting
spac
es.
Whi
leth
esc
hool
will
rece
ive
sign
ific
ant
impro
vem
ents
inm
any
area
sof
the
exis
ting
scho
ol,
ago
alof
this
proj
ect
isto
pre
serv
eas
muc
hof
the
rece
ntly
com
ple
ted
200
6im
prov
emen
tsan
dlim
itde
mol
itio
nof
thes
ear
eas
asm
uch
aspo
ssib
le.
The
team
has
mad
eev
ery
effo
rtto
wor
kca
refu
lly
arou
nd
tho
sear
eas.
Not
wit
hsta
ndin
g,a
maj
orgo
alof
the
proj
ect
isto
enhan
ceth
een
vir
onm
enta
lco
ndit
ions
ofth
eex
isti
ngar
eas
bypr
ovid
ing
air
cond
itio
ning
thro
ughout.
Mor
eove
ras
apu
blic
scho
olC
GS
requir
esth
atst
ate
funded
sch
ools
incl
ude
anau
tom
atic
fire
prot
ecti
onsy
stem
,(s
prin
kler
syst
em).
Thi
sis
incl
uded
inth
epr
ojec
tsc
op
e.O
ther
exis
ting
buil
ding
impro
vem
ents
are
incl
uded
inth
epr
ojec
tan
dar
ed
escr
ibed
here
in.
Min
orfa
çade
impro
vem
ent
toen
han
ceth
eex
teri
orap
pea
rance
are
also
incl
uded
inth
epr
ojec
t.W
ithm
inor
exce
pti
ons
the
exis
ting
win
dow
s,re
pla
ced
in2006,
rem
ain
asis
.
Into
tal,
the
exis
ting
10
0,0
00
SF
scho
olis
incr
ease
din
size
toap
prox
imat
ely
141,0
00
SF.
Sev
eral
site
impro
vem
ents
are
also
incl
uded
in’t
hepr
ojec
t.M
ost
sign
ific
antl
yis
the
crea
tion
ofa
new
low
ersc
hool
bus
drop
-off
and
pic
kup
loop
with
ded
icat
edp
aren
tpa
rkin
gar
ea.
The
exis
ting
bus
loop
atth
efr
ont
ofth
esc
hool
issl
ight
lyre
conf
igur
edan
dis
shar
edby
mid
dle
and
low
ersc
hool
for
bus
queu
ing.
Rec
ogni
zing
that
arri
vals
and
dep
artu
res
for
each
scho
olar
est
agger
edby
one
half
hour
,th
etr
affi
cis
dir
ecte
dac
cord
ingl
yto
dif
fere
nt
route
san
dlo
ops
for
each
scho
ol.
An
addi
tion
al“s
tack
ing
lane
”is
prov
ided
atth
em
ain
entr
ypr
ovid
ing
clea
rpa
thw
ays
for
bus
acce
ssto
the
drop
off
and
pick
area
s.
Exp
ande
dpa
rkin
gin
crea
ses
the
tota
lpa
rkin
gar
eato
over
200
spac
es.
Bus
loop
isin
crea
sed
to12
full
size
dbuss
esw
ithlo
wer
scho
oldr
op-o
fflo
opho
ldin
g15
vehi
cles
curb
side
and
14
atth
eM
Sdr
op-o
ff.
With
the
new
low
ersc
hool
addi
tion
s,tw
one
wen
close
dco
urt
yar
ds
are
form
ed.
The
one
toth
eso
uth
isd
edic
ated
topr
imar
ily
toth
elo
wer
scho
oloutd
oor
lear
ning
and
acti
vite
s.T
heon
eto
the
nort
his
ded
icat
edto
STE
Mle
arni
ngan
dis
prim
aril
yd
edic
ated
toth
eM
Sst
uden
ts.
Bot
hsp
ace
prov
ide
exce
ptio
nal
envir
onm
ents
for
outd
oor
enjo
ym
ent
inse
ttin
gs
scal
edfo
rea
chsc
hool
studen
t.
To
the
south
ofth
elo
wer
scho
olad
diti
on,
are
new
pla
ysc
ape
stru
cture
san
dsp
ace
for
ane
wpa
ved
play
area
.A
new
pave
dpa
thw
aypr
ovid
esse
rvic
eac
cess
toth
ere
arof
the
exis
ting
and
asw
ell
asth
ene
wad
diti
ons.
SCH
EM
AT
ICD
ESI
GN
PAC
KA
GE
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,2018
Sch
emat
icD
esig
nP
has
eS
tate
#T
MP
-103
-RB
TS
Page 53, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
EX
EC
UT
IVE
SUM
MA
RY
Ane
wst
orm
wat
erre
tenti
on
basi
nca
ptu
res
addi
tion
alw
ater
asa
resu
ltof
incr
ease
dim
perv
ious
surf
ace
incr
ease
sis
pla
nned
for
anar
eato
the
nort
hof
the
exit
driv
eway
.T
his
syst
emta
kes
adv
anta
ge
ofex
isti
ngpi
ping
syst
ems,
natu
ral
flow
dire
ctio
nan
dex
isti
ngto
pogr
aphy
.E
xist
ing
san
itar
ypi
ping
,an
dw
ater
serv
ice
pipi
ngar
ere
use
dan
dno
wne
wst
reet
connec
tions
are
requ
ired
for
this
proj
ect
expan
sion
proj
ect.
PRO
JEC
TSC
HE
DU
LE
The
proj
ect
will
bedes
igned
inth
ree
dist
inct
phas
esre
cogn
ized
inth
ein
dust
ryas
Sch
emat
ic,
Des
ign
Dev
elop
men
tan
dC
onst
ruct
ion
Doc
umen
tP
has
e.T
his
Sch
emat
icD
esig
nP
has
ehas
bee
nco
mple
ted
and
isbe
ing
subm
itte
dfo
rC
ity’s
revi
ewan
dco
mm
ent,
asw
ell
asfo
ruse
byth
eC
onst
ruct
ion
Man
ager
,N
ewli
eld
Con
stru
ctio
n.T
heC
Mw
illde
velo
pa
cons
truc
tabi
lity
revi
ew,
com
men
cea
phas
ing
plan
and
deve
lop
apr
obab
leco
stof
const
ruct
ion.
Val
ueen
gin
eeri
ng
sugges
tions,
cost
effe
ctiv
eal
tern
ativ
esas
wel
las
appro
aches
toco
nst
ruct
ion
mea
ns
and
met
hods
will
also
bepr
ovid
edby
New
fiel
d.
Upo
nsu
bm
issi
on
ofth
eS
chem
atic
Des
ign
pac
kag
e,th
ede
sign
team
will
pro
ceed
with
the
Des
ign
Dev
elop
men
tP
has
eef
fort
s.It
isan
tici
pat
edth
atth
ees
tim
atin
gpro
cess
will
requ
ire
appr
oxim
atel
y2
wee
ks
with
anad
diti
onal
wee
kfo
rre
conc
ilia
tion
and
VE
ifnec
essa
ry.
The
Des
ign
Dev
elop
men
tP
has
eis
sch
edu
led
for
appr
oxim
atel
y3
1/2
month
sw
ithC
onst
ruct
ion
Docu
men
tssc
hed
ule
dfo
rap
prox
imat
ely
4m
onth
sw
ithco
mpl
etio
nsc
hed
ule
dS
ept
1,2018.
PRO
JEC
TC
OST
ESTI
MA
TE
The
encl
ose
dde
sign
draw
ings
,sk
etch
es,
tab
les,
nar
rati
ves
,et
c.pr
ovid
ea
com
pre
hen
sive
desc
ript
ion
ofth
epro
pose
dim
pro
vem
ents
and
expan
sion
atth
eP
onus
Rid
geS
choo
l.T
his
info
rmat
ion
will
beus
eful
toth
eC
ityan
dC
onst
ruct
ion
Man
ager
tode
velo
pa
prob
able
const
ruct
ion
cost
.T
his
cost
will
bead
ded
toth
isre
port
atits
conc
lusi
onan
dac
cepta
nce
sby
the
City
.
CO
NC
LUSI
ON
The
Pon
usR
idge
Sch
ool
proj
ect,
prov
ides
the
City
ofN
orw
alk
with
aw
ell-
pla
nned
and
effi
cien
t21
stce
ntur
yle
arnin
gan
dST
EM
teac
hin
g
SCH
EM
AT
ICD
ESI
GN
PAC
KA
GE
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,2
01
8
envir
onm
ent
suit
able
and
appro
pri
ate
for
PK—
8g
rad
est
ud
ents
and
teac
her
s.M
oreo
ver,
the
prop
osed
expan
sion
prov
ides
aco
mp
act
const
ruct
ion
area
,m
inim
izin
gth
eco
nst
ruct
ion
zone
and
cons
olid
atin
gth
ear
eaof
site
dis
turb
ance
.T
his
opti
onpr
ovid
esth
epr
ojec
tw
ithself
crea
ted”
swin
gsp
ace
use
dfo
rdis
pla
ced
studen
tsw
hile
renovat
ions
inth
eex
isti
ngar
eas
are
unde
rway
.L
astl
y,as
aone
stor
yad
diti
on,th
epr
ojec
tusa
ble
area
effi
cien
cyis
max
imiz
edm
eeti
ng
stat
esp
ace
stan
dar
ds
per
studen
t.
Sch
emat
icD
esig
nP
has
eS
tate
#T
MP
-103
-RB
TS
Page 54, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
2Is
-15
IND
EXO
FSC
HE
MA
TIC
DE
SIG
ND
RA
WIN
GS
AN
DE
XH
IBIT
S
SDD
RA
WIN
GLI
ST
GEN
ERA
LG
-OO
1C
OV
ERA
ND
DR
AW
ING
IND
EXA
RC
HIT
EC
TU
RA
LM
EP
FPA
-OO
1N
OT
ES,
AB
BR
EV
IAT
ION
S,L
EG
EN
DS
PLA
CE
HO
LD
ER
FOR
DD
ZO
NIN
GA
-100
OV
ERA
LLFI
RST
AN
DSE
CO
ND
FLO
OR
Z-0
00Z
ON
ING
INFO
RM
AT
ION
A-1
O1
AR
CH
ITE
CT
UR
AL
FIR
STFL
OO
RPL
AN
-A
REA
1PL
UM
BIN
GA
-1O
2A
RC
HIT
EC
TU
RA
LFI
RST
FLO
OR
PLA
N-
AR
EA2
PLA
CE
HO
LD
ER
FOR
DD
CO
DE
SA
ND
LIFE
SAFE
TY
A-1
O3
AR
CH
ITE
CT
UR
AL
FIR
STFL
OO
RPL
AN
—A
REA
3
LS
-100
GE
NE
RA
LC
OD
EIN
FOR
MA
TIO
NA
-104
AR
CH
ITE
CT
UR
AL
FIR
STFL
OO
RPL
AN
—A
REA
4FI
RE
PRO
TE
CT
ION
A-1
05A
RC
HIT
EC
TU
RA
LFI
RST
FLO
OR
PLA
N-
AR
EA5
PLA
CE
HO
LD
ER
FOR
DD
SIT
EU
TILI
TIES
A-1
06A
RC
HIT
EC
TU
RA
LFI
RST
FLO
OR
PLA
N--
AR
EA6
A-1
O7
AR
CH
ITE
CT
UR
AL
2ND
FLO
OR
-A
REA
1
SIT
EL
AN
DSC
APE
A-l
OS
AR
CH
ITE
CT
UR
AL
2ND
FLO
OR
-A
REA
2T
EC
HN
OL
OG
Y
LA-O
O1
SIT
EC
ON
CE
PT(1
:30)
A109
AR
CH
ITE
CT
UR
AL
2ND
FLO
OR
-A
REA
6PL
AC
EH
OL
DE
RFO
RD
D
LA-O
O2
SIT
EC
ON
CE
PT(1
:50)
A11
OO
VER
ALL
RO
OF
PLA
N
SEC
UR
ITY
HA
ZA
RD
OU
SM
ATE
RIA
LSA
-13O
EN
LA
RG
ED
PLA
NS
PLA
CE
HO
LD
ER
FOR
DD
PLA
CE
HO
LD
ER
FOR
DD
A-1
31E
NL
AR
GE
DPL
AN
SA
-132
EN
LA
RG
ED
PLA
NS
DE
MO
LIT
ION
A-1
33E
NL
AR
GE
DPL
AN
S
DM
-100
DE
MO
LIT
ION
PLA
NO
VER
ALL
A-1
34E
NL
AR
GE
DPL
AN
S
DM
-101
DE
MO
LIT
ION
PLA
NA
REA
1A
-2O
1EX
TER
IOR
ELEV
ATI
ON
S
DM
-1O
2D
EM
OL
ITIO
NPL
AN
AR
EA2
A-2
O2
EXTE
RIO
REL
EVA
TIO
NS
SD
EXH
IBIT
LIST
DM
-1O
3D
EM
OL
ITIO
NPL
AN
AR
EA3
DM
-1O
4no
tu
sed
A-3
50W
ALL
SEC
TIO
NS
EXH
IBIT
AA
LT
ER
AT
ION
SSC
OPE
MA
TRIX
DM
-105/6
DE
MO
LIT
ION
PLA
NA
REA
5&
6A
-351
WA
LLSE
CT
ION
SEX
HIB
ITB
AL
TE
RA
TIO
NS
CO
LOR
CO
DE
DPL
AN
DM
-107
DE
MO
LIT
ION
PLA
N2N
DFL
OO
R-
AR
EA1
DM
-108
DE
MO
LIT
ION
PLA
N2N
DFL
OO
R-
AR
EA2
DM
-109
DE
MO
LIT
ION
PLA
N2N
DFL
OO
R-
AR
EA6
FOO
DSE
RV
ICE
PLA
CE
HO
LD
ER
FOR
DD
FUR
NIT
UR
E-
FOR
INFO
RM
AT
ION
PLA
CE
HO
LD
ER
FOR
DD
FIN
ISH
ES
PLA
CE
HO
LD
ER
FOR
DD
SIG
NA
GE
PLA
CE
HO
LD
ER
FOR
DD
SCH
EM
AT
ICD
ESI
GN
PAC
KA
GE
Sch
emat
icD
esig
nP
has
eP
onus
Rid
geS
choo
lIN
orw
alk,
Con
nect
icut
Sta
te#
TM
P-1
O3-
RB
TS
Feb
ruar
y15
,2018
Page 55, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
IND
EXO
FSC
HE
MA
TIC
DE
SIG
ND
RA
WIN
GS
AN
DE
XH
IBIT
S
GE
NER
AL
G-O
O1
SIT
EU
TILI
TIES
DE
MO
LIT
ION
DM
-100
DM
-1O
1D
M-1
02D
M-1
03
DM
-104
DM
-10
5/6
DM
-107
DM
-108
DM
-109
DE
MO
LIT
ION
PLA
NO
VER
ALL
DE
MO
LIT
ION
PLA
NA
REA
1D
EM
OL
ITIO
NPL
AN
AR
EA2
DE
MO
LIT
ION
PLA
NA
REA
3no
tuse
dD
EM
OL
ITIO
NPL
AN
AR
EA5
&6
DE
MO
LIT
ION
PLA
N2N
DFL
OO
R-
AR
EA1
DE
MO
LIT
ION
PLA
N2N
DFL
OO
R-
AR
EA2
DE
MO
LIT
ION
PLA
N2N
DFL
OO
R-
AR
EA6
A-O
O1
A-1
00A
-1O
1
A-1
02
A-1
O3
A-1
04
A-1
O5
A-1
O6
A-1
O7
A-i
D8
A-1
O9
A-1
30
A-1
31A
-132
A-1
33
NO
TE
S,A
BB
RE
VIA
TIO
NS,
LE
GE
ND
SO
VER
ALL
FIR
STA
ND
SEC
ON
DFL
OO
RA
RC
HIT
EC
TU
RA
LFI
RST
FLO
OR
PLA
N-
AR
EA1
AR
CH
ITE
CT
UR
AL
FIR
STFL
OO
RPL
AN
-A
REA
2A
RC
HIT
EC
TU
RA
LFI
RST
FLO
OR
PLA
N--
AR
EA3
AR
CH
ITE
CT
UR
AL
FIR
STFL
OO
RPL
AN
--
AR
EA4
AR
CH
ITE
CT
UR
AL
FIR
STFL
OO
RPL
AN
-A
REA
5A
RC
HIT
EC
TU
RA
LFI
RST
FLO
OR
PLA
N--
AR
EA6
AR
CH
ITE
CT
UR
AL
2ND
FLO
OR
-A
REA
1A
RC
HIT
EC
TU
RA
L2N
DFL
OO
R-
AR
EA2
AR
CH
ITE
CT
UR
AL
2ND
FLO
OR
-A
RE
A6
EN
LA
RG
ED
PLA
NS
EN
LA
FGE
DPL
AN
S-
ENLA
RG
EDPL
AN
SE
NL
AR
GE
DL
AN
SE
N1G
ED
PLA
NS
‘EX
iER
IOR
ELEV
ATI
ON
SY
EXTE
RIO
REL
EVA
TIO
NS
WA
LLSE
CT
ION
SW
ALL
SEC
TIO
NS
FOO
DSE
RV
ICE
PLA
CE
HO
LD
ER
FOR
DD
PLU
MR
ING
ILA
CE
HO
LD
ER
FOR
DD
VFI
RE
PRO
TEC
TIO
NPL
AC
EH
OL
DE
RFO
RD
D
TEC
HN
OLO
GY
PLA
CE
HO
LD
ER
FOR
DD
SEC
UR
ITY
P,LA
CEH
OLD
ERFO
RD
D
SDEX
HIB
ITLI
ST
EXH
IBIT
AA
LTER
ATI
ON
SSC
OPE
MA
TRIX
EXH
IBIT
BA
LT
ER
AT
ION
SC
OLO
RC
OD
ED
PLA
N
FIN
ISH
ES
PLA
CE
HO
LD
ER
FOR
DD
SIG
NA
GE
PLA
CE
HO
LD
ER
FOR
DD
SCH
EM
AT
ICD
ESI
GN
PAC
KA
GE
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,2018
Sch
emat
icD
esig
nP
has
eS
tate
#T
MP
-103
-RB
TS
SDD
RA
WIN
GLI
ST CO
VER
AN
DD
RA
WIN
GIN
DEX
ZON
ING
Z-0
00Z
ON
ING
INFO
RM
AT
ION
CO
DE
SA
ND
LIFE
SAFE
TYL
S-1
00G
ENER
AL
CO
DE
INFO
RM
ATI
ON
AR
CH
ITEC
TUR
AL
zz
ME
PF
PPL
AC
EH
OLD
ERFO
RD
D
SITE
LAN
DSC
APE
LA
-OD
iSI
TE
CO
NC
EPT
(1:3
0)
LA-O
O2
SIT
EC
ON
CE
PT(1
:50)
HA
ZA
RD
OU
SM
ATE
RIA
LSPL
AC
EH
OL
DE
RFO
RD
D
7
A-1
34
A-2
01A
-2O
2
A-3
5OA
-351
FUR
NIT
UR
E-
FOR
INFO
RM
ATI
ON
PLA
CE
HO
LDER
FOR
DD
Page 56, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
SP
AC
EP
RO
GR
AM
Pre
-R
lnd
erg
afta
oC
tu0000lf
lt
To
rlet
s
sunder
gar
ten
Cla
saro
orm
a
ToI
lets
Gra
deI
Ose
.srs
onrs
Gra
de
Cla
ssro
om
s
Gra
de
3C
lasu
rou
ers
Gro
upR
oper
Dyso
nS
ubto
tal
Gra
deS
Cla
ssro
om
s
Tea
mA
Cla
ssro
om
s(G
oode
81
Tea
mA
Cla
ssro
om
sG
rade
TIT
eam
BC
lass
room
,(G
radeS
)
Taør
nB
Cla
ssro
om
s(G
rads
8)
Ty
mB
Cla
ssro
om
s(G
rad
e7)
Turn
BC
lass
room
.IG
rad.
8(
loam
CC
lsas
rosm
.(G
rade
B)
Tea
mC
Cla
ssru
om
e)S
rsd
.7)
Teo
mC
Cla
ssro
om
s(G
rad
eS)
Wor
ldL
arg
uaf
e0.5
.10cm
).c5
.Oc
Su
bto
tal
Mat
hL
ab
Scene,
Lab
s
ScI
ence
Pro
pI
Sto
rag
ero
om
s
En
glo
oan
ng
Th
oh
no
loId
e
Gen
eral
Art
Cla
ssro
om
Mrs
Sto
rag
e/
RId
e
Elam
onta
cyA
rtC
.ass
roo
m
Ban
dC
lass
roo
m
Cho
ral
Muso
Cla
ssro
om
Mus
Ic/
Tec
hC
late
ruo
m
S(r
,I.V
M.u
slc
Src
roge
Arc
Sto
rage
AT
(Asa
d.m
ooel
Tal
ente
d)
SP
WA
I.ED
UCA
TiO
N07/P
T
Spec
a(E
duca
tIon
Cla
ssro
om
sIM
SI
Spo
oral
Ed/R
.oau
toe
P0
.2
Gra
ded&
5.
lnta
rueo
tlo
n
Tea
mA
-In
tero
entl
on
Tea
mB
Ict,
ruen
t.cn
Tea
mC
Inte
ruan
ton
SP
ED
/EW
ende
dR
eso
urc
eal
day
00
4eØ
1p.n
adl
SP
ED
/EoO
enda
dR
eso
urc
eal
lda
yao
oep
t1
pen
alk
Spee
chP
atho
logI
st
Clu
llcc
Su
bro
tic
PE
RK
INS
EAST
MA
NA
RC
HIT
EC
TS
RErIT
SED
&AP
PROV
EDED
.00
8FT-
OPB
ON
5.5
0SP
ACE
SF
501.
NOVE
MBE
R14.2
017
SUM
MN
OFF
BB
RU
MY
5.2
O1
DU
STIN
G
EX
IST
ING
MW
CO
OE
DW
ITH
AB
OV
EIN
TOO
NE
RO
OM
NE
W)
CXW
IW
IG
EX
ITIN
G
Wor
kT
latr
efS
angA
oea
Co
mp
ote
Be*
oc.
oe
ISO
Pro
duth
on
Roo
m
r.eg
oIS
O
Sto
rag
e/
Wor
kB
oon
CC
64
MEO
WC
EN
TE
R
0110
00
Clr
ou
lato
cO
.sk/
Med
ra
Boo
kS
talk
Are
a
Wor
kT
able
/S
eafu
ngA
rea
Rea
dre
f/S
oory
tell
lng
Spac
e
Ars
onSu
Bt0
00l
)DBC
AT1
ON
Full
5101
4G
ym
nas
Ium
lEw
oN
nE
00
01
lory
Gym
onac
lum
IEO
.sbr
glS
teog
ear
rdL
ock
er,
0115
0mg)
Ocy
o&
GIl
lsL
ooke
rR
oom
s&
ToI
let.
Gym
cPtT
nac
her
s01
(10c
c
Hea
lth
Cas
sro
om
WeI
gh
t!A
cne,
.R
oom
Ilo
lslo
nS
ub
tota
l
3M ILL DIn
Ing
Ro
om
&S
erun
ry
Edls
tlrg
KIt
chen
/F
ood
Sto
rag
e/
ORfo
eA
rtth
,n
Ser
onry
0,5k
Was
hIng
Dry
Sto
rag
e
Refr
Igera
tor
Sto
rag
e
Fre
eoer
Sto
rag
e
Off
Ice
ToI
let
Load
InD
ock
Shlp
eng
and
Reo
erur
ng
MaI
nO
ffIc
e
Rec
eptI
on/
WaI
tIng
SeO
refa
rlal
Are
a
Wor
kA
rea/
Mai
lR
oom
Pri
norp
at01
100.
AO
Ole
tonr
Pri
ncip
alER
Boo
Con
fere
npo
Roo
mo
Stu
den
tR
eco
rds
Off
ice
Stor
age
Toi
let
inS
chool
Susp
ensI
on
60-2
AD
MIN
STR
ATI
ON
MoI
nO
fTto
a
Rec
epbo
n/
Wad
Ing
Sec
reta
rial
Are
.
Wor
kA
rea!
Ma1
1
PrI
ncIp
alO
ffic
e
Ass
ista
nt
Pri
ncip
alO
ffic
e
Stu
den
tR
ecor
do
Off
ice
Sto
rogo
Mai
nO
fflo
aTo
Ilet
Fac
ulty
Reo
ouro
eR
oom
leath
ers
Wor
kR
oom
EALT
IID
IRTS
GuI
danc
e
Soho
olP
ey00
0log
1st
500,
aIW
orke
r
Nym
esS
ota
Reo
ecbo
n/
Wao
lng
Are
a
Off
oe
Eoa
m
Cot
kte
a
ToI
let
BC
and
Am
bula
tory
Sto
rag
e
6.7
15
I6.
814
I
280
430
360
554
525
507
230
181
132
23
2
75
3
0 0 0 0 0 0 0
783
568
374
125
249
IN
cLU
DEO
INM
ECIA
CEN
’WV
UN
EA
000E
)1.3
0.1
).FrC
LUC
0GIN
MED
ICCE
rOTE
OJN
Ecl
OV
E)
.3IN
CLU
DED
I’)M
EDIA
CE
LT
ER
]NE
AB
OV
E)
i.r13
1.N
VIN
CLU
DED
luM
ED
IACE
NTER
ON
EA
BOV
E)
EXIS
TING
INC
LUD
EDIN
MED
IAC
ENTE
RU
N)
ABO
VE)
1S
t
MIS
TIN
GIN
CL
UD
ED
INM
EDIV
CE
NT
ER
UN
EA
BO
VE
)
MIS
TIN
GIN
CLU
DED
INM
EDIA
CEN
TER
UN
EA
BO
VE
)
MIS
TIN
GIN
CLU
DED
INM
EDIA
CEN
TER
USE
ABO
VE)
EXIS
TIN
GIN
CL
UD
ED
INM
EDIA
CE
NT
ER
ON
EA
BOV
E)
LU
STIN
GIN
CL
UD
ED
INM
ED
IAC
EN
TE
RO
NE
AB
OV
E)
____
____
____
____
____
____
____
_
993
015D
m, 3
REM
OV
EDFR
OM
PRO
GRA
M
EXIS
TIN
G
TXIS
TIN
S
CX13
710
5
REM
OV
EDFR
OM
PR
OG
RA
M
.9)
losu
mes
PRK
ond
tea
tln
cfae
oro
cm
TIS
TIN
S0
NEr
oA
DD
ITIO
N
-ZNI
NTIN
SB
DI
EXIS
TIN
G
EXIS
TIN
G
XG
ISTI
NS
EXIS
T)V
S
EXIS
TIN
G
ESIS
OIN
S
0115
055
EX
:SO
NS
EXIS
TIN
G
EXIS
TIN
G
NEW
NEW
INC
LUD
EDIN
MA
INO
FFIC
EU
SE
N00
VE)
NEW
)IN
CLG
DED
INM
AIN
OFF
ICE
UN
EB
BO
VEI
NEW
INC
LUD
EDIN
MA
INO
FFIC
ELI
NE
AB
OV
E)
NEW
(IN
CL
UD
ED
INM
AIN
OFF
ICE
LIN
EA
BO
VE)
NEW
(IN
CL
UD
ED
INM
AIN
OFF
ICE
LIN
EA
BO
VE)
NEW
INC
LU
DE
DIN
MA
INO
FFIC
ELI
NE
AB
OV
E)
NEW
IIN
CL
XD
ED
INM
AIN
OFF
ICE
LIN
EA
BO
VE)
NEW
IIN
CL
GD
ED
INM
AIN
OFF
ICE
LIN
EA
BO
VE)
EXIS
TIN
G
EXIS
TIN
G
EMS
TIN
G
EMS
TiN
S
EX
ST
INI
TeM
etR
oom
.
Gra
des
123
Bcy
ran
dG
irls
Totto
n.
Mus
Ic
Gym
Cof
etor
la&
Upc
tOIr
o
Caf
eter
Ia&
Gps
ta)r
o
Apo
tair
o
Neo
EnC
afet
arla
New
At
Sore
nce
New
Sta
ffB
PK2
Eor
sbng
Ups
tair
sS
tuden
ts
New
Ups
taIr
sS
taff
Sto
rag
eT
hrou
ghou
t
Met
hac
ita(
/Bo
ller
Roo
m
Ele
ctrI
Cal
0105
0cc
Wat
erR
oom
Isbn
Su
bto
tal
BU
ILD
ING
NET
ARE
A
7,62
1
NO
RW
AL
KP
UB
LIC
SC
HO
OL
S
AL
TE
RA
TIO
NS
AN
DA
DD
ITIO
NS
TO
PD
NU
SR
IDG
ES
CH
OO
L
SCH
EMA
TIC
DES
IGN
SPA
CE
SUM
MA
RY
- ST
AT
EN
o.T
MP-
103-
RB
TS
REI4
SED
&AP
PROV
EDED
.D
RAFT
-OPt
iON
5-S
DSP
AC
ESP
EED
.NO
VEM
BER
14,2
017
SUM
MAR
YFE
BRUA
RY5,
20
18
Not
OV
/ED
MM
€NTI
)
-0-0
)kth
oc
S••_
••_
,j
•j_
NU
TESI
EDM
UEN
TSI
g 825
64 BOO
68
85
0
65
0
850
250
2 3
1.8
80
238
2.7
00
192
2.58
0
25
50
25
90
12
00
REM
SED
&AP
PROV
EDED
.SP
EED
.N
OV
EMB
ER1
4,2
017
Gla
de
0C
las,
rOsm
s
630
1.30
0
200
750
120 0 0 400
300
30
0
DR
AR
-OPB
ON
B-S
DSP
ACE
SUM
MAR
YFE
BRUA
RY5,
2018
0 0 0 B 0 1 0 0 0 0 S
0 0 0 0 716 0 0 0 0
0 0 0 0 0 738
0 0 0 0 090
0
59 877
58 807
807
508
184
811
773
752
756
786
680
74
6
70
5
745
764
748
741
Cus
todl
olO
RIO
n&
Wo
rkP
roc
Sate
ltim
eC
usto
dIal
Are
a
1.60
0
1DB
2630
17
4
24
21
24
22
24
18
1106
24
32
23
19
1.50
4
1.5
111871
1370
149
2
1490
1490
1527
1496
2.9
83
4,58
7
33N
335
ES
240
0 0 3 I
14 2 2 2 2 2 4 54 9 6 2
54
78
2.40
0
1.00
0
360
70
4
135
4
465
BOB
723
731
731
731
731
734
737
737
737
737
718
850
1.0
85
77
1,00
0
13.7
2014
7.42
73
21
68
3
1452
2
1.46
22
5402
2
14
62
21.
460
21474
2
1474
21474
254r4
2
2.6
)24
20.9
6054
585B
B
65
10
4
231
62
00
01
5.4
25
960
U99
410
5.4
2S
D.9
2X
597
410
1100
NE
W
631
IIEX
’I
IIEXG
EX
IST
ING
XXW
T[N
D
CX:I
TIN
V
IX: S
TIII
El:
STIN
N
CT: S
TIN
G
490
EX
IST
ING
XXX
STII
IG
47
24
8,9
97
lro
dal
4 2 2 2 2 2 2 2 2 2 1 1 1 3 1 2
250
116
80 250
329
54 15
4
294
04 205
04
UBO
X
130
0
140
150
60T
50/E
OM
MR
NT
&
354
WIl
TIN
G
250
2EX
ISTI
NG
25C
M
503
NEW
159
EXIS
TIN
S
0EX
ISTI
NG
581
EX
IST
ING
INEB
TTX
015
EL
EV
AT
OR
)
hR
UK
ISTI
NG
)VPN
TA
IRS
5NSL
ESI
523
EX
IST
ING
OX
EA
581
EXD
TNG
04E
XS
XiN
GG
RC
lND
FL
DX
RS
IN0
LE
@N
EE
0U
16
27
LUST
AG
S19
9C
c.ST
IfrX
568
EXIS
TIN
GEN
22
NO
W
140
EXIS
TIN
G
BOO
500
232
100
500
558
120
308
588
128
410
64
1800
1200
420
150
Dit
reto
nS
ubto
tal
0 2 10
282
80 291
60
262
72
291
04
1027
11
95
189
145
638
10
70
100
24
04
4.59
2
1580
574
6
64
21
490
24
04
386
,833
100,
917
103,2
07
163
0
265
01
200
175
0S
120
Cl0
010
0
010
01
450
13
00
13
00
S 15
41
8
12
40
0
290
0
312
0
17D
4
00
16
73
9
1. 14
37
54
37
51
40
92
11979
19
70
11
59
0
28,
364
2
125
025
01
280
150
050
01
43
6
115
015
01
360
155
0150
115
4
112
012
01
125
225
050
02
254
1250
2S0
123
61
150
150
118
11
6464
265
12
00
200
1232
O0
01
753
1100
160
00
135
035
00
0
1.12
012
00
0
1O
NX
150
00
11
50
150
0S
O10
010
00
01
120
120
00
16
46
40
0
154
594
51
763
1171
171
1
312
036
03
125
112
012
01
120
212
0240
2225
S11
511
51
103
163
2120
240
2163
32
S
112
0120
1153
163
220
040
02
103
325
110
010
01
16
3163
110
015
01
163
163
Sch
emat
icD
esig
nP
has
eS
tate
#T
MP
-103
-RB
TS
TUTA
LS1S
DEN
TCA
FACT
Y
11.
14.5
6730
50,0
88
11150
1150
51294
1284
1358
398
116
810
81
BO
O8
00
1798
760
11407
1407
11185
1105
11.
128
3,3.
361
1401
1.4
01
11.1
83
1.1
03
13,0
63
1.0
83
176
878
01
850
650
00
01
9797
270
01400
00
B
170
47
04
174
87
48
340
00
20
03
497
1462
240
0BO
O2
360
735
140
040
00
00
3.40
040
01
444
444
140
040
01
444
444
14
00
400
126
026
0
14
00
40
01
74
0740
160
0BO
O1
747
747
212
024
01
748
748
Moo
rsC
orne
r
Crr
coia
ban
Doc
k/
Med
Ia
Book
Stan
kH
oes
23-
iA7S
a20
oj
00
0200
200
112
012
0
720
725
13,
340
3341
00
0
00
0
00
0
60
SCH
EMA
TIC
DE
SIG
NPA
CK
AG
EP
onus
Rid
geS
choo
lIN
orw
alk,
Con
nect
icut
334
111
1301
111
II’i
CL
UD
ET
IVN
(CS(
kC
EN
TE
RU
NE
BB
OX
E)
1XS
)Ili
G(I
NC
lUD
ED
IV(C
MX
CE
NT
ER
UN
EA
00
0E
)
IXW
TIN
GlIN
EL
UD
ED
INX
ED
IVC
EN
TE
RU
NEA
BO
XE(
9.0
TE
RiO
RPR
OG
RAM
Out
door
Way
EdIp
soco
Ils
for
uoia
ong
rod
dtso
wos
ion
P15
yoca
pegr
ades
Fk-K
1
Plo
yena
pegr
odeo
1-
S1
ESpo
cnd
ployarn
.I
MS
Fou
ndpl
ayar
ea15
0080
’)1
fuN
oour
to
two
coos
,oo
urta
)toto
lof
Bho
ops)
Ost
doon
Laa
mic
gEo
Spec
hlgmr
. t0
STEM
Mn
loom
ing
op
m.O
urs
sa.
MS
1ES
1
Dro
p-of
fan
dP0
4-up
EdSp
ncca
ll,fo
rse
par
ator
ofbu
son
dcu
rV
EST
SFU
LLV
IZEI
MS
12C
orr
e80yo
lUte
sB
USE
S(S
MEL
L,.T
IAN
I.
MN
E.cm
enX
y2
cr00
11lu
00
0
BU
SES
IFU
LL
SIZ
E)
.ES
4B
USE
S)S
MA
LL
/VA
SI-
ES2
CARS
-dr
opoR
and
pIc
kup
)Rgu
med
Tom
MSI
50to
10
Par
kIng
Fre
K-
Par
ent
drop
-off
and
pick
-up
40E
dspn
ccol
)oftm
dedl
tote
dom
naA
llS
taff
Itea
cher
s.ad
mln
,n
urs
e.cu
slod
iall
140
Edsp
ecco
il,
for
eopo
ndnd
pom
klng
X),
Itnr
,20
Can
siso
uoe
PRdr
opof
fpa
rkIn
gam
eoF
orki
ngT
otal
200
0
741
WX
STIN
1
EX
IST
ING
EXIS
TIN
G
EXIS
TIN
G
EXIS
TIN
G
EXIS
TIN
G
Page 57, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
TE
CH
NIC
AL
SP
EC
IFIC
AT
ION
S-
TAB
LEO
FC
ON
TE
NT
S
INTR
OD
UCT
ORY
INFO
RM
ATI
ON
00
01
00
PRO
JEC
TM
AN
UA
LC
OV
ER
00
01
01
PRO
JEC
TTI
TLE
PAG
E
00
01
02
PRO
JEC
TD
ESI
GN
TEA
M
00
01
10
TAB
LEO
FC
ON
TE
NT
S
BID
DIN
GR
EQU
IREM
ENTS
00
21
13IN
STR
UC
TIO
NS
TOB
IDD
ER
S
00
31
32
GE
OT
EC
HN
ICA
LD
ATA
00
41
00
BID
FOR
MS
CON
TRA
CTIN
GR
EQU
IREM
ENTS
00
52
00
AG
RE
EM
EN
TFO
RM
S
00
72
00
GE
NE
RA
LC
ON
DIT
ION
S
00
73
00
SUPP
LE
ME
NT
AR
YC
ON
DIT
ION
S
00
85
13E
LE
CT
RO
NIC
INFO
RM
ATI
ON
USA
GE
FOR
MS
0090
13A
DD
EN
DA
AN
DM
OD
IFIC
AT
ION
S
01-
GEN
ERA
LR
EQU
IREM
ENTS
SUM
MA
RY
MU
LTIP
LEC
ON
TRA
CT
SUM
MA
RY
ALL
OW
AN
CES
UN
ITPR
ICE
S
ALT
ERN
ATE
S
SUB
STIT
UT
ION
PRO
CE
DU
RE
S
CO
NTR
AC
TM
OD
IFIC
ATI
ON
PRO
CE
DU
RE
S
CO
NT
RA
CT
OR
’SR
EQ
UE
STS
FOR
INFO
RM
ATI
ON
PAY
MEN
TPR
OC
ED
UR
ES
01
31
00
PRO
JEC
TM
AN
AG
EM
EN
TA
ND
CO
OR
DIN
ATI
ON
01
32
00
CO
NST
RU
CT
ION
PRO
GR
ESS
DO
CU
MEN
TATI
ON
0132
33
PHO
TO
GR
APH
ICD
OC
UM
EN
TA
TIO
N
01
33
00
SUB
MIT
TAL
PRO
CE
DU
RE
S
01
33
01
SUB
MIT
TA
LR
EVIE
WST
AM
P
01
40
00
QU
ALI
TYR
EQ
UIR
EM
EN
TS
01
42
00
RE
FER
EN
CE
S
01
45
23.1
3TE
ST
ING
FOR
IAQ
,B
ASE
LIN
EIA
QA
ND
MA
TER
IALS
01
50
00-
TE
MPO
RA
RY
FAC
ILIT
IES
AN
DC
ON
TR
OL
S
01
56
39
TE
MPO
RA
RY
TR
EE
AN
DPL
AN
TPR
OT
EC
TIO
N
0157
30
IND
OO
RE
NV
IRO
NM
EN
TA
LC
ON
TR
OL
0157
40
CO
NST
RU
CT
ION
IAQ
MA
NA
GE
ME
NT
PLA
N
01
60
00
PRO
DU
CT
RE
QU
IRE
ME
NT
S
01
730
0EX
ECU
TIO
N
01
73
29
CU
TTIN
GA
ND
PATC
HIN
G
01
74
19C
ON
STR
UC
TIO
NW
AST
EM
AN
AG
EM
EN
TA
ND
DIS
POSA
L
01
770
0C
LO
SEO
UT
PRO
CE
DU
RE
S
0178
23
OPE
RA
TIO
NA
ND
MA
INTE
NA
NC
ED
ATA
01
78
39
PRO
JEC
TR
EC
OR
DD
OC
UM
EN
TS
01
790
0D
EM
ON
STR
AT
ION
AN
DTR
AIN
ING
01
81
13
.13
CT
HIG
HPE
RFO
RM
AN
CE
BU
ILD
ING
RE
QU
IRE
ME
NT
S
01
91
13G
EN
ER
AL
CO
MM
ISSI
ON
ING
RE
QU
IRE
ME
NT
S
DIV
ISIO
N02
-EX
ISTI
NG
CO
ND
ITIO
NS
02
41
19SE
LE
CT
IVE
STR
UC
TU
RE
DEM
OLI
TIO
N
DIV
ISIO
N03
-C
ON
CR
ETE
03
30
00
CA
ST-I
N-P
LAC
EC
ON
CR
ET
E
03
49
00
GL
ASS
-FIB
ER
-RE
INFO
RC
ED
CO
NC
RE
TE
(GFR
C)
03
54
16H
YD
RA
ULI
CC
EM
EN
TU
ND
ER
LA
YM
EN
T
DIV
ISIO
N04
-M
ASO
NR
Y
04
21
13B
RIC
KM
ASO
NR
Y
04
22
00
CO
NC
RE
TE
UN
ITM
ASO
NR
Y
04
43
00
STO
NE
MA
SON
RY
04
7200
CA
STST
ON
EM
ASO
NR
Y
DIV
ISIO
N05
-M
ETA
LS
051
200
STR
UC
TU
RA
LST
EE
LFR
AM
ING
05
21
00
STE
EL
JOIS
TFR
AM
ING
05
31
00
STE
EL
DE
CK
ING
(AC
OU
STIC
DEC
KIN
CL
UD
ED
)
05
4000
CO
LD
-FO
RM
ED
MET
AL
FRA
MIN
G
05
50
00
MET
AL
FAB
RIC
ATI
ON
S
05
51
00
MET
AL
STA
IRS
(EX
TER
IOR
AS
NE
ED
ED
)
05
52
13PI
PEA
ND
TUB
ER
AIL
ING
S
05
52
14SI
TE
HA
ND
RA
ILS
05
53
00
MET
AL
GR
AT
ING
S
05
7300
DEC
OR
ATI
VE
MET
AL
RA
ILIN
GS
DIV
ISIO
N
01
00
0
01
12
00
01
21
00
012200
01
23
00
012500
012600
012616
01
29
00
DIV
ISIO
N
061
000
06
1600
06
4023
DIV
ISIO
N
07
2100
07
2726
07
421
3
06-
WO
OD
,PL
AST
ICS,
AN
DC
OM
POSI
TES
-RO
UG
HC
AR
PEN
TR
Y
SHE
AT
HIN
G
INTE
RIO
RA
RC
HIT
ECTU
RA
LW
OO
DW
OR
K
07-
THER
MA
LA
ND
MO
ISTU
RE
PRO
TEC
TIO
N
TH
ER
MA
LIN
SULA
TIO
N
FLU
ID-A
PPLI
EDM
EM
BR
AN
EA
IRB
AR
RIE
RS
MET
AL
WA
LLPA
NE
LS
Page 58, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
TE
CH
NIC
AL
SP
EC
IFIC
AT
ION
S-
TAB
LEO
FC
ON
TE
NT
S0
75
42
3
07
62
00
07
71
00
07
71
29
07
72
00
07
84
13
07
84
46
07
92
00
07
95
00
DIV
ISIO
N
08
11
13
08
14
16
08
31
13
08
33
26
08
41
13
08
51
13
08
71
00
08
80
00
08
83
00
088723
08
90
00
LOU
VER
SA
ND
VE
NT
S
09
29
00
09
30
00
09
51
13
09
54
46
09
63
40
09
65
13
09
65
16
09
65
19
09
67
23
09
68
16
09
72
00
09
77
23
09
84
33
09
91
13
09
91
23
99300
DIV
ISIO
N
101100
101200
101400
101450
102113
102123
102213
10
22
26
10
28
00
104413
GY
PSU
MB
OA
RD
(IN
CL
UD
ING
AB
USE
RE
SIST
AN
T)
TILI
NG
AC
OU
STIC
AL
PAN
ELC
EIL
ING
S
FAB
RIC
-WR
APP
ED
CEI
LIN
GPA
NE
LS
TE
RR
AZ
ZO
FLO
OR
ING
(RE
PAIR
)
RE
SIL
IEN
TB
ASE
AN
DA
CC
ESS
OR
IES
RE
SIL
IEN
TSH
EE
TFL
OO
RIN
G
RE
SIL
IEN
TTI
LEFL
OO
RIN
G
RE
SIN
OU
SFL
OO
RIN
G
SHE
ET
CA
RPE
TIN
G
WA
LLC
OV
ERIN
G
FAB
RIC
-WR
APP
ED
PAN
EL
S
SOU
ND
-AB
SOR
BIN
GW
ALL
UN
ITS
•EX
TER
IOR
PAIN
TIN
G
INTE
RIO
RPA
INTI
NG
STA
ININ
GA
ND
TR
AN
SPA
RE
NT
FIN
ISH
ING
DIV
ISIO
N
122413
1232
00
124
813
124
816
126
60
0
12
930
0
DIV
ISIO
N
DIV
ISIO
N
13
240
0
FIR
EE
XT
ING
UIS
HE
RS
MET
AL
LO
CK
ER
S
FLA
GPO
LE
S
11
-EQ
UIP
MEN
T
CO
MM
ON
MO
TOR
RE
QU
IRE
ME
NT
SFO
RE
QU
IPM
EN
T
RE
SID
EN
TIA
LA
PPL
IAN
CE
S
FOO
DSE
RV
ICE
EQ
UIP
ME
NT
LIB
RA
RY
STA
CK
SYST
EM
S
PRO
JEC
TIO
NSC
RE
EN
S
FOLD
ING
AN
DPO
RT
AB
LE
STA
GE
S
GY
MN
ASI
UM
EQ
UIP
ME
NT
GY
MN
ASI
UM
DIV
IDE
RS
FOLD
ING
AC
OU
STIC
AL
PAR
TITI
ON
S
UPW
AR
DA
CTI
NG
GL
ASS
PAR
TITI
ON
12-
FUR
NIS
HIN
GS
RO
LLER
WIN
DO
WSH
AD
ES
MA
NU
FAC
TUR
EDW
OO
DC
ASE
WO
RK
EN
TR
AN
CE
FLO
OR
MA
TSA
ND
FRA
ME
S
EN
TR
AN
CE
FLO
OR
GR
ILL
ES
TE
LE
SCO
PIN
GB
LE
AC
HE
RS
SIT
EFU
RN
ISH
ING
S
13-
SPEC
IAL
CO
NST
RU
CTI
ON
14-
CON
VEY
ING
EQU
IPM
ENT
-H
YD
RA
ULI
CEL
EVA
TOR
S
SCH
EM
AT
ICD
ESI
GN
PAC
KA
GE
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,2018
Sch
emat
icD
esig
nP
has
eS
tate
#T
MP
-1O
3-R
BT
S
TH
ER
MA
LPL
AST
ICPO
LYO
LEFI
NR
OO
FIN
GM
EM
BR
AN
E
SHE
ET
MET
AL
FLA
SHIN
GA
ND
TRIM
RO
OF
SPE
CIA
LT
IES
MA
NU
FAC
TUR
EDR
OO
FE
XPA
NSI
ON
JOIN
TS
RO
OF
AC
CE
SSO
RIE
S
PEN
ET
RA
TIO
NFI
RE
STO
PPIN
G
FIR
E-R
ESI
STIV
EJO
INT
SYST
EM
S
JOIN
TSE
AL
AN
TS
EX
PAN
SIO
NC
ON
TR
OL
08O
PEN
ING
S
HO
LLO
WM
ETA
LD
OO
RS
&FR
AM
ES
FLU
SHW
OO
DD
OO
RS
AC
CE
SSD
OO
RS
AN
DFR
AM
ES
OV
ERH
EAD
CO
ILIN
GG
RIL
LE
S
AL
UM
INU
M-F
RA
ME
DE
NT
RA
NC
ES
AN
DST
OR
EFR
ON
TS
ALU
MIN
UM
WIN
DO
WS
DO
OR
HA
RD
WA
RE
GLA
ZIN
G
MIR
RO
RS
SAFE
TYA
ND
SEC
UR
ITY
FILM
1044
16
105113
10
750
0
DIV
ISIO
N
110513
1131
00
1140
00
115
12
3
115
21
3
116123
116623
116653
1100
00
11
0000
DIV
ISIO
N09
-FI
NIS
HES
09
21
16.2
3G
YPS
UM
BO
AR
DSH
AFT
WA
LLA
SSE
MB
LIE
S
09
2216
NO
N-S
TR
UC
TU
RA
LM
ETA
LFR
AM
ING
09
2716
GL
ASS
-RE
INFO
RC
ED
GY
PSU
M(G
RG
)FA
BR
ICA
TIO
NS
10-
SPEC
IALT
IES
VIS
UA
LD
ISPL
AY
SUR
FAC
ES
DIS
PLA
YC
ASE
S
SIG
NA
GE
SIT
ESI
GN
AG
E(B
&G
)
TOIL
ETC
OM
PAR
TM
EN
TS
CUBI
CL
ES
WIR
EM
ESH
PAR
TITI
ON
S
OPE
RA
BL
EPA
RTI
TIO
NS
TOIL
ET,
BA
TH,
AN
DLA
UN
DR
YA
CC
ESS
OR
IES
FIR
EE
XT
ING
UIS
HE
RC
AB
INET
S
Page 59, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
TE
CH
NIC
AL
SP
EC
IFIC
AT
ION
S-
TAB
LEO
FC
ON
TE
NT
SD
IVIS
ION
21-
FIR
ESU
PPR
ESS
ION
21
01
00
GE
NE
RA
LC
ON
DIT
ION
SFO
RFI
RE
PRO
TE
CT
ION
TRA
DE
21
05
13C
OM
MO
NM
OTO
RR
EQ
UIR
EM
EN
TS
FOR
FIR
ESU
PPR
ESS
ION
EQ
UIP
ME
NT
21
05
17SL
EE
VE
SA
ND
SLE
EV
ESE
AL
SFO
RFI
RE
-SU
PPR
ESS
ION
EQU
IPM
EN
T
21
05
18
ESC
UT
CH
EO
NS
FOR
FIR
E-S
UPP
RE
SSIO
NPI
PIN
G
21
05
23
GEN
ERA
L-D
UTY
VA
LVES
FOR
FIR
EPR
OT
EC
TIO
NPI
PIN
G
21
05
48
VIB
RA
TIO
NA
ND
SEIS
MIC
CO
NT
RO
LS
FOR
FIR
E-SU
PPR
ESS
ION
PIPI
NG
AN
DE
QU
IPM
EN
T
21
1313
WE
T-P
IPE
SPR
INK
LE
RSY
STE
MS
DIV
ISIO
N22-
PLU
MB
ING
22
01
00
22
05
13
GE
NE
RA
LC
ON
DIT
ION
SFO
RPL
UM
BIN
GTR
AD
E
CO
MM
ON
MO
TOR
RE
QU
IRE
ME
NT
SFO
RPL
UM
BIN
GE
QU
IPM
EN
T
22
05
16EX
PAN
SIO
NFI
TTIN
GS
AN
DL
OO
PSFO
RPL
UM
BIN
GPI
PIN
G
SLE
EV
ES
AN
DSL
EE
VE
SEA
LS
FOR
PLU
MB
ING
PIPI
NG
ESC
UT
CH
EO
NS
FOR
PLU
MB
ING
PIPI
NG
ME
TE
RS
AN
DG
AG
ES
FOR
PLU
MB
ING
PIPI
NG
BA
LLV
ALV
ESFO
RPL
UM
BIN
GPI
PIN
G
BU
TTER
FLY
VA
LVES
FOR
PLU
MB
ING
PIPI
NG
CH
ECK
VA
LVES
FOR
PLU
MB
ING
PIPI
NG
HA
NG
ER
SA
ND
SUPP
OR
TS
FOR
PLU
MB
ING
PIPI
NG
AN
DE
QU
IPM
EN
T
HEA
TTR
AC
ING
FOR
PLU
MB
ING
PIPI
NG
VIB
RA
TIO
NC
ON
TR
OL
SFO
RPL
UM
BIN
GPI
PIN
GA
ND
EQ
UIP
ME
NT
22
05
53
IDEN
TIFI
CA
TIO
NFO
RPL
UM
BIN
GPI
PIN
GA
ND
EQ
UIP
ME
NT
SCH
EM
AT
ICD
ESI
GN
PAC
KA
GE
Pon
usR
idge
Sch
ool
Nor
wal
k,C
onne
ctic
utF
ebru
ary
2,2
01
8
HV
AC
GE
NE
RA
LC
ON
DIT
ION
SFO
RM
ECH
AN
ICA
LT
RA
DE
S
HV
AC
AIR
-DIS
TRIB
UTI
ON
SYST
EM
CLE
AN
ING
CO
MM
ON
MO
TOR
RE
QU
IRE
ME
NT
SFO
RH
VA
CE
QU
IPM
EN
T
EX
PAN
SIO
NFI
TTIN
GS
AN
DL
OO
PSFO
RH
VA
CPI
PIN
G
SLE
EV
ES
AN
DSL
EE
VE
SEA
LS
FOR
HV
AC
PIPI
NG
ESC
UT
CH
EO
NS
FOR
HV
AC
PIPI
NG
ME
TE
RS
AN
DG
AG
ES
FOR
HV
AC
PIPI
NG
GEN
ERA
L-D
UTY
VA
LVES
FOR
HV
AC
PIPI
NG
Sch
emat
icD
esig
nP
has
eS
tate
#T
MP
-103
-RB
TS
23
05
29H
AN
GE
RS
AN
DSU
PPO
RT
SFO
RH
VA
CPI
PIN
GA
ND
EQU
I PM
EN
T
VIB
RA
TIO
N&
SEIS
MIC
CO
NR
OL
SFO
RH
VA
C
IDEN
TIFI
CA
TIO
NFO
RH
VA
CPI
PIN
GA
ND
EQ
UIP
ME
NT
TE
STIN
G,
AD
JUST
ING
,A
ND
BA
LAN
CIN
GFO
RH
VA
C
DU
CT
INSU
LATI
ON
HV
AC
EQ
UIP
ME
NT
INSU
LATI
ON
HV
AC
PIPI
NG
INSU
LATI
ON
DIR
ECT
DIG
ITA
LC
ON
TR
OL
(DD
C)
SYST
EM
FOR
HV
AC
SEQ
UE
NC
EO
FO
PER
AT
ION
SFO
RH
VA
CC
ON
TR
OL
S
HY
DR
ON
ICPI
PIN
G
HY
DR
ON
ICPI
PIN
GSP
EC
IAL
TIE
S
HY
DR
ON
ICPU
MPS
RE
FRIG
ER
AN
TPI
PIN
G
MET
AL
DU
CTS
AIR
DU
CT
AC
CE
SSO
RIE
S
FLEX
IBLE
DU
CTS
HV
AC
POW
ER
VEN
TILA
TOR
S
LIST
EDK
ITC
HEN
VEN
TILA
TIO
NSY
STE
MEX
HA
UST
DU
CTS
AIR
TE
RM
INA
LU
NIT
S
DIF
FUSE
RS,
RE
GIS
TE
RS,
AN
DG
RIL
LE
S
HV
AC
GR
AV
ITY
VEN
TILA
TOR
S
AIR
-CO
OLE
DR
EFR
IGE
RA
NT
CO
ND
EN
SER
S
MO
DU
LAR
OU
TD
OO
RA
IRH
AN
DLI
NG
UN
ITS
PAC
KA
GED
,R
OO
FTO
PA
IR-C
ON
DIT
ION
ING
UN
ITS
DU
CT
LE
SSSP
LIT
-SY
STE
MAl
R-C
ON
DIT
ION
ER
S
SPL
IT-S
YST
EM
AIR
-CO
ND
ITIO
NE
RS
VA
RIA
BL
E-R
EFR
IGE
RA
NT
-FL
OW
HV
AC
SYST
EM
S
RA
DIA
NT-
HEA
TIN
GH
YD
RO
NIC
PAN
ELS
PLU
MB
ING
PIPI
NG
INSU
LATI
ON
FAC
ILIT
YW
ATE
RD
IST
RIB
UT
ION
PIPI
NG
(CIV
IL)
DO
ME
STIC
WA
TER
PIPI
NG
DO
ME
STIC
WA
TER
PIPI
NG
SPE
CIA
LT
IES
DO
ME
STIC
WA
TER
PUM
PS
FAC
ILIT
YSA
NIT
AR
YSE
WE
RS
(CIV
IL)
SAN
ITA
RY
WA
STE
AN
DV
ENT
PIPI
NG
SAN
ITA
RY
WA
STE
PIPI
NG
SPE
CIA
LT
IES
SAN
ITA
RY
WA
STE
INT
ER
CE
PTO
RS
STO
RM
DR
AIN
AG
EPI
PIN
G
STO
RM
DR
AIN
AG
EPI
PIN
GSP
EC
IAL
TIE
S
RA
DO
NA
ND
SUB
SLA
BV
ENTI
LATI
ON
PIPI
NG
FUE
L-F
IRE
D,
DO
ME
STIC
-WA
TE
RH
EA
TE
RS
CO
MM
ER
CIA
LW
ATE
RC
LO
SET
S
CO
MM
ER
CIA
LU
RIN
ALS
CO
MM
ER
CIA
LLA
VA
TOR
IES
CO
MM
ER
CIA
LSH
OW
ER
S
PRE
SSU
RE
WA
TER
CO
OL
ER
S
22
07
19
22
11
13
22
11
16
22
11
19
22
11
23
22
13
13
22
13
16
22
13
19
22
13
23
22
14
13
22
14
23
22
15
10
22
34
00
22
42
13.1
3
22
42
13.1
6
22
42
16
.13
22
42
23
22
47
16
DIV
ISIO
N23
-
23
00
50
230
13
0.5
1
23
05
13
23
05
16
230517
23
05
18
23
05
19
23
05
23
22
05
17
220518
22
05
19
22
05
23.1
2
22
05
23
.13
22
05
23
.14
22
05
29
2305
48
2305
53
230
593
230
713
2307
16
230
719
230
900
230
993
2321
13
23
2116
23
212
3
23
230
0
23
311
3
23
330
0
23
334
6
23
342
3
23
353
3
23
360
0
2337
13
2337
23
2363
13
237
314
237
416
238
123
23
8126
23
812
9
23
8213
22
05
33
22
05
48.1
3
Page 60, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
TE
CH
NIC
AL
SP
EC
IFIC
AT
ION
S-
TAB
LEO
FC
ON
TE
NT
S23
82
39.1
3C
AB
INET
UN
ITH
EA
TE
RS
DIV
ISIO
N26
-
260100
260519
ELEC
TRIC
Al.
GE
NE
RA
LR
EQ
UIR
EM
EN
TS
FOR
ELEC
TRIC
AL
WO
RK
LOW
-VO
LTA
GE
ELEC
TRIC
AL
POW
ER
CO
ND
UC
TO
RS
AN
DC
AB
LES
GR
OU
ND
ING
AN
DB
ON
DIN
GFO
REL
ECTR
ICA
LSY
STE
MS
HA
NG
ER
SA
ND
SUPP
OR
TS
FOR
ELEC
TRIC
AL
SYST
EM
S
RA
CEW
AY
SA
ND
BO
XES
FOR
ELEC
TRIC
AL
SYST
EM
S
UN
DE
RG
RO
UN
DD
UC
TSA
ND
RA
CEW
AY
SFO
REL
ECTR
ICA
LSY
STE
MS
26
05
44
SLE
EV
ES
AN
DSL
EE
VE
SEA
LS
FOR
ELEC
TRIC
AL
RA
CEW
AY
SA
ND
CA
BLI
NG
SEIS
MIC
CO
NT
RO
LS
FOR
ELEC
TRIC
AL
SYST
EM
S
IDEN
TIFI
CA
TIO
NFO
REL
ECTR
ICA
LSY
STE
MS
OV
ER
CU
RR
EN
TPR
OTE
CTI
VE
DEV
ICE
SHO
RT
-CIR
CU
ITC
OO
RD
INA
TIO
N-A
RC
-FL
ASH
STU
DY
26
24
13SW
ITC
HB
OA
RD
26
24
16PA
NE
LB
OA
RD
S
26
27
26
WIR
ING
DEV
ICES
26
28
13FU
SES
26
28
16E
NC
LO
SED
SWIT
CH
ES
AN
DC
IRC
UIT
BR
EA
KE
RS
26
51
16LE
DIN
TER
IOR
LIG
HTI
NG
26
51
19LE
DIN
TER
IOR
LIG
HTI
NG
26
52
19E
ME
RG
EN
CY
AN
DEX
ITLI
GH
TIN
G
26
56
13LI
GH
TIN
GPO
LE
SA
ND
STA
ND
AR
DS
26
56
19LE
DEX
TER
IOR
LIG
HTI
NG
PATH
WA
YS
FOR
CO
MM
UN
ICA
TIO
NS
SYST
EM
S
CA
BLE
TRA
YS
FOR
CO
MM
UN
ICA
TIO
NS
SYST
EM
S
SLE
EV
ES
AN
DSL
EE
VE
SEA
LS
FOR
CO
MM
UN
ICA
TIO
NS
PATH
WA
YS
AN
DC
AB
LIN
G
CO
MM
UN
ICA
TIO
NS
EQ
UIP
ME
NT
RO
OM
FIH
ING
S
CO
MM
UN
ICA
TIO
NS
BA
CK
BO
NE
CA
BLI
NG
CO
MM
UN
ICA
TIO
NS
HO
RIZ
ON
TAL
CA
BLI
NG
AU
DIO
VID
EOSY
STE
MS
PUB
LIC
AD
DR
ESS
SYST
EM
CLO
CK
SYST
EM
SEC
UR
ITY
CO
ND
UC
TO
RS
&C
AB
LES
PATH
WA
YS
FOR
SEC
UR
ITY
SYST
EM
S
AC
CE
SSC
ON
TR
OL
SYST
EM
INT
RU
SIO
ND
ETEC
TIO
NSY
STE
M
VID
EOSU
RV
EIL
LA
NC
ESY
STE
M
DIV
ISIO
N28-
ELEC
TRO
NIC
SAFE
TYA
ND
SEC
UR
ITY
28
130
0-
AC
CE
SSC
ON
TR
OL
28
23
00
-V
IDEO
SUR
VE
ILL
AN
CE
28
31
11
DIG
ITA
L,A
DD
RE
SSA
BL
EFI
RE-
ALA
RM
SYST
EM
DIV
ISIO
N31
-EA
RTH
WO
RK
31
1000
-SI
TE
PRE
PAR
AT
ION
31
20
00
EAR
THM
OV
ING
31
23
19
DEW
ATE
RIN
G
31
23
33
-T
RE
NC
HIN
GA
ND
BA
CK
FILL
ING
31
25
00
-SE
DIM
EN
TA
TIO
NA
ND
ER
OSI
ON
CO
NT
RO
LS
31
50
00
EXC
AV
ATI
ON
SUPP
OR
TA
ND
PRO
TE
CT
ION
DIV
ISIO
N32
-EX
TERI
OR
IMPR
OV
EMEN
TS
32
1210
-B
ITU
MIN
OU
SC
ON
CR
ET
EPA
VE
ME
NT
SA
ND
CU
RB
S
32
1310
-SI
TE
CO
NC
RE
TE
3214
43
-PO
RO
US
UN
ITPA
VIN
G
3217
20
-D
ETEC
TAB
LEW
AR
NIN
GSU
RFA
CE
32
1723
-PA
VE
ME
NT
MA
RK
ING
S
32
31
13-
CH
AIN
LIN
KFE
NC
ES
AN
DG
ATE
S
32
90
10-
LA
ND
SCA
PIN
G
32
9800
-A
THLE
TIC
FIE
LD
S
SCH
EM
AT
ICD
ESI
GN
PAC
KA
GE
Pon
usR
idge
Sch
ool
IN
orw
alk,
Con
nect
icut
Feb
ruar
y2,
2018
Sch
emat
icD
esig
nP
has
eS
tate
#T
MP
-103
-RB
TS
260526
260529
260533
260543
27
05
28
27
05
36
27
05
44
27
11
00
27
13
00
27
15
00
27
41
00
27
51
16
27
53
13
28
05
00
28
05
28
28
13
00
28
16
00
28
23
00
26
05
48
.16
26
05
53
26
05
73
.11
DIV
ISIO
N
331
000
33
3dO
O
33
4000
33
4100
33
7000
33
800
0
33-
UTI
LITI
ES
-W
ATE
RU
TILI
TIES
-SA
NIT
AR
YSE
WE
RA
GE
UTI
LITI
ES
-ST
OR
MD
RA
INA
GE
UTI
LITI
ES
STO
RM
UTI
LITY
DR
AIN
AG
EPI
PIN
G
-EL
ECTR
ICA
LU
TILI
TIES
-C
OM
MU
NIC
AT
ION
UTI
LITI
ES
DIV
ISIO
N27
-C
OM
MU
NIC
ATI
ON
S
Page 61, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
-“‘Jo)CDOQ
O3
—‘Jz>00-‘:z
00zCD
aC
(flU)D)CD
—1
‘CD
-
Page 62, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
CIHD‘-I.
pCD
—f-4.
