20
Aluminium Formwork System & Scaffolding Aluminium Formwork System & Scaffolding JIANGXI GETO NEW MATERIALS CORPORATION LIMITED East China Production Base / Jiangxi Guangchang Central China Production Base / Hubei Xianning Southern China Production Base / Guangdong Jiangmen North China Production Base/ Shandong Weifang TEL : (+86)0794 3637 899 E-mail : [email protected] Singapore GETO Blk 808 French Road #05-157 Kitchener Complex,Singapore. TEL : (+65)6294 4386 E-mail : [email protected] Malaysia GETO No. 17-3, Jalan Anggerik Vanilla BE 31/BE, Kota Kemuning, 40460 Shah Alam, Selangor Darul Ehsan, Malaysia. TEL : (+603)5131 5887 E-mail : [email protected] India GETO 20 Neha Industrial Estate , Dattapada Road, Borivali East , Mumbai, Maharshtra, India Pin Code 400066 Office: +912228702842 Mobile: +917738080937 E-mail: [email protected] / [email protected] www.getoformwork.com

Aluminium Formwork System & Scaffolding

Embed Size (px)

Citation preview

Aluminium Formwork System & Scaffolding

Aluminium Formwork System &Scaffolding

JIANGXI GETO NEW MATERIALS CORPORATION LIMITED

East China Production Base / Jiangxi GuangchangCentral China Production Base / Hubei XianningSouthern China Production Base / Guangdong JiangmenNorth China Production Base/ Shandong WeifangTEL : (+86)0794 3637 899 E-mail : [email protected]

Singapore GETOBlk 808 French Road #05-157 Kitchener Complex,Singapore.TEL : (+65)6294 4386 E-mail : [email protected]

Malaysia GETONo. 17-3, Jalan Anggerik Vanilla BE 31/BE, Kota Kemuning, 40460 Shah Alam, Selangor Darul Ehsan, Malaysia.TEL : (+603)5131 5887 E-mail : [email protected]

India GETO20 Neha Industrial Estate ,Dattapada Road, Borivali East ,Mumbai, Maharshtra, India Pin Code 400066Office: +912228702842Mobile: +917738080937E-mail: [email protected] / [email protected]

www.getoformwork.com

GETO History

Overseas Market

GETO Production Bases

Qualification Certificates

Conference & Social Networking

National Patents

GETO System Advantages

Manufacturing Facilities

Manufacturing Process

System Features

Friction Stir Welding (FSW)

Research and Development (R&D)

01

02

02

03

03

04

05

06

06

07

09

10

12

14

15

17

23

25

26

27

29

31

33

34

Panel Recycling

Five-Star Service

Accessories

Components

Working Process

Quick-deck System

Project in China

Project in Singapore

Project in Malaysia

Project in India

Project in Cambodia

Other Project References

CONTENTSGETO is a comprehensive joint-stock company specialized in Aluminium Formwork and Scaffolding system. Headquarter registered in Jiangxi and the global operation management center is based in Tsui Hang New District, heart of Guangdong-Hong Kong-Macao Greater Bay Area. We had set up more than 20 subsidiaries in Beijing, Shanghai, Shenzhen, Changsha, and overseas in Singapore, Malaysia, Cambodia, India, UAE, Panama, Algeria. The products are sold well in over 30 countries and regions. With four domestic production bases, we are one of the first specially qualified and national high-tech enterprises. With a backbone team of over 2,000 people, we are taking the lead in the realization of scale, specialization and modernization, focusing on formwork system R&D, production, leasing,sale, renovation and technical services, providing customers with a full range of high-quality services.

