Upload
wooilindo
View
799
Download
4
Embed Size (px)
Citation preview
1
PT.WOOIL INDONESIASteel Structure, Steel Fabrication & Machine Manufacture
Head Office/ FactoryJl.Raya Pasar kemis - Rajeg
Kel.Sindangsari, Pasar KemisTangerang – BantenTlp : 021-59350101Fax : 021-59350123
Email : [email protected]
Company Profile
2
Company Profile1
Business Fields2
Organization3
Picture of Workshop4
Equipment List5
List of Clients7
Project Experience6
3
1. Company Profile
Location : Tangerang, Banten, Indonesia1
Registered Name : PT. WOO IL INDONESIA2
Office Address : JL.RAYA PASAR KEMIS No. 25, SINDANGSARI PASAR KEMIS, SINDANGSARI, TANGERANG 15560, BANTEN,
3
Authorized Capital : US$ 4,200,0004
Total Asset : US$ 14,250,0005
Tel No. : + 62 -21- 5935-0101 / Fax No. + 62 -21-5935-01236
Work Shop : Shop (8,023m2) / Yard (44,560m2)7
Established : JUNE 30, 19898
CEO & Major Share Holder : Jung, Sung-Koo 9Education & Experience : Gim Hae, South Korea Korea University, Seoul Worked for S-Oil Refinery Co., Ltd. Seoul
4
2. Business fields
<Business fields>1. Steel Structure Fabricator and Erection, Machining
Manufacture
2. Industrial Machinery Manufacturing & Erection for the Fac-
tory, Refinery and other processing plant.
3. Fabrication of Conveyor, Vessel, Storage tank and Silo.
4. Various Steel Structural Products.
5. Fabrication of Production line for Plywood, Tyre making
Machinery
6. Ducting, Piping, Hydraulic ,Pneumatic and Electrical WorkHead Office
Jl.Raya Pasar kemis-Rajeg No.25, Kel.Sindangsari, Pasar KemisKab.Tangerang – Banten, Tlp : 021-59350101, Fax : 021-59350123
Email : [email protected]
5
2. 1 Business fields
7. Plastic Extrusion Machinery – Screw Barrel, Extru-
sion Mould and Electric Panel
8. Transfer Car, Ware house Drive in Rack.
6
IPCR – Indonesia Posco Chosun RefractoriesCilegon - Banten
Fabrication of whole refractory making facility Structure S/Bin for Mud, D/C & H/S Mixer Mud Mixer, D/C Mixer & H/S Mixer Skip Hoist for Mud Mixer, D/C Mixer & H/S Mixer Mixer Deck Mud,D/C & H/S Transfer Car Tar Tank
7
KRAKATAU POSCO PROJECTCilegon, Banten – Indonesia
BLAST FURNACE
FURNACE TOP Steel Structure, Platform & Stair Bleeder Valve Inspection Deck
CASTHOUSE Mould for Main Iron Runner Mould for Tilting Runner Main Iron Trough Cover
8
DONG SUH Chemical ProjectCikande – Banten
PROCESS AREA Steel Construction Mazzanine Floor Stair and Deck Handrail
BOILER HOUSE Steel Construction
COMPRESSOR HOUSE Steel Construction
PIPE RACK Steel Construction
DRYER STRUCTURE Steel Construction
WARE HOUSE Steel Construction
PACKING HOUSE Steel Construction
9
KING POSTSAMSUNG C&TINTERNATIONAL
FINANCIAL CENTER II
10
RACK SYSTEM Drive Rack Raw Material Pallet Rack Second Floor Rack
11
STEEL STRUCTUREDOOSAN HEAVY INDUSTRIES
Mong Duong II 2x560MW (NET)Coal Fired Power Project -Vietnam :
Internal Platform Silo # & Silo #2 Pipe Rack for Silo #1 & Silo #2 Pre – Heating hanging Platform Pipe Bridges for Silo #1 & Silo #2 Maintenance Hoist Roof Hoist
