Upload
kavyauchil
View
19
Download
1
Embed Size (px)
Citation preview
# of Open Cases: 6Common Issues Solution
JD Misalignment – the job is different from what was promised on the Job Description.
Have your EP meet with the TN manager and the TN Taker Responsible to discuss job responsibilities. If this is unsuccessful, your EP can request to be placed on a new project (XPP: 6.2.3 & 4.6.1-G)
Basic Work Conditions – the TN Taker does not provide adequate working conditions, which makes the EP’s job impossible.
Have your EP meet with the TN manager and the TN Taker Responsible to see how basic working conditions can be improved. This may include the provision of new materials or a physical working space. If this is unsuccessful, your EP can request to be placed on a new project (XPP: 6.2.3 & 4.6.1-J)
Check on your EPs at least once per week!(Mandated by 4.5.4.1 of the XPP!)
NCB Forms and ContactName What’s it for? Link
Feedback Form Does your EP want to provide feedback about their experience? Does your EP have a complaint that needs to be solved? Fill out this form and the NCB will respond with recommendations.
http://bit.ly/USExchangeFeedback
Break Match Form Has your EP broken a match? Fill out this form to help us track broken matches and refunds. Updates from this form will be included in the next newsletter
http://bit.ly/USBreakMatch
Name Position Email
Michael Lenmark National Control Board, Chair [email protected]
Cam Tu Le Quality Case Manager [email protected]
Berk Özmeral Reporting and Auditing Manager [email protected]