;.4-.. ETectniidlp:lVléciianïcaf aWater1Vreters= `ZS B`unyat Street: Eágle Faim q40 09 $- mites e OPERATINGMANi7AL FOR: Ptïsd(07Y340311849= Fr.. (07).3403; 1898; 20th. June:199T. EDMONSTONE STREET RISING SEWER MAIN CATHODIC PROTECTION SYSTEM CLIENT: BRISBANE: WATER SEWERAGE UTILITIES SERVICES Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual Q-Pulse Id TMS1259 Active 21/07/2015 Page 1 of 24

Cathodic Protection System - Sewer Rising Main - OM Manual

Embed Size (px)

Citation preview

;.4-.. ETectniidlp:lVléciianïcaf aWater1Vreters=

`ZS B`unyat Street: Eágle Faim q40 09 $-

mites

e

OPERATINGMANi7AL FOR:

Ptïsd(07Y340311849= Fr.. (07).3403; 1898;

20th. June:199T.

EDMONSTONE STREET RISING SEWER MAIN

CATHODIC PROTECTION SYSTEM

CLIENT:

BRISBANE: WATER SEWERAGE UTILITIES SERVICES

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 1 of 24

(T.0) Tntroduction:. -

(2:0) Corrosion andCathòdiaPïrotectiórr= (3:0) Máiñs-Details: (4:0) CathodiePiotectión (4:1) , Tÿpec;ofSÿstém- (4:2) Réctifiéì:' (43) -. Cátliödés ... (4.4) -sÁñódés- (4'.5) Test Points, (+-6): Associated Drawings (4: Associated .Standards

Government: Regulations PeförmedTesting. Conclüsión Maintenance:

DRAWINGS

48676725- AA1C0021E Standard Rectifier Wiring:Diagram

(No Number) Monthly Maintenance Program.

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 2 of 24

Steel when_inimeised'_ or covered. in; water -hasp a*.tend:éiïcyto: corrode (ór rust). as, the Oxidized.- .

''foimyrs =móre: stabléäthai tl e: metal

Because. of thïs, precaution- must be takes to stoFFor ruin mile: .the° corrosion- reaction-. to air acceptable lévitconsistent.witli the:-dés g-. lifét of the sfruttare:. This is- normally- achieved by

-_theuse.ofprotectivecoating iwwlücli .control_ the corrosion -reáctiönby isolatingthe :steelfrom° itssurroundii en .'' e-

However ,.itis -not racticâlxt&achieve a perfect coatingandcoatingdamage.will: always occur with tune: Because:oftnis,. Corrosion-may occur atimperfectionsn the.:paintcoating,_ causing : further deteribi=àtton; iítthe_ coating as well as loss of metal..

this;.. the. coating defects- must be. rectified: by, perfodïc: maintenance. or an . t oc of protection.used:to prevent:this deterioration: and corrosion_ occurring:: This tionallprotectiön_is achievedby the cathodic_ protection° system:..:

0) - CORROSIONpAND- CATHODIC' PROTECTION;

rrosiorris:an°_elèctrochemical processin thatitis.accompaniëdby a.-flöw:ofeIectrical current..

Corrosion'. occurs :: on: the surface of metals- at: actives areas known: as anodes;. which:: are electrically continuous with less active orpassive areas known as Cathodes. The electric current flows :- fromahe' anodethrough.the:electrolyte to the: cathode _ with .the:ciicuitbeing.completed: by- the electrical. continuity between the: cathode: and anode:_ Ii practice:: anodes-and. cathodes are generally part of the. same: metallic: surface: and: individual anodic; areas -may be: small..

lï applying-cathodic protection and external current is applied to the surface so that the entire surface to beprotected acts as a cathode. This involves the use_ of an- auxiliary anode and when the current flow from this anode is sufficient, no part of the. structure. acts as an anode-.

An external source of direct current such as a transformer rectifier is used in conjunction with an anode consisting.of material with a very slow corrosion rate.

While it is the flow of current which achieves the cathodic protection of the surface it is impractical to measure these currents over individual anodic areas to determine when cathodic protection has been achieved. However, with the flow of cathodic protection current, the structure becomes more negative with respect to the surrounding electrolyte. Because of this, it is possible to state values of metal/electrolyte potential at which corrosion does not occur. This metal/electrolyte potential is generally measured against a standard reference electrode which allows a reproducible potential at which corrosion does not occur to be quoted.