12
STACKER RECLAIMERDOOSAN HEAVY INDUSTRIES
Cikarang Listrindo CFPP 3 x 140 MWFuil Handling System
Scope : Drive Truck, Portal, Slewing Platform Boom Head & Structure, Bucket Wheel Pylon, Counter Weight Boom Boom Stay, Tie Rod, Luffing Drive Tripper Structure, Electric House
13
GRAB TYPE SHIP UNLOADERDOOSAN HEAVY INDUSTRIES
Cikarang Listrindo CFPP 3 x 140 MWFuil Handling System
Scope : Gantry & Base Rail Land Side Frame & Water Side Frame Girder Frame, Deflector Sheave M-House Electric House M-House Electric Support Ect part for GTSU
14
3. Location View
PT.WOOIL INDONESIAJl.Raya Pasar Kemis-Rajeg No.25
Kel.Sindangsari, Pasar KemisTangerang – Banten
Tlp.021-59350101, Fax.021-59350123
TOL JAKARTA – MERAKGuard Tol Cikupa-Kedaton
TOL JAKARTA – MERAKGuard Tol Kebon Jeruk
https://www.google.com/maps/place/PT.+WOO+IL+INDONESIA/@-6.152371,106.532368,17z
15
3.1 Organization OF Com-pany
<Status of Local Manpower>
• Staff : 9 Person• Full time : 25 Person• Part time : 183 Person
Project Team FabricationTeam
Quality ControlQuality
Assurance
AdministrationDivision
EngineeringManager
CEO
16
3.2 Project OrganizationCLIENT
Project Manager
PROJECT CONTROLMANAGER
ENGINEERINGMANAGER
PROCUREMENTMANAGER
CONSTRUCTIONMANAGER
COMMISSIONINGMANAGER
SCHEDULECOST CONTROLDOCUMENT CONTROLMATERIAL CONTROL
OPTIMIZATION STUDYPROCESS SIMULATIONBASIC ENGINEERINGDETAILED ENGINEERINGOPERATION SERVICES
PURCHASINGEXPEDITINGINSPECTIONTRAFFIC CONTROL
CONST.MANAGEMENTFIELD ENGINEERINGPROCUREMENTSAFETYFIELD QA/AC
COMMISSIONINGSTART-UPPERFORMANCE TEST
FABRICATIONMANAGER
QA / QCMANAGER
ADMMANAGER
PROJECTENGINEER
SINGLE CONTACT POINTWITH FULL RESPONSIBILITY
17
KOREAN INDONE-SIAN
Managerial Staff 1 9
Administration 10 Engineers (Graduated) - Mechanical / Piping 1 7 - Electrical 3 - I & C 1 4
Surveyor 1
Drafter 3
Field Supervisor 1 2 Summary 4 39
3.3 Company Organization
18
Description Maximum Mobi-lization
1. Pipe Fitters 100 2. Steel Fabricator 100 3. Millwright or Mechanical 150 4. Riggers 40 5. Welders 80 6. Insulators 130 7. Painters 50 8. Vehicle Mechanics 20 9. Electricians 40
Total 710
3.5 Company Organization - WORKER Mobilization
19
4. Picture of Work Shop
Milling M/CBending M/C
Plano Miller
Gun drill M/C
Radial Drill M/C
Sharing
Lathe M/C
Scraf M/C
Bending M/C
CNC Plasma & Flame Cutting M/C
20
4.1. Picture of Work Shop
Band Saw MachineWith Infeed Roller Conveyor and Outfeed Roller Conveyor
For Cutting H-Beam, UNP, Angle, Pipe Lip Channal
21
CNC Plasma Cutting M/C- Hypertherm
4.2. Picture of Work Shop
22
Work Shop Work Shop
Work Shop
Factory Guard
4.3. Picture of Work Shop
Work Shop
23
SHOT / SAND BLASTING AND PAINTING AREA
4.4. Picture of Work Shop
24
No. Descriptions Qty. Unit
1. Overhead Crane 5 Ton 3 Set
2. Forklift 5 Ton 1 Set
3. Forkllift 3 Ton 2 Set
4. Milling Machine # 10. 1 Set
5. Milling Machine # 5. 2 Set
6. Gun Drill Machine dia 19 mm – 50 mm 1 Set
7. Radial Drilling Machine 3 Set
8. Plate Roll Bending Machine 15 T 2 Unit
