PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 2 of 49

TABLE OF CONTENTS

1.0 INTRODUCTION .................................................................................................. 4

1.1 GENERAL PROJECT DESCRIPTION ................................................................... 4

1.2 LOCATION ............................................................................................................. 4

1.3 FIELD DEVELOPMENT ........................................................................................ 5

1.4 SCOPE OF WORK .................................................................................................. 5

1.5 SYSTEM OF UNITS ............................................................................................... 6

1.6 SOFTWARES .......................................................................................................... 6

1.7 ANALYSIS PROCEDURE ...................................................................................... 6

1.8 ANALYSIS RESULTS ............................................................................................ 7

2.0 REFERENCES ....................................................................................................... 8

2.1 PROJECT SPECIFICATIONS AND REPORTS ...................................................... 8

2.2 CODES AND STANDARDS ................................................................................... 8

3.0 PILE DRIVEABILITY ANALYSIS ...................................................................... 9

3.1 DESCRIPTION OF DRIVEABILITY ANALYSIS .................................................. 9

3.2 LIMITATION OF PILE STRESS ............................................................................ 9

3.3 SOIL RESISTANCE TO DRIVING......................................................................... 9

3.4 HAMMER DATA .................................................................................................. 10

3.5 WAVE AND CURRENT LOAD ........................................................................... 11

3.6 SOIL PROPERTIES .............................................................................................. 11

3.7 RESULTS OF DRIVEABILITY ANALYSIS ........................................................ 12

4.0 PILE MAKE-UP DESIGN ................................................................................... 14

4.1 PILE UP-ENDING ................................................................................................. 14

4.2 PILE STICK-UP .................................................................................................... 14

APPENDIX A: TL PLEM PILE DRIVEABILITY ANALYSIS RESULTS…………..…....16

APPENDIX B: DD PLEM PILE DRIVEABILITY ANALYSIS RESULTS………….……33

Page 3: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 3 of 49

TABLE OF FIGURES

Figure 1.1: Thang Long – Dong Do Field…………………………………………………………..….4

Figure 1.2: Development Schematic…………………………………………………………………..5

Figure 1.3: Pile and Soil Model for Stress Wave Analysis …………………………………...……….6

TABLE OF TABLES

Table 1.1: Summary of TL Pile Driveability and Stick-up Analysis ………………….……………….7

Table 1.2: Summary of DD Pile Driveability and Stick-up Analysis ………………………………….7

Table 3.1: Hammer data used in the analysis .……………………………………………...…………11

Table 3.2: Wave and Current Parameters ……………………………………………………………..11

Table 3.3: Soil profile input for Wave equation analysis ………………………………………...…...11

Table 3.4: Soil dynamic properties for wave equation analysis ………………………..…………..…12

Table 3.5: Pile Drivability Result Summary for TL PLEM …………………………….……………..12

Table 3.6: Pile Drivability Result Summary for DD PLEM …………………………………….…….13

Table 3.7: Pile Self-penetration ………………………………………………………………………..13

Table 4.1: Pile Stress Unity Check ………………………………………….………………………....14

Table 4.2: TP PLEM Pile Stick Up Length & Combined Static and Dynamic UC …………………...15

Table 4.3: DD PLEM Pile Stick Up Length & Combined Static and Dynamic UC ………..…………15

Page 4: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 4 of 49

1.0 INTRODUCTION

1.1 GENERAL PROJECT DESCRIPTION

Lam Son JOC was established following a Petroleum Contract being signed between

Petro Vietnam (50%) and Petronas Carigali Overseas Sdn. Bhd. (50%) on 7th January

2003, providing for Lam Son JOC to conduct petroleum exploration within Blocks

01/97 & 02/97 which are the relinquishments of a Petroleum Sharing Contract (PSC)

for Blocks 01 & 02 signed in September 1991 between Petronas Carigali Overseas

Sdn. Bhd. (85%) and Petro Vietnam (15%).

1.2 LOCATION

Thang Long is geographically located in the south-western part of Block 01/97 &

02/97 in the Cuu Long basin (see Figure 1.1) approximately 120 km east of Vung

Tau, 26 km south of Ruby field and 35 km northeast of Su Tu Vang Field. The oil

was discovered by 02/97-TL-1X well (June, 2004) in the Lower Miocene and Lower

Oligocene sandstones. Dong Do is approximately located 5 km southeast of Thang

Long. The oil was discovered by 02/97-DD-1X (May, 2007). Water depths across the

block range from 60m to 70m. There were total 06 wells drilled in Thang Long -

Dong Do field.