CD
0-•
—ID)
C)C
mC)
C)
-l=—
=
m-I,
C
C)m
I
—
C)
fltCI)000
m
MI,,
03o
00
00
00
0C
Page 63, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
CO
DE
SG
OV
ER
NIN
GSC
HO
OL
CO
NST
RU
CT
ION
The
foll
owin
gis
alis
tof
the
curr
ent
buil
ding
cod
esw
hich
are
appl
icab
lefo
rth
eS
tate
ofC
onne
ctic
ut,
and
thes
eco
de
wer
eus
edas
the
bas
isfo
rth
eC
ode
revi
ewfo
rth
ispr
ojec
t.P
leas
eno
teth
atth
eC
ode
issu
esw
illco
nti
nue
tobe
revi
ewed
and
updat
edas
the
proj
ect
desi
gnp
rog
ress
esan
dis
dev
eloped
furt
her.
Sta
tean
dF
eder
alC
odes
Gov
erni
ngC
onne
ctic
utS
choo
lC
onst
ruct
ion
2016
Con
nect
icut
Sta
teB
uild
ing
Cod
ead
opti
ng
the
foll
owin
gna
tion
alm
odel
cod
esas
amen
ded
inth
e2
01
6C
onne
ctic
utS
tate
Bui
ldin
gC
ode
Cod
esco
nti
nue
tobe
updat
edan
dch
ang
esm
ayaf
fect
the
prop
osed
inte
rpre
tati
on
ofth
eC
odes
used
topre
par
eth
issu
bm
issi
on.
Fac
ilit
ies
and
des
igns
shou
ldbe
revi
ewed
for
com
pli
ance
with
the
curr
ent
oran
tici
pat
edco
des
duri
ngea
chpr
ojec
t’s
desi
gnphas
esan
dre
view
edca
refu
lly
prio
rto
const
ruct
ion
perm
itsu
bm
issi
on.
Cod
esin
effe
ctar
eus
uall
yen
forc
edat
the
tim
eth
eB
uild
ing
Per
mit
isobta
ined
byco
ntr
acto
rs.
Con
sequ
entl
ych
ang
esin
code
shou
ldbe
care
full
ym
onit
ored
and
plan
ssh
ould
refl
ect
up
dat
edco
depr
ovis
ions
asno
ted
abov
e.
-2012
Inte
rnat
iona
lC
ode
Cou
ncil
(IC
C)
Inte
rnat
iona
lB
uild
ing
Cod
e-
2012
Inte
rnat
iona
lC
ode
Cou
ncil
(IC
C)
Inte
rnat
iona
lE
xist
ing
Bui
ldin
gsC
ode
-2
01
2In
tern
atio
nal
Cod
eC
ounc
il(I
CC
)In
tern
atio
nal
Mec
hani
cal
Cod
e-
20
12
Inte
rnat
iona
lC
ode
Cou
ncil
(IC
C)
Inte
rnat
iona
lP
lum
bing
Cod
e-
20
12
Inte
rnat
iona
lC
ode
Cou
ncil
(IC
C)
Inte
rnat
iona
lE
nerg
yC
onse
rvat
ion
Cod
e-
2014
Nat
iona
lFi
reP
rote
ctio
nA
ssoc
iati
on70
—N
atio
nal
Ele
ctri
cal
Cod
e-
20
09
Inte
rnat
iona
lC
ode
Cou
ncil
/A
NSI
A117.1
-A
cces
sibl
e&
Usa
ble
Bui
ldin
g&
Fac
ilit
ies
-2016
Con
nect
icut
Fire
Saf
ety
Cod
e—
consi
stin
gof
the
foll
owin
gna
tion
alm
odel
codes
:2
01
2In
tern
atio
nal
Cod
eC
ounc
il(I
CC
)In
tern
atio
nal
Fire
Cod
e2
01
2N
atio
nal
Fire
Pro
tect
ion
Ass
ocia
tion
Sta
nd
ard
10
1-
Lif
eS
afet
yC
ode
19
73
Uni
form
Fed
eral
Acc
essi
bili
tyS
tandar
ds
(UFA
S)S
ecti
on5
04
,R
ehab
ilit
atio
nA
ctof
19
73
20
06
Con
nect
icut
Pub
lic
Hea
lth
Cod
e-
19
99
Con
nect
icut
0.S.
H.A
,re
gula
tions
-T
itle
29
Dep
artm
ent
ofL
abor
-1
99
6U
SC
onsu
mer
Pro
duct
Saf
ety
Com
mis
sion
-
Pla
ygro
und
Saf
ety
19
91
Am
eric
ans
with
Dis
abil
itie
sA
ct(A
DA
)T
itle
I-
Em
ploy
men
tT
itle
II—
Gov
ernm
ent
Fac
ilit
ies
Titl
eIII
—P
ubli
cA
ccom
mod
atio
ns
SCH
EM
AT
ICD
ESI
GN
PAC
KA
GE
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,2013
Sch
emat
icD
esig
nP
has
eS
tate
#T
MP
-103
-RB
TS
Page 64, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
CIV
IL/S
ITE
DE
SIG
N-
NA
RR
AT
IVE
2-1
5-l
UTI
LITI
ES
! DR
AIN
AG
E
Gen
eral
The
new
syst
ems
will
bed
esig
ned
inac
cord
ance
wit
hth
ere
quir
emen
tsof
the
foll
owin
gco
des
and
stan
dar
ds:
•S
tate
ofC
onnec
ticu
tD
epar
tmen
tof
Tra
nsp
ort
atio
nS
tandar
dS
pec
ific
atio
ns
for
Roa
ds,
Bri
dges
and
Inci
dent
alC
onst
ruct
ion
For
m817
•2002
Co
nnec
ticu
tG
uide
line
sfo
rSo
ilE
rosi
onan
dS
edim
ent
Con
trol
,D
epB
ulle
tin
34.
•C
ityof
Nor
wal
k,C
onnec
ticu
tD
rain
age
Man
ual
Ava
ilabl
eU
tiliti
es
The
avai
lab
leut
ilit
ies
are
asfo
llow
s:E
lect
ric
(Eve
rsou
rce)
,te
lephone
(South
ern
New
Eng
land
Tel
ephone)
,F
iber
(Cro
wn
Cas
tle
Fib
er),
Wat
er(S
outh
Nor
wal
kE
lect
ric
and
Wat
er),
and
San
itar
yS
ewer
(Nor
wal
kW
ater
Pol
luti
onC
ontr
olA
utho
rity
.
Gas
iscu
rren
tly
not
avai
lable
atth
issi
te.
Sch
emat
icSt
orm
Wat
erM
anag
emen
t App
roac
h
Cur
rent
ly,
storm
runo
fffr
omth
esi
tepas
ses
over
land
,an
dth
rough
pipe
dsy
stem
s,to
acu
lver
tex
itin
gth
esi
teth
rough
ad
rain
age
ease
men
tal
ong
the
nort
her
ndr
ivew
ay
Sto
rmru
noff
from
the
impr
oved
area
san
dbu
ildi
ngad
diti
onw
illbe
coll
ecte
dby
ase
ries
ofya
rddra
ins,
catc
hb
asin
s,sw
ales
and
roof
dra
inag
esy
stem
s.T
hep
rop
ose
dim
pro
vem
ents
will
incr
ease
the
impe
rvio
usar
eaco
mp
ared
toex
isti
ngco
ndit
ions.
An
addi
tion
acre
ofla
ndw
illno
wdr
ain
tow
ard
the
exis
ting
outl
et.
The
refo
re,
asy
stem
ofst
orm
wat
erdet
enti
on
/in
filt
rati
on
will
bere
quir
ed.
The
storm
runo
ffw
illbe
div
erte
din
totw
ob
asin
s.T
hefi
rst
basi
nw
illbe
size
dto
infi
ltra
teth
ere
quir
edg
rou
nd
wat
erre
char
ge
volu
me.
The
rem
ainin
gw
ater
will
bedi
vert
edto
the
seco
nd
basi
nto
mai
ntai
nth
ep
red
evel
op
men
tdis
char
ge
rate
.T
hese
cond
basi
nw
illre
quir
ean
outl
etst
ruct
ure
and
over
flow
wei
r.S
torm
runo
ffw
illfo
llow
exis
ting
pat
tern
,dra
inin
gfr
omso
uth
tono
rth.
An
alte
rnat
eunder
gro
und
det
enti
on
syst
emis
prov
ided
.
Bes
tM
anag
emen
tP
ract
ices
will
bead
her
edto
for
trea
tmen
tof
storm
wat
erfo
rpoll
uta
nt
rem
oval
.T
heB
MP’
sm
ayin
clud
eca
tch
basi
n
ho
od
s/su
mp
s,veg
etat
edsw
ales
,bio
rete
nti
on
faci
liti
es,
hydr
odyn
amic
sep
arat
ors
,et
c.
Add
itio
nal
mea
sure
san
dst
orm
wat
erro
utin
gw
illbe
dev
elop
edas
des
ign
pro
gre
sses
.
Sch
emat
icU
tility
App
roac
h
An
exis
ting
8”w
ater
mai
nfr
omH
unte
rsla
ne
foll
ows
alon
gth
eno
rther
ndr
ivew
ayan
dco
nnec
tsto
anex
isti
ng10
”w
ater
mai
nfr
omP
onus
Ave
nue.
The
exis
ting
6”se
rvic
eru
nspa
rall
elw
ith
the
buil
ding
and
ente
rsin
the
util
ity
room
.T
his
wat
erse
rvic
ew
illre
mai
n.
App
roxi
mat
ely
620
Ifof
new
8”D
ucti
leIr
onpi
pew
illbe
requir
edfo
rfi
rese
rvic
e.C
urre
ntly
ther
eis
afi
rehydra
nt
loca
ted
nort
hof
the
exis
ting
buil
ding
.A
new
fire
hydr
ant
will
bere
quir
edn
ear
the
new
fire
serv
ice.
Cur
rent
lyth
esa
nit
ary
dra
ins
bygr
avit
yto
war
dth
eno
rth.
An
8”se
wer
run
along
the
emer
gen
cypa
thto
war
dP
onus
Ave
nue.
App
roxi
mat
ely
80
0If
ofne
w6”
PVC
and
4sa
nit
ary
man
ho
les
will
bere
quir
edto
con
nec
tth
ead
diti
onto
the
exis
ting
sanit
ary
mai
n.
Ele
ctri
can
dco
mm
un
icat
ion
sse
rvic
esw
illbe
tou
ted
thro
ugh
under
gro
und
duct
ban
ks
from
the
exis
ting
pole
line
inth
enort
her
ndr
ivew
ayto
the
pro
po
sed
util
ity
room
.C
oord
inat
eel
ectr
ican
dco
mm
un
icat
ion
sw
ith
Ele
ctri
cal
syst
ems
and
Tec
hnol
ogy
Syst
ems.
Site
Lig
htin
g
Sit
eli
ghti
ngw
illbe
requir
edfo
rth
ead
dit
ional
park
ing
and
egre
sspat
h.
Coo
per
Lig
htin
gm
odel
MSA
ME
SALE
Dw
illbe
use
d.
Mat
eria
ls:
San
itar
yPi
ping
PVC
Pip
ean
dFi
tting
s:A
STM
D30
34,
SD
R35
,PV
CT
ype
PSM
,A
STM
F78
9T
ype
PS
-46,
sew
er
Sto
rmPi
ping
Cor
ruga
ted
PEdr
aina
gepi
pean
dfi
tting
s:N
PS
3to
NP
S10
:A
ASH
TO
M25
2M,
Typ
eS,
with
smoo
thw
ater
way
for
coup
ling
join
ts.
Soilt
ight
Cou
plin
gs:
AA
SHT
OM
252M
,co
rrug
ated
,m
atch
ing
tube
and
fitti
ngs.
NP
S12
toN
PS
60:
AA
SHT
OM
294M
,T
ype
S,w
ithsm
ooth
wat
erw
ayfo
rco
upli
ngjo
ints
.So
iltig
htC
oupl
ings
:A
ASH
TO
M29
4M,
corr
ugat
ed,
mat
chin
gpi
pean
dfi
tting
s.S
torm
Man
hole
sP
reca
stM
anho
le:
AST
MC
913:
desi
gned
acco
rdin
gto
AS
IMC
890
for
A-1
6(A
SS
HT
OH
S2O
-44)
,he
avy-
traf
fic,
stru
ctur
allo
adin
g;of
dept
h,sh
ape,
and
dim
ensi
ons
indi
cate
d,w
ithpr
ovis
ion
for
seal
ant j
oint
s.M
inim
umdi
amet
erof
4fe
et.
Join
tS
eala
nt:
AS
IMC
990,
bitu
men
orbu
tyl
rubb
er.
Res
ilie
ntP
ipe
Con
nect
ors:
AST
MC
923,
cast
orfi
tted
into
man
hole
wal
ls,
for
each
pipe
conn
ecti
on.
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,20
18
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
1
San
itar
yM
anho
les
pipe
with
bell
-and
-spi
got
ends
for
gask
eted
join
ts.
Sha
llm
eet
Nor
wal
kW
ater
Pollu
tion
Con
trol
Aut
hori
ty’s
stan
dard
s.
Gas
kets
:A
SIM
F47
7,el
asto
mer
icse
als
Pre
cast
Man
hole
:A
STM
C91
3;de
sign
edac
cord
ing
toA
STM
C89
0fo
rA
-16
(AS
SH
TO
HS2
O-4
4),
heav
y-tr
affi
c,st
ruct
ural
load
ing;
ofde
pth,
shap
e,an
ddi
men
sion
sin
dica
ted,
with
prov
isio
nfo
rse
alan
tjo
ints
.M
inim
umdi
amet
erof
4fe
et.
Shal
lm
eet
Nor
wal
kW
ater
Pollu
tion
Con
trol
Aut
hori
ty’s
stan
dard
s.
Join
tS
eala
nt:
AST
MC
990,
bitu
men
orbu
tyl
rubb
er.
Res
ilie
ntP
ipe
Con
nect
ors:
AST
MC
923,
cast
orfi
tted
into
man
hole
wal
ls,
for
each
pipe
conn
ecti
on.
Fra
me
and
Cov
er:
24-i
nch
IDby
7-to
9-in
chri
ser,
with
4-in
ch-
min
imum
-wid
thfl
ange
and
26-
inch
-di
amet
erco
ver.
Incl
ude
inde
nted
top
desi
gnw
ithle
tter
ing
cast
into
cove
r,us
ing
wor
ding
equi
vale
ntto
“SA
NIT
AR
YSE
WE
R”.
Mat
eria
l:A
SIM
A48
/A48
M,
Cla
ss35
gray
iron
unle
ssot
herw
ise
indi
cate
Dom
esti
cW
ater
and
Fire
Pro
tect
ion
Pipi
ngP
ush-
on-J
oint
,D
uctil
e-Ir
onPi
pe:
AW
VV
AC
151,
with
push
-on-
join
tbe
llan
dpl
ain
spig
oten
d,A
WN
AC
li0,
duct
ile-
orgr
ay-i
ron
stan
dard
patt
ern,
thic
knes
scl
ass
52.
Sha
llm
eet
Sou
thN
orw
alk
Ele
ctri
can
dW
ater
stan
dard
s.
All
join
tssh
all
bere
stra
ined
with
mec
hani
cal
reta
iner
glan
dsan
dtie
rods
with
Meg
a-L
ugty
pecl
amps
,or
appr
oved
equi
vale
nt.
Gas
kets
:A
WW
AC
lii,
rubb
er.
Det
ecta
ble
war
ning
tape
shal
lbe
inst
alle
dov
erth
epi
ping
.
Page 65, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
CIV
IL
/SIT
ED
ES
IG
N-
NA
RR
AT
IV
E
UTI
LITI
ES
!DR
AIN
AG
E
Gen
eral
The
new
syst
ems
will
bedes
igned
inac
cord
ance
wit
hth
ere
quir
emen
tsof
the
foll
owin
gco
des
and
stan
dar
ds:
•S
tate
ofC
onnec
ticu
tD
epar
tmen
tof
Tra
nsp
ort
atio
nS
tandar
dS
pec
ific
atio
ns
for
Roa
ds,
Bri
dges
and
Inci
dent
alC
onst
ruct
ion
For
m817
•2002
Co
nnec
ticu
tG
uide
line
sfo
rSo
ilE
rosi
onan
dS
edim
ent
Con
trol
,D
epB
ulle
tin
34.
•C
ityof
Nor
wal
k,C
onnec
ticu
tD
rain
age
Man
ual
Ava
ilabl
eU
tiliti
es
The
avai
lab
leut
ilit
ies
are
asfo
llow
s:E
lect
ric
(Eve
rsou
rce)
,te
lephone
(So
uth
ern
New
Eng
land
Tel
ephone)
,F
iber
(Cro
wn
Cas
tle
Fib
er),
Wat
er(S
outh
Nor
wal
kE
lect
ric
and
Wat
er),
and
San
itar
yS
ewer
(Nor
wal
kW
ater
Pol
luti
onC
ontr
olA
utho
rity
.
Gas
isno
tav
aila
ble
atth
issi
te.
Sch
emat
icSt
orm
Wat
erM
anag
emen
tApp
roac
h
Cur
rent
ly,
storm
runo
fffr
omth
esi
tepas
ses
over
land
,an
dth
rough
pipe
dsy
stem
s,to
acu
lver
tex
itin
gth
esi
teth
rough
ad
rain
age
ease
men
tal
ong
the
nort
her
ndr
ivew
ay
Sto
rmru
noff
from
the
impr
oved
area
san
dbu
ildi
ngad
diti
onw
illbe
coll
ecte
dby
ase
ries
ofya
rddra
ins,
catc
hb
asin
s,sw
ales
and
roof
dra
inag
esy
stem
s.T
hepro
pose
dim
pro
vem
ents
will
incr
ease
the
impe
rvio
usar
eaco
mp
ared
toex
isti
ngco
ndit
ions.
An
addi
tion
acre
ofla
ndw
illno
wdr
ain
tow
ard
the
exis
ting
outl
et.
The
refo
re,
asy
stem
ofst
orm
wat
erdet
enti
on
/in
filt
rati
on
will
bere
quir
ed.
The
storm
runo
ffw
illbe
dive
rted
into
two
bas
ins.
The
firs
tba
sin
will
besi
zed
toin
filt
rate
the
requir
edg
rou
nd
wat
erre
char
ge
volu
me.
The
rem
ainin
gw
ater
will
bedi
vert
edto
the
seco
nd
basi
nto
mai
nta
inth
ep
red
evel
op
men
tdis
char
ge
rate
.T
hese
con
dba
sin
will
requir
ean
outl
etst
ruct
ure
and
over
flow
wei
r.S
torm
runo
ffw
illfo
llow
exis
ting
pat
tern
,dra
inin
gfr
omso
uth
tono
rth.
Bes
tM
anag
emen
tP
ract
ices
will
bead
her
edto
for
trea
tmen
tof
storm
wat
erfo
rp
oll
uta
nt
rem
oval
.T
heB
MP’
sm
ayin
clud
eca
tch
basi
nh
oo
ds/
sum
ps,
veg
etat
edsw
ales
,bio
rete
nti
on
faci
liti
es,
hydr
odyn
amic
sep
arat
ors
,et
c.
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Scho
olIN
orw
alk,
Con
nect
icut
Feb
ruar
y2,
2018
Add
itio
nal
mea
sure
san
dst
orm
wat
erro
utin
gw
illbe
dev
eloped
asdes
ign
pro
gre
sses
.
Sch
emat
icU
tility
App
roac
h
An
exis
ting
8”w
ater
mai
nfr
omH
unte
rsla
nefo
llow
sal
ong
the
no
rther
ndr
ivew
ayan
dco
nnec
tsto
anex
isti
ng10
”w
ater
mai
nfr
omP
onus
Ave
nue.
The
exis
ting
6”se
rvic
eru
ns
para
llel
wit
hth
ebu
ildi
ngan
den
ters
inth
eut
ilit
yro
om.
Thi
sw
ater
serv
ice
will
rem
ain.
App
roxi
mat
ely
620
Ifof
new
8”D
ucti
leIr
onpi
pew
illbe
requir
edfo
rfi
rese
rvic
e.C
urre
ntly
ther
eis
afi
rehydra
nt
loca
ted
nort
hof
the
exis
ting
buil
ding
.A
new
fire
hydra
nt
will
bere
quir
ednea
rth
ene
wfi
rese
rvic
e.
Cur
rent
lyth
esa
nit
ary
dra
ins
bygr
avit
yto
war
dth
eno
rth.
An
8”se
we,
.rru
nal
ong
the
emer
gen
cypa
thto
war
dP
onus
Ave
nue.
App
roxi
mat
ely
80
0If
ofne
w6”
PVC
and
4sa
nit
ary
man
ho
les
will
bere
quir
edto
connec
tth
ead
dit
ion
toth
eex
isti
ngsa
nit
ary
mai
n.
Ele
ctri
can
dco
mm
un
icat
ion
sse
rvic
esw
illbe
route
dth
rough
under
gro
und
du
ctban
ks
from
the
exis
ting
pole
line
inth
en
ort
her
ndr
ivew
ayto
the
pro
pose
dut
ilit
yro
om.
Coord
inat
eeI
ettr
ican
dco
mm
un
icat
ion
sw
ith
Ele
ctri
cal
syst
ems
and
Tec
hnol
ogy
Sy
stem
s.
Site
Lig
htin
g
Sit
eli
ghti
nL
ill
bere
quir
edfo
rth
ead
dit
ional
park
ing
and
play
area
s.C
ooçti
ghti
ng
mod
elM
SAM
ESA
LED
will
beuse
d.
t\\
“Mat
eria
ls:
Pus
h-on
-Joi
nt,
Duc
tile-
Iron
Pipe
:A
WW
AC
15i,
with
push
-on-
join
tbe
llan
dpl
ain
spig
oten
d,A
’MN
AC
ilO
,du
ctil
e-or
gray
-iro
nst
anda
rdpa
tter
n,th
ickn
ess
clas
s52
.S
hall
mee
tS
outh
Nor
wal
kE
lect
ric
and
Wat
erst
anda
rds.
All
join
tssh
all
bere
stra
ined
with
mec
hani
cal
reta
iner
glan
dsan
dtie
rods
with
Meg
a-L
ugty
pecl
amps
,or
appr
oved
equi
vale
nt.
Gas
kets
:A
WW
AC
lii,
rubb
er.
Det
ecta
ble
war
ning
tape
shal
lbe
inst
alle
dov
erth
epi
ping
.S
anit
ary
Pipi
ngPV
CP
ipe
and
Fitti
ngs:
AST
MD
3034
,S
DR
35,
PVC
Typ
ePS
M,
AST
MF
789
Typ
eP
S-4
6,se
wer
pipe
with
bell
-and
-spi
got
ends
for
gask
eted
join
ts.
Sha
llm
eet
Nor
wal
kW
ater
Pollu
tion
Con
trol
Aut
hori
ty’s
stan
dard
s.
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
1
Dom
esti
cW
ater
and
Fire
Pro
tect
ion
Pipi
ng
—-
Gas
kets
:A
STM
F47
J-la
sto
mer
icse
als
San
itar
yM
anho
les
Pre
cast
Man
hole
>’A
STM
C91
3;de
sign
edac
cord
ing
toA
ST
MC
890
forA
-i6
(AS
SH
TO
HS
20
-44
)he
avy-
traf
fic,
stru
ctur
allo
adin
g;of
dept
h,sh
ape,
and
dim
ensi
ons
indi
cate
d,w
ithp
ov
isio
nfo
rse
alan
tjo
ints
.M
inim
umdi
amet
erof
4fe
et.
Sha
llm
eet
Nor
wal
kW
ater
Pollu
tion
Con
trol
Aut
hori
ty’s
stan
dard
s.
,Jo
int
Sea
lant
:A
STM
C99
0,bi
tum
enor
buty
lru
bber
.
Res
ilie
ntP
ipe
Con
nect
ors:
AST
MC
923,
cast
orfi
tted
into
man
hole
wal
ls,
for
each
pipe
conn
ecti
on.
Fra
me
and
Cov
er:
24-i
nch
IDby
7-to
9-in
chri
ser,
with
4-in
ch-
min
imum
-wid
thfl
ange
and
26-
inch
-di
amet
erco
ver.
Incl
ude
inde
nted
top
desi
gnw
ithle
tteri
ngca
stin
toco
ver,
usin
gw
ordi
ngeq
uiva
lent
to“S
AN
ITA
RY
SEW
ER
”.M
ater
ial:
.9ST
MA
48/A
48M
,C
lass
35gr
ayir
onun
less
othe
rwis
ein
dica
teS
torm
Pipi
ngC
orru
gate
dPE
drai
nage
pipe
and
fitti
ngs:
NP
S3
toN
PS
10:
AA
SHT
OM
252M
,T
ype
S,w
ithsm
ooth
wat
erw
ayfo
rco
upli
ngjo
ints
.So
iltig
htC
oupl
ings
:A
ASH
TO
M25
2M,
corr
ugat
ed,
mat
chin
gtu
bean
dfi
tting
s.
NP
S12
toN
PS60
:A
ASH
TO
M29
4M,
Typ
eS,
with
smoo
thw
ater
way
for
coup
ling
join
ts.
Soilt
ight
Cou
plin
gs:
AA
SHT
OM
294M
,co
rrug
ated
,m
atch
ing
pipe
and
fitti
ngs.
Sto
rmM
anho
les
Pre
cast
Man
hole
:A
STM
C91
3;de
sign
edac
cord
ing
toA
STM
C89
0fo
rA
-i6
(AS
SH
TO
HS2
O-4
4),
heav
y-tr
affi
c,st
ruct
ural
load
ing;
ofde
pth,
shap
e,an
ddi
men
sion
sin
dica
ted,
with
prov
isio
nfo
rse
alan
tjoi
nts.
Min
imum
diam
eter
of4
feet
.
Join
tS
eala
nt:
AST
MC
990,
bitu
men
orbu
tyl
rubb
er.
Res
ilie
ntP
ipe
Con
nect
ors:
AST
MC
923,
cast
orfi
tted
into
man
hole
wal
ls,
for
each
pipe
conn
ecti
on.
Fra
me
and
Cov
er:
24-i
nch
IDby
7-to
9-in
chri
ser,
with
4-in
ch-
min
imum
-wid
thfl
ange
and
26-
inch
-di
amet
erco
ver.
Incl
ude
inde
nted
top
desi
gnw
ithle
tteri
ngca
stin
toco
ver,
usin
g
Page 66, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
CIV
IL
/SIT
ED
ES
IG
N-
NA
RR
AT
IVE
wor
ding
equi
vale
ntto
‘ST
OR
M”.
Mat
eria
l:A
STM
A48
/A48
M,
Cla
ss35
gray
iron
unle
ssot
herw
ise
indi
cate
Cat
chB
asin
sP
reca
stC
oncr
ete
Cat
chB
asin
s:A
STM
C91
3,pr
ecas
t,re
info
rced
conc
rete
;de
sign
edac
cord
ing
toA
STM
C89
0fo
rA
-16
(AS
SH
TO
HS2
O-4
4),
heav
y-tr
affi
c,st
ruct
ural
load
ing;
ofde
pth,
shap
e,an
ddi
men
sion
sin
dica
ted,
with
prov
isio
nfo
r joi
ntse
alan
ts.
Yar
dD
rain
sC
ast-
Iron
Are
aD
rain
s:A
SM
EA
112.
6.3
gray
-iro
nsq
uar
ebo
dyw
ithan
chor
flan
gean
dsq
uar
egr
ate.
Top
-Loa
ding
Cla
ssif
icat
ion:
Hea
vyD
uty.
Sch
emat
icD
esig
nD
raw
ings
Sch
emat
icD
esig
nP
hase
Pag
e2
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utS
tate
#T
MP
-103-R
BT
SF
ebru
ary
2,20
18
Page 67, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
I
mCo02:00I
-H)
coo
>>o.
Page 68, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
BU
ILD
ING
SIT
EW
OR
K
SITE
PRE
PAR
AT
ION
Prio
rto
any
exca
vati
on,
eros
ion
cont
rol
mea
sure
sw
illbe
inst
alle
din
acco
rdan
cew
ithth
eS
tate
ofC
onne
ctic
ut2
00
2So
ilan
dE
rosi
onC
ontr
olgu
idel
ines
topre
ven
tth
etr
ansm
issi
on
ofse
dim
ent
lade
nru
noff
from
the
const
ruct
ion
area
.P
leas
ese
eE
rosi
onC
ontr
olP
lan.
Cle
arin
g,G
rubb
ing
&Tr
eeR
emov
al
•W
here
appl
icab
le,
tops
oil
will
best
ripped
and
stoc
kpil
edw
ithap
pro
pri
ate
eros
ion
cont
rols
appl
ied
toal
ldis
turb
edar
eas.
•W
here
appl
icab
letr
ees
tore
mai
nw
illbe
pro
tect
edfr
omco
nst
ruct
ion
acti
viti
esby
the
pla
cem
ent
oftr
eepr
otec
tion
fenci
ng
assh
own
onL
10
1.
•R
emov
eal
ltr
ees
mar
ked
with
anX
onL
-101
incl
udin
gst
um
ps
and
rem
ove
from
the
site
.G
rind
stu
mp
san
dre
mov
ero
ots
toa
dep
thof
18
inch
esbe
low
sub-g
rade.
•A
llsh
rub
s,b
ush
es,
and
under
story
mat
eria
lis
tobe
clea
red
and
gru
bb
edw
ithi
nth
eco
nst
ruct
ion
area
and
rem
oved
from
the
site
.•
Fill
dep
ress
ions
cau
sed
bycl
eari
ngan
dgr
ubbi
ngoper
atio
ns
with
sati
sfac
tory
soil
mat
eria
lunle
ssoth
erfu
rther
exca
vati
onor
erth
wo
rkis
indi
cate
d.•
Are
asth
atw
illbe
left
dis
turb
edan
dex
pose
dfo
ra
sign
ific
ant
peri
odof
tim
ew
illbe
seed
edfo
rpr
otec
tion
.•
The
const
ruct
ion
site
islo
cate
dw
ithi
nan
acti
veca
mp
us
sett
ing.
Con
stru
ctio
nfe
ncin
gsh
all
bein
stal
led
around
the
per
imet
erof
the
wor
kar
eato
isol
ate
itfr
oman
ypu
blic
acti
viti
esan
dsh
all
bem
ainta
ined
until
the
proj
ect
isco
mple
te.
•T
raff
icco
ntro
l,si
gnag
ean
dba
rrie
rsw
illbe
nee
ded
thro
ughout
the
proj
ect
for
stag
ing,
phas
ing
and
prot
ecti
onof
the
publ
icfr
omco
nst
ruct
ion
acti
viti
es.
Site
Dem
oliti
onan
dR
eloc
atio
ns
Con
duct
Dem
olit
ion
ina
man
ner
that
will
pre
ven
td
amag
eto
adja
cent
stru
ctu
res,
util
itie
s,si
teim
pro
vem
ents
and
oth
erfa
cili
ties
tore
mai
n.S
urf
aces
tobe
dem
oli
shed
shal
lbe
clea
rly
defi
ned
with
per
imet
ersa
wcu
ts.
All
dem
oli
shed
mat
eria
lsm
ust
bepr
oper
lyhan
dle
dan
ddis
pose
dof
offs
ite.
Dem
oliti
onof
Site
Com
pone
nts
•E
xist
ing
pave
dsu
rfac
eson
site
,as
show
non
Sit
eP
repar
atio
nP
lan
will
bedem
oli
shed
incl
udin
gas
phal
tpa
rkin
gar
eas
and
acce
sspat
hs,
con
cret
esi
dew
alks
,an
dcu
rbs.
•R
emov
eeq
uip
men
tsh
edad
jace
nt
sport
fiel
ds.
SIT
EIM
PRO
VE
ME
NT
S
Ageo
tech
nic
alre
po
rth
asN
OT
bee
ndone
for
the
site
as
ofth
issu
bm
itta
lso
pav
emen
tse
cti
ons
may
chan
ge
upon
the
futu
rere
port
’sre
com
men
dat
ions.
Roa
dway
san
dV
ehic
ular
Cir
cula
tion
•S
choo
lst
art
and
dism
issa
lti
mes
for
upper
and
low
ersc
hoo
lsw
illbe
stag
ger
edto
avoi
dov
erla
pan
dco
nges
tion.
•P
aren
tsdr
oppi
ngor
pick
ing
upst
uden
tsw
illen
ter
atth
em
ain
entr
ance
from
Hun
ters
Lan
eat
the
sou
thw
est
corn
erof
the
site
and
que
alon
gth
eon
e-w
aydo
uble
lane
.P
aren
tsof
stu
den
tsat
tendin
gth
elo
wer
scho
ol(g
rade
spr
e-k
thru
5)w
illta
ke
the
firs
tri
ght
and
load
/un
load
atth
ed
esig
nat
edar
eaal
ong
the
wes
tsi
de
ofth
ene
wsc
hola
stic
win
g,an
dex
itby
cutt
ing
acro
ssto
the
one
way
nort
hex
itla
neba
ckto
Hun
ters
Lan
evi
ath
ene
wtw
ow
ay90
deg
ree
park
ing
bay.
•P
aren
tsdr
oppi
ngor
pick
ing
upst
uden
ts8tt
endin
gPr
e-K
orK
inde
rgar
ten
can
use
the
new
south
park
ing
lot
and
wal
kth
eir
studen
tsto
the
door
way
.•
Par
ents
ofst
uden
tsat
ten
din
gth
eupper
scho
ol(g
rades
6-8)
will
turn
left
into
the
new
two
way
park
ing
bay,
then
turn
righ
tan
dlo
ad/u
nlo
adat
the
des
ign
ated
area
atth
enort
hw
est
corn
erof
the
exis
ting
scho
ol.
Par
ents
will
exit
thru
the
nort
hpa
rkin
glo
tto
the
one-
way
nort
hex
itla
neba
ckto
Hun
ters
Lan
e.•
Sta
ffw
illen
ter
atth
em
ain
entr
ance
from
Hun
ters
Lan
eat
the
sou
thw
est
corn
erof
the
site
and
park
inth
em
iddl
epa
rkin
glo
t.S
taff
will
exit
via
the
nort
hex
itla
neba
ckto
Hun
ters
Lan
e.•
Buse
sw
illen
ter
atth
em
ain
entr
ance
from
Hun
ters
Lan
eat
the
sou
thw
est
corn
erof
the
site
and
conti
nue
toth
ebu
squeu
ing
lane
infr
ont
ofth
esc
hool
.T
here
isen
ough
load
ing
leng
thto
stac
k12
scho
olb
use
s.B
use
sw
illex
itvi
ath
eon
e-w
ayno
rth
exis
tla
neba
ckto
Hun
ters
Lan
e.B
uses
will
shar
eth
esa
me
qu
euei
ng
lane
for
both
low
eran
dupper
schools
byst
agger
ing
scho
olst
art
and
dis
mis
sal
tim
es.
•V
isit
ors
will
ente
rat
the
mai
nen
tran
cefr
omH
unte
rsL
ane
atth
eso
uth
wes
tco
rner
ofth
esi
tean
dpro
ceed
toei
ther
the
new
sou
thlo
tor
the
nort
hlo
t.V
isit
ors
will
exit
from
via
the
one-
way
nort
hex
ist
lane
back
toH
unte
rsL
ane.
•S
ervi
ceve
hicl
esen
ter
atth
em
ain
entr
ance
from
Hun
ters
Lan
eat
the
sou
thw
est
corn
erof
the
site
and
pro
ceed
tose
rvic
ear
eavi
ath
ene
wso
uth
lot.
Ser
vice
vehi
cle
will
exit
bycu
ttin
gac
ross
toth
eone
way
nort
hex
itla
neba
ckto
Hun
ters
Lan
evi
ath
ene
wtw
ow
ay90
deg
ree
park
ing
bay.
•A
12fo
otw
ide
grav
else
rvic
e/fi
reac
cess
road
ispro
po
sed
onth
eea
stsi
de
ofth
esc
hool
runn
ing
from
the
south
park
ing
lot
toth
eno
rth
park
ing
lot.
•T
rash
dum
pst
ers
are
loca
ted
insi
deth
ese
rvic
ear
ea.
•Al
ldr
ivew
ays
will
bebi
tum
inou
sco
ncr
ete
pavi
ngT
ype
1or
2as
per
the
det
ails
ondr
awin
gL
-501
.T
hedr
ivew
ays
whi
char
esh
aded
onL
-102
are
tobe
Typ
e1
and
all
oth
ers
are
tobe
Typ
e2.
•Al
lcu
rbs,
incl
udin
gtr
affi
cis
land
sw
ithi
nth
est
aff
park
ing
lot
are
tobe
eith
erco
ncr
ete
curb
sor
inte
gral
concr
ete
curb
sas
per
the
det
ails
onL
-501
.
Park
ing
Lots
The
rear
eth
ree
mai
npa
rkin
gar
eas.
The
pre-
k,lo
wer
scho
olvi
sito
rpa
rkin
glo
tto
the
sou
thw
ith24
spac
esin
clud
ing
2ac
cess
ible
spac
es,
the
staf
fpa
rkin
glo
tin
the
mid
dle
with
11
7sp
aces
incl
udin
g4
acce
ssib
lesp
aces
,an
dth
eupper
scho
olvi
sito
rpa
rkin
glo
tto
the
nort
hw
ith25
spac
es.
The
rear
eal
so40
even
tpa
rkin
gsp
aces
alon
gth
eon
e-w
ayen
tran
cedr
ive.
All
park
ing
lots
will
bebi
tum
inou
sco
ncr
ete
Typ
e2
aspe
rth
ede
tail
s.E
xist
ing
pav
emen
tis
tobe
use
dre
gar
dle
ssof
cond
itio
nto
the
gre
ates
tex
tent
poss
ible
.
Side
wal
ksan
dP
edes
tria
nC
ircu
latio
n
•T
hesi
teis
fully
AD
Aac
cess
ible
from
Hun
ters
Lan
evi
abo
thth
een
tran
cean
dex
itla
nes
.•
The
bus
loop
has
an8
foot
side
wal
kal
ong
full
leng
th.
•T
hep
aren
tdr
op-o
ffh
asan
8fo
otsi
dew
alk
alon
gen
tire
leng
th.
•O
nce
park
ed,
ther
ear
eco
llec
ting
acce
ssib
lesi
dew
alks
whi
chdi
rect
one
toth
esc
hool
’supper
scho
olm
ain
entr
y,lo
wer
scho
olm
ain
entr
yan
dth
epr
e-k
entr
y.•
All
egre
ssdoors
for
the
scho
olha
veac
cess
ible
wal
ksto
vehi
cula
rdr
ives
and
wal
ksto
the
parc
elper
imet
er.
•T
hepl
aygr
ound
s,ba
llfi
elds
,an
doutd
oor
gat
her
ing
spac
esar
eal
lac
cess
ible
.•
All
sidew
alks
are
tobe
concr
ete
Typ
e1
aspe
rth
ede
tail
s.
Ret
aini
ngan
dSi
teW
alls
The
rear
e2
types
ofsi
tew
alls
thro
ug
hou
tth
epr
ojec
t.R
efer
tode
tail
s.
•P
oure
d-in
-pla
ceco
ncr
ete
wal
lw
itha
rubb
edfi
nish
and
apre
cast
con
cret
eco
ping
.Al
lco
ncr
ete
foot
ing
and
stru
ctura
lre
info
rcin
gto
bedet
aile
don
the
civi
len
gin
eer
draw
ings
.•
Seg
men
tal
con
cret
ebl
ock
reta
inin
gw
all.
All
wal
lsov
er3
feet
inhe
ight
will
been
gin
eere
dby
the
bloc
km
anu
fact
ure
ran
dre
view
edby
the
civi
len
gin
eer.
Sta
irs
and
Ram
ps
All
site
stai
rsan
dra
mps
tobe
pour
ed-i
n-pl
ace
concr
ete
with
aru
bbed
fini
shon
all
expose
dve
rtic
alel
emen
ts.
All
stai
rsto
have
nose
guar
ds.
Ram
psw
illbe
atco
nst
ruct
edat
am
axim
um8%
slope.
Ref
erto
deta
ils.
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,20
18
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
1
Page 69, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
BU
ILD
ING
SIT
EW
OR
K
All
con
cret
efo
otin
gan
dst
ruct
ura
lre
info
rcin
gto
bedet
aile
don
the
civi
len
gin
eer
draw
ings
.
Han
dra
ils
•Al
lh
and
rail
sto
galv
aniz
edst
eel
pipe
with
arch
itec
tura
lpow
der
coat
fini
sh.
•Al
lguar
dra
ils
tobe
galv
aniz
edst
eel
pipe
with
arch
itec
tura
lpow
der
coat
fini
sh.
•Al
lhan
dra
ils
and
guar
dra
ils
toha
vem
idra
ilat
1-1
0”
high
for
youn
ger
use
rs.
•R
efer
todet
ails
.
Fen
ces
•C
hain
link
fence
arou
ndso
uth
end
ofbas
ket
bal
lco
urt:
12fo
othi
ghPV
Cco
ated
galv
aniz
ed.
•D
ecor
ativ
est
eel
pick
etfe
nce
with
doub
legat
esat
play
grou
nd:
4fo
othi
ghpo
wde
rco
atfi
nish
.•
Met
alsc
reen
and
louv
ergat
esat
entr
yw
ayto
serv
ice
area
:8
foot
high
.G
ate
fram
esfr
omst
ruct
ura
lst
eel
tubin
gw
elde
dto
form
rigi
done
piec
eun
itw
ithdi
agon
alcr
oss
brac
e.M
anufa
cture
rsst
andar
dga
lvan
ized
coat
ing,
epox
ypo
wde
rpr
imer
and
sho
pap
plie
dpo
lyes
ter
pow
der
coat
fini
sh.
•R
efer
tode
tail
s.
Sit
eF
urni
shin
gs
•(1
5)M
etal
fram
eb
ench
esw
ithw
ood
seat
and
back
—per
man
entl
yan
chore
d,
toco
mple
men
tar
chit
ectu
re.
Loc
atio
nsno
tsh
own
ondr
awin
gs.
•(3
)C
afé
table
sw
ithat
tach
edse
atin
gto
bepl
aced
onth
epl
aza
over
look
ing
the
play
grou
nd.
Ref
erto
deta
il.
•(2
0)B
ike
Rac
ks—
per
man
entl
ym
ounte
d,
met
alri
ngs
atva
riou
slo
cati
ons
onca
mpus.
Ref
erto
deta
il.
Loc
atio
nsno
tsh
own
ondr
awin
gs.
•F
lagp
oles
—S
pun
alum
inum
,(1
)35
’hi
gh(2
)an
d30
’hi
gh.
Ref
erto
deta
ilon
L-5
04.
Loc
atio
nsno
tsh
own
ondr
awin
gs.
•(1
3)T
rash
and
(13)
recy
clab
leco
nta
iner
sto
bepla
ced
thro
ughout
cam
pu
s.R
efer
tode
tail
.L
ocat
ions
not
show
non
draw
ings
.•
Bou
lder
sse
tin
agg
reg
ate
surf
acin
gfo
routd
oor
read
ing
circ
le.
Ref
erto
deta
il.
•B
ould
ers
set
alon
gea
stsi
de
offi
rela
neto
serv
eas
guar
drai
l.
Lan
dsca
peA
men
itie
san
dE
quip
men
t
•P
layg
roun
dsfo
rP
reK
and
Kin
derg
arte
n,an
dfo
rG
rades
1-5.
Ref
erto
shee
tL
-105
for
anen
larg
emen
tof
thes
ear
eas
and
alis
tof
the
pro
po
sed
equip
men
t.
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
ut
Feb
ruar
y2,
2018
•P
oure
d-in
-pla
cepl
aygr
ound
prot
ecti
vesu
rfac
ing
under
all
play
equip
men
t.•
(2)
Bas
ketb
all
hoop
son
bas
ket
bal
lco
urt
adja
cent
play
grou
nds.
See
L-1
02fo
rlo
cati
on.
PR3O
Tou
gh-D
uty
byB
ison
,In
c.w
ith3
½”
dia
met
erg
oo
sen
eck
galv
aniz
eddi
rect
bury
pole
and
54
inch
alum
inum
bac
kboar
d.
Cou
rts
tobe
coat
edw
ithan
acry
lic
athle
tic
cour
tsu
rfac
ing.
Col
ors
tobe
det
erm
ined
.•
(21)
Con
cret
efi
lled
stee
lbo
llar
dsw
ithga
lvan
ized
fini
sh.
Var
ious
loca
tion
s.R
efer
tode
tail
.•
(17)
Con
cret
efi
lled
stee
lbo
llar
dsfo
rac
cess
ible
and
rese
rved
park
ing
spac
es.
Ref
erto
deta
il.
•D
etec
table
war
ning
stri
p:2
foot
squar
eca
stir
onpa
ver.
Loc
ated
atd
esig
nat
edp
aren
tdr
opof
f,al
lac
cess
ible
park
ing
spac
esan
dcu
rbra
mps.
Ref
erto
deta
il.
Lan
dsc
apin
g
•S
had
ean
dorn
amen
tal
tree
plan
ting
sar
ein
tended
tobe
inco
rpora
ted
thro
ughout
the
site
assh
own
onL
-104
.T
ree
plan
ting
sha
vebe
end
esig
nat
edar
ound
the
scho
olbu
ildi
ngto
prov
ide
area
sof
shad
efo
rpl
ay,
seat
ing
area
san
dco
urty
ards
.S
had
etr
ees
have
also
bee
nad
ded
inth
epa
rkin
glo
tsto
prov
ide
ali
mit
edam
ou
nt
ofsh
ade
asw
ell.
•T
hesp
ort
fiel
dsar
eabet
wee
nen
try
and
exit
driv
esis
tobe
ano
n-en
cro
ach
men
tar
ea,
asd
elin
eate
don
L-1
01an
du
nd
istu
rbed
thro
ughout
const
ruct
ion
with
the
exce
ptio
nof
the
stor
mw
ater
det
enti
on
area
.•
Shru
bs
will
also
beuse
din
ali
mit
edfa
shio
nfo
rsl
ope
prot
ecti
onan
din
rais
edpla
nte
rsat
vari
ous
loca
tion
sar
ound
the
scho
ol.
Shr
ubpl
anti
ngs
will
not
allo
wpe
ople
tohi
defr
omvi
ew.
•A
llre
mai
ning
open
spac
esno
tpa
ved,
orle
ftundis
turb
edar
eto
bese
eded
with
gra
sses
.Al
lne
wla
wn
area
sar
eto
bepr
ovid
edw
ith6”
ofpl
anti
ngso
il.
All
over
seed
edla
wn
area
sar
eto
bepr
ovid
edw
ith2”
ofpl
anti
ngso
il.
•A
12”
min
imum
wid
em
ow
/mai
nte
nan
cest
rip
will
bepl
aced
alon
gal
lbu
ildi
ngw
alls
whi
chab
ut
law
nar
eas.
Ref
erto
deta
il.
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
2
Page 70, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
AR
CH
ITE
CT
UR
AL
DE
SIG
N
PRO
JEC
TD
ESC
RIP
TIO
N
The
Po
nu
sR
idge
Sch
ool
isan
exis
ting
Mid
dle
Sch
ool,
serv
ing
just
under
700
studen
tsto
day,
gra
des
6th
rough
8th
gra
de.
The
school
incl
udes
anA
udit
oriu
man
dla
rge
gym
.T
hepro
pose
dal
tera
tions
toth
eex
isti
ngbu
ildi
ng,
and
asso
ciat
edsi
tew
ork
will
conver
tth
efa
cili
tyin
toa
STE
Mpr
ogra
mse
rvin
ggra
des
Pre-
Kth
rough
8th
gra
de
wit
h1
,05
0st
uden
ts.
The
Edu
cati
onS
pec
ific
atio
nca
lls
for
ast
ud
ent
popula
tion
of4
50
for
the
Low
erS
choo
lan
d600
for
the
Mid
dles
Sch
ool.
The
Sch
ool
will
bean
intr
a-di
stri
ctm
agn
etsc
hool,
add
ing
cho
ice
for
Nor
wal
kfa
mil
ies;
fam
ilie
sin
close
prox
imit
yw
illbe
give
npre
fere
nce
.
The
exis
ting
,pa
riti
al2-
stor
y,B
uild
ing
isap
pro
xim
atel
y100,0
00
nsf
and
the
addi
tion
will
beab
out
41,0
00
nsf.
Ponus
islo
cate
don
a+
/-41
acre
site
ina
centr
alre
siden
tial
Mzo
neof
Nor
wal
k.It
isap
pro
xim
atel
yeq
ual
dis
tance
tobo
thth
eM
erri
tP
arkw
ayan
d1-
95(it
isno
rth
ofi-
95an
dso
uth
ofth
eM
erri
t).
The
add
ress
and
veh
icula
rac
cess
isfr
omH
unte
rsL
ane
isa
one
way
loop
from
the
south
entr
ance
and
out
atth
eno
rth
curb
cut.
Lar
geopen
play
fiel
dsth
atar
eu
sed
byth
esc
hool
and
the
com
mun
ity
front
the
site
and
set
the
buil
ding
back
from
the
road
.T
hep
rop
ose
dS
ite
acce
ssci
rcul
atio
nw
illco
nti
nue
tou
seth
islo
opbu
tw
illin
tern
ally
,on
the
site
will
add,
loop
sfo
rse
par
ate
par
ent/
guar
dia
nca
rpic
k-u
p/d
rop-
off
for
LSan
dM
San
dth
ebus
will
have
anin
dep
enden
tlo
opth
atw
illse
rve
both
LSan
dM
S.
The
new
addi
tion
will
incl
ude
the
Low
erS
choo
lw
ing
with
alo
op
/cir
cuit
circ
ulat
ion,
whi
chco
nn
ect
itw
ell
toST
EM
prog
ram
reso
urc
es,
the
new
Tea
ch-t
o-o
ne
Mat
hL
aban
dth
een
larg
emen
tof
the
Din
ing
Hal
l.T
head
diti
onw
illbe
aone
stor
yst
ruct
ure
and
will
have
prim
aril
y(4
)ty
pes
ofex
teri
orco
nst
ruct
edw
ith
ast
ud
back
er:
Bri
ck,
Phe
noli
cra
insc
reen
and
met
alp
anel
sfo
ra
rain
scre
enap
pli
cati
on.
Gla
ssw
alls
and
win
dow
sw
illbe
sto
refr
on
t.
ALT
ERA
TIO
NS
The
alte
rati
ons
toth
eex
isti
ng2-
stor
ybu
ildi
ngin
clud
ene
wsp
rinkle
rsan
dai
r-co
ndit
ioni
ngth
roughout.
Whe
reth
ece
ilin
gsex
isti
ngas
conce
aled
spli
ne,
they
will
bere
mov
edto
acco
mm
odat
eth
esp
rinkle
ran
dai
r-co
ndit
ioni
ng.
Ane
wce
ilin
gw
ith
new
ligh
ting
will
bein
stal
led
inpl
ace.
At
loca
tions
wher
ean
exis
ting
lay-
ince
ilin
gex
ists
,th
ece
ilin
g,gr
idan
dsu
spen
sion
syst
emw
illbe
reu
sed
along
with
the
ligh
ting
.P
rovi
sion
sfo
rta
kin
gdo
wn
and
rein
stal
ling
asnec
essa
ryw
illbe
requir
ed.
The
curr
ent
thin
kin
gfo
rth
eau
dit
ori
um
isto
run
the
spri
nkle
rsan
ddu
ctw
ork
for
the
air-
condit
ionin
gbe
low
the
exis
ting
ceil
ing
(exi
stin
gli
ghti
ngw
ould
rem
ain)
,bu
tth
isnee
ds
furt
her
inve
stig
atio
n.
Sin
ceth
esc
hool
will
rem
ain
op
erat
ion
aldu
ring
the
enti
reco
nst
ruct
ion
phas
e,co
nst
ruct
ion
phas
ing
and
prov
idin
gad
equat
esw
ing
spac
efo
rst
ud
ent
use
will
ben
eces
sary
.
OR
GA
NIZ
ING
PRIN
CIP
ALS
The
desi
gnof
Ponu
sR
idge
STEM
Scho
olis
guid
edby
the
follo
win
gpr
inci
ples
:
a.S
ite:
Sep
arat
eca
ran
db
use
s.S
epar
ate
loop
sfo
rpar
ent/
guar
dia
nca
rpi
ck-u
pan
ddr
op-o
ffat
LSan
dM
Sw
itha
thir
din
dep
enden
tlo
opfo
rbuse
s.b.
Bui
ldin
g:A
STE
Mb
ased
prog
ram
with
LSan
dM
Sw
ings
.T
head
diti
onw
illbe
prim
aril
yth
eL
ower
Sch
ool
‘win
g,’
whi
chis
asi
ngle
stor
yth
athas
aco
nti
nuous
circ
ulat
ion
corr
idor
loop
whi
chti
esit
into
the
scho
olan
dcr
eate
stw
ose
par
ate
wel
l-pr
opor
tion
edco
urty
ards
.O
neco
urty
ard
will
focu
son
STE
Mac
tivit
esan
dth
ese
con
dso
uth
ern
cour
tyar
dw
illin
clud
eoutd
oor
seat
ing
for
eati
ng
and
poss
ibly
agar
den
.T
head
diti
onw
illbe
asi
ngle
stor
y,w
hich
isap
pro
pri
ate
for
the
age
and
will
limit
shad
ow
sin
the
cour
tyar
ds.
c.ST
EM
spac
esar
epr
imar
ily
loca
ted
inth
ece
nte
rof
the
scho
ol.
d.O
pera
tion
ally
,M
Sw
illbe
orga
nize
dby
house
s.T
heh
ouse
sar
egra
de
vert
ical
lyor
gani
zed
with
6th,
7th
and
8th
gra
de
rep
rese
nte
d.
The
rew
illbe
(3)
house
s,ea
chw
ith3
sect
ion
sof
6th,
7th
and
8th
gra
de.
e.T
heex
isti
ngno
rth
south
corr
idor
will
beex
tended
toco
nn
ect
toth
eL
ower
Sch
ool
win
g.T
his
corr
idor
serv
ices
asa
kind
ofM
ain
Str
eet/
spin
efo
rth
esc
hool
.
f.T
hem
ain
entr
yfo
rth
esc
hool
will
rem
ain
whe
reit
iscu
rren
tly,
but
ase
cure
ves
tibule
with
a‘m
antr
ap’
and
adja
cent
acce
ssto
the
Mai
nof
fice
ispla
nned
.
g.A
seco
nd
LSen
tran
cew
itha
secu
reves
tibule
and
adja
cenc
yto
the
LSA
dmin
istr
ativ
ear
eais
plan
ned
atth
ene
wad
diti
on.
GEN
ERA
LB
UIL
DIN
G
EXTE
RIO
RM
ATE
RIA
LS
The
rew
illbe
prim
aril
y3
exte
rior
wal
lco
nst
ruct
ion
sfo
rth
ene
wad
diti
on.
Gla
ss
wal
lsw
illbe
ast
ore
front
syst
em.
Sol
idw
all
area
sw
illbe
bric
kven
eer,
met
al
orph
enol
icpa
nel
inst
alle
das
par
tof
ara
insc
reen
syst
emw
itha
stud
con
stru
ctio
n.
Rec
entl
yad
op
ted
exte
rior
enve
lop
ener
gyd
etai
lsw
illbe
empl
oyed
whi
chin
clud
eco
nti
nuo
us
exte
rior
insu
lati
onan
da
air
bar
rier
that
ties
into
the
bar
rier
atth
ero
of.
Win
dow
sin
the
addi
tion
will
bew
ithst
ore
front
syst
em.
The
roof
atth
ene
wad
diti
onw
illbe
aT
POm
embra
ne
syst
emov
er
taper
edin
sula
tion
(str
uct
ure
will
beuse
dto
pitc
hw
her
epo
ssib
le).
All
roof
dra
ins
will
incl
ude
and
over
flow
.
The
exis
ting
exte
rior
wal
lsar
ege
nera
lly
mas
onry
with
abr
ick
face
.W
indo
ws
wer
ere
pla
ced
abou
t10
yea
rsag
o.E
xcep
tin
sele
ctlo
cati
ons,
the
exis
ting
exte
rior
wal
ls,
win
dow
san
dro
otw
illno
tbe
tou
ched
and
are
tore
mai
n.A
tthe
new
engin
eeri
ng
tech
nolo
gy
lab
and
the
Med
iaC
ente
r,ne
ww
indo
ws
and
open
ing
sw
illbe
add
edto
acco
mm
odat
eth
epr
ogra
m.
The
exis
ting
cafe
teri
a
(whi
chw
illbe
call
edth
eD
inin
gH
all)
will
beex
pan
ded
(so
the
exis
ting
exte
rior
wal
lsw
illbe
rem
oved
and
the
roof
will
requ
ire
pat
chin
gan
dti
e-in
).
h.M
ason
ryV
enee
r,co
mm
onbr
ick:
ASI
MC
62,
Gra
deSW
.A
llow
for
four
(4)
colo
rsof
bric
k,co
lors
tobe
sele
cted
byA
rchi
tect
.C
ast
Sto
ne:
Win
dow
sill
s.j.
Ext
erio
rcl
addi
ng:
Ext
erio
rin
sula
ted
met
alpa
nel
syst
emto
beC
entr
iaor
equal
with
Dur
agar
dP
lus
oreq
ual
fini
sh.
Pro
vide
cust
om
colo
rsas
sele
cted
byA
rchi
tect
,fo
rea
chpa
nel
type
.C
entr
iaM
odel
:D
imen
sion
seri
es,
Fla
tP
anel
,S
moo
th2
0ga
ge,
2”S
tandar
dT
hick
ness
,1/2
”re
veal
,R
=14
.5;
and
Pro
file
Ser
ies,
Lin
erP
anel
,L
-21A
.
EXTE
RIO
RD
OO
RS,
WIN
DO
WS
AN
DLO
UV
ERS
a.P
ubli
cen
tran
cedo
ors:
Ext
rahe
avy
duty
extr
uded
alum
inum
door
sw
ithgla
zing
asin
dica
ted.
Fin
ish:
3-co
atfl
uoro
poly
mer
coat
ing
inco
lor
sele
cted
byA
rchi
tect
.
b.T
heE
ntra
nce
vest
ibul
e‘b
ox’
shal
lbe
ofm
ater
ials
and
syst
ems
that
are
ball
isti
cpr
oof.
c.Al
lgl
azin
gat
asse
mbly
area
s(c
afet
eria
,m
ath
lab,
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
ut
Feb
ruar
y2,
2018
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
O3-R
BT
SP
age
1
Page 71, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
AR
CH
ITE
CT
UR
AL
DE
SIG
N
Med
iaC
ente
r,E
ngin
eeri
ngT
ech
Lab
)sh
all
rece
ive
secu
rity
intr
uder
det
eren
tfi
lm.
(Alt
erna
te,
all
new
glaz
ing
shal
lre
ceiv
ese
curi
tydet
eren
tfi
lm).
d.A
lum
inum
fram
esto
tm
ain
entr
ance
door
s:2”
x6”
flus
hgl
azed
fact
ory
fin
ish
edth
erm
ally
brok
enal
umin
umen
tran
cefr
amin
gfo
rgl
azin
gas
requ
ired
,re
info
rcin
g,an
dtr
imas
requ
ired
.e.
Alu
min
umst
ore
front:
2”x
6”as
man
ufa
cture
dby
Kaw
neer
,gl
azed
with
1”in
sula
ting
low
“E”
glas
s.F
inis
h:3
-co
atfl
uoro
poly
mer
coat
ing
inco
lor
sele
cted
byA
rchi
tect
.1.
Alu
min
umth
resh
old
san
dw
eath
erst
ripp
ing
will
bepr
ovid
edfo
ral
lex
teri
ord
oo
rs.
g.Al
lex
teri
ordo
ors
tobe
alum
inum
.h.
Whe
reU
Lra
ted
door
sar
ere
quir
ed,
con
stru
ctho
llow
met
alfr
ames
toco
nfor
mto
UL
req
uir
emen
tsfo
rla
bele
dfr
ames
.F
urni
shfr
ames
with
labe
lsat
tach
ed.
i.R
einf
orce
,dr
ill,
tap,
and
othe
rwis
epre
par
efr
ames
tore
ceiv
efi
nish
har
dw
are
and
oth
erit
ems
spec
ifie
d.
j.L
ouve
rssh
all
bepre
fabri
cate
d,
pref
inis
hed
Alu
min
umw
ithin
tern
albi
rdsc
reen
s.F
inis
hsh
all
be3
-co
atD
uran
arco
atin
gto
mat
chcu
stom
colo
rsof
exte
rior
insu
late
dm
etal
pan
els.
EXTE
RIO
RSU
NA
ND
GLA
RECO
NTR
OL
a.E
xten
ded
roof
over
han
ds
will
prov
ide
exte
rior
sun
and
glar
eco
ntro
l.
b.H
oriz
onta
lw
indo
wsh
adin
gdev
ices
shal
lbe
atta
ched
toal
umin
umw
indo
wfr
ames
.C
olor
san
dfi
nish
mat
eria
lsto
bese
lect
edby
Arc
hite
ct.
RO
OFS
a.EX
ISTI
NG
RO
OFS
SHA
LLR
EMA
IN.
PATC
HA
SR
EQ
UIR
ED
FOR
NEW
RO
OF-
TO
PM
ECH
AN
ICA
LE
QU
IPM
EN
T.
b.R
oof
syst
em:
Car
ryFM
win
dup
-lif
tcl
assi
fica
tion
Cla
ss1-9
0ra
ting
.c.
Roo
fco
nst
ruct
ion
whe
relo
wsl
oped
roof
soc
cur:
Sin
gle-
ply
mem
bra
ne,
eith
erPV
Cor
TPO
,ro
ofsy
stem
,fu
llyad
her
ed,
with
long
est
avai
labl
em
anufa
cture
r’s
war
rant
ype
riod
(min
imum
of20
year
s).
Min
imum
slope
shal
lbe
½”
per
foot
for
dra
inag
e.S
lope
ofro
offo
rdra
inag
esh
all
becr
eate
dw
ithta
per
edin
sula
tion
inar
eas
whe
rest
ruct
ura
lsy
stem
isle
vel.
Are
asof
new
const
ruct
ion,
stru
ctu
rew
illbe
sloped
todr
ain.
d.O
verf
low
roof
dra
inag
esy
stem
sw
illbe
prov
ided
,as
requ
ired
,to
mee
tco
de
requir
emen
ts.
Aco
mbi
nati
onof
scupper
/dra
inov
erfa
scia
san
din
tern
al(o
verf
low
)d
rain
age
syst
ems
will
beuse
d.
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
ut
e.R
ooft
opm
echa
nica
leq
uip
men
tw
illbe
loca
ted
onlo
wsl
ope
roof
area
sas
requ
ired
.f.
Rooft
op
mec
han
ical
equ
ipm
ent
will
bepl
aced
tom
inim
ize
visi
bili
tyan
d/o
rbe
scre
ened
from
view
.R
efer
toel
evat
ions
and
roof
plan
sfo
rex
tent
ofsc
reen
ing.
g.R
ooft
op
equip
men
tw
illbe
plac
edto
min
imiz
eno
ise
impa
cton
the
scho
ol.
h.P
rovi
detw
ola
yers
ofpo
lyis
ocya
nura
teri
gid
insu
lati
on,
each
laye
r2
½”
plus
2”th
ick
for
ato
tal
of4
½”
thic
k,in
4’x
8’sh
eets
,w
ithst
agg
ered
join
tsan
d½
”non-c
om
bust
ible
roof
cove
rbo
ard.
Pro
vide
taper
edin
sula
tion
,ca
nts
and
cric
kets
asre
quir
ed.
Att
ach
insu
lati
onto
deck
with
FMap
prov
edfa
sten
ers.
i.G
rave
lst
ops
and
fasc
iaw
illbe
prov
ided
inac
cord
ance
with
roof
ing
mat
eria
lm
anufa
cture
rs’
reco
mm
end
atio
ns
and
code
requir
emen
ts.
Gra
vel
stops
will
bew
ind
resi
stan
tan
dw
arra
nte
dal
umin
uman
dfa
ctor
ym
ade
with
fact
ory
appl
ied
fluo
ropo
lym
erfi
nish
.
j.P
rovi
dero
ofp
enet
rati
on
sas
indi
cate
dor
requ
ired
with
appro
pri
ate
flas
hing
and
counte
rfl
ashi
ng.
k.R
oof
scutt
les:
2’-6
”x
3’-O
”in
sula
ted
alum
inum
scutt
les
shal
lbe
prov
ided
for
flat
roof
acce
ssw
here
inac
cess
ible
flat
roof
soc
cur.
Loc
ate
scutt
les
wit
hin
des
ign
ated
utili
tysp
aces
orin
stai
rs.
I.Al
lw
ork
spec
ifie
d:P
erfo
rmed
byan
esta
bli
shed
roof
erap
pro
ved
byth
ero
ofin
gm
ater
ials
man
ufa
ctu
rer
and
perf
orm
edunder
the
supe
rvis
ion
and
insp
ecti
onof
the
roof
ing
mat
eria
lsm
anufa
cture
ran
das
requ
ired
byFM
toac
hie
ve
FMap
prov
al.
m.
All
root
sw
illm
eet
ener
gyst
andar
dre
qu
irem
ents
for
new
const
ruct
ion.
n.T
heC
ityin
tends
toin
stal
lP
hoto
volt
aic
pan
els
aspa
rtof
this
proj
ect
atth
ene
wad
diti
onro
ofse
ctio
ns.
Thi
sw
illre
quir
eco
ordi
nati
onw
ithth
ero
ofin
stal
lati
on.
FIR
ERE
SIST
ATI
VE
CO
NST
RU
CTI
ON
a.T
heex
isti
ngan
dne
wad
diti
onar
ea
Typ
eII
BC
onst
ruct
ion
-kn
own
asno
n-co
mbu
stib
le,
unpro
tect
edco
nst
ruct
ion.
b.T
here
will
beth
ree
fire
wal
ls.