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 3 of 24

Coating:-

Length:

Location:

Dia:600'mnt mildsteelL.

Ta.r Epoxy.'

0.8-1nr

FrontEdinonstone:St Pump.Stir to-cnrVálek.Olney-Sts:

Ctonstruction -, _3667/600 Breakfast Ck Diversion Sewer _ Drawings:

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 4 of 24

CATHODI C°PROTECTION MICAIP:& -

of r Cäthôdic Protection= I'mpresseaC'urrent.:

Rectifier. Speciá132 Volt;, 103amp: direct:currennoutput.enclosed.m stainless. steel has a. 24-0V-supply front the nearby Sandgate -Rd. Sübmersibl Sewerage: Pùmpiñg Station_ S P: 23= _.

Cáthodê:t` Th cathode° point: is- located: in they valve pit adjacent: to the pump statforTfie: cathode point is where the cabling.front the rectifier is attached. to- thmstructureunder. cathodic: protection.

(46)

(4.7)

odes:: Tho ,1500 x; 75inm silicone. iron: anodes were' iñstalled 1.5' meters. in front: ofthegateandthe second .anode 4- meters. in:fr ont :of that,;. fit a:vertical_bed:. Theanodes were firstly packaged with.. cokebreeze.theteby 1improvinganode-- ground resitance:. The anodes areidentiñed.byy a.- markerpost: and:label:

Test Póints:: Test -points are: installed: on: cathodically :- protected. structures; to . _enable; testing-,to. ensure : . full. protection. of: the: mains:- On_these: mains- three test poiñts haves been_ installed: fir- details see dWgl.no.3007/600 Breakfasts Creek: .

Diversion Sewer._

Associated Drawings:: Càthodic :Protection Details - 2714:2137: Cathodic-Protection Test-Point Details - 486/1/22 AA1.T0001E Standard. Rectifier Wiring Diagram - 486/6/25=AA1C0021E Vertical Ground bed Details - 486/6/25=AA1C0024E

Associated Standards: AS 3000 1986 Australia Wiring Rules AS 2832.1 1985 Pipes, Cables, Ducts, Guide to Cathodic Protection,

Part One.

(4.8) Government Regulations: Queensland Electricity Acts and Regulations.

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 5 of 24

(3) Soil Resitancerestiiig-._

(4)- einTentDi-ain-Surver.

.-.:..,?105'CoiatingAnomaly Survey:.

.(6)i - Rectifier Loop-Resistance:.

_ .

Foreign StructurezInterference:Survi.yand_Mitigation...

FinarP_oténtial Survey and:CbinmEssfoningi.

(6.0) CONCLUSION

Full Cathodfc:protection- has been. achieve& on thi section: of. trunk: mains. The: cathodic: protection: system- is registere'd: with the: Electricity Regulator Department of:Minerals and. Energy andlas .approval.to operate:

(7:0) .MAINTENANCE

The cathodic protection system is maintained on a monthly basis after commissioning. These checks involve testing rectifier operation and recording of pipe to soil potentials.

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 6 of 24

BlèctricaL Engiñeering;.Unit (:atliodic P'rotectiòlr.

CP&Mönthly Maintenance Details:.

Required::

u Notify plant: opérátótánd/or. signe entry logs where: necessary:. 2/ Have approp faterkëÿiig..

ertrádésperson;_oneevehicle:. 20 minutes per site..

öcédüre :-

Tdèntifÿ installation:. Z!' Check:sy-stem;för. operation.. 3/ R'ecord:voltmeter..

Record ammeter._ 51 Comments. 6/ Log entry..

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 7 of 24

-20t1Tun1997;.. ElëctricaLEhgiñeerimg;iliiit Cathodic Erotectiòm

CPS =6:Mönthlÿ: Màihtenancer Details':.

Requiredi:

u Notif'y,--ptant:operatoañd/orsign entry logswhere:necessary:. :.<..-

2/. Have appropriáte:keyïngr. 3/ S"et:oftools: (F1'èctricïáns) 4/` Mültiméfé'r_':_ ' S/: DCwclänipmeter.; . ,V40.1T--

4 pgersulphater reférence: cell' and. leads:. ._ eamng;equipment:. aticcover.-lifters:

Labour:

One: tradesperson.elëctrical,. one. laborer; one: vehicle:. Tvvo- hours5per..site:_

Procedure:..