Company Profile

200,000 square meters

340,000 square meters

270,000 square meters

270,000 square meters

Jiangxi Guangdong ShangdongHubei Malaysia

30,000square meters

2

Overseas Market

GETO Production Base

Singapore GETOBlk 808 French Road #05-157 Kitchener Complex, Singapore

HeadquarterTsui Hang New District, Zhongshan, Guangdong-Hong kong-Macao greater bay area, China

GETO Milestone

2012.08 Foundation of East China Production Base 1#

2014.03

2014.04

2015.12

2012.09 Establishment of Research and Development Department

2016.03 Establishment of Zhongshan GETO AluminiumFormwork Tech Co.,Ltd

2017.02 Foundation of East China Production Base 2#

2017.05 Establishment of Shandong GETO New Materials Tech Co.,Ltd

2018.08 Obtained Special Class Certificate in aluminium formwork

2016.03

2014.07 Participated in China national standard of aluminium formwork

2014.08 Establishment of Shanghai GETO Construction Tech Co.,Ltd

2014.06 Elected as "Standing director units" of the Chinese formwork and sca

Establishment of GETO Global Construction Tech Malaysia SDN BHD

ffolding association

Obtained National New High-tech Enterprise Certificate

2015.04

Rebrand to Jiangxi GETO New Materials Corporation Limited

Establishment of Guangdong GETO New Materials Tech Co.,Ltd

2016.10 Public listed on National Equities Exchange and Quotations

2017.12 Establishment of Hubei GETO New Materials Tech Co.,Ltd

2018.02 Establishment of GETO University

2018.11 Establishment of Jiangmen GETO New Materials Tech Co.,Ltd

India GETO20 Neha IndustrialEstate ,Dattapada Road,Borivali East , Mumbai,Maharshtra, IndiaPin Code 400066

Establishment of Jiangxi GETO Aluminium Formwork Tech R&D Co.,Ltd

1

North China Production Base

Central China Production Base

East China Production Base

South China Production BaseMalaysia Production Base: No.5, Jalan P4/11A, Seksyen 4, Bandar Teknologi Kajang,43500 Semenyih, Selangor, Malaysia

North China Production Base: China aluminium formwork industrial park, Weifang, Shandong, China

Central China Production Base: Xianning, Hubei, China

East China Production Base 1#: Guangchang, Jiangxi, ChinaEast China Production Base 2#: Guangchang, Jiangxi, China

South China Production Base: Jiangmen, Guangdong, China

Malaysia GETONo.17-3, Jalan Anggerik Vanilla BE 31/BE, Kota Kemuning, 40460 Shah Alam, Selangor Darul Ehsan, Malaysia

Asia

Europe

Oceania

South America

Nouth America

Djibouti

AlgeriaSouth Asia

IndiaMaldives

Sri Lanka

Pakistan

Bhutan

MalaysiaSingapore

CambodiaVietnamPhilippinesLaosIndonesia

The United Arab Emirates

Saudi Arabia

Kazakhstan

Southeast Asia

Western Asia

Central Asia

Romania

Saint MartinRussia

ArgentinaChilePeru

America

New Zealand

Australia

PanamaJamaica

Business Map1

3

4

2Africa

4

Over the years, GETO has been committed to product innovation and technology research, and has obtained more than 100 scientific research achievements and more than 70 national patents.

Qualification Certificate

Conference & Social Networking

National Patents

3

The Workplace Safety and Health Councilis pleased to certify that

has fulfilled the requirements to attain bizSAFE Level 3

GETO GLOBAL SINGAPORE PTE. LTD.

Winston YewDeputy Director, Industry Capability Building

Workplace Safety and Health Council

Date of issue: 21/08/2017

Certificate No. E28357

This certificate will expire on 20/08/2020

5 6

GETO System Advantages

Less Construction CostThe cost saving throughout the whole construction progress from deflect rectification, machineries, additional conventional formwork cost, time etc.

Excellent QualityGETO aluminium formwork system does not require plastering as the off-the-form finish is less than 3.5mm tolerance in deflection. SpeedThe wall, beam, column, slab can be casted at one time by using GETO aluminium formwork. Furthermore, our prop-head system will allow to dismantling the slab panels without removing the props. Thus, 6 days cycle is no longer a dream but a reality. Extensive ApplicationThe aluminium panel can be used in wall, slab, column, beam, staircase, window, etc. The system can also be included in secondary structure, such as the lintel, tie column, etc. Reliable SystemWith GETO's Aluminium Formwork System, brackets for wall, slab, elevator and external working platform are provided.

GETO uses the modern management system, automated manufacturing system, advanced production equipment and skilled labour to manufacture the best aluminium formwork system with a competitive price.