Figure 1.1: Thang Long - Dong Do Field

Page 5: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 5 of 49

1.3 FIELD DEVELOPMENT

The development plan calls for a central processing facility located on an FPSO with

production from the two fields via dry trees only. As such two wellhead platforms will

be tied back; one located on Thang Long the other on Dong Do delivering full well

stream transfer to the FPSO as shown in Figure 1.2.

Figure 1.2: Development Schematic

The FPSO will be located 2.84 km from the Thang Long WHP and 2.0 km from Dong

Do WHP.

Unprocessed fluids from the wellhead platforms will be transferred to the FPSO where

the crude will be dewatered and stabilized to meet a tanker loading specification.

Associated gas will be used to provide fuel for the FPSO and lift gas for Thang Long

and Dong Do wells with the balance exported to a near-by gas export pipeline.

Produced water will be treated prior to discharge overboard.

1.4 SCOPE OF WORK

This report documents the results of the TL PLEM and DD PLEM pile drivability and

pile stick-up analyses. The scope covers the followings:

• Skirt pile installation feasibility study.

• Perform pile driveability study based on lower bound and upper bound SRD values

extracted from final Geotechnical report.

Page 6: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 6 of 49

• Asses the performance viability of hydraulic hammers IHC S-400 for piling.

• Perform pile stick-up analysis to check the pile stresses during hammer placement.

• Recommend piling sequence to the target depth

1.5 SYSTEM OF UNITS

The System International of Units (SI units) shall be used in all design, engineering

document and drawings. Where standard equipment is supplied with Imperial Units,

the Imperial Units shall be shown on the drawings with Metric equivalent in brackets.

1.6 SOFTWARES

The Pile driveability analyses for TL PLEM and DD PLEM are performed with GRL-

WEAP and SACs computer programs.

1.7 ANALYSIS PROCEDURE

1. Performing the pile driveability analysis base on the stress wave equation model as

the figure bellow:

Figure 1.3: Pile and Soil Model for Stress Wave Analysis

2. Determining the parameters are follow:

- Blow count versus depth of penetration for the given soil properties and

particular hammer type.

Page 7: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 7 of 49

- SRD versus blow count relationship for the given soil properties and particular

hammer type.

- Self-weight penetration and any incremental penetration upon placement of

hammer.

- Maximum dynamic stresses during continuous driving.

3. Pile strength code checking for pile stick-up and pile driving condition in

accordance with API RP 2A.

1.8 ANALYSIS RESULTS

1.8.1 Summary of Analysis results

The summary of pile driveability and stick-up analysis results for TL and DD PLEM

are shown in the table 1.1 and 1.2 bellow:

Table 1.1: Summary of TL Pile Driveability and Stick-up Analysis

Case

Pile

length

(m)

Stick-up

length

(m)

Hammer

Type

Maximum

Blown

count/m

Max

Combine

UC

Conclusion

TL

PLEM

Pile

19 14 IHC S-500 6.7 0.44 Acceptable

Table 1.2: Summary of DD Pile Driveability and Stick-up Analysis

Case

Pile

length

(m)

Stick-up

length

(m)

Hammer

Type

Maximum

Blown

count/m

Max

Combine

UC

Conclusion

DD

PLEM

Pile

21 16 IHC S-500 7.9 0.45 Acceptable

1.8.2 Conclusion

1. The hammer IHC S-500 is satisfied the driving capacity for TL PLEM pile and DD

PLEM pile.

2. The piles are satisfied the strength of material for the stick-up condition and the

driving condition.

Page 8: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 8 of 49

2.0 REFERENCES

2.1 PROJECT SPECIFICATIONS AND REPORTS

1. TLDD-0003-4JAW-A01-0001, “PLEM Design Basis”

2. TLDD-0003-4JAW-A07-0001, “PLEM Foundation Design”.

3. TLDD-0003-4JAW-A07-0003, “PLEM In-place Analysis Report”.

4. Metocean Criterial Study, Block 01/97 and 02/97, Viet Nam – Fugro Global

Environmental and Ocean Sciences, October, Number C50631/5751/R1, February,

17th

, 2010.

