Upload
cathyhiggins
View
105
Download
1
Embed Size (px)
Citation preview
AGENDA
How can LEED for Existing Buildings encourage more aggressive energy savings?
AGENDA
AGENDA
The Aventine Of ce BuildingLa Jolla, CA, USA
YEAR 1 RESULTS:• Increased EPA ENERGY STAR
score to from “84? to “100”• GHG Emission Reduction
From Baseline –234 (MtCO2e)• Pre-Retrofit Electrical Cost at
$2.90 $per/ ft2 • Post-Retrofit Electrical Cost at
$2.20 $per/ ft2
• 2011 Year End Electrical Cost at <$1.90$per/ ft2
Source: Glenborough PropertiesSource: Glenborough Properties
The Alliance Center Office BuildingDenver, CO USA
Connections to LEED
AGENDA