Warehousing of raw material Cutting Hole processing

Notching Welding Straightening

Coating QR code Packing

Easy TransferThe formwork panels of next floor can be transferred through the material transfer openings on the slab without using the crane after dismantling. SafetyIt is safe enough for the construction requirement due to the strength, deflection and stability of GETO aluminium formwork system. Light WeightThe system panel is an easily handling & handheld product. All components almost can be transfered by labour through the slab transfer box during the installation, dismantling & transferring.

Cycle UseGETO system panels are designed for strength and maximum usability. This provides the ability to reuse your existing GETO panel stock into new project designs in order to maximize value and return on investment of your GETO formwork assets.

Environment FriendlyBy minimizing limited resource using such as plywood and timber, GETO provides an environment-friendly system.

Manufacturing Facilities

Manufacturing Process

East China Production Base 1#: Guangchang, Jiangxi, China

Central China Production Base: Xianning, Hubei, ChinaGuangchang, Jiangxi, China

Malaysia Production Base:

East China Production Base 2#:

North china Production Base :

GETO company values provide customers with solid solutions to offer concrete framing solutions that deliver faster construction time and achieve high quality and increase efficiency on site. We focus on creating high-end brands of aluminium formwork.

China aluminium formwork industrial park, Weifang, Shandong, China

No.5, jalan P4/11a, Seksyen 4, bandar teknologi kajang,43500 semenyih, selangor, Malaysia

1 2 3

5 6 7

8 9 10

Quality testing

4

Southern China Production Base 2#: Jiangmen, Guangdong

7 8

No skilled labour required for formwork system

No heavy equipments required for formwork system

Cast column & wall, beam & slab in one time

Form staircase with accurate dimensions for riser and thread

Dismantle slab panels without moving props

Self correction feature provides unmatched forming accuracy

Environment-friendly: no construction waste, no messy disposals

Suitable for high-rise buildings

High strength & bearing capacity

Easy to combine with other types of formwork

Excellent concrete surface quality, no need plastering

More cycle times, less average cost

High speed of construction

CharacteristicsGETO Aluminium Formwork

Steel Formwork

Plastic Formwork

TimberFormwork

System Features

Poisson's ratio(Va) 0.3

2.7g/cm3

70000N/mm2

200N/mm2

Shear strength(Fva)

Yield strength(Fa)

Elasticity modulus(Ea)

Density(ρ)

115N/mm2

Composition

Inner & Outer wall panel and corner panel

Beam bottom & side panel and corner panel

Slab panel & prop head and corner panel

Staircase panel

Alloy Temper 6061-T6

Material Type Complete Extrusion

Main Welding Type Friction Stir Welding

Thickness of Panel 4mm

Thickness of Frame 8mm

Height of Frame 65mm

Standard Wall Panel Width 50mm to 600mmStandard Wall Panel Height 2400mm

Standard Slab Panel Size 600mm × 1200mm

Weight of Aluminium Panel 25kg/sq.m

Standard Prop Adjustable Steel Prop

Aluminium Alloy(6061-T6)

Item Specification

Five Major Professional Laboratories

GETO has set up a special R&D team with over 200 members. GETO successfully developed GETO-BIM automatic modulation software and GETO-VR virtual reality inspection software, co-engineering in the development of the automatic punching machine and intelligent robot welding. GETO also has an university-enterprise in cooperation with NanChang HangKong University and established five professional laboratories of aluminium formwork system for basic materials, structural mechanics, surface treatment, welding technology and robot application.

Developed in 1991 in Cambridge, United Kingdom by The Welding Institute(TWI). During welding, stir welding head will move through the connection joint and turn it to the welding joint. This welding technology applies high pressure between 2 plates and welds them through the heat caused by the friction.

As it is a joining technology on a solid state (low heat input), compared to the traditional welding method, FSW is environment-friendly, minimizing residual stress and strain.

Not only FSW allows aluminium welding, but it also allows bimetallic welding such as aluminium/magnesium, alloy steel and lightweight alloy.

GETO applied FSW into aluminium formwork manufactering to achieve perfect quality.

Technical Background

Advantages of FSW

As a solid state process it can be applied to all the major aluminium alloys and avoids problems of hot cracking, porosity, element loss, etc. common to aluminium fusion welding processes.