1/ Identifÿ system. 2/ Check system for operation.' 3/ Record voltmeter. 4/ Record. ammeter. 5/ Record "on" potentials for all test points. 6/ Record. "instant off" potentials for all test points. 7/ Record "off" potentials for all test points. 8/ Perform loop resistance and record. 9/ Check and record anode string currents. 10/ Comments. 11/ Log entry.

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 8 of 24

ZQAliTuñe.1997;. Electrice E"ngiñeering Unit: Càthodic P'rote ctiótL

CPS=60-M`onthlÿMàiñtenance: Détails:_

Required:-,

1! Notify plant: operatorandlor= sign entry logs where. necessary: 2J Hàve appropriate:ltéyiñg: 37 Set_oftoo1'sr.. (El'éctriián_ s) 4/ Múltimetez:z 51' DC elámQmeter.. :.

Cöiesulpliate;reference: cell, ánd:leads.. ;--- t - eamng;equipment:. ccoverlifters.

"ectifier_ Tóad:bank:. l'07.PCS2000 Detectión.Equipment:.

,Labour:

. _. One: tradesperson .electrical,_one:laborer; one vehicle. Eight hours per site.

Pìocedure:.

1/ Identify system. 2/ Check system for operation. 3/ Record voltmeter. 4/ Record. ammeter: 5/ Record "on" potentials for all test points. 6/ Record "instant off" potentials for all test points. 7/ Record "off" potentials for all test points. 8/ Perform loop resistance and record. 9/ Check and record anode string currents. 10/ Load test rectifier for 10 minutes. 11/ Check all switchboard and testpoint terminals for tightness. 12/ Check all switchboard and testpoints are labelled and I.D. tags attached. 13/ Check plans are correctly drawn and modify if necessary. 14/ Remove and inspect anodes. 15/ Recheck all interference (CPS) bleeds. 16/ Pipecamp structure if applicable. 17/ Apply to reregister system, if applicable.

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 9 of 24

^;.,x+t° .:_ 2w; ï:

PFcrrn;N¢.1g

äürSï'

RESISTiVITY'''`:; :

RESIS:TIVITY'..... : 3 / ° 447

RESISTIVITY

TESTNCE :_<..

PIN;SP'ACING" MEGGEi:READING

TESTNO'3 PIN SPACING

-MEGGERREADING.

COMMENTS./ LOCATION DRAWING'

INSTALLED BY P Ç(1( 1d

Revision 09/28/95

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 10 of 24

StarrctärdCátEtodfa Rr.rotea[órt>TestiRciñtQátGätheriirg: Fcrrrr-

P- r.oïect 0000050P 02 3 .

000009000000000041110200 ._

Qatw.Z?

TFc Ne: ::L' ........^

MaïriS-

:;r'_ - -

TiQDETCZCATHODERETUfZK (RESIETANC CftEFEEENCETC: PIPE

úSa*REFETENCETl2 PIPE NCrTCICíiSá4 : ..

RESISTIVITY"

TESTN012 '-`

PIN:SPACING -5-M MEGGEFE:READING 1 = 2 _IL_

TESTNO 3' PIN .SPACING-

-MEGGER READING

COMMENTS / LOCATION DRAWING

1:1

C"Z c .

-RESISTIVITY' 7-6 :ll.

RESISTIVITY

INSTALLED BY P Smy -0H

Revision 09/28/95

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 11 of 24

Bcïs fi.a ne Water Engi neering Swedes CR F=orrrr Ivo:1 S

ectecal:Enw-neeñng;Unit

Standard Cathodic DatztGatherihg:Form-.

Projèct..e.V. ::! ti.^ S (-......:

TFz L'ocaticns..n`-,;,_Pcle. TP NQ- - Máiins, STZa. :.31.

Data= 17-4 -

Tlx Type?

pOTENTTaL.:TESTFNG

i4THaDETCCCA-THO.DERETt1RN:(RESIS:TANCE): = ZINC REIREZEVCETCEPIPE .

:. Cuò4RtENCET PIPE. . .

ZIN CúS"o4 .. . .

EARTI+TESTING.

