Iain R M Cameron

Presentation of Professional Experience

Page 2: Iain Cameron CV presentation jun13

Introduction

• This presentation is a visual demonstration of my experience.

• It contains photographs of some of the exciting projects I have had the privilege of being involved in and details of some of the employers I have had the pleasure to work for.

• It also shows the durations I have been involved in each of the various categories.

Page 3: Iain Cameron CV presentation jun13

Experience Categories• Project Management• Construction Management• Business Development• Contract Administration• Highways and Transportation• Rail• Water and Drainage• Structures• Health & Safety• Environmental• Education and Training

Page 4: Iain Cameron CV presentation jun13

Employment List

• The following slides show details of my employment listed chronologically, starting from the present.

• Each employment period is broken down into time spent on the various experience categories.

Page 5: Iain Cameron CV presentation jun13

Employment List

Period Duration

(mths)

Employer Post Projects Experience

Category mths

Sept 12 – To date

14Parsons Brinckerhoff, Doha, Qatar

Construction ManagerLocal Roads & Drainage Programme

Construction Management

14

Aug 11 – Jun 12

11CPG – Global, Auckland, NZ

Transport Sector Manager - NZ

Roads, Rail, Marine & Airports Projects

Highways & Transportation 11

Project Management 6

Business Development 8

Jul 10 – Jul 11

12 QPM Doha, Qatar Infrastructure Director Lusail Light Rail Network Bid

Highways & Transportation 9

Contract Administration 6

Business Development 9

Feb 09 – Jul 10 18

KiwiRail, Auckland, NZ

Project Interface Manager

New Lynn Rail Trench

Rail 18

Project Management 18

Contract Administration 5

Nov 07 – Nov 08 12

EC Harris, Abu Dhabi, UAE

Service Delivery Team Leader (Snr Project Manager)

 Shopping Mall and Hotel Development, Abu Dhabi

Project Management 12

Contract Administration 6

 Business Development  6

Oct 06 - Nov 07

13 Hyder Consulting, Abu Dhabi, UAE

Construction Director

 Responsible for over 200 site staff – Projects incl. 60 storey towers, marine works, infrastructure works

Construction Management 12

Project Management 10

Contract Administration 6

Health & Safety 6

Environmental 3

Education & Training 3

Jan 06 - Oct 06 10

MWH, Hawkes Bay, NZ

Group Manager - Local Government

 Responsible for teams involved in infrastructure works and environmental

Project Management 10

Contract Administration 5

Water & Drainage 6

Environmental 4

Business Development 5

Page 6: Iain Cameron CV presentation jun13

Elwood Engineering Services Ltd – Own Ltd Company • Between Oct 1991 (on returning to Scotland from the

Middle East) and January 2006 when I took up the post in New Zealand I ran my own Consultancy (EES Ltd). I generally contracted my services out to one major client at a time (as listed below). These appointments were generally of a fairly senior nature with significant staff management responsibility. The length of time for each of these posts was very much dependent on the clients’ staffing needs and policy.

• I also carried out work on an ongoing basis for a considerable number of smaller clients, particularly for Structural and Civil Designs. I received regular commissions for Tender Preparation and Assessment and also for Claims Evaluation and Reporting.

Page 7: Iain Cameron CV presentation jun13

EES Ltd Projects List

Period Duration

(mths)

Client Post Projects Experience

Category mths

Oct 91 - Jan 06

170EES Ltd, Linlithgow, Scotland

DirectorFor details of EES Projects refer below.

 Business Development 50 

   