Bimetallic (aluminium/magnesium) welding is possible. [bimetallic: different metallic properties]

No shielding gas or filler wire is required for aluminium alloys.

Excellent mechanical properties, competing strongly with welds made by other processes.

The absence of fusion removes much of the thermal contraction associated with solidification and cooling, leading to significant reductions in distortion.

Research and Development (R&D)

9 10

Workplace friendly: There is no ultraviolet or electromagnetic radiation hazards as the absence of arc removes these hazards from the process; the process is no noisier than a milling machine of similar power, and generates virtually zero spatter, fume and other pollutants.

As a mechanized process, FSW does not rely on special welding skills; indeed manual intervention is seldom required.

Friction Stir Welding (FSW)

GETO has accumulated rich experience in panels renovating through standard panel system research and development. We have realized the recycling series for panel renovating, selecting & warehousing, old panel reusing. Not only guarantee the quality, but also reduce the cost through improving the reusing rates of old panels effectively. So as to realize the green energy conservation and sustainable development mode.

Step 3: Shot Blasting

Step 4: Quality Control Step 5: Selecting Step 6: Tidying Standard Panel

Step 8: Cutting To Standard PanelStep 7: Tidying Non-Standard Panel Step 9: Grinding

Step 12: WarehousingStep 11: QC Before WarehousingStep 10: Coating

Step 2: Concrete CleaningStep 1: Old Panels Back The Factory

11 12

GETO-VR virtual reality inspection software with special equipments makes you do the inspection and acceptance at your home.

GETO-VR

GETO independently developed it's own intellectual property GETO-BIM automatic modulation software after 3 years R&D. The accuracy rate of GETO-BIM has reached 100%.

GETO-BIM

Panel Recycling

Appearance and temperament of sunshine imageAt present, there are more than 300 engineering and technical teams, all of whom have unified image and logo, providing customers with a sunny, vibrant and professional service experience and unified management on site, so that customers can find our professional technical guide and solve the problems on site at the first time.

Turn material resources to good accountOur on-site technical service guide shall timely assist the construction team to install all the standard materials according to the actual use on site;We will register the quantity of other surplus materials, pack and transport them back to the factory in time.

Professional programEach project is equipped with 2-3 professional technical guide. On-site technical service guide can provide all-round professional technical services. Local structure modification can be directly cut, drilled and welded on site.

GETO is famous for its five-star product service including techinical disclosure, techinical training, site instruction, secondary design and modulation, panel modification and panel & accessories supplement.

13 14

Five-Star Service

2-24hour responseWe have established a 2-24-hour on-the-job processing mechanism for major problems, with fast material replenishment service, and the company is equipped with a special vehicle for material replenishment service.

Secure all the wayBefore the installation of aluminium formwork, our company's technical guide will organize the construction team to conduct theoretical training, and the on-site technical guide will assist the construction team in the whole process of aluminium formwork installation, and the technical guide are obliged to serve the project until the completion of the project building.

Basement formwork system

Podium formwork system

Typical floor formwork system

Roofing formwork system

Quick-Deck formwork system

Self-climbing platform

Comprehensive Solutions

GETO offers a wide variety of solutions, from Aluminium Formwork system for basement construction.

GETO have rich experience on podium projects by aluminium formwork system to handle the car ramp, column capital, etc.

GETO provides self-climbing platform system that worker's safety, efficient construction and economy are integrated, in which you can quickly progress construction.

GETO Quick-Deck Formwork System is developed to construct large slab areas quickly, safely, with minimal labour, and is fully compatible with all GETO formwork systems or timber formwork.

Roofing formwork system is specially designed for the construction of roof which have special components to the typical floor system.

Typical floor formwork system is precisely-engineered system fabricated in aluminium. Using this system, all the elements of a building namely, load bearing walls, columns, beams, floor slabs, stairs, balconies etc. can be constructed with cast in situ concrete.

HOLLOW SECTION Item Item Item Item ItemWALLER BRACKET WORKING BENCH TIE ROD BOLT, NUT&WASHER

DESCRIPTION:The hollow section are used to allow the horizontal straightness of wall panels and a flat wall surface (especially at the bottom) after concrete casting.