9. Bending Machine 1 Unit
10. Magnetic Drill 13 Unit
11. Shearing Machine 2 Unit
12. Scraf Machine 2 Set
13. CNC Plasma Cutting Machine, Hyper-therm 1 Unit
5-1. List of EquipmentsNo. Descriptions Qty. Unit
14. Portable Flame Cutting Machine 6 Set
15. Automatic Flame Cutting Machine 3 Set
16. Bench Grinder 3 Set
17. Air Compressor, 100 HP, 50 HP, 15 HP 3 Set
18. Cutting Wheel Machne 2 Set
19. Balancing Machine 1 Unit
20. Lathe Machine Max 6 meter, Swing 1.5 meter 5 Set
21. Planer Miller, wiidth 1,8 mter, length 15 mtr 1 Unit
22. Band Sawing Machine, H650, Amada 1 Unit
23. Gantry Crane 10 Ton 1 Unit
24. Band Saw 2 Unit
25. CNC Cutting 2 Unit
25
No. Descriptions Qty. Unit Capacity
1.DIESEL ENGINE , ENGINE DEUTZ F3L-
912TAHUN 1997
45 SetMILLER BIG BLUE TYPE : 500DX - 500A / Weld output range : 45 - 500Amp / Rated welding output : 500A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase, 3 KVA/KW / 25A, 120V AC, 60 Hz
2.DIESEL ENGINE, ENGINE DEUTZ F3L-
912TAHUN 2002
12 SetMILLER BIG BLUE TYPE : 602DX - 600A / Weld output range : 45 - 600Amp / Rated welding output : 600A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase, 3 KVA/KW / 25A, 120V AC, 60 Hz
3.DIESEL ENGINE, ENGINE DEUTZ F3L-
912TAHUN 2002
1 SetMILLER BIG BLUE TYPE : 401DX - 400A / Weld output range : 45 - 400Amp / Rated welding output : 400A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase, 3 KVA/KW / 25A, 120V AC, 60 Hz
4. DIESEL ENGINE, ENGINE DEUTZ F3L-912 2 Set
MILLER BIG BLUE TYPE : 300A / Weld output range : 45 - 300Amp / Rated welding output : 300A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase, 3 KVA/KW / 25A, 120V AC, 60 Hz
5. DIESEL ENGINE, THERMAL ARC TA 20/500PS, TAHUN 2000 12 Set
PERKINS 3.1524-500A / Welding current max : 500Amp / Duty cycle : 60 - 100% / Power : 36 HP (26KW) – 1500 RPM / Voltage : 230V/50Hz, 1 Phase, 12 KVA
6. WELDING RECTIFIER , TAHUN 2001 60 Set DC Rectifier SRH 444 - 500A / Merk MILLER / 3 Phase, 220V/380V - 50Hz / Duty cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) Welding
7. AUTOMATIC WELDING, TAHUN 2005 1 Set Merk ESAB / Double Side Horizontal
8. WELDING RECTIFIERYear 2013 50 Unit DC Rectifier SRH 444 - 500A / MILLER / 3 Phase, 220V/380V - 50Hz /
Duty cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) Welding
9. WELDING MACHINE Co2 50 Unit INVERTER, MIG Welding Riland 350 A
10. WELDING RECTIFIER 4 Unit MILLER Delta Weld 402
11. WELDING RECTIFIER, TAHUN 1998 7 UnitDC Rectifier 300 - 400A / AECO/DAIHEN/ESAB LHF 400 / 3 Phase, 220V/380V - 50HzDuty cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) Welding
5-2. List of Equipments
26
No. Descriptions Qty. Unit Capacity
12. WELDING RECTIFIERTAHUN 1998 1 Unit
DC Rectifier 400A / THERMAL ARC 400 GTS / 3 Phase, 220V/380V - 50HzDuty cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) / Titanium Welding
13. WIRE FEEDER (CO)TAHUN 2000 2 Unit
DC ARC VOLTAGE 15 - 40V - 400A / LINCOLN - LN 25 / 3 Phase, 220V/380V - 50HzMIG Welding
