13
2012 Green Building Festival Hi-Rise Geo Condo Project Why Go High-Performance? Oct 12 th , 2012 Vince Molinaro President, Molinaro Group

Hi-Rise Geo Condo Project

Embed Size (px)

DESCRIPTION

Vince Molinaro Reasons to go high performance with geothermal and an energy cost analysis of Strata Condominium

Citation preview

Page 1: Hi-Rise Geo Condo Project

2012 Green Building Festival Hi-Rise Geo Condo Project Why Go High-Performance?

Oct 12th, 2012

Vince Molinaro

President, Molinaro Group

Page 2: Hi-Rise Geo Condo Project

Who we are? What we do?

Why go high performance?

Strata case study

Future projects

Topics

Page 3: Hi-Rise Geo Condo Project

Who we are

Molinaro Group

Page 4: Hi-Rise Geo Condo Project

Leadership – the right thing to do

Competitive advantage

Marketing

Financial

Why Go High Performance?

Page 5: Hi-Rise Geo Condo Project

Strata

LEED® Certification

Page 6: Hi-Rise Geo Condo Project

c

Each Suite:

Geo Field

76 holes

560 ft

Heat Absorption

Geothermal Heating

Page 7: Hi-Rise Geo Condo Project

Geo Field

Each Suite:

76 holes

560 ft

Heat Rejection

Geothermal Cooling

Page 8: Hi-Rise Geo Condo Project

Components of a Geothermal

Internal portion

Geothermal heatpump unit

supplies heating or cooling

the space

External portion

Fluid is circulated through a

network of vertical bore

holes to extract/reject heat

into the ground from

heatpump unit

Page 9: Hi-Rise Geo Condo Project

External Geothermal Field

Heat rejection in summer; heat absorption in winter

Basement mech room – geo pumps circulate fluid to heat exchanger; central W/W heat pumps deliver building fluid to suite heat pumps

Geofield located under building: 76 vertical holes; 560 ft depth

Page 10: Hi-Rise Geo Condo Project

Long-term energy agreement

Strata

Page 11: Hi-Rise Geo Condo Project

Strata Condominium Energy Cost Analysis

Page 12: Hi-Rise Geo Condo Project

Fairview Street Burlington

Page 13: Hi-Rise Geo Condo Project

Thank you