Exc
ept
for
the
expan
sion
atth
ear
eaof
the
dini
ngha
llan
dLS
entr
ance
,th
efi
rew
alls
separ
ate
the
new
from
the
exis
ting
.c.
The
exis
ting
buil
ding
area
for
the
firs
tfl
oor
exce
eds
the
Chap
ter
5A
rea
lim
itat
ion,
soth
epr
ojec
tw
illbe
seek
ing
am
odif
icat
ion
for
reli
efon
this
exis
ting
cond
itio
n.T
hebu
ildi
ngw
illbe
fully
spri
nkl
ered
.
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
S
INTE
RIO
RW
ALL
SA
ND
PAR
ITIT
ION
S
a.T
heco
nst
ruct
ion
will
bea
pred
omin
antl
yst
andar
dgy
psum
for
exte
rior
bac
ker
wal
ls,
clas
sroom
dem
isin
gpa
rtit
ions
,co
rrid
ors,
and
adm
inis
trat
ion
area
s.U
seco
ncr
ete
mas
onry
atne
wto
ilet
room
s,ca
fete
ria,
entr
yves
tibule
s,cu
stod
ial
and
utili
tyro
oms.
All
part
itio
nsto
exte
ndto
under
side
ofst
ruct
ural
deck
.b.
Unl
ess
othe
rwis
ein
dica
ted
all
inte
rior
mas
onry
wal
lsto
be8”
thic
kti
ght
toun
der
sid
eofd
eck.
c.Al
lC
MU
:T
obe
laid
inru
nnin
gbo
nd,
with
allj
oint
sco
nca
ve
tool
ed.
Rei
nfor
cebl
ock
wit
hho
rizo
ntal
join
tre
info
rcem
ent
inev
ery
seco
nd
hori
zont
alco
urs
e.L
ayal
lbl
ock
inhi
ghst
rength
cem
ent-
lim
e(T
ype
5)m
orta
r.U
se8”
x16
”bl
ock
whe
repr
acti
cal.
Pro
vide
cont
rol
join
ts20
’-O
”o.
c.m
axim
um.
ci.In
teri
orG
WB
wal
lsto
be6”
met
alst
ud
s16
”o.
c.w
ith1
laye
rof
5/8
”im
pact
resi
stan
tgy
psum
boar
d.T
ypic
ally
,pr
ovid
eso
und
atte
nu
atio
nbla
nk
ets
tofil
lth
est
ud
spac
e.e.
Moi
stur
ere
sist
ant
gyps
umbo
ard
tobe
use
din
all
wet
area
s.1.
Inte
rior
wal
lsh
all
exte
ndto
deck
abov
eun
less
othe
rwis
ein
dica
ted.
Stu
dw
alls
,w
hich
dono
tex
tend
tode
ckab
ove,
shal
lbe
bra
ced,p
erco
ld-f
orm
edm
etal
fram
ing
com
po
nen
tsm
anu
fact
ure
rs’
reco
mm
endat
ions.
Evi
denc
eof
man
ufa
ctu
rers
’re
com
men
dat
ion
ssh
all
bepa
rtof
subm
itta
lsm
ade
for
revi
ew.
g.R
ated
wal
ls,
incl
udin
gbu
tno
tli
mit
edto
stai
rs,
elev
ators
,bet
wee
nu
ses
and
fire
wal
lsuse
concr
ete
bloc
kex
tendin
gfu
llhe
ight
tou
nder
side
ofst
ruct
ure
abov
ew
ithap
pro
ved
fire
orsm
oke
stoppin
gm
ater
ials
and
syst
ems
whe
rere
quir
ed.
h.P
rovi
dede
flec
tion
connec
tion
atto
pof
all
wal
lsex
tendin
gfu
llhe
ight
from
floo
rto
stru
ctura
lsy
stem
abov
e.I.
Fire
rate
dgy
psum
boar
d:T
ype
“X”
gyps
umbo
ard
inac
cord
ance
with
the
req
uir
emen
tsof
appr
oved
test
edas
sem
bly
tobe
use
din
all
fire
-rat
edas
sem
bli
es.
j.S
ound
atte
nuat
ion
bla
nket
s:F
iber
glas
sN
oise
Bar
rier
Bat
ts,
and
oreq
uiva
lent
,th
icknes
sto
fill
dep
thof
stud
spac
e.k.
Gla
ssfi
ber
rein
forc
edce
men
tbo
ard
whe
rew
all
tile
isin
stal
led
over
met
alst
ud
const
ruct
ion.
WA
LLFI
NIS
HES
a.Al
lar
eas
fini
shed
inm
ason
ry:
Toha
ve3
coat
sw
ater
bas
esy
stem
.P
rim
er:
Pri
mer
Sea
ler(
on
dryw
all)
orM
ason
ryFi
ller
(on
con
cret
ebl
ock)
.F
inis
h:2
coat
seg
gshe
llco
atin
g.C
olor
sto
beas
sele
cted
byth
eA
rchi
tect
.b.
All
area
sfi
nish
edin
Gyp
sum
wal
lbo
ard:
Pro
vide
prim
erpl
us2-
fini
shco
atal
kyd
pain
tsy
stem
,eg
gshe
llor
sati
n.
c.T
oile
tro
oms
shal
lha
vece
ram
icw
all
tile
exte
ndin
gfr
omfl
oor
to
Pag
e2
Feb
ruar
y2,
2018
Page 72, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
AR
CH
ITE
CT
UR
AL
DE
SIG
N
ceil
ing
heig
hton
all
wal
ls.
U.K
itch
enw
alls
shal
lre
ceiv
eti
lefr
omfl
oor
toce
ilin
g.
FLO
OR
FIN
ISH
ES
a.T
hepre
dom
inan
tfl
oor
finis
hes
inth
esc
hool
will
bevi
nyl
com
posi
tion
tile
(VC
T)an
dca
rpet
.C
arpe
tw
illbe
inad
min
istr
ativ
eof
fice
s,m
edia
cen
ter/
Co
mm
on
san
dM
ath
Lab
.C
arpet
tobe
anti
-mic
robi
alty
pean
dan
tist
atic
type
.V
CT
will
beuse
din
clas
sroom
corr
idor
s,di
ning
hall,
and
staf
f/te
ach
ers
loun
ge.
b.W
here
VC
Tis
used
,al
low
for
two
colo
rsw
itha
pat
tern
tobe
det
erm
ined
byA
rchi
tect
c.U
sePL
AN
KV
CT
inD
inin
gH
all
and
atea
stw
est
connec
ting
corr
idor
from
LSen
try
toM
ath
Lab
.N
ote
that
the
exis
ting
fini
shfl
oor
ofth
eca
fete
ria
will
bere
mov
ed;
anA
rdex
leve
ling
trea
tmen
tw
illbe
nec
essa
ryfo
rle
veli
ngan
dbl
endi
ngw
ithth
eex
pan
ded
area
ofsl
ab.
d.T
oile
tro
oms:
Cer
amic
tile
qupl
ity
cert
ifie
dby
the
Tile
Cou
ncil
ofA
mer
ica,
Inc.
Tile
:U
ngla
zed
porc
elai
nce
ram
icm
osai
cti
le,
inth
ree-
colo
rs,
pat
tern
sto
bese
lect
ed.
e.P
rovi
de1/8
”th
ick
x1”
wid
eso
lid
colo
rvi
nyl
tile
feat
ure
stri
ps
atdo
ors
and
oth
erlo
cati
ons
whe
reco
lor
orpat
tern
ofti
lech
ang
es.
f.P
rovi
deap
pro
pri
ate
tran
siti
on
atdi
ssim
ilar
floo
rm
ater
ials
.g.
Pro
vide
mar
ble
thre
shold
atto
ilet
room
s.A
DA
acce
ssib
lehe
ight
sat
thre
shold
s.h.
Rub
ber
bas
e:4”
high
,ex
trud
edru
bber
cove
bas
e,se
t-on-t
ype,
with
pref
orm
edco
rner
s.P
rovi
defi
eld
form
eden
dst
op
unit
sw
here
bas
ete
rmin
ates
orab
uts
open
ings
.R
ubber
bas
eto
beus
edat
all
loca
tion
sw
ithV
CT
and
carp
et.
Bas
e@
CM
Uw
alls
:8”
high
glaz
edbl
ock.
Jani
tors
’an
del
ectr
iccl
ose
ts:
Sea
led
concr
ete.
Kit
chen
Ser
very
Are
as:
Liq
uid
appl
ied
seam
less
epox
yfl
oori
ngw
ithin
tegr
alco
ver
bas
e.S
lope
floo
rto
drai
n.R
emov
eex
isti
ngce
ram
icti
lean
dpre
par
esl
abw
ithan
Ard
exle
veli
ngm
ater
ial.
CEI
LIN
GS
a.E
xpos
edde
ck,
incl
udin
gar
eas
above
acl
oud,
but
are
visi
ble,
shal
lbe
pain
ted
expose
d.
Pai
ntin
gS
yste
m:
Spr
ayA
ppli
edA
lkyd
Cei
ling
Fin
ish:
One
coat
,ru
stin
hibi
tive
,se
lfpr
imin
gin
teri
orsp
ray
appl
ied
flat
alky
dfo
ruse
atlo
cati
ons
with
expose
dm
etal
deck
ing,
man
ufa
cture
dro
ofpan
els,
met
aljo
ists
,m
etal
gird
ers,
met
alb
eam
s,duct
and
cond
uit.
b.P
rovi
decl
osu
repla
tes
atth
em
etal
deck
toco
nce
alro
offa
sten
ers.
c.P
rovi
desu
spen
ded
acoust
ical
clou
dsin
clas
sroom
and
educa
tional
spac
esw
here
ceil
ing
isex
pose
d.
USG
Com
pas
soin
vari
ous
shap
esan
dsi
zes.
U.S
usp
ended
,la
y-in
acoust
icti
le.
Was
hab
lece
ilin
gsw
illbe
use
din
the
kitc
hen
and
serv
ery
area
sas
requ
ired
byco
de.
Moi
stur
ere
sist
ant
ceil
ings
will
beuse
din
all
oth
erw
etar
eas
incl
udin
gto
ilet
s.e.
Cor
rido
rat
firs
tfl
oor
clas
sroom
win
g,ad
min
istr
ativ
ear
eas,
and
mis
cell
aneo
us
spac
esw
here
sod
esig
nat
ed:
2x
2su
spen
ded
acoust
ical
pane
lce
ilin
gs.
1.M
ath
lab
shal
lha
vece
ilin
gcl
ouds
that
def
ine
area
sof
inst
ruct
ion
orco
llab
orat
ion.
Pro
vide
6”“A
xiom
”ed
ge
atal
lcl
ouds
.A
ddit
iona
lso
und
baff
leac
oust
icpan
els.
g.In
exis
ting
buil
ding
whe
rece
ilin
gis
bein
gre
pla
ced,
use
stan
dar
d2x
2ac
oust
icla
y-in
.h.
Cor
rido
rsin
area
sof
new
const
ruct
ion,
com
bin
atio
nof
expose
dde
ckan
dac
oust
icti
lece
ilin
gcl
ouds
with
6”“A
xiom
”,ed
ge.
I.M
echa
nica
l,el
ectr
ical
orbo
iler
orut
ility
room
s:E
xpos
edst
ruct
ure
;no
fini
shed
ceil
ing.
j.Ja
nito
r’s
close
ts:
Exp
osed
stru
cture
;no
fini
shed
ceil
ings
.k.
Toi
let
room
ceil
ings
:P
aint
edM
oist
ure
resi
stan
tgy
psum
boar
d.I.
Cei
ling
inC
afet
eria
,C
om
mons/
Med
iaC
ente
r(L
San
dM
S):
Susp
ended
acoust
icti
lecl
ouds
,ed
ge
ofcl
ouds
shal
lha
ve“A
xiom
”cl
osu
reed
ge,
4”hi
gh.
m.
Cei
ling
inG
ymna
sium
:E
xpos
edpa
inte
dex
isti
ngst
ruct
ure
and
under
side
ofde
ck.
n.S
usp
ensi
on
syst
emfo
ral
lac
oust
ical
pane
lce
ilin
gs;
inte
rmed
iate
duty
expose
dte
ety
pe.
Pro
vide
seis
mic
brac
ing
ofce
ilin
gsy
stem
.M
ain
and
cross
tees
;el
ectr
o-ga
lvan
ized
stee
lw
ithbo
ttom
flan
ge
wra
pped
inen
amel
edst
eel.
Tee
san
dha
nger
:d
esig
ned
tosu
pport
load
s,in
clud
ing
fixt
ures
.D
efle
ctio
noft
ees:
Not
toex
ceed
1/3
60
span
.o.
Pro
vide
wal
lm
oldi
ngs,
corn
erpi
eces
,an
doth
erac
cess
ory
item
sre
quir
es.
Cut
bott
omfl
anges
ofte
esab
utt
ing
wal
lm
oldi
ngs
topr
ovid
efl
ush
fit.
p.H
ange
rs:
#1
2ga
gega
lvan
ized
low
carb
onst
eel
wir
e.D
oubl
ew
ires
atsu
pp
ort
oflig
htfi
xtur
esan
dhea
ting
and
vent
ilat
ing
unit
s.C
eili
ngsy
stem
shal
lbe
anch
ore
dto
stru
ctu
reab
ove.
Connec
tions
tout
ility
syst
ems
inth
ece
ilin
gpl
enum
are
not
allo
wed
;pr
ovid
eco
dere
quir
edfo
rsu
spen
sio
nof
ceil
ing
unde
rlyi
ngar
eas
ofut
ilit
ies
bloc
king
acce
ssto
stru
ctura
lsy
stem
abov
e.
INTE
RIO
RSU
NA
ND
GL4
RE
CON
TRO
L
a.U
se‘M
echo
-S
had
e”ro
ller
type
man
ual
‘bla
ckou
t”ro
ller
shad
esat
all
win
dow
sin
occu
pied
spac
esin
clud
ing
clas
sro
om
s,ad
min
istr
ativ
eof
fice
s,et
c.b.
Use
“Mec
ho-S
hade
”ty
pero
ller
type
(auto
mat
icm
otor
ized
)sh
ades
atth
eC
afet
eria
,M
SC
omm
ons,
Tec
hL
aban
dM
ath
Lab
win
dow
s.
INTE
RIO
RD
OO
RS
AN
DFR
AM
ES
a.W
ood
door
sin
holl
owm
etal
fram
esw
illbe
used
thro
ug
ho
ut
the
cons
truc
tion
exce
ptm
etal
door
sat
mec
hani
cal
area
san
dat
util
ity
spac
esan
dst
ore
front
door
sat
exte
rior
open
ings
.D
oors
will
mee
tal
lm
anuf
actu
rers
’re
quir
emen
tsfo
rfi
nish
es(p
aint
&cl
ear
fini
sh).
b.W
ood
door
ssh
all
be:
Flus
h,A
Wl
Pre
miu
mQ
uali
ty,
1%
“th
ick
wit
hpl
ain
slic
edM
aple
face
ven
eers
and
mat
chin
gsi
deed
gest
rips
,fa
ctor
yfi
nish
edin
colo
ras
sele
cted
byA
rchi
tect
.c.
Fire
rate
dw
ood
door
s:M
anuf
actu
red
inac
cord
ance
wit
hA
Wl
Typ
e“E
D1
Y2”
for
1Y
2”hr
.“B
”la
bel
door
s,“E
DY4
”fo
r¾
hr.
“C”
labe
ldo
ors,
“FD
34”
for
30m
m.
labe
ldo
ors,
and
“FD
1/3”
for
20m
m.
labe
ldo
ors.
All
door
ssh
all
beco
nstr
ucte
dto
U.L
.re
quir
emen
tsin
dica
tean
dfu
rnis
hed
wit
hU
.L.
labe
lsat
tach
ed.
d.A
lldo
ors
toin
stru
ctio
nal
spac
esan
dth
rou
gh
out
corr
idor
s:P
rovi
dea
4”x
30”
visi
onlig
ht,
conf
orm
ing
toCT
Sec
urit
yC
ounc
ilgu
idel
ines
.Al
lgl
azin
gat
door
ssh
all
have
intr
uder
det
erre
nt
film
.e.
All
door
sw
ith
visi
onlig
htor
louv
ercu
tou
ts:
Hav
est
aved
lum
ber
core
sco
nfor
min
gto
AW
lty
peSL
C-5
cons
truc
tion
.f.
All
oth
erfl
ush
door
s:H
ave
solid
part
icle
boar
dco
res
conf
orm
ing
toA
Wl
type
PC-S
cons
truc
tion
.g.
Alu
min
umfr
ames
atin
teri
orgl
ass
wal
ls:
1¾
”x
434
”st
iles
wit
hfa
ctor
yfi
nish
glaz
ing
wit
h3/
4”gl
ass,
tem
per
ed,
wit
hre
info
rcin
g,ad
trim
asre
quir
ed.
Fini
sh:
3-co
atfl
uoro
poly
mer
coat
ing
inco
lor
sele
cted
byA
rchi
tect
.h.
All
inte
rior
holl
owm
etal
fram
es:
16ga
gest
eel
wel
ded
cons
truc
tion
,U
.L.
labe
lsw
here
requ
ired
.i.
Util
ityho
llow
met
alfr
ames
:16
gage
stee
lw
elde
dco
nstr
ucti
on,
galv
aniz
ed;
U.L
.la
bels
whe
rere
quir
ed.
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,20
18
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
3
J. k.
Page 73, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
AR
CH
ITE
CT
UR
AL
DE
SIG
N
FIN
ISH
HA
RDW
ARE
a.Al
lhar
dw
are
spec
ifie
dsh
all
mee
tst
ate
and
feder
alac
cess
ibil
ity
stan
dar
d.
b.S
urf
ace-
mounte
dhe
avy-
duty
over
hea
dau
tom
atic
door
close
rsw
illbe
prov
ided
onal
lmai
nen
tran
ces;
toil
et,
sto
rag
e,an
dm
echan
ical
room
door
s;an
dra
ted
door
s.P
rovi
dehan
dic
apac
cess
ible
har
dw
are
onal
len
tran
cedo
ors,
toil
etro
omdo
ors,
clas
sroom
door
set
c.c.
Pro
vide
appro
pri
ated
knur
led
har
dw
are
onhi
ghha
zard
room
door
ssu
chas
mec
han
ical
and
elec
tric
alsp
aces
.U.
Doo
rst
ops
will
bepr
ovid
edw
here
door
orhar
dw
are
will
stri
kea
wal
lor
oth
erob
ject
.W
here
cond
itio
nsdo
not
perm
itth
euse
ofa
door
stop,
ase
par
ate
over
hea
dty
pedo
orst
op
will
beuse
d.
No
door
stops
will
bein
stal
led
onth
efl
oor.
e.S
tain
less
stee
lki
ckpla
tes
will
bein
stal
led
whe
reki
ckpla
tes
are
requ
ired
.P
rovi
dea
mop
pla
teat
all
wet
area
san
dat
utili
tyro
oms.
f.R
unne
rsi
lence
rsw
illbe
prov
ided
for
all
do
orf
ram
es.
g.D
oor
Clo
sers
-as
man
ufa
ctu
red
byLC
Nor
Gla
ston
bury
Sta
nd
ard
.h.
All
loqk
san
dcy
lind
ers
shal
lbe
Mas
ter
Key
edan
d/o
rG
rand
Mas
ter
Key
ed,
with
keyi
ngca
pabi
lity
,as
dir
ecte
dby
the
Arc
hite
ctor
Ow
ner.
Loc
kset
sby
Sar
gen
tor
City
ofN
orw
alk
Sta
ndar
d.
i.Al
lex
itdo
ors
will
have
pani
char
dw
are
asre
quir
edby
code
clea
rly
iden
tifi
edas
emer
gen
cyex
its.
Exit
Dev
ices
man
ufa
ctu
red
byV
onD
upri
nor
City
ofN
orw
alk
Sta
nd
ard
.j.
Pro
vide
conti
nues
hing
esat
all
heav
ily
used
and
serv
ice
door
s.k.
Pro
vide
elec
tric
stri
kes
whe
rere
quir
edfo
rac
cess
cont
rol.
I.P
rovi
deac
oust
icac
cess
ori
espe
rac
oust
icre
quir
emen
ts.
MIL
LWO
RK
/CA
SEW
OR
KA
ND
LAB
CA
SEW
OR
K
a.M
illw
ork
—Al
lm
illw
ork
toin
clud
e:F
inis
h-
Tra
nsp
aren
t
Qua
lity
-P
rem
ium
Gra
de
Ven
eer
-P
lain
Sli
ced
Map
le“M
”G
rade
Ven
eer
mat
chbet
wee
nad
jace
nt
leav
esin
apan
elto
bebo
okm
atch
ed,
bal
ance
d.
Ven
eer
seq
uen
cebet
wee
nad
jace
nt
pan
els
tobe
seq
uen
ced
and
nu
mb
ered
sets
.E
dge
and
reve
altr
eatm
ent:
All
exp
ose
ded
ges
ven
eere
dsa
me
spec
ies
asfa
cew
hen
reve
lor
part
ial
thic
knes
sof
3/4
”L
umbe
r:P
rem
ium
Gra
dew
ell
mat
ched
for
grai
nco
lor
bet
wee
nven
eer
and
lum
ber.
b.C
ount
ers,
cabin
ets,
cubbie
s,w
ardro
bes
,an
dst
ora
ge
unit
s:H
igh
pre
ssu
redec
ora
tive
plas
tic
lam
inat
eov
erpar
ticl
eboar
d.
Pro
vide
plyw
ood
atal
lw
etlo
cati
ons.
c.C
abin
etan
dhar
dw
are
fini
sh:
Sel
ecte
dfr
omm
anufa
cture
rs’
stan
dar
dco
lor
rang
e.d.
Bas
e,upper
cab
inet
san
dfu
llhe
ight
war
dro
bes
incl
assr
oom
.M
eet
and
exce
edA
rchi
tect
ural
Woo
dwor
kIn
stit
ute
(AW
l)Q
uali
tyS
tandar
d1
60
0/1
60
DB
,R
evea
lO
verl
ayM
odul
arC
asew
ork.
Pro
vide
plas
tic
lam
inat
efa
cing
and
hig
h-p
ress
ure
cab
inet
line
rove
rpl
ywoo
d.e.
Art
clas
sroom
case
work
tobe
plas
tic
lam
inat
eov
erpl
ywoo
dw
ithso
lid
surf
ace
resi
nto
ps.
f.C
ount
erT
opat
Med
iaC
ente
rS
ervi
ceD
esk
and
atM
ain
Off
ice
Ser
vice
:C
ount
ers
shal
lbe
soli
dsu
rfac
ere
sin
top
s.g.
Win
dow
sill
sto
beso
lid
surf
ace.
h.S
cien
cecl
assr
oo
ms
shal
lha
veD
ivis
ion
12st
andar
dla
bca
sew
ork
wit
hep
oxy
counte
rto
ps
inar
rangem
ent
show
nin
plan
s.S
inks
shal
lbe
inte
gral
toco
unte
rs.
TOIL
EtR
OO
MA
CC
ESSO
RIE
S
a.E
ach
staf
fto
ilet
will
have
ast
ainle
ssst
eel
toil
etti
ssu
ed
isp
ense
r,so
apd
isp
ense
r,p
aper
tow
eld
isp
ense
r,sh
elf
abov
eea
chsi
nk,
afl
oat
gla
ssw
all
mounte
dm
irro
r,an
dco
atho
okas
man
ufa
cture
dby
Bob
rick
.In
addi
tion
,pr
ovid
ea
sanit
ary
napk
indis
pen
ser
and
asa
nit
ary
napk
indi
spos
alre
cep
tacl
eat
each
wom
an’s
staf
ftoi
let.
b.E
ach
studen
tst
all
toha
vest
ainle
ssst
eel
toil
etti
ssue
dis
pen
ser
and
coat
hook
.A
lso
prov
ide
pap
erto
wel
dis
pen
ser,
shel
fab
ove
each
sink
,la
rge
wal
lm
ounte
dm
irro
r,so
apd
isp
ense
r,an
da
floa
tgla
ssw
all
mounte
dm
irro
rat
each
sink
and
requ
ired
larg
erm
irro
rat
acce
ssib
lesi
nk(s
).c.
Toi
let
room
stal
lsto
bedi
vide
dby
soli
dph
enol
icpa
rtit
ions
,fl
oor
mounte
dan
dover
hea
dbra
ced.
All
floo
rm
ounti
ng
hard
war
e,cl
ips
and
fast
ener
ssh
all
best
ain
less
stee
l.d.
Han
ddr
yers
tobe
rece
ssed
into
wal
lan
dha
vest
ainle
ssst
eel
cove
ras
man
ufa
cture
dby
Dys
onor
equa
lpr
oduc
t.
GEN
ERA
LEQ
UIP
QM
ENT
Tec
hnol
ogy
equi
pmen
t:R
efer
toT
echn
olog
yan
dE
lect
rica
lna
rrat
ives
.C
ompu
ter
Hub
sse
rver
san
dro
uter
s,ac
tive
elec
tron
ics
and
desk
top
elec
tron
ics
shal
lbe
par
tof
the
Ow
ner’
sFF
&E
pack
age
and
will
bede
sign
edan
dbi
dap
prox
imat
ely
six
toei
ght
mon
ths
prio
rto
the
com
plet
ion
ofth
epr
ojec
t.
SPEC
IFIC
ROO
MFI
NIS
HES
AN
DSP
ECIA
LTIE
S
A.
Com
mons/
Med
iaC
ente
rtL
San
dM
S
a.Al
ldo
ors
and
gla
ssfr
omC
omm
ons
into
Adm
inis
trat
ion,
Art
and
Nur
se’s
Sui
te,
etc.
tobe
alum
inum
.b.
All
door
san
dgl
ass
from
stai
rsto
befi
rera
ted.
c.P
rovi
deil
lum
inat
edcu
stom
mad
ew
ood
disp
lay
case
sw
ithgla
ssfr
onts
.
B.A
dmin
istr
atio
n.guid
ance
.an
doth
erfa
cult
yar
eas:
a.P
last
icla
min
ate
case
work
with
soli
dsu
rfac
eso
lid
surf
ace
cou
nte
rtop
sfo
rw
orkr
oom
s,m
ail
area
s,et
c.Al
lsu
bst
rate
mat
eria
lto
bepl
ywoo
d,no
tpa
rtic
lebo
ard.
b.C
usto
mbu
ilt
rece
ptio
nd
esk
with
woo
dven
eer,
soli
dsu
rfac
ere
sin,
and
soli
dw
ood
edg
eco
nst
ruct
ion.
c.Al
ldo
ors
and
borr
owed
ligh
tsat
entr
ylo
cati
ons
that
are
not
inC
omm
ons
tobe
hollo
wm
etal
.
C.G
ymna
sium
:a.
No
new
equ
ipm
ent
orfu
rnis
hing
s.
D.
Caf
eter
ia;
a.S
tain
less
Ste
elS
ervi
ngC
ount
ers
and
food
serv
ice
equip
men
tw
illbe
prov
ided
atS
erv
ery
(see
Foo
dS
ervi
ce)
b.A
cous
tic
trea
tmen
tsto
beap
plie
dto
the
wal
lsof
the
dini
nga
tea.
c.P
rovi
dean
elec
tron
ical
lyo
per
ated
proj
ecti
onsc
reen
.d.
Pro
vide
LED
wal
lm
ounte
ddi
spla
ypan
els
e.P
rovi
deco
ilin
gdo
orat
Ser
very
(to
beve
rifi
edw
ithth
edev
elo
pm
ent
ofth
epl
an)
E.M
usic
:
a.N
one
weq
uip
men
tof
furn
ishi
ngs.
F. a.
Pro
vide
1el
ectr
icki
lnan
dw
ire
mes
hdr
ying
rack
s.b.
Pro
vide
case
work
for
sto
rage.
c.P
rovi
debo
thdee
psi
nkan
dac
cess
ible
sink
—eq
uip
ped
with
pla
ster
trap
s.
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Scho
olIN
orw
alk,
Con
nect
icut
Feb
ruar
y2,
2018
Sch
emat
icD
esig
nP
hase
Sta
teT
MP
-103-R
BT
SP
age
4
Page 74, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
AR
CH
ITE
CT
UR
AL
DE
SIG
N
G.
Cla
ssro
oms:
a.P
rovi
debu
ilt
inca
sew
ork,
upper
cabin
ets,
and
teac
her
war
drob
e.b.
Pro
vide
box
cubbie
sfo
rst
uden
tbe
long
ings
inPr
eK—
5G
rade
Cla
ssro
oms.
c.P
rovi
de2
tack
boar
ds
U.P
rovi
de2
mar
ker
boar
ds.
e.R
efer
tote
chno
logy
sect
ion
for
elec
tron
icdi
spla
ysc
reen
s.
H.
Cor
rido
rs:
a.N
one
wlo
cker
s.M
Sre
usin
gex
isti
ng.
Nur
seS
uite
:
a.M
ain
room
and
Exa
mro
omar
eto
have
buil
t-in
,lo
ckab
leca
sew
ork
with
upper
and
low
erca
bin
ets
and
sink
.b.
Pro
vide
buil
t-in
,ded
icat
ed,
lock
able
med
icat
ion
supp
lylo
cker
inM
ain
Roo
m.
c.P
rovi
ded
edic
ated
acce
ssib
leto
ilet
room
.d.
Pro
vide
smal
lst
ora
ge
clos
et,
lock
able
.e.
Pro
vide
ceil
ing
hung
cubi
cal
curt
ains
for
cots
inM
ain
Roo
m.
J.C
usto
dial
.m
echan
ical
.st
ora
ge.
utili
ty:
a.S
eale
dco
ncr
ete
floo
r.b.
Exp
osed
stru
ctu
rece
ilin
g.c.
Pro
vide
mop
sink
.
K.O
ther
:
a.Id
enti
fyin
gdev
ices
will
incl
ude
inte
rior
sign
s,di
rect
iona
lgr
aphi
cs,
lett
ers,
sym
bols
,ex
teri
orsi
gns
and
lett
ers,
and
oth
erm
isce
llan
eous
iden
tify
ing
devi
ces
asre
quir
edat
all
door
sin
new
addi
tion
.b.
Pro
vide
allo
wan
cefo
ral
umin
umsi
gnag
eon
exte
rior
ofbu
ildi
ngw
ithsc
hool
nam
e.c.
Pro
vide
for
new
sidi
ngat
port
ion
ofex
isti
ngbu
ildi
ngat
entr
yal
ong
with
anex
tens
ion
ofth
eca
nopy
(ple
ase
see
draw
ings
)fo
rex
isti
ngen
try
defi
niti
on.
Sch
emat
icD
esig
nD
raw
ings
Sch
emat
icD
esig
nP
hase
Pag
e5
Pon
usR
idge
Scho
olIN
orw
alk,
Con
nect
icut
Sta
te#
TM
P-1
03-R
BT
SF
ebru
ary
2,20
18
Page 75, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
FOO
DSE
RV
ICE
INTR
OD
UC
TIO
N
The
Pon
usR
idge
Sch
ool
foodse
rvic
ear
eaw
illac
com
modat
eth
ean
tici
pat
ed1
05
0st
ud
ents
,g
rad
esP
re-K
thro
ugh
8.G
rades
Pre-
Kth
rough
1w
illea
tin
thei
rcl
assr
oo
ms.
The
rem
ainin
g900
stu
den
tsw
illea
tlu
nch
inth
edi
ning
hall
inth
ree
wav
esw
hich
requir
e3
00
seat
s.
The
goal
ofth
eN
orw
alk
Boa
rdof
Edu
cati
onis
topr
ovid
enu
trit
iona
lm
eals
,fr
omsc
ratc
h,
wit
hm
ore
fres
han
dlo
cal
ingre
die
nts
,ul
tim
atel
yel
imin
atin
gfr
ozen
and
pre
-pac
kag
edfo
ods.
Ava
riet
yof
hea
thy
food
opti
ons,
both
hot
and
cold
entr
ees,
des
sert
san
dsn
acks
and
bev
erag
esw
illbe
serv
ed.
Sal
adb
ars
whi
chw
illin
clud
efr
esh
veg
etab
les
and
frui
tsw
illbe
inco
rpora
ted.
The
exis
ting
kitc
hen
and
serv
ery
will
beto
tall
ydem
oli
shed
toac
com
mo
dat
eth
ese
new
chan
ges
.A
ddit
iona
lex
pan
sion
into
the
dini
ngha
llm
aybe
requir
ed.
The
dini
ngha
llw
illal
sobe
now
incl
ude
roun
ddi
ning
tab
les
wit
hpi
votse
ats
for
am
ore
soci
aldi
ning
exper
ience
.
The
new
kitc
hen
and
sevin
gar
eas
will
mee
tal
llo
cal
hea
lth
code
requir
emen
ts.
Serv
ing
Line
The
rew
illbe
two
serv
ing
line
sw
hich
will
incl
ude
hea
ted
hot
food
counte
rs,
mec
han
ical
lyre
frig
erat
edco
ldfo
odco
un
ters
,ea
chw
ithpro
per
pro
tect
or
and
disp
lay
unit
s.R
efri
ger
ated
bev
erag
ere
frig
erat
ors
will
also
bein
clud
ed.
Inad
diti
onth
ere
will
bea
mec
han
ical
lyre
frig
erat
edsa
lad
bar
loca
ted
inth
edi
ning
hall
.A
bac
kco
un
ter,
asi
ngle
sect
ion
refr
iger
ator
and
asi
ngle
sect
ion
free
zer
and
ahan
dw
ash
sink
will
bein
clud
edfo
rea
chse
rvin
gli
ne.
Tw
odouble
-sid
edca
shie
rst
atio
ns
will
incl
ude
aca
shle
ssch
eck-o
ut
syst
em,
sele
cted
byth
eT
own.
Tra
ysw
illbe
reu
sable
soth
ere
will
bea
tray
retu
rn/t
rash
coll
ecti
onar
eaw
ithi
nth
edi
ning
room
.W
ater
and
con
dim
ents
will
also
beav
aila
ble
inth
edi
ning
room
.
Full
Serv
ice
Kitc
hen
Equ
ipm
ent
The
kitc
hen
will
acco
mm
odat
ere
ceiv
ing
ofgoods
and
pre
par
atio
nof
the
stu
den
tm
eals
.A
food
serv
ice
offi
ce,
foodse
rvic
eto
ilet
and
lock
erro
oman
dja
nit
or’
scl
ose
tw
illal
sobe
incl
uded
orlo
cate
dim
med
iate
lya
dja
cent.
SCH
EMA
TIC
DES
IGN
PAC
KA
GE
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,20
18
The
prep
area
will
incl
ude
stora
ge
for
non-
food
and
food
item
sto
best
ore
don
self
-support
ing
shel
ves
onca
ster
s,pro
per
refr
iger
atio
n/f
reez
erst
ora
ge
wit
hse
lf-s
upport
ing
refr
iger
atio
nsh
elvin
gw
ithca
ster
san
dw
ork
table
s,one
wit
ha
double
sink
for
veg
etab
lepr
ep.
The
cook
ing
area
will
incl
ude
anex
hau
stven
tila
tor,
doub
leco
nvec
tion
oven
,ra
nges
,ti
ltin
gsk
ille
tw
ith
floo
rtr
ough
and
com
par
tmen
tst
eam
er.
Ach
ef’s
table
with
sink
and
uten
sil
rack
will
bepar
tof
the
cook
ing
area
.A
ddit
iona
leq
uip
men
tin
cludes
asl
icer
,port
able
war
min
gca
bin
ets,
spee
dra
cks
and
mix
er.
The
potw
ash
area
will
incl
ude
ath
ree
com
par
tmen
tsi
nk,
read
yfo
rch
emic
alsa
nit
izin
gsy
stem
,as
wel
las
anunder
counte
rdis
hw
asher
for
tray
was
hin
gan
dsa
nit
izin
gat
180
deg.
F.
Han
dwas
hsi
nks
will
belo
cate
din
each
area
asre
quir
ed.
Ven
tilat
ion
Thee
xhau
stve
ntil
ator
will
mee
tN
FP
A-9
6,U
Lan
dN
SFre
qu
irem
ents
.T
empe
red
mak
e-up
air
can
beac
com
mo
dat
edif
requ
ired
for
the
over
all
HV
AC
syst
em.
An
Ans
ulfi
resu
pp
ress
ion
syst
emw
illbe
incl
uded
.
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
1
Page 76, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
STR
UC
TU
RA
LSY
STE
MS
-N
AR
RA
TIV
E
GEN
ERA
L
Com
plet
ene
wst
ruct
ura
lsy
stem
sar
eto
bepr
ovid
edfo
rth
ene
wone
stor
yad
dit
ion.
The
new
addi
tion
shal
lbe
separ
ated
from
the
exis
ting
stru
cture
bya
seis
mic
separ
ate
join
t.T
hes
ew
illlik
ely
incl
ude
rein
forc
edco
ncr
ete
foundat
ions
wit
ha
port
ion
ofth
efo
undat
ion
bein
gre
tain
ing.
Inad
dit
ion,
the
roof
fram
ing
will
best
eel
gir
der
san
dst
eel
jois
tsw
ith
typi
cal
roof
dec
kin
most
area
san
dac
ou
stic
roof
dec
kin
som
ear
eas.
New
roof
ssh
all
bed
esig
ned
per
the
2018
Connec
ticu
tS
tate
Bui
ldin
gC
ode
whi
chin
cludes
the
20
15
BC
wit
hlo
cal
amen
dm
ents
and
all
asso
ciat
edre
fere
nce
codes
asw
ell
asad
dit
ional
capac
ity
for
ap
rop
ose
dso
lar
phot
o-vo
ltai
csy
stem
.W
ork
atth
eex
isti
ngbu
ildi
ngw
illin
clud
elo
ose
lint
els
atne
wo
pen
ing
sin
exis
ting
wal
ls,
rein
forc
ing
ofro
offr
amin
gto
support
long
erm
echan
ical
roof
top
unit
s,an
dth
ead
diti
onof
foundat
ion
wor
kan
dst
eel
fram
ing
tosu
pp
ort
exis
ting
fram
ing
along
the
expan
sion
join
tat
the
cafe
teri
a.
CO
DE
S&
STA
ND
AR
DS
The
new
stru
ctura
lsy
stem
sw
illbe
des
ign
edin
acco
rdan
cew
ithth
ere
qii
rem
ents
ofth
efo
llow
ing
cod
esan
dst
and
ard
s:
•2018
CT
Sta
teB
uild
ing
Cod
ew
ithA
men
dm
ents
•2
01
5In
tern
atio
nal
Bui
ldin
gC
ode
•A
CI3
18-1
4B
uild
ing
Cod
eR
equir
emen
tsfo
rS
truct
ura
lC
oncr
ete
•A
CI53
0-1
3B
uild
ing
Cod
eR
equir
emen
tsfo
rM
ason
ryS
tru
ctu
res
•A
CI530.1
-13
Spe
cifi
cati
onfo
rM
ason
ryS
tru
ctu
res
•A
ISC
14
thE
d.S
teel
Con
stru
ctio
nM
anua
l•
AIS
C360-1
0S
peci
fica
tion
for
Str
uctu
ral
Ste
elB
uild
ings
•A
SCE
3-9
1S
truc
tura
lD
esig
nof
Com
posi
teS
labs
•A
SCE
7-1
0M
inim
umD
esig
nL
oads
for
Bui
ldin
gsan
dO
ther
Str
uct
ure
s•
AW
SD
1.1
-2000
Str
uctu
ral
Wel
ding
Cod
e-
Ste
el•
AW
SD
1.4
-20
11
Str
uctu
ral
Wel
ding
Cod
e-
Rei
nfor
cing
Ste
el•
SD
I-C
-201
1S
tandar
dfo
rC
ompo
site
Ste
elFl
oor
Dec
k•
SD
I/A
NS
I/R
D1.0
-10
Sta
nd
ard
for
Ste
elR
oof
Dec
k•
SJI
-JG
-10
Sta
nd
ard
Spe
cifi
cati
onfo
rJo
ist
Gir
ders
•SJ
I-K
-1O
Sta
ndar
dS
peci
fica
tion
for
Ope
nW
ebS
teel
Jois
ts•
SJI
-LH
/DL
H-1
0S
tandar
dS
peci
fica
tion
for
Lon
gspa
nan
dD
eep
Lon
gspa
nS
teel
Jois
ts
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,20
18,
Rev
ised
Feb
ruar
y15
,20
18
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
S
Ris
kC
ateg
ory
Ill
le,
Sei
smic
Import
ance
Fac
tor
1.2
5
Ss,
Short
Map
ped
Res
po
nse
0.2
32
51,
1S
econ
dM
appe
dR
espo
nse
0.0
67
Sit
eC
lass
Ass
um
edD
,T
BD
per
Geo
tech
nic
alR
epor
t
Sds,
Sho
rtD
esig
nR
esp
on
se0.2
47
Sdl,
1S
eco
nd
Des
ign
Res
po
nse
0.1
07
Sei
smic
Des
ign
Cat
egor
yB
Bas
icS
eism
icR
esis
ting
Sys
tem
Ste
elO
rdin
ary
Mom
ent
Fra
mes
Des
ign
Bas
eS
hea
rTB
DP
erA
SCE
7-1
0
Cs,
Sei
smic
Res
ponse
Coe
ffic
ient
0.2
34
R,
Res
ponse
Mod
ific
atio
nC
oeff
.3
.5
Ana
lysi
sP
roce
du
reE
quiv
alen
tL
ater
alF
orce
Ana
lysi
s
All
concr
ete
shal
lbe
com
pris
edof
mix
esus
ing
norm
alw
eigh
tag
gre
gat
esco
nfor
min
gto
AST
MC
33.
Sla
bs-o
n-gr
ade,
all
found
atio
ns
and
wal
lssh
all
have
am
inim
um28
-day
com
pre
ssiv
est
ren
gth
of4
,00
0ps
i.
Pag
e1
LOA
DIN
G
Min
imum
Live
Loa
dsfo
rN
ewC
onst
ruct
ion:
Ear
thq
uak
eD
esig
nD
ata
1st
Flo
orC
orri
dors
and
Lob
bies
10
0ps
f
Sta
irs
and
Exi
ts1
00
psI
Cla
ssro
om
s/O
ffic
es50
psf
Min
imum
Roo
f3
0ps
fpl
ussn
owdr
ift
and
8.0
psf
per
sola
rPV
syst
em
Roo
fS
now
Loa
dD
ata
Pg,
Gro
und
Sno
wL
oad
30
psI
Pt,
Fla
tR
oof
Sno
wL
oad
30
psI
per
CT
Am
endm
ent
Ce,
Sno
wE
xpos
ure
Fac
tor
1.0
Is,
Sno
wL
oad
Import
ance
Fac
tor
1.1
0
Ct,
The
rmal
Fac
tor
i.d
Pd,
Sno
wD
rift
Su
rch
arg
eTB
Dpe
rA
SCE
7-10
Wd,
Sno
wD
rift
Wid
thTB
Dpe
rA
SCE
7-1
0
Exi
stin
gR
oofs
Con
firm
atio
nTB
D
Win
dD
esig
nD
ata
Vul
t,U
ltim
ate
Des
ign
Win
dS
pee
d130
mph
Ris
kC
ateg
ory
Ill
Win
dE
xpos
ure
C
Inte
rnal
Pre
ssure
Coe
ffic
ient
Enc
lose
dB
uild
ing,
±0.1
8
Des
ign
Win
dP
ress
ure
sfo
rC
&C
TBD
per
ASC
E7-1
0
MA
TER
IALS
Con
cret
e:
Ste
elR
einf
orce
men
t:
Def
orm
edst
eel
rein
forc
emen
tsh
all
conf
orm
toA
STM
A61
5G
rade
60.
Wel
ded
wir
efa
bric
shal
lco
nfor
mto
AST
MA
185.
Page 77, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
‘2-’
-(
STR
UC
TU
RA
LSY
STE
MS
-N
AR
RA
TIV
E
Ste
el:
Wid
efl
ange
stee
lm
embe
rssh
all
conf
orm
toA
STM
A57
2G
rade
50or
AST
M99
2gr
ade,
50ks
i.
Pla
tes
and
mis
cell
aneo
ussh
apes
shal
lco
nfor
mto
AST
MA
36.
Hol
low
stru
ctur
alse
ctio
nssh
all
conf
orm
toA
STM
A50
0G
rade
B.
Ste
elpi
pesh
all
conf
orm
toA
STM
A53
,G
rade
B.
Anc
hor
bolt
ssh
all
conf
orm
toA
STM
F1554,
Fy=
36K
si.
Bol
ts,
nuts
,an
dw
ash
ers
shal
lco
nfor
mto
ATS
MA
325.
Wel
ding
elec
tro
des
shal
lco
nfor
mto
E7O
XX
.
EXIS
TIN
GC
ON
DIT
ION
S
Add
itio
nof
loos
eli
ntel
sw
illbe
requir
edat
new
op
enin
gs
inex
isti
ngw
alls
.E
xist
ing
roof
top
unit
sar
ean
tici
pat
edto
incr
ease
inle
ngth
and
wei
ght
thus
requ
irin
gad
dit
ional
stee
lfr
amin
gas
support
.A
nex
pan
sio
njo
int
atth
eex
is’t
ing
cafe
teri
aw
illnee
dto
becu
tin
toth
eex
isti
ngro
ofd
eck
and
(2)
stee
lco
lum
ns,
support
edby
rein
forc
edco
ncr
ete
foot
ings
and
pier
s,w
illbe
requir
edto
rep
lace
(2)
exis
ting
han
ger
mem
ber
s.E
ith
erjo
ints
orfi
rew
alls
will
bere
quir
edat
all
exis
ting
and
new
inte
rlac
esbu
tno
oth
erw
ork
onex
isti
ngco
ndit
ions
du
eto
thes
ein
terf
aces
isan
tici
pat
ed.
NE
WA
DD
ITIO
N
Geo
tech
nica
l:
Ass
umed
allo
wab
leso
ilbea
ring
pre
ssure
onundis
turb
edso
ilsh
all
be4,0
00
psI
bas
edon
const
ruct
ion
draw
ings
pre
par
edby
Lyo
ns,
Mat
her,
&L
echn
erA
rchi
tect
s,dat
ed2
-18
-19
76
,fo
rth
eA
ddit
ions
and
Alt
erat
ions
toP
onus
Rid
geM
iddl
eS
choo
l.A
llow
able
bea
ring
pre
ssure
tobe
veri
fied
byfo
rthc
omin
ggeo
tech
nic
alre
port
.
orco
mpac
ted
stru
ctura
lfil
l.T
heper
imet
erw
all
will
besu
pp
ort
edby
aco
nti
nuous
stri
pfo
otin
g,th
ebo
ttom
ofw
hich
will
bea
min
imum
of3’
-6”
belo
wfi
nish
gra
de
for
frost
prot
ecti
on.
The
typi
cal
foundat
ion
wal
lis
esti
mat
edto
be16
”w
ide
and
besu
pp
ort
edon
a3
foot
wid
est
rip
foot
ing.
The
top
ofth
ety
pica
lfo
undat
ion
wal
lw
illha
vean
8-in
ch-t
all
by6
inch
wid
esh
elf
alon
gth
eex
teri
orfa
ce.
48
pounds
ofre
info
rcin
gst
eel
per
cubi
cya
rdof
concr
ete
shou
ldbe
carr
ied
inth
ees
tim
ate
for
the
typj
cal
foun
dati
onw
all.
The
foundat
ion
atth
eno
rth
corn
erof
the
new
addi
tion
will
need
tobe
des
igned
asa
canti
lever
ed,
rein
forc
edco
ncr
ete
reta
inin
gw
all,
roug
hly
10’-
O”
tall
.T
hees
tim
ated
wal
lsi
zesh
all
be16
”th
ick
and
shal
lbea
ron
a1’
-4”
thic
kx
7’-6
”w
ide
stri
pfo
otin
g(2
-8”
toe
and
3’-6
”he
el).
Th
leng
thof
foundat
ion
wal
lth
atw
illnee
dto
bedes
ign
edas
are
tain
ing
wal
lis
190
line
arfe
et(1
50
line
arfe
etal
ong
the
nort
hel
evat
ion
and
40
line
arfe
etal
ong
the
east
elev
atio
nof
the
nort
hea
stcl
assr
oom
addi
tion
).72
pounds
ofre
info
rcin
gst
eel
per
cubi
cya
rdof
concr
ete
shou
ldbe
carr
ied
inth
ees
tim
ate
for
thes
ere
tain
ing
foundat
ion
wal
ls.
Col
umns
shal
lbe
sup
po
rted
onre
info
rced
con
cret
epi
ers
whi
char
esu
pport
edby
rein
forc
edco
ncr
ete
spre
adfo
otin
gs.
The
typi
cal
pier
size
is2’
x2’
and
will
bere
info
rced
with
eigh
t#8
vert
ical
rein
forc
ing
bar
sw
ith#4
clos
edti
esat
12in
ches
once
nte
r.200
pounds
ofre
info
rcin
gst
eel
per
cubi
cya
rdof
concr
ete
shou
ldbe
carr
ied
inth
ees
tim
ate
for
the
pier
s.T
hree
ties
at3
inch
eson
cen
ter
shal
len
clo
seth
eco
lum
nan
chor
bolt
s.Fo
res
tim
atin
gpurp
ose
s,th
eav
erag
esp
read
foot
ing
size
shal
lbe
5’x5
’x1’
-6”
thic
k.pounds
ofre
info
rcin
gst
eel
per
cubi
cya
rdof
con
cret
esh
ould
beca
rrie
din
the
esti
mat
efo
rth
ese
spre
adfo
otin
gs.
All
con
cret
efo
undat
ion
wal
lsan
dfo
otin
gssh
all
bere
info
rced
concr
ete
with
atle
astth
em
inim
umre
quir
edre
bar
per
ACI
318
bas
edon
area
.In
spec
ific
loca
tion
s,su
chas
the
reta
inin
gw
all
and
(to
bedet
erm
ined
)la
tera
lre
sist
ing
mem
ber
s,re
bar
size
and
spac
ing
will
bein
crea
sed
due
tode
sign
load
s.
Typ
ical
grou
ndfl
oor
const
ruct
ion
will
con
sist
ofa
5-in
chth
ick
con
cret
esl
ab-o
n-g
rade
rein
forc
edw
ith6x
6-W
2.9x
W2.
9w
elde
dw
ire
fabr
ic.
Sla
bs
will
bepl
aced
over
a10
mit
vapo
rba
rrie
ron
top
ofa
min
imum
thic
kn
ess
of8
inch
esof
3/4
”cr
ush
edst
on
e.
Rec
om
men
dat
ions
for
foundat
ion
drai
ns,
un
der
slab
dra
inag
esy
stem
san
d/o
ren
viro
nmen
tal
rem
edia
tion
syst
ems
will
beco
nti
ngen
tup
onre
com
men
dat
ion
sin
the
geo
tech
nic
alre
port
.
Sit
ere
tain
ing
wal
llo
cate
dnort
hw
est
ofth
ene
wad
diti
on,
ifco
nst
ruct
edfr
omca
stin
plac
eco
ncr
ete
shal
lbe
roug
hly
8’0”
toll
with
aw
all
size
of8-t
hic
kan
dsh
all
bea
ron
a1’
4”th
ick
x7’
6”w
ide
stri
pfo
otin
g(2
’8”
tee-
and
3’6”
heel
).
Roo
fF
ram
ing
and
Dec
king
:
Roo
ffr
amin
gw
illbe
sele
cted
from
the
foll
owin
gpr
elim
inar
yro
offr
amin
gsc
hem
es.
Typ
ical
Cla
ssro
omR
oof:
Typ
ical
clas
sro
om
sro
offr
amin
gw
illbe
wid
efl
ange
stee
lgi
rder
sw
ithop
enw
ebst
eel
jois
ts(2
0K9)
spac
edat
6’-O
’on
cen
ter
with
1‘/
2in
chdee
p,
galv
aniz
ed,
type
B,18
gage
,st
eel
roof
deck
.8.6
pounds
per
squar
efo
otof
roof
area
for
det
aile
dst
ruct
ura
lst
eel
fram
ing
(not
incl
udin
gro
ofde
ck)
shou
ldbe
carr
ied
inth
ees
tim
ate
for
all
roof
area
sex
cept
for
the
mat
hla
bro
of.
Thi
s8
.6poun
ds
per
squar
efo
otin
cludes
open
web
stee
lio
ists
,st
eel
bea
ms,
gird
ers.
colu
mns
and
seco
ndar
yst
eel
fram
ing.
Mat
hL
abR
oof:
The
mat
hla
bro
offr
amin
gw
illbe
wid
efl
ange
stee
lgi
rder
sw
ithdee
plo
ngsp
anop
enw
ebst
eel
jois
ts(4
OL
H1O
)sp
aced
at6’
-O”
once
nte
rw
ith2”
dee
p,
galv
aniz
ed,
18ga
ge,
Epi
core
acou
stic
alst
eel
roof
deck
ing.
10
.0pounds
per
squar
efo
otof
mat
hro
ofar
eafo
rdet
aile
dst
ruct
ura
lst
eel
fram
ing
(no
nclu
din
gro
ofde
ck)
shou
ldbe
carr
ied
inth
ees
tim
ate
for
the
mat
hla
bro
of.
Thi
s10.0
pounds
per
squar
efo
otin
clud
esop
enw
ebst
eel
iois
ts.
stee
lb
eam
s,gi
rder
s.co
lum
nsan
dse
cond
ary
stee
lfr
amin
g.
Oth
erar
eas,
whi
char
esh
ort
ersp
ans,
such
asth
eco
rrid
ors,
ves
tib
ule
s,lo
bbie
s,an
dca
fete
ria
will
likel
ybe
fram
edw
ithst
ruct
ura
lst
eel
gird
ers
and
stru
ctura
lst
eel
bea
ms.
Sp
ou
nd
spe
rsq
uar
efo
otro
ofar
eafo
rd
etai
led
stru
ctura
lst
eel
fram
ing
(not
incl
udin
gro
ofde
ck)
shou
ldbe
carr
ied
for
thes
eo
ther
roof
area
s.
Aco
usti
cal
deck
will
bere
quir
edat
the
Mat
hL
abas
prev
ious
lyno
ted
and
atth
eno
rth
and
south
hall
souts
ide
ofth
em
ath
lab,
the
new
cafe
teri
aex
tensi
on
area
,th
elo
wer
scho
olen
tran
celo
bby,
and
the
east
wes
tco
nn
ecti
ng
corr
idor
from
lobb
yto
the
mat
hla
b.
Supp
ort
stru
ctu
refo
rth
ero
ofgi
rder
ssh
all
best
eel
colu
mns
.D
efle
ctio
nsof
the
stru
ctura
lro
ofsy
stem
and
mem
ber
sth
ereo
fsh
all
bedes
igned
toco
mpl
yw
ithth
edef
lect
ions
lim
its
give
nin
Tab
le1
60
4.3
ofth
eIB
C2
015
code
.F
lat
roof
area
ssh
all
besl
oped
1/4
”pe
rfo
otm
inim
um.
Fou
ndat
ion
Sys
tem
:
Ap
rop
ose
dco
nven
tion
alfo
undat
ion
syst
emw
illco
nsi
stof
typi
cal
spre
adfo
otin
gsw
ith
con
cret
epi
ers
sup
po
rted
byei
ther
undis
turb
edna
tura
lso
il
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,20
18,
Rev
ised
Feb
ruar
y15
,20
18
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
O3-
RB
TS
Pag
e2
Page 78, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
STR
UC
TU
RA
LSY
STE
MS
-N
AR
RA
TIV
E
Roo
fC
anop
yV
”C
olum
nsP
ropose
dre
ola
cem
ent
ofM
echa
nica
lU
nits
onex
isti
ngro
ofs
will
requ
ire
mod
ific
atio
nsto
the
exis
ting
stee
lfr
amin
gm
ember
sw
hich
are
to“V
”co
lum
ns
support
ing
roof
fram
ing
atex
teri
orover
han
gin
gca
no
pie
ssu
nort
the
oro
oose
dun
its.
The
rear
e14
exis
ting
unit
sto
bere
pla
ced.
shal
lbe
fabri
cate
dfr
om10
-inc
hdia
met
er,
3/8
”w
all
thic
kn
ess,
roun
dT
here
shou
ldbe
doll
ars
carr
ied
inth
ees
tim
ate
toco
ver
the
stru
ctura
lH
SSse
ctio
ns.
Indi
vidu
alse
ctio
ns
atbas
esh
all
becu
ton
beve
lan
dm
odif
icat
ions
atth
ese
14
unit
s.(S
ugge
stio
nat
the
poin
tw
ould
bew
elde
dto
get
her
via
a3
/4”
thic
kve
rtic
alkn
ife
spli
cepl
ate
exte
ndin
g$5000
per
unit
x14
unit
s=
$7
0,0
00
allo
wan
ce).
from
bas
epl
ate.
Exp
osed
wel
dssh
all
begr
ound
smooth
.A
ssem
bly
shal
lbe
hot
dip
galv
aniz
edaf
ter
fabr
icat
ion.
Fir
ewal
l
Fir
ewal
lsw
illbe
loca
ted
at(3
)lo
cati
ons.
Fire
wal
lssh
all
bedes
igned
asei
ther
free
stan
din
gca
nti
lever
wal
ls,
sim
ply
sup
po
rted
wal
lsw
ithm
elt-
away
clip
son
both
sides
,or
sim
ply
sup
po
rted
wal
lsw
ithst
eel
clip
son
one
side
ifth
ead
jace
nt
side
isan
exis
ting
wal
lw
hich
mee
tsth
ere
quir
edfi
rera
ting
.F
irew
alls
requ
ire
ajo
int
inth
ebu
ildi
ngan
dth
eref
ore
colu
mns
and
fram
ing
mem
ber
sw
illbe
requ
ired
adja
cent
toea
chsi
de.
The
nort
h-so
uth
fire
wal
lse
par
atin
gB
uild
ing
‘A’
from
Bui
ldin
g‘B
’at
the
south
win
gof
clas
sro
om
ssh
all
bea
canti
lever
ed.
eigh
t-in
ch-t
hick
concr
ete
mas
onry
unit
wal
l,gr
oute
dso
lid
full
heig
htan
dfu
llle
ngth
and
rein
forc
edw
ith#
6ve
rtic
albar
sat
16in
ches
once
nte
rfu
llhe
ight
.T
hefi
rew
all
shal
lbe
sup
po
rted
ona
4’-8
”w
ide
x1’-
6’t
hic
kre
info
rced
concr
ete
stri
pfo
otin
g.T
opof
the
foot
ing
shal
lbe
1-4
”be
low
the
fini
shed
floo
rel
evat
ion.
55
pounds
ofre
info
rcin
gst
eel
per
cubi
cya
rdof
concr
ete
shou
ldbe
carr
ied
inth
ees
tim
ate
for
this
foot
ing.
Lat
eral
Loa
dR
esis
ting
Sys
tem
:
The
late
ral
load
resi
stin
gsy
stem
shal
lco
nsi
stof
stee
lor
dina
rym
om
ent
fram
es.
The
cont
roll
ing
late
ral
forc
es,
from
win
dor
seis
mic
,sh
all
beco
llec
ted
byth
eho
rizo
ntal
dia
phra
gm
san
dtr
ansf
erre
dto
the
vert
ical
late
ral
load
resi
stin
gsy
stem
elem
ents
whi
chw
illtr
ack
dow
nto
the
foundat
ion
syst
em.
The
esti
mat
ednum
ber
ofm
om
ent
fram
esis
(20)
twen
tyw
ithtw
oco
nnec
tions
per
fram
e(4
0co
nnec
tions
tota
l).
Support
ofM
echa
nica
lU
nits
Mec
hani
cal
Uni
tspo
siti
oned
onth
ero
ofof
the
pro
pose
dad
dit
ions
will
besu
pp
ort
edon
the
new
roof
fram
ing
and
isac
counte
dfo
rin
the
po
un
ds
per
squ
are
foot
ofdet
aile
dst
ruct
ura
lst
eel
fram
ing
val
ues
pre
sente
dea
rlie
r.
Sch
emat
icD
esig
nD
raw
ings
Sch
emat
icD
esig
nP
hase
Pag
e3
Pon
usR
idge
Scho
olIN
orw
alk,
Con
nect
icut
Sta
te#
TM
P-1
03-R
BT
SF
ebru
ary
2,20
18,
Rev
ised
Feb
ruar
y15
,20
18
Page 79, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
STR
UC
TU
RA
LSY
STE
MS
-N
AR
RA
TIV
E
GE
NE
RA
L
Com
plet
ene
wst
ruct
ura
lsy
stem
sar
eto
bepr
ovid
edfo
rth
ene
wone
stor
yad
dit
ion.
The
new
addi
tion
shal
lbe
separ
ated
from
the
exis
ting
stru
ctu
reby
ase
ism
icse
par
ate
join
t.T
hes
ew
illlik
ely
incl
ude
rein
forc
edco
ncr
ete
fou
nd
atio
ns
with
apo
rtio
nof
the
foundat
ion
bein
gre
tain
ing.
Inad
dit
ion,
the
roof
fram
ing
will
best
eel
gir
der
san
dst
eel
jois
tsw
ith
typi
cal
roof
dec
kin
most
area
san
dac
ou
stic
roof
dec
kin
som
ear
eas.
New
roof
ssh
all
bed
esig
ned
per
the
2018
Connec
ticu
tS
tate
Bui
ldin
gC
ode
whi
chin
cludes
the
20
15
IBC
wit
hlo
cal
amen
dm
ents
and
all
asso
ciat
edre
fere
nce
codes
asw
ell
asad
dit
ional
capac
ity
for
ap
ropose
dso
lar
phot
o-vo
ltai
csy
stem
.W
ork
atth
eex
isti
ngbu
ildi
ngw
illin
clud
elo
ose
lint
els
atne
wopen
ings
inex
isti
ngw
alls
,re
info
rcin
gof
roof
fram
ing
tosu
pport
long
erm
echan
ical
roof
top
unit
s,an
dth
ead
diti
onof
foundat
ion
wor
kan
dst
eel
fram
ing
tosu
pport
exis
ting
fram
ing
along
the
expan
sion
join
tat
the
cafe
teri
a.
•2018
CT
Sta
teB
uild
ing
Cod
ew
ithA
men
dm
ents
•2015
Inte
rnat
iona
lB
uild
ing
Cod
e•
ACI
318-1
4B
uild
ing
Cod
eR
equir
emen
tsfo
rS
truc
tura
lC
oncr
ete
•A
CI530
-13
Bui
ldin
gC
ode
Req
uir
emen
tsfo
rM
ason
ryS
tru
ctu
res
•A
CI530.1
-13
Spe
cifi
cati
onfo
rM
ason
ryS
tru
ctu
res
•A
ISC
14th
Ed.
Ste
elC
onst
ruct
ion
Man
ual
•A
ISC
36
0-1
0S
peci
fica
tion
for
Str
uctu
ral
Ste
elB
uild
ings
•A
SCE
3-9
1S
truct
ura
lD
esig
nof
Com
posi
teS
labs
•A
SCE
7-10
Min
imum
Des
ign
Loa
dsfo
rB
uild
ings
and
Oth
erS
tru
ctu
res
•A
WS
D1.1
-2000
Str
uctu
ral
Wel
ding
Cod
e-
Ste
el•
AW
SD
1.4
-2011
Str
uctu
ral
Wel
ding
Cod
e-
Rei
nfor
cing
Ste
el•
SD
I-C
-201
1S
tan
dar
dfo
rC
ompo
site
Ste
elF
loor
Dec
k•
SD
I/A
NS
I/R
D1.0
-10
Sta
nd
ard
for
Ste
elR
oof
Dec
k•
SJI
-JG
-10
Sta
nd
ard
Spe
cifi
cati
onfo
rJo
ist
Gir
ders
•SJ
I-K
-1O
Sta
nd
ard
Spe
cifi
cati
onfo
rO
pen
Web
Ste
elJo
ists
•S
JI-L
H/D
LH
-10
Sta
nd
ard
Spe
cifi
cati
onfo
rL
ongs
pan
and
Dee
pL
ongs
pan
Ste
elJo
ists
Ris
kC
ateg
ory
le,
Sei
smic
Imp
ort
ance
Fac
tor---
1.2
5--
Ss,
Short
Map
ped
Res
po
nse
0.2
32
---
Si,
1S
econ
dM
appe
dR
espo
nse
0.0
67
Sit
eC
lass
Ass
um
edD
,T
BD
per
,G
eote
chnic
alR
epor
t
Sds
,S
hort
Des
ign
Res
pon
se0
.24
7
Sdl,
1S
econ
dD
esig
nR
espo
nse
0.1
07
Sei
smic
Des
ign
Cat
egor
yB
Bas
icS
eism
icR
esis
ting
Sys
tem
Ste
elO
rdin
ary
Mom
ent
Fra
mes
Des
ign
Bas
eS
hea
rT
BD
Per
ASC
E7
-10
Cs,
Sei
smic
Res
ponse
Coe
ffic
ient
0.2
34
R,R
esp
on
seM
odif
icat
ion
Coe
ff.
3.5
Ana
lysi
sP
roce
dure
Equ
ival
ent
Lat
eral
For
ceA
naly
sis
All
con
cret
esh
all
beco
mpr
ised
ofm
ixes
usin
gno
rmal
wei
ght
agg
reg
ates
conf
orm
ing
toA
STM
C33
.
Sla
bs-o
n-gr
ade,
all
found
atio
ns
and
wal
lssh
all
have
am
inim
um28
-day
com
pre
ssiv
est
reng
thof
4,0
00
psi.