14. WIRE FEEDER (CO)TAHUN 2000 2 Unit
DC ARC VOLTAGE 15 – 40V - 400A / MILLER / 3 Phase, 220V/380V - 50HzMIG Welding
15. PLASMA CUTTING MACHINE 1 Unit ESAB - PCM 875 / Max. Carbon Steel : 25mm / SUS Max. : 15mm
16. GENERATOR SETSOUND PROOF
11
UnitUnit
DENYO - 180 SPKMitsubishi – 100 KVA
17. GENERATOR SET , SOUND PROOF 2 Unit HOKUETSU / Cap. : PDG - 35KVA
18. SANDPOT 4 Set GRACO – USA / Cap. : 1M3
19. PAINTING 2 Set Cap. : 10 Liter
5-3. List of Equipments
27
No. Descriptions Qty. Unit Capacity21. FORKLIFT 3 Unit KOMATSU/MITSUBISHI Cap. : 3 Ton
22. CRANE TELESCOPIC, TAHUN 1982 1 Unit KATO, Cap. : 30T
23. CRANE TELESCOPIC, TAHUN 1997 1 Unit P & H, Cap. : 35T
24. CARGO CRANE, TAHUN 1997 1 Unit TADANO, Cap. : 3T
25. KOBELCO, TAHUN 1998 1 Unit YUTANI, Cap. : 0.8 M3
26. STONE WALES 1 Unit Tahun 1992
27. VEHICLE’STRUCK ISUZU ELF 135 PS
TRUCK MITSUBISHIPICK UP PANTHERPICK UP KIJANG
DAIHATSU ROCKY 4WDHINO TRONTON (Blue)
422111
UnitUnitUnitUnitUnitUnit
Tahun 1997Tahun 1997Tahun 1997Tahun 2003Tahun 1995Tahun 1998
5-4. List of Equipments
28
CLIENT / LOCATION PROJECT NAME PROJECT PERIOD REMARK
PT. SK KERIS 1) Fabrication & Erection Quenching Stack 1992. 06 ~ 1993.07
TANGERANG 2) Mechanical & Piping Work For Utility Area 1993. 09 ~ 1994.02
-WEST JAVAINDONESIA 3) Fabrication & Erection Work For Steel Structure , Piping & Equipment For ISBL Area
1994. 02 ~ 1995.11
4) Erection ISP- 4 Polyester Spinning M/C Piping Work 1995. 12 ~ 1997.04
5) Modification Cp-1 & Overhaul 1997. 09 ~ 1998.02
6) Sm#2 For ISP-7a Project 1998.10 ~ 1999.05
HYUNDAI DUTA GRAHA 1) Fabrication & Erection Steel Structure Work 1996.11 ~ 1997.05
PT. CHEIL JEDANG 1) Equipment Erection & Piping Installation 1997.07 ~ 2010.12
2) DISMANTLING & ERECTION OF PADDLE MIXER 2003.07 ~ 2009.12
PT. GARUDA TWIN JAYA 1) Fabrication & Erection Tape Coating Machine 1997.09, 2004.07
BOSOWA CEMENT PROJECT 1) Fabrication & Erection Work For Steel Structure 1997.09 ~ 2010.04
PT. SAMICK INDONESIA 1) Fabrication & Erection Water Painting System 1996.04 ~ 2003.02
2) Fabrication & Erection Duct Line 2003.02 ~ 2010.05
PT. ASPEX KUMBONG 1) Fabrication & Erection Auto Welding System for Container Line
1998.06 ~ 2011.01
PT. SEPARINDO INDUSTRY 1) Fabrication & Erection Equipment & Piping Work 2001.08 ~ 2008.03
PT. DOOSAN HEAVY INDUSTY 1) SIPAT AIR DUCT PROJECT 2005.07 ~ 2006.02
2) PSA - RTGC PROJECT 2006.3 ~ 2006.11
PT. GOLD STAR PAPERTECH 1) Installation Press System 2006.09 ~ 2007.12
6. Experience Projects
29
CLIENT / LOCATION PROJECT NAME PROJECT PERIOD REMARKPT. Hankook Tyre 1) Tyre Making machinery 2011 ~ 2012
Cikarang, West Java 2) Hydraulic Trans machine
3) Fabrication & Erection Work4) Transfer Car
5) Catridge Roller
POCSO E&C
Cilegon, Banten
1) Steel Structure Fabrication for Krakatau Steel2) COG, Gas Holder Tank3) Inspection Deck, Handrail for Blast Furnace 4) Iron Runner Mould Fabrication5) Iron Runner Trough Fabrication6) Mould Cover Fabriation7) Duct, Flange, etc.