5. Geotechnical Investigation report for BH-DD WHP, DONG DO LOCATION

OFFSHORE VIET NAM” – No AGSB/116/SI/09/SGN(B) – Asiangeos, October,

23rd

, 2009

2.2 CODES AND STANDARDS

2.2.1. American Institute of Steel Construction (AISC)

• “Specification for Structural Steel Buildings - Allowable Stress Design and Plastic

Design”.

2.2.2. American Petroleum Institute (API)

• RP 2A-WSD, "Recommended Practice for Planning, Designing and Constructing

Fixed Offshore Platforms - Working Stress Design”. Errata and Supplement 3

October 2007.

• RP 17 A, “Recommended Practice for Design and Operation of Subsea Production

System”, second edition, December 1996.

2.2.3. Des Norske Veritas (DNV)

• RP – C204, “Design Against Accidental Loads”, October 2010.

• OS – C101, “Design of Steel structures general (LRFD method)”, October 2008.

Page 9: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 9 of 49

3.0 PILE DRIVEABILITY ANALYSIS

Pile drivability analysis has been carried out using the GRLWEAP program based on

the wave equation analysis concept with the soil data of the geo-technical report

“Geotechnical Investigation report for BH-DD WHP, DONG DO LOCATION

OFFSHORE VIET NAM” – No AGSB/116/SI/09/SGN(B).

3.1 DESCRIPTION OF DRIVEABILITY ANALYSIS

Pile drivability analysis employing wave equation is used to compute the pile driving

stresses and to predict blow counts based on soil resistance to driving, quake, soil

damping, pile section and segment length, hammer properties (driving rated energy,

hammer efficiency).

In wave equation analysis, pile is subdivided into segments of approximately 1.0m in

length. In order to cover the variety of soil resistances, various Soil Resistance to

Driving (SRD) is input for investigation of anticipated driving (dynamic) stresses

acting throughout the entire pile length.

3.2 LIMITATION OF PILE STRESS

Limitation of pile stresses during pile driving of a free standing pile is in accordance

with API RP 2A WSD:

• The combination of stresses due to the dynamic impact of hammer and dead load

of hammer and pile shall not exceed the yield stress of the material.

• The maximum dynamic stresses shall not exceed 90 percent of the yield stresses.

• Pile refusal is considered when blow count exceeds 300 blows/ft (1000 blows/m)

for consecutive five feet (1.5m) as per API RP2A clause 12.5.6.

3.3 SOIL RESISTANCE TO DRIVING

Skirt Pile drivability analysis is carried out to ensure the pile drivability

performance, despite for pile make up verifications and as guidelines for pile

installation. The analysis is not intentionally aimed to predict the blow counts

accurately.

In this one dimensional wave equation analysis, the driving stresses and predicted

blow counts are governed by the input SRD values taken from the geotechnical

report.

The static soil resistances can be estimated based on the followings:

• API static soil capacity for unplugged condition = ( ) ( ) upcisrsr AqAFAF +∑+∑ 0

• API static soil capacity for plugged condition = ( )pcsr AqAF +∑ 0

Page 10: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 10 of 49

Where,

Fsr = Unit skin friction calculated based on remolded shear strength

qc = Toe resistance at the pile tip

Ao = Outer pile shaft area

Ai = Inner pile shaft area

Ap = Plugged pile end bearing area

Aup = Unplugged pile end bearing area

The estimated SRD for continuous driving and soil set-up cases for either plugged or

unplugged pile can be taken as per PLEM Design Basis, Document No.: TLDD-

0003-4JAW-A01-0001.

Three (3) pile driving cases are considered in the analysis described as follows,

a) Continues driving case

Estimated SRD equals to 0.6 API static capacity.

b) Soil set up case - Lower Bound case

Assuming restart condition up to 12 hour delay, the estimated SRD is 0.9 API static

capacity.

c) Soil set up case - Upper Bound case

Assuming the delays of few days, the estimated SRD is taken equal to API static

capacity.

The skin friction on the inside wall of the piles is considered for the continuous

driving condition as per point a) above. The end bearing component of driving

resistance is assumed to be less than static end bearing as recommended in PLEM

Design Basis and assumed to be acting on the annular tip area.

After delays depending on the delay duration, the internal friction is assumed to

result in plugged driving, hence plugged condition is considered for the restart

condition. The end bearing component of driving resistance is assumed to be equal

to or less than static end bearing and assumed to be acting on the gross tip area in

accordance PLEM Design Basis..