Ear
thq
uak
eD
esig
nD
ata
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,20
18
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
1
LOA
DIN
G
Min
imum
Liv
eL
oads
for
New
Const
ruct
ion:
qOD
ES
&ST
AN
DA
RD
S
The
new
stru
ctu
ral
syst
ems
will
bed
esig
ned
inac
cord
ance
wit
hth
ere
quir
emen
tsof
the
foll
owin
gco
des
and
stan
dar
ds:
1st
Flo
orC
orri
dors
and
Lob
bies
100
psf
Sta
irs
and
Exi
ts100
psf
Cla
ssro
om
s/O
ffic
es50
psf
Min
imum
Roo
f3
0ps
fpl
ussn
owdr
ift
and
8.0
psf
per
sola
rPV
syst
em
—
Roo
fS
now
Loa
dD
ata
Pg,
Gro
und
Sno
wL
oad
30
psI
Pf,
Fla
tR
oof
Sno
wL
oad
30
sf
per
CTA
men
dm
ent
Ce,
Sno
wE
xpos
ure
Fac
tor
1.0
Is,
Sno
wL
oad
lrnp
b.rt
anQ
eF
acto
r1.1
0
C-c
rIrç
Iicto
r1.0
Pd,
Si’n
owD
rift
Su
rch
arg
eT
BD
per
ASC
E7-1
0
Wd,
Sno
wD
rift
Wid
thT
BD
per
ASC
E7-1
0
Exi
stin
gR
oofs
Con
firm
atio
nT
BD
MA
TER
IALS
Con
cret
e:
Win
dD
esig
nD
ata
Vul
t,U
ltim
ate
Des
ign
Win
dS
pee
d130
mph
Ris
kC
ateg
ory
III
Win
dE
xpos
ure
C
Inte
rnal
Pre
ssure
Coe
ffic
ient
Enc
lose
dB
uild
ing,
±0.1
8
Des
ign
Win
dP
ress
ure
sfo
rC
&C
TB
Dpe
rA
SCE
7-1
0
Ste
elR
einf
orce
men
t:
Def
orm
edst
eel
rein
forc
emen
tsh
all
conf
orm
toA
STM
A61
5G
rade
60.
Wel
ded
wir
efa
bric
shal
lco
nfor
mto
AST
MA
185.
Page 80, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
STR
UC
TU
RA
LSY
STE
MS
-N
AR
RA
TIV
E
Ste
el:
Wid
efl
ange
stee
lm
ember
ssh
all
conf
orm
toA
STM
A57
2G
rade
50
orA
STM
992
gra
de,
50
ksi.
Pla
tes
and
mis
cell
aneo
us
shap
essh
all
conf
orm
toA
STM
A36
.
Hol
low
stru
ctu
ral
sect
ion
ssh
all
conf
orm
toA
STM
A50
0G
rade
B.
Ste
elpi
pesh
all
conf
orm
toA
STM
A53
,G
rade
B.
Anc
hor
bolt
ssh
all
conf
orm
toA
STM
F1554,
Fy=
36K
si.
Bol
ts,
nuts
,an
dw
ash
ers
shal
lco
nfor
mto
ATS
MA
325.
Wel
ding
elec
trodes
shal
lco
nfor
mto
E7O
XX
.
EXIS
TIN
GC
ON
DIT
ION
S
Add
itio
nof
loos
eli
ntel
sw
illbe
requir
edat
new
open
ings
inex
isti
ngw
alls
.E
xist
ing
roof
top
unit
sar
ean
tici
pat
edto
incr
ease
inle
ngth
and
wei
ght
thus
requ
irin
gad
dit
ional
stee
l’fr
amin
gas
sup
po
rt.
An
exp
ansi
on
join
tat
the
exis
ting
cafe
teri
aw
illnee
dto
becu
tin
toth
eex
isti
ngro
ofd
eck
and
(2)
stee
lco
lum
ns,
support
edby
rein
forc
edco
ncr
ete
footi
ngs
and
pier
s,w
illbe
requir
edto
rep
lace
(2)
exis
ting
han
ger
mem
ber
s.E
ith
erjo
ints
orf
irew
alls
will
bere
quir
edat
all
exis
ting
and
new
inte
rlac
esbu
tno
oth
erw
ork
onex
isti
ngco
ndit
ions
du
eto
thes
ein
terf
aces
isan
tici
pat
ed.
NE
WA
DD
ITIO
N
Geo
tech
nica
l:
Ass
umed
allo
wab
leso
ilbea
ring
pre
ssu
reon
undis
turb
edso
ilsh
all
be4
,00
0ps
fbas
edon
const
ruct
ion
draw
ings
pre
par
edby
Lyo
ns,
Mat
her,
&L
echn
erA
rchi
tect
s,dat
ed2
-18
-19
76
,fo
rth
eA
ddit
ions
and
Alt
erat
ions
toP
onus
Rid
geM
iddl
eS
choo
l.A
llow
able
bea
ring
pre
ssure
tobe
veri
fied
byfo
rthc
omin
ggeo
tech
nic
alre
port
.
Fou
ndat
ion
Sys
tem
:
Apr
opos
edco
nven
tion
alfo
undat
ion
syst
emw
illco
nsi
stof
typi
cal
spre
adfo
otin
gsw
ithco
ncr
ete
pier
ssu
pp
ort
edby
eith
erundis
turb
edna
tura
lso
ilor
com
pac
ted
stru
ctura
lfil
l.T
heper
imet
erw
all
will
besu
pp
ort
edby
aco
nti
nu
ou
sst
rip
foot
ing,
the
bott
omof
whi
chw
illbe
am
inim
umof
3’-6
”
belo
wfi
nish
gra
de
for
frost
prot
ecti
on.
The
typi
cal
foundat
ion
wal
lis
esti
mat
edto
be16
”w
ide
and
besu
pp
ort
edon
a3
foot
wid
est
rip
foot
ing.
The
foundat
ion
atth
eno
rth
corn
etof
the
new
addi
tion
will
nee
dto
bedes
igned
asa
canti
lever
ed,
rein
forc
edco
ncr
ete
reta
inin
gw
all,
roug
hly
10-0
”ta
ll.
The
esti
mat
edw
all
size
shal
lbe
16”
thic
kan
dsh
all
bea
ron
a1’
-4”
thic
kx
7’-6
”w
ide
stri
pfo
otin
g(2
’-8”
toe
and
3’-6
”he
el).
Col
umns
shal
lbe
sup
po
rted
onre
info
rced
con
cret
epi
ers
whi
char
esu
pp
ort
edby
rein
forc
edco
ncr
ete
spre
adfo
otin
gs.
The
typi
cal
pier
size
is2’
x2’
and
will
bere
info
rced
with
eigh
t#
8ve
rtic
alre
info
rcin
gbat
sw
ith#
4cl
osed
ties
at12
inch
eson
cente
r.T
hree
ties
at3
inch
eson
cen
ter
shal
len
close
the
colu
mn
anch
or
bolt
s.Fo
res
tim
atin
gp
urp
ose
s,th
eav
erag
esp
read
foot
ing
size
shal
lbe
5’x5
’x1’
-6”
thic
k.
All
concr
ete
foundat
ion
wal
lsan
dfo
otin
gssh
all
bere
info
rced
co_n
cret
ew
ithat
leas
tth
em
inim
umre
quir
edte
bat
per
ACI
318
bas
edon
area
.In
spec
ific
loca
tion
s,su
chas
the
reta
inin
gw
all
and
(to
bedet
erm
ined
)la
tera
lre
sist
ing
mem
ber
s,te
bar
size
and
spac
ing
will
bein
crea
sed
du
eto
desi
gnlo
ads.
Typ
ical
grou
ndfl
oor
const
ruct
ion
will
con
sist
ofa
5-in
chth
ick
concr
ete
slab
-on-g
rade
rein
forc
edw
ith6x
6-W
2.9x
W2.
9w
elde
dw
ire
fabr
ic.
Sla
bs
will
bepl
aced
over
a10
mil
vapo
rba
rrie
ron
top
ofa
min
imum
thic
kn
ess
of8
inch
esof
3/4
”cr
ush
edst
on
e.
Sit
ere
tain
ing
wal
llo
cate
dnort
hw
est
ofth
ene
wad
diti
on,
ifco
nst
ruct
edfr
omca
st-i
n-pl
ace
con
cret
esh
all
beto
ughl
y8
-0”
tall
with
aw
all
size
of8”
thic
kan
dsh
all
bea
ron
a1’
-4”
thic
kx
7’-6
”w
ide
stri
pfo
otin
g(2
’-S”
toe
and
3’-6
”he
el).
Roo
fF
ram
ing
and
Dec
king
:
Roo
ffr
amin
gw
illbe
sele
cted
from
the
foll
owin
gpr
elim
inar
yro
offr
amin
gsc
hem
es.
Typ
ical
Cla
ssro
omR
oof:
Typ
ical
clas
sro
om
sro
offr
amin
gw
illbe
wid
efl
ange
stee
lgi
rder
sw
ithop
enw
ebst
eel
jois
ts(2
0K9)
spac
edat
6’-O
”on
cente
rw
ith1
½in
chdee
p,
galv
aniz
ed,
type
B,18
gage
,st
eel
roof
deck
.
Mat
hL
abR
oof:
The
mat
hla
bro
offr
amin
gw
illbew
ide
flan
ge
stee
lgi
rder
sw
ithdee
plo
ngsp
anop
enw
ebst
eel
joJ,
st(4
0L
H10
)sp
aced
at6’
-O”
once
nte
rw
ith2”
dee
p,g
alv
ajz
,18
gage
,E
pico
reac
oust
ical
stee
lro
ofde
ckin
g.
Oth
erar
eas,
whi
char
esh
ort
erspan
su
ch
asth
eco
rrid
ors,
ves
tibule
s,lo
bbie
s,an
dca
fete
ria
will
lik9
lybe
fram
edw
ithst
ruct
ura
lst
eel
gird
ers
and
stru
ctura
lst
eelbearn
Aco
usti
cal
deck
wil
(req
uir
ed
atth
eM
ath
Lab
aspr
evio
usly
note
dan
dat
the
no
rth
ard
south
hall
souts
ide
ofth
em
ath
lab,
the
new
cafe
teri
aex
tens
ion
area
,th
elo
wer
scho
olen
tran
celo
bby,
and
the
east
wes
tco
nnec
ting
corr
idor
from
lobb
yto
the
mat
hla
b.
Su
pp
ort
stru
ctu
refo
rth
ero
ofgi
rder
ssh
all
best
eel
colu
mns
.D
efle
ctio
nsof
the
stru
ctura
lro
ofsy
stem
and
mem
ber
sth
ereo
fsh
all
bedes
ign
edto
com
ply
with
the
def
lect
ions
lim
its
give
nin
Tab
le1604.3
ofth
eIB
C2015
code
.F
lat
roof
area
ssh
all
besl
oped
1/4
”pe
rfo
otm
inim
um.
Fir
ewal
l
Fir
ewal
lsw
illbe
loca
ted
at(3
)lo
cati
ons.
Fire
wal
lssh
all
bed
esig
ned
asei
ther
free
stan
din
gca
nti
lever
wal
ls,
sim
ply
sup
po
rted
wal
lsw
ithm
elt-
away
clip
son
both
sides
,or
sim
ply
sup
po
rted
wal
lsw
ithst
eel
clip
son
one
side
ifth
ead
jace
nt
side
isan
exis
ting
wal
lw
hich
mee
tsth
ere
quir
edfi
rera
ting
.F
irew
alls
requ
ire
ajo
int
inth
ebu
ildi
ngan
dth
eref
ore
colu
mns
and
fram
ing
mem
ber
sw
illbe
requ
ired
adja
cent
toea
chsi
de.
Lat
eral
Loa
dR
esis
ting
Sys
tem
:
The
late
ral
load
resi
stin
gsy
stem
shal
lco
nsi
stof
stee
lor
dina
rym
om
ent
fram
es.
The
cont
roll
ing
late
ral
forc
es,
from
win
dor
seis
mic
,sh
all
beco
llec
ted
byth
eho
rizo
ntal
dia
ph
ragm
san
dtr
ansf
erre
dto
the
vert
ical
late
ral
load
resi
stin
gsy
stem
elem
ents
whi
chw
illtr
ack
dow
nto
the
foundat
ion
syst
em.
The
esti
mat
ednum
ber
ofm
om
ent
fram
esis
(20)
twen
ty.
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,20
18
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
2
Rec
om
men
dat
ions
for
foundat
ion
drai
ns,
under
slab
dra
inag
esy
stem
san
dyqr
envir
onm
enta
lre
med
iati
on
syst
ems
will
beco
nti
ng
ent
upon
iDo
1m
en
dati
on
sin
the
geo
tech
nic
alre
port
.
Page 81, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
ME
CH
AN
ICA
LSY
STE
MS
-N
AR
RA
TIV
E
2-ic
-1
GE
NE
RA
L
Com
plet
ene
wm
echan
ical
syst
ems
are
tobe
prov
ided
for
the
new
addit
ion.
Air
condit
ionin
gsy
stem
sar
eto
bepr
ovid
edfo
ral
lar
eas
ofth
eex
isti
ngbu
ildi
ng,
whi
chin
volv
esth
ere
nova
tion
orre
pla
cem
ent
ofm
uch
ofth
eex
isti
ngm
echan
ical
equ
ipm
ent.
Are
asof
the
exis
ting
buil
ding
wit
hex
tensi
ve
arch
itec
tura
lre
novat
ions,
incl
udin
gth
em
ain
offi
cear
ea,
nurs
e’s
suit
e,ar
tro
om,
engin
eeri
ng
tech
lab,
kitc
hen,
cafe
teri
a,an
dad
jace
nt
scie
nce
room
s,w
illre
quir
ere
confi
gura
tion
orre
pla
cem
ent
ofex
isti
ngm
echan
ical
syst
ems.
CO
DE
S&
STA
ND
AR
DS
The
new
syst
ems
will
bed
esig
ned
inac
cord
ance
wit
hth
ere
qu
irem
ents
ofth
efo
llow
ing
codes
and
stan
dar
ds:
•2018
CT
Sta
teB
uild
ing
Cod
ew
ithE
rrat
a’s
•2018
CT
Sta
teFi
reS
afet
yC
ode
with
Err
ata’
s•
2015
Inte
rnat
iona
lB
uild
ing
Cod
ean
dre
fere
nce
dpu
blic
atio
ns•
2015
Inte
rnat
iona
lP
lum
bing
Cod
ean
dre
fere
nce
dpubli
cati
ons
•2
01
5In
tern
atio
nal
Ene
rgy
Con
serv
atio
nC
ode
•C
onne
ctic
utH
igh
Per
form
ance
Bui
ldin
gS
tandar
ds
•A
SHR
AE
Sta
nd
ard
62.1
•O
ther
Sta
tean
dL
ocal
Cod
es
NE
WA
DD
ITIO
N
Cla
ssro
om
san
dA
dmin
istr
atio
nA
reas
Cla
ssro
oman
dA
dmin
istr
atio
nar
eas
will
bese
rved
bya
com
bina
tion
ofva
riab
lere
frig
eran
tfl
ow(V
RF)
syst
ems
(Mit
subi
shi,
Dai
kin,
orsi
mil
ar)
with
hea
tre
cove
ryan
dded
icat
edoutd
oor
air
unit
s(D
OA
S).
The
VR
Fsy
stem
s(M
itsu
bish
i,D
aiki
n,or
sim
ilar
)w
illpr
ovid
ehea
ting
and
cool
ing
toth
esp
aces
they
serv
e.A
VR
Fsy
stem
consi
sts
ofan
outd
oor
conden
sing
unit
loca
ted
onth
ero
of,
indo
orduct
edfa
n-co
ilun
its
supp
lyin
gai
rfo
rhea
ting
and
cool
ing
toea
chsp
ace,
and
refr
iger
ant
pipi
ngco
nn
ecti
ng
the
indo
oran
doutd
oor
unit
s.
Tw
oD
OA
Sun
its
(Aao
nM
odel
RN
orsi
mil
ar),
each
with
anes
tim
ated
capa
city
of6
,00
0-7
,00
0cu
bic
feet
per
min
ute,
will
bepr
ovid
edto
supp
lyve
ntil
atio
nai
rto
all
spac
esse
rved
byV
RF
syst
ems.
The
DO
AS
unit
sw
illbe
vari
able
air
volu
me,
pac
kag
edro
ofto
pun
its
with
ener
gyre
cove
ryw
heel
s,w
hich
will
hea
t,co
ol,
and
dehu
mid
ify
the
inco
min
gai
rto
prov
ide
tem
per
edve
ntil
atio
nai
r.T
hes
eun
its
will
incl
ude
hot-
wat
er
heat
ing,
vari
able
capa
city
dir
ect
expan
sion
(DX
)co
olin
g,en
ergy
reco
very
whe
els
toco
nse
rve
ener
gyby
tran
sfer
rin
gen
ergy
from
exh
aust
air
toth
ein
com
ing
outd
oor
air,
and
hot-
gas
rehea
tco
ils
for
dehu
mid
ific
atio
n.T
hey
will
dis
trib
ute
vent
ilat
ion
air
via
duct
wor
kto
the
spac
es.
Rel
ief
and
exhau
stai
rw
illbe
duct
edba
ckto
exh
aust
fan
sin
the
ded
icat
edoutd
oor
air
unit
s,al
low
ing
ener
gyfr
omth
isai
rto
beus
edto
tem
per
the
inco
min
gou
tdoo
rai
r.T
heD
OA
Sun
its
will
inco
rpora
tedem
and
cont
rol
vent
ilat
ion,
whi
chw
illm
odula
teth
eam
ou
nt
ofouts
ide
air
bas
edon
occ
upan
cyan
dca
rbon
diox
ide
leve
ls.
Hyd
roni
cra
dia
nt
ceil
ing
pan
els
will
bein
stal
led
atper
imet
erw
alls
tooff
set
the
hea
tlo
ssfr
omth
ebu
ildi
ngen
velo
pe,
and
pre
ven
tco
lddra
fts
nea
rth
ew
indo
ws.
Hot
wat
erfo
rhea
ting
will
bepr
ovid
edby
the
exis
ting
boil
erpl
ant,
and
serv
eth
eD
OA
Sun
its,
Mat
hL
aban
dC
afet
eria
roof
top
unit
s,an
dra
dia
nt
ceil
ing
pan
els.
New
hot
wat
ersu
pply
and
retu
rnli
nes
will
beco
nn
ecte
dto
the
exis
ting
hea
der
inth
ebo
iler
room
,tw
one
wpum
ps
ded
icat
edto
the
new
addi
tion
will
bein
stal
led
inth
ebo
iler
room
,an
dne
wpi
ping
will
beru
nfr
omth
ebo
iler
room
toth
ene
wad
diti
on.
Fur
ther
calc
ula
tions
are
requ
ired
todet
erm
ine
whet
her
one
addi
tion
albo
iler
will
nee
dto
bead
ded
toth
ebo
iler
plan
t.If
ane
wbo
iler
isre
quir
ed,
asso
ciat
edco
mponen
ts,
such
asth
een
tire
boil
erfl
uew
ithi
nth
ebo
iler
room
and
the
oil
pum
ping
syst
emw
illha
veto
beev
aluat
edto
det
erm
ine
com
pati
bili
tyw
ithth
ela
rger
boil
erpl
ant.
Mat
hL
aban
dC
afet
eria
The
Mat
hL
aban
dC
afet
eria
will
each
bese
rved
will
bese
rved
byva
riab
leai
rvo
lum
e,pac
kag
edro
ofto
pun
its
(Aao
nM
odel
RN
orsi
mil
ar)
with
ener
gyre
cove
ryw
heel
s,w
hich
will
prov
ide
heat
ing,
cool
ing,
dehu
mid
ific
atio
n,an
dve
ntil
atio
n.T
hes
eun
its
will
incl
ude
hot-
wat
erhe
atin
g,va
riab
leca
paci
tydi
rect
expan
sion
(DX
)co
olin
g,en
ergy
reco
very
whe
els
toco
nse
rve
ener
gyby
tran
sfer
rin
gen
ergy
from
exh
aust
air
toth
ein
com
ing
outd
oor
air,
and
hot-
gas
rehea
tco
ils
for
dehu
mid
ific
atio
n.T
hey
will
dis
trib
ute
vent
ilat
ion
air
via
duct
wor
kto
the
spac
es.
Rel
ief
and
exhau
stai
rw
illbe
duct
edba
ckto
exh
aust
fan
sin
the
roof
top
unit
s,al
low
ing
ener
gyfr
omth
isai
rto
beuse
dto
tem
per
the
inco
min
goutd
oor
air.
Thes
ero
ofto
pun
its
will
inco
rpora
tedem
and
cont
rol
vent
ilat
ion,
whi
chw
illm
odula
teth
eam
ou
nt
ofouts
ide
air
bas
edon
occ
upan
cyan
dca
rbon
diox
ide
leve
ls.
Est
imat
edco
olin
gca
pac
itie
sar
eap
prox
imat
ely
25-t
ons
with
airf
low
sof
8,0
00
-9,0
00
cfm
.
Hyd
roni
cra
dia
nt
ceil
ing
pan
els
will
bein
stal
led
atper
imet
erw
alls
toof
fset
the
hea
tlo
ssfr
omth
ebu
ildi
ngen
velo
pe,
and
pre
ven
tco
lddra
fts
nea
rth
ew
indo
ws.
Hot
wat
erfo
rh
eati
ng
will
bepr
ovid
edby
the
exis
ting
boil
erpl
ant,
asd
escr
ibed
inth
eC
lass
room
san
dA
dmin
istr
ativ
eA
reas
abov
e.
ITR
oom
Aduct
less
spli
tsy
stem
hea
tpu
mp
(Mit
subi
shi,
Dai
kin,
orsi
mil
ar)
will
bein
stal
led
tose
rve
the
IT/T
echn
olog
yro
omin
the
new
addi
tion
.E
stim
ated
cool
ing
capac
ity
is2-
tons
.
EXIS
TIN
GB
UIL
DIN
G
Cla
ssro
om
san
dA
dmin
istr
atio
nA
reas
All
exis
ting
clas
sroom
and
adm
inis
trat
ion
area
sar
ecu
rren
tly
serv
edby
per
imet
erho
tw
ater
fin-
tube
radi
atio
nfo
rhe
atin
g.T
heex
isti
ngfi
n-tu
bera
diat
ion
will
rem
ain
inoper
atio
n,
with
all
cont
rol
valv
esre
plac
edan
dco
mpat
ible
with
the
buil
ding
’sne
wel
ectr
onic
dir
ect
digi
tal
cont
rol
(DD
C)
syst
em.
The
exis
ting
clas
sroom
area
sar
ecu
rren
tly
serv
edby
seven
Tra
nem
odul
arh
eati
ng
and
vent
ilat
ing
DO
AS
unit
s,w
hich
prov
ide
hea
ted
vent
ilat
ion
air
toth
esp
aces
serv
ed.
Thes
eun
its
dono
tha
vean
yco
olin
gor
ener
gyre
cove
ry,
resu
ltin
gin
hot,
hum
idai
rbe
ing
brou
ght
into
the
buil
ding
duri
ngw
arm
and
hum
idoutd
oor
tem
per
ature
s.In
addi
tion
,du
ring
cold
eroutd
oor
wea
ther
,th
ese
unit
sw
ere
mos
tly
obse
rved
tobe
turn
edof
f,re
sult
ing
inno
vent
ilat
ion
air
bein
gpr
ovid
edto
man
yar
eas
ofth
ebu
ildi
ng.
Thes
eex
isti
ngun
its
have
capac
itie
sof
8,0
00
cfm
,6,5
00
cfm
,2,7
00
cfm
,5
,50
0cf
m,
4,0
00
cfm
,4
,000
cfm
,an
d2,2
50
cfm
.
Bas
eB
idfo
rE
xist
ing
DO
AS
Uni
ts:
Rep
lace
exis
ting
DO
AS
unit
sin
thei
ren
tire
tyw
ithne
wun
its
like
those
bein
gpr
ovid
edfo
rth
ene
wad
diti
on(A
aon
Mod
elR
Nor
sim
ilar
).A
nyunin
sula
ted
outd
oor-
air
orsu
pply
-air
duct
sw
illha
vene
wduct
insu
lati
onin
stal
led.
Are
asof
heav
yre
nova
tion
(Opp
osit
esi
de
ofco
rrid
orfr
omM
ain
Off
ice,
Art
Roo
m,
Sci
ence
Roo
ms.
and
PK-2
LC)
will
requ
ire
duct
wor
km
odif
icat
ions
tosu
itth
ene
wsp
ace
layo
uts.
Pot
enti
alD
educ
tA
lter
nate
#1
for
Exi
stin
gD
OA
SU
nits
:E
xten
dth
ele
ngth
ofth
eun
its,
and
inst
all
new
cool
ing
coil
san
dac
cess
sect
ion
sw
ithi
nth
eex
isti
ngm
odul
arun
its
topr
ovid
ete
mp
ered
vent
ilat
ion
air
year
-rou
nd.
Tem
pere
dve
ntil
atio
nai
rw
illel
imin
ate
pote
ntia
lm
old
issu
esca
use
dby
brin
ging
hot,
hum
idai
rin
toth
ebu
ildi
ngdu
ring
war
mer
outd
oor
tem
per
ature
s.T
heco
olin
gco
ils
will
beco
nnec
ted
byre
frig
eran
tpi
ping
tone
wro
ofto
p-m
ount
edco
nd
ensi
ng
unit
s.S
uppl
y-ai
rfa
ns
insi
deth
eD
OA
Sun
its
will
have
tobe
repla
ced
wit
hla
rger
fans
and
mot
ors
toac
count
for
the
new
cool
ing
coil
s.N
ewbas
ese
ctio
ns
and
unit
roof
sw
illbe
requ
ired
,as
will
new
roof
pen
etra
tio
ns
for
duct
wor
k,an
das
soci
ated
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,20
18
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
1
Page 82, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
ME
CH
AN
ICA
LSY
STE
MS
-N
AR
RA
TIV
E
2-s-
elec
tric
alco
mponen
ts.
Any
unin
sula
ted
outd
oor-
air
orsu
pply
-air
du
cts
will
have
new
duct
insu
lati
onin
stal
led.
Are
asof
heav
yre
nova
tion
(Opp
osit
esi
deof
corr
idor
from
Mai
nO
ffic
e,A
rtR
oom
.S
cien
ceR
oom
s,an
dPK
-2LC
)w
illre
quir
edu
ctw
ork
mod
ific
atio
nsto
suit
the
new
spac
ela
yout
s.
The
exis
ting
Mai
nO
ffic
ear
eais
curr
entl
yse
rved
byan
olde
rpac
kag
edro
ofto
pun
itfo
rco
olin
g,w
hich
isbe
yond
the
end
ofits
usef
ullif
e.T
his
unit
will
bere
pla
ced
bya
new
DO
AS
unit
like
those
bein
gpr
ovid
edfo
rth
ene
wad
diti
on.
VR
Fsy
stem
s(M
itsu
bish
i,D
aiki
n,or
sim
ilar
)w
illbe
inst
alle
dto
prov
ide
cool
ing
and
sup
ple
men
tal
hea
ting
for
the
clas
sroom
and
adm
inis
trat
ion
area
sof
the
exis
ting
buil
ding
.T
hes
eV
RF
syst
ems
will
con
sist
ofoutd
oor
conden
sing
unit
slo
cate
don
the
roof
,in
door
ceil
ing
cass
ette
unit
sfo
rea
chsp
ace,
and
refr
iger
ant
pipi
ngco
nnec
ting
the
indo
oran
doutd
oor
unit
s.
Aud
itor
ium
The
audi
tori
umis
curr
entl
yse
rved
bya
Tra
nem
odul
arhea
ting
and
vent
ilat
ing
roof
top
unit
.T
his
unit
do
esno
tha
vean
yco
olin
gor
ener
gyre
cove
ry,
resu
ltin
gin
hot,
hum
idai
rbe
ing
brou
ght
into
the
buil
ding
duri
ngw
arm
and
hum
idou
tdoo
rte
mper
ature
s.T
his
exis
ting
unit
has
aca
pac
ity
of11,0
00
cfm
.
Bas
eB
idfo
rE
xist
ing
Aud
itor
ium
Uni
t:R
epla
ceex
isti
ngun
itin
itsen
tire
tyw
itha
new
unit
like
those
bein
gpr
ovid
edfo
rth
ene
wM
ath
Lab
and
Caf
eter
ia(A
aon
Mod
elR
Nor
sim
ilar
).C
ompl
etel
yne
wdu
ctw
ork
will
bein
stal
led
tose
rve
the
audi
tori
uman
dst
age.
The
new
unit
will
have
anes
tim
ated
cool
ing
capa
city
ofap
prox
imat
ely
40
to50-t
ons
with
anai
rflo
wof
14,0
00
cfm
.
Pot
enti
alD
educ
tA
lter
nat
es(S
eeF
ollo
win
gP
arag
raphs)
:W
hile
furt
her
calc
ula
tions
are
requ
ired
toco
nfir
mth
eex
act
tem
per
ature
that
coul
dbe
mai
nta
ined
duri
ngai
rco
ndit
ioni
ngoper
atio
n,
itap
pea
rsth
atth
eex
isti
ngai
rflo
wm
aybe
larg
een
ough
topa
rtia
lly
cool
the
Aud
itor
ium
wit
hout
repl
acin
gal
lof
the
duct
wor
kan
dce
ilin
g.H
owev
er,
itsh
ould
beno
ted
that
this
coul
dre
sult
inw
arm
erth
anno
rmal
spac
ete
mper
ature
sdu
ring
peri
ods
whe
nth
eau
dito
rium
isfu
llyoc
cupi
eddu
ring
high
outd
oor
tem
per
ature
s.
Pot
enti
alD
educ
tA
lter
nate
#1
for
Exi
stin
gA
udit
oriu
mU
nit:
Rep
lace
exis
ting
unit
inits
enti
rety
with
ane
wun
itlik
eth
ose
bein
gpr
ovid
edfo
rth
ene
wM
ath
Lab
and
Caf
eter
ia(A
aon
Mod
elR
Nor
sim
ilar
).A
nyunin
sula
ted
outd
oor-
air
orsu
pply
-air
du
cts
will
requ
ire
new
duct
insu
lati
onto
bein
stal
led.
Thi
sun
itw
illha
vean
esti
mat
edco
olin
g
capa
city
ofap
prox
imat
ely
40
to50-t
ons
with
anai
rflo
wof
11
,00
0cf
m.
Ifth
ein
teri
orte
mper
ature
ofth
eau
dito
rium
that
isca
lcula
ted
for
util
izin
gth
eex
isti
ngdu
ctw
ork
and
airf
low
sis
not
acce
pta
ble
toth
eow
ner,
then
the
Bas
eB
idfo
rE
xist
ing
Aud
itor
ium
Uni
tm
ust
beim
ple
men
ted.
Pot
enti
alD
educ
tA
lter
nate
#2
for
Exi
stin
gA
udit
oriu
mU
nit:
Ext
end
the
leng
thof
the
unit
,an
din
stal
lne
wco
olin
gco
ilan
dac
cess
sect
ion
sw
ithi
nth
eex
isti
ngm
odul
arun
itto
prov
ide
heat
ing,
part
ial
cool
ing,
and
vent
ilat
ion.
The
cool
ing
coil
will
beco
nn
ecte
dby
refr
iger
ant
pipi
ngto
ane
wro
ofto
p-m
ount
edco
nden
sing
unit
(app
roxi
mat
ely
40
to50-t
ons
cool
ing
capa
city
).T
hesu
pply
-air
fan
insi
deth
eun
itw
illha
veto
bere
pla
ced
with
ala
rger
fan
and
mot
orto
acco
un
tfo
rth
ene
wco
olin
gco
il.A
new
bas
ese
ctio
nan
dun
itro
ofw
illbe
requ
ired
,as
will
ane
wro
ofpen
etra
tion
for
duct
wor
k,an
das
soci
ated
elec
tric
alco
mp
onen
ts.
Any
unin
sula
ted
outd
oor-
air
orsu
pply
-air
du
cts
will
requ
ire
new
duct
insu
lati
onto
bein
stal
led.
Ifth
ein
teri
orte
mper
ature
ofth
eau
dito
rium
that
isca
lcula
ted
for
util
izin
gth
eex
isti
ngdu
ctw
ork
and
airf
low
sis
not
acce
pta
ble
toth
eow
ner,
then
the
Bas
eB
idfo
rE
xist
ing
Aud
itor
ium
Uni
tm
ust
beim
ple
men
ted.
Eng
inee
ring
Tec
hL
ab
The
exis
ting
au*i
liar
ygy
mis
curr
entl
yse
rved
bya
Tra
nem
odul
arhea
ting
and
vent
ilat
ing
roof
top
unit
.T
his
unit
do
esno
tha
vean
yco
olin
gor
ener
gyre
cove
ry,
resu
ltin
gin
hot,
hum
idai
rbe
ing
brou
ght
into
the
buil
ding
duri
ngw
arm
and
hum
idoutd
oor
tem
per
ature
s.T
his
exis
ting
unit
has
aca
pac
ity
of6,5
00
cfm
,w
hich
isla
rge
enough
toad
dco
olin
g.
Bas
eB
idfo
rE
xist
ing
Eng
inee
ring
Tec
hL
ab/
Aux
iliar
yG
ymU
nit:
Rep
lace
exis
ting
unit
init
sen
tire
tyw
itha
new
unit
like
tho
sebe
ing
prov
ided
for
the
new
Mat
hL
aban
dC
afet
eria
(Aao
nM
odel
RN
orsi
mil
ar).
All
new
supp
ly-a
iran
dre
turn
-air
duct
wor
kw
illbe
inst
alle
d.E
stim
ated
cool
ing
capac
ity
ofap
prox
imat
ely
20-t
ons
with
anai
rflo
wof
6,5
00
cfm
.
Pot
enti
alD
educ
tA
lter
nate
#1
for
Exi
stin
gE
ngin
eeri
ngT
ech
Lab
/A
uxili
ary
Gym
Uni
t:E
xten
dth
ele
ngth
ofth
eun
it,
and
inst
all
new
cool
ing
coil
and
acce
ssse
ctio
ns
wit
hin
the
exis
ting
mod
ular
unit
topr
ovid
ehe
atin
g,pa
rtia
lco
olin
g,an
dve
ntil
atio
n.T
heco
olin
gco
ilw
illbe
con
nec
ted
byre
frig
eran
tpi
ping
toa
new
roof
top-
mou
nted
conden
sin
gun
it(a
ppro
xim
atel
y20-t
ons
cool
ing
capa
city
).T
hesu
pply
-air
fan
insi
deth
eun
itw
illha
veto
bere
pla
ced
with
ala
rger
fan
and
mot
orto
acco
unt
for
the
new
cool
ing
coil.
Ane
wbas
ese
ctio
nan
dun
itro
ofw
illbe
requ
ired
,as
will
ane
wro
ofpen
etra
tion
for
duct
wor
k.an
das
soci
ated
elec
tric
alco
mpon
ents
.Al
lne
wsu
pply
-air
and
retu
rn-a
irdu
ctw
ork
will
bein
stal
led.
Loc
ker
Roo
ms
and
Hea
lth
Cen
ter
The
lock
erro
oms
are
curr
entl
yse
rved
bya
Tra
nem
odul
arh
eati
ng
and
vent
ilat
ing
roof
top
unit
.T
his
unit
do
esno
tha
vean
yco
olin
gor
ener
gyre
cove
ry,
resu
ltin
gin
hot,
hum
idai
rbe
ing
brou
ght
into
the
buil
ding
duri
ngw
arm
and
hum
idoutd
oor
tem
per
ature
s.T
his
exis
ting
unit
has
aca
paci
tyof
6,5
00
cfm
.
Bas
eB
idfo
rL
ocke
rR
oom
Uni
t:If
the
owne
rw
ishes
toai
rco
ndit
ion
the
lock
erro
oms,
rep
lace
exis
ting
unit
init
sen
tire
tyw
itha
new
unit
like
those
bein
gpr
ovid
edfo
rth
ene
wM
ath
Lab
and
Caf
eter
ia(A
aon
Mod
elR
Nor
sim
ilar
).A
llne
wre
turn
-air
duct
wor
kw
illbe
inst
alle
d.A
nyun
insu
late
dou
tdoo
r-ai
ror
supp
ly-a
irduct
sw
illre
quir
ene
wduct
insu
lati
onto
bein
stal
led.
Inst
all
new
unit
sim
ilar
toth
ose
bein
gpr
ovid
edfo
rth
ene
wM
ath
Lab
and
Caf
eter
ia(A
aon
Mod
elR
Qor
sim
ilar
)to
serv
eth
ene
wH
ealt
hC
ente
rsp
ace.
Est
imat
edco
olin
gca
pac
itie
sar
eap
prox
imat
ely
20-t
ons
with
anai
rflo
wof
6,5
00
cfm
,an
d2-
tons
with
anai
rflo
wof
600
cfm
.
Pot
enti
alD
educ
tA
lter
nate
#1
for
Loc
ker
Roo
mU
nit:
Exi
stin
gun
itw
illre
mai
nin
oper
atio
nto
serv
eth
elo
cker
room
s.T
hene
wun
itdes
crib
edin
the
Bas
eB
idto
serv
eth
eH
ealt
hC
ente
rsp
ace
isal
sore
quir
edfo
rth
isop
tion
.E
stim
ated
cool
ing
capa
city
isap
prox
imat
ely
2-to
nsw
ithan
airf
low
of6
00
cfm
.
Gym
nasi
um
The
exis
ting
gym
nasi
umis
curr
entl
yse
rved
bya
com
bina
tion
oftw
osm
all
hea
ting
and
vent
ilat
ing
unit
san
dper
imet
erfi
n-tu
bera
diat
ion.
Ane
wun
itlik
eth
ose
bein
gpr
ovid
edfo
rth
ene
wM
ath
Lab
and
Caf
eter
iaw
illbe
inst
alle
d(A
aon
Mod
elR
Nor
sim
ilar
).E
stim
ated
cool
ing
capa
city
isap
prox
imat
ely
20-t
ons
with
anai
rflo
wof
8,0
00
cfm
.
Lib
rary
The
libr
ary
iscu
rren
tly
serv
edby
aT
rane
mod
ular
heat
ing,
cool
ing,
and
vent
ilat
ing
roof
top
unit
,w
itha
cool
ing
capa
city
ofap
prox
imat
ely
17.5
-to
ns
with
anai
rflo
wof
6,5
00
cfm
.T
his
unit
ism
uch
loud
erth
anne
wun
its
typi
call
yin
stal
led
insc
hool
s,w
ithbo
thai
rno
ise
and
vibr
atio
ns.
Thi
slik
ely
exce
eds
the
Con
nect
icut
acoust
ical
guid
elin
es.
Bas
eB
idfo
rL
ibra
ryU
nit:
Rep
lace
exis
ting
unit
inits
enti
rety
with
ane
wun
itlik
eth
ose
bein
gpr
ovid
edfo
rth
ene
wM
ath
Lab
and
Caf
eter
iatA
aon
Mod
elR
Nor
sim
ilar
).Al
lne
wsu
pply
-air
and
retu
rn-a
irdu
ctw
ork
will
be
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Scho
olIN
orw
alk,
Con
nect
icut
Feb
ruar
y2,
2018
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
2
Page 83, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
2-i
cic
j
ME
CH
AN
ICA
LSY
STE
MS
-N
AR
RA
TIV
E
inst
alle
d.E
stim
ated
cool
ing
capa
city
ofap
prox
imat
ely
20-t
ons
with
ante
chno
logy
for
ener
gysa
vin
gst
rate
gie
s.It
will
incl
ude
BA
Cne
tan
dW
ebai
rflo
wof
6,5
00
cfm
.en
able
din
terf
aces
,m
icro
com
pute
rw
orks
tati
on,
appl
icat
ion
soft
war
e,co
ntro
lun
its,
senso
rs,
ther
most
ats,
tem
per
ature
and
pre
ssu
reP
oten
tial
Ded
uct
Alt
erna
te#1
for
Lib
rary
Uni
t:E
xist
ing
unit
will
rem
ain
tran
smit
ters
,g
aug
esva
lves
,d
amp
ers,
op
erat
ors
,re
lays
,an
doth
erin
oper
atio
nto
serv
eth
eli
brar
y.In
stal
lal
lne
wsu
pply
-air
and
retu
rn-a
ireq
uip
men
tan
dap
purt
enan
ces,
incl
udin
gel
ectr
ical
wir
ing.
The
syst
emdu
ctw
ork.
will
prov
ide
365-d
aysc
hed
uli
ng
with
over
ride
,m
onit
orin
g,re
port
ing,
Pot
enti
alD
educ
tA
lter
nate
#2
for
Lib
rary
Uni
t:E
xist
ing
unit
and
alar
min
gan
dse
tpo
int
cont
roll
ing
capab
ilit
ies
for
all
HV
AC
equ
ipm
ent
duct
wor
kw
illre
mai
nin
oper
atio
nto
serv
eth
elib
rary
,an
dzo
nes.
The
VR
Fsy
stem
sut
iliz
ese
lf-c
onta
ined
cont
rols
that
are
inad
diti
onto
the
DD
Cco
ntro
ls.
The
DD
Csy
stem
will
mon
itor
the
self
-K
itch
enco
nta
ined
cont
rols
ofth
eV
RF
syst
ems.
As
the
kitc
hen
will
behe
avil
yre
novat
ed,
the
mak
eup-
air
unit
and
kitc
hen
New
DD
Cco
ntro
lsw
illbe
inst
alle
dfo
ral
lne
wan
dex
isti
ngH
VA
Cex
hau
stsy
stem
will
bere
pla
ced.
equ
ipm
ent
inth
ebu
ildi
ng.
IT&
Ele
ctri
cal
Roo
ms
Duc
tles
ssp
lit
syst
emhea
tpum
ps
(Mit
subi
shi,
Dai
kin,
orsi
mil
ar)
will
bein
stal
led
tose
rve
two
IT/T
echn
olog
yro
oms
inth
eex
isti
ngpo
rtio
nof
the
buil
ding
.E
stim
ated
cool
ing
cap
acit
ies
are
2-to
nsan
d4-
tons
.
Ad
uct
less
spli
tsy
stem
hea
tpu
mp
will
also
bein
stal
led
tose
rve
the
new
Ele
ctri
cal
Sw
itch
boar
dro
omin
the
exis
ting
port
ion
ofth
ebu
ildi
ng.
Est
imat
edco
olin
gca
paci
tyis
4-to
ns.
‘FU
EL
-OIL
TAN
K
Ifn
atu
ral
gas
isno
tbro
ught
toth
ebu
ildi
ng.
the
exis
ting
under
gro
und
fuel
-oil
tan
kw
illbe
repla
ced
wit
ha
new
10
,00
0ga
llon
,do
uble
-wal
l,under
gro
und
tan
k.
Ifn
atu
ral
gas
isbro
ught
toth
ebu
ildi
ng,
the
exis
ting
under
gro
und
fuel
-oi
lta
nk
will
bere
mov
edan
dno
tre
pla
ced.
The
bu
rner
sfo
rth
eth
ree
exis
ting
boil
ers
will
bere
pla
ced
wit
hne
wga
s-fi
red
burn
ers.
PIPI
NG
MA
TER
IALS
Ref
rige
rant
pipi
ngw
illbe
Typ
eL
copper
tube
with
sold
ered
join
ts.
All
refr
iger
ant
pipi
ngw
illbe
insu
late
d,
incl
udin
gli
quid
,su
ctio
n,ho
t-ga
s,d
isch
arg
e,an
dhe
at-r
ecov
ery
pipi
ng.
Hea
ting
hot
wat
erpi
ping
will
beS
ched
ule
40
stee
lpi
pew
ithw
elde
djo
ints
for
pipi
ng2
-1/2
”an
dla
rger
,an
dT
ype
Lco
pper
pipi
ngw
ithso
lder
edjo
ints
for
pipi
ng2”
and
smal
ler.
HV
AC
CO
NT
RO
LS
Ane
wbu
ildi
ngm
anag
emen
tsy
stem
/di
rect
digi
tal
cont
rol
(DD
C)
syst
em(A
lert
onor
sim
ilar
)w
illbe
inst
alle
dem
ploy
ing
the
late
st,
bes
tav
aila
ble
Sch
emat
icD
esig
nD
raw
ings
Sch
emat
icD
esig
nP
hase
Pag
e3
Pon
usR
idge
Scho
olIN
orw
alk,
Con
nect
icut
Sta
te#
TM
P-1
03-R
BT
SF
ebru
ary
2,20
18
Page 84, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
ME
CH
AN
ICA
LSY
STE
MS
-N
AR
RA
TIV
E
heat
ing,
vari
able
capa
city
dire
ctex
pan
sion
(DX
)co
olin
g,en
ergy
reco
very
whe
els
toco
nse
rve
ener
gyby
tran
sfer
rin
gen
ergy
from
exh
aust
air
toth
ein
com
ing
outd
oor
air,
and
hot-
gas
rehea
tco
ils
for
dehu
mid
ific
atio
n.T
hey
will
dis
trib
ute
vent
ilat
ion
air
via
duct
wor
kto
the
spac
es.
Rel
ief
and
exhau
stai
rw
illbe
duct
edba
ckto
exh
aust
fan
sin
the
ded
icat
edoutd
oor
air
unit
s,al
low
ing
ener
gyfr
omth
isai
rto
beuse
dto
tem
per
the
inco
min
gou
tdoo
rai
r.T
heD
OA
Sun
its
will
inco
rpora
ted
eman
dco
ntro
lve
ntil
atio
n,w
hich
will
modula
teth
eam
ou
nt
ofouts
ide
air
bas
edon
occ
upan
cyan
dca
rbon
diox
ide
leve
ls.
Hyd
roni
cra
dia
nt
ceil
ing
pan
els
will
bein
stal
led
atper
imet
erw
alls
tooff
set
the
hea
tlo
ssfr
omth
ebu
ildi
ngen
vel
ope,
and
pre
ven
tco
lddr
afts
-nea
rth
ew
indo
ws.
Hot
wat
erfo
rhea
ting
will
bepr
ovid
edby
the
exis
ting
boil
erpl
ant,
and
serv
eth
eD
OA
Sun
its,
Mat
hL
aban
dC
afet
eria
roof
top
unit
s,an
dra
dia
nt
ceil
ing
pan
els.
New
hot
wat
ersu
pply
and
retu
rnli
nes
will
beco
nn
ecte
dto
the
exis
ting
hea
der
inth
ebo
iler
room
,tw
one
wpum
ps
ded
icat
edto
the
new
addi
tion
will
bein
stal
led
inth
ebo
iler
room
,an
dne
wpi
ping
will
beru
nfr
omth
ebo
iler
room
toth
ene
wad
diti
on.
Fur
ther
calc
ula
tions
are
requ
ired
todet
erm
ine
whet
her
one
addi
tion
albo
iler
will
nee
dto
bead
ded
toth
ebo
iler
plan
t.If
ane
wbo
iler
isre
quir
ed,
asso
ciat
edco
mponen
ts,
such
asth
een
tire
boil
erfl
uew
ithi
nth
ebo
iler
room
and
the
oil
pum
ping
syst
emw
illha
veto
beev
aluat
edto
det
erm
ine
com
pati
bili
tyw
ithth
ela
rger
boil
erpl
ant.
The
Mat
hL
aban
dC
afet
eria
will
each
bese
rved
will
bese
rved
byva
riab
leai
rvo
lum
e,pac
kag
edro
ofto
pun
its
(Aao
nM
odel
RN
orsi
mil
ar)
with
ener
gyre
cove
ryw
heel
s,w
hich
will
prov
ide
heat
ing,
cool
ing,
dehu
mid
ific
atio
n,an
dve
ntil
atio
n.T
hes
eun
its
will
incl
ude
hot-
wat
erhe
atin
g,va
riab
leca
pac
ity
dire
ctex
pans
ion
(DX
)co
olin
g,en
ergy
reco
very
whe
els
toco
nse
rve
ener
gyby
tran
sfer
ring
ener
gyfr
omex
hau
stai
rto
the
inco
min
goutd
oor
air,
and
hot-
gas
rehea
tco
ils
for
dehu
mid
ific
atio
n.T
hey
will
dis
trib
ute
vent
ilat
ion
air
via
duct
wor
kto
the
spac
es.
Rel
ief
and
exhau
stai
rw
illbe
duct
edba
ckto
exh
aust
fan
sin
the
roof
top
unit
s,al
low
ing
ener
gyfr
omth
isai
rto
beuse
dto
tem
per
the
inco
min
goutd
oor
air.
Thes
ero
ofto
pun
its
will
inco
rpora
tedem
and
cont
rol
vent
ilat
ion,
whi
chw
illm
odula
teth
eam
ou
nt
ofouts
ide
air
bas
edon
occ
upan
cyan
dca
rbon
diox
ide
leve
ls.
Est
imat
edco
olin
gca
pac
itie
sar
eap
prox
imat
ely
25-t
ons
with
airf
low
sof
8,0
00-9
,000
cfm
.
Hyd
roni
cra
dia
nt
ceil
ing
pan
els
will
bein
stal
led
atper
imet
erw
alls
tooff
set
the
hea
tlo
ssfr
omth
ebu
ildi
ngen
velo
pe,
and
pre
ven
tco
lddra
fts
nea
rth
ew
indo
ws.
Sch
emat
icD
esig
nD
raw
ings
Sch
emat
icD
esig
nP
hase
Pag
e1
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utS
tate
#T
MP
-103
-RB
TS
GEN
ERA
L
Com
plet
ene
wm
echan
ical
syst
ems
are
tobe
prov
ided
for
the
new
addit
ion.
Air
condit
ionin
gsy
stem
sar
eto
bepr
ovid
edfo
ral
lar
eas
ofth
eex
isti
ngbu
ildi
ng,
whi
chin
volv
esth
ere
novat
ion
orre
pla
cem
ent
ofm
uch
ofth
eex
isti
ngm
echan
ical
equ
ipm
ent.
Are
asof
the
exis
ting
buil
ding
wit
hex
tensi
ve
arch
itec
tura
lre
novat
ions,
incl
udin
gth
em
ain
offi
cear
ea,
nurs
e’s
suit
e,ar
tro
om,
engin
eeri
ng
tech
lab,
kitc
hen,
cafe
teri
a,an
dad
jace
nt
scie
nce
room
s,w
illre
quir
ere
confi
gura
tion
orre
pla
cem
ent
ofex
isti
ngm
echan
ical
syst
ems.
CO
DE
S&
STA
ND
AR
DS
The
new
syst
ems
will
bed
esig
ned
inac
cord
ance
wit
hth
ere
qu
irem
ents
ofth
efo
llow
ing
codes
and
stan
dar
ds:
•2018
CT
Sta
teB
uild
ing
Cod
ew
ithE
rrat
a’s
•2018
CTS
tate
Fire
Saf
ety
Cod
ew
ithE
rrat
a’s
•2
01
5In
tern
atio
nal
Bui
ldin
gC
ode
and
refe
rence
dpu
blic
atio
ns•
20
15
Inte
rnat
iona
lP
lum
bing
Cod
ean
dre
fere
nce
dpu
blic
atio
ns•
20
15
Inte
rnat
iona
lE
nerg
yC
onse
rvat
ion
Cod
e•
Con
nect
icut
Hig
hP
erfo
rman
ceB
uild
ing
Sta
ndar
ds
•A
SHR
AE
Sta
nd
ard
62.1
•O
ther
Sta
tean
dL
ocal
Cod
es
NE
WA
DD
ITIO
N
Cla
ssro
om
san
dA
dmin
istr
atio
nA
reas
Cla
ssro
oman
dA
dmin
istr
atio
nar
eas
will
bese
rved
bya
com
bina
tion
ofva
riab
lere
frig
eran
tfl
ow(V
RF)
syst
ems
(Mit
subi
shi,
Dai
kin,
orsi
mil
ar)
with
hea
tre
cove
ryan
dded
icat
edoutd
oor
air
unit
s(D
OA
S).
The
VR
Fsy
stem
s(M
itsu
bish
i,D
aiki
n,or
sim
ilar
)w
illpr
ovid
ehea
ting
and
cool
ing
toth
esp
aces
they
serv
e.A
VR
Fsy
stem
consi
sts
ofan
outd
oor
con
den
sin
gun
itlo
cate
don
the
roof
,in
door
duct
edfa
n-co
ilun
its
supp
lyin
gai
rfo
rh
eati
ng
and
cool
ing
toea
chsp
ace,
and
refr
iger
ant
pipi
ngco
nnec
ting
the
indo
oran
doutd
oor
unit
s.
Tw
oD
OA
Sun
its
(Aao
nM
odel
RN
orsi
mil
ar),
each
wit
han
esti
mat
edca
paci
tyof
6,0
00-7
,000
cubi
cfe
etpe
rm
inut
e,w
illbe
prov
ided
tosu
pply
vent
ilat
ion
air
toal
lsp
aces
serv
edby
VR
Fsy
stem
s.T
heD
OA
Sun
its
will
beva
riab
leai
rvo
lum
e,pac
kag
edro
ofto
pun
its
with
ener
gyre
cove
ryw
heel
s,w
hich
will
heat
,co
ol,
and
dehu
mid
ify
the
inco
min
gai
rto
prov
ide
tem
per
edve
ntil
atio
nai
r.T
hes
eun
its
will
incl
ude
hot-
wat
er
Mat
hL
aban
dC
afet
eria
Hot
wat
erfo
rh
eati
ng
will
bepr
ovid
edby
thex
if1
boil
erpl
ant,
asd
escr
ibed
inth
eC
lass
room
san
dA
dm
jJst
rtiv
eA
reas
abov
e.
EXIS
TIN
GB
UIL
DIN
G
Cla
ssro
om
san
dA
dm
nif
ion
Are
as
All
exis
ting
clas
sf6om
and
adm
inis
trat
ion
area
sar
ecu
rren
tly
serv
edby
peri
mete
rht
wat
erfi
n-tu
bera
diat
ion
for
heat
ing.
The
exis
ting
fin-
tube
radi
atio
nw
illre
mai
nin
oper
atio
n,
with
all
cont
rol
valv
esre
pla
ced
and
com
pati
bIe
with
the
buil
ding
’sne
wel
ectr
onic
dir
ect
digi
tal
cont
rol
(DD
C)
syst
em.
The
exis
ting
clas
sroom
area
sar
ecu
rren
tly
serv
edby
sev
enT
rane
mod
ular
hea
ting
and
vent
ilat
ing
DO
AS
unit
s,w
hich
prov
ide
hea
ted
vent
ilat
ion
air
toth
esp
aces
serv
ed.
The
seun
its
dono
tha
vean
yco
olin
gor
ener
gyre
cove
ry,
resu
ltin
gin
hot,
hum
idai
rbe
ing
brou
ght
into
the
buil
ding
duri
ngw
arm
and
hum
idou
tdoo
rte
mp
erat
ure
s.In
addi
tion
,du
ring
cold
eroutd
oor
wea
ther
,th
ese
unit
sw
ere
mos
tly
obse
rved
tobe
turn
edof
f,re
sult
ing
inno
vent
ilat
ion
air
bein
gpr
ovid
edto
man
yar
eas
ofth
ebu
ildi
ng.
Thes
eex
isti
ngun
its
have
capac
itie
sof
8,0
00
cfm
,6,5
00
cfm
,2,7
00
cfm
,5,5
00
cfm
,4,0
00
cfm
,4,0
00
cfm
,an
d2,2
50
cfm
.
Opt
ion
1fo
rE
xist
ing
DO
AS
Uni
ts:
Ext
end
the
leng
thof
the
unit
s,an
din
stal
lne
wco
olin
gco
ils
and
acce
ssse
ctio
ns
wit
hin
the
exis
ting
mod
ular
unit
sto
prov
ide
tem
per
edve
ntil
atio
nai
rye
ar-r
ound
.T
empe
red
vent
ilat
ion
air
will
elim
inat
epo
tent
ial
mol
dis
sues
cause
dby
brin
ging
hot,
hum
idai
rin
toth
ebu
ildi
ngdu
ring
war
mer
outd
oor
tem
per
atu
res.
The
cool
ing
coil
sw
illbe
connec
ted
byre
frig
eran
tpi
ping
tone
wro
ofto
p-m
ounte
dco
nd
ensi
ng
unit
s.S
uppl
y-ai
rfa
ns
insi
deth
eD
OA
Sun
its
will
have
tobe
rep
lace
dw
ithla
rger
fan
san
dm
otor
sto
acco
unt
for
the
new
cool
ing
coil
s.N
ewbas
ese
ctio
ns
and
unit
roof
sw
illbe
requ
ired
,as
will
new
roof
pen
etra
tio
ns
for
duct
wor
k,an
das
soci
ated
elec
tric
alco
mpon
ents
.A
nyun
insu
late
dou
tdoo
r-ai
ror
supp
ly-a
irdu
cts
will
have
new
duct
insu
lati
onin
stal
led.
Are
asof
heav
yre
nova
tion
(Opp
osit
esi
de
ofco
rrid
orfr
omM
ain
Off
ice,
Art
Roo
m,
Sci
ence
Roo
ms,
and
PK-2
LC)
will
requ
ire
duct
wor
km
odif
icat
ions
tosu
itth
ene
wsp
ace
layo
uts.
Opt
ion
2fo
rE
xist
ing
DO
AS
Uni
ts:
Rep
lace
exis
ting
DO
AS
unit
sin
thei
ren
tire
tyw
ithne
wun
its
like
those
bein
gpr
ovid
edfo
rth
ene
wad
diti
on(A
aon
Mod
elR
Nor
sim
ilar
).A
nyunin
sula
ted
outd
oor-
air
orsu
pply
-air
du
cts
will
have
new
duct
insu
lati
onin
stal
led.
Are
asof
heav
yre
nova
tion
(Opp
osit
esi
de
ofco
rrid
orfr
omM
ain
Off
ice,
Art
Roo
m,
Sci
ence
Roo
ms,
and
PK-2
LC)
will
requ
ire
duct
wor
km
odif
icat
ions
tosu
itth
ene
wsp
ace
layo
uts.
Feb
ruar
y2,
2018
Page 85, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
ME
CH
AN
ICA
LSY
STE
MS
-N
AR
RA
TIV
E
The
exis
ting
Mai
nO
ffic
ear
eais
curr
entl
yse
rved
byan
olde
rpac
kag
edro
ofto
pun
itfo
rco
olin
g,w
hich
isbe
yond
the
end
ofits
usef
ullif
e.T
his
unit
will
bere
pla
ced
bya
new
DO
AS
unit
like
those
bein
gpr
ovid
edfo
rth
ene
wad
diti
on.
VR
Fsy
stem
s(M
itsu
bish
i,D
aiki
n,or
sim
ilar
)w
illbe
inst
alle
dto
prov
ide
cool
ing
and
sup
ple
men
tal
hea
ting
for
the
clas
sroom
and
adm
inis
trat
ion
area
sof
the
exis
ting
buil
ding
.T
hes
eV
RF
syst
ems
will
con
sist
ofoutd
oor
conden
sing
unit
slo
cate
don
the
roof
,in
door
ceil
ing
cass
ette
unit
sfo
rea
chsp
ace,
and
refr
iger
ant
pipi
ngco
nnec
ting
the
indo
oran
doutd
oor
unit
s.
Aud
itor
ium
The
audi
tori
umis
curr
entl
yse
rved
bya
Tra
nem
odul
arhea
ting
and
vent
ilat
ing
roof
top
unit
.T
his
unit
do
esno
tha
vean
yco
olin
gor
ener
gyre
cove
ry,
resu
ltin
gin
hot,
hum
idai
rbe
ing
brou
ght
into
the
buil
ding
duri
ngw
arm
and
hum
idoutd
oor
tem
per
ature
s.T
his
exis
ting
unit
has
aca
pac
ity
of11,0
00
cfm
.
Whi
lefu
rth
erca
lcula
tions
are
requ
ired
toco
nfir
mth
eex
act
tem
per
ature
that
coul
dbe
mai
nta
ined
duri
ngai
rco
ndit
ioni
ngo
pra
tio
n,
itap
pea
rsth
atth
eex
isti
ngai
rflo
wm
aybe
larg
een
ough
toad
da
reas
onab
leam
ou
nt
ofco
olin
gw
itho
utre
plac
ing
all
ofth
edu
ctw
ork
and
ceil
ing.
How
ever
,it
shou
ldbe
note
dth
atth
isco
uld
resu
ltin
war
mer
than
norm
alsp
ace
tem
per
ature
sdu
ring
peri
ods
whe
nth
eau
dito
rium
isfu
llyoc
cupi
edw
hen
the
outd
oor
tem
per
ature
ishi
gh.
Opt
ion
ifo
rE
xist
ing
Aud
itor
ium
Uni
t:E
xten
dth
ele
ngth
ofth
eun
it,
and
inst
all
new
cool
ing
coil
and
acce
ssse
ctio
ns
wit
hin
the
exis
ting
mod
ular
unit
topr
ovid
ehe
atin
g,pa
rtia
lco
olin
g,an
dve
ntil
atio
n.T
heco
olin
gco
ilw
illbe
con
nec
ted
byre
frig
eran
tpi
ping
toa
new
roof
top-
mou
nted
conden
sing
unit
(app
roxi
mat
ely
40
to50-t
ons
cool
ing
capa
city
).T
hesu
pply
-air
fan
insi
deth
eun
itw
illha
veto
bere
pla
ced
with
ala
rger
fan
and
mot
orto
acco
un
tfo
rth
ene
wco
olin
gco
il.A
new
bas
ese
ctio
nan
dun
itro
ofw
illbe
requ
ired
,as
will
ane
wro
ofpen
etra
tion
for
duct
wor
k,an
das
soci
ated
elec
tric
alco
mponen
ts.
Any
unin
sula
ted
outd
oor-
air
orsu
pply
-air
duct
sw
illre
quir
ene
wduct
insu
lati
onto
bein
stal
led.
Opt
ion
2fo
rE
xist
ing
Aud
itor
ium
Uni
t:R
epla
ceex
isti
ngun
itin
its
enti
rety
with
ane
wun
itli
eth
ose
bein
gpr
ovid
edfo
rth
ene
wM
ath
Lab
and
Caf
eter
ia(A
aon
Mod
elR
Nor
sim
ilar
).A
nyunin
sula
ted
outd
oor-
air
orsu
pply
-air
duct
sw
illre
quir
ene
wduct
insu
lati
onto
bein
stal
led.
Thi
sun
itw
illha
vean
esti
mat
edco
olin
gca
paci
tyof
appr
oxim
atel
y4
0to
50-t
ons
with
anai
rflo
wof
11,0
00
cfm
.
Opt
ion
3fo
rE
xist
ing
Aud
itor
ium
Uni
t:Al
lw
ork
incl
uded
with
Opt
ion
2ab
ove,
plus
com
ple
tene
wdu
ctw
ork
tose
rve
the
audi
tori
uman
dst
age.
Ifth
ein
teri
orte
mper
ature
ofth
eau
dito
rium
that
isca
lcula
ted
for
Opt
ions
1an
d2
util
izin
gth
eex
isti
ngdu
ctw
ork
and
airf
iow
sis
not
acce
pta
ble
toth
eow
ner,
the
duct
wor
kw
illha
veto
bere
pla
ced
with
larg
erdu
ctw
ork.
Thi
sop
tion
will
incl
ude
ane
wun
itw
ithan
esti
mat
edco
olin
gca
paci
tyof
appr
oxim
atel
y40
to50-t
ons
with
anai
rflo
wof
14,0
00
cfm
.
Eng
inee
ring
Tec
hL
ab
The
exis
ting
auxi
liar
ygy
mis
curr
entl
yse
rved
bya
Tra
nem
odul
arhea
ting
and
vent
ilat
ing
roof
top
unit
.T
his
unit
does
not
have
any
cool
ing
oren
ergy
reco
very
,re
sult
ing
inho
t,hu
mid
air
bein
gbr
ough
tin
toth
ebu
ildi
ngdu
ring
war
man
dhu
mid
outd
oor
tem
per
ature
s.T
his
exis
ting
unit
has
aca
pac
ity
of6,5
00
cfm
,w
hich
isla
rge
eno
ug
hto
add
cool
ing.
Opt
ion
1fo
rE
xist
ing
Eng
inee
ring
Tec
hL
ab/A
uxil
iary
Gym
Uni
t:E
xten
dth
ele
ngth
ofth
eun
it,
and
inst
all
new
cool
ing
coil
and
acce
ssse
ctio
ns
wit
hin
the
exis
ting
mod
ular
unit
topr
ovid
ehe
atin
g,pa
rtia
lco
olin
g,an
dve
ntil
atio
n.T
heco
olin
gco
ilw
ill,b
èco
nn
ecte
dby
refr
iger
ant
pipi
ngto
ane
wro
ofto
p-m
ount
edco
nden
sing
unit
(app
roxi
mat
ely
20-t
ons
cool
ing
capa
city
).T
hesu
pply
-air
fan
insi
deth
eun
itw
illha
veto
bere
pla
ced
with
ala
rger
fan’ñ
jJm
otor
toac
cou
nt
for
the
new
cool
ing
coil.
Ane
wbas
ese
ctio
nàd
unit
roof
will
bere
quir
ed,
asw
illa
new
roof
pen
etra
tio
nfo
rdu
ctw
ork,
and
asso
ciat
edel
ectr
ical
com
ponen
ts.
All
new
supp
ly-a
iran
dre
turn
-air
duct
wor
kw
illbe
inst
alle
d.