May 04 – Jan 06

20West Lothian Council Roads Operations

Programme Manager Roads Capital Programme

Highways & Transportation 20

Project Management 20

Contract Administration 10

 Education & Training  4

Sept 03 – May 04

8Northern Ireland Rail

Resident Project Manager

Upgrade of 22 No. Stations in Northern Ireland

Project Management 8

Rail 8

Contract Administration  6

Construction Management 6

Health & Safety  6

Sept 00 –Aug 03 35

Babtie (Jacobs) Group, Glasgow for Railtrack Scotland

Bridge Engineering Project Manager

Rail Bridge Inspections and Assessments throughout Scotland 

Project Management 35

Rail 35

Structures 8

Health & Safety 20

Jun 97 – Sept 00

39 East of Scotland Water

Project Manager

Bonnybridge WWTW, Falkirk, Scotland

Project Management 39

Contract Administration 10

Water & Drainage 39

Health & Safety 8

Environmental 6

Sept 95 - Jun 97

21

Brand Leonard, Consulting Engineers, Scotland

Resident EngineerBuchanan Galleries, Glasgow

Construction Management 21

Contract Administration  15

Structures   9 

Health & Safety 6

Page 8: Iain Cameron CV presentation jun13

EES Ltd Projects List, Cont’d

Period Duration

(mths)

Client Post Projects Experience

Category mths

Oct 91 – Sept 95 47

Carl Bro Group, Stirling and Glasgow Project Manager

D & B Project for 3 Water Treatment Plants

Project Management 36

Construction Management 24

Water & Drainage 30

Structures 20

Business Development 12

Employment List, Cont’d

Jun 90 – Oct 91 16

Sir M MacDonald & Partners (MMP), Abu Dhabi, UAE

Water Manager

Infrastructure Projects for WED, Abu Dhabi; Leak detection

Project Management 12

Construction Management 6

Water & Drainage 16

Business Development 6

Oct 88 -Jun 90 20

De Leuw Cather International Ltd, Abu Dhabi, UAE

Resident Engineer

Al Salaam St. upgrading project, Abu Dhabi

Construction Management 20

Contract Administration 12

Highways & Transportation 20

Jan 88 – Sept 88 10

Asco Consulting Engineers, Doha, Qatar

Senior Design Engineer

Infrastructure Projects for Army Camps in Qatar

Water & Drainage 6

Highways & Transportation 4

Contract Administration 4

Jan 87 – Dec 87

12 Bullen & Ptnrs, Glasgow, Scotland

Senior Highway Engineer

A96 Kintore Bypass, Scotland

Highways & Transportation 12

Environmental 4

   

Page 9: Iain Cameron CV presentation jun13

Employment List, Cont’d

Period Duration

(mths)

Client Post Projects Experience

Category mths

Sept 84 – Jan 87

28Waterman & Ptnrs, Edinburgh, Scotland

Section Engineer

Structural and Infrastructure Projects for Ministry of Defence

Structures 14

Water & Drainage 12

Highways & Transportation 8

Aug 81 -Sept 84 37

Central Region Council Roads Dept, Scotland

Highway Engineer

Town Centre Relief Roads & Trunk Road Improvement Schemes

Highways & Transportation 37

Contract Administration 6

Construction Management 9

1976 - 1981

Paisley University, Scotland

Apr 74 -Sept 76 29

South-East Scotland Water Board

Civil Engineering Technician

Water Supply Projects

Water & Drainage 29

Structures 6

Contract Administration 6

   

Page 10: Iain Cameron CV presentation jun13

Total Experience per Category

Category Months

Project Management 204

Construction Management 112

Business Development 95

Contract Administration 93

Highways and Transportation

117

Rail 55

Water and Drainage 138

Structures 57

Health & Safety 46

Environmental 17

Education and Training 13

Page 11: Iain Cameron CV presentation jun13

Construction of over 4 km of mainly 1600mm diameter sewers by micro-tunnelling

Construction of 33 No. GRP lined very deep manholes

Parsons Brinckerhoff – Constuction Manager

Construction Manager for Doha West Area for the Local Roads and Drainage Programme in Qatar

Construction of deep interceptor trunk sewer varying from 9 metres to 18 metres deep in the Al Gharrafa area.

Start of drilling operations 1600mm diameter TBM

I am currently scheduling $2 billion roads and drainage projects for the next two years.

Page 12: Iain Cameron CV presentation jun13

CPG Global – Transport Sector Manager - NZ

• Overall responsibility for the Transport business for the whole of New Zealand, with around 70 Transportation staff in 8 offices.

• Responsible for Management of Local Authority networks & assets for 7 councils throughout NZ.

• Responsible for around 60 projects covering Roads, Rail, Marine and Airports.