Weight:3.73KG/M

DESCRIPTION:The Aluminium Waller Bracket use to allow the horizontal straightness of wall panels and a flat wall surface (especially at the bottom) after concrete casting.

Weight:0.58KG

DESCRIPTION:The working bench is used as the inner working platform.

Weight:15KG

DESCRIPTION:The tie rod will be used as anembedded anchor in order to fixthe bracket /panels on the concretesurface during its installation.

Weight:1.7KG/M

DESCRIPTION:The set of accessories are used to connect panels with panels.

Weight:0.185KG

ELEVATOR BRACKET Item Item Item Item ItemSLAB BRACKET WALL BRACKET REUSABLE FLAT-TIE

AND PVC SLEEVESEMBEDDED FLAT-TIE

DESCRIPTION:The elevator bracket is used as a substitute of scaffolding system, the working platform, slab platform and elevator platform will be fixed on the concrete.

Weight:8.5KG

DESCRIPTION:The slab bracket is used as a substitute of scaffolding system, the working platform, slab platform and elevator platform will be fixed on the concrete.

Weight:12.5KG

DESCRIPTION:The wall bracket is used as a substitute of scaffolding system, the working platform, slab platform and elevator platform will be fixed on the concrete.

Weight:13KG

DESCRIPTION:The flat tie is used to joint the wall panel to the opposite side's wall panel. And the PVC sleeves will make the flat-tie reusable.

Weight:0.158-0.711KG

DESCRIPTION:The embedded flat-tie is one-time flat tie.

Weight:0.064-0.286KG

PIN &WEDGE Item Item Item Item ItemLONG PIN SLAB TRANSFER BOX STEEL PROPS JOINT BAR

DESCRIPTION:The pin and wedge will be used to joint the panels together.

Weight:0.064&0.03KG

DESCRIPTION:The long pin is used to fix the middle-beam and joint bar with wedge.

Weight:0.286KG

DESCRIPTION:The slab transfer box is used to transfer panels after formwork dismantlement.

DESCRIPTION:The steel props are used to support the slab during concrete pouring and casting. It will remain under the prop head until it can satisfy the dismantling requirement.

DESCRIPTION:The Y type panel puller is used to remove the wall panels .

Weight:11.63-17.808KG

DESCRIPTION:The joint bar is used to connectwith the prop head and middlebeam.

Weight:0.713KG

PVC SLEEVE EJECTOR Item Item Item Item ItemREUSABLE FLAT-TIE

EJECTORT TYPE PANEL PULLER

Y TYPE PANEL PULLER HOLE HOOK

DESCRIPTION:The PVC sleeve ejector is used to remove the reusable PVC sleeves .

Weight:1.983KG

DESCRIPTION:The reusable flat-tie ejector is used to remove the reusable flat-tie .

Weight:2.679KG

DESCRIPTION:The T type panel puller is used to remove the slab panels.

Weight:4.86KG

Weight:13KG

Weight:3.25KG

DESCRIPTION:The hole hook is used to adjust the position of panels.

Weight:0.768KG

15 16

Accessories

17 18

Wall Panel

REMARKS:1. Without external corner at both sides2. Without Rocker at the bottom

Wall End Panel

REMARKS:1. With external corner at both sides2. Without Rocker at the bottom

Internal Corner Joint

Kicker

External Corner Joint

DESCRIPTION: Used to connect wall panels at external corner area.

DESCRIPTION: Wall Panel to support vertical structure like wall and column. Usually the bottom part is linked to Rockers with Bolt & Nut for easy dismantling while the top is connected to Beam Joint for beam or Slab Joint with Pin & Wedge.

DESCRIPTION: Wall Panel to support vertical structure like wall and column. Usually the bottom part is linked to Rockers with Bolt & Nut for easy dismantling while the top is connected to Beam Joint for beam or Slab Joint with Pin & Wedge.

GETO -- WALL & COLUMN

Rocker

Item W(WxH) Weight (kg)

600 W 2400

500 W 2400

400 W 2400

350 W 2400

300 W 2400

250 W 2400

200 W 2400

150 W 2400

125 W 2400

100 W 2400

50 W 2400

27.89

24.10

19.90

17.93

14.89

13.13

11.44

9.35

8.56

7.76

6.18

DESCRIPTION: Wall top panel is used to connect the standard wall panel to satisfy the storey.

