StevenSeconArchitect, P.C. typical design & construction sequence 145 Palisade Street, Suite 391 Dobbs Ferry, New York 10522 914.674.2950 tel. 914.693.1537 fax [email protected] Sunday, October 12, 2014 1.initial meeting, discuss objectives, schedule, budget 2. proposal and retainer 3. measure, draw existing, survey, verify applicable regulations 4. preliminary design, develop options 5. initial design meeting, review and select option 6. design and refine selected option 7. design meeting(s), review schedule budget, next steps 8 .drawings are developed into technical construction documents 9. Filing and Permitting:Construction documents, fees and applications filed with municipality , reviewed, adjusted 10. bidding and negotiation : Builders review, assess and provide estimate. Negotiation to best terms. Vetting and selection, contract writing 11. Construction begins. Permit obtained by builder. 12. Demolition and / or site work & prep 13. Foundation , utility work 14. framing 15. Roughin g (pipe, ducts and wires in walls and floors) 16. Finishes, site work 17. Punchlist Furnishings, movein party!

Design construction-sequence

Embed Size (px)

Citation preview

Page 1: Design construction-sequence

StevenSeconArchitect, P.C. typical design & construction sequence 145 Palisade Street, Suite 391 Dobbs Ferry, New York 10522

914.674.2950 tel. 914.693.1537 fax

[email protected]

Sunday, October 12, 2014

1.initial meeting, discuss

objectives, schedule,

budget

2. proposal and retainer

3. measure, draw existing,

survey, verify applicable regulations

4. preliminary design,

develop options

5. initial design meeting,

review and select option

6. design and refine

selected option7. design meeting(s),

review schedule budget, next steps

8 .drawings are developed

into technical construction documents

9. Filing and

Permitting:Construction documents, fees and applications filed with

municipality , reviewed, adjusted

10. bidding and

negotiation : Builders review, assess and provide estimate.

Negotiation to best terms. Vetting and selection,

contract writing

11. Construction begins.

Permit obtained by builder.

12. Demolition and / or site

work & prep13. Foundation , utility

work

14. framing

15. Roughin g (pipe, ducts

and wires in walls and floors)

16. Finishes, site work

17. Punchlist Furnishings,

movein

party!