PIN:SFrACING MEGGER,READING:

- 17 crc) 79 o 13 o-o

TESTNGZ PIN=SPACING. MEGGER REÁDING°-

TEST NO` 3 PIN SPACING

--- MEGGER.READING

2, P.1. /-5

G-

- I

COMMENTS/ LOCATION DRAWING

RESISTIVITY

RESISTIVITY

RESISTIVITY

INSTALLED BY P. Sw yr-

Revision 09/28/95=

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 12 of 24

I.

ii:ve . - ::,-.., ._ .:: -'" Y .=_T_:

3 4 5 6

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 13 of 24

t ?'_:,r.' -, r...L . --. .. . Y .?-.-1,.t

Err%;~tìárte Water Eng%n:eerih Se; .._,.

EectriïallEngineerinTUñit

Ensurated ihtTesti-ng, Details For

CI? FomrNa. 217

Project d M0 Ns i ONE- ' 'IVEIA K KL- Data 7 9 7

DESCRIPTiONF .

'.MAINDETAILS:: ::=_LaC'ÁTIQNS

: CO'ÀTING:: VALVENo:: .- .

gQMONS-row D?On/SrONC ''_ 67-r . -

/ S " g M4_0 . SrEii 'L_ : :...CEM

/1// L-

f1 L. E 1317-

I:1/A/C EA/ f .G,.v.r/...

IIVx GROUN D' TESTING°f.

B.OLTTG;:FL'ANGERESISTANCE: NUMBER:.OFBOLT:: Ft_ANGE;TO: FLANGE RESISTANCE -

INS.ULATION:CHECKER,MO:DEL-702:-

POTENTIAL DIFFERENCETO REFERENCE'CELL.

PROTECTED SIDE UNPROTECTED- SIDE:.

ABOVE"TESTING

BOLT TO FLANGE RESISTANCE: NUMBER OFBOLTS: FLANGETO FLANGE - RESISTANCE:

COMMENTS / LOCATION DRAWING

5-6 MA/

LO O,IL c`A'-g-r

TESTED: BY 6. FR,q

Revision 09/28/95-

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 14 of 24

Brisbane Wa.ter. Engin:epring

ElëctricalEngiñeeriñq Uñi : .. . :.. .

maces CP- Farm No: 21-

Ìiisül"ated="Jòiiï>>é:Testiña etailsáF'orrn: : , =_

projéc; Nro,JSTö,J.r_ r .-/FI,/

DESCRIPTIONi

_= .MïcIPSDETÁILS:. L-7b:4-1 " LQC'ATIONS:. IZË ,

MÄTERIAL: .

COi4TING::,' VALVENo::

FAMonláóñ/c' Pr ,iv

ß y - PA: T s -Va-L. k-`

IN+GROUND:'TESTING .

{:

BOLTTO'FLANGE RESISTANCE :

NUMBER'.OFBOLT FLANGETOTLANGE RESISTANCE INSULATIONZHECKER: MODEL 702:

POTENTIAL DIFFERENCE TO REFERENCE CELL:

PROTECTED SIDE: UNPROTECTED SIDE:

ABOVE-TESTING

BOLT TO FLANGE RESISTANCE: ó ' M 0 NUMBER OF BOLTS: ó

FLANGE-TO FLANGE RESISTANCE: / (, o ,ì COMMENTS / LOCATION DRAWING

TESTED BY 6. Pe Ari,

Revision 09/28/95

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 15 of 24

errs-bane. Wate r° Engineering- Se rzir:é: _.,%:

Erèctrical Engürìeérüim Unit

Insulátéd.lóintTestihg Détáii Eärir>:

CP'FbmrNo: 2.1

Project r ModSTO Sr" Data i7-- -9T

DESCRIPTION..-

Mio'tIIVSDETAILS::: C'.p Hod 6-roe - VT- ' QeATTONS:. .A 140 IV 57-0A/E-. 61- VAL cs Prr IZE.`: -- -

.,. NI,tiN 4-/NE;: á. *TRIAL: /Ì/Lp TE-EL. e&-lfr9eNT. .G /We p.

COATING:: j(/. i c.. .

' VALVE No: -

IN=GROUNIXTESTING=

BOLTM FLANGERESISTANCE_ NUMBERfOFBOLT:` FLANGETO FLANGERESISTANCE: INSULATION CHECKER' MODEL702::

POTENTIAL DIFFERENCE-TO REFERENCECELL:-

PROTECTED-SIDE UNPROTECTED SIDE

ABOVE:TESTING

I BOLT TO FLANGE - RESISTANCE: 2i. ' ' M Iv NUMBER OF BOLTS: t FLANGE TO FLANGE RESISTANCE: l 6, O s/

COMMENTS / LOCATION DRAWING

TESTED BY PRA

Revision 09/28/95

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 16 of 24

B'rfsbaneVVater EnarneerrngSerirce

EléctricaliEngiheerinmUnit

Cathodic Protection System- Potential: Recording, Form:

CP- Form- No: 23'

Project Edmonstone.St-Rising.Main Date?. 20th. June199T

Test Point number

.