Opt
ion
2fo
rE
xist
ing
Eng
inee
ring
Tec
hL
ab/
Aux
iliar
yG
ymU
nit:
Rep
lace
exis
ting
unit
inits
enti
rety
with
ane
wun
itlik
eth
ose
bein
gpr
ovid
edfo
rth
ene
wM
ath
Lab
and
Caf
eter
ia(A
aon
Mod
elR
Nor
sim
ilar
).A
llne
wsu
pply
-air
and
retu
rn-a
irdu
ctw
ork
will
bein
stal
led.
Est
imat
edco
olin
gca
paci
tyof
appr
oxim
atel
y20-t
ons
with
anai
rflo
wof
6,5
00
cfm
.
Loc
ker
Roo
ms
and
Hea
lth
Cen
ter
The
lock
erro
oms
are
curr
entl
yse
rved
bya
Tra
nem
odul
arh
eati
ng
and
vent
ilat
ing
roof
top
unit
.T
his
unit
do
esno
tha
vean
yco
olin
gor
ener
gyre
cove
ry,
resu
ltin
gin
hot,
hum
idai
rbe
ing
brou
ght
into
the
buil
ding
duri
ngw
arm
and
hum
idoutd
oor
tem
per
ature
s.T
his
exis
ting
unit
has
aca
paci
tyof
6,5
00
cfm
.
Opt
ion
1fo
rL
ocke
rR
oom
Uni
t:E
xist
ing
unit
will
rem
ain
inoper
atio
nto
serv
eth
elo
cker
room
s.In
stal
lne
wun
itsi
mil
arto
those
bein
gpr
ovid
edfo
rth
ene
wM
ath
Lab
and
Caf
eter
ia(A
aon
Mod
elR
Qor
sim
ilar
)to
serv
eth
ene
wH
ealt
hC
ente
rsp
ace.
Est
imat
edco
olin
gca
pac
ity
isap
prox
imat
ely
2-to
nsw
ithan
airf
low
of6
00
cfm
.
Opt
ion
2fo
rL
ocke
rR
oom
Uni
t:If
the
owne
r-W
ishe
sto
air
cond
itio
nth
elo
cker
room
s,re
pla
ceex
isti
ngun
itin
itsé
nti
rety
with
ane
wun
itlik
eth
ose
bein
gpr
ovid
edfo
rth
ene
wM
ath
Lab
and
Caf
eter
ia(A
aon
Mod
elR
Nor
sim
ilar
).Al
lne
wre
turn
-air
duct
wor
kw
illbe
inst
alle
d.A
nyu
nin
sula
ted
outd
oor-
airo
r’su
pply
-air
du
cts
will
requ
ire
new
duct
insu
lati
onto
bein
tafl
ed.
The
new
unit
des
crib
edin
opti
on1
for
the
Hea
lth
Cen
ter
sj5a
ceis
also
requ
ired
for
this
opti
on.
Est
imat
edco
olin
gca
pac
itie
sar
eap
prox
imat
ely
20
-tons
with
anai
rflo
wof
6,5
00
cfm
,an
d2-t
ons
with
anai
rflo
wof
600
cfm
.
Gym
nasi
um
The
exis
ting
gym
nasi
umis
curr
entl
yse
rved
bya
com
bina
tion
oftw
osm
all
hea
ting
and
vent
ilat
ing
unit
san
dper
imet
erfi
n-tu
bera
diat
ion.
Ane
wun
itlik
eth
ose
bein
gpr
ovid
edfo
rth
ene
wM
ath
Lab
and
Caf
eter
iaw
illbe
inst
alle
d(A
aon
Mod
elR
Nor
sim
ilar
).E
stim
ated
cool
ing
capa
city
isap
prox
imat
ely
20
-tons
with
anai
rflo
wof
8,0
00
cfm
.
Lib
rary
The
libr
ary
Iscu
rren
tly
serv
edby
aT
rane
mod
ular
heat
ing,
cool
ing,
and
vent
ilat
ing
roof
top
unit
,w
itha
cool
ing
capa
city
ofap
prox
imat
ely
17.5
-to
ns
with
anai
rflo
wof
6,5
00
cfm
.T
his
unit
ism
uch
loud
erth
anne
wun
its
typi
call
yin
stal
led
insc
hool
s,w
ithbo
thai
rno
ise
and
vibr
atio
ns.
Thi
slik
ely
exce
eds
the
Con
nect
icut
acoust
ical
guid
elin
es.
Opt
ion
1fo
rL
ibra
ryU
nit:
Exi
stin
gun
itan
ddu
ctw
ork
will
rem
ain
inoper
atio
nto
serv
eth
elib
rary
.
Opt
ion
2fo
rL
ibra
ryU
nit:
Inst
all
all
new
supp
ly-a
iran
dre
turn
-air
duct
wor
k.
Opt
ion
3fo
rL
ibra
ryU
nit:
Rep
lace
exis
ting
unit
inits
enti
rety
with
ane
wun
itlik
eth
ose
bein
gpr
ovid
edfo
rth
ene
wM
ath
Lab
and
Caf
eter
ia(A
aon
Mod
elR
Nor
sim
ilar
).Al
lne
wsu
pply
-air
and
retu
rn-a
irdu
ctw
ork
will
bein
stal
led.
Est
imat
edco
olin
gca
pac
ity
ofap
prox
imat
ely
20
-ton
sw
ithan
airf
low
of6,5
00
cfm
.
Kit
chen
As
the
kitc
hen
will
behe
avil
yre
novat
ed,
the
mak
eup-
air
unit
and
kitc
hen
exh
aust
syst
emw
illbe
repla
ced.
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,20
18
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
2
Page 86, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
ME
CH
AN
ICA
LSY
STE
MS
-N
AR
RA
TIV
E
PIPI
NG
MA
TER
IALS
Ref
rige
rant
pipi
ngw
illbe
Typ
eL
copper
tub
ew
ithso
lder
edjo
ints
.Al
lre
frig
eran
tpi
ping
will
bein
sula
ted,
incl
udin
gli
quid
,su
ctio
n,ho
t-ga
s,dis
char
ge,
and
heat
-rec
over
ypi
ping
.
Hea
ting
hot
wat
erpi
ping
will
beS
ched
ule
40
stee
lpi
pew
ithw
elde
djo
ints
for
pipi
ng2-1
/2”
and
larg
er,
and
Typ
eL
copper
pipi
ngw
ithso
lder
edjo
ints
for
pipi
ng2”
and
smal
ler.
HV
AC
CO
NT
RO
LS
Ane
wbu
ildi
ngm
anag
emen
tsy
stem
/di
rect
digi
tal
cont
rol
(DD
C)
syst
em(A
lert
onor
sim
ilar
)w
illbe
inst
alle
dem
ploy
ing
the
late
st,
bes
tav
aila
ble
tech
nolo
gyfo
ren
ergy
savin
gst
rate
gie
s.It
will
incl
ude
BA
Cne
tan
dW
eben
able
din
terf
aces
,m
icro
com
pute
rw
orks
tati
on,
appl
icat
ion
soft
war
e,co
ntro
lun
its,
senso
rs,
ther
most
ats,
tem
per
ature
and
pre
ssu
retr
ansm
itte
rs,
gau
ges
,va
lves
,d
amp
ers,
oper
ators
,re
lays
,an
doth
ereq
uip
men
tan
dap
purt
enan
ces,
incl
udin
gel
ectr
ical
wir
ing.
The
syst
emw
illpr
ovid
e365-d
aysc
hed
uli
ng
with
over
ride
,m
onit
orin
g,re
port
ing,
alar
min
gan
dse
tpo
int
cont
roll
ing
capab
ilit
ies
for
all
HV
AC
equ
ipm
ent
and
zone
s.T
heV
RF
syst
ems
util
ize
self
-conta
ined
cont
rols
that
are
inad
diti
onto
the
DD
Cco
ntro
ls.
The
DD
Csy
stem
will
mon
itor
the
self
con
tain
edco
ntro
lsof
the
VR
Fsy
stem
s.
New
DD
Cco
ntro
lsw
illbe
inst
alle
dfo
ral
lne
wan
dex
isti
ngH
VA
Ceq
uip
men
tin
the
buil
ding
.
Sch
emat
icD
esig
nD
raw
ings
Sch
emat
icD
esig
nP
hase
Pag
e3
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utS
tate
#T
MP
-103
-RB
TS
Feb
ruar
y2,
2018
Page 87, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
PLU
MB
ING
GEN
ERA
L
Com
plet
ene
wpl
umbi
ngsy
stem
sar
eto
bepr
ovid
edfo
rth
ene
wad
diti
onan
dm
inor
wor
kfo
rth
ere
no
vat
edpo
rtio
nsof
the
exis
ting
buil
ding
.A
reas
tobe
renovat
edin
clud
eth
een
tire
kitc
hen,
anar
tro
oman
da
scie
nce
room
.T
hero
ofw
illre
mai
nas
is.
The
new
syst
ems
will
bedes
igned
inac
cord
ance
wit
hth
ere
quir
emen
tsof
the
foll
owin
gco
des
and
stan
dar
ds:
•2018
Inte
rnat
iona
lB
uild
ing
Cod
ean
dre
fere
nce
dpu
blic
atio
ns•
2018
CT
Sta
teB
uild
ing
Cod
ew
ith
Err
ata’
s•
2018
CI
Sta
teFi
reS
afet
yC
ode
with
Err
ata’
s•
2015
Inte
rnat
iona
lP
lum
bing
Cod
ean
dre
fere
nce
dpu
blic
atio
ns•
20
15
Inte
rnat
iona
lE
nerg
yC
onse
rvat
ion
Cod
e•
CT
Com
plia
nce
for
Hig
hP
erfo
rman
ceB
uild
ings
Sco
pe
ofP
roje
ct
New
plum
bing
fixt
ures
asin
dica
ted
onar
chit
ectu
ral
draw
ings
.
New
hot
wat
er,
hot
wat
erre
circ
ulat
ing
and
cold
wat
erli
nes
will
bein
clud
edto
acco
mm
od
ate
all
new
plum
bing
fixt
ures
.A
new
sanit
ary
was
tean
dst
orm
line
syst
emw
illbe
dev
eloped
toac
com
mo
dat
eth
ene
wbu
ildi
ng.
Exi
stin
gre
novat
edar
eas
will
con
nec
tto
exis
ting
near
bypi
ping
.
Roo
fD
rain
age
Sco
pe:
new
addi
tion
only
.C
ourt
yard
catc
hbas
ins
and
roof
dra
ins
(pri
mar
yan
dse
condar
y)
con
nec
ted
toin
teri
orra
inle
ader
san
dst
orm
drai
npi
ping
.Al
lra
inle
ader
sw
illco
nn
ect
into
unde
rgro
und
stor
mdr
ain
pipi
ngsy
stem
ste
rmin
atin
gin
the
site
stor
mdra
inag
esy
stem
.
Des
ign
Cri
teri
a:In
tern
atio
nal
Plu
mbi
ngC
ode
and
Sta
teof
Con
nect
icut
code
,bas
edon
2.8
in/h
r.ra
infa
ll.
Dis
posa
l:co
nnec
tin
tosi
tedra
inag
esy
stem
sep
arat
efr
omsa
nit
ary
sew
er.
Pip
ing
mat
eria
ls:
1.PV
Csc
hed
ule
40
with
solv
ent
cem
ent
join
ts.
Insu
lati
on:
above
grou
ndho
rizo
ntal
runs
cove
red
with
fibr
ous
gla
ssan
dfi
re-r
etar
dan
tva
por
barr
ier
jack
et.
Inte
rior
Roo
fD
rain
s:ca
stir
onbo
dy,
dom
est
rain
er,
sum
ppa
n,fl
ashi
ngan
dunder
dec
kcl
amps.
San
itar
yD
rain
age
Sco
pe:
dra
inag
eof
plum
bing
fixt
ures
,si
nks,
show
ers,
drin
king
founta
ins,
and
floo
rdra
ins
pipe
dto
sanit
ary
buil
ding
drai
n.V
enti
ngof
fixt
ures
and
dra
ins
toat
mo
sph
ere.
Des
ign
Cri
teri
a:In
tern
atio
nal
Plu
mbi
ngC
ode
and
Sta
teof
Con
nect
icut
Plu
mbi
ngC
ode.
Dis
posa
l:C
onne
ctto
buil
ding
sanit
ary
sew
ersy
stem
separ
ate
from
stor
mse
wer
syst
em.
Pip
ing
Mat
eria
ls:
1.PV
Csc
hed
ule
40
with
solv
ent
cem
ent
join
ts.
Flo
orD
rain
s:ca
stir
onbo
dyw
ithtr
appr
imer
connec
tion,
app
ropri
ate
inle
tst
rain
eran
din
teri
ordr
ain.
Kit
chen
Was
te
All
ofth
eki
tche
nw
aste
will
bene
wan
dro
uted
toan
outd
oor,
under
gro
und
gre
ase
inte
rcep
tor,
Xer
xes
mod
elG
l-6-
3500
-UP
C,
3,5
00
gall
ons
capa
city
.U
nder
grou
ndki
tche
nw
aste
pipi
ngw
illbe
insu
late
dan
dhea
ttr
aced
topre
ven
tth
egre
ase
inth
epi
pefr
omco
agul
atin
g.
Rad
onR
emov
alS
yste
m
Ara
don
syst
emis
requ
ired
for
tore
mov
era
don
gas
from
the
slab
ongra
de
leve
lw
hich
will
per
mea
teth
roughout
the
buil
ding
.T
hesy
stem
shal
lco
nsi
stof
anac
tive
soil
dep
ress
uri
zati
on
syst
em,
ara
don
suct
ion
pit,
sch
edu
le4
0PV
Cve
ntpi
ping
and
rado
nIa
non
roof
.A
sep
arat
era
don
syst
emw
illbe
prov
ided
inea
chw
ing
ofth
ebu
ildi
ngto
tali
ng
two
syst
ems
inal
l.
Dom
esti
cW
ater
Sco
pe:
new
wat
erpi
ped
tone
wpl
umbi
ngfi
xtur
es,
drin
king
founta
ins,
law
nhy
dran
tsan
dcl
assr
oom
sink
s.H
otw
ater
pipe
dto
plum
bing
fixt
ures
,cl
assr
oom
sink
s.
Des
ign
Cri
teri
a:pi
pesi
zing
inac
cord
ance
with
the
Sta
teof
Con
nect
icut
and
App
endi
x“D
’of
the
Inte
rnat
iona
lP
lum
bing
Cod
ebas
edup
onfr
icti
onlo
ssch
arts
with
am
axim
umof
8fe
etpe
rse
cond
velo
city
.S
ite
wat
erse
rvic
eex
ceed
s80
-psi
,a
pre
ssu
rere
duci
ngst
atio
nis
requ
ired
.
Sou
rce:
Exi
stin
gex
teri
orsi
teto
wn
wat
erm
ain
separ
ate
serv
ice
from
fire
mai
n.
Pip
ing
Mat
eria
ls:
Val
ves:
1.W
ithin
buil
ding
:T
ype
“L”
copper
tubi
ng,
nole
adso
lder
join
tfi
ttin
gs.
1.T
hree
inch
esan
dsm
alle
r:al
lbr
onze
,1
25
psi
WSP
rate
d,ba
llty
pe.
2.F
our
inch
esan
dla
rger
:12
5ps
iW
SPra
ted,
butt
erfl
yty
pe.
Pip
eIn
sula
tion
:pi
ping
wit
hin
buil
ding
insu
late
dw
ithfi
brou
sgla
ssan
dfi
re-r
etar
dan
tva
por
barr
ier
jack
et.
Red
uced
pre
ssu
reba
ckfl
owpre
ven
ter:
Wat
ts90
9S
erie
s(1
”).
Asi
teir
riga
tion
syst
emis
not
requ
ired
.
Cro
ssC
onne
ctio
nP
rote
ctio
nD
evic
es
Mai
ndo
mes
tic
wat
erse
rvic
een
tran
ceto
bepro
tect
edw
itha
reduce
dp
ress
ure
back
flow
pre
ven
ter
-R
PD:
auto
mat
ical
lyop
erat
ing
asse
mbly
ofp
ress
ure
diff
eren
tial
reli
efva
lve,
loca
ted
bet
wee
ntw
opo
siti
vese
atin
gch
eck
valv
es,
equip
ped
with
inle
tst
rain
ef,
inle
tan
doutl
etgat
eva
lves
,te
stco
cks;
all
bron
zeco
nst
ruct
ion,
with
non-
corr
osiv
ein
tern
alpar
ts,
15
0ps
iW
WP.
Pip
ing
Su
ppo
rts
Sco
pe:
supp
ort
ofpi
ping
from
buil
ding
stru
cture
.
Des
ign
Cri
teri
a:M
anufa
cture
rsS
tan
dar
diz
atio
nS
ocie
ty(M
SS)
Sta
ndar
dP
ract
ice
SP
-69.
Sle
eves
,E
scutc
heo
ns,
Fire
Sto
ppin
g
Sco
pe:
slee
ves
and
fire
sto
ppin
gfo
rpi
ping
pas
sing
thro
ugh
wal
lsan
dpa
rtit
ions
.E
scutc
heo
ns
for
pipi
ngex
pose
dto
view
.
Des
ign
Cri
teri
a:si
zesl
eeves
for
conti
nuous
pipe
insu
lati
on.
Pip
eM
arke
rsan
dV
alve
Tag
s
Sco
pe:
viny
lpl
asti
cpi
pem
arker
san
dfl
owar
row
s,bra
ssva
lve
tags,
valv
ech
arts
and
dia
gra
ms.
Des
ign
Cri
teri
a:A
NSI
A13
.1.
Cle
anouts
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,20
18
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
1
Page 88, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
PLU
MB
ING
Sco
pe:
acce
ssib
lecl
ean
ou
tsto
perm
it“s
naki
ng”
ofdra
inag
epi
ping
,an
dbu
ildi
ngis
aban
doned
and
once
serv
edth
esc
ien
cecl
assr
oo
ms
and
will
oth
erbu
ried
non-p
ress
ure
pipi
ng.
Cle
anou
tpla
tes
for
buri
edpi
ping
.ne
edto
bere
mov
ed.
Des
ign
Cri
teri
a:cl
ean
ou
tsat
bas
eof
vert
ical
stac
ks
and
lead
ers,
atP
ipin
g:B
lack
stee
lpi
pe,
AST
MA
-53,
sch
edu
le40
,w
ithm
alle
able
iron
ends
ofho
rizo
ntal
runs
,at
each
chan
ge
indi
rect
ion
gre
ater
than
45
°F.
,th
read
edfi
ttin
gs.
appr
oxim
atel
y50
feet
apar
ton
pipi
ngru
ns.
Dom
esti
cW
ater
Hea
ters
Flo
orpl
ates
:ca
stir
onbo
dy,
appro
pri
ate
bra
ssco
ver
plat
e.E
xist
ing
wat
ers
hea
ters
are
nea
rth
eir
end
oflif
ean
din
nee
dof
Wal
lpl
ates
:st
ainle
ssst
eel.
repla
cem
ent.
Tw
ow
ater
hea
ter
hea
ters
shou
ldbe
repla
ced
with
two
new
oil-
fire
dhea
ters
insa
me
loca
tion
,PV
Im
odel
500
L15
0A-T
PO.
Plu
mbi
ngF
ixtu
res
Sco
pe:
renovat
edpo
rtio
nsof
the
exis
ting
buil
ding
;an
art
room
and
asc
ien
cero
omw
illin
clud
ene
wpl
umbi
ngfi
xtur
esth
atw
illco
nn
ect
toex
isti
ngne
arby
pipi
ng.
Exi
stin
ggan
gto
ilet
room
sw
illre
mai
nas
is.
New
addit
ion
will
incl
ude
sinks
inev
ery
clas
sroom
and
new
toil
etro
oms.
Wat
erC
lose
ts:
wal
lhu
ng,
vitr
eous
chin
a,lo
wfl
owfl
ush
valv
e,op
enfr
ont
soli
dpl
asti
cse
atle
ssco
ver,
chai
rca
rrie
rsu
pport
.K
ohle
rK
-432
5.
Uri
nals
:w
all
hung
,vit
reous
chin
a,ex
tended
shie
lds,
low
flow
flus
hva
lve,
chai
rca
rrie
rsu
pport
.K
ohie
rK
-490
4.
Lav
ator
ies:
vitr
eous
chin
a,w
all
hung
orco
unte
rin
sert
ed,
supp
lyan
ddr
ain
fitt
ings
,ca
rrie
rsu
pport
.K
ohle
rK
-203
2.S
ingl
ele
ver
fauce
tw
ithex
ten
ded
hand
le.
Law
nH
ydra
nts:
all
bra
ss,
non-
free
zety
pe.
Cla
ssro
omS
inks
:S
ingl
ebo
wl,
stai
nle
ssst
eel,
counte
rtop,
barr
ier
free
with
supp
lyan
ddr
ain
fitt
ings
insu
late
d,
Elk
ayL
RA
D19
18.
Dri
nkin
gF
ount
ain:
self
-conta
ined
,w
all
hung
,st
ainle
ssst
eel,
sem
i-re
cess
ed,
lead
free
,ba
rrie
rfr
ee,
fron
tpu
shba
rco
ntro
ls,
Haw
s1011.
Mol
ded
Sto
ne
Rec
epto
r(M
opS
ink)
:F
iat
MSB
36”
x24
”m
olde
dst
one
rece
pto
rw
ithca
stb
rass
drai
nbo
dy,
stai
nle
ssst
eel
dom
est
rain
er,
lint
bas
ket
,su
pply
fau
cet
with
vacu
umbre
aker
and
buck
etho
ok.
Pro
pan
ean
dN
atur
alG
asP
ipin
gan
dE
quip
men
t
Nat
ural
gas
may
beav
aila
ble
from
Fillo
wS
tree
tan
dE
vers
ourc
eG
asC
ompa
ny.
Eve
rsou
rce
isev
aluat
ing
the
feas
ibil
ity
ofbr
ingi
ngg
asto
the
site
atno
cost
.It
isto
bed
eter
min
edw
ith
the
Tow
nan
dE
vers
ourc
eif
this
isfe
asib
le.
Ifg
asis
avai
lable
itw
illse
rve
the
new
and
exis
ting
boil
ers,
wat
erhea
ters
,H
VA
Cro
ofto
pun
its
and
kitc
hen
equip
men
t.
Ifgas
isno
tav
aila
ble,
the
thre
eex
isti
ngpro
pan
eta
nks
will
rem
ain
inth
ese
rvic
ear
eaw
hich
serv
eth
ebo
iler
pilo
t.N
ewpro
pan
epi
ping
will
serv
ene
wki
tche
nov
ens
and
stoves
.A
nex
isti
ngta
nk
inth
ere
arof
the
Sch
emat
icD
esig
nD
raw
ings
Sch
emat
icD
esig
nP
hase
Pag
e2
Pon
usR
idge
Scho
olIN
orw
alk,
Con
nect
icut
Sta
te#
TM
P-1
03-R
BT
SF
ebru
ary
2,20
18
Page 89, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
PLU
MB
ING
Inte
rior
Roo
fD
rain
s:ca
stir
onbo
dy,
dom
est
rain
er,
sum
ppa
n,fl
ashin
gP
ipin
gM
ater
ials
:an
dunder
dec
kcl
amps
.
San
itar
yD
rain
age
Val
ves:
Sco
pe:
dra
inag
eof
plum
bing
fixt
ures
,si
nks,
show
ers,
drin
king
founta
ins,
and
floo
rdra
ins
pipe
dto
sanit
ary
buil
ding
drai
n.V
enti
ngof
fixt
ures
and
dra
ins
toat
mo
sph
ere.
Des
ign
Cri
teri
a:In
tern
atio
nal
Plu
mbi
ngC
ode
and
Sta
teof
Con
nect
icut
Plu
mbi
ngC
ode.
Dis
posa
l:C
onne
ctto
buil
ding
sanit
ary
sew
ersy
stem
separ
ate
from
stor
mse
wer
syst
em.
Pip
ing
Mat
eria
ls:
1.PV
Csc
hed
ule
40
with
solv
ent
cem
ent
join
ts.
Flo
orD
rain
s:ca
stir
onbo
dyw
ithtr
appr
imer
connec
tion,
appro
pri
ate
inle
tst
rain
eran
din
teri
ordr
ain.
Kit
chen
Was
te
All
ofth
eki
tche
nw
aste
will
bene
wan
dro
uted
toan
outd
oor,
under
gro
und
gre
ase
inte
rcep
tor,
Xer
xes
mod
elG
l-6-
3500
-UP
C,
3,5
00
gall
ons
capa
city
.
Rad
bii
fem
ovaI
Sys
tem
rado
nsy
stem
isre
quir
edfo
rto
rem
ove
rado
ngas
from
the
slab
ongra
de
leve
lw
hich
will
per
mea
teth
roughout
the
buil
ding
.T
hesy
stem
shal
lco
nsi
stof
anac
tive
soil
dep
ress
uri
zati
on
syst
em,
ara
don
suct
ion
pit,
sch
edu
le4
0PV
Cve
ntpi
ping
and
rado
nfa
non
roof
.A
separ
ate
rado
nsy
stem
will
bepr
ovid
edin
each
win
gof
the
bu
ild
ingto
tali
ng
two
syst
ems
inal
l.
Dom
esti
cW
ater
Sco
pe:
new
wat
erpi
ped
tone
wpl
umbi
ngfi
xtur
es,
drin
king
founta
ins,
law
nhydra
nts
and
clas
sroom
sink
s.H
otw
ater
pipe
dto
plum
bing
fixt
ures
,cl
assr
oom
sink
s.
Des
ign
Cri
teri
a:pi
pesi
zing
inac
cord
ance
with
the
Sta
teof
Con
nect
icut
and
App
endi
x“D
”of
the
Inte
rnat
iona
lP
lum
bing
Cod
eb
ased
upon
fric
tion
loss
char
tsw
itha
max
imum
of8
feet
per
seco
nd
velo
city
.S
ite
wat
erse
rvic
eex
ceed
s80
-psi
,a
pre
ssure
redu
cing
stat
ion
isre
quir
ed.
Sou
rce:
Exi
stin
gex
teri
orsi
teto
wn
wat
erm
ain
sep
arat
ese
rvic
efr
omfi
rem
ain.
Sch
emat
icD
esig
nD
raw
ings
Sch
emat
icD
esig
nP
hase
Pag
e1
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utS
tate
#T
MP
-103
-RB
TS
Feb
ruar
y2,
2018
GEN
ERA
L
Com
plet
ene
wpl
umbi
ngsy
stem
sar
eto
bepr
ovid
edfo
rth
ene
wad
diti
onan
dm
inor
wor
kfo
rth
ere
no
vat
edport
ions
ofth
eex
isti
ngbu
ildi
ng.
Are
asto
bere
novat
edin
clud
eth
een
tire
kitc
hen,
anar
tro
oman
da
scie
nce
room
.T
hero
ofw
illre
mai
nas
is.
The
new
syst
ems
will
bed
esig
ned
inac
cord
ance
with
the
requir
emen
tsof
the
foll
owin
gco
des
and
stan
dar
ds:
•2018
Inte
rnat
iona
lB
uild
ing
Cod
ean
dre
fere
nce
dpu
blic
atio
ns•
2018
CT
Sta
teB
uild
ing
Cod
ew
ithE
rrat
a’s
•2018
CTS
tate
Fire
Saf
ety
Cod
ew
ith
Err
ata’
s•
20
15
Inte
rnat
iona
lP
lum
bing
Cod
ean
dre
fere
nce
dpu
blic
atio
ns•
20
15
Inte
rnat
iona
lE
nerg
yC
onse
rvat
ion
Cod
e•
CT
Com
plia
nce
for
Hig
hP
erfo
rman
ceB
uild
ings
Sco
pe
ofP
roje
ct
New
plum
bing
fixt
ures
asin
dica
ted
onar
chit
ectu
ral
draw
ings
.
New
hot
wat
er,
hot
wat
erre
circ
ulat
ing
and
cold
wat
erli
nes
will
bein
clud
edto
acco
mm
od
ate
all
new
plum
bing
fixt
ures
.A
new
sanit
ary
was
tean
dst
orm
line
syst
emw
illbe
dev
eloped
toac
com
mo
dat
eth
ene
wbu
ildi
ng.
Exi
stin
gre
novat
edar
eas
will
con
nec
tto
exis
ting
near
bypi
ping
.
Roo
fD
rain
age
Sco
pe:
new
addi
tion
only
.C
ourt
yard
catc
hbas
ins
and
roof
dra
ins
(pri
mar
yan
dse
cond
ary)
con
nec
ted
toin
teri
orra
inle
ader
san
dst
orm
drai
npi
ping
.Al
lra
inle
ader
sw
illco
nn
ect
into
under
gro
und
storm
dra
inpi
ping
syst
ems
term
inat
ing
inth
esi
test
orm
dra
inag
esy
stem
:
Des
ign
Cri
teri
a:In
tern
atio
nal
Plu
mbi
ngC
ode
and
Sta
teof
Con
nect
icut
code
,bas
edon
2.8
in/h
r.ra
infa
ll.
Dis
posa
l:co
nn
ect
into
site
dra
inag
esy
stem
separ
ate
from
sanit
ary
sew
er.
Pip
ing
mat
eria
ls:
1.PV
Csc
hed
ule
40
with
solv
ent
cem
ent
join
ts.
Insu
lati
on:
above
grou
ndho
rizo
ntal
runs
cove
red
with
fibr
ous
gla
ssan
dfi
re-r
etar
dan
tva
por
barr
ier
jack
et.
1.W
nbu
ildi
ng:
Typ
e“
op
per
tubi
ng,
nole
adso
lder
join
t
1.T
hree
inch
esan
dsm
alle
r:al
lbr
onze
,1
25
psi
WSP
rate
d,ba
j[’t
5pe.
2.F
ou
rin
ches
and
larg
er:
12
5ps
iW
SPra
ted,
butt
erfl
yty
pe.
Pip
eIn
sula
tion
:pi
ping
wit
hin
buil
ding
insu
late
dw
ith
fibr
ous
gla
ssan
dfi
re-r
etar
dan
tva
por
barr
ier
jack
et.
Red
uced
pre
ssu
reba
ckfl
owpre
ven
ter:
Wat
ts90
9S
erie
s(1
”).
Asi
teir
riga
tion
syst
emis
not
requ
ired
.
Cro
ssC
onne
ctio
nP
rote
ctio
nD
evic
es
Mai
ndo
mes
tic
wat
erse
rvic
een
tran
ceto
bepro
tect
edw
itha
redu
ced
pre
ssure
back
flow
pre
ven
ter
-R
PD:
auto
mat
ical
lyo
per
atin
gas
sem
bly
ofp
ress
ure
diff
eren
tial
reli
efva
lve,
loca
ted
bet
wee
ntw
opo
siti
vese
atin
gch
eck
valv
es,
equ
ipped
with
inle
tst
rain
er,
inle
tan
do
utl
etg
ate
valv
es,
test
cock
s;al
lbr
onze
const
ruct
ion,
with
non-
corr
osiv
ein
tern
alpar
ts,
150
psi
WW
P.
Pip
ing
Su
pport
s
Sco
pe:
suppo
rtof
pipi
ngfr
ombu
ildi
ngst
ruct
ure
.
Des
ign
Cri
teri
a:M
anufa
cture
rsS
tand
ardiz
atio
nS
ocie
ty(M
SS)
Sta
nd
ard
Pra
ctic
eS
P-6
9.
Sle
eves
,E
scutc
heo
ns,
Fire
Sto
ppin
g
Sco
pe:
slee
ves
and
fire
stoppin
gfo
rpi
ping
pas
sing
thro
ugh
wal
lsan
dpa
rtit
ions
.E
scu
tch
eon
sfo
rpi
ping
expose
dto
view
.
Des
ign
Cri
teri
a:si
zesl
eev
esfo
rco
nti
nuous
pipe
insu
lati
on.
Pip
eM
arke
rsan
dV
alve
Tag
s
Sco
pe:
viny
lpl
asti
cpi
pem
arker
san
dfl
owar
row
s,bra
ssva
lve
tags,
valv
ech
arts
and
dia
gra
ms.
Des
ign
Cri
teri
a:A
NSI
A13
.1.
Cle
anouts
Sco
pe:
acce
ssib
lecl
ean
ou
tsto
perm
it“s
naki
ng”
ofdra
inag
epi
ping
,an
do
ther
buri
edn
on-p
ress
ure
pipi
ng.
Cle
anou
tp
late
sfo
rbu
ried
pipi
ng.
Page 90, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
PLU
MB
ING
Des
ign
Cri
teri
a:cl
ean
ou
tsat
bas
eof
vert
ical
stac
ks
and
lead
ers,
atD
omes
tic
Wat
erH
eate
rsen
ds
ofho
rizo
ntal
runs
,at
each
chan
ge
indi
rect
ion
gre
ater
than
45
0F.
,ap
prox
imat
ely
50
feet
apar
ton
pipi
ngru
ns.
Exi
stin
gw
ater
shea
ters
are
nea
rth
eir
end
oflif
ean
din
need
ofre
pla
cem
ent.
Tw
ow
ater
hea
ter
hea
ters
shou
ldbe
repla
ced
with
two
Flo
orpl
ates
:ca
stir
onbo
dy,
appro
pri
ate
bra
ssco
ver
plat
e.ne
woi
l-fi
red
hea
ters
insa
me
loca
tion
,PV
Im
odel
500
L15
0A-T
PO.
Wal
lpla
tes:
stai
nle
ssst
eel.
New
addi
tion
wat
erhea
ter
will
bean
80
gall
onel
ectr
icst
ora
ge
wat
erhea
ter
loca
ted
ina
near
byst
ora
ge
orja
nito
r’s
close
t.PV
Im
odel
90
LP
lum
bing
Fix
ture
s11
9A-v
E
Sco
pe:
renovat
edport
ions
ofth
eex
isti
ngbu
ildi
ng;
anar
tro
oman
da
scie
nce
room
will
incl
ude
new
plum
bing
fixtu
res
that
will
con
nec
tto
exis
ting
near
bypi
ping
.E
xist
ing
gan
gto
ilet
room
sw
illre
mai
nas
is.
New
addit
ion
will
incl
ude
sinks
inev
ery
clas
sro
om
and
new
toil
etro
oms.
Wat
erC
lose
ts:
wal
lhu
ng,
vitr
eous
chin
a,lo
wfl
owfl
ush
valv
e,op
enfr
ont
soli
dpl
asti
cse
atle
ssco
ver,
chai
rca
rrie
rsu
pport
.K
ohle
rK
-432
5.
Uri
nals
:w
all
hung
,vi
treo
usch
ina,
exte
nded
shie
lds,
low
flow
flus
hva
lve,
chai
rca
rrie
rsu
pport
.K
ohle
rK
-490
4.
Lav
ator
ies:
vitr
eous
chin
a,w
all
hung
orco
un
ter
inse
rted
,su
pply
and
drai
nfi
ttin
gs,
carr
ier
support
.K
ohle
rK
-203
2.S
ingl
ele
ver
fauce
tw
ithex
ten
ded
hand
le.
Law
nH
ydra
nts:
all
bra
ss,
non-
free
zety
pe.
Cla
ssro
omS
inks
:S
ingl
ebo
wl,
stai
nle
ssst
eel,
counte
rtop,
barr
ier
free
with
supp
lyan
ddr
ain
fitt
ings
insu
late
d,
Elk
ayL
RA
D19
18.
Dri
nkin
gF
ount
ain:
self
-conta
ined
,w
all
hung
,st
ainle
ssst
eel,
sem
i-re
cess
ed,
lead
free
,ba
rrie
rfr
ee,
fron
tpu
shba
rco
ntro
ls,
Haw
s1
01
1.
Mol
ded
Sto
ne
Rec
epto
r(M
opS
ink)
:F
iat
MSB
36”
x24
”m
olde
dst
one
V
rece
pto
rw
ithca
stb
rass
drai
nbo
dy,
stai
nle
ssst
eel
dom
est
rain
er,
lint
bas
ket
,su
pply
fauce
tw
ithva
cuum
bre
aker
and
buck
etho
ok.
Pro
pan
ean
dN
atur
alG
asP
ipin
gan
dE
quip
men
t
Nat
ural
gas
isno
tav
aila
ble.
Thr
eeex
isti
ngpro
pan
eta
nks
will
rem
ain
inth
ese
rvic
ear
eaw
hich
serv
eth
ebo
iler
pilo
t.N
ewpro
pan
epi
ping
will
serv
ene
wki
tche
noven
san
dst
oves
.A
nex
isti
ngta
nk
inth
ere
arof
the
buil
ding
isab
andoned
and
once
serv
edth
esc
ien
cecl
assr
oom
s.
Pro
pan
ePi
ping
:B
lack
stee
lpi
pe,
ASI
MA
-53,
sch
edu
le4
0,
wit
hm
alle
able
iron
thre
aded
fitt
ings
.
Sch
emat
icD
esig
nD
raw
ings
Sch
emat
icD
esig
nP
hase
Pag
e2
Pon
usR
idge
Scho
olIN
orw
alk,
Con
nect
icut
Sta
te#
TM
P-1
03-R
BT
SF
ebru
ary
2,20
18
Page 91, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
FIR
EPR
OT
EC
TIO
N
Gen
eral
Com
plet
ene
wsp
rink
ler
syst
ems
are
tobe
prov
ided
for
the
enti
rebu
ildi
ng,
incl
udin
gbo
thth
ere
novat
edpo
rtio
nsof
the
buil
ding
and
new
addi
tion
s.T
hene
wsy
stem
sw
illbe
des
igned
inac
cord
ance
with
the
req
uir
emen
tsof
the
foll
owin
gco
des
and
stan
dar
ds:
•2018
Inte
rnat
iona
lB
uild
ing
Cod
ean
dre
fere
nce
dpu
blic
atio
ns•
2018
CI
Sta
teB
uild
ing
Cod
ew
ithE
rrat
a’s
•2018
CI
Sta
teFi
reS
afet
yC
ode
with
Err
ata’
s•
20
15
Inte
rnat
iona
lFi
reC
ode
and
refe
rence
dpu
blic
atio
ns•
NFP
A13/2
015,
Sta
nd
ard
for
the
Inst
alla
tion
ofS
prin
kler
Sys
tem
•N
FPA
24
/20
15
,S
tan
dar
dfo
rth
eIn
stal
lati
onof
Pri
vate
Fire
Ser
vice
Mai
nsan
dth
eir
Appurt
enan
ces
Fir
eP
rote
ctio
nS
yste
m
Sco
pe:
prot
ecti
onof
buil
ding
,of
fice
area
s,cl
assr
oom
s,gy
mna
sium
,w
orkr
oom
s,st
ora
ge.
area
san
dco
nte
nts
with
auto
mat
icw
etpi
pesp
rinkle
rsy
stem
.S
prin
kler
syst
emto
befe
dfr
omsi
tepi
ping
syst
emsu
ppli
edfr
ompu
blic
wat
erm
ain.
Des
ign
Cri
teri
a:O
wne
r’s
Insu
rance
Com
pany
req
uir
emen
tsan
dN
FPA
Sta
ndar
ds.
Sy
stem
sto
behy
drau
lica
lly
bal
ance
dsy
stem
sb
ased
upon
the
foll
owin
gin
form
atio
n.
Fire
prot
ecti
onsy
stem
shal
lin
clud
ea
hydr
auli
call
ybal
ance
dsp
rinkle
rsy
stem
thro
ughout
the
enti
rebu
ildi
ng.
Ast
andpip
esy
stem
isno
tre
quit
edat
this
tim
e.Fi
rem
ain
serv
ice
shal
lbe
loca
ted
wit
hin
the
fire
serv
ice
room
ofth
eb
asem
ent.
Afi
repu
mp
isno
tre
quir
edat
pre
sent
tim
e.
Fire
Spr
inkl
ers
Gen
eral
Are
as,
Wet
Pip
e,L
ight
Haz
ard
Den
sity
-0.1
0g
pm
/s.f
.ov
erth
em
ost
rem
ote
1,5
00
s.f.
area
with
100
gpm
added
for
hose
stre
ams.
Spr
inkl
erhea
ds
rate
dat
165°
spac
edat
225
s.f.
per
head
(max
imum
).
Sto
rag
eR
oom
s,M
echa
nica
lan
dE
lect
rica
lE
quip
men
tR
oom
s-
Ord
inar
yH
azar
dG
roup
2
Den
sity
-0.2
0g
pm
/s.f
.ov
erth
em
ost
rem
ote
1,5
00
s.f.
area
with
250
gpm
added
for
hose
stre
ams.
Spr
inkl
erhea
ds
rate
dat
165°
spac
edat
13
0s.
f.pe
rhe
ad(m
axim
um).
Den
sity
-0
.20
gpm
/s.f
.ov
erth
em
ost
rem
ote
1,9
50
s.f.
area
with
250
gpm
add
edfo
rhose
stre
ams.
Spr
inkl
erhea
ds
rate
dat
21
2°
spac
edat
13
0s.
f.pe
rhe
ad(m
axim
um).
Pip
ing
Mat
eria
ls:
Spr
inkl
erE
quip
men
t
1.W
ithin
Bui
ldin
g(W
etP
ipe
Sys
tem
):i.
Mai
n-S
ched
ule
10lig
htw
all
pipe
and
Vic
taul
icfi
ttin
gs.
Pip
eD
iam
eter
-2-1
/2in
ches
and
abov
e.ii.
Bra
nch
es-S
ched
ule
40
blac
kst
eel
pipe
and
thre
aded
fitt
ings
.P
ipe
Dia
met
er-
2in
ches
and
belo
w.
Spr
inkl
erhea
ds:
UL
list
ed/F
Map
prov
edau
tom
atic
type
;up
righ
t,co
nce
aled
pen
den
t,pen
den
t,or
side
wal
lto
mee
tco
ndit
ions
,an
dof
prop
erte
mper
ature
rati
ng.
Def
lect
orto
bem
arke
dto
indi
cate
posi
tion
.
Upr
ight
hea
ds:
expose
dpi
ping
,br
ight
chro
me
plat
edbr
onze
,g
lass
bulb
for
expose
dar
eas.
Con
ceal
edp
end
ent
hea
ds:
conce
aled
pipi
ng,
brig
htch
rom
epl
ated
bron
ze,
gla
ssbu
lb,
with
two-
piec
esp
rink
ler
cup
escu
tch
eon
asse
mbly
plat
eto
mat
chce
ilin
gco
lor
for
hung
ceil
ing
area
s.
Hea
dguar
ds:
requ
ired
for
hea
ds
sub
ject
tom
echan
ical
inju
rysu
chas
gym
and
sto
rag
ear
eas.
Sp
are
hea
ds:
not
less
than
12,
tota
lnum
ber
bas
edon
one
spar
eh
ead
ofea
chty
pean
dra
ting
per
each
10
0si
mil
arhea
ds,
orpar
tth
ereo
f,in
stal
led.
Sp
are
head
cabi
net:
bak
eden
amel
edst
eel
cabin
et,
hing
edco
ver,
ofad
equ
ate
size
toco
ntai
nhea
ds
and
wre
nch.
Hea
dw
renc
h:pr
ovid
eat
leas
ton
e,w
ithsu
itab
leop
enin
gs.
Val
veS
uper
viso
ryD
evic
es
Val
vesu
perv
isor
yde
vice
s:U
L/F
Map
prov
edta
mp
erp
roo
fsi
gnal
ing
init
iati
ngsw
itch
arra
nged
todet
ect
clos
edva
lve
posi
tion
.E
lect
rica
lra
ting
:1
20
VA
C.
Div
isio
n(Z
one)
Val
ves:
spac
edto
isola
tesp
ecif
icar
eas
wit
hin
buil
ding
san
dhose
suppli
es.
Aut
omat
icA
larm
Val
ve:
loca
ted
onea
chsp
rink
ler
rise
rco
mple
tew
ithal
ltr
im,
incl
udin
gw
ater
flow
“ala
rm”
swit
chan
dw
ater
gong
.
Cro
ssC
onne
ctio
nP
rote
ctio
nD
evic
es
Red
uced
pre
ssure
back
flow
pre
ven
ter
-R
PD:
auto
mat
ical
lyoper
atin
gas
sem
bly
ofpre
ssure
diff
eren
tial
reli
efva
lve,
loca
ted
bet
wee
ntw
opo
siti
vese
atin
gch
eck
valv
es,
equip
ped
with
inle
tst
rain
er,
inle
tan
doutl
etg
ate
valv
es,
test
cock
s;al
lbr
onze
const
ruct
ion,
with
non-
corr
osiv
ein
tern
alpar
ts,
150
psi
WW
P.
Fire
Flow
Tes
t
Afl
owte
stw
aspe
rfor
med
in2
016
whi
chpr
ovid
ed84
psi
stat
ic,
68
psi
resi
dual
and
1,3
60
gpm
flow
ing.
Thi
spre
ssure
isgo
odan
dsu
pp
ort
sa
spri
nkle
rsy
stem
wit
hout
afi
repu
mp.
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,2018
Sch
emat
icD
esig
nP
has
eS
tate
#T
MP
-103-R
BIS
Pag
e1
Page 92, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
EL
EC
TR
ICA
L
GE
NE
RA
L
Com
plet
ene
wE
lect
rica
lsy
stem
sar
eto
bepr
ovid
edfo
rth
ene
wad
diti
onan
dse
lect
ive
wor
kfo
rth
ere
novat
edpo
rtio
nsof
the
exis
ting
buil
ding
.A
reas
tobe
renovat
edin
clud
eth
een
tire
kit
chen
/caf
eter
ia,
anar
tro
om,
scie
nce
room
s,m
ain
offi
ces,
and
clas
sro
om
s.
APP
LIC
AB
LE
CO
DE
S
The
new
syst
ems
will
bedes
igned
inac
cord
ance
wit
hth
ere
qu
irem
ents
ofth
efo
llow
ing
codes
and
stan
dar
ds:
•2
01
8C
TS
tate
Bui
ldin
gC
ode
with
Err
ata’
s•
20
18
CT
Sta
teFi
reS
afet
yC
ode
with
Err
ata’
s•
20
15
Inte
rnat
iona
lB
uild
ing
Cod
ean
dre
fere
nce
dpu
blic
atio
ns•
20
15
Inte
rnat
iona
lE
xist
ing
Bui
ldin
gC
ode
and
refe
rence
dpu
blic
atio
ns•
20
15
Inte
rnat
iona
lFi
reC
ode
and
refe
rence
dpu
blic
atio
ns•
20
15
Inte
rnat
iona
lE
nerg
yC
onse
rvat
ion
Cod
e•
20
15
Nat
iona
lFi
reP
rote
ctio
nA
ssoc
iati
on10i
-L
ife
Saf
ety
Cod
e•
20
17
Nat
iona
lFi
reP
rote
ctio
nA
ssoc
iati
on70
—N
atio
nal
Ele
ctri
cal
Cod
e•
CT
Com
plia
nce
for
Hig
hP
erfo
rman
ceB
uild
ings
BA
SEB
UIL
DIN
GSE
RV
ICE
S
Pri
mar
yel
ectr
ical
serv
ice
and
site
tran
sform
er.
Sec
ondar
yel
ectr
ical
dist
ribu
tion
swit
chbo
ard,
tran
sfo
rmer
s,pan
els,
grou
ndin
gan
dbo
ndin
g.
Wir
ing
devi
ces,
cond
uit,
and
bran
chci
rcui
ts.
Mec
hani
cal
equ
ipm
entfe
eder
s/b
ran
chci
rcui
ts.
Inte
rior
and
exte
rior
ligh
ting
.
Em
erge
ncy
and
exit
ligh
ting
.
Ad
dre
ssab
lefi
real
arm
syst
em.
PRIM
AR
YEL
ECTR
ICA
LSE
RV
ICE
AN
DT
RA
NSF
OR
ME
R
Pro
vide
unde
rgro
und
prim
ary
elec
tric
serv
ices
from
the
nea
rest
ov
erh
ead
pole
line
,th
roug
ha
pad
-mounte
dut
ility
step
-dow
ntr
ansf
orm
erto
a2,5
00-a
mp
480/2
77-v
olt
,th
ree-
ph
ase,
four
-wir
e,w
yeco
nn
ecte
dse
condar
yse
rvic
em
ain
swit
chbo
ard.
The
tran
sfo
rmer
sw
illbe
loca
ted
atth
eex
teri
oran
dth
esw
itch
boar
dw
illbe
inth
eol
dcu
sto
dia
nro
omar
eaan
dw
illbe
conver
ted
toa
mai
nel
ectr
ical
room
.
The
load
calc
ulat
ion
incl
udes
200kva
for
ligh
ting
,lO
Okv
afo
rre
cep
tacl
esan
dsm
all
load
s,l3
00kva
for
HV
AC
,35
Okv
am
isce
llan
eous
for
the
exis
ting
buil
ding
pea
kdem
and
for
ato
tal
ofl9
5O
kv
aco
nnec
ted.
At
480-
volt
,th
ree
phas
e,th
ese
rvic
esi
zesh
all
bera
ted
for
250
0am
p.
The
utili
tyre
pre
sen
tati
ve
has
not
been
con
tact
edye
t.F
ees
asso
ciat
edw
ithth
ein
stal
lati
onof
the
new
elec
tric
alse
rvic
eha
veno
tbee
nes
tab
lish
ed.
SEC
ON
DA
RY
ELEC
TRIC
AL
DIS
TR
IBU
TIO
N
The
serv
ice
entr
ance
will
term
inat
ein
asw
itch
boar
dli
neup
.Al
lci
rcui
tb
reak
ers
will
bein
sula
ted
-cas
ety
pe.
Bre
aker
s1200
amp
san
dsm
alle
rw
illbe
grou
p-m
ount
ed.
AW
SS
syst
emw
illbe
inst
alle
dat
the
mai
nse
rvic
een
tran
ceto
reduce
the
man
yha
rmfu
lvo
ltag
eir
regu
lari
ties
ente
ring
the
buil
ding
serv
ice.
An
Arc
-fla
shre
duct
ion
mai
nte
nan
cesw
itch
shal
lbe
loca
ted
onth
em
ain
serv
ice.
The
exis
ting
buil
ding
’sm
ain
serv
ice
shal
lre
mai
nan
dbe
back
-fee
dfr
omth
ene
wse
rvic
ean
dth
roug
ha
step
-dow
ntr
ansf
orm
er.
The
exis
ting
mai
nse
rvic
eis
circ
a1956
and
has
reac
hed
its
usef
ullif
e.A
ddit
ion
wor
kov
erth
eyea
rsha
vead
ded
new
pan
els,
butth
ese
are
reac
hin
gth
eir
usef
ullif
e.N
ow
ork
isan
tici
pat
edw
ithth
ese
old
elec
tric
alp
anel
sor
feed
ers.
All
new
wor
ksh
all
orig
inat
efr
omne
wel
ectr
ical
equ
ipm
ent.
A480/2
77-v
olt
,3-p
has
e,4-
wir
edi
stri
buti
onsy
stem
will
bepr
ovid
edth
roughout
the
scho
olto
serv
ep
anel
bo
ard
sfo
rm
echan
ical
equ
ipm
ent
and
ligh
ting
.
A208/1
20-v
olt
,3-p
has
e,4
wir
edi
stri
buti
onsy
stem
will
bepr
ovid
edth
roughout
the
scho
olto
serv
ep
anel
bo
ard
sfo
rre
cepta
cles
,fr
acti
onal
hors
epow
erm
otor
s,m
isce
llan
eous
120-
volt
ligh
ting
,an
dm
isce
llan
eou
seq
uip
men
t.
Ele
ctri
cal
clo
sets
will
best
rate
gica
lly
loca
ted
thro
ugho
ut
the
buil
ding
.E
ach
close
tw
illco
ntai
na
480/2
77-v
olt
pane
l,a
tran
sfo
rmer
and
a208/1
20-v
olt
pane
l.D
edic
ated
tran
sfo
rmer
san
dp
anel
boar
ds
with
WS
San
dha
rmon
icfi
lter
unit
sw
illbe
prov
ided
for
com
pute
rlo
ads
incl
assr
oom
s,la
bs,
and
tele
com
room
s.
WIR
EA
ND
INSU
LATI
ON
APP
LIC
AT
ION
S
Bra
nch
Cir
cuit
sE
xpos
ed:
THH
Nco
nduct
ors
inco
ndui
t,#1
2A
WG
min
imum
.
Bra
nch
Cir
cuit
sC
once
aled
:M
Cca
ble,
#12
AW
Gco
ndu
cto
rs
min
imum
.
Hom
eR
uns:
TH
HN
condu
cto
rsin
cond
uit.
Fee
der
s:T
HH
Nco
nd
uct
ors
inco
ndui
t.
Fire
Ala
rmC
ircu
its:
Fir
e-ra
ted
MC
cabl
e,op
enw
irin
gin
cond
uit.
Not
e:M
inim
umco
nduit
size
shal
lbe
3/4
”an
dal
lco
nduct
ors
shal
l
beco
pper
.
CO
ND
UIT
APP
LIC
ATI
ON
OU
TD
OO
RS
Exp
osed
:R
igid
galv
aniz
edst
eel
conduit
(RG
S).
Con
ceal
ed:
RG
S.
Und
ergr
ound
:R
igid
non-
met
alli
cco
ndui
t.
Con
nect
ion
toV
ibra
ting
Equ
ipm
ent:
Liq
uid-
tigh
tfl
exib
lem
etal
lic
cond
uit
(LFM
C).
Incl
udin
gtr
ansf
orm
ers
and
hydr
auli
c,pneu
mat
ic,
elec
tric
sole
noid
orm
otor
-dri
ven
equip
men
t.
Box
esan
dE
nclo
sure
s:N
EMA
25
0,
Typ
e3R
orT
ype
4.
Con
duit
inst
alle
dbe
low
floo
rsl
abs
shal
lbe
RG
S.
Not
e:M
inim
umco
nduit
size
shal
lbe
3/4
”an
dal
lco
nduct
ors
shal
lbe
copp
er.
CO
ND
UIT
APP
LIC
ATI
ON
IND
OO
RS
Exp
osed
area
sno
tsu
bje
ctto
phys
ical
dam
age:
Ele
ctri
cal
met
alli
ctu
bin
g(E
MT)
.
Exp
osed
area
ssu
bje
ctto
phys
ical
dam
age:
RG
Sbe
low
48”
fini
shed
floo
ran
dEM
Tab
ove
48”
fini
shed
floo
r.
Are
assu
bje
ctto
phys
ical
dam
age
incl
ude,
but
are
not
lim
ited
toat
tic,
mec
han
ical
room
s,bo
iler
room
s,sp
rink
ler
room
and
like
utili
tyro
oms.
Con
ceal
ed:
MC
cabl
e.
Con
nect
ion
toV
ibra
ting
Equ
ipm
ent:
flex
ible
met
alli
cco
nduit
(FM
C):
exce
pt
inw
etor
dam
plo
cati
ons,
use
LFM
C.
Incl
udin
gtr
ansf
orm
ers
and
hydr
auli
c,pneu
mat
ic,
elec
tric
sole
noid
orm
otor
-dri
ven
equip
men
t.
Dam
por
Wet
Loc
atio
ns:
RG
S.
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utfe
bru
ary
2,20
18
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
1
Page 93, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
EL
EC
TR
ICA
L
Ple
num
Spac
es:
Wir
ing
met
hods
inpl
enum
spac
essh
all
conf
orm
with
the
requir
emen
tsof
NEC
Sec
tion
300-2
2.
All
conduit
ssh
all
bem
etal
.E
xpos
edca
ble
s,w
her
euse
d,
shal
lbe
list
edan
dap
pro
ved
for
use
inpl
enum
.
Box
esan
dE
nclo
sure
s:N
EMA
25
0,
Typ
e1.
Box
esan
dE
nclo
sure
sin
dam
por
wet
loca
tion
s:N
EMA
25
0,
Typ
e
4. Not
e:M
inim
umco
ndui
tsi
zesh
all
be3
/4”
and
all
conduct
ors
shal
lbe
copp
er.
MEC
HA
NIC
AL
Pro
vide
all
nec
essa
ryd
isco
nn
ects
,w
irin
gJra
cew
ays
for
VR
Fsy
stem
equ
ipm
ent,
exh
aust
fans,
pum
ps,
roof
top
unit
s,fa
n-co
ils,
wat
erh
eate
rs,
etc.
Mot
orco
ntro
ller
san
dvar
iable
-fre
quen
cydr
ives
shal
lbe
furn
ished
bym
echan
ical
con
trac
tor
and
inst
alle
dby
elec
tric
alco
ntra
ctor
.
KIT
CH
ENE
QU
IPM
EN
T
Pro
vide
pow
erfo
ral
lki
tche
neq
uip
men
tfro
mlo
cal
pan
elboar
d(s
).
All
kitc
hen
equ
ipm
ent
shal
lbe
pro
tect
edby
aG
FIty
pere
cep
tacl
eor
circ
uit
bre
aker
per
the
NEC
.P
rovi
ded
edic
ated
connec
tion
per
man
ufa
cture
r’s
reco
mm
end
atio
ns
for
conv
ecti
onov
ens,
port
able
war
mer
s,re
ach
inre
frig
erat
ion
and
free
zer
and
dis
hw
asher
.P
rovi
dean
sul
syst
emm
onit
orin
gan
dgas
shut
off
for
kitc
hen
equip
men
t.
RE
CE
PTA
CL
ES
DEV
ICES
Pro
vide
a20
A,
120V
,gr
ound
ing
type
quad
conven
ience
rece
pta
cle
atea
chdat
ao
utl
etlo
cati
on.
Pro
vide
20A
,12
0Vgr
ound
ing
type
dupl
exco
nven
ience
rece
pta
cles
inpu
blic
gat
her
ing
area
sfo
rge
nera
lus
e.
Pro
vide
floo
rboxes
/poke-
thru
’sas
requ
ired
for
confe
rence
room
s,et
c.to
house
20A
,12
0Vgr
ound
ing
type
dupl
exco
nven
ience
rece
pta
cle(
s).
Pro
vide
20A
,12
0Vgr
ound
ing
type
dupl
exco
nven
ience
rece
pta
cles
inal
lof
fice
area
s,m
eeti
ng
room
s,lo
unge
area
s,et
c.A
min
imum
ofone
(1)
rece
pta
cle
per
wal
lis
requ
ired
.
Pro
vide
agr
ound
ing
type
rece
pta
cle
with
ad
edic
ated
circ
uit
for
each
vend
ing
mac
hine
,an
dal
lki
tche
neq
uip
men
t,re
frig
erat
ors,
etc.
Loc
ate
conven
ience
rece
pta
cles
inal
lco
rrid
ors
onap
prox
imat
ely
40-
foot
cen
ters
.
Pro
vide
rece
pta
cles
/ju
nct
ion
boxe
sas
requ
ired
for
mis
cell
aneo
us
equip
men
t,te
leco
mm
unic
atio
ns,
A/V
and
secu
rity
syst
ems,
digi
tal
signag
e,et
c.
GEl
type
rece
pta
cles
shal
lbe
use
dw
ithi
n6-f
eet
ofa
sink
orw
ater
Sou
rce,
appro
pri
ate
bra
ssco
ver
plat
e.
INT
ER
IOR
LIG
HTI
NG
-U
SELE
DFI
XTU
RES
The
Ever
sourc
eC
ompa
nyhas
been
conta
cted
about
this
proj
ect.
Des
ign
toin
corp
ora
teut
ilit
yre
bat
epr
ogra
mre
qu
irem
ents
.
Lig
htin
gle
vels
will
bepe
rIE
Sst
and
ard
s.
Occ
upan
cy/d
ayli
ghti
ng
sen
sors
will
bepr
ovid
edth
rou
gh
ou
tas
feas
ible
.T
his
will
allo
wfo
ren
suri
ng
that
the
ligh
tsin
thes
esp
aces
dono
tget
left
onfo
rlo
ngper
iods
ofti
me.
AL
ight
ing
cont
rol
syst
emsh
all
bepr
ovid
edth
rou
gh
ou
tth
esc
hool
faci
lity
.
Lig
htin
gin
clas
sroom
sw
illbe
rece
ssed
2x4
LED
pri
smat
icty
petr
off
ers.
Mul
tipl
esw
itch
esw
illbe
prov
ided
toac
com
modat
e40
and
60
foot-
candle
s.
Lig
htin
gin
gen
eral
corr
idor
sw
illbe
rece
ssed
2x4
LED
pri
smat
icty
petr
off
ers.
Lig
htin
gle
vels
will
be2
0to
30
foot-
candle
s.
Off
ice
and
adm
inis
trat
ive
area
sw
illbe
rece
ssed
2x4
LED
pri
smat
icty
petr
off
ers.
Mul
tipl
esw
itch
esw
illbe
prov
ided
toac
com
mo
dat
e40
and
60
foot-
candIe
sof
illu
min
atio
n.
Gym
Lig
htin
g-
surf
ace
mounte
dhi
ghba
yhi
ghoutp
ut
2x4
LED
type
troff
ers
wit
hin
tegr
albat
tery
bac
kup
for
emer
gen
cyli
ghti
ng.
EX
TE
RIO
R/S
ITE
LIG
HTI
NG
USE
LED
FIX
TUR
ES
Bui
ldin
g-m
ount
edse
curi
tyli
ghti
ngw
illbe
prov
ided
onal
lsi
des
ofth
ebu
ildi
ngan
dat
each
entr
y/e
gre
sspo
int.
Sit
eli
ghti
ngpo
les/
boll
ards
for
fire
loop
arou
ndbu
ildi
ngw
illbe
requ
ired
asth
isis
doub
ling
aseg
ress
exit
ing
ofbu
ildi
ngo
ccu
pan
ts.
Lam
pty
pew
illbe
LED
.
Sit
eli
ghti
ngw
illbe
prov
ided
onth
eso
uth
acce
ssdr
ive
toth
em
ain
road
and
exte
rior
park
ing
lots
.E
xist
ing
park
ing
lot
ligh
ting
tobe
retr
ofit
ted
with
LED
fixt
ures
.L
amp
tve
will
beLE
D,
arch
itec
tura
lty
pefi
xtur
e.
No
ligh
ting
requ
ired
for
spo
rts
fiel
ds,
bas
ket
bal
lco
urt
sor
pla
ysc
ape
area
s.
EMER
GEN
CY
LIG
HTI
NG
Em
erge
ncy
ligh
ting
will
beb
ased
onin
tegr
albat
tery
bac
kup
orin
vert
erty
pesy
stem
s.
EXIT
LIG
HTI
NG
Exit
sign
sw
illbe
univ
ersa
lm
ount
ing,
LED
illu
min
ated
with
cast
alum
inum
hous
ing
with
inte
gral
bat
tery
back
up.
AD
DR
ESSA
BLE
FIR
EA
LARM
SYST
EM
An
inte
llig
ent,
addre
ssab
lene
twor
kfi
real
arm
syst
emw
illbe
prov
ided
with
requ
ired
peri
pher
aldev
ices
inst
alle
din
com
pli
ance
with
AD
Are
gula
tion
s.V
oice
evac
uat
ion
will
bepr
ovid
edth
roughout.
Am
ain
fire
alar
mLC
Dgr
aphi
can
nunci
ator
pan
els
(FA
GA
P)w
illbe
loca
ted
byth
efr
ont
entr
y.T
hem
ain
fire
alar
mco
ntro
lpa
nel
(FA
CP)
will
bein
the
mai
nel
ectr
ical
room
.
Man
ual
pull
stat
ions
will
bein
stal
led
inth
eeg
ress
pat
hs
atex
teri
ordo
ors
and
aten
tran
ces
tost
airw
ells
.A
udib
lean
dvi
sual
sign
alin
gdev
ices
will
bein
stal
led
incl
assr
oom
s,co
rrid
ors,
toil
ets,
cafe
teri
a,gy
mna
sium
,et
c.V
isua
l-on
lysi
gnal
ing
devi
ces
will
bein
stal
led
inal
lco
nfe
rence
room
s,w
orkr
oom
san
dst
ora
ge
roo
ms
etc.
Sm
oke
det
ecto
rslo
cate
din
stora
ge
close
ts,
mec
han
ical
and
elec
tric
alro
oms
asap
pro
pri
ate
for
the
proj
ect.
Flow
and
tam
per
swit
chm
onit
orin
gof
the
spri
nkle
rsy
stem
.
The
exis
ting
fire
alar
msy
stem
has
nosp
are
capa
city
and
isap
prox
imat
ely
15—
20
year
sol
d,an
dth
ese
area
sar
eno
n-co
mpl
iant
and
thes
ear
eas
are
requ
ired
tobe
sup
ple
men
ted
with
spea
ker
/str
obes
and
addi
tion
alA
Vde
vice
s.T
heol
dsy
stem
shal
lbe
use
ddu
ring
the
phas
eco
nst
ruct
ion
ofth
epr
ojec
tan
dw
illbe
rem
oved
afte
rne
wsy
stem
isbr
ough
ton
line.
OPT
ION
AL
STA
ND
BY
GE
NE
RA
TO
RSY
STE
MS
480Y
/277V
,3-p
has
e,4-
wir
e,15
0KW
dies
el-f
ired
gen
erat
or
with
a24
-hour
sub-b
ase
double
wal
lta
nk,
rem
ote
ann
unci
atio
npa
nel,
and
a22
5Aau
tom
atic
tran
sfer
swit
chw
ithdi
stri
buti
onp
anel
san
dci
rcui
ting
for
the
foll
owin
glo
ads:
1.H
eati
ngan
dho
tw
ater
cont
rols
and
pum
ps
2.F
reez
ers
3.D
ata
clo
sets
sele
ctiv
e4.
Mis
cell
aneo
us
load
s
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,20
18
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
2
Page 94, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
EL
EC
TR
ICA
L
Ple
num
Sp
aces
:W
irin
gm
eth
od
sin
plen
umsp
aces
shal
lco
nfor
mw
ithth
ere
qu
irem
ents
ofN
ECS
ecti
on300-2
2.
