29 th October 2015 Global Street Design Program – NACTO, Austin THE CROSSWALK LAB (an initiative of Centre for Green Mobility)

The Crosswalk Lab

Embed Size (px)

Citation preview

Page 1: The Crosswalk Lab

29th October 2015Global Street Design Program – NACTO, Austin

THE CROSSWALK LAB(an initiative of Centre for Green

Mobility)

Page 2: The Crosswalk Lab

The Crosswalk LabTraffic Junction management through improved design

Traffic Police Municipal Corporation

Vijay CrossingNarol Crossing

Traffic Management, Signaling Plan & Design

Page 3: The Crosswalk Lab

PUBLIC CONNECT | The Crosswalk Lab

The Crosswalk LabTraffic Junction management through improved design

STUDY AREA DEFINING

SURVEYS

ANALYSIS

STREET AUDIT:

PERCEPTION STUDYMEASUREMENT FOR DRAWING

TRAFFIC :

PEAK HOUR VEDIOGRAPHYUNDERSTANDING OF TRAFFIC

BEHAVIOURSIGNAL PHASING

PREPARATION OF DRAWINGVOLUME COUNT ANALYSIS

SIGNAL PHASING

DEMONSTRATION & COLLECTING EVIDENCE

PROPOSAL TO MUNICIPAL CORPORATION

Page 4: The Crosswalk Lab

PUBLIC CONNECT | TCL – Vijay Crossing

Feedback before the experimentShopkeepers, Pedestrians and Motorists

What we have needs to change

What we have is alright

Page 5: The Crosswalk Lab

PUBLIC CONNECT | TCL – Vijay Crossing

High number of pedestrians

Page 6: The Crosswalk Lab

PUBLIC CONNECT | TCL – Vijay Crossing

Issues

Parking at intersection and footpathConflict between traffic, pedestrians and parked vehiclesNo safe crossing path for pedestriansHigh speed of turning vehiclesHigh incidence of wrong turning vehicles

Page 7: The Crosswalk Lab

Left lane: 8 mC- 2400 PCUD- 166 PCU6.9% Used

Left lane: 8 mC- 2400 PCUD- 187 PCU7.9 % Used

PUBLIC CONNECT | TCL – Vijay Crossing

Page 8: The Crosswalk Lab

PUBLIC CONNECT | TCL – Vijay Crossing

Towa

rds U

NIVE

RSIT

Y

Towards DRIVE-INTo

ward

s DAR

PAN

towards COMMERCE

Phase 1 50 sec

Phase 3 50 sec

Phase 4 50 sec

Existing signal cycle: 200 sec

Phase 2 50 sec

Page 9: The Crosswalk Lab

PUBLIC CONNECT | TCL – Vijay Crossing

Towa

rds U

NIVE

RSIT

Y

Towards DRIVE-IN

Towa

rds D

ARPA

N

towards COMMERCE

Phase 1 45 secPhase 2 15 sec

Phase 3 40 sec

Phase 4 15 sec

254

8 P

CU/h

r

1200 PCU/hr

500

PCU

/hr

500 PCU/hr

Proposed signal cycle: 115 secReduction by

20seconds in each arm

Phase 2 15 sec

Page 10: The Crosswalk Lab

PUBLIC CONNECT | TCL – Vijay Crossing

Maximum speed at left turn:50 kmphMaximum speed at right turn: 20

kmphMaximum speed at straight: 40 kmph

Page 11: The Crosswalk Lab

PUBLIC CONNECT | TCL – Vijay Crossing

No lane discipline

Wide open left turnsUnguided road space

8 m

Too wide carriage way

Delay in junction clearance

8 m

Page 12: The Crosswalk Lab

PUBLIC CONNECT | TCL – Vijay Crossing

No sight distance for pedestriansLeft turn with high speed

Unsafe pedestrians

Page 13: The Crosswalk Lab

PUBLIC CONNECT | TCL – Vijay Crossing

Unsafe pedestriansIsland covered by greenery

Mix of trafficUnrestrictive u turn

No refuge while crossing at junction – median too far – too narrow

Page 14: The Crosswalk Lab

PUBLIC CONNECT | TCL – Vijay Crossing

Page 15: The Crosswalk Lab

PUBLIC CONNECT | TCL – Vijay Crossing

Page 16: The Crosswalk Lab

PUBLIC CONNECT | TCL – Vijay Crossing

Page 17: The Crosswalk Lab

PUBLIC CONNECT | TCL – Vijay Crossing

Page 18: The Crosswalk Lab

Improving SAFETY while crossing the road

Safe left turns

Page 19: The Crosswalk Lab

Improving SAFETY while crossing the road

Speed reduced by 60%

Page 20: The Crosswalk Lab

Improving SAFETY while crossing the road

A space to wait while crossingImproved and constrained turning – notice the police standing in the refuge

Page 21: The Crosswalk Lab

Junction Re-design

Existing Situation – No clear space for cyclists and pedestrians which is blocked by parked vehicles

Page 22: The Crosswalk Lab

Junction Re-design

New Situation – Space created for cyclists and pedestrians by aligning parking away from edge.

Page 23: The Crosswalk Lab

Junction Re-design

New Situation – Space created for cyclists and pedestrians by aligning parking away from edge.

Page 24: The Crosswalk Lab

Improving SAFETY while crossing the road

A space to wait while crossing

Page 25: The Crosswalk Lab

A space to wait while crossing

PUBLIC CONNECT | TCL – Vijay Crossing

Page 26: The Crosswalk Lab

A space to wait while crossingReduction in wrong side - No extra space

PUBLIC CONNECT | TCL – Vijay Crossing

Page 27: The Crosswalk Lab

DAY 0Implementation

Improving SAFETY while crossing the road

Page 28: The Crosswalk Lab

Day 1Slow left turns

Improving SAFETY while crossing the road

Page 29: The Crosswalk Lab

Day 1Slow U turns

Improving SAFETY while crossing the road

Page 30: The Crosswalk Lab

Day 1Parking getting organized

Improving SAFETY while crossing the road

Page 31: The Crosswalk Lab

Day 2

Improving SAFETY while crossing the road

Day 1More walking space,But parking persists

Page 32: The Crosswalk Lab

Day 2

Improving SAFETY while crossing the road

Day 1Refuge helps

Page 33: The Crosswalk Lab

Day 3

Improving SAFETY while crossing the road

Day Parking back to its original position

Page 34: The Crosswalk Lab

Day 3

Improving SAFETY while crossing the road

Day Much talking to people helps

Page 35: The Crosswalk Lab

Day 3

Improving SAFETY while crossing the road

Day Parking getting organized again

Page 36: The Crosswalk Lab

Day 4Talking talking and more talking to peopleTo get them to understand new parking space

Improving SAFETY while crossing the road

Page 37: The Crosswalk Lab

Day 5Much discipline observed

Improving SAFETY while crossing the road

Page 38: The Crosswalk Lab

Day 5

Improving SAFETY while crossing the road

Observed managed parking

Page 39: The Crosswalk Lab

Issues on street (Shopkeepers)

IMPACT

Page 40: The Crosswalk Lab

Do you feel street safe? (pedestrians)

IMPACT

Page 41: The Crosswalk Lab

THE IMPACT

Geometric Design of Junction

Pedestrian safety at the junction. High IncreaseSafety for cyclists at the junction. Little IncreaseHigh turning speeds. Reduced by 60%High incidence of wrong lane driving (opposite currents). Reduced by 90%Large wait time at junctions. Decrease by 35%Managing traffic. Easy

PUBLIC CONNECT | TCL – Vijay Crossing

Page 42: The Crosswalk Lab