• Project Director for a number of capital projects including Warramboo Mine Haul Road in Western Australia and realignment of State Highway 2 at Manawatu Hill in North Island, New Zealand.

Realignment of SH2 Manawatu

Hill

Mining Haul Road - Warramboo, Australia

Client – Rio Tinto

Page 13: Iain Cameron CV presentation jun13

KiwiRail - PROJECT INTERFACE MANAGER

Employed by KiwiRail for the proposed $40 million (NZ) new Rail

Station at New Lynn, West Auckland as part of the New Lynn Rail

Duplication Project.Duties & Responsibilities:• Manage the Interface with Principal Stakeholders to ensure

continued input and co-operation.• Draft NZS 3910 Professional Services Contract to procure a

Contract Administration Consultant.• Provide co-ordination between Contractor and Stakeholders to

manage project risk, implement change control and explore value engineering opportunities.

• Set up a financial reporting mechanism for project.• Carry out Hazard Identification and Risk Assessment for Station

and prepare Safety Case and Evacuation Plan.

Page 14: Iain Cameron CV presentation jun13

New Lynn Rail Station prior to commencement of project – single track, ground level.

Page 15: Iain Cameron CV presentation jun13

New Lynn Rail Trench during construction (Sept 09) showing diaphragm walls, high level permanent props, mid level temporary props and platform walls.

Page 16: Iain Cameron CV presentation jun13

First Train in Trench Milestone (March 2010)

Page 17: Iain Cameron CV presentation jun13

Artists Impression of Completed Station (due August 2010)

Page 18: Iain Cameron CV presentation jun13

EC Harris - Senior Project Manager

• Proposed Marina Mall Extension and Hotel Towers Development

Page 19: Iain Cameron CV presentation jun13

Hyder Consulting - Construction Director

• Acted as Senior Project Manager, responsible for the planning and execution of large high-rise residential / commercial development (2 Billion AED) on Reem Island, Abu Dhabi.

Page 20: Iain Cameron CV presentation jun13

West Lothian Council Roads Operations - Programme Manager

• In 2004 an additional £83m (Dh 500m) was identified by WLC to eliminate backlog of repairs necessary to bring roads, footways, street lighting and structures up to standard. This resulted in the creation of a 3 year Capital Programme for road maintenance works.

• I was appointed to advise the client on every aspect of delivering this project from the initial establishment of the project team, through the planning stage and on to delivery.

• This was a very ambitious programme but innovative ideas and prudent management ensured successful delivery of 20% additional work over target for budget cost.

• WLC were named as UK Council of the year in 2006 due to the success of this project.

Page 21: Iain Cameron CV presentation jun13

West Lothian Council Roads Operations - Programme Manager – cont’d

Duties & Responsibilities:• Advising on Staff structures and establishment of teams for

design and supervision of contracts and to provide effective management and co-ordination of the Project and Project Team

• Liaison with Statutory Undertakers and other Council Departments.

• Monitor progress and financial targets utilising excel spreadsheets and Ms Project Gantt Charts.

• Monitor performance of Design Teams and Contractors against Programme

• Management of Task Execution Contract to utilise 17 Contractors in the execution of the maintenance works.

• Training of Council Staff – delivered a highway engineering course to the design teams

• Training of staff in use of Ms project and excel.

Page 22: Iain Cameron CV presentation jun13

Northern Ireland Rail - Resident Project Manager

• Responsible for planning, administering and supervising the Contract to upgrade 22 No. stations in Northern Ireland on behalf of Northern Ireland Rail.

• Belfast Central – Platform Alterations

Page 23: Iain Cameron CV presentation jun13

Antrim Station –Reconstruction

Lurgan Station – Platform Extension Detail

Page 24: Iain Cameron CV presentation jun13

Babtie Group - Bridge Engineering Project Manager

Carried out bridge inspections and assessments for Railtrack Scotland.

Dunblane Station FootbridgeSouth Elevation Corrosion to U/S X-

Bracing

Page 25: Iain Cameron CV presentation jun13

Newmill Road Overbridge, Keith – General view of the West elevation.

Characteristic freeze-thaw damage at edges of the arch brickwork masonry.