Distances. to T:P.

Potentials to CuSO4 -- Resistivities-. atZ metres: Natural Off- Orr

(metres) (mV) (mV) (mV) (ohm:metres) 1 0 -499 -730 -1150 16.3 2 300 -491 -790 -1200. 18.8 3 800. -465 -715 -1155 175 4.

5.

6 7 8 ' 9.

10 1t 12 13'

14

Graph of potentials and resistivity vs pipelength

E

co

o

o

-500

-1000

-1500

-2000

500

400

300

200

100

o

A A

61

o 300

Distance (metres) 800

Natural G Off * Rectifier located

Revision 06/30/97

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 17 of 24

Brisbane. Water Eflg,i veering# S'er vices-

Electrical '. Engineering: Unit:

Cathodic Protection System Loop-Resistance-

CP Form No: 24-

Date: 20th JUNE.1997' Cathodic. Protection System:. Edmonstone. St. Rising Main New Market System Operating; Volts 6' System Operating amps 2

14

12

10

8

> m rn co ..

> 6

4

2

o

Loop Resistance. (ohms)

3.111111

Graph of System voltage vs current.

o 2 3

Current (amps) 4 5

06/30/97 LPESTONE.WK4

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 18 of 24

B r ni e .IPC Er

;i.nzeei.rr

ñlijéct:RCóatiñgdéfect:survey fór. Edmonstone°.St:risingsewer_maül:. _. .

SS

:,;_.. aEi`"ecá'°"cà¿tMéclian1caLa=Water. Mé'tersi

=4* .TBimáS'trcétagierFar..Q4009= .

. : - . _

Pira. (07) ,3403:41849=

Fr-(07),34011898;

Equipment-used :: Pipecamp PCS -2000 coating anomaly_ equipment:.

Length -.Of Mains: Aprox... 800 Metres.

Size.of mains: 680 mm. Dia mild steel cement lined.

Operator: John Taylor

Date of survey:- 4th, July 1997,

S th-Jùly.1997"

Procedure: Equipment was set up as per operation manual while operator traversed Pipeline route. Potentials were measured at each test point and no defects were. noted .

Evaluation: Over the length of the main no notable defects were found .

Conclusion: The coating is still of reasonable condition and no further action is needed other than the CP System.

John Taylor Electrical Engineering Unit.

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 19 of 24

M

III á ,.. in ° Ú tie

--4

p Q .. Q uU)

1

G

2

[ 1-2

Wti11 :80 2.6 , 61 Nn!' - ... __._.Cb8bEE0bE 2.0) d3ltjM 3NUfiSINB Wtj21 :80 1.6. 61 Nllf.,... ..-.

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 20 of 24

1 I 2 I 3 4 5 I 6 7 8

A

7P

13

14

16

17

18

aieeci. -

Aeut(LEAs;

rP2 ---ILI

Tpl i?ei-frtr:er

PUMP STATION

36

37

38

N O T E S

A

0 9.96 ISSUED FOR COMMENT I O.L.P.

No DATE ANENDNENT INITIALS

AMENDENT & ISSUE REGISTER

MANAGER

DATE

DIRECTOR DF DIRECTOR OF

PUNNING & DESIGN WATER SUPPLY

DIRECTOR OF

TECHNOLOGY SERVICES

DATE:

DATE:

DESIGN J.S.

DATE:

DIRECTOR OF

CONSTRICTION

DATE:

9.9.96 ENGINEER IN CHARGE

DRAWN O.L.P. 12.9.96 SUPERVISING ENGINEER

CHECKED A21 REDUCED

B

REFERMES

CARD FIE N0. 76T00060

C

D

COPYRIGHT ® 1996 No rspoduotion is permitted in whole or in pert without

the express consent of

THIS DRAWING WAS BRISBANE CITY COUNCIL

USING QI AW BRISBANE WATER

hVáter.hl Medmiumo lgft PROFESSIONAL SERVICES

PROJECT:

CATHODIC PROTECTION EDMONDSTONE STREET 680 DIA. RISING MAIN

TITLE:

CATHODIC PROTECTION SYSTEM DETAILS

SCALE: N.T.S. 1 No.1 OF 1 SHEETS

DRAWING No.