Item WT(WxH) Weight (kg)

600 WT 600

500 WT 600

400 WT 600

350 WT 600

300 WT 600

250 WT 600

200 WT 600

150 WT 600

125 WT 600

100 WT 600

50 WT 600

6.65

5.72

4.80

4.32

3.87

3.39

2.94

2.47

2.24

2.00

1.53

DESCRIPTION: Internal corner joint is used to connect wall panel and wall end panel at internal corner. The height of IC are equal to the wall panel height.

Item(A1+A2) IC (H) Weight (kg)

100×100 IC 2400

100×120 IC 2400

100×125 IC 2400

100×130 IC 2400

100×140 IC 2400

100×150 IC 2400

100×160 IC 2400

150×150 IC 2400

14.12

15.32

15.62

16.30

16.51

17.12

17.33

20.12

DESCRIPTION: Kickers are fixed on the external wall panels with kicker screws before concrete pouring. The function of kickers is to support the external wall panels for next floor.

Item K(LxH) Weight (kg)

350 K 1800

350 K 1200

300 K 1800

300 K 1200

150 K 1800

150 K 1200

12.59

8.50

11.30

7.62

7.31

4.92

Item WS(WxH) Weight (kg)

400 WS 2400

350 WS 2400

300 WS 2400

250 WS 2400

200 WS 2400

150 WS 2400

125 WS 2400

100 WS 2400

28.77

27.01

25.34

23.57

18.26

19.79

19.01

18.21

Item EC(H) Weight (kg)

63.5×63.5 EC 2400

63.5×63.5 EC 600

4.81

1.21

DESCRIPTION: Used to connect wall panels at external corner area.

Item R (H+W) Weight (kg)

63.5 R 45 600

63.5 R 50 600

1.02

1.06

Wall Top PanelComponents

19 20

Beam Corner Joint

Beam Soffit

Beam Soffit

Beam Prop Head

GETO -- BEAM

Beam internal corner

REMARKS:With external corner at both sides.

DESCRIPTION: Beam soffit issued to support Beam.

Item BS(HxL) Weight (kg)

400 BS 1100

300 BS 1100

250 BS 1100

200 BS 1100

150 BS 1100

125 BS 1100

13.35

11.69

10.84

8.37

9.20

8.79

REMARKS:Without external corner at both sides.

DESCRIPTION: Beam soffit issued to support Beam.

Item BSB(HxL) Weight (kg)

400 BSB 1100

300 BSB 1100

250 BSB 1100

200 BSB 1100

150 BSB 1100

125 BSB 1100

8.71

7.05

6.20

5.39

4.56

4.15

DESCRIPTION: Internal corner joint is used to connect panels at internal corner. The height of IC are equal to the beam side panel height.

Item (A1+A2) IC (H) Weight (kg)

100×100 IC 400

100×150 IC 400

150×150 IC 400

100×100 IC 600

100×150 IC 600

150×150 IC 600

2.05

2.42

2.79

3.17

3.77

4.37

DESCRIPTION: Use for internal corners usually at beams. Connect to other panels using Pin & Wedge.

Item(A1+A2)LS(L) Weight (kg)

100×100 LS 200

100×120 LS 200

100×125 LS 200

100×130 LS 200

100×140 LS 200

100×150 LS 200

100×160 LS 200

150×150 LS 200

2.24

2.57

2.64

2.74

2.85

2.99

3.13

3.70

DESCRIPTION: Use for internal corners usually at beams. Connect to other panels using Pin & Wedge.

Item B(HxL) Weight (kg)

400 B 1100

300 B 1100

200 B 1100

150 B 1100

100 B 1100

8.71

7.05

5.40

4.56

3.73

Prop Head

DESCRIPTION: Use to join the beams together(Middle beam and/or End beam), the steel props will be placed under the prop head.

Item PH(HxL) Weight (kg)

150 PH 330

150 PH 280

150 PH 230

1.74

1.50

1.26

DESCRIPTION: Panel to support beam and use to join two Beam Bottom with Pin & Wedge.

