5
O’Brien Contractors Limited – Case Study www. obriencontractors.co.uk | Tel: 01926 423 918

Principal contractor for flood alleviation scheme at National Trust Property

Embed Size (px)

Citation preview

Page 1: Principal contractor for flood alleviation scheme at National Trust Property

O’Brien Contractors Limited – Case Study

www. obriencontractors.co.uk | Tel: 01926 423 918

Page 2: Principal contractor for flood alleviation scheme at National Trust Property

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Project Profile:

National Trust Property, Coughton Court, Alcester – Case Study

O’Brien is confident to say, using its wealth of knowledge it is able to target each and every new contract with a smart approach, offering clients the best in quality and construction knowledge.

Client: The National Trust Project: Coughton Court Location: Alcester Value: £250K Duration: 15 Weeks

Page 3: Principal contractor for flood alleviation scheme at National Trust Property

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

About the Project:

Work carried out by O’Brien

O’Brien Contractors were principal contractor on the flood alleviation scheme at the National Trust property, Coughton Court, Alcester.

The project involved bulk earthworks to form a swale, bridge construction and landscaping works to the heritage gardens, as well as removal and refurbishment of historic estate fencing and gates that surrounds the grade one listed property.

This project was O’Brien’s first site under the Considerate Constructors Scheme, it involved a large amount of interaction with the general public which proved extremely effective.

Page 4: Principal contractor for flood alleviation scheme at National Trust Property

Core Operations:

“O’Brien – Delivering a Smart Approach to Construction”

O’Brien Group offers expert teams across a diverse range of services. All five construction led services, Design and Build, Construction, Sports Pitches, Earthworks, Laser Levelling and Plant Hire operate highly skilled teams who aim to provide the best in construction knowledge and a smart approach to every aspect of our works.

• Bulk earthworks and site clearance• Ground stabilization• Reinforced concrete works including foundations, floors, retaining walls and external service yards• Roads and sewers• Drainage, pipework and associated works• External works including block paving and slabbing• Parking areas• Earthworks’ design and ground modelling facilities• Fine tolerance Laser Levelling and 3D machine control system

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Page 5: Principal contractor for flood alleviation scheme at National Trust Property

O'Brien Contractors Ltd Manor CottageChurch LaneLeamington SpaCV32 7JT

Website: www. obriencontractors.co.uk

Email: [email protected]

Tel: 01926 423 918

Contact Details:

Connect with us via our social media channels:

Twitter

Google+

Facebook

Linkedin