3.4 HAMMER DATA

The list of hammers and their properties have been tabulated in the below table 3.1:

Page 11: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 11 of 49

Table 3.1: Hammer Data used in the Analysis

Hammer

Type

Rated

Energy

(kJ)

Ram

weight

(kN)

Strole

length

(m)

Hammer

Efficiency

(%)

IHC S-500 496.544 246.085 2.018 95

3.5 WAVE AND CURRENT LOAD

Wave and current forces act on the pile have been considered as per PLEM Design

Basis [Ref.1]. No reduction due to wave kinematics and current blockage is

considered. The installation sea state considered for the analysis is:

Table 3.2: Wave and Current Parameters

Wave height

(m)

Wave period

(s)

Current Velocity

(m/s)

3 6 0.5

3.6 SOIL PROPERTIES

Soil properties used for the wave equation analysis in the GRLWEAP program are

tabulated in the table 3.3 and 3.4 bellow:

Table 3.3: Soil Profile Input for Wave Equation Analysis

Layer Soil depth (m)

Soil type

Unit Skin

Friction (kPa)

Unit End

Bearing (kPa)

From To Top Bottom Top Bottom

1 0 2.6 Loose to medium

dense silty sand 0 4.7 0 180

2 2.6 4.6 Stiff Clayey silt 23.4 27.5 540 540

3 4.6 6.6 Medium dense sandy

silt 12.3 18.1 510 750

4 6.6 11.6 Stiff Clayey silt 37.5 47.1 720 720

5 11.6 30 Stiff Silty Clay 47.1 75.1 720 720

Page 12: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 12 of 49

Table 3.4: Soil Dynamic Properties for Wave Equation Analysis

Parameters Clay Sand

Side Quake (mm) 2.5 2.5

Point Quake (mm) 2.5 2.5

Side Damping (m/s) 0.33 0.16

Point Damping (m/s) 0.5 0.5

3.7 RESULTS OF DRIVEABILITY ANALYSIS

For the driveability assessment, two criteria are evaluated to determine the selection

of the hammer for the pile installation as below:

• Maximum pile dynamic stress during driving

• Pile refusal

3.7.1 Pile Driveability Analysis Results

The wave equation analysis for the PLEM Pile - Combination Lower Bound, Upper

Bound Condition and Continuous Condition for the selected hammer IHC S-400

performed.

The material used for piles in this project is the high tensile steel (type II) with a

minimum yield stress (Fy) of 345 MPa. The dynamic axial stress due to the driving

is limited to 0.9Fy according to the API RP 2A.

The results is tabulated in Table 3.5 and Table 3.6. For detailed results, refer to the

GRLWEAP output files.

Table 3.5: Pile Drivability Result Summary for TL PLEM

Condition

Target

penetration

depth (m)

Maximum

blow count/m

to target

penetration

depth

Maximum

Dynamic

Stress

(Mpa)

Allowable

Stress

(Mpa)

Unity

check

Continuous

Driving

Plug 13 3.9 118.7 310.5 0.382

Unplug 13 2.5 120.4 310.5 0.388

Set up

Lower

bound

Plug 13 6.7 111.4 310.5 0.359

Unplug 13 3.4 122 310.5 0.393

Page 13: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 13 of 49

Condition

Target

penetration

depth (m)

Maximum

blow count/m

to target

penetration

depth

Maximum

Dynamic

Stress

(Mpa)

Allowable

Stress

(Mpa)

Unity

check

Set up

Upper

bound

Plug 13 6.4 119.4 310.5 0.385

Unplug 13 3.7 121.4 310.5 0.39

Table 3.6: Pile Drivability Result Summary for DD PLEM

Condition

Target

penetration

depth (m)

Maximum

blow count/m

to target

penetration

depth

Maximum

Dynamic

Stress

(Mpa)

Allowable

Stress

(Mpa)

Unity

check

Continuous

Driving

Plug 15 8.2 122.1 310.5 0.393

Unplug 15 5 121.4 310.5 0.391

Set up Lower

bound

Plug 15 7.9 120 310.5 0.386

Unplug 15 4.2 124.6 310.5 0.4

Set up Upper

bound

Plug 15 8.6 125.3 310.5 0.41

Unplug 15 4.7 124.6 310.5 0.4

3.7.2 Estimate Self-penetration

From the soil properties provided, the estimated self penetration of the piles with

respective pile self weight and hammer weight are calculated. The calculation for the

pile self weight and the self penetration estimation is present in Appendix A1 and

B1. The summary of the self penetration calculation results are tabulated in table 3.7

bellow:

Table 3.7: Pile Self-penetration

Description Hammer Minimum

Self-penetration (m)

TL PLEM Pile IHC S-500 5.5

DD PLEM Pile IHC S-500 5.2

Note: The estimated self weight includes the pile weight, hammer and pile helmet.

