New Sun light Window with 5cm upper the roof surface

Number of target windows is 230 window with dimension 290cm x 95 cm and galvanized Steel duct Z shape 5cm

1.5mm thickness they coast about =230x 220 SAR = 46000 SAR

Page 11: Roof works 2

The Current situation

Page 12: Roof works 2
Page 13: Roof works 2
Page 14: Roof works 2
Page 15: Roof works 2
Page 16: Roof works 2
Page 17: Roof works 2
Page 18: Roof works 2

•Installation of Galvanized steel duct with dimension 35cmx20cmx20cm connected to the drain pipe

It is about 550m it will coast about 550m x 50 27,500 SAR=SAR

Page 19: Roof works 2

The Current situation

Page 20: Roof works 2
Page 21: Roof works 2
Page 22: Roof works 2
Page 23: Roof works 2
Page 24: Roof works 2
Page 25: Roof works 2
Page 26: Roof works 2
Page 27: Roof works 2
Page 28: Roof works 2
Page 29: Roof works 2
Page 30: Roof works 2

•Installation of Galvanized steel duct with dimension 15cmx20cm connected to the drain pipe

It is about 142 m it will coast about 142m x 70 9,900 SAR=SAR

Page 31: Roof works 2
Page 32: Roof works 2
Page 33: Roof works 2
Page 34: Roof works 2
Page 35: Roof works 2

•removing the obstruction(Cable , Pipes ) by using pipe support like the attached photo

Page 36: Roof works 2

•Rising the pipe with length about 100m with coast about = 100x 6 SAR =600 SAR

•Rising the cable (earthing cable) with length about SAR2100420 m with coast about =420x 5 SAR=

Page 37: Roof works 2
Page 38: Roof works 2
Page 39: Roof works 2
Page 40: Roof works 2
Page 41: Roof works 2
Page 42: Roof works 2
Page 43: Roof works 2
Page 44: Roof works 2
Page 45: Roof works 2
Page 46: Roof works 2

•The area of the damaged insulation about 1130m² with coast about 33000 SAR

Filing the pockets and the surface holes with foam solution

•Remove, restoration, and resealing in with insulation foam the damaged factory surface

•The pockets about 113 with it will coast about 113x 80 SAR =9000 SAR