All
conduit
ssh
all
bem
etal
.E
xpos
edca
ble
s,w
here
use
d,
shal
lbe
list
edan
dap
prov
edfo
ruse
inpl
enum
.
Box
esan
dE
nclo
sure
s:N
EMA
25
0,
Typ
e1.
Box
esan
dE
nclo
sure
sin
dam
por
wet
loca
tion
s:N
EMA
250,
Typ
e
4. Not
e:M
inim
umco
ndui
tsi
zesh
all
be3/4
”an
dal
lco
nduct
ors
shal
lbe
copp
er.
MEC
HA
NIC
AL
Pro
vide
all
nec
essa
rydis
connec
ts,
wir
ing/
race
way
sfo
rV
RF
syst
emeq
uip
men
t,ex
hau
stfa
ns,
pum
ps,
roof
top
unit
s,fa
n-co
ils,
wat
erhea
ters
,et
c.
Mot
orco
ntro
ller
san
dvar
iable
-fre
quen
cydr
ives
shal
lbe
furn
ishe
dby
mec
han
ical
contr
acto
ran
din
stal
led
byel
ectr
ical
contr
acto
r.
KIT
CH
ENE
QU
IPM
EN
T
Pro
vide
pow
erfo
ral
lki
tche
neq
uip
men
tfr
omlo
cal
pan
elboar
d(s
).
All
kitc
hen
equ
ipm
ent
shal
lbe
pro
tect
edby
aG
FIty
pere
cep
tacl
eor
circ
uit
bre
aker
per
the
NE
C.
Pro
vide
ded
icat
edco
nnec
tion
per
man
ufa
ctu
rer’
sre
com
men
dat
ion
sfo
rco
nvec
tion
oven
s,po
rtab
lew
arm
ers,
reac
hin
refr
iger
atio
nan
dfr
eeze
ran
ddis
hw
asher
.P
rovi
dean
sul
syst
emm
onit
orin
gan
dgas
shut
off
for
kitc
hen
equip
men
t.
RE
CE
PTA
CL
ES
DEV
ICES
Pro
vide
a20
A,
120V
,gr
ound
ing
type
quad
conven
ience
rece
pta
cle
atea
chdat
ao
utl
etlo
cati
on.
Pro
vide
20A
,12
0Vgr
ound
ing
type
dupl
exco
nven
ience
rece
pta
cles
inpu
blic
gat
her
ing
area
sfo
rgen
eral
use.
Pro
vide
floo
rboxes
/poke-
thru
’sas
requ
ired
for
confe
rence
room
s,et
c.to
ho
use
20A
,12
0Vgr
ound
ing
type
dupl
exco
nven
ience
rece
pta
cle(
s).
Pro
vide
20A
,12
0Vgr
ound
ing
type
dupl
exco
nven
ience
rece
pta
cles
inal
lof
fice
area
s,m
eeti
ng
room
s,lo
unge
area
s,et
c.A
min
imum
ofone
(1)
rece
pta
cle
per
wal
lis
requ
ired
.
Pro
vide
agr
ound
ing
type
rece
pta
cle
with
ad
edic
ated
circ
uit
for
each
vend
ing
mac
hine
,an
dal
lki
tche
neq
uip
men
t,re
frig
erat
ors,
etc.
Loc
ate
conven
ience
rece
pta
cles
inal
lco
rrid
ors
onap
prox
imat
ely
40
-fo
otce
nte
rs.
Pro
vide
rece
pta
cles
/ju
nct
ion
boxe
sas
requ
ired
for
mis
cell
aneo
us
equip
men
t,te
leco
mm
unic
atio
ns,
A/V
and
secu
rity
syst
ems,
digi
tal
signag
e,et
c.
GFI
type
rece
pta
cles
shal
lbe
use
dw
ithi
n6-f
eet
ofa
sink
orw
ater
Sou
rce,
appro
pri
ate
bra
ssco
ver
plat
e.
INT
ER
IOR
LIG
HTI
NG
-U
SELE
DFI
XTU
RES
The
Ever
sourc
eC
ompa
nyhas
bee
nco
nta
cted
about
this
proj
ect.
Des
ign
toin
corp
ora
teut
ilit
yre
bat
epr
ogra
mre
qu
irem
ents
.
Lig
htin
gle
vels
will
bepe
rIE
Sst
and
ard
s.
Occ
upan
cy/d
ayli
ghti
ng
senso
rsw
illbe
prov
ided
thro
ug
ho
ut
asfe
asib
le.
Thi
sw
illal
low
for
ensu
rin
gth
atth
eli
ghts
inth
ese
spac
esdo
not
get
left
onfo
rlo
ngper
iods
ofti
me.
AL
ight
ing
cont
rol
syst
emsh
all
bepr
ovid
edth
rou
gh
ou
tth
esc
hool
faci
lity
.
Lig
htin
gin
clas
sroom
sw
illbe
rece
ssed
2x4
LED
pri
smat
icty
petr
off
ers.
Mul
tipl
esw
itch
esw
illbe
prov
ided
toac
com
modat
e40
and
60
foot-
candle
s.
Lig
htin
gin
gen
eral
corr
idor
sw
illbe
rece
ssed
2x4
LED
pri
smat
icty
petr
qff
&s.
Lig
htin
gle
vels
will
be20
to3
0fo
ot-
candle
s.
Q’-
’Off
ice
and
adm
inis
trat
ive
area
sw
illbe
rece
ssed
2x4
LED
pri
smat
icty
petr
off
ers.
Mul
tipl
esw
itch
esw
illbe
prov
ided
toac
com
modat
e40
-an
d60
foot-
candle
sof
illu
min
atio
n.
Gym
Lig
htin
g-
surf
ace
mounte
dhi
ghba
yhi
ghoutp
ut
2x4
LED
type
troff
ers
wit
hin
tegr
albat
tery
bac
kup
for
emer
gen
cyli
ghti
ng.
EX
TE
RIO
R/S
ITE
LIG
HTI
NG
USE
LED
FIX
TUR
ES
Bui
ldin
g-m
ount
edse
curi
tyli
ghti
ngw
illbe
prov
ided
onal
lsi
des
ofth
ebu
ildi
ngan
dat
each
entr
y/e
gre
sspo
int.
Lam
pty
pew
illbe
LED
.
Sit
eli
ghti
ngw
illbe
prov
ided
onth
eac
cess
road
and
exte
rior
park
ing
lots
.L
amp
type
will
beLE
D,
arch
itec
tura
lty
pefi
xtur
e.
EM
ER
GE
NC
YLI
GH
TIN
G
Em
erge
ncy
ligh
ting
will
beb
ased
onin
tegr
alba
tter
ybac
kup
orin
vert
erty
pesy
stem
s.
EXIT
LIG
HTI
NG
Exit
sign
sw
illbe
univ
ersa
lm
ount
ing,
LED
iIIu
min
ate
€ca
stal
umin
umho
usin
gw
ithin
tegr
alba
tter
ybackup’
AD
DR
ESS
AB
LE
FIR
EA
LAR
MS
YS
TE
M-
An
inte
llig
ent,
add
ress
able
netw
ork
fire
alar
msy
stem
will
bepr
ovid
edw
ithre
quir
edp
erip
her
al.d
evic
esin
stal
led
inco
mp
lian
cew
ithA
DA
regula
tions.
Voi
ceev
acu
atio
nw
illbe
prov
ided
thro
ughout.
Am
ain
fire
alar
mLC
Dgr
aphi
can
nu
nci
ato
rpan
els
(FA
GA
P)w
illbe
loca
ted
byth
efr
ont
entr
9T
hem
ain
fire
alar
mco
ntro
lpa
nel
(FA
CP)
will
bein
the
mai
nel
ectr
ical
room
.
Man
ual
pull
stat
ions
will
bein
stal
led
inth
eeg
ress
pat
hs
atex
teri
ordoors
and
aten
tran
ces
tost
airw
ells
.A
udib
lean
dvi
sual
sign
alin
gdev
ices
will
bein
stal
led
incl
assr
oom
s,co
rrid
ors,
toil
ets,
cafe
teri
a,gy
mna
sium
,et
c.V
isua
l-on
lysi
gnal
ing
dev
ices
will
bein
stal
led
inal
lco
nfe
rence
room
s,w
orkr
oom
san
dst
ora
ge
room
s,et
c.S
mok
edet
ecto
rslo
cate
din
stora
ge
close
ts,
mec
han
ical
and
elec
tric
alro
oms
asap
pro
pri
ate
for
the
proj
ect.
Flow
and
tam
per
swit
chm
onit
orin
gof
the
spri
nkle
rsy
stem
.
The
exis
ting
fire
alar
msy
stem
has
nosp
are
capac
ity
and
isap
prox
imat
ely
15-
20
yea
rsol
d,an
dth
ese
area
sar
eno
n-co
mpl
iant
and
thes
ear
eas
are
requ
ired
tobe
sup
ple
men
ted
with
spea
ker
/str
obes
and
addi
tion
alA
Vde
vice
s.T
heol
dsy
stem
shal
lbe
used
duri
ngth
ephas
eco
nst
ruct
ion
ofth
epr
ojec
tan
dw
illbe
rem
oved
afte
rne
wsy
stem
isbr
ough
ton
line.
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,20
18
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
2
Page 95, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
TE
CH
NO
LO
GY
SYST
EM
S-
NA
RR
AT
IVE
INTR
OD
UC
TIO
N
The
foll
owin
gsu
mm
ariz
atio
ndef
ines
the
Tec
hnol
ogy
Syst
ems,
alon
gw
ith
thei
rfu
ncti
onal
ity,
that
are
inte
nded
tobe
des
igned
and
spec
ifie
din
toth
eP
onus
Rid
geS
choo
l.
The
Tec
hnol
ogy
Syst
ems
des
crib
edw
ithi
nth
isse
ctio
nsh
all
incl
ude
Tel
eD
ata-
Vid
eo-S
ecur
ity
Com
mun
icat
ion
cabl
ing
infr
astr
uct
ure
,T
elep
hone
,A
udio
Vis
ual,
Clo
cks,
Pub
lic
Add
ress
,P
hysi
cal
Sec
urit
yS
yste
ms,
Net
wor
kE
lect
roni
cs,
Wifi
,C
om
pute
rsan
dpe
riph
eral
devi
ces.
Inst
alla
tion
ofen
tire
lyne
wte
chno
logy
syst
ems
shal
lno
tbe
requ
ired
wit
hin
the
exis
ting
scho
ol.
Man
yof
the
exis
ting
tech
nolo
gysy
stem
ssh
all
rem
ain
and
beex
pan
ded
upon
toac
com
mo
dat
eth
ene
wad
diti
onas
expl
aine
din
the
foll
owin
g.
CO
MM
UN
ICA
TIO
NCA
BLIN
GIN
FRA
STR
UC
TUR
E
Sha
llco
nsi
stof
Eth
ernet
cabl
ing
tosu
pp
ort
the
Pho
ne,
Dat
a,A
udio
Vid
eo,
and’
Sec
urit
ysy
stem
s.
The
exis
ting
scho
olsh
all
not
requ
ire
rep
lace
men
tof
the
exis
ting
com
munic
atio
nca
blin
gex
cept
for
the
room
sth
atar
ebe
ing
reco
nfig
ured
aspar
tof
this
proj
ect.
The
exis
ting
Eth
ernet
cabl
ing
isC
ateg
ory
5Ean
dis
dee
med
suff
icie
ntfo
rit
sin
tended
use.
Add
itio
nall
y,al
lef
fort
sw
illbe
mad
eto
ensu
reth
atal
lex
isti
ngT
elec
omm
unic
atio
nR
oom
s(T
R’s
)an
ddat
ara
cks
and
cab
inet
ssh
all
rem
ain
inth
eir
curr
ent
loca
tion
s.
The
rew
illbe
on
ene
wTR
loca
ted
inth
ene
wad
diti
onto
acco
mm
od
ate
the
new
area
sre
quir
ing
Eth
ernet
cabl
ing.
The
new
Eth
erne
tca
blin
gin
fras
truct
ure
shal
lac
com
mo
dat
eal
lcu
rren
tan
dfu
ture
tech
nolo
gie
svi
aT
CP
/IP
.A
llca
blin
gin
fras
truct
ure
for
each
tech
nolo
gysy
stem
des
crib
edw
ithi
nth
issu
mm
ary
shal
lut
iliz
ea
Sta
rN
etw
ork
Top
olog
y.Al
lw
orks
tati
onan
deq
uip
men
tca
blin
gsh
all
term
inat
ew
ithi
na
TR,
whi
leal
lT
R’s
shal
lco
nn
ect
dire
ctly
toth
eM
ain
Equ
ipm
ent
Roo
m(M
ER
)vi
ath
efi
ber
opti
can
dco
pper
bac
kb
on
eca
blin
gd
escr
ibed
belo
w.
All
Eth
ern
etho
rizo
ntal
dist
ribu
tion
cabl
ing
shal
lco
nsi
stof
cate
gory
6(2
50
Mhz
min
imum
per
pair
)U
TP,
24
AW
Gco
pper
,pl
enum
rate
dca
blin
gfo
ral
lde
vice
conn
ecti
vity
.Al
lca
blin
gsh
all
bete
rmin
ated
onto
RJ4
5st
yle
jack
sat
each
end
devi
cean
d19
”ra
ckm
ount
edR
J45
styl
e,ca
tegory
6ra
ted
patc
hpan
els
wit
hin
the
TR
’san
dth
eex
isti
ngM
ain
Equ
ipm
ent
Roo
m(M
ER
).T
his
hori
zont
alco
mm
unic
atio
nne
twor
k
cabl
ing
shal
lde
live
ra
min
imum
oflG
ps
toea
chen
dp
oin
tan
dsh
all
sup
po
rtal
lIn
tern
et,
Voi
ce,
Dat
a,S
ecur
ity
Syst
ems
and
,/V
conte
nt
via
TC
P/I
P.
All
Eth
ernet
cabl
ing
inst
alla
tion
shal
lco
nfor
mto
TIA
/EIA
-568
-C
.2.
The
Dat
aB
ackb
one
dist
ribu
tion
cabl
ing
for
the
netw
ork
conn
ecti
vity
bet
wee
nth
eex
isti
ngM
ER
toal
lne
wT
R(s
)sh
all
be50/1
25um
,0M
3,m
ulti
mod
e,in
door
,pl
enum
,ar
more
dfi
ber
opti
cca
ble.
12
stra
nds
offi
ber
shal
lbe
spec
ifie
dbet
wee
nth
eex
isti
ngM
ER
toea
chne
wT
R(s
).
The
Ana
log
Bac
kbon
edi
stri
buti
onca
blin
gfo
rco
nnec
tivi
tybet
wee
nth
eex
isti
ngM
ER
and
each
new
TR
(s)
shal
lbe
25
pair
sof
Cat
egor
y5E
(10
0M
hzm
inim
umpe
rpa
ir),
UTP
,2
4A
WG
copp
er,
plen
umra
ted
cabl
e.
Typ
ical
clas
sro
om
sE
ther
net
cabl
ing
shal
lco
nsi
stof
:
•T
each
ers
stat
ion:
1V
oice
,1
Dat
aca
ble.
•W
ifica
blin
g:2
Dat
aca
ble
coil
edab
ove
ceil
ing.
•In
tera
ctiv
eD
ispl
ay:
1D
ata
cabl
e.
•A
dmin
istr
atio
nO
ffic
es:
1V
oice
,1
Dat
aca
ble
.
TELE
PHO
NE
SYST
EM
The
voic
edi
stri
buti
onsy
stem
iscu
rren
tly
aC
isco
Voi
ceov
erIn
tern
etP
roto
col
(V0I
P)sy
stem
.T
heC
all
man
ager
/Ser
ver
islo
cate
dat
City
Hal
las
this
VoI
Psy
stem
issh
ared
wit
hth
eC
ity.
The
reis
noC
isco
serv
erlo
cate
dw
ithi
nth
issc
hool
.T
heE
ther
net
cabl
ing
and
netw
ork
elec
tron
icin
fras
truct
ure
shal
lbe
inpl
ace
aspar
tof
this
proj
ect
but
all
expa
nsio
n,li
cens
ing,
voic
em
ail,
call
ing
plan
san
dan
yco
nfig
urat
ion
requ
ired
ofth
ese
exis
ting
Cis
cose
rver
sto
acco
mm
od
ate
the
addit
ions
ofth
issc
hool
shal
lbe
byth
eC
ityan
dN
PS.
All
phone
cabl
ing
shal
lbe
cate
gory
6pl
enum
rate
dca
blin
gas
des
crib
edpr
evio
usly
.
Cis
cohan
dse
tssh
all
belo
cate
dw
ithi
nal
lad
min
istr
atio
nar
eas,
con
fere
nce
room
s,m
echan
ical
and
dat
aro
oms,
larg
est
ora
ge
room
s,w
ork
area
san
dw
ithi
nth
ete
ach
ing
clas
sro
om
sm
ounte
dat
the
teac
her
’sd
esk
s.Al
lhan
dse
tssh
all
beca
pab
leto
sen
dan
dre
ceiv
eouts
ide
phone
call
sas
per
mit
ted
byN
PS.
The
voic
esy
stem
shal
lin
terf
ace
wit
hth
eP
ubli
cA
ddre
ss(P
A)
syst
emto
allo
wfo
rse
cure
dac
cess
toth
eco
ntr
ols
ofth
ePA
syst
emvi
aan
yhan
dse
ton
the
Cis
coV
oIP
syst
em.
AU
DIO
VIS
UA
LSY
STEM
S
Cla
ssro
omA
udio
Visu
alSy
stem
s
Sha
llco
nsi
stof
anIn
tera
ctiv
eD
ispl
ay,
rem
ote
ceil
ing
spea
ker
s,au
dio-
vide
oin
puts
,co
ntro
lp
late
s,vo
ice
uplif
t,an
dan
AD
Aas
sist
edli
sten
ing
syst
em.
The
Inte
ract
ive
Dis
play
Mon
itor
shal
lbe
fixe
dto
the
inst
ruct
iona
lte
ach
ing
wal
lw
itha
min
imum
oftw
oce
ilin
gm
ounte
dsp
eak
ers
cen
tere
dab
ove
the
stud
ent
seat
ing
spac
es.
Thes
esp
eak
ers
shal
lin
clud
ea
prio
rity
over
ride
tocu
tout
duri
ngan
announce
men
tfr
omth
eP
ubli
c-A
ddre
ssS
yste
m.
Inte
ract
ive
Dis
play
Mon
itor
ssh
all
bem
ounte
dto
heig
htad
just
able
mou
ntin
gbra
cket
sw
ithi
nth
eyo
unge
rg
rades
toal
low
both
stud
ents
and
teac
hin
gst
aff
tout
iliz
eth
eIn
tera
ctiv
eD
ispl
ayco
mfo
rtab
ly.
The
audi
o-vi
deo
inpu
tp
late
ssh
all
belo
cate
dat
the
inst
ruct
or’s
teac
hin
gar
eato
acco
mm
odat
eth
ein
stru
ctor
totr
ansm
itco
nte
nt
toth
esp
eaker
s&
Inte
ract
ive
Dis
play
Mon
itor
from
the
inst
ruct
or’s
CPU
,la
ptop
and
/or
ad
iscr
ete
devi
ce(D
VD
oriP
od).
All
cont
rols
for
the
inte
ract
ive
disp
lay
shal
lbe
via
ahan
dhel
dre
mote
cont
rol
for
on/o
ff,
volu
me
upan
ddo
wn.
Teac
h-To
-One
Mat
hC
lass
room
The
Aud
io-V
isua
lsy
stem
sw
ithi
nth
isro
omsh
all
assi
stth
ein
stru
cto
rsw
ith
thei
rsm
all
grou
ple
arnin
gcu
rric
ulum
and
shal
lco
nfor
mto
the
arch
itec
tura
lla
yout
ofth
isM
ath
Cla
ssro
om
.
Thi
sM
ath
Cla
ssro
om
shal
lbe
com
pri
sed
ofei
gh
tin
divi
dual
and
smal
ler
teac
hin
gar
eas.
Eac
hof
the
eigh
tte
achin
gar
eas
shal
lre
ceiv
eth
efo
llow
ing:
•O
neIn
tera
ctiv
eD
ispl
ayM
onit
orin
each
teac
hin
gar
ea.
•O
neA
DA
Ass
iste
dL
iste
ning
Sys
tem
inea
chte
achin
gar
ea.
•O
nece
ilin
gm
ount
edsp
eaker
cen
tere
dab
ove
each
teac
hin
gar
ea.
The
audi
o-vi
deo
inpu
tpla
tes
shal
lbe
loca
ted
atth
esa
me
teac
hin
gw
all
asth
eIn
tera
ctiv
eD
ispl
ayto
acco
mm
odat
eth
ein
stru
ctor
totr
ansm
itco
nte
nt
toth
esp
eaker
s&
Inte
ract
ive
Dis
play
Mon
itor
from
the
inst
ruct
or’s
CPU
,la
ptop
and
/or
ad
iscr
ete
devi
ce(D
VD
oriP
od).
All
cont
rols
for
the
inte
ract
ive
disp
lay
shal
lbe
via
ah
and
hel
dre
mo
te
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onne
ctic
utF
ebru
ary
2,20
18
Sch
emat
icD
esig
nP
hase
Sta
teft
TM
P-1
O3-R
BT
SP
age
1
Page 96, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
TE
CH
NO
LO
GY
SYST
EM
S-
NA
RR
AT
IVE
cont
rol
for
on/o
ff,
volu
me
upan
ddo
wn.
The
inst
ruct
or’s
com
pu
ter
shal
lal
sobe
capab
leto
util
ize
Wifi
tose
nd
con
ten
tto
the
Inte
ract
ive
Dis
play
.
The
over
all
spac
esh
all
incl
ude
anau
dib
leto
ne
syst
emto
info
rmth
est
ud
ents
ofa
shif
tto
anoth
erte
ach
ing
area
.T
his
audi
ble
ton
esh
all
bese
par
ate
from
the
Pub
lic-
Add
ress
syst
embu
tsh
all
besy
nchr
oniz
edw
itha
mas
ter
cloc
ksy
stem
.
Vid
eoD
ispl
ayM
onit
ors
shal
lbe
loca
ted
atbo
then
tran
ces
ofth
isM
ath
Cla
ssro
omw
ithin
form
atio
nal
conte
nt
for
stu
den
tsen
teri
ng
the
clas
sroom
.T
heC
onte
nt
shal
lbe
prov
ided
byN
PS.
Caf
eter
iaA
udio
Vis
ual S
yste
ms
The
cafe
teri
ash
all
incl
ude
anel
ectr
icro
lldo
wn
proj
ecti
onsc
reen
and
/or
ala
rge
form
atLC
Ddi
spla
yw
hich
will
bedec
ided
byth
ede
sign
layo
utof
this
spac
e.T
his
area
shal
lal
soin
clud
ea
loca
lso
und
syst
emth
atsh
all
bein
teg
rate
dw
ithth
epubli
c-ad
dre
sssy
stem
whi
chw
illal
low
prio
rity
over
ride
from
the
mai
nPA
announce
men
ts.
Thi
slo
cal
sound
syst
emsh
all
incl
ude:
•O
nera
ckty
peam
plif
ier.
•O
nefe
edb
ack
elim
inat
or.
•O
nesy
stem
for
the
hea
ring
impa
ired
tom
eet
orex
ceed
the
min
imal
Sta
teof
CT
req
uir
emen
tsfo
rla
rge
teac
hin
gsp
aces
.
•O
new
irel
ess
mic
roph
one
dist
ribu
tion
syst
em.
•O
new
all
mounte
dca
bin
etan
das
soci
ated
equip
men
t.
•T
wo
Low
imped
ance
dyna
mic
mic
rophones
.
•T
wo
wir
eles
sm
icro
phones
.
•O
neC
D/M
P3
Pla
yer
/Rec
ord
er.
•F
our
12”
2-w
ayfu
llra
nge,
sound
rein
forc
emen
tlo
udsp
eaker
s.
Dis
play
Sign
age
Mon
itors
The
resh
all
beo
ne
LCD
pro
fess
ional
mon
itor
atea
chpr
ogra
men
tran
cean
dfo
ur
wit
hin
the
cafe
teri
aof
the
new
addit
ion.
Thes
em
onit
ors
shal
lin
clud
ea
cloud-b
ased
sig
nag
eap
pli
cati
on
todi
spla
yco
nte
nt
onto
thes
em
onit
ors.
CLO
CK
S
The
exis
ting
mas
ter
cloc
ksy
stem
shal
lre
mai
nin
plac
ean
dbe
exp
anded
upon
toac
com
mo
dat
eth
ene
wad
diti
on.
Thi
sis
a3-
wir
edsy
nch
ronous
cock
syst
em.
Clo
cks
shal
lbe
inst
alle
din
toev
ery
teac
hin
gsp
ace,
adm
inis
trat
ion
offi
ce,
and
publ
icgat
her
ing
area
s.
PUB
LIC
AD
DR
ESS
SYST
EM
The
exis
ting
syst
emis
aB
ogen
3zo
ne,
PCM
20
00
with
one
25O
wat
tam
plif
ier.
Thi
sex
isti
ngam
plif
ier
shal
lbe
repla
ced
with
new
500w
att
ampl
ifie
rto
acco
mm
od
ate
the
new
addi
tion
.
All
exis
ting
publi
c-ad
dre
sssp
eaker
ssh
all
rem
ain
with
the
exce
ptio
nof
any
room
bein
gre
novat
edas
part
ofth
ispr
ojec
t.
The
curr
ent
use
ofth
issy
stem
isfo
rA
ll-C
all
feat
ure
son
ly.
All
publi
c-ad
dre
sssp
eak
ers
inst
alle
dw
ithi
nth
ene
wad
diti
onsh
all
be
cable
das
aho
me
run
back
toth
eap
pro
pri
ate
TR.
Con
nect
ivit
ybet
wee
nth
ene
wTR
and
the
exis
ting
Bog
enam
plif
ier
shal
lbe
wit
h5
0pa
irof
cate
gory
3ra
ted
cabl
ing.
Thi
ssh
all
allo
wth
esy
stem
toof
fer
rout
ine
com
munic
atio
ns
asw
ell
asem
ergen
cybro
adca
stin
gto
the
new
addi
tion
.T
hePA
syst
emsh
all
com
plet
ely
inte
gra
tew
ith
the
ph
on
esy
stem
soth
atan
yphone
han
dse
tca
nut
iliz
eth
ePA
syst
emfo
r
com
munic
atio
nto
any
and
all
loca
tion
sw
ith
PAsp
eaker
sin
stal
led.
PHY
SIC
AL
SEC
UR
ITY
SYST
EMS
Phy
sica
lS
ecur
ity
Syst
ems
issp
ecif
ical
lyre
ferr
ing
toIn
trus
ion
Det
ecti
on
Syst
ems,
Acc
ess
Con
trol
Sys
tem
s,an
dV
ideo
Sur
veil
lanc
eS
yst
ems.
The
Sec
urit
yS
yst
ems
wit
hin
the
new
addi
tion
shal
lbe
des
igned
in
acco
rdan
ceto
the
Sta
teof
Con
nect
icut
’sS
choo
lS
afet
yIn
fras
truct
ure
Cou
ncil
’sR
epor
t,an
dto
the
reques
tsan
ddi
rect
ion
oflo
cal
firs
tre
spo
nd
ers
and
NPS
secu
rity
prog
ram
stak
eho
lder
s.
Intr
usio
nD
etec
tion
Syst
em
The
exis
ting
syst
emis
aH
oney
wel
lV
ista
12
8w
ith
ato
tal
of72
poin
ts
wit
hsp
are
poin
tsat
3se
par
ate
expan
der
loca
tion
sth
roug
hout
the
exis
ting
buil
ding
.
Thi
ssy
stem
shal
lbe
upgra
ded
toac
com
mod
ate
the
new
addi
tion
.
The
maj
orit
yof
all
exis
ting
exte
rior
door
scu
rren
tly
dono
tha
vedo
or
posi
tion
swit
ches
(conta
cts)
.E
ach
exis
ting
exte
rior
door
shal
lre
ceiv
ea
new
door
posi
tion
swit
chto
noti
fyth
em
onit
orin
gse
rvic
ew
hen
ado
oris
bre
ach
edaf
ter
hour
sw
hen
the
alar
mis
set.
The
new
addi
tion
shal
lin
clud
ea
com
bina
tion
ofp
assi
ve
infr
ared
det
ecto
r(P
IRm
otio
ndet
ecto
rs)
wit
hin
all
corr
idor
san
dgla
ss-b
reak
senso
rsat
all
grou
ndle
vel
win
dow
sth
roug
ho
ut
the
enti
refa
cili
ty.
Doo
rpo
siti
onsw
itch
esw
illbe
inst
alle
dat
each
exte
rior
door
for
both
the
new
and
exis
ting
door
s.T
heco
ntro
ller
keyp
ad(s
)sh
all
belo
cate
dw
ithi
nth
e
scho
olas
defi
ned
byN
PSan
dm
aybe
incl
uded
atse
ver
allo
cati
ons
asre
quir
ed.
All
dev
ices
shal
lbe
wir
edba
ckto
the
secu
rity
pan
els,
whi
chsh
all
belo
cate
dw
ithi
nth
eal
loca
ted
TR
’s.
Thi
sIn
trus
ion
syst
emsh
all
incl
ude
adu
ress
butt
on
sth
atsh
all
noti
fyth
e
poli
cedep
artm
ent
inth
eev
ent
ofan
emer
genc
y,th
ere
shal
lbe
pan
ic/d
ure
ssb
utt
ons
pla
ced
thro
ug
hou
tth
efa
cili
tyas
requ
ired
byN
PS.
Thi
ssy
stem
may
also
acti
vat
ea
“loc
k-do
wn”
ofth
eac
cess
cont
rol
syst
emfo
rpr
even
ting
un-a
utho
rize
dper
son
nel
toen
ter
the
faci
lity
duri
ngan
emer
genc
y,as
stat
edab
ove.
Thi
ssy
stem
shal
lin
terf
ace
with
the
Fire
Ala
rm,
mas
sno
tifi
cati
onsy
stem
and
the
oth
erse
curi
tysy
stem
sas
man
dat
edby
loca
lco
de
and
NPS
.
Acc
ess
Con
trolS
yste
m
The
exis
ting
acce
ssco
ntro
lsy
stem
iscu
rren
tly
aL
enel
man
ufa
ctu
rer
and
incl
udes
thre
ese
cure
ddo
ors
with
cred
enti
alre
ader
s.T
heL
enel
cont
rol
pan
els
shal
lbe
repla
ced
wit
ha
new
S2
Sec
urit
yac
cess
cont
rol
syst
empa
nel
toal
ign
with
the
NPS
curr
ent
stan
dar
ds.
Cre
dent
ial
read
ersh
all
belo
cate
dat
exte
rior
door
ssp
ecif
ied
byN
PS.
The
S2
Sec
urit
ym
anu
fact
ure
rsh
all
besp
ecif
ied
for
all
exis
ting
and
new
doors
requ
irin
gac
cess
cont
rols
.T
his
syst
emsh
all
consi
stof
prox
imit
yre
ader
s,re
qu
est
toex
itdev
ices
and
door
posi
tion
swit
ches
toal
low
per
mit
ted
entr
yin
toth
efa
cili
tydu
ring
hour
sdes
crib
edby
NPS
.T
his
syst
emsh
all
furn
ish
repo
rtd
ocu
men
tati
on
feat
ure
san
dsh
all
bein
tegra
ted
with
the
fire
alar
m,
mas
sno
tifi
cati
onsy
stem
san
dth
evi
deo
surv
eill
ance
syst
ems
asre
quir
edby
NPS
.In
tegr
atio
nto
the
Vid
eoS
urve
illa
nce
syst
emsh
all
allo
wfo
ref
fici
ent
rese
arch
ofre
cord
edre
port
san
dev
ents
.A
ta
min
imum
,th
issy
stem
shal
lal
low
for
the
foll
owin
g:
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Scho
olIN
orw
alk,
Con
nect
icut
Feb
ruar
y2,
2018
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
O3-R
BT
SP
age
2
Page 97, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
TE
CH
NO
LO
GY
SYST
EM
S-
NA
RR
AT
IVE
•M
anag
ean
dlo
gau
thor
ized
entr
yin
toea
chco
ntro
lled
door
.T
his
shal
lin
clud
ea
mul
titu
deof
repo
rtin
gfe
ature
sto
do
cum
ent
whi
chdo
orw
asen
tere
dby
who
and
whe
n.
•In
clud
ea
thre
atle
vel
man
ager
whi
chw
illbe
conf
igur
edfo
rth
efo
llow
ing
thre
atle
vels
:(a
san
exam
ple)
Nor
mal
,L
ockd
own
and
Aft
er-
Hou
rsE
vent
sin
acco
rdan
cew
ithth
ecl
ients
des
ired
port
alst
atu
san
dac
cess
leve
lac
tiva
tion
s.T
hrou
ghco
nfig
urat
ion
ofan
indi
vidu
al’s
prox
imit
yca
rd,
this
wou
ldal
low
and
/or
not
allo
wen
try
into
aco
ntro
lled
door
whe
nan
yof
thes
eev
ents
are
init
iate
d.
•A
llow
man
agem
ent
(add/r
emove)
ofea
chca
rdan
dth
eac
cess
righ
ts
ofal
lper
sonnel
.
Min
imal
ly,
this
syst
emsh
all
bean
open
arch
itec
ture
syst
emal
low
ing
for
the
foll
owin
g:
•T
heac
cess
cont
rol
syst
emsh
all
beca
pab
leto
acco
mm
od
ate
bro
wse
r-bas
edac
cess
for
cont
roll
ing
the
syst
em,
with
nocl
ient
soft
war
ere
quir
ed.
•T
his
syst
emsh
all
allo
wcl
ient
acce
ssvi
aa
PCor
MA
Cor
mob
ile
han
dh
eld
dev
ices
via
aw
eb,
bro
wse
r-bas
edap
plic
atio
nw
ithN
ativ
eIP
/SS
L(S
ecur
eS
ock
etL
ayer
)fo
rse
cure
dac
cess
into
the
vide
om
anag
emen
tsy
stem
.
•C
lien
tac
cess
and
brow
ser
inte
rfac
esh
all
acco
mm
od
ate
Nat
ive
lP/
SSL
(Sec
ure
Sock
etL
ayer
)fo
rse
cure
dac
cess
.
•T
hesp
ecif
ied
syst
emsh
all
bea
soli
d-s
tate
emb
edd
eded
ge
devi
ce.
Vid
eoSu
rvei
llanc
eSy
stem
The
exis
ting
VM
Ssy
stem
along
wit
hal
lex
isti
ngvi
deo
surv
eill
ance
cam
eras
shal
lre
mai
n.
Thi
ssy
stem
isa
Mil
esto
neV
MS.
The
stora
ge
devi
cesh
all
bein
crea
sed
,an
dne
wca
mer
ali
cen
ses
shal
lbe
incl
uded
toac
com
modat
eal
lth
ene
wca
mer
asad
ded
into
the
new
addi
tion
.
The
new
addi
tion
shal
lin
clud
eIP
,hi
ghde
fini
tion
,5
meg
apix
elca
mer
asan
dse
ver
alsp
ot
mon
itor
sas
dir
ecte
dby
NPS
.T
his
Vid
eoM
anag
emen
tsy
stem
shal
lin
teg
rate
wit
hth
ene
wA
cces
sC
ontr
olsy
stem
toal
low
for
effi
cien
tre
sear
chof
reco
rded
rep
ort
san
dev
ents
.
The
IPca
mer
assh
all
besp
ecif
ied
asre
quir
edby
the
secu
rity
nee
ds
asse
ssm
ent
wit
hN
PSan
dlo
cal
auth
ori
ties
.
The
inte
nt
ofth
isdes
ign
anti
cipat
esth
ein
clus
ion
ofth
efo
llow
ing:
Inte
rior
cam
eras
•In
teri
orca
mer
assh
all
bein
stal
led
atE
ach
prog
ram
entr
ance
inan
effo
rtto
obta
infa
cial
des
crip
tio
ns
wit
hhi
gh-r
esol
utio
n
imag
esan
dvi
deo
ofpeo
ple
ente
rin
gan
dex
itin
gth
efa
cili
ty.
Thes
eca
mer
alo
cati
ons
will
beat
appro
xim
atel
y7’
AFF
and/o
rce
ilin
gm
ounte
d.
•In
teri
orca
mer
assh
all
bein
stal
led
into
the
mai
nco
rrid
orar
eas.
Ext
erio
rca
mer
as
•E
xter
ior
cam
eras
shal
lbe
inst
alle
dat
each
door
entr
yin
anef
fort
toobta
infa
cial
des
crip
tio
ns
wit
hhi
gh-r
esol
utio
nim
ages
and
vide
oof
peo
ple
ente
rin
gth
efa
cili
ty.
Th
ese
cam
era
loca
tions
will
beat
appro
xim
atel
y7’
AFF
inan
effo
rtto
obta
in
the
lace
sof
all
peo
ple
ente
rin
gth
efa
cili
ty.
•E
xter
ior
cam
eras
shal
lbe
inst
alle
don
the
exte
rior
ofth
çfa
cili
tyin
anef
fort
toobta
inov
eral
lco
ver
age
ofal
lpa
rkin
glo
ts,
front
entr
ance
,st
ud
ent
drop
off
area
s,pl
ayar
eas,
fiel
dan
dg
ener
alco
vera
ge
Spot
Mon
itor
s
•S
pot
mon
itor
ssh
all
belo
cate
din
the
Mai
nO
ffic
ear
ea.
•M
onit
ors
shal
lbe
60”
LCD
pro
fess
ional
styl
edis
pla
ys
toac
com
modat
eef
fici
ent
view
ing
ofal
lth
eex
isti
ngan
dne
wca
mer
as.
Tw
om
onit
ors
wit
hm
icro
i7C
PU
sm
ou
nte
dbe
hind
the
monit
ors
are
anti
cip
ated
.C
ontr
ols
ofth
eC
PUsh
all
bevi
a
wir
eles
sm
ouse
and
key
boar
ds.
Sto
rag
eD
evic
esh
all
bein
crea
sed
bas
edon
the
foll
owin
gca
lcula
tion
s:
•R
ecor
ded
Vid
eoC
om
pre
ssio
nR
ate:
H.2
64
•F
ram
eR
ecord
edP
erS
econd:
Fif
teen
(15)
.
•S
tore
ddat
ash
all
besa
ved
for
thir
ty(3
0)ca
lendar
days
.
•In
teri
orca
mer
assh
all
reco
rdei
gh
teen
(18)
hours
per
day.
•E
xter
ior
amer
assh
all
reco
rdtw
enty
-fou
r(2
4)hours
per
day
Man
Trap
Styl
eE
ntra
nce
Eac
hpr
ogra
men
tran
ceth
atw
illbe
use
dto
allo
wvi
sito
rsan
dst
uden
tsto
ente
rin
toth
esc
hool
shal
lha
vea
man
trap
-sty
led
entr
ance
vest
ibul
e.
Thi
ssh
all
incl
ude:
•C
rede
ntia
lre
ader
san
del
ectr
onic
ally
lock
eddo
ors
shal
lbe
incl
uded
atth
eex
teri
ordo
or,
inte
rior
ves
tibule
door
and
the
off
ice/
secu
rity
door
whi
chsh
all
bew
ithi
nth
eves
tibule
area
toal
low
visi
tors
entr
ance
into
the
offi
cear
eas.
•A
nau
dio-
visu
al-i
nter
com
-doo
r-re
leas
est
atio
nat
the
exte
rior
door
and
the
off
ice/
secu
rity
door
s.T
hes
edo
orst
atio
ns
shal
lin
terf
ace
wit
hse
ver
alm
aste
rst
atio
ns
wit
hin
the
adm
inis
trat
ion
offi
cean
d
oth
erlo
cati
ons
asdir
ecte
dby
the
owne
r.T
his
shal
lof
fer
the
staf
fto
have
a2-
way
com
mun
icat
ion
with
the
visi
tor,
beca
pab
leto
atta
inre
cogn
itio
nof
the
visi
tor
and
then
dec
ide
toun
lock
thes
eco
ntro
lled
doors
rem
otel
y.
•T
his
man
trap
styl
een
try
shal
lal
low
staf
fto
have
sever
alop
po
rtunit
ies
tod
eter
min
ew
het
her
avi
sito
rsh
ould
have
acce
ssin
toth
efa
cili
ty;
once
atth
eex
teri
ordo
orin
toth
ese
cure
dves
tibu
lean
d
agai
nfr
omth
ese
cure
dv
esti
bule
into
the
off
ice/
secu
rity
area
,an
dla
stly
from
wit
hin
the
off
ice/
secu
rity
area
into
the
gre
ater
faci
lity
.
NET
WO
RKEL
ECTR
ON
ICS
All
ofth
eex
isti
ngne
twor
kel
ectr
onic
ssh
all
rem
ain
and
are
dee
med
adeq
uat
efo
rth
eir
inte
nded
use
The
new
TRlo
cate
dw
ithi
nth
ene
wad
diti
onsh
all
rece
ive
Cis
coC
290
0ne
twor
ksw
itch
esan
dsh
all
acco
mm
od
ate
100%
util
izat
ion
with
the
Eth
ernet
cabl
ing.
10G
bps
SF
P’s
shal
lco
nn
ect
the
new
TRw
ithth
eex
isti
ngM
ERvi
ath
e
0M3
fibe
rb
ack
bone
cabl
e.
Thes
ene
twor
ksw
itch
essh
all
sup
po
rtth
ed
ata,
voic
e,w
ifi,
acce
ss
cont
rols
,vi
deo
surv
eill
ance
,al
lcu
rren
tan
dfu
ture
Aud
io-V
ideo
appl
icat
ion
netw
orks
.M
inim
ally
,th
ese
dev
ices
shal
lbe
10
/100
/10
00
giga
bit,
Lay
er3
prot
ocol
tech
nolo
gyth
atw
illac
com
mod
ate
mul
tipl
eV
LAN
S,m
ulti
cast
ing
and
rout
ing
capa
bili
ties
.A
llof
the
new
Net
wor
ksw
itch
essh
all
belo
cate
dw
ithi
nth
ene
wT
R’s
and
shal
lbe
mou
nted
onto
the
19”
rack
s.
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Scho
olIN
orw
alk,
Con
nect
icut
Feb
ruar
y2,
2018
Sch
emat
icD
esig
nP
hase
Sta
te#
TM
P-1
03-R
BT
SP
age
3
Page 98, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
TE
CH
NO
LO
GY
SYST
EM
S-
NA
RR
AT
IVE
WIE
l
The
exis
ting
Wi-F
lsh
all
rem
ain
and
ism
ade
upof
Cis
co/M
erak
i,cl
oud
man
aged
acce
sspoin
ts.
Atth
isti
me,
itis
unkn
own
ifsu
pple
men
tal
wir
eles
sac
cess
poin
tsar
ere
quir
edto
achie
ve
100%
cover
age
wit
hin
the
exis
ting
school
area
.
The
wir
eles
ssy
stem
shal
lbe
des
igned
from
aca
blin
gan
dsw
itch
ing
infr
astr
uct
ure
topr
ovid
e8
02
.lia
c.
Wir
eles
sA
cces
sP
oint
ssh
all
bedis
trib
ute
dth
roughout
the
new
addi
tion
topr
ovid
e10
0%w
irel
ess
acce
ssto
the
Sch
ool’
sne
twor
k,as
man
dat
edby
NPS
.T
hes
ew
irel
ess
acce
sspo
ints
shal
lin
clud
eth
esu
pp
ort
for
IEEE
802.l
lac
wir
eles
soper
atio
n.
At
am
inim
um,
ther
esh
all
beone
acce
sspo
int
per
clas
sroom
,4
acce
sspo
ints
inla
rge
gat
her
ing
spac
esan
dac
cess
poin
tsas
requ
ired
wit
hin
adm
inis
trat
ive
offi
ces.
CO
MPU
TER
SA
ND
PER
IPH
ERA
LD
EVIC
ES
NPS
shal
lbe
resp
on
sib
leto
prov
ide
all
serv
ers,
com
pu
ters
,pri
nte
rs,
Chr
omeb
ook,
lapto
ps
and
asso
ciat
edper
ipher
aldev
ices
.
Sch
emat
icD
esig
nD
raw
ings
Sch
emat
icD
esig
nP
hase
Pag
e4
Pon
usR
idge
Scho
olIN
orw
alk,
Con
nect
icut
Sta
te#
TM
P-1
03-R
BT
SF
ebru
ary
2,20
18
Page 99, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
AC
OU
STIC
S
DES
IGN
REQ
UIR
EMEN
TSA
ND
WA
IVER
To
com
ply
wit
hC
onnec
ticu
tC
GS
10
-28
5g
,‘c
ore
lear
nin
gsp
aces
”in
the
Ponus
Rid
gepro
ject
are
requir
edto
com
ply
wit
hA
NSI
S12.6
0-
2002
Cla
ssro
omA
cous
tics
Sta
ndar
ds.
The
core
-lea
rnin
gsp
aces
inth
ispr
ojec
tin
clud
eT
ypic
alC
lass
room
s,M
usic
Roo
ms,
Mat
hL
ab,
and
the
Lea
rnin
gC
omm
ons.
The
pro
po
sed
open
clas
sro
om
des
ign
for
the
new
Mat
hL
abw
illp
rev
ent
this
spac
efr
omco
mpl
ying
with
the
AN
SIst
andar
du
nle
ssth
een
tire
lab
isco
nsi
der
edo
ne
lear
nin
gsp
ace,
and
the
loca
lor
regi
onal
boar
dof
edu
cati
on
may
beab
leto
appl
yto
the
Com
mis
sioner
ofA
dmin
istr
ativ
eS
ervic
esfo
ra
Wai
ver
from
the
stan
dar
dre
qu
irem
ents
.T
hat
said
,th
isnar
rati
ve
ou
tlin
esm
eth
od
sfo
ren
han
cing
the
aco
ust
ical
lear
nin
gen
vir
on
men
tof
this
import
ant
spac
e.
Att
his
poin
tin
the
proj
ect,
we
under
stan
dth
atth
ere
novat
edse
ctio
ns
ofth
ebu
ildi
ngm
ayre
ceiv
eon
lyco
smet
icupgra
des
toex
isti
ngfi
nis
hes
,w
hich
may
not
bere
quir
edto
com
ply
wit
hal
las
pec
tsof
the
AN
SIst
and
ard
.T
his
should
also
beco
nfir
nied
wit
hth
est
ate.
AN
SI12.6
0-2
002
STA
ND
AR
DS
AN
DD
ESIG
NA
PPR
OA
CH
Rev
erbe
ratio
nTi
me
Req
uire
men
ts
The
max
imum
allo
wab
lere
ver
ber
atio
nti
mes
inco
re-l
earn
ing
spac
es,
dep
endin
gon
volu
me
are:
Core
-lea
rnin
gsp
aces
wit
ha
volu
me
less
than
10
,00
0ff
3
Cor
e-le
arni
ngsp
aces
wit
ha
volu
me
bet
wee
n10,0
00
ff3
and
20,0
00
ff3
Cor
e-le
arni
ngsp
aces
wit
ha
volu
me
exce
edin
g20,0
00
ft
Rev
erber
atio
nT
ime
(sec
onds
)
Rev
erbe
ratio
nTi
me
Prel
imin
ary
Des
ign
Rec
omm
enda
tions
Tyl
ical
clas
sroom
s:10
0%of
ceil
ing
surf
ace
area
trea
ted
with
NR
C0.7
0A
CT.
Lea
rnin
gC
omm
ons:
Dep
endi
ngon
the
inte
rior
volu
me
ofth
isan
do
ther
larg
ero
oms,
sound
abso
rbin
gw
all
pan
els
may
bere
quir
edin
addi
tion
toth
eA
CT
ceil
ings
.
Mus
iccl
assr
oom
s:M
ixtu
reof
sound
abso
rbin
gfi
nis
hes
and
sound
diff
usin
gpy
ram
ids
oroth
er“b
umps
”on
both
ceil
ing
and
wal
ls.
Thes
ere
com
men
dat
ion
sw
illbe
refi
ned
ifth
ese
room
sar
eex
pec
ted
tobe
prov
ided
with
new
finis
hes
from
the
exis
ting
.
Soun
dIs
olat
ion
Req
uire
men
ts
The
min
imum
SIC
1ra
tings
requir
edfo
rne
ww
all,
floo
r-ce
ilin
gan
dro
of-
ceil
ing
asse
mbli
esth
atse
par
ate
anen
clo
sed
core
-lea
rnin
gsp
ace
from
anad
jace
nt
spac
ear
e:
Oth
erco
re-
lear
nin
g
spac
e,sp
eech
clin
ic,
hea
lth
care
room
and
ou
tdo
ors
Inad
dit
ion,
the
floo
r-ce
ilin
gco
nst
ruct
ion
sof
room
slo
cate
dab
ov
eco
re-
lear
nin
gsp
aces
are
requir
edto
ach
iev
ean
11C2
rati
ngof
45
(min
imum
),but
pre
fera
bly
50.
Soun
dIs
olat
ion
Prel
imin
ary
Des
ign
Rec
omm
enda
tions
The
exis
ting
CM
Uw
alls
wit
hout
add
edm
ater
ials
will
gene
rall
yfa
llsl
ight
lybe
low
the
SIC
requir
emen
tsfo
rco
rele
arni
ngsp
aces
.
Typ
ical
new
wal
lsfo
rth
ead
dit
ions
shou
ldbe
con
stru
cted
with
the
foll
owin
gto
mee
tA
NSI
:
STC
45-
2+
1G
WB
,in
sula
ted,
todec
k-
or-
8”C
MU
.
STC
50
-2+
2G
WB
,in
sula
ted,
todec
k-
or8”
CM
U,
gro
ute
d,
wit
hfu
rred
GW
Bon
one
side
.
STC
53-
2G
WB
+1
GW
Bon
resi
lien
tcl
ips,
insu
late
d,
tode
ck—
orC
MU
wit
hin
sula
ted
stu
dw
all.
STC
60
—D
oubl
est
ud
waI
l,2
+2
GW
B,
insu
late
d,
tod
eck
—or
—
CM
Uw
itha
separ
ate
stu
dw
all.
Doo
rs:
Gas
ket
s,sw
eep
s,an
dth
resh
old
for
stan
dar
dcl
assr
oom
sdo
ors
are
nee
ded
toac
com
pli
shS
IC45
.A
cous
tica
lly-
rate
ddo
ors
(ST
C45
+)
are
expec
ted
for
any
com
munic
atin
gdoors
bet
wee
nco
rele
arni
ngsp
aces
inor
der
toac
hie
ve
STC
50.
Inte
rior
Iazin
:L
imit
side
lite
to10
sfor
less
onco
rrid
orw
alls
,w
hich
nee
ds
tobe
sing
lela
min
ated
orIG
U.
Aco
usti
cal
win
dow
sar
ere
quir
edfo
rla
rger
win
dow
sat
the
corr
idor
wal
lsof
core
lear
ning
spac
esin
orde
rto
mee
tST
C45.
Thi
sis
com
mon
lya
des
ign
conf
lict
with
Lea
rnin
gC
omm
ons.
Flo
or/
ceiI
inas
sem
bly
:It
app
ears
that
the
only
2-st
ory
port
ion
ofth
epro
ject
isin
the
ren
ovat
edse
ctio
nof
the
buil
ding
.F
orth
ese
area
s,w
eex
pec
ta
con
tinu
ous
min
eral
fibe
rA
CT
ceil
ing
susp
end
edat
leas
t18
”be
low
the
dec
kw
illm
eetth
em
inim
umA
NSI
requir
emen
tsof
STC
50
and
IIC45.
1So
und
Tra
nsm
issi
onC
lass
(SIC
)de
scri
bes
the
soun
dis
olat
ion
perf
orm
ance
of
anas
sem
bly,
aste
sted
ina
lab
unde
rid
eal
cond
itio
ns.
Ass
embl
ies
inth
efi
eld
typi
cally
perf
orm
5-10
poin
tslo
wer
than
thei
rST
Cra
ting
.
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
INor
wal
k,C
onnec
ticu
t
Feb
ruar
y2,
2018
2Im
pact
Insu
lati
onC
lass
(IIC)
desc
ribe
sth
epe
rfor
man
ceof
afl
oor/
ceil
ing
asse
mbl
yat
isol
atin
gim
pact
s.
Sch
emat
icD
esig
nP
has
e
Sta
te*1
TM
P-1
03-R
BT
SP
age
1
Spa
ce
Toi
lets
SIC
53A
djac
ent
Spa
ce
Cor
rido
r,
stai
rcas
e,of
fice
,co
nfe
rence
room
SIC
45
SIC
50
Mus
icro
om,
mec
han
ical
room
,ca
fete
ria,
gym
nas
ium
SIC
60
0.6
0.7 1.5
Page 100, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
AC
OU
STIC
S
Bac
kgro
und
Soun
dR
equi
rem
ents
Cor
e-le
arni
ngsp
aces
upto
20,0
00
CF
must
bed
esig
ned
to35
dBA
asth
em
axim
umbac
kgro
und
nois
ele
vel.
Lar
ger
core
-lea
rnin
gsp
aces
and
anci
llar
ysp
aces
mu
stbe
des
ign
edto
achie
ve
40
dBA
.
Bac
kgro
und
Soun
dLe
vel
Prel
imin
ary
Des
ign
Rec
omm
enda
tionsD
esig
nG
oal
(dBA
)
New
centr
aliz
edm
echan
ical
syst
ems
can
gen
eral
lyac
hie
ve
the
bac
kg
rou
nd
sou
nd
requir
emen
tsw
ith
the
foll
owin
gdes
ign
appro
aches
:
•B
udge
tfo
rso
un
dat
ten
uat
ors
onth
esu
pply
and
retu
rnai
r
duct
sof
each
roof
top
unit
•B
udge
tfo
rso
me
leng
thof
aco
ust
ical
du
ctli
ning
inad
dit
ion
toth
eso
und
atte
nu
ato
rs.
•L
ocat
ing
nois
egen
erat
ing
elem
ents
abo
ve
corr
idor
sin
stea
dof
over
clas
sro
om
s,an
dbudget
ing
for
som
ele
ngth
ofac
ou
stic
al
duct
lini
ngfo
rth
elo
w-p
ress
ure
du
ctsy
stem
sw
ithi
nth
eco
rele
arnin
gsp
aces
.
•L
owd
uct
airf
low
vel
oci
ties
atth
elo
w-p
ress
ure
air
dist
ribu
tion
duct
wor
kw
ithi
nco
rele
arnin
gan
dsp
ecia
lty
spac
es.
•V
ibra
tion
isol
atio
nof
all
maj
orro
ofto
peq
uip
men
tan
dta
nco
ilun
its.
SPEC
IALT
YSP
AC
ES
Mat
hLa
b
We
un
der
stan
dth
epe
dago
gyof
the
“Tea
chT
oO
ne”
prog
ram
requir
esha
ving
ala
rge,
open
Mat
hL
ab.
Acc
ordi
ngly
,yo
urcu
rren
tde
sign
com
pri
ses
movea
ble
part
ial
bar
rier
sto
def
ine
the
S“I
nstr
ucti
onA
reas
”an
d2
“Bre
akou
t”ar
eas.
The
over
all
acoust
ical
goal
isto
opti
miz
eac
oust
ical
sep
arat
ion
and
min
imiz
edis
trac
tions
bet
wee
nth
eIn
stru
ctio
nA
reas
,w
hile
mai
ntai
ning
afl
exib
lede
sign
that
isas
visu
ally
open
aspo
ssib
le.
As
we
have
dis
cuss
ed,
open
-pla
ncl
assr
oo
ms
have
gene
rall
yfa
llen
out
offa
vor
for
under
stan
dab
lere
aso
ns.
Use
rsha
vefo
und
that
with
only
part
ial
separ
atio
nbet
wee
nte
ach
ing
area
s,th
etr
ansm
itte
dno
ise
and
conver
sati
on
leve
lsca
use
seri
ou
sdis
trac
tions
that
inte
rfer
ew
ithgo
odle
arni
ng.
The
foll
owin
gre
com
men
dat
ion
sar
ein
tended
toen
han
ceth
eac
ou
stic
sof
the
Mat
hL
ab.
How
ever
,d
epen
din
gon
the
loudnes
sof
vari
ous
acti
viti
esth
atm
aybe
adja
cent
toquie
ter
use
s,te
acher
san
dst
ud
ents
alik
em
ayfi
ndth
ele
arni
ngco
ndit
ions
tobe
un
acce
pta
ble
even
ifal
lof
thes
ere
com
men
dat
ion
sar
eim
ple
men
ted:
Abs
ornt
ion:
100%
ofth
ece
ilin
gsh
ould
betr
eate
dw
itha
NR
C0
.90
fini
sh.
Sou
ndab
sorp
tive
vert
ical
finis
hes
are
help
ful
asw
ell,
whi
chca
nbe
inth
efo
rmof
wal
lpan
els,
curt
ains,
and
soft
furn
ishi
ng.
Car
pet
edfl
oor
will
also
behe
lpfu
l.
Sol
idB
arri
ers:
To
elim
inat
edir
ect
and
open
pat
hs
for
soun
dbet
wee
nin
stru
ctio
nar
eas,
consi
der
full
-hei
ght
op
erab
lepa
rtit
ions
,so
lid
and
clos
eto
full
heig
htst
ora
ge
unit
s,an
dso
lid
bre
ak-o
ut
room
sas
soli
dba
rrie
rs.
Stu
den
t/te
ach
erla
yout
s:S
tuden
tssh
ould
begr
oupe
das
close
asposs
ible
toin
stru
ctors
,st
uden
tpre
sente
rs,
PJs
,or
oth
erte
ach
ing
sou
rces
.F
urni
ture
layo
uts
should
avoi
dlo
cati
ngst
ud
ents
nea
ropen
ings
betw
een
Inst
ruct
ion
Are
as,
even
ifth
ose
open
ings
are
trea
ted
acou
stic
ally
.
stat
eba
ckgr
ound
sound
leve
lth
rou
gh
ou
tth
eM
ath
Lab
bym
ean
sof
anel
ectr
onic
sou
nd
mas
kin
gsy
stem
wou
ldhe
lpto
less
enau
dibl
edis
trac
tion
sbe
twee
nIn
stru
ctio
nA
reas
.A
las,
the
loud
erba
ckgr
ound
sound
leve
lsw
ould
inte
rfer
ew
ithco
mm
unic
atio
nw
ithin
the
Inst
ruct
ion
Are
as,
asuse
rsat
tem
pte
dto
mak
eth
emse
lves
hear
dov
erth
eba
ckgr
ound
sou
nd.
And
unfo
rtun
atel
y,it
isno
tpr
acti
cal
toap
ply
elec
tron
icm
ask
ing
in“s
pots
”in
ala
rge,
conti
nuou
svo
lum
e.
Aud
itori
um
We
look
forw
ard
tofe
edbac
kfr
omuse
rsre
gar
din
gpo
ssib
leac
ou
stic
alco
nce
rns
about
the
exis
ting
faci
lity
,an
dth
eex
ten
tof
the
reno
vati
onof
this
spac
e.B
ased
onth
atin
form
atio
n,as
wel
las
our
revi
ewof
the
exis
ting
spac
e,w
ew
illde
velo
psp
ecif
icre
com
men
dat
ions,
asn
eed
ed,
for
room
fini
shes
,sh
apin
g,
and
mec
hani
cal
syst
emno
ise
cont
rol.
Gym
nasi
um
Inord
erto
enhan
cesp
eech
com
mun
icat
ion
and
toco
ntro
lth
ebu
ild-
upof
nois
ean
dre
ver
ber
atio
n,
ata
min
imum
,th
een
tire
ceil
ing
will
betr
eate
dw
itha
sou
nd
abso
rbin
gfi
nish
.S
ubst
anti
altr
eatm
ent
onth
eupper
wal
lsis
also
expec
ted
.
Caf
eter
ia
The
enti
rece
ilin
gar
eash
ould
betr
eate
dw
itha
high
lyso
un
dab
sorb
ing
fini
sh(i
.e.,
rate
dN
RC
0.9
0).
Som
epo
rtio
nof
the
wal
lsw
ould
beex
pec
ted
toal
soha
veso
und
abso
rpti
ve
trea
tmen
ts.
3W
ere
com
men
ddes
ignin
gth
ese
crit
ical
list
enin
gsp
aces
toa
low
erbac
kgro
und
no
ise
leve
lth
anre
quir
edby
the
AN
SIst
andar
dof
35
dBA
.
Act
ivity
nois
ele
vels
and
elec
tron
icso
und
mas
king
:It
isposs
ible
toin
trod
uce
arti
fici
ally
elev
ated
back
grou
ndso
und
tohe
lpm
ask
adja
cent
conver
sati
ons.
Thi
sre
pre
sents
per
hap
sth
ebi
gges
tac
oust
ical
chal
lenge
ofal
l.O
nth
eone
hand
,ra
isin
gth
est
eady-
Sch
emat
icD
esig
nD
raw
ings
Pon
usR
idge
Sch
ool
jN
orw
alk,
Con
nect
icut
Feb
ruar
y2,
2018
Sch
emat
icD
esig
nP
hase
Sta
tet
TM
P-1
03-R
BT
SP
age
2
Spac
e
Aud
itor
ium
Inst
rum
enta
lan
dC
hora
lM
usic
Roo
ms3
Cla
ssro
om
s,L
earn
ing
Com
mon
s
Caf
eter
ia,
Gym
nasi
um
25
30
35
40
Page 101, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
Pon
usR
idge
Sch
ool
Alt
erat
ions
and
Add
itio
nsA
lter
atio
nsan
dA
ddit
ions
21H
unte
rsL
ane,
Nor
wal
k,C
T06
850
Ow
ner
Con
stru
ctio
nM
anag
er:
Surv
eyor
:Ci
vilI
Site
:L
ands
cape
:St
ruct
ural
:M
echa
nica
l&
Plum
bing
:El
ectri
cal:
NV
and
Secu
rity
:Fo
odSe
rvic
e,A
cous
tical
Con
sulta
nt:
Nn
wfl
nid
Const
ruct
ion
Inc.
D’A
ndre
aS
urve
ying
AD
Tc,
Inc.
Ric
hte
r&
Ceg
anIn
c.U
SC
,In
c.U
SC,
Inc.
USC
,In
c.U
’Ago
ntin
nA
Aen
eclu
ten
FondnnM
ceF
acil
itie
sA
cente
chE
ng
inee
rin
g,
P.C
Intn
mutl
unai
cmoc
NORW
ALK
325
Nov
icE
Aon
tnH
anfo
rdCT
PCO
cr54
0M
wcn
ade
CR
5870
2321
iMfl
Ave
tcS
tar
301
socu
reca
rMc,
5478m
CT23
21W
Am
yA
,eo,
nSu
reX
l23
2154
tmy
Auc
ajuT
tac
Xl
2321
Wfl
yA
ma
Sue
301
1205
0M
anSE
mi
#725
5Sl
umlo
rd13
7Er
dR
umN
raC
arau
nC
R58
4533
Mo,
,Ecn
Sica
rtar
egen
2512
5H
ae54
acC
R5
51
002
5.21
Han
rdrn
CT
38S1
IH
arE
mcT
inlt
Hae
rdao
CT
AR
18C
TAR
3222
138
DR
AW
ING
SCH
ED
UL
E
GE
NE
RA
L
TM
-1C
NT
EM
OL
ITIO
NP
LA
NS
AR
EA
5)5
154
P
Rce9
PON
USM
IDD
LE
SCH
OO
L
I
or‘
Nor
w
Slr
pp,n
g!
M,n
e,,m
Icrch
gq
t,.
TM
ts
WE
ST
NO
RW
AL
K
lie
&lr
no
ri’9
-A
qu.I,
irm
dlN
lt.a
in40
3101
3117
0‘A
000rr
mndy
Ico
e9e
‘f
Weln
iart
9at
[3
S/
SO
UT
HN
OR
WA
LK
CoC
ciW
inIf
lie9
C’o:e
F
RE
ND
ER
ING
AT
LO
WE
RSC
HO
OL
EN
TR
AN
CE
AN
DC
AFE
TE
RIA
LO
CA
TIO
NM
AP
PE
RK
INS
—P
RO
JEC
TN
o.72
050
EA
STM
AN
422
Sum
mer
Sir
ed
Sch
emat
icD
esig
n2
/2/2
01
8Sl
umlo
rd,
CT
0090
3T
+120
328
174
00F
+120
325
174
74
Page 102, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
dS
oys
unD,lao
Ponus
Ridge
School
Alterations
andA
dditions
ZO
NIN
GIN
FOR
MA
TIO
N
SC
OWz
-10
0
ZO
NIN
GIN
FOR
MA
TIO
N
AD
DR
ESS
PON
US
RID
GE
MID
DLE
SCH
OO
L21
HU
NT
ER
SLN
NO
RW
ALK
,C
TD
685D
OW
NE
RCITY
OF
NO
RW
AL
K125
EA
STA
VE
NO
RW
ALK
,C
T66051
PAR
CE
L1D
5-55-7-0
AC
RE
AG
E41R
3AC
RE
S
ZO
NIN
GA
S-
SPEC
IAL
PER
MIT
-N
ON
-CO
NFO
RM
ING
USE
DA
TEO
FC
ON
STR
UC
TIO
N5956
AD
DIT
ION
S1976
BU
ILDIN
GZ
ON
EM
AP
PON
US
MID
DLE
SCH
OO
LSIT
E
[i
PE
RK
INS
—
EA
STM
AN
iI
L
21H
onleroL
one.N
orwelk,
CT
06050
‘I
CC
C
PRO
JEC
TN
o72050
Schenrobo
Design
2/2
/2D
b
I
Page 103, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
F
ON
IdO
Odd
3dId
‘9L
01001000006
000
30
00
0000113030
00030
0N
01
10
00
00
00
10
30
00
00
00
06
00
00003110000
001
NO
0340
310
[00
0N
0)1
00
10
03
0‘1
1000
006
01100
00
001
101300000
aNY
00100010
0010
0013010
DN
Idd
OiS
3d
Id‘9
[
103’
1O-!
r3
10
00
1
(Ain
Iovd
adli
Na)
N0I
IV1f
lD1V
DIN
VH
DdO
dS
V3d
VO
NIG
lIfl
8fl
G3N
0193
0SV
M1D
B0dd
SIH
IH
DIH
M01
93
00
Dt[
01
03
,30
00
00
10
00
0
10
00
0310’
oo
sooT
lILO
JIl
G1O
HS
3dH
I‘[
0000
odor
.,,—
oo
o-o
oo
oo
’io
or
NO
IiD
SiO
dd
d31)
lNId
dS‘[I
-
00300001600330030033
Sdf
lQdO
3Sfl
liv
1V
IOI
I
0[
II
00
00
00
10
10
1
O00
00011
0000
03
0001300
1000000
0,o
oo10000o
0)30
)00013000
I0
00
00
300030
0010
0100
03)0
010000
0100010
00100
300
00300000
000010080.