Page 14: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 14 of 49

4.0 PILE MAKE-UP DESIGN

4.1 PILE UP-ENDING

The calculation results are shown in the report TLDD-0003-4JAW-A07-0001

“PLEM Foundation Design” – Section 4.5.

4.2 PILE STICK-UP

The maximum pile stick up length at different installation stages is calculated to

ensure that the acting stresses are within the allowable stress limit during stick-up

above the pile guide. The maximum permissible stick-up length along with pile self-

penetration with and without the hammer system is used to predict stickup length

from the skirt pile guide.

During pile driving operation, the following stress check applies for pile stickup

section:

• Static stresses are compared with allowable stresses as per API-RP-2A.

• Combined stresses = (Static Stresses + Dynamic Stresses)

Table 4.1: Pile Stress Unity Check

Stress Stress Unity

check

Allowable Stress

Static

Dynamic fd/0.9Fy 0.9Fy

Static +

Dynamic

Fy

The pile stick up static analysis subject to installation wave and current using SACS

package program provides member stress unity check. The analysis results are

attached in Appendix A2 and B2.

The pile stick up dynamic analysis due to hammer impact energy is calculated using

GLRWEAP to obtain pile dynamic stress. The analysis results are attached in

Appendix A3 and B3.

Page 15: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 15 of 49

Combined stress analysis result is tabulated in table 4.2 and table 4.3 below:

Table 4.2: TP PLEM Pile Stick Up Length & Combined Static and Dynamic UC

Case

Stick-up

length

(m)

Static

Stress

(MPa)

Dynamic

Stress

(MPa)

Yield

Stress Fy

(MPa)

Static

UC

Dynamic

UC

Combine

UC

TL

Pile 5.5 7.74 122 345 0.172 0.442 0.4

Table 4.3: DD PLEM Pile Stick Up Length & Combined Static and Dynamic UC

Case

Stick-up

length

(m)

Static

Stress

(MPa)

Dynamic

Stress

(MPa)

Yield

Stress Fy

(MPa)

Static

UC

Dynamic

UC

Combine

UC

DD

Pile 5.2 7.9 125 345 0.222 0.453 0.41

Page 16: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 16 of 49

APPENDIX A. TL PLEM PILE DRIVEABILITY ANALYSIS

RESULTS

Page 17: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 17 of 49

APPENDIX A1. PILE SELF-PENETRATION CALCULATION

Page 18: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 18 of 49

Page 19: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 19 of 49

APPENDIX A2. PILE STICK-UP CALCULATION

Page 20: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 20 of 49

Page 21: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 21 of 49

SACs Model

LDOPT SFINOP +Z 1.025 7.85 -66.00 66.00GLOBMN MPTNPNP K

PILE DD PLEM

OPTIONS MN SD 1 1

LCSEL CB01 CB02 CB03 CB04 CB05 CB06 CB07 CB08

GRUP

GRUP PIL 61.000 2.060 21.00 8.0034.50 1 1.001.00 0.50F 7.850

MEMBER

MEMBER 1 3 PIL

MEMBER 2 1 PIL

JOINT

JOINT 1 0.000 0.000-66.000 110000

JOINT 2 -0.015 -0.015 -71. 111111

JOINT 3 0.086 0.086-52.000

CDM

CDM 10.00 0.683 1.680 1.102 1.260

CDM 200.00 0.683 1.680 1.102 1.260

MGROV

MGROV 0.000 6.000 4.500 1.300

MGROV 6.000 16.000 5.500 1.300

LOAD

LOADCN 1

LOADLB 1PLEM SUBMERGED SELF WEIGHT

DEAD

DEAD -Z M BML

LOADCN 2

LOADLB 2HAMMER WEIGHT

LOAD 3 -250. GLOB JOIN

* OPERATION SEA CONDITION

LOADCN 21

LOADLB 21OPER WAVE 0 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 0.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 0.000 0.850 US LN