486/7/6- MO1T00060

-_' ......._. _ .... .:.:; .:_,., ww+mc`. ,ï _ . _,i:-. ._

. . -._..-.-.r;..;..-. , i_; [_ !Z.....Ä4+..:'

AMEND.

O

E

F

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 21 of 24

1 2 4 5 6 7 8 9 10 1? 12 13 :4 15 16 17 18 ç Pr, 21 22 .i 24 2t

A

G.PD. `x \x RECTIFIER C/3 10A b b UNIT C/B

10A

VARISTOR TO DATA

R

11

N

EI N/L

11

NEON

K1

4

4

K2.1 REMOTE INTERUPT

-1U 15

INTERUPT SWITCH

u ® u

NOTES

u

4

VARIAC

TRANSFORMER GAYRAD <SEE NOTE 1)

DIDDE FUSE 25A

CTIFIER UNIT

VE

VARISTOR

- {.

0 +VE OUTPUT SEE NOTE

O AMMETER

C

x

0 -VE

-VE

R1 51

R2 R3 .4=3-7-c=

sa

TRAIISFDRMER OUTPUT CURRENT & VOLTAGE

TO SUIT APPLICATION PROVIDING SUITABLE

REV- _UTiDN & CONTROL

AMMETER & VOLTMETER TD PROVIDE

SUITABLE RESOLUTION FOR SYSTEM

+ POSITIVE WIRING TO BE RED

- NEGATIVE WIRING TO BE BLACK

L.V. AC WIRING TO BE 4nn2 BLUE /WHITE DC WIRING TO BE 4nn2 240V AC WIRING TO 3E 1.5nn2- BROWN /BLACK REM. 2ENCE WIRING TO 3E 1.5nn2 -GREY

LEGID

ti

TERMINALS WITH 4nn TEST PLUG SOCKETS

ñ

ñ

K4.i COUPON DISCONNECT

0.1,4

t---: 1

A,OC CAT/CC=

CATIOZC R7-7

CCUP04 numb

57 ME RCi

ñ

GI = =PM

R { 6i

m

K3.1

w

K1 - 240V RELAY

K2.1C3. & K4 - 24V DC RELAYS

R1 - SHUNT RESISTOR (SIZED TO PRODUCE A 1V DROP AT FULL LOAD)

92.R3 - VOLTAGE DIVIDER (SIZED TO PRODUCE A VOLTAGE OF 10V ACROSS R2 AT MAX. OUTPUT VOLTAGE)

VE AND -VE DC FUSES TO BE SIZED APPROX. 5AMPS ABOVE NORMAL OUTPUT. CURRENT

111íI

I-Z~- . L ° - CU.7

RI ñ

hill

TO TELEMETRY EQUIPMEN7

n

U Z N

ú

ms Ra CCCoo 62 CutW TaT CD1atLTIm

TN n

K2 K3

KL

Si3Imßi

u

z

BAWANA PLUG SOCKETS ON FRENT PANEL

Zn

z C ¢

Z 4-

C W C O .

LJ

J ¡, C W

U ~ N I C 3 z 1

COUPON :ITN PE REFERENCE

A I R.L. 118.10.931 CHANGtS AS SHOWN

0 I R.L. 125.8.53 ISSUE? FOR CONSTRUCTION

Ka I BY I DATE REVISION

1

ICHECil APPR IcazzI .':

B :1SBANL_ CITY COUNCIL

DEPARTMENT GF WATER ER SUPPLY _& SEWERAGE

MECHrNICIL ô _-_..Tr,:CA.L SERVICES

POD-T .7 .- STANDARD CATHODIC PROTECTION

T:ST POINT TERMINALS FOR REMOTE RECTIFIER SITES

IUY: 3.. I

DRAWN R.L. I 3.8..S.î I SUPER ENG. I

DESIGN I JS, 1 3.8.93 I SENIOR. ENG.

j°-.8.93

TITLE RECTIFIER UNIT 'WIITH DATA LOGGING FACILITIES /IRING D i ARUM

CHECKE:' I J.S. 2:.E.93I ELECT. ENG. I

DRAWING No.

