What is NAWINIA?
• Logistics Holding NAWINIA was created in 2014 through a merger of several
large logistics companies with a long history and vast experience since the 90s
of the last century.
• The main priority of the company is a high quality service which we always
want to surprise our customers with. Always!
• The main focus of the company is a supply chain between Russia, the CIS
countries and Asia, Europe and the USA, as well as within the CIS countries.
• The company invests in its own infrastructure in Russia, the CIS countries and
Asia.
• NAWINIA = QUALITY
1. Challenges: Climate, Infrastructure and Laws
2. Solutions: Science, out-of-the-box-thinking and various gate-
ways
3. Experience: Unique cases and Legal Advice
- West-East: almost 10.000km
- North-South: more then 4.000dkm
- 11 time zones
- Temperature: -62C/+45C
Challenges: Climate, Infrastructure and Laws
• Long distance and remoteness
• Undeveloped transport infrastructure
• Bad and difficult Roads
• Long winter
• Complicated Laws
• Bureaucracy
• Changing Investment environment
• Sanctions
Gate-Ways
St. Petersburg, Murmansk, Novorossiysk, Astrakhan, Vostochny, Vladivostok, Mariupol , Ilyichevsk (UKR)
Rail Transportation
• Vast Network
• All year around accessibility
• More then 200 years of service
• OOG Dedicated Engineering and
Modeling Bureau
Sea-River Transportation
• Vast Network
• 165.000km
• Modern Canals and locks
• Low cost
• The Northern Sea Route
• Navigation: 5-6 months
Out-of-the-box approach
in Project Logistics
Within the years of experience our company
carried out:
• Construction, reconstruction and
extension of railways and roads
• Construction and upgrade of docks and
piers
• New design of rail platforms and barges
• Changing the power poles and lines
• Using the military and police convoys
• Laying of Rails
• New design • Construction of Roads
Case Study Transportation of turbines and transformers from Italy for
Bogutchanskaya hydro power plant (Krasnoyarsk)
• 1. Mariupol- Rostov-on-Don
• 2. Rostov-on-Don – White Sea
• 3. Belomorsk –Krasnoyarsk
• 4. Krasnoyarsk – Angarsk
• 5. Angarsk – Bogutchabskaya
hydro power plant
Belomorsk Rostov-on-
Don
Krasnoyarsk Angarsk
Yenisei –
Angara River
Azov sea
Mariupol Hydro Power Plant
Rail+auto Northern Sea
Route to
Yenisei River
Import Customs
Clearance
Don River
Exit to the White
sea
Discharge on a jetty
Case Study Transportation of turbines and transformers for
Bogutchanskaya hydro power plant (Krasnoyarsk)
• Re-loading in Mariupol
• Loading on a special heavy lift barges In
Krasnoyarsk
• Using 2x250MTs cranes • Welding on a Transportation frame on a
turbine
• Assembling a protection casing
Case Study Transportation of turbines and transformers from Italy for
Bogutchanskaya hydro power plant (Krasnoyarsk)
Case Study Transportation of turbines and transformers for
Bogutchanskaya hydro power plant (Krasnoyarsk)
• Discharge on a jetty in Angarsk
• Using low chassis
Caution!!!
Customs and Legal Aspects
Tariff regulations NON-Tariff Regulations
• Consignee Status
• HS Code
• Import Duties
• VAT
• Licenses
• Bans and Sanctions
• Certification
• Quotas
Experience local Forwarder with a Brokerage License is a MUST
Crucial Steps for Successful Transportation of OOG and
Heavy Cargo in Russia*
Route selection and approval
The RIGHT time of the year to start shipment
Approval of all the legal, technical and customs documents and special licenses for Project cargo transportation
Cargo delivery to the Client
Cargo convoy with all the legal documents and approvals
*Consulting with engineers before production can save the millions