CURR 33.000 0.500 0.000

CURR 66.000 0.500 0.000

LOADCN 22

LOADLB 22OPER WAVE 45 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 45.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 45.000 0.850 US LN

CURR 33.000 0.500 45.000

CURR 66.000 0.500 45.000

LOADCN 23

Page 22: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 22 of 49

LOADLB 23OPER WAVE 90 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 90.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 90.000 0.850 US LN

CURR 33.000 0.500 90.000

CURR 66.000 0.500 90.000

LOADCN 24

LOADLB 24OPER WAVE 135 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 135.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 135.000 0.850 US LN

CURR 33.000 0.500 135.000

CURR 66.000 0.500 135.000

LOADCN 25

LOADLB 25OPER WAVE 180 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 180.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 180.000 0.850 US LN

CURR 33.000 0.500 180.000

CURR 66.000 0.500 180.000

LOADCN 26

LOADLB 26OPER WAVE 225 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 225.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 225.000 0.850 US LN

CURR 33.000 0.500 225.000

CURR 66.000 0.500 225.000

LOADCN 27

LOADLB 27OPER WAVE 270 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 270.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 270.000 0.850 US LN

CURR 33.000 0.500 270.000

CURR 66.000 0.500 270.000

LOADCN 28

LOADLB 28OPER WAVE 315 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 315.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 315.000 0.850 US LN

CURR 33.000 0.500 315.000

CURR 66.000 0.500 315.000

Page 23: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 23 of 49

*LOAD COMBINATION

LCOMB

LCOMB CB01 1 1.150 2 1.000 21 1.100

LCOMB CB02 1 1.150 2 1.000 22 1.100

LCOMB CB03 1 1.150 2 1.000 23 1.100

LCOMB CB04 1 1.150 2 1.000 24 1.100

LCOMB CB05 1 1.150 2 1.000 25 1.100

LCOMB CB06 1 1.150 2 1.000 26 1.100

LCOMB CB07 1 1.150 2 1.000 27 1.100

LCOMB CB08 1 1.150 2 1.000 28 1.100

END

Page 24: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 24 of 49

Page 25: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 25 of 49

SACs Results

PILE DD PLEM DATE 03-FEB-2012 TIME 07:26:46 PST PAGE 8

SACS-IV SYSTEM MEMBER DETAIL REPORT

DIST MAX

MEMBER GRP LOAD FROM FORCE MOMENT MOMENT SHEAR SHEAR TORSION AXIAL BENDING STRESS COMB. SHEAR CRIT. COMB.

CASE END FX MY MZ FY FZ MX STRESS Y Z STRESS STRESS COND. UNITY

M KN KN-M KN-M KN KN KN-M N/MM2 N/MM2 N/MM2 N/MM2 N/MM2 CHECK

1- 3 PIL CB01 0.00 -294.5 -38.9 -5.7 0.8 3.3 0.0 -7.72 -7.15 -1.04 -14.95 0.18 C<.15 0.08

CB02 -294.5 -41.2 0.0 0.0 3.7 0.0 -7.72 -7.58 0.00 -15.30 0.19 C<.15 0.08

CB03 -294.5 -38.9 5.7 -0.8 3.3 0.0 -7.72 -7.15 1.04 -14.95 0.18 C<.15 0.08

CB04 -294.5 -33.2 8.0 -1.1 2.6 0.0 -7.72 -6.11 1.48 -14.00 0.15 C<.15 0.08

CB05 -294.5 -27.5 5.7 -0.8 1.8 0.0 -7.72 -5.06 1.04 -12.89 0.10 C<.15 0.07

CB06 -294.5 -25.2 0.0 0.0 1.5 0.0 -7.72 -4.63 0.00 -12.35 0.08 C<.15 0.07

CB07 -294.5 -27.5 -5.7 0.8 1.8 0.0 -7.72 -5.06 -1.04 -12.89 0.10 C<.15 0.07

CB08 -294.5 -33.2 -8.0 1.1 2.6 0.0 -7.72 -6.11 -1.48 -14.00 0.15 C<.15 0.08

CB0114.00 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04

CB02 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04

CB03 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04

CB04 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04

CB05 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04

CB06 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04

CB07 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04

CB08 -250.0 0.0 0.0 0.0 2.2 0.0 -6.55 0.00 0.00 -6.55 0.11 C<.15 0.04

Page 26: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 26 of 49

APPENDIX A3. DRIVEABILITY RESULTS

Page 27: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 27 of 49

Page 28: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 28 of 49

Continuous Driving (Plug)