^. 86/6/25-.AA100021E ...CAQ112 fI:t w

A625C21 A

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 22 of 24

02:0/.TT H.r -55rf'gi5 05,0/ ,.9e *P914°Id

05-6/ -4990POlig?

ipu/ i S'ulpeo 9 Neas,

13M3G 1400H8 NO8C134 H11:10N 01 NOUVIS

9Nrd-lAnd WOW S3SU3AVH1 3A11VNt1311V

HMS NOISIGAIG

.3 c 7 SJ A PJ1

. 10;2pi/Jul.2/0..)Ry) aSsi,APJ_I

.V 3.511iA

.70 riclARd //P a/ /AI eff WOO -

*Rgov ticy,:pis. tio.41P./S arduind waif °JP sa,aw/iery awe/eau/co

II 4'

0,y151.5 a 04/ oLl u

:1:4'.73 -11.7

rt.-v/./71r ,. !

C't

./..ao4S Sz/121,/

"YrIA--7

A-(11r13. 71V C:1(7.;

oøJg 1/ Ana

!Au- -

(ido'( --9711.711

,...2y.oauf44ay

60/Yaqte '

427.45- 15-cyd

aall.tqati

_1

Id /mte

1 77 } / 4.#14/

Pooa'

/1P

1CD

o

o

op

10

1/10,41.wa7

s.

s-ear irtil UM/

5,0/o

s-,57-to

41,1? :74.7

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 23 of 24

8 1 L 9 I s

0

ON3NV

3TOOO1T11V-ZZ/T/9817 'eN 9NIMYäO

S1331.6 T JO T'WI I 'S'I'N =31Y3S

SlIV130 NOI13i1211SN03 1NIOd 1531 02fVONV1S

1311I1

NOI133108d 3I00H1V3 :1O3f0äd

A9010NH031 NOI1VNäOdNI 1-DNV69 S3)IAà3S A901ONFD31

831dM 3NV8SI88

1I3Nf103 JlI3 3Nd8SId8

Ryn 1 sown

s

2131YM 3NY8SI?18 1IONf20O AlIO 3NY8SIÖ8 jo ;ueeuoo eee.udxe ey;

4^o4iTe i ui JO 010444 UT

pe3;TeJ ST uoT;onpodai ON

966T ® 1HOI8AdO3

MYäCDIID 9PAS(1 O3Jf10021d SYM 9NIMV2:IO SIHl

OT0001ZZT 'gr 371 010

S33N3213-1321

Zd 035.7323

03381

N33NI9N3 9NISIA23d12S 96'7'îZ di O NMYäO

MOO NI ä33NI9N3

96'7'6 'S'f N9IS30

131Y0

NOI13f211SN03 30 ä01J3äI0

31Y0

A1dd9S 1131YM

30 801732II0

131Y0

rieIS30 4 ONIINiY1d

10 ä01336I0

131Y0

S33IAI3S 19019N2331 O ä013321I0

131Y0

ä39YNYN

?J31SI93a 3fSSI 4 1N3ON3Nd S1YIlINI IN3NON3MY 31Y0 oN

'd'TO 1VAOäddY 2103 031SSI 96'7 0

N31V388Vd 2331-4Y 35INYA1V9 dI0 10H 1

S310N 8 I

9NIN3d0 30

SOn1S O31V1nSNI 9W

19-9. N0ID3S

.d d. NOI133S

rn

I T /

03NOLD3S NOI1dA313 30IS N011d/1313 10413J

lInONOD a3SnNn dVD

SllnaNOp ---- 7Ad 'VIO OS

s.

v

L-J

(00)'AlV9 sL x Su

SI-Id NI

S310H 030V321H1

SHa '8 X3dSa3d N33M139 13XSV9

31V-Id dVD NO 013M 1311I3 E

OS

1

SL

SHd OlNI ln) 310H 09 X O%

S1109 OV3H >GH 9W X 9 H11M Ski OlNO 031109

M00NIM X3d213d OZL X 09L

86

LE

9E

tE

EE

ZE

TE

OE

SZ

8Z

CZ

9Z

SZ

tZ

EZ

ZZ

TZ

OZ

8T

8T

LT

9T

ST

1T

ET

ZT

TT

OT

8 e

e

til

8 i i

L 9 I S E 3

3

0

3

e

Y

Cathodic Protection System - Edmonstone Street - Sewer Rising Main - OM Manual

Q-Pulse Id TMS1259 Active 21/07/2015 Page 24 of 24