4
Implementation of Social Engineering at Division level Workshop with SECs and SOs 27 June 2008 Hyderabad Dr. N. Sai Bhaskar Reddy GEO

Social Engineering Lift Irrigation Schemes

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Social Engineering Lift Irrigation Schemes

Implementation of Social Engineering at Division level

Workshop with SECs and SOs27 June 2008Hyderabad

Dr. N. Sai Bhaskar ReddyGEO

Page 2: Social Engineering Lift Irrigation Schemes

Social Engineering includes… Empowering farmers to own and

operate sustainable lift irrigation schemes

Livelihoods Promotion to increase production and productivity

Participatory Monitoring, Learning and Evaluation for best results through efficient processes and systems

Page 3: Social Engineering Lift Irrigation Schemes

Objectives of Social Engineering Mission

To empower Community for participatory Water Resource Planning to fulfill the contemplated ayacut of LI Schemes and maximize output.

To develop and inculcate sustainable Water Management practices through participatory modules and capacity building exercises

To empower community for management, operation and maintenance of the schemes with an emphasis on social equity

To facilitate users participation in comprehensive management of LI Schemes.

Page 4: Social Engineering Lift Irrigation Schemes

Sustainability of LI Schemes

Regular Water Tax being paid by Ayacutdars (as decided by the LI Society) & Corpus

System Operation i.e., Payments to pump operators, luskers etc., - Management

System Maintenance (Preventive and emergency), AMC & Insurance