Item BP(HxL) Weight (kg)

300 BP 300

200 BP 300

200 BP 250

200 BP 200

150 BP 300

150 BP 200

150 BP 150

2.51

1.98

1.72

1.47

1.71

1.26

1.03

Beam Outer Corner DESCRIPTION:

Use for internal corners usually at beams. Connect to other panels using Pin & Wedge.

Item (A1+A2) LC (L1+L2) Weight (kg)

100×100 LC 400+400

100×150 LC 400+400

150×150 LC 400+400

4.76

5.87

7.00

Beam Side Panel

21 22

Slab Panel

Slab Corner Joint Middle Beam

End Beam

Slab Incorner JointProp Head

GETO -- SLAB

DESCRIPTION: The slab corner joint will be used to connect the wall panel and slab panel.

Item (A1+A2) SN (L) Weight (kg)

100×100 SN 1800

100×120 SN 1800

100×125 SN 1800

100×130 SN 1800

100×140 SN 1800

100×150 SN 1800

100×160 SN 1800

150×150 SN 1800

9.95

10.79

10.99

11.48

11.60

12.00

12.40

14.01

DESCRIPTION: The slab panel will be used to support the concrete weight during concretepouring and casting.

Item D(WxL) Weight (kg)

DESCRIPTION: Use to join the prop head and slab corner, the end beam supports the slab panels.

Item EB Weight (kg)

150 EB 300

150 EB 400

150 EB 500

150 EB 600

150 EB 700

150 EB 800

2.42

3.20

3.97

4.75

5.53

6.31

DESCRIPTION: Use to join the prop heads, the middle beam supports the slab panels.

Item MB Weight (kg)

150 MB 1050

150 MB 900

8.41

7.16

DESCRIPTION: The slab incorner joint will be used to connect the wall panel and slab panel at the incorner position.

Item (A1+A2) SC (L1+L2) Weight (kg)

100×100 SC 400+400

100×150 SC 400+400

150×150 SC 400+400

4.76

5.87

7.00

600 D 1200

450 D 1200

400 D 1200

300 D 1200

200 D 1200

12.84

10.19

9.34

7.29

6.91

DESCRIPTION: Prop head to support the slab with steel props.Also it will be connected with long pin & wedge and BB bar for middle beam & end beam.

Item PH Weight (kg)

150 PH 300 2.50

23 24

The site surveyor shall based on the approved construction drawings to ensure that the structural line and level of the slab is properly set up.

Installation of M&E, plumbing components and steel rebar. Then the wall panels setup process shall be the inner corner wall panels, inner wall panels, flat-tie, external wall panels, pin and wedges.

Setup beam panels according to the construction drawing for beam soffit panels, beam support, beam side panels, etc.

Fixed the slab corner panels on the top of wall panels. Then the slab panels setup process shall be middle beam, prop head, end beam, slab panels, etc.

Kickers are fixed on the external wall panels with kicker screws before concrete pouring. The function of kickers is to support the external wall panels for next floor.

The staircase panels setup process shall be staircase soffit length, step panels, step angles,etc.

Installation of M&E, plumbing components , steel rebar and slab box-out.

All the vertical panels shall be fixed in position and the external corner should be checked. This will determine if further action is required to control the deviation.

Concrete pouring is distributed evenly throughout the wall secti before commencing to cast the slab areas.

The first wall panel will be the most difficult to remove out from wall. And it's forbidden to remove it violently.

Remove all pins and wedges from the section of beam side. Then, remove all the beam panels.

After remove all pin and wedges, middle beam and end beam will be easily removed. BTW, the prop head and steel props must not be removed to support the floor slab.

The wall panels are removed to disconnecting the lower kicker from the adjacent formwork and prepared for reuse.

Flat ties are used to ensure the wall thickness and fixed the wall panels. PVC sleeves are used to protect the flat tie so as to reuse it. Both of it can be removed by special tools.

All components shall be cleaned after dismantlement for a better quality in next floor.

Transfer all panels outthrough Slab box to large openspace.After that, it can be filled with second-time concrete.