0

500

1000

1500

2000

2500

3000

3500

0 2 4 6 8 10 12

Depth (m)

SD

R (

kP

a)

SDR

Set up Lower Bound (Plug)

0

1000

2000

3000

4000

5000

6000

0 5 10 15 20 25

Depth (m)

SD

R (

kP

a)

SDR

Set up Upper Bound (Plug)

0

1000

2000

3000

4000

5000

6000

0 5 10 15 20 25

Depth (m)

SD

R (

kP

a)

SDR

Page 29: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 29 of 49

Page 30: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 30 of 49

Continuous Driving Case

Plug Condition

Unplug Condition

Page 31: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 31 of 49

Lower Bound Case

Plug Condition

Unplug Condition

Page 32: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 32 of 49

Upper Bound Case

Plug Condition

Unplug Condition

Page 33: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 33 of 49

APPENDIX B. DD PLEM PILE DRIVEABILITY ANALYSIS

RESULTS

Page 34: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 34 of 49

APPENDIX B1. PILE SELF-PENETRATION CALCULATION

Page 35: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 35 of 49

Page 36: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 36 of 49

APPENDIX B2. PILE STICK-UP CALCULATION

Page 37: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 37 of 49

Page 38: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 38 of 49

SACs Model

LDOPT SFINOP +Z 1.025 7.85 -66.00 66.00GLOBMN MPTNPNP K

PILE DD PLEM

OPTIONS MN SD 1 1

LCSEL CB01 CB02 CB03 CB04 CB05 CB06 CB07 CB08

GRUP

GRUP PIL 61.000 2.060 21.00 8.0034.50 1 1.001.00 0.50F 7.850

MEMBER

MEMBER 1 3 PIL

MEMBER 2 1 PIL

JOINT

JOINT 1 0.000 0.000-66.000 110000

JOINT 2 -0.015 -0.015 -71. 111111

JOINT 3 0.083 0.083-50.000

CDM

CDM 10.00 0.683 1.680 1.102 1.260

CDM 200.00 0.683 1.680 1.102 1.260

MGROV

MGROV 0.000 6.000 4.500 1.300

MGROV 6.000 16.000 5.500 1.300

LOAD

LOADCN 1

LOADLB 1PLEM SUBMERGED SELF WEIGHT

DEAD

DEAD -Z M BML

LOADCN 2

LOADLB 2HAMMER WEIGHT

LOAD 3 -250. GLOB JOIN

* OPERATION SEA CONDITION

LOADCN 21

LOADLB 21OPER WAVE 0 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 0.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 0.000 0.850 US LN

CURR 33.000 0.500 0.000

CURR 66.000 0.500 0.000

LOADCN 22

LOADLB 22OPER WAVE 45 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 45.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 45.000 0.850 US LN

CURR 33.000 0.500 45.000

CURR 66.000 0.500 45.000

LOADCN 23

Page 39: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 39 of 49

LOADLB 23OPER WAVE 90 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 90.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 90.000 0.850 US LN

CURR 33.000 0.500 90.000

CURR 66.000 0.500 90.000

LOADCN 24

LOADLB 24OPER WAVE 135 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 135.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 135.000 0.850 US LN

CURR 33.000 0.500 135.000

CURR 66.000 0.500 135.000

LOADCN 25

LOADLB 25OPER WAVE 180 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 180.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 180.000 0.850 US LN

CURR 33.000 0.500 180.000

CURR 66.000 0.500 180.000

LOADCN 26

LOADLB 26OPER WAVE 225 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 225.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 225.000 0.850 US LN

CURR 33.000 0.500 225.000

CURR 66.000 0.500 225.000

LOADCN 27

LOADLB 27OPER WAVE 270 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 270.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 270.000 0.850 US LN