Page 26: Iain Cameron CV presentation jun13

East of Scotland Water - Project Manager

• Upgrade to Bonny bridge WWTWDuties & Responsibilities:• Liaison with ESW Designers (Civil, Structural and Process)

and co-ordinate with ESW Operations (end users) to develop and finalise scope of works.

• Procurement of Lead Design Contractor.• Agree scope of work and fee with MEP Consultant.• Managing client’s Project Team.• Liaison with Environmental Authority and HSE in

development of Risk Assessment.

Page 27: Iain Cameron CV presentation jun13

Construction of Pumping Chamber

Page 28: Iain Cameron CV presentation jun13

Outlet from Pumping Chamber

Page 29: Iain Cameron CV presentation jun13

Inlet Pipework

Page 30: Iain Cameron CV presentation jun13

Inlet Works

Page 31: Iain Cameron CV presentation jun13

Brand Leonard - Resident Engineer

£150m, Buchanan Galleries Project, Glasgow. This is now Glasgow’s premier shopping mall, containing numerous large, top-brand department stores.

Duties & Responsibilities:• Design approval, supervision and checking of all piling,

foundation, sub-structure and super-structure works.• Monitored Quality and Progress of Construction and

reported on same.• Overall approval of Contractor’s method statements.

Page 32: Iain Cameron CV presentation jun13

South AreaConstruction of Tower Crane Base and Mini Piling Rigs for Piling adjacent to Railway Lines

Page 33: Iain Cameron CV presentation jun13

North Area with Steel Framed Loading Area and Concrete Framed Shopping Mall

Page 34: Iain Cameron CV presentation jun13

This was the largest crane in Scotland

Page 35: Iain Cameron CV presentation jun13

4.5 m deep Girders to carry Multi Storey Car Park over Main Glasgow – Edinburgh Railway Line

Page 36: Iain Cameron CV presentation jun13

Congratulations All Round after Successful Removal of 120 year old Cast Iron Road Bridge from over Main Glasgow – Edinburgh Railway Line

Page 37: Iain Cameron CV presentation jun13

Large Diameter Piling Rig

Page 38: Iain Cameron CV presentation jun13

Carl Bro Group - Project Manager

Design and Build project in consortium with Trafalgar House to construct 3 No. Water Treatment Plants for Strathclyde Water -value £14 million stg.

Duties & Responsibilities:• Co-ordination between consortium partners.• Agree detailed scope of work and share of responsibilities

for each party.• Management of B/CE design and coordination of design

teams in Carl Bro’s Edinburgh and Glasgow offices and procurement of external Architectural services.

• Liaison with Water Authority, Statutory and Environmental Authorities and Planners.

• Management of Programme.

Page 39: Iain Cameron CV presentation jun13

WTW at Picketlaw

Page 40: Iain Cameron CV presentation jun13

Sludge Treatment Building with Sludge Press

Page 41: Iain Cameron CV presentation jun13

Sedimentation Tanks

Page 42: Iain Cameron CV presentation jun13

Sir M MacDonald & Partners, Abu Dhabi - Water Manager• Responsible for all design and site supervisory staff for

various water supply, pipe laying and rehabilitation projects for the Water and Electricity Department, Abu Dhabi.

• Also involved in ‘leak detection’ studies for Abu Dhabi, a dam rehabilitation project for the Dubai government, and preparation of prequalification document for Consultancy Services for Al Ain City.

• Worked closely with WED, Abu Dhabi to develop water policy and write specifications. I visited the Bayard Fire Hydrant Factory in Lyon, France and the Vanadour Valve Factory in Pau, France to ensure compliance with the specification. <Bayard Fire Hydrants

Vanadour Butterfly Valves >

Page 43: Iain Cameron CV presentation jun13

De Leuw Cather, Abu Dhabi - Resident EngineerAl Salaam Street widening and upgrading project.

Al Salaam Street looking north.

Page 44: Iain Cameron CV presentation jun13

Al Salaam Street – Pavement Construction

Page 45: Iain Cameron CV presentation jun13

Al Salaam Street – Construction of Storm Water Drainage

Al Salaam Street – Asphalt Operations