2012 .11~ 2013.12
IPCR (Refractory making Fac-tory)
1) Storage Tank 72 Set2) Steel Structure 3) Mud Making machinery4) Hoist Crane
2013 .02~ 2013.09
Cilegon, Banten
Dong Suh Chemical
Cikande, Banten
1) Steel Structure for Chemical Plant2) Process Are Building3) Boiler House Constrution4) Compressor House Construction5) Ware House Constructoin6) Packing House Construction7) Pipe Rack Construction
2013 .06~ 2013.09
6. Experience Projects
30
CLYDE BERGEMANNMong Duong II wx560MW (NET)Coal Fired Power ProjectVietnam
1) Internal Platform Silo #1 & Silo #22) Steel Structure & Pipe Rack3) Silo 1 & 2 Maintenance Hoist4) Silo 1 & 2 Roof Hoist5) Pipe Support & Hangers6) Cast Plates, Pipe Support, Hangers7) Pre-Heater Hanging Platform Unit 1 & 2
2013 .09~ 2013.12
PT. CIKARANG LISTRINDOCFPP 3x140MWFuel Handling SystemIndonesia
STACKER RECLAIMER
1) Drive Truck, Portal, Slewing Platform2) Boom Head & Structure, Bucket Wheel3) Pylon, Counter Weight Boom4) Boom Stay, Tie Rod, Luffing Drive5) Tripper Structure, Electric House6) Ect part for STRE
2014 .08~ 2015.07
PT. CIKARANG LISTRINDOCFPP 3x140MWFuel Handling SystemIndonesia
GRAP TYPE SHIP UNLOADER
1) Gantry, Base Rail2) Land Side Frame, Water Side Frame3) Girder Frame, Deflector Sheave4) M-House Electric House5) M-House Electric Support6) Ect part for GTSU
2014 .08~ 2015.07
31
List of CLIENT List of CLIENT
PT. KRAKATAU STEELPT. ASPEX KUMBONGPT. CHEIL JEDANGPT. HANKOOK CERAMICPT. DOOSAN HEAVY INDUSTRYPT. SAMICK INDONESIAPT. HYUNDAI HEAVY INDUSTRYPT. INNE DONGHWAPT. KALIMAS PLYWOODPT. INDAH KIATPT. INTI INDORAYON UTAMAPT. KAYU LAPISPT. RIMBUNAN HIJAUPT. DONG INNEPT. WAENIBEPT. WIJAYA GROUPPT. SUMBER GRAHA SEJAHTERAPT. KOSTRAMAS JAYAPT. BASIRIH INDUSTRIPT. PUTRA SUMBER UTAMAPT.SK KERISPT. POSCO E&C
PT. HANJUNG Heavy IndustryPT. HASKO JAYAPT. TIRTA MAHAKAMPT. HANKOOK TYREPT. PANCA USAHA PALOPOPT. SEPARINDOPT. LEEWONPT. BOSUNG INDONESIAPT. FEDERAL TIREPT. GARUDA TWINJAYAPT. DONGSUNG CHEMICALPT. DAESHINPT. EURASIA WOODPT. ABHIRAMA KRESNAPT. OMEGA PRIMAWOODPT. BALIKPAPAN FORESTPT. BADE MAKMUR ORISSAPT. PRATAMA ABADIPT. KRAKATAU POSCOPT. TEKNIKO INDONESIAPT. CIKARANG LISTRINDO
7. List of Clients
32
JL.RAYA PASAR KEMIS NO.25, KEC.PASAR KEMIS, DESA SINDANGSARI, TANGERANG 15560, BANTEN, INDONESIA
Tel : + 62 - 21 - 5935 - 0101, Fax: + 62 - 21 - 5935 - 0123, Mobile : + 62 - 812 - 100 - 7151Email: [email protected] [email protected]