CURR 33.000 0.500 270.000

CURR 66.000 0.500 270.000

LOADCN 28

LOADLB 28OPER WAVE 315 DEGREE

WAVE

WAVE0.90STOK 3.00 71.75 6.00 315.00 D 0.00 18.00 20MS10 1 0

CURR

CURR 0.000 0.500 315.000 0.850 US LN

CURR 33.000 0.500 315.000

CURR 66.000 0.500 315.000

Page 40: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 40 of 49

*LOAD COMBINATION

LCOMB

LCOMB CB01 1 1.150 2 1.000 21 1.100

LCOMB CB02 1 1.150 2 1.000 22 1.100

LCOMB CB03 1 1.150 2 1.000 23 1.100

LCOMB CB04 1 1.150 2 1.000 24 1.100

LCOMB CB05 1 1.150 2 1.000 25 1.100

LCOMB CB06 1 1.150 2 1.000 26 1.100

LCOMB CB07 1 1.150 2 1.000 27 1.100

LCOMB CB08 1 1.150 2 1.000 28 1.100

END

Page 41: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 41 of 49

Page 42: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 42 of 49

SACs Results

PILE DD PLEM DATE 02-FEB-2012 TIME 17:44:55 PST PAGE 6

SACS-IV SYSTEM MEMBER DETAIL REPORT

DIST MAX

MEMBER GRP LOAD FROM FORCE MOMENT MOMENT SHEAR SHEAR TORSION AXIAL BENDING STRESS COMB. SHEAR CRIT. COMB.

CASE END FX MY MZ FY FZ MX STRESS Y Z STRESS STRESS COND. UNITY

M KN KN-M KN-M KN KN KN-M N/MM2 N/MM2 N/MM2 N/MM2 N /MM2 CHECK

1- 3 PIL CB01 0.00 -301.0 -40.7 -7.4 0.9 3.2 0.0 -7.89 -7.48 -1.37 -15.49 0.17 C<.15 0.09

CB02 -301.0 -43.7 0.0 0.0 3.5 0.0 -7.89 -8.04 0.00 -15.93 0.19 C<.15 0.09

CB03 -301.0 -40.7 7.4 -0.9 3.2 0.0 -7.89 -7.48 1.37 -15.49 0.17 C<.15 0.09

CB04 -301.0 -33.2 10.5 -1.3 2.3 0.0 -7.89 -6.11 1.94 -14.30 0.14 C<.15 0.08

CB05 -301.0 -25.8 7.4 -0.9 1.4 0.0 -7.89 -4.74 1.37 -12.82 0.09 C<.15 0.08

CB06 -301.0 -22.7 0.0 0.0 1.0 0.0 -7.89 -4.17 0.00 -12.06 0.05 C<.15 0.07

CB07 -301.0 -25.8 -7.4 0.9 1.4 0.0 -7.89 -4.74 -1.37 -12.82 0.09 C<.15 0.08

CB08 -301.0 -33.2 -10.5 1.3 2.3 0.0 -7.89 -6.11 -1.94 -14.30 0.14 C<.15 0.08

CB01 16.00 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05

CB02 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05

CB03 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05

CB04 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05

CB05 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05

CB06 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05

CB07 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05

CB08 -250.0 0.0 0.0 0.0 1.9 0.0 -6.55 0.00 0.00 -6.55 0.10 C<.15 0.05

Page 43: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 43 of 49

APPENDIX A3. DRIVEABILITY RESULTS

Page 44: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 44 of 49

Page 45: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 45 of 49

Continuous Driving (Plug)

0

500

1000

1500

2000

2500

3000

3500

0 2 4 6 8 10 12

Depth (m)

SD

R (

kP

a)

SDR

Set up Lower Bound (Plug)

0

1000

2000

3000

4000

5000

6000

0 5 10 15 20 25

Depth (m)

SD

R (

kP

a)

SDR

Set up Upper Bound (Plug)

0

1000

2000

3000

4000

5000

6000

0 5 10 15 20 25

Depth (m)

SD

R (

kP

a)

SDR

Page 46: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 46 of 49

Page 47: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 47 of 49

Continuous Driving Case

Plug Condition

Unplug Condition

Page 48: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 48 of 49

Lower Bound Case

Plug Condition

UnPlug Condition

Page 49: Tldd 0003-4 jaw-a07-0006 pile driveability analysis-rev a1

PILE DRIVEABILITY ANALYSIS REPORT

Document No.: TLDD-0003-4JAW-A07-0006 Revision A1

Page No.: 49 of 49

Upper Bound Case

Plug Condition

Unplug Condition