Wall Panels setup Beam Panels setup Slab Panels setup Installation of M&E,rebar Inspection and acceptance

Concrete pouring Wall Panels dismantlement Beam Panels dismantlement Slab Panels dismantlement Kickers dismantlement Panels cleansing Transfer PanelsFlat ties & PVC sleeves

Leveling and structural line Kickers setup Staircase Panels setup

Working Process

GETO Quick-Deck Formwork System is developed to construct large slab areas quickly, safely, with minimal labour, and is fully compatible with all GETO formwork systems or timber formwork. This is an advanced aluminium deck-prop-formwork system which allows early dismantling operation.

The 1.2m X 1.8m lightweight aluminium deck panels are easy and safe to erect using a minimum of only two workers by swivelling the panel upwards from below and locking it into our quick release prop heads for a fast, safe and systematic assembly procedure.

Removing the formwork is also simple with our specially designed quick release prop head that allows the panels to drop from the formed surface without disturbing the prop. The newly developed 2-stage lowering function of the quick release prop head prevents panels from accidentally falling during dismantling and speeds up the formwork dismantling process.

As quick deck formwork panels are standard sizes and not specifically designed for one project, they are able to be re-used repeatedly on new projects without additional design costs by 100%.

Also, the standard panels are allowed to transfer by small handcart in site which is convenient for site construction.

Fast Construction. All components are light enough to erect, assembly &

dismantle by labour without heavy cranes.

Easy & Compatible. GETO Quick-Deck Formwork System are allowed and

easy to compatible with other aluminium formwork system and timber

formwork system. So it's able to be used in any areas without limitations.

Intelligent Prop Head. The special prop heads and props can be seperated.

And the props are able to be used in traditional aluminium formwork system.

High Quality. The concrete surface by aluminium panel will be better than

other formwork.

25 26

Quick-Deck Formwork System Projects in China

Zhangzhou Yango property-Versailles Guangzhou CRCE-South Headquarters Pingding mountain Country garden -Pingding mountain Tianxi

Nanning Poly real estate-Lingxiu residence Jinjiang Avitation Industrial-Tianxi City Fuzhou Country Garden - Ten Miles River Bay

Shenzhen Construction Engineering Group-CUHK Shenzhen campus Nanning Haitian real estate-Kaixuan No.1 Guyang zunyi- Longjing Phase

Suqian Country garden -Dangshan Country garden

Xuzhou Risesun property-Risesun Chengquan Sheng Mei Jia Foshan Time Square-Waterfront Garden

Advantages

27 28

Projects in Singapore

The ALPS Santorini

Tampines Senja Ridges(Bukit Panjang N6C12)

BedokBukit Panjang N6C15

TNIM COLLECTION Ang Mo Kio Court(Ang Mo Kio N2C31)

POIZ Queenspeak

Mercedes Benz CenterLE QUEST

29 30

Projects in Malaysia

IOI CITY MALLSkyridge Gardon @ Penang MAYA Residence Pavilion Hilltop @ PAVILION

PAVANA RESIDENCE @ Meleka Forest City Landmark Phase 1 @ Country Garden The Trion @ BinastraForest City P52 @ Country Garden

NOVO Ampang @ AlfrankoParadigm Mall @ WCT The ERA-Duta North @ JKG The Tropika @ Berjaya Land

31 32

MJS Rehab-2 Platnum Vogue - D.N.Nagar 71 Rain Tree Lotus Park View

Satra Eastern HeightsMarine PalaceAdhirit Tower Satra Properties Jia Rameshwar

Shreeji Atlantis

Projects in India

33 34

Projects in Cambodia Other Project References

Sea Gate

Office and Villa Street 2004 Bakong Village

The GIA TOWER

R&F CITY

Andaluz-Panama IMPERIAL-Panama

SIENNA-Panama Emperatriz-Panama

The Wellington-Jamaica

35 36

Silos Foundation-RomaniaIntegral prefabricated slab and column project-Kazakhstan

Ho Chi Minh CT03 project-VietnamBak Villas-The United Arab Emirates

Azumi phase II-Philippines

COFICO - ArgentinaSpectacular heights development-Jamaica

UDA housing project-Sri Lanka

Cite Residintielle-Djibouti

Oran 3000 units affordable house-Algeria