.0-
0010
1103
0
__
001000100
00:j
M_’
oso
oo
oL0
30Io;
oooo
1000
0101
00
)00
10
00
10100010
00000
001600100000
0)3
0108
000
10100000
003
10101
001
00000
0001000030010100030
GV
OlA
DN
Vdf
lDD
O’L
11
10
00
)00
0
001000
00
00
10
01
00010000
1
00010000010
00
00
00
00
001
0010
.6’
00
01
30
10
0’
00
01
0)3
003
0o)
00
00
00
04
0
o’)
to‘o
oco
o)’
oo
oo
OI
30
OO
LI0
000)+
bO
l00
00
30
00
30
11
00
-00
01
03
00
00
30
08
00
31
00
10
10
00
00
:00
0001011106
10
00
00
03
031
0010
-0-
0001
130)
V36
031
SYM
O11
V13
0301 ::
00
00
00
1J0.
OTO’
1101
03
00
00
00
00
00
00
010)0
3101
030
(dl
00
10
01
00
00
01
01
13
81
31
00
)H10
100
00
0N
Il0
00
00)0
00
30000
03
00
00
00
00)3
800
000000000
H000
031361030
03101081
(0)
00013000
0010
0108
10
10
1
81010/0
)0
uO
i000
00
00
01
03
0
001,-
si
SIS
AlV
NV
BO
OS
0001
0103
1380083
0888013
‘N)O
MJO
N‘0
001
0003
00H
10
SUO
1T!p
pVpue
SU
0!}
BJ9
4f
IoO
tID
S6P
!dS
flU
Od
SO
NII
Vd
]dld
IdV
HS
ON
YdI
VIS
‘9L
00
00
0000
000
00008
00
11
00
00
00
0010
0100
00
01
00
01
00
00
00
01
0
0000
0030
(0003101)
00
00
10
00
000
01100
0000030000
030
=00”
30001601000
10010300010000000000001100000)0
000000
0113
001
(000
0100
0)0
00
08
01
0
(sdnoH
)1N
3JJ
3i3
ON
IGlI
flS
dOd
SIN
3VJ
-3dI
flO
3dC
3lV
dS
DN
VIS
IS3H
-S
dId
‘9SO
NIN
3dO
d000
liv
ivS
IN3V
JSdI
flO
SN
AIO
ISIS
S30
0V‘IL
0301
30
00
00
03
800630.0
1001000
00
00000000001
00
05
0=
03
05
00
W80,0
0008
0r.
00
60
0.0
NV
HL
SV
3—
SN
I)Id
3d
000
80
00
0J3
0I3
0ld
10101
000
0000
,_0j1 03;:i
00
30
10
10
1
‘[oo-*J
::
0311
300
103001000000000100
3100
30(0
)0010010000010113013101
(010100000
0)0
,0’1
00
0)3
00
00
00
00300
00000
03000000010000
00100
001001030
00101130)
roo
oz
(0)0
00030000010110010101
‘0-
0301
0113
0
8013
003
3003
NO
N)
3000130030000
0000300
Go)
00
01
00
30
01
003031001000
‘3.
91fl
1U
d0
06
0300
100N
O)1
0030
03-3
,
9o9
3iS
VI
-V
SdV
dOO
ldS
isv
Mo
iiv
‘9
LII
-
010000000000
=000100000030003011001
6)
10
00
10
00
00
3,
-.8
.00
00
30
01
(9d3
ldvI
-Jo)
V3d
VO
NIG
iIfl
S‘*
3100
030
010)0
3030)0
33
0)M
03
01
000
3000
N0)I
000N
3O
INV
D)d
)N0)
000
MO
NA
1NO
01
Ald
dVO
NO
)lV
lflD
lVD
30061
03
03
10
)30000313
03
31
30
30
do
08
00
03
03
0)3
)31
31
00
60
31
80
01
(t’da
idV
i-ID
‘OdD
INfl
OD
3d
fliX
ldO
NIS
VJf
l1d
VJflL
NJIN
IVJ
‘OL
DN
IQuI
flS
S1S
ISS
333V
‘6
-
8130
310
000000001000100300
‘0,
(d
aId
vH
D)
1HO
I3H
ON
ICuI
fl9
‘C
811
01
11
-0
00
10
00
0)1
00
00
00
10
0010)0
0
(9d
3ld
vH
o)
3dil
NO
IIO
AdI
SN
OD
‘
00
01
00
00001008
0.
0
ftdat
dvH
o)
N0i1
VO
LS
SV
1D
dfl
OdO
3S
fl‘L
SNO
IIV
DId
IOO
L6J
‘900
00
NO
IIV
VTh
IOdN
Iaao
o
0
L1
Page 104, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
IIthH
II— -.IS
3dL9ZlO&SIROBMPI3czrz,u.oOWOP3OO3513IflUOdseunhIoe’d
i11i—
III.
z4z—
‘Ua
A,
4
‘4
‘4
00r0co-p0w0)U)
0c
c0rot
V
-“I
0
I
.3-
z
0w
-J-J
0
00rI
U
•0
(.4.
I
.4
,0
C
:3,
‘7
2.4
0.’
49/
.4..7.•....
4_fl”—
—••‘•‘7•.
._.?•-
9..—•..—-‘‘-.,_..--.;—-
--:---<•--:i”’‘-
‘,.ç
*•‘*•
/_•(_
-‘4\97:
/‘‘“4-/
--
4—
0
.1’;-
)
N
/
L
Page 105, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
I.’
900V
VZ
uO
oao
090W
0009
vooI
I-o ro
Ds
(BIv
NdB
I1V
)N
V1d
BD
VN
IVdQ
11V
H3A
O
0900
LON
IDO
POO
d
9999093
9jP
MIO
ND
UE
]5000009
00
suom
ppv
UB
SUO
!1EJ
OflV
ooqog
5p!d
SnU
Od
0O
LtO
OE
50
0D
bO
0000
IE
.9soI00
I0li
0•J
•S
I•fl••
•N
00001505O
rnm
os,
,
swoD
D&
OoO
D
5000
0ID
DID
LOS
LID
0000010
PLL
LL
LIO
DL
1L
oO
SLO
IILL
ILL
NV
flL
SV
J—
SN
DId
3d
0000
000
L
-
DIC
0D
•__9
1_fA0
-
-<
:.—
-
306
01C
]13
9’d
90
•/aI
1oos
Q]l
0L
]d3
930
1—’
zt
dN
JdA
!O
dOH
9V
—”
DO
SY
IO
1]t
d
3-1-
96
01Q
3139d3D
.;-N
OI1
3sW
OA
eI]
S3
oooooQ
s]o
ooi
:--‘
-
00!
47-
•0
•
fl
DL
—9 —
9
\
9•
0D
0
\
I
‘I
j3
3
ji
-3--
-.-
----
--9
I
-.0
0j//
‘49:
04!
0001
03M
—A
-‘S
OIL
0100
0D
LI
02
9-
J4-s
Page 106, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
-a,1
fl4
-i
L
oC
OO
PER
LIGH
TING
MO
DEL
MSA
MESA
LED
H
‘,.2
6.N,\3
N’
N,N
N’
&
“3
’N
N,,
3
NI--.-.
J4N‘:N
*’2
-’*
:H
..-5k
0,
i-I
II,
2.2
-:‘6
C4
-q
:L-
il“
‘‘p
•;4
-,_
__•
.
4—
.
2’
.1
-S
‘‘2
fl-
5F?
e3
SCA
LEI.
40’0’
PE
RK
INS
—
EA
STM
AN
Soy
AN
oso
lS
CC
C3’L
’rN
,,IC
C.’
uno
ow
i
DC
C,
4C
C.C
EC
OS
C5
L4
g5
0,o
oC
.ow
$to
wo...
Cgw
-c“A
4JC
’333
33C
o,eo
yo
t4
65
50
46
040
4136
ER
OJE
ET
TC
L4
Ponus
Ridge
School
Alterations
andA
dditions
21H
untersL
aneN
orwalk,
CT
06850
PRO
JEC
TSo
72050
CR
OC
1S
Cn
L5
SITE
LIG
HT
ING
PLANC
-200
Ssh
enoss
Design
2120528
A‘‘0
6
3.-
3—4
S
•‘--V
.’••4
.-
-.
,•--.,
‘--
,
-.
---.--
,-
Page 107, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
zC bCx4g•WcuIIiI0
U’t
?IiiHIIFJa
zr U-F
rorS
ih iLJU-D_
C
iHI
0z
IxDILl
PNfllidESSOPOiO?JSIRO8lOl-VOOOlOliWOli3HOiPVPltê7
J
Page 108, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
n95
001C
R
u0so
Q30
9093
31
qio
vi
NV
1dN
OII
VH
VdB
Hd
BdV
DSG
NV
1
0800
1IN
Ilir
oN
d
0889
0ID
NIC
MJO
Nau
oi51
9110
1-I
00
030N
CSI
MW
9H1O
9931
Nfl
0389
NO
ilDO
HIS
NO
DNI
iN3a
iAD
HdL
’Slail
sO
NII
SIX
]C
NN
NO
li91]O
]AT
iN30
0953
89
5311
1001
39N
OII
OR
H1S
NO
O11
995
08d
N10
0430
01
CR
1938
0153
008
1109
503H
1N
O810005
53
35
108
1181
0311
91331051
C0330953535013195015
3301
0N11
51X
311
90
80110030181
N01
1930
1310
N01
1110
9530
1111
111
OIl
S1
19
90
35
081
10
95
011
013
33
90
SIO
N
18
39
03
00
3303033
103900
01
00
93
03
80
10
10
93
13
83
53
83
03
01
53
93
80
11N
3903
003
31
39
35
13
00
08
15
00
9
33
93
3N
011331053
33
81E
935019
9N13
013N
110
30
05
30
39
01
03
39
1 0N
3031
SUO
1I!p
pVpu
esu
oiJe
Ja}I
Voo
qog
6P
’dS
flU
Od
S S 9 S
‘5
9P
’’9
91fl
I!
-:9-
.7.
V
n0
N040
NV
HL
SVB
—S
NI)
Id3
d.8
90.L
31838
3l0
NN
C C C
C
C‘9
11905
55
01
39
53
810
50
09
195
50
903190033838399
asq
uE2a
aCY
}Taq
3PJ
133118038099
30
05
11
A )/
/S
.\ ‘V
NN N
N-
\.1
\
1N3Y
4339
d0
50
03
-
\\\
\
0300
9538
55
01
‘.fl
VM
SflO
Nl9
5flh
iS08
1151
03
1539
5309
109
1191
X3
30
30031931099
4
‘1
S
—
-I
xx
Page 109, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
I-
rI-
0N0)
z.Mo1sz2scHEMh.7’Ba’o2dn 02715.QOIB 40407 PM GN,ool
zCHm0)
I
I/
/7
-<HZ —
OmCS —
.
4I
9 (0* 9
. 9Z 9
t9 9 9 .9
2
/
I/
1,m
xc”z
n n
9:In
Page 110, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
S
.0’
.2
dR
lOn.O
MM
u.I&
e[e
1b
W
EIeo
l,eel
UB
INC
CC
ee,a
t.ets
..e.
L!3h.,d
1lA
dl!
118
Ce,’w
’dge00021
38
WO
JRO
PT
YL
E
Ponus
Ridge
School
Alterations
andA
dditions
21H
untersL
ane.N
orwalk
CT
06850
NO
TE
S1
FOR
POSK
IRL
ET
RA
FFICR
OA
DW
AY
IMPR
OV
EM
EN
TS
SEE
TR
AfFIC
EN
GIN
EE
RS
RE
POR
TA
ND
RE
CO
MM
EN
DA
TIO
NS.
aM
:NIM
UM
CU
RS
RA
DIU
SIR
SFE
ET
UN
LE
SSO
TH
ER
WISE
NO
TE
S3
ALLPA
VEM
ENT
MA
RK
ING
SSH
ALL
BE
EP
00
04
SIDN
AO
EPR
OV
lDE
AN
ALLO
WA
NC
EFO
RSID
HA
DE
DO
APH
ICA
PAC
KA
GE
SEE
TRA
FFICD
RA
WIN
GS
5PR
OV
IDE
AN
ALLO
WA
NC
EFO
R(1)
ON
E30
EO
OT
ALU
MIN
UM
FLA
GPO
LE
5.PR
OV
IDE
AN
ALLO
WA
NC
EFO
R(20)
TWEN
TYRIKO
RIN
DS.
7PR
OV
IDE
AN
ALLO
WA
NC
EFO
R(13)
TH:R
TEVN
TR
ASH
AN
D(13)
TH
iRT
EE
NR
ECY
CLIN
GR
EC
EPT
AC
LE
S8.
PRO
VID
EA
NA
LLOW
AN
CE
FOR
(14)FO
UY
TEVN
BE
NC
HE
SA
ND
13)T
HR
EE
TAR
LEAFO
RIN
FOR
MA
TION
ON
FLAY
AR
EAC
OM
PON
EN
TS
AN
DPR
ICIN
GSE
EL
bs
IDA
LLR
OA
DW
AY
SA
ND
TRA
FFICISLA
ND
STO
HA
VE
A’C
ON
CR
ET
EC
UR
BS.
11.A
LLW
ALK
WA
YS
TORE
CO
NC
RE
TE
UN
LE
SSO
TH
ER
WSE
NO
TED
PRO
JEC
TN
o72W
0
LA
ND
SCA
PEM
AT
ER
IALS/
LAY
OU
TPLA
N
L-1
02b
SnAem
abicD
esign
-C
ON
CR
ET
EC
UR
B
t±
Ztry
LM
4DS
CA
PE
AA
DO
DE
DT
ffithterJC
egan
inc.
BRC
MM
LC
OU
RT
PS
80
8587
RV
DN
,C
TX
OU
PRO
NE
.B
643m-3000
-BITU
MIN
OU
SPA
VE
ME
NT
TY
PE1
—SC
AL
E.1
0O•
PE
RK
INS
—E
AST
MA
N
2P2OD
1N
Page 111, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
I’
L0
00
5C
AP
EA
RC
HIT
EC
T
Rith
terflCeg
anInc.
50C
OTIA
LC
OU
RT
P0
.50
0SO
TA
VO
N.
CT
TO
Ni
PHO
NE
860-570-5000
mN
E
SCA
LE
1-0
0o
V-
PE
RK
INS
—E
AST
MA
N
TAT
OP
OF
OTEP
00A
OU
OM
OF
STE
P
TAT
OP
OP
VA
MP
BAS
OT
E0500P
RA
MP
TCTO
PO
PC
UR
S
SCB
OTTO
MO
FC
UR
S
PCFLU
SHC
UR
S
1WTO
PO
FW
ALL
SWB
OTTO
MO
FW
ALL
LPLO
WPO
INT
HP
0100PO
INT
TFTO
PO
PFR
AM
E
(a)
SOIST
INO
OR
AO
U
FFEFIN
ISHE
DFLO
OR
ELEVA
TION
e—
eFL
TSH
CO
ND
ITION
Eao
wa
AgkS
i50S
aoo
NE
a,rIN
.....
8
-‘
H\
TN
--
-.
..
:-U
\C
Th\1
-N
El
L
TiO
ai
TiC
ow
odg
o00
02100
LE
GE
ND
SOO
JRC
TT
ITL
E
Ponus
Ridge
School
Alterations
andA
dditions
21H
uotersL
aosN
orwalk,
CT
06850
PRO
JEC
TN
oT2TU
T
LA
ND
SCA
PEG
RA
DIN
GPLA
N
NO
TEA
LLTWELEV
ATIO
NS
AR
ETO
TOP
OF
THU
PRE
CA
STC
ON
CR
ET
EC
OPIN
O
L-1
03a
DC
hemorlo
DeN
igo
2120078
Page 112, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
\zzz\z
z\z
z\
LZ
N
\zzz\Z
EZ
\—
ro
lE
LM
OD
SCA
PEA
RC
HIT
EC
T
Thchter(j1jC
eganInc.
SRC
AR
OL
CO
AST
PS
65
5SeT
AV
ON
.C
TO
Nes
PHO
NE
SS
XR
VL
XE
O
OiS
0002
-r
i
—ST
OL
EV
.A
RV
PE
RK
INS
—E
AST
MA
N
ao
ras3
0IL
eaib
00
L5T
OR
9V
I,SeO
Ugh
ess
GC
SS
US
RN
GG
65M
ootosSI
CasS
otg
eM
O02136
Ponus
Ridge
School
Alterations
andA
dditions
21H
oste
lsL
ane.
Norw
alkC
T05550
LE
GE
ND
75T
OP
OP
STE
P
55S
OflO
MO
FST
EP
TXT
OP
OF
RA
MP
SRSO
TFO
MO
FR
AM
P
TCT
OP
OF
CU
ES
SCS
OH
OM
OF
CU
SS
FCFL
USH
CU
ES
NO
TEA
LLTW
ELEHA
TION
SA
ES
TOT
OP
OF
THE
PRE
CA
STC
ON
CR
ET
EC
OPIN
G
TWT
OP
OP
WA
LL
SWS
OH
OM
OF
WA
LL
LPLO
WP
ON
T
HP
HIG
HPO
INT
iTT
OP
OF
FE
AM
S
ESH
OISTIN
GG
RA
SS
FF5FIN
ISHE
SFLO
OR
SLE
PAT
ION
•FLU
SHC
ON
DIT
ON
PRO
JEC
TN
o72050
LA
ND
SCA
PEG
RA
DIN
GPLA
N
L-1
03b
Schsm
alio
DE
sign
—
“S
N
—\
VV
2120016
Page 113, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
FDAD
ATE
lAR
DS
LA
ND
SCA
PEA
RC
HIT
EC
T
Rich
terjCeg
anInc.
ERC
AN
AL
CO
UR
TP
AR
OO
TS?
060
5,
0706001P
00
50
REDEPA
-DA
RE
PE
RK
INS
—E
AS
TM
AN
CD0
of
ME
000
00
0R
P11.05W
AN
DR
EA
E.o
1.R
*oE
a....
/Toto
TT
.oD
.EçE
EA
D2T
A
Ponus
Ridge
School
Alterations
andA
dditions
21H
untE
rsL
AT
EN
orusAk
CTDSAED
PLAN
TLIST
PLAN
TING
TYPE
OTY
SIZE
DE
CID
UO
US
SHA
DE
TR
EE
573
31/2
CAL
DE
CID
UO
US
SHR
UA
S843
3D36”
SPRE
AD
ME
IDH
T
ER
ER
DR
EE
NSH
RU
BS
5433D
-3D”
SPRE
AD
ME
IDR
T
LE
GE
ND
NO
TE
S
ESIST
NG
TR
EE
LAW
NSE
ED
ING
TOR
EMA
IN
EDISTIN
GM
ASS
SHA
US
0E
VE
RG
RE
EN
TR
EE
PLAN
TING
PRO
POSE
DTR
EELIN
E
SHA
DE
TR
EE
1ALL
EST
ER
IOR
GR
OU
ND
AR
EAN
DIST
UR
SED
STC
ON
STR
UC
TIO
NA
ND
NO
TO
OV
ERED
STB
UILD
ING
SST
RU
CT
UR
ES.
PAV
ING
CO
NT
INU
OU
SPLA
NTIN
GB
ED
SO
RO
TH
ER
SITEIM
PRO
VE
ME
NT
SSH
ALL
BEG
RA
DE
D.
TO
PSOIL
ED
WITH
PLAN
TING
SOIL
TOA
DEPTH
OF
SA
ND
SEE
DE
D2
ALLPLA
NT
RED
SA
ND
LAW
NA
REA
SIN
PAR
IRN
GLO
TISLA
ND
ST
OR
ETO
PSO
ILEDW
ITHPLA
NTIN
GSO
ILTO
AD
EPT
HO
P18”
3.M
ULC
HA
LLN
EWPLA
NT
BE
DS
TOA
CH
IEV
ES
3’D
EPT
H(A
FTERSE
TT
LE
ME
NT
)FO
RT
RE
ES
AN
DSH
RU
BS,
AN
DA
2”D
EPT
H(A
FTERSE
TT
LE
ME
NT
)FO
RPE
RE
NN
IAL
AN
DG
RO
UN
DC
OV
ER
RE
DS
MU
LCH
FOR
SAU
CE
RS
AN
DPLA
NTIN
GA
RE
AS
TO
RE
DO
UB
LEG
RO
UN
DE
DSH
RE
DD
ED
BA
RK
MU
LCH
4ALL
LAW
NA
ND
PLAN
TING
AR
EASO
ILPR
EPA
RA
TIO
NSH
ALL
RE
FERTILIZED
AN
DA
MEN
DED
AC
CO
RD
ING
TOTH
ER
EC
OM
ME
ND
AT
ION
SO
FA
SOIL
AN
ALY
SISPR
OV
IDE
DBY
ANA
PPRO
VE
DSO
ILT
EST
ING
LAB
OR
ATO
RY
AN
DA
PPRO
VE
DBY
THE
LA
ND
SCA
PEA
RC
HIT
EC
TD.
PRO
VID
ETY
PEII
PLAN
TING
SOIL
INR
ED
SW
HE
RE
ACID
LOV
ING
PLAN
TSH
AV
ESE
ES
SFEC
IFIED
PRO
VID
EM
AIN
TENA
NC
EM
OW
STR
IPA
LON
GA
LLPE
RIM
ET
ER
WA
LLSW
HIC
HA
RU
TLA
WN
AR
EA
S
PRO
JEC
TN
oT2D
SD
LA
ND
SCA
PEPL
AN
TIN
GPLA
N
L-1
04
aS
EA
Em
EV
CD
esig
n
200D1R
L
Page 114, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
21H
untersL
ane,N
anwaIk
CT
SRASD
LE
GE
ND
OEX
ISTING
TR
EE
TOR
EMA
IN
0EX
ISTING
EV
ER
GR
EE
NT
RE
E
OE
RO
EO
SED
SHA
DE
TR
EE
LAW
NSE
ED
ING
MA
SSSH
RU
BPLA
NTIN
G
TR
EE
LINE
NO
TE
S
IALL
EST
ER
IOR
GR
OU
ND
AR
EA
SD
ISTU
RB
ED
BT
CO
NST
RU
CT
ION
AN
DN
OT
CO
VE
RE
DST
BU
ILDIN
GS,
STR
UC
TU
RE
SEA
RIN
G.
CO
NE
INU
OU
SPLA
NTIN
GB
EGS
OR
OT
HE
RSITE
IMPR
OV
EM
EN
TS
SHA
LLBE
GR
AD
ED
TO
PSOIL
ED
WITH
PLAN
TING
SOIL
TOA
DE
PTh
OP
UA
ND
SEE
DE
D2
ALL
PLAN
TB
ESS
AN
DLA
WN
AR
EAS
INPA
RK
ING
LOT
ISLAN
GB
To
BE
TO
PSO
ILEDW
ITHPLA
NTIN
GSO
ILTO
AD
EPT
HO
P1B
3M
ULC
HA
LLN
EWPLA
NT
BE
DS
TOA
CH
IEVE
AT
DE
PTH
(AFTER
SET
TL
EM
EN
T)
POR
TR
EE
SA
ND
SHR
UB
SA
ND
A2
DE
PTH
IAPTER
SEU
LE
ME
NT
IPO
PPE
RE
NN
IAL
AN
DG
RO
UN
GC
OV
ER
BE
SS.M
ULC
HFO
RSA
UC
ER
SA
ND
PLAN
TING
AR
EA
STO
BED
OU
BLE
GR
OU
ND
ED
SHR
ED
DE
DB
AR
KM
ULC
H4
ALLLA
WN
AN
DPLA
NTIN
GA
REA
SOIL
PRE
PAR
AT
ION
SHA
LLBE
PERTILIZED
AN
DA
MEN
DED
AC
CO
RD
ING
TOTH
ER
EC
OM
ME
ND
AT
ION
SO
PA
SOIL
AN
ALY
SISPR
OV
IDE
DBT
AN
APPR
OV
ED
SOIL
TESTING
LAB
OR
ATO
RY
AN
DA
PPRO
VE
DBY
THE
LA
ND
SCA
PEA
RC
HIT
EC
TS.
PRO
RISP
TYPE
IIPLAN
TING
SOIL
INB
ED
SW
HER
EA
CIDLO
VIN
GPLA
NTS
HA
VE
BEEN
SPEC
IPIED
PRO
VID
EM
AIN
TENA
NC
E/MO
WST
RIP
ALO
NG
ALL
PER
IME
TE
RW
ALLS
WH
ICH
AB
UT
LAW
NA
RE
AS
PRO
JEC
TN
aP2555
LA
ND
SCA
PEPL
AN
TIN
GPLA
N
L-1
04
bS
cAew
atieT
eage
200
01
8
1
—
S
.2-
\zz
LA
AS
SC
AP
ES
SD
HS
ED
T
Rich
ter?Ceg
anInc.
BaSA
tIRE
SOR
RY
PD
aDS
taoA
SSN,
ST565C
rP
AS
SE
555S
Teassa
\zt
\zz
‘—7
?.L
i
p
\ZT
h
N-
\—
/
mu
e
SCALE
C—3D
U
PE
RK
INS
—E
AS
TM
AN
/-
.-
-p.—
C
—
—V
—5
t
VV
ON
urro
eCalu
—.
u-u
•-<V
p
Ponus
Ridge
School
Alterations
andA
dditions
L’U
u-5
Uw
ala
s
UP
Sas5.,R
..ta-..
53aed
eeSr
U.e
eeag.
Dew
rra
L
Page 115, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
•M
.E.O
’RR
IEN
&O
ON
S,INC
.
&sorris
03W
estS
treet-P
0O
re0
60
/M
edlieldM
A03052
50
0-3
59
-42
00
(phore)/
50
0-3
59
-28
17
(feel
50
0C
ertifiedW
OE
(MA
Oely)
OU
OT
AT
ION
Rare:
Frb
nsary
t,2000
Pagele
fz
Job:P
eerokld
geS
eborl
LeoaO
re:N
erwaIk
CC
Salam
as:P
eterW
ailer.,C
PNI
IO
bese:203-0
094323
IFax:
203-8004299P
arr
Walb
oe0
ebd
eaaxd
aam,o
ma
Altrealeas:
bokeC
egar
Iso
eeasbid
rhtrro
reee.o,:o
sG
eeg6
lrdlrsio
sll@d
00
0ro
sxar.ro
sr
We
arepleased
tooffer
mr
quo:a000on
Orefo
lirairgIre
Ac
there
subjectjob:
CT
ST
AT
EC
ON
TR
AC
TP
RIC
ING
IC
ON
TR
AC
T#I7PN
X001I
Qfl
RE
9C
RW
CIO
N
By
Lerd
ryao
rt:ro
ose
e,
bc.
-O
bffiOlW
7bA
-rE-E
dn
a(2
-tyraro
ldrl
IP
laytbrparStroooar
I5-b
aydrc
btw
isgtrr
modes
1-SAm
oa(502
yrorokay
IC
onbirrO
mrP
lsyhorserlto
odtie:B
esS
nr:o
nI
Global
Moore
Spirras
I4-b
aydrrb
Srirg
tO
S::rtoeoA
moera-
Barlioo,d
Pasord-Ir-O
ror•
Macdale
ard:o
rolfrd
oo
otm
bb
rrorly
•Sob
bareis
byolbmn.
•P
reKK
Arra-O
.tWrq
seorter:a0
3-IIrd
ooL
•C
adreI-S
Aora—
0,W5
aqoanfraser
4”Ihick
•50%
black,50%eterdard
color,epmukled
air,•
Srordaedam
madclee&
riapreluded.
•Itary
msorr:rge
orsky
tIre,royal
bIer.0gb:easy,dark
grayorseal
aorircludrd
alipbadcbinder
issrqcirrd
rodlob
poorm
dlisorsear
bybf25
peraq
oarrlro
t
Re:
Pro
seR
idgeS
oharlN
orwalk.
CT
Febsoasy
0,2010
IOE
AC
RIPT
ION
•T
osl,y
rlloo,y
u,p
leaodpdoary
odrn
sualrm
rdoo.
Itaradiro
ser0
as2
5%
uto
ysc
rtao
r.soau
did
oo
slsoso
prrrq
serrtro
roril:b
madded.
aToo
000%color
add11.50
peraqosor
trot
•II
iseollarioris
:rcludrd,pleaserose
dotollow
irg:Ptm
ceil:rgw
agesan
iroluded,lrso
llsuo
oisco
ok
rpleas
rearsgrrpsrrd
sub-baseby
--
odors.losolia:irr
bad-flewiso
be&
Orrriood
aolis
orato
r4
dry
seder:
Sio
ro0
00
yia
lorso
prse
ihli:y
ryrte
oo
rrdco
o:o
rcto
rurlil
doreodrot
isoat
dr:rtla:i,
•O
see:r&u
ffoad
rqu
:prw
srdrlioory
•L
ayn
olso
dsopor
boles•
trrlollrq
r:prro
kp
oo
roo
ese
roto
orra
•R
oco
op
ao
rosu
rgo
ose
baro
5AIl
porpan:orysioroork,
sasdiog.rscerarior
is‘M
Irob-base
‘:0
0.
:sbo.tdas_as
ACES
2—5
TOTALELEVATED
PLAYCO
MPO
NEN
TS15
TOTALELEVATED
COM
PON
ENTS
ACCESSIBLE
BYPA
MP
0PEO
UIRED
0TOTAL
ELEVATEDCO
MPO
NEN
TSA
CCESSIBLEBY
TPAN
SFEP15
REDU
IREDB
TOTALA
CCESSIBLEG
ROU
ND
LEVELCO
MPO
NEN
TSSHOW
N11
REOU
IEEU5
TOTALD
IFFERENT
TYPES
OF
GRO
UN
DLEVEL
COM
PON
ENTS
6PED
UIRED
3
LAN
DSC
APE
PLA
YG
RO
UN
DE
QU
IPME
NT
L-105
Soh
rmal:o
Des:gr
27212010
_---
TO
TA
L
$5b,700lessS%853,021W
$200,000less
5%$190750.00
Tssaf
EAt
Equiperost
Fuorirbrd
asdD
dirarrd0202,d72.00
(SoulsC
orOnet
0%R
iarsoslaed
Fr..
Frslgblf
$109,051.00
On
L010S
0670b004ffE
0T
Rich
ter(,1C
egan
Inc.5R
01010kC
OU
RT
P.O.
tOO
507A
0O
S,C
y0
00
rnPH
ON
E190-670-1069
Pag
eOrb
l
JQflL
$106700.19
SCALE
1—10
-5’
5CPL
EA
SER
EA
R-
IMP
OR
TA
NT
NO
TE
S-
PL
EA
SE
RE
AD
5’a
CsrO
nrso
rlCaoso
rrkrsep
ssrdM
rfor
qoarlity,selse,
aadp
osd
or$
raalh
ora
tba
aP
ans
basedor
qaaalidsehaled,
dry
‘Score
toqrax
dflse
may
Imp
artpsfea
spsated,•
MG
RoA
rs&
Sem
isN
OT
esepetaib
le(or
plaslab
orIte,
AKqrsselida,ysaanborsrgo0-
AkU
arorse,alaare
herap
rsdM
ilyefp
arob
asrr.C
asOra
roddm
bkth
mhqem
ilflmquoted.
Ilkshe
rmp
eed
klk
yof
Ar
parrhaorrIa
.ppesra
rrbm
aham
°pn
plaiT
•P
alo.,are
qarledfor
0000are
Ross
for30
dgearely
sedan
mabjasa
sam
l.,.$hantrr,
•P
ets,.an
feem
aterIalsrsdy
role,.
tekan
ekaseld
,P
etmdrN
OT
hsd
adraalm
taa,•
Ifisesu$adrrA
Irohsdad,M.E
O’R
rler&
trea
IaN
OT
esepasolblefar
braId
aadargerasdb
aaeda
iedamiss&
hateal
liaisedha:
hdgeo
aeailabkberd
segcaIro
anrk
dasm
6ea5
basMera,sa
anooss
delirIacad
caprooor
rocA
llasbrpred
me
sealed,A
ddlilrsedsad
mill
berrq
alrd09
rectIfyIbm
.dlaaffm
s.•
Slaedaed
saaarfaesarerododge,
edgar
apedoradaaa,cad
seaafraotlroapply.
-R
elaleagedan
cesapply.
aR
akas
meal
bem
.d.
nO
ne
30ed
asdar
day.at
ranip
ledard
er.C
adra
nlsm
yo
rdb
kfor
n’atmolog
I.epIes
akppergdasegre
(toad
fsea(r,rallretoned
krr
Pro
rd-h
aflare
haN
OT
rolseroble,a
Oerffiw
aan
:to
ben
ag
ed
.a
dOs..4
arlinseb
forO
deenyat
maledab
aflerreceipt
dard
or
aedaeskosrloral
apperealP
r.qdre
t$m
lalkoaeoak.
pla
n..
mar
aspredhhe
altarm
oOrs
r(asetodeb
aadan
ord
lag0
laaatrr’aabed
sh:
preralliagrare
nlee
doart
applyarIa..
etberalerre
set
ifw
eroe
haaffe
flhrr
roth
keo
a,pO
rnodro
ol
hero
ala10
reeked
caT
haek
yoal
PE
RK
INS
—
EA
ST
MA
N
C405rrra
R
0000w
oyrryA
reewS
co
e::
melee
0700511
rgO
aegr.m
dre
esr•n
.
Pcad
a.Mrc
Park
Sac
leaaa.aaod
ACES
5—12
TOTALELEVATED
PLAYCO
MPO
NEN
TSTELEV
TOTALELEVATED
COM
PON
ENTS
ACCESSIBLE
BYRAM
PTA
CRREOU
IPEDTACRR
TOTALELEVATED
COM
PON
ENTS
ACCESSIBLE
BYTRA
NSFER
TACTPEO
UIPFD
TACTRTOTAL
ACCESSIBLE
GRO
UN
DLEVEL
COM
PON
ENTS
SHOWN
TGLREO
UIPED
TGLRTOTAL
DIFFEREN
TTY
PESO
FG
ROU
ND
LEVELCO
MPO
NEN
TSTD
TGBEO
UIRED
DTGLR
Ponus
Ridge
School
Alterations
andA
dditions
21H
urlersLam
e,N
orwalk,
CT
WO
St
PRO
JEC
TN
o72050
Page 116, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
---
—
__
___
___
__
____
_
HO
LDR
EIN
FOR
CIN
G3”
CLEA
RO
FJO
INT
TIP
)114”
RO
UN
DIN
G(T
IP)
114”FR
EM
OLD
EDJO
INT
FILLER&
SEALA
NT
74”k
“—1W
DO
WE
LS
@iS”
DC
WITH
SLEDD
ERD
OW
EL
STO
ED314”
DIE
WR
END
IMEN
SION
“A”IS
LEERTFW
NE”
AN
D1”
DIE
WR
END
IMEN
SION
A”IS
S’O
RG
RE
AT
ER
NO
TEDI
INSTA
LLTO
OLED
JOIN
TS
AT
SPAC
ING
EOU
AL
TOTH
EW
ALK
WID
TH,
UF
TOA
MA
SMU
MO
F5
FEE
T,
UN
LE
SSD
IME
NSIO
NE
DO
TRER
WIR
D2
INSTA
LLD
SFAN
SION
JOIN
TS
WITH
INTH
ETO
OLED
JOIN
TSPA
CIN
GM
OD
ULE
UP
TOA
MA
BIMU
MSPA
CIN
OO
F25
FEE
T3.
TYPIC
AL
SPAC
ING
WA
LKW
IDTH
ESPA
NSIO
NJO
NT
SPAC
INO
420(5
PAN
ELS@
4I
S25’(4P
AN
EL
S@
S(
5’iS
(3PA
NE
LS
LE
SI
4IN
S/AL
LFU
LLSL
PIR
1/2”PR
EM
O/SL
DJO
IN1
FILLERA
NU
SEALA
NT
WR
RR
FSER
PASE
MFN
TA
BU
TSFIR
EDO
SJDC
TS
SSE
ETY
PICA
LJO
INT
PLA
CE
ME
NT
DETA
IL
rSY
NT
HD
TIC
CO
UR
TSU
RFA
CIN
G
N/rB
IWE
MIN
OU
SC
ON
CR
DTD
‘SUR
FAC
EC
OU
RSE
/B
ITUM
INO
US
CO
NC
RE
TY
‘BIN
DE
RC
OU
RSD
Imnwnnmt CII
__________________________
PRO
CE
SSED
STO
NE
BA
RE
AeL
tL
,9—
GR
APE
LSU
BB
ASE
CO
MPA
CT
ED
SUB
GR
AD
D
OP
AV
ED
PLA
YA
RE
AS
UR
FA
CIN
GSC
AL
E:l”
I’0
/005
0i0
t/C00
0IR
ER
OIL
O/0
212
16
CR
WO
WELD
EDW
IRE
FAB
RIC
W2xW
2
/“
‘-—
1—-—
CO
NC
RD
TE
__
___
____
____
____
____
_
WIR
EC
HA
IRS
—PR
OC
ESSE
DST
ON
EB
ASE
“Ii
OR
ASE
LSU
BB
ASE
CO
MPA
CT
ED
SUSG
RA
DS
NO
TESE
EFO
RJO
INT
DETA
ILSA
ND
LOC
ATIO
NS
OC
ON
CR
ET
EW
AL
KT
YP
E2
SCA
LD’
1*—i’
0/C
AR
010N0000/C
AT
AIL
SO21O
1O’R
RW
S
CO
NC
RE
TE
,—“f—
WELD
EDW
IDE
FAB
RIC
•,“
(‘“‘
SoS
”W
2oW2
A”
‘A
IW
WD
CH
WR
S
•-:
‘O
SAR
EL
RU
SSAR
E
CO
MPA
CT
ED
SUSO
RA
DE
NO
TESE
EFO
RJO
NT
DETA
ILSA
ND
LO
CA
TIO
NS
OC
ON
CR
ET
EW
AL
KT
YP
E1
SCA
LD1”=1’
5IRA
R000N
RA
RR
IRE
TA
I/0i32/3i3A
OW
S
BIT
UM
INO
US
CO
NC
RE
TE
QP
AV
EM
EN
TT
YP
E2
SCA
LE1
=1’O
iCO
R0
10N
/CR
R2S
RA
1L
S/0
21
01
0B
OW
S
OR
APD
LSU
BB
ASE
‘12”S
5/0”D
IER
DA
AR
@24”
0C
24”R
AD
IUS
CO
NC
RD
TDC
RD
TEW
ALK
OU
AR
TD
RR
OU
ND
2’P
E2
CU
RB
BEY
ON
D
1/2’U
P
Iic
-%T
jiIjjI%
_
Jfl
\B
ASE
1t0
\D
SPAN
SION
JOIN
T
EO
,R}I’5R
r5”
CO
NC
RE
TE
RA
MP
5”j.B
SEC
TIO
N
OC
ON
CR
ET
ED
RIV
EW
AY
AP
RO
NA
ND
SID
EW
AL
KSC
ALE
1_i
Z1
18
tCE
1A
8flS
5rW
0612166
W2L
/0022R,O
WS
LAW
NO
RD
AR
ERS
-
LA
ND
SDA
PDA
RO
R11D
DT
Ric
hte
rJCeg
an
Inc.G
BC
AN
AL
55
550
P.S
.B
OB
500B
RA
N,
SR
00201D
RO
sS.
80
06
78
060
5
HFD
NC
DTB
TO
ED
EDT
DN
’SRR
INK
GR
OU
T
‘PITC
HT
OP
OF
FLUSH
CU
RB
1/4”A
WA
YFR
OM
PLAY
SUR
FAC
DFO
RPO
SITIRD
DR
AIN
AG
D
TA
PER
EDD
EO
FA
GG
SEO
AT
DB
ASD
TOA
LLOW
FOR
RA
UN
CR
ED
ER
OS
OF
SAFE
TY
SUR
FAC
ING
AT
UN
DT
SDSA
IN
LO
CA
TIO
NS
NSA
FETYSU
RFA
CIN
G
-(2)B4
BA
RR
RO
LD
2”C
LEAR
(TIP
)-
CA
STIN
PLAC
EC
ON
CR
FTD
CU
RB
PRO
CE
SSED
STO
NE
AG
GR
EG
AT
EB
ASE
I)#6B
AR
RH
OLD
2”C
LEAR
(TIP
)
‘CSR
RH
DD
STO
NE
“,NU
LAR
FILL
4”PE
RFO
RA
TE
DPSC
PIPEW
HE
RE
NO
TE
DO
NPLA
NS
WR
AP
ING
EO
TD
STIL
DFILTER
FAB
RIC
4
OF
LU
SH
CO
NC
RE
TE
CU
RB
SCALD
V=
I6/C
O
1/4”R
AD
IUS
**
FINISH
GR
AD
E\,,,,—
1”RA
DIU
S
OT
YP
ICA
LJO
INT
PL
AC
EM
EN
TIN
CO
NC
RE
TE
SCA
LD1/B
”=I’X
ICS
5512ND
05520TA
1LS
O21O
IO’C
025
PE
RK
INS
—
EA
STM
AN
FINISH
GR
AD
E
CO
NC
RD
TB
PAV
DM
E14T
—PR
OC
ESSE
DST
ON
EB
ASE
—C
ON
CB
DT
DC
USS
Se”
‘—
‘3/4
0B
24”D
OW
ELW
ITH
6”‘
SLE
DR
DA
TA
LL
JOIN
TS
#1’#S
SA
DT
OPA
ND
SOT
TO
M
GR
AN
ULA
RFILL
OC
ON
CR
ET
EC
UR
BSCA
LD1”=i’
XiC
O
AE
SPAN
SION
JOIN
T
Ssolo1
1/2
=1
R’
CO
NC
RE
TD
PAR
DM
ENT
CO
NC
RR
TE
PAR
EM
EN
T
CO
NT
NU
OU
SR
EIN
FOR
CIN
G\
/1/4”
WID
SJO
INT
DE
PTH
EOU
AL
_“\\%
/‘TO
2S
*O
FD
IMF
NS
IoN
’A”
TOO
LEDJO
INT
Soalo2/
=1’S
OC
ON
CR
ET
EJO
INT
DE
TA
ILS
SCA
LE1_i’
‘BIT
UM
INO
US
CO
NC
RE
TE
SUSPA
CD
CO
UR
SEto
/500
arO
s6
20
21
60
‘BIT
UM
INO
US
CO
NC
RD
TD
BIN
DER
CO
UR
SE
ISTO
NE
BA
SE
SUB
BA
SE
3SU
BG
RA
DD
INT
EG
RA
LC
ON
CR
ET
E
OW
AL
K!
CU
RB
SCA
LE1—
1O
LO
CS
/AN
000//C
000
AJC
lolo
’5025
Ponus
Ridge
School
Alterations
andA
dditions
20R
ostersL
ane,N
orwalk
CT
DSBS2
-B
ITUM
INO
US
CO
NC
RE
TE
SUR
FAC
EC
OU
SSD
‘BIT
UM
INO
US
CO
NC
RE
TE
BIN
DER
CO
UR
SDPSO
JDC
TNo’
72D5S
—PR
OC
ESSE
DST
ON
EBA
RDSITE
DETA
ILS
SA
C/C
CO
MPA
CT
ED
SUB
DR
AD
R
BIT
UM
INO
US
CO
NC
RE
TE
QP
AV
EM
EN
TT
YP
E1
SCA
LEi”_
1’
OC
O/5
00N
U6
05S
00
0/5
05r0
16’O
CW
S
L-501
SoHem
aSoD
esig
n
2/2/2010
Page 117, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
NA
DA
TEISSU
E
•2%M
AX
LAN
DIN
G
RA
MP
112
MA
XSL
OPE
•EDG
EO
FA
CC
ESSIB
LE
RO
UT
E
•CO
NC
RE
TE
SIDEW
ALK
•FLAR
EDSID
E112
MAD
SLO
PE
Z-iS
ioiB
LA
ND
SC
AP
EA
RD
AIIC
AT
Rich
ter(5teg
anIn
c.SB
CA
NA
LX
DA
VT
PD
,ED
O557
AX
ON
,C
T05611
P00C
C16
0-6
70
001
5
2BIT
PAV
EMEN
TR
EPL
AO
EM
EN
T
I2
GR
AN
ITEC
UR
B-FL
USH
II
USR
I
IS
THIC
KEN
EDE
DG
EO
FC
ON
CR
ET
E
/L
ESt
WA
LKPA
VEM
ENT
DO
WEL
TOC
UR
B
IX
DETEC
TAB
LEW
AR
NIN
GPA
VER
/-
INSTA
LLEDIN
WET
CO
NC
RE
TE
I
L—
L-NA12C
XFU
LL
WID
TH
/_
FULL
DEPTH
ESFA
NV
ION
JOIN
T
__
__
__
__
_
-4C
ON
CR
ET
EW
ALK
PAV
EMEN
T
/G
RA
NU
LAR
BA
SE
PRE
PAR
ED
SUB
GR
AD
E
NO
NSLIP
SUR
FAC
EO
NB
OTH
PLATE
&B
UT
TO
NS
LE
TT
ER
ED
TAD
AR
EA(O
PTION
AL)
B—
14)3/CDIA
•a44
•,
C
VEN
TH
OL
ES
•.0
_P
A12.
2::::
::::*t::::
/z_-,
-5—
/2C
-\
TO
PVIE
W
SEC
TIO
NA
A-
SUT
TO
N
__
__
__
__
__
__
__
DETA
IL
PE
RK
INS
—E
AST
MA
N
AIT
AN
o,o
oC
U
FULL
TRA
NEITIO
NC
NO
TE
S1
MA
INTA
ING
UT
TE
RFLO
WA
CR
OSS
CU
RE
RA
MP
OR
FRO
MH
IGH
POIN
TIN
CU
RB
RA
MP
AS
RE
OU
IRE
D2
2%M
AE
CR
OSS
EL
OPE
DO
MA
EC
OU
NT
ER
EL
OPE
OFU
LLW
IDTH
CU
RB
RA
MP
ON
RA
DIU
SSC
ALE
0-1’
FLUSH
CU
RB
-
NO
TE
S.1
MA
INTA
ING
UT
TE
RFL
OW
AC
RO
SSC
UR
BR
AM
PO
SFR
OM
HIG
HPO
INT
INC
UR
BR
AM
PA
ER
EO
UIR
ED
D. DO
ME
SC
R000
EL
OPE
D%M
AE
CO
UN
TE
RE
LO
PE
OFU
LLW
IDTH
CU
RB
RA
MP
ON
TA
NG
EN
TSC
ALE
1=1
4C
QI1
01IA
CS
AL
SA
IBO
II.DD
oe
FULL
CU
RB
‘TR
AN
EIT
ION
CU
RB
-11U
MA
EV
AM
PE
LO
PE
FLE
SHC
UR
B-
FULL
LENG
THO
FR
AM
P
FULL
HEIG
HT
CU
RB
CU
RB
TRA
NSITIO
N
NO
TE
S1
MA
INTA
ING
UT
TE
RPLO
WA
CR
OSS
CU
RB
RA
MP
OR
FRO
MH
IGH
POIN
TIN
CU
RB
RA
MP
AS
RE
QU
IRE
D2.
2%M
AE.
CR
OSS
EL
OPE
D%M
AX
.C
OU
NT
ER
EL
OPE
DIA
GO
NA
LD
RO
PPED
CU
RB
RA
MP
SCA
LE0=1’
FLNC
EH
EIGH
TO
SN
OMTT
FEI
TT
FEII
DE
TE
CT
AB
LE
WA
RN
ING
PAV
ER
OA
TC
ON
CR
ET
EC
UR
BR
AM
PSC
ALE
0—i’
om
00010N
UoA
j,06T
AU
AIX
1I:o
60256
NO
TEALL
FEN
CE
CO
MPO
NL
NT
STO
BEBLA
CKV
INPL
CO
ATED
AN
CH
OR
PLUG
/r(B
OTH
SIDE
S)
0L
IS
AC
A4
IllI1111111)11111111111111111
I1T
FA
7N
A250C
rEM
I
Ath.4o
5*2
204
A))
Co
!!0oO
0oO
Ak
IIflN2
D=
*A
CP
20
00
UU
U(U
UU
UU
UU
UU
()UIi
__________________
24”
5057CM
VIEW
SEC
TIO
N5
5/’
AN
CH
OR
NO
TE
S1.
INSTA
LLATIO
NTO
BEC
OM
PLE
TE
DIN
AC
CO
RD
AN
CE
WITH
MA
NU
FAC
TU
RE
RS
SPEC
IFICA
TIO
NS
EQN
OT
SCA
LED
RA
WIN
GS
3.FO
RPR
OD
UC
TA
ND
CC
MPA
NT
INFO
RM
ATIO
NV
ISITwow
EJIWC
OM
(PRO
DU
CT
NU
MB
ERTESS
TI4.
4E
AST
JOR
DaN
IRO
NW
OR
KS.
INC
,371SPR
ING
STR
EE
T.
EAST
JOR
DO
N,
MI
1- STEEDO
4653
55
,0.2
04
00
0P
N
LN
IO5
6A
00
0I.T
1075*76°.
56=
A.0
.R6
00
00
11D
,’1A
HSt
Alt0
04g
000
21
0
OD
ET
EC
TA
BL
EW
AR
NIN
GPA
VE
RB
CA
LE:V
olA
AA
AA
SA
NA
AR
A5
CA
’LS
:5r1
21
00
00
-CO
NC
RE
TE
0A
LLLIN
PA
ND
TERM
INA
LPO
STS
-FIRM
,U
ND
ISTU
RB
ED
OR
CO
MPA
CT
ED
SOIL
—p—
OtT
Drp
iii
1013LISTR
JAL
STR
EN
GT
HST
EE
LC
p.q1
”5o
tdo
d.p
otA
,.ooo
Li
FINISH
GR
AD
E
gjT
E
H‘
FEN
CE
POST
-
‘C
ON
CR
ET
E
CR
OSS
SECTIO
N
OV
INY
LC
LAD
CH
AIN
LINK
FEN
CE
N.T
B.
Ponus
Ridge
School
Alterations
andA
dditions
Dl
Hunters
Lane,
Norw
alk,C
TDABSU
PRO
JEC
TSo
PDSSU
I--.
SITE
DE
TA
ILS
AE
GIS
IIM
AJE
ST
IC213-R
AIL
11
115
5C,og”
GE:
CCSIC.
loTII
SE
SL
E.
DO
ND
TS
EA
LX
II.;11I AM
ERISTA
R®
Tt,I.C
OK
T4
II6
ED
PS
S.D
OC
T20
IEE
T:
0010100rn
Unuarf0
00U
oC
OO
RN
AM
ENTA
LFE
NC
EN
.T.B.
AIC
OA
07
5I0
000
IAC
IAIU
SI0
20
I1000
0A
L-5
02
SohanaS
oD
eC10
2012010
Page 118, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
•PRO
VID
EPO
SITIV
ED
RA
INA
GE
15%T
IP)
-TOP
WEA
RIN
OSU
RFA
CE
)EPDM
AN
DU
RETH
AN
E)-BA
DE
MA
TER
RA
SSU
RETH
AN
E)
NO
TEA
CC
ESSIB
LE
PASSE
NG
ER
LOA
SINO
SPAC
E,
AC
CE
SSA
ISLEA
ND
AD
JOIN
ING
AC
CE
SSIBL
EW
ALK
WA
TSSH
ALL
HA
VE
SMO
OT
HFLU
SHT
RA
NSIT
ION
SB
ET
WE
EN
THEM
AN
TSFLNLL
NO
TE
LO
PEM
OR
ETH
AN
2PE
RC
EN
TIN
AN
TD
IREC
TION
AC
CE
SSIBL
EPA
SSEN
GE
R
OLO
AD
ING
ZO
NE
LAY
OU
TSC
ALE
1”1DZ
,tlAotlD
rAIL
stjln
AlA
-cD
WD
3”R
EPL
EC
TIE
ET
APE
BA
NE
2PE
NB
OLLA
RD
VA
PAR
T
•SIG
NA
GE
AC
CE
SSIBL
E/
DIG
NA
GE
PLUSH
CU
EB-t’-—
——
>
NO
TE
SI
PITC
HPA
EE
ME
NT
NO
MO
RE
THA
NA
2%SL
OPE
AN
TSIN
EC
TIO
N2
CO
LON
OP
STR
IPING
SHA
LLEE
WI-IITE
——
PRO
CE
SSES
STON
EB
ASE
-“—O
EA
EE
LS
UR
SA
SE
-W
ASH
ED
3/CC
RU
SHE
DST
ON
E
-U
NEN
DR
AIN
RE
PER
TOC
3DI
POR
AD
DITIO
NA
LIN
POSM
AT
ION
TPSE
NIC
EDSU
EG
NA
DE
OSA
FET
YSU
RFA
CIN
GSC
ALE
1=
1’
AD
AS
AT
AN
LA
RD
SE
TA
ILA
AA
tB2A
-AA
DA
FINISH
OV
ATE
(SUN
PAC
INO
-CO
NC
RE
TE
FOO
TIN
GTO
SSPSI
MIS
CR
UE
HE
UST
ON
E
SUSO
SAD
ECIA
AS
SPEC
IFIEO
JJNP
001S
TC
FWR
T
NO
TE
S1
INSTA
LLATIO
NTO
SEC
OM
PLE
TE
SIS
AC
CO
SCA
SCE
WITH
MA
NU
FAC
TU
RE
RS
WR
ITTENSPE
CIPIC
AT
ION
S
OPLA
YC
OM
PON
EN
TFO
OT
ING
SCA
LE;1=
1X
CA
DS
TA
SS
AR
DD
ET
ML
AIIA
AO
AA
SV
O
LA
NT
SDA
PEA
ND
SS
SD
S
Richter?1C
eganInc.
aNEA
NA
LD
AU
NT
P.S
.A
DA
557A
SAN
.ST
SHAS1P
AS
SE
.055-6755569
InrD
FINISH
GR
AD
E
/3W
CR
USH
ED
STO
NE
EO
UO
MC
OE
NSE
//
/-3/8
CR
ESH
ED
STO
NE
TO
PC
OU
RSE
///
SC
ON
CR
ET
EW
ALK
L-SS1W
PE
I
iii
1
EPPIC
IEST
CA
NS
SIZE
12”X
18”12
GR
EE
NIM
AG
EO
NW
HITE
—SN
IDE
-ON
GA
LV
AN
IZE
SE
NS
CA
P
PAN
ENG4
—12”X
24”SIG
NW
HITE
IMA
GE
ON
BLU
EFA
STE
NW
ITHZ
-23SB
RA
CK
ET
SET
S
VA
N1
25
8SIG
NW
HITE
IMA
GE
OS
BLU
EFA
STE
NW
ITHZ
-23SB
RA
CK
ET
SET
S
-r
AS
NO
TEA
LLLIN
ESSH
ALL
HE
WW
ISE)N
EU
TSA
LZO
NE
ESC
LU
CFC
)
DIW
SO
NU
SEF
OU
LLIN
E
BA
CK
BO
AR
DA
SSH
OO
P
r%
NA’IN
SIDE)
CR
ASH
ED
5IO
N5
TO
BE
CH
OSE
NB
YSU
RFA
CE
OP
CR
ASH
ES
STO
NE
TOSE
LA
ND
SCA
PEA
RC
HTEEO
FFR
OM
FULL
RA
NO
RSE
AL
ED
WISH
GR
AV
EL-LOK
AD
GSE
GA
TE
BO
ND
ING
SYST
EM
OS
APPR
OV
ES
EO
UA
L
NPS
2)2
37W00)
STA
NC
AN
OW
SIOH
TST
EE
LPIPE
MO
UN
TE
ON
SW
ITHZ
-23EB
RA
CK
ET
SET
SA
ND
AM
INIM
UM
CL
EA
RA
NC
EO
PS
PEE
TPR
OM
PINISH
ON
ASE
.
OC
RU
SHE
DST
ON
EPA
VE
ME
NT
SCA
LE
:P4
552513/
1SE’
-AC
CE
SSIBL
EPA
SSEN
GE
RLO
AD
ING
ZO
NE
SIGN
AT
HA
NC
ICA
PD
NO
P-OPP
SPAC
ES
SIZE12”
S18”
WH
ITEIM
AG
EO
NS
LJE
OB
ASK
ETBA
LLC
OU
RT
LAY
OU
TSC
ALE
IL1E”=FZA
NISA
AN
AA
SALN
AA
AA
ATB
AU
LASA
ATA
WA
PE
RK
INS
—
EA
STM
AN
IM)
TA
SDA
NO
‘liii/C
FIN
ISF
I05
AC
E
CO
NC
RE
TE
EA
SET
OP
TOB
ES
ET
PLU
SHW
ITHC
ON
CR
ET
ESID
EWA
LK
DN
A5552N
D
WE
LC
EC
ON
CO
ME
CA
PFIN
ISHTO
MA
TCH
BOLLEN
S
IS05
SS
S3]
STA
NSA
NS
WEIG
HT
STE
EL
PIPEFILLED
WITH
CO
NC
RE
TE
LENG
TH7’-D”
MIS
-FINISH
GR
AD
E
-180
CO
NC
RE
TE
FOO
TIN
GSL
OPE
TO55515
—U
NSIST
USSE
CEA
RTH
ON
CO
MPA
CT
ED
SAC
KFILL
NO
TE
NPS
SPIPE
TOSE
PRO
VISE
ETO
GA
LSAN
IZERFO
RH
OT
-SIPG
ALV
AN
IZING
WITH
HIG
HPE
RFO
NM
AN
CE
CO
ATIN
GC
OLO
NTO
SESE
LE
CT
ES
AT
LE
NSSC
SPEA
RC
HIT
EC
TFR
OM
MA
SUFA
CT
UN
ER
SFU
LLR
AN
GE
.
RE
SER
VE
SPA
NK
INO
SIGN
SIN
STALLES
WITH
SOL
LE
NS
INM
AIN
PAR
KIN
GLO
TA
NT
WITH
OU
TR
OL
LE
RS
INPN
EK
PAR
KIN
GLO
T
55/IS”
OS
GA
LVA
NIZED
-
STE
EL
BEN
TPO
ST
SEALA
NT
-
AC
CE
SSIBL
E/R
ESE
RV
ED
PAR
KIN
GA
ND
QA
CC
ESSIB
LE
LOA
DIN
GZ
ON
ESIG
NA
GE
N.T
5A
IDA
DA
SA
ND
AA
mD
DT
A,L
SIA
143A-A
AC
CE
SSIBL
EN
OU
TE
AS
_______
\Ij
/SH
OW
HO
ND
RA
WIN
O
/N
ISEAI
r
cQS
ThcE
LPIPE
BO
LLAR
D
4-tE
i
I8
SEE
MA
TERIA
LPLA
NFO
RL
OC
AT
ION
S
________
STE
EL
EO
LL
EN
D
ATTA
CH
SIGN
AT
EAC
HA
CC
ESSIE
LE
SP
AC
EO
NS
TE
EL
EO
LL
EN
SC
EN
TE
NB
OLLA
RD
ON
PAR
KIN
GS
PA
CE
S’
FNO
MFA
CE
OF
CU
RS
4”ST
RIPIN
T@
12”OC
SA
lflHA
,ttey
Ata
t’e55,ta
Aol
SceN
es
WA
6AA
O
O5
2lh
.llAyA
,n52
aA
:teS
O1O
a,td
e,,
W
LO
AN
e9N
.n.A
t.et
N.e
..
SN
AO
A.iA
tS
tH
aD
AW
MA
N2IA
O
Ponus
Ridge
School
Alterations
andA
dditions
TIH
AnIA
rSL
ane,
Norw
elA,
CT
DESSA
PRO
JEC
TN
o.TW
OS
SITE
DE
TA
ILS
CO
NC
RE
TE
WE
LD
ES
PIPE—
AN
CH
OR
-
3IF
ON
LTO
NE
AC
CE
SSIBL
ESPA
CE
ISPR
OS/C
EO
,IT
SHA
LLE
ElS
WID
E,W
ITHA
STR
IPED
AISLE
THA
TIS
SW
ISE
OA
CC
ESSIB
LE
PAR
KIN
GSPA
CE
S(TY
PICA
L)SC
ALE
l”lC
SA
D
NO
TE
:FIN
AL
DIM
ENESA
NS
DE
PEN
DE
NT
ON
RE
CO
MM
EN
GA
TIO
NS
OF
EA
SICE
BA
LL
POSE
MN
MJPA
CT
UR
ER
.
QB
ASK
ETBA
LLPO
STFO
OT
ING
SeA
nm
aSo
SeD
An
SCA
LE:P
4”
ZH
/1n/LH
AL
OS05515H
IDL
DS1500L
OA
HA
G
212/2018 L-5
03
Page 119, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
NO
TE
SI
INSTA
LLPE
RM
AN
UFA
CTU
RER
SIN
STALLA
TION
INST
RU
CT
iON
S2.
TAB
LEC
AR
OU
SEL
AS
MA
NU
FAC
TUR
EDBY
LA
ND
SCA
PEFO
RM
S231
LAW
ND
ALEA
VU
NU
UK
ALA
MA
ZOO
MI4SD
4B1
STY521
2546O
RA
PPRO
VE
DEQ
UA
L3
STYLE
GR
IDB
AC
KED
.1216
SEAT
(11E
SEA
T4.
TAB
LEST
EE
LH
EA
DPE
RFO
RA
TE
DW
LU
MB
Rh
LAH
OLE
S.M
OU
NTIN
GSU
RPA
CE
MO
UN
TB.
PINISH
SEA
TS
AN
DTA
BLE
ALU
MIN
UM
W1TH
PAN
GA
RD
IIPO
LY
EST
ER
POW
DE
RC
OA
TC
OL
OR
TOBE
SEL
EC
TE
DBY
AR
CIC
TE
OT
1C
HA
MPER
I4
GA
LSC
AR
RIA
GE
BO
UTS.
0).-
-C
OU
NT
ER
BO
RE
POST
TO4—
REC
EIVE
NU
T
-
iO
POST
LA
ND
SCA
PEA
RC
MT
EC
T
ffichten
Ceg
anInc.
SBC
AN
AL
CO
UR
TP
DB
OX
567A
VO
N.
CT
06001PH
ON
E060
870.0509
IA
DO
OR
LA
ICH
—R
EL
EA
SE
BBBN
ON
MA
RR
ING
GLID
ES
NO
TE1
INSTA
LLPE
RM
AN
UFA
CT
UR
ER
SIN
STALLA
TION
INST
RU
CT
ION
S2
TRA
SHR
EC
EPT
AC
LE
CH
ASE
PASS
LITTERR
.ECEPTA
CLE
BYL
A.N
DSC
APE
POR
MS
431LA
WN
DA
LEA
VEN
UE.
KA
LAM
AZO
OM
I49540.
1.800521
2546O
RA
PPRO
VE
DEQ
UA
LA.
STYLE
24DIA.
TO
PO
PEN
ING
.3S
H.
4TG
ALLO
NB
MO
UN
TING
PREE
STAN
DIN
GC
MA
TERIAL
ALU
MIN
UM
DFIN
ISHL
AN
DSC
APE
POR
MS
INC
TA
NG
AR
DIT
3R
ECY
CLIN
GSE
CE
PTA
CL
EC
pASE
PAR
KR
EC
YC
LIN
GR
EC
EPT
AC
LE
BYL
AN
DSC
APE
FOR
MS
431
LAW
ND
ALE
AV
ENU
EK
ALA
MA
ZOO
.MI
49040.1
035521
2546O
RA
PPRO
VE
SE
QJS
L//
ASTY
LE3S
H40
GA
LLON
5OP
EN
ING
BM
OU
NTIN
GSU
RFA
CE
MO
UN
TEDC
MA
TERIAL
ALU
MIN
UM
DFIN
ISHL
EN
DSC
A8E
FOR
MS
INC
PAN
GA
RD
B.
4.ALL
TRA
SHA
ND
REC
YC
LING
RE
CE
PTA
CL
ES
TOB
ESU
RFA
CE
MO
UN
TEDW
1TH30
DIA
S4
SSA
NC
HO
RB
OLTS
INO
RD
ER
THA
TTH
EYM
AYBE
RE
MO
VE
DPR
IOR
TOFLO
OD
ING
AS
RE
QU
IRE
D
NO
TEO
INSTA
LLPE
RM
AN
UFA
CT
UR
ER
SIN
STALLA
T.ON
INST
RU
CT
ION
S2.
BEN
CH
AU
STINA
SM
AN
UFA
CTU
RED
BYLA
ND
SCA
PEFO
RM
S431
LAW
ND
ALE
AV
ENU
EK
ALA
MA
ZOO
. MI
USD
481
0CC521
2S2EO
RA
8PRO
VE
DEQ
UA
L.3
STYLE
BA
CK
ED.
24S
33X72
FOR
EX
TE
RIO
RU
SE4
MO
UN
TING
SUR
FAC
EM
OU
NT
SP16055
SEAT
AN
DB
AC
KPA
NE
LS
ALU
M.N
UM
WITH
PAN
GA
RO
IIPO
LY
EST
ER
POW
DE
RC
OA
TC
OL
OR
TOBE
SEL
EC
TE
DBY
AR
CH
ITE
CT
PRE
CA
STC
OPIN
GIUA
LENG
THM
ASI
WiTH
ACID
WA
SHPIN
ISHC
OLO
RTO
BEA
PPRO
SED
BYL
AN
DSC
APE
AR
CH
ITE
CT
(2)05RE
BAR
CO
NT
INU
OU
S-
KE
EP
2C
LEAR
1/2M
OR
TAR
BED
WiTH
-
SAC
KE
RR
OD
AN
DU
RETH
AN
EE
ASE
DC
AU
LK-
CO
LOR
TOBE
SEL
EC
TE
DRY
LA
ND
SCA
PEA
RC
HIT
EC
T
3.SD
IAX
3SS
PINSE
TIN
-N
ON
SHR
INK
GR
OU
T(2
PER
EAC
HC
OPIN
GPIE
CE
)
NO
TE
.A
LLJO
INT
SB
ET
WE
EN
CO
PING
PIEC
ES
TOB
EH
ALF
INC
HM
OR
TAR
JOIN
TW
ITHB
AC
KER
RO
DA
ND
UR
ETHA
NE
BA
RED
CA
ULK
-C
OL
OR
TOSE
SEL
EC
TE
DBY
LA
ND
SCA
PEA
RC
HIT
EC
T
QPR
EC
AST
CO
NC
RE
TE
CO
PING
SCA
LE3=
tZ
ON
I0AST
YE
HA
ILSIV
SPING
.SHR
OW
Ath
0916
PLAN
VIEW
------—
-------—
-----
ERR
ING
LOA
DED
LOC
KIN
GB
OLT
SEC
UR
ES
GA
TEIN
THE
\j
,—
MELO
ND
ISC-
OP
EN
OR
CL
OS
ED
PO
SIT
ION
-/
BE
TW
EE
NPO
ST
27
2A
ND
POST
CO
VER
1M
OD
LO
OP
—l
IAO
DA
KA
CE
\
__________
2)7MO
OT
OP
RA
IL—
9—
70
OD
PO
ST
JC
EE
Z___
_d
EzT
E
BR
AC
ED
IAG
ON
AL
BR
AC
E
CU
RB
-P5
4S
HG
RA
DE
)4)1
øA
3S
”J”BO
LT
S—
[I
IS.
STA
FPG
AT
DR
IVE
300
CO
NC
RE
TE
FOO
TIN
GSL
OPE
TO
PA
WA
YFR
OM
POR
T
___________
-
POU
RC
ON
CR
ET
EO
NC
OM
PAC
TE
DO
RU
ND
ISTU
RB
ED
SUB
GR
AD
E
____
____
___
(1)5C
HA
IRTA
BLE
FOR
CO
MPA
NIO
NSE
AT
ING
(2)0C
HA
IRTA
BLEB
LA
ND
SCA
PEFO
RM
STA
BLE
NTS
5D
ISO
PE60N
G—
52
DIA
OPE
NIN
G.—
UU
TR
iA—
1.
U
TR
ASH
SEC
EPT
AC
LE
REC
YC
LING
RE
CE
PTA
CL
ET
OP
VIEW
TOP
VIEW
QJJM
BE
RG
UID
ER
AIL
rD
IAH
OLES
FOR
/O
PTION
AL
AN
CH
OR
ING
./
NO
N-C
OR
VO
SIVE
/M
OU
NTIN
GH
AR
DW
AR
EN
OT
INC
LU
EE
D
c____
1D
IAD
RAIN
HO
LE
BO
TTOM
VIEW
CY
NC
SC
YO
WA
rIC
PE
RK
INS
—E
AS
TM
AN
t’ULA
ND
SCA
PEFO
RM
ST
RA
SH/R
EC
YC
LIN
GR
EC
EPT
AC
LE
SSC
ALE
1-1
Z.l2O
lSE2SD
ET
AIL
S\LP-C
HA
SEPA
RK
TRA
SHD
WG
PAV
EMEN
T
—r—L————PR
EC
AST
CO
NC
YE
TE
WA
LLC
OPIN
G
FINISH
GR
AD
E
RU
BB
EDPIN
ISHFO
RE
XPO
SED
SUT
FAC
ER
•.A
PPLYD
AM
PPRO
OP
TOC
ON
CR
ET
E
SEE
CIVIL
DR
AW
ING
SPO
RFO
OT
ING
AN
DST
EE
LR
EIN
FOR
CIN
GD
ETAILS
OC
ON
CR
ET
EW
AL
L/PL
AN
TE
RB
CA
LE:1/2=
1Z
QV
1H
W1C
ON
CH
ET
EW
AL
L4e5
iH____..
___
I
__
____
ALU
MIN
UM
SEATIN
GSU
RFA
CE
VPo
A
OT
C.
IAA
.
Lh,A
4Aa
00A
zCA
ULK
z—
COL
LAS
IW
ALK
5L5E
,iPAV
EM
EN
T
EX
PAN
SION
JOIN
TSEA
LAN
T
-.
--—
-.-
‘H3
CO
NC
RE
TE
WA
LK
/L-501
TYPE
1
.5
,...
..
V••.•
.’•
NO
NM
AS
RIN
G—
’I4
GU
IDE
S-.
—12X
12356
ALU
M/
ALLO
YC
ASTIN
G
/SH
OE
BA
SE
SET
TIN
GPLA
TE
GR
OU
ND
SPIKE
I—S—
i
NO
TEFIN
AL
DIM
EN
SION
SE
UPE
ND
AN
TO
NR
EC
OM
ME
ND
AT
ION
SO
PFL
AG
POL
EM
AN
UFA
CTU
RER
AN
DA
RE
SUB
JEC
TTO
CH
AN
GE
Ponus
Ridge
School
Alterations
andA
dditions
21H
Aon1ers
Lane.
Norw
aIkC
T00505
OFL
AG
POL
EFO
OT
ING
SCA
LEV—
iP
VC
—SC
HO
OL
SIDEW
ALK
OV
EHIC
LEB
AR
RIE
RG
ATE
SCA
LE112=I
PRO
JEC
TN
o72950
SITE
DE
TA
ILS
L-504
SC
hem
atiCD
ec07
20)2518
Page 120, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
CO
NTA
INER
SIZEM
AY
VA
RY
FINSH
ED
GR
AD
E(PA
VE
ME
NT
S)
I
PE
RK
INS
—E
AS
TM
AN
-D
ECO
RA
TIVE
LA
ND
SCA
PEST
ON
E
-W
EEDB
AR
RIER
FAB
RIC
-M
ETAL
EDG
ING
-FIN
ISHG
RA
EE
-M
ATER
IAL
VA
RIE
ST
OPSO
ILO
RPLA
NTIN
GM
IX
OM
AIN
TENA
NC
EST
RIP
SCA
LE
’1
1/2”=1W
T8iU
NA
SC
EC
AN
6506-CS
TuN
NO
TE
SI
SET
CR
OW
NO
FR
OO
TB
AL
LIE
VE
LW
ITHFIN
ISHG
RA
EE
2M
AIN
TAIN
MIN
IMU
MO
F4’
PLAN
TING
SOIL
BELO
WEA
CH
IND
IVID
UA
LPLA
NT
3M
ULC
HEN
TIRE
AR
EAO
FG
RO
UN
DC
OV
ER
,PE
RE
NN
IAL
SO
RA
NN
UA
LS,4
MU
LCH
CA
RE
FUtLV
AR
OU
ND
EAC
HPLA
NT
DO
NO
TC
OV
ERC
RO
WN
SO
FPLA
NTS
WITH
MU
LCH
NO
MIN
AL
DIM
EN
SION
STY
PELEN
GTH
IX)W
IDTH
)Y)
HEIG
HT
)Z)1
16”16”
16”2
24”2T”
2D”3
3D”24”
24
SET
CR
OW
NO
FR
OO
TB
ALL•
2’A
BO
VE
THE
LEVEL
OF
THE
PLAN
TING
MIX
CO
NT
INU
OU
SLY
MU
LCH
’EN
TIRE
SUR
FAC
EO
FB
ED3”
DE
EP
FINISH
EDG
RA
DE
-
(PAV
EMEN
TS)
LM
4DSD
APE
ftRC
HIT
EC
T
Rich
ter(Ceg
anInc.
SBCANAL
CD
DR
TP.O
.B
DS
56
7flV
ON
,Cr06001
PRO
NE:
660-678-OS6S
UN
DIST
UR
BE
DSO
IL.J
/PLA
NTIN
GSO
ILT
YPE
I’
SCA
RIFY
BO
TTOM—
)PLA
NTIN
GSO
ILT
YP
E)
OP
BED
GR
OU
ND
CO
VE
RS
/PE
RE
NN
IAL
S
OC
ON
TIN
UO
US
PLAN
TING
BED
SCA
LEt1
’X
tflDS
TA
NC
AR
/UC
TA
’LS
u2
u3
U-C
DW
G
SCA
RIFY
BO
TTOM
AN
D-
SIDE
SO
FBED
NO
TE
S1.
BO
ULD
ERSIZE
AN
DTY
PESH
ALL
BEA
PPRO
VE
DBY
LAN
DSC
APE
AR
CH
ITE
CT
PRIO
RTO
PUR
CFW
SE2.
BO
UL
DE
RS
SHA
LLH
AV
ES
NA
TSRA
LFLA
TTENED
SHA
PEC
ON
DU
CIV
ETO
SITTING
3A
LLB
OU
LDER
PLA
CE
ME
NT
ON
SITESH
ALL
BEA
SD
IREC
TEDBY
LA
ND
SCA
PEA
RC
HIT
EC
T
QB
OU
LD
ER
SEA
TS
SCA
LE1=
1’
SEE
DE
DLA
WN
4PLA
NTIN
GSO
IL
QC
ON
TIN
UO
US
PLAN
TING
BED
FOR
SHR
UB
SSC
ALE
1”1
6cn
Dsrflu
CnH
sCA
rnrc
saauau
u-6
OW
O
OSE
ED
ED
LAW
NSC
AL
E:
,—
TO
PO
FED
GIN
GTO
BEA
/M
AX
IMU
MO
F1/2
AB
OV
EFIN
ISHG
RA
DE
058
,In
..A
la,W
,-Hrey
fl,nS
uN
331/8
1,3
486
CT
06518
I-—I/B
”X
51/2’
PER
MA
LO
CC
LEAN
LINE’
ALU
MIN
UM
LA
ND
SCA
PEED
GIN
GPA
INTED
BLACK
DU
RA
FLEX
F—
CO
MPA
CT
ED
SUB
GR
AD
E
12”A
LUM
INU
MST
AK
ES
TOLO
CK
INTO
PER
FOR
ME
DL
OO
PS-(3)
STAK
EDPE
RFO
OT
LENG
THO
FE
DG
ING
NO
TE
SSET
TREE
PLUM
BPR
IOR
TOSTA
KIN
GO
RG
UY
ING
THIS
DETA
ILIL
LU
STR
AT
ES
THE
MIN
IMU
MR
EQ
UIR
ED
STAK
ING
OR
GU
YIN
GSY
STE
MPR
OR
IDE
AD
DITIO
NA
LST
AK
ES
OR
GU
YS
IFR
EQ
UIR
ED
DU
ETO
FIELDC
ON
DIT
ION
SO
RSIZE
OF
TR
EE
SET
CR
OW
NO
FR
OO
TBA
LL3”
AD
OR
EFIN
ISHED
GR
AD
E
NO
TE
S1)
1ST
”SE
CT
ION
ST
OIN
CLU
DE
(5)12A
LUM
INU
MST
AK
ES
2)
CO
MPA
CT
GR
AD
ES
AD
JAC
EN
TTO
EDG
ING
TOA
RO
IDSE
TT
LIN
G,
3)C
OR
NE
RS
-C
UT
BA
SEO
FM
ATER
IAL
TOFO
RM
AC
ON
TIN
UO
US
CO
RN
ER
4)
PER
MA
LO
CC
LEAN
LINE
ALU
MIN
IML
AN
DSC
APE
EDG
ING
AS
MA
NU
FAC
TU
RE
DBY
PER
BE
LO
CC
OR
POR
AT
ION
,H
OLLA
ND
MI,
1BD
T-3S6SEED
OL
AN
DSC
APE
ED
GIN
GSC
AL
E.3”=1
X:C
AD
ST
MD
AR
DO
ET
CL
SIT
1S%
OC
OW
S
-D
RIP
LINE
OR
AS
IND
ICA
TEDO
NPLA
NS
-T
OP
TE
NSIO
NR
OPE
3/B”B
RA
IDED
NY
LO
NPO
LY
PRO
PYL
RN
ER
OPE
E:::
HEA
lEr’G
UA
GE
STE
EL
POST
SO
RA
NG
ESA
FETYFE
NC
ING
“FINISH
GR
AD
E
NO
TE
S1
NO
CLEA
RIN
GO
RE
AR
TH
WO
RK
ISPER
MITTED
WITH
INT
RE
EPR
OT
EC
TIO
NFE
NC
EU
NL
ESS
OT
HE
RW
ISEN
OTED
2N
OST
OC
KPIL
ING
OF
MA
TERIA
LSO
RE
QU
IPME
NT
ISPE
RM
ITT
ED
WITH
INT
RE
EPR
OT
EC
TIO
NFE
NC
E
OT
RE
EPR
OT
EC
TIO
NFE
NC
ESC
AL
E:
NTS
XC
AC
ST
O604B
OO
ET
flILS
WIS
AI6
C5
7,5
Ponus
Ridge
SchoolA
lterationsand
Additions
21H
untersL
ane,N
orwelk,
CT
DSBSD
UPR
IGH
TSTA
KIN
GA
ND
TYIN
GD
ETAIL
STAK
ING
AI
GU
YV
D&
AL
FOR
TR
EE
SU
PTO
5”C
ALIPER
FOR
TR
EE
SG
WEA
TERTI-IA
N5
CA
IJPER
PRO
JEC
TN
o72D
TD
SITE
DETA
ILS
OT
RE
EPLA
NTIN
GW
ITHT
RU
NK
STAB
ILIZATIO
NSC
ALE’
1/2”=l’X
WA
O6T
06OA
BD
W6T
OPL
S029IOO
-0T
WO
L-505
Sehernat:oD
esign
2W2X
18
Page 121, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
-S
—
-
/V
//
/5-—
w/
/
I/
5-’
H5-
V
‘Hf
-/
i
PO
NU
SR
IDG
EM
IDD
LES
CH
OO
L
SITE
CO
NC
EP
TFEB
2,2018
Rich
terCeg
anin
AV
ON
.cro
ol
PHO
NE
:S
Th-A
&8
.8
5,
/
4i
//5
-
/
2.
--
V
.5-5-55
--
H/ì
H‘J
VSL
I8i5
\.\
IN•SS-4
J
/H’
H_S
_-_
\
‘\
\\
\N
5-—
I,’—
.V
V5
5-
-.
-
-5
—.
——
—
I
SC
AtE
P.5
00
I
Page 122, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
I_
__
_
r:
-
:\\\%
N-’--
-
\\
-.N
\’-c.
\“\
‘.-
.
\:
““‘\
C’
\\
%\•
\\\
‘\\\\
I
-
N
FOR
‘::N
s-:-
OF
:.
N\\
LY
gOC
AR
S.
-N
-
I-\\
Vi
PON
US
RID
GE
MID
DLE
SC
HO
OL
SITE
CO
NC
EP
TFE
B2.2
018
ffichte
r(Cegan
thE
,
1%
V
Page 123, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
Ponus
Ridge
SchoolA
lterationsand
Additions
21H
iirtelCL
ane,N
o,w
ak,
CT
06810
PR
OJE
CT
No
72050
OV
ER
AL
LD
EMO
LITION
PLA
NS
DM
-100
Sch
em0
60
Design
2/2
120
18
t
06
16
SJE
EO
VE
RA
LL
DE
MO
LIT
ION
PL
AN
SE
CO
ND
FL
OO
R
DM
-105
PE
RK
INS
—E
AST
MA
N
DM
-1O1
AU
DITO
RIM
06rU06
flA
e&
..5
a.s
.yI,5
=E
eeO
e..fl.I,
P.C
816
,
816,i.
AJV
an4
6eC
,rl
r..d
..00..
8.6
01
8.8
Iet.e
.fl..w
0l]7
61eP
006
NC
.n.e
,6
50
084
0
/!M
A02
11
8
DM
-102
CO
VE
RA
LL
DE
MO
LIT
ION
PL
AN
FIR
ST
FL
OO
RW
140
L
Page 124, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
CIREVIT LOCAL\72650_NORWALK-MS_ARCH_REVIT2O17_k IobIboM21512010 647:27PM
>DOmm>o
H0z-tJ
zC,)
0
z
>>-U
CDOj
zca
ZIaC1)
0
00
so
0 0 0 V
q
-Um
pz
L -J
Page 125, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
F
LA
I+H _±
_J
rT
7
==
==
==
BO
ILE
RR
OO
M
2I
PE
RK
INS
—E
AS
TM
AN
C**
.C5aO
e.)lCS
aE
eg
lC..d
g,
P.C
2021120
0,
fl0n
2SO
O33100
0301
CT
O6S
SC
Area
Area
EL
EV
AT
OR
IIII
3-
LA
DM.106
DM-103
LA115
S0
LA
__
=L
JE
—=
=rU
SCI
126
_____________________
-S
TO
RA
I
STO
RA
GE
__
_fl{
tG
M-106
DM
-105—
DM
-103D
M13
f4
-—
JL
111
‘.
1[..F11
ER../ll’.j
F”11
1__jI
IIII
IiI
_0
II2.1
1I
1II
II
IiII
Ii:
II.
Lj
J=
==
=i
L_=
-H
JI
I\
II
II
GU
IDA
NC
E
1fl.._
___
OFFIC
E1
HIi
i/
F\
‘[i1
Lirrerd
II_aII_
1II
IIII
IIH
EALTH
IIII
IIII
IIII
II
-lOT
.L
’‘J
CO
UR
TY
AR
D
IIST
OR
AG
E
CU
STO
DIA
N
GY
M
ISo
STO
RA
GE
BO
YS
LO
CK
ER
7
030I<I
STO
RA
GE
fyi
>K
*99
Tfr
GIR
LS
LO
CK
ER
—
LA
IST
OR
AG
E145
Cau
ldro
nSt
Ca0
305e
Un
02130
L
FEI1j
FEP
onusR
idgeSchool
Alterations
andA
dditions
21H
untersC
ane,N
erwutk.
CT
06650
PRO
JEC
TN
o72050
EX
IST
fLO
OR
AR
EA
2
DEM
OLITIO
NPL
AN
SA
RE
A2
DM
-102
Sch
em
ato
Desig
n
2/2
/201
6
-J
Page 126, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
F
C:REVIT WCAW5O_NOR1YMSJRCN.REV112O17JJoba,o.M24512010 0:4730 PM
0
0012
120ioVo
\I III IEEE
Coq
B fl1B2 X
4 2
£ 3—
-
— •oZ F D B B B
9 - £j.4r - 9 9 9> 0z aU)
Fl
L H
Page 127, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
I—
C:tREVIT L0CA1272050_NORWALK-MSARCHREVI120t7_k Inbalbo vt2/5fl018647 32 PM
I
DID
>09
m>oUi ra5zi
0z-U
zC’)
•um
z
3
C
0
0
C>>-u
a 0-CD D 9
C0-DQCPD—.
K(0
K_Co
0KK 0
0
C2
C-22. a,j> >v . v.5
El nI(
a C
Fr’
L J
Page 128, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
F-
C
C:REVIT LOCAL\72050_NORWALK-MS_ARCH_REVIT2O17_kIobalborvt215!2015 5:47:33 PM
S
3
C
00m7m>o.a r
H
0z-U
zC))
fl-Uaoa aCDD‘ C
zoz
(“Coa
9 0_U)g 0
00
;h U FV fl q*
q J 7 d77
q I I i
•U‘ii
-iZea1Q)
L
Page 129, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
1
>07Omo>QMr
H0z-a
z0)
7 >>maoa Li3 ‘ C Li
P
7
Li CO
a00
C PIEVIT LOCAL/72O5QNORWALK-MS_ARCH_REVIT2O17_k.Iobalbo.rvt215/201884735 PM
— J
C 0C
C II 8 p[3
aO
- 7 L,8 033; 3 7 ci.
7 7 73V I
7 7 7
I I I
L —
•0m
L”fl
pz
Page 130, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
E1
PE
RK
INS
—
EA
STM
AN
.e.•
yM
C£
CØ
C..d
og
,P
.C
DO
N3,..
AT
CdS
eoooy
S3O
;.’;,Oi
Oa,these
A032130
Ponus
Ridge
SchoolA
lterationsand
Additions
21H
unters
Lan
a,N
orw
alk,
CT
05650
PRO
JEC
TN
o72050
DEM
OLITIO
NPL
AN
SA
RE
A5/6
DM
-109S
chemaac
Design
21
21
201
6
J
Ire
T—
—J
KIN
EX
2N
DF
LO
OR
.D
•p.n
dent
306.
n0
L
Page 131, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
MA
TE
RIA
LS
LE
GE
ND
SYM
BO
LS
LE
GE
ND
1
AL
LSE
SS
WO
ES
00
0A
SELNA
TTE
ERLEA
STOO
TLO
CC
W5
00
00
0S
IT
000Th
GT
PTV
EL
PLA
ET
EE
STEAL
PEAGRAVEL
ATONE
NEW
N5t.A
TT&E
PRETEST
0T
h
00
00-
SOLO
TOrO
NTO
5000
NoJO
TE
TSTO
NE
ROTA
TOR
005PTE
ITE
RO
TEELTO
ErNO
TO
TE
500
•A
101T
.RE
TN
s
OrT
EG
A—
-Z
t.50
SLEETEO
SOSTN
E
•T
EL
L
4EVSLEET i
)V
AS
•
•)
•T
E
TE
EL
EU
SR
AE
EL
ET
O
a-
—STEELSO
___
__
__
__
__
_
-—
——
.
EWTT >
4/
OE
S:•o••
AN
NE
TEE500*0
Tco
STARTO
OTLE
STO
RE
S
00
000
TAPE
________
5SE
P05
TSLLTAET
ERLISO
TEG
FTON
ITLPNTOG
A0
SCOPE
SOAR
@A
-TO
ECETERA
T0
00
00
00
PEAT
ET
GA
RT
T*0000000
R0
50
00
000
TW
O0000
NC
ErA
TT
EC
WO
TS
I0000000rTIO
00
0T
EL
OL
000W
A00000
5050PRO
OG
AW
TSRTOrANTONG
SOC
00
00
50
0E
rTO
TAL
SOW
MSO
WETC
SOW
TEWN
LAN
WEO
TNN
WA
RS
TERELOW
ON
EWT
00
06
00
00
STEA
ITLNITO
TOLTTEE
TOO
TE
SE
00050PR
00
00
0TO
MA
TOW
EOG
WSO
ETT
000ET
EW
000JWT
EL
TE
OfiT
TT
OSET
000500TL
OTO
OL
50000000PEP
PT
ER
AT
EE
OL
AO
CP
TE
ThSOT
ar
RON
ETS
OT
Pt
AG
AS
TT
ar0000STO
TOSO
TTE0*5
TROTEESO
TNE
SOP
WC
EP
ET
sW00C
ON
TAPT
S000000•E
LTO
STEL
OO
TO
0000T000O
NT
ES
GO
NE
SG
AO
00
00
.L550W
00
00
0PR
PE
MW
TTAO
TOO
LSW
ES
WC
ATEC
E0
00
50
00
00
505O
TR
OSO
LTO
OT
OTO
LTEOW
TOO
STA
WP000
ATE0
00
00
00
1W
OW
SA
TE
EG
RO
OT
AG
OT
GS
OsS
STO
TE
E0
SR
PEPPW
ON
TO
GTE
T0000R
EL
LST
OO
LA
TE
EE
PNT
O-TO
CO
EC
T09
OW
SOC
ET
OSO
PEA
r000W
000A
SO
rO
WT
WW
PW
ST
OE
PT
OA
N5000
00
00
00
00
0ff
NA
ET
EO
TE
000
00
00
00
05
00
EG
GE
EE
IW000PT
TO
TAS
00TO
RANA
CT
0000T
ET
OL
EO
WO
50C
r000500
SO0
00
050000
AST
EA
TT
OU
DarT
LC
5OTTO
AG
NE
WNE
ON
ES-TWO
ESE
TSE
OPW
rOW
00
00
50
PETEE
TO
Tfl
TAO•T
W000A
NS
WW
DW
EE
ET
TOEE
SO
A00000W
TT
NO
NST00000T
TOC
ESSATO
TOTA
RO
OT
P0PE
TE
TW
00T
00-
EWTO
TLSoPO
ET
EO
TIG
WO
OPE
ON
N000N
N000T
DO
TE
RPRO
P00550W
000000
AG000500
TO
rGO
ON
TOCS*
TOTERO
STRAN
EO
NT
EN
ER
E05000
AGO00000k
Mo
AE
LS
S&
0000AT
OT
TE
ON
EAT
0000500
5T€A
TTNEW
ORA
00J0
00
00
T-5000’
00
50
00
05
00
0EO
ATO
pA
N’
SOTR
STEGTO
RR
000050000
000
500000000
SOC000S
O0A
NT
C005.000
STEA
TOFETO
OTT
TT
NN
RT
VTTO
OEESA
WT
SOS
0000NW
OO
LS
000E0000
SOParN
NC
0IT
OftG
SWO
SOM
O0
00
00
50
00
OL
SST0000T
ET
TOO
00
00
00
0001500
000500000*000
0000
00
RO
OT
000STO
JAA
W0
00
00
05
00
0oy
oo
oro
To
xT
.oLAW
0E
SS
GA
TE
0ThW
000TOO
00
00
’T
I0000S-O5
005ETTTN
OW
RA
W000T
EN
TT.EATA
OTE001TO
WO
yE
75
TO
o00
StW
.O
W00000
505005STO
OSO
W0000
TGV
LETOOTT
000TA
TN
TV
000
no
ER
00aE
OL
SE
ELD
OO
SE
ER
ThO
5000P
GA
AW
T0000001
00000
0500
0W
£0
,L
O00S
7RA
000LSTTWS
PET50000
00000
00OEOW
SAGEANT
TOTA
TEOTE
RA
ESLEO
TAITEL
SO00500
ESSCTTA
TT000OCT
OTA
G0TN
0000rOA
TTWE
050
ALLEETN
EW
ooR
EL
ET
TE
05O
TO
WT
WT
0000ET
000r00050
ELAS15
5500LETO
TETTIOOTO0000
555000015
ST
EO
TA
5000000LEA
AL
LO
T000T
SO
T50
TLA5ST
SATE
OTTOO
RSECEL
000ETEO
OTTO
ALPN
EWTELTG
TTO
00
00
0CRA
WV
SEQ
TM
OT
OR
STO
TER!00
EE
NO
OT
ET
WrG
OftA
TTEAT
050005500000000
000EOTSO
TELOS
OT
RARTO
STAG
05T
E000A
SOAR
SOP
000000
OP
ORETTO
TTErNE
oS
EPE
TT
LO
501
OT
WT
EO
TR
TT
OT
S000R
T000000
SOC
OEOREENNOPTS
OSTO
STSO
TTPEA
WSTU
RAG
S000A
WA
NL
EE
G.0
R000T
R0000T
EW
ELW
050050
0000ARTOCCAGALSOLT
000
RE
RST
ON
LLEST
NE
ACASTANTOTO
VSW
LM
PEE
E0000
ESTAWLT
NSS
AN
TE
TE
SUA
SOS
TEATRA
TOPE
RETPRPTJO
STATTE
TOV
A500TTW
PRTTTS
ON
EL
PTI0000000A
GPO
AT
0000TO
ETAO
EO
TR
I00000EO
OST
ME
MEITO
TTOR)
AO
LSO
PSTT
TE
LALSPG
ATA
EES00015000000
ATETLELET)
ML
MO
ETOET
ERGREG
ETAE
TOO
CT
005
50
00
OTTE
TW
ET
OL
WC
TE
OE
L00000
0000000000LO
T)PG
EOTS)
SAN
ESO
TNO
TETEE)TO
TTO
AREP
05
00
0O
RLISO
SATET
OLTO
ALTO
SMO
T0
P00000000
00L
LT
0050000TSA
GSO
GEA
ST00
OSPEA
TNA
NEN
A000
0000000ATE
POLEST55000W
TTETTAG
LA000R
TE
PTT
T)FT
hflEEN
LSO
EL005T005
WA
OL
)TSA
0001)TSL
ATOPSELL
SOLTL000STO
)OEA
VTA
PTITTT0000
REMLO
TCATO
LCRTTETTTTONE
SOSTO
TEEOS
OTTO
ETETSO
TTOROT
ASTO
ATA
OS
LTSSTWANT
0000500LA
05005000)0E
A000
EAT
A00050000L
LT
ASO
TN
O)T
TOW
RO
TEAA
TLEO
055000*SAG
SOTETTA
RET505
LSELW
ATTO
GSO
SOESO
000N
RT
TA
)0000SA
00000TOE
10
00
0PT
SOE
LO
ET
WT
TT
)EE
TOE
00000TO
GT
NE
5005
ATT00100LT
ROEETTC
E)OA
E)TSTTO
T0)05000*
APE
ATTA
)NO
005OTTO
TAb
STOP
SOEAOW
LTAROE
ROTEV
ETLAG
LO
WPSST
SO00000)050
000O
AA
GLN
STETTTEGSA
PSO
OTTO
ROOT000000
LT0
)00
AMA
WE
LAST00000S
TO
00000AE
500
OLEW
NO
ROT000050)
LWL)N
SOELTTtC
ELOTTIN
G50
00
00
00
00
)00
0SO
NIS
NE
TNAT
NA
T000
LTWT
L)E
ET
5000TA
TEE)G
TOTA
TEO0
EA
TSE
50
00
00
TAT)ER
AM
AE
LOS100500
SON
ELAO
NE
0)0
TS
1LT
004LSET
OT
UT
ETOE
AASA)ON
EWT
SOA
OL
R00000
0)000
SOO
STAO
TMTA)
ASE
SOO
IEE
T000
TOTE
000500
00S0000T
ER
T0
0A
AE
OS)O
STT
ESO
E00000TLO
0500P050010K
5000015-T
OT
SAT
00S
OL
OS
0010
05000000
00A
000EC
RO
TOPSA
0000)TO
TE
T050)O
ON
I1TO
PA)0L
SON
TETTAO
LTA
ALTN
EEOEN
TSE
500S
OS
O0000
5000000
TOGP
0)0TL
LOT
500E00)ER
MREF
A0000
00000T000A
GG
ST
OSO
NT
0000TO
VEN
SON
NETS
0A
000STESLS00
SOO
TT
OSSA
RETA
GI0005000ST
OW
51
SOL
0000NIT
GA
lAA
LL
TO
TE
00000E
N0
55
00
00
000
NM
LAO
TST
TOO
TSR
5000
TO50000000
TNA
)SNETTO
EL)SO0A
00N
ITA
E000
ATEA
USW
OT
000T05000
050
0005*0
NE
tC
00
S0
0TNT
TE
NE
NE
EL
)S000000)0W
NATON
EO
EO
OS
T000A
ATETLSA
NN
TNN
LSOO
IETOIA
000
TO
TE
AALAEO
TOLTLO
T0
050*0Th
PTAE
OS
0000A
NW
0000
NO
NE
I000ES
000TPE
RN
EA
TT
O0550
500P
00000
OT
TO
TOETCA
TTTOTTW
ATAN
OSO
AO
TSEN
EA
TT
050000TO
EO
EL
0010T00001
TOGSTITW
OTO
ELS0000050
OTTO
SAG
EORATE
050*0000
MT
00000000TO
7000050
5500007SE
SLA
GO
))LAE
5STO
WO
REO
AO
GW
0500ET
O)000W
0000000
00
00
SOO
NRET
OA
ETTEOO
A000T
SOO
TSO
AM
EO
L000
ESSTEAT
T100)T
1OTO
T0050000
ErG5A
ISAESA
)N
WN
EL
ENO
SOLO
TEAR
OR
S0000000000)0
)00
05
50
000AW
TT
GT
O)E
WT
OT
)RO
TOR
TO
S000AL
OO
SNATO
50005570N
OW
E000L
OC
SOT
SOT
E0000E
EE
S010TSL
005TL
OTEA
00000
SA
RA
TITESOR
OSA
SOT
NTO
LTAA
GLE5A
)E
ON
STSAO
IWEAL
5000
LR
LE
AES
00010
LATTETROT
OTTO
TEER
E000000NNOT
STO
LA
G05000T
000E050
OT
UT
O0
OSO
RA
TMEO
TMET0)W
)M
ElA
OS
00N
OEPO
TOO
TEOT
00
500550100
00050
TTTE005
T000AM
AT
MO
TE
00000000005
050A
TAW
OTO
E00
000050000
P05500
00
5OTIS
MET
05500000005
50A
0LSME
TE
AA
TA
OL
PUTIGS
OT
STE
RE
OSOLOS
OL
LO
E00050
NA
TO
EST
EE
STE
SOE
SEA
TER0
SE5000T
IAO
E0
MO
TIATN
RUTA
AG
OA
G0000L
SNAG*0000)010
00SO
AN
N0000
TOA
SOW
PE100
OR
0000)0
050
RTET
0000R
0000A
TT
OEOLTNRTCA
OTT5000C
RO
P500A
TO
PEIT
O0
0000050100
ROE700500
TiF000N
O5000T
TO
TPE
TSO
O00005
5000550030
00
5O
ATTA
PETOR
SOO
WO
GR
ANO
NA
000RRO
EA
00500ETGTA
OA
TER
TROTU
EAA
EG)A
AA
TTN
E0
00
0E
R000N
NT
SAEETSG
TTO
TG
ON
GS
TW
OROE
FAG
ORSTONE
0000700N
EShO
OT
S000TO
EG
WE
SORERO
PETOT
OTELNETOGS
TE
000TE
LL
SOT
000EO
LT
ON
AE
LT
ST
SNELO
OTT
TS
NA
AO
0L000
OG
OTT
OR
OJTT0000TT
OPTISO
ETTON
EE
070SA
SOS0000000
AT
AN
GLO
05
005TE
SAG
OE
OO
TA
TAGR
ISOO
TTO00
500015
NE
T000
0000A
0000TN
PE
OT
IOTOT
ANOSETRE
000000N
EN
ET
LT
OT
05
0SN
OT
ALOEOROTLO
OS
NA
TOA
NRA
TSOTEA
GTRO
TOETO
NE
OREE
IOS
SE
OT
00000000500050
*00)0
00
00000S
OT
000000WIO
GE
TOT
OO
005T
ON
OE
T00000A
TL
OPEP
TIO
TO
TE
OA
RA
OO
TN
E550770
*00
E000AN
ETO
OL
SO00000T
TPE
0000PE000
000O
OA
00
00
00
OPTE1SE
SETASO
ETOTR
EEFON
OE
S000E
LR
NE
SLSPO
OST
05
00
00
50
00
00
005005000000
TOTT
IEE
E000T
PE
01W
ON
STAT
NE
OT
A)G
PEO
RM
OO
NSO
SO
S000T
ITO
RSTLT0000005
TOA
OA
SOE
STSO
R)E
OW
00500ETA
050000RO
50000OG
WO
S)T00000)
000000)0
000000050000W
AGEA
00
00
TOTE
0N
Sk
SORT000500
5050001000
0000ELO
SINO
SOPS
000TO
EL
NSA
TROA
CAG
OI
ETASA
ND
FaT
TIE
R000ITT)A
TTTAE
00005050
ROT000150
AE
0055005OE
OELTEE
00570000
TWO
AA
SO)0055L
EO
LN
00LO
AM
ON
TOEO
NE
T000)O
ET
0RO
)0
0E
GL
ILAW
PW
OT
OT
0050SAG
GFO
CO
STO
E00
OW
NER
500E
OG
OT
OR
0OG
PW
500OT
*OT
)N
EW
LEA000TN
N•
00CA
OL
ST
AL
TA
AT
O0000
Ts0
O&
000
OW
NN
RTE0
00
10
00
ST
0AG
SO
RLOT
5550000
O’N
E000000
00000
*0055
TO
rTos
000
000
00
00
000050010000
00000
0GAG
NO
NE
OW
OSA
LOO
TOT
OSLOE
OL
ToT
OL
E00
00
*0
00
ITN
EO
NA
ON
01ST0000005
00005005
00O
L5500005T
00
ST00005
WEST
0000500TE
ES0
00
00
00
00
00
00
00
0O
WSO
S‘SO
NST
EW
ET
NO
EL00000?
05
00000000500550
00
0000
AE
5o
TE
)EA
.70
00
00
GALO
OT
OW
00
00
70
)00
00
50
0TOT
0*000
)ON
OW
SPAE0LO
WI
OTTO
SSOO
TO
PE
SS
OO
00
0O
WO
TO
ON
RO
Th
OR
0’0
oos
ro
tar
SO5000T
OO
T050
05
05
000
SO
_50000
00000*NOT
00005000
OTTOS
00
50
SOT
WA
GW
TO
TT
TEAl
50000‘0
0S
AA
T0000
sftflEA
0010000000
EAST
0000
SOE
AO
EQ
EO
OJ
01E
TG
O)O
TO
TO
NE
OT
OO
TO
GA
O0
00
05
0SO
SAT
ET
0500
15
00
50
05
00
so00-ISA
OT
TO
?N
TN
LO
TO
)E00)T
OT
LSO
L0
NES500TO
E0
50
50
0005055
000P5000000
500000000W
0000000
000000
SMA
N502
05000501
P00150WW
OO
000’000O
OR
MIR
000150000
OT
EA
EA
ER
550000T
UL
TSAOT
00000
00
0000000000
AGFO
TM
OT
AN
000G
REVO
O00
MO
N‘ET
PE
ON
0000000
SO
C0
00
0T
NW
ST
,)TAO
05
00
0flR
SS
OR
000005
00
00
50
00
00
0000000
-
OW
00000
00
0000
lOAGO
PEG
ME
TW
EO
AG
OSO
NY
ET
00500M
L00
WA
NE
00
WO
MA
N‘W
CA
NO
NTA
,TT00000A
TA
N?
OS
OT
OT
00500T
000R*0
NE
RT
E000
ETSSTA
TOE
0000
WA
5050
STT
EO
EE
T00
SOO
EE
SO11000
TASCOT
-
ANTW
S50000T
SA
L0
00
00
PESON
EPETRO
WA
TE000
TOT570SO
AG
OM
WA
N00050
Os?
ESTATE
500
00
00
00
00
00
1000*00000000
GA
MO
SE
NI0
0N
05
00
00
55
00
50
00
50005050000000.0
00
O-o
—o
o00
00
01
ML
R0
0N
LO
00
0P
50
±00
SR
EL
SA
O00
5000TO
EN
0C
EL
OE
C*0
05
0T
50sA
TO‘O
OT
WA
0000
00
00
00
05
00
00
05
00
00
00555
TM
05000000
OW
E0000
0C
EO
00
00
00
00
5PR
oAR
00
0005
000050000
RO
SA
PE
OS
OI0
000
j
2M
P!0
E1
0N
LE
GE
ND
GE
NE
RA
LD
EM
OL
ITIO
NN
OT
ES
EO
ST
NE
TO
AS
TIT
ES
ASLETECTLT
AT-SO
T0005
TE
TL
EC
)O
LSA
5TO
OEO
AT
OM
OIL
IISV
LA
I0010000E
LO
TSO
LO
OA
0010TE
T
[N
0050E
00
OT
TO
0
WA
O
SO
r4E->i0050
TT
SE
SOM
OO
SA-SEE
505PME
TT
ES
RT
SA
RES
TOES
EE
S000
09
00107)700STO
LOTU
SOL
TO
E000
STEELT
T0
00
0T
OS
SE
EE
0OA
E
Lc:A
LJ
RL
00
0T
TT
T
TY
PICA
LM
OU
NT
ING
HE
IGH
TS
(AN
SI)A
117.1
T000A
PARSE
LEITTOE
LL
ST
EO
TS
OA
EOR
STEB
EOTE
00)0WSOELR
ETEPENEET
OOLLEBA
SISN
EE
AT
rm
D
PE
RK
INS
—
EA
STM
AN
ROBE
WO
ETO
OEL
SOT
OTTI
EI
W00N
ES
OE
ROTORA
SSETEROA
TAPER
ASO
5IPO
ET
T055L
TA
5505S
P5005)
COLO
RT
SS
AE
ET
OSPEG
NETW
OSO
PENEET
1-H
Hi
t:
TO00N02
BA
sSO
..5005059
OS
S&
A*O
Sg,
SN
EN
TA
SL
EE
RS
005
DO
G,
EN
’
65
00
SN
NR
N5
5
R..d
TO
.EE
T.
FAR
ASO
D.
SNA
DN
TO50000
OT
00
1S
OT
ST
LO
-00
55
SU
SS
LT
’AS
TrA
TA
ES
PE
DM
A’O
OE
OS
ELLT
ST
LT
NA
TO
E0
A0
OS
TA
TO
SE
EL
TE
AR
TS
RO
TR
WA
OO
000
0S
LG
ML
SA
SO
001010000A
0E
00
OU
jr
__
-F--—
_________________
J0
Pon
usR
idgeS
choo
li
:I
-T0
1A
lterationsand
0000000-
Additions
2TH
0TAR
AB
OA
RS
Nosw
o50,C
T00550
PRO
JEC
TT
oT
2000
NO
TE
S,A
BB
RE
VIA
TIO
NS,
LE
GE
ND
S
A-O
O1
000TSOA
EED
esigE
2/2
02
015
L
Page 132, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
n
z4
zI-—w
wa
‘1K
K!ti
1Kftnft
K!qfl:K
00-c0co-p0)
CO
0c
CflitCry
U)z
U--J-J
;ujK>
00r
z0
0E
Nd009099L005ft)Mqo,fnou,o3sThQeC9iN-w1vMHoNo9ozznvoo1IIANth0
L1
Page 133, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
1
CEVIT LOCAL72O5O_NORLK-MS_ARCH_REVfl2Ol7JUobb.M2i512018 6:4:O5 PM
r:i I
.
m
(1)—
U)
z
-I•1Ir00
0
-
-s-riI00
XQCDZ
5,Cn
zCL
D)p
Cl)0
CC
L ]
Page 134, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
F 1
C:MT L0C4U72050j404WAL0-MS_ARCH_REMUOI?flIobaIboM5Q016 64609 PM
—
0 0
0
>H1’)
-,
r00
C
>>-Ua aa CD
CC azcCPD—
Wa
&U)0
CC
4 *
1 iC
0
m
ru)
z
p
Page 135, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
F-
C:REVIT LOCAU72O5O_NORWALK-MS_ARCH_REVI12OI7_kIobalbo vt2Jt2O1 8:4a:15 PM
L -J
Page 136, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
-T
C R6V1T L0CAU72050_NORW6UGM5_ARCH_6EV1T2017_k 106a160 46215)2018 64618 PM
H
r00
In
a
4j
--
\
S
-
- —0
90
0m
4 mr00
o_oact
O ‘
D 0- mD—
Co
o acflo 0
00
69 8
I
-Um
z
L J
Page 137, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
1
C[EVlTCOCALl7205O_NOWALX-MS_ARCH_REViT20t7k Io5Ibo ,vt2(5(2018 64634 PM
I
I
L
E- m
• I00
>>-U 2
226
2 DOz
2 CD5CD
Q0)0
00
6
2 22 12 6
22 26
m
-I ZU)
z
JH LZtF
Page 138, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
C vtEVIT LocALt72a5a_NORWALK-MS_ARCH_REVIT2O17_kIobIbo vt215t2018 6.4638 PM
z
.4•1IF.00
‘ii
I00
.uP1
cn—
z
F
30
0QCDD
: 5Ci P
z
CDCD
0
00
P
6 4 I 4 4—
P P P
111
1
-J
Page 139, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
C39E51T LOCAUY2S5O_NORWA3K-M5ARCH_REVll2Ol7jdobalbo.M21512018 6:46:39 PM
aoaCDD
C cit0
2
Co
£ oCl)0
00
1
C
0
C
it >cDitm O
-z9 0
mr00
P1 IP !! P&
I :iit
&oit 89
its
m
3399 X COpz
Page 140, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
n 1
L
c
-J
I
cooovir LOCAL72060_NORWALX-MSfRCH_REM12017_kIobaIba vt215d2016 6:46:40 PM
VV
0>cDo
m 0
9 0mr00
>>-nao
a aCDD‘ C
DQz Do (flO
(0
C
00
S *
-
6 6
0 0
m
32axW
z
Page 141, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
F
eelsm
aiD
Dane..
5..s
.et’.q
CD
nn..d
n,
P.C
DIG
,—
DiG
,tea.
12C
......5
C12rs
isa
5*1
21
CC
Ponus
Ridge
SchoolA
lterationsand
Additions
21H
untersL
ane,N
erwalt
CT
08850
PRO
JEC
TN
e72060
SEC
ON
DFL
OO
RA
RE
A6
A-1
09
Sc/inm
ateD
esgn
2(2
/201
8
JF
-PE
RK
INS
—
EA
STM
AN
I-...
.
nfl
flHr.
L
O02_S
EC
ON
DF
LO
OR
-A
RE
A6
15
.10
I
r
Page 142, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
1
fiFp
aa
-CC
0)t0
C0Qoc
CflitUIat
IL00
-J
E0Z9uJ<
0
r
0E
z
a-I-I
Ill‘I
0I’
0-
99L09191ftinIIA3HUID
Page 143, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
rD
ATE
SS
UE
CT
5tDA
DT
UaW
Dfl*..
5..ss.y
Isa
E5
Iffi..dI
P.C
S3U
TtT
StC
5T
AQ
5U
fl021
38
Ponus
Ridge
SchoolA
lterationsand
Additions
21H
Eeters
Leee,
Norw
elk.C
T06850
PRO
JEC
TN
o72050
EN
LA
RG
ED
PLA
NS
A-1
30
Schem
ateD
esgn
2/2
/20
18
OF
IRS
TF
LO
OR
-N
UR
SE
&G
UID
AN
CE
2,
..
PE
RK
INS
—
EA
STM
AN
L
cF
IRS
TF
LO
OR
-A
DM
INIS
TR
AT
ION
IS:
NY
I
Page 144, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
———VdSP9V99tOIlZ
oqIqoI,IC.LIt,dHDVSLh17VMONOO1VDO91IA3-3
L--iz
zI-,—u,
Ua.
h:
-9
00-z0
-U)C0
CfliD0-0
U)z
0LuCD
LU0
4,.14,-?
--
--S•&-
-.
‘r’
e
S’t:5/,’
Ci’)t
zl1IUI
-I-I
x0zz0
00-III.I..
q
‘j,S.;,
•A’
0/
0
•.y•,,
“S
-5•
5/i’
,_•y;b--’
/4,‘4,4
5’
--‘S
/
/5
‘‘-5-,-•S
—,----
-A’:
S-5-5-
-‘6’
/
S’/’**.
-5-
“A’
/-N--••%_)
‘A
H
-5*
1
-5-
--5I-,
-I_—r--’’-
--
S••
-
—I
/4,-L
—
S/i
IIII
L
Page 145, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
F-
-f•100
0
0m
C,Ienen
00
-f•I’r00
0
0IIIC,enen
00
CEVIT LoCAL/72o5o_NoRWALR-MS_ARCH_REVIT20l7_kIobIbo.M2/5/2018 64650 PM
•1Ien-f11r00
mC,enen
00
—
8
</ N)
ISS
8 2
8 0 10
0 o: 0
0 5 5 0
1V
0
2
3
C0
0
zI>2
m0-U
zCD
2 >>U 2
OCD 2S 2
S
- CI2D—•2
DE ciO)
022 0
0
-Um
z T-
L -J
Page 146, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
tL
%%
_%
_
8050
Li
-2513S
F
<_3
Ll
[—] 1
DO
SEA
E
NOW0000110
JI
[r- I
IU
EWSTH
REFR
031
EXISTW
ALL
52
-0
0t
213SE
PE
RK
INS
—
EA
STM
AN
CO
lAS
SORSU
N
001ER
UX
5110
II
•EU
HkC
VC
USEES
S--i
SJVdS
K3
030
All
StN
.e0
eU
002138
4o
W
LOWBOOK
SHELV
ES
[üL
L-J—
-H8000
BOO
SUHXLLXS
Ponus
Ridge
SchoolA
lterationsand
Additions
21H
ostelsC
ane,N
eowalk.
CT
06850
1F
IRS
TF
LO
OR
-L
EA
RN
ING
CO
MM
ON
S
[E:JL
L:
J.if
-oso
nses
PRO
JEC
TN
o72050
EN
LA
RG
ED
PLA
NS
A-1
33
Schem
atoD
esign
2/2
/201
8
Page 147, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
z
mD-ti
zci,
\ // \\ /y
/j \\ 7/ \\
\i \J
: //[\ / 7j_
SPLAV
ç4\
//\\ /\\
\\ /y
/ \\
CREVIT LOCAL\72O5O_NORWALK-MS_ARCH_REVIT2O17_kIobboM2i5I2O18647D1 PM
g
:9
r
/j\\ //\
Qi
\// \\I/
,-:, —-
7>
\ /4 .4
//\\
\/7 iL:y//\\ f>\\
]
]
]
]
S7j
tI/
\/? //
4) \ 4j.
//\ /\\
0
z;/,
-
E..
I
I QCD D
0C1)
CD0CD
O)0
aC
0m
z
L -J
Page 148, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
F
TT
PT
7-
IL
000000A
MA
TA
LE
000
FF
F/_
_
POFN
OU
CPOO
OLV
ENO
FR
F7r ____
/:/4I
jL
$1
91Ii
i1lii: II
II
PH
EN
OU
CP
FL
UF
AF
ER
AT
Elev
ation
12
UFO
OFLID
OO
FR
OO
FO
VER
HA
NG
AL
VA
NU
MA
UW
OL
FAA
LNFO
AFN
FFFTO
MW
TVA
LU
MIM
JMC
FOT
GFM
AL
L
TT
CO
AT
OSIFE
META
LFO
VO
L
r
EDE
levatio
n13
TFO
RM
FOM
ET
AL
OO
—jE
JAF
FF
Ew
AL
L
__
—
0W
AF
OF
OF
AF
FA
LF
AN
EL
EDE
levatio
n10
EDE
levatio
n11
T
t_LE
levatio
n9
PE
RK
INS
—E
AST
MA
N
rH
C>0•0>b
0
I
DA
e*
.eS
e,e
.yle
ga
(eg
A’e
.de9,
P.R
&eF
dS
ILL
ILy
OE
MFA
TSI
OM
AN
WI
MA
ALO
OF
EN
[F
OF
OE
S
FAN
‘
WC
____
-
-
ED:a
tboh1
4ED
Elev
ation
3
TFFFA
EOM
ETALM
AM
FGO
VE
AA
LUM
ALA
FOEMO
METAL
LOV
OG
¶3
/=
M
ED:a
tb0I1
2
AW
MSU
MO
UF
FE
I005005
.--.
at
LL
FA
WF
TA
Iesk
LFEFTO
RMA
FOF
TAINTj
-
Ponus
Ridge
SchoolA
lterationsand
Additions
21H
unleosL
aneN
eowalk,
CT
06850
,•
-
FO
OM
EJM
€?A
LC
OflC
\
r
I/
tti:
PRO
JEC
TN
o72050
AM
LS
TIF
000WE
FR
F
EDE
levatio
nI
TOD
RO
OL
ER
0
‘L
TE
EX
TE
RIO
RE
LE
VA
TIO
NS
A-2
01
SchemeSn
Design
2/2
/20
18
J
Page 149, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
T
no
ons
SN
OI±
VA
37dO
Id±
X3
O9O
LO
NiD
3rod
0990010
3110
OO
Nan
nls
3e;U
OH
[0
SUO
!1ip
pVPU
BSU
O14B
JB1I
VIO
QIP
Se6
pi
Sfl
UO
d
BS
liIL
09001d
cL
03901110
SN
nn
l10
lOIS
StI
llV
I&
00
]qID
ISV
Ifl0
99
I.
UO
!lC
AaI]C
j
91.U
o!A
aIE
V0
00
03
03
00
10
NO 0 I> 0
103S
91.U
O!A
aI0
s=
0n
00
SO
p...&
5S53
v£
ss5
.O.9
Oc
5•39
039.
0
61.
UO
fleA
aI]
ED
l50
0J3
dU
IS
nfll
OT
flhln
nfl
Mnfl
bO
1E
J1010300150=
1355010305
1S
0d
n0
9”
03
35
50
13100
SI1
00
1ld
OJI
SIS
5S
ilfl
SS
ltr.
VS
1W
0333S
01S
flfl
UIf
lfl1
Y\
.f_w
:,]
EL
00
00
331
150
05
05
53J
0001
NV
VII
SV
3—
SN
I)Id
3d
[ ‘I
.3.1
=01
OU
O!;
cA
a3
L
SS
ll°
UO
!A
O]
I03d
VU
O!W
AO
I]
0S
IS
l51
S3
90
10
15
fl5
0S
10
flC
.J
LJ
Page 150, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
DA
TE
JE
II
SE
CT
ION
AT
DIN
NIN
GH
AL
L,
NE
WC
ON
ST
RU
CT
ION
0H
PE
RK
INS
—E
AST
MA
N
B’A
*..
IY.A
CS
q&
P.C
•CdS
CS
YY
SV
Fi..M
C.
33
53S
fC
S5A
Ufl3
213
8
-flO
CSN
GkV
.DA
N,€
•ISJJC
Y
CrEYrG
YP
___
___-
54/4
313
333.
SG
’lSM
tEk
aY
cAsrsrY
n€
su
CS
GY
P1510
Th.
SE
CT
ION
AT
ME
TA
LP
AN
EL
,T
YP
SE
CT
ION
AT
ME
TA
LP
AN
EL
,T
YP
SE
CT
ION
AT
BR
ICK
,T
YP
.S
EC
TIO
NA
TB
RIC
K,
TY
P.
Ponus
Ridge
SchoolA
lterationsand
Additions
21HYntEGY
LanE,N
osv&k.
CT
O6BSrD
PRO
JEC
TN
O72050
WA
LLSE
CT
ION
S
SC
A..E
1P
M
A-3
50
SchematA
Deogn
2/2
/20
18
-J
Page 151, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
F
>071
---
SE
CT
ION
AT
MA
TH
LA
B,
TY
P.
PE
RK
INS
—E
AST
MA
N
CIW
CF
000W
AL
K
At&
,dS
oO
ffy
13
US
Co
!og
o0002
128
Ponus
Ridge
School
Alterations
andA
dditions
21H
0o
llSL
flS.
Norw
olk,C
TX
S5O
PRO
JEC
TN
o72250
WA
LLS
EC
TIO
NS
SC
AL
EfltS
A-351
Schernete
Des:gn
21222018
-A
LEIOG
PUS
LU
L
flO—
J_
2L
3puc
-
rop
20
oC
o0
-
iirP
qi.
U0
SIG
OIL
SU
J02
0
1N
SE
CT
ION
AT
MA
TH
LA
B,
TY
P.
PIU
-
J
Page 152, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
EX
HIB
ITA
-A
LT
ER
AT
ION
SM
AT
RIX
Proposed
Scope
ofA
lterationsin
Existing
Building
11
o-ci
-IC%l
C)
I)
D.
Net
Room
Room
Nam
eA
rea
1STLO
OR
101AUDITORIUM
5,233SF
38
lolASTAGE
1,514SF3
8biB
AUDITORIUMCORRIDOR
992SF3
1010CORRIDOR
2373SF102
US1401SF
34
58
11102A
STORA
GE
159SF8
1028T
T78SF
102CT
T81SF
102DCO
RRIDO
R459
SF102E
TA
CORRID
DR
1,382SF102F
CO
RR
IDO
R3,461
SF1020
REV
EST.108SF
102HCECO
RRIDO
R1,124SF
102JA
CENTER
789SF
OCR102K
CORRID
OR
1,170SF103
1,185SF3
45
811
103ADEN.STO
RAG
E99SF
1038PR
121SF3
45
811
103CCO
RRIDO
R99SF
104STO
R.
18SF105
TOILET
84SF106
MU
SICTECH1,983SF
34
56
811
bOA
MU
SICSTO
R97SF
107STRING/M
USIC834SF
3108
ART1,091
SFI
108AKILN
168SFI
108CA
RTSTO
R197SF
12
45
6109
OT
/PT740SF
I110
SPEDLIFE
SKILLS662SF
23
45
1111OA
TOILET64SF
2ill
SPED372SF
23
45
ii112
SPEECH159SF
I112A
PASSAGE78SF
11128
SPEECH122SF
1113
WAITING
218SF1
113AGUID.
169SF1
1138UIO.
159SFI
113CU
ID._______________
138SF1
1130R.
61SF1
114W
TING155SF
I114A
S._
__
__
__
__
__
__
_126SF
11148
._
__
__
__
__
__
__
_160SF
1114C
PCH.
159SF1
114DP
SAG
E137SF
1114F
CI
33SFI
114GST
R.37SF
1115
SE185SF
I115A
RSE
OFC
139SF1
8115B
RSESTOR.
99SF1
uSC
RSE
OFC
140SF1
1150TA
REA
268SF1
1155M
RM117SF
11155
STOR.113SF
1115F
RSETOILET
86SF1
116TODIAN
55SF2
116ABOYS
264SF2
1168RLS
317SF2
117NTERVENTIONA
343SF1
8118
SSAG
E171SF
1119
MA
INELEC
RM
212SF2
120FA
CULTY
LOUNGE691
SF1
8
10
‘-
c,IC
)L
ICD
O‘-
‘-
‘-
Net
Room
Room
Nam
eA
rea
12DBELEV.M
ACH
INE
55SF
2120C
TOILET
61SF
18
1200ELEVATOR
53SF121
MEDIA
CENTER
2,813SF
34
56
811
1219PRO
DU
CTION
213SF3
45
811
121CO
FFICE
282SF3
45
811
1210STO
R84SF
122SCI
1,249SFI
8122A
PREP
160SF1
8123
SCI941SF
38
123APR
EP44SF
124SCIENCE
941SF
3124A
PREP
93SF
1249PREP
93SF125
SCIENCE
935SF
38
125APREP
42SF126
TOILET61
SF126A
GIRLS
255SF1268
BOYS259
SF7
TEAM
A755SF
ATEAM
A749SF
TEAMA
751SFTEAM
A710SF
TEAMA
761SF8
TOR.I EQUIPMENT
316SF
EAMA
757SFC(PK
-2)864SF
34
511
AOILET
59SF4
511
34CIEN
CE1,041
SF3
45
11A
EP113SF
45
iiB/C
232SF3
45
iiENCE
1044SF3
45
11NG
HALL4,670
SF1
CH/SERV
ERY1,580SF
140
N. STORA
GE
192SF
41K-S
PEOFC
132SF
38
42STOOIAL
317SF
43C
SBETCHGEAR
355SF
43AASSAGE
47SF
438LET
106SF43C
PETOILET
149SF430
LET39SF
43EY’S
LOCKERRM
666SF
34
58
1143F
SSAG
E48SF
44Y
SPEO
FC115SF
34
58
1145
TORAGE335
SF47/148
EERINGTECH
LAB2,060
SFI
8LTH
CR410SF
18
LOCKERRM
880SF
34
58
11W
APEO
FC156SF
34
58
11B
TOT
54SF/152
ASIUM5,425
SF3
8PE
TORAGE367SF
45
6NG
280SFBA
ErARLtL
427SF
BOXES
89SFSOC
GE373SF
0FRM
252SF606
PRIN132
SF60F
RIN154SF
160G
OILET66SF
1H
TOR107SF
160J
WO
RKRO
OM
343SF
1I
CC
0.
‘-
c’1C
)U
3CD
1-
0)
.-
-
NC)
C)W
WW
a)W
G)
a)0
.4-
.I
44
‘4
‘l
+.I
4-’
4-’
4-’
4A
000
00
00
00
000
room
room
nam
e,re
az
zz
zz
zz
zz
z
160LSTU
DEN
TREC
OR
OS
236SF1
8M
ECH-l
BOILER
1,199SF
MECH
-2VAULT
143SFM
ECH-3
ELECRM
SISF
ST-i-ISTA
IRI-1197SF
ST-2-1STA
IR2-1208SF
ST-3-1STA
IR3-1201SF
EX_2N
0FLOOR
VEN
TION
C260SF
34
58
IIA
DIANSSSF
B264SF
CTO
317SFD
LAN
G719SF
4Ii
OLA
NG
748SF4
11O
LAN
G748SF
411
OLA
NG
748SF4
11C
748SF4
11C
748SF4
11P
536SF4
11A
RV
ENTIO
NB
536SF4
11B
P368SF
24
11B
588SF4
11A
558SF4
II11B
TEAM
B695SF
24
5Il
TEAM
B748SF
411
ThAM
B748SF
411
TEAM
B748SF
411
TEAM
B744SF
411
CAM
PUSPRIN
CIPAL
285SF4
11A
OLET
57SFC
UL
TY
WR
M168SF
411
ALET
61SFSAM
730SF2
411
EAM760SF
24
11EAM
760SF2
411
21TEAM
768SF2
411
LEV-01ELEVATOR
53SF
2T-1-2
STAIR1-2
203SF
2[-2-2
STAIR
2-2208
SF
Proposed
Scope
ofA
lterationsin
Existing
Building
Proposed
Scope
ofA
lterationsin
Existing
Building
GE
NE
RA
LN
OT
ES
1)Allconcealed
splineceiling
shallberem
ovedand
replacedwith
newgrid
andacousticaltile
ceiUng.
2)Ifan
areaw
herea
ceilingis
beingrem
ovedthen
thelighting
willalsobe
removed
andreplaced
intothe
newceiling.
t-203[fA
IR3-2
208SF
120AEN
. STORA
GE
74SF2
SCH
EMA
TICD
ESIG
NPA
CK
AG
EP
onusR
idgeS
choolIN
orwalk,
Connecticut
AL
TE
RA
TIO
NK
EY
NO
TE
SN
OTE
1A
reaofheavy
renovation.Including
replacementofall finishes
andupgrade
toallM
EPsystem
s,new
hardware,
newcasew
ork,new
ceilings,new
lighting.
NO
TE2
Installfireprotection
throughout.
NO
TE3
Provideairconditioning.
Seeapproach
describedin
narrativesfor
A/Csystem
sin
classrooms
andlarger
volumes
spaces.
NO
TE4
Ceilingreplacem
entwith
systemequalto
newacoustical
systems
NO
TE5
Installnew
lighting.Seenarrative
for typicalreplacementlighing
selections.N
ewlighting
shallbe
installedat allareas
where
newceilings
arebeing
installed.
NO
TE6
New
floorfinish.See
narrativefor typicalfloorselections.
)NFRM
2S7SF
NO
TE7
New
casework
NO
TE8
New
doorhardw
are.N
ewsecurity
deadboltinexisting
doorand
frames
NO
TE9
Upgrade
ITdata
drops(SEE
NA
RRATIV
E)
NO
TE10
New
displayscreen
(s)(SEE
NA
RRATIV
E)
NO
TE11
Paintwalls
NO
TE12
New
furnishings(SEE
NA
RRATIV
E)
Sch
ematic
Design
Ph
aseS
tate#
TM
P4O
3R
BT
S
Page 153, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
EX
HIB
ITB
-C
OL
OR
CO
DE
DPLA
NS
HO
WIN
GH
EAV
YA
LT
ER
AT
ION
SA
ND
CE
ILIN
GR
EPL
AC
EM
ENT
SCH
EMA
TICD
ESIG
NPA
CK
AG
EP
onusR
idgeS
choolIN
orwalk,
Connecticut
,i[
ME
DIA
CE
NT
ER
rA
-107
__
C
Sch
ematic
Design
Phase
State
#T
MP
-1O3R
BT
S
Page 154, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School
-
12018-
19
‘Sc:HO
OL
YEA
R
12019-2
0‘SC
HO
OL
YEA
R
12
02
0-2
1‘Sc:H
&O
LY
EAR
NO
TE
S:1)
Construction
durationto
befinalized
onceA
LTERA
TION
Sscope
andphasing
ism
oredefined.
2)SD
Draft
=Friday,
February
2nd
PON
US
PROJECT
SCHED
ULE
-D
RAFT
1-25-182018
12017-1
8!S
nHO
OL
YEA
R
------
:_
__
•_
_
20192
02
012021
I__i
II
It
II
II
II
C..!
IIII
It
II
!_!
EST
’G2W
KS
EST
’G2W
KS
FE
B5-1
2M
AY
Z-21
ES
T’G
2W
KS
SE
P3
-17
PERK
INS
EASTM
AN
NO
RWA
LKPU
BLIC
SCH
OO
LS42
Page 155, 3827 Commissioning Services for the Addition and Renovations